Loading...
HomeMy WebLinkAboutSITE PLAN REVIEW LETTER - 02-00092 - Celestial Village Apartments - 3 Buildings (36 Units)STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY 900 North Skyline, Suite B • Idaho Falls, Idaho 83402-1718 • (208) 528-2650 Dlrk Kempthorne Governor July 22 2002 C. Stephen Allred, Director Roger Greaves, PE Forsgren Associates Inc. 350 N. 2nd E. PO. Box 549 Rexburg,ID 83440 Re: Celestial Village Phase 1 Housing Complex, Rexburg DEQ M 02-10-33 Dear Mr. Greaves We have reviewed the plans and specifications for the proposed water, sewer and storm drain design. The project plans and specifications appear to meet State standards and are hereby approved with the following condition: 1. A will serve letter from the City of Rexburg Will be Required. It is also our understanding that the storm drain piping will be connected to the proposed City system where a detention pond and a lift station will be utilized. Per our phone conversation this will be a separate project proposed by the City. Our approval is for the design. We will give final project approval after the systems are constructed. Deviations from the approved design that might result in violations of Idaho Regulations must be reviewed by this office before field installation. This office must be kept informed of the scheduling of all construction phases so that we can make spot inspections as necessary. This approval will expire July 22, 2003. If construction is not complete by the expiration date, plans will need to be resubmitted for approval before further construction proceeds. Within 30 days after construction, a professional engineer registered in the State of Idaho must provide this office with as -built plans, or a letter of certification stating that the project was installed substantially according to the approved design. A copy of the approved design and specifications will be kept on file at this office. Please reference DEQ No. 02- 10-33 when submitting any future correspondence related to this project. If you have any questions regarding this letter or if we can be of further assistance, please call me at (208) 528-2650. Sincerely, iiillita-mTeus er PE Water Quality Engineer 02-10-33 CELESTIAL VILLAGE PHASE 1, HOUSING COMPLEX.DOC Cc: John Millar, City of Rexburg Richard Horne, Rich Bly, D7HD IF Craig Hammond, State Plumbing Inspector, PO Box 506 Ashton, ID 83420 Plan File Read file 02-10-33 CELESTIAL VILLAGE PHASE 1, HOUSING COMPLEX.DOC