HomeMy WebLinkAboutP&Z MINUTES SEPTEMBER 24, 1997` \ • DATE: (092497) Planning & Zoning 9/24/97 Work Meeting 6:00 P. M. Present were: Chairman: John Millar Members: Mary Ann Mounts Mike Thueson Jim Long Davawn Beattie City Clerk: Rose Bagley Engineer: Joe Laird Attorney: Stephen Zollinger Council member: Marsha Bjornn Work Meeting on Comprehensive Plan. RaNae Mc Gee was at the meeting to discuss and go over the plan. Regular Meeting Starting at 7:00 P. M. RE: REVISED PLAN FOR THE BROULIM5 PROJECT ACCEPTED TOPIC: (500,17,,,BROULIMS,LANDSCAPING,TREES,SCHOOL DISTRICT, • SPRINKLER SYSTEM) Discussion on the revised plan for the Broulims project. Jim discussed what was discussed in the Redevelopment Agency Meeting about the landscaping elimination on 1st West. In the meeting Glen was trying to eliminate the landscaping on that street. Joe stated he would prefer to see the trees relocated. Jim felt he was trying to eliminate them. Mary Ann felt strongly that we need that planter strip. Joe stated that if the school doesn't care enough to pay for it, they don't want it. Mary Ann thought Broulims was paying for it. Joe told her that Broulims are paying for the landscaping on their property. The board remembered when Mr Broulims presented the plan that landscaping was there. Joe stated that it had been showed on the over all plan. Joe explained that their building permit only covers the area of the building. Re Nae suggested that a development agreement would have solved the problem. Joe described that their site plan did not show that they had anything to do with the utility strip between the sidewalk and the curb and gutter. In trying to cut the costs, Broulims said they would do all the landscaping in the utility strip but they wanted to change some of the trees from being back in there landscaping strip to go out into landscaping strip between the sidewalk and the curb and gutter. The only difference is that some of the trees that were setting back on Broulims property before have been shifted out into the utility strip between the sidewalk and the curb and gutter. The width of the utility • strip with the landscaping strip has all stayed the same. \~ Mary Ann stated that she felt the board was deceived because Broulims had shown as part of their site plan, the landscaping on the east. Jim stated that the Redevelopment Agency did not care about the landscaping on the east side of the street. Joe said if that landscaping is not put in, it will save the city money, because the city won't have to put in a sprinkling system or trees in that area. Joe stated that some of their feeling was that they felt the school should be doing some of it and we have not been able to get the school to do any of it. (discussion) A motion was made to accept the revised site plan on the Broulims Property as shown. Seconded by Davawn Beattie. All Aye Joe explained it would be extended in front of J.B.'s with the same landscaping strip. The board felt it should be in the agreement that the landscaping strip will be maintained. Continued discussion on the landscaping on the East side of 1st West. P&Z felt the landscaping should be put in as it was previously shown. A motion was made by Mary Ann that we request that they put back the planting area with trees, grass and a sprinkling system on the east side of 1st West as proposed in the original plan. Seconded by Davawn. All Aye. A motion was made by Jim Long and seconded by Mary Ann Mounts to approve the minutes of September 10. All Aye A motion was made by Jim Long to recommend that all items dealing with landscaping and tree issues be forwarded to the Tree Committee. Seconded by Davawn Beattie. All Aye Rose was asked to write a letter to the Redevelopment Agency with the recommendation about the landscaping by the Broulims Building. A motion was made by Mike Thueson and seconded by Mary Ann Mounts to adjourn. All Aye •