HomeMy WebLinkAboutWest Highway P&Z MemoMEMORANDUM
To: Rexburg Planning and Zoning Commission
From: Brad Cramer, Perspective Planning and Consulting, on behalf of the Rexburg
Urban Renewal Agency
Date: October 5, 2026
Re: Proposed West Highway Urban Renewal Plan
Introduction
In 2025, the Rexburg Urban Renewal Agency (RURA) began evaluating the creation of a new
urban renewal area (URA) west of US highway 20 and north of University Boulevard. The
Agency accepted the West Highway District Eligibility Report on October 15, 2025. Because the
study area included unincorporated land, the Madison Board of County Commissioners (BOCC)
also adopted the eligibility findings on October 27, 2025.
The Rexburg City Council then found the area eligible on November 18, 2025 and directed
RURA to prepare an urban renewal plan and revenue allocation area. After completion of the
draft plan and accompanying Economic Feasibility Study, RURA approved the plan on
September 16, 2026. The BOCC considered the plan on September 28, 2026.
Before City Council consideration, Idaho Code §50-2008(b) requires that the plan be reviewed
by the Rexburg Planning and Zoning Commission “for review and recommendations as to (the
plan’s) conformity with the general plan for the development of the municipality as a whole.”
The purpose of this memo is to outline how the proposed URA complies with this statute.
Project Overview
The West Highway Area encompasses approximately 840 acres, bounded by 1000 South, US
Highway 20, 3000 West, and 2000 North. South 12th West is the main north/south route.
Highway 33 runs east/west and connects the area to the rest of the City to the east. The area
includes land within City limits and unincorporated land within the Area of City Impact (AOCI).
Parcels outside the AOCI were included in the eligibility report, but removed from the final
boundary.
Lands within the boundary are generally undeveloped or transitioning from agriculture, but the
general area includes a mix of developed residential and commercial uses. Commercial and
office development is actively being developed in the central portion of the URA around the
Highway 33/12th West intersection, where such development activity has been occurring since
the early 2000s. There are new residential neighborhoods on the far north and south ends of the
boundary. Madison High School and an elementary school sit just south of the area and are part
of the University Boulevard Urban Renewal District.
The primary barrier to development is infrastructure that individual developers cannot
reasonably carry as well as a defective street network that doesn’t currently serve the growing
traffic. There eligibility report also found areas of deterioration, the need to coordinate with the
rest of the City’s street network, faulty lot layout, unsafe conditions, diversity of ownership, and
conditions that generally slow development of the area. Specific items include:
• A misaligned Highway 33/12th West intersection with limited right-of-way
• Too many access points on Highway 33, creating conflict points near the curve west of
the intersection with 12th West
• Two-lane county road sections on 12th West with no curb, gutter, sidewalk or bike
facilities near schools
• An open canal parallel to 12th West that must be piped or relocated to widen the road
• Regional sewer lift stations needed on both the north and south ends of the area.
Conformity with the Comprehensive Plan
Plan Rexburg: How We Live and Grow, the City’s 2023 Comprehensive Plan, organizes its
policy direction into a Future Land Use Map (FLUM) and four plan implementation chapters.
These implementation sections are summarized by charts focusing on goals, objectives and
actions. This section evaluates the proposed West Highway Plan against both.
Future Land Use Map
The West Highway Area includes four FLUM designations as described on Map 5, page 53 of
Plan Rexburg: Low Residential, Intermediate Residential, Commercial, and Open Space and
Public Facilities. The map below shows where each designation is located in the study area. Note
that since this map was created, the boundary has adjusted somewhat, but as of the writing of this
report an updated boundary was not available.
The development pattern assumed in the Economic Feasibility Study follow these designations.
Residential areas were modeled at 4-units per acre for low density and 9-units per acre for
medium density development. This matched existing conditions in developments near the study
area. Commercial and mixed-use development is concentrated at the Highway 33/12th West
intersection and along US 20, reflecting existing development patterns and zoning in that area.
An important note is that an urban renewal plan does not modify the FLUM or zoning
designations. Section 401 of the plan specifically states that no zoning rights are granted by the
plan. All development must go through the same process as any project outside of a URA. While
zoning dictates the types of uses that may occur, a URA enables those uses by funding the
infrastructure needed to serve them. The West Highway Plan does not change what the FLUM
calls for or zoning allows. Rather, it makes the FLUM’s vision achievable on a schedule that
matches the area’s growth by supporting necessary infrastructure.
Goals, Objectives, and Actions
Plan Rexburg’s implementation tables on pages 38-46 are intended to “prioritize capital
investments” and “leverage partnerships.” Nearly every project in the West Highway Plan
implements a specific Plan Rexburg goal or action.
How We Serve Our Community
Goal or Action West Highway Plan Supporting Project
Ensure that development occurs in a manner
that is safe, that facilitates efficient delivery
of public services, and does not outstrip
available or potential capacities (pg. 38).
The region infrastructure projects supported
by the plan ensures the efficient delivery of
utilities, safer roadways and intersections, and
increased connectivity
Implement financing programs to maintain
and upgrade critical facilities and services
(pg. 39)
Tax Increment Financing (TIF) is intended to
be used for these types of facilities in the
West Highway Area
Follow recommendations in the 2021
Wastewater Facilities Planning Study and the
2015 Water Facilities Planning Study (pg. 39)
The West Highway Area plan supports
facilities such as lift stations, a regional
pressurized sewer line
How We Grow our Community
Goal or Action West Highway Plan Supporting Project
Plan and facilitate purposeful growth patterns
that promote efficiencies in infrastructure
provision and advance quality of life for the
Rexburg Community (pg. 41).
The West Highway Area plan includes
infrastructure that supports growth both
within the boundaries and the surrounding
region. It also identifies the need for
expanded roadways and pathways to connect
current and future residents with schools,
goods, and services.
Promote attainable, accessible, and quality
housing options that meet the needs of all
Rexburg residents (pg. 41).
According to Plan Rexburg, Rexburg’s has
the highest rate of cost-burdened renters, at
63%. Infrastructure that developers would
otherwise pass into lot prices helps add
housing supply across a range of densities.
Ensure streets design and improvements
consider both aesthetic and functional
perspectives, including traffic control devices,
signs, lighting medians, curb and
gutter...pedestrian and bicyclist safety (p. 42).
Streetscape enhancements, signage and
wayfinding, signalization, and lighting area
all eligible plan activities in the URA.
How We Strengthen Our Economy
Goal or Action West Highway Plan Supporting Project
Convene Madison Economic Partners, State
Economic Development Agencies, and the
Urban Renewal Agency to assess grant
opportunities, public-private partnerships, and
infrastructure improvements that can support
more economic development (pg. 44)
TIF is a public-private partnership tool used
within URAs.
Ensure Infrastructure capacity is maintained
and expanded to attract key businesses (pg.
44)
Lift stations, water and sewer oversizing and
roadway widening create the capacity for the
rapid commercial and residential growth
happening in the area.
Align economic development and housing
options (pg. 43)
The West Highway plan supports commercial
and residential development together, helping
to provide necessary supportive infrastructure.
Assess opportunities for expanding incentives
for business growth and relocation (pg. 44)
Because TIF assists with major infrastructure
costs, it is a commonly used incentive tool to
encourage growth in a particular area.
How We Move Good and People
Goal or Action West Highway Plan Supporting Project
Facilitate, provide, and maintain
transportation options that support economic
development and enhance quality of life. (pg.
45)
Projects identified in the plan include
widening of roadways and intersections to
support the increased traffic in the area and
improve overall traffic safety.
Improve safety, connectivity, and
accessibility of sidewalks, bike lines, and
trails to provide year-round active
transportation to everyday destinations, like
schools, parks, downtown, and places for
work, worship, and shopping. (pg. 45)
Lack of sidewalks connecting neighborhoods
with nearby schools, goods, and services was
identified as an eligibility condition within the
URA. Projects include the addition of these
pathways, increasing safety and connectivity
to these neighborhood services.
Conclusion and Recommended Action
The proposed West Highway Urban Renewal Area aligns with Plan Rexburg by:
• Funding the transportation, sewer, and water infrastructure necessary to serve growth
efficiently.
• Improving safe walking and biking routes to schools and extending the trail network
along 12thWest.
• Using RURA, public-private partnerships, and intergovernmental cooperation as
recommended by Plan Rexburg.
The Rexburg Urban Renewal Agency respectfully requests that the Planning and Zoning
Commission find the West Highway Urban Renewal Plan in conformity with the Comprehensive
Plan and forward that recommendation to the City Council. .
Steps in Creating a New Urban Renewal Area and Revenue Allocation Area
Steps in Creating a URA and Revenue Allocation Area
If an urban renewal agency is in existence in in a community, the creation of an urban renewal
area, including a revenue allocation area (required for use of tax increment financing), begins
with an eligibility report for a designated area within the community. The central question for an
eligibility report whether the study area has at least one of the statutory characteristics which
must be found to be considered eligible for urban renewal activities. These characteristics or
criteria are:
1. The presence of a substantial number of deteriorated or deteriorating structures and
deterioration of site [50-2018(9), 50-2903(8)(b) and (8)(c), and 50-2008(d)(4)(2)],
2. Age or obsolescence [50-2018(8) and 50-2903(8)(a)],
3. Predominance of defective or inadequate street layout [50-2018(9) and 50-2903(8)(b)],
4. Outmoded street patterns [50-2008(d)(4)(2)],
5. Need for correlation of area with other areas of municipality by streets and modern traffic
requirements [50-2008(d)(4)(2)],
6. Faulty lot layout in relation to size, adequacy, accessibility, or usefulness; obsolete
platting [50-2018(9), 50-2903(8)(b) and (8)(c)], and 50-2008(d)(4)(2)]
7. Unsuitable topography [50-2008(d)(4)(2)],
8. Insanitary or unsafe conditions [50-2018(9), 50-2903(8)(b)],
9. Diversity of ownership [50-2018(9), 50-2903(8)(b) and (8)(c), and 50-2008(d)(4)(2)],
10. Tax or special assessment delinquency [50-2018(9), 50-2903(8)(b)], and 50-2008
(d)(4)(2)]
11. Defective or unusual conditions of title [50-2018(9), 50-2903(8)(b) and (8)(c), and 50-
2008(d)(4)(2)],
12. Existence of conditions which endanger life or property by fire and other causes [50-
2018(9), 50-2903(8)(b)],
13. Substantially impairs or arrests the sound growth of a municipality and is a menace to the
public health, safety, morals or welfare [50-2018(9), 50-2903(8)(b) and 8(c)],
14. Conditions which retard development of the area [50-2008(d)(4)(2)], and
15. Results in economic underdevelopment of the area [50-2903(8)(b)] and economic disuse
[50-2008(d)(4)(2)].
If it is determined the Study Area has characteristics which meet one or more of the statutory
criteria listed above, the Agency may accept the eligibility report and request its consideration by
the governing body. No URA can be formed unless the City Council adopts a resolution finding
the area under consideration is deteriorated or deteriorating due to such characteristics, the
redevelopment of the area is necessary for the welfare of the residents, and the area is
appropriate for an urban renewal project.
The resolution approved by City Council authorizes the Agency to prepare a plan for the
proposed urban renewal area. The urban renewal area plan is to include the following with
specificity:
1. A statement describing the total assessed valuation of the base assessment roll of the
revenue allocation area and the total assessed valuation of all taxable property within the
municipality;
2. A statement listing the kind, number, and location of all proposed public works or
improvements within the revenue allocation area;
3. An economic feasibility study;
4. A detailed list of estimated project costs;
5. A fiscal impact statement showing the impact of the revenue allocation area, both until
and after the bonds are repaid, upon all taxing districts levying taxes upon property on the
revenue allocation area;
6. A description of the methods of financing all estimated project costs and the time when
related costs or monetary obligations are to be incurred;
7. A termination date for the plan and revenue allocation area as provided for in section 50-
2903(20), Idaho Code. In determining the termination date, the plan shall recognize that
the agency shall receive allocation of revenues in the calendar year following the last year
of the revenue allocation provision described in the urban renewal plan;
8. A description of the disposition or retention of any assets of the agency upon the
termination date. Provided however, nothing herein shall prevent the agency from
retaining assets or revenues generated from such assets as long as the agency shall have
resources other than revenue allocation funds to operate and manage such assets;
Once the plan is prepared and approved by the Agency, it is forwarded to the City Council. Prior
to the public hearing before the City Council, the City Council forwards the plan to the City
Planning and Zoning Commission for its determination that the plan conforms to the City’s
comprehensive plan. At least thirty (30) days prior to the public hearing, a copy of the notice and
plan is distributed to the taxing entities overlapping the boundaries of the proposed district. After
receiving the recommendation of the commission, and after notice fully published, the public
hearing is held. The City Council must approve an urban renewal plan, including revenue
allocation financing provisions, by an ordinance. If the ordinance is adopted by the City
Council, a copy of the ordinance with legal description of the Revenue Allocation Area (RAA) is
distributed to all the overlapping taxing entities, county officials and the State Tax Commission.
By state statute, following adoption of the ordinance, the RAA is effective January 1, of the year
in which it is adopted. The RAA has a maximum life of twenty years under Idaho statutes. The
urban renewal agency implements the plan adopted by the City Council.
Eligibility Report Summary of Findings
Criterion Criterion Met Characteristics Supporting
Finding
Substantial deterioration of
site
No Most existing development is
older residential homes,
which are still in good
condition. The site is also in
generally good condition.
Age or Obsolescence No Commercial development is
newer and residential homes
are still functional and in
good condition.
Predominance of Defective
Street Layout or Inadequate
Street Layout
Yes There are issues with a
misaligned intersection, and
extreme challenges with
widening 12th West.
Outmoded Street Patterns Yes Too many access points
create slower speeds than
designed. Lack of bicycle
and pedestrian infrastructure
is not reflective of
development patterns in the
Study Area
Need for Correlation of Area
with Other Areas of
Municipality by Streets and
Modern Traffic
Requirements
Yes The main intersection of the
Study Area, Hwy 33 and 12th
West, is misaligned and very
difficult to correct and widen
due to lack of right-of-way.
This is the main connection
to Rexburg to the west.
Faulty Lot Layout Yes Areas with existing housing
would require platting to
establish developable lots.
Unsuitable Topography No Study Area is generally flat
and challenges to
development due to
topography are limited.
Insanitary or Unsafe
Conditions
Yes Too many access points
along arterials creates unsafe
traffic conditions. Lack of
bicycle and pedestrian
infrastructure on arterials is
also unsafe.
Diversity of Ownership Yes The area northwest of the
Hwy 33 and 12th West
intersection has multiple
owners that make
redevelopment challenging.
Ownership along the arterials
is diverse, making road
widening difficult.
Tax or Special Assessment
Delinquency
No Not reviewed
Defective or Unusual
Conditions of Title
No Not reviewed
Existence of Conditions
Which Endanger Life or
Property
Yes Lack of bicycle and
pedestrian infrastructure on
arterials endangers life. Too
many access points on
arterials, especially near the
curve in Hwy 33 creates
overlapping points of
conflict.
Impairs or Arrests the Sound
Growth of a Municipality
Yes Major infrastructure in the
Study Area is required to
support development both
within and without the
boundaries. There are major
challenges to constructing
these necessary components.
Retards Development of the
Area
Yes The challenges to
development have or will
slow growth due to extreme
costs and lack of opportunity
for cost sharing.
Economic
Underdevelopment and
Economic Disuse
Yes See above.