HomeMy WebLinkAboutREDLINED SITE PLAN - 22-00481 - 4774 S Hwy 191 - StorageAuthor Name Author Email Author Phone No.:
Cody Jones Cody.Jones@rexburg.org 208-372-2173
Stan Crittenden Stan.Crittenden@rexburg.org 208-372-2314
Description : 4774 S Hwy 191 - Storage
Address : 4774 S Hwy 191
Application Type :
Document Filename : SITE PLAN - 22-00481 - 4774 S Hwy 191 - Storage.pdf Array
Comment Author Contact Information:
Corrections in the following table need to be applied before a permit can be issued
Review Report
Revisions Required
Page Reference Annotation
Type
Author : Department Status Page Review Comments Applicant Response Comments
Pg. 1 Free text Cody Jones : Building Open 1 Due to square footage and proximity to other buildings a
sprinkler system (section 903) or fire wall is needed.
Pg. 1 Free text Cody Jones : Building Open 1 Dan stated building will just be a shell and used as S2.
Pg. 1 Callout Stan Crittenden : Fire Open 1 Need to be able to park the fire truck and reach anywhere on
the building with a 150 ft. fire hose.
International Fire Code 503.1.1.
Pg. 1 Callout Stan Crittenden : Fire Open 1 Need to be able to park the fire truck and reach anywhere on
the building
with a 150 ft. fire hose.
International Fire Code 503.1.1.
Pg. 1 Callout Stan Crittenden : Fire Open 1 Any Driveway more than 150 ft. deep will require a turn
around. International Fire Code 2018 Appendix D
# 22-00481
Madison County - Commercial
Report Date: 07.14.2022
Approval of plans does not constitute approval of variance from code
Page 1 of 1
Powered by TCPDF (www.tcpdf.org)
Need to be able to park
the fire truck and reach
anywhere on the building
with a 150 ft. fire hose.
International Fire Code
503.1.1.
Any Driveway more
than 150 ft. deep will
require a turn around.
International Fire Code
2018 Appendix D
Due to square footage and proximity to other buildings
a sprinkler system (section 903) or fire wall is needed.
Need to be able to park
the fire truck and reach
anywhere on the building
with a 150 ft. fire hose.
International Fire Code
503.1.1.
Dan stated building will just be a shell and used
as S2.