HomeMy WebLinkAboutDETAIL CHANGES - 22-00481 - Vorp Energy - StorageSeptember 20, 2022
Vektor Construction
Miscellaneous Detail Changes
For
Vorp Energy (Dan Arnold)
Pre -Engineered Building
Rexburg, Idaho 83440
The following changes to the drawings are approved:
1) The #5 hairpin can be drilled through the pier on the outside of the
bolts and be bent at approximately 45 degrees into the concrete slab.
The hairpins should extend 8 feet minimum in length.
2) The two vertical dowel in the piers adjacent to the existing building
can be eliminated. Their will not be a grade beam installed between
the interior piers.
Any further questions or concerns please contact me.
Bryce Harper
Harper ngineering, Inc
175 N 900 W
Blackfoot, ID 83221
bryce cr,harperen ineering.net
(208) 684-5117
(888) 684-6151
\\`\