Loading...
HomeMy WebLinkAboutDETAIL CHANGES - 22-00481 - Vorp Energy - StorageSeptember 20, 2022 Vektor Construction Miscellaneous Detail Changes For Vorp Energy (Dan Arnold) Pre -Engineered Building Rexburg, Idaho 83440 The following changes to the drawings are approved: 1) The #5 hairpin can be drilled through the pier on the outside of the bolts and be bent at approximately 45 degrees into the concrete slab. The hairpins should extend 8 feet minimum in length. 2) The two vertical dowel in the piers adjacent to the existing building can be eliminated. Their will not be a grade beam installed between the interior piers. Any further questions or concerns please contact me. Bryce Harper Harper ngineering, Inc 175 N 900 W Blackfoot, ID 83221 bryce cr,harperen ineering.net (208) 684-5117 (888) 684-6151 \\`\ \01nn1ur1/"// NB NO. 7 $