HomeMy WebLinkAboutResolution No 2026 - 11 ITD E Parkway Barney Dairy Rd to 7th N Key No 23330Instrument # 475599 REXBURG, MADISON, IDAHO 8-10-2026 02:25:10 PM No. of Pages: 16 Recorded for: CITY OF REXBURG KIM H. MUIR Fee: 0.00 Ex-Officio Recorder Deputy A& Resolution 2026 — ii WHEREAS, the Idaho Transportation Department, hereafter called the STATE, has submitted an Agreement stating obligations of the STATE and the CITY OF REXBURG, hereafter called the CITY, for construction of E PARKWAY; BARNEY DAIRY RD TO 7T11 N; and WHEREAS, the STATE is responsible for obtaining compliance with laws, standards and procedural policies in the development, construction and maintenance of improvements made to the Federal -aid Highway System when there is federal participation in the costs; and WHEREAS, certain functions to be performed by the STATE involve the expenditure of funds as set forth in the Agreement; and WHEREAS, The STATE can only pay for work associated with the State Highway system; and WHEREAS, the CITY is fully responsible for its share of project costs; and NOW, THEREFORE, BE IT RESOLVED: 1. That the Agreement for Federal Aid Highway Project A023(330) is hereby approved. 2. That the Mayor and the City Clerk are hereby authorized to execute the Agreement on behalf of the CITY. 3. That duly certified copies of the Resolution shall be furnished to the Idaho Transportation Department. Passed by the City Council and approved by the Mayor this 5th day of August 2026. CITY OF REXBURG, MADISON COUNTY, IDAHO BY: J L. enill, Mayor f C�RI'O', :G ATTEST: ' �'''••. �••• liuIII0,M Deborah Lovejoy, City CIO CERTIFICATE I, Deborah Lovejoy, City Clerk, do hereby certify that the foregoing is a full, true, and correct copy of Resolution No. 2026 - ii adopted at a regular meeting of the City Council held on the 5th day of August 2026, and that the same is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and impressed the official seal of the City, this 5th day of August 2026. Deborah Lovejoy, City Clerk STATE/LOCAL AGREEMENT (CONSTRUCTION) PROJECT NO. A023(330) E PARKWAY; BARNEY DAIRY RD TO 7TH N MADISON COUNTY KEY NO. 23330 PARTIES THIS AGREEMENT is made and entered into this r day of � p.)�_, by and between the IDAHO TRANSPORTATION BOARD bOy and through the IDAHO TRANSPORTATION DEPARTMENT, hereafter called the State, and CITY OF REXBURG, acting by and through its Mayor and Council, hereafter called the Sponsor. PURPOSE The Sponsor has requested federal participation in the costs of E Parkway; Barney Dairy Rd to 7th N. which has been designated as Project No. A023(330). This Agreement sets out the responsibilities of the parties in the construction and maintenance of the project. Authority for this Agreement is established by Section 40- 317 of the Idaho Code. The Parties agree as follows: SECTION I. GENERAL 1. This Agreement is entered into for the purpose of complying with certain provisions of the Federal -Aid Highway Act in obtaining federal participation in the construction of the project. 2. Federal participation in the costs of the project will be governed by the applicable sections of Title 23, U.S. Code (Highways) and rules and regulations prescribed or promulgated by the Federal Highway Administration, including, but not limited to, the requirements of 23 U.S.C. §313.23 and CFR §635.410. 3. Funds owed by the Sponsor shall be remitted to the State/Local Agreement (Construction) E Parkway; Barney Dairy Rd to 7' N Key No.23330 Page No. I State through the ITD payment portal at: https://apps.itd.idaho.gov/Pay-TTD . 4. All information, regulatory and warning signs, pavement or other markings, and traffic signals, the cost of which is not provided for in the plans and estimates, must be erected at the sole expense of the Sponsor upon the completion of the project. 5. The location, form and character of all signs, markings and signals installed on the project, initially or in the future, shall be in conformity with the Manual of Uniform Traffic Control Devices as adopted by the State. 6. This State/Local Agreement (Construction) upon its execution by both Parties, supplements the State/Local Agreement (Project Development) by and between the same parties, dated December 27,2021. 7. Sufficient Appropriation. It is understood and agreed that the State is a governmental agency, and this Agreement shall in no way be construed so as to bind or obligate the State beyond the term of any particular appropriation of funds by the Federal Government or the State Legislature as may exist from time to time. The State reserves the right to terminate this Agreement if, in its sole judgment, the Federal Government or the legislature of the State of Idaho fails, neglects or refuses to appropriate sufficient funds as may be required for the State to continue payments. Any such termination shall take effect immediately upon notice and be otherwise effective as provided in this Agreement. SECTION II. That the State shall: 1. Enter into an Agreement with the Federal Highway Administration covering the federal government's pro rata share of construction costs. 2. Advertise, open bids, prepare a contract estimate of cost based on the successful low bid and notify the Sponsor thereof. State/Local Agreement (Construction) E Parkway; Barney Dairy Rd to 7" N Key No. 23330 Page No. 2 3. Award a contract for construction of the project, based on the successful low bid, if it does not exceed the State's estimate of cost of construction by more than ten (10) percent. If the low bid exceeds the estimate by more than 10%, the bid will be evaluated, and if justified, the contract will be awarded and the Sponsor will be notified. 4. Obtain concurrence of the Sponsor before awarding the contract if the Sponsor's share of the low bid amount exceeds the amount set forth in Section III, Paragraph 1 by more than ten (10) percent. 5. Provide to the Sponsor sufficient copies of the Contract Proposal, Notice to Contractors, and approved construction plans. 6. Designate a resident engineer and other personnel, as the State deems necessary, to supervise and inspect construction of the project in accordance with the plans and specifications in the manner required by applicable state and federal regulations. This engineer, or his authorized representatives, will prepare all monthly and final contract estimates and change orders, and submit all change orders to the Sponsor for their concurrence. If the Sponsor's share of any change order exceeds $1,000.00, the State will submit a statement to the Sponsor indicating the amount owed by the Sponsor. 7. Appoint the Local Highway Technical Assistance Council as the contract administrator for the State. 8. Notify the Sponsor when construction engineering and inspection (CE&I) costs have reached approximately 85% of the estimated cost for CE&I. 9. Maintain complete accounts of all project funds received and disbursed, which accounting will determine the final project costs. 10. Upon completion of the project, after all costs have been accumulated and the final voucher paid by the Federal Highway Administration, provide a statement to the Sponsor summarizing the estimated and actual costs, indicating an adjustment for or against the Sponsor. State/Local Agreement (Construction) E Parkway; Barney Dairy Rd to 7' N Key No. 23330 Page No. 3 Any excess funds transmitted by the Sponsor and not required for the project will be applied to any outstanding balance the Sponsor may have on a previously completed project. If no such outstanding balance exists, the excess funds will be returned to the Sponsor. 11. If additional Federal -aid is secured, the State will modify the TIP and the Sponsor may request any Local Participation funds provided above the required match exceeding $50,000 be reimbursed to the Sponsor within 60 days after TIP modification and ITD-2101 are approved. SECTION III. That the Sponsor shall: 1. Pay to the State before the advertisement for bids, the amount of SEVEN MILLION NINE HUNDRED SIXTEY-NINE THOUSAND FIVE HUNDRED NINETY DOLLARS ($7,969,590), which is the Sponsor's estimated share of the cost for construction, plus the total non -participating funds, plus preliminary engineering, and construction engineering & inspection (CE&I). These costs and the Sponsor's match are detailed in the attached Worksheet for State/Local Construction Agreements marked Exhibit A. The actual cost to the Sponsor will be determined from the total quantities obtained by measurement plus the actual cost of engineering and contingencies required to complete the work. Construction engineering, inspection and contingencies will be approximately 14.5% of the total construction cost. 2. Upon approval of the lowest qualified bid received, if the Sponsor's share exceeds the amount set forth in Section III, Paragraph 1, transmit to the State the Sponsor's portion of such excess cost. 3. Authorize the State to administer the project and make any necessary changes and decisions within the general scope of the plans and specifications. Prior approval of the Sponsor will be obtained if it is necessary, during the life of the construction contract, to deviate from the plans and specifications to such a degree that the costs will be increased or the nature of the completed work will be significantly changed. 4. Designate an authorized representative to act on the State/Local Agreement (Construction) E Parkway; Barney Dairy Rd to 7" N Key No. 23330 Page No. 4 Sponsor's behalf regarding action on change orders. That authorized representative's name is Phone No. 5. When change orders are submitted by the State for approval pursuant to Section II, Paragraph 6, the Sponsor or its authorized representative shall give approval of same as soon as possible, but no later than ten (10) calendar days after receipt of the change order. If approval is delayed, any claims due to that delay shall be the responsibility of the Sponsor. 6. Upon receipt of any statement referred to in Section II, Paragraphs 6 and 10, indicating an adjustment in cost against the Sponsor, promptly remit to the State a check or warrant in that amount. 7. Maintain the project upon completion to the satisfaction of the State. Such maintenance includes, but is not limited to, preservation of the entire roadway surface, shoulders, roadside cut and fill slopes, drainage structures, and such traffic control devices as are necessary for its safe and efficient utilization. Failure to maintain the project in a satisfactory manner will jeopardize the future allotment of federal -aid highway funds for projects within the Sponsor's jurisdiction. 8. To the extent permitted by Idaho law and as provided by the Idaho Tort Claims Act, indemnify, save harmless the State, regardless of outcome, from the expenses of and against suits, actions, claims or losses of every kind, nature and description, including costs, expenses and attorney fees that may be incurred by reason of any act or omission, neglect or misconduct of the Sponsor or its consultant in the design, construction and maintenance of the work which is the subject of this Agreement, or Sponsor's failure to comply with any state or federal statute, law, regulation or rule. Nothing contained herein shall be deemed to constitute a waiver of the State's sovereign immunity, which immunity is hereby expressly reserved. State/Local Agreement (Construction) E Parkway; Barney Dairy Rd to 7" N Key No.23330 Page No. 5 This Agreement is executed for the State by its Division Administrator and executed for the Sponsor by the Board of Commissioners, attested to by the City Clerk, with the imprinted corporate seal of the City of Rexburg. IDAHO TRANSPORTATION DEPARTMENT Division Administrator ATTEST: CITY OF REXBURG City Clerk yor (SEAL) B=reularyspecial meeting on : /I ;In--2- to HP:23330 SLA CN StateiLoca! Agreement (Construction) E Parkway; Barney Dairy Rd to 7' N Key No. 23330 Page No. 6 WORKSHEET FOR STATE / LOCAL CONSTRUCTION AGREEMENTS Key No: 23330 Project No: A023(330) Project Name: E Parkway; Barney Dairy Rd to 7th N Sponsor: City of Rexburg, Madison County Description of work: For the work of constructing the first phase of East Parkway which is a new arterial connecting Barney Dairy Road and 7th North and includes a new bridge over the South Fork of the Teton River. Date of State/Local Agreement for Project Development: 12/27/2021 TOTAL ESTIMATED COST OF CONSTRUCTION Includes E&C $12,707,522 APPROVED FORCE ACCOUNT WORK $0 PLUS PE BY STATE (from 2101) $18,000 PLUS PL BY LHTAC (from 2101) $155,000 PLUS PC (from PC Agreements) $1,249,877 PLUS ROW (from 2101) $0 PLUS LP (from 2101) $0 MINUS ALL LOCAL -PARTICIPATING $7,660,000 FEDERAL LOCAL PARTICIPATING TOTAL $6,530,399 MATCH PERCENTAGES 92.66% 7.34% PERCENTAGE AMOUNTS $6,051,067.35 $479,331.26 MINUS FEDERAL MAXIMUM $0 ADD OVERAGE (If Any To Local) r -_ 6,051,067_ ♦ $0 LOCAL SHARE OF CONSTRUCTION AMOUNT _ _ $479,331 ADJUSTMENTS PLUS ALL LOCAL -PARTICIPATING (From above if work by contract) $7,600,000 MINUS FUNDS ADVANCED BY THE SPONSOR FOR LP $0 MINUS FUNDS ADVANCED BY THE SPONSOR FOR STATE PE (from PD Agreement) $18,000 MINUS APPROVED FORCE ACCOUNT WORK (From above) $0 MINUS PRELIMINARY ENGINEERING PAID BY LOCAL $91,741 (If LPA has not reed reimbursement, use actual PC dollars paid by LPA) (If LPA has rec'd reimbursement, use local match % of actual PC dollars paid by LPA) (Amounts must be supported by District Records Inspector Audit) CONSTRUCTION AMOUNT REQUIRED FROM SPONSOR AFTER ADJUSTMENTS1 $7,969,590 Construction Estimate (CN): $11,074,103.61 Non -Bid Items : $34,342.00 Contingencies (5.00%): $553,705.00 Const Engineering (CE&I) (7.32%): $810,000.00 Const Admin (CL) (1.63%): $180,000.00 Const Admin (CE) (0.50%): $55,371.00 Utilities: $0.00 TOTAL CN ESTIMATED COST: $12,707,521.61 Comments: Design Agreement Administrator -Muhammad Zubery, P.E. Resident Engineer - Matt Koster, P.E. rd 8/06 PREPARED BY: Craig Herndon & Ryan Rush Date: 7/23/2026 07/21 /2026 07:43:16 Idaho Transportation Department AASHTOWare Project- Version 5.03.03 Revision 039 Cost Estimate Summary Report Cost Estimate Name: 23330 Improvement Type: Description: E PARKWAY; BARNEY DAIRY TO 7TH N Work Type: 01 Spec Book: 23 Estimated By: Unit System: English Estimate Phase: 05 Construction Year: 2026 Estimate Type: Total Construction Budget: $11,108,445.61 Base Cost Estimate Total Cost Estimate Items: $11,108,445.61 Total Construction Contingency: $0.00 Name Description Cost Total Non -Bid Items: $0.00 Name Description Amount Total Allowances: $0.00 Contingency & Risk Total Market Contingency: $0.00 Cost Estimate: 23330 Page: 1 of 8 07/21 /2026 07:43:16 Idaho Transportation Department AASHTOWare Project- Version 5.03.03 Revision 039 Cost Estimate Summary Report Cost Category Breakdown Catg Name Catg Description Total Cost 001 ROADWAY WORK BY CONTRACT $5,183,861.91 002 BRIDGE WORK BY CONTRACT $5,890,241.70 003 NON -BID ITEM WORK BY CONTRACT $34,342.00 Cat Line # Item # Item Description Unit Quantity Price Item Total Price Source 001 5 107-019A SURVEY MONUMENT PRESERVATION CA 2,000.000 $1.00 $2,000.00 Ad Hoc 001 10 202-005A SELECTIVE REMOVAL OF TREES EACH 3.000 $1,054.55 $3,163.65 Average INCLUDING STUMPS 001 15 203-015A REMOVAL OF BITUMINOUS SURFACE SY 1,837.000 $8.34 $15,316.92 Regression 001 20 205-005A EXCAVATION CY 3,213.000 $36.47 $117,162.75 Regression 001 25 205-040A GRANULAR BORROW CY 32,569.000 $22.79 $742,162.50 Regression 001 30 205-060A WATER FOR DUST ABATEMENT MG 800.000 $20.05 $16,043.13 Average 001 35 205-071A EXCAVATION AND REPAIR OF SOFT CY 360.000 $146.25 $52,649.81 Regression SPOTS 001 40 212-011A FIBER WATTLE FT 4,973.000 $4.65 $23,105.80 Average 001 45 212-060A STABILIZED CONSTRUCTION ENTRANCE EACH 2.000 $4,055.96 $8,111.91 Regression Cost Estimate: 23330 Page: 2 of 8 f% 07121 /2026 07:43:16 Idaho Transportation Department AASHTOWare Project- Version 5.03.03 Revision 039 Cost Estimate Summary Report 001 50 212-105A WATER AND POLLUTION CA 5,000.000 $1.00 $5,000.00 Ad Hoc 001 55 301-005A GRANULAR SUBBASE TON 25,950.000 $26.47 $686,984.99 Regression 001 60 303-022A 3/4" AGGREGATE TYPE B FOR BASE TON 9,534.000 $37.08 $353,531.40 Regression 001 65 401-020A CSS-1 DILUTED EMULSIFIED ASPHALT GAL 1,268.000 $4.01 $5,085.16 Regression FOR TACK COAT 001 70 405-245A APPROACH EACH 5.000 $3,014.73 $15,073.66 Regression (PRIVATE) 001 75 405-245B APPROACH EACH 1.000 $1,543.87 $1,543.87 Regression (PUBLIC) 001 80 405-435A SUPERPAVE HMA PAVEMENT TON 2,835.000 $142.99 $405,382.12 Regression INCLUDING ASPHALT & ADDITIVES CLASS SP-3 001 170 602-035A 18" PIPE CULVERT FT 29.000 $127.88 $3,708.66 Average 001 175 602-045A 24" PIPE CULVERT FT 223.000 $200.00 $44,600.00 Ad Hoc 001 180 602-105A 60" PIPE CULVERT FT 1,496.000 $300.00 $448,800.00 Ad Hoc 001 185 602-250A PIPE ARCH FT 160.000 $350.00 $56,000.00 Ad Hoc 77 WIDE x 52" TALL 001 190 605-025A 12" STORM SEWER PIPE FT 134.000 $94.02 $12,598.03 Regression Cost Estimate: 23330 Page: 3 of 8 ' 07/21/2026 07:43:16 Idaho Transportation Department AASHTOWare Project- Version 5.03.03 Revision 039 Cost Estimate Summary Report 001 195 605-505A CATCH BASIN TYPE 1A EACH 4.000 $3,310.79 $13,243.16 Average 001 200 608-035A 18"APRON FOR PIPE EACH 2.000 $1,061.09 $2,122.19 Regression 001 205 608-045A 24" APRON FOR PIPE EACH 3.000 $1.300.00 $3,900.00 Ad Hoc 001 210 609-025A MINOR STRUCTURES EACH 1.000 $6,000.00 $6,000.00 Ad Hoc 001 215 612-005A W-BEAM GUARDRAIL FT 237.500 $37.92 $9,005.22 Regression 001 220 612-115C GUARDRAIL TERMINAL, TANGENT EACH 2.000 $3.432.88 $6,865.76 Regression 001 225 612-120A GUARDRAIL TRANSITION, LOW SPEED EACH 2.000 $1,649.23 $3,298.46 Regression 001 230 616-010A SIGN TYPE B-1 SF 44.000 $30.47 $1,340.75 Regression 001 235 616-040J STEEL SIGN POST TYPE E-1 FT 40.000 $74.85 $2,994.13 Regression 001 240 616-040K STEEL SIGN POST TYPE E-2 FT 30.000 $93.34 $2,800.18 Regression 001 245 621-005A SEED BED PREPARATION ACRE 2.400 $1,547.08 $3,712.99 Regression 001 250 621-010A SEEDING ACRE 2.400 $1.921.13 $4,610.71 Regression Cost Estimate: 23330 Page: 4 of 8 07/21/2026 07:43:16 Idaho Transportation Department AASHTOWare Project- Version 5.03.03 Revision 039 Cost Estimate Summary Report 001 255 621-015A MULCHING ACRE 2.400 $3,577.25 $8,585.41 Regression 001 260 621-025A MULCH ANCHORING (TACKIFIER) ACRE 2.400 $2,500.00 $6,000.00 Ad Hoc 001 265 621-025B MULCH ANCHORING (TACKIFIER) ACRE 2.400 $2,500.00 $6,000.00 Ad Hoc TEMPORARY 001 275 624-005B LOOSE RIPRAP CY 240.000 $110.00 $26,400.00 Ad Hoc 001 280 626-010A TEMPORARY TRAFFIC CONTROL SIGNS SF 137.000 $17.64 $2,416.43 Regression 001 285 626-040A BARRICADE TYPE 3 EACH 8.000 $134.23 $1,073.81 Regression 001 290 626-100A MISCELLANEOUS TEMPORARY TRAFFIC CA 1,000.000 $1.00 $1,000.00 Ad Hoc CONTROL ITEMS 001 295 626-105A TEMPORARY TRAFFIC CONTROL HR 400.000 $69.03 $27,613.63 Regression MAINTENANCE 001 300 630-010A TRANSVERSE, WORD, SYMBOL, AND SF 119.000 $14.35 $1,707.23 Regression ARROW PAVEMENT MARKINGS - PREFORMED THERMOPLASTIC 001 305 630-025A LONGITUDINAL PAVEMENT MARKING - FT 12,958.000 $0.50 $6,516.84 Regression WATERBORNE 001 315 675-005A SURVEY LS 1.000 $50,000.00 $50,000.00 Ad Hoc Cost Estimate: 23330 Page: 5 of 8 07/21/2026 07:43:16 Idaho Transportation Department AASHTOWare Project- Version 5.03.03 Revision 039 Cost Estimate Summary Report 001 320 675-010A DIRECTED SURVEYING CA 5,000.000 $1.00 $5,000.00 Ad Hoc 001 325 677-005A RECORD DRAWINGS LS 1.000 $5,000.00 $5,000.00 Ad Hoc 001 340 S501-15A RETAINING WALL SF 4,472.000 $109.80 $491,022.96 Average GRAVITY CONCRETE BLOCK 001 355 S900-50A CONTINGENCY AMOUNT CA 5,000.000 $1.00 $5,000.00 Ad Hoc MISCELLANEOUS WORK 001 360 S901-05A SP EACH 4.000 $500.00 $2,000.00 Ad Hoc REMOVE AND RESET MAILBOX 001 365 S901-05B SP EACH 1.000 $10,000.00 $10,000.00 Ad Hoc CONCRETE HEADWALL FOR PIPE ARCH CULVERT 001 370 S914-05A SP TON 21.000 $80.00 $1,680.00 Ad Hoc ROCK CAP 001 375 Z629-05A MOBILIZATION LS 1.000 $1,448,927.69 $1,448,927.69 Reference 002 85 502-140A CONCRETE CLASS 40-A SCHEDULE NO. CY 206.400 $1,250.00 $258,000.00 Ad Hoc 1 002 90 502-310A CONCRETE CLASS 40 AF SCHEDULE CY 625.800 $1,300.00 $813,540.00 Ad Hoc NO. 2 002 95 502-435A APPROACH SLAB SY 338.000 $400.00 $135,200.00 Ad Hoc Cost Estimate: 23330 Page: 6 of 8 07/21/2026 07:43:16 Idaho Transportation Department AASHTOWare Project- Version 5.03.03 Revision 039 Cost Estimate Summary Report 002 100 503-010A METAL REINFORCEMENT SCHEDULE LB 49,535.000 $1.20 $59,442.00 Ad Hoc NO. 1 002 105 503-015A METAL REINFORCEMENT SCHEDULE LB 168,965.000 $1.20 $202,758.00 Ad Hoc NO. 2 002 110 503-020A EPDXY COATED METAL LB 125,159.000 $1.50 $187,738.50 Ad Hoc REINFORCEMENT 002 115 504-005A STEEL BRIDGE LS 1.000 $2,800,000.00 $2,800,000.00 Ad Hoc 002 120 504-040A COMBINATION PEDESTRIAN/BICYCLE & FT 429.500 $270.00 $115,965.00 Ad Hoc TRAFFIC RAILING 002 125 507-005A ELASTOMERIC BEARINGS PLAIN EA 8.000 $800.00 $6,400.00 Ad Hoc 0.5"x19"x23" 002 130 507-010A ELASTOMERIC BEARINGS LAMINATED EA 8.000 $1,500.00 $12,000.00 Ad Hoc CLASS 002 135 511-005A CONCRETE WATERPROOF SYSTEM SY 544.000 $125.00 $68,000.00 Ad Hoc TYPE D 002 140 520-010A PREDRILLING FOR PILING IN ROCK FT 306,000 $1,200.00 $367,200.00 Ad Hoc 002 145 566-005A COMPRESSION EXPANSION JOINT FT 76.000 $130.00 $9,880.00 Ad Hoc 002 150 567-005A STRIP SEAL EXPANSION JOINT FT 76.000 $400.00 $30,400.00 Ad Hoc Cost Estimate: 23330 Page: 7 of 8 07/21/2026 07:43:16 Idaho Transportation Department AASHTOWare Project- Version 5.03.03 Revision 039 Cost Estimate Summary Report 002 155 576-005A GLASS FIBER REINFORCED POLYMER FT 608.000 $3.50 $2,128.00 Ad Hoc (GFRP) REINFORCEMENT 002 160 578-005A PRECAST CONCRETE CULVERT L S 1.000 $450,000.00 $450,000.00 Ad Hoc 002 165 586-005A UTILITY CONDUIT L S 1.000 $10,000.00 $10,000.00 Ad Hoc COMPLETE INSTALLATION 002 270 624-005A LOOSE RIPRAP CY 1,910.000 $93.16 $177,942.07 Regression 002 310 640-010A RIPRAP/EROSION CONTROL SY 2,866.000 $3.52 $10,093.13 Average GEOTEXTILE 002 345 S501-30A SP BRIDGE FT 1,152.000 $150.00 $172,800.00 Ad Hoc ROCK SOCKETED STEEL SHELL PILES 002 350 S501-35A SP BRIDGE SY 151.000 $5.00 $755.00 Ad Hoc ELASTIC INCLUSION 003 330 A303-05A QA -AGGR FOR BASE CA 13,572,000 $1.00 $13,572.00 Ad Hoc 003 335 A405-05A QA- PL MIX PAV CA 20,770.000 $1.00 $20,770.00 Ad Hoc Cost Estimate: 23330 Page: 8 of 8