HomeMy WebLinkAboutTIA_Moody Townhomes_Rexburg, ID_4.23.2026 (1)Rexburg, ID | Moody Townhomes Traffic Impact Analysis Prepared for: Utah Development Group 10808 S. River Front Parkway, Suite 300 South Jordan, UT 84095 801-641-8956 Prepared by: Hunt Day 3445 Antelope Drive St 200 Syracuse, UT 84075 801.664.4724 Thomas Hunt, PE 4/23/2026 March 24, 2026 City of Rexburg, ID Kacey Ramsauer 35 N 1st East Rexburg, ID 83440 208-372-2167 RE: Moody Townhomes – Rexburg, ID – Traffic Impact Analysis The proposed Moody Townhomes development is located at N 5th West & Moody Road in Rexburg, ID. The main access into the development is from the Moody Rd (2000 North) and 2nd East intersection. The Moody Townhome development will consist of 137 townhome units and will be completed in one single phase. It is estimated that the development will be open by late 2027. A full traffic impact analysis at the Moody Rd/2nd East intersection has been performed to determine if any improvements and/or mitigation measures are needed due to the impact of this development. This analysis also discusses if any improvements are needed to Moody Roa and the new driveways that service the proposed development. To perform this report, manual traffic counts were obtained on multiple days during the AM and PM peak hours on multiple days in February 2026. The highest peak traffic counts during the field observations were used in this study to determine how the existing intersection and accesses currently function; this includes the AM and PM peak hours. With this information, we can project the trip distribution from this development to determine the impact this project has on traffic. It is my professional opinion that upon completion of this project, it will not significantly alter the existing traffic patterns and should be permitted per the traffic data and improvements contained within this report. If you have any questions, or if we can be of further assistance, please let us know. Regards, Thomas Hunt Principal Engineer & Planner Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 3 ITEM PAGE NAME FIGURE Introduction and Summary 4 Principal Findings & Conclusion Proposed Development 4 5 Study Area Conditions 5 Analysis of Existing Conditions Proposed Traffic (2027) Results (2027) Projected Traffic (2032) Results (2032) 8 14 19 20 25 Conclusion & Recommendations 26 Vicinity Map Study Area 1 2 Trip Distribution 3 Existing Peak Hours Traffic Volumes 4, 5 Proposed Traffic Volumes (2027) Projected Traffic Volumes (2032 ) 6, 7, 8, 9 10, 11, 12, 13 Table of Contents – Moody Townhomes Rexburg, ID List of Figures –Moody Townhomes Rexburg, ID Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 4 Introduction and Summary The proposed Moody Townhomes development is located at N 5th West & Moody Road in Rexburg, ID. The main access into the development is from the Moody Rd (2000 North) and 2nd East intersection. The Moody Townhome development will consist of 137 townhome units and will be completed in one single phase. It is estimated that the development will be open by late 2027. The purpose of this study is to complete a Category A IDT Traffic Impact Analysis by: - Assess the existing traffic flow and Level of Service in the AM and PM Peak hours - Distribute the new trip generation from the project and determine the roadway’s level of service. - Project the traffic to the end of the build out year (2027) on the accesses and surrounding developments to determine the roadway’s level of service. - Determine if any mitigation measures may be needed. Principal Findings & Conclusion Existing 2026 Traffic Conditions: • Moody Rd/2000 North (signalized) functions at a Level of Service B during both peak hours. However, Moody Rd existing Level of Service is a D. Proposed 2027 Traffic Conditions: • Single-Family Attached Housing (ITE-215): Single Family Attached Housing with 137 townhome units generates 19/56 AM trips and 52/32 PM trips entering/exiting during the peak hours using ITE Trip Generation Manual, 11th edition. • All existing and proposed intersections/accesses will function at an acceptable level of service with the proposed mitigation measures in both peak hours with a slight increase in delay with the new development. An overall Level of Service remains a B during both peak hours. Recommendations Our principal findings from our traffic impact analysis have determined that during the AM and PM peak hours, all studied intersections and accesses operate at an acceptable Level of Service and should be permitted with the required recommendation stated below. • Increase the signal timing on the Moody Road flow of traffic. By year 2032, adding 2.3 seconds to the street light along the Moody Road flow, Moody Road and 2nd East will operate at a Level of Service C or better • Widen Moody Road to the full right of way widths along their frontage. This will allow the proper turning movements at the accesses into the development. • Move or add a ‘Yield Left Turn 15 MPH’ sign closer to the turn at Moody Rd and 1000 West. It is currently 575’ from the turn. An additional sign should be added 150’ from the turn. Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 5 • Street lights may also help mitigate the turn at Moody Rd/1000 West and should be implemented. Proposed Development The proposed Moody Townhomes development is located at N 5th West & Moody Road in Rexburg, ID. The main access into the development is from the Moody Rd (2000 North) and 2nd East intersection. The Moody Townhome development will consist of 137 townhome units. Study Area Conditions This development will generate a maximum of 84 trips during the Peak hour, resulting in a ‘small’ grouping, requiring: • The first intersection plus all intersection and access points within 0.25 miles of a property line of the site. Based upon the above criteria, the study areas are: • Moody Rd / 2nd East intersection (signalized) • Mood Rd / Access 1 (unsignalized) • Moody Rd / Access 2 (unsignalized) This report addresses the impacts based on Level of Service (LOS) values calculated by delay. A Vicinity Map has been provided in Figure #1 that shows this location, and a Study Area exhibit has been provided in Figure #2 is a Trip Distribution Map for the proposed development. Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 6 Figure #1 Vicinity Map Moody Road & 2nd East | Rexburg, ID Project Site Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 7 Figure #2 Trip Distribution Map Moody Rd and 2nd East | Rexburg, ID Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 8 Analysis of Existing Conditions Physical Characteristics Moody Rd / 2nd East is a signalized four-way stop-controlled intersection. Moody Road is the minor street and runs east/west. Eastbound and Westbound have a dedicated left turn lane and a shared thru/right turn lane. is stop controlled with stop signs. The speed limit is 35 mph. 2nd East southbound has a dedicated left turn lane, two (2) dedicated thru lanes, and a dedicated right turn lane. 2nd East northbound has a dedicated thru lane, one (1) dedicated thru lane, and one (1) shared thru/right turn lane. The speed limit is 45 mph. The roadway intersection geometrics, turn lanes, driveways, traffic control devices, stop signs etc. are shown in Figures below. Level of Service Analysis For this traffic impact study, the LOS was determined by calculating the average delay time per vehicle in seconds using Synchro 11. Each LOS is associated with a designated range of delay times in seconds per vehicle. Table 1 (below) is used to determine the LOS for a signalized intersection based on the delay in seconds per vehicle. Table 2 (below) is used to determine the LOS for an unsignalized intersection based on the delay in seconds per vehicle. According to the Highway Capacity Manual, most facilities are designed for a service flow rate at LOS D or better to ensure acceptable operating conditions to users. Table 1 - Signalized Intersections Level of Service Table 2 - Unsignalized Intersections Level of Service LOS Intersection Delay per Vehicle (sec/veh) General Description A ≤ 10 Free Flow B > 10 - 20 Stable Flow (slight delays) C > 20 - 35 Stable Flow (acceptable delays) D > 35 - 55 Approaching unstable (tolerable delay) E > 55 - 80 Unstable Flow (intolerable delay) F > 80 Forced Flow (congested and failure) LOS Intersection Delay per Vehicle (sec/veh) General Description A ≤ 10 Free Flow B > 10 - 15 Stable Flow (slight delays) C > 15 - 25 Stable Flow (acceptable delays) D > 25 - 35 Approaching unstable (tolerable delay) E > 35 - 50 Unstable Flow (intolerable delay) F > 50 Forced Flow (congested and failure) Source: Highway Capacity Manual (HCM) 2022. Source: Highway Capacity Manual (HCM) 2022. Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 9 Existing Traffic Volumes Data collection was obtained in accordance with the latest edition of the Institute of Transportation Engineers “Manual of Transportation Engineering Studies”. Traffic counts were obtained in 15-minute increments to determine if any atypical PHF exists – none were determined. Daily AM and PM peak hour traffic volumes were obtained at all turning movements at the studied intersection and accesses were obtained. These existing traffic volumes can be found in Figures 4 and 5 below. Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 10 Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 11 Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 12 Existing Study Area Level of Service The existing intersection was analyzed using Synchro 11. The results, indicating the current level of service, are shown in Table 3 and the appendix. Table 3 – Existing Level of Service for Study Area Summary of Existing Conditions Based upon the existing traffic conditions in the AM and PM peak hours, the overall Level of Service performs at a level of service B. The main direction of traffic (North and South) has a Level of Service B, while the minor traffic (East and West) has a Level of Service D. Based upon the 2022 Transportation Master Plan, any Level of Service greater than a C is not acceptable. So, mitigation measures should be implemented to existing conditions. Recommended mitigation measures: - Increase the signal timing on the Moody Road flow of traffic. By adding 1.2 seconds to the Moody Road flow a traffic with the street light, Moody Road increases to a Level of Service C, while 2nd East traffic flows still functions at a Level of Service C or better. For a detailed report and individual lane LOS’s, the results of the study can be found in the Appendix. Other required Data & Analysis No crashes were observed while obtaining traffic counts. Based on the crash data from ITD, there have been 16 accidents since 2018. 1 was a fatality, 4 were injuries, the remaining 11 were minor. This results in approximately 2 accidents/year. Intersection Approach Existing AM Existing PM Delay LOS Delay LOS 2nd East / Moody Road EBL 36.6 D 36.8 D EBT/R 40.2 D 40.4 D WBL 48.4 D 52.9 D WBT/R 50.0 D 53.2 D NBL 10.4 B 14.0 B NBT 12.3 B 12.0 B NBR 12.4 B 12.1 B SBL 33.8 C 33.4 C SBT 8.8 A 10.4 B SBR 7.0 A 7.1 A Source: Delay times and LOS determined using Synchro 11. Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 13 The proposed development will be long term residents that become familiar with the intersection geometry and timing. It is not anticipated that the proposed development will create an increase in accidents at the intersection. To the west of the proposed development is a 90 degree bend in the roadway as Moody Rd turns into 5th West. There have been two accidents there. One was someone running into a fence and the other is loss of control at the turn at nighttime. The existing conditions should provide the mitigation measure(s) below: Recommended mitigation measures: - Move the ‘Yield Left Turn 15 MPH’ sign closer to the turn. It is currently 575’ from the turn. An additional sign should be added 150’ from the turn. - Street lights may also help mitigate the turn. Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 14 Proposed Traffic Trip Generation The number of new trips generated for the proposed development was determined using trip generation figures obtained from ITE Trip Generation Manual 11th Edition. The number of new trips generated for the proposed Single Family Attached housing with 137 residential units was determined using trip generation figures obtained from ITE Trip Generation Manual 11th Edition for that specific use (ITE Land Use Code 215). The calculations for this can be found in the Appendix. These results can be seen in Table 4 below. Table 4 – Project Trip Generation The proposed new trips were added to the traffic represented opening day of this project based upon the trip distribution found in Figure 3 above and the Project Trip Generation found in Table 4 above. The proposed combined vehicle movements are shown in Figure 6, 7, 8 and 9 below. Land Use Weekday Trips Entering Weekday Trips Exiting AM Trips Entering AM Trips Exiting PM Trips Entering PM Trips Exiting Single Family Attached (215) 497 496 19 56 52 32 Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 15 Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 16 Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 17 Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 18 Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 19 Results Based on current conditions, combined with the generated traffic flows from the proposed development, we have prepared a study of the studied intersection and new accesses. The results of the study are shown in Table 5 below. Table 5 – Proposed (2027) Level of Service for Study Area Summary of Proposed Development (2027) Based upon the projected traffic from the development, in the AM and PM peak hours, the overall Level of Service performs at a level of service B. The main direction of traffic (North and South) has a Level of Service B, while the minor traffic (East and West) has a Level of Service D. Based upon the 2022 Transportation Master Plan, any Level of Service greater than a C is not acceptable. So, mitigation measures should be implemented to existing conditions. Recommended mitigation measures: - Increase the signal timing on the Moody Road flow of traffic. By adding 2.1 seconds to the street light on the Moody Road flow a traffic, Moody Road improves to a Level of Service C, while 2nd East still functions at a Level of Service C or better with a slight increase in delay in all turn movements. To the west of the proposed development is a 90 degree bend in the roadway as Moody Rd turns into 5th West. There have been two accidents there. One was someone running into a fence and Intersection Approach Existing AM Existing PM Proposed AM Proposed PM Delay LOS Delay LOS Delay LOS Delay LOS 2nd East / Moody Road EBL 36.6 D 36.8 D 37.5 D 35.6 D EBT/R 40.2 D 40.4 D 42.4 D 40.7 D WBL 48.4 D 52.9 D 53.3 D 46.3 D WBT/R 50.0 D 53.2 D 50.5 D 49.1 D NBL 10.4 B 14.0 B 10.7 B 15.9 B NBT 12.3 B 12.0 B 12.3 B 12.6 B NBR 12.4 B 12.1 B 12.4 B 12.7 B SBL 33.8 C 33.4 C 33.8 C 35.4 D SBT 8.8 A 10.4 B 8.8 A 10.8 B SBR 7.0 A 7.1 A 7.1 A 7.4 A Acc. 2 / Moody Rd EBLT - - - - 7.2 A 7.3 A WBTR - - - - 0.0 A 0.0 A SBLR - - - - 8.6 A 8.6 A Acc. 1 / Moody Rd EBLT - - - - 7.3 A 7.3 A WBTR - - - - 0.0 A 0.0 A SBLR - - - - 8.9 A 8.8 A Source: Delay times and LOS determined using Synchro 11. Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 20 the other is loss of control at the turn at nighttime. The existing conditions should provide the mitigation measure(s) below: Recommended mitigation measures: - Widen Moody Road along the projects frontage to the full right of way width. - Move or add a ‘Yield Left Turn 15 MPH’ sign closer to the turn at Moody Rd and 1000 West. It is currently 575’ from the turn. An additional sign should be added 150’ from the turn. - Street lights may also help mitigate the turn and should be implemented. 5-Year Horizon Projection (2032) Following direction from Rexburg City engineering, this analysis also looked at 5-years after opening year (2032). Rexburg City has a current growth rate of 0.57% annually. This growth rate has been used to calculate the projected traffic to the year 2032. The projected trips were added to the proposed traffic represented on opening day. The projected trips can be found in Figures 10, 11, 12 and 13 below. Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 21 Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 22 Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 23 Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 24 Projected Results (2032) Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 25 Based on current conditions, combined with the generated traffic flows from the proposed development, and projected 5-years into the future based on the existing growth rate of 0.57% per year, we have prepared a study of the studied intersection and new accesses. The results of the study are shown in Table 6 below. * The below results are with an increase of 2.3 seconds to the Projected AM/PM signal phasing in the east/westbound directions from current conditions. Table 6 – Projected (2032) Level of Service for Study Area Summary of Projected 5-year Development (2032) Based upon the existing traffic conditions, with the planned development, and project 5-years our, in the AM and PM peak hours, the overall Level of Service performs at a level of service C. The main direction of traffic (North and South) has a Level of Service C, while the minor traffic (East and West) also has a Level of Service C. The above shown results, are with an increase of 2.1 seconds to the signal phasing in the east/westbound directions from current conditions, So, mitigation measures should be implemented to existing conditions. Recommended mitigation measures: - Increase the signal timing on the Moody Road flow of traffic. By adding 2.3 seconds to the Moody Road flow a traffic with the street light, Moody Road improves to a Level of Service C, while 2nd East still functions at a Level of Service C or better with a slight increase in delay in all turn movements. Intersection Approach Proposed AM Proposed PM Projected AM Projected PM Delay LOS Delay LOS Delay LOS Delay LOS 2nd East / Moody Road EBL 37.5 D 35.6 D 30.6 C 30.4 C EBT/R 42.4 D 40.7 D 33.3 C 34.6 C WBL 53.3 D 46.3 D 33.3 C 33.7 C WBT/R 50.5 D 49.1 D 34.1 C 34.2 C NBL 10.7 B 15.9 B 13.6 B 16.5 B NBT 12.3 B 12.6 B 33.2 C 34.5 C NBR 12.4 B 12.7 B 33.7 C 34.9 C SBL 33.8 C 35.4 D 25.3 C 25.5 C SBT 8.8 A 10.8 B 16.4 B 20.6 C SBR 7.1 A 7.4 A 13.0 B 13.7 B Acc. 2 / Moody Rd EBLT 7.2 A 7.3 A 7.2 A 7.3 A WBTR 0.0 A 0.0 A 0.0 A 0.0 A SBLR 8.6 A 8.6 A 8.6 A 8.7 A Acc. 1 / Moody Rd EBLT 7.3 A 7.3 A 7.3 A 7.3 A WBTR 0.0 A 0.0 A 0.0 A 0.0 A SBLR 8.9 A 8.8 A 8.9 A 8.8 A Source: Delay times and LOS determined using Synchro 11. Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 26 To the west of the proposed development is a 90 degree bend in the roadway as Moody Rd turns into 5th West. There have been two accidents there. One was someone running into a fence and the other is loss of control at the turn at nighttime. The existing conditions should provide the mitigation measure(s) below: Recommended mitigation measures: - Widen Moody Road along the projects frontage to the full right of way width. - Move or add a ‘Yield Left Turn 15 MPH’ sign closer to the turn at Moody Rd and 1000 West. It is currently 575’ from the turn. An additional sign should be added 150’ from the turn. - Street lights may also help mitigate the turn and should be implemented. Conclusion Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 27 The proposed Moody Townhomes development is located at N 5th West & Moody Road in Rexburg, ID. The main access into the development is from the Moody Rd (2000 North) and 2nd East intersection. The Moody Townhome development will consist of 137 townhome units and will be completed in one single phase. It is estimated that the development will be open by late 2027. After a full analysis of these roadways, intersections, accesses and this proposed development, the overall Level of Service in the AM and PM peak hours at the studied intersection and accesses will perform at an acceptable level of service with only a slight increase of delay, as long as a few mitigation measures are implemented. Those recommendations are below. Recommendations Recommended mitigation measures: • Increase the signal timing on the Moody Road flow of traffic. By year 2032, adding 2.3 seconds to the street light along the Moody Road flow, Moody Road and 2nd East will operate at a Level of Service C or better • Widen Moody Road to the full right of way widths along their frontage. This will allow the proper turning movements at the accesses into the development. • Move or add a ‘Yield Left Turn 15 MPH’ sign closer to the turn at Moody Rd and 1000 West. It is currently 575’ from the turn. An additional sign should be added 150’ from the turn. • Street lights may also help mitigate the turn at Moody Rd/1000 West and should be implemented. No other mitigation measures are required per the information found in this report. Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 28 Appendix 90 102 101131132127128 686763625354525146453738 34 85 84 83 82 80 79 78 77 76 74 73 72 71 70 95 96 91 92 93 86 87 88 111 110 109 107 106 105 104 137 136 103 49 50 585755564847434442 1 9810099 3 2 8 7 6 5 4 13 12 11 10 9 18 17 16 15 14 23 22 21 20 19 28 27 26 25 24 33 32 31 30 29 41 36 35 126 125 124 123 122 121 120 119 118 117 116 115 114 113 112 129 130 133 134 135 108 94 97 89 81 75 69 39 40 59 60 61 64 65 66 N0°17'01"W 16.73' R=8474.37' L=215.42' Δ=1°27'23" CH=N53°12'12"E 215.41' N53°5 5 ' 5 3 " E 1 4 5 8 . 2 6 ' S0 ° 0 0 ' 0 8 " E 7 5 . 4 0 ' S53°5 9 ' 3 7 " W 3 3 4 . 5 4 ' S0 ° 2 5 ' 2 9 " E 7 2 5 . 5 0 ' S89°38'36"W 1085.92' N0°17'01"W 39.50' 270.00' S89°38'36"W 2674.47' S0 ° 2 1 ' 2 4 " E 44 . 1 5 ' R=35.00' L=33.16' Δ=54°17'17" CH=N26°47'14"E 31.94' N53°5 5 ' 5 3 " E 7 6 3 . 5 6 ' S89°38'36"W 829.91' R=34.50' L=54.19' Δ=90°00'00" CH=S44°38'36"W 48.79' S0 ° 2 1 ' 2 4 " E 51 . 5 0 ' S0 ° 2 1 ' 2 4 " E 4 1 4 . 8 0 ' S0 ° 2 5 ' 2 9 " E 4 6 2 . 7 8 ' 370.99'186.92'86.00'186.00' 229.5 3 ' 95.07 ' 438.9 7 ' 32 8 . 8 0 ' 86 . 0 0 ' S53° 5 5 ' 5 3 " W 1 1 0 . 0 0 ' S53°5 5 ' 5 3 " W 1 1 0 . 0 0 ' S53°5 5 ' 5 3 " W 1 1 0 . 0 0 ' S0 ° 2 1 ' 2 4 " E 6 6 . 0 0 ' S89°38'36"W 88.00'S89°38'36"W 88.00' S0 ° 2 5 ' 2 9 " E 1 1 0 . 0 0 ' S0 ° 2 5 ' 2 9 " E 8 8 . 0 0 ' S0 ° 2 5 ' 2 9 " E 6 6 . 0 0 ' S89°38'36"W 110.00'S0 ° 2 5 ' 2 9 " E 1 3 2 . 0 0 ' S0 ° 2 5 ' 2 9 " E 1 3 2 . 0 0 ' S0 ° 2 5 ' 2 9 " E 1 1 0 . 0 0 ' S89°38'36"W 110.00'S89°38'36"W 110.00'S89°38'36"W 132.00'S89°38'36"W 132.00'S89°38'36"W 110.00'S89°38'36"W 110.00' N89°38'36"E 66.00'N53° 5 5 ' 5 3 " E 1 1 0 . 0 0 ' N53°5 5 ' 5 3 " E 1 1 0 . 0 0 ' N53°5 5 ' 5 3 " E 1 1 0 . 0 0 ' N53° 5 5 ' 5 3 " E 1 1 0 . 0 0 ' N53°5 5 ' 5 3 " E 1 1 0 . 0 0 ' N53°5 5 ' 5 3 " E 6 6 . 0 0 ' N 3 6 ° 0 4 ' 0 7 " W 4 6 . 0 0 ' N89°34'31"E 46.00' S0°21'24"E 46.00' N0°21'24"W 46.00' N 3 6 ° 0 4 ' 0 7 " W 4 6 . 0 0 ' S0 ° 2 1 ' 2 4 " E 46 . 0 0 ' S0 ° 2 1 ' 2 4 " E 46 . 0 0 ' N89°34'31"E 46.00' N89°38'36"E 46.00' N0 ° 2 1 ' 2 4 " W 46 . 0 0 ' 2 0 . 0 ' 2 0 . 0 ' 20 . 0 ' 20 . 0 ' 20 . 0 ' 20 . 0 ' 20 . 0 ' 20 . 0 ' 20.0' 20.0'20.0' 20.0' S0 ° 2 1 ' 2 4 " E 2 2 . 0 0 ' S0 ° 2 1 ' 2 4 " E 2 2 . 0 0 ' N89°38'36"E 46.00' N53°55'53"E 110.00' REV.DESCRIPTION BYDATE Designed: Date: Drawn: Proj. No. PROJECT INFORMATION 10 / 10 / 2025 186 - 01 VERIFY SCALES BAR IS ONE INCH ON ORIGINAL DRAWING IF NOT ONE INCH ON THIS SHEET, ADJUST SCALES ACCORDINGLY 1" PROJECT TITLE SHEET NO. SHEET TITLE Approved:T. HUNTN 5TH WEST & MOODY ROAD REXBURG, MADISON COUNTY, ID 0" SEAL HU N T D A Y _ 1 C: \ U s e r s \ H u n t D a y _ 1 \ H u n t D a y D r o p b o x \ P r o j e c t s \ 1 8 6 - 0 1 _ M o o d y T o w n h o m e s \ 0 0 - C A D \ 0 1 - A u t o C A D \ P R E L I M I N A R Y P L A T 10 / 3 0 / 2 0 2 5 1 1 : 2 8 A M MOODY TOWNHOMES LOCATED IN THE SOUTHWEST QUART OF SECTION 7, TOWNSHIP 6 NORTH, RANGE 40 EAST, BOISE MERIDIAN T. PRIDEMORE T. HUNT 3445 ANTELOPE DRIVE, ST 200 SYRACUSE, UT 84075 PH: 801.664.4724 EM: THOMAS@HUNTDAY.CO HUNT DAY E N G I N E E R I N G VICINITY MAP W N E S Scale: 1" = 60' 60 0 60 120 180 SITUATED IN THE STATE OF IDAHO, COUNTY OF MADISON, BEING PART OF SECTION 7, TOWNSHIP 6 NORTH, RANGE 40 EAST, OF B.M., BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT A BRASS CAP FOUND MARKING THE SOUTH WEST CORNER OF SAID SECTION 7, SAID POINT BEING THE POINT OF BEGINNING; THENCE NORTH 00°17'01" WEST, A DISTANCE OF 56.23 FEET TO A REBAR WITH A PLASTIC CAP SET, STAMPED "PLS 13856"; THENCE ALONG A NON TANGENT CURVE TO THE RIGHT, HAVING A DELTA ANGLE 01°27'23", A RADIUS OF 8,474.37 FEET, AN ARC LENGTH OF 215.42 FEET, WITH A CHORD BEARING OF NORTH 53°12'12" EAST, AND A CHORD LENGTH OF 215.41 FEET; THENCE NORTH 53°55'53" EAST, A DISTANCE OF 1,458.26 FEET TO A REBAR WITH A PLASTIC CAP FOUND, STAMPED "PLS 13856"; THENCE SOUTH 00°00'08" EAST, A DISTANCE OF 75.40 FEET TO A REBAR WITH A PLASTIC CAP SET, STAMPED "PLS 13856"; THENCE SOUTH 53°59'37" WEST, A DISTANCE OF 334.54 FEET TO A REBAR WITH A PLASTIC CAP SET, STAMPED "PLS 13856"; THENCE SOUTH 00°25'29" EAST, A DISTANCE OF 765.00 FEET TO A PK MAG NAIL SET; THENCE SOUTH 89°38'36" WEST, A DISTANCE OF 1,086.02 FEET TO THE POINT OF BEGINNING. CONTAINING 11.67 ACRES OF LAND, MORE OR LESS. DEED DESCRIPTION DEVELOPER TEAM S.L. COUNTY MONUMENT AS NOTED SET REBAR AND CAP BOUNDARY LINE ADJACENT PARCEL SECTION LINE EASEMENT LEGEND MOODY TOWNHOMES PRELIMINARY PLAT LOCATED IN THE SOUTHWEST QUART OF SECTION 7, TOWNSHIP 6 NORTH, RANGE 40 EAST, BOISE MERIDIAN CITY OF REXBURG, MADISON COUNTY, ID NOVEMBER 2025 PROJECT SITE DEVELOPER: UTAH DEVELOPMENT GROUP 10808 S. RIVER FRONT PARKWAY, SUITE 300 SOUTH JORDAN, UTAH 84095 (801) 641-8956 SURVEYOR: LAYTON SURVEYS ATTN: WILLIS D. LONG 837 SOUTH 500 WEST, STE 201, WOODS CROSS, UT 84015 (801) 663-1641 CIVIL ENGINEER: HUNT DAY ENGINEERING ATTN: THOMAS HUNT, PE 3445 ANTELOPE DRIVE SYRACUSE, UT 84075 (801) 664-4724 GEOTECHNICAL ENGINEER: ROCKSMITH ENGINEERING 2426 DIAMOND H LANE REXBURG, ID 83440 (801) 556-6407 SOUTH QUARTER CORNER SEC. 7, T6N, R40E, B.M. FOUND BRASS CAP IN. 404616MOODY ROAD 79-FT PUBLIC RIGHT-OF-WAY SOUTHWEST CORNER SEC. 7, T6N, R40E, B.M. FND 3" BRASS MON @ W EDGE OF BRIDGE IN. 268004 POINT OF BEGINNING CA L L F A M I L Y T R U S T U / A PA R C E L ʌ R P 0 6 N 4 0 E 0 7 6 1 6 9 }O N E ʌ T * A HIGH W A Y 2 0 PUBL I C R I G H T - O F - W A Y ( W I D T H V A R I E S ) TETO N I S L A N D C A N A L SET RBC PLS "20907" FOUND RBC "TVS PLS 13856" FOUND RBC "TVS PLS 13856" SET RBC PLS "20907" SET RBC PLS "20907" SET RBC PLS "20907" SET RBC PLS "20907" SET RBC PLS "20907" EX 80-FT CANAL EASEMENT PRIVATE ROAD - A PRIV A T E R O A D - B PR I V A T E R O A D - 2 PR I V A T E R O A D - 3 PRIVATE ROAD - 1 SUB9ECT PROPERTY SHIRLEY SUBDIVISION, BLOCK 1 465,560 SQ FT / 10.69 AC 2nd East / Moody Rd Moody Townhomes AM Existing 03/24/2026 AM EXISTING 1:53 pm 03/16/2026 Baseline Synchro 12 Report Hunt Day Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 10 4 8 209 2 138 5 876 229 152 575 3 Future Volume (veh/h) 10 4 8 209 2 138 5 876 229 152 575 3 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1863 1863 1900 1863 1863 1863 Adj Flow Rate, veh/h 11 4 9 227 2 150 5 952 249 165 625 3 Adj No. of Lanes 1 1 0 1 1 0 1 2 0 1 2 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 259 96 215 387 4 294 525 1830 477 282 2330 1042 Arrive On Green 0.04 0.19 0.19 0.04 0.19 0.19 0.66 0.66 0.66 0.66 0.66 0.66 Sat Flow, veh/h 1774 511 1149 1774 21 1566 795 2779 725 464 3539 1583 Grp Volume(v), veh/h 11 0 13 227 0 152 5 605 596 165 625 3 Grp Sat Flow(s),veh/h/ln 1774 0 1660 1774 0 1586 795 1770 1735 464 1770 1583 Q Serve(g_s), s 0.6 0.0 0.8 5.0 0.0 10.3 0.3 21.3 21.4 34.5 8.8 0.1 Cycle Q Clear(g_c), s 0.6 0.0 0.8 5.0 0.0 10.3 9.1 21.3 21.4 55.9 8.8 0.1 Prop In Lane 1.00 0.69 1.00 0.99 1.00 0.42 1.00 1.00 Lane Grp Cap(c), veh/h 259 0 311 387 0 297 525 1165 1142 282 2330 1042 V/C Ratio(X) 0.04 0.00 0.04 0.59 0.00 0.51 0.01 0.52 0.52 0.58 0.27 0.00 Avail Cap(c_a), veh/h 259 0 311 387 0 297 525 1165 1142 282 2330 1042 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 36.3 0.0 39.9 42.0 0.0 43.8 10.4 10.6 10.7 25.2 8.5 7.0 Incr Delay (d2), s/veh 0.3 0.0 0.3 6.4 0.0 6.2 0.0 1.7 1.7 8.6 0.3 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.0 0.4 5.1 0.0 5.0 0.1 10.8 10.6 5.1 4.3 0.0 LnGrp Delay(d), s/veh 36.6 0.0 40.2 48.4 0.0 50.0 10.4 12.3 12.4 33.8 8.8 7.0 LnGrp LOS D D D D B B B C A Approach Vol, veh/h 24 379 1206 793 Approach Delay, s/veh 38.6 49.0 12.3 14.0 Approach LOS D D B B Timer 1 2 3 4 5 6 7 8 Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 83.5 9.5 27.0 83.5 9.5 27.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 79.0 5.0 18.0 79.0 5.0 22.5 Max Q Clear Time (g_c+I1), s 23.4 7.0 2.8 57.9 2.6 12.3 Green Ext Time (p_c), s 10.9 0.0 0.0 6.6 0.0 0.5 Intersection Summary HCM 2010 Ctrl Delay, s/veh 18.9 HCM 2010 LOS B 2nd East / Moody Rd Moody Townhomes PM Existing 03/24/2026 PM EXISTING 3:00 pm 03/24/2026 Baseline Synchro 12 Report Hunt Day Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 8 6 10 239 6 158 8 826 242 162 925 8 Future Volume (veh/h) 8 6 10 239 6 158 8 826 242 162 925 8 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1863 1863 1900 1863 1863 1863 Adj Flow Rate, veh/h 9 7 11 260 7 172 9 898 263 176 1005 9 Adj No. of Lanes 1 1 0 1 1 0 1 2 0 1 2 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 235 123 193 382 12 287 349 1779 520 295 2330 1042 Arrive On Green 0.04 0.19 0.19 0.04 0.19 0.19 0.66 0.66 0.66 0.66 0.66 0.66 Sat Flow, veh/h 1774 654 1028 1774 62 1530 554 2703 790 482 3539 1583 Grp Volume(v), veh/h 9 0 18 260 0 179 9 587 574 176 1005 9 Grp Sat Flow(s),veh/h/ln 1774 0 1681 1774 0 1593 554 1770 1723 482 1770 1583 Q Serve(g_s), s 0.5 0.0 1.1 5.0 0.0 12.3 0.9 20.4 20.5 35.4 16.3 0.2 Cycle Q Clear(g_c), s 0.5 0.0 1.1 5.0 0.0 12.3 17.2 20.4 20.5 55.8 16.3 0.2 Prop In Lane 1.00 0.61 1.00 0.96 1.00 0.46 1.00 1.00 Lane Grp Cap(c), veh/h 235 0 315 382 0 299 349 1165 1135 295 2330 1042 V/C Ratio(X) 0.04 0.00 0.06 0.68 0.00 0.60 0.03 0.50 0.51 0.60 0.43 0.01 Avail Cap(c_a), veh/h 235 0 315 382 0 299 349 1165 1135 295 2330 1042 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 36.5 0.0 40.0 43.4 0.0 44.6 13.9 10.5 10.5 24.8 9.8 7.0 Incr Delay (d2), s/veh 0.3 0.0 0.3 9.4 0.0 8.6 0.1 1.6 1.6 8.6 0.6 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.0 0.5 6.7 0.0 6.1 0.2 10.3 10.1 5.4 8.0 0.1 LnGrp Delay(d), s/veh 36.8 0.0 40.4 52.9 0.0 53.2 14.0 12.0 12.1 33.4 10.4 7.1 LnGrp LOS D D D D B B B C B A Approach Vol, veh/h 27 439 1170 1190 Approach Delay, s/veh 39.2 53.0 12.1 13.7 Approach LOS D D B B Timer 1 2 3 4 5 6 7 8 Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 83.5 9.5 27.0 83.5 9.5 27.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 79.0 5.0 18.0 79.0 5.0 22.5 Max Q Clear Time (g_c+I1), s 22.5 7.0 3.1 57.8 2.5 14.3 Green Ext Time (p_c), s 10.5 0.0 0.0 9.8 0.0 0.6 Intersection Summary HCM 2010 Ctrl Delay, s/veh 19.4 HCM 2010 LOS B 2nd East / Moody Rd Moody Townhomes AM Proposed 03/24/2026 AM Synchro 12 Report Hunt Day Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 24 18 36 209 7 138 15 876 229 152 575 7 Future Volume (veh/h) 24 18 36 209 7 138 15 876 229 152 575 7 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1863 1863 1900 1863 1863 1863 Adj Flow Rate, veh/h 26 20 39 227 8 150 16 952 249 165 625 8 Adj No. of Lanes 1 1 0 1 1 0 1 2 0 1 2 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 254 106 207 345 15 284 523 1830 477 282 2330 1042 Arrive On Green 0.04 0.19 0.19 0.04 0.19 0.19 0.66 0.66 0.66 0.66 0.66 0.66 Sat Flow, veh/h 1774 565 1103 1774 81 1515 791 2779 725 464 3539 1583 Grp Volume(v), veh/h 26 0 59 227 0 158 16 605 596 165 625 8 Grp Sat Flow(s),veh/h/ln 1774 0 1668 1774 0 1595 791 1770 1735 464 1770 1583 Q Serve(g_s), s 1.4 0.0 3.6 5.0 0.0 10.7 1.0 21.3 21.4 34.5 8.8 0.2 Cycle Q Clear(g_c), s 1.4 0.0 3.6 5.0 0.0 10.7 9.8 21.3 21.4 55.9 8.8 0.2 Prop In Lane 1.00 0.66 1.00 0.95 1.00 0.42 1.00 1.00 Lane Grp Cap(c), veh/h 254 0 313 345 0 299 523 1165 1142 282 2330 1042 V/C Ratio(X) 0.10 0.00 0.19 0.66 0.00 0.53 0.03 0.52 0.52 0.58 0.27 0.01 Avail Cap(c_a), veh/h 254 0 313 345 0 299 523 1165 1142 282 2330 1042 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 36.7 0.0 41.1 43.9 0.0 44.0 10.5 10.6 10.7 25.2 8.5 7.0 Incr Delay (d2), s/veh 0.8 0.0 1.3 9.5 0.0 6.5 0.1 1.7 1.7 8.6 0.3 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 0.0 1.8 5.6 0.0 5.3 0.2 10.8 10.6 5.1 4.3 0.1 LnGrp Delay(d), s/veh 37.5 0.0 42.4 53.3 0.0 50.5 10.7 12.3 12.4 33.8 8.8 7.1 LnGrp LOS D D D D B B B C A A Approach Vol, veh/h 85 385 1217 798 Approach Delay, s/veh 40.9 52.2 12.3 13.9 Approach LOS D D B B Timer 1 2 3 4 5 6 7 8 Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 83.5 9.5 27.0 83.5 9.5 27.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 79.0 5.0 18.0 79.0 5.0 22.5 Max Q Clear Time (g_c+I1), s 23.4 7.0 5.6 57.9 3.4 12.7 Green Ext Time (p_c), s 11.1 0.0 0.2 6.6 0.0 0.5 Intersection Summary HCM 2010 Ctrl Delay, s/veh 20.0 HCM 2010 LOS B 1:53 pm 03/16/2026 Baseline PROPOSED 9: Moody Rd & Acc. 2 Moody Townhomes AM Proposed 04/21/2026 AM PROPOSED_1 1:53 pm 03/16/2026 Baseline Synchro 12 Report Hunt Day Page 1 Intersection Int Delay, s/veh 5.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 4 3 5 20 1 Future Vol, veh/h 1 4 3 5 20 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 4 3 5 22 1 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 8 0 - 0 12 6 Stage 1 - - - - 6 - Stage 2 - - - - 6 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1612 - - - 1008 1077 Stage 1 - - - - 1017 - Stage 2 - - - - 1017 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1612 - - - 1007 1077 Mov Cap-2 Maneuver - - - - 1007 - Stage 1 - - - - 1016 - Stage 2 - - - - 1017 - Approach EB WB SB HCM Ctrl Dly, s/v 1.4 0 8.6 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1612 - - - 1010 HCM Lane V/C Ratio 0.001 - - - 0.023 HCM Ctrl Dly (s/v) 7.2 0 - - 8.6 HCM Lane LOS A A - - A HCM 95th %tile Q(veh) 0 - - - 0.1 11: Moody Rd & Acc. 1 Moody Townhomes AM Proposed 04/21/2026 AM PROPOSED_1 1:53 pm 03/16/2026 Baseline Synchro 12 Report Hunt Day Page 2 Intersection Int Delay, s/veh 4.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 23 7 12 34 1 Future Vol, veh/h 1 23 7 12 34 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 25 8 13 37 1 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 21 0 - 0 42 15 Stage 1 - - - - 15 - Stage 2 - - - - 27 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1595 - - - 969 1065 Stage 1 - - - - 1008 - Stage 2 - - - - 996 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1595 - - - 968 1065 Mov Cap-2 Maneuver - - - - 968 - Stage 1 - - - - 1007 - Stage 2 - - - - 996 - Approach EB WB SB HCM Ctrl Dly, s/v 0.3 0 8.9 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1595 - - - 971 HCM Lane V/C Ratio 0.001 - - - 0.039 HCM Ctrl Dly (s/v) 7.3 0 - - 8.9 HCM Lane LOS A A - - A HCM 95th %tile Q(veh) 0 - - - 0.1 2nd East / Moody Rd Moody Townhomes PM Proposed 03/24/2026 PM PROPOSED 4:06 pm 03/24/2026 Baseline Synchro 12 Report Hunt Day Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 16 14 26 239 19 158 34 826 242 162 925 21 Future Volume (veh/h) 16 14 26 239 19 158 34 826 242 162 925 21 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1863 1863 1900 1863 1863 1863 Adj Flow Rate, veh/h 17 15 28 260 21 172 37 898 263 176 1005 23 Adj No. of Lanes 1 1 0 1 1 0 1 2 0 1 2 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 248 95 178 395 34 280 334 1720 503 285 2252 1008 Arrive On Green 0.05 0.16 0.16 0.08 0.20 0.20 0.64 0.64 0.64 0.64 0.64 0.64 Sat Flow, veh/h 1774 583 1088 1774 175 1434 546 2703 790 482 3539 1583 Grp Volume(v), veh/h 17 0 43 260 0 193 37 587 574 176 1005 23 Grp Sat Flow(s),veh/h/ln 1774 0 1671 1774 0 1610 546 1770 1723 482 1770 1583 Q Serve(g_s), s 0.8 0.0 2.4 8.5 0.0 12.1 4.1 19.9 20.0 34.5 15.9 0.6 Cycle Q Clear(g_c), s 0.8 0.0 2.4 8.5 0.0 12.1 19.9 19.9 20.0 54.5 15.9 0.6 Prop In Lane 1.00 0.65 1.00 0.89 1.00 0.46 1.00 1.00 Lane Grp Cap(c), veh/h 248 0 273 395 0 315 334 1126 1097 285 2252 1008 V/C Ratio(X) 0.07 0.00 0.16 0.66 0.00 0.61 0.11 0.52 0.52 0.62 0.45 0.02 Avail Cap(c_a), veh/h 248 0 273 395 0 315 334 1126 1097 285 2252 1008 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 35.1 0.0 39.5 37.9 0.0 40.5 15.2 10.9 10.9 25.7 10.2 7.4 Incr Delay (d2), s/veh 0.5 0.0 1.2 8.3 0.0 8.7 0.7 1.7 1.8 9.7 0.6 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.0 1.2 4.1 0.0 6.1 0.7 10.2 9.9 5.3 7.9 0.3 LnGrp Delay(d), s/veh 35.6 0.0 40.7 46.3 0.0 49.1 15.9 12.6 12.7 35.4 10.8 7.4 LnGrp LOS D D D D B B B D B A Approach Vol, veh/h 60 453 1198 1204 Approach Delay, s/veh 39.3 47.5 12.8 14.3 Approach LOS D D B B Timer 1 2 3 4 5 6 7 8 Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 74.5 13.0 22.5 74.5 9.5 26.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 70.0 8.5 18.0 70.0 5.0 21.5 Max Q Clear Time (g_c+I1), s 22.0 10.5 4.4 56.5 2.8 14.1 Green Ext Time (p_c), s 10.9 0.0 0.1 7.5 0.0 0.6 Intersection Summary HCM 2010 Ctrl Delay, s/veh 19.3 HCM 2010 LOS B 9: Moody Rd & Acc. 2 Moody Townhomes PM Proposed 04/21/2026 PM PROPOSED 4:06 pm 03/24/2026 Baseline Synchro 12 Report Hunt Day Page 1 Intersection Int Delay, s/veh 2.8 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 5 5 15 10 1 Future Vol, veh/h 1 5 5 15 10 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 5 5 16 11 1 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 21 0 - 0 20 13 Stage 1 - - - - 13 - Stage 2 - - - - 7 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1595 - - - 997 1067 Stage 1 - - - - 1010 - Stage 2 - - - - 1016 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1595 - - - 996 1067 Mov Cap-2 Maneuver - - - - 996 - Stage 1 - - - - 1009 - Stage 2 - - - - 1016 - Approach EB WB SB HCM Ctrl Dly, s/v 1.2 0 8.6 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1595 - - - 1002 HCM Lane V/C Ratio 0.001 - - - 0.012 HCM Ctrl Dly (s/v) 7.3 0 - - 8.6 HCM Lane LOS A A - - A HCM 95th %tile Q(veh) 0 - - - 0 11: Moody Rd & Acc. 1 Moody Townhomes PM Proposed 04/21/2026 PM PROPOSED 4:06 pm 03/24/2026 Baseline Synchro 12 Report Hunt Day Page 2 Intersection Int Delay, s/veh 2.6 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 14 4 35 20 1 Future Vol, veh/h 1 14 4 35 20 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 15 4 38 22 1 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 42 0 - 0 40 23 Stage 1 - - - - 23 - Stage 2 - - - - 17 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1567 - - - 972 1054 Stage 1 - - - - 1000 - Stage 2 - - - - 1006 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1567 - - - 971 1054 Mov Cap-2 Maneuver - - - - 971 - Stage 1 - - - - 999 - Stage 2 - - - - 1006 - Approach EB WB SB HCM Ctrl Dly, s/v 0.5 0 8.8 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1567 - - - 975 HCM Lane V/C Ratio 0.001 - - - 0.023 HCM Ctrl Dly (s/v) 7.3 0 - - 8.8 HCM Lane LOS A A - - A HCM 95th %tile Q(veh) 0 - - - 0.1 3: 2nd East & Moody Road Moody Townhomes AM Projected (2032) 04/23/2026 AM Projected 2032 9:19 am 04/23/2026 Baseline Synchro 12 Report Hunt Day Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 24 18 36 209 18 138 15 876 229 152 575 7 Future Volume (veh/h) 24 18 36 209 18 138 15 876 229 152 575 7 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1863 1863 1900 1863 1863 1863 Adj Flow Rate, veh/h 27 20 40 234 20 154 17 981 256 170 644 8 Adj No. of Lanes 1 1 0 1 1 0 1 2 0 1 2 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 323 101 201 445 42 324 456 1215 316 316 1738 777 Arrive On Green 0.05 0.18 0.18 0.10 0.23 0.23 0.05 0.44 0.44 0.10 0.49 0.49 Sat Flow, veh/h 1774 556 1111 1774 185 1426 1774 2781 723 1774 3539 1583 Grp Volume(v), veh/h 27 0 60 234 0 174 17 623 614 170 644 8 Grp Sat Flow(s),veh/h/ln 1774 0 1667 1774 0 1611 1774 1770 1735 1774 1770 1583 Q Serve(g_s), s 1.2 0.0 3.1 9.7 0.0 9.4 0.5 30.6 30.8 4.6 11.3 0.3 Cycle Q Clear(g_c), s 1.2 0.0 3.1 9.7 0.0 9.4 0.5 30.6 30.8 4.6 11.3 0.3 Prop In Lane 1.00 0.67 1.00 0.89 1.00 0.42 1.00 1.00 Lane Grp Cap(c), veh/h 323 0 302 445 0 366 456 773 758 316 1738 777 V/C Ratio(X) 0.08 0.00 0.20 0.53 0.00 0.48 0.04 0.81 0.81 0.54 0.37 0.01 Avail Cap(c_a), veh/h 323 0 302 445 0 366 456 773 758 316 1738 777 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 30.1 0.0 34.8 28.9 0.0 33.5 13.4 24.5 24.5 18.9 15.8 13.0 Incr Delay (d2), s/veh 0.5 0.0 1.5 4.4 0.0 4.4 0.2 8.8 9.1 6.4 0.6 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.0 1.5 1.4 0.0 4.6 0.3 16.8 16.6 2.8 5.6 0.1 LnGrp Delay(d), s/veh 30.6 0.0 36.3 33.3 0.0 37.9 13.6 33.2 33.7 25.3 16.4 13.0 LnGrp LOS C C B C C C B B Approach Vol, veh/h 87 408 1254 822 Approach Delay, s/veh 33.2 18.2 Approach LOS C D C B Timer 1 2 3 4 5 6 7 8 Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 15.0 48.2 14.2 22.6 9.6 53.6 9.6 27.2 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 10.5 43.7 9.7 18.1 5.1 49.1 5.1 22.7 Max Q Clear Time (g_c+I1), s 6.6 32.8 11.7 5.1 2.5 13.3 3.2 11.4 Green Ext Time (p_c), s 0.1 5.9 0.0 0.2 0.0 4.8 0.0 0.7 Intersection Summary HCM 2010 Ctrl Delay, s/veh 28.8 HCM 2010 LOS C C 33.3 1 4. 33. 1 C 33.2 33 4.8 C 9: Moody Rd & Acc. 2 Moody Townhomes AM Projected (2032) 04/23/2026 AM Projected 2032 9:19 am 04/23/2026 Baseline Synchro 12 Report Hunt Day Page 2 Intersection Int Delay, s/veh 5.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 4 3 5 20 1 Future Vol, veh/h 1 4 3 5 20 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 4 3 6 22 1 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 9 0 - 0 12 6 Stage 1 - - - - 6 - Stage 2 - - - - 6 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1611 - - - 1008 1077 Stage 1 - - - - 1017 - Stage 2 - - - - 1017 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1611 - - - 1007 1077 Mov Cap-2 Maneuver - - - - 1007 - Stage 1 - - - - 1016 - Stage 2 - - - - 1017 - Approach EB WB SB HCM Ctrl Dly, s/v 1.4 0 8.6 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1611 - - - 1010 HCM Lane V/C Ratio 0.001 - - - 0.023 HCM Ctrl Dly (s/v) 7.2 0 - - 8.6 HCM Lane LOS A A - - A HCM 95th %tile Q(veh) 0 - - - 0.1 11: Moody Rd & Acc. 1 Moody Townhomes AM Projected (2032) 04/23/2026 AM Projected 2032 9:19 am 04/23/2026 Baseline Synchro 12 Report Hunt Day Page 3 Intersection Int Delay, s/veh 4.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 23 7 12 34 1 Future Vol, veh/h 1 23 7 12 34 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 26 8 13 38 1 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 21 0 - 0 43 15 Stage 1 - - - - 15 - Stage 2 - - - - 28 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1595 - - - 968 1065 Stage 1 - - - - 1008 - Stage 2 - - - - 995 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1595 - - - 967 1065 Mov Cap-2 Maneuver - - - - 967 - Stage 1 - - - - 1007 - Stage 2 - - - - 995 - Approach EB WB SB HCM Ctrl Dly, s/v 0.3 0 8.9 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1595 - - - 970 HCM Lane V/C Ratio 0.001 - - - 0.04 HCM Ctrl Dly (s/v) 7.3 0 - - 8.9 HCM Lane LOS A A - - A HCM 95th %tile Q(veh) 0 - - - 0.1 3: 2nd East & Moody Road Moody Townhomes PM Projected (2032) 04/23/2026 PM Projected 2032 9:20 am 04/23/2026 Baseline Synchro 12 Report Hunt Day Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 16 14 26 239 19 158 34 826 242 162 925 21 Future Volume (veh/h) 16 14 26 239 19 158 34 826 242 162 925 21 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1863 1863 1900 1863 1863 1863 Adj Flow Rate, veh/h 18 16 29 268 21 177 38 925 271 181 1036 24 Adj No. of Lanes 1 1 0 1 1 0 1 2 0 1 2 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 314 107 194 475 40 341 304 1130 330 329 1706 763 Arrive On Green 0.05 0.18 0.18 0.11 0.24 0.24 0.05 0.42 0.42 0.12 0.48 0.48 Sat Flow, veh/h 1774 595 1078 1774 171 1438 1774 2703 790 1774 3539 1583 Grp Volume(v), veh/h 18 0 45 268 0 198 38 605 591 181 1036 24 Grp Sat Flow(s),veh/h/ln 1774 0 1673 1774 0 1609 1774 1770 1723 1774 1770 1583 Q Serve(g_s), s 0.8 0.0 2.3 10.7 0.0 10.7 1.2 30.2 30.4 5.1 21.4 0.8 Cycle Q Clear(g_c), s 0.8 0.0 2.3 10.7 0.0 10.7 1.2 30.2 30.4 5.1 21.4 0.8 Prop In Lane 1.00 0.64 1.00 0.89 1.00 0.46 1.00 1.00 Lane Grp Cap(c), veh/h 314 0 301 475 0 381 304 740 720 329 1706 763 V/C Ratio(X) 0.06 0.00 0.15 0.56 0.00 0.52 0.12 0.82 0.82 0.55 0.61 0.03 Avail Cap(c_a), veh/h 314 0 301 475 0 381 304 740 720 329 1706 763 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 30.1 0.0 34.5 28.9 0.0 33.2 15.6 25.7 25.8 19.0 19.0 13.6 Incr Delay (d2), s/veh 0.3 0.0 1.0 4.8 0.0 .0 0.8 9.7 10.2 6.5 1.6 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.0 1.1 1.8 0.0 .3 0.6 16.6 16.5 5.4 10.7 0.4 LnGrp Delay(d), s/veh 30.4 0.0 35.6 33.7 0.0 38.2 16.5 35.5 35.9 25.5 20.6 13.7 LnGrp LOS C C B C C B Approach Vol, veh/h 63 466 1234 1241 Approach Delay, s/veh 34.1 21.2 Approach LOS C D D C Timer 1 2 3 4 5 6 7 8 Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 16.0 46.3 15.2 22.5 9.6 52.7 9.5 28.2 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 11.5 41.8 10.7 18.0 5.1 48.2 5.0 23.7 Max Q Clear Time (g_c+I1), s 7.1 32.4 12.7 4.3 3.2 23.4 2.8 12.7 Green Ext Time (p_c), s 0.2 5.2 0.0 0.1 0.0 8.1 0.0 0.8 Intersection Summary HCM 2010 Ctrl Delay, s/veh 29.4 HCM 2010 LOS C .4 C C 35. .4 4. 4. 35. .4 C C 35. .4 34.1 C C 34. 0.4 9: Moody Rd & Acc. 2 Moody Townhomes PM Projected (2032) 04/23/2026 PM Projected 2032 9:20 am 04/23/2026 Baseline Synchro 12 Report Hunt Day Page 2 Intersection Int Delay, s/veh 2.8 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 5 5 15 10 1 Future Vol, veh/h 1 5 5 15 10 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 6 6 17 11 1 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 23 0 - 0 23 15 Stage 1 - - - - 15 - Stage 2 - - - - 8 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1592 - - - 993 1065 Stage 1 - - - - 1008 - Stage 2 - - - - 1015 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1592 - - - 992 1065 Mov Cap-2 Maneuver - - - - 992 - Stage 1 - - - - 1007 - Stage 2 - - - - 1015 - Approach EB WB SB HCM Ctrl Dly, s/v 1.2 0 8.7 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1592 - - - 998 HCM Lane V/C Ratio 0.001 - - - 0.012 HCM Ctrl Dly (s/v) 7.3 0 - - 8.7 HCM Lane LOS A A - - A HCM 95th %tile Q(veh) 0 - - - 0 11: Moody Rd & Acc. 1 Moody Townhomes PM Projected (2032) 04/23/2026 PM Projected 2032 9:20 am 04/23/2026 Baseline Synchro 12 Report Hunt Day Page 3 Intersection Int Delay, s/veh 2.6 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 14 4 35 20 1 Future Vol, veh/h 1 14 4 35 20 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 16 4 39 22 1 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 43 0 - 0 42 24 Stage 1 - - - - 24 - Stage 2 - - - - 18 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1566 - - - 969 1052 Stage 1 - - - - 999 - Stage 2 - - - - 1005 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1566 - - - 968 1052 Mov Cap-2 Maneuver - - - - 968 - Stage 1 - - - - 998 - Stage 2 - - - - 1005 - Approach EB WB SB HCM Ctrl Dly, s/v 0.5 0 8.8 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1566 - - - 972 HCM Lane V/C Ratio 0.001 - - - 0.024 HCM Ctrl Dly (s/v) 7.3 0 - - 8.8 HCM Lane LOS A A - - A HCM 95th %tile Q(veh) 0 - - - 0.1 Hunt Day Thomas Hunt, PE 3445 Antelope Drive Suite 200 Syracuse, UT 84050 801.664.4724