Loading...
HomeMy WebLinkAboutIFRO-26-0022 - 1 - CB Shop Subdivision - Approval Letter 900 N. Skyline Drive, Suite B Idaho Falls, ID 83402 • (208) 528-2650 Brad Little, Governor Jess Byrne, Director July 17, 2026 Dave Decker 2338 Southfork Cir. Sugar City, ID 83448 Email: 3ddevelopment@msn.com Subject: Approved for Construction – CB Shop – Thompson Farm Road, Water and Wastewater Improvements DEQ No. IFRO-26-0022 Dear Mr. Decker: The Idaho Department of Environmental Quality (DEQ) received plans and specifications entitled CB Shop – Thompson Farm Road, submitted by Wyatt Jenkins on July 8, 2026. The approved plans and specifications were sealed and signed by Jeff Freiberg, P.E. on February 10, 2022. The project generally includes water, wastewater, and stormwater. DEQ has reviewed the plans and specifications for general conformance with DEQ Rules 1 and determined it to be approved for construction subject to the following conditions: I. Standard Conditions: A. DEQ’s construction approval expires after one calendar year from the date of this letter. For construction to proceed beyond this date, an extension request or new plans and specifications must be submitted to DEQ for review and approval before construction may proceed. B. Any material deviations from the approved plans and specifications must be reviewed and approved by DEQ before construction. C. We attached a copy of the approved drawings for you. An additional copy has been sent to your engineer. The owner is required to maintain one copy of the approved plans and specifications and this DEQ approval letter on-site during construction at all times. The owner must ensure that the contractor, construction inspector, and certifying engineer are aware of the approval conditions. D. Construction must be inspected by an Idaho-licensed Professional Engineer, or designee, to the extent required to confirm material compliance with approved plans. An Idaho-licensed Professional Engineer representing the system must submit record drawings, or a statement of material compliance, to DEQ within 30 days after construction completion. E. This approval pertains only to drinking water and wastewater infrastructure and does not relieve the owner, engineer, or the contractor of the responsibility to comply with all current applicable federal, state, and local laws, rules, regulations, or ordinances. II. Sanitary Restrictions: A. DEQ recommends the release of sanitary restrictions for the parcels being served by this project. DEQ recommends that Public Health utilize the Example No. 4 Certificate of Approval on the 1 IDAPA 58.01.08 – Idaho Rules for Public Drinking Water Systems, IDAPA 58.01.16 – Wastewater Rules 2 plat, as shown below. CERTIFICATE OF APPROVAL Sanitary restrictions as required by Idaho Code, Title 50, Chapter 13 have been satisfied based on the Department of Environmental Quality (DEQ) approval of the design plans and specifications and the conditions imposed on the developer for continued satisfaction of the sanitary restrictions. Buyer is cautioned that at the time of this approval, no drinking water or sewer/septic facilities were constructed. Building construction can be allowed with appropriate building permits if drinking water or sewer facilities have since been constructed or if the developer is simultaneously constructing those facilities. If the developer fails to construct facilities or meet the other conditions of DEQ, then sanitary restrictions may be reimposed, in accordance with Section 50-1326, Idaho Code, by the issuance of a certificate of disapproval, and no construction of any building or shelter requiring drinking water or sewer/septic facilities shall be allowed.] III. Project-Specific Conditions: A. DEQ has not conducted design review for stormwater plans and specifications and has made no determination regarding whether the plans and specifications include appropriate best management practices (BMPs) to protect ground water and surface water quality. If the project is anticipated to disturb at least one acre of land, or is part of a larger project that disturbs one acre or more of land, the project must obtain coverage under the Idaho Pollution Discharge Elimination System (IPDES) Construction General Permit. Stormwater events that occur during construction should be managed according to the site specific Stormwater Pollution Prevention Plan, and other requirements of the General Permit. To submit a Notice of Intent for permit coverage under the Construction General Permit, apply online at http://www2.deq.idaho.gov/water/IPDES/. Please reference project IFRO-26-0022 when submitting any further correspondence regarding this project. If you have any questions regarding this letter or if we can be of further assistance, please call me at (208) 528-2650 or email me at carlin.feisthamel@deq.idaho.gov. Sincerely, Carlin Feisthamel, P.E. Regional Engineering Manager c: Troy Saffle, Regional Administrator, troy.saffle@deq.idaho.gov Steve Heath, Mountain West Engineering, steve@mwengr.com City of Rexburg, publicworks@rexburg.org Kellye Johnson, EIPHD, kjohnson@eiph.gov Jeremy Kirk, Building Safety Program Manager, DOPL, jeremy.kirk@dopl.idaho.gov