Loading...
HomeMy WebLinkAbout2026-03-17 LANDSCAPE & STRIPING PLAN (1)(p)(p)(p)(p)(p)(p)(p) (p ) (p ) (p ) (p ) (p ) (p ) (p ) (p ) SHEET INFORMATION REV #DESCRIPTION BY DATE SHEET REVISIONS DRAFTER: JPD, TRH DESIGNER: JPD REVIEWER: TLK PROJECT #: 2025011 CREATED: MARCH 2026 PLOTTED: 2026-03-17 ENGINEERING PAGE 23 OF 29 C-7.1UNIVERSITY TOWNE CENTER TC REXBURG INVESTMENTS LLC REXBURG, IDAHO PROJECT INFORMATION SHEET IDENTIFICATION SHEET # PROJECT SIGNAGE & STRIPING PLAN R E E N IGNELANOISSEFORP TSIGER S T A T E I DA H O D E RE 14952 T Y SON L . K N U D S E NOF 3/17/2026 SIGN LEGEND SIGN DESCRIPTION TRAFFIC FLOW ARROWS YIELD CROSSWALK WARNING ROUNDABOUT AHEAD WARNING ROAD NAME NOT USED ISLAND WARNING STOP SIGN 1 2 3 4 5 6 7 8 STRIPING LEGEND LINETYPE / SYMBOL DESCRIPTION 4" WHITE 4" YELLOW 4" WHITE BROKEN WHITE 4" COMBINATION SOLID AND BROKEN YELLOW 12" ROUNDABOUT ENTRY MARKING 2'/3' BROKEN WHITE 24" WHITE CROSSWALK (5' AND 10' WIDTHS ARE TYPICAL) 24" WHITE STOP BAR (15' WIDE) 6" WHITE CROSSWALK LINE A B C D E F G H YIELD 17' GAP8'8' 2'3' GAP2' Road Name 1 1.19 AC. 0 SCALE: 1" = 60'120' 60' 2 1.15 AC. 3 4.07 AC. 4 2.57 AC. 5 1.82 AC. 6 1.31 AC. 7 1.37 AC. 8 0.97 AC. 10 2.15 AC. YE L L O W S T O N E H I G H W A Y T A M A N A D R I V E M I K A N D R I V E ACCESS 3 A C C E S S 1 A C C E S S 2 DENTAL OFFICE TRUCK ACCESS PAD 3 PAD 4 PAD 5 PAD 6 PAD 7 PAD 8PAD 9 PAD 10 PAD 11 PAD 12 1326 13262626 1687 6 7 8 17 30 30 54 32 13 8 10 6 20 17 16 26' TYP 26' TYP 26' TYP 26' TYP 26' TYP 26' TYP 26' 12' 14' 26' 8' 18' 26' 26' 26' 35' 42.69' 26' 26'29.38' 26' 16' PARKING COUNTS LEGEND NAME GFA PARKING REQUIRED ACTUAL LOT 3 PAD 3 7,500 30 100 LOT 3 PAD 4 3,500 14 LOT 3 PAD 5 5,000 20 LOT 3 PAD 6 5,000 20 LOT 3 PAD 7 25,000 100 LOT 6 PAD 8 6,000 45 85 LOT 7 PAD 9 6,000 45 53 LOT 7 PAD 10 2,625 32 LOT 8 PAD 11 8,700 35 48 LOT 8 PAD 12 2,700 27 TOTAL 72,025 366 385 7 SHEET NOTES 1.TYPICAL PARKING STALLS ARE 10'x20' 2.HANDICAP STALLS ARE NOT SHOWN LEGEND SYMBOL / HATCH DESCRIPTION PARKING SPACE COUNT 12' WIDE MAIN PEDESTRIAN PATH 5' WIDE SECONDARY PEDESTRIAN PATH X 7 7 1 1 2 2 2 3 3 4 4 4 8 8 8 8 7 5 5 A A A A A B B B A B B BB B B B B B B B B B B B B B 5 D D 17' GAP8'8' C C C C A F F F F F F F F FF F F F G G G G B F F B 3 3 3 3 E E E B B A A B BB A D 0 SCALE: 1" = 50'100' 50' SHEET INFORMATION REV #DESCRIPTION BY DATE SHEET REVISIONS DRAFTER: JPD, TRH DESIGNER: JPD REVIEWER: TLK PROJECT #: 2025011 CREATED: MARCH 2026 PLOTTED: 2026-03-17 ENGINEERING PAGE 24 OF 29 C-7.2UNIVERSITY TOWNE CENTER TC REXBURG INVESTMENTS LLC REXBURG, IDAHO PROJECT INFORMATION SHEET IDENTIFICATION SHEET # LANDSCAPE PLAN R E E N IGNELANOISSEFORP TSIGER S T A T E I DA H O D E RE 14952 T Y SON L . K N U D S E NOF 3/17/2026 LEGEND & SCHEDULE SYMBOL / HATCH DESCRIPTION QUANTITY STELLA DE ORO DWARF DAYLILY +/- 226 PLANTINGS MOPS MUGO PINE +/- 231 PLANTINGS PRINCESS KAY PLUM +/- 22 PLANTINGS PARROTIA PERSIAN +/- 57 PLANTINGS 4" IRRIGATION SLEEVE +/-1,275 ft. NATIVE RE-VEGETATION AREAS +/- 0.19 ac. SODDED AREAS +/- 0.17 ac. GRAVEL OR BARKED AREAS +/- 0.92 ac. RETENTION POND +/- 0.05 ac. SHEET NOTES 1.LANDSCAPE AREAS WITHIN PUBLIC RIGHT-OF-WAY SHALL CONFORM WITH CITY OF REXBURG LANDSCAPE REQUIREMENTS. 2.WITHIN THE DEVELOPMENT ONE (1) TREE CAN BE SWAPPED FOR FIVE (5) SHRUBS AND VICE VERSA FOR REASONS SUCH AS MAINTAINING A CLEAR SIGHT TRIANGLE AND FOR ROOT CONCERNS ABOVE OR NEARBY UNDERGROUND UTILITIES. 3.THIS PLAN IS A HIGH LEVEL PLAN FOR THE DEVELOPMENT. A PAD SPECIFIC LANDSCAPE PLAN WILL BE SUBMITTED AS PART OF THE BUILDING PERMIT PROCESS. THESE PLANS SHOULD CONFORM ROUGHLY TO THE INFORMATION ON THIS PLAN. 4.WITHIN THE DEVELOPMENT THERE MAY BE AREAS THAT SHOW PLANTINGS, BUT UNDERGROUND INFRASTRUCTURE PROHIBITS THEM. IN THIS CASE THE LOST PLANTINGS SHOULD BE RELOCATED TO ANOTHER NEARBY AREA TO THE BEST EXTENT POSSIBLE. 5.FOR NATIVE RE-VEGETATION AREAS, BROADCAST NATIVE DROUGHT RESISTANT SEED WITH MULCH AND/OR NETTING AS REQUIRED TO STABILIZE THE SURFACE. 1 1.19 AC. 2 1.15 AC. 3 4.07 AC. 4 2.57 AC. 5 1.82 AC. 6 1.31 AC. 7 1.37 AC. 8 0.97 AC. 9 0.14 AC. 10 2.15 AC. PLANTING GROUPS A.ONE (1) TREE & FIVE (5) SHRUBS FOR EVERY 30 LINEAR FEET OF PLANTER STRIP. B.ONE (1) TREE C.FIVE (5) SHRUBS D.FOUR (4) SHRUBS E.ONE (1) TREE & FIVE (5) SHRUBS F.FIVE (5) SHRUBS FOR EVERY 30 LINEAR FEET OF PLANTER STRIP ALONG THE ROUNDABOUT. THIS IS TO KEEP A CLEAN LINE OF SIGHT BUT TO ALSO HELP REDUCE THE LIKELIHOOD OF ERRANT PEDESTRIAN TRAFFIC G.TWO (2) TREES & FIVE (5) SHRUBS H.THESE AREAS ARE LIKELY TO HAVE SPECIFIC RECREATIONAL AREAS DESIGNED AND BUILT IN THIS AREA. IF NOT THIS AREA WILL HAVE AT LEAST THE NUMBER OF TREES SHOWN. A A A A B B B BB B B B B B E B B B B B B C C C C C DD B B C D E E D F F F F G E H H H YE L L O W S T O N E H I G H W A Y T A M A N A D R I V E M I K A N D R I V E ACCESS 3 A C C E S S 1 A C C E S S 2 TRUCK ACCESS LANDSCAPE AREA BREAKDOWN LOT #LOT SIZE (S.F.) REQ. 10% LANDSCAPE (S.F.) ACTUAL LANDSCAPE (S.F.)ACTUAL % 3 177,238 17,724 12,428 7.0% 6 56,850 5,685 6,943 12.2% 7 59,812 5,981 11,050 18.5% 8 42,200 4,220 12,808 30.4% 9 6,092 609 1,791 29.4% 10 93,642 9,364 0 0.0% TOTAL 435,834 43,583 45,021 10.3% NOTE: LOTS 1, 2, 4, & 5 ARE NOT INCLUDING IN THE ABOVE TABLE AND WILL SUBMIT THEIR OWN LANDSCAPE PLAN AT THE BUILDING PERMIT PHASE MOPS MUGO PINESTELLA DE ORO DWARF DAYLILY PRINCESS KAY PLUM PARROTIA PERSIAN RETENTION POND