HomeMy WebLinkAboutRexburg Water Sewer and Sanitation Rate and Capitalization Fee Study Presentation_v21_with Notes
Council Workshop
Water, Sewer, and Sanitation Rate Study and Capitalization Fee Analysis
Angie Sanchez Virnoche, Principal
Angie Hammrich, Project Manager
CITY OF REXBURG
1
Overview
FCS retained to complete a Water, Sewer, and Sanitation Rate Study and a Capitalization Fee Analysis.
Multi-year financial plan providing a forward look at each system’s needs
Cost-of-Service Analysis and Rate Design for each system
Capitalization Fee Analysis for water and sewer.
Focus for today:
Overview of the Rate Study
Capitalization Fee Analysis results
Present key data inputs and assumptions
Summary of findings for each system
Questions
2
Why A Rate Study?
Enables each utility to remain self-sufficient
Enables long-term fiscal sustainability
Informs financial decisions and their impact
Develops capital funding plan and evaluates future needs
Living Plan sets rate path to achieve long-term planning objectives
3
Key Rate and Fee Study Components
Revenue Requirement Financial Plan
“Define Overall system Needs”
Cost of Service Analysis
“Equitable Cost Allocation”
Rate
Design
“Collect Needed Revenue”
Capitalization
Fee
“Determine Value of system capacity”
Meetings, Presentations, Documentation
4
Governing Statutes/Guidance
Idaho Code Title 50, Chapter 10 Finances
Section 1030(f) allows cities “to prescribe and collect rates, fees, tolls or charges”
Section 1032 “shall be and always remain self-supporting”
Provide for all expenses of operation and maintenance of such works*, bonds, and interest, including reserves
Capitalization Fees
2015 Idaho Supreme Court Ruling NIBCA** v. City of Hayden
Identifies methodology to calculate connection/capitalization fees - Loomis v. Hailey
Does not allow for including future facility costs
*The term “works” shall include water systems, drainage systems, sewerage systems
**NIBCA = North Idaho Building Contractors Association
Start with statutes as they provide the authority and guidance for what is being requested.
5
Capitalization Fee Analysis
6
Overview of Capitalization Fees
One-time charge, not ongoing rates
Recovers value of system capacity new user will utilize
Based on the replacement cost of system infrastructure investment
Includes only existing infrastructure in use
Calculated fee represents maximum allowable
For capital use only
7
Overview of Capitalization Fees (cont.)
Fee based on specific asset investment for each system
Focus is value of system capacity rather than revenue producing
8
Capitalization Fee – Water
Current Fee $2,403
MAX Capitalization Fee
Supply & Pumping: $.30 per GPD
Storage:
$1.15 per GPD
Transmission & Distribution:
$1.14 per GPD
Residential:
1,825 GPD
$4,727
No Outside Cap Fee
9
Capitalization Fee – Sewer
MAX Capitalization Fee Current Fee: $1,869 Residential – 198 GPD: $2,151
Rexburg Capitalization Fee:
Treatment: $5.45 per GPD + Collection Rexburg: $4.47 per GPD +Shared Collection – Rexburg: $.94 GPD = $10.86 per GPD
Shared Collection – Sugar City/Teton: $.94 per GPD each + Treatment $5.45 per GPD for each
No Outside Cap Fee
10
Water Utility – Monthly Rates
11
Revenue Requirement Overview
Determine the amount of annual revenue necessary to fund all financial obligations on a standalone basis
Operating expenses | debt service (principal & interest) | capital
Meet financial parameters and targets (coverage | reserves)
Evaluate revenue sufficiency over a multi-year period
Develop a rate plan to balance financial needs and minimize customer impacts
12
Forecast Basis
Study Period: 2025-2030
Budget FY 2025/2026
Used as a baseline
Financial Forecast Key Assumptions
Customer Growth
Water: 2.15% per year
Operating Reserve Target
Water: 120 days $1.09 – 1.17M
Existing Debt Service
Water: $6.9M
Capital Plan
2025-2030
Water: $33.7M
Expense Inflation
3.50% to 4.00% annual cost inflation
Annual Rate Revenue
Water: $4.6 – 5.0M
13
Capital and Funding 2025-2030
$33.7M capital costs
Funding Sources
S. WATER TANK AND WELL - 42
S Hidden Valley Road Pipeline WELL #10 -BURTON-WELL AND WELLHOUSE CONSTRUCTION, PUMPS, BOOSTERS
Burton and North Well Fence and Landscaping
1.1 Zone 3 Well Increase Supply Capacity to Zone 3 $6,020,000 (Well 11)
1.4 New Burton Booster Increase Delivery Capacity to Zone 1 $270,000
1.9 Zone 1 1.5 MG Tank Increase Storage Capacity in Zone 1 $7,410,000 (Tank 5)
2.1 Zone 1 Well #1 Increase Supply Capacity to Zone 1 $3,920,000 (Well 12)
Chlorinating water system
Cathodic Protection
14
Water Rate Strategy– Rate and Debt Funded
This rate strategy will support:
Operating costs
Full capital improvement program of $33.7M
Annual New Debt Service
$310k in FY2027 – FY2029 for $3.5M in new debt proceeds.
$1.33M in FY2030 for $11.5M in new debt proceeds.
Adopted
Right of Way Charge & Asset Security, removed in 2026
15
Water Rate Strategy – Rate and Debt Funded
Revenues meet annual operating needs
Funds $33.7M in capital projects
System Reinvestment Funding Phased – In, fully funded by FY2030
Adopted
16
Distribution of costs to customer classes based on their proportional demands on and use of the system(s).
Use of industry standard methodologies*/practices
Cost distribution considers usage characteristics and facility requirements
City specific usage and demand
Planning, engineering, and design criteria
Determines unit costs as foundation for rate design
Total cost by class (equity)
Unit costs ($/usage; $/meter/account/ERU)
* Industry Standard Methodologies; AWWA Principles of Water Rates, Fees and Charges, M1 Manual
Cost of Service Analysis
17
Customer
Meters & Services
Base Capacity
Peak Capacity
Fire Protection
Allocate Costs to Customer Classes
Water Cost of Service - Methodology
Accounts
Meter Size
Average Use
Peak Use
Fire Flow Req.
* Industry Standard Methodologies; AWWA Principles of Water Rates, Fees and Charges, M1 Manual
4.44%
3.62%
24.85%
42.59%
24.50%
18
±10% is considered within cost of service
Residential is under-collecting
Commercial is aligned with their cost-of service.
Multi-Family collecting approximately 1.3x cost to serve
Result of one rate schedule for all customers.
Rate design proposals will work to align cost of service between classes
Water Cost of Service Results (Revenue ÷ COS Findings)
19
Proposed Water Rate Schedule (Inside City)
The largest change is the removal of the 6,000 gallons included in the monthly fixed fee. Every gallon is billed going forward.
20
Proposed Water Bill Impacts (Inside City)
21
±10% is considered within cost of service
By 2030, all classes are aligned with their cost-of-service using the proposed rate design.
2030 Cost of Service Results with Rate Design
Review and revisit in three years to confirm it is acting as intended.
22
Sewer Utility – Monthly Rates
23
Forecast Basis
Study Period: 2025-2030
Budget FY 2025/2026
Used as a baseline
Financial Forecast Key Assumptions
Customer Growth
Sewer: 2.15% per year
Operating Reserve Target
Sewer: 120 days $1.2 - $1.4M
Existing Debt Service
Sewer: $799k
Capital Plan
2025-2030
Sewer: $63M
Expense Inflation
3.50% to 4.00% annual cost inflation
Annual Rate Revenue
Sewer: $6.07M – $6.61M
24
Capital and Funding 2025-2030
$63M capital costs
Funding Sources
SEWER PLANT CONSTRUCTION 52
Projects from 2022 Wastewater Treatment Plant Facility Planning Study
2023 Design of 80' Clarifier
2024 Construction of additional 80’ Clarifier
2023 Design of Bio-Tower and Aerated Oxidation Ditch
2024 Construction of Bio-Tower Aerated Oxidation Ditch
2026 Design of Additional 80' Clarifier
2027 Construction of Additional 80' Clarifier or when ADF exceeds 4.2 MGD
25
Sewer Rate Strategy– Rate and Debt Funded
This rate strategy will support:
Operating costs
Full capital improvement program of $63M
Annual New Debt Service
$310k in FY2027– FY2028 for $3.5M in new debt proceeds.
$2.08M in FY2029 – FY2030 for adding $20M in new debt proceeds.
Adopted
26
Sewer Rate Strategy – Rate and Debt Funded
Revenues meet annual operating needs
Funds $63M in capital projects
System Reinvestment Funding Phased – In, fully funded by FY2030
Adopted
27
Customer
Flow
BOD* Treatment
TSS** Treatment
Allocate Costs to Customer Classes
Sewer Cost of Service - Methodology
Accounts
Gallons
lb. of BOD
lb. of TSS
* Industry Standard Methodologies.
*BOD = biochemical oxygen demand
**TSS = total suspended solids
7.59%
44.67%
22.64%
25.09%
28
±10% is considered within cost of service
Residential over-collecting
Commercial is aligned with their cost-of service.
Multi-Family is slightly under collecting
Result of one rate schedule for all customers.
Rate design proposals will work to align cost of service between classes
2027 Sewer Cost of Service Results (Revenue ÷ COS Findings)
29
Proposed Sewer Rate Schedule (Inside City)
Inside/Outside charges – not reviewing outside city factor
30
Proposed Sewer Bill Impacts (Inside City)
31
±10% is considered within cost of service
By changing the meter rate schedule to the MCE ratio, all classes are aligned to their cost of service.
2027 Sewer Cost of Service Results With Updated Rate Design
32
Sanitation Utility – Monthly Rates
33
Forecast Basis
Study Period: 2025-2030
Budget FY 2025/2026
Used as a baseline
Financial Forecast Key Assumptions
Customer Growth
Sanitation: 2.15% per year
Operating Reserve Target
Sanitation: 120 days $583 – 609k
Existing Debt Service
Sanitation: No Debt
Capital Plan
2025-2030
Sanitation: $2.5M
Expense Inflation
3.50% to 4.00% annual cost inflation
Annual Rate Revenue
Sanitation: $3.4 – $3.7M
34
Capital and Funding 2025-2030
$2.5M capital costs
Funding Sources
New Shop/Trucks
35
Sanitation Rate Strategy– Rate Funded
This rate strategy will support:
Operating costs
Capital improvement program of $2.5M
36
Sanitation Rate Strategy – Rate Funded
Revenues meet annual operating needs
Funds $2.5M in capital projects
System Reinvestment Funding – Fully Funded
37
±10% is considered within cost of service
Residential under-collecting but is aligned with their cost-of service.
Commercial is over-collecting but is aligned with their cost-of service.
Rate design proposals will work to align cost of service between classes
2027 Sanitation Cost of Service Results (Revenue ÷ COS Findings)
38
Proposed Sanitation Rates
39
Bill Examples
40
Summary & Next Steps
Discussion
Implementation
Capitalization fees effective July 2, 2026
Monthly water, sewer and sanitation rates effective October 1, 2026
41
Thank you!
Questions?
Angie Hammrich
(605) 601-5544
Angie.Hammrich@bowman.com
Angie Sanchez Virnoche
(425) 336 - 4157
Angie.Virnoche@bowman.com
www.fcsgroup.com
42
Appendix
43
Overuse Charge Calculation - Example
44