Loading...
HomeMy WebLinkAbout23289D06202024BB_CE_Density_AggregatePRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7A35734E-FF34-4281-8A45-F0B6572978D6 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23289D06202024BB In Place Density of Soils ASTM D2922 & D3017 Date: 06/20/2024 Project Number: 23-289 Project Name: Good to Go Rexburg Client: Uncommon Builders Time Start: 01:00 PM Contractor: HK Contractors Total Time on Project: 2 Current Weather Conditions: Sunny/Clear Wind: Calm Instrument ID 76560 MS: 628 Ambient Temperature (°F): 74 DS: 2350 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 East shoulder of S 12th West from University Blvd. approximately 75’ Approximately 1’ below top of sub grade. 8 Pit Run 135.0 127.7 5.7 131.8 97 Pass 2 East shoulder of S 12th West from University Approximately 1’ below top of sub 8 Pit Run 135.9 128.9 5.5 131.8 98 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7A35734E-FF34-4281-8A45-F0B6572978D6 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result Blvd. approximately 150’ grade. 3 East shoulder of S 12th West from University Blvd. approximately 225’ Approximately 1’ below top of sub grade. 8 Pit Run 135.9 130.0 4.5 131.8 99 Pass 4 East shoulder of S 12th West from University Blvd. approximately 300’ Approximately 1’ below top of sub grade. 8 Pit Run 137.8 131.9 4.5 131.8 100 Pass Field Technician Information Truck PUNISHER Mileage from Lab to Project (One Way) 8 Total Mileage 63192.00 Tested By: Ben E Ball Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: Arrived on site at 12:20 PM and spoke with Travis, the dozer operator from HK Contractors. He reported that approximately 350 feet of the northbound shoulder had been excavated to solid subgrade, fabric had been spread, and the first lift of pit run had been installed and compacted. I performed four density tests with satisfactory results. Travis then organized the installation of the second lift and asked me to return at 4:30 PM. I completed my reports and left for the lab at 2:00 PM. PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7A35734E-FF34-4281-8A45-F0B6572978D6 3 Reviewed By: Luke Hammar Signature: Inspection Images: