Loading...
HomeMy WebLinkAbout23289D06192024BB_CE_Density_AggregatePRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 2C79AA9E-2834-4540-B1D6-522BC0FA4ACA 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23289D06192024BB In Place Density of Soils ASTM D2922 & D3017 Date: 06/19/2024 Project Number: 23-289 Project Name: Good to Go Rexburg Client: Uncommon Builders Time Start: 01:00 PM Contractor: HK Contractors Total Time on Project: 3.5 Current Weather Conditions: Sunny/Clear Wind: Calm Instrument ID 76560 MS: 624 Ambient Temperature (°F): 67 DS: 2355 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 South shoulder of University Blvd. East of S 12th West approximately 650’ Approximately 1’ above bottom of excavation 6 Pit Run 136.6 126.5 8.0 131.8 96 Pass 2 South shoulder of University Blvd. East of S 12th West approximately Approximately 1’ above bottom of excavation 6 Pit Run 137.4 127.9 7.4 131.8 97 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 2C79AA9E-2834-4540-B1D6-522BC0FA4ACA 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 575’ 3 South shoulder of University Blvd. East of S 12th West approximately 500’ Approximately 1’ above bottom of excavation 6 Pit Run 137.0 130.7 4.8 131.8 99 Pass 4 North side of wash bay drain approximately 425’ from the east end. Approximately 1’ above bottom of excavation 6 Pit Run 134.2 129.6 3.5 131.8 98 Pass 5 North side of wash bay drain approximately 350’ from the east end. Approximately 1’ above bottom of excavation 6 Pit Run 141.9 133.5 6.3 131.8 101 Pass 6 North side of wash bay drain approximately 275’ from the east end. Approximately 1’ above bottom of excavation 6 Pit Run 132.9 126.3 5.3 131.8 96 Pass 7 South shoulder of University Blvd. East of S 12th West approximately 200’ from the east end. Approximately 1’ above bottom of excavation 6 Pit Run 137.6 125.7 5.4 131.8 95 Pass 8 South shoulder of University Blvd. East of S 12th West approximately 125’ from the east end. Approximately 1’ above bottom of excavation 6 Pit Run 131.1 125.8 4.1 131.8 95 Pass 9 South Approximately 6 Pit Run 134.9 127.2 6.0 131.8 97 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 2C79AA9E-2834-4540-B1D6-522BC0FA4ACA 3 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result shoulder of University Blvd. East of S 12th West approximately 50’ from the east end. 1’ above bottom of excavation Field Technician Information Truck PUNISHER Mileage from Lab to Project (One Way) 8 Total Mileage 63050.00 Tested By: Ben E Ball Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: Arrived on site at 1:20 PM and met Leon from HK Contractors. He directed me to the South shoulder of University Blvd, from S 12th West Street, approximately 700’ east. The contractor was still installing the first lift on the west end, so I began testing on the east end. After testing approximately 600’, I caught up to them. I informed Leon that I had another job to attend to and would return later. Left the site at 2:30 PM and returned at 3:50 PM to finish testing. I informed Leon of my results before leaving the site at 4:55 PM. Reviewed By: Luke Hammar Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 2C79AA9E-2834-4540-B1D6-522BC0FA4ACA 4