File Name:
23289AD10042024TH
In Place Density of Asphalt by Nuclear Methods ASTM D2950
Date:
10/04/2024
Project Number:
23-289
Project Name:
Good to Go Rexburg
Client:
Uncommon Builders
Time Start:
08:30 AM
Contractor:
HK Contractors
Total Time on Project
3hrs
Ambient Temperature (°F):
38
Current Weather Conditions:
Sunny/Clear
Wind:
5-15 mph
Instrument ID
76561
Daily Standardization:
MS:
754
DS:
2619
Results
Details
Test
#:
Location:Lift: Material:Marshall
#:
Wet:%
Marshall:
Result
1 East access road, 140 ft S of
University Parkway. 6 ft RCL
Asphalt
SP3 (Teton
Mix)
143.3 133.1 93 Pass
2 East access road, 40 ft S of
University Parkway. 4 ft RCL
Asphalt
SP3 (Teton
Mix)
143.3 133.5 93 Pass
Field Technician Information
Number of Grout Bags Used:
Number of Ice bags used
0
Core Drill Used
No
Total Mileage
60753
Tested By:
Travis Hutmacher
Signature:
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
3d1abdb3be25fb83-1728052797845 2
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation given in
Observations and/or Remarks.)
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Observations and/or Remarks:
Arrived on site and unpacked the gauge. Standardized the gauge and prepared to take shots. Observed asphalt
workers preparing to pave.
Observed dump trucks delivering asphalt to the paver. Workers began paving. Observed rollers compacting the
asphalt. Established a rolling pattern with the roller operators.
Took multiple passing shots. Switched out with Nate (CTI).
Reviewed By:
E. Vail
Signature:
Inspection Images:
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
3d1abdb3be25fb83-1728052797845 3
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
3d1abdb3be25fb83-1728052797845 4