Loading...
HomeMy WebLinkAbout23289AD10042024TH_CE_Density___AsphaltPRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3d1abdb3be25fb83-1728052797845 1 4103 E 605 N Suite 1 Rigby, Idaho 83442 208.932.4428 File Name: 23289AD10042024TH In Place Density of Asphalt by Nuclear Methods ASTM D2950 Date: 10/04/2024 Project Number: 23-289 Project Name: Good to Go Rexburg Client: Uncommon Builders Time Start: 08:30 AM Contractor: HK Contractors Total Time on Project 3hrs Ambient Temperature (°F): 38 Current Weather Conditions: Sunny/Clear Wind: 5-15 mph Instrument ID 76561 Daily Standardization: MS: 754 DS: 2619 Results Details Test #: Location:Lift: Material:Marshall #: Wet:% Marshall: Result 1 East access road, 140 ft S of University Parkway. 6 ft RCL Asphalt SP3 (Teton Mix) 143.3 133.1 93 Pass 2 East access road, 40 ft S of University Parkway. 4 ft RCL Asphalt SP3 (Teton Mix) 143.3 133.5 93 Pass Field Technician Information Number of Grout Bags Used: Number of Ice bags used 0 Core Drill Used No Total Mileage 60753 Tested By: Travis Hutmacher Signature: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3d1abdb3be25fb83-1728052797845 2 Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation given in Observations and/or Remarks.) Items observed are in general conformance with approved project documents and jurisdictional requirements. Observations and/or Remarks: Arrived on site and unpacked the gauge. Standardized the gauge and prepared to take shots. Observed asphalt workers preparing to pave. Observed dump trucks delivering asphalt to the paver. Workers began paving. Observed rollers compacting the asphalt. Established a rolling pattern with the roller operators. Took multiple passing shots. Switched out with Nate (CTI). Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3d1abdb3be25fb83-1728052797845 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3d1abdb3be25fb83-1728052797845 4