HomeMy WebLinkAboutRexburg, Comp Safety Action Plan, 2026-05-18, For Council Adoption
COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG
MAY 2026
Prepared By Keller Associates
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 i
Contents
Executive Summary ........................................................................................................................ 1
Purpose and Commitment ............................................................................................................... 2
Steering Committee Framework ..................................................................................................... 3
Safety Analysis ............................................................................................................................... 4
Public Involvement Summary ......................................................................................................... 7
Systemic Countermeasures Toolbox............................................................................................. 10
High Crash Location Projects ....................................................................................................... 11
Policy And Procedure Recommendations .................................................................................... 33
Project Prioritization ..................................................................................................................... 35
Implementation Grant Prioritization ............................................................................................. 37
References ..................................................................................................................................... 38
Appendices List ............................................................................................................................ 38
Appendix A: Rexburg Safety Data Summary and Analysis Technical Memo
(DKS, November 2025) .........................................................................................
Appendix B: Public Involvement Survey (2025)...................................................
Appendix C: Rexburg CSAP Countermeasure Toolbox .......................................
Appendix D: High Crash Location Concepts and Cost Estimates .........................
Appendix E: HCL Project Cost Estimates .............................................................
Appendix F: Project Prioritization - Methodology and Matrix Results .................
Appendix G: Implementation Grant Project Overview and Cost Estimate ...........
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 1
EXECUTIVE SUMMARY
From 2020 to 2024, 2,029 crashes occurred on the City of Rexburg’s roadways, resulting in three fatal and
30 serious injury crashes. To directly address this crash risk and reduce the severity of crashes, the
Rexburg Comprehensive Safety Action Plan (CSAP) was developed. The CSAP follows a data-driven
strategy for identifying high-risk locations and systemic crash trends, which are addressed through a list of
projects and an evidence-based safety countermeasure toolbox. The CSAP also produced a catalog of
non-infrastructure, policy-based strategies to facilitate a continued commitment to achieving the City’s
stated goal — to eliminate all fatal and serious injury crashes on roadways within Rexburg.
Recommended infrastructure and policy-based
strategies are tailored to address six emphasis
areas – reoccurring characteristics of crashes in
Rexburg (see right) and the 20 most dangerous
crash locations from the prior five years. A public
involvement survey was conducted to capture
community member concerns around both specific
locations of concern as well as broad systemic
challenges they face. Further, high crash locations
were screened for overlap with areas of persistent
poverty, ensuring project prioritization can serve
historically underserved areas of Rexburg.
Countermeasures and strategies presented in the
CSAP follow the principles of the Safe System
Approach: a multi-disciplinary approach that
prioritizes safety of all roadway users during the
design and planning of infrastructure improvements.
Year 2020 2021 2022 2023 2024
Total
(2020 – 2024)
Fatal Crashes 0 2 1 0 0 33 Fatal and
Serious Injury
Crashes Serious Injury
Crashes 3 2 3 9 13
Total Crashes 286 439 409 477 418 2,029 Crashes
Emphasis Areas
Young Drivers
Intersection-Related Crashes
Nighttime Crashes
Roadway and Lane Departure Crashes
Bicycle and Pedestrian Crashes
Motorcycle Crashes
Crash Data Analysis
Identified Concerns
from Public Survey Areas of Persistent Poverty
Emphasis
Areas
High Crash
Locations
Projects
Systemic
Countermeasures
Policies and
Procedures
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 2
PURPOSE AND COMMITMENT
The City of Rexburg (City) received a Safe Streets and Roads for All (SS4A) Grant to develop a
Comprehensive Safety Action Plan (CSAP). The City has identified numerous safety challenges that are
faced by its transportation network. The focus of the CSAP is to identify high-impact strategies that can be
deployed across Rexburg, on facilities owned by the City and the State alike. Through adoption of this
Comprehensive Safety Action Plan by the Rexburg City Council, the City establishes a clear community
safety goal:
Eliminate fatal and serious injury crashes on roadways within Rexburg by 2036.
The CSAP utilizes a data-driven, evidence-based approach to guide future development and strengthen
the City’s ability to secure funding for safety improvements.
The Rexburg CSAP embraces the Vision Zero Mindset – that even one roadway fatality or serious injury is
unacceptable. As part of a nationally recognized commitment to reach a goal of zero deaths on our
roadways, the Federal Highway Administration has adopted a Safe System Approach (Reference 1). This
proactive safety approach is rooted in the fact that humans make mistakes, and the human body is fragile.
The Safe System Approach uses a five-layer multi-disciplinary process of creating mitigations that, when a
crash occurs, reduces the severity of the crash. The six principles that guide Safe System Approach are:
1. Deaths and serious injuries are unacceptable. 4. Responsibility is shared.
2. Humans make mistakes. 5. Safety is proactive.
3. Humans are vulnerable. 6. Redundancy is crucial.
Strategies presented in this plan leverage multiple principles, thereby creating a system of road user
safety elements. Safety countermeasures should mitigate human mistakes and facilitate safe travel for all
users, especially the most vulnerable road users.
Figure 1: The Safe Systems Approach (Source: Federal
Highway Administration)
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 3
The vision of achieving zero deaths and serious injuries on Rexburg roadways is supported by core
principles that drive the recommendations outlined in this Comprehensive Safety Action Plan:
1. Invest in improvements and raise the standard of facility design such that the entire network is
safe for all community members.
2. Make recommendations based on data-driven decision making that implement proven and
innovative solutions to current safety challenges.
3. Engage and collaborate with the community by identifying teaming partners and refining outreach
aspirations.
4. Foster a culture of safety by adopting the Safe System Approach.
Progress toward the City’s CSAP goal will be tracked using a combination of outcome‑based safety metrics
and implementation‑focused performance measures, with results reported publicly on an annual basis. The
City will track and report the following metrics:
• Fatal and serious injury crashes | Target: Reduce fatal and serious injury crashes to four or fewer
per year within five years, and to zero or near-zero within ten years.
• Number of safety projects completed | Target: Two per year
• Progress towards policy and progress changes | Target: One documented update per year
• Continuation of CSAP Steering Committee meetings | Target: At least two meetings per year
STEERING COMMITTEE FRAMEWORK
As part of a multidisciplinary and multi-agency commitment to the CSAP goal, a steering committee was
established to help guide the development of the CSAP. The steering committee team consisted of:
Keith Davidson and Justin Beard – Rexburg Public Works
Alan Parkinson – Rexburg Planning and Zoning
Jerry Merrill – Rexburg Mayor
Colin Erickson, Bryanna Johnson, Erik Erickson – Rexburg Councilmembers
Jon Lewis – Rexburg Recreation Director
Kyle Williams – Bringham Young University-Idaho
K-12 School District Transportation
Jeff Sneddon – ITD District 6
Gary Hagen – Rexburg Assistant Chief of Police
The steering committee team facilitated community outreach and engagement, provided guidance and
direction to the consultant team during the development of the CSAP, and will lead the ongoing
implementation of the CSAP strategies and principles to advance the City’s adopted safety goal.
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 4
SAFETY ANALYSIS
As part of the goal of developing a data-driven approach to enhancing safety, a comprehensive safety
evaluation was conducted using five-years of crash data (2020-2024) (Appendix A). The safety evaluation
analyzed systemic crash trends and hotspot crash locations – creating safety emphasis areas and a high
priority network for project implementation.
Table 1: Vehicular Crashes (2020-2024)
High Crash Locations
High Crash Locations (HCLs) include the streets and intersections within Rexburg that have the highest
rates of fatal and serious injury crashes over the last five years. Table 2 lists the twenty HCLs identified
through the data-driven the safety evaluation. Figure 3 indicates their locations across Rexburg, ranked
based on an Equivalent Property Damage Only (EPDO) score.
Areas of Persistent Poverty Evaluation
The Rexburg CSAP is committed to safeguarding the well-being and dignity of all community members,
and accordingly has also explored crash trends within underserved communities affected by persistent
poverty. The safety evaluation compared the location of HCLs with designated Areas of Persistent Poverty
as determined by U.S. Department of Transportation (Reference 2). HCLs that overlapped with these areas
were identified in Table 2.
Year 2020 2021 2022 2023 2024
Fatal
Crashes 0 2 1 0 0
Serious
Injury
Crashes
3 2 3 9 13
Total
Crashes 286 439 409 477 418 0
100
200
300
400
500
600
2020 2021 2022 2023 2024
Vehicle Crashes in Rexburg
(2020 -2024)
Total Crashes Trendline
Figure 2: Vehicular Crash Trend (2020-2024)
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 5
Table 2: Rexburg High Crash Locations
HCL
Rank Location EPDO
Score
Intersection /
Segment
Located in Area of
Persistent Poverty
1 N. 2nd East: E 2nd North to S Teton
River 425 Segment Yes
2 Golden Beauty Dr / University Blvd 395 Intersection Yes
3 S 2nd East: E 7th South to E 3rd South 391 Segment Yes
4 N 2nd East: Moran View Rd to Moody
Rd 292 Segment No
5 S 1st West: W 3rd South to W 1st
South 275 Segment Yes
6 Yellowstone Hwy / W 7th South 202 Intersection Yes
7 University Blvd: 200’ east of
Yellowstone Highway to S 5th West 196 Segment Yes
8 S 2nd West / W 1st South 194 Intersection Yes
9 S 2nd West / W 7th South 190 Intersection Yes
10 N 2nd East / Moody Rd 187 Intersection No
11 S 12th West / Main St 166 Intersection Yes
12 N 2nd East : S Teton River to E 7th
North 155 Segment No
13 Main St / Pahsimeroi Blvd / Summit
Dr 144 Intersection Yes
14 S 2nd West / W 5th South 134 Intersection Yes
15 S 5th West / W 7th South 131 Intersection Yes
16 N 2nd East / Lorene St 131 Intersection No
17 Pioneer Rd / Main St 127 Intersection Yes
18 N 2nd East / E 15th North 126 Intersection No
19 W 1st North / N 2nd West 116 Intersection Yes
20 Center St / E 7th South 114 Intersection Yes
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 6
Figure 3: Rexburg High Crash Locations
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 7
Emphasis Areas
Systemic safety recommendations were developed to address recurring crash patterns and risk factors
identified through the crash data analysis. This analysis identified six safety emphasis areas that represent
the most significant contributors to fatal and serious injury crashes in Rexburg. These emphasis areas
provide a guide to prioritizing systemic countermeasures and strategies that can be applied proactively
across the transportation network.
• Young Drivers
Drivers aged 16–25 were involved in 1,572 crashes in Rexburg. Two-thirds of all fatal or serious
injury crashes involved a young driver.
• Intersection-Related Crashes
56% of all crashes and 51.5% of fatal and serious injury crashes occurred at intersections.
• Nighttime Crashes
27% of all crashes occurred during dark, dusk, or dawn conditions, while 39% of fatal and serious
injury crashes occurred in low‑light conditions.
• Roadway and Lane Departure Crashes
29% of all crashes were roadway or lane departure crashes, accounting for approximately one‑third
of all fatal and serious injury crashes.
• Bicycle and Pedestrian Crashes
While comprising less than 3% of all crashes, bicycle and pedestrian crashes represented 24% of
fatal and serious injury crashes.
• Motorcycle Crashes
1.7% of all crashes involved motorcycles, yet these crashes accounted for 23% of all fatal and
serious injury crashes.
PUBLIC INVOLVEMENT SUMMARY
A public engagement survey was conducted early in the plan development process that polled roughly 160
community members on a variety of questions related to how they move around the community and their
concerns around safety (Appendix B). A summary of the questions and response results is shown below.
• How safe do you feel when driving Rexburg’s roadways?
Less than half of respondents (41%) feel safe driving on Rexburg’s roadways.
• How safe do you feel when walking Rexburg’s sidewalks?
Roughly one-third of respondents (36%) feel safe walking in Rexburg, while 24% reported feeling
unsafe.
• How safe do you feel when biking in Rexburg?
Nearly 80% of respondents felt neutral or unsafe biking in Rexburg.
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 8
• Where do you feel the greatest safety concerns exist in Rexburg?
Most respondents identified areas near the BYU–Idaho campus as having the greatest safety
concerns, followed by the 2nd West & 4th South roundabout and 7th South (Yellowstone Highway
to BYU–Idaho).
• If you have children or teens, how often do they walk, bike, or use a scooter to get to school?
Among applicable respondents, the majority indicated their children or teens walk, bike, or use a
scooter daily to get to school.
• What are the biggest challenges to walking safely in Rexburg?
Primary challenges identified were poor lighting, drivers failing to yield to pedestrians, and unsafe
crossings. Secondary concerns included speeding traffic and missing sidewalks.
• What are the biggest challenges to biking safely in Rexburg?
Respondents primarily cited driver behavior (failure to yield, unsafe passing) and lack of bike lanes
or bike routes, followed by traffic speeds and volumes.
• Are there intersections, crossings, or streets in Rexburg that you avoid because they feel
unsafe?
Seventy-five percent (75%) of respondents reported avoiding certain locations due to safety
concerns.
• Do you think vehicle speeds in Rexburg are generally appropriate?
Half of respondents (46%) felt speeds are sometimes or frequently too fast in certain areas, and
that speeding is a major issue.
• Which types of traffic safety improvements are most needed in Rexburg?
Intersection lighting was identified as the most needed improvement. Other priorities included a
north–south pedestrian/bicycle pathway along 2nd East, vehicular capacity improvements on major
corridors, traffic calming, improved crosswalk markings, speed feedback signs, and sidewalk/ADA
curb ramp improvements.
• What is the most important outcome you want to see from the City’s Safe Streets for All
Action Plan?
75% of respondents prioritized reducing serious crashes, improving bicycle and pedestrian
pathways, and safer pedestrian crossings. 25% prioritized reduced speeding on key streets, safer
school zones, and improved sidewalks and ramps.
• Where do you live?
The majority of respondents (78%) live within Rexburg city limits. 13% live within 10 miles of the
city limits, and fewer than 10% either live in Sugar City or live more than 10 miles outside the city.
• What is your employment status?
Respondents largely worked in at a business in Rexburg (38%), were students at BYU-Idaho
(16%), or worked from home (14%). A tenth of respondents commute out of Rexburg for work.
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 9
• What is your age range?
The majority of respondents were aged 18-45 (60%)
• Do you have a physical disability or health condition that affects the way you travel?
6% of respondents indicated they have a physical disability / health condition that affects the way
they travel.
Respondents also provided where they
felt safety concerns were via map pins as
shown in Figure 4. The HCL locations are
overlain on this map as well.
2nd Public Feedback Survey
A 2nd public feedback survey was conducted in May 2026 to present the recommended projects and
strategies. 12 respondents participated in the survey and results can be found in Appendix B. Key
findings from the responses include:
Do the proposed projects and Safety Emphasis Areas reflect the safety concerns you experience
in Rexburg?
• 92% of respondents said Mostly or Yes
Would you be willing to accept slightly longer travel times if it resulted in improved traffic safety
(fewer serious injuries and fatal crashes)?
• 83% of respondents said Yes
Figure 4: Respondent Locations
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 10
SYSTEMIC COUNTERMEASURES TOOLBOX
Systemic Countermeasures identify safety strategies that can be
applied proactively across the Rexburg transportation network to
address recurring crash patterns and risk factors associated with the
CSAP Emphasis Areas. Unlike site‑specific projects that focus on
individual high‑crash locations, systemic countermeasures are
intended for broader deployment at locations that share similar
roadway characteristics, traffic conditions, or safety risks, even if those
locations do not yet exhibit a documented history of severe crashes.
Young Drivers
Comprehensive safety evaluation of crashes involving young drivers
indicated that the most prevalent causes of serious injury and fatality
were angle/turning crashes (36.4%), distracted driving (25%), and
crashes involving a pedestrian or bicyclist (36.4%). The Intersection
and angle/turning crashes as well as crashes involving vulnerable
road users – the focus of strategies addressing young drivers is
mitigating distracted driving.
• High Visibility Cell Phone Enforcement Campaign
Intersection Related
Evaluation of crash patterns indicate that over half of all crashes in Rexburg occur at or near intersections
– and similarly represent roughly half of fatal and serious injury crashes.
• Corridor Access Management
• Dedicated Left and Right Turn Lanes at Intersections
• Roundabouts
• Multiple Low-Cost Countermeasures at Stop-Controlled Intersections
• Signal Phasing Improvements
Nighttime Crashes
Nighttime crashes in Rexburg are a contributing factor to roadway departures, lane departures and
intersection crashes. Moreover, safety evaluations indicated that the majority of crashes occurred along
roadways zoned for 35 mph or under, and that speeding contributed to 13% of all nighttime crashes.
• Backplates with Retroreflective Borders
• Improved Intersection and Segment Lighting
• Deployment of Improved Retroreflective Signage
Roadway and Lane Departure
Roadway and lane departure crashes are roughly one third of all total crashes, and roughly one third of all
fatal and serious injuries. Head-on collisions and striking fixed objects are the predominant crash type under
this category, with speeding and icy/snowy/slushy road conditions as top factors.
• Enhanced Delineation for Horizontal Curves
• Median Barriers
• Roadside Design and Clear Zone Improvements
• Wider Edge Lines
Strategies are drawn from
FHWA and NHTSA best
practices and applied
using a Safe System
approach. See Appendix
C for the full toolbox.
COUNTERMEASURE
RESOURCES
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 11
Bike and Pedestrian
Top factors among all bike and pedestrian crashes includes failure to yield, vision obstruction, distraction,
and low-light conditions – largely occurring on roads zoned for 25 mph or less. Bike and pedestrian crashes
that resulted in fatalities or serious injuries followed the same pattern of top factors, weighted more heavily
towards roadways zoned for 25 mph or less. Countermeasures explored in this toolbox focus on physical
separation and/or increased visibility.
• Medians and Pedestrian Refuge Islands
• Curb Extensions or Bulb outs
• Crosswalk Visibility Enhancements
• Bicycle Lanes
• Rectangular Rapid Flashing Beacon
• Pedestrian Hybrid Beacon
• Leading Pedestrian Interval
Motorcycle
Top factors among all motorcycle crashes include young drivers, speeding, and improper maneuvers. The
majority of crashes occur on segments.
• High-Visibility Media Campaign Encouraging Proper Riding Gear and S.T.A.R.S. Training
Crosscutting Strategy – Appropriate Speed Limits for All Road Users
Global research concurs that there is a direct relationship between vehicle speed and human survival during
a crash. Managing speeds is a critical method for reducing fatalities and serious injuries on roadways. This
is especially important along facilities where there are frequent interactions between vehicles and
vulnerable road users.
Speed management can be achieved by the jurisdiction setting an appropriate speed limit that reduces the
severity of crashes. While speed limits are often set by statutory law, agencies can seek designated
authority to establish non-statutory speed limits or designate reduced speed zones. Non-statutory speed
limits require that changes based on an engineering study conducted in accordance with the Manual on
Uniform Traffic Control Devices (MUTCD). Implementation guidance points to the use of 20 mph speed
limits in urban cores – where there is a greater density of conflicts between vehicles and vulnerable road
users – and setting speed limits on rural road applications no more than 5 mph below the 85th-percentile
speed.
Emergency Medical Services
• Multidisciplinary Collaboration
To meet post-crash care objectives, agencies must prioritize deep coordination with EMS partners through
joint forums to identify high-priority improvements such as roadway element design input, work zone
planning, and signal preemption. This collaboration extends beyond operational efficiency to include
hospital data-sharing and public education, fostering a comprehensive, multi-agency approach to both
incident response and regional safety.
HIGH CRASH LOCATION PROJECTS
As part of the comprehensive safety evaluation of the City of Rexburg’s network and identification of 20
high-crash locations, potential projects that address existing safety challenges were developed for each of
the 20 HCL locations. These projects act as “hot spot” treatments to address an identified, existing need.
Concept-level design exhibits were developed for select locations and included in Appendix D.
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 12
HCL 1: N 2nd East: E 2nd North to S Teton River
This location is a one-third mile segment with a five-lane cross-section. It has lighting and sidewalks
present and no bike lanes. It is bounded by a signalized intersection at the south end and a bridge over
the South Teton River at the north end. A concept design for this location is included as an appendix item
(Appendix D).
The following is a summary of the 2020 – 2024 crashes:
• 83 crashes
• 1 serious injury
• 1 bicycle related crash
• 36% rear-end
• 34% angle crashes (serious injury)
• 29% occurred at a driveway
• 26% occurred at an intersection
• 24% failed to yield
• 23% turning left
• 20 crashes occurred with 100’ of E 4th North
• 14 crashes occurred within 100’ of Valley River Drive
Countermeasures Description
Create directional medians Install directional median openings to allow and restrict
left-turns and u-turns
Yellow Change Intervals
Review signal timing for appropriate yellow and red
change interval
Install Traffic Signal at E 4th
North
A traffic control device that efficiently controls and
manages competing flows of traffic.
Estimated Cost: $3,169,000
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 13
HCL 2: Golden Beauty Dr / University Blvd
Golden Beauty Drive and University Boulevard meet at a five-lane by two-lane unsignalized intersection
with two-way stop control on the north and south minor road approaches. Street lighting is present at this
location. Sidewalks are present on the west side of the intersection and on the north side of the east leg,
and there are no bike lanes. This intersection is located about 300 feet east of the diverging diamond
interchange of US Highway 20 and University Boulevard. A concept design for this location is included as
an appendix item (Appendix D).
The following is a summary of the 2020 – 2024 crashes:
• 26 crashes
• 3 serious injuries
• 38% angle-turning (serious injury)
• 15% head-on (serious injury), rear-end, side-
swipe same
• 31% failed to yield
• 19% improper turn
Countermeasures Description
Create directional medians Install directional median openings to allow and restrict
left-turns and u-turns.
Install right-turn lane on
single major road approach at
3- or 4-leg unsignalized
intersection
A right-turn auxiliary lane for storage and to
accommodate decreasing speeds for right-turn vehicles
as they approach an intersection.
Estimated Cost: $583,000
*Roundabout or other intersection modifications may be needed to facilitate vehicle travel in all
directions after installation of directional medians
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 14
HCL 3: S 2nd East: E 7th South to E 3rd South
This location is an approximately 0.6-mile long segment with a three-lane cross section. The segment has
street lighting and sidewalks, and it has bike lanes along most of its length. The segment is bounded by
two signalized intersections, and there are four rectangular rapid flashing beacon (RRFB) pedestrian
crossings along this section.
The following is a summary of the 2020 – 2024 crashes:
• 31 crashes
• 3 serious injuries (all pedestrian involved)
• 4 pedestrian, 1 bike
• 4 occurred at intersections
• 48% rear-end
• 13% angle-turning
• 19% inattention
• 23% driveway/parking lot related
• 4 crashes (1 ped, serious injury) occurred at the
southern-most RRFB
• 4 crashes (3 ped, 1 serious injury) occurred at E
3rd South
Road Safety Audit (RSA)
A Road Safety Audit (RSA) was conducted on April 2, 2026, for S 2nd East between E 7th South and E
3rd South. The audit team included three members of the project steering committee (two City of Rexburg
staff and one BYU–Idaho representative) and two consultant team members. The team reviewed corridor
crash history in advance of the field visit and completed a walking audit of the study area.
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 15
The corridor is a three-lane roadway with
multiple RRFB-equipped crossings.
While excessive vehicle speeds were not
observed during the site visit, the
corridor experiences frequent pedestrian
activity, including reported jaywalking
despite posted enforcement signage.
Lighting is present at intersections, but
their positioning could be improved to
better illuminate pedestrians for
approaching vehicles. The audit
identified several opportunities to
enhance pedestrian visibility, reduce
crossing distances, and better
accommodate crossing demand.
Estimated Cost: $1,507,000
Recommended Countermeasures (RSA findings)
Enhance Pedestrian
Crossings (RRFBs)
Add refuge islands at select midblock crossings where turning movements can be
maintained. Incorporate refuge islands at T-intersections on left-out approaches
where feasible. Consider raised crosswalks at crossing locations.
Improve Lighting at
Crosswalks
Install supplemental lighting in advance of crosswalks in both directions to reduce
silhouette effect and improve nighttime pedestrian visibility.
Address Crossing
Behavior
Recognize continued jaywalking activity despite existing signage and enforcement
messaging. Consider new crossings at locations with demonstrated illegal crossing
demand.
Reduce Pedestrian
Crossing Distance
Install curb extensions at the E 3rd South intersection to shorten crossing length
and improve pedestrian visibility.
Figure 5: S 2nd East RRFB Crossing
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 16
HCL 4: N 2nd East: Moran View Rd to Moody Rd
This location is a half-mile long segment with a five-lane cross section. The segment includes a T-
intersection at Moran View Road, signal at Stationary Place, and ends 200’ south of the signalized
intersection at Moody Road. There is no street lighting present outside of the signal, and sidewalk is
present along most of the east side of the segment, but not the west. There are no bike lanes along this
segment.
The following is a summary of the 2020 – 2024 crashes:
• 40 crashes
• 1 fatality
• 45% rear-end
• 38% occurred at a signalized intersection
• 15% angle-turning
• 13% head-on turning (fatal)
• 23% speed too fast for conditions
• 30% during icy conditions
• 23% involved left-turning vehicles
Countermeasures Description
Create directional medians Install directional median openings to allow and restrict
left-turns and u-turns
Provide “STOP AHEAD”
pavement markings
Pavement markings on a roadway surface that informs
drivers of an approaching unsignalized intersection
Advanced yield or stop
marking and signs
Markings and signs placed in advance of intersection
Install lighting on a roadway
segment
A permanent source of artificial lighting installed at a
segment of roadway that provides greater visibility.
Install lighting at intersection A permanent source of artificial lighting installed at an
intersection that provides greater visibility of the
intersection.
Estimated Cost: $3,831,000
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 17
HCL 5: S 1st West: W 3rd South to W 1st South
This 0.3-mile long segment has a two-lane cross section and both angled and parallel on-street parking.
Street lighting and sidewalks are present, and there is a southbound bike lane between W 1st South and
W 2nd South. The segment is bounded by a four-leg all-way stop-controlled intersection at W 1st South
and a three-leg all-way stop-controlled intersection at W 3rd South. A four-leg signalized intersection is
located at W 2nd South.
The following is a summary of the 2020 – 2024 crashes:
• 23 crashes
• 2 serious injuries
• 56% angle crashes (2 serious injury)
• 1 pedestrian and 2 bike crashes
• 17% rear-end
• 17% speed too fast for conditions
• 43% driveway or parking lot related
• 39% intersection related
• 43% nighttime conditions
Countermeasures Description
Install lighting on a roadway
segment
A permanent source of artificial lighting installed at a
segment of roadway that provides greater visibility.
Install lighting at intersection A permanent source of artificial lighting installed at an
intersection that provides greater visibility of the
intersection.
Install refuge island Concrete refuge islands separate crossing pedestrians
from motor vehicles.
Install curb ramps and
extensions with a marked
crosswalk and pedestrian
warning signs
Install curb extensions with marked crosswalk and
pedestrian warning signs
Install cycle tracks A bike lane (one‑ or two‑way) with a physical barrier
between the bike and motor vehicle travel lanes, such
as a curb or parking lanes.
Estimated Cost: $2,776,000
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 18
HCL 6: Yellowstone Hwy / W 7th South
Yellowstone Highway and W 7th Street is a signalized intersection with five-lanes on the south, east, and
west legs and six lanes on the north. The eastbound and westbound right turns are channelized and
controlled with yield signs. The intersection has an approximately 30° skew, with the north and south legs
skewed to the northeast. There is a railroad crossing with automatic gates approximately 60 feet west of
the intersection. Street lighting is present, and there are sidewalks on all four legs except the west side of
Yellowstone Highway. No bike lanes are present at this intersection.
The following is a summary of the 2020 – 2024 crashes:
• 31 crashes
• 1 serious injury (head on)
• 32% rear-end (5 eastbound, 5 northbound)
• 39% angle or head-on turning
• 13% failed to obey signal
• 35% nighttime conditions
• 26% during icy conditions
• 19% involved a left-turn
Countermeasures Description
Consider right-turn-on-red
restrictions
A sign indicating that a vehicle is prohibited from
making a right turn when the signal is red.
Install lighting at intersection
(additional)
A permanent source of artificial lighting installed at an
intersection that provides greater visibility of the
intersection.
Install actuated advance
warning dilemma zone
detection system for
passenger cars or
freight/trucks
This countermeasure provides microwave radar that
detects the speed and distance of a vehicle from the
intersection and extends the green interval if the vehicle
is within the dilemma zone.
Install signal ahead advance
warning signs
Warning signs placed before a signalized intersection to
inform drivers of an approaching signal.
Install guide signs Guide signs provide directional and mileage information
to specific destinations.
Construct sidewalk Install sidewalk on southwest quadrant.
Estimated Cost: $1,098,000
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 19
HCL 7: University Boulevard: Yellowstone Highway to S 5th West
This location is a half-mile segment with a two-lane cross section. It
begins 200 feet east of Yellowstone Highway and ends at S 5th
West. There is no street lighting along this segment until the S 5th
West intersection. There is a detached sidewalk present along the
north side of the segment but not the south. While there is no
established bike lane, there is a wide paved shoulder with a fog
line on the south side of the segment.
The following is a summary of the 2020 – 2024 crashes:
• 34 crashes
• 24% road departure/overturning
• 18% angle crashes
• 15% head-on crashes
• 18% due to improper turn
• 24% related to risky driving behavior (distraction, speed, impairment)
• 3 motorcycle crashes
• 50% intersection related
• 21% between left-turn and through vehicle at intersections
Countermeasures Description
Install raised or recessed
pavement markers
Delineators placed on the roadway adjacent to the
longitudinal pavement markings of a road. They are
used to supplement the delineation provided by existing
pavement markings.
Install lighting on roadway
segment
A permanent source of artificial lighting installed at a
segment of roadway that provides greater visibility.
High-visibility intersection
enforcement program
Conduct high-visibility enforcement campaigns focusing
on aggressive and/or distracted driving at intersections.
Increase pavement friction on
Curve Segment
Install pavement surfacing systems with exceptional
skid‑resistant properties not typically provided by
conventional materials. Supplement with curve warning
signs.
Install speed feedback signs Speed feedback signs provide drivers with real‑time
information about their speed as they pass the sign.
Widen paved shoulder by 3
feet
Increasing the width of the paved surface adjacent to or
outside of the travel lanes by 3 (3) feet.
Estimated Cost: $3,066,000
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 20
HCL 8: S 2nd West / W 1st South
S 2nd W and W 1st S is a five-lane by two-lane intersection with two-way stop control on the east and
west legs. An RRFB pedestrian crossing is present across the north leg. Street lighting and sidewalks are
present, and there are bike lanes along both sides of S 2nd West. A concept design for this location is
included as an appendix item (Appendix D).
The following is a summary of the 2020 – 2024 crashes:
• 23 crashes
• 1 serious injury
• 1 pedestrian
• 61% angle crashes
• 17% lane departure (serious injury)
• 13% improper turn
• 48% of angle, angle-turning, and head-on crashes involved a westbound driver
Countermeasures Description
Improve intersection warning A list of proven low-cost countermeasures that can be
implemented at unsignalized intersections.
Convert minor road stop
controlled intersection into
roundabout
Converts an unsignalized, stop controlled intersection
into a roundabout. Roundabouts eliminate up to 75% of
vehicle conflict points typically associated with
traditional intersections.
Install rectangular rapid
flashing beacons on 3-lane or
more roadway with median
Install rectangular rapid flash beacons that give warning
signs at unsignalized intersections or midblock
crosswalks
Estimated Cost: $702,000
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 21
HCL 9: S 2nd West / W 7th South
S 2nd West and W 7th South is a signalized intersection with five lanes on the east and west, three lanes
on the north, and four lanes on the south. Street lighting and sidewalks are present, and there are no bike
lanes at this location.
The following is a summary of the 2020 – 2024 crashes:
• 28 crashes
• 1 serious injury (parked car)
• 36% rear-end
• 29% head-on turning
• 29% angle-related
• 21% speed too fast for conditions
• 25% involved a left-turn and through driver
(4 between eastbound/westbound, 2 between
northbound/southbound)
Countermeasures Description
Protected left turn: split side
street signal phasing
Assign the right of way to all movements of one
approach through split phasing. For intersections with
protected left turns.
Replace urban permissive left
turns to protected/permissive
In a ʺpermissiveʺ mode, a green signal permits vehicles
to turn left only when an appropriate gap becomes
available.
Install Leading Pedestrian
Intervals
Leading pedestrian interval (LPI) gives pedestrians
and bicycles using the marked crosswalk an advance
walk signal
before the motorists get a green indication
Install actuated advance
warning dilemma zone
detection system for
passenger cars or
freight/trucks
This countermeasure provides microwave radar that
detects the speed and distance of a vehicle from the
intersection and extends the green interval if the vehicle
is within the dilemma zone.
Install signal ahead advance
warning signs
Warning signs placed before a signalized intersection to
inform drivers of an approaching signal.
Estimated Cost: $506,000
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 22
HCL 10: N 2nd East / Moody Rd
N 2nd E and Moody Road is a signalized intersection with three lanes on the east and west legs, five
lanes on the south, and six lanes on the north. The intersection has street lighting present. Sidewalks are
present everywhere except on the north side of the west leg. There are no bike lanes at this intersection.
A concept design for this location is included as an appendix item (Appendix D).
The following is a summary of the 2020 – 2024 crashes:
• 25 crashes
• 1 fatal crash (rear-end, medical emergency)
• 68% rear-end
• 16% head-on turning
• 24% speed too fast for conditions
• 28% icy or snowy conditions
• 5 left-turn conflicts occurred between northbound and
southbound vehicles
• 8 rear-end crashes northbound, 5 southbound, 3
westbound
Countermeasures Description
Install signal ahead advance
warning signs
Warning signs placed before a signalized intersection to
inform drivers of an approaching signal.
Install right-turn lane on both
major road approaches at 3-
or 4-leg signalized
intersection
A right-turn auxiliary lane for storage and to
accommodate decreasing speeds for right-turn vehicles
as they approach an intersection.
Left turn lane on both major
road approaches at urban 4-
leg signalized intersection
Adds a left-turn auxiliary lane on both approaches for
storage and to accommodate the deceleration of left-
turn vehicles.
Estimated Cost: $1,486,000
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 23
HCL 11: S 12th West / Main St
S 12th West and Main Street is a signalized intersection with three lanes on the north and south legs and
four lanes on the east and west legs. Street lighting is present, and there are sidewalks on the east leg
and on the east side of the north and south legs. No bike lanes are present at this location. A concept
design for this location is included as an appendix item (Appendix D).
The following is a summary of the 2020 – 2024 crashes:
• 22 crashes
• 1 serious injury
• 55% rear-end related (serious injury)
• 28% angle-related
• 36% due to distraction or inattention
• 23% failed to yield
• 18% in icy or snowy conditions
• 63% of angle-turning or head-on turning involved an
eastbound driver
Countermeasures Description
Install signal ahead advance
warning signs
Warning signs placed before a signalized intersection to
inform drivers of an approaching signal.
Install right-turn lane on both
major road approaches at 3-
or 4-leg signalized
intersection
A right-turn auxiliary lane for storage and to
accommodate decreasing speeds for right-turn vehicles
as they approach an intersection.
Left turn lane on both major
road approaches at urban 4-
leg signalized intersection
Adds a left-turn auxiliary lane on both approaches for
storage and to accommodate the deceleration of left-
turn vehicles.
Install actuated advance
warning dilemma zone
detection system for
passenger cars or
freight/trucks
This countermeasure provides microwave radar that
detects the speed and distance of a vehicle from the
intersection and extends the green interval if the vehicle
is within the dilemma zone.
Install signal ahead advance
warning signs
Warning signs placed before a signalized intersection to
inform drivers of an approaching signal.
Estimated Cost: $5,144,000
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 24
HCL 12: N 2nd East – S Teton River to E 7th North
This location is a one-third mile segment with a five-lane cross section. There is intersection lighting at the
minor cross street approaches. There are sidewalks and no bike lanes along this segment. It is bounded
by a bridge over the Teton River at the south end and ends 200 feet south of the intersection of E 7th
North. There is a traffic signal at Teton R. Village intersection that is included in this segment. The crashes
within 200 feet of E Lorene Street were analyzed as a separate high crash location (HCL 16). A concept
design for this location is included as an appendix item (Appendix D).
The following is a summary of the 2020 – 2024 crashes:
• 56 crashes
• 2 pedestrian crashes (One at Teton R. Village, one at
Denny’s/Java driveway)
• 64% intersection related
• 57% occurred at the Teton R. Village traffic signal
• 52% rear-end
• 25% risky driving (distraction, speed, impairment)
• 23% lane departure
• 18% angle-turning
• 11% head-on turning
Countermeasures Description
Speed enforcement Increasing penalties for speeding and other traffic
offences
Install speed feedback signs Speed feedback signs provide drivers with real‑time
information about their speed as they pass the sign.
Install median barrier Median barriers are longitudinal barriers most
commonly used to separate opposing directions of
traffic on a divided highway.
Create directional medians Install directional median openings to allow and restrict
left-turns and U-turns
Estimated Cost: $3,209,000
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 25
HCL 13: Main St / Pahsimeroi Blvd / Summit Dr
This intersection has 6-lanes on the east-west approaches, and 2-lanes on the side street approaches.
The south leg is stop-controlled and the north leg is restricted by a median to right-in-right-out only, with a
yield sign controlling the right-out movement. Street lighting and sidewalks are present, and there are no
bike lanes present. This intersection is located roughly 700 feet to the west of the diverging diamond
interchange of US Highway 20 and State Highway 33. A concept design for this location is included as an
appendix item (Appendix D).
The following is a summary of the 2020 – 2024 crashes:
• 9 crashes
• 1 serious injury (westbound vehicle struck a curb and
traffic sign support)
• 44% rear-end
• 2 lane/roadway departure (curb and overturn)
• 3 turning crashes (angle, head-on, same-direction)
Countermeasures Description
Install right-turn lane on
single major road approach at
3- or 4- leg unsignalized
intersection
A right-turn auxiliary lane for storage and to
accommodate decreasing speeds for right-turn vehicles
as they approach an intersection.
Install left-turn lane on single
major road approach at 3- or
4- leg unsignalized
intersection
Adds a left-turn auxiliary lane on the major approach for
storage and to accommodate the deceleration of left-
turn vehicles.
Create directional medians
that restrict and allow left-
turns and u-turns
Install directional median openings to allow and restrict
left-turns and u-turns
Estimated Cost: $531,000
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 26
HCL 14: S 2nd West / W 5th South
S 2nd West and W 5th South is a three-lane by two-lane intersection with two-way stop control on the
west and east legs. There are pedestrian crossing signs enhanced with round flashing beacons on the
south leg. Street lighting and sidewalks are present, and there are bike lanes adjacent to on-street
parking on the east and west legs. Parallel on-street parking is also permitted on the west side of the
south leg. A concept design for this location is included as an appendix item (Appendix D).
The following is a summary of the 2020 – 2024 crashes:
• 8 crashes
• 1 serious injury
• 2 pedestrian (serious injury, crossing E-W)
• 50% nighttime conditions
• 25% angle
• 25% parked car
• 25% due to risky behaviors (inattention, speeding
too fast for conditions)
Countermeasures Description
Provide flashing beacons at
minor-road stop-controlled
intersections
At minor road stop controlled intersections, red flashing
beacons installed on top of the stop signs on the minor
controlled road.
Install speed feedback signs Speed feedback signs provide drivers with real‑time
information about their speed as they pass the sign.
Speed enforcement Increasing penalties for speeding and other traffic
offences
Curb extensions Curb extensions narrow the width of the roadway by
extending the curb line or sidewalk out into the parking
lane
Install intersection lighting Provide lighting at an intersection
Estimated Cost: $583,000
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 27
HCL 15: S 5th West / W 7th South
S 5th W and W 7th S is a two-lane by five-lane unsignalized intersection with two-way stop control on the
north and south legs. Street lighting is present, and sidewalks are present everywhere but the east side of
the north leg. Bike lanes are present on the north leg.
The following is a summary of the 2020 – 2024 crashes:
• 14 crashes
• 1 serious injury
• 79% angle-related (serious injury)
• 14% failed to obey stop sign
• 14% speed too fast for conditions
• 73% of angle-related crashes were caused by a
northbound driver
Countermeasures Description
Increase triangle sight
distance
Removal of sight distance restrictions (vegetation,
parked vehicles, signs, buildings) from the sight
triangles at an intersection.
Convert unsignalized
intersection to compact
roundabout
Convert a non-signalized intersection into a compact
roundabout.
Install traffic signal at urban
intersection
A traffic control device that efficiently controls and
manages competing flows of traffic.
Install lighting at intersection A permanent source of artificial lighting installed at an
intersection that provides greater visibility of the
intersection.
Improve Intersection Warning A list of proven low-cost countermeasures that can be
implemented at unsignalized intersections.
Install / upgrade larger or
additional stop signs or other
intersection warning /
regulatory signs
Install oversized or double-up Stop signs on side street
approaches and/or intersection warning signs on un-
controlled approaches
Estimated Cost: $2,820,000
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 28
HCL 16: N 2nd East / Lorene St
N 2nd E and Lorene Street is an unsignalized T-intersection with five-lanes on the north and south legs.
The east leg is stop controlled, and the west is a driveway access that is uncontrolled. The intersection
has sidewalks, but it does not have street lighting or bike lanes. Crashes within 200’ of this intersection
along N 2nd East are included. The adjacent segments of N 2nd East are included as HCL 12. A concept
design for this location is included as an appendix item (Appendix D).
The following is a summary of the 2020 – 2024 crashes:
• 14 crashes
• 1 serious injury
• 57% intersection or driveway related
• 43% rear-end (serious injury on Lorene St)
• 36% turning (head-on and angle)
Countermeasures Description
Install right-turn lane on
single major road approach at
3- or 4- leg unsignalized
intersection
A right-turn auxiliary lane for storage and to
accommodate decreasing speeds for right-turn vehicles
as they approach an intersection.
Install intersection lighting Provide lighting at an intersection
Install / upgrade larger or
additional stop signs or other
intersection warning /
regulatory signs
Install oversized or double-up Stop signs on side street
approaches and/or intersection warning signs on un-
controlled approaches
Estimated Cost: $694,000
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 29
HCL 17: Pioneer Rd / Main St
Pioneer Road and Main Street is a signalized intersection with five lanes on the east and west legs and
three lanes on the north and south legs. Street lighting and sidewalks are present, and there are bike
lanes on the south leg. This intersection is located roughly 500 feet to the east of the diverging diamond
interchange of US Highway 20 and State Highway 33.
The following is a summary of the 2020 – 2024 crashes:
• 46 crashes
• 63% rear-end (2/3 caused by westbound vehicle)
• 28% angle-related
• 20% speed too fast for conditions
• 28% in icy or snowy conditions
• 15% failed to yield
• 13% failed to obey signal
Countermeasures Description
Install right-turn lane on both
major road approaches at 3- or 4-
leg signalized intersection
A right-turn auxiliary lane for storage and to
accommodate decreasing speeds for right-turn
vehicles as they approach an intersection.
Install signal ahead advance
warning signs
Warning signs placed before a signalized intersection
to inform drivers of an approaching signal.
Improve signal hardware: lenses,
reflectorized backplates, size, and
number
Low‑cost countermeasures that can be implemented
at signals along a corridor to enhance visibility at a
signalized intersection
Estimated Cost: $1,536,000
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 30
HCL 18: N 2nd East / E 15th North
N 2nd East and E 15th North is a T-intersection with stop control on the side-street. The intersection is
currently under construction to develop the west leg, and the stop controlled east leg goes into a
shopping center. Street lighting and sidewalks are only on the southeast corner, and there are no bike
lanes. A concept design for this location is included as an appendix item (Appendix D).
The following is a summary of the 2020 – 2024 crashes:
• 9 crashes
• 1 serious injury
• 44% angle-turning
• 33% rear-end
• 33% icy, slush, or snowy conditions
• 22% roadway departure (serious injury)
• 22% improper turn
• 22% speed too fast for conditions
Countermeasures Description
Install raised pavement
markers and striping (through
intersection)
Installs raised pavement markers and striping at an
intersection.
Increase pavement friction Install pavement surfacing systems with exceptional
skid‑resistant properties not typically provided by
conventional materials.
Create directional medians Install directional median openings to allow and restrict
left-turns and u-turns.
Install speed feedback signs
(southbound)
Speed feedback signs provide drivers with real‑time
information about their speed as they pass the sign.
Estimated Cost: $657,000
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 31
HCL 19: W 1st North / N 2nd West
W 1st North and N 2nd West is a three-lane by five-lane unsignalized T-intersection located along a
horizontal curve. The minor road approach is stop-controlled and the south leg has an RRFB pedestrian
crossing. The intersection has street lighting and sidewalks, but there are no bike lanes.
The following is a summary of the 2020 – 2024 crashes:
• 8 crashes
• 1 serious injury (angle-turning)
• 88% roadway departure
• 75% ice, snow, or slush conditions
• 75% occurred while negotiating curve
• 38% fixed object
• 38% other object (not fixed) or embankment
• 63% speed too fast for conditions
Countermeasures Description
Increase pavement friction Install pavement surfacing systems with exceptional
skid‑resistant properties not typically provided by
conventional materials.
Improve roadway
superelevation
Reconstruct the roadway cross section through
horizontal curves to provide appropriate superelevation
and better manage lateral (centrifugal) forces.
Install speed feedback signs Speed feedback signs provide drivers with real‑time
information about their speed as they pass the sign.
Install curve warning signs Curve warning signs and chevrons give advance notice
to drivers to a sharp turn in the road, indicating a slower
speed is advised to maintain travel lane placement.
Estimated Cost: $2,067,000
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 32
HCL 20: Center St / E 7th South
Center Street and E 7th South is a three-lane by five-lane unsignalized intersection with stop control on
the north and south legs. There is an RRFB pedestrian crossing on the west leg, street lighting, and
sidewalks throughout. There are no bike lanes. The south leg has perpendicular parking spaces along
both sides of the street, and the north leg has angled parking spaces
along both sides of the street.
The following is a summary of the 2020 – 2024 crashes:
• 6 crashes
• 1 fatality
• 2 pedestrian (fatality)
• Both involved an eastbound driver failing to yield
• 1 each angle, angle-turning, head-on turning, rear-end
• 50% of crashes were caused by a southbound driver
Countermeasures Description
Install traffic signal at urban
intersection
A traffic control device that efficiently controls and
manages competing flows of traffic.
Install leading pedestrian
intervals
Leading pedestrian interval (LPI) gives pedestrians
and bicycles using the marked crosswalk an advance
walk signal before the motorists get a green indication
Estimated Cost: $1,408,000
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 33
POLICY AND PROCEDURE RECOMMENDATIONS
Policies and procedures play a critical role in institutionalizing the safety goals and strategies identified in
this Comprehensive Safety Action Plan. While individual projects address specific locations, policy and
procedural changes ensure that safety is consistently considered in day‑to‑day decision‑making, project
development, and long‑term planning. The policies described in Table 3 are intended to support the City’s
commitment to the Safe System approach by prioritizing actions and processes that reduce the likelihood
and severity of fatal and serious injury crashes over time. Adoption of these policies is most effective when
multiple community teaming partners participate in policy drafting and implementation.
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 34
Table 3: Recommended Safety Policy and Procedure Changes
Design & Operational Safety Policies
Policy / Procedure Name Description
Adopt a Complete Streets
Policy
Formally commit to designing and operating streets for all modes, ages,
and abilities.
Adopt a Complete Network
Policy
Adopt a policy to ensure a connected, safe, and accessible multimodal
transportation network across the entire network.
Update and Apply Access
Management Policy
Revisit guidelines to manage the location, design, and operation of
driveways and street connections to preserve roadway safety and
capacity.
Adopt a Slow Streets Policy
Adopt and implement a program that limits vehicle access / reduces
speeds on residential streets – to prioritize walking, biking, and community
use.
Adopt an Intersection
Control Evaluation (ICE)
Policy
Implement a data-driven process to evaluate and select the most
appropriate intersection control (signalization, roundabout, stop controlled)
based on safety and performance.
Adopt the Safe System
Approach
Commit to planning and design of streets using a holistic safety framework
that anticipates human error and aims to reduce crash severity through
safer roads, speeds, vehicles, and users.
Conduct Routine Road
Safety Audits
Establish a procedure for conducting regular road safety audits (RSA).
Invest in staff training to effectively lead road safety audits and develop
actionable next steps based on RSA findings.
Develop a Safety Working
Group / Vision Zero Local
Task Force
Form a multidisciplinary group team members to regularly review safety
challenges and form actionable solutions.
Program & Administrative Policies to Support Safety
Policy / Procedure Name Description
Allow Developers to Make
Safety and/or Multimodal
Improvements in Lieu of
Capacity Improvements
Adjust requirements for developers to assess and mitigate the traffic
impacts of new developments through formal studies that support
improvements to safety, versus reaching capacity standards.
Adopt Multimodal
Transportation Impact
Analysis Requirements
Require development projects to assess impacts to all roadway users,
including pedestrians and bicyclists users, with emphasis on connectivity,
crossing safety, accessibility (ADA), and consistency with the City’s
transportation safety goals.
Develop a Stakeholder
Engagement Group
Form a group dedicated to community outreach and education around
transportation safety efforts conducted by the city. This group should bring
together community members, health partners, enforcement officials, and
city staff together.
Regularly Assess
Implementation Successes
and Challenges
Assess strategy success by establishing clear, objective metrics and track
progress over multiple years. Establish a procedure to review and revise
strategies to ensure ongoing, dynamic approaches to address
transportation safety.
Develop Ordinances and
Policies Surrounding E-Bike
Safety
Develop ordinances or design guidance to ensure effective integration of
E-Bike usage on the roadway network.
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 35
PROJECT PRIORITIZATION
Policy and process change priorities were established to support effective implementation of the City’s
safety goals. Priority Ranks 1 and 2 establish the foundational framework needed to guide decision‑making
and advance subsequent safety policies. Priority Ranks 3, 4, and 5 build on this foundation by strengthening
planning practices that prioritize safe speeds and support safe travel for vulnerable road users. The
prioritized policies include:
• Policy Priority Rank 1: Adopt the Safe System Approach.
• Policy Priority Rank 2: Develop a Safety Working Group / Vision Zero Local Task Force
• Policy Priority Rank 3: Adopt Multimodal Transportation Impact Analysis Requirements
• Policy Priority Rank 4: Adopt a Slow Streets Policy
• Policy Priority Rank 5: Adopt a Complete Streets Policy
High Crash Location projects have been prioritized through a comprehensive review that considers safety
need, equity, feasibility, alignment with existing plans, and public input. Table 4 presents the resulting
priority ranking based on a weighted evaluation of the following criteria:
• Equivalent Property Damage Only (EPDO) Score
• Location within an Area of Persistent Poverty
• Consistency with adopted transportation plans (TSP/CIP)
• Identified Public Concern
Infrastructure and Non-Infrastructure prioritization methodology – including weighting and ranking – is
included in Appendix E.
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 36
Table 4: Infrastructure Priority Ranking
Infrastructure
Priority Ranking HCL ; Project Location Priority
Score
Project Cost
Estimate
Ne
a
r
-Te
r
m
P
r
i
o
r
i
t
y
Pr
o
j
e
c
t
s
1 HCL 1 ; N 2nd E: E 2nd N to S Teton
River 15 $3.17M
2 HCL 5 ; S 1st W: W 3rd S to W 1st S 14.5 $0.59M
3 HCL 3 ; S 2nd E: E 7th S to E 3rd S 13.5 $1.51M
4 HCL 7 ; University Blvd:
Yellowstone Hwy to S 5th W 13 $3.84M
5 HCL 9 ; S 2nd W & W 7th S 13 $2.78M
Mi
d
-Te
r
m
P
r
i
o
r
i
t
y
P
r
o
j
e
c
t
s
6 HCL 14 ; S 2nd W & W 5th S 11.5 $1.10M
7 HCL 2; Golden Beauty Dr &
University Blvd 11 $3.07M
8 HCL 11 ; S 12th W & Main St 10.5 $0.71M
9 HCL 6 ; Yellowstone Hwy & W 7th S 9.5 $0.51M
10 HCL 15 ; S 5th W & W 7th S 9 $1.49M
11 HCL 19 ; W 1st N & N 2nd W 9 $5.15M
12 HCL 20 ; Center St & E 7th S 9 $3.21M
13 HCL 8 ; S 2nd W & W 1st S 8 $0.54M
14 HCL 4 ; N 2nd E: Moran View to
Moody Rd 7 $0.59M
15 HCL 13 ; Main St & Pahsimeroi
Blvd & Summit Dr 6.5 $2.82M
Lo
n
g
-Te
r
m
Pr
i
o
r
i
t
y
P
r
o
j
e
c
t
s
16 HCL 17 ; Pioneer Rd & Main St 6.5 $0.70M
17 HCL 10 ; N 2nd E & Moody Rd 5.5 $1.54M
18 HCL 12 ; N 2nd E: S Teton River to
E 7th N 3 $0.66M
19 HCL 16 ; N 2nd E & Lorene St 1.5 $2.07M
20 HCL 18 ; N 2nd E & E 15th N 1.5 $1.41M
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 37
IMPLEMENTATION GRANT PRIORITIZATION
To accomplish the CSAP goal of eliminating fatal and serious injury crashes on Rexburg roadways, it is
recommended to apply for Safe Streets and Roads for All (SS4A) grant implementation funding. Funding
priority should target a high-impact project focused on the implementation of systemic improvements across
multiple high-crash locations and locations with similar characteristic, targeting the safety emphasis areas
identified in this plan.
Systemic improvements in the pedestrian emphasis district focus on implementing concentrated, district-
wide safety projects in a high‑activity area surrounding the BYU‑Idaho campus. These systemic
improvements target vulnerable road users (pedestrians, bicyclists, and young drivers aged 16–25) who
are heavily represented in the area’s crash data. The proposed improvements include enhanced crossings
(RRFBs, Pedestrian Hybrid Beacons, high‑visibility markings), intersection upgrades (signalization, lighting,
turn controls), and pedestrian‑focused infrastructure such as walkway infill, refuge islands, curb extensions,
and buffered bike lanes. These treatments are aimed at reducing pedestrian conflicts, failure‑to‑yield
crashes, and nighttime incidents. While overall crash totals are not fully quantified, fatal and serious injury
incidents are highly concentrated within this active student district, supporting a strong safety justification.
The recommended systemic improvements align strongly with key safety emphasis areas—particularly
young drivers, intersections, nighttime crashes, and vulnerable road users. Implementation of the
improvements would be relatively straightforward given the project location is within City jurisdiction and
the option for modular design strategies. Pursuing funding for this effort is strengthened by the
improvements direct impact on severe crash locations, high visibility, and strong alignment with SS4A
priorities. The pedestrian emphasis area and cost estimate of safety improvements are included in
Appendix G.
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 38
REFERENCES
Reference 1: US Department of Transportation – Federal Highway Administration. Safe Systems
Approach. August 2025. Zero Deaths and Safe System | FHWA
Reference 2: US Department of Transportation. MPDG – Areas of Persistent Poverty and Historically
Disadvantaged Communities. April 2024. Areas of Persistent Poverty and Historically Disadvantaged
Communities - USDOT
APPENDICES LIST
Appendix A: Safety Evaluation
Appendix B: Public Involvement Summary
Appendix C: Countermeasures Toolbox
Appendix D: HCL Concepts
Appendix E: Project Cost Estimates
Appendix F: Project Prioritization Matrix
Appendix G: Pedestrian Emphasis Area Improvements and Cost Estimate
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
Appendix A: Rexburg Safety Data
Summary and Analysis Technical
Memo (DKS, November 2025)
SAFETY DATA SUMMARY & ANALYSIS [DRAFT]
DATE: November 25, 2025
TO: Justin Beard | City of Rexburg
FROM: Colby GeDeros, PE, PTOE | DKS Associates
Meagan Romenesko, PE | DKS Associates
Nathan Edelmann, PE | DKS Associates
SUBJECT: City of Rexburg CSAP Safety Data Summary & Analysis DKS P#26005-000
INTRODUCTION
This memorandum presents the findings of a comprehensive safety evaluation as part of the
development of the City of Rexburg Comprehensive Safety Action Plan (CSAP). Keller Associates
is leading the development of the CSAP with safety analysis and GIS support from DKS
Associates. The CSAP will provide an evidence-based approach toward reducing fatal and serious
injury crashes, consistent with the Safe Systems Approach and the goals of the U.S. Department
of Transportation’s Safe Streets and Roads For All (SS4A) program.
This memo identifies systemic crash trends and safety emphasis areas, which target crash types
and contributing factors that are disproportionately leading to fatal and serious injury crashes.
This memo also identifies a high priority network, which is a system of streets and intersections
within the city that have the highest risk of fatal and serious injury crashes based on the previous
5-years of crash history. This memo also includes an analysis to understand how these crash risk
factors overlap with historically disadvantaged communities in Rexburg.
PROJECT LOCATION
The City of Rexburg is located in eastern Idaho within Madison County. The city is comprised of
about 10 square miles of land and contains 85 miles of city-owned roadways1 (Figure 1). The
total population of the City of Rexburg was 39,409 in 2020 according to the most recent census2.
1 https://www.rexburg.org/page/2024-state-of-the-city-address
2 https://data.census.gov/table?q=Rexburg%20city,%20Idaho
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 2
Rexburg is home to Brigham Young University-Idaho, with an on-campus student population of
25,837 as of the Fall 2025 semester.
The crash analysis encompasses all public roadways within the Rexburg city limits, including both
City-maintained streets and the Idaho Transportation Department (ITD) routes SH-33 and US-20.
CITY OF REXBURG
N
FIGURE 1. STUDY AREA
City Limits
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 3
EXISTING SAFETY ANALYSIS
A safety analysis was conducted to evaluate the existing safety performance of the study
roadways using the most recent five years of crash data available from ITD (2020-2024)3. The
analysis follows the Safe System Approach, as defined by the U.S. Department of Transportation,
which emphasizes building a transportation system designed to anticipate human error and
prevent those errors from resulting in death or serious injury. The Safe System Approach
prioritizes the reduction of fatal and serious injury crashes, recognizing that these outcomes
represent the greatest cost to individuals and the community.
Crash records provide all data collected by the reporting officer, including crash identification
(crash identification number, jurisdiction, street, cross street, location, date, time), demographics
(age, sobriety), environmental (lighting, weather, road surface), and crash details (type of crash,
contributing circumstances, vehicle type, severity).
For this safety analysis, crash severity is categorized as follows:
● Fatal (F): A collision that results in the death of a person within 30 days of the collision.
● Serious Injury (A): A collision that results in life-altering injuries.
● Minor Injury (B): A collision that results in other visible injuries that are not life-altering,
such as minor lacerations and bruising.
● Possible Injury (C): A collision that results in the complaint of non-visible pain/injury,
such as confusion, limping, and soreness.
● No Apparent Injury (PDO): A collision without injury or complaint of pain but resulting
in property damage to a vehicle or another object (more than $1,501), commonly referred
to as a “fender bender.”
CITY-WIDE CRASH SUMMARY
Between 2020 and 2024, 2,029 crashes were reported on the study roadways within the City of
Rexburg, resulting in an average of 423 crashes per year. Figure 2 shows the number of crashes
by severity between 2020 and 2024. During the five-year period, 3 crashes resulted in fatality
and 30 crashes resulted in seriously injury.
3 Data provided by ITD Office of Highway Safety on October 7, 2025
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 4
FIGURE 2. CRASH SEVERITY BY YEAR
Crashes are inherently random events and, as such, will naturally fluctuate in frequency and
severity over time. However, two important patterns are present in the data. First, the decrease
in the total number of crashes in 2020 was likely related to the COVID-19 pandemic and the
overall reduction in vehicle miles traveled. Second, the number of fatal and serious injury crashes
and proportion of crashes resulting in fatal or serious injuries increased two- and threefold in
2023 and 2024, respectively (Figure 3).
2020 2021 2022 2023 2024
Fatal 0 2 1 0 0
Serious Injury 3 2 3 9 13
Minor Injury 26 39 37 49 41
Possible Injury 52 64 80 73 52
No Apparent Injury 205 332 288 346 312
Total 286 439 409 477 418
286
439 409
477
418
0
100
200
300
400
500
600
Nu
m
b
e
r
o
f
C
r
a
s
h
e
s
Year
Crash Severity By Year
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 5
FIGURE 3. LIKELIHOOD OF HIGH SEVERITY CRASHES BY YEAR
The historical crash data for Rexburg was compared to crash data for the entire State of Idaho,
using the Idaho Transportation Department’s 2024 Crash Analysis Report4. This report compiles
crash data for three years (2022-2024) for each city in the state, allowing a comparison of
Rexburg to other cities around the state. Population estimates were used in conjunction with the
crash totals to calculate a crash rate per 10,000 residents. Figure 4 shows the resulting crash
rates for all cities in Idaho with populations over 15,000 people. Rexburg is situated almost at
the center of this graph, indicating a crash rate (333 per 10,000 residents) just slightly lower
than the median (352 per 10,000 residents).
4 https://apps.itd.idaho.gov/Apps/OHS/Crash/24/Analysis.pdf
1.05%
0.91%
0.98%
1.89%
3.11%
0.00%
0.50%
1.00%
1.50%
2.00%
2.50%
3.00%
3.50%
2020 2021 2022 2023 2024
Pe
r
c
e
n
t
o
f
C
r
a
s
h
e
s
R
e
s
u
l
t
i
n
g
i
n
F
a
t
a
l
o
r
Se
r
i
o
u
s
I
n
j
u
r
y
Year
Likelihood of High Severity Crashes
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 6
FIGURE 4. CRASH RATE FOR IDAHO CITIES
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 7
Fatal and serious-injury crash locations are shown on the map in Figure 5. Additional analysis
leading to the identification of high-risk crash locations is presented later in this memo.
FIGURE 5. FATAL AND SERIOUS INJURY CRASH LOCATIONS (2020 - 2024)
Fatal
Serious Injury
City Limits
N
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 8
CRASH STATISTICS
Table 1 shows a summary of leading crash attribute statistics in the City of Rexburg. To better
understand the risk factors associated with fatal and serious injury (F&A) crashes, attributes in all
crashes are compared to those in fatal and serious injury crashes to understand which attributes
hold the highest risk for life-altering results. The characteristics included in Table 1 are the
leading crash attributes for each data element. The table does not reflect all possible crash
characteristics, and characteristics are not mutually exclusive (i.e., a single crash event involving
a young driver who left the roadway and struck a fixed object would be reported in multiple rows
of the table).
TABLE 1. SUMMARY OF REXBURG CRASH ATTRIBUTES
DATA ELEMENT CRASH ATTRIBUTE % OF ALL CRASHES
WITH THIS ATTRIBUTE
% OF F&A CRASHES
WITH THIS ATTRIBUTE
Crash Type Roadway Departure or Lane
Departure A 28.5% 33.4%
Head-On 9.3% 15.2%
Fixed Object 4.8% 6.1%
Parked Car 4.4% 3.0%
Side Swipe 9.1% 3.0%
Ditch/Embankment 0.6% 3.0%
Angle/Turning 28.2% 30.3%
Pedestrian or Bicycle Involved 2.8% 24.2%
Rear-End 33.3% 9.1%
Contributing
Circumstance
(For at least
one vehicle)
Failure to Yield 21.3% 30.3%
Speeding 12.2% 18.2%
Distraction B 10.7% 21.2%
Alcohol and Drug Impairment 1.0% 3.0%
Motor Vehicle
Type Involved
Motorcycle 1.7% 23.3%
Heavy Vehicle 3.8% 0.0%
Pedestrian and
Bicycle Involved Pedestrian-Involved 1.8% 21.2%
Bicycle-Involved 0.9% 3.0%
Lighting Condition Dark/Dusk/Dawn 27.4% 39.4%
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 9
DATA ELEMENT CRASH ATTRIBUTE % OF ALL CRASHES
WITH THIS ATTRIBUTE
% OF F&A CRASHES
WITH THIS ATTRIBUTE
Roadway
Characteristic
At Intersection or Intersection
Related 56.0% 51.5%
At Stop Sign 27.4% 39.4%
At Signal 28.5% 15.2%
At Four-Way Intersection 44.7% 36.4%
At T-Intersection 8.2% 15.2%
Functional Class Principal Arterial 50.8% 30.3%
Minor Arterial 14.6% 15.2%
Collector 14.2% 15.2%
Local 15.1% 24.2%
Road User Younger Road User
(age 16 – 25) 77.5% 66.7%
Older Road User
(age 65+) 11.8% 6.1%
Road Surface
Conditions
Wet 4.6% 6.1%
Ice/Snow/Slush 23.2% 18.2%
Protective Device
Usage C No Protective Device Used 5.8% 18.2%
A Roadway Departure crashes include collisions with objects on the side of the roadway. Lane Departure crashes include head-on and side swipe crashes.
B Distraction includes distraction and inattention.
C Protective devices include helmets and seatbelts.
† Red text is used to highlight crash factors that account for over 20% of fatal and serious injury crashes.
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 10
EMPHASIS AREAS
Emphasis areas are commonly developed by studying the crash characteristics that are most
predominant or that are over-represented in fatal and serious injury crashes compared to lower
severity crashes. For example, pedestrian-involved crashes may represent a small percentage of
all crashes, but a much higher percentage of fatal and serious injury crashes. If so, an agency
may choose to focus on pedestrian safety as an emphasis area as they are more likely to be
seriously injured or killed when involved in a crash.
While there is no requirement for a certain number of emphasis areas, it is recommended that
between 4 and 6 emphasis areas be selected. Too many emphasis areas can dilute the value of
the plan with too many strategies and actions to feasibly implement, while too few can result in
missed opportunities to reduce fatal and serious injury crash risks.
OVERVIEW OF CRASH ATTRIBUTE PATTERNS
In Rexburg, two crash attributes stand out for their high prevalence in fatal and serious injury
crashes:
• Young Road Users
• Intersection-Related Crashes
Together, these two attributes are each present in more than 50% of all fatal and serious injury
crashes, warranting their inclusion as emphasis areas.
Table 2 further identifies additional crash attributes that either appear frequently in severe
crashes (Flag 1—Predominant) or are over-represented in severe crashes relative to all crashes
(Flag 2—High Severity Indicator). Nine total attributes received both of these flags, indicating
potential areas of focus.
TABLE 2. REXBURG CRASH ATTRIBUTE TABLE
ATTRIBUTE Flag 1:
PREDOMINANT
Flag 2:
HIGH SEVERITY INDICATOR
ROADWAY OR LANE
DEPARTURE CRASHES
ANGLE/TURNING
CRASHES
CRASHES INVOLVING
YOUNG DRIVER (15-25)
FAILURE TO YIELD
SPEEDING
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 11
ATTRIBUTE Flag 1:
PREDOMINANT
Flag 2:
HIGH SEVERITY INDICATOR
DISTRACTION
CRASHES INVOLVING
MOTORCYCLES
CRASHES INVOVLING
BICYCLISTS OR
PEDESTRIANS
INTERSECTION
CRASHES
NIGHTTIME
(DARK/DAWN/DUSK)
CONDITIONS
CRASHES ON PRINCIPAL
ARTERIALS
CRASHES ON LOCAL
ROADS
FAILURE TO WEAR
PROTECTION DEVICES
The following sections summarize how these attributes were evaluated and how they inform the
final list of six recommended emphasis areas.
ROADWAY AND LANE DEPARTURE CRASHES
Roadway and Lane Departure crashes often have overlapping causes (e.g. speed, distraction,
light conditions) and possible safety solutions (e.g. signing and striping, pavement markers,
lighting). Combining these attributes into a single emphasis area allows the City to address both
crash types through the parallel safety improvement efforts, maximizing efficiency of future
investments. Recommended Emphasis Area.
ANGLE/TURNING CRASHES
Angle and turning crashes are common at intersections and are driven largely by visibility issues,
failure to yield, and operational conditions. Because these patterns are closely tied to intersection
design and control, they are best addressed under the Intersection emphasis area rather than as
a standalone category.
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 12
FAILURE TO YIELD
Failure-to-yield is a contributing factor that strongly overlaps with intersection, turning, and
young driver crashes. As a behavioral contributor, it can be addressed through the strategies
developed for the Intersection and Young Drivers emphasis areas.
DISTRACTION
Distraction is flagged as both predominant and high severity. Young Drivers were responsible for
70% of fatal and serious injury crashes and 80% of all crashes involving a distraction, indicating a
strong correlation. For this reason, distraction will be directly addressed within the Young Drivers
emphasis area.
MOTORCYCLE CRASHES
Motorcyclists face substantial vulnerability on the roadways, and are much more likely to be
involved in fatal or serious injury crashes. In Rexburg, 1 in 5 motorcycle crashes resulted in
serious injury. Recommended Emphasis Area.
PEDESTRIAN AND BICYCLE CRASHES
Pedestrian and bicycle related crashes are also much more likely to be severe. 1 in 7 resulted in a
fatal or serious injury in Rexburg. Given this elevated risk and the unique strategies required to
protect vulnerable road users, a combined Pedestrian and Bicycle emphasis area is recommended.
Recommended Emphasis Area.
NIGHTTIME CONDITIONS
Most traffic activity occurs during the day, so crashes during dark, dusk, or dawn are
disproportionately high with nearly 40 percent of fatal and serious injury crashes in Rexburg
occurring during nighttime or low-light conditions. Addressing lighting, visibility, and nighttime
driver behavior requires targeted engineering and enforcement strategies, supporting its inclusion
as an emphasis area. Recommended Emphasis Area.
CRASHES ON LOCAL ROADS
Although 20% of fatal and serious injury crashes occur on local roads, the lack of clear patterns
make this attribute difficult to address as a standalone emphasis area. Strategies targeting
nighttime crashes, intersections, and vulnerable road users are likely to improve safety on local
roads without designating it as a specific emphasis area.
Based on the prevalence, severity risk, and the potential for each attribute to support a clear,
implementable set of strategies, the following six emphasis areas are recommended for the
Rexburg Safety Action Plan.
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 Y
1. Young Drivers
2. Intersection-Related
3. Nighttime
4. Roadway and Lane Departure
5. Bike and Pedestrian
6. Motorcyclists
To support the development of targeted strategies, the following sections explore each emphasis
area in greater detail, including key crash characteristics and considerations.
YOUNG DRIVERS
1,572 crashes involved drivers aged 16-25 in Rexburg, with 22 resulting in fatalities or serious
injuries.
KEY ISSUES CRASH CHARACTERISTICS
(ALL CRASHES)
SEVERE CRASH CHARACTERISTICS
24% (1 IN 4) OF ALL
CRASHES INVOLVED RISKY
DRIVING BEHAVIORS
SUCH AS SPEEDING,
DISTRACTION,
INATTENTION, OR DROWSY
DRIVING.
Most common crash types:
• Rear-end: 34.7%
• Angle/Turning: 29.3%
• Lane Departure: 19.5%
In fatal and serious injury
crashes:
• Angle/turning: 36.4%
• Distracted driving: 25%
• Ped/bike involved: 36.4%
INTERSECTION-RELATED
56 percent of all crashes in Rexburg occurred at or near intersections, and 51.5 percent of fatal
and serious injury crashes also occurred at or near intersections.
KEY ISSUES CRASH CHARACTERISTICS
(ALL CRASHES) SEVERE CRASH CHARACTERISTICS
2 IN 3 (67%) INTERSECTION
CRASHES THAT RESULTED IN
FATAL OR SERIOUS INJURIES
OCCURRED AT STOP-
CONTROLLED INTERSECTIONS,
PRIMARILY WHERE ONLY THE
MINOR-ROAD IS STOPPED.
1 IN 4 (24%) INTERSECTION
CRASHES THAT RESULTED IN
FATAL OR SERIOUS INJURIES
OCCURRED AT A TRAFFIC
SIGNAL.
Top contributing factors:
• Failure to Yield: 27%
• Following Too Close: 19%
• Speeding: 13%
Crash types at
intersections:
• Rear-End: 36%
• Angle: 36%
• Head-On: 13%
In fatal & serious injury crashes:
• Failure to Yield: 35%
• Distraction: 24%
• Pedestrian Involved: 29%
• At stop-controlled intersection:
67%
• At traffic signal: 24%
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 14
NIGHTTIME
27 percent of all crashes in Rexburg occurred during dark, dusk, or dawn conditions (Nighttime),
and 39 percent of fatal and serious injury crashes occurred in low light.
KEY ISSUES CRASH CHARACTERISTICS
(ALL CRASHES) SEVERE CRASH CHARACTERISTICS
ROADWAY
DEPARTURES, LANE
DEPARTURES, AND
INTERSECTION
CRASHES ARE LEADING
SEVERE CRASH
OUTCOMES IN LOW-
LIGHT CONDITIONS.
Top factors:
• Intersection-Related: 57%
• ≤25 MPH roadways: 45%
• 35 MPH roadways: 32%
• Speeding: 13%
Crash types at intersections:
• Roadway or Lane Departure: 35%
• Angle: 27%
• Rear End: 23%
In fatal & serious injury crashes:
• Roadway or Lane Departure: 54%
• Intersection-related: 46%
• Angle/Turning: 23.1%
• ≤25 MPH roadways: 25%
• 35 MPH roadways: 45%
• Speeding: 30%
ROADWAY AND LANE DEPARTURE
Roadway and lane departure crashes made up 29 percent of all crashes in Rexburg and just over
one-third of fatal and serious injury crashes.
KEY ISSUES CRASH CHARACTERISTICS
(ALL CRASHES)
SEVERE CRASH
CHARACTERISTICS
HEAD-ON COLLISIONS AND
STRIKING FIXED OBJECTS
OR EMBANKMENTS
PRESENT THE GREATEST
SAFETY CONCERN.
Top Factors:
• Speeding: 38%
• Ice, Snow, or Slush Road Surface:
27%
Crash types
• Head-on Collision (Lane Departure
Only): 51%
• Striking a Fixed Object or
Embankment (Roadway Departure
Only): 54%
Among fatal & serious injury
crashes:
• Head on Collision (Lane
Departure Only): 83%
• Striking a Fixed Object or
Embankment (Roadway Departure
Only): 60%
• Low light conditions: 64%
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 15
BIKE AND PEDESTRIAN
Bikes and pedestrians represented less than 3 percent of all crashes (56 incidents) but 24 percent
of fatal & serious injury crashes (8 incidents), showing a significant severity disproportion.
Pedestrians were involved in two-thirds of the 56 total crashes and 89 percent fatal or serious
injury crashes. Since pedestrian and bicycle crashes disproportionately lead to fatal or serious
injuries, it is important to closely examine crash patterns across all severities to fully understand
the risks and contributing factors.
KEY ISSUES CRASH CHARACTERISTICS
(ALL CRASHES)
SEVERE CRASH
CHARACTERISTICS
44% OF ALL PEDESTRIAN
CRASHES, AND 71% OF
FATAL OR SERIOUS INJURY
PEDESTRIAN CRASHES WERE
CAUSED BY VISION
OBSTRUCTIONS,
DISTRACTION, OR
INATTENTION.
Top Factors:
• Failure to Yield: 52%
• Vision Obstruction: 18%
• Distraction: 16%
• Nighttime: 32%
Where crashes occur:
• Unsignalized intersections: 52%
• ≤25 MPH roadways: 70%
Among fatal & serious injury
crashes:
• Distraction: 50%
• Failure to Yield: 38%
• Vision Obstruction: 13%
Where crashes occur:
• Unsignalized intersections: 50%
• ≤25 MPH roadways: 89%
MOTORCYCLISTS
Motorcyclists represent a small share of total crashes (1.7 percent) and road users, but a
disproportionately high share of severe crashes, accounting for 23 percent of all fatal and serious
injury crashes. Although motorcycle crashes are relatively infrequent, the lack of physical
protection significantly increases the likelihood of severe outcomes. Since motorcycle-involved
crashes carry a high risk of serious injury or death, it is important to examine crash
characteristics across all severities to understand where the greatest risks occur.
KEY ISSUES CRASH CHARACTERISTICS
(ALL CRASHES)
SEVERE CRASH
CHARACTERISTICS
3 IN 4 (75%) MOTORCYCLE
CRASHES INVOLVED A
YOUNG DRIVER.
RISKY BEHAVIORS,
INCLUDING SPEEDING AND
IMPROPER MANEUVERS, PLAY
A MAJOR ROLE IN ELEVATED
CRASH RISK.
Top Factors:
• Young Drivers: 75%
• Failure to Yield: 30%
• Speeding: 32%
• Improper Maneuver: 24%
Where crashes occur:
• Not at Intersections: 65%
• ≤25 MPH roadways: 53%
Among fatal & serious injury
crashes:
• Speeding: 29%
• Failure to Yield: 29%
Where crashes occur:
• Not at Intersections: 71%
• ≤25 MPH roadways: 43%
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 16
HIGH-CRASH LOCATIONS
Spatial analysis was used to identify the leading crash locations within Rexburg where there was a
high crash frequency and high crash severity. To rank these locations, an Equivalent Property
Damage Only (EPDO) score was used. The EPDO score quantifies crash severity at each
intersection or segment based on the following:
• Fatal and serious injury = 100 points
• Minor and possible injuries = 10 points
• Property damage only = 1 point
To identify high-crash locations, signalized intersections were evaluated separately from adjacent
roadway segments. Crashes occurring within 200 feet of an intersection center were classified as
intersection-related to address inconsistencies in the crash database.
Roadway segments were defined using a project-based approach to reflect logical limits for future
improvements. Signalized intersections were generally excluded from segments; therefore,
crashes within 200 feet of these intersections were removed from the segment’s EPDO score. In
limited cases where a signalized intersection exists mid-segment, the intersection was included in
the segment to better capture overall safety conditions. All unsignalized intersections at the
beginning or end of segments are included.
Table 2 lists the 20 high-crash locations in Rexburg ranked according to 2020 – 2024 crash
data.5 Figure 5 provides a map of the high crash location locations, and the following pages
provide an overview and detailed crash analysis for each location.
5 The 2020–2024 crash data indicated elevated crash frequencies at locations on Main Street and University
Boulevard near the US-20 interchange. However, because of the recent construction of diverging diamond
interchanges (DDIs) at both locations, they were not included in the high-crash location list.
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 17
TABLE 2. REXBURG HIGH CRASH LOCATIONS
RANK LOCATION EPDO INTERSECTION/SEGMENT
1 N 2nd East: E 2nd North to S Teton River 425 Segment
2 Golden Beauty Dr / University Blvd 395 Intersection
3 S 2nd East: E 7th South to E 3rd South 391 Segment
4 N 2nd East: Moran View Rd to Moody Rd 292 Segment
5 S 1st West: W 3rd South to W 1st South 275 Segment
6 Yellowstone Hwy / W 7th South 202 Intersection
7 University Blvd: 200’ east of Yellowstone
Highway to S 5th West 196 Segment
8 S 2nd West / W 1st South 194 Intersection
9 S 2nd West / W 7th South 190 Intersection
10 N 2nd East / Moody Rd 187 Intersection
11 S 12th West / Main St 166 Intersection
12 N 2nd East: S Teton River to E 7th North 155 Segment
13 Main St / Pahsimeroi Blvd / Summit Dr 144 Intersection
14 S 2nd West / W 5th South 134 Intersection
15 S 5th West / W 7th South 131 Intersection
16 N 2nd East / Lorene St 131 Intersection
17 Pioneer Rd / Main St 127 Intersection
18 N 2nd East / E 15th North 126 Intersection
19 W 1st North / N 2nd West 116 Intersection
20 Center St / E 7th South 114 Intersection
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 18
FIGURE 6. HIGH-CRASH LOCATIONS
High Crash Intersection
High Crash Segment
City Limits
Top 20 High-Crash Locations
N
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 19
HIGH CRASH LOCATION DESCRIPTIONS
HCL 1: N 2nd East: E 2nd North to S Teton River
This location is a one-third
mile segment with a five-lane
cross-section. It has lighting
and sidewalks present and no
bike lanes. It is bounded by a
signalized intersection at the
south end and a bridge over
the South Teton River at the
north end.
The following is a summary of
the 2020 – 2024 crashes:
• 83 crashes
• 1 serious injury
• 1 bicycle related crash
• 36% rear-end
• 34% angle crashes (injury A)
• 29% occurred at a driveway
• 26% occurred at an intersection
• 24% failed to yield
• 23% turning left
• 20 crashes occurred with 100’ of E 4th
North
• 14 crashes occurred within 100’ of
Valley River Drive
HCL 2: Golden Beauty Dr / University Blvd
Golden Beauty Drive and University Boulevard
meet at a five-lane by two-lane unsignalized
intersection with two-way stop control on the
north and south minor road approaches. Street
lighting is present at this location. Sidewalks
are present on the west side of the
intersection and on the north side of the east
leg, and there are no bike lanes. This
intersection is located about 300 feet east of
the diverging diamond interchange of US
Highway 20 and University Boulevard.
The following is a summary of the 2020 – 2024 crashes:
• 26 crashes
• 3 serious injuries
• 38% angle-turning (injury A)
• 15% head-on (injury A), rear-end,
side-swipe same
• 31% failed to yield
• 19% improper turn
FIGURE 7. N 2ND EAST: E 2ND NORTH TO S TETON RIVER
SEGMENT
FIGURE 8. GOLDEN BEAUTY DR / UNIVERSITY
BLVD INTERSECTION
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 20
HCL 3: S 2nd East: E 7th South to E 3rd
South
This location is an approximately 0.6-mile
long segment with a three-lane cross section.
The segment has street lighting and
sidewalks, and it has bike lanes along most of
its length. The segment is bounded by two
signalized intersections, and there are four
rectangular rapid flashing beacon (RRFB)
pedestrian crossings along this section.
The following is a summary of the 2020 –
2024 crashes:
• 31 crashes
• 3 serious injuries (all pedestrian
involved)
• 4 pedestrian, 1 bike
o 4 occurred at intersections
• 48% rear-end
• 13% angle-turning
• 19% inattention
• 23% driveway/parking lot related
• 4 crashes (1 ped, injury A) occurred
at the southern-most RRFB
• 4 crashes (3 ped, 1 injury A) occurred
at E 3rd South
HCL 4: N 2nd East: Moran View Rd to Moody Rd
This location is a half-mile long segment with a
five-lane cross section. The segment includes a
T-intersection at Moran View Road, signal at
Stationary Place, and ends 200’ south of the
signalized intersection at Moody Road. There is
no street lighting present outside of the signal,
and sidewalk is present along most of the east
side of the segment, but not the west. There
are no bike lanes along this segment.
The following is a summary of the 2020 – 2024
crashes:
• 40 crashes
• 1 fatality
• 45% rear-end
• 38% occurred at a signalized
intersection
• 15% angle-turning
• 13% head-on turning (fatal)
• 23% speed too fast for conditions
• 30% during icy conditions
• 23% involved left-turning vehicles
FIGURE 9. S 2ND EAST: E 7TH SOUTH TO E 3RD
SOUTH SEGMENT
FIGURE 10. N 2ND EAST: MORAN VIEW RD TO
MOODY RD SEGMENT
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 21
HCL 5: S 1st West: W 3rd South to W 1st South
This 0.3-mile long segment has a two-lane
cross section and both angled and parallel on-
street parking. Street lighting and sidewalks
are present, and there is a southbound bike
lane between W 1st South and W 2nd South.
The segment is bounded by a four-leg all-way
stop-controlled intersection at W 1st South and
a three-leg all-way stop-controlled intersection
at W 3rd South. A four-leg signalized
intersection is located at W 2nd South.
The following is a summary of the 2020 – 2024
crashes:
• 23 crashes
• 2 serious injuries
• 56% angle crashes (2 injury A)
• 1 pedestrian and 2 bike crashes
• 17% rear-end
• 17% speed too fast for conditions
• 43% driveway or parking lot related
• 39% intersection related
• 43% nighttime conditions
HCL 6: Yellowstone Hwy / W 7th South
Yellowstone Highway and W 7th Street is a
signalized intersection with five-lanes on the
south, east, and west legs and six lanes on
the north. The eastbound and westbound
right turns are channelized and controlled
with yield signs. The intersection has an
approximately 30° skew, with the north and
south legs skewed to the northeast. There is
a railroad crossing with automatic gates
approximately 60 feet west of the
intersection. Street lighting is present, and
there are sidewalks on all four legs except
the west side of Yellowstone Highway. No bike lanes are present at this intersection.
The following is a summary of the 2020 – 2024 crashes:
• 31 crashes
• 1 serious injury (head on)
• 32% rear-end (5 eastbound, 5
northbound)
• 39% angle or head-on turning
• 13% failed to obey signal
• 35% nighttime conditions
• 26% during icy conditions
• 19% involved a left-turn
FIGURE 11. S 1ST WEST: W 3RD SOUTH TO W
1ST SOUTH SEGMENT
FIGURE 12. YELLOWSTONE HWY / W 7TH SOUTH
INTERSECTION
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 22
HCL 7: University Boulevard: Yellowstone Highway to S 5th West
This location is a half-mile segment with
a two-lane cross section. It begins 200
feet east of Yellowstone Highway and
ends at S 5th West. There is no street
lighting along this segment until the S 5th
West intersection. There is a detached
sidewalk present along the north side of
the segment but not the south. While
there is no established bike lane, there is
a wide paved shoulder with a fog line on
the south side of the segment.
The following is a summary of the 2020 –
2024 crashes:
• 34 crashes
• 24% road departure/overturning
• 18% angle crashes
• 15% head-on crashes
• 18% due to improper turn
• 24% related to risky driving behavior
(distraction, speed, impairment)
• 3 motorcycle crashes
• 50% intersection related
• 21% between left-turn and through
vehicle at intersections
HCL 8: S 2nd West / W 1st South
S 2nd W and W 1st S is a five-lane by
two-lane intersection with two-way stop
control on the east and west legs. An
RRFB pedestrian crossing is present
across the north leg. Street lighting and
sidewalks are present, and there are
bike lanes along both sides of S 2nd
West.
The following is a summary of the 2020
– 2024 crashes:
• 23 crashes
• 1 serious injury
• 1 pedestrian
• 61% angle crashes
• 17% lane departure (injury A)
• 13% improper turn
• 48% of angle, angle-turning, and
head-on crashes involved a
westbound driver
FIGURE 13. UNIVERSITY BLVD: YELLOWSTONE
HWY TO S 5TH WEST SEGMENT
FIGURE 14. S 2ND WEST / W 1ST SOUTH
INTERSECTION
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 23
HCL 9: S 2nd West / W 7th South
S 2nd West and W 7th South is a signalized
intersection with five lanes on the east and
west, three lanes on the north, and four
lanes on the south. Street lighting and
sidewalks are present, and there are no
bike lanes at this location.
The following is a summary of the 2020 –
2024 crashes:
• 28 crashes
• 1 serious injury (parked car)
• 36% rear-end
• 29% head-on turning
• 29% angle-related
• 21% speed too fast for conditions
• 25% involved a left-turn and through
driver (4 between
eastbound/westbound, 2 between
northbound/southbound)
HCL 10: N 2nd East / Moody Rd
N 2nd E and Moody Road is a signalized
intersection with three lanes on the east and
west legs, five lanes on the south, and six
lanes on the north. The intersection has
street lighting present. Sidewalks are present
everywhere except on the north side of the
west leg. There are no bike lanes at this
intersection.
The following is a summary of the 2020 –
2024 crashes:
• 25 crashes
• 1 fatal crash (rear-end, medical
emergency)
• 68% rear-end
• 16% head-on turning
• 24% speed too fast for conditions
• 28% icy or snowy conditions
• 5 left-turn conflicts occurred between
northbound and southbound vehicles
• 8 rear-end crashes northbound, 5
southbound, 3 westbound
FIGURE 15. S 2ND WEST / W 7TH SOUTH INTERSECTION
FIGURE 16. N 2ND EAST / MOODY RD INTERSECTION
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 24
HCL 11: S 12th West / Main St
S 12th West and Main Street is a signalized
intersection with three lanes on the north
and south legs and four lanes on the east
and west legs. Street lighting is present,
and there are sidewalks on the east leg and
on the east side of the north and south
legs. No bike lanes are present at this
location.
The following is a summary of the 2020 –
2024 crashes:
• 22 crashes
• 1 serious injury
• 55% rear-end related (injury A)
• 28% angle-related
• 36% due to distraction or inattention
• 23% failed to yield
• 18% in icy or snowy conditions
• 63% of angle-turning or head-on
turning involved an eastbound driver
HCL 12: N 2nd East – S Teton River to E 7th North
This location is a one-third mile segment
with a five-lane cross section. There is
intersection lighting at the minor cross
street approaches. There are sidewalks
and no bike lanes along this segment. It
is bounded by a bridge over the Teton
River at the south end and ends 200 feet
south of the intersection of E 7th North.
There is a traffic signal at Teton R. Village
intersection that is included in this
segment. The crashes within 200 feet of E
Lorene Street were analyzed as a
separate high crash location (HCL 16).
The following is a summary of the 2020 – 2024 crashes:
• 56 crashes
• 2 pedestrian crashes (One at Teton R.
Village, one at Denny’s/Java
driveway)
• 64% intersection related
• 57% occurred at the Teton R. Village
traffic signal
• 52% rear-end
• 25% risky driving (distraction, speed,
impairment)
• 23% lane departure
• 18% angle-turning
• 11% head-on turning
FIGURE 17. S 12TH WEST / MAIN ST INTERSECTION
FIGURE 18. N 2ND EAST: S TETON RIVER TO E 7TH
NORTH SEGMENT
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 25
HCL 13: Main St / Pahsimeroi Blvd / Summit Dr
This intersection has 6-lanes on the
east-west approaches, and 2-lanes on
the side street approaches. The south
leg is stop-controlled and the north leg
is restricted by a median to right-in-
right-out only, with a yield sign
controlling the right-out movement.
Street lighting and sidewalks are
present, and there are no bike lanes
present. This intersection is located
roughly 700 feet to the west of the
diverging diamond interchange of US
Highway 20 and State Highway 33.
The following is a summary of the 2020 – 2024 crashes:
• 9 crashes
• 1 serious injury (westbound vehicle
struck a curb and traffic sign support)
• 44% rear-end
• 2 lane/roadway departure (curb and
overturn)
• 3 turning crashes (angle, head-on,
same-direction)
HCL 14: S 2nd West / W 5th South
S 2nd West and W 5th South is a three-lane
by two-lane intersection with two-way stop
control on the west and east legs. There are
pedestrian crossing signs enhanced with
round flashing beacons on the south leg.
Street lighting and sidewalks are present,
and there are bike lanes adjacent to on-
street parking on the east and west legs.
Parallel on-street parking is also permitted
on the west side of the south leg.
The following is a summary of the 2020 –
2024 crashes:
• 8 crashes
• 1 serious injury
• 2 pedestrian (injury A, crossing E-W)
• 50% nighttime conditions
• 25% angle
• 25% parked car
• 25% due to risky behaviors
(inattention, speeding too fast for
conditions)
FIGURE 19. MAIN ST / PAHSIMEROI BLVD / SUMMIT DR
INTERSECTION
FIGURE 20. S 2ND WEST / W 5TH SOUTH
INTERSECTION
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 26
HCL 15: S 5th West / W 7th South
S 5th W and W 7th S is a two-lane by
five-lane unsignalized intersection with
two-way stop control on the north and
south legs. Street lighting is present,
and sidewalks are present everywhere
but the east side of the north leg. Bike
lanes are present on the north leg.
The following is a summary of the 2020
– 2024 crashes:
• 14 crashes
• 1 serious injury
• 79% angle-related (injury A)
• 14% failed to obey stop sign
• 14% speed too fast for conditions
• 73% of angle-related crashes were
caused by a northbound driver
HCL 16: N 2nd East / Lorene St
N 2nd E and Lorene Street is an
unsignalized T-intersection with five-lanes
on the north and south legs. The east leg
is stop controlled, and the west is a
driveway access that is uncontrolled. The
intersection has sidewalks, but it does not
have street lighting or bike lanes. Crashes
within 200’ of this intersection along N 2nd
East are included. The adjacent segments
of N 2nd East are included as HCL 12.
The following is a summary of the 2020 –
2024 crashes:
• 14 crashes
• 1 serious injury
• 57% intersection or driveway related
• 43% rear-end (injury A on Lorene St)
• 36% turning (head-on and angle)
FIGURE 21. S 5TH WEST / W 7TH SOUTH
INTERSECTION
FIGURE 22. HCL 16: N 2ND EAST / LORENE ST
INTERSECTION
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 27
HCL 17: Pioneer Rd / Main St
Pioneer Road and Main Street is a
signalized intersection with five lanes
on the east and west legs and three
lanes on the north and south legs.
Street lighting and sidewalks are
present, and there are bike lanes on
the south leg. This intersection is
located roughly 500 feet to the east of
the diverging diamond interchange of
US Highway 20 and State Highway 33.
The following is a summary of the 2020
– 2024 crashes:
• 46 crashes
• 63% rear-end (2/3 caused by
westbound vehicle)
• 28% angle-related
• 20% speed too fast for conditions
• 28% in icy or snowy conditions
• 15% failed to yield
• 13% failed to obey signal
HCL 18: N 2nd East / E 15th North
N 2nd East and E 15th North is a T-
intersection with stop control on the side-
street. The intersection is currently under
construction to develop the west leg, and
the stop controlled east leg goes into a
shopping center. Street lighting and
sidewalks are only on the southeast
corner, and there are no bike lanes.
The following is a summary of the 2020 –
2024 crashes:
• 9 crashes
• 1 serious injury
• 44% angle-turning
• 33% rear-end
• 33% icy, slush, or snowy conditions
• 22% roadway departure (injury A)
• 22% improper tun
• 22% speed too fast for conditions
FIGURE 24. N 2ND EAST / E 15TH NORTH
INTERSECTION
FIGURE 23. PIONEER RD / MAIN ST INTERSECTION
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 28
HCL 19: W 1st North / N 2nd West
W 1st North and N 2nd West is a three-
lane by five-lane unsignalized T-
intersection located along a horizontal
curve. The minor road approach is stop-
controlled and the south leg has an RRFB
pedestrian crossing. The intersection has
street lighting and sidewalks, but there
are no bike lanes.
The following is a summary of the 2020 –
2024 crashes:
• 8 crashes
• 1 serious injury (angle-turning)
• 88% roadway departure
• 75% ice, snow, or slush conditions
• 75% occurred while negotiating curve
• 38% fixed object
• 38% other object (not fixed) or
embankment
• 63% speed too fast for conditions
HCL 20: Center St / E 7th South
Center Street and E 7th South is a
three-lane by five-lane unsignalized
intersection with stop control on the
north and south legs. There is an
RRFB pedestrian crossing on the west
leg, street lighting, and sidewalks
throughout. There are no bike lanes.
The south leg has perpendicular
parking spaces along both sides of the
street, and the north leg has angled
parking spaces along both sides of the
street.
The following is a summary of the 2020 – 2024 crashes:
• 6 crashes
• 1 fatality
• 2 pedestrian (fatality)
• Both involved an eastbound driver
failing to yield
• 1 each angle, angle-turning, head-on
turning, rear-end
• 50% of crashes were caused by a
southbound driver
FIGURE 25. W 1ST NORTH / N 2ND WEST
INTERSECTION
FIGURE 26. CENTER ST / E 7TH SOUTH INTERSECTION
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 29
STEERING COMMITTEE FEEDBACK AND ADDITIONAL LOCATIONS OF CONCERN
During the November 6, 2025 CSAP Steering Committee meeting, concerns were raised about the
area surrounding Burton Elementary School, including 7th South. The area has experienced rapid
traffic growth due to residential development and school-related traffic.
Two crashes occurred between 2020-2024 in the vicinity of Burton Elementary School. Both
crashes occurred in the vicinity of the 7th South and 12th West intersection. Both crashes involved
drivers speeding too fast for conditions and both resulted in property damage only.
AREAS OF PERSISTENT POVERTY
To ensure the plan is addressing the needs of underserved communities, particularly those
affected by persistent poverty, an analysis was performed to compare the high crash locations
with Areas of Persistent Poverty. According to the U.S. Department of Transportation6, a project is
located within an “Area of Persistent Poverty” if:
1. The County in which the project is located consistently had greater than or equal to 20
percent of the population living in poverty in all three of the following datasets: (a) the
1990 decennial census; (b) the 2000 decennial census; and (c) the most
recent (2022) Small Area Income Poverty Estimates; OR
2. The Census Tract in which the project is located has a poverty rate of at least 20 percent
as measured by the 2014-2018 5-year data series available from the American Community
Survey of the Bureau of the Census; OR
3. The project is located in any territory or possession of the United States.
Census tract 9502, 9503.01, 9504.02, 9504.03, 9503.04, 9504.01, and 9505.01 fall within the
City of Rexburg and qualify as Areas of Persistent Poverty according to Multimodal Project
Discretionary Grant FY2025-FY2026 (MPDG) criteria7. In addition, Madison County appears on the
MPDG persistent-poverty list. Figure 27 shows the Areas of Persistent Poverty in relation to the
Rexburg City limits, and the high crash locations identified for this project. The following high
crash locations fall within Areas of Persistent Poverty:
• HCL 1: N 2nd East: E 2nd North to S
Teton River
• HCL 2: Golden Beauty Dr / University
Blvd
6 https://www.transportation.gov/grants/mpdg-areas-persistent-poverty-and-historically-disadvantaged-
communities-1
7 https://maps.dot.gov/BTS/GrantProjectLocationVerification/
• HCL 3: S 2nd East: E 7th South to E
3rd South
• HCL 5: S 1st West: W 3rd South to W
1st South
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 30
• HCL 6: Yellowstone Hwy / W 7th
South
• HCL 7: University Blvd: 200’ east of
Yellowstone Highway to S 5th West
• HCL 8: S 2nd West / W 1st South
• HCL 9: S 2nd West / W 7th South
• HCL 11: S 12th West / Main St
• HCL 13: Main St / Pahsimeroi Blvd /
Summit Dr
• HCL 14: S 2nd West / W 5th South
• HCL 15: S 5th West / W 7th South
• HCL 17: Pioneer Rd / Main St
• HCL 19: W 1st North / N 2nd West
• HCL 20: Center St / E 7th South
CITY OF REXBURG CSAP • SAFETY DATA SUMMARY & ANALYSIS • NOVEMBER 2025 31
FIGURE 27. AREAS OF PERSISTENT POVERTY AND HIGH CRASH LOCATIONS
High Crash Intersection
High Crash Segment
City Limits
Areas of Persistent Poverty
N
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
Appendix B: Public Involvement
Survey (2025)
PUBLIC
INVOLVEMENT
SURVEY #1
(2025)
City of Rexburg
How safe do you feel when driving Rexburg’s roadways?
Answered: 160 Skipped: 5
0
10
20
30
40
60
70
50
Very safe Somewhat safe Neutral Somewhat unsaf...Very unsafe
Very safe 15 9.09%
Somewhat safe 68 41.21%
Neutral 30 18.18%
Somewhat unsafe 35 21.21%
Very unsafe 12 7.27%
How safe do you feel when walking Rexburg’s sidewalks?
Answers Count Percentage
Answered: 160 Skipped: 5
0
10
20
30
40
50
60
Very safe Somewhat safe Neutral Somewhat unsaf...Very unsafe
Very safe 22 13.33%
Somewhat safe 60 36.36%
Neutral 23 13.94%
Somewhat unsafe 39 23.64%
Very unsafe 16 9.7%
How safe do you feel when biking in Rexburg?
Answers Count Percentage
Answered: 158 Skipped: 7
0
10
20
30
40
60
70
50
Very safe Somewhat safe Neutral Somewhat unsaf...Very unsafe
Very safe 1 0.61%
Somewhat safe 25 15.15%
Neutral 63 38.18%
Somewhat unsafe 37 22.42%
Very unsafe 32 19.39%
Where do you feel the greatest safety concerns exist in Rexburg?
Answers Count Percentage
Answered: 159 Skipped: 6
0
20
40
60
80
100
120
University Blv...7th South (Yel...2nd W & 4th S ...2nd E Near Alb...2nd E Near Wal...Near BYU-Idaho...Near Madison H...Neighborhood s...Other
University Blvd and Yellowstone Hwy 46 27.88%
7th South (Yellowstone to BYU-Idaho)53 32.12%
2nd W & 4th S Roundabout 73 44.24%
2nd E Near Albertsons 40 24.24%
2nd E Near Walmart 38 23.03%
Near BYU-Idaho Campus 108 65.45%
Near Madison High 24 14.55%
Neighborhood streets 38 23.03%
Other 23 13.94%
If you have children or teens, how often do they walk, bike, or use a scooter t…
Answers Count Percentage
Answered: 158 Skipped: 7
0
20
40
60
80
100
No
t
Ap
p
l
i
c
a
b
l
e
.
.
.
Da
i
l
y
2-3
Tim
e
s
a
W
e..
.
On
c
e
p
e
r
W
ee
k
Us
e
s
B
u
s
I ta
k
e
t
h
e
m
t
o
.
.
.
Th
e
y
d
r
i
v
e
t
h
e
.
.
.
Not Applicable, does not apply to me 98 59.39%
Daily 14 8.48%
2-3 Times a Week 8 4.85%
Once per Week 3 1.82%
Uses Bus 16 9.7%
I take them to school 10 6.06%
They drive themselves 9 5.45%
What are the biggest challenges to walking safely in Rexburg?
Answers Count Percentage
Answered: 160 Skipped: 5
0
20
40
60
80
100
Mi
s
s
i
n
g
s
i
d
e
w
a
.
.
.
Un
s
a
f
e
c
r
o
s
s
i
n
.
.
.
Sp
e
e
d
i
n
g
t
r
a
f
f...
Traf
fic
F
a
i
l
i
n
.
.
.
Po
o
r
l
i
g
h
t
i
n
g
AD
A
ac
c
e
s
s
i
b
i
l
.
.
.
Ot
h
e
r
Missing sidewalks 60 36.36%
Unsafe crossings 81 49.09%
Speeding traffic 72 43.64%
Traffic Failing to Yield to Pedestrians 86 52.12%
Poor lighting 96 58.18%
ADA accessibility issues (ramps, slopes, obstructions)20 12.12%
Other 19 11.52%
What are the biggest challenges to biking safely in Rexburg?
Answers Count Percentage
Answered: 152 Skipped: 13
0
20
40
60
80
100
Lack of bike l...Traffic speeds...Driver behavio...Other
Lack of bike lanes or bike routes 90 54.55%
Traffic speeds and volumes 52 31.52%
Driver behavior (not yielding, unsafe passing)92 55.76%
Other 17 10.3%
Are there intersections, crossings, or streets in Rexburg that you avoid…
Yes
No
Answers Count Percentage
Answered: 159 Skipped: 6
Yes 124 75.15%
No 35 21.21%
Do you think vehicle speeds in Rexburg are generally appropriate?
Answered: 160 Skipped: 5
Yes, speeds feel appropriate
Sometimes too fast in
certain areas
Frequently too fast,
speeding is a major issue
Unsure / No opinion
Yes, speeds feel appropriate 80 48.48%
Sometimes too fast in certain areas 45 27.27%
Frequently too fast, speeding is a major issue 32 19.39%
Unsure / No opinion 3 1.82%
Which types of traffic safety improvements do you think are most needed in Rexburg?
Answers Count Percentage
Answers Count Percentage
Answered: 159 Skipped: 6
0
20
40
60
80
100
Minor improvem...Intersection L...Sidewalks and ...North-South Bi...Traffic calmin...Major corridor...
Minor improvements (crosswalk markings, speed feedback
signs)
55 33.33%
Intersection Lightings 92 55.76%
Sidewalks and ADA curb ramps 43 26.06%
North-South Bike/Ped Pathway along 2nd E 65 39.39%
Traffic calming 59 35.76%
Major corridor capacity improvements for cars 61 36.97%
What is the most important outcome you want to see from the City’s Safe…
Answers Count Percentage
Answered: 159 Skipped: 6
0
10
20
30
40
50
Sa
f
e
r
s
c
h
o
o
l
z
.
.
.
Sa
f
e
r
p
e
d
e
s
t
r
i
.
.
.
Re
d
u
c
e
d
s
p
e
e
d
i
.
.
.
Be
t
t
e
r
s
i
d
e
w
a
l
.
.
.
Im
p
r
o
v
e
d
p
a
t
h
w
...
Ov
e
r
a
l
l
r
e
d
u
c
t
.
.
.
Safer school zones 9 5.45%
Safer pedestrian crossings at intersections 37 22.42%
Reduced speeding on key streets 18 10.91%
Better sidewalks and ramps 9 5.45%
Improved pathways for bicyclists and pedestrians 39 23.64%
Overall reduction in serious crashes 47 28.48%
Where do you live?
Answers Count Percentage
Answered: 161 Skipped: 4
I live within Rexburg’s City
Limits
I live outside City Limits
within 10 miles
I live within Sugar City’s
City Limits
I live outside City Limits
greater than 10 miles
I live within Rexburg’s City Limits 129 78.18%
I live outside City Limits within 10 miles 21 12.73%
I live within Sugar City’s City Limits 7 4.24%
I live outside City Limits greater than 10 miles 4 2.42%
What is your Employment Status?
0
10
20
30
40
60
70
50
I am a High Sc...I am a BYU-Ida...I work at a bu...I commute outs...I commute into...I work from ho...I am retired I prefer not t...
Answers Count Percentage
Answered: 160 Skipped: 5
I am a High School Student 0 0%
I am a BYU-Idaho Student 26 15.76%
I work at a business in Rexburg 62 37.58%
I commute outside of Rexburg to my place of employment 16 9.7%
I commute into Rexburg to my place of employment 12 7.27%
I work from home 23 13.94%
I am retired 11 6.67%
I prefer not to answer 10 6.06%
What is your age range?
0
10
20
30
40
60
70
50
Under 18 18–26 27–44 45–64 65–74 75 or older I prefer not t...
Under 18 1 0.61%
18–26 54 32.73%
Answers Count Percentage
Answers Count Percentage
Answered: 161 Skipped: 4
27–44 63 38.18%
45–64 33 20%
65–74 5 3.03%
75 or older 3 1.82%
I prefer not to answer 2 1.21%
Do you have a physical disability or health condition that affects the way you…
Answered: 161 Skipped: 4
No
Yes
I prefer not to answer
No 147 89.09%
Yes 10 6.06%
I prefer not to answer 4 2.42%
Do you have any additional comments on traffic safety?
Answers Count Percentage
traffic roadsPedestriansDriverspeople
lightsstoppedestrian road
cars
Bike
crossing
walk
Rexburg
winter
Snow
Driving
2nd students
sidewalks
lot
walking
turn
City Street
7th
light
intersection
town South
speed
school driver
lightingcampushitmake
intersectionsspeeding turning
huge
it’s
&
west lanes
left
lane
cross
ice
high
streets kids
5th
1st
dark
main
red
coming waitingwork
putI’ve
makes
removal
BYUI
that’s
due
streets.area
I’m
3rd
live
east
care
St
long
wait
time
day.
ice.
etc.
day
sign
issue
2
3
5
car
campus.
river
cars.
zone
cop
town.
you.
4
10
20
90
lit
4th
it.
hit.
jay
one.all.
1)
2)
HS
large
1 6
8
sides
fine
go.
lit.
ins
-
3.4)
You need way more lighting on key streets, at crosswalks, at round abouts. Rexburg can get really
dark and if you’re in a car it makes it really hard to see pedestrians.
1
Winter always makes me more nervous than summer. Especially if I feel like the roads are slippery
enough that the drivers arent taking appropriate caution. But I generally avoid busy roads and campus
roads if I can help it as I feel most accident occur around campus.
1
While I do not have a condition that makes ramps and such necessary for me, it has been difficult for
friends of mine to get around so please do not disregard my input on that. Additionally!!! Better road
care would also be great
1
West Main St and K St need better street lamps at night. Our neighborhood is completely dark at
night.
1
We need to not have a crosswalk right in a roundabout.1
We need to invest in better bike lanes and increase the use of ‘Share the Lane’ signage. Our
community has a growing number of students and residents who rely on cycling, and improving safety
benefits everyone. As someone who has been cycling competitively for decades—and who moved to
Rigby and later Rexburg specifically because they felt safer for riders—I see how important it is to
continue building on that progress. Strengthening our cycling infrastructure will support students,
protect families, and encourage a healthier, more connected community.
1
We need better snow/ice removal in winter!! The main roads get cleared well, but the neighborhood
roads are TERRIBLE for as long as the snow lasts.
1
Response Count
We need better lighting at the University. I have had several friends kids hit as a pedestrian because
they are not seen in the winter time. We need better lighting everywhere and better bike and
pedestrian lanes and continuous sidewalks that are shoveled. And de iced.
1
We need another river crossing over the Teton River at 5th West and we need crossings across Hwy
20 at Moody Rd and 7th South.
1
We definitely need more streetlights. At night it is so dark in a lot of parts which make it unsafe for
people crossing the road, people walking in general, and drivers who can’t see
1
Traffic lights around BYUI would greatly help, especially at the major intersections coming in and out
of the school. That’s where I have seen a lot of near misses.
1
Traffic light patterns need to be reevaluated for intersections that don't have a designated left turn
lane with a light. Those drivers waiting to turn left get desperate because they have to wait through
multiple light cycles in order to keep traffic flowing causing speeding and unsafe driving. Not just for
pedestrians but for everyone. And drivers going straight will swerve around those waiting to turn left
causing accidents because those turning left from the opposite lane can't see them. Example: 5th W
and Main. This intersection is very busy with pedestrians crossing both directions, frequently. Drivers
get desperate to turn because they're tired of waiting for an opening that won't come. This backs up
traffic on both sides of Main Street. People make unsafe choices when it feels like there are no
options due to poor planning and accommodations for increased population.
1
Traffic is not the problem. It is the entitled electric bike and scooter users that ride irresponsibly. They
need to obey laws just like vehicles but show no concern for their or anyone else’s safety. They need
to be trained and be held accountable for their driving behaviors just like anyone else.
1
They volume of traffic seems to be increasing all the time and aggressive driving seems to follow.1
There needs to be speed bumps in the neighborhood behind Kennedy (Aries, Gemini) because
everyone comes whipping through there and so many kids play on the sidewalks and streets.
1
There need to be reform for cross walk near BYUI as people fail to use them properly and there poorly
lit area
1
There could be better signs such as no right turn on red by the highway exits, better street lighting,
better quality sidewalks or sidewalks in general, and pedestrians that need to be educated about how
yes they do have the right of way but think vehicles can just stop immediately but they can’t.
1
There are so many students who use other modes of transport other than cars and this city only
caters to cars. I’m not asking to get rid of roads in any way, all I want is for my friends and I not to
have to bike around town with fear of getting hit by a car because the bike lanes are not protected
from cars. Protected bike lanes would make a huge difference.
1
There are pedestrian lights for adult students but none for school zones. Speed indicator signs are
mostly ignored.
1
There ABSOLUTELY NEEDS a traffic light, or at least some sort of traffic control, at the intersection of
West 4th South and South 3rd West. That intersection is very dangerous to both drivers AND
pedestrians. You sometimes had to wait 5 to 10 minutes to go from South 3rd West ONTO West 4th
South
1
The traffic lights need to be timed better at most intersections to reduce congestion. There needs to
be more lights near campus on streets where students walk often (campus to broulims type areas).
Better signage and enforcement at round a bouts. Pedestrians should only have right of way when a
vehicle is entering the circle. I have personally almost been hit driving many times leaving a round
about because everyone slammed on their brakes for a pedestrian. Pedestrians (and drivers, but
pedestrians have more at risk) generally need much better awareness while on roads. Creating an
alternate route to get across town without having to funnel through campus would be huge.
Something to get to Walmart or Albertsons area or even broulims without having to get through the
campus congestion would alleviate a lot of vehicle/pedestrian interactions.
1
The traffic laws need to be rigorously enforced for motorcycles. I have noticed them speeding, illegally
passing on the right, even one-wheeled exhibitions.
1
The timing of the stoplights is a issue. It causes people to stop in the intersections because traffic gets
very backed up, especially around 5pm when people are getting off of work and when the college kids
have move in day.
1
The thing I would like to see the most would be more street lights throughout Rexburg. A crossing
guard by Maddison Middle would be incredibly helpful.
1
The speeding I see happening in Rexburg is the most troubling thing for me while driving. People
frequently drive 10 miles over the speed limit and that severely limits their reaction time for a
pedestrian or cyclist.
1
The speeding along W 7th S is out of control. People blow through that school zone and crosswalk
every single day. When I follow the school zone speed limit (while flashing) I’m being tailgated and it’s
just ridiculous. A cop was posted there maybe a week ago and didn’t stop anyone speeding he only
flashed his lights at people as a warning. This will not stop at all school zones unless they are policed
correctly. It’s an extreme danger to the children who walk and I refuse to let my children walk because
of it.
1
The snow removal system is awful. The roads need to be plowed, and there needs to be salt used for
ice. Rexburg seems to consistently have the worst roads, I've personally witnessed, in the area. Why
is it I can go to Idaho falls and everything is plowed and and safe, but here in Rexburg, we have snow
everywhere that turns to slush and then dangerous ice? I was rear ended earlier this year, and
because of it, I have chronic back issues, may very well need spine surgery, and part of that was
because of the poorly maintained roads. I understand money is not infinite, but I can't think of any
good reason why Rexburg can't maintain their roads when neighboring cities can.
1
The sidewalks maintained by BYU-I are in good condition, but the rest of the city’s sidewalks are
extremely difficult to navigate in my wheelchair due to being broken down, blocked by parked vehicles
in driveways, pits, deep cracks, uneven sections/bumps, huge puddles next to ramps, etc. Especially
near the fire station/library, W 1st S, and S 1st W (from 4 way stop down to Broulim’s, both sidewalks).
More flashing pedestrian lights would be AWESOME. As a driver, day or night, they help alert me to a
pedestrian earlier, especially on a hill. One at the roundabout would be great. I think the HAWK light is
awesome too, it would be great to put one at W 5th S and S 2nd W crossing. Lack of driver &
pedestrian awareness is what makes driving so hazardous here. Jaywalkers, drivers on phones, etc.
Scooter/bike awareness is also low, that’s how I’ve been hit by cars in the 2 years I’ve been here.
Cars don’t stop before sidewalks before exiting lots, and that’s how I got hit.
1
The sidewalks here have so much damage that I cannot get around in my wheelchair without rolling
on the road. There NEEDS to be a traffic light at E 2nd S and S 1st E crossing. Students NEVER look.
I have been stuck at the stop sign for 5 minutes before. It is the most dangerous intersection I have
ever driven through (and I lived in Provo, SLC, and Boise! Come on!) Speed limits are fine but nobody
(including many police officers I have seen, esp. on main st) follow them and it causes problems.
1
The roads during Winter are 100% the scariest part for me when it comes to driving here. I avoid
going out because there's always a thick sheet of ice on the roads once the snow starts. Either that or
black ice. It's scary just walking around rexburg because of the ice. Everytime I'm pregnant, this is just
the worst city to be in during Winter. I can't walk or drive anywhere without being terrified of slipping or
someone slipping into me.
1
The road from S 1st W intersecting with W 7th S frequently has had issues. As a pedestrian, my
husband and I have been yelled at multiple times for using the crosswalk because the drivers dont
want to slow down. As a driver, at sunrise and sunset its almost impossible to see pedestrians at that
intersection whatsoever. I also avoid ever having to turn left out of S Center St where it meets with W
7th S. The traffic is always so congested that it makes so sense to wait in that line rather than go
around town the opposite way. Pulling into University Village from University Blvd when traveling north
can be very dangerous. Even though the speed limit is fairly restricted there, a turning lane would be a
huge help as people will still bear down and blare their horns when you are clearly making a turn with
a blinker on in advance.
1
The plowing of roads during the winter is a major problem because the roads turn into ice rinks
because the roads are not plowed regularly.
1
The highway off ramp improvements have only made my commute worse every day. Traffic is worse,
confusion is worse. Whomever approved that was clueless to the outcome. I will help vote any city
and state politician who approved those "improvements" out of their position when I get the
opportunity. Also, fix the railroad crossings across town. They make people slam their brakes to not
hurt their cars, causing further traffic issues
1
The drivers are not necessarily the only problem. Pedestrians fail to be aware and cross without
looking.
1
The college kids will press the button that lights the intersection they are crossing and just go. Never
looking up and checking. They ride e scooters and bikes in the sidewalk. Walking or riding the college
students do not follow the laws of traffic. It’s like they think the crossing lights have an invisible force
field around it when they press it, they way the just dart out without making sure cats have stopped
but are also able to stop in time. The crossing lights are not red lights. They are the problem!!!!!!!!
1
The city needs snow plows for the winter. I believe that the roads, especially around BYU-I campus,
need better sidewalks and infrastrucure, but everything gets so much worse in the winter because
there are no snow plows and the roads get icy. The brine put on the roads are not enough to stop
serious accidents happening in the winter!!
1
The city needs more traffic signals at key intersections and pedestrian crossings around the BYU-I
campus. Reliance on 4-way stops creates a non-stop stream of traffic between Main and 7th South,
and again between 7th South and 2nd West. Relying on pedestrian initiated signals which disrupt
traffic flow create more opportunities for injury. We should have traffic lights at 2nd E & E 2nd S, & E
3rd S, and along 7th South at Center & 1st West at a minimum.
1
The biggest issue, I think, is crosswalks. They are not well lit. Even when the lights are on, to indicate
people are in the crosswalk, cars will blast through it so its a gamble whether or not people will
actually stop for you. Ive seen the biggest issue of the by porter park and the big crosswalk by the
snow building on byui campus. Also. Because of the side street parking and lack of lighting a lot of
turns are completely blind so turning is way too dangerous.
1
Thank you for the survey. I’d like to comment on the question: What is the most important outcome
you want to see from the City’s Safe Streets for All Action Plan? As a mom of kids ages 6–15—and an
experienced road, mountain, and commuter cyclist—safe school zones/routes and better pathways for
cyclists and pedestrians are incredibly important to me. Many kids and college students also commute
by bike, so better pathways benefit the entire community. I live at the top of the hill and would love for
my middle and high schoolers to bike to school and work, but I’m concerned about intersections on W
7th S/E 7th S and the speed/traffic volume on S Yellowstone Hwy. The wide pathway on University
Blvd works well for both cyclists and pedestrians; it simply needs clearer signage and user education.
The intersection at University Blvd and S 5th W also needs more visibility for safer crossings. My
friends and I road bike every Tuesday during Daylight Savings and can give more insight.
1
take better care of roads in winter, people stop in the intersection too often which blocks the road for
others, pedestrians (especially around BYU-I) start to walk into the road without looking just because
they hit the flashing lights. This is a problem especially in the winter because if there’s ice on the road
i can’t stop fast enough and they blame the driver for almost hitting them when they don’t stop and
make sure it is safe and clear.
1
Students Jay walk constantly. Jut out on crosswalks and you have to slam on the brakes. Enforcing
jay walking as well as phones when crossing the street. Especially in snow when drivers can’t stop
easily
1
South Yellowstone highway is repeatedly used as a drag strip through the day and late at night and
drivers are constantly flying through at high speeds near the Toyota dealership. The light near Les
schewab seems like a bad idea as people also fly at high speeds through that area coming from the
roundabout
1
Some of the intersections need blinking lights and fewer pedestrians crosswalks around campus to
force them to cross in a singular pattern instead of in all directions which backs up traffic.
1
Snow removal and winter weather management in general is the worst part of road safety in Rexburg.
This survey should have included that somehow among the main responses.
1
Snow plows would be amazing. These roads when it snows suck to drive on because no one knows
how to drive in the snow.
1
Snow and ice are huge hazards here. Some roads and sidewalks were literal sheets of ice on
Thursday and in some places I had to drive no faster than 3 mph to maintain control of my vehicle.
I’ve lived in much snowier places with much better winter road maintenance. People say it’s too
expensive to maintain safe winter roads here but somehow adjacent cities and counties have much
better winter roads than Rexburg.
1
Roads to narrow 1
Road ice are not getting melted quick enough 1
Rexburg is a small enough town that people shouldn’t need cars for everything. Students shouldn’t
need cars. Sidewalks, bike lanes, and A BUS would solve more problems in Rexburg than expanding
roads. Additionally, having small businesses than could cater to people in more areas of town, instead
of clumping businesses along one or two roads, would solve the problem of people needing to drive
everywhere. This is not a suburb. It doesn’t need any spread of one. There are fewer people here
than in my neighborhood in Chicago. We walked everywhere. In a space double the size of the land I
live on now, we had a school, 3 stores, a pharmacy, restaurants, multiple dry cleaners, two banks, and
a 6 acre park, which was the hub of social activity. Growing up my uncle used to tell me that Rexburg
was getting too big. I now agree, only it’s not due to population, it’s due to unnecessary and inefficient
sprawl.
1
Red lights get run, pedestrians do not look when crossing, speeding vehicles every single street,
street racing and loud mufflers, not enough street lights for safe crossing, bikes/scooters/atvs using
the roads but can’t maintain traffic speeds causing more traffic, byui move ins and move outs adding
to extra traffic that’s unsafe, drivers not clearing snow and ice before driving, drivers not using
headlights when necessary, following distance when driving is too close. All of this needs addressed!
Rexburg has major safety issues!
1
Quiet e-scooters/etc. that use sidewalks along with pedestrians (can not hear them coming up behind
you). Unleashed dogs are an issue when walking as well!
1
Put a 90 second timer lock on yellow crosswalk strobes so pedestrians can’t abuse the lights to
terrorize drivers and it creates a 90 second traffic flow improvement. And make yellow lights at all
traffic controlled intersections 15 seconds to reduce intersection accidents at red lights.
1
Protected bike lanes are the blue ribbon solution for biking - public works will fight them but they’re
wrong. Look up bicycle level of traffic stress- protect those bike lanes if you want to see us bike more
1
Please work on something for our roads when it ices. It is such a huge problem that we don’t care for
our roads at all.
1
PLEASE PLEASE PLEASE drastically improve plowing and salting of Rexburg's city and
neighborhood streets during periods of snowfall and ice. I do a lot of driving for my income, and I
honestly feel unsafe on many local roads within Rexburg because of 1) the lack of adequate plowing
and salting and 2) most drivers' tendency to speed even on slick, icy, snowy, and/or slushy roads
during wintertime.
1
Please for the love of everything good and holy, PLEASE PLOW THE STREETS WHEN IT SNOWS!
It shouldn't come as a surprise that it snows in East Idaho! There should be more resources allocated
for snow removal, rather than a new park or useless city building every year! The ice rink on every
road is dangerous! It's a joke that Jerry Merrill has been mayor for so long but can't put snow removal
in the city budget.
1
Please consider a 4-way stop at 1st N & 3rd E by Smith Park. I’m terrified watching little kids headed
to/from Adams almost get flattened while crossing 1st N. Unless a cop is sitting there, drivers fly
through the 20 mph school zone between the Jr High and Adams like it doesn’t exist. A stop sign
would slow them down and help keep our children alive. Also, studies show pedestrian countdown
timers increase risks compared to simple flashing hand signals. Please consider removing the
countdown crosswalk timers. Those ticking seconds encourage pedestrians to sprint into the street.
Drivers turning left with no protected arrow struggle to watch for both sprinters and oncoming traffic.
This summer I slammed on my brakes three separate times to avoid killing someone who bolted in
front of me. I had to stop in oncoming traffic once. I watched the same thing happen to an individual
on a motorcycle. Those timers turn our streets into a deadly game. Please replace them before
someone dies.
1
Please add more streetlights 1
Pedestrians need to walk a little faster when crossing the street when traffic is waiting on them.1
On 7th South there are 4lanes of traffic and a turning lane that have to come to a stop frequently to
accommodate pedestrians. It seems crazy to have a major road in town be stopping that often and the
pedestrians stepping out right as they hit the button for the light. There are so many times it is slick
and cars are not able to stop. How can we get a safer system on 7th South. Also…. With the new
BYUI facility being build on University there needs to be a wider road or turning lane because it is
going to get backed up…. And again it is hard to stop in that stretch of road. There are. TON of high
school students traveling that road. Please think ahead.
1
No 1
Need better designed multimodal streets.1
My husband and I would love to see better reflective paint on the road that glows so that you can see
the lines better when driving at night. And after crossing for pedestrians at byui! Thank you for your
service!
1
My dad will not live here simply because it is not accessible. He is in a jazzy chair. That to me is a
huge problem.
1
My biggest concern is the intersection across from Burton. When the pedestrian video went viral, I
was happy to hear there was already a plan in place to improve the intersection. The new lights, in my
opinion, are not much of an improvement at all. With speeding teenagers and walking kids, I had
expected an intersection like the one by Taco Bell. I believe there should be more of those, or a traffic
light should be installed there, as well as more done to mitigate the traffic coming in and out of the HS
and field house. Many of the HS students get impatient because of long waits and drive unsafely
(passing on the right hand side, speeding, taking illegal shortcuts, failure to yield, speeding through
parking lots to “beat traffic” etc. This creates unsafe conditions for pedestrians and drivers in the
parking lot and on the roads near the high school.
1
Most of the issues and concerns I see are more related to driver inattention than to infrastructure. It
would be nice if people would stay off their phones while driving and learn to signal and turn on their
lights *before* they hit someone.
1
More Street lights for single family residential areas. It’s extremely dark at night and in the mornings
during those long winter months. Better lighting is safer for driver, pedestrians AND can deter burglary,
vandalism and other crime which has obviously become more prevalent.
1
More stop lights rather than the arbitrary flashing amber crossings. Better stop lights that are actually
in sync and respond to emergency vehicles.
1
more public transportation for walking pedestrians 1
More lighting in general would be my suggestion. Especially now that lines disappear in the snow! I'm
also for lowered speed limits, but I think I'm the only one. I'm a mom who wants kiddos to be safe.
1
In general there is a concerning lack of viable modes of transportation outside the car. I work 1 mile
away from where I live in Rexburg and I feel uncomfortable biking, but I would love to. Cars don’t ever
seem to see me biking because the roads and intersections are huge- I’m usually far outside their
peripheral vision. The cars parked along the roadside also make it very dangerous to cross the road
on foot or bike because I have to step into oncoming traffic to see if anyone is coming. Daylighting/
bump outs are needed all over town. Also please!! The crossing on S 2nd E by Adam’s elementary
needs major changes. I’ve seen cars take a right on red and pull right out past the cross walk. They
can’t see the little people crossing. I have seen many near collisions, please don’t wait for a disaster
to make a change. At the end of the day, our goal can’t be to move cars faster if safety is a top priority.
Drivability and walkability are conflicting. Please prioritize people outside cars!!
1
If any grant is given ever again for walking paths the state needs to monitor the recipients for proper
maintenance. City and county DO NOT spray weeds or seal coat asphalt and all the money is wasted.
No more walking path grants to anyone unless they prove they’ve maintained what has already been
granted in the past. Also, FIRE the Mccines lazy fuck that works in Rexburg city. He also uses city
pickups for personal use, hauling his personal shit.
1
Icy street, hills, and pedestrians expecting cars to stop quickly for them don’t mix well.1
I would recommend better street lighting near crosswalks on busy streets.1
I would love a bridge across the river on the east side of second east, connecting the Jr high area the
the neighborhoods on the other side of the river.
1
I would like to see more snowplows, and more ice melt along 2nd east on the hill. It’s impossible to
stop quickly if a student crosses in front of you.
1
I worry often about pedestrians getting hit by cars on the crosswalks by the roundabouts. Why not
move the pedestrian crosswalk further away from the roundabouts? Drivers already have a lot to think
about when going through a roundabout, it just ads unnecessary stress to add pedestrians to the mix.
I also think there needs to be better care of the roads when it’s icy. I also think there should be free
educational resources for people (mostly students from warm climates) who aren’t familiar with
cold/wet/icy roads.
1
I wish I knew how to encourage people to Go the speed limits! Many go way too fast! There are too
many who are continuing through the intersections while the light turns red! Common sense would be
nice… but seems lacking!!
1
I used to walk dogs, and it was hard sometimes (especially in the winter) because there were missing
sidewalks in some places. This was mostly in the neighborhood streets. I would have to either walk
through someone's yard (which I don't like doing) or walk out in the road when the sidewalk ended,
and it felt very unsafe.
1
I think a 4 way stop at the 3rd W and 2nd S corner Porter park would be safer. Visibility is really bad
when cars are parked on the road.
1
I strongly feel RPD need to be know to give tickets for texting and driving. When walking and crossing
the number one reason we almost get hit is because of a driver not paying attention on their phone
texting or face timing. Texting and driving is just as dangerous as drunk driving.
1
I often find myself concerned with the lack of knowledge of how to use traffic helps, such as
roundabouts and flashing light crosswalks. There are so many drivers who use them wrong and I’ve
wondered what would be a good way to improve that.
1
I just think poor lighting is a huge issue. A lot of bicyclists and pedestrians don’t wear good clothing for
night time and that’s when I’ve felt the most unsafe driving or walking around. I feel this is a major
problem around the college, in pioneer Rd, and in town. The only well lit place is the new highway
intersections. It is much too dark around town in general and I would be so happy to see some
improvement. The Pioneer Rd concern is because we there’s only one place for people to cross, it’s
dark, and there’s a lot of gravel in the turning lane.
1
I feel making it mandatory for any and all Byu-idaho students to take winter driver course for driving
on the streets of Rexburg before they ever come to school would be helpful. I live down moranview
road/cemetery road less than 5 minutes from Walmart and trying to get out on 2nd east going out of
town or in town can be a huge pain in the ass most days because the line of cars going from up on
the hill by the temple clear out to Walmart is really terrible theres cars lined up for like 2 to 3 miles. I
dont expect this city to ever do anything about keeping the roads safe for its residents because you
just simply dont ever. You dont SANDtl the roads where desperately needed and this De-Icing stuff
only works if you dont put it down 2 days before a storm so stop with it and wasting our money it. Go
back to sand it does better for traction. The winter driving around town is terrible you need more cops
out patrolling streets not sitting around eating donuts. Not just down main street.
1
Get bikes & other personal transportation devices off the roads.1
Fix the lighting so the lights line up, and make it illegal to park in bike lanes. You guys actually have a
speed trap set up in the bike lane on Pioneer Rd. Seriously retarded.
1
Especially with the start of winter salting the roads would drastically improve safety. When the roads
were icy on December 2nd I was walking down W 2nd S and not only did I see a cop car slide and
almost hit the side walks I also saw multiple cars sliding within the span of minutes on my walk home.
1
Enforcement in the roundabouts is a serious problem. Seldom do people yield, instead they just go
when the lead in their direction goes, even more than 8 vehicles at a time, as if it were a green light
rather than a roundabout. This clogs up the traffic for the other directions. Then, when other directions
finally go due to no more cars in that other direction, that whole line goes, also not yielding. If there
were serious enforcement with the roundabouts in town, word would spread and it would help the
roundabouts to actually work like the simulated models that are always referenced to say that
roundabouts are so efficient and fast, rather than the reality of being a near free-for-all with
apprehension of being hit.
1
Drivers running red lights has become a huge issue. I see it nearly every light change.1
Driver ignoring stop signs especially in the morning. Drivers not paying attention to pedestrians in
cross walks. Drivers not looking for pedestrians in cross walks when turning left on a flashing yellow
light. When the pedestrians has a walk sign drivers should have a red arrow. Pedestrian crossing at
University and 5th West. Drivers right side visibility heading south on 5th West crossing University.
1
Driver and pedestrian distractions are a huge issue that I see every day. So many pedestrians walk
out into the road without looking up and drivers turn without watching for pedestrian traffic. Also,
speeding in residential neighborhoods and around campus is something I notice every day while out
on a walk in town around 5th west area and second south. Driving around campus is also a struggle
because pedestrians don’t give cars a chance to go and cars get antsy waiting for all the pedestrians
that keep coming without a break to allow for traffic to also flow.
1
Answered: 99 Skipped: 66
County needs a bike lane on west Hwy 33.1
At the intersection of Trejo Street going East. There are no markings on the road about the separate
lanes, and because of this a lot of cars are in the turning lane instead of the straight or right lane, and
cause a lot of us turning left to miss lights because they are waiting for their light
1
As a driver and a pedestrian there needs to be more lights and better sidewalks. In some
neighborhoods you have to walk on the road because there is no side walk, just dirt and plants. I
usually walk my children in a stroller and it doesn’t go well over that stuff. Plus, you could easily pop
your tires from the stickers in the plants
1
Add buses to the city before we make a large group to go yell at the mayor and council at City Hall.1
A pedestrian bridge to cross 2nd S anywhere between Center St and 2nd W would fix a lot of your
traffic and pedestrian issues
1
1. We need consistently marked school zones that are up to national standards and the same as
other large communities. With the number of people from out of Rexburg who come here, they should
be easily recognized by everyone. Just reducing the speed limit isn't enough. 2. Flashing ped
crossings need pedestrian countdowns so that they aren't just push-and-walk. 3. Roads need to be
plowed (not motor graded) when it's snowing, not at night after it's already packed on the roads and
frozen solid. Skating to work is the most unsafe problem we have.
1
1) Drivers need to slow down. Never get in a hurry driving. No matter what. 2) Pedestrians need to
pay attention going through crosswalks. They need to unplug and pay attention as well as drivers. 3)
There are pedestrian crossings that are too dark at night, making it difficult to see a pedestrian. 4)
Drivers need to be patient at crosswalks and stop trying to drive on until the pedestrian is safely out of
the crosswalk. 5) Drivers need to get off their phones when driving. We all need to look out for each
other. Thank you.
1
I would like to see more roundabouts where there is high pedestrian traffic, especially near the BYU-I
campus, like 2nd South at Center & 1st intersections: Traffic too fast, too much trickle walking, hard to
turn, etc. No left turn out of the Snow parking lot and a roundabout (w/ 3-way/triangle paths) in front of
the building would smooth things. 7th South by campus could use better crossings-don't know if
roundabouts would be good there, but better lights & crosswalks would be! "Cross traffic does not
stop" signs would be good where they apply (too many expect places like 3rdW & 2nd S to be 4-way).
A no-left-turn sign that lights up when a train is coming on Yellowstone & 5th would help. It is not
obvious, esp. to newcomers, that there is a RR crossing there and the new building does block some
visibility. Bike lanes are nice, but they put bikers too close to the traffic. I don't like biking in them;
prefer sidewalks, esp. on high traffic streets. Love the walk/bike paths!
1
PUBLIC
INVOLVEMENT
SURVEY #2
(2026)
City of Rexburg Public Involvement Meeting #2
Do the proposed projects and Safety Emphasis Areas reflect the safety…
Answered: 12 Skipped: 0
0
1
2
3
4
6
7
5
Mostly Yes No
Mostly 7 58.33%
Yes 4 33.33%
No 1 8.33%
Please Explain
The word cloud requires at least 20 answers to show.
Answers Count Percentage
5/14/26, 9:23 AM City of Rexburg Public Involvement Meeting #2
https://survey123.arcgis.com/surveys/ec7ec7933d1a477fb995feef951a1a08/analyze?position=0.are_there_locations_shown_on_th&chart=0.do_the_p…1/6
Do the proposed projects and Safety Emphasis Areas reflect the safety concerns you experience in
Rexburg?
Answered: 5 Skipped: 7
We need much more bike infrastructure, such as protected bike lanes. Rexburg is small enough that
we shouldn't be encouraging people to drive 5 minutes to campus or the store, but incentivizing
cycling or walking. This will save taxpayers money by reducing wear and tear a=on roads, as well as
accidents.
1
The four-way stop at 1st West and Viking Dr/4th South needs a traffic light because of how many cars
and pedestrians go through that intersection. The roundabout at 2nd West and 4th South needs a
better solution as many students drive all the way around in the right lane and almost cause accidents
or they don't know how to yield to traffic in the roundabout. Once you get to the new light on 4th South
at Trejo/5th West going west, traffic slows a lot because you fear ramming into the back of cars that
are stopped. There should be warning lights prior to the bend to prepare drivers for a potential yellow
or red light. All in all, 4th South/Yellowstone Hwy is a dumpster fire leaving campus heading west until
you get past Madison Middle. Also, Rexburg as a whole needs more street lights along the roads
because the visibility sucks on the roads and LED headlights shouldn't be the go-to solution as it
sucks being blinded by them while driving.
1
Test 1
Some intersections drivers don't pay any attention to pedestrians (our common place of having this
issue is the intersection closest to the teton river bridge with people turning into town from the
businesses on either side). Walking with a child in a stroller ahead of us makes this extremely
concerning. Then other issues I see is connected to people speeding and running stop signs and
redlights even completely blowing through them when already solid red for a while.
1
It appears nothing is being done/considered about the traffic concerns near Adams Elementary. It
feels like a majority of the considerations are being done near the university.
1
Which types of safety improvements should be prioritized citywide?
Response Count
5/14/26, 9:23 AM City of Rexburg Public Involvement Meeting #2
https://survey123.arcgis.com/surveys/ec7ec7933d1a477fb995feef951a1a08/analyze?position=0.are_there_locations_shown_on_th&chart=0.do_the_p…2/6
Answered: 12 Skipped: 0
Controlling or limiting driveway access on busy corridors
Speed management
Bicycle facilities
Traffic calming
Better Lighting
Intersection safety improvements
Safer pedestrian crossings
Education and enforcement
0 105
Education and enforcement 8 66.67%
Safer pedestrian crossings 7 58.33%
Intersection safety improvements 7 58.33%
Better Lighting 6 50%
Traffic calming 4 33.33%
Bicycle facilities 3 25%
Speed management 3 25%
Controlling or limiting driveway access on busy corridors 1 8.33%
Would you be willing to accept slightly longer travel times if it resulted in…
Answers Count Percentage
5/14/26, 9:23 AM City of Rexburg Public Involvement Meeting #2
https://survey123.arcgis.com/surveys/ec7ec7933d1a477fb995feef951a1a08/analyze?position=0.are_there_locations_shown_on_th&chart=0.do_the_p…3/6
Would you be willing to accept slightly longer travel times if it resulted in an increase in safety?
Answered: 11 Skipped: 1
Yes
Not sure
No
Yes 10 83.33%
Not sure 1 8.33%
No 0 0%
Are there locations shown on the High Crash Location (HCL) map that you fe…
Yes
No
Answers Count Percentage
5/14/26, 9:23 AM City of Rexburg Public Involvement Meeting #2
https://survey123.arcgis.com/surveys/ec7ec7933d1a477fb995feef951a1a08/analyze?position=0.are_there_locations_shown_on_th&chart=0.do_the_p…4/6
Are there locations shown on the High Crash Location (HCL) map that you feel are especially important to
address?
Answered: 11 Skipped: 1
Yes 6 50%
No 5 41.67%
Please Describe
Answered: 5 Skipped: 7
The word cloud requires at least 20 answers to show.
University blvd by 5W. I believe it was number 4?1
Test 1
Not one specific area but just the few areas that have the highest numbers. That’s self explanatory
and I assume that projects will be done from most important to least important places and will
probably be determined by these numbers
1
Anywhere on campus. I avoid it like the plague. The type of pedestrian crosswalk needs to be
addressed. The ones where you push and cross are the worst. It causes traffic backup issues, which
then can cause accidents. They should be more like normal pedestrian intersection crosswalk where
you push it and wait for a red light to cross.
1
#20. A light at this intersection would help at times of the year when the sun is directly in driver's eyes
coming up the hill.
1
Is there anything else you’d like to share about traffic safety in Rexburg?
The word cloud requires at least 20 answers to show.
Answers Count Percentage
Response Count
5/14/26, 9:23 AM City of Rexburg Public Involvement Meeting #2
https://survey123.arcgis.com/surveys/ec7ec7933d1a477fb995feef951a1a08/analyze?position=0.are_there_locations_shown_on_th&chart=0.do_the_p…5/6
Answered: 4 Skipped: 8
There needs to be more collaboration with the college when there are big events. I’ve gone to multiple
events on campus and traffic is a huge concern before and after. It gets very dangerous with all the
pedestrians.
1
Test 1
Protected bike lanes (or just bike lanes in general) along main travel routes would encourage people
to commute by bike and reduce traffic. The reason a lot of people don’t right now is because of safety
concerns. University blvd, W 7th S, Yellowstone highway, S fourth W, s second E are the big ones. I
also see a lot of pedestrians walking along the road, sometimes after dark, along S. Yellowstone
Highway between archer and South rexburg. A sidewalk there would greatly improve safety and
visibility along a higher speed road.
1
I’m tired of people, specially college kids, not using cross walks and not being penalized 1
Response Count
5/14/26, 9:23 AM City of Rexburg Public Involvement Meeting #2
https://survey123.arcgis.com/surveys/ec7ec7933d1a477fb995feef951a1a08/analyze?position=0.are_there_locations_shown_on_th&chart=0.do_the_p…6/6
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
Appendix C: Rexburg CSAP
Countermeasure Toolbox
Rexburg CSAP Safe System Toolbox
# COUNTERMEASURE NAME SHORT DESCRIPTION CRF RANGE1 SOURCE LOCATION INFRASTRUCTURE / NON-INFRASTRUCTURE SAFE SYSTEM ELEMENT FHWA PROVEN SAFETY COUNTERMEASURE? INCLUDES ITS? PEDS BIKES INTERSECTION SPEEDING DISTRACTION LANE/ROAD DEPARTURE MOTORCYCLISTS YOUNG DRIVERS NIGHTTIME
1 Install Refuge Island
Concrete refuge islands seperate crossing
pedestrians from motor vehicles.0.31-0.45 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X X
2 Install Sidewalk A paved path dedicated to pedestrians 0.2-0.8 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X
3 Install rectangular rapid flashing beacon on 2-
lane road
Rectangular rapid flash beacons that give
warning signs at unsignalized intersections
or midblock crosswalks
0.1 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes Yes X X
4 Install rectangular rapid flashing beacon on 3-
lane road without median
Rectangular rapid flash beacons that give
warning signs at unsignalized intersections
or midblock crosswalks
0.1 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes Yes X X
5 Install rectangular rapid flashing beacons on 3-
lane or more roadway with median
Install rectangular rapid flash beacons that
give warning signs at unsignalized
intersections or midblock crosswalks
0.56 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes Yes X X
6
Install curb ramps and extensions with a
marked crosswalk and pedestrian warning
signs
Install curb extensions with marked
crosswalk and pedestrian warning signs 0.35-0.37 https://highways.dot.gov/sites/fhwa.dot.gov/files/2022-
06/techSheet_VizEnhancemt2018.pdf?utm_source=chatgpt.com Segment Infrastructure Safe Roads No No X
7 Install pedestrian hybrid beacon
Also known as the high intesity activated
crosswalk,when activated, it displays a brief
flashing yellow followed by two steady red
indications to drivers
0.55 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes Yes X X
8 Convert a 4-lane roadway to a 3-lane roadway
with center turn lane (road diet)
A road diet involves converting an
undivided four-lane roadway into three
lanes consisting of two through lanes and a
center TWLTL.
0.29-0.35 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X
9 Install Cycle tracks
A bike lane (one- or two-way) with a
physical barrier between the bike and
motor vehicle travel lanes, such as a curb
or parking lanes.
0.45-0.59 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X
10 Install raised crosswalk
Raised crosswalks are the same height as
the sidewalk they
connect with and span the width of the
roadway.
0.3-0.35 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X X X X X
11 Install speed hump or table for non-state
highways
A speed hump is a raised area (normally 3-4
inches in height) in the roadway pavement
surface extending transversely across the
roadway.
0.3-0.5 Crash Modification Factors Clearinghouse Segment Infrastructure Safe Roads No No X
12 Increase pavement friction
Install pavement surfacing systems with
exceptional skid-resistant properties not
typically provided by conventional
materials.
0.52-0.55 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X X X
13 Install speed feedback signs (temporary or
permanent)
Speed feedback signs provide drivers with
real-time information about their speed as
they pass the sign.
0.1 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes Yes X X
14 Install raised or recessed pavement markers
Delineators placed on the roadway
adjacent to the longitudinal pavement
markings of a road. They are used to
supplement the delineation provided by
existing pavement markings.
0.15 Crash Modification Factors Clearinghouse Segment Infrastructure Safe Roads No No X X
15 Widen paved shoulder by 1 foot
Increasing the width of the paved surface
adjacent to or outside of the travel lanes by
one (1) foot.
0.06 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X
16 Widen paved shoulder by 2 feet
Increasing the width of the paved surface
adjacent to or outside of the travel lanes by
two (2) feet.
0.13 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X
17 Widen paved shoulder by 3 feet
Increasing the width of the paved surface
adjacent to or outside of the travel lanes by
3 (3) feet.
0.18 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X
18 Install median barrier
Median barriers are longitudinal barriers
most commonly used to separate opposing
directions of traffic on a divided highway.
0.25-0.3 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X
19 Install new guard rail
A semi-rigid barrier typically consisting of
connected segments of metal railing
supported by posts and blocks.
0.25-0.47 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X
20 Provide "STOP AHEAD" pavement markings
Pavement markings on a roadway surface
that informs drivers of an approaching
unsignalized intersection
0.25-0.31 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X
21 Install lighting on a roadway segment
A permanent source of artificial lighting
installed at a segment of roadway that
provides greater visibility.
0.28-0.35 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X X X X X
22 Install any type of median barrier
Longitudinal barriers that separate
opposing directions of traffic on a divided
highway.
0.25-0.3 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X
23 Install new guard rail
A semi-rigid barrier typically consisting of
connected segments of metal railing
supported by posts and blocks.
0.25-0.47 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X
24 Install two-way left-turn lane on 2-lane road
A type of traversable median reserved for
the exclusive use of vehicles turning left
from both directions.
0.19-0.37 Crash Modification Factors Clearinghouse Segment Infrastructure Safe Roads No No X
25 Reduce urban driveways density from 48 per
mile to 26-48 per mile
Limit the private roads that provide access
between public ways. Reducing the
number of driveways intersecting public
roadways is an access management
technique.
0.29 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X X
26 Reduce urban driveways density from 26-48
per mile to 10-24 per mile
Limit the private roads that provide access
between public ways. Reducing the
number of driveways intersecting public
roadways is an access management
technique.
0.31 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X X
27 Reduce urban driveways density from 10-24
per mile to less than 10 per mile
Limit the private roads that provide access
between public ways. Reducing the
number of driveways intersecting public
roadways is an access management
technique.
0.25 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X X
28 Provide a raised median on approaches
A concrete median separation between
opposing through lanes on a segment of
roadway.
0.25-0.39 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X
29 Provide a raised median on multilane road
A concrete median separation between
opposing through lanes on a segment of a
multilane roadway.
0.22 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X X
30 Increase pavement friction on curve segment
by installing High Friction Surface Treatment
Install materials that provide exceptional
skid-resistant properties not typically
provided by conventional materials.
0.52-0.55 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X X
EMPHASIS AREAS
31 Increase pavement friction on ramps by
installing High Friction Surface Treatment
Install materials that provide exceptional
skid-resistant properties not typically
provided by conventional materials.
0.55-0.86 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X X
32 Convert two-way left-turn lane to raised
median
Converts a two-way left-turn lanes to
raised medians.0.47 Crash Modification Factors Clearinghouse Segment Infrastructure Safe Roads No No X
33 Install rectangular rapid flashing beacon
Rectangular rapid flashing beacon includes
pedestrian activated flashing lights and
additional signage that enhance the
visibility of marked crosswalks and alert
motorists to pedestrian crossings.
0.35 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes Yes X X X
34 Widen shoulder
Add or widen a shoulder to provide a
greater are to regain control of a vehicle.0.3 FHWA Proven Safety Countermeasures Segment Infrastructure Safe Roads Yes No X
35 Install Leading Pedestrian Intervals
Leading pedestrian interval (LPI) gives
pedestrians
and bicycles using the marked crosswalk an
advance walk signal
before the motorists get a green indication
0.37-0.6 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes Yes X X X
36 Install Pedestrian Countdown Timers
Pedestrian signal heads that display the
remaining seconds for the pedestrian
phase
0.25-0.7 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No Yes X X
37 Install Intersection Lighting Provide lighting at an intersection 0.38-0.4 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes No X X X X X X
38
Install no pedestrian phase feature with
Flashing Yellow Arrow, Inhibit Flashing Yellow
Arrow
Prevent Flashing Yellow Arrow from
appearing for a duration when the
pedestrian pushbutton is activated.
0.43
(Emerging strategy)
Intersection Infrastructure Safe Roads No Yes X X
39 Install a permissive right turn to reduce
vehicle-pedestrian conflicts
A leading pedestrian interval before
permissive right turn (flashing yellow
arrow)
0.10-0.14
(Emerging strategy)
Intersection Infrastructure Safe Roads No Yes X X
40 Install pedestrian activated flashing beacon in
conjunction with median and stop bar
A pedestrian crossing that combines a
flashing beacon with a median and other
safety enhancements
0.35-0.56 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes Yes X X
41 Prohibit right-turn-on-red
A sign indicating that a vehicle is prohibited
from making a right turn when the signal is
red.
0.41 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No Yes X X X
42 Install lighting at intersection
A permanent source of artificial lighting
installed at an intersection that provides
greater visibility of the intersection.
0.38-0.4 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes No X X
43 Improve signal hardware: lenses,
reflectorized backplates, size, and number
Low-cost countermeasures that can be
implemented at signals along a corridor to
enhance visibility at a signalized
intersection
0.15 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes Yes X X
44 Add 3-inch yellow retroreflective sheeting to
signal backplates
A strip of yellow retroreflective sheeting
placed along the perimeter edges of a
backplate, providing a “frame” for the
signal face.
0.15 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes No X X
45 Replace 8-inch red signal heads with 12-inch
An existing 8-inch signal head replaced with
a larger 12-inch head.0.15-0.42 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes Yes X
46
Replace urban permissive and
protected/permissive left turns to protected
only
Replace the permissive left turn into a
protected left turn phase where the left
turn movement receives an exclusive,
protected phase.
0.3-0.99 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No Yes X
47 Protected left turn: split side street signal
phasing
Assign the right of way to all movements of
one approach through split phasing. For
intersections with protected left turns.
0.7 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No Yes X
48 Replace urban permissive left turns to
protected/permissive
In a ″permissive″ mode, a green signal
permits vehicles to turn left only when an
appropriate gap becomes available.
0.16 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No Yes X
49 Change from permissive only to FYA
permissive only
Replacing a circular green indication with a
flashing yellow arrow (FYA)0.5 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No Yes X
50 Coordination or adaptive signal timing for
urban traffic signals
The synchronization of multiple
intersections and the ability to adjust signal
timing in real time
0.15-0.17 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No Yes X
51
Install actuated advance warning dilemma
zone detection system for passenger cars or
freight/trucks
This countermeasure provides microwave
radar that detects the speed and distance
of a vehicle from the intersection and
extends the green interval if the vehicle is
within the dilemma zone.
0.08 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No Yes X
52 Increase triangle sight distance
Removal of sight distance restrictions
(vegetation, parked vehicles, signs,
buildings) from the sight triangles at an
intersection.
0.2-0.48 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No No X
53 Left-turn traffic calming treatments for
speeds less than 35mph
Two treatments include hardened
centerline, and a left-turn wedge. These
force vehicles making turns to slow down
and make a more 90-degree turn
0.1
(Emerging strategy)
Intersection Infrastructure Safe Roads No No X X
54 Improve intersection warning
A list of proven low-cost countermeasures
that can be implemented at unsignalized
intersections.
0.15-0.40 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes No X
55
Install/upgrade larger or additional stop signs
or other intersection warning/regulatory
signs
0.15 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes No X
56 Install signal ahead advance warning signs
Warning signs placed before a signalized
intersection to inform drivers of an
approaching signal.
0.35 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No No X
57 Increase retroreflectivity of stop signs
A material applied to a stop sign that
reflects a large portion of light directly back
to the source.
0.07 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes No X X
58 Install Flashing beacons at all-way stop-
controlled intersections
Red flashing beacons placed on top of the
stop signals at an all-way stop controlled
intersection.
0.15-0.28 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No Yes X X
59 Provide flashing beacons at minor-road stop-
controlled intersections
At minor road stop controlled
intersections, red flashing beacons installed
on top of the stop signs on the minor
controlled road.
0.13-0.3 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No Yes X X
60
Provide actuated flashing beacons triggered
by approaching vehicles at unsignalized
intersections
Flashing beacons that only flash when a
sensor detects a vehicle approaching an
intersection.
0.27 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No Yes X X
61 Install transverse rumble strips on stop-
controlled approach(es)
Rumble strips placed across the roadway to
provide audible warning (rumbling sound)
to alert drivers of an upcoming
intersection.
0.2-0.25 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes No X
62 Install 6-foot or greater raised divider on stop
approach (splitter island)
A channelizing island that separates traffic
in opposing directions of travel at a stop
approach of an unsignalized intersection
and contains a left side, supplemental stop
sign.
0.15-0.2 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No No X
63 Provide overhead lane-use signs
Intersection lane control signs mounted
overhead and placed over the lane to
which it applies.
0.1 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No No X
64 Curb extensions
Curb extensions narrow the width of the
roadway by extending the curb line or
sidewalk out into the parking lane
0.3-0.35 https://highways.dot.gov/sites/fhwa.dot.gov/files/2022-06/fhwasa2213.pdf Intersection Infrastructure Safe Roads No No X X
65
Install right-turn lane on single major road
approach at 3- or 4-leg unsignalized
intersection
A right-turn auxiliary lane for storage and
to accommodate decreasing speeds for
right-turn vehicles as they approach an
intersection.
0.14-0.2 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes No X
66
Install right-turn lane on both major road
approaches at 3- or 4-leg unsignalized
intersection
A right-turn auxiliary lane for storage and
to accommodate decreasing speeds for
right-turn vehicles as they approach an
intersection.
0.2-0.26 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes No X
67
Install right-turn lane on single major road
approaches at 3- or 4-leg signalized
intersection
A right-turn auxiliary lane for storage and
to accommodate decreasing speeds for
right-turn vehicles as they approach an
intersection.
0.04-0.15 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No No X
68
Install right-turn lane on both major road
approaches at 3- or 4-leg signalized
intersection
A right-turn auxiliary lane for storage and
to accommodate decreasing speeds for
right-turn vehicles as they approach an
intersection.
0.08-0.15 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No No X
69 Channelized right-turn lane with raised
median
A right-turn lane separated from the
through and left-turn lanes on the
approach by a raised island and has
separate traffic control from the primary
intersection.
0.35 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No No X
70 Left turn lane on single major road approach
at urban 3-leg unsignalized intersection
Adds a left-turn auxiliary lane on the major
approach for storage and to accommodate
the deceleration of left-turn vehicles.
0.33-0.35 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes No X
71 Left turn lane on both major road approaches
at urban 3-leg unsignalized intersection
Adds a left-turn auxiliary lane on both
approaches for storage and to
accommodate the deceleration of left-turn
vehicles.
0.35-0.47 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes No X
72 Left turn lane on single major road approach
at urban 3-leg signalized intersection
Adds a left-turn auxiliary lane on the major
approach for storage and to accommodate
the deceleration of left-turn vehicles.
0.07-0.55 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes No X
73 Left turn lane on single major road approach
at urban 4-leg signalized intersection
Adds a left-turn auxiliary lane on the major
approach for storage and to accommodate
the deceleration of left-turn vehicles.
0.1-0.55 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes No X
74 Left turn lane on both major road approaches
at urban 4-leg signalized intersection
Adds a left-turn auxiliary lane on both
approaches for storage and to
accommodate the deceleration of left-turn
vehicles.
0.19-0.55 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes No X
75
Channelized left-turn lane at 3- or 4-leg
intersection with raise median on all
approaches
Provides a median separation between the
designated left turn lane and opposing
through lanes at an intersection.
0.27 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No No X
76 Convert minor road stop controlled
intersection into roundabout
Converts an unsignalized, stop controlled
intersection into a roundabout.
Roundabouts eliminate up to 75% of
vehicle conflict points typically associated
with traditional intersections.
0.82 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes No X X
77 Convert signalized intersection into
roundabout
Converts a signalized intersection into a
roundabout. Roundabouts eliminate up to
75% of vehicle conflict points typically
associated with traditional intersections.
0.78 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes No X X
78 Convert urban 2-way or yield control to all-
way stop control
Modifies an intersection with minor road
stop or yield control to an intersection that
is stop controlled for all approaches.
0.5-0.75 https://www.cmfclearinghouse.org/detail.php?facid=314 Intersection Infrastructure Safe Roads No No X
79 Install traffic signal at urban intersection
A traffic control device that efficiently
controls and manages competing flows of
traffic.
0.3 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No Yes X
80
Convert 4-leg intersection to two 3-leg
intersections when minor road ADT is 15 -
30% of total entering volume
realigns an approach to a 4-leg intersection
elsewhere to create two 3-leg
intersections. Minor road must meet ADT
requirements
0.25 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No No X
81
Convert 4-leg intersection to two 3-leg
intersections when minor road ADT is more
than 30% of total entering volume
Realign an approach to a 4-leg intersection
elsewhere to create two 3-leg
intersections. Minor road must meet ADT
requirements
0.33 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No No X
82 Reduce intersection skew angle on 3-leg
minor street stop-controlled intersection
Reduce the skew of an intersection
between intersecting streets.Varies Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No No X
83 Reduce intersection skew angle on 4-leg
minor street stop-controlled intersection
Reduce the skew of an intersection
between intersecting streets.Varies Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No No X
84 Double left-turn lanes
Two lanes that can be used to make a turn
left at a signalized intersection.0.29-0.3 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No No X
85 Install offset or buffered right-turn lane
A right-turn lane that is offset by moving
the lane laterally.0.69 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No No X
86 Install emergency vehicle preemption systems
Install a preemption system for emergency
vehicles to allow them to move safely
through the intersection.
0.7 https://highways.dot.gov/sites/fhwa.dot.gov/files/2024-
01/Safe_System_Roadway_Design_Hierarchy.pdf
Intersection Infrastructure Safe Roads No Yes X
87 Convert signal to mast arm (from pedestal-
mounted)
Replace pedal-mounted traffic signals with
a mast arm.0.3 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No No X
88 Install raised pavement markers and striping
(through intersection)
Installs raised pavement markers and
striping at an intersection.0.1 Crash Modification Factors Clearinghouse Intersection Infrastructure Safe Roads No No X X
89 Convert signalized intersection to compact
roundabout
Convert a signalized intersection into a
compact roundabout.FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes No X X
90 Install pedestrian scramble
A form of pedestrian "WALK" phase which
all vehicular traffic is stopped, allowing
pedestrians and bicycles to cross in any
direction.
0.4 https://highways.dot.gov/sites/fhwa.dot.gov/files/2024-01/Safe_System_Roadway_Design_Hierarchy.pdfIntersection Infrastructure Safe Roads No Yes X X
91 Convert unsignalized intersection to compact
roundabout
Convert a non-signalized intersection into a
compact roundabout.FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes No X X
92
Install/upgrade pedestrian crossing at
uncontrolled locations (with enhanced safety
features)
Install a pedestrian crossing at uncontrolled
locations where pedestrians are known to
be crossing.
0.35 FHWA Proven Safety Countermeasures Intersection Infrastructure Safe Roads Yes Yes X X X
93 Install Bike Lanes (including buffered,
protected, and raised)
A portion of the roadway marked by
signing and striping for exclusive use by
bicyclists
0.27.-0.57 FHWA Proven Safety Countermeasures Both Infrastructure Safe Roads Yes No X
94 Install green bike lanes at conflict points in
urban areas
Green colored bike lanes placed on the
roadway to enhance visibility of the bicycle
lane.
0.39 Crash Modification Factors Clearinghouse Both Infrastructure Safe Roads No No X
95 Install pedestrian activated beacon at
intersection
A warning device located at roadside
pedestrian intersection crossings.0.1 Crash Modification Factors Clearinghouse Both Infrastructure Safe Roads No Yes X X
96
Install crosswalk markings and advance
pedestrian warning sign at uncontrolled
locations
A marked crosswalk using pavement
markings and signage to indicate
pedestrians are crossing
0.15-0.25 FHWA Proven Safety Countermeasures Both Infrastructure Safe Roads Yes No X
97 Install pedestrian signal
A dedicated signal on roadways dedicated
to pedestrians crossing 0.55 Crash Modification Factors Clearinghouse Both Infrastructure Safe Roads No Yes X
98 Advanced yield or stop marking and signs
Markings and signs placed in advance of
crosswalks 0.25 FHWA Proven Safety Countermeasures Both Infrastructure Safe Roads Yes No X X X
99 Install bicycle boulevard
Bicycle boulevards are designated areas for
use by bicyclists. Side streets that are
signed and improved
0.63 Crash Modification Factors Clearinghouse Both Infrastructure Safe Roads No No X X
100 Install guide signs
Guide signs provide directional and mileage
information to specific destinations.0.15 Crash Modification Factors Clearinghouse Both Infrastructure Safe Roads No No X
101 Create directional medians that restrict and
allow left-turns and u-turns
Install directional median openings to allow
and restrict left-turns and u-turns 0.5 FHWA Proven Safety Countermeasures Both Infrastructure Safe Roads Yes No X
1 Represents either the crash reduction factor (inverse of the CMF) or potential reduction in crashes based on case studies or similar evaluation (primarily sourced from FHWA's proven safety countermeasures.
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
Appendix D: High Crash Location
Concepts and Cost Estimates
8+00 9+00 10+00 11+00 12+00 13+00
14+00 15+00 16+00 17+00 18+00 19+00
10 12 16 22 26 30 34 38 42 46 50
10 12 16 22 26 30 34 38 42 46 50
J:
\
2
2
5
0
9
1
R
E
X
B
U
R
G
\
0
0
1
S
S
4
A
A
C
T
I
O
N
P
L
A
N
\
C
_
D
E
S
N
\
_
C
A
D
\
2
_
P
R
E
L
I
M
\
D
_
P
L
A
N
S
\
F
I
G
U
R
E
6
-
2
N
D
.
D
W
G
LA
S
T
S
A
V
E
D
:
3/2
0
/
2
0
2
6
1
2
:
0
3
P
M
PR
I
N
T
E
D
:
3/
2
5
/
2
0
2
6
9
:
5
4
A
M
0'20'40'
SCALE: 1"=20'
----
PROJECT NO.
SHEET NO.
225091-001
CHECK:DRAWN:
VERIFY SCALE: Scales
based on 22"x34" prints.
1-1/2 Inches
PAGE
SA
F
E
S
T
R
E
E
T
S
A
N
D
R
O
A
D
S
FO
R
A
L
L
(
S
S
4
A
)
NO
.
RE
V
I
S
I
O
N
S
DA
T
E
Th
i
s
d
o
c
u
m
e
n
t
o
r
a
n
y
p
a
r
t
t
h
e
r
e
o
f
i
n
d
e
t
a
i
l
o
r
d
e
s
i
g
n
co
n
c
e
p
t
i
s
t
h
e
p
e
r
s
o
n
a
l
p
r
o
p
e
r
t
y
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
In
c
.
a
n
d
s
h
a
l
l
n
o
t
b
e
c
o
p
i
e
d
i
n
a
n
y
f
o
r
m
w
i
t
h
o
u
t
t
h
e
wr
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
PRELIMINARY
Not For
Construction
0'20'40'
SCALE: 1"=20'
KEY MAP
KEY MAP
E
2
n
d
N
N 2nd E
N 2nd E
HC
L
1
:
N
2
N
D
E
A
S
T
-
E
2
N
D
N
O
R
T
H
T
O
S
T
E
T
O
N
R
I
V
E
R
HC
L
1
2
:
N
2
N
D
E
A
S
T
-
S
T
E
T
O
N
R
I
V
E
R
T
O
E
7
T
H
N
HC
L
1
6
:
N
2
N
D
E
A
S
T
/
L
O
R
E
N
E
S
T
R
E
E
T
1 OF 4
20+00 21+00 22+00 23+00 24+00 25+00
26+00 27+00 28+00 29+00 30+00 31+00
10 12 16 22 26 30 34 38 42 46 50
10 12 16 22 26 30 34 38 42 46 50
J:
\
2
2
5
0
9
1
R
E
X
B
U
R
G
\
0
0
1
S
S
4
A
A
C
T
I
O
N
P
L
A
N
\
C
_
D
E
S
N
\
_
C
A
D
\
2
_
P
R
E
L
I
M
\
D
_
P
L
A
N
S
\
F
I
G
U
R
E
6
-
2
N
D
.
D
W
G
LA
S
T
S
A
V
E
D
:
3/2
0
/
2
0
2
6
1
2
:
0
3
P
M
PR
I
N
T
E
D
:
3/
2
5
/
2
0
2
6
9
:
5
4
A
M
0'20'40'
SCALE: 1"=20'
----
PROJECT NO.
SHEET NO.
225091-001
CHECK:DRAWN:
VERIFY SCALE: Scales
based on 22"x34" prints.
1-1/2 Inches
PAGE
SA
F
E
S
T
R
E
E
T
S
A
N
D
R
O
A
D
S
FO
R
A
L
L
(
S
S
4
A
)
NO
.
RE
V
I
S
I
O
N
S
DA
T
E
Th
i
s
d
o
c
u
m
e
n
t
o
r
a
n
y
p
a
r
t
t
h
e
r
e
o
f
i
n
d
e
t
a
i
l
o
r
d
e
s
i
g
n
co
n
c
e
p
t
i
s
t
h
e
p
e
r
s
o
n
a
l
p
r
o
p
e
r
t
y
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
In
c
.
a
n
d
s
h
a
l
l
n
o
t
b
e
c
o
p
i
e
d
i
n
a
n
y
f
o
r
m
w
i
t
h
o
u
t
t
h
e
wr
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
PRELIMINARY
Not For
Construction
0'20'40'
SCALE: 1"=20'
KEY MAP
KEY MAP
Te
t
o
n
R
.
V
i
l
l
a
g
e
N 2nd E
N 2nd E
Va
l
l
e
y
R
i
v
e
r
D
r
E
4
t
h
N
Closed Access Closed Access
2 OF 4
HC
L
1
:
N
2
N
D
E
A
S
T
-
E
2
N
D
N
O
R
T
H
T
O
S
T
E
T
O
N
R
I
V
E
R
HC
L
1
6
:
N
2
N
D
E
A
S
T
/
L
O
R
E
N
E
S
T
R
E
E
T
FUTURE-PLANNED PATHWAY TUNNEL
(NOT PART OF THIS PROJECT)
31+00 32+00 33+00 34+00 35+00 36+00
37+00 38+00 39+00 40+00 41+00 42+00
10 12 16 22 26 30 34 38 42 46 50
10 12 16 22 26 30 34 38 42 46 50
J:
\
2
2
5
0
9
1
R
E
X
B
U
R
G
\
0
0
1
S
S
4
A
A
C
T
I
O
N
P
L
A
N
\
C
_
D
E
S
N
\
_
C
A
D
\
2
_
P
R
E
L
I
M
\
D
_
P
L
A
N
S
\
F
I
G
U
R
E
6
-
2
N
D
.
D
W
G
LA
S
T
S
A
V
E
D
:
3/2
0
/
2
0
2
6
1
2
:
0
3
P
M
PR
I
N
T
E
D
:
3/
2
5
/
2
0
2
6
9
:
5
4
A
M
0'20'40'
SCALE: 1"=20'
----
PROJECT NO.
SHEET NO.
225091-001
CHECK:DRAWN:
VERIFY SCALE: Scales
based on 22"x34" prints.
1-1/2 Inches
PAGE
SA
F
E
S
T
R
E
E
T
S
A
N
D
R
O
A
D
S
FO
R
A
L
L
(
S
S
4
A
)
NO
.
RE
V
I
S
I
O
N
S
DA
T
E
Th
i
s
d
o
c
u
m
e
n
t
o
r
a
n
y
p
a
r
t
t
h
e
r
e
o
f
i
n
d
e
t
a
i
l
o
r
d
e
s
i
g
n
co
n
c
e
p
t
i
s
t
h
e
p
e
r
s
o
n
a
l
p
r
o
p
e
r
t
y
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
In
c
.
a
n
d
s
h
a
l
l
n
o
t
b
e
c
o
p
i
e
d
i
n
a
n
y
f
o
r
m
w
i
t
h
o
u
t
t
h
e
wr
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
PRELIMINARY
Not For
Construction
0'20'40'
SCALE: 1"=20'
KEY MAP
KEY MAP
E
L
o
r
e
n
e
S
t
N 2nd E
N 2nd E
10
'
-
1
/
4
"
10
'
-
1
/
4
"
3 OF 4
HC
L
1
:
N
2
N
D
E
A
S
T
-
E
2
N
D
N
O
R
T
H
T
O
S
T
E
T
O
N
R
I
V
E
R
HC
L
1
6
:
N
2
N
D
E
A
S
T
/
L
O
R
E
N
E
S
T
R
E
E
T
43+00 44+00 45+00 46+00 47+00
48+00
10 12 16 22 26 30 34 38 42 46 50
J:
\
2
2
5
0
9
1
R
E
X
B
U
R
G
\
0
0
1
S
S
4
A
A
C
T
I
O
N
P
L
A
N
\
C
_
D
E
S
N
\
_
C
A
D
\
2
_
P
R
E
L
I
M
\
D
_
P
L
A
N
S
\
F
I
G
U
R
E
6
-
2
N
D
.
D
W
G
LA
S
T
S
A
V
E
D
:
3/2
0
/
2
0
2
6
1
2
:
0
3
P
M
PR
I
N
T
E
D
:
3/
2
5
/
2
0
2
6
9
:
5
5
A
M
0'20'40'
SCALE: 1"=20'
----
PROJECT NO.
SHEET NO.
225091-001
CHECK:DRAWN:
VERIFY SCALE: Scales
based on 22"x34" prints.
1-1/2 Inches
PAGE
SA
F
E
S
T
R
E
E
T
S
A
N
D
R
O
A
D
S
FO
R
A
L
L
(
S
S
4
A
)
NO
.
RE
V
I
S
I
O
N
S
DA
T
E
Th
i
s
d
o
c
u
m
e
n
t
o
r
a
n
y
p
a
r
t
t
h
e
r
e
o
f
i
n
d
e
t
a
i
l
o
r
d
e
s
i
g
n
co
n
c
e
p
t
i
s
t
h
e
p
e
r
s
o
n
a
l
p
r
o
p
e
r
t
y
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
In
c
.
a
n
d
s
h
a
l
l
n
o
t
b
e
c
o
p
i
e
d
i
n
a
n
y
f
o
r
m
w
i
t
h
o
u
t
t
h
e
wr
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
PRELIMINARY
Not For
Construction
KEY MAP
E
7
t
h
N
N 2nd E
R
R
R
R
4 OF 4
HC
L
1
:
N
2
N
D
E
A
S
T
-
E
2
N
D
N
O
R
T
H
T
O
S
T
E
T
O
N
R
I
V
E
R
HC
L
1
6
:
N
2
N
D
E
A
S
T
/
L
O
R
E
N
E
S
T
R
E
E
T
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 1 + HCL 12 + HCL 16 N 2ND EAST: S TETON RIVER TO YELLOWSTONE WAY CONCEPT
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
11615 CY 18$ 204,316$
HMA PAVEMENT 9286 TON 115$ 1,067,840$
PAVEMENT MARKINGS AND STRIPING - SYMBOLS 4055 SF 9$ 36,493$
PAVEMENT MARKINGS AND STRIPING - LONGITUDINAL MARKINGS 8789 LF 9$ 77,345$
CONCRETE SIDEWALK 1673 SY 70$ 117,656$
MODIFY EXISTING TRAFFIC SIGNALS (PER QUADRANT)6 EA 140,000$ 840,000$
1 EA 500,000$ 500,000$
2525 SY 70$ 177,582$
TRAFFIC SEPERATION CURB 1647 FT 25$ 41,686$
DRAINAGE ITEMS 1 LS 50,000$ 50,000$
SUB-TOTAL 3,112,919$
MOBILIZATION, BONDING, & INSURANCE 10%311,292$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%155,646$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%155,646$
CONSTRUCTION SUB-TOTAL 3,735,503$
SOFT COSTS
PRELIMINARY ENGINEERING 15%560,325$
CONSTRUCTION ENGINEERING AND INSPECTION 10%373,550$
ITD/LHTAC ADMINISTRATION 5%186,775$
SOFT COST SUB-TOTAL 1,120,651$
OPINION OF CONSTRUCTION COST 4,856,154$
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable costs at this time
and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials, equipment, services provided by others,
contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies. Keller Associates cannot and does not warrant or guarantee
that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST
EXCAVATION
-15%
4,128,000$
50%
7,285,000$
OPINION RANGE ROUNDED TO NEAREST
THOUSAND
CLASS IV, -15% TO +50%
NEW TRAFFIC SIGNAL
TRAFFIC MEDIAN
225091-001
S. Gillie
Rexburg, ID
4/30/2026
S 2nd E, E 2nd N to N Yellowstone Estimate PAGE 1/1
J:
\
2
2
5
0
9
1
R
E
X
B
U
R
G
\
0
0
1
S
S
4
A
A
C
T
I
O
N
P
L
A
N
\
C
_
D
E
S
N
\
_
C
A
D
\
2
_
P
R
E
L
I
M
\
D
_
P
L
A
N
S
\
F
I
G
U
R
E
1
-
U
N
I
V
E
R
S
I
T
Y
.
D
W
G
LA
S
T
S
A
V
E
D
:
3/2
5
/
2
0
2
6
9
:
4
9
A
M
PR
I
N
T
E
D
:
4/7
/
2
0
2
6
8
:
4
3
A
M
----
PROJECT NO.
SHEET NO.
225091-001
CHECK:DRAWN:
VERIFY SCALE: Scales
based on 22"x34" prints.
1-1/2 Inches
PAGE
SA
F
E
S
T
R
E
E
T
S
A
N
D
R
O
A
D
S
FO
R
A
L
L
(
S
S
4
A
)
NO
.
RE
V
I
S
I
O
N
S
DA
T
E
Th
i
s
d
o
c
u
m
e
n
t
o
r
a
n
y
p
a
r
t
t
h
e
r
e
o
f
i
n
d
e
t
a
i
l
o
r
d
e
s
i
g
n
co
n
c
e
p
t
i
s
t
h
e
p
e
r
s
o
n
a
l
p
r
o
p
e
r
t
y
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
In
c
.
a
n
d
s
h
a
l
l
n
o
t
b
e
c
o
p
i
e
d
i
n
a
n
y
f
o
r
m
w
i
t
h
o
u
t
t
h
e
wr
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
PRELIMINARY
Not For
Construction
0'150'300'
SCALE: 1"=150'
CITY ART
CITY ART
HC
L
2
:
U
N
I
V
E
R
S
I
T
Y
B
O
U
L
E
V
A
R
D
/
G
O
L
D
E
N
BE
A
U
T
Y
D
R
I
V
E
1 OF 1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 2: GOLDEN BEAUTY DR/ UNIVERSITY BLVD
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
225 FT 302$ 67,950$
INSTALL RIGHT-TURN LANE 1 LS 181,000$ 181,000$
SUB-TOTAL 248,950$
MOBILIZATION, BONDING, & INSURANCE 10%24,895$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%12,448$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%12,448$
CONSTRUCTION SUB-TOTAL 298,741$
SOFT COSTS
PRELIMINARY ENGINEERING 15%44,811$
CONSTRUCTION ENGINEERING AND INSPECTION 10%29,874$
ITD/LHTAC ADMINISTRATION 5%14,937$
SOFT COST SUB-TOTAL 89,622$
OPINION OF CONSTRUCTION COST 388,363$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of
probable costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor,
materials, equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding
strategies. Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented
herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 2
DIRECTIONAL MEDIANS
-15%
331,000$
50%
583,000$
OPINION RANGE ROUNDED TO
NEAREST THOUSAND
CLASS IV, -15% TO +50%
HCL 2 OPCC PAGE 1/1
J:
\
2
2
5
0
9
1
R
E
X
B
U
R
G
\
0
0
1
S
S
4
A
A
C
T
I
O
N
P
L
A
N
\
C
_
D
E
S
N
\
_
C
A
D
\
2
_
P
R
E
L
I
M
\
D
_
P
L
A
N
S
\
F
I
G
U
R
E
3
-
2
N
D
-
1
S
T
.
D
W
G
LA
S
T
S
A
V
E
D
:
3/1
7
/
2
0
2
6
4
:
2
0
P
M
PR
I
N
T
E
D
:
3/1
8
/
2
0
2
6
9
:
4
2
A
M
0'20'40'
SCALE: 1"=20'
----
PROJECT NO.
SHEET NO.
225091-001
CHECK:DRAWN:
VERIFY SCALE: Scales
based on 22"x34" prints.
1-1/2 Inches
PAGE
SA
F
E
S
T
R
E
E
T
S
A
N
D
R
O
A
D
S
FO
R
A
L
L
(
S
S
4
A
)
NO
.
RE
V
I
S
I
O
N
S
DA
T
E
Th
i
s
d
o
c
u
m
e
n
t
o
r
a
n
y
p
a
r
t
t
h
e
r
e
o
f
i
n
d
e
t
a
i
l
o
r
d
e
s
i
g
n
co
n
c
e
p
t
i
s
t
h
e
p
e
r
s
o
n
a
l
p
r
o
p
e
r
t
y
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
In
c
.
a
n
d
s
h
a
l
l
n
o
t
b
e
c
o
p
i
e
d
i
n
a
n
y
f
o
r
m
w
i
t
h
o
u
t
t
h
e
wr
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
PRELIMINARY
Not For
Construction
W 1st S
S
2
n
d
W
HC
L
8
:
S
2
N
D
W
E
S
T
/
W
1
S
T
S
O
U
T
H
1 OF 1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 8: S 2ND WEST/ W 1ST SOUTH (RRFB w/ Median Option)
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
843 CY 18$ 14,822$
HMA PAVEMENT 624 TON 115$ 71,754$
PAVEMENT MARKINGS AND STRIPING - SYMBOLS 382 SF 9$ 3,520$
PAVEMENT MARKINGS AND STRIPING - LONGITUDINAL MARKINGS 997 LF 9$ 8,772$
LIGHTING 1 LS 20,000$ 20,000$
CONCRETE SIDEWALK 208 SY 70$ 14,606$
915 SF 6$ 5,344$
3 EA 25,000$ 75,000$
DRAINAGE 1 LS 75,000$ 75,000$
SUB-TOTAL 288,818$
MOBILIZATION, BONDING, & INSURANCE 10%28,882$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%14,441$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%14,441$
CONSTRUCTION SUB-TOTAL 346,582$
SOFT COSTS
PRELIMINARY ENGINEERING 15%51,987$
CONSTRUCTION ENGINEERING AND INSPECTION 10%34,658$
ITD/LHTAC ADMINISTRATION 5%17,329$
SOFT COST SUB-TOTAL 103,975$
OPINION OF CONSTRUCTION COST 450,557$
RRFB
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable costs at this time
and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials, equipment, services provided by others,
contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies. Keller Associates cannot and does not warrant or guarantee
that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST
EXCAVATION
-15%
383,000$
50%
676,000$
OPINION RANGE ROUNDED TO NEAREST
THOUSAND
CLASS IV, -15% TO +50%
LANDSCAPING
S 2nd W, W 1st S INT Estimate PAGE 1/1
J:
\
2
2
5
0
9
1
R
E
X
B
U
R
G
\
0
0
1
S
S
4
A
A
C
T
I
O
N
P
L
A
N
\
C
_
D
E
S
N
\
_
C
A
D
\
2
_
P
R
E
L
I
M
\
D
_
P
L
A
N
S
\
F
I
G
U
R
E
5
-
2
N
D
-
M
O
O
D
Y
.
D
W
G
LA
S
T
S
A
V
E
D
:
3/2
5
/
2
0
2
6
1
0
:
0
3
A
M
PR
I
N
T
E
D
:
3/2
5
/
2
0
2
6
1
0
:
0
3
A
M
0'40'80'
SCALE: 1"=40'
----
PROJECT NO.
SHEET NO.
225091-001
CHECK:DRAWN:
VERIFY SCALE: Scales
based on 22"x34" prints.
1-1/2 Inches
PAGE
SA
F
E
S
T
R
E
E
T
S
A
N
D
R
O
A
D
S
FO
R
A
L
L
(
S
S
4
A
)
NO
.
RE
V
I
S
I
O
N
S
DA
T
E
Th
i
s
d
o
c
u
m
e
n
t
o
r
a
n
y
p
a
r
t
t
h
e
r
e
o
f
i
n
d
e
t
a
i
l
o
r
d
e
s
i
g
n
co
n
c
e
p
t
i
s
t
h
e
p
e
r
s
o
n
a
l
p
r
o
p
e
r
t
y
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
In
c
.
a
n
d
s
h
a
l
l
n
o
t
b
e
c
o
p
i
e
d
i
n
a
n
y
f
o
r
m
w
i
t
h
o
u
t
t
h
e
wr
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
PRELIMINARY
Not For
Construction
Mo
o
d
y
R
d
E
1
5
t
h
N
N 2nd E
HC
L
1
0
:
N
2
N
D
E
A
S
T
/
M
O
O
D
Y
R
O
A
D
HC
L
1
8
:
N
2
N
D
E
A
S
T
/
E
1
5
T
H
N
O
R
T
H
1 OF 1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 10: N 2ND EAST/ MOODY RD + HCL 18: N 2ND EAST/ E 15TH NORTH CONCEPT
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
1112 CY 18$ 19,564$
HMA PAVEMENT 829 TON 115$ 95,298$
AGGREGATE BASE 2654 TON 45$ 119,449$
PAVEMENT MARKINGS AND STRIPING - SYMBOLS 2548 SF 9$ 23,493$
PAVEMENT MARKINGS AND STRIPING - LONGITUDINAL MARKINGS 966 LF 9$ 8,503$
CONCRETE SIDEWALK 213 SY 70$ 14,982$
1595 SF 6$ 9,316$
TRAFFIC SIGNAL MODIFICATION 1 LS 250,000$ 250,000$
500 FT 302$ 151,000$
SPEED FEEDBACK SIGNS 2 EA 46,000$ 92,000$
DRAINAGE 1 LS 50,000$ 50,000$
SUB-TOTAL 833,605$
MOBILIZATION, BONDING, & INSURANCE 10%83,361$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%41,681$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%41,681$
CONSTRUCTION SUB-TOTAL 1,000,328$
SOFT COSTS
PRELIMINARY ENGINEERING 15%150,049$
CONSTRUCTION ENGINEERING AND INSPECTION 10%100,033$
ITD/LHTAC ADMINISTRATION 5%50,017$
SOFT COST SUB-TOTAL 300,099$
OPINION OF CONSTRUCTION COST 1,300,428$
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable costs at this time
and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials, equipment, services provided by others,
contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies. Keller Associates cannot and does not warrant or guarantee
that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST
EXCAVATION
-15%
1,106,000$
50%
1,951,000$
OPINION RANGE ROUNDED TO NEAREST
THOUSAND
CLASS IV, -15% TO +50%
LANDSCAPING
225091-001
S. Gillie
Rexburg, ID
4/30/2026
DIRECTIONAL MEDIANS
N 2nd E, E Moody Rd, E 15th N INT Estimate PAGE 1/1
J:
\
2
2
5
0
9
1
R
E
X
B
U
R
G
\
0
0
1
S
S
4
A
A
C
T
I
O
N
P
L
A
N
\
C
_
D
E
S
N
\
_
C
A
D
\
2
_
P
R
E
L
I
M
\
D
_
P
L
A
N
S
\
F
I
G
U
R
E
4
-
H
I
G
H
W
A
Y
3
3
.
D
W
G
LA
S
T
S
A
V
E
D
:
3/1
7
/
2
0
2
6
4
:
4
0
P
M
PR
I
N
T
E
D
:
3/1
8
/
2
0
2
6
9
:
4
2
A
M
0'30'60'
SCALE: 1"=30'
----
PROJECT NO.
SHEET NO.
225091-001
CHECK:DRAWN:
VERIFY SCALE: Scales
based on 22"x34" prints.
1-1/2 Inches
PAGE
SA
F
E
S
T
R
E
E
T
S
A
N
D
R
O
A
D
S
FO
R
A
L
L
(
S
S
4
A
)
NO
.
RE
V
I
S
I
O
N
S
DA
T
E
Th
i
s
d
o
c
u
m
e
n
t
o
r
a
n
y
p
a
r
t
t
h
e
r
e
o
f
i
n
d
e
t
a
i
l
o
r
d
e
s
i
g
n
co
n
c
e
p
t
i
s
t
h
e
p
e
r
s
o
n
a
l
p
r
o
p
e
r
t
y
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
In
c
.
a
n
d
s
h
a
l
l
n
o
t
b
e
c
o
p
i
e
d
i
n
a
n
y
f
o
r
m
w
i
t
h
o
u
t
t
h
e
wr
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
PRELIMINARY
Not For
Construction
SH-33
S
1
2
t
h
W
Su
m
m
i
t
D
r
Pa
h
s
m
e
r
o
i
B
l
v
d
HC
L
1
1
:
S
1
2
T
H
W
/
M
A
I
N
S
T
(
S
H
-
3
3
)
H
C
L
1
3
:
M
A
I
N
S
T
(
S
H
-
3
3
)
/
P
A
H
S
I
M
E
R
O
L
B
L
V
D
/
S
U
M
M
I
T
D
R
1 OF 1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 11: S 12TH WEST/ MAIN ST + HCL 13: MAIN ST/ PAHSIMEROI BLVD/ SUMMIT DR CONCEPT
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
4390 CY 18$ 77,219$
HMA PAVEMENT 3439 TON 115$ 395,528$
AGGREGATE BASE 8496 TON 45$ 382,304$
PAVEMENT MARKINGS AND STRIPING - SYMBOLS 2795 SF 9$ 25,767$
PAVEMENT MARKINGS AND STRIPING - LONGITUDINAL MARKINGS 4601 LF 9$ 40,489$
TRAFFIC MEDIAN 513 SY 120$ 61,538$
TRAFFIC BARRIER 316 LF 100$ 31,575$
CONCRETE SIDEWALK 536 SY 70$ 37,683$
3645 SF 6$ 21,289$
1 LS 137,000$ 137,000$
INSTALL TRAFFIC SIGNAL 1 LS 750,000$ 750,000$
DRAINAGE 1 LS 100,000$ 100,000$
SUB-TOTAL 2,060,391$
MOBILIZATION, BONDING, & INSURANCE 10%206,040$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%103,020$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%103,020$
CONSTRUCTION SUB-TOTAL 2,472,471$
SOFT COSTS
PRELIMINARY ENGINEERING 15%370,871$
CONSTRUCTION ENGINEERING AND INSPECTION 10%247,247$
ITD/LHTAC ADMINISTRATION 5%123,624$
SOFT COST SUB-TOTAL 741,741$
OPINION OF CONSTRUCTION COST 3,214,213$
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable costs at this time
and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials, equipment, services provided by others,
contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies. Keller Associates cannot and does not warrant or guarantee
that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST
EXCAVATION
-15%
2,733,000$
50%
4,822,000$
OPINION RANGE ROUNDED TO NEAREST
THOUSAND
CLASS IV, -15% TO +50%
LANDSCAPING
ADVANCE SIGNAL WARNING SIGN
225091-001
S. Gillie
Rexburg, ID
4/30/2026
HWY 33, S 12th W, Summit Dr INT Estimate PAGE 1/1
J:
\
2
2
5
0
9
1
R
E
X
B
U
R
G
\
0
0
1
S
S
4
A
A
C
T
I
O
N
P
L
A
N
\
C
_
D
E
S
N
\
_
C
A
D
\
2
_
P
R
E
L
I
M
\
D
_
P
L
A
N
S
\
F
I
G
U
R
E
2
-
2
N
D
-
5
T
H
.
D
W
G
LA
S
T
S
A
V
E
D
:
3/1
7
/
2
0
2
6
4
:
2
1
P
M
PR
I
N
T
E
D
:
3/1
8
/
2
0
2
6
9
:
4
1
A
M
0'20'40'
SCALE: 1"=20'
----
PROJECT NO.
SHEET NO.
225091-001
CHECK:DRAWN:
VERIFY SCALE: Scales
based on 22"x34" prints.
1-1/2 Inches
PAGE
SA
F
E
S
T
R
E
E
T
S
A
N
D
R
O
A
D
S
FO
R
A
L
L
(
S
S
4
A
)
NO
.
RE
V
I
S
I
O
N
S
DA
T
E
Th
i
s
d
o
c
u
m
e
n
t
o
r
a
n
y
p
a
r
t
t
h
e
r
e
o
f
i
n
d
e
t
a
i
l
o
r
d
e
s
i
g
n
co
n
c
e
p
t
i
s
t
h
e
p
e
r
s
o
n
a
l
p
r
o
p
e
r
t
y
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
In
c
.
a
n
d
s
h
a
l
l
n
o
t
b
e
c
o
p
i
e
d
i
n
a
n
y
f
o
r
m
w
i
t
h
o
u
t
t
h
e
wr
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
PRELIMINARY
Not For
Construction
W 5th S
S
2
n
d
W
HC
L
1
4
:
S
2
N
D
W
E
S
T
/
W
5
T
H
S
O
U
T
H
1 OF 1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 14: S 2ND WEST/ W 5TH SOUTH CONCEPT
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
528.783333 CY 18$ 9,301$
HMA PAVEMENT 305.929375 TON 115$ 35,182$
PAVEMENT MARKINGS AND STRIPING - SYMBOLS 543.01 SF 9$ 5,007$
PAVEMENT MARKINGS AND STRIPING - LONGITUDINAL MARKINGS 144.3206 LF 9$ 1,270$
LIGHTING 1 LS 20,000$ 20,000$
CONCRETE SIDEWALK 299.054444 SY 70$ 21,030$
1795.92 SF 6$ 10,488$
4 EA 25,000$ 100,000$
DRAINAGE 1 LS 50,000$ 50,000$
SUB-TOTAL 252,277$
MOBILIZATION, BONDING, & INSURANCE 10%25,228$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%12,614$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%12,614$
CONSTRUCTION SUB-TOTAL 302,733$
SOFT COSTS
PRELIMINARY ENGINEERING 15%45,410$
CONSTRUCTION ENGINEERING AND INSPECTION 10%30,273$
ITD/LHTAC ADMINISTRATION 5%15,137$
SOFT COST SUB-TOTAL 90,820$
OPINION OF CONSTRUCTION COST 393,553$
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable costs at this time and
is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials, equipment, services provided by others,
contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies. Keller Associates cannot and does not warrant or guarantee
that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST
EXCAVATION
-15%
335,000$
50%
591,000$
OPINION RANGE ROUNDED TO NEAREST
THOUSAND
CLASS IV, -15% TO +50%
LANDSCAPING
RRFB
225091-001
S. Gillie
Rexburg, ID
4/30/2026
S 2nd W, W 5th S INT Estimate PAGE 1/1
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
Appendix E: HCL Project Cost
Estimates
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 1: N 2ND EAST: E 2ND NORTH TO S TETON RIVER
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
2000 LF 302$ 604,000$
INSTALL TRAFFIC SIGNAL 1 EA 500,000$ 500,000$
MODIFY TRAFFIC SIGNALS 1 EA 250,000$ 250,000$
SUB-TOTAL 1,354,000$
MOBILIZATION, BONDING, & INSURANCE 10%135,400$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%67,700$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%67,700$
CONSTRUCTION SUB-TOTAL 1,624,800$
SOFT COSTS
PRELIMINARY ENGINEERING 15%243,720$
CONSTRUCTION ENGINEERING AND INSPECTION 10%162,480$
ITD/LHTAC ADMINISTRATION 5%81,240$
SOFT COST SUB-TOTAL 487,440$
OPINION OF CONSTRUCTION COST 2,112,240$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable
costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials, equipment,
services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies. Keller Associates
cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 1
DIRECTIONAL MEDIANS
-15%
1,796,000$
50%
3,169,000$
OPINION RANGE ROUNDED TO NEAREST
THOUSAND
CLASS IV, -15% TO +50%
HCL 1 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 2: GOLDEN BEAUTY DR/ UNIVERSITY BLVD
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
225 FT 302$ 67,950$
INSTALL RIGHT-TURN LANE 1 LS 181,000$ 181,000$
SUB-TOTAL 248,950$
MOBILIZATION, BONDING, & INSURANCE 10%24,895$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%12,448$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%12,448$
CONSTRUCTION SUB-TOTAL 298,741$
SOFT COSTS
PRELIMINARY ENGINEERING 15%44,811$
CONSTRUCTION ENGINEERING AND INSPECTION 10%29,874$
ITD/LHTAC ADMINISTRATION 5%14,937$
SOFT COST SUB-TOTAL 89,622$
OPINION OF CONSTRUCTION COST 388,363$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of
probable costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor,
materials, equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding
strategies. Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented
herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 2
DIRECTIONAL MEDIANS
-15%
331,000$
50%
583,000$
OPINION RANGE ROUNDED TO
NEAREST THOUSAND
CLASS IV, -15% TO +50%
HCL 2 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 3: S 2ND EAST: E 7TH SOUTH TO E 3RD SOUTH
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
4 EA 40,000$ 160,000$
INSTALL RAISED CROSSWALK 4 EA 46,000$ 184,000$
3000 FT 100$ 300,000$
SUB-TOTAL 644,000$
MOBILIZATION, BONDING, & INSURANCE 10%64,400$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%32,200$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%32,200$
CONSTRUCTION SUB-TOTAL 772,800$
SOFT COSTS
PRELIMINARY ENGINEERING 15%115,920$
CONSTRUCTION ENGINEERING AND INSPECTION 10%77,280$
ITD/LHTAC ADMINISTRATION 5%38,640$
SOFT COST SUB-TOTAL 231,840$
OPINION OF CONSTRUCTION COST 1,004,640$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable
costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials,
equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies.
Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 3
INSTALL REFUGE ISLAND
INSTALL LIGHTING ON ROADWAY SEGMENT
-15%
854,000$
50%
1,507,000$
OPINION RANGE ROUNDED TO
NEAREST THOUSAND
CLASS IV, -15% TO +50%
HCL 3 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 4: N 2ND EAST: MORAN VIEW RD TO MOODY RD
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
1000 FT 302$ 302,000$
ADVANCED STOP MARKINGS 4 EA 14,000$ 56,000$
4 EA 14,000$ 56,000$
INSTALL ROADWAY LIGHTING 2500 FT 272$ 680,000$
INSTALL INTERSECTION LIGHTING 3 EA 181,000$ 543,000$
SUB-TOTAL 1,637,000$
MOBILIZATION, BONDING, & INSURANCE 10%163,700$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%81,850$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%81,850$
CONSTRUCTION SUB-TOTAL 1,964,400$
SOFT COSTS
PRELIMINARY ENGINEERING 15%294,660$
CONSTRUCTION ENGINEERING AND INSPECTION 10%196,440$
ITD/LHTAC ADMINISTRATION 5%98,220$
SOFT COST SUB-TOTAL 589,320$
OPINION OF CONSTRUCTION COST 2,553,720$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable
costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials,
equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies.
Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 4
DIRECTIONAL MEDIANS
ADVANCED INTERSECTION SIGNS
-15%
2,171,000$
50%
3,831,000$
OPINION RANGE ROUNDED TO
NEAREST THOUSAND
CLASS IV, -15% TO +50%
HCL 4 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 5: S 1ST WEST: W 3RD SOUTH TO W 1ST SOUTH
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
2000 FT 254$ 508,000$
INSTALL ROADWAY LIGHTING 1000 FT 272$ 272,000$
1 EA 50,000$ 50,000$
REFUGE ISLAND 2 EA 40,000$ 80,000$
CURB EXTENSIONS 4 EA 69,000$ 276,000$
SUB-TOTAL 1,186,000$
MOBILIZATION, BONDING, & INSURANCE 10%118,600$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%59,300$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%59,300$
CONSTRUCTION SUB-TOTAL 1,423,200$
SOFT COSTS
PRELIMINARY ENGINEERING 15%213,480$
CONSTRUCTION ENGINEERING AND INSPECTION 10%142,320$
ITD/LHTAC ADMINISTRATION 5%71,160$
SOFT COST SUB-TOTAL 426,960$
OPINION OF CONSTRUCTION COST 1,850,160$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable
costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials,
equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies.
Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 5
CYCLE TRACKS
INSTALL INTERSECTION LIGHTING
-15%
1,573,000$
50%
2,776,000$
OPINION RANGE ROUNDED TO
NEAREST THOUSAND
CLASS IV, -15% TO +50%
HCL 5 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 6: YELLOWSTONE HWY/ W 7TH SOUTH
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
4 EA 2,000$ 8,000$
INSTALL INTERSECTION LIGHTING 1 EA 181,000$ 181,000$
1 EA 51,000$ 51,000$
SIGNAL AHEAD ADVANCE WARNING 1 EA 137,000$ 137,000$
GUIDE SIGNS 2 EA 46,000$ 92,000$
SUB-TOTAL 469,000$
MOBILIZATION, BONDING, & INSURANCE 10%46,900$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%23,450$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%23,450$
CONSTRUCTION SUB-TOTAL 562,800$
SOFT COSTS
PRELIMINARY ENGINEERING 15%84,420$
CONSTRUCTION ENGINEERING AND INSPECTION 10%56,280$
ITD/LHTAC ADMINISTRATION 5%28,140$
SOFT COST SUB-TOTAL 168,840$
OPINION OF CONSTRUCTION COST 731,640$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of
probable costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor,
materials, equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding
strategies. Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented
herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 6
PROHIBIT RIGHT-ON-RED
ACTUATED ADVANCE WARNING DETECTION
-15%
622,000$
50%
1,098,000$
OPINION RANGE ROUNDED TO
NEAREST THOUSAND
CLASS IV, -15% TO +50%
HCL 6 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 7: UNIVERSITY BLVD: YELLOWSTONE HWY TO S 5TH WEST
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
3000 FT 2$ 6,000$
INSTALL ROADWAY LIGHTING 3000 FT 150$ 450,000$
INCREASE PAVEMENT FRICTION (CURVE)750 FT 148$ 111,000$
SPEED FEEDBACK SIGNS 2 EA 46,000$ 92,000$
WIDEN PAVED SHOULDER 3'3000 FT 217$ 651,000$
SUB-TOTAL 1,310,000$
MOBILIZATION, BONDING, & INSURANCE 10%131,000$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%65,500$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%65,500$
CONSTRUCTION SUB-TOTAL 1,572,000$
SOFT COSTS
PRELIMINARY ENGINEERING 15%235,800$
CONSTRUCTION ENGINEERING AND INSPECTION 10%157,200$
ITD/LHTAC ADMINISTRATION 5%78,600$
SOFT COST SUB-TOTAL 471,600$
OPINION OF CONSTRUCTION COST 2,043,600$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable
costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials,
equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies.
Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 7
INSTALL PAVEMENT MARKERS
-15%
1,738,000$
50%
3,066,000$
OPINION RANGE ROUNDED TO
NEAREST THOUSAND
CLASS IV, -15% TO +50%
HCL 7 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 8: S 2ND WEST/ W 1ST SOUTH
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
1 EA 14,000$ 14,000$
1 LS 211,000$ 211,000$
INTERSECTION LIGHTING 1 LS 75,000$ 75,000$
SUB-TOTAL 300,000$
MOBILIZATION, BONDING, & INSURANCE 10%30,000$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%15,000$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%15,000$
CONSTRUCTION SUB-TOTAL 360,000$
SOFT COSTS
PRELIMINARY ENGINEERING 15%54,000$
CONSTRUCTION ENGINEERING AND INSPECTION 10%36,000$
ITD/LHTAC ADMINISTRATION 5%18,000$
SOFT COST SUB-TOTAL 108,000$
OPINION OF CONSTRUCTION COST 468,000$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable
costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials,
equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies.
Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 8
IMPROVE INTERSECTION WARNING
RRFB (>= 3-lane w/median application)
-15%
398,000$
50%
702,000$
OPINION RANGE ROUNDED TO NEAREST
THOUSAND
CLASS IV, -15% TO +50%
HCL 8 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 9: S 2ND WEST/ W 7TH SOUTH
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
1 LS 14,000$ 14,000$
PROTECTED/PERMISSIVE TURNS 1 LS 12,000$ 12,000$
1 LS 2,000$ 2,000$
ACTUATED ADVANCE WARNING DETECTION 1 LS 51,000$ 51,000$
SIGNAL AHEAD WARNING SIGNS 1 LS 137,000$ 137,000$
SUB-TOTAL 216,000$
MOBILIZATION, BONDING, & INSURANCE 10%21,600$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%10,800$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%10,800$
CONSTRUCTION SUB-TOTAL 259,200$
SOFT COSTS
PRELIMINARY ENGINEERING 15%38,880$
CONSTRUCTION ENGINEERING AND INSPECTION 10%25,920$
ITD/LHTAC ADMINISTRATION 5%12,960$
SOFT COST SUB-TOTAL 77,760$
OPINION OF CONSTRUCTION COST 336,960$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of
probable costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor,
materials, equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding
strategies. Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented
herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 9
PROTECTED LEFT TURN
LEADING PEDESTRIAN INTERVALS
-15%
287,000$
50%
506,000$
OPINION RANGE ROUNDED TO
NEAREST THOUSAND
CLASS IV, -15% TO +50%
HCL 9 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 10: N 2ND EAST/ MOODY RD
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
1 LS 20,000$ 20,000$
RIGHT-TURN LANE 1 LS 605,000$ 605,000$
1 LS 10,000$ 10,000$
SUB-TOTAL 635,000$
MOBILIZATION, BONDING, & INSURANCE 10%63,500$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%31,750$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%31,750$
CONSTRUCTION SUB-TOTAL 762,000$
SOFT COSTS
PRELIMINARY ENGINEERING 15%114,300$
CONSTRUCTION ENGINEERING AND INSPECTION 10%76,200$
ITD/LHTAC ADMINISTRATION 5%38,100$
SOFT COST SUB-TOTAL 228,600$
OPINION OF CONSTRUCTION COST 990,600$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable
costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials,
equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies.
Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 10
ADVANCE SIGNAL WARNING SIGN
LEFT TURN LANE
-15%
843,000$
50%
1,486,000$
OPINION RANGE ROUNDED TO
NEAREST THOUSAND
CLASS IV, -15% TO +50%
HCL 10 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 11: S 12TH WEST/ MAIN ST
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
1 LS 137,000$ 137,000$
RIGHT-TURN LANE 1 LS 605,000$ 605,000$
1 LS 1,405,000$ 1,405,000$
ACTUATED ADVANCE WARNING DETECTION 1 LS 51,000$ 51,000$
SUB-TOTAL 2,198,000$
MOBILIZATION, BONDING, & INSURANCE 10%219,800$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%109,900$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%109,900$
CONSTRUCTION SUB-TOTAL 2,637,600$
SOFT COSTS
PRELIMINARY ENGINEERING 15%395,640$
CONSTRUCTION ENGINEERING AND INSPECTION 10%263,760$
ITD/LHTAC ADMINISTRATION 5%131,880$
SOFT COST SUB-TOTAL 791,280$
OPINION OF CONSTRUCTION COST 3,428,880$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable
costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials,
equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies.
Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 11
ADVANCE SIGNAL WARNING SIGN
LEFT-TURN LANE
-15%
2,915,000$
50%
5,144,000$
OPINION RANGE ROUNDED TO
NEAREST THOUSAND
CLASS IV, -15% TO +50%
HCL 11 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 12: N 2ND EAST: S TETON RIVER TO E 7TH NORTH
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
2 EA 46,000$ 92,000$
DIRECTIONAL MEDIANS 2000 LF 302$ 604,000$
MODIFY TRAFFIC SIGNALS 3 EA 225,000$ 675,000$
SUB-TOTAL 1,371,000$
MOBILIZATION, BONDING, & INSURANCE 10%137,100$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%68,550$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%68,550$
CONSTRUCTION SUB-TOTAL 1,645,200$
SOFT COSTS
PRELIMINARY ENGINEERING 15%246,780$
CONSTRUCTION ENGINEERING AND INSPECTION 10%164,520$
ITD/LHTAC ADMINISTRATION 5%82,260$
SOFT COST SUB-TOTAL 493,560$
OPINION OF CONSTRUCTION COST 2,138,760$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable
costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials,
equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies.
Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 12
SPEED FEEDBACK SIGNS
-15%
1,818,000$
50%
3,209,000$
OPINION RANGE ROUNDED TO
NEAREST THOUSAND
CLASS IV, -15% TO +50%
HCL 12 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 13: MAIN ST/ PAHSIMEROI BLVD/ SUMMIT DR
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
750 FT 302$ 226,500$
SUB-TOTAL 226,500$
MOBILIZATION, BONDING, & INSURANCE 10%22,650$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%11,325$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%11,325$
CONSTRUCTION SUB-TOTAL 271,800$
SOFT COSTS
PRELIMINARY ENGINEERING 15%40,770$
CONSTRUCTION ENGINEERING AND INSPECTION 10%27,180$
ITD/LHTAC ADMINISTRATION 5%13,590$
SOFT COST SUB-TOTAL 81,540$
OPINION OF CONSTRUCTION COST 353,340$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable
costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials,
equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies.
Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 13
DIRECTIONAL MEDIANS
-15%
301,000$
50%
531,000$
OPINION RANGE ROUNDED TO
NEAREST THOUSAND
CLASS IV, -15% TO +50%
HCL 13 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 14: S 2ND WEST/ W 5TH SOUTH
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
1 LS 13,000$ 13,000$
SPEED FEEDBACK SIGNS 2 EA 46,000$ 92,000$
1 LS 69,000$ 69,000$
INTERSECTION LIGHTING 1 LS 75,000$ 75,000$
SUB-TOTAL 249,000$
MOBILIZATION, BONDING, & INSURANCE 10%24,900$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%12,450$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%12,450$
CONSTRUCTION SUB-TOTAL 298,800$
SOFT COSTS
PRELIMINARY ENGINEERING 15%44,820$
CONSTRUCTION ENGINEERING AND INSPECTION 10%29,880$
ITD/LHTAC ADMINISTRATION 5%14,940$
SOFT COST SUB-TOTAL 89,640$
OPINION OF CONSTRUCTION COST 388,440$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of
probable costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor,
materials, equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding
strategies. Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented
herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 14
FLASHING BEACONS
CURB EXTENSIONS
-15%
331,000$
50%
583,000$
OPINION RANGE ROUNDED TO
NEAREST THOUSAND
CLASS IV, -15% TO +50%
HCL 14 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 15: S 5TH WEST/ W 7TH SOUTH
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
1 EA 10,000$ 10,000$
ROUNDABOUT 1 LS 1,000,000$ 1,000,000$
1 LS 181,000$ 181,000$
IMPROVE INTERSECTION WARNING 1 LS 14,000$ 14,000$
SUB-TOTAL 1,205,000$
MOBILIZATION, BONDING, & INSURANCE 10%120,500$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%60,250$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%60,250$
CONSTRUCTION SUB-TOTAL 1,446,000$
SOFT COSTS
PRELIMINARY ENGINEERING 15%216,900$
CONSTRUCTION ENGINEERING AND INSPECTION 10%144,600$
ITD/LHTAC ADMINISTRATION 5%72,300$
SOFT COST SUB-TOTAL 433,800$
OPINION OF CONSTRUCTION COST 1,879,800$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable
costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials,
equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies.
Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 15
INCREASE TRIANGLE SIGHT DISTANCE
INTERSECTION LIGHTING
-15%
1,598,000$
50%
2,820,000$
OPINION RANGE ROUNDED TO
NEAREST THOUSAND
CLASS IV, -15% TO +50%
HCL 15 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 16: N 2ND EAST/ LORENE ST
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
1 LS 181,000$ 181,000$
1 LS 181,000$ 181,000$
UPGRADE INTERSECTION WARNING 1 LS 5,000$ 5,000$
SUB-TOTAL 367,000$
MOBILIZATION, BONDING, & INSURANCE 10%36,700$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%18,350$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%18,350$
CONSTRUCTION SUB-TOTAL 440,400$
SOFT COSTS
PRELIMINARY ENGINEERING 15%66,060$
CONSTRUCTION ENGINEERING AND INSPECTION 10%44,040$
ITD/LHTAC ADMINISTRATION 5%22,020$
SOFT COST SUB-TOTAL 22,020$
OPINION OF CONSTRUCTION COST 462,420$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable
costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials,
equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies.
Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 16
RIGHT-TURN LANE
INTERSECTION LIGHTING
-15%
394,000$
50%
694,000$
OPINION RANGE ROUNDED TO
NEAREST THOUSAND
CLASS IV, -15% TO +50%
HCL 16 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 17: PIONEER RD/ MAIN ST
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
1 LS 605,000$ 605,000$
1 LS 51,000$ 51,000$
SUB-TOTAL 656,000$
MOBILIZATION, BONDING, & INSURANCE 10%65,600$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%32,800$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%32,800$
CONSTRUCTION SUB-TOTAL 787,200$
SOFT COSTS
PRELIMINARY ENGINEERING 15%118,080$
CONSTRUCTION ENGINEERING AND INSPECTION 10%78,720$
ITD/LHTAC ADMINISTRATION 5%39,360$
SOFT COST SUB-TOTAL 236,160$
OPINION OF CONSTRUCTION COST 1,023,360$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable
costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials,
equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies.
Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 17
RIGHT-TURN LANE
ADVANCE SIGNAL WARNING
-15%
870,000$
50%
1,536,000$
OPINION RANGE ROUNDED TO
NEAREST THOUSAND
CLASS IV, -15% TO +50%
HCL 17 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 18: N 2ND EAST/ E 15TH NORTH
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
250 FT 2$ 500$
INCREASE PAVEMENT FRICTION 1 LS 37,000$ 37,000$
500 FT 302$ 151,000$
SPEED FEEDBACK SIGNS 2 EA 46,000$ 92,000$
SUB-TOTAL 280,500$
MOBILIZATION, BONDING, & INSURANCE 10%28,050$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%14,025$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%14,025$
CONSTRUCTION SUB-TOTAL 336,600$
SOFT COSTS
PRELIMINARY ENGINEERING 15%50,490$
CONSTRUCTION ENGINEERING AND INSPECTION 10%33,660$
ITD/LHTAC ADMINISTRATION 5%16,830$
SOFT COST SUB-TOTAL 100,980$
OPINION OF CONSTRUCTION COST 437,580$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable
costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials,
equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies.
Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 18
RAISED PAVEMENT MARKERS
DIRECTIONAL MEDIANS
-15%
372,000$
50%
657,000$
OPINION RANGE ROUNDED TO
NEAREST THOUSAND
CLASS IV, -15% TO +50%
HCL 18 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 19: W 1ST NORTH/ N 2ND WEST
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
1 LS 37,000$ 37,000$
SPEED FEEDBACK SIGNS 2 EA 46,000$ 92,000$
1 LS 4,000$ 4,000$
SUPERELEVATION IMPROVEMENTS 1 LS 750,000$ 750,000$
SUB-TOTAL 883,000$
MOBILIZATION, BONDING, & INSURANCE 10%88,300$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%44,150$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%44,150$
CONSTRUCTION SUB-TOTAL 1,059,600$
SOFT COSTS
PRELIMINARY ENGINEERING 15%158,940$
CONSTRUCTION ENGINEERING AND INSPECTION 10%105,960$
ITD/LHTAC ADMINISTRATION 5%52,980$
SOFT COST SUB-TOTAL 317,880$
OPINION OF CONSTRUCTION COST 1,377,480$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable
costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials,
equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies.
Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 19
INCREASE PAVEMENT FRICTION
CURVE WARNING SIGNS
-15%
1,171,000$
50%
2,067,000$
OPINION RANGE ROUNDED TO
NEAREST THOUSAND
CLASS IV, -15% TO +50%
HCL 19 OPCC PAGE 1/1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
HCL 20: CENTER ST/ E 7TH SOUTH
CONSTRUCTION ITEM QUANTITY UNITS UNIT PRICE COST
1 LS 600,000$ 600,000$
LEADING PEDESTRIAN INTERVAL 1 LS 1,500$ 1,500$
SUB-TOTAL 601,500$
MOBILIZATION, BONDING, & INSURANCE 10%60,150$
CONSTRUCTION CONTINGENCY (CHANGE ORDERS)5%30,075$
FUNDING REQUIREMENTS (AIS, BABA, DAVIS BACON, ETC.)5%30,075$
CONSTRUCTION SUB-TOTAL 721,800$
SOFT COSTS
PRELIMINARY ENGINEERING 15%108,270$
CONSTRUCTION ENGINEERING AND INSPECTION 10%72,180$
ITD/LHTAC ADMINISTRATION 5%36,090$
SOFT COST SUB-TOTAL 216,540$
OPINION OF CONSTRUCTION COST 938,340$
225091-001
S. Gillie
Rexburg, ID
4/30/2026
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable
costs at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials,
equipment, services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies.
Keller Associates cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented herein.
ENGINEER'S OPINION OF MOST PROBABLE CONSTRUCTION COST- HCL 20
TRAFFIC SIGNAL
-15%
798,000$
50%
1,408,000$
OPINION RANGE ROUNDED TO NEAREST
THOUSAND
CLASS IV, -15% TO +50%
HCL 20 OPCC PAGE 1/1
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
Appendix F: Project Prioritization -
Methodology and Matrix Results
PROJECT PRIORITIZATION MATRIX
High Crash Location project concepts have been developed to address the identified safety challenge at
those locations and mitigate crash trends. This plan recommends project implementation based on a priority
ranking of projects given the considerations below, and an associated weight to determine an ultimate
priority rank:
Equivalent Property Damage Only
Initial HCL project identification was driven by locations with the most significant crash trends (frequency
and severity of crashes). To apply a quantifiable ranking of locations, an Equivalent Property Damage Only
(EPDO) score was applied based on the following conversion:
Fatal and serious injury crashes = 100 EPDO points
Minor and possible injury crashes = 10 EPDO points
Property Damage Only crashes = 1 EPDO point
Based on the EPDO ranking, the top 20 highest EPDO ranking locations were chosen. To prioritize these
locations further, EPDO scores were divided into five score brackets:
Score 5 : EPDO ≥ 400
Score 4: 300 ≤ EPDO < 400
Score 3: 200 ≤ EPDO < 300
Score 2: 150 ≤ EPDO < 200
Score 1: EPDO < 150
The EPDO score was given an overall priority weighting of 0.75.
Area of Persistent Poverty
HCL locations were screened for presence in a historically underserved area. Based on whether locations
were or were not located in an area of persistent poverty:
Located in an area of persistent poverty : Score of 1
Not located in an area of persistent poverty : Score of 0
The area of persistent poverty score was given an overall priority weighting of 0.50.
Presence in the TSP / CIP
Project’s recommended in this plan are more effectively implemented if coordinated with currently planned
projects at the same location or adjacent to the proposed project location. To identify where HCL proposed
projects overlap currently planned project locations, the city of Rexburg’s 5-Year Capital Improvement Plan
(CIP) as well as Rexburg’s Transportation System Plan (TSP) were reviewed. Scoring was accordingly:
Located at the same location or adjacent to an existing planned project : Score of 1
Not located at the same location or adjacent to an existing planned project : Score of 0
The Presence in the TSP / CIP score was given an overall priority weighting of 0.25.
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 2
Identified Public Concern
As part of the Public Involvement Survey, respondents were asked to indicate specific locations that they
had safety concerns. HCL projects were scored based on whether they were or were not located in proximity
to these identified public concern points:
Located at or near an identified public concern : Score of 1
Not located at or near an identified public concern : Score of 0
The identified public concern score was given an overall priority weighting of 0.25.
HCL Priority Project Ranking and Non-Infrastructure Strategy Prioritization
HCL projects explored in this plan should be programmed per the ranking shown in Table X.
Non-infrastructure strategies recommended in this plan were not evaluated on the same weighted criteria
as the HCL project recommendations. Of the policy recommendations given in this study, the following are
foundational approaches that inform and facilitate the adoption of other safety focused policies:
• Priority Rank 1 : Adopt the Safe System Approach
Adoption of the Safe System Approach (SSA) is a fundamental commitment to designing and planning
infrastructure that prioritizes harm reduction and human life at least on the same weight as operational
efficiency and cost. An SSA commitment supports further investment in all other safety policies that align
with the principles and goals of the CSAP.
• Priority Rank 2: Develop a Safety Working Group / Vision Zero Local Task Force
To reach the goal of zero deaths and serious injuries on Rexburg’s roads by 2036, establishing an
accountable group to reaching this goal is critical. The appointment of individuals to a group that actively
works to implement safety investments and adapt current policies to better serve the community is an
effective means to continue efforts, track progress, and refine approaches to transportation safety.
Based on input from the CSAP Steering Committee, there is a priority on infrastructure investments and
adopted policy recommendations that directly address safety around schools. Priority Policy ranks 3
through 5 are recommended based on their effectiveness and relevance to streets surrounding schools and
routes to schools, and their applicability to city wide safety improvements.
• Priority Rank 3: Adopt a Slow Streets Policy
The ability to manage speeds based on an existing safety need over statutory operational requirements is
necessary to meet the goal of reducing crash occurrence and severity. Adoption of a Slow Streets Policy is
an effective first step to establishing safety as a design priority along local roads and routes to schools.
• Priority Rank 4: Adopt a Complete Streets Policy
Committing to designing roads around all modes is necessary to accommodate all ages and abilities,
ensuring all community members are served by investments into infrastructure. Adoption of a Complete
Streets Policy is a critical component of designing streets, especially those that serve students travelling to
and from school, that allow walking, biking, or rolling safely.
• Priority Rank 5: Adopt a Complete Network Policy
A Complete Network Policy prioritizes infrastructure planning such that multimodal investments are
implemented intentionally, providing a contiguous means of reaching destinations safely. This is particularly
important for students walking, biking, or rolling to reach schools without needing to rely on roadway
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
CITY OF REXBURG | KA 225091-001 3
facilities that do not prioritize their safety. A Complete Network Policy ensures that multimodal infrastructure
investments have maximized return on investment by enhancing an existing effort.
Table 1: Infrastructure Priority Ranking
Infrastructure
Priority
Ranking
HCL ; Project Location Priority
Score
Timeframe for
Implementation
1 HCL 1 ; N 2nd E: E 2nd N to S Teton River 15 1 – 3 Years
2 HCL 5 ; S 1st W: W 3rd S to W 1st S 14.5 1 – 3 Years
3 HCL 3 ; S 2nd E: E 7th S to E 3rd S 13.5 1 – 3 Years
4 HCL 7 ; University Blvd: Yellowstone Hwy to S 5th W 13 1 – 3 Years
5 HCL 9 ; S 2nd W & W 7th S 13 1 – 3 Years
6 HCL 14 ; S 2nd W & W 5th S 11.5 3 – 5 Years
7 HCL 2; Golden Beauty Dr & University Blvd 11 3 – 5 Years
8 HCL 11 ; S 12th W & Main St 10.5 3 – 5 Years
9 HCL 6 ; Yellowstone Hwy & W 7th S 9.5 3 – 5 Years
10 HCL 15 ; S 5th W & W 7th S 9 3 – 5 Years
11 HCL 19 ; W 1st N & N 2nd W 9 3 – 5 Years
12 HCL 20 ; Center St & E 7th S 9 3 – 5 Years
13 HCL 8 ; S 2nd W & W 1st S 8 3 – 5 Years
14 HCL 4 ; N 2nd E: Moran View to Moody Rd 7 3 – 5 Years
15 HCL 13 ; Main St & Pahsimeroi Blvd & Summit Dr 6.5 3 – 5 Years
16 HCL 17 ; Pioneer Rd & Main St 6.5 5 – 10 Years
17 HCL 10 ; N 2nd E & Moody Rd 5.5 5 – 10 Years
18 HCL 12 ; N 2nd E: S Teton River to E 7th N 3 5 – 10 Years
19 HCL 16 ; N 2nd E & Lorene St 1.5 5 – 10 Years
20 HCL 18 ; N 2nd E & E 15th N 1.5 5 – 10 Years
Rank Location Facility Type EPDO Score Safety Need Score Area of Persistent Poverty Poverty Score Within TSP/CIP Project TSP/CIP Score Identified Public Concern Public Concern Score Total Priority Score (0-10)
Weight: 0.75 0.50 0.25 0.25
1 N 2nd E: E 2nd N to S Teton River Segment 425 5 Yes 1 Yes 1 No 0 15.0
2 Golden Beauty Dr & University Blvd Intersection 395 4 Yes 1 No 0 No 0 11.0
3 S 2nd E: E 7th S to E 3rd S Segment 391 4 Yes 1 No 0 Yes 1 13.5
4 N 2nd E: Moran View to Moody Rd Segment 292 3 No 0 No 0 Yes 1 7.0
5 S 1st W: W 3rd S to W 1st S Segment 275 3 Yes 1 Yes 1 Yes 1 14.5
6 Yellowstone Hwy & W 7th S Intersection 202 3 Yes 1 No 0 No 0 9.5
7 University Blvd: Yellowstone Hwy to S 5th W Segment 196 2 Yes 1 Yes 1 Yes 1 13.0
8 S 2nd W & W 1st S Intersection 194 2 Yes 1 No 0 No 0 8.0
9 S 2nd W & W 7th S Intersection 190 2 Yes 1 Yes 1 Yes 1 13.0
10 N 2nd E & Moody Rd Intersection 187 2 No 0 Yes 1 No 0 5.5
11 S 12th W & Main St Intersection 166 2 Yes 1 Yes 1 No 0 10.5
12 N 2nd E: S Teton River to E 7th N Segment 155 2 No 0 No 0 No 0 3.0
13 Main St & Pahsimeroi Blvd & Summit Dr Intersection 144 1 Yes 1 No 0 No 0 6.5
14 S 2nd W & W 5th S Intersection 134 1 Yes 1 Yes 1 Yes 1 11.5
15 S 5th W & W 7th S Intersection 131 1 Yes 1 Yes 1 No 0 9.0
16 N 2nd E & Lorene St Intersection 131 1 No 0 No 0 No 0 1.5
17 Pioneer Rd & Main St Intersection 127 1 Yes 1 No 0 No 0 6.5
18 N 2nd E & E 15th N Intersection 126 1 No 0 No 0 No 0 1.5
19 W 1st N & N 2nd W Intersection 116 1 Yes 1 Yes 1 No 0 9.0
20 Center St & E 7th S Intersection 114 1 Yes 1 No 0 Yes 1 9.0
EPDO Scoring Key
Score 5: EPDO ≥ 400
Score 4: 300 ≤ EPDO < 400
Score 3: 200 ≤ EPDO < 300
Score 2: 150 ≤ EPDO < 200
Score 1: EPDO < 150
NOTES:
• Weights in Row 2 should sum to 1.0 for proper 0-10 scaling
• TSP/CIP and Public Concern columns: Enter 'Yes' or 'No' to populate scores
• Total Priority Score ranges from 0 to 10, with higher scores indicating higher priority
• Binary criteria (Poverty, TSP/CIP, Public Concern): Yes = 1, No = 0
REXBURG COMPREHENSIVE SAFETY ACTION PLAN
Appendix G: Implementation
Grant Project Overview and Cost
Estimate
J:
\
2
2
5
0
9
1
R
E
X
B
U
R
G
\
0
0
1
S
S
4
A
A
C
T
I
O
N
P
L
A
N
\
C
_
D
E
S
N
\
_
C
A
D
\
2
_
P
R
E
L
I
M
\
D
_
P
L
A
N
S
\
F
I
G
U
R
E
7
-
E
1
S
T
S
T
O
E
7
T
H
S
.
D
W
G
LA
S
T
S
A
V
E
D
:
4/7
/
2
0
2
6
7
:
4
2
A
M
PR
I
N
T
E
D
:
4/
7
/
2
0
2
6
8
:
3
4
A
M
----
PROJECT NO.
SHEET NO.
225091-001
CHECK:DRAWN:
VERIFY SCALE: Scales
based on 22"x34" prints.
1-1/2 Inches
PAGE
SA
F
E
S
T
R
E
E
T
S
A
N
D
R
O
A
D
S
FO
R
A
L
L
(
S
S
4
A
)
NO
.
RE
V
I
S
I
O
N
S
DA
T
E
Th
i
s
d
o
c
u
m
e
n
t
o
r
a
n
y
p
a
r
t
t
h
e
r
e
o
f
i
n
d
e
t
a
i
l
o
r
d
e
s
i
g
n
co
n
c
e
p
t
i
s
t
h
e
p
e
r
s
o
n
a
l
p
r
o
p
e
r
t
y
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
In
c
.
a
n
d
s
h
a
l
l
n
o
t
b
e
c
o
p
i
e
d
i
n
a
n
y
f
o
r
m
w
i
t
h
o
u
t
t
h
e
wr
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
o
f
K
e
l
l
e
r
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
PRELIMINARY
Not For
Construction
0 250'500'
Scale: 1" = 250'
209
14
W 7TH S
W 6TH S
W 5TH S
W 4TH S
W 3RD S
W 2ND S
W 1ST S
S
4
T
H
W
S
3
R
D
W
S
2
N
D
W
S
1
S
T
W
S
2
N
D
E
S
C
E
N
T
E
R
S
T
8
LEGEND
#HIGH INJURY NETWORK INTERSECTION LOCATION
HIGH INJURY NETWORK CORRIDOR LOCATION
CAPITAL IMPROVEMENT PLAN PROJECT
PEDESTRIAN EMPHASIS DISTRICT
3
5
S 2nd E: W 7th S to W 3rd S- RRFB relocations- Pedestrian refuge islands at selectlocations- Street lighting improvements- High-visibility crosswalks with advancedyield markings
W 7th S and S CenterStreet- Leading PedestrianInterval
S 2nd W and W 7th S - Leading PedestrianIntervals- High-visibility crosswalks
S 2nd W and W 5th S- RRFBs- High-visibilitycrosswalk markings,signs, and streetlighting- Bulbouts
S 2nd W: W 4th S to W 7thS- Buffered bike lanes- Lighting
S 2nd W and W 6th S- RRFBs- Median pedestrianrefuge island- High-visibility crosswalkmarkings, signs, andstreet lighting- Bulbouts
S 2nd W and W 1st S- PHB or RRFB- Median pedestrianrefuge island- High-visibility crosswalkmarkings, signs, andstreet lighting
W 7th S and S 1st W- Leading PedestrianIntervals- High-visibilitycrosswalks
S 1st W: W 2nd S to W 5th S- RRFBs- Bike lanes or separatedshared-use path- High-visibility crosswalkmarkings, signs, and streetlighting- Pedestrian Refuge Medians- Bulbouts
S 3rd W and W 2nd S- High-visibility crosswalkmarkings, signs, andstreet lighting
S 2nd W and W 2nd S- Leading PedestrianIntervals- High-visibilitycrosswalks
S 1st E and E 1st S- High-visibility crosswalkmarkings, signs, andstreet lighting
S Center St and W 2nd SS College Ave and W 2nd SS 1st E and E 2nd S- High-visibility crosswalkmarkings, signs, and streetlighting- Bulbouts
S 1st W and W 2nd S- Leading PedestrianIntervals- High-visibilitycrosswalks
S
C
O
L
L
E
G
E
A
V
E
S 1st E and E 1st S- High-visibility crosswalkmarkings and streetlighting
S 1st E and W 3rd S- High-visibility crosswalkmarkings, signs, andstreet lighting
PE
D
E
S
T
R
I
A
N
E
M
P
H
A
S
I
S
D
I
S
T
R
I
C
T
IM
P
L
E
M
E
N
T
A
T
I
O
N
P
A
C
K
A
G
E
1 OF 1
Project:
100 E Bower St, Suite 110 Meridian, Idaho 83642 Engineer:
Phone: 208.288.1992 - kellerassociates.com Client:
Printed:
Opinion of Probable Cost
S 2nd West S 1st W S 2nd E
4th to 7th S 2nd to 5th S 3rd to 7th S
Construction item Unit Cost TOTAL
High-Visibility Crosswalk (per locaiton) 4,000$ 8 4 -15%
Street Lighting (per light) 15,000$ 4 6 6 50%
RRFB (per device)20,000$ 8
Bulbouts (per crossing)30,000$ 8 4
Miscellaneous Roadway Items 1,000,000$
Subtotal 1,100,000$ 656,000$ 230,000$ 1,986,000$
Mobilization, Bonding, & Insurance 10%110,000$ 65,600$ 23,000$
Construction Contignency (Change Orders)5%55,000$ 32,800$ 11,500$
Funding Requirements (AIS, BABA, Davis Bacon, Etc.)5%55,000$ 32,800$ 11,500$
Construction Subtotal 1,320,000$ 787,200$ 276,000$ 2,383,200$
Preliminary Engineering 15%198,000$ 118,080$ 41,400$
Construction Engineering and Inspection 10%132,000$ 78,720$ 27,600$
ITD/LHTAC Administration 5%66,000$ 39,360$ 13,800$
Soft Cost Subtotal 396,000$ 236,160$ 82,800$ 714,960$
Opinion of Construction Cost 1,716,000$ 1,023,360$ 358,800$ 3,098,160$
Opinion Range Rounded to the Nearest Thousand -15%1,459,000$ 870,000$ 305,000$ 2,634,000$
Class IV, -15% to +50%50%2,574,000$ 1,536,000$ 539,000$ 4,649,000$
Intersections
S 3rd W S 2nd W S 2nd W S 2nd W S 2nd W S 2nd W S 2nd W S 1st W S 1st W S Center St S Center St S College Ave S 1st E S 1st E S 1st E S 2nd E
W 2nd S W 1st S W 1st S W 2nd S W 5th S W 6th S W 7th S W 2nd S W 7th S W 2nd S W 7th S W 2nd S E 1st S E 2nd S W 3rd S W 2nd S TOTAL
Construction item Unit Cost
High-Visibility Crosswalk (per locaiton)4,000$
Signs (per locaiton)2,500$
Street Lighting (per locaiton)20,000$ 2
RRFB (per device)20,000$ 2 3 2
PHB (per crossing)100,000$
Median Refuge Island (each)30,000$
Leading Pedestrian Intervals (each)1,500$
Bulbouts (per crossing)30,000$ 2 2 2 4 4 4
Subtotal 26,500$ 96,500$ 236,500$ 5,500$ 146,500$ 156,500$ 5,500$ 5,500$ 5,500$ 146,500$ 1,500$ 146,500$ 26,500$ 146,500$ 26,500$ 26,500$ 1,205,000$
Mobilization, Bonding, & Insurance 10%2,650$ 9,650$ 23,650$ 550$ 14,650$ 15,650$ 550$ 550$ 550$ 14,650$ 150$ 14,650$ 2,650$ 14,650$ 2,650$ 2,650$
Construction Contignency (Change Orders)5%1,325$ 4,825$ 11,825$ 275$ 7,325$ 7,825$ 275$ 275$ 275$ 7,325$ 75$ 7,325$ 1,325$ 7,325$ 1,325$ 1,325$
Funding Requirements (AIS, BABA, Davis Bacon, Etc.)5%1,325$ 4,825$ 11,825$ 275$ 7,325$ 7,825$ 275$ 275$ 275$ 7,325$ 75$ 7,325$ 1,325$ 7,325$ 1,325$ 1,325$
Construction Subtotal 31,800$ 115,800$ 283,800$ 6,600$ 175,800$ 187,800$ 6,600$ 6,600$ 6,600$ 175,800$ 1,800$ 175,800$ 31,800$ 175,800$ 31,800$ 31,800$ 1,446,000$
Preliminary Engineering 15%4,770$ 17,370$ 42,570$ 990$ 26,370$ 28,170$ 990$ 990$ 990$ 26,370$ 270$ 26,370$ 4,770$ 26,370$ 4,770$ 4,770$
Construction Engineering and Inspection 10%3,180$ 11,580$ 28,380$ 660$ 17,580$ 18,780$ 660$ 660$ 660$ 17,580$ 180$ 17,580$ 3,180$ 17,580$ 3,180$ 3,180$
ITD/LHTAC Administration 5%1,590$ 5,790$ 14,190$ 330$ 8,790$ 9,390$ 330$ 330$ 330$ 8,790$ 90$ 8,790$ 1,590$ 8,790$ 1,590$ 1,590$
Soft Cost Subtotal 9,540$ 34,740$ 85,140$ 1,980$ 52,740$ 56,340$ 1,980$ 1,980$ 1,980$ 52,740$ 540$ 52,740$ 9,540$ 52,740$ 9,540$ 9,540$ 433,800$
Opinion of Construction Cost 41,340$ 150,540$ 368,940$ 8,580$ 228,540$ 244,140$ 8,580$ 8,580$ 8,580$ 228,540$ 2,340$ 228,540$ 41,340$ 228,540$ 41,340$ 41,340$ 1,879,800$
Opinion Range Rounded to the Nearest Thousand -15%36,000$ 128,000$ 314,000$ 8,000$ 195,000$ 208,000$ 8,000$ 8,000$ 8,000$ 195,000$ 2,000$ 195,000$ 36,000$ 195,000$ 36,000$ 36,000$ 1,608,000$
Class IV, -15% to +50%50%63,000$ 226,000$ 554,000$ 13,000$ 343,000$ 367,000$ 13,000$ 13,000$ 13,000$ 343,000$ 4,000$ 343,000$ 63,000$ 343,000$ 63,000$ 63,000$ 2,827,000$
Corridors
Pedestrian Emphasis District (BYU‑Idaho Area)
225091-001
S. Gillie
Rexburg, ID
5/6/2026
COMBINED TOTAL (CORRIDORS + INTERSECTIONS)
CONTINGENCY 4,242,000$
7,476,000$
The opinion of most probable cost herein is based on our perception of current conditions at the project location. This estimate reflects our opinion of probable costs
at this time and is subject to change as the project design matures. Keller Associates has no control over variances in the cost of labor, materials, equipment,
services provided by others, contractor’s methods of determining prices, competitive bidding or market conditions, practices or bidding strategies. Keller Associates
cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented herein.