Loading...
HomeMy WebLinkAboutTIA_Moody Townhomes_Rexburg, IDRexburg, ID | Moody Townhomes Traffic Impact Analysis Prepared for: Utah Development Group 10808 S. River Front Parkway, Suite 300 South Jordan, UT 84095 801-641-8956 Prepared by: Hunt Day 3445 Antelope Drive St 200 Syracuse, UT 84075 801.664.4724 Thomas Hunt, PE 3/24/2026 March 24, 2026 City of Rexburg, ID Kacey Ramsauer 35 N 1st East Rexburg, ID 83440 208-372-2167 RE: Moody Townhomes – Rexburg, ID – Traffic Impact Analysis The proposed Moody Townhomes development is located at N 5th West & Moody Road in Rexburg, ID. The main access into the development is from the Moody Rd (2000 North) and 2nd East intersection. The Moody Townhome development will consist of 137 townhome units and will be completed in one single phase. It is estimated that the development will be open by late 2027. A full traffic impact analysis at the Moody Rd/2nd East intersection has been performed to determine if any improvements and/or mitigation measures are needed due to the impact of this development. This analysis also discusses if any improvements are needed to Moody Road. To perform this report, manual traffic counts were obtained on multiple days during the AM and PM peak hours on multiple days in February 2026. The highest peak traffic counts during the field observations were used in this study to determine how the existing intersection and accesses currently function; this includes the AM and PM peak hours. With this information, we can project the trip distribution from this development to determine the impact this project has on traffic. It is my professional opinion that upon completion of this project, it will not significantly alter the existing traffic patterns and should be permitted per the traffic data and improvements contained within this report. If you have any questions, or if we can be of further assistance, please let us know. Regards, Thomas Hunt Principal Engineer & Planner Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 3 ITEM PAGE NAME FIGURE Introduction and Summary 4 Principal Findings & Conclusion Proposed Development 4 5 Study Area Conditions 5 Analysis of Existing Conditions Proposed Traffic (2027) Results (2027) 8 13 16 Conclusion & Recommendations 17 Vicinity Map Study Area 1 2 Trip Distribution 3 Existing Peak Hours Traffic Volumes 4, 5 Proposed Traffic Volumes (2027) 6, 7 Table of Contents – Moody Townhomes Rexburg, ID List of Figures –Moody Townhomes Rexburg, ID Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 4 Introduction and Summary The proposed Moody Townhomes development is located at N 5th West & Moody Road in Rexburg, ID. The main access into the development is from the Moody Rd (2000 North) and 2nd East intersection. The Moody Townhome development will consist of 137 townhome units and will be completed in one single phase. It is estimated that the development will be open by late 2027. The purpose of this study is to complete a Category A IDT Traffic Impact Analysis by: - Assess the existing traffic flow and Level of Service in the AM and PM Peak hours - Distribute the new trip generation from the project and determine the roadway’s level of service. - Project the traffic to the end of the build out year (2027) on the accesses and surrounding developments to determine the roadway’s level of service. - Determine if any mitigation measures may be needed. Principal Findings & Conclusion Existing 2026 Traffic Conditions: • Moody Rd/2000 North (signalized) functions at a Level of Service B during both peak hours. Proposed 2027 Traffic Conditions: • Single-Family Attached Housing (ITE-215): Single Family Attached Housing with 137 townhome units generates 19/56 AM trips and 52/32 PM trips entering/exiting during the peak hours using ITE Trip Generation Manual, 11th edition. • All existing and proposed intersections/accesses will function at an acceptable level of service in both peak hours with a slight increase in delay with the new development. An overall Level of Service remains a B during both peak hours. Recommendations Our principal findings from our traffic impact analysis have determined that during the AM and PM peak hours, all studied intersections and accesses operate at an acceptable Level of Service and should be permitted with the required recommendation stated below. Along the frontage of the proposed project, the street should be improved and widened to meet the city public street cross section. This will allow for proper turn movements in/out of the site. Proposed Development The proposed Moody Townhomes development is located at N 5th West & Moody Road in Rexburg, ID. The main access into the development is from the Moody Rd (2000 North) and 2nd East intersection. The Moody Townhome development will consist of 137 townhome units. Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 5 Study Area Conditions This development will generate a maximum of 84 trips during the Peak hour, resulting in a ‘small’ grouping, requiring: • The first intersection plus all intersection and access points within 0.25 miles of a property line of the site. Based upon the above criteria, the study areas are: • Moody Rd / 2nd East intersection (signalized) This report addresses the impacts based on Level of Service (LOS) values calculated by delay. A Vicinity Map has been provided in Figure #1 that shows this location, and a Study Area exhibit has been provided in Figure #2 is a Trip Distribution Map for the proposed development. Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 6 Figure #1 Vicinity Map Moody Road & 2nd East | Rexburg, ID Project Site Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 7 Figure #2 Trip Distribution Map Moody Rd and 2nd East | Rexburg, ID Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 8 Analysis of Existing Conditions Physical Characteristics Moody Rd / 2nd East is a signalized four-way stop-controlled intersection. Moody Road is stop controlled with stop signs. W. Frontage Road has a dedicated left turn lane, dedicated thru lane and dedicated right turn lane in both directions and has a speed limit of 25 mph. I-84 Business Loop southbound has a dedicated left turn lane, two dedicated thru lanes, and a dedicated right turn lane. Northbound has a dedicated left turn lane, a dedicated thru lane, and a dedicated right turn lane. The posted speed limit is 45 mph. The roadway intersection geometrics, turn lanes, driveways, traffic control devices, stop signs etc. are shown in Figures below. Level of Service Analysis For this traffic impact study, the LOS was determined by calculating the average delay time per vehicle in seconds using Synchro 11. Each LOS is associated with a designated range of delay times in seconds per vehicle. Table 1 (below) is used to determine the LOS for a signalized intersection based on the delay in seconds per vehicle. Table 2 (below) is used to determine the LOS for an unsignalized intersection based on the delay in seconds per vehicle. According to the Highway Capacity Manual, most facilities are designed for a service flow rate at LOS D or better to ensure acceptable operating conditions to users. Table 1 - Signalized Intersections Level of Service Table 2 - Unsignalized Intersections Level of Service LOS Intersection Delay per Vehicle (sec/veh) General Description A ≤ 10 Free Flow B > 10 - 20 Stable Flow (slight delays) C > 20 - 35 Stable Flow (acceptable delays) D > 35 - 55 Approaching unstable (tolerable delay) E > 55 - 80 Unstable Flow (intolerable delay) F > 80 Forced Flow (congested and failure) LOS Intersection Delay per Vehicle (sec/veh) General Description A ≤ 10 Free Flow B > 10 - 15 Stable Flow (slight delays) C > 15 - 25 Stable Flow (acceptable delays) D > 25 - 35 Approaching unstable (tolerable delay) E > 35 - 50 Unstable Flow (intolerable delay) F > 50 Forced Flow (congested and failure) Source: Highway Capacity Manual (HCM) 2022. Source: Highway Capacity Manual (HCM) 2022. Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 9 Existing Traffic Volumes Data collection was obtained in accordance with the latest edition of the Institute of Transportation Engineers “Manual of Transportation Engineering Studies”. Traffic counts were obtained in 15-minute increments to determine if any atypical PHF exists – none were determined. Daily AM and PM peak hour traffic volumes were obtained at all turning movements at the studied intersection and accesses were obtained. These existing traffic volumes can be found in Figures 4 and 5 below. Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 10 Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 11 Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 12 Existing Study Area Level of Service The existing intersection was analyzed using Synchro 11. The results, indicating the current level of service, are shown in Table 3 and the appendix. Table 3 – Existing Level of Service for Study Area Summary of Existing Conditions Based upon the existing traffic conditions in the AM and PM peak hours, Level of Service at all studied intersections and accesses perform at an acceptable level of service. The main direction of traffic (North and South) has a Level of Service B, while the minor traffic (East and West) has a Level of Service D. The overall Level of Service for the intersection is a B. For a detailed report and individual lane LOS’s, the results of the study can be found in the Appendix. Other required Data & Analysis No crashes were observed while obtaining traffic counts. Based on the crash data from ITD, there have been 7 minor accidents since 2018. This results in approximately 1 accident/year. It is not anticipated that the proposed development will create an increase in accidents at the intersection. Intersection Approach Existing AM Existing PM Delay LOS Delay LOS 2nd East / Moody Road EBL 36.6 D 36.8 D EBT/R 40.2 D 40.4 D WBL 48.4 D 52.9 D WBT/R 50.0 D 53.2 D NBL 10.4 B 14.0 B NBT 12.3 B 12.0 B NBR 12.4 B 12.1 B SBL 33.8 C 33.4 C SBT 8.8 A 10.4 B SBR 7.0 A 7.1 A Source: Delay times and LOS determined using Synchro 11. Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 13 Proposed Traffic Trip Generation The number of new trips generated for the proposed development was determined using trip generation figures obtained from ITE Trip Generation Manual 11th Edition. The number of new trips generated for the proposed Single Family Attached housing with 137 residential units was determined using trip generation figures obtained from ITE Trip Generation Manual 11th Edition for that specific use (ITE Land Use Code 215). The calculations for this can be found in the Appendix. These results can be seen in Table 4 below. Table 4 – Project Trip Generation The proposed new trips were added to the traffic represented opening day of this project based upon the trip distribution found in Figure 3 above and the Project Trip Generation found in Table 4 above. The proposed combined vehicle movements are shown in Figure 6 and 7 below. Land Use Weekday Trips Entering Weekday Trips Exiting AM Trips Entering AM Trips Exiting PM Trips Entering PM Trips Exiting Single Family Attached (215) 497 496 19 56 52 32 Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 14 Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 15 Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 16 Results Based on current conditions, combined with the generated traffic flows from the proposed development, we have prepared a study of the studied intersection and new accesses. The results of the study are shown in Table 5 below. Table 5 – Proposed (2027) Level of Service for Study Area Summary of Proposed Development (2027) Based upon the proposed traffic conditions in the AM and PM peak hours, the overall Level of Service at all studied intersections and accesses perform at an acceptable level of service with a slight increase in delay from current conditions. The main direction of traffic (North and South) has a Level of Service B, while the minor traffic (East and West) has a Level of Service D. The overall Level of Service for the intersection is a B. For a detailed report and individual lane LOS’s, the results of the study can be found in the Appendix. Intersection Approach Existing AM Existing PM Proposed AM Proposed PM Delay LOS Delay LOS Delay LOS Delay LOS 2nd East / Moody Road EBL 36.6 D 36.8 D 37.5 D 35.6 D EBT/R 40.2 D 40.4 D 42.4 D 40.7 D WBL 48.4 D 52.9 D 53.3 D 46.3 D WBT/R 50.0 D 53.2 D 50.5 D 49.1 D NBL 10.4 B 14.0 B 10.7 B 15.9 B NBT 12.3 B 12.0 B 12.3 B 12.6 B NBR 12.4 B 12.1 B 12.4 B 12.7 B SBL 33.8 C 33.4 C 33.8 C 35.4 D SBT 8.8 A 10.4 B 8.8 A 10.8 B SBR 7.0 A 7.1 A 7.1 A 7.4 A Source: Delay times and LOS determined using Synchro 11. Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 17 Conclusion The proposed Moody Townhomes development is located at N 5th West & Moody Road in Rexburg, ID. The main access into the development is from the Moody Rd (2000 North) and 2nd East intersection. The Moody Townhome development will consist of 137 townhome units and will be completed in one single phase. It is estimated that the development will be open by late 2027. After a full analysis of these roadways, intersections, accesses and this proposed development, the overall Level of Service in the AM and PM peak hours at all studied intersections and accesses will perform at an acceptable level of service with only a slight increase of delay from existing conditions. Based upon the traffic analysis, the proposed development will not require any mitigation measures to the roadway infrastructure. Recommendations The mitigation measures for the proposed development should be to widen Moody Road to the full right of way widths along their frontage. This will allow the proper turning movements at the accesses into the development. No other mitigation measures are required per the information found in this report. Traffic Impact Analysis Moody Townhomes. | Rexburg, ID 18 Appendix 90 102 101131132127128 686763625354525146453738 34 85 84 83 82 80 79 78 77 76 74 73 72 71 70 95 96 91 92 93 86 87 88 111 110 109 107 106 105 104 137 136 103 49 50 585755564847434442 1 9810099 3 2 8 7 6 5 4 13 12 11 10 9 18 17 16 15 14 23 22 21 20 19 28 27 26 25 24 33 32 31 30 29 41 36 35 126 125 124 123 122 121 120 119 118 117 116 115 114 113 112 129 130 133 134 135 108 94 97 89 81 75 69 39 40 59 60 61 64 65 66 N0°17'01"W 16.73' R=8474.37' L=215.42' Δ=1°27'23" CH=N53°12'12"E 215.41' N53°5 5 ' 5 3 " E 1 4 5 8 . 2 6 ' S0 ° 0 0 ' 0 8 " E 7 5 . 4 0 ' S53°5 9 ' 3 7 " W 3 3 4 . 5 4 ' S0 ° 2 5 ' 2 9 " E 7 2 5 . 5 0 ' S89°38'36"W 1085.92' N0°17'01"W 39.50' 270.00' S89°38'36"W 2674.47' S0 ° 2 1 ' 2 4 " E 44 . 1 5 ' R=35.00' L=33.16' Δ=54°17'17" CH=N26°47'14"E 31.94' N53°5 5 ' 5 3 " E 7 6 3 . 5 6 ' S89°38'36"W 829.91' R=34.50' L=54.19' Δ=90°00'00" CH=S44°38'36"W 48.79' S0 ° 2 1 ' 2 4 " E 51 . 5 0 ' S0 ° 2 1 ' 2 4 " E 4 1 4 . 8 0 ' S0 ° 2 5 ' 2 9 " E 4 6 2 . 7 8 ' 370.99'186.92'86.00'186.00' 229.5 3 ' 95.07 ' 438.9 7 ' 32 8 . 8 0 ' 86 . 0 0 ' S53° 5 5 ' 5 3 " W 1 1 0 . 0 0 ' S53°5 5 ' 5 3 " W 1 1 0 . 0 0 ' S53°5 5 ' 5 3 " W 1 1 0 . 0 0 ' S0 ° 2 1 ' 2 4 " E 6 6 . 0 0 ' S89°38'36"W 88.00'S89°38'36"W 88.00' S0 ° 2 5 ' 2 9 " E 1 1 0 . 0 0 ' S0 ° 2 5 ' 2 9 " E 8 8 . 0 0 ' S0 ° 2 5 ' 2 9 " E 6 6 . 0 0 ' S89°38'36"W 110.00'S0 ° 2 5 ' 2 9 " E 1 3 2 . 0 0 ' S0 ° 2 5 ' 2 9 " E 1 3 2 . 0 0 ' S0 ° 2 5 ' 2 9 " E 1 1 0 . 0 0 ' S89°38'36"W 110.00'S89°38'36"W 110.00'S89°38'36"W 132.00'S89°38'36"W 132.00'S89°38'36"W 110.00'S89°38'36"W 110.00' N89°38'36"E 66.00'N53° 5 5 ' 5 3 " E 1 1 0 . 0 0 ' N53°5 5 ' 5 3 " E 1 1 0 . 0 0 ' N53°5 5 ' 5 3 " E 1 1 0 . 0 0 ' N53° 5 5 ' 5 3 " E 1 1 0 . 0 0 ' N53°5 5 ' 5 3 " E 1 1 0 . 0 0 ' N53°5 5 ' 5 3 " E 6 6 . 0 0 ' N 3 6 ° 0 4 ' 0 7 " W 4 6 . 0 0 ' N89°34'31"E 46.00' S0°21'24"E 46.00' N0°21'24"W 46.00' N 3 6 ° 0 4 ' 0 7 " W 4 6 . 0 0 ' S0 ° 2 1 ' 2 4 " E 46 . 0 0 ' S0 ° 2 1 ' 2 4 " E 46 . 0 0 ' N89°34'31"E 46.00' N89°38'36"E 46.00' N0 ° 2 1 ' 2 4 " W 46 . 0 0 ' 2 0 . 0 ' 2 0 . 0 ' 20 . 0 ' 20 . 0 ' 20 . 0 ' 20 . 0 ' 20 . 0 ' 20 . 0 ' 20.0' 20.0'20.0' 20.0' S0 ° 2 1 ' 2 4 " E 2 2 . 0 0 ' S0 ° 2 1 ' 2 4 " E 2 2 . 0 0 ' N89°38'36"E 46.00' N53°55'53"E 110.00' REV.DESCRIPTION BYDATE Designed: Date: Drawn: Proj. No. PROJECT INFORMATION 10 / 10 / 2025 186 - 01 VERIFY SCALES BAR IS ONE INCH ON ORIGINAL DRAWING IF NOT ONE INCH ON THIS SHEET, ADJUST SCALES ACCORDINGLY 1" PROJECT TITLE SHEET NO. SHEET TITLE Approved:T. HUNTN 5TH WEST & MOODY ROAD REXBURG, MADISON COUNTY, ID 0" SEAL HU N T D A Y _ 1 C: \ U s e r s \ H u n t D a y _ 1 \ H u n t D a y D r o p b o x \ P r o j e c t s \ 1 8 6 - 0 1 _ M o o d y T o w n h o m e s \ 0 0 - C A D \ 0 1 - A u t o C A D \ P R E L I M I N A R Y P L A T 10 / 3 0 / 2 0 2 5 1 1 : 2 8 A M MOODY TOWNHOMES LOCATED IN THE SOUTHWEST QUART OF SECTION 7, TOWNSHIP 6 NORTH, RANGE 40 EAST, BOISE MERIDIAN T. PRIDEMORE T. HUNT 3445 ANTELOPE DRIVE, ST 200 SYRACUSE, UT 84075 PH: 801.664.4724 EM: THOMAS@HUNTDAY.CO HUNT DAY E N G I N E E R I N G VICINITY MAP W N E S Scale: 1" = 60' 60 0 60 120 180 SITUATED IN THE STATE OF IDAHO, COUNTY OF MADISON, BEING PART OF SECTION 7, TOWNSHIP 6 NORTH, RANGE 40 EAST, OF B.M., BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT A BRASS CAP FOUND MARKING THE SOUTH WEST CORNER OF SAID SECTION 7, SAID POINT BEING THE POINT OF BEGINNING; THENCE NORTH 00°17'01" WEST, A DISTANCE OF 56.23 FEET TO A REBAR WITH A PLASTIC CAP SET, STAMPED "PLS 13856"; THENCE ALONG A NON TANGENT CURVE TO THE RIGHT, HAVING A DELTA ANGLE 01°27'23", A RADIUS OF 8,474.37 FEET, AN ARC LENGTH OF 215.42 FEET, WITH A CHORD BEARING OF NORTH 53°12'12" EAST, AND A CHORD LENGTH OF 215.41 FEET; THENCE NORTH 53°55'53" EAST, A DISTANCE OF 1,458.26 FEET TO A REBAR WITH A PLASTIC CAP FOUND, STAMPED "PLS 13856"; THENCE SOUTH 00°00'08" EAST, A DISTANCE OF 75.40 FEET TO A REBAR WITH A PLASTIC CAP SET, STAMPED "PLS 13856"; THENCE SOUTH 53°59'37" WEST, A DISTANCE OF 334.54 FEET TO A REBAR WITH A PLASTIC CAP SET, STAMPED "PLS 13856"; THENCE SOUTH 00°25'29" EAST, A DISTANCE OF 765.00 FEET TO A PK MAG NAIL SET; THENCE SOUTH 89°38'36" WEST, A DISTANCE OF 1,086.02 FEET TO THE POINT OF BEGINNING. CONTAINING 11.67 ACRES OF LAND, MORE OR LESS. DEED DESCRIPTION DEVELOPER TEAM S.L. COUNTY MONUMENT AS NOTED SET REBAR AND CAP BOUNDARY LINE ADJACENT PARCEL SECTION LINE EASEMENT LEGEND MOODY TOWNHOMES PRELIMINARY PLAT LOCATED IN THE SOUTHWEST QUART OF SECTION 7, TOWNSHIP 6 NORTH, RANGE 40 EAST, BOISE MERIDIAN CITY OF REXBURG, MADISON COUNTY, ID NOVEMBER 2025 PROJECT SITE DEVELOPER: UTAH DEVELOPMENT GROUP 10808 S. RIVER FRONT PARKWAY, SUITE 300 SOUTH JORDAN, UTAH 84095 (801) 641-8956 SURVEYOR: LAYTON SURVEYS ATTN: WILLIS D. LONG 837 SOUTH 500 WEST, STE 201, WOODS CROSS, UT 84015 (801) 663-1641 CIVIL ENGINEER: HUNT DAY ENGINEERING ATTN: THOMAS HUNT, PE 3445 ANTELOPE DRIVE SYRACUSE, UT 84075 (801) 664-4724 GEOTECHNICAL ENGINEER: ROCKSMITH ENGINEERING 2426 DIAMOND H LANE REXBURG, ID 83440 (801) 556-6407 SOUTH QUARTER CORNER SEC. 7, T6N, R40E, B.M. FOUND BRASS CAP IN. 404616MOODY ROAD 79-FT PUBLIC RIGHT-OF-WAY SOUTHWEST CORNER SEC. 7, T6N, R40E, B.M. FND 3" BRASS MON @ W EDGE OF BRIDGE IN. 268004 POINT OF BEGINNING CA L L F A M I L Y T R U S T U / A PA R C E L ʌ R P 0 6 N 4 0 E 0 7 6 1 6 9 }O N E ʌ T * A HIGH W A Y 2 0 PUBL I C R I G H T - O F - W A Y ( W I D T H V A R I E S ) TETO N I S L A N D C A N A L SET RBC PLS "20907" FOUND RBC "TVS PLS 13856" FOUND RBC "TVS PLS 13856" SET RBC PLS "20907" SET RBC PLS "20907" SET RBC PLS "20907" SET RBC PLS "20907" SET RBC PLS "20907" EX 80-FT CANAL EASEMENT PRIVATE ROAD - A PRIV A T E R O A D - B PR I V A T E R O A D - 2 PR I V A T E R O A D - 3 PRIVATE ROAD - 1 SUB9ECT PROPERTY SHIRLEY SUBDIVISION, BLOCK 1 465,560 SQ FT / 10.69 AC 2nd East / Moody Rd Moody Townhomes AM Existing 03/24/2026 AM EXISTING 1:53 pm 03/16/2026 Baseline Synchro 12 Report Hunt Day Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 10 4 8 209 2 138 5 876 229 152 575 3 Future Volume (veh/h) 10 4 8 209 2 138 5 876 229 152 575 3 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1863 1863 1900 1863 1863 1863 Adj Flow Rate, veh/h 11 4 9 227 2 150 5 952 249 165 625 3 Adj No. of Lanes 1 1 0 1 1 0 1 2 0 1 2 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 259 96 215 387 4 294 525 1830 477 282 2330 1042 Arrive On Green 0.04 0.19 0.19 0.04 0.19 0.19 0.66 0.66 0.66 0.66 0.66 0.66 Sat Flow, veh/h 1774 511 1149 1774 21 1566 795 2779 725 464 3539 1583 Grp Volume(v), veh/h 11 0 13 227 0 152 5 605 596 165 625 3 Grp Sat Flow(s),veh/h/ln 1774 0 1660 1774 0 1586 795 1770 1735 464 1770 1583 Q Serve(g_s), s 0.6 0.0 0.8 5.0 0.0 10.3 0.3 21.3 21.4 34.5 8.8 0.1 Cycle Q Clear(g_c), s 0.6 0.0 0.8 5.0 0.0 10.3 9.1 21.3 21.4 55.9 8.8 0.1 Prop In Lane 1.00 0.69 1.00 0.99 1.00 0.42 1.00 1.00 Lane Grp Cap(c), veh/h 259 0 311 387 0 297 525 1165 1142 282 2330 1042 V/C Ratio(X) 0.04 0.00 0.04 0.59 0.00 0.51 0.01 0.52 0.52 0.58 0.27 0.00 Avail Cap(c_a), veh/h 259 0 311 387 0 297 525 1165 1142 282 2330 1042 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 36.3 0.0 39.9 42.0 0.0 43.8 10.4 10.6 10.7 25.2 8.5 7.0 Incr Delay (d2), s/veh 0.3 0.0 0.3 6.4 0.0 6.2 0.0 1.7 1.7 8.6 0.3 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.0 0.4 5.1 0.0 5.0 0.1 10.8 10.6 5.1 4.3 0.0 LnGrp Delay(d), s/veh 36.6 0.0 40.2 48.4 0.0 50.0 10.4 12.3 12.4 33.8 8.8 7.0 LnGrp LOS D D D D B B B C A Approach Vol, veh/h 24 379 1206 793 Approach Delay, s/veh 38.6 49.0 12.3 14.0 Approach LOS D D B B Timer 1 2 3 4 5 6 7 8 Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 83.5 9.5 27.0 83.5 9.5 27.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 79.0 5.0 18.0 79.0 5.0 22.5 Max Q Clear Time (g_c+I1), s 23.4 7.0 2.8 57.9 2.6 12.3 Green Ext Time (p_c), s 10.9 0.0 0.0 6.6 0.0 0.5 Intersection Summary HCM 2010 Ctrl Delay, s/veh 18.9 HCM 2010 LOS B 2nd East / Moody Rd Moody Townhomes PM Existing 03/24/2026 PM EXISTING 3:00 pm 03/24/2026 Baseline Synchro 12 Report Hunt Day Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 8 6 10 239 6 158 8 826 242 162 925 8 Future Volume (veh/h) 8 6 10 239 6 158 8 826 242 162 925 8 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1863 1863 1900 1863 1863 1863 Adj Flow Rate, veh/h 9 7 11 260 7 172 9 898 263 176 1005 9 Adj No. of Lanes 1 1 0 1 1 0 1 2 0 1 2 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 235 123 193 382 12 287 349 1779 520 295 2330 1042 Arrive On Green 0.04 0.19 0.19 0.04 0.19 0.19 0.66 0.66 0.66 0.66 0.66 0.66 Sat Flow, veh/h 1774 654 1028 1774 62 1530 554 2703 790 482 3539 1583 Grp Volume(v), veh/h 9 0 18 260 0 179 9 587 574 176 1005 9 Grp Sat Flow(s),veh/h/ln 1774 0 1681 1774 0 1593 554 1770 1723 482 1770 1583 Q Serve(g_s), s 0.5 0.0 1.1 5.0 0.0 12.3 0.9 20.4 20.5 35.4 16.3 0.2 Cycle Q Clear(g_c), s 0.5 0.0 1.1 5.0 0.0 12.3 17.2 20.4 20.5 55.8 16.3 0.2 Prop In Lane 1.00 0.61 1.00 0.96 1.00 0.46 1.00 1.00 Lane Grp Cap(c), veh/h 235 0 315 382 0 299 349 1165 1135 295 2330 1042 V/C Ratio(X) 0.04 0.00 0.06 0.68 0.00 0.60 0.03 0.50 0.51 0.60 0.43 0.01 Avail Cap(c_a), veh/h 235 0 315 382 0 299 349 1165 1135 295 2330 1042 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 36.5 0.0 40.0 43.4 0.0 44.6 13.9 10.5 10.5 24.8 9.8 7.0 Incr Delay (d2), s/veh 0.3 0.0 0.3 9.4 0.0 8.6 0.1 1.6 1.6 8.6 0.6 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.0 0.5 6.7 0.0 6.1 0.2 10.3 10.1 5.4 8.0 0.1 LnGrp Delay(d), s/veh 36.8 0.0 40.4 52.9 0.0 53.2 14.0 12.0 12.1 33.4 10.4 7.1 LnGrp LOS D D D D B B B C B A Approach Vol, veh/h 27 439 1170 1190 Approach Delay, s/veh 39.2 53.0 12.1 13.7 Approach LOS D D B B Timer 1 2 3 4 5 6 7 8 Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 83.5 9.5 27.0 83.5 9.5 27.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 79.0 5.0 18.0 79.0 5.0 22.5 Max Q Clear Time (g_c+I1), s 22.5 7.0 3.1 57.8 2.5 14.3 Green Ext Time (p_c), s 10.5 0.0 0.0 9.8 0.0 0.6 Intersection Summary HCM 2010 Ctrl Delay, s/veh 19.4 HCM 2010 LOS B 2nd East / Moody Rd Moody Townhomes AM Proposed 03/24/2026 AM Synchro 12 Report Hunt Day Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 24 18 36 209 7 138 15 876 229 152 575 7 Future Volume (veh/h) 24 18 36 209 7 138 15 876 229 152 575 7 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1863 1863 1900 1863 1863 1863 Adj Flow Rate, veh/h 26 20 39 227 8 150 16 952 249 165 625 8 Adj No. of Lanes 1 1 0 1 1 0 1 2 0 1 2 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 254 106 207 345 15 284 523 1830 477 282 2330 1042 Arrive On Green 0.04 0.19 0.19 0.04 0.19 0.19 0.66 0.66 0.66 0.66 0.66 0.66 Sat Flow, veh/h 1774 565 1103 1774 81 1515 791 2779 725 464 3539 1583 Grp Volume(v), veh/h 26 0 59 227 0 158 16 605 596 165 625 8 Grp Sat Flow(s),veh/h/ln 1774 0 1668 1774 0 1595 791 1770 1735 464 1770 1583 Q Serve(g_s), s 1.4 0.0 3.6 5.0 0.0 10.7 1.0 21.3 21.4 34.5 8.8 0.2 Cycle Q Clear(g_c), s 1.4 0.0 3.6 5.0 0.0 10.7 9.8 21.3 21.4 55.9 8.8 0.2 Prop In Lane 1.00 0.66 1.00 0.95 1.00 0.42 1.00 1.00 Lane Grp Cap(c), veh/h 254 0 313 345 0 299 523 1165 1142 282 2330 1042 V/C Ratio(X) 0.10 0.00 0.19 0.66 0.00 0.53 0.03 0.52 0.52 0.58 0.27 0.01 Avail Cap(c_a), veh/h 254 0 313 345 0 299 523 1165 1142 282 2330 1042 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 36.7 0.0 41.1 43.9 0.0 44.0 10.5 10.6 10.7 25.2 8.5 7.0 Incr Delay (d2), s/veh 0.8 0.0 1.3 9.5 0.0 6.5 0.1 1.7 1.7 8.6 0.3 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 0.0 1.8 5.6 0.0 5.3 0.2 10.8 10.6 5.1 4.3 0.1 LnGrp Delay(d), s/veh 37.5 0.0 42.4 53.3 0.0 50.5 10.7 12.3 12.4 33.8 8.8 7.1 LnGrp LOS D D D D B B B C A A Approach Vol, veh/h 85 385 1217 798 Approach Delay, s/veh 40.9 52.2 12.3 13.9 Approach LOS D D B B Timer 1 2 3 4 5 6 7 8 Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 83.5 9.5 27.0 83.5 9.5 27.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 79.0 5.0 18.0 79.0 5.0 22.5 Max Q Clear Time (g_c+I1), s 23.4 7.0 5.6 57.9 3.4 12.7 Green Ext Time (p_c), s 11.1 0.0 0.2 6.6 0.0 0.5 Intersection Summary HCM 2010 Ctrl Delay, s/veh 20.0 HCM 2010 LOS B 1:53 pm 03/16/2026 Baseline PROPOSED 2nd East / Moody Rd Moody Townhomes PM Proposed 03/24/2026 PM PROPOSED 4:06 pm 03/24/2026 Baseline Synchro 12 Report Hunt Day Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 16 14 26 239 19 158 34 826 242 162 925 21 Future Volume (veh/h) 16 14 26 239 19 158 34 826 242 162 925 21 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1863 1863 1900 1863 1863 1863 Adj Flow Rate, veh/h 17 15 28 260 21 172 37 898 263 176 1005 23 Adj No. of Lanes 1 1 0 1 1 0 1 2 0 1 2 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 248 95 178 395 34 280 334 1720 503 285 2252 1008 Arrive On Green 0.05 0.16 0.16 0.08 0.20 0.20 0.64 0.64 0.64 0.64 0.64 0.64 Sat Flow, veh/h 1774 583 1088 1774 175 1434 546 2703 790 482 3539 1583 Grp Volume(v), veh/h 17 0 43 260 0 193 37 587 574 176 1005 23 Grp Sat Flow(s),veh/h/ln 1774 0 1671 1774 0 1610 546 1770 1723 482 1770 1583 Q Serve(g_s), s 0.8 0.0 2.4 8.5 0.0 12.1 4.1 19.9 20.0 34.5 15.9 0.6 Cycle Q Clear(g_c), s 0.8 0.0 2.4 8.5 0.0 12.1 19.9 19.9 20.0 54.5 15.9 0.6 Prop In Lane 1.00 0.65 1.00 0.89 1.00 0.46 1.00 1.00 Lane Grp Cap(c), veh/h 248 0 273 395 0 315 334 1126 1097 285 2252 1008 V/C Ratio(X) 0.07 0.00 0.16 0.66 0.00 0.61 0.11 0.52 0.52 0.62 0.45 0.02 Avail Cap(c_a), veh/h 248 0 273 395 0 315 334 1126 1097 285 2252 1008 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 35.1 0.0 39.5 37.9 0.0 40.5 15.2 10.9 10.9 25.7 10.2 7.4 Incr Delay (d2), s/veh 0.5 0.0 1.2 8.3 0.0 8.7 0.7 1.7 1.8 9.7 0.6 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.0 1.2 4.1 0.0 6.1 0.7 10.2 9.9 5.3 7.9 0.3 LnGrp Delay(d), s/veh 35.6 0.0 40.7 46.3 0.0 49.1 15.9 12.6 12.7 35.4 10.8 7.4 LnGrp LOS D D D D B B B D B A Approach Vol, veh/h 60 453 1198 1204 Approach Delay, s/veh 39.3 47.5 12.8 14.3 Approach LOS D D B B Timer 1 2 3 4 5 6 7 8 Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 74.5 13.0 22.5 74.5 9.5 26.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 70.0 8.5 18.0 70.0 5.0 21.5 Max Q Clear Time (g_c+I1), s 22.0 10.5 4.4 56.5 2.8 14.1 Green Ext Time (p_c), s 10.9 0.0 0.1 7.5 0.0 0.6 Intersection Summary HCM 2010 Ctrl Delay, s/veh 19.3 HCM 2010 LOS B Hunt Day Thomas Hunt, PE 3445 Antelope Drive Suite 200 Syracuse, UT 84050 801.664.4724