Loading...
HomeMy WebLinkAboutUniversity Towne Center TIA Addendum 1 www.focusutah.com 6949 South High Tech Drive Suite 200 Midvale, UT 84047 801.352.0075 To: City of Rexburg From: Jason Watson, PE, PTOE FOCUS Engineering & Surveying, LLC File: University Towne Center TIA Date: January 9, 2026 Addendum 1 to Traffic Impact Study for the University Towne Center dated October 29, 2025. This addendum is to address the comments that were provided by Justin Beard with Rexburg City in an email dated January 7, 2026. The comments were provided with respect to the University Towne Center – Traffic Impact Study dated October 29, 2025. This memo presents the comment provided with the response and necessary documentation or analysis to support how the comments is being addressed. University/Yellowstone Intersection: I think the model is showing that the EBL is at LOS D under existing condition, but there are a couple of statements that say that all intersections currently meet the city’s minimum thresholds – in the executive summary and in the line under Table 9. Under existing conditions, the eastbound left movement functions with failing levels of service based on the City of Rexburg’s requirements. The statements throughout the report referred to the overall eastbound approach and the intersection level of service. Under existing conditions, to improve the eastbound left movement, it is recommended that a second dedicated eastbound left turn lane be constructed with a protected signal phase. It is also recommended a dedicated southbound right turn lane be constructed with a permissive + overlap signal phase to improve the intersections LOS. The following table illustrates the expected levels of service and MOE’s to the Yellowstone Highway and University Blvd intersection under the 2027 Phase 1 Background conditions with the above-mentioned mitigations. Table 1 – 2025 Existing Traffic Level of Service Mitigated Intersection MOE's AM Peak PM Peak 1 Yellowstone Hwy & University Blvd Intersection LOS B B Intersection Delay (s/veh) 19.3 19.6 Intersection v/c 0.46 0.41 Worst Lane Group MOEs C / 0.70 (EBL) C / 0.72 (EBL) Since the scenario is under the 2025 Existing conditions, we did not make a recommendation to mitigate this until the 2027 Background scenario as this mitigation would most likely not be able to be completed until this timeframe. Addendum 1 - University Towne Center Comment Response Memo Page 2 of 3 6949 South High Tech Drive Suite 200 Midvale, UT 84047 801.352.0075 www.focusutah.com Did the model show the southbound right turn lane is needed to keep the intersection at a LOS C or better? I didn’t see this in the model printouts, but maybe I missed something. Or is the recommendation that the right turn be added based on the volume of traffic in the right lane and the need for a deceleration lane? Yes, it was determined that the dedicated southbound right turn lane was needed to maintain a LOS C or better at the intersection. When changing the eastbound left turn to a protected movement the existing split phase signal timing could no longer be used. This change caused excessive delays along the southbound right movement due to its high volume. Yellowstone/Access: What is the necessary length of the deceleration lane at the access on Yellowstone? With the proposed development, a queuing analysis was performed to determine the adequate queue length for the northbound right turn lane at the Yellowstone Highway and Access 1 intersection. The queuing analysis was performed using the 95th percentile queue lengths from the 12th Edition Sim Traffic Software. Ten separate simulations were run using Sim Traffic and the average over those ten runs is used to determine the 95th percentile queuing lengths. 2027 Phase 1 Total Traffic Recommended Storage Length Using the proposed traffic volumes as illustrated in Figure 14 – 2027 Phase 1 Total Traffic scenario, the following queue length was determined at the Yellowstone Highway and Access 1 intersection. Table 2 – 2027 Phase 1 Total Traffic Recommended Deceleration Length Movement Existing Decel Length (ft) 2027 Phase 1 Total Traffic 95th Percentile Recommended Decel Length AM PM 4: Yellowstone Highway & Access 1 NBR - 8 10 105 Yellowstone Highway & Access 1: With the full buildout of Phase 1 of the University Towne Center, it is recommended the dedicated northbound right turn lane along Yellowstone Highway at Access 1 be constructed with a deceleration length of 105 feet. Is an acceleration lane warranted at the access on Yellowstone? The westbound right turn approach at Access 1 functions with a level of service B or better through the 2040 Total Traffic scenario, it is not recommended an acceleration Addendum 1 - University Towne Center Comment Response Memo Page 3 of 3 6949 South High Tech Drive Suite 200 Midvale, UT 84047 801.352.0075 www.focusutah.com lane be constructed at the Yellowstone Highway and Access 1 intersection. Refer to the appendix of the University Towne Center TIA to see a detailed view of the intersection capacity analysis. Based on the amount of traffic making the eastbound right turn in relation to the number of northbound thru vehicles, not acceleration lane is warranted. University Blvd/Mikan/Tamana: Are deceleration or acceleration lanes warranted to be added at Mikan Drive or Tamana Drive on University Blvd? And if so, at what phase will those need to be added? Refer to the attached Rexburg Lot 6 Retail Phase 1 University Blvd Access Memo dated May 19, 2025. With the close proximity of Tamana Drive and Mikan Drive, vehicles making a right turn from University Blvd onto Tamana Drive and the McDonalds access, the required acceleration length is not able to be met. It is not recommended to construct acceleration lanes where the full acceleration lengths cannot be obtained as it introduces safety concerns and a false sense for vehicles to make a safe turning movement. We appreciate you taking the time to review this traffic study. Please feel free to contact me with any questions or comments. 01/15/26 www.focusutah.com 6949 South High Tech Drive Suite 200 Midvale, UT 84047 801.352.0075 To: City of Rexburg From: Jason Watson, PE, PTOE FOCUS Engineering & Surveying, LLC File: Rexburg Lot 6 Retail Phase 1 University Access Date: May 19, 2025 Reference: Rexburg Lot 6 Retail Phase I University Blvd Access This memorandum is in response to the need for an acceleration lane at the eastern access to the Rexburg Mixed-Use Development off University Blvd (1055 and 1057 Tamana Drive). This proposed access is located east of Tamana Drive. As part of this development, this new roadway connection will be constructed with a separate right turn deceleration lane along University Blvd. There has been discussion on the need for an acceleration lane along University Blvd. for vehicles exiting the development. University Blvd. currently has a posted speed limit of 45 mph east of Tamana Drive. With the proposed access located east of Tamana Drive, an acceleration lane for vehicles traveling westbound along University Blvd. would need to meet the design standards for a design speed of 50 mph. Typically design speed is 5 to 10 mph above the posted speed limit per AASHTO Design Standards. In order to meet the design standards for an acceleration lane with a design speed of 50 mph, the length of acceleration would need to be 885 feet, with a 50 to 1 taper back into the existing westbound through lane. With the close proximity of Tamana Drive and vehicles making a right turn from University Blvd. onto Tamana Drive, the required acceleration length is not able to be met. Therefore, it is not recommended an acceleration lane be constructed from the new proposed access east of Tamana Drive onto University Blvd. There is not adequate distance between this new access and Tamana Drive to provide a safe and efficient acceleration lane. The weave of traffic merging onto University Blvd. and vehicles trying to make a right turn onto Tamana Drive would be unsafe and is not recommended. Please feel free to contact me with any questions or comments. Sincerely, FOCUS ENGINEERING & SURVEYING, LLC Jason Watson, PE, PTOE Transportation Department Manager 801.352.0075 jwatson@focus-es.com 05/19/25