Loading...
HomeMy WebLinkAboutSITE LAYOUT - 25-01061 - Cafe Zupas - 792 University Blvd - New Commercial Bldg4852.74 TBC END 4852.89 TBC-PC 4853.79 TBC-PC 4854.08 TBC-PC 4854.30 TBC-PC 4854.40 TBC-PC 4855.65 TBC-PC 4855.53 TBC-PC 4854.76 TBC-PC 4854.81 TBC-PC 4854.22 TBC-PC 4854.10 TBC-PC 4855.67 TBC-PC 4855.42 TBC-PC 4853.35 TBC-PC 4853.45 TBC-PC 4853.29 TBC-PC 4853.37 TBC-PC 4853.47 TBC-PC 4853.51 TBC-PC 4853.49 TBC-PC 4853.65 TBC-PC 4853.58 TBC-PC 4853.60 TBC-PC4853.62 TBC-PC 4853.55 TBC-PC 4853.52 TBC-PC 4853.21 TBC-PC4853.70 TBC-PI 4853.58 TBC-PI 4855.40 TBC-PI 4856.16 TBC-PI 4855.68 TBC-PI 4853.55 TOC 4853.47 TOC 4853.95 TOC 4853.92 TOC 48 5 4 . 6 0 FF 4853.95 TOC 4854.14 TOC 4853.47 TOC 4853.28 TOC 4853.56 TOC 4853.63 TOC4853.58 TOC 4853.75 TOC 4853.03 TOC 4853.05 TOC Install 63' of 12" ADS N 12 Storm Pipe @ 0.23% CB #3 Rim:4852.71 INV IN:4847.97 INV OUT:4847.87 CB #4 Rim:4852.79 INV IN:4847.73 INV OUT:4847.63 CB #2 Rim:4852.51 INV IN:4848.21 INV OUT:4848.11 CB #1 Rim:4852.19 INV OUT:4848.69 Install 96' of 12" ADS N 12 Storm Pipe @ 0.22% Install 63' of 12" ADS N 12 Storm Pipe @ 0.22% Install 39' of 12" ADS N 12 Storm Pipe @ 0.22% 4856.34 TBC END 4853.34 TBC-PC 4853.95 TOC 4853.95 TOC 4853.16 TBC-MATCH 4852.66 TBC 4852.65 TBC 4852.59 TOC 4852.64 TOC 4853.21 TBC-PI4853.00 TOC 4853.34 TOC 4852.60 TOC PC 4853.04 TOC PC 4853.14 TOC MATCH 4853.24 TBC-PI 4853.20 TBC-PC -3.23% -2.52% -1 . 7 0 % -2 . 5 2 % -2 . 0 8 % -3.37% -3 . 9 9 % -3 . 1 1 % -2 . 9 4 % 4853.95 TOC 4854.00 TOC 4854.04 TOC Install 80' of 12" ADS N 12 Storm Pipe @ 0.22% Point Table Point # 1 2 3 Elevation 4856.38 4853.67 4853.60 Northing 779261.20 779212.62 779212.33 Easting 751075.33 751032.52 751021.95 Description RBNC CP4 RBPC ROLAND RBPCS PRELIMINARY FOR REVIEW ONLY SURVEY NOTE: THIS SITE PLAN IS DESIGNED TO CONFORM WITH AN ACTUAL SURVEY THAT WAS PERFORMED ON THE GROUND BY A LAND SURVEYOR LICENSED BY THE STATE OF IDAHO. THE BOUNDARY LINES OF THE SURVEY ARE SHOWN HEREON WITH BEARINGS AND DISTANCES. IT IS THE OWNER’S/DEVELOPER’S RESPONSIBILITY TO CONSTRUCT ALL STRUCTURES SHOWN ON THIS SITE PLAN IN ACCORDANCE WITH SAID SURVEY. CHECK BYDRAWN BY JOB NO: OFSHEET JJBMJA SHEET NAME: PROJECT: LOCATION: 25-100 DATEREVISIONS SITE OVERVIEW ZUPPA'S REXBURG, ID C-09 ENGINEERS STAMP SHEET INFORMATION SHEET SIZE: VERTICAL EXAGGERATION: PROJECT CONTACT: JOSH BALL & BLAKE JOLLEY CONNECT ENGINEERING 208-881-0081 DATE:October 3, 2025 24" X 36" (ARCH D) N/A SITE INFORMATION: TOTAL AREA OF PROPERTY : 53,387 SQ. FT. ( 1.23 ACRES) ONE COMMERCIAL UNIT 1 RESTAURANT CONSTRUCTION TYPE III-A AREA:2966.1 FT² BUILDING HEIGHT : LESS THAN 30' PROPOSED PARKING: REQUIRED : 25 TOTAL PROVIDED : 27 STALLS INCLUDING 1 ADA 3 COMPACT STALLS STORM WATER: SEE SHEET C-06 FOR STORM WATER INFORMATION. SANITATION: DUMPSTERS PROVIDED. BASIS OF BEARING BENCHMARK IDAHO STATE PLAN COORDINATE SYSTEM NAD 83 DATUM REFERENCE FRAME NAD 83(2011)(EPOCH 2010.0000 ADJUSTED LOT 3, BLOCK 1, TAMANA FIELDS-NORTH, SECTION 36, TOWNSHIP 6N, RANGE 39 E, B.M. NAD 83 ELEV. 4900. CONSTRUCTION NOTE: 1.CONTRACTOR TO VERIFY ALL EXISTING UTILITY LOCATIONS AND ELEVATIONS. PRIOR TO CONNECTING ANY PROPOSED UTILITIES. 2.ENSURE 10' MINIMUM HORIZONTAL CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ STANDARDS. IF MANHOLES ARE IN AN ASPHALT PAVED AREA THE COLLARS ARE TO BE ASPHALT COLLARS 3.ENSURE 18" MINIMUM VERTICAL CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ STANDARDS. 4.ARCHITECT OR CONTRACTOR TO ENSURE PROPER CONCRETE STEM WALL OR EQUIVALENT HEIGHT FOR 6" MINIMUM REVEAL ON ALL BUILDINGS UNLESS OTHERWISE SPECIFIED BY ENGINEER. CONTROL POINT #1 CONTROL POINT #2 CONTROL POINT #3 53.79' 63.18' BUILDING FOOTPRINT 100-1 200-1 504-4 601-12 602-1 602-2 706-1 706-V1 706-S1 SEE SHEET 3 FOR MORE INFORMATION 706-R1 SEE SHEET 3 FOR MORE INFORMATION 404-2 RETAIN AND PROTECT SAW CUT AND ASPHALT REMOVAL 2'' WATER SERVICE 4'' SEWER SERVICE 12'' STORM MAIN STORM MAIN MANHOLE STORM MAIN CATCH BASIN 6'' VERTICAL CURB & GUTTER PEDESTRIAN RAMP CONCRETE SIDEWALK CONCRETE VALLEY GUTTER 706-F1 1' FLUSH CURB 401-6 6'' DEDICATED FIRE SERVICE OLDCASTLE GT-1000 GREASE INTERCEPTOR OR EQUIVALENT 706-1 706-1 706-1 706-1 706-1 706-1 706-S1 706-S1 706-S1 706-S1 706-R1 706-R1 706-R1 706-1 100-1 100-1 100-1 20.00' TYP 9.00' TYP 24.00' 23.00' 100-1 100-1 C-05 ADS STORM WATER STORAGE SYSTEM SEE SHEET C-08 FOR DETAILS 24.00' TRASH ENCLOSURE WITH DUMPSTERS 12.00' 24.00' R3.50' R3.50' R3.50' R3.50' R3.50' R3.50' R2.50' R5.50' R2.50' R5.00' R4.00' R3.00'R3.00' R30.00' R32.00' 16.00' 20.00' 5.00' 504-4 504-4 504-4 24.00' 401-6 404-2 20.00' 9.00' 9.00' REINFORCE SOUTH SIDE DITCH BANK AS PER PAGE C-03 R18.00' R5.00' R5.00' R18.00' 602-2 602-2 602-2 602-2602-2 602-1 601-24 POTENTIAL POLLUTANTS CHEMICAL MSDS #LOCATION TO BE FILLED OUT BY CONTRACTOR TO BE FILLED OUT BY CONTRACTOR OFFSITE OPERATIONS START DATE END DATE TO BE FILLED OUT BY CONTRACTOR AREA TO BE DISTURBED STABILIZE CONSTRUCTION ENTRANCE/EXIT COMBINATION STAGING AREA & VEHICLE EQUIPMENT CLEANING, FUELING AND MAIN. MATERIALS STORAGE AREA & STOCKPILE MANAGEMENT SILT FENCE OR EROSION EEL STORM WATER DRAINAGE SEQUENCE OF MAJOR ACTIVITIES ACTIVITY START DATE END DATE POTENTIAL POLLUTANTS CHEMICAL MSDS #LOCATION TO BE FILLED OUT BY CONTRACTOR TO BE FILLED OUT BY CONTRACTOR OFFSITE OPERATIONS START DATE END DATE TO BE FILLED OUT BY CONTRACTOR BEST MANAGEMENT PRACTICES NOTES 1. This plan should be revised and updated to address changes in site conditions, new or revised government regulations, and additional on-site storm water pollution. Additional erosion control measures may be required. 2. All revisions to this plan must be documented on the SWPPP Revision Documentation Form. 3. Current versions of the SWPPP, the NOI, and the NOC will be kept on site for the duration of the project. These items will be available for the use of all operators and site personal involved with erosion and sediment controls, and be available to EPA visiting the site. A notice will be posted near the construction entrance during construction, containing the SWPPP, the NOI and the NOC. 4. Fugitive dust blowing from the site shall be controlled by spraying water and dust control polymers as needed on dry areas of the site. 5. The contractor will be responsible for supervision and inspection of all erosion and sedimentation controls and for ensuring the SWPPP is implemented. 6. Prior to beginning earth-moving activities, including clearing and grubbing, all clearing limits, easements, setbacks, sensitive areas and their buffers will be clearly marked to prevent environmental damage both on and off the site. 7. If sediment is accidentally transported on to the street it will be removed from the street surface on a daily basis. 8. All off-site construction shall be stabilized at the end of the working day. 9. All waste material will be collected and stored in a securely lidded dumpster. The dumpster will meet all local and state solid water management regulations. 10. Portable sanitary units will be provided for use by all workers for the entire project. Sanitary waste will be collected regularly for the portable units by an approved sanitary waste management contractor. 11. All exposed soils will be stabilized with vegetation or covered no more than 14 days after the construction activity in that portion of the site has temporarily or permanently ceased. 12. Existing and new vegetation will be maintained to the maximum extent practicable to prevent the contamination of storm water with sediment. 13. The contractor shall be responsible for adjusting the erosion control measure; due to grade changes during the development of the project. 14. Maintain on the site or have readily available sufficient oil and grease absorbing materials to contain and clean up fuel or chemical spills and leaks. 15. Adequate energy dissipation, erosion control, and soil stabilization measures will be provided for all point source discharges of storm water, including run-on discharges and outlets for onsite discharges. 16. Temporary and permanent swells and small detention ponds will be used as necessary to reduce the velocity of runoff and enhance particle settling. 17. Consistent with the general permit requirements, all potential pollutants other than sediment will be handled and disposed of in a manner that does not affect contamination of stormwater. 18. Materials used during construction with the potential to impact storm water, will be stored, managed, used, and disposed of in a manner that minimizes the potential for releases to the environment and especially in the storm water. 19. If a spill of pollutants threatens storm water at the site, the spill response procedures must be implemented in a timely manner to prevent the release of pollutants. 20. All temporary and permanent erosion and sediment control BMPs will be maintained and repaired as needed to assure continued performance of their intended use. 21. All temporary erosion control and sediment control BMPs will be removed within 30 days after final site stabilization is achieved or after the temporary BMPs are no longer needed. 22. Regardless of recommended maintenance schedule, all control measures and inspections shall be performed within 24 hours following any storm of 0.5 inches or greater. An inspection report shall be kept at all times and should be retained for at least three (3) years from the date the site is stabilized. 23. All contractors providing services on the project which may cause storm water pollution will be given a copy of the SWPPP and appropriate training regarding stormwater pollution prevention. LEGEND Concrete Washout SEDIMENTATION AREA CONCRETE WASHOUT INLET PROTECTION Concrete Washout INLET PROTECTION MATERIAL STORAGE AREA STABILIZE CONSTRUCTION ENTRANCE/EXIT SILT FENCE OR EROSION EEL THIS IS NOT A FULL SWPPP. OWNER OR CONTRACTOR IS RESPONSIBLE FOR A COMPLETE SWPPP NOTE: 1.AFTER ASPHALT PAVING HAS TAKEN PLACE STORM WATER DEVELOPED WILL BE DIRECTED TO RETENTION BASINS AND PIPING PER THE APPROVED SITE PLAN AND PERCOLATE IN DESIGNATED AREAS 2.INLET PROTECTION TO BE PLACED ON ALL STORM DRAIN INLETS AFTER INSTALLATION THROUGH THE DURATION OF THE PROJECT. CONTRACTOR RESPONSIBLE TO REMOVE AFTER CITY ACCEPTANCE. OUTHOUSE SWPPP SIGN SWPPP PROJECT: CONTRACTOR: PLAN LOCATION: ONSITE CONTACT: PRELIMINARY FOR REVIEW ONLY CHECK BYDRAWN BY JOB NO: OFSHEET JJBMJA SHEET NAME: PROJECT: LOCATION: 25-100 DATEREVISIONS BEST MANAGEMENT PRACTICES ZUPPA'S REXBURG, ID C-09 ENGINEERS STAMP SHEET INFORMATION SHEET SIZE: VERTICAL EXAGGERATION: PROJECT CONTACT: JOSH BALL & BLAKE JOLLEY CONNECT ENGINEERING 208-881-0081 DATE:October 3, 2025 24" X 36" (ARCH D) N/A INLET PROTECTION CONCRETE WASHOUT AREA SEDIMENTATION AREA AREA TO BE DISTURBED C-08 COMBINATION STAGING AREA & VEHICLE FUEL & CLEANING