HomeMy WebLinkAboutRexburg-Nature Park-pickleball-2025
3137 Hillcrest Drive, Bozeman, MT 59715
406-570-5182 • kochcourts@gmail.com • www.kochscourts.com
----------------------------------------------------------------------------------------------------------------------------------------------------------------
Contractor license #’s: MT #: 23561, ID #: 015592-D4, WA #: CC KOCHSTC885J3, ND #: 41042
Proposal
4/17/25
Submitted to:
City of Rexburg
Parks & Recreation
35 N. 1st East
Rexburg, ID 83440
Project: Resurface 4 pickleball courts at Nature Park.
Work to be done: We propose to furnish the materials and perform the labor necessary for the completion of:
Resurface 4 asphalt pickleball courts (61’ x 140’)
-Hand scrape, power blow courts free of loose debris.
-Pressure wash
-Patch cracks with Laykold Deep Patch.
-Apply one coat of Laykold resurfacer to the entire surface.
-Apply two coats of Laykold ColorCoat to the entire surface (Dark Blue interior playing boxes & Dark Grey kitchen/ exterior areas)
-Apply white, textured pickleball playing lines per ASBA specs.
Notes:
-Add $5380 to use Laykold Polyurethane crack filler on the larger cracks in the playing areas.
-Owner will provide water access (hose hookup) and garbage to the project.
-Owner will spray weeds in cracks and around the court where needed.
All the material is guaranteed as specified, and the above work to be performed as stated above and completed for the sum of:
TWENTY EIGHT THOUSAND NINE HUNDRED EIGHTY DOLLARS ($28,980.00) plus tax and any additional costs which may be incurred
for additional work not in the job specification, insurance/bonding, licensing, prevailing wages, or legal requirements.
Payment terms: Monthly progress payments (materials/equipment), 100% upon completion of the project.
Respectfully submitted by: Koch’s Courts--Lorne Koch______________________________________
*This proposal may be withdrawn if not accepted within 30 days.
*This agreement is contingent upon weather, material availability or price increases, shipping, labor, or other delays that are out of our control.
Accepted by: ___________________________ _ Date: _________________ ___