Loading...
HomeMy WebLinkAboutTraffic Light Pole Base 04052024MJV_Concrete_Field_TestsPRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. B87C330D-44EF-4C74-B5C0-3486B4801FEB 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 24004C04052024MJV Compressive Strength of Concrete Test Specimens Date: 04/05/2024 Project Number: 24004 Project Name: Teton River Temple Client: The Church of Jesus Christ of Latter-day Saints Time on Project: 3 hours Start Time: 11:30 AM Contractor: Mountain West Electric Supplier: KNIFE RIVER Mix Number: 50C1I435 Concrete Member: Pole Base Required 28 day Strength (psi): 5,000.0 Admixtures: POLY980, AC534 Entrained Air Spec. (%): 4 to 6 Slump Spec. (inches): Max 5 Results Testing: Set #:Cumulative Test Load Amount: Ticket #: Time Tested: Test Location:Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Slump (in): 1 5.0 22421177 01:00 PM Moody Rd., STA 56, 50’ North of Moody Rd. 56 35.140 141.1 72 4 3 1/2 Field Technician Information Truck: THANOS Total Trip Mileage: 26.00 Tested By: Matthew Valinotti Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. B87C330D-44EF-4C74-B5C0-3486B4801FEB 2 Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation to be given in Observations and/or Remarks.) Observations and/or Remarks: Arrived at job site and met with Sam with Big D Construction and Whit with Depatco. Tested concrete and results met general conformance. Relayed those results to Sam and Whit. Created cylinders and put them in secure container and placed them in an area where they would not be disturbed. Cleaned equipment and left job site. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. B87C330D-44EF-4C74-B5C0-3486B4801FEB 3 Testing: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. B87C330D-44EF-4C74-B5C0-3486B4801FEB 4 Ticket Image: