HomeMy WebLinkAbout24004FB04122024JPC_Concrete_First_BreakPRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
36618B67-12CF-462E-A849-65680C61A109 1
4103 E 605 N Suite 1
Rigby, ID 83442
208.932.4428
File name:
24004FB04122024JPC
Compressive Strength of Concrete Test Specimens
Project Number:
24004
Cumulative Test Load Amount:
5.0
Project Name:
Teton River Temple
Test Location:
Moody Rd., STA 56, 50' North of Moody Rd.
Client:
The Church of Jesus Christ of Latter-day Saints
Admixtures:
POLY980, AC534
Ticket Number:
22421177
Contractor:
Mountain West Electric
Supplier:
KNIFE RIVER
Mix Number:
50C1I435
Date:
4/5/2024
Cylinder Log #:
157
Set #:
1
Entrained Air (%):
4.0
Concrete Temperature (°F):
72
Ambient Temperature (°F):
56
Unit Weight (PCF):
141.1
Tested By:
Matthew Valinotti
Time Tested:
08:30 AM
Pick Up Date:
4/6/2024
Picked Up By:
Matthew Hammar
Time:
10:30 AM
Max, Min Temperature:
80, 60
Compressive Strength Data
Initial Break Testing:
Cylinder
ID:
Break
Age:
Break
Date:
Diameter
(in):
Area
(in^2):
Maximum
Load
(lbs):
Compressive
Strength
(psi):
Required
28 day
Strength
(psi):
Break
Type:
A 7 4/12/2024 4.000 12.56 49,075.0 3907 5,000.0 Type 3
Date:
04/15/2024
Reviewed By:
E. Vail
Signature: