Loading...
HomeMy WebLinkAbout24004FB04122024JPC_Concrete_First_BreakPRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 36618B67-12CF-462E-A849-65680C61A109 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File name: 24004FB04122024JPC Compressive Strength of Concrete Test Specimens Project Number: 24004 Cumulative Test Load Amount: 5.0 Project Name: Teton River Temple Test Location: Moody Rd., STA 56, 50' North of Moody Rd. Client: The Church of Jesus Christ of Latter-day Saints Admixtures: POLY980, AC534 Ticket Number: 22421177 Contractor: Mountain West Electric Supplier: KNIFE RIVER Mix Number: 50C1I435 Date: 4/5/2024 Cylinder Log #: 157 Set #: 1 Entrained Air (%): 4.0 Concrete Temperature (°F): 72 Ambient Temperature (°F): 56 Unit Weight (PCF): 141.1 Tested By: Matthew Valinotti Time Tested: 08:30 AM Pick Up Date: 4/6/2024 Picked Up By: Matthew Hammar Time: 10:30 AM Max, Min Temperature: 80, 60 Compressive Strength Data Initial Break Testing: Cylinder ID: Break Age: Break Date: Diameter (in): Area (in^2): Maximum Load (lbs): Compressive Strength (psi): Required 28 day Strength (psi): Break Type: A 7 4/12/2024 4.000 12.56 49,075.0 3907 5,000.0 Type 3 Date: 04/15/2024 Reviewed By: E. Vail Signature: