Loading...
HomeMy WebLinkAbout24004DFR03212024MJV_DFRPRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8C5489F1-538F-40A3-B51B-48FFBCBF629D 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 24004DFR03212024MJV Daily Field Report Date: 03/21/2024 Project Number: 24004 Project Name: Teton River Temple Client: The Church of Jesus Christ of Latter-day Saints Start Time: 02:00 PM Contractor: Depatco Time on Project: 2 hours Current Weather Conditions: Rain Wind: 5-15 mph Ambient Temperature (°F): 56 Results Inspection Type(s): Other Location(s): Moody Rd., STA 42+20 Observations/ Remarks: Arrived at job site and checked in with Sam with Big D and Jordan and Slade with Depatco. Confirmed with Jordan and Slade that no testing would be done today or tomorrow due to some complications during excavation and weather. They advised to come back on Monday afternoon and test then. Left job site. Inspector Information Truck: THANOS Mileage From Lab to Project (One Way) 13 Total Mileage 26.00 Inspector's Name: Matthew Valinotti Inspector's Signature: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8C5489F1-538F-40A3-B51B-48FFBCBF629D 2 Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation given in Observations and/or Remarks.) Reviewer's Name: E. Vail Reviewer's Signature: Inspection Images: