Loading...
HomeMy WebLinkAbout24004D10012024TH_CE_Density_AggregatePRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3d1abdb3be25fb83-1727802127464 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 24004D10012024TH In Place Density of Soils ASTM D2922 & D3017 Date: 10/01/2024 Project Number: 24004 Project Name: Teton River Temple Client: The Church of Jesus Christ of Latter-day Saints Time Start: 11:00 AM Contractor: Depatco Total Time on Project: 3½hrs Current Weather Conditions: Partly Cloudy Wind: 5-15 mph Instrument ID 76562 MS: 671 Ambient Temperature (°F): 54 DS: 2570 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 West Church Dr, STA: 120+00 20' LCL FG 6 Native Pit Run 128.2 120.8 6.1 126.5 95 Pass 2 West Church Dr, STA: 119+ 00 20' LCL FG 6 Native Pit Run 127.6 121.2 5.3 126.5 96 Pass Field Technician Information Truck Mileage from Lab to Project (One Way)Total Mileage PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3d1abdb3be25fb83-1727802127464 2 STARLORD 13 60466.00 Tested By: Travis Hutmacher Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: Arrived on site and unpacked the gauge. Standardized the gauge and prepared to take shots. Observed an excavator backfilling material on West Church Dr. Spoke with the excavator driver and informed him that I would be testing the material he was backfilling. Observed as he filled in material. Took multiple passing shots. Continued to observe. Observed a front end loader supplying material for the base of the trench. Observed the excavator filling in the trench and compacting with a roller attachment. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3d1abdb3be25fb83-1727802127464 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3d1abdb3be25fb83-1727802127464 4