Loading...
HomeMy WebLinkAbout24004D09172024TH_CE_Density_AggregatePRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3d1abdb3be25fb83-1726595381612 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 24004D09172024TH In Place Density of Soils ASTM D2922 & D3017 Date: 09/17/2024 Project Number: 24004 Project Name: Teton River Temple Client: The Church of Jesus Christ of Latter-day Saints Time Start: 12:00 PM Contractor: Depatco Total Time on Project: 2 Current Weather Conditions: Rain Wind: 15-25 mph Instrument ID 10483 MS: 592 Ambient Temperature (°F): 50 DS: 1649 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 Teton River Temple St, STA:74+00 4' RCL 3" below FG BS 3/4" Base (Hendricks Pit) 128.9 123.2 4.7 125.6 98 Pass 2 Teton River Temple St, STA: 76+00 6' LCL 3" below FG BS 3/4" Base (Hendricks Pit) 132.1 128.0 5.7 125.6 102 Pass Field Technician Information Truck Mileage from Lab to Project (One Way)Total Mileage PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3d1abdb3be25fb83-1726595381612 2 STARLORD 13 59206.00 Tested By: Travis Hutmacher Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: Arrived on site and unpacked the gauge. Standardized the gauge. Observed workers building lifts on the pile pad. Observed a front end loader supplying pit run, and a skid steer spread the material. Observed a dozer spreading ¾base on Teton River Temple St. Observed as a front end loader loaded material into a dump truck. Observed as a roller compacted material on Teton River Temple St. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3d1abdb3be25fb83-1726595381612 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3d1abdb3be25fb83-1726595381612 4