Loading...
HomeMy WebLinkAbout24004D08142024TH_CE_Density_AggregatePRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1723645942996 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 24004D08142024TH In Place Density of Soils ASTM D2922 & D3017 Date: 08/14/2024 Project Number: 24004 Project Name: Teton River Temple Client: The Church of Jesus Christ of Latter-day Saints Time Start: 08:00 AM Contractor: Depatco Total Time on Project: 7 hrs Current Weather Conditions: Partly Cloudy Wind: Calm Instrument ID 78653 MS: 650 Ambient Temperature (°F): 62 DS: 2423 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 West Church Dr, STA: 105+00 4' RCL 24" below FG 8 Pit Run 137.9 128.7 7.1 134.8 95 Pass 2 West Church Dr, STA: 102+50 15' RCL 24" below FG 8 Pit Run 137.6 131.7 4.4 134.8 98 Pass 3 Teton River Temple St, STA: 63+00 24" below FG 6 Native Pit Run 131.2 124.6 5.3 126.5 98 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1723645942996 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 6' RCL 4 Teton River Temple St, STA: 62+00 3' LCL 24" below FG 6 Native Pit Run 129.1 122.5 5.4 126.5 97 Pass Field Technician Information Truck STARLORD Mileage from Lab to Project (One Way) 13 Total Mileage 57632.00 Tested By: Travis Hutmacher Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: Arrived on site at 8am. Unpacked the gauge and standardized it. Observed as dump trailer delivered material. A dozer spread the material. And a roller compacted the material. Spoke with the roller operator. Took multiple passing shots and coordinated with the roller operator. Continued to observe workers and equipment. Spoke with the contractor and got updated site plans through procore. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1723645942996 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1723645942996 4