HomeMy WebLinkAbout24004D08142024TH_CE_Density_AggregatePRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
19884116872ae642-1723645942996 1
4103 E. 605 N. Suite 1
Rigby ID, 83442
208.932.4428
File Name:
24004D08142024TH
In Place Density of Soils ASTM D2922 & D3017
Date:
08/14/2024
Project Number:
24004
Project Name:
Teton River Temple
Client:
The Church of Jesus Christ of Latter-day Saints
Time Start:
08:00 AM
Contractor:
Depatco
Total Time on Project:
7 hrs
Current Weather Conditions:
Partly Cloudy
Wind:
Calm
Instrument ID
78653
MS:
650
Ambient Temperature (°F):
62
DS:
2423
Results
Test
#:
Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor
#:
%
Proctor:
Result
1 West
Church Dr,
STA:
105+00 4'
RCL
24"
below
FG
8 Pit Run 137.9 128.7 7.1 134.8 95 Pass
2 West
Church Dr,
STA:
102+50 15'
RCL
24"
below
FG
8 Pit Run 137.6 131.7 4.4 134.8 98 Pass
3 Teton River
Temple St,
STA: 63+00
24"
below
FG
6 Native Pit Run 131.2 124.6 5.3 126.5 98 Pass
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
19884116872ae642-1723645942996 2
Test
#:
Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor
#:
%
Proctor:
Result
6' RCL
4 Teton River
Temple St,
STA: 62+00
3' LCL
24"
below
FG
6 Native Pit Run 129.1 122.5 5.4 126.5 97 Pass
Field Technician Information
Truck
STARLORD
Mileage from Lab to Project (One Way)
13
Total Mileage
57632.00
Tested By:
Travis Hutmacher
Signature:
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
Observations/Remarks:
Arrived on site at 8am. Unpacked the gauge and standardized it. Observed as dump trailer delivered material. A
dozer spread the material. And a roller compacted the material.
Spoke with the roller operator. Took multiple passing shots and coordinated with the roller operator. Continued
to observe workers and equipment.
Spoke with the contractor and got updated site plans through procore.
Reviewed By:
E. Vail
Signature:
Inspection Images:
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
19884116872ae642-1723645942996 3
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
19884116872ae642-1723645942996 4