HomeMy WebLinkAbout24004D08082024TH_CE_Density_AggregatePRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
19884116872ae642-1723125108229 1
4103 E. 605 N. Suite 1
Rigby ID, 83442
208.932.4428
File Name:
24004D08082024TH
In Place Density of Soils ASTM D2922 & D3017
Date:
08/08/2024
Project Number:
24004
Project Name:
Teton River Temple
Client:
The Church of Jesus Christ of Latter-day Saints
Time Start:
07:00 AM
Contractor:
Depatco
Total Time on Project:
6 hrs
Current Weather Conditions:
Overcast
Wind:
Calm
Instrument ID
76562
MS:
679
Ambient Temperature (°F):
61
DS:
2567
Results
Test
#:
Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor
#:
%
Proctor:
Result
1 Street A,
STA: 66+00
4' RCL
24"
below
FG
4 Native Pit Run 134.7 129.1 4.4 126.5 102 Pass
2 Street A,
STA: 65+00
7' LCL
24"
below
FG
4 Native Pit Run 137.0 129.9 5.4 126.5 103 Pass
Field Technician Information
Truck
STARLORD
Mileage from Lab to Project (One Way)
13
Total Mileage
57388.00
Tested By:Signature:
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
19884116872ae642-1723125108229 2
Travis Hutmacher
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
Observations/Remarks:
Arrived on site, unpacked the gauge and standardized it. Observed as dump trucks supplied pit run, a dozer
spread the pit run, and a roller compacted.
Coordinated with the roller operator and took multiple passing shots. Continued to observe workers.
Spoke with the roller operator and the water truck driver. Continued to observe workers and take passing shots.
Reviewed By:
E. Vail
Signature:
Inspection Images:
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
19884116872ae642-1723125108229 3