Loading...
HomeMy WebLinkAbout24004D03292024MJV_CE_Density_AggregatePRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 2149BE74-FD77-4784-AD40-25A667E92813 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 24004D03292024MJV In Place Density of Soils ASTM D2922 & D3017 Date: 03/29/2024 Project Number: 24004 Project Name: Teton River Temple Client: The Church of Jesus Christ of Latter-day Saints Time Start: 12:00 PM Contractor: Depatco Total Time on Project: 4.25 hours Current Weather Conditions: Partly Cloudy Wind: 15-25 mph Instrument ID 76561 MS: 771 Ambient Temperature (°F): 44 DS: 2731 Results Field Technician Information Truck THANOS Mileage from Lab to Project (One Way) 13 Total Mileage 48795.00 Tested By: Matthew Valinotti Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 2149BE74-FD77-4784-AD40-25A667E92813 2 Observations/Remarks: Arrived on job site and met with Jordan and Slade with Depatco. Observed as they installed a manhole and continued to lay sewage pipe down and fill trench over sewage pipe with native material. They used a 345D CAT excavator with a sheep’s foot attachment to condense and compact material each lift. Progress was roughly 30’-40’ from previous nuclear gauge testing, which no tests were performed today. Left job site. Reviewed By: E. Vail Signature: Inspection Images: