HomeMy WebLinkAbout24004D03272024MJV_CE_Density_AggregatePRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
2214DDD6-B437-441F-8047-EB2EB105BD2E 1
4103 E. 605 N. Suite 1
Rigby ID, 83442
208.932.4428
File Name:
24004D03272024MJV
In Place Density of Soils ASTM D2922 & D3017
Date:
03/27/2024
Project Number:
24004
Project Name:
Teton River Temple
Client:
The Church of Jesus Christ of Latter-day Saints
Time Start:
02:30 PM
Contractor:
Depatco
Total Time on Project:
2 hours
Current Weather Conditions:
Overcast
Wind:
15-25 mph
Instrument ID
78653
MS:
587
Ambient Temperature (°F):
45
DS:
2507
Results
Test
#:
Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor
#:
%
Proctor:
Result
1 Moody Rd.,
STA 43+80,
LCL 10’
4’
below
FG
6 Native Pit Run 134.2 129.8 4.8 126.5 103 Pass
2 Moody Rd.,
STA 43+80,
LCL 10’
3’
below
FG
6 Native Pit Run 130.2 125.6 4.8 126.5 99 Pass
3 Moody Rd.,
STA 43+80,
LCL 10’
2’
below
FG
6 Native Pit Run 123.5 119.6 3.2 126.5 95 Pass
4 Moody Rd.,
STA 43+80,
LCL 10’
1’
below
FG
6 Native Pit Run 126.8 121.3 4.6 126.5 96 Pass
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
2214DDD6-B437-441F-8047-EB2EB105BD2E 2
Field Technician Information
Truck
THANOS
Mileage from Lab to Project (One Way)
13
Total Mileage
48622.00
Tested By:
Matthew Valinotti
Signature:
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements.
Observations/Remarks:
Arrived at job site and checked in with Sam with Big D Construction and Jordan and Slade with Depatco.
Observed as Slade used a 345D CAT excavator with a sheep’s foot attachment to compact each 1’ lift for testing.
Used my nuclear gauge and took a shot per each 1’ lift. Relayed passing results to Sam, Jordan, and Slade.
Cleaned equipment and left job site.
Reviewed By:
E. Vail
Signature:
Inspection Images:
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
2214DDD6-B437-441F-8047-EB2EB105BD2E 3