Loading...
HomeMy WebLinkAbout24004D03252024MJV_CE_Density_AggregatePRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 352121C9-B8A9-406C-9870-14CF58632B10 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 24004D03252024MJV In Place Density of Soils ASTM D2922 & D3017 Date: 03/25/2024 Project Number: 24004 Project Name: Teton River Temple Client: The Church of Jesus Christ of Latter-day Saints Time Start: 02:00 PM Contractor: Depatco Total Time on Project: 2.5 hours Current Weather Conditions: Partly Cloudy Wind: 5-15 mph Instrument ID 78653 MS: 637 Ambient Temperature (°F): 39 DS: 2465 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 Moody Rd., STA 43 + 10, LCL 10’ 5’ below FG 6 Native Pit Run 122.9 119.9 3.8 126.5 95 Pass 2 Moody Rd., STA 43 + 10, LCL 10’ 4’ below FG 6 Native Pit Run 123.3 120.1 3.7 126.5 95 Pass 3 Moody Rd., STA 43 + 10, LCL 10’ 3’ below FG 6 Native Pit Run 125.8 119.9 4.9 126.5 95 Pass 4 Moody Rd., STA 43 + 10, LCL 10’ 2’ below FG 6 Native Pit Run 124.3 120.2 4.5 126.5 95 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 352121C9-B8A9-406C-9870-14CF58632B10 2 Field Technician Information Truck THANOS Mileage from Lab to Project (One Way) 13 Total Mileage 48539.00 Tested By: Matthew Valinotti Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: Arrived at job site and met with Jordan and Slade with Depatco. Observed as they used a 345 D CAT Excavator to add aggregate for each 1’ lift and use a sheep’s foot attachment to compact and level aggregate for each lift. Used nuclear gauge to take several shots at each 1’ lift (4 lifts). Each shot passed and those passing results were relayed to the Depatco team. Cleaned equipment and left job site. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 352121C9-B8A9-406C-9870-14CF58632B10 3