Loading...
HomeMy WebLinkAbout24004D03192024MJV_CE_Density_AggregatePRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7FA709BA-EBE9-4B95-AED8-CB42522E895E 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 24004D03192024MJV In Place Density of Soils ASTM D2922 & D3017 Date: 03/19/2024 Project Number: 24004 Project Name: Teton River Temple Client: The Church of Jesus Christ of Latter-day Saints Time Start: 08:00 AM Contractor: Depatco Total Time on Project: 4 hours Current Weather Conditions: Sunny/Clear Wind: Calm Instrument ID 76561 MS: 702 Ambient Temperature (°F): 29 DS: 2752 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 Moody Rd., STA 41+25, LCL 10’ 1’ below FG 12 Native Pit Run 129.5 122.9 5.4 126.5 97 Pass 2 Moody Rd., STA 41+30, LCL 15’ 1’ below FG 12 Native Pit Run 132.0 122.3 7.9 126.5 97 Pass Field Technician Information Truck STARLORD Mileage from Lab to Project (One Way) 18 Total Mileage 14268.00 Tested By:Signature: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7FA709BA-EBE9-4B95-AED8-CB42522E895E 2 Matthew Valinotti Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: Arrived on job site at Teton River Temple project. Was able to meet with Depatco team and Big D Construction representative and engineers with Horrocks and had a pre-construction meeting going over layout and construction of site. Discussed plan moving forward with the project. Went over to meet with onsite Depatco foreman, Jordan, who was installing 12” DR35 sewer pipe along Moody Rd. We observed the means and methods of compaction as they continued. They used a CAT 345D excavator to bring in material and compact it with a bucket, then used a sheep’s foot to compact material further. We discussed test methods with Horrocks Engineering, and it was decided that anything below the 5’ mark we would observe the means and methods of compaction as it was taking place. Anything 5’ above would be tested using nuclear methods. We were able to take several passing shots in areas that were already compacted and all were results were reported back to Depatco. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7FA709BA-EBE9-4B95-AED8-CB42522E895E 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7FA709BA-EBE9-4B95-AED8-CB42522E895E 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7FA709BA-EBE9-4B95-AED8-CB42522E895E 5 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 7FA709BA-EBE9-4B95-AED8-CB42522E895E 6