Loading...
HomeMy WebLinkAbout24004AD10212024NLS_CE_Density___AsphaltPRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 15304dddab85d4a6-1729522891522 1 4103 E 605 N Suite 1 Rigby, Idaho 83442 208.932.4428 File Name: 24004AD10212024NLS In Place Density of Asphalt by Nuclear Methods ASTM D2950 Date: 10/21/2024 Project Number: 24004 Project Name: Teton River Temple Client: The Church of Jesus Christ of Latter-day Saints Time Start: 08:30 AM Contractor: Depatco Total Time on Project 7.5 Hrs Ambient Temperature (°F): 40 Current Weather Conditions: Sunny/Clear Wind: Calm Instrument ID 76562 Daily Standardization: MS: 684 DS: 2561 Results Details Test #: Location:Lift: Material:Marshall #: Wet:% Marshall: Result 1 Teton River Temple St, STA 78+50, LCL 5' Asphalt SP3 151.6 139.0 92 Pass 2 Teton River Temple St, STA 74+20, LCL 3' Asphalt SP3 151.6 141.2 93 Pass 3 Teton River Temple St, STA 70+40, LCL 3' Asphalt SP3 151.6 139.6 92 Pass 4 Teton River Temple St, STA 62+00, LCL 6' Asphalt SP3 151.6 138.8 92 Pass 5 West Church Dr, STA 103+25, RCL 4' Asphalt SP3 151.6 139.8 92 Pass 6 West Church Dr, STA 107+25, RCL 2' Asphalt SP3 151.6 140.1 92 Pass Field Technician Information PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 15304dddab85d4a6-1729522891522 2 Number of Grout Bags Used: Number of Ice bags used Core Drill Used No Total Mileage 17897 Tested By: Nathaniel Speas Signature: Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation given in Observations and/or Remarks.) Items observed are in general conformance with approved project documents and jurisdictional requirements. Observations and/or Remarks: Arrived to the job site and standardized the gauge. Started my report for the job. Met with the contractor to determine where they were going to be paving. Met with the roller to establish a rolling pattern. Observed the rollers compacting the asphalt. Observed trucks bringing in asphalt. Observed the crew paving. Took some density shots where the contractor had wanted and let him know the results. Finished filling out my report, packed up my stuff and left the job site. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 15304dddab85d4a6-1729522891522 3