Loading...
HomeMy WebLinkAbout24004AD10172024TH_CE_Density___AsphaltPRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3d1abdb3be25fb83-1729179978217 1 4103 E 605 N Suite 1 Rigby, Idaho 83442 208.932.4428 File Name: 24004AD10172024TH In Place Density of Asphalt by Nuclear Methods ASTM D2950 Date: 10/17/2024 Project Number: 24004 Project Name: Teton River Temple Client: The Church of Jesus Christ of Latter-day Saints Time Start: 08:00 AM Contractor: Depatco Total Time on Project 9½hrs Ambient Temperature (°F): 46 Current Weather Conditions: Overcast Wind: 5-15 mph Instrument ID 10483 Daily Standardization: MS: 588 DS: 1752 Results Details Test #: Location:Lift: Material:Marshall #: Wet:% Marshall: Result 1 Temple View Dr, STA: 96+00 Asphalt SP3 151.6 139.8 92 Pass 2 Temple View Dr, STA: 94+00 Asphalt SP3 151.6 142.3 94 Pass 3 Temple View Dr, West lane, STA: 92+00 Asphalt SP3 151.6 145.4 96 Pass 4 Temple View Dr, West lane, STA: 90+00 Asphalt SP3 151.6 144.4 95 Pass 5 Temple View Dr, West lane, STA: 88+00 Asphalt SP3 151.6 139.2 92 Pass 6 Temple View Dr, West lane, STA: 86+00 Asphalt SP3 151.6 145.5 96 Pass 7 Temple View Dr, East lane, STA: 95+00 Asphalt SP3 151.6 146.1 96 Pass 8 Temple View Dr, East lane, STA: Asphalt 151.6 144.4 95 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3d1abdb3be25fb83-1729179978217 2 Test #: Location:Lift: Material:Marshall #: Wet:% Marshall: Result 93+00 SP3 9 Temple View Dr, East lane, STA: 91+00 Asphalt SP3 151.6 143.0 94 Pass 10 Temple View Dr, East lane, STA: 89+00 Asphalt SP3 151.6 144.0 95 Pass Field Technician Information Number of Grout Bags Used: Number of Ice bags used 0 Core Drill Used No Total Mileage 69312 Tested By: Travis Hutmacher Signature: Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation given in Observations and/or Remarks.) Items observed are in general conformance with approved project documents and jurisdictional requirements. Observations and/or Remarks: Arrived on site and unpacked the gauge. Standardized the gauge and prepared to take shots. Observed workers preparing to pave asphalt. Observed dump trucks delivering asphalt to the paver. The paver layed the asphalt. Observed rollers compacting the asphalt. Took multiple shots and established a rolling pattern. Took passing shots and continued to observe. Coordinated with the roller operators to get passing shots. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3d1abdb3be25fb83-1729179978217 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3d1abdb3be25fb83-1729179978217 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3d1abdb3be25fb83-1729179978217 5