Loading...
HomeMy WebLinkAbout24004AD08062024TH_CE_Density___AsphaltPRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1722950958720 1 4103 E 605 N Suite 1 Rigby, Idaho 83442 208.932.4428 File Name: 24004AD08062024TH In Place Density of Asphalt by Nuclear Methods ASTM D2950 Date: 08/06/2024 Project Number: 24004 Project Name: Teton River Temple Client: The Church of Jesus Christ of Latter-day Saints Time Start: 07:30 AM Contractor: Depatco Total Time on Project 11 hrs Ambient Temperature (°F): 68 Current Weather Conditions: Sunny/Clear Wind: Calm Instrument ID 76562 Daily Standardization: MS: 669 DS: 2575 Results Details Test #: Location:Lift: Material:Marshall #: Wet:% Marshall: Result 1 Moody rd, STA: 42+00 3' RCL Asphalt SP3 151.6 139.9 92 Pass 2 Moody rd, STA: 47+00 5' RCL Asphalt SP3 151.6 139.1 92 Pass 3 Moody rd, STA: 49+00 2' RCL Asphalt SP3 151.6 139.5 92 Pass 4 Moody rd, STA: 51+00 6' RCL Asphalt SP3 151.6 139.8 92 Pass 5 Moody rd, STA: 53+00 3' RCL Asphalt SP3 151.6 142.8 94 Pass 6 Moody rd, STA: 54+00 4' RCL Asphalt SP3 151.6 138.8 92 Pass 7 Moody rd, STA: 43+50 6' LCL Asphalt SP3 151.6 141.6 93 Pass 8 Moody rd, STA: 46+50 5' LCL Asphalt 151.6 138.9 92 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1722950958720 2 Test #: Location:Lift: Material:Marshall #: Wet:% Marshall: Result SP3 9 Moody rd, STA: 48+50 4' LCL Asphalt SP3 151.6 140.8 93 Pass 10 Moody rd, STA: 51+50 3' LCL Asphalt SP3 151.6 138.8 92 Pass 11 Moody rd, STA: 54+50 2' LCL Asphalt SP3 151.6 141.3 93 Pass Field Technician Information Number of Grout Bags Used: Number of Ice bags used 0 Core Drill Used No Total Mileage 57318 Tested By: Travis Hutmacher Signature: Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation given in Observations and/or Remarks.) Items observed are in general conformance with approved project documents and jurisdictional requirements. Observations and/or Remarks: Arrived on site at 7:00am observed a paver prepped and ready to put down asphalt. Spoke with the contractor. Unpacked my gauge and standardized it. Observed as dump trucks started to deliver asphalt to the paver. Waited for and observed as a CATCB15 double drum roller and a smaller volvo double drum roller compacted the asphalt. Established a rolling pattern of 6 passes on the large roller and 4-5 passes on the smaller roller. Took multiple passing shots and coordinated with the roller operators. Continued to take passing shots. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1722950958720 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1722950958720 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1722950958720 5 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1722950958720 6 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1722950958720 7