Loading...
HomeMy WebLinkAboutReconstruction Plan-Budget-Asphalt CostsAll City Roads (asphalt only) Road Type Local Roads Collector Roads Arterial Roads Total Average Annual Budget (last 5 years) Road Reconstruction Budget Plan Ideal Design Life 1 Street Segment (a City Block) Road Type Local Roads Collector Roads Arterial Roads Total Sq. Ft. 11270611.1 2292734.7 3972825.8 17.5M Sq. Ft. Reconstruction Plan 20 Year Plan 30 Year Plan 40 Year Plan 50 Year Plan 50.8 Year Plan (Average Budget) 60 Year Plan 70 Year Plan Total Sq. Ft. 27885 35750 46475 2024 Rate 6.28 7.98 9.8 Total Cost 70779437.708 18296022.906 38933692.84 $128 Million $2.52 Million Annual Budget Required $ 6.40 Million $ 4.27 Million $ 3.20 Million $ 2.58 Million $ 2.52 Million $ 2.13 Million $ 1.83 Million Asphalt Cost 175117.8 285285 455455 2024 Rate 6.28 7.98 9.8