Loading...
HomeMy WebLinkAboutCONCRETE FIELD TESTS - 22-00694 - U-Haul Bldg B - New CommercialFile Name: 22247D10022022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 803D04E7-6113-4B9F-9A25-2205675450BB 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Instrument ID 78653 Client: Bateman-Hall Date: 10/03/2022 Time End: 09:45 AM Time Start: 07:45 AM Daily Standardization: MS: 651 DS: 2628 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Middle of west end of pad 1st lift of pitrun 8 138.2 133.3 3.7 138.5 Material Type Pit Run 96 2 100 feet east of northwest corner of pad 1st lift of pitrun 12 138.6 133.6 3.7 138.5 Material Type Pit Run 96 3 200 feet east of southwest corner of pad 1st lift of pitrun 12 139.8 135.5 3.2 138.5 Material Type Pit Run 98 4 300 feet east of northwest corner of pad 1st lift of pitrun 12 135.1 130.9 3.2 138.5 Material Type Pit Run 95 5 Middle of pad 1st lift of pitrun 10 138.6 133.3 4.0 138.5 Material Type Pit Run 96 6 300 feet west of southeast corner of pad 1st lift of pitrun 10 136.5 132.4 3.1 138.5 Material Type Pit Run 96 7 200 feet west of northeast corner of pad 1st lift of pitrun 12 141.8 135.9 4.4 138.5 Material Type Pit Run 98 8 100 feet west of southeast 1st lift of pitrun 10 142.1 135.5 4.9 138.5 Material Type 98 File Name: 22247D10022022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 803D04E7-6113-4B9F-9A25-2205675450BB 2 Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail corner of pad Pit Run 9 Middle of east end of pad 1st lift of pitrun 12 140.7 133.9 5.0 138.5 Material Type Pit Run 97 Observations/Remarks: I arrived on site and spoke with the contractor who showed me what they wanted tested. I proceeded to test the first left of pit run for the building pad. I took test approximately every 100 linear feet. I observed that the tests were within general conformance to project guidelines and I reported my results to the contractor as I went. I left the jobsite by 9:30 AM. Tested By: C Hammar Signature: Reviewed By: E. Vail Signature: Date: 10/13/2022 Inspection Images: File Name: 22247D10022022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 803D04E7-6113-4B9F-9A25-2205675450BB 3 File Name: 22247D10022022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 803D04E7-6113-4B9F-9A25-2205675450BB 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Instrument ID 78653 Client: Bateman-Hall Date: 10/03/2022 Time End: 09:45 AM Time Start: 07:45 AM Daily Standardization: MS: 651 DS: 2628 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Middle of west end of pad 1st lift of pitrun 8 138.2 133.3 3.7 138.5 Material Type Pit Run 96 2 100 feet east of northwest corner of pad 1st lift of pitrun 12 138.6 133.6 3.7 138.5 Material Type Pit Run 96 3 200 feet east of southwest corner of pad 1st lift of pitrun 12 139.8 135.5 3.2 138.5 Material Type Pit Run 98 4 300 feet east of northwest corner of pad 1st lift of pitrun 12 135.1 130.9 3.2 138.5 Material Type Pit Run 95 5 Middle of pad 1st lift of pitrun 10 138.6 133.3 4.0 138.5 Material Type Pit Run 96 6 300 feet west of southeast corner of pad 1st lift of pitrun 10 136.5 132.4 3.1 138.5 Material Type Pit Run 96 7 200 feet west of northeast corner of pad 1st lift of pitrun 12 141.8 135.9 4.4 138.5 Material Type Pit Run 98 8 100 feet west of southeast 1st lift of pitrun 10 142.1 135.5 4.9 138.5 Material Type 98 File Name: 22247D10022022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 803D04E7-6113-4B9F-9A25-2205675450BB 2 Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail corner of pad Pit Run 9 Middle of east end of pad 1st lift of pitrun 12 140.7 133.9 5.0 138.5 Material Type Pit Run 97 Observations/Remarks: I arrived on site and spoke with the contractor who showed me what they wanted tested. I proceeded to test the first left of pit run for the building pad. I took test approximately every 100 linear feet. I observed that the tests were within general conformance to project guidelines and I reported my results to the contractor as I went. I left the jobsite by 9:30 AM. Tested By: C Hammar Signature: Reviewed By: E. Vail Signature: Date: 10/13/2022 Inspection Images: File Name: 22247D10022022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 803D04E7-6113-4B9F-9A25-2205675450BB 3 File Name: 22247D10042022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 69151D30-50B0-49A2-AF5A-1853F0F114B6 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Construction Instrument ID 78653 Client: Bateman-Hall Date: 10/04/2022 Time End: 04:45 PM Time Start: 06:45 AM Daily Standardization: MS: 635 DS: 2628 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 South middle of north side Top of 4th lift of pitrun 12 142.6 132.2 7.9 138.5 Material Type Pit Run 95 2 West end of north side Top of 4th lift of pitrun 12 142.6 138.1 3.2 138.5 Material Type Pit Run 100 3 North middle of north side Top of 4th lift of pitrun 12 141.2 133.6 5.7 138.5 Material Type Pit Run 96 4 East end of north side Top of 4th lift of pitrun 12 145.6 138.6 5.1 138.5 Material Type Pit Run 100 5 Northwest side Top of 5th lift of pitrun 12 140.8 134.4 4.8 138.5 Material Type Pit Run 97 6 North middle Top of 5th lift of pitrun 10 142.2 134.4 5.8 138.5 Material Type Pit Run 97 7 Northeast side Top of 5th lift of pitrun 12 142.0 136.1 4.3 138.5 Material Type Pit Run 98 8 Southeast side Top of 5th lift 12 142.8 136.9 4.4 138.5 Material Type 99 File Name: 22247D10042022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 69151D30-50B0-49A2-AF5A-1853F0F114B6 2 Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail of pitrun Pit Run 9 South middle Top of 5th lift of pitrun 10 140.1 130.9 7.0 138.5 Material Type Pit Run 95 10 Southwest side Top of 5th lift of pitrun 8 140.5 132.4 6.1 138.5 Material Type Pit Run 96 Observations/Remarks: I arrived on site and began observations on the north portion of the 4th lift of pitrun. I took a test approximately every 100 linear feet. I observed that the tests were within general conformance to project guidelines. I reported my results to the contractor and left the jobsite by 8:00 AM. I returned at 3:00 PM to test the 5th lift I took a test approximately every 100 linear feet and observed that the tests were within general conformance to project guidelines. I reported my results to the contractor and left the jobsite by 4:45 PM. Tested By: C Hammar Signature: Reviewed By: E. Vail Signature: Date: 10/13/2022 Inspection Images: File Name: 22247D10042022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 69151D30-50B0-49A2-AF5A-1853F0F114B6 3 File Name: 22247D10052022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8A709758-EC39-4026-8377-0A700B522929 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Construction Instrument ID 78653 Client: Bateman-Hall Date: 10/05/2022 Time End: 01:45 PM Time Start: 12:30 PM Daily Standardization: MS: 645 DS: 2611 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Northeast corner Top of 6th lift 12 142.1 133.5 6.5 138.5 Material Type Pit Run 96 2 Southeast corner Top of 6th lift 12 139.1 130.9 5.6 138.5 Material Type Pit Run 95 3 North middle Top of 6th lift 12 145.1 137.2 5.8 138.5 Material Type Pit Run 99 4 South middle Top of 6th lift 12 137.5 130.9 5.1 138.5 Material Type Pit Run 95 5 Northwest corner Top of 6th lift 12 147.7 138.5 6.6 138.5 Material Type Pit Run 100 6 Southwest corner Top of 6th lift 12 140.3 132.8 5.7 138.5 Material Type Pit Run 96 Observations/Remarks: I arrived on site and begin observations on the pit run for the 6th lift of the building pad. I took tests in each section of the pad approximately every 100 linear feet apart. I observed that the tests were within general conformance to project guidelines and I reported my results to the contractor. I left the jobsite by 1:30 PM. File Name: 22247D10052022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8A709758-EC39-4026-8377-0A700B522929 2 Tested By: C Hammar Signature: Reviewed By: E. Vail Signature: Date: 10/13/2022 Inspection Images: File Name: 22247D10062022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 61C517DB-CA81-4FC9-A7F8-D9EB78C85AF5 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Construction Instrument ID 18025 Client: Bateman-Hall Date: 10/06/2022 Time End: 01:15 PM Time Start: 11:00 AM Daily Standardization: MS: 528 DS: 1649 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Northeast corner Top of 7th lift 12 148.0 139.2 6.3 138.5 Material Type Pit Run 101 2 North middle Top of 7th lift 12 146.5 138.0 7.0 138.5 Material Type Pit Run 100 3 Northwest corner Top of 7th lift 12 145.2 136.3 6.0 138.5 Material Type Pit Run 98 Observations/Remarks: I arrived on site and began observations on the Seventh left of pit run on the north side of the building pad. I performed several tests, one every 100 linear feet. I observed that the tests were within general conformance to project guidelines and I reported my results to contractor. Tested By: C Hammar Signature: Reviewed By: E. Vail Signature: File Name: 22247D10062022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 61C517DB-CA81-4FC9-A7F8-D9EB78C85AF5 2 Date: 10/13/2022 Inspection Images: File Name: 22247D10072022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. C548422D-DB59-425A-A841-41922382B8A9 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Instrument ID 18025 Client: Bateman-Hall Date: 10/07/2022 Time End: 04:00 PM Time Start: 02:00 PM Daily Standardization: MS: 520 DS: 1651 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Northeast 2 feet below finished grade 12 139.5 132.0 5.7 138.5 Material Type Pit Run 95 2 South middle 2 feet below finished grade 12 146.3 138.1 6.0 138.5 Material Type Pit Run 100 3 Northwest 2 feet below finished grade 12 144.4 135.7 6.4 138.5 Material Type Pit Run 98 Observations/Remarks: I arrived on site and began observations on the pitrun for the building pad. I took tests every 100 linear feet of area that was ready to be tested. I observed the test were within general conformance to project guidelines and I reported my results to the contractor. Tested By: C Hammar Signature: Reviewed By: E. Vail Signature: File Name: 22247D10072022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. C548422D-DB59-425A-A841-41922382B8A9 2 Date: 10/13/2022 Inspection Images: File Name: 22247D10102022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D0E5F850-1989-423A-9B13-460E3964611E 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Construction Instrument ID 18025 Client: Bateman-Hall Date: 10/10/2022 Time End: 04:30 PM Time Start: 03:00 PM Daily Standardization: MS: 518 DS: 1663 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 South east Top of sub base 12 143.8 132.6 8.4 138.5 Material Type Pit Run 96 2 South middle Top of sub base 12 144.8 136.4 9.2 138.5 Material Type Pit Run 98 3 South west Top of sub base 12 144.3 131.7 9.6 138.5 Material Type Pit Run 95 Observations/Remarks: I arrived on site and spoke with the contractor who showed me that he wanted me to test the southern half of the building pad. I tested the second to last lift of imported pit run material. I tested approximately every 100 linear feet and observed that the results of the test were within general conformance to project guidelines. I reported my results to contractor and left the job site. Tested By: C Hammar Signature: Reviewed By: E. Vail Signature: File Name: 22247D10102022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D0E5F850-1989-423A-9B13-460E3964611E 2 Date: 10/13/2022 Inspection Images: File Name: 22247D10112022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. BA45B521-7ACC-4C46-B0EF-DB9D65F5E236 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Construction Instrument ID 18025 Client: Bateman-Hall Date: 10/11/2022 Time End: 05:30 PM Time Start: 03:45 PM Daily Standardization: MS: 527 DS: 1656 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Southeast Top of sub base 12 141.1 130.9 7.8 138.5 Material Type Pit Run 95 2 South middle Top of sub base 12 144.7 134.4 7.6 138.5 Material Type Pit Run 97 3 Southwest Top of sub base 12 144.1 133.8 7.7 138.5 Material Type Pit Run 97 4 Northeast Top of sub base 12 145.6 135.8 7.2 138.5 Material Type Pit Run 98 5 North middle Top of sub base 12 143.8 133.4 6.9 138.5 Material Type Pit Run 96 6 Northwest Top of sub base 12 146.8 136.1 8.1 138.5 Material Type Pit Run 98 Observations/Remarks: I arrived on site and began observations on the final list of pitrun for the building pad. I took tests approximately every 100 linear feet. I observed that the test werewithin general conformance to project guidelines and I reported my results to the contractor. File Name: 22247D10112022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. BA45B521-7ACC-4C46-B0EF-DB9D65F5E236 2 Tested By: C Hammar Signature: Reviewed By: E. Vail Signature: Date: 10/13/2022 Inspection Images: File Name: 22247D10112022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. BA45B521-7ACC-4C46-B0EF-DB9D65F5E236 3 File Name: 22247D10132022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 9F74E9F2-324A-4FAB-B554-4002442E9110 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Construction Instrument ID 18025 Client: Bateman-Hall Date: 10/13/2022 Time End: 10:30 AM Time Start: 07:45 AM Daily Standardization: MS: 530 DS: 1660 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Northwest end of north east pad 2 lift of pit run 12 141.2 131.9 9.5 138.5 Material Type Pit Run 95 2 Middle of north east section 2 lift of pit run 12 142.4 132.7 7.4 138.5 Material Type Pit Run 96 3 South west end of north east pad 2 lift of pit run 12 142.1 131.4 7.2 138.5 Material Type Pit Run 95 4 South east corner of south building pad Top of sub base 12 140.6 131.0 6.9 138.5 Material Type Pit Run 95 Observations/Remarks: I arrived on site and began observations on the Second lift of pit run on the north east pad. I took Tess approximately every 100 linear feet and observed that the test were within general conformist a project guidelines. I will put in my results to the contractor and took a sample of slightly different material back to the lab to run tests on. Tested By: C Hammar Reviewed By: E. Vail File Name: 22247D10132022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 9F74E9F2-324A-4FAB-B554-4002442E9110 2 Signature:Signature: Date: 10/13/2022 Inspection Images: File Name: 22247D10172022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19BED570-CEA8-41DF-B2D7-762C16920A2E 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Construction Instrument ID 18025 Client: Bateman-Hall Date: 10/17/2022 Time End: 10:00 AM Time Start: 08:00 AM Daily Standardization: MS: 529 DS: 1649 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Southwest corner of Northeast pad 2 lift of pit run 12 141.6 133.5 6.1 138.5 Material Type Pit Run 96 2 Northeast corner of north east pad 2 lift of pit run 12 139.3 131.8 5.7 138.5 Material Type Pit Run 95 3 Southeast corner of northeast pad 2 lift of pit run 12 138.6 131.2 6.0 138.5 Material Type Pit Run 95 4 Northwest corner of northeast pad 2 lift of pit run 12 144.4 136.3 5.9 138.5 Material Type Pit Run 98 5 Middle of northeast pad 2 lift of pit run 12 139.3 131.5 5.9 138.5 Material Type Pit Run 95 Observations/Remarks: I arrived on site and began observations on the second list of pet run on the northeast pad. I took the test approximately every 100 linear feet. I observed that the test were within general conformance to project guidelines and I reported my results to the contractor. File Name: 22247D10172022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19BED570-CEA8-41DF-B2D7-762C16920A2E 2 Tested By: C Hammar Signature: Reviewed By: E. Vail Signature: Date: 10/23/2022 Inspection Images: File Name: 22247D10172022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19BED570-CEA8-41DF-B2D7-762C16920A2E 3 File Name: 22247D10192022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 0E9C0089-9EB8-4AEC-B085-CEE9FD80F566 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Instrument ID 78653 Client: Bateman-Hall Date: 10/19/2022 Time End: 06:00 PM Time Start: 04:00 PM Daily Standardization: MS: 653 DS: 2659 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Southwest corner of northeastern pad Top of second to last lift 12 140.9 128.8 9.5 134.5 Material Type Pit Run 96 2 Northwest corner of northeastern pad Top of second to last lift 12 140.0 127.4 9.2 134.5 Material Type Pit Run 95 3 Southeast corner of northeastern pad Top of second to last lift 12 142.6 131.2 10.7 138.5 Material Type Pit Run 95 4 Northeast corner of northeastern pad Top of second to last lift 12 143.2 131.8 11.1 134.5 Material Type Pit Run 98 Observations/Remarks: I arrived on site and began observations on the second to last lift of pit run. I performed multiple tests, one approximately every 100 linear feet. I observed that the results of the compaction testing were within general conformance to project guidelines and I reported my results to contractor. File Name: 22247D10192022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 0E9C0089-9EB8-4AEC-B085-CEE9FD80F566 2 Tested By: C Hammar Signature: Reviewed By: E. Vail Signature: Date: 10/23/2022 Inspection Images: File Name: 22247D10242022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. C8F3504A-D160-43E7-A69C-62CB68353F2C 1 4103 E. 605 N. Suite. 1 Rigby ID, 83442 208.881.0081 www.connectengr.com In Place Density of Soils ASTM D2922 & D3017 Project Number: 22-247 Project Name: U-Haul Moving and Storage Contractor: Jerome Bowen Construction Instrument ID 78653 Client: Bateman-Hall Date: 10/24/2022 Time End: 11:00 AM Time Start: 08:00 AM Daily Standardization: MS: 647 DS: 2569 Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Southwest corner of building B Top of sub base 12 142.3 132.8 7.1 134.5 Material Type Pit Run 99 2 Northwest corner of building B Top of sub base 12 142.5 133.0 7.1 134.5 Material Type Pit Run 99 3 Northeast corner of building B Top of sub base 12 138.6 129.3 7.2 134.5 Material Type Pit Run 96 4 Middle of building B Top of sub base 12 139.0 128.3 8.4 134.5 Material Type Pit Run 95 5 Southeast corner of building B Top of sub base 12 134.5 128.1 5.0 134.5 Material Type Pit Run 95 6 Sewer line in front of building A 1’ below top of sub grade 12 133.4 127.6 6.5 134.5 Material Type Pit Run 95 Observations/Remarks: I arrived on site and began observations on the final lift of pit run for the entirety of building B. I proceeded to take tests for density and compaction approximately every 100 linear feet. I observed that the results of the test File Name: 22247D10242022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. C8F3504A-D160-43E7-A69C-62CB68353F2C 2 were within general conformance to project guidelines and I reported my results to the contractor. The contractor also asked if I could test the density above the sewer line in front of building A. I proceeded to take one test and observed that the results of the test for within general conformance to project guidelines. There were a few test that did not pass and I let the contractor know and told them to roll over the sewer line once again. Tested By: C Hammar Signature: Reviewed By: E. Vail Signature: Date: 10/25/2022 Inspection Images: File Name: 22247D10242022CH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. C8F3504A-D160-43E7-A69C-62CB68353F2C 3