Loading...
HomeMy WebLinkAboutINFRASTRUCTURE PLAN 7.28.22 - 22-00457 - Herndon Apartments - Walsh - 4-plex - 263 S 4th W4T H W E S T SE T B A C K 10 ' - 0 " SETBACK 20' - 0" SE T B A C K 10 ' - 0 " 165' - 0" 80 ' - 0 " 165' - 0" 80 ' - 0 " 75' - 0"90' - 0" 30' - 0"24' - 6" 40 ' - 0 " 12 ' - 0 " 22' - 6" LO T S P L I T 40 ' - 0 " 4' - 0"9' - 0"9' - 6" 20 ' - 0 " 20 ' - 0 " 24 ' - 0 " EXISTING GARAGE TO BE REMOVED 8' - 0"9' - 0"8' - 0"9' - 0"9' - 0"9' - 0"9' - 0"9' - 0" 1' - 0 " 23 ' - 0 " 16 ' - 0 " 1A 2A 1W 2W 1X 2X 1Y 2Y 1Z 2Z 17' - 10 1/2" SIDEWALK 5' - 0" SIDEWALK 5' - 0" 5' - 0" 14 ' - 0 " 27' - 0" EXISTING WATER WATER METER 20 ' - 0 " EXISTING SEWER LINE E L E C T R I C A L L I N E 1 1 1 NE W S E W E R L I N E NE W S E W E R L I N E NEW WATER 1 1 801.455.2080 devin@dswdrafting.com D S W DRAFTING Let's create something together Date Drawn by Designed for Sheet OF CCopyright DSW Drafting All rights reserved. The use of these plans is expressly limited to DSW Drafting and those who have purchased plans with a letter of usage. Reproduction,re-use, or publication by any method, in whole or in part, is prohibited. REVISED: 7/27/2022 6:00:05 PM S I T E P L A N (slab on grade) May 2022 DSW Patrick Walsh A1.1 20 4-Plex NOTE: ADD FENCING AND WATER RETENTION METHODS TO PREVENT DIRT & DEBRIS FROM ENTERING STORM DRAINS DURING CONSTRUCTION NOTE: ALL STORM WATER AND DIRT WILL BE KEPT ON SITE DURING CONSTRUCTION UNTIL FINAL LANDSCAPING IS DONE. GENERAL CONTRACTOR WILL BE HELD RESPONSIBLE FOR KEEPING DIRT/MUD ON SITE DURING BAD WEATHER AND FOR CLEANING UP AFTER SUBCONTRACTORS THE GRADE AWAY FROM FOUNDATION WALLS SHALL FALL A MINIMUM OF 6" WITHIN THE FIRST 10 FEET (5%) STREET, CURB AND GUTTER WILL BE INSPECTED AND CLEANED OF ALL MUD AND DIRT AT THE END OF EVERY DAY GRAVEL BAGS TO BE PLACED AND MAINTAINED AROUND ANY STORM DRAIN INLET ADJACENT TO OR IMMEDIATELY DOWNSTREAM FROM SITE DURING CONSTRUCTION SILT FENCES OR BERMS ARE REQUIRED ALONG PROPERTY LINES TO PREVENT STORM WATER FLOW ONTO ADJACENT LOTS ADD EXTERNAL ACCESSIBLE INTERSYSTEM BONDING TERMINAL FOR THE GROUNDING AND BONDING OF COMMUNICATIONS SYSTEMS. THIS IS A GROUNDING BUS ON THE OUTSIDE OF THE ELECTRICAL SERVICE, NOT A UFER A LINED CONCRETE WASHOUT AREA MUST BE PROVIDED AT THE SITE FOR ALL CONCRETE WORK. WASHOUT INTO FOUNDATION OR ON THE GROUND IS PROHIBITED NOTE: WINDOW WELLS TO BE A MIN. OF 3" ABOVE FINISHED GRADE EXCAVATION-FOUNDATION VERIFY SEWER DEPTH @ MANHOLE BEFORE EXCAVATION TO DETERMINE DRIVEWAY SLOPE REVISION SCHEDULE No. Description Date 1 ADDED UTILITIES 7.26.22 ADDRESS: 263 S. 4TH WEST REXBURG, IDAHO 83440 DATE: MAY, 2022 SQUARE FEET: 13,200 NOTE: GRADE LOT SO SURFACE WATER IS PREVENTED FROM CROSSING PROPERTY LINES. SCALE:1/8" = 1'-0"1 SITE PLAN