Loading...
HomeMy WebLinkAboutEden Apartments Traffic Impact Study FINAL First 200 ppEden Apartments Traffic Impact Study February 24, 2017 5700 East Franklin Road, Suite 160 Tel: 208-463-4197 Nampa, ID 83687 1 Eden Apartments Traffic Impact Study Prepared by: Prepared for: Rexburg, ID February 24, 2017 IF-739-1702 Eden Apartments Traffic Impact Study February 24, 2017 ii Contents Contents .......................................................................................................................................ii List of Tables ............................................................................................................................... iv List of Figures .............................................................................................................................. iv I. Introduction and Summary ..................................................................................................... 1 Purpose of Report and Study Objectives .................................................................................... 1 Executive Summary ..................................................................................................................... 1 Site Location and Study Area .................................................................................................. 1 Development Description ....................................................................................................... 1 Principal Findings, Conclusions, and Recommendations........................................................ 1 II. Proposed Development .......................................................................................................... 2 Site Location ................................................................................................................................ 2 Land Use and Intensity ................................................................................................................ 4 Proposed Development Details .................................................................................................. 4 Access Geometrics ...................................................................................................................... 4 Development Phasing and Timing .............................................................................................. 4 III. Analysis of Existing Conditions ................................................................................................ 4 Study Area ................................................................................................................................... 4 Physical Characteristics ............................................................................................................... 4 Roadway Characteristics ......................................................................................................... 4 Traffic Control Devices ............................................................................................................ 5 Pedestrian/Bicycle Facilities ................................................................................................... 5 Traffic Volumes ........................................................................................................................... 5 Level of Service ........................................................................................................................... 7 Recommended Mitigations......................................................................................................... 8 Safety .......................................................................................................................................... 8 IV. Analysis of Future Without-Project Conditions ...................................................................... 9 Planned Improvements ............................................................................................................... 9 Traffic Volumes ........................................................................................................................... 9 Volume Forecast Methods ...................................................................................................... 9 Forecasted Volumes by Horizon Year ..................................................................................... 9 Level of Service ........................................................................................................................... 9 Eden Apartments Traffic Impact Study February 24, 2017 iii V. Analysis of Future With-Project Conditions .......................................................................... 11 Site Traffic Forecasts ................................................................................................................. 11 Trip Generation ..................................................................................................................... 11 Mode Split ............................................................................................................................. 11 Internal Capture .................................................................................................................... 11 Trip Distribution .................................................................................................................... 11 Trip Assignment .................................................................................................................... 11 Existing Plus Project Condition ................................................................................................. 13 Level of Service Analysis ........................................................................................................... 13 Mitigations ................................................................................................................................ 13 Traffic Safety Implications......................................................................................................... 13 Sight Distance ............................................................................................................................ 13 Pedestrian/Bicycle Considerations ........................................................................................... 13 2022 Background Plus Project Condition ................................................................................. 15 Mitigations ................................................................................................................................ 15 VI. Findings and Recommendations ........................................................................................... 17 VII. Appendix ............................................................................................................................ 18 Eden Apartments Traffic Impact Study February 24, 2017 iv List of Tables Table 1: Level of Service Criteria ..................................................................................................... 7 Table 2: Existing Level of Service .................................................................................................... 8 Table 3: Historical Counts ............................................................................................................... 9 Table 4: 2022 Background Level of Service .................................................................................... 9 Table 5: Trip Generation ............................................................................................................... 11 Table 6: Existing Plus Project Level of Service .............................................................................. 13 Table 7: 2022 Background Plus Project Level of Service (Mitigation Analysis Included) ............. 15 List of Figures Figure 1: Site Locations ................................................................................................................... 2 Figure 2: Eden Apartments Site Plan .............................................................................................. 3 Figure 3: Existing Turning Movement Volumes .............................................................................. 6 Figure 4: 2022 Background Turning Movement Volumes ............................................................ 10 Figure 5: Trip Distribution ............................................................................................................. 12 Figure 6: Existing Plus Project Turning Movement Volumes ........................................................ 14 Figure 7: 2022 Background with Project Turning Movement Counts (Mitigation Included) ....... 16 Eden Apartments Traffic Impact Study February 24, 2017 1 I. Introduction and Summary Purpose of Report and Study Objectives The purpose of this Traffic Impact Study (TIS) is to identify possible traffic impacts of the proposed development known as Eden Apartments in Rexburg, Idaho. The study objectives are to define the study intersections, estimate trip generation and distribution for the site, analyze AM and PM peak traffic conditions, and recommend improvements to mitigate traffic impacts. Executive Summary Site Location and Study Area The proposed development is located at the northwest corner of University Boulevard and 5th West near the southern end of the city as shown in Figure 1. The development is east of Highway 20. The study area includes the intersections of University Boulevard and 5th West and 7th South and 5th west. Development Description The proposed development will be on approximately 16 acres, and will contain an apartment complex. The site includes 484 total units, 232 one-bedroom units and 252 two-bedroom units. There will be three total accesses, two on the north side and one on the west side of the development. The existing access road on the north side will be widened and extend to connect to University Boulevard south of the proposed development. Principal Findings, Conclusions, and Recommendations  The project creates 3,219 daily trips o 247 during the AM peak o 300 during the PM peak  Under the scenario “Existing conditions”, all intersections operate at an acceptable LOS.  Under the scenario “Existing plus project”, all intersections operate at an acceptable LOS.  Under the scenario “2022 background traffic”, all intersections operate at an acceptable LOS.  Under the scenario “2022 plus project” mitigations are required at 7th south and 5th West. o Mitigation Recommendation: Dedicated left turn lane for the southern approach. Eden Apartments Traffic Impact Study February 24, 2017 2 II. Proposed Development Site Location The proposed development is located on the northwest corner of 5th West and between University Boulevard in Rexburg, Idaho as shown in Figure 1. Also included in Figure 2 is the proposed site plan. Figure 1: Site Locations Proposed Location Eden Apartments Eden Apartments Traffic Impact Study February 24, 2017 3 Figure 2: Eden Apartments Site Plan Eden Apartments Traffic Impact Study February 24, 2017 4 Land Use and Intensity The surrounding area is mostly undeveloped. There is an existing apartment complex directly north of the project, which shares the access road with the proposed development. Proposed Development Details The proposed development is located on approximately 22 acres. Included within the development will be thirteen buildings with 484 units. Included will be 869 total parking spaces with 406 covered and 463 uncovered. Access Geometrics As shown in Figure 2, there will be three total accesses to the site, two on the north and one on the west. The existing access road on the north side will be widened and extend to connect to University Boulevard south of the proposed development. There are no planned accesses directly to 5th West. Development Phasing and Timing This report assumes that the project will build-out like other developments; as building schedule, the demand, and infrastructure can accommodate demand. The build-out condition is estimated to be done during the year 2017. In our analysis, we also added project traffic to existing (2017) counts to estimate the impact if the proposed projects were built-out prior to 2022. III. Analysis of Existing Conditions Study Area The study area analyzed the following intersections: 1. 5th West and 7th South 2. University Boulevard and 5th West 3. University Boulevard and Access Road Physical Characteristics Roadway Characteristics 5th West is a small local road that runs north/south in the southern area of Rexburg. It curves west at Yellowstone Highway and becomes Trejo Street. It dead-ends to the south at 2000 south. The posted speed limit is 25 mph within the study area. University Boulevard is a minor arterial that runs east/west in the southern area of Rexburg. There are two travel lanes in each direction with a middle turning lane for both directions. The posted speed limit is 45 mph within the study area. Eden Apartments Traffic Impact Study February 24, 2017 5 7th South is a local road that runs north/south. There are five lanes with two lanes in each direction with a middle turning lane. The posted speed limit is 25 mph within the study area. Access Road is a local road that runs east/west. It starts at 5th West and dead ends after the accesses to Mesa Falls Apartments. There are no lane markings. The proposed development will widen the roadway to allow access to both complexes. It will also extend to connect to University Boulevard south of the proposed development. Traffic Control Devices The following shows the configurations for each study intersection: 1. 5th West and & 7th South a. Two Way Stop Controlled (Stop Control on 5th West) 2. University Boulevard and 5th West a. Four Way Stop Controlled 3. University Boulevard and Access Road a. Proposed Stop Controlled (Stop Control on Access Road) Pedestrian/Bicycle Facilities There are currently no pedestrian/bicycle facilities in the area. Traffic Volumes AM and PM Peak hour turning movement counts were obtained at the intersections of 5th West/7th South, University Boulevard/5th West and at the proposed location for the Access Road/University Boulevard intersection in January of 2017 by Horrocks Engineers. These counts establish a base condition and confirms the regional traffic model output regarding the direction of travel that vehicles will take to access and leave the site. Existing intersection count volumes are included in Figure 3 . SCALE: DATE: Eden Apartments Existing Turning Movement Volumes FIGURE 3 N/A 01/2017 2162 WEST GROVE PARKWAY SUITE #400 PLEASANT GROVE, UT. 84062 (801) 763-5100 1 AM PEAK HOUR PM PEAK HOUR 2 AM PEAK HOUR PM PEAK HOUR 2 3 1 3 AM PEAK HOUR PM PEAK HOUR University Boulevard 5t h W e s t 7th South Yel l o w s t o n e H i g h w a y Eden Apartments Traffic Impact Study February 24, 2017 7 Level of Service In order to quantify the traffic conditions currently exhibited in the study area, the roadway geometries and collected traffic data were analyzed using the VISTRO software package. The 2010 Highway Capacity Manual (HCM) method of calculating intersection delay and level of service (LOS) grade was assigned to each intersection for both the existing AM and PM peak hours. LOS is a term used by the HCM to describe the traffic operations of an intersection, based on congestion and delay. LOS ranges from A (almost no congestion or delay) to F (traffic demand exceeds capacity and intersection experiences long queues and delay). LOS D is generally acceptable for urbanized intersections. LOS E is the threshold when the intersection exceeds acceptable standards and mitigations are required. The delay criteria used to assign a letter grade to an intersection for signalized and unsignalized intersections is shown below in Table 1. Table 1: Level of Service Criteria Level of Service Average Control Delay (sec/veh) Signalized Unsignalized A ≤ 10 ≤ 10 B > 10 - 20 > 10 - 15 C > 20 - 35 > 15 - 25 D > 35 - 55 > 25 - 35 E > 55 - 80 > 35 - 50 F > 80 > 50 Source: Highway Capacity Manual (HCM) The LOS value is used to help size intersections, add turn lanes, change-timing patterns, modify intersection layouts, estimate the delay per vehicle at an intersection, and other traffic effectiveness measurements. For all way stop-controlled intersections, LOS is expressed in terms of the average vehicle delay of all of the movements, much like that of a signalized intersection. For two-way, stop-controlled intersection, LOS is defined in terms of the average vehicle delay of an individual movement. This is because the performance of a two-way, stop-controlled intersection is more closely reflected in terms of its individual movements, rather than its performance overall. Existing analysis shows all intersections performing at LOS C or better. The delay and LOS values for each intersection are shown in Table 2. Eden Apartments Traffic Impact Study February 24, 2017 8 Table 2: Existing Level of Service Intersection AM Peak Hour PM Peak Hour Average Control Delay (sec/veh) Level of Service Average Control Delay (sec/veh) Level of Service Existing Conditions 5th & University Boulevard 14.6 B 15.6 C 5th West & 7Th South 17.7 C 25.0 C Access Road & University Blvd 12.4 B 12.3 B Recommended Mitigations There are no recommended mitigations at this time. Safety There are no recommended safety improvements at this time. Eden Apartments Traffic Impact Study February 24, 2017 9 IV. Analysis of Future Without-Project Conditions Planned Improvements There are no current roadway improvements planned between now and the estimated 2022 build-out Traffic Volumes Volume Forecast Methods Historical counts were obtained from ITD. A conservative 2% annual growth rate in the study area can be used to predict future growth. Results are shown in Table 3. Table 3: Historical Counts Yellowstone Highway Historical Counts 2011 9,491 2015 10,282 Forecasted Volumes by Horizon Year Existing background traffic was increased by 2% annually to represent a 2022 background condition and the intersection volumes are included in Figure 4. This represents future traffic volumes in the area if the proposed development was not build. Level of Service After increasing traffic volumes to accommodate future growth, all intersection remained at an acceptable LOS. Although all intersections perform at an adequate LOS, the intersection at 5th west and 7th South performs just barely within LOS D. All intersections are included in Table 4. Table 4: 2022 Background Level of Service Intersection AM Peak Hour PM Peak Hour Average Control Delay (sec/veh) Level of Service Average Control Delay (sec/veh) Level of Service 2022 Without Project 5th & University Boulevard 15.4 C 16.4 C 5th West & 7th South 19.2 C 27.9 D Access Road & University Blvd 12.9 B 12.9 B SCALE: DATE: Eden Apartments 2022 Background Turning Movement Volumes FIGURE 4 N/A 01/2017 2162 WEST GROVE PARKWAY SUITE #400 PLEASANT GROVE, UT. 84062 (801) 763-5100 1 AM PEAK HOUR PM PEAK HOUR 2 AM PEAK HOUR PM PEAK HOUR 2 3 1 3 AM PEAK HOUR PM PEAK HOUR University Boulevard 5t h W e s t 7th South Yel l o w s t o n e H i g h w a y Eden Apartments Traffic Impact Study February 24, 2017 11 V. Analysis of Future With-Project Conditions Site Traffic Forecasts Trip Generation Project traffic is generated at the proposed development using trip generation standards from the Institute of Transportation Engineers’ (ITE) publication Trip Generation Manual, 9th Edition. The proposed development includes 484 Apartment units, consisting of one and two bedroom units. According to the trip generation shown in Table 5. It is anticipated that the new development will generate a total of 3,219 trips, with 247 occurring during the AM Peak Hour, and 300 occurring during the PM Peak Hour. Table 5: Trip Generation Eden Apartments Variable Quantity Daily AM Peak Hour PM Peak Hour Total In Out Total In Out Total In Out Apartments (ITE 220) 6.65 50% 50% 0.51 20% 80% 0.62 65% 35% Dwelling Units 484 3,219 1,609 1,609 247 49 197 300 195 105 Total New Trips 3,219 1,609 1,609 247 49 197 300 195 105 Mode Split There are currently no transit options in this area, and there are no pedestrian or bicycle facilities, so it is assumed all of the trips will be vehicle trips. Internal Capture There is no internal capture required for this project. Trip Distribution It is anticipated that vehicle traffic will use University Boulevard as the means to travel east/west from the proposed development. This is due to the close proximity to HWY 191 and US-20 on the west and BYU Idaho to the east. Trip distribution percentages are shown in Figure 5. Trip Assignment Using the assumed distribution of traffic, the trips generated by the development were assigned to the existing roadway network using the travel demand model. The land-uses were included in the model, which then estimates where project traffic will arrive from and travel to the proposed development. Eden Apartments Traffic Impact Study February 24, 2017 12 Figure 5: Trip Distribution 10 % 10% 5% 5% 35% 35% Site Location Eden Apartments Traffic Impact Study February 24, 2017 13 Existing Plus Project Condition The project traffic was added to the existing traffic volumes at each intersection and is included in Figure 6. Level of Service Analysis After adding project traffic to existing traffic volumes, all intersections perform at an acceptable LOS and is shown in Table 6. With the addition of project traffic, the PM peak hour conditions at 5th & University Blvd performs at LOS D, which is near the threshold for acceptable LOS. Mitigations No Mitigations are recommended at this time. Table 6: Existing Plus Project Level of Service Intersection AM Peak Hour PM Peak Hour Average Control Delay (sec/veh) Level of Service Average Control Delay (sec/veh) Level of Service 2022 Without Project 5th & University Boulevard 16.1 C 18.2 C 5th West & 7th South 20.8 C 32.1 D Access Road & University Blvd 14.4 B 15.6 B Traffic Safety Implications The new development adds traffic to the study area, but it is not expected to have a substantial impact on the safety of the surrounding network. The LOS for the intersection and accesses in question are acceptable LOS. Sight Distance Most of the traffic will use existing roadways and intersections. Where new intersections or accesses are created adequate sight distance needs to be maintained per the AASHTO “A Policy on Geometric Design of Highways and Streets”, also known as the “Greenbook”. Pedestrian/Bicycle Considerations Sidewalks of standard width and specifications will be contained within the subdivision. There are no current bike lanes adjacent to the projects. Therefore, no new bike lanes are proposed. SCALE: DATE: Eden Apartments Existing Plus Project Turning Movement Volumes FIGURE 6 N/A 01/2017 2162 WEST GROVE PARKWAY SUITE #400 PLEASANT GROVE, UT. 84062 (801) 763-5100 1 AM PEAK HOUR PM PEAK HOUR 2 AM PEAK HOUR PM PEAK HOUR 2 3 1 3 AM PEAK HOUR PM PEAK HOUR University Boulevard 5t h W e s t 7th South Yel l o w s t o n e H i g h w a y Eden Apartments Traffic Impact Study February 24, 2017 15 2022 Background Plus Project Condition Project traffic was added to the 2022 Background traffic to create a 2022 Background Plus Project Condition. The 2022 Background Plus Project volumes for each intersection are included in Figure 7. For this condition, the intersection of 5th West & 7th South performs at LOS E, which is not acceptable. This is due to the left turning traffic on 5th West not having adequate gaps to turn causing significant delay for the entire approach. All other intersections perform at an acceptable LOS and are included in Table 7. Mitigations To mitigate the delay at 7th South and 5th West, a dedicated left turn lane is recommended for the southern approach on 5th West. With this mitigation included, analysis shows all intersections perform at an acceptable LOS. The LOS at 7th South and 5th West improves from LOS E to LOS D. Table 7: 2022 Background Plus Project Level of Service (Mitigation Analysis Included) Intersection AM Peak Hour PM Peak Hour Average Control Delay (sec/veh) Level of Service Average Control Delay (sec/veh) Level of Service 2022 With Project 5th & University Boulevard 17.1 C 19.3 C 5th West & 7th South 23.1 C 37.1 E New Access & University Blvd 15.2 C 16.5 C 2022 With Project & Mitigations 5th & University Boulevard 17.1 C 19.3 C 5th West & 7th South 19.7 C 29.1 D Access Road & University Blvd 15.2 C 16.5 C SCALE: DATE: Eden Apartments 2022 Background Plus Project Turning Movement Volumes (Mitigation Included) FIGURE 7 N/A 01/2017 2162 WEST GROVE PARKWAY SUITE #400 PLEASANT GROVE, UT. 84062 (801) 763-5100 1 AM PEAK HOUR PM PEAK HOUR 2 AM PEAK HOUR PM PEAK HOUR 2 3 1 3 AM PEAK HOUR PM PEAK HOUR University Boulevard 5t h W e s t 7th South Yel l o w s t o n e H i g h w a y Eden Apartments Traffic Impact Study February 24, 2017 17 VI. Findings and Recommendations  The project creates 3,219 daily trips o 247 during the AM peak o 300 during the PM peak  Under the scenario “Existing conditions”, all intersections operate at an acceptable LOS.  Under the scenario “Existing plus project”, all intersections operate at an acceptable LOS.  Under the scenario “2022 background traffic”, all intersections operate at an acceptable LOS.  Under the scenario “2022 plus project” mitigations are required at 7th south and 5th West. o Mitigation Recommendation: Dedicated left turn lane for the southern approach. Eden Apartments Traffic Impact Study February 24, 2017 18 VII. Appendix TRAFFIC COUNT SUMMARY City: N-S Street:South 5th West E-W Street:West 7th South Date: Begin Time: Interval Length:15 min EB Left Thru Right Trucks Left Thru Right Trucks Left Thru Right Trucks Left Thru Right Trucks Total Hourly 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 All Moves Totals 07:00 AM 07:15 AM 0 1 5 0 4 11 1 0 1 2 10 0 3 33 2 0 73 07:15 AM 07:30 AM 8 2 7 0 3 20 2 0 0 6 26 0 4 65 1 0 144 07:30 AM 07:45 AM 15 1 11 0 7 22 1 0 3 10 39 0 5 117 1 0 232 07:45 AM 08:00 AM 11 4 26 0 5 40 2 0 13 13 31 0 6 117 4 0 272 721 08:00 AM 08:15 AM 9 4 23 1 8 58 4 0 6 7 16 0 10 73 7 0 225 873 08:15 AM 08:30 AM 7 3 12 0 3 56 2 0 3 1 10 0 5 68 5 0 175 904 08:30 AM 08:45 AM 5 1 3 1 4 20 0 0 5 2 13 0 7 74 4 0 138 810 08:45 AM 09:00 AM 11 7 15 0 14 37 8 0 7 8 31 0 8 73 2 0 221 759 South 5th West Southbound North Leg 126 66 East Leg Westbound Total Volume:Right Thru Left Total Volume: 192 72 12 42 721 9 Right 273 176 Thru 208 23 Left West 7th South Eastbound Left 26 418 Thru 375 513 Right 17 West Leg 25 31 96 South Leg Total Volume:Left Thru Right Total Volume: 691 52 152 204 Northbound OPTIONAL ADJUSTED PEAK HOUR TRAFFIC VOLUMES Adjustment Factors Southbound Westbound Northbound Eastbound Monthly:1.00 Left Thru Right Left Thru Right Left Thru Right Left Thru Right Daily:1.00 42 12 72 23 176 9 25 31 96 26 375 17 Interval:1.00 126 208 152 418 Count:1.00 Trucks:1%Trucks:0%Trucks:0%Trucks:0% Total:1 Peak Hour:Peak Vol:904 PHF:0.83 Time Interval 07:30 AM to SB WB Rexburg Completed By: CM NB 8:30 AM Thursday, February 16, 2017 07:00 AM South 5th West & West 7th South [Date] TRAFFIC COUNT SUMMARY City: N-S Street:South 5th West E-W Street:West 7th South Date: Begin Time: Interval Length:15 min SB WB NB EB Left Thru Right Trucks Left Thru Right Trucks Left Thru Right Trucks Left Thru Right Trucks Total Hourly 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 All Moves Totals 04:00 PM 04:15 PM 7 9 6 2 11 23 5 0 0 12 18 0 7 38 6 0 142 04:15 PM 04:30 PM 4 5 7 0 15 65 14 0 2 6 10 0 11 28 5 0 172 04:30 PM 04:45 PM 8 10 20 0 19 56 8 0 0 7 11 0 12 45 7 0 203 04:45 PM 05:00 PM 4 6 18 0 37 76 15 0 4 8 21 0 5 57 4 0 255 772 05:00 PM 05:15 PM 8 14 15 0 27 86 12 0 7 11 23 0 11 65 8 0 287 917 05:15 PM 05:30 PM 4 11 14 0 25 75 7 0 5 11 14 0 9 50 9 0 234 979 05:30 PM 05:45 PM 6 11 17 0 21 37 8 0 7 8 14 0 17 38 7 0 191 967 05:45 PM 06:00 PM 7 17 14 0 22 45 5 0 2 10 18 0 7 53 6 0 206 918 South 5th West Southbound North Leg 132 116 East Leg Westbound Total Volume:Right Thru Left Total Volume: 248 67 41 24 753 42 Right 376 293 Thru 443 108 Left West 7th South Eastbound Left 37 282 Thru 217 310 Right 28 West Leg 16 37 69 South Leg Total Volume:Left Thru Right Total Volume: 658 177 122 299 Northbound OPTIONAL ADJUSTED PEAK HOUR TRAFFIC VOLUMES Adjustment Factors Southbound Westbound Northbound Eastbound Monthly:1.00 Left Thru Right Left Thru Right Left Thru Right Left Thru Right Daily:1.00 24 41 67 108 293 42 16 37 69 37 217 28 Interval:1.00 132 443 122 282 Count:1.00 Trucks:0%Trucks:0%Trucks:0%Trucks:0% Total:1 Peak Hour:Peak Vol:979 PHF:0.85 Time Interval 04:30 PM to Rexburg Completed By: CM Updated January 31, 2017 For Use with Jamar PetraPro Software Thursday, February 16, 2017 5:30 PM 04:00 PM TRAFFIC COUNT SUMMARY City: N-S Street:South 5th West E-W Street:University Blv Date: Begin Time: Interval Length:15 min EB Left Thru Right Trucks Left Thru Right Trucks Left Thru Right Trucks Left Thru Right Trucks Total Hourly 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 All Moves Totals 07:00 AM 07:15 AM 0 0 6 0 1 37 0 0 3 0 2 0 0 41 0 0 90 07:15 AM 07:30 AM 1 1 20 0 0 30 0 0 0 1 1 0 7 57 1 0 119 07:30 AM 07:45 AM 4 1 21 0 1 24 0 0 3 2 3 0 6 69 0 0 134 07:45 AM 08:00 AM 1 2 29 0 0 40 0 0 2 4 2 0 4 80 0 0 164 507 08:00 AM 08:15 AM 1 0 13 1 2 60 2 0 5 3 0 0 3 55 1 0 145 562 08:15 AM 08:30 AM 1 2 16 0 2 61 0 0 4 3 0 0 9 58 4 0 160 603 08:30 AM 08:45 AM 0 1 4 1 2 20 0 0 1 1 0 0 4 48 2 0 83 552 08:45 AM 09:00 AM 0 1 6 0 0 32 0 0 1 2 0 0 5 55 0 0 102 490 South 5th West Southbound North Leg 91 36 East Leg Westbound Total Volume:Right Thru Left Total Volume: 127 79 5 7 466 2 Right 278 185 Thru 192 5 Left University Blv Eastbound Left 22 289 Thru 262 274 Right 5 West Leg 14 12 5 South Leg Total Volume:Left Thru Right Total Volume: 567 15 31 46 Northbound OPTIONAL ADJUSTED PEAK HOUR TRAFFIC VOLUMES Adjustment Factors Southbound Westbound Northbound Eastbound Monthly:1.00 Left Thru Right Left Thru Right Left Thru Right Left Thru Right Daily:1.00 7 5 79 5 185 2 14 12 5 22 262 5 Interval:1.00 91 192 31 289 Count:1.00 Trucks:1%Trucks:0%Trucks:0%Trucks:0% Total:1 Peak Hour:Peak Vol:603 PHF:0.92 Time Interval 07:30 AM to SB WB Rexburg Completed By: CM NB 8:30 AM Thursday, February 16, 2017 07:00 AM South 5th West & University Blv [Date] TRAFFIC COUNT SUMMARY City: N-S Street:South 5th West E-W Street:University Blv. Date: Begin Time: Interval Length:15 min SB WB NB EB Left Thru Right Trucks Left Thru Right Trucks Left Thru Right Trucks Left Thru Right Trucks Total Hourly 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 All Moves Totals 04:00 PM 04:15 PM 0 2 13 2 5 55 3 0 1 0 0 0 17 32 1 0 129 04:15 PM 04:30 PM 2 2 8 0 2 55 2 0 0 2 0 0 6 37 1 0 117 04:30 PM 04:45 PM 2 2 6 0 0 56 1 0 0 4 1 0 5 40 2 0 119 04:45 PM 05:00 PM 1 2 10 0 1 69 0 0 0 1 0 0 15 38 1 0 138 503 05:00 PM 05:15 PM 1 6 13 0 2 92 1 0 3 4 2 0 21 39 0 0 184 558 05:15 PM 05:30 PM 1 0 8 0 3 53 1 0 0 2 2 0 19 48 1 0 138 579 05:30 PM 05:45 PM 1 2 7 0 2 47 3 0 1 4 0 0 19 49 0 0 135 595 05:45 PM 06:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 457 South 5th West Southbound North Leg 52 90 East Leg Westbound Total Volume:Right Thru Left Total Volume: 142 38 10 4 456 5 Right 303 261 Thru 274 8 Left University Blv. Eastbound Left 74 250 Thru 174 182 Right 2 West Leg 4 11 4 South Leg Total Volume:Left Thru Right Total Volume: 553 20 19 39 Northbound OPTIONAL ADJUSTED PEAK HOUR TRAFFIC VOLUMES Adjustment Factors Southbound Westbound Northbound Eastbound Monthly:1.00 Left Thru Right Left Thru Right Left Thru Right Left Thru Right Daily:1.00 4 10 38 8 261 5 4 11 4 74 174 2 Interval:1.00 52 274 19 250 Count:1.00 Trucks:0%Trucks:0%Trucks:0%Trucks:0% Total:1 Peak Hour:Peak Vol:595 PHF:0.81 Time Interval 04:45 PM to Rexburg Completed By: CM Updated January 31, 2017 For Use with Jamar PetraPro Software Thursday, February 16, 2017 5:45 PM 04:00 PM TRAFFIC COUNT SUMMARY City: N-S Street:N/A E-W Street:University Blv Date: Begin Time: Interval Length:15 min EB Left Thru Right Trucks Left Thru Right Trucks Left Thru Right Trucks Left Thru Right Trucks Total Hourly 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 All Moves Totals 07:00 AM 07:15 AM 0 0 0 0 0 46 0 0 0 0 0 0 0 40 0 0 86 07:15 AM 07:30 AM 0 0 0 0 0 47 0 0 0 0 0 0 0 67 0 0 114 07:30 AM 07:45 AM 0 0 0 0 0 48 0 0 0 0 0 0 0 72 0 0 120 07:45 AM 08:00 AM 0 0 0 0 0 71 0 0 0 0 0 0 0 84 0 0 155 475 08:00 AM 08:15 AM 0 0 0 1 0 73 0 0 0 0 0 0 0 57 0 0 130 519 08:15 AM 08:30 AM 0 0 0 0 0 85 0 0 0 0 0 0 0 70 0 0 155 560 08:30 AM 08:45 AM 0 0 0 1 0 24 0 0 0 0 0 0 0 56 0 0 80 520 08:45 AM 09:00 AM 0 0 0 0 0 39 0 0 0 0 0 0 0 58 0 0 97 462 N/A Southbound North Leg 0 0 East Leg Westbound Total Volume:Right Thru Left Total Volume: 0 0 0 0 560 0 Right 277 277 Thru 277 0 Left University Blv Eastbound Left 0 283 Thru 283 283 Right 0 West Leg 0 0 0 South Leg Total Volume:Left Thru Right Total Volume: 560 0 0 0 Northbound OPTIONAL ADJUSTED PEAK HOUR TRAFFIC VOLUMES Adjustment Factors Southbound Westbound Northbound Eastbound Monthly:1.00 Left Thru Right Left Thru Right Left Thru Right Left Thru Right Daily:1.00 0 0 0 0 277 0 0 0 0 0 283 0 Interval:1.00 0 277 0 283 Count:1.00 Trucks:0%Trucks:0%Trucks:0%Trucks:0% Total:1 Peak Hour:Peak Vol:560 PHF:0.90 Time Interval 07:30 AM to SB WB Rexburg Completed By: CM NB 8:30 AM Thursday, February 16, 2017 07:00 AM NA & University [Date] TRAFFIC COUNT SUMMARY City: N-S Street:N/A E-W Street:University Blv. Date: Begin Time: Interval Length:15 min SB WB NB EB Left Thru Right Trucks Left Thru Right Trucks Left Thru Right Trucks Left Thru Right Trucks Total Hourly 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 All Moves Totals 04:00 PM 04:15 PM 0 0 0 2 0 61 0 0 0 0 0 0 0 47 0 0 108 04:15 PM 04:30 PM 0 0 0 0 0 66 0 0 0 0 0 0 0 48 0 0 114 04:30 PM 04:45 PM 0 0 0 0 0 64 0 0 0 0 0 0 0 48 0 0 112 04:45 PM 05:00 PM 0 0 0 0 0 59 0 0 0 0 0 0 0 44 0 0 103 437 05:00 PM 05:15 PM 0 0 0 0 0 81 0 0 0 0 0 0 0 59 0 0 140 469 05:15 PM 05:30 PM 0 0 0 0 0 112 0 0 0 0 0 0 0 55 0 0 167 522 05:30 PM 05:45 PM 0 0 0 0 0 60 0 0 0 0 0 0 0 66 0 0 126 536 05:45 PM 06:00 PM 0 0 0 0 0 54 0 0 0 0 0 0 0 67 0 0 121 554 N/A Southbound North Leg 0 0 East Leg Westbound Total Volume:Right Thru Left Total Volume: 0 0 0 0 554 0 Right 307 307 Thru 307 0 Left University Blv. Eastbound Left 0 247 Thru 247 247 Right 0 West Leg 0 0 0 South Leg Total Volume:Left Thru Right Total Volume: 554 0 0 0 Northbound OPTIONAL ADJUSTED PEAK HOUR TRAFFIC VOLUMES Adjustment Factors Southbound Westbound Northbound Eastbound Monthly:1.00 Left Thru Right Left Thru Right Left Thru Right Left Thru Right Daily:1.00 0 0 0 0 307 0 0 0 0 0 247 0 Interval:1.00 0 307 0 247 Count:1.00 Trucks:0%Trucks:0%Trucks:0%Trucks:0% Total:1 Peak Hour:Peak Vol:554 PHF:0.83 Time Interval 05:00 PM to Rexburg Completed By: CM Updated January 31, 2017 For Use with Jamar PetraPro Software Thursday, February 16, 2017 6:00 PM 04:00 PM feet meters 2000 700 Total In Out Total In Out Total In Out 6.65 50%50%0.51 20%80%0.62 65%35% Dwelling Units 484 3,219 1,609 1,609 247 49 197 300 195 105 3,219 1,609 1,609 247 49 197 300 195 105 ITE Trip Generation 9th Edition Total New Trips Eden Apartments Variable Quantity Daily AM Peak Hour PM Peak Hour Apartments (ITE 220) Version 4.00-00 Generated with Intersection Analysis Summary 2/22/2017Report File: \...\2023 AM + Project + Mitigations(1).pdf Scenario 9: 2023 AM + Project MitigationsVistro File: \...\Eden Apartments.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. A9.70.092EB LeftHCM 2010Two-way stopAccess Road & 5th West4 C15.20.124SB LeftHCM 2010Two-way stopUniversity Blvd & New Access3 C19.70.158SB LeftHCM 2010Two-way stop7th South & 5th West2 C17.10.049NB LeftHCM 2010Two-way stopUniversity Blvd & 5th West1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Version 4.00-00 Generated with 0.049Volume to Capacity (v/c): CLevel Of Service: 17.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 1: University Blvd & 5th West Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 001101000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 52186113352485101961316Total Analysis Volume [veh/h] 155238462135234Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 52186113352485101961316Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 314054726512011Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.101.101.101.101.001.001.001.001.101.001.10Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 21855526222795751214Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with CIntersection LOS 2.84d_I, Intersection Delay [s/veh] AABCApproach LOS 0.210.5011.9315.27d_A, Approach Delay [s/veh] 0.000.000.370.000.001.3616.3116.3116.317.447.447.4495th-Percentile Queue Length [ft] 0.000.000.010.000.000.050.650.650.650.300.300.3095th-Percentile Queue Length [veh] AAAAAABCCBCCMovement LOS 0.000.007.980.000.007.7210.6415.4415.8711.0215.0317.06d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.020.100.030.050.010.030.05V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Version 4.00-00 Generated with 0.158Volume to Capacity (v/c): CLevel Of Service: 19.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 2: 7th South & 5th West Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00400.00100.00100.00400.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 001001001001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 101942819413297917461266135Total Analysis Volume [veh/h] 3497510372041232159Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 101942819413297917461266135Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 005200050303010Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.101.101.001.001.101.101.101.001.101.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 9176231737526721242963125Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with CIntersection LOS 5.57d_I, Intersection Delay [s/veh] AABCApproach LOS 1.000.4813.7815.66d_A, Approach Delay [s/veh] 0.000.001.920.000.001.6311.8211.8213.8538.3838.389.6395th-Percentile Queue Length [ft] 0.000.000.080.000.000.070.470.470.551.541.540.3995th-Percentile Queue Length [veh] AAAAAAACCBCCMovement LOS 0.000.008.280.000.007.699.6716.8819.7013.0519.4918.35d_M, Delay for Movement [s/veh] 0.000.000.020.000.000.020.080.050.160.160.190.11V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Version 4.00-00 Generated with 0.124Volume to Capacity (v/c): CLevel Of Service: 15.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 3: University Blvd & New Access Intersection Level Of Service Report YesYesYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 15311313155352Total Analysis Volume [veh/h] 4787841313Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 15311313155352Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 1562155352Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.101.101.101.101.101.10Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0277283000Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with CIntersection LOS 2.01d_I, Intersection Delay [s/veh] AABApproach LOS 0.000.3613.40d_A, Approach Delay [s/veh] 0.000.0026.9126.9118.1518.1595th-Percentile Queue Length [ft] 0.000.001.081.080.730.7395th-Percentile Queue Length [veh] AAAABCMovement LOS 0.000.000.007.9511.6315.21d_M, Delay for Movement [s/veh] 0.000.000.000.010.070.12V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Version 4.00-00 Generated with 0.092Volume to Capacity (v/c): ALevel Of Service: 9.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 4: Access Road & 5th West Intersection Level Of Service Report YesYesYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 338017523610Total Analysis Volume [veh/h] 82041393Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 338017523610Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 237012006Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1010552364Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with AIntersection LOS 5.04d_I, Intersection Delay [s/veh] AAAApproach LOS 9.530.001.60d_A, Approach Delay [s/veh] 10.6110.610.000.002.322.3295th-Percentile Queue Length [ft] 0.420.420.000.000.090.0995th-Percentile Queue Length [veh] AAAAAAMovement LOS 9.159.680.000.000.007.37d_M, Delay for Movement [s/veh] 0.030.090.000.000.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Version 4.00-00 Generated with Turning Movement Volume: Summary 2/22/2017Report File: \...\2023 AM + Project + Mitigations(1).pdf Scenario 9: 2023 AM + Project MitigationsVistro File: \...\Eden Apartments.vistro 228 Total Volume 33 Right 80 Left Eastbound 17 Right 52 Thru Southbound 36 Thru 10 Left Northbound Access Road & 5th West4 Intersection NameID 759 Total Volume 15 Right 311 Thru Westbound 313 Thru 15 Left Eastbound 53 Right 52 Left Southbound University Blvd & New Access3 Intersection NameID 1057 Total Volume 10 Right 194 Thru 28 Left Westbound 19 Right 413 Thru 29 Left Eastbound 79 Right 17 Thru 46 Left Southbound 126 Right 61 Thru 35 Left Northbound 7th South & 5th West2 Intersection NameID 748 Total Volume 5 Right 218 Thru 6 Left Westbound 11 Right 335 Thru 24 Left Eastbound 85 Right 10 Thru 19 Left Southbound 6 Right 13 Thru 16 Left Northbound University Blvd & 5th West1 Intersection NameID Version 4.00-00 Generated with Turning Movement Volume: Detail 2/22/2017Report File: \...\2023 AM + Project + Mitigations(1).pdf Scenario 9: 2023 AM + Project MitigationsVistro File: \...\Eden Apartments.vistro 228 0 111 0 - 117 Total Volume 33 0 23 0 1.00 10 Right 80 0 70 0 1.00 10 Left Eastbound 17 0 12 0 1.00 5 Right 52 0 0 0 1.00 52 Thru Southbound 36 0 0 0 1.00 36 Thru 10 0 6 0 1.00 4 Left Northbound Future Total Other Net New Trips In Process Growth Rate Final Base Access Road & 5th West4 Volume TypeIntersection NameID 759 0 143 0 - 560 Total Volume 15 0 15 0 1.10 0 Right 311 0 6 0 1.10 277 Thru Westbound 313 0 2 0 1.10 283 Thru 15 0 15 0 1.10 0 Left Eastbound 53 0 53 0 1.10 0 Right 52 0 52 0 1.10 0 Left Southbound Future Total Other Net New Trips In Process Growth Rate Final Base University Blvd & New Access3 Volume TypeIntersection NameID 1057 0 82 0 - 904 Total Volume 10 0 0 0 1.10 9 Right 194 0 0 0 1.10 176 Thru 28 0 5 0 1.00 23 Left Westbound 19 0 2 0 1.00 17 Right 413 0 0 0 1.10 375 Thru 29 0 0 0 1.10 26 Left Eastbound 79 0 0 0 1.10 72 Right 17 0 5 0 1.00 12 Thru 46 0 0 0 1.10 42 Left Southbound 126 0 30 0 1.00 96 Right 61 0 30 0 1.00 31 Thru 35 0 10 0 1.00 25 Left Northbound Future Total Other Net New Trips In Process Growth Rate Final Base 7th South & 5thWest2 Volume TypeIntersection NameID 748 0 96 0 - 603 Total Volume 5 0 3 0 1.00 2 Right 218 0 14 0 1.10 185 Thru 6 0 0 0 1.10 5 Left Westbound 11 0 5 0 1.10 5 Right 335 0 47 0 1.10 262 Thru 24 0 2 0 1.00 22 Left Eastbound 85 0 6 0 1.00 79 Right 10 0 5 0 1.00 5 Thru 19 0 12 0 1.00 7 Left Southbound 6 0 0 0 1.10 5 Right 13 0 1 0 1.00 12 Thru 16 0 1 0 1.10 14 Left Northbound Future Total Other Net New Trips In Process Growth Rate Final Base University Blvd & 5th West1 Volume TypeIntersection NameID Version 4.00-00 Generated with Signal Warrants Report For Intersection 1: University Blvd & 5th West 1143537022924 1093435522023 1073334821522 912829618321 872728117420 782425215619 722223314418 682122213717 551717811016 511616710315 511616710314 49151599813 44141448912 41131338211 41131338210 4012130809 23774468 13441257 11437236 511595 311174 311173 21752 21751 NSWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph S, NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach NoNoTotal Volume Condition Met 44Number of Approaches on Intersection 748748Total Entering Volume on All Approaches During Same Hour YesNoHigh Minor Volume Condition Met 11435Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:220:08VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 11Number of Lanes on Minor Street Approach 11.915.3Total Stopped Delay Per Vehicle on Minor Approach (s) NSOrientation Warrant 3 Condition A 0030005300Hours Met NoNoYesNoNoNoYesYesNoNo1492599524 NoNoYesNoNoNoYesYesNoNo1432575523 NoNoYesNoNoNoYesYesNoNo1402563522 NoNoNoNoNoNoYesNoNoNo1192479521 NoNoNoNoNoNoYesNoNoNo1142455520 NoNoNoNoNoNoNoNoNoNo1022408519 NoNoNoNoNoNoNoNoNoNo942377518 NoNoNoNoNoNoNoNoNoNo892359517 NoNoNoNoNoNoNoNoNoNo722288516 NoNoNoNoNoNoNoNoNoNo672270515 NoNoNoNoNoNoNoNoNoNo672270514 NoNoNoNoNoNoNoNoNoNo642257513 NoNoNoNoNoNoNoNoNoNo582233512 NoNoNoNoNoNoNoNoNoNo542215511 NoNoNoNoNoNoNoNoNoNo542215510 NoNoNoNoNoNoNoNoNoNo52221059 NoNoNoNoNoNoNoNoNoNo30212058 NoNoNoNoNoNoNoNoNoNo1726657 NoNoNoNoNoNoNoNoNoNo1526056 NoNoNoNoNoNoNoNoNoNo622455 NoNoNoNoNoNoNoNoNoNo421854 NoNoNoNoNoNoNoNoNoNo421853 NoNoNoNoNoNoNoNoNoNo321252 NoNoNoNoNoNoNoNoNoNo321251 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Signal Warrants Report For Intersection 2: 7th South & 5th West 439524 439523 7414722 7414721 9618920 2214462319 2416512618 4428924617 78501618116 80511668415 80511668414 87551809013 956119810012 1006420710411 1006420710410 107682211119 133852771398 140892901467 151973131586 1691083501765 1781143691864 2091334332183 2131364432232 2221424612321 SNWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph N, SMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 10571057Total Entering Volume on All Approaches During Same Hour YesNoHigh Minor Volume Condition Met 222142Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:570:32VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 22Number of Lanes on Minor Street Approach 15.713.8Total Stopped Delay Per Vehicle on Minor Approach (s) SNOrientation Warrant 3 Condition A 0253008753Hours Met NoNoNoNoNoNoNoNoNoNo7414624 NoNoNoNoNoNoNoNoNoNo7414623 NoNoNoNoNoNoNoNoNoNo11421622 NoNoNoNoNoNoNoNoNoNo11421621 NoNoNoNoNoNoNoNoNoNo15427620 NoNoNoNoNoNoNoNoNoNo36469619 NoNoNoNoNoNoNoNoNoNo40477618 NoNoNoNoNoNoNoNoNoNo724138617 NoNoNoNoNoNoNoNoNoNo1284242616 NoNoNoNoNoNoNoNoNoNo1314250615 NoNoNoNoNoNoNoNoNoNo1314250614 NoNoNoNoNoNoNoNoNoNo1424270613 NoNoNoNoNoNoNoNoNoNo1564298612 NoNoNoNoNoNoNoNoNoNo1644311611 NoNoNoNoNoNoNoNoNoNo1644311610 NoNoNoNoNoNoNoNoNoNo175433269 NoNoNoNoNoNoYesNoNoNo218441668 NoNoNoNoNoNoYesYesNoNo229443667 NoNoNoNoNoNoYesYesNoNo248447166 NoNoYesNoNoNoYesYesYesNo277452665 NoNoYesNoNoNoYesYesYesNo292455564 NoNoYesYesNoNoYesYesYesYes342465163 NoYesYesYesNoNoYesYesYesYes349466662 NoYesYesYesNoNoYesYesYesYes364469361 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Signal Warrants Report For Intersection 3: University Blvd & New Access 27724 27723 3101022 3101021 4131320 11333319 12363618 21666517 3711511416 3811811715 3811811714 4112812713 4514114012 4714814711 4714814710 501571569 631971968 662072057 712232226 802492485 842622614 993083063 1013153132 1053283261 NWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 759Total Entering Volume on All Approaches During Same Hour YesHigh Minor Volume Condition Met 105Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:23VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 13.4Total Stopped Delay Per Vehicle on Minor Approach (s) NOrientation Warrant 3 Condition A 0041004100Hours Met NoNoNoNoNoNoNoNoNoNo2114224 NoNoNoNoNoNoNoNoNoNo2114223 NoNoNoNoNoNoNoNoNoNo3120222 NoNoNoNoNoNoNoNoNoNo3120221 NoNoNoNoNoNoNoNoNoNo4126220 NoNoNoNoNoNoNoNoNoNo11166219 NoNoNoNoNoNoNoNoNoNo12172218 NoNoNoNoNoNoNoNoNoNo211131217 NoNoNoNoNoNoNoNoNoNo371229216 NoNoNoNoNoNoNoNoNoNo381235215 NoNoNoNoNoNoNoNoNoNo381235214 NoNoNoNoNoNoNoNoNoNo411255213 NoNoNoNoNoNoNoNoNoNo451281212 NoNoNoNoNoNoNoNoNoNo471295211 NoNoNoNoNoNoNoNoNoNo471295210 NoNoNoNoNoNoNoNoNoNo50131329 NoNoNoNoNoNoNoNoNoNo63139328 NoNoNoNoNoNoNoNoNoNo66141227 NoNoNoNoNoNoNoNoNoNo71144526 NoNoNoNoNoNoNoNoNoNo80149725 NoNoYesNoNoNoYesNoNoNo84152324 NoNoYesNoNoNoYesNoNoNo99161423 NoNoYesNoNoNoYesNoNoNo101162822 NoNoYesYesNoNoYesYesNoNo105165421 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Signal Warrants Report For Intersection 4: Access Road & 5th West 21124 21123 32122 32121 53220 117519 128518 2314917 40241616 41251715 41251714 44271813 49302012 51312111 51312110 5433229 6841288 7143297 7747316 8652355 9055374 10665433 10866442 11369461 WNS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph WMinor Approaches S, NMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach NoTotal Volume Condition Met 3Number of Approaches on Intersection 228Total Entering Volume on All Approaches During Same Hour YesHigh Minor Volume Condition Met 113Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:17VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 9.5Total Stopped Delay Per Vehicle on Minor Approach (s) WOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo212224 NoNoNoNoNoNoNoNoNoNo212223 NoNoNoNoNoNoNoNoNoNo313222 NoNoNoNoNoNoNoNoNoNo313221 NoNoNoNoNoNoNoNoNoNo515220 NoNoNoNoNoNoNoNoNoNo11112219 NoNoNoNoNoNoNoNoNoNo12113218 NoNoNoNoNoNoNoNoNoNo23123217 NoNoNoNoNoNoNoNoNoNo40140216 NoNoNoNoNoNoNoNoNoNo41142215 NoNoNoNoNoNoNoNoNoNo41142214 NoNoNoNoNoNoNoNoNoNo44145213 NoNoNoNoNoNoNoNoNoNo49150212 NoNoNoNoNoNoNoNoNoNo51152211 NoNoNoNoNoNoNoNoNoNo51152210 NoNoNoNoNoNoNoNoNoNo5415529 NoNoNoNoNoNoNoNoNoNo6816928 NoNoNoNoNoNoNoNoNoNo7117227 NoNoNoNoNoNoNoNoNoNo7717826 NoNoNoNoNoNoNoNoNoNo8618725 NoNoNoNoNoNoNoNoNoNo9019224 NoNoNoNoNoNoNoNoNoNo106110823 NoNoNoNoNoNoNoNoNoNo108111022 NoNoNoNoNoNoNoNoNoNo113111521 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Trip Generation summary 2/22/2017Report File: \...\2023 AM + Project + Mitigations(1).pdf Scenario 9: 2023 AM + Project MitigationsVistro File: \...\Eden Apartments.vistro 100.0024719849Added Trips Total 100.002471984980.0020.00247.0001.000ITE 2207: Apartments % of Total Trips Total TripsTrips OutTrips In% Out% InQuantityRateInd. Var.CodeLand Use variablesZone ID: Name Added Trips Version 4.00-00 Generated with Trip Distribution summary 2/22/2017Report File: \...\2023 AM + Project + Mitigations(1).pdf Scenario 9: 2023 AM + Project MitigationsVistro File: \...\Eden Apartments.vistro 198100.0048100.00Total 105.0025.006: Gate 3015.00510.005: Gate 3015.00510.004: Gate 5930.001735.003: Gate 105.0025.002: Gate 5930.001735.001: Gate TripsShare %TripsShare %Zone / Gate From Apartments:To Apartments: Zone 7: Apartments Version 4.00-00 Generated with Study Intersections Version 4.00-00 Generated with Lane Configuration and Traffic Control Version 4.00-00 Generated with Traffic Volume - Base Volume Version 4.00-00 Generated with Traffic Volume - In-Process Volume Version 4.00-00 Generated with Traffic Volume - Net New Site Trips Version 4.00-00 Generated with Traffic Volume - Other Volume Version 4.00-00 Generated with Traffic Volume - Future Total Volume Version 4.00-00 Generated with Traffic Conditions Version 4.00-00 Generated with Intersection Analysis Summary 2/22/2017Report File: \...\2023 AM + Project.pdf Scenario 7: 2023 AM + ProjectVistro File: \...\Eden Apartments.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. A9.70.092EB LeftHCM 2010Two-way stopAccess Road & 5th West4 C15.20.124SB LeftHCM 2010Two-way stopUniversity Blvd & New Access3 C23.10.115NB LeftHCM 2010Two-way stop7th South & 5th West2 C17.10.049NB LeftHCM 2010Two-way stopUniversity Blvd & 5th West1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Version 4.00-00 Generated with 0.049Volume to Capacity (v/c): CLevel Of Service: 17.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 1: University Blvd & 5th West Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 001101000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 52186113352485101961316Total Analysis Volume [veh/h] 155238462135234Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 52186113352485101961316Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 314054726512011Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.101.101.101.101.001.001.001.001.101.001.10Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 21855526222795751214Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with CIntersection LOS 2.84d_I, Intersection Delay [s/veh] AABCApproach LOS 0.210.5011.9315.27d_A, Approach Delay [s/veh] 0.000.000.370.000.001.3616.3116.3116.317.447.447.4495th-Percentile Queue Length [ft] 0.000.000.010.000.000.050.650.650.650.300.300.3095th-Percentile Queue Length [veh] AAAAAABCCBCCMovement LOS 0.000.007.980.000.007.7210.6415.4415.8711.0215.0317.06d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.020.100.030.050.010.030.05V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Version 4.00-00 Generated with 0.115Volume to Capacity (v/c): CLevel Of Service: 23.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 2: 7th South & 5th West Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00400.00100.00100.00400.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 001001000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 101942819413297917461266135Total Analysis Volume [veh/h] 3497510372041232159Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 101942819413297917461266135Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 005200050303010Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.101.101.001.001.101.101.101.001.101.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 9176231737526721242963125Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with CIntersection LOS 6.46d_I, Intersection Delay [s/veh] AACCApproach LOS 1.000.4815.5918.72d_A, Approach Delay [s/veh] 0.000.001.920.000.001.6330.5330.5330.5359.7759.7759.7795th-Percentile Queue Length [ft] 0.000.000.080.000.000.071.221.221.222.392.392.3995th-Percentile Queue Length [veh] AAAAAABCCCCCMovement LOS 0.000.008.280.000.007.6911.9619.1720.4915.8022.2423.06d_M, Delay for Movement [s/veh] 0.000.000.020.000.000.020.080.050.160.160.190.11V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Version 4.00-00 Generated with 0.124Volume to Capacity (v/c): CLevel Of Service: 15.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 3: University Blvd & New Access Intersection Level Of Service Report YesYesYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 15311313155352Total Analysis Volume [veh/h] 4787841313Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 15311313155352Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 1562155352Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.101.101.101.101.101.10Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0277283000Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with CIntersection LOS 2.01d_I, Intersection Delay [s/veh] AABApproach LOS 0.000.3613.40d_A, Approach Delay [s/veh] 0.000.0026.9126.9118.1518.1595th-Percentile Queue Length [ft] 0.000.001.081.080.730.7395th-Percentile Queue Length [veh] AAAABCMovement LOS 0.000.000.007.9511.6315.21d_M, Delay for Movement [s/veh] 0.000.000.000.010.070.12V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Version 4.00-00 Generated with 0.092Volume to Capacity (v/c): ALevel Of Service: 9.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 4: Access Road & 5th West Intersection Level Of Service Report YesYesYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 338017523610Total Analysis Volume [veh/h] 82041393Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 338017523610Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 237012006Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1010552364Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with AIntersection LOS 5.04d_I, Intersection Delay [s/veh] AAAApproach LOS 9.530.001.60d_A, Approach Delay [s/veh] 10.6110.610.000.002.322.3295th-Percentile Queue Length [ft] 0.420.420.000.000.090.0995th-Percentile Queue Length [veh] AAAAAAMovement LOS 9.159.680.000.000.007.37d_M, Delay for Movement [s/veh] 0.030.090.000.000.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Version 4.00-00 Generated with Turning Movement Volume: Summary 2/22/2017Report File: \...\2023 AM + Project.pdf Scenario 7: 2023 AM + ProjectVistro File: \...\Eden Apartments.vistro 228 Total Volume 33 Right 80 Left Eastbound 17 Right 52 Thru Southbound 36 Thru 10 Left Northbound Access Road & 5th West4 Intersection NameID 759 Total Volume 15 Right 311 Thru Westbound 313 Thru 15 Left Eastbound 53 Right 52 Left Southbound University Blvd & New Access3 Intersection NameID 1057 Total Volume 10 Right 194 Thru 28 Left Westbound 19 Right 413 Thru 29 Left Eastbound 79 Right 17 Thru 46 Left Southbound 126 Right 61 Thru 35 Left Northbound 7th South & 5th West2 Intersection NameID 748 Total Volume 5 Right 218 Thru 6 Left Westbound 11 Right 335 Thru 24 Left Eastbound 85 Right 10 Thru 19 Left Southbound 6 Right 13 Thru 16 Left Northbound University Blvd & 5th West1 Intersection NameID Version 4.00-00 Generated with Turning Movement Volume: Detail 2/22/2017Report File: \...\2023 AM + Project.pdf Scenario 7: 2023 AM + ProjectVistro File: \...\Eden Apartments.vistro 228 0 111 0 - 117 Total Volume 33 0 23 0 1.00 10 Right 80 0 70 0 1.00 10 Left Eastbound 17 0 12 0 1.00 5 Right 52 0 0 0 1.00 52 Thru Southbound 36 0 0 0 1.00 36 Thru 10 0 6 0 1.00 4 Left Northbound Future Total Other Net New Trips In Process Growth Rate Final Base Access Road & 5th West4 Volume TypeIntersection NameID 759 0 143 0 - 560 Total Volume 15 0 15 0 1.10 0 Right 311 0 6 0 1.10 277 Thru Westbound 313 0 2 0 1.10 283 Thru 15 0 15 0 1.10 0 Left Eastbound 53 0 53 0 1.10 0 Right 52 0 52 0 1.10 0 Left Southbound Future Total Other Net New Trips In Process Growth Rate Final Base University Blvd & New Access3 Volume TypeIntersection NameID 1057 0 82 0 - 904 Total Volume 10 0 0 0 1.10 9 Right 194 0 0 0 1.10 176 Thru 28 0 5 0 1.00 23 Left Westbound 19 0 2 0 1.00 17 Right 413 0 0 0 1.10 375 Thru 29 0 0 0 1.10 26 Left Eastbound 79 0 0 0 1.10 72 Right 17 0 5 0 1.00 12 Thru 46 0 0 0 1.10 42 Left Southbound 126 0 30 0 1.00 96 Right 61 0 30 0 1.00 31 Thru 35 0 10 0 1.00 25 Left Northbound Future Total Other Net New Trips In Process Growth Rate Final Base 7th South & 5thWest2 Volume TypeIntersection NameID 748 0 96 0 - 603 Total Volume 5 0 3 0 1.00 2 Right 218 0 14 0 1.10 185 Thru 6 0 0 0 1.10 5 Left Westbound 11 0 5 0 1.10 5 Right 335 0 47 0 1.10 262 Thru 24 0 2 0 1.00 22 Left Eastbound 85 0 6 0 1.00 79 Right 10 0 5 0 1.00 5 Thru 19 0 12 0 1.00 7 Left Southbound 6 0 0 0 1.10 5 Right 13 0 1 0 1.00 12 Thru 16 0 1 0 1.10 14 Left Northbound Future Total Other Net New Trips In Process Growth Rate Final Base University Blvd & 5th West1 Volume TypeIntersection NameID Version 4.00-00 Generated with Signal Warrants Report For Intersection 1: University Blvd & 5th West 1143537022924 1093435522023 1073334821522 912829618321 872728117420 782425215619 722223314418 682122213717 551717811016 511616710315 511616710314 49151599813 44141448912 41131338211 41131338210 4012130809 23774468 13441257 11437236 511595 311174 311173 21752 21751 NSWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph S, NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach NoNoTotal Volume Condition Met 44Number of Approaches on Intersection 748748Total Entering Volume on All Approaches During Same Hour YesNoHigh Minor Volume Condition Met 11435Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:220:08VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 11Number of Lanes on Minor Street Approach 11.915.3Total Stopped Delay Per Vehicle on Minor Approach (s) NSOrientation Warrant 3 Condition A 0030005300Hours Met NoNoYesNoNoNoYesYesNoNo1492599524 NoNoYesNoNoNoYesYesNoNo1432575523 NoNoYesNoNoNoYesYesNoNo1402563522 NoNoNoNoNoNoYesNoNoNo1192479521 NoNoNoNoNoNoYesNoNoNo1142455520 NoNoNoNoNoNoNoNoNoNo1022408519 NoNoNoNoNoNoNoNoNoNo942377518 NoNoNoNoNoNoNoNoNoNo892359517 NoNoNoNoNoNoNoNoNoNo722288516 NoNoNoNoNoNoNoNoNoNo672270515 NoNoNoNoNoNoNoNoNoNo672270514 NoNoNoNoNoNoNoNoNoNo642257513 NoNoNoNoNoNoNoNoNoNo582233512 NoNoNoNoNoNoNoNoNoNo542215511 NoNoNoNoNoNoNoNoNoNo542215510 NoNoNoNoNoNoNoNoNoNo52221059 NoNoNoNoNoNoNoNoNoNo30212058 NoNoNoNoNoNoNoNoNoNo1726657 NoNoNoNoNoNoNoNoNoNo1526056 NoNoNoNoNoNoNoNoNoNo622455 NoNoNoNoNoNoNoNoNoNo421854 NoNoNoNoNoNoNoNoNoNo421853 NoNoNoNoNoNoNoNoNoNo321252 NoNoNoNoNoNoNoNoNoNo321251 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Signal Warrants Report For Intersection 2: 7th South & 5th West 439524 439523 7414722 7414721 9618920 2214462319 2416512618 4428924617 78501618116 80511668415 80511668414 87551809013 956119810012 1006420710411 1006420710410 107682211119 133852771398 140892901467 151973131586 1691083501765 1781143691864 2091334332183 2131364432232 2221424612321 SNWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph N, SMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 10571057Total Entering Volume on All Approaches During Same Hour YesYesHigh Minor Volume Condition Met 222142Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 1:090:36VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 11Number of Lanes on Minor Street Approach 18.715.6Total Stopped Delay Per Vehicle on Minor Approach (s) SNOrientation Warrant 3 Condition A 0353008753Hours Met NoNoNoNoNoNoNoNoNoNo7214624 NoNoNoNoNoNoNoNoNoNo7214623 NoNoNoNoNoNoNoNoNoNo11221622 NoNoNoNoNoNoNoNoNoNo11221621 NoNoNoNoNoNoNoNoNoNo15227620 NoNoNoNoNoNoNoNoNoNo36269619 NoNoNoNoNoNoNoNoNoNo40277618 NoNoNoNoNoNoNoNoNoNo722138617 NoNoNoNoNoNoNoNoNoNo1282242616 NoNoNoNoNoNoNoNoNoNo1312250615 NoNoNoNoNoNoNoNoNoNo1312250614 NoNoNoNoNoNoNoNoNoNo1422270613 NoNoNoNoNoNoNoNoNoNo1562298612 NoNoNoNoNoNoNoNoNoNo1642311611 NoNoNoNoNoNoNoNoNoNo1642311610 NoNoNoNoNoNoNoNoNoNo175233269 NoNoNoNoNoNoYesNoNoNo218241668 NoNoNoNoNoNoYesYesNoNo229243667 NoNoNoNoNoNoYesYesNoNo248247166 NoNoYesNoNoNoYesYesYesNo277252665 NoNoYesNoNoNoYesYesYesNo292255564 NoYesYesYesNoNoYesYesYesYes342265163 NoYesYesYesNoNoYesYesYesYes349266662 NoYesYesYesNoNoYesYesYesYes364269361 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Signal Warrants Report For Intersection 3: University Blvd & New Access 27724 27723 3101022 3101021 4131320 11333319 12363618 21666517 3711511416 3811811715 3811811714 4112812713 4514114012 4714814711 4714814710 501571569 631971968 662072057 712232226 802492485 842622614 993083063 1013153132 1053283261 NWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 759Total Entering Volume on All Approaches During Same Hour YesHigh Minor Volume Condition Met 105Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:23VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 13.4Total Stopped Delay Per Vehicle on Minor Approach (s) NOrientation Warrant 3 Condition A 0041004100Hours Met NoNoNoNoNoNoNoNoNoNo2114224 NoNoNoNoNoNoNoNoNoNo2114223 NoNoNoNoNoNoNoNoNoNo3120222 NoNoNoNoNoNoNoNoNoNo3120221 NoNoNoNoNoNoNoNoNoNo4126220 NoNoNoNoNoNoNoNoNoNo11166219 NoNoNoNoNoNoNoNoNoNo12172218 NoNoNoNoNoNoNoNoNoNo211131217 NoNoNoNoNoNoNoNoNoNo371229216 NoNoNoNoNoNoNoNoNoNo381235215 NoNoNoNoNoNoNoNoNoNo381235214 NoNoNoNoNoNoNoNoNoNo411255213 NoNoNoNoNoNoNoNoNoNo451281212 NoNoNoNoNoNoNoNoNoNo471295211 NoNoNoNoNoNoNoNoNoNo471295210 NoNoNoNoNoNoNoNoNoNo50131329 NoNoNoNoNoNoNoNoNoNo63139328 NoNoNoNoNoNoNoNoNoNo66141227 NoNoNoNoNoNoNoNoNoNo71144526 NoNoNoNoNoNoNoNoNoNo80149725 NoNoYesNoNoNoYesNoNoNo84152324 NoNoYesNoNoNoYesNoNoNo99161423 NoNoYesNoNoNoYesNoNoNo101162822 NoNoYesYesNoNoYesYesNoNo105165421 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Signal Warrants Report For Intersection 4: Access Road & 5th West 21124 21123 32122 32121 53220 117519 128518 2314917 40241616 41251715 41251714 44271813 49302012 51312111 51312110 5433229 6841288 7143297 7747316 8652355 9055374 10665433 10866442 11369461 WNS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph WMinor Approaches S, NMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach NoTotal Volume Condition Met 3Number of Approaches on Intersection 228Total Entering Volume on All Approaches During Same Hour YesHigh Minor Volume Condition Met 113Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:17VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 9.5Total Stopped Delay Per Vehicle on Minor Approach (s) WOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo212224 NoNoNoNoNoNoNoNoNoNo212223 NoNoNoNoNoNoNoNoNoNo313222 NoNoNoNoNoNoNoNoNoNo313221 NoNoNoNoNoNoNoNoNoNo515220 NoNoNoNoNoNoNoNoNoNo11112219 NoNoNoNoNoNoNoNoNoNo12113218 NoNoNoNoNoNoNoNoNoNo23123217 NoNoNoNoNoNoNoNoNoNo40140216 NoNoNoNoNoNoNoNoNoNo41142215 NoNoNoNoNoNoNoNoNoNo41142214 NoNoNoNoNoNoNoNoNoNo44145213 NoNoNoNoNoNoNoNoNoNo49150212 NoNoNoNoNoNoNoNoNoNo51152211 NoNoNoNoNoNoNoNoNoNo51152210 NoNoNoNoNoNoNoNoNoNo5415529 NoNoNoNoNoNoNoNoNoNo6816928 NoNoNoNoNoNoNoNoNoNo7117227 NoNoNoNoNoNoNoNoNoNo7717826 NoNoNoNoNoNoNoNoNoNo8618725 NoNoNoNoNoNoNoNoNoNo9019224 NoNoNoNoNoNoNoNoNoNo106110823 NoNoNoNoNoNoNoNoNoNo108111022 NoNoNoNoNoNoNoNoNoNo113111521 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Trip Generation summary 2/22/2017Report File: \...\2023 AM + Project.pdf Scenario 7: 2023 AM + ProjectVistro File: \...\Eden Apartments.vistro 100.0024719849Added Trips Total 100.002471984980.0020.00247.0001.000ITE 2207: Apartments % of Total Trips Total TripsTrips OutTrips In% Out% InQuantityRateInd. Var.CodeLand Use variablesZone ID: Name Added Trips Version 4.00-00 Generated with Trip Distribution summary 2/22/2017Report File: \...\2023 AM + Project.pdf Scenario 7: 2023 AM + ProjectVistro File: \...\Eden Apartments.vistro 198100.0048100.00Total 105.0025.006: Gate 3015.00510.005: Gate 3015.00510.004: Gate 5930.001735.003: Gate 105.0025.002: Gate 5930.001735.001: Gate TripsShare %TripsShare %Zone / Gate From Apartments:To Apartments: Zone 7: Apartments Version 4.00-00 Generated with Study Intersections Version 4.00-00 Generated with Lane Configuration and Traffic Control Version 4.00-00 Generated with Traffic Volume - Base Volume Version 4.00-00 Generated with Traffic Volume - In-Process Volume Version 4.00-00 Generated with Traffic Volume - Net New Site Trips Version 4.00-00 Generated with Traffic Volume - Other Volume Version 4.00-00 Generated with Traffic Volume - Future Total Volume Version 4.00-00 Generated with Traffic Conditions Version 4.00-00 Generated with Intersection Analysis Summary 2/22/2017Report File: \...\2023 AM.pdf Scenario 5: 2023 AMVistro File: \...\Eden Apartments.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. A9.10.011EB LeftHCM 2010Two-way stopAccess Road & 5th West4 B12.90.000SB LeftHCM 2010Two-way stopUniversity Blvd & New Access3 C19.20.079NB LeftHCM 2010Two-way stop7th South & 5th West2 C15.40.041NB LeftHCM 2010Two-way stopUniversity Blvd & 5th West1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Version 4.00-00 Generated with 0.041Volume to Capacity (v/c): CLevel Of Service: 15.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 1: University Blvd & 5th West Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 001101000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 22046628822795761215Total Analysis Volume [veh/h] 151227262012234Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 22046628822795761215Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.101.101.101.101.001.001.001.001.101.001.10Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 21855526222795751214Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with CIntersection LOS 2.51d_I, Intersection Delay [s/veh] AABBApproach LOS 0.220.5310.5414.00d_A, Approach Delay [s/veh] 0.000.000.360.000.001.2310.4510.4510.456.166.166.1695th-Percentile Queue Length [ft] 0.000.000.010.000.000.050.420.420.420.250.250.2595th-Percentile Queue Length [veh] AAAAAAABBBBCMovement LOS 0.000.007.850.000.007.689.9914.0414.2710.4813.9915.42d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.020.090.010.020.010.030.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Version 4.00-00 Generated with 0.079Volume to Capacity (v/c): CLevel Of Service: 19.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 2: 7th South & 5th West Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00400.00100.00100.00400.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 001001000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 10194231741329791246963125Total Analysis Volume [veh/h] 349641037203122486Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 10194231741329791246963125Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.101.101.001.001.101.101.101.001.101.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 9176231737526721242963125Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with CIntersection LOS 4.69d_I, Intersection Delay [s/veh] AABBApproach LOS 0.840.4913.9514.81d_A, Approach Delay [s/veh] 0.000.001.560.000.001.6325.0925.0925.0930.3530.3530.3595th-Percentile Queue Length [ft] 0.000.000.060.000.000.071.001.001.001.211.211.2195th-Percentile Queue Length [veh] AAAAAABCCBCCMovement LOS 0.000.008.260.000.007.6911.1218.1117.7212.4218.6519.24d_M, Delay for Movement [s/veh] 0.000.000.020.000.000.020.080.040.130.120.090.08V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Version 4.00-00 Generated with 0.000Volume to Capacity (v/c): BLevel Of Service: 12.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 3: University Blvd & New Access Intersection Level Of Service Report YesYesYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 0305311000Total Analysis Volume [veh/h] 07678000Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 0305311000Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.101.101.101.101.101.10Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0277283000Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with BIntersection LOS 0.00d_I, Intersection Delay [s/veh] AABApproach LOS 0.000.0011.41d_A, Approach Delay [s/veh] 0.000.000.000.000.000.0095th-Percentile Queue Length [ft] 0.000.000.000.000.000.0095th-Percentile Queue Length [veh] AAAAABMovement LOS 0.000.000.007.879.9012.93d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Version 4.00-00 Generated with 0.011Volume to Capacity (v/c): ALevel Of Service: 9.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 4: Access Road & 5th West Intersection Level Of Service Report YesYesYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 1010552364Total Analysis Volume [veh/h] 3311391Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 1010552364Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1010552364Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with AIntersection LOS 1.77d_I, Intersection Delay [s/veh] AAAApproach LOS 8.860.000.73d_A, Approach Delay [s/veh] 1.611.610.000.001.991.9995th-Percentile Queue Length [ft] 0.060.060.000.000.080.0895th-Percentile Queue Length [veh] AAAAAAMovement LOS 8.649.090.000.000.007.33d_M, Delay for Movement [s/veh] 0.010.010.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Version 4.00-00 Generated with Turning Movement Volume: Summary 2/22/2017Report File: \...\2023 AM.pdf Scenario 5: 2023 AMVistro File: \...\Eden Apartments.vistro 117 Total Volume 10 Right 10 Left Eastbound 5 Right 52 Thru Southbound 36 Thru 4 Left Northbound Access Road & 5th West4 Intersection NameID 616 Total Volume 0 Right 305 Thru Westbound 311 Thru 0 Left Eastbound 0 Right 0 Left Southbound University Blvd & New Access3 Intersection NameID 975 Total Volume 10 Right 194 Thru 23 Left Westbound 17 Right 413 Thru 29 Left Eastbound 79 Right 12 Thru 46 Left Southbound 96 Right 31 Thru 25 Left Northbound 7th South & 5th West2 Intersection NameID 652 Total Volume 2 Right 204 Thru 6 Left Westbound 6 Right 288 Thru 22 Left Eastbound 79 Right 5 Thru 7 Left Southbound 6 Right 12 Thru 15 Left Northbound University Blvd & 5th West1 Intersection NameID Version 4.00-00 Generated with Turning Movement Volume: Detail 2/22/2017Report File: \...\2023 AM.pdf Scenario 5: 2023 AMVistro File: \...\Eden Apartments.vistro 117 0 0 0 - 117 Total Volume 10 0 0 0 1.00 10 Right 10 0 0 0 1.00 10 Left Eastbound 5 0 0 0 1.00 5 Right 52 0 0 0 1.00 52 Thru Southbound 36 0 0 0 1.00 36 Thru 4 0 0 0 1.00 4 Left Northbound Future Total Other Net New Trips In Process Growth Rate Final Base Access Road & 5th West4 Volume TypeIntersection NameID 616 0 0 0 - 560 Total Volume 0 0 0 0 1.10 0 Right 305 0 0 0 1.10 277 Thru Westbound 311 0 0 0 1.10 283 Thru 0 0 0 0 1.10 0 Left Eastbound 0 0 0 0 1.10 0 Right 0 0 0 0 1.10 0 Left Southbound Future Total Other Net New Trips In Process Growth Rate Final Base University Blvd & New Access3 Volume TypeIntersection NameID 975 0 0 0 - 904 Total Volume 10 0 0 0 1.10 9 Right 194 0 0 0 1.10 176 Thru 23 0 0 0 1.00 23 Left Westbound 17 0 0 0 1.00 17 Right 413 0 0 0 1.10 375 Thru 29 0 0 0 1.10 26 Left Eastbound 79 0 0 0 1.10 72 Right 12 0 0 0 1.00 12 Thru 46 0 0 0 1.10 42 Left Southbound 96 0 0 0 1.00 96 Right 31 0 0 0 1.00 31 Thru 25 0 0 0 1.00 25 Left Northbound Future Total Other Net New Trips In Process Growth Rate Final Base 7th South & 5thWest2 Volume TypeIntersection NameID 652 0 0 0 - 603 Total Volume 2 0 0 0 1.00 2 Right 204 0 0 0 1.10 185 Thru 6 0 0 0 1.10 5 Left Westbound 6 0 0 0 1.10 5 Right 288 0 0 0 1.10 262 Thru 22 0 0 0 1.00 22 Left Eastbound 79 0 0 0 1.00 79 Right 5 0 0 0 1.00 5 Thru 7 0 0 0 1.00 7 Left Southbound 6 0 0 0 1.10 5 Right 12 0 0 0 1.00 12 Thru 15 0 0 0 1.10 14 Left Northbound Future Total Other Net New Trips In Process Growth Rate Final Base University Blvd & 5th West1 Volume TypeIntersection NameID Version 4.00-00 Generated with Signal Warrants Report For Intersection 1: University Blvd & 5th West 913331621224 873230320423 863129719922 732625317021 692524016120 622221514419 572119913418 552019012717 441615210216 41151429515 41151429514 39141369113 35131238312 33121147611 33121147610 3212111749 18763428 10435237 9332216 411385 31964 31963 21642 21641 NSWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph S, NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach NoNoTotal Volume Condition Met 44Number of Approaches on Intersection 652652Total Entering Volume on All Approaches During Same Hour NoNoHigh Minor Volume Condition Met 9133Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:150:07VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 11Number of Lanes on Minor Street Approach 10.514Total Stopped Delay Per Vehicle on Minor Approach (s) NSOrientation Warrant 3 Condition A 0020003000Hours Met NoNoYesNoNoNoYesNoNoNo1242528524 NoNoYesNoNoNoYesNoNoNo1192507523 NoNoNoNoNoNoYesNoNoNo1172496522 NoNoNoNoNoNoNoNoNoNo992423521 NoNoNoNoNoNoNoNoNoNo942401520 NoNoNoNoNoNoNoNoNoNo842359519 NoNoNoNoNoNoNoNoNoNo782333518 NoNoNoNoNoNoNoNoNoNo752317517 NoNoNoNoNoNoNoNoNoNo602254516 NoNoNoNoNoNoNoNoNoNo562237515 NoNoNoNoNoNoNoNoNoNo562237514 NoNoNoNoNoNoNoNoNoNo532227513 NoNoNoNoNoNoNoNoNoNo482206512 NoNoNoNoNoNoNoNoNoNo452190511 NoNoNoNoNoNoNoNoNoNo452190510 NoNoNoNoNoNoNoNoNoNo44218559 NoNoNoNoNoNoNoNoNoNo25210558 NoNoNoNoNoNoNoNoNoNo1425857 NoNoNoNoNoNoNoNoNoNo1225356 NoNoNoNoNoNoNoNoNoNo522155 NoNoNoNoNoNoNoNoNoNo421554 NoNoNoNoNoNoNoNoNoNo421553 NoNoNoNoNoNoNoNoNoNo321052 NoNoNoNoNoNoNoNoNoNo321051 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Signal Warrants Report For Intersection 2: 7th South & 5th West 339524 339523 5414722 5414721 6518920 1514462319 1715502518 3027924517 53481617916 55491658215 55491658214 59531798913 65591979812 686220710211 686220710210 73662201099 91822751368 96862891437 103933121546 1161043491735 1221103671824 1431294312133 1461324412182 1521374592271 SNWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph N, SMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 975975Total Entering Volume on All Approaches During Same Hour YesYesHigh Minor Volume Condition Met 152137Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:370:31VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 11Number of Lanes on Minor Street Approach 14.814Total Stopped Delay Per Vehicle on Minor Approach (s) SNOrientation Warrant 3 Condition A 0153008541Hours Met NoNoNoNoNoNoNoNoNoNo6214624 NoNoNoNoNoNoNoNoNoNo6214623 NoNoNoNoNoNoNoNoNoNo9221622 NoNoNoNoNoNoNoNoNoNo9221621 NoNoNoNoNoNoNoNoNoNo11227620 NoNoNoNoNoNoNoNoNoNo29269619 NoNoNoNoNoNoNoNoNoNo32275618 NoNoNoNoNoNoNoNoNoNo572137617 NoNoNoNoNoNoNoNoNoNo1012240616 NoNoNoNoNoNoNoNoNoNo1042247615 NoNoNoNoNoNoNoNoNoNo1042247614 NoNoNoNoNoNoNoNoNoNo1122268613 NoNoNoNoNoNoNoNoNoNo1242295612 NoNoNoNoNoNoNoNoNoNo1302309611 NoNoNoNoNoNoNoNoNoNo1302309610 NoNoNoNoNoNoNoNoNoNo139232969 NoNoNoNoNoNoYesNoNoNo173241168 NoNoNoNoNoNoYesNoNoNo182243267 NoNoNoNoNoNoYesNoNoNo196246666 NoNoYesNoNoNoYesYesNoNo220252265 NoNoYesNoNoNoYesYesYesNo232254964 NoNoYesYesNoNoYesYesYesNo272264463 NoNoYesYesNoNoYesYesYesNo278265962 NoYesYesYesNoNoYesYesYesYes289268661 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Signal Warrants Report For Intersection 3: University Blvd & New Access 06624 06623 09922 09921 0121220 0313119 0343418 0626117 010910716 011211015 011211014 012111913 013413112 014013711 014013710 01491469 01871838 01961927 02112076 02362325 02492444 02922873 02992932 03113051 NWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach NoTotal Volume Condition Met 3Number of Approaches on Intersection 616Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 0Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:00VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 11.4Total Stopped Delay Per Vehicle on Minor Approach (s) NOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo0112224 NoNoNoNoNoNoNoNoNoNo0112223 NoNoNoNoNoNoNoNoNoNo0118222 NoNoNoNoNoNoNoNoNoNo0118221 NoNoNoNoNoNoNoNoNoNo0124220 NoNoNoNoNoNoNoNoNoNo0162219 NoNoNoNoNoNoNoNoNoNo0168218 NoNoNoNoNoNoNoNoNoNo01123217 NoNoNoNoNoNoNoNoNoNo01216216 NoNoNoNoNoNoNoNoNoNo01222215 NoNoNoNoNoNoNoNoNoNo01222214 NoNoNoNoNoNoNoNoNoNo01240213 NoNoNoNoNoNoNoNoNoNo01265212 NoNoNoNoNoNoNoNoNoNo01277211 NoNoNoNoNoNoNoNoNoNo01277210 NoNoNoNoNoNoNoNoNoNo0129529 NoNoNoNoNoNoNoNoNoNo0137028 NoNoNoNoNoNoNoNoNoNo0138827 NoNoNoNoNoNoNoNoNoNo0141826 NoNoNoNoNoNoNoNoNoNo0146825 NoNoNoNoNoNoNoNoNoNo0149324 NoNoNoNoNoNoNoNoNoNo0157923 NoNoNoNoNoNoNoNoNoNo0159222 NoNoNoNoNoNoNoNoNoNo0161621 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Signal Warrants Report For Intersection 4: Access Road & 5th West 01124 01123 12122 12121 12220 26419 26418 411817 7201416 7211415 7211414 8221613 9251712 9261811 9261810 1027199 1234248 1336257 1439276 1543305 1646324 1954383 1955382 2057401 WNS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph WMinor Approaches S, NMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach NoTotal Volume Condition Met 3Number of Approaches on Intersection 117Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 20Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:02VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 8.9Total Stopped Delay Per Vehicle on Minor Approach (s) WOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo012224 NoNoNoNoNoNoNoNoNoNo012223 NoNoNoNoNoNoNoNoNoNo113222 NoNoNoNoNoNoNoNoNoNo113221 NoNoNoNoNoNoNoNoNoNo114220 NoNoNoNoNoNoNoNoNoNo2110219 NoNoNoNoNoNoNoNoNoNo2110218 NoNoNoNoNoNoNoNoNoNo4119217 NoNoNoNoNoNoNoNoNoNo7134216 NoNoNoNoNoNoNoNoNoNo7135215 NoNoNoNoNoNoNoNoNoNo7135214 NoNoNoNoNoNoNoNoNoNo8138213 NoNoNoNoNoNoNoNoNoNo9142212 NoNoNoNoNoNoNoNoNoNo9144211 NoNoNoNoNoNoNoNoNoNo9144210 NoNoNoNoNoNoNoNoNoNo1014629 NoNoNoNoNoNoNoNoNoNo1215828 NoNoNoNoNoNoNoNoNoNo1316127 NoNoNoNoNoNoNoNoNoNo1416626 NoNoNoNoNoNoNoNoNoNo1517325 NoNoNoNoNoNoNoNoNoNo1617824 NoNoNoNoNoNoNoNoNoNo1919223 NoNoNoNoNoNoNoNoNoNo1919322 NoNoNoNoNoNoNoNoNoNo2019721 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Trip Generation summary 2/22/2017Report File: \...\2023 AM.pdf Scenario 5: 2023 AMVistro File: \...\Eden Apartments.vistro 0.00000Added Trips Total 0.0000050.0050.000.0001.000ITE 2207: Apartment % of Total Trips Total TripsTrips OutTrips In% Out% InQuantityRateInd. Var.CodeLand Use variablesZone ID: Name Added Trips Version 4.00-00 Generated with Trip Distribution summary 2/22/2017Report File: \...\2023 AM.pdf Scenario 5: 2023 AMVistro File: \...\Eden Apartments.vistro 0100.000100.00Total 05.0005.006: Gate 015.00010.005: Gate 015.00010.004: Gate 030.00035.003: Gate 05.0005.002: Gate 030.00035.001: Gate TripsShare %TripsShare %Zone / Gate From Apartment:To Apartment: Zone 7: Apartment Version 4.00-00 Generated with Study Intersections Version 4.00-00 Generated with Lane Configuration and Traffic Control Version 4.00-00 Generated with Traffic Volume - Base Volume Version 4.00-00 Generated with Traffic Volume - In-Process Volume Version 4.00-00 Generated with Traffic Volume - Net New Site Trips Version 4.00-00 Generated with Traffic Volume - Other Volume Version 4.00-00 Generated with Traffic Volume - Future Total Volume Version 4.00-00 Generated with Traffic Conditions Version 4.00-00 Generated with Intersection Analysis Summary 2/22/2017Report File: \...\2023 PM + Project + Mitigations.pdf Scenario 10: 2023 PM+ Project MitigationsVistro File: \...\Eden Apartments.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. B10.30.070EB LeftHCM 2010Two-way stopAccess Road & 5th West4 C16.50.078SB LeftHCM 2010Two-way stopUniversity Blvd & New Access3 D29.10.149SB LeftHCM 2010Two-way stop7th South & 5th West2 C19.30.033NB LeftHCM 2010Two-way stopUniversity Blvd & 5th West1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Version 4.00-00 Generated with 0.033Volume to Capacity (v/c): CLevel Of Service: 19.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 1: University Blvd & 5th West Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 001101000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 1934195216814113104169Total Analysis Volume [veh/h] 5852154201033142Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 1934195216814113104169Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 145403257336055Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.101.101.101.101.001.001.001.001.101.001.10Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 52618217474381044114Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with CIntersection LOS 2.77d_I, Intersection Delay [s/veh] AABCApproach LOS 0.192.2013.7617.15d_A, Approach Delay [s/veh] 0.000.000.500.000.005.4311.5811.5811.587.297.297.2995th-Percentile Queue Length [ft] 0.000.000.020.000.000.220.460.460.460.290.290.2995th-Percentile Queue Length [veh] AAAAAABCCBCCMovement LOS 0.000.007.690.000.008.2211.3717.6318.5210.4517.6019.33d_M, Delay for Movement [s/veh] 0.000.000.010.000.000.070.060.040.030.000.050.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Version 4.00-00 Generated with 0.149Volume to Capacity (v/c): DLevel Of Service: 29.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 2: 7th South & 5th West Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00400.00100.00100.00400.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 001001001001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 463221283823941746126855321Total Analysis Volume [veh/h] 1281321060101915721135Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 463221283823941746126855321Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 00201000020016165Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.101.101.001.001.101.101.101.001.101.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 422931082821737674124693716Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with DIntersection LOS 7.00d_I, Intersection Delay [s/veh] AACCApproach LOS 2.091.0521.6319.36d_A, Approach Delay [s/veh] 0.000.008.290.000.002.6840.7640.7612.7436.4536.459.5695th-Percentile Queue Length [ft] 0.000.000.330.000.000.111.631.630.511.461.460.3895th-Percentile Queue Length [veh] AAAAAABDDBDDMovement LOS 0.000.008.120.000.008.1414.8326.7029.1213.4525.7027.24d_M, Delay for Movement [s/veh] 0.000.000.100.000.000.030.090.280.150.100.240.11V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Version 4.00-00 Generated with 0.078Volume to Capacity (v/c): CLevel Of Service: 16.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 3: University Blvd & New Access Intersection Level Of Service Report YesYesYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 59341279612927Total Analysis Volume [veh/h] 1585701577Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 59341279612927Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 5937612927Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.101.101.101.101.101.10Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0307247000Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with CIntersection LOS 1.61d_I, Intersection Delay [s/veh] AABApproach LOS 0.001.4913.87d_A, Approach Delay [s/veh] 0.000.0030.7830.7810.2610.2695th-Percentile Queue Length [ft] 0.000.001.231.230.410.4195th-Percentile Queue Length [veh] AAAABCMovement LOS 0.000.000.008.2811.4016.51d_M, Delay for Movement [s/veh] 0.000.000.000.050.040.08V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Version 4.00-00 Generated with 0.070Volume to Capacity (v/c): BLevel Of Service: 10.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 4: Access Road & 5th West Intersection Level Of Service Report YesYesYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 245260409033Total Analysis Volume [veh/h] 6131510238Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 245260409033Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 1237500025Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 12151040908Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with BIntersection LOS 3.34d_I, Intersection Delay [s/veh] AAAApproach LOS 9.920.002.00d_A, Approach Delay [s/veh] 7.767.760.000.006.726.7295th-Percentile Queue Length [ft] 0.310.310.000.000.270.2795th-Percentile Queue Length [veh] ABAAAAMovement LOS 9.0910.300.000.000.007.47d_M, Delay for Movement [s/veh] 0.020.070.000.000.000.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Version 4.00-00 Generated with Turning Movement Volume: Summary 2/22/2017Report File: \...\2023 PM + Project + Mitigations.pdf Scenario 10: 2023 PM+ Project MitigationsVistro File: \...\Eden Apartments.vistro 299 Total Volume 24 Right 52 Left Eastbound 60 Right 40 Thru Southbound 90 Thru 33 Left Northbound Access Road & 5th West4 Intersection NameID 796 Total Volume 59 Right 341 Thru Westbound 279 Thru 61 Left Eastbound 29 Right 27 Left Southbound University Blvd & New Access3 Intersection NameID 1134 Total Volume 46 Right 322 Thru 128 Left Westbound 38 Right 239 Thru 41 Left Eastbound 74 Right 61 Thru 26 Left Southbound 85 Right 53 Thru 21 Left Northbound 7th South & 5th West2 Intersection NameID 764 Total Volume 19 Right 341 Thru 9 Left Westbound 5 Right 216 Thru 81 Left Eastbound 41 Right 13 Thru 10 Left Southbound 4 Right 16 Thru 9 Left Northbound University Blvd & 5th West1 Intersection NameID Version 4.00-00 Generated with Turning Movement Volume: Detail 2/22/2017Report File: \...\2023 PM + Project + Mitigations.pdf Scenario 10: 2023 PM+ Project MitigationsVistro File: \...\Eden Apartments.vistro 299 0 124 0 - 175 Total Volume 24 0 12 0 1.00 12 Right 52 0 37 0 1.00 15 Left Eastbound 60 0 50 0 1.00 10 Right 40 0 0 0 1.00 40 Thru Southbound 90 0 0 0 1.00 90 Thru 33 0 25 0 1.00 8 Left Northbound Future Total Other Net New Trips In Process Growth Rate Final Base Access Road & 5th West4 Volume TypeIntersection NameID 796 0 186 0 - 554 Total Volume 59 0 59 0 1.10 0 Right 341 0 3 0 1.10 307 Thru Westbound 279 0 7 0 1.10 247 Thru 61 0 61 0 1.10 0 Left Eastbound 29 0 29 0 1.10 0 Right 27 0 27 0 1.10 0 Left Southbound Future Total Other Net New Trips In Process Growth Rate Final Base University Blvd & New Access3 Volume TypeIntersection NameID 1134 0 87 0 - 979 Total Volume 46 0 0 0 1.10 42 Right 322 0 0 0 1.10 293 Thru 128 0 20 0 1.00 108 Left Westbound 38 0 10 0 1.00 28 Right 239 0 0 0 1.10 217 Thru 41 0 0 0 1.10 37 Left Eastbound 74 0 0 0 1.10 67 Right 61 0 20 0 1.00 41 Thru 26 0 0 0 1.10 24 Left Southbound 85 0 16 0 1.00 69 Right 53 0 16 0 1.00 37 Thru 21 0 5 0 1.00 16 Left Northbound Future Total Other Net New Trips In Process Growth Rate Final Base 7th South & 5thWest2 Volume TypeIntersection NameID 764 0 125 0 - 595 Total Volume 19 0 14 0 1.00 5 Right 341 0 54 0 1.10 261 Thru 9 0 0 0 1.10 8 Left Westbound 5 0 3 0 1.10 2 Right 216 0 25 0 1.10 174 Thru 81 0 7 0 1.00 74 Left Eastbound 41 0 3 0 1.00 38 Right 13 0 3 0 1.00 10 Thru 10 0 6 0 1.00 4 Left Southbound 4 0 0 0 1.10 4 Right 16 0 5 0 1.00 11 Thru 9 0 5 0 1.10 4 Left Northbound Future Total Other Net New Trips In Process Growth Rate Final Base University Blvd & 5th West1 Volume TypeIntersection NameID Version 4.00-00 Generated with Signal Warrants Report For Intersection 1: University Blvd & 5th West 642930236924 612829035423 602728434722 512324229521 492223028020 442020525119 401819023218 381718122117 311414517716 291313616615 291313616614 281213015913 251111814412 231010913311 231010913310 22101061299 13660748 7333417 6330376 3112155 219114 219113 11672 11671 NSWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph S, NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach NoNoTotal Volume Condition Met 44Number of Approaches on Intersection 764764Total Entering Volume on All Approaches During Same Hour NoNoHigh Minor Volume Condition Met 6429Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:140:08VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 11Number of Lanes on Minor Street Approach 13.817.2Total Stopped Delay Per Vehicle on Minor Approach (s) NSOrientation Warrant 3 Condition A 0053000000Hours Met NoNoYesYesNoNoNoNoNoNo932671524 NoNoYesYesNoNoNoNoNoNo892644523 NoNoYesYesNoNoNoNoNoNo872631522 NoNoYesNoNoNoNoNoNoNo742537521 NoNoYesNoNoNoNoNoNoNo712510520 NoNoNoNoNoNoNoNoNoNo642456519 NoNoNoNoNoNoNoNoNoNo582422518 NoNoNoNoNoNoNoNoNoNo552402517 NoNoNoNoNoNoNoNoNoNo452322516 NoNoNoNoNoNoNoNoNoNo422302515 NoNoNoNoNoNoNoNoNoNo422302514 NoNoNoNoNoNoNoNoNoNo402289513 NoNoNoNoNoNoNoNoNoNo362262512 NoNoNoNoNoNoNoNoNoNo332242511 NoNoNoNoNoNoNoNoNoNo332242510 NoNoNoNoNoNoNoNoNoNo32223559 NoNoNoNoNoNoNoNoNoNo19213458 NoNoNoNoNoNoNoNoNoNo1027457 NoNoNoNoNoNoNoNoNoNo926756 NoNoNoNoNoNoNoNoNoNo422755 NoNoNoNoNoNoNoNoNoNo322054 NoNoNoNoNoNoNoNoNoNo322053 NoNoNoNoNoNoNoNoNoNo221352 NoNoNoNoNoNoNoNoNoNo221351 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Signal Warrants Report For Intersection 2: 7th South & 5th West 3361024 3361023 55101522 55101521 66132020 1616325019 1718355518 3232649917 565611117416 575811417915 575811417914 626312419313 686913721312 727214322311 727214322310 76771532389 95971912988 1001012003127 1081092163376 1211222423775 1271292543974 1491512994663 1531553054762 1591613184961 SNWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph N, SMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 11341134Total Entering Volume on All Approaches During Same Hour YesYesHigh Minor Volume Condition Met 159161Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:510:58VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 22Number of Lanes on Minor Street Approach 19.421.6Total Stopped Delay Per Vehicle on Minor Approach (s) SNOrientation Warrant 3 Condition A 0374305310Hours Met NoNoNoNoNoNoNoNoNoNo6416624 NoNoNoNoNoNoNoNoNoNo6416623 NoNoNoNoNoNoNoNoNoNo10425622 NoNoNoNoNoNoNoNoNoNo10425621 NoNoNoNoNoNoNoNoNoNo12433620 NoNoNoNoNoNoNoNoNoNo32482619 NoNoNoNoNoNoNoNoNoNo35490618 NoNoNoNoNoNoNoNoNoNo644163617 NoNoNoNoNoNoNoNoNoNo1124285616 NoNoNoNoNoNoNoNoNoNo1154293615 NoNoNoNoNoNoNoNoNoNo1154293614 NoNoNoNoNoNoNoNoNoNo1254317613 NoNoNoNoNoNoNoNoNoNo1374350612 NoNoNoNoNoNoNoNoNoNo1444366611 NoNoNoNoNoNoNoNoNoNo1444366610 NoNoNoNoNoNoNoNoNoNo153439169 NoNoNoNoNoNoNoNoNoNo192448968 NoNoYesNoNoNoNoNoNoNo201451267 NoNoYesNoNoNoNoNoNoNo217455366 NoNoYesNoNoNoYesNoNoNo243461965 NoNoYesYesNoNoYesNoNoNo256465164 NoYesYesYesYesNoYesYesNoNo300476563 NoYesYesYesYesNoYesYesNoNo308478162 NoYesYesYesYesNoYesYesYesNo320481461 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Signal Warrants Report For Intersection 3: University Blvd & New Access 17824 17823 2101222 2101221 2141620 6344019 6374418 11688017 2011914016 2012214415 2012214414 2213315613 2414617212 2515318011 2515318010 271631929 342042408 352142527 382312726 432583045 452723204 533203763 543263842 563404001 NWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 796Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 56Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:12VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 13.9Total Stopped Delay Per Vehicle on Minor Approach (s) NOrientation Warrant 3 Condition A 0053000000Hours Met NoNoNoNoNoNoNoNoNoNo1115224 NoNoNoNoNoNoNoNoNoNo1115223 NoNoNoNoNoNoNoNoNoNo2122222 NoNoNoNoNoNoNoNoNoNo2122221 NoNoNoNoNoNoNoNoNoNo2130220 NoNoNoNoNoNoNoNoNoNo6174219 NoNoNoNoNoNoNoNoNoNo6181218 NoNoNoNoNoNoNoNoNoNo111148217 NoNoNoNoNoNoNoNoNoNo201259216 NoNoNoNoNoNoNoNoNoNo201266215 NoNoNoNoNoNoNoNoNoNo201266214 NoNoNoNoNoNoNoNoNoNo221289213 NoNoNoNoNoNoNoNoNoNo241318212 NoNoNoNoNoNoNoNoNoNo251333211 NoNoNoNoNoNoNoNoNoNo251333210 NoNoNoNoNoNoNoNoNoNo27135529 NoNoNoNoNoNoNoNoNoNo34144428 NoNoNoNoNoNoNoNoNoNo35146627 NoNoNoNoNoNoNoNoNoNo38150326 NoNoYesNoNoNoNoNoNoNo43156225 NoNoYesNoNoNoNoNoNoNo45159224 NoNoYesYesNoNoNoNoNoNo53169623 NoNoYesYesNoNoNoNoNoNo54171022 NoNoYesYesNoNoNoNoNoNo56174021 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Signal Warrants Report For Intersection 4: Access Road & 5th West 22224 22223 23422 23421 34520 8101219 8111418 15202517 27354316 27364415 27364414 30394813 33435312 34455511 34455510 3648599 4660748 4863777 5268846 5876935 6180984 71941163 73961182 761001231 WNS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph WMinor Approaches S, NMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach NoTotal Volume Condition Met 3Number of Approaches on Intersection 299Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 76Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:12VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 9.9Total Stopped Delay Per Vehicle on Minor Approach (s) WOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo214224 NoNoNoNoNoNoNoNoNoNo214223 NoNoNoNoNoNoNoNoNoNo217222 NoNoNoNoNoNoNoNoNoNo217221 NoNoNoNoNoNoNoNoNoNo319220 NoNoNoNoNoNoNoNoNoNo8122219 NoNoNoNoNoNoNoNoNoNo8125218 NoNoNoNoNoNoNoNoNoNo15145217 NoNoNoNoNoNoNoNoNoNo27178216 NoNoNoNoNoNoNoNoNoNo27180215 NoNoNoNoNoNoNoNoNoNo27180214 NoNoNoNoNoNoNoNoNoNo30187213 NoNoNoNoNoNoNoNoNoNo33196212 NoNoNoNoNoNoNoNoNoNo341100211 NoNoNoNoNoNoNoNoNoNo341100210 NoNoNoNoNoNoNoNoNoNo36110729 NoNoNoNoNoNoNoNoNoNo46113428 NoNoNoNoNoNoNoNoNoNo48114027 NoNoNoNoNoNoNoNoNoNo52115226 NoNoNoNoNoNoNoNoNoNo58116925 NoNoNoNoNoNoNoNoNoNo61117824 NoNoNoNoNoNoNoNoNoNo71121023 NoNoNoNoNoNoNoNoNoNo73121422 NoNoNoNoNoNoNoNoNoNo76122321 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Trip Generation summary 2/22/2017Report File: \...\2023 PM + Project + Mitigations.pdf Scenario 10: 2023 PM+ Project MitigationsVistro File: \...\Eden Apartments.vistro 100.00300105195Added Trips Total 100.0030010519535.0065.00300.0001.000ITE 2207: Apartment % of Total Trips Total TripsTrips OutTrips In% Out% InQuantityRateInd. Var.CodeLand Use variablesZone ID: Name Added Trips Version 4.00-00 Generated with Trip Distribution summary 2/22/2017Report File: \...\2023 PM + Project + Mitigations.pdf Scenario 10: 2023 PM+ Project MitigationsVistro File: \...\Eden Apartments.vistro 105100.00196100.00Total 55.00105.006: Gate 1615.002010.005: Gate 1615.002010.004: Gate 3130.006835.003: Gate 55.00105.002: Gate 3230.006835.001: Gate TripsShare %TripsShare %Zone / Gate From Apartment:To Apartment: Zone 7: Apartment Version 4.00-00 Generated with Study Intersections Version 4.00-00 Generated with Lane Configuration and Traffic Control Version 4.00-00 Generated with Traffic Volume - Base Volume Version 4.00-00 Generated with Traffic Volume - In-Process Volume Version 4.00-00 Generated with Traffic Volume - Net New Site Trips Version 4.00-00 Generated with Traffic Volume - Other Volume Version 4.00-00 Generated with Traffic Volume - Future Total Volume Version 4.00-00 Generated with Traffic Conditions Version 4.00-00 Generated with Intersection Analysis Summary 2/22/2017Report File: \...\2023 PM + Project(1).pdf Scenario 8: 2023 PM+ ProjectVistro File: \...\Eden Apartments.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. B10.30.070EB LeftHCM 2010Two-way stopAccess Road & 5th West4 C16.50.078SB LeftHCM 2010Two-way stopUniversity Blvd & New Access3 E37.10.149SB LeftHCM 2010Two-way stop7th South & 5th West2 C19.30.033NB LeftHCM 2010Two-way stopUniversity Blvd & 5th West1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Version 4.00-00 Generated with 0.033Volume to Capacity (v/c): CLevel Of Service: 19.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 1: University Blvd & 5th West Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 001101000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 1934195216814113104169Total Analysis Volume [veh/h] 5852154201033142Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 1934195216814113104169Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 145403257336055Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.101.101.101.101.001.001.001.001.101.001.10Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 52618217474381044114Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with CIntersection LOS 2.77d_I, Intersection Delay [s/veh] AABCApproach LOS 0.192.2013.7617.15d_A, Approach Delay [s/veh] 0.000.000.500.000.005.4311.5811.5811.587.297.297.2995th-Percentile Queue Length [ft] 0.000.000.020.000.000.220.460.460.460.290.290.2995th-Percentile Queue Length [veh] AAAAAABCCBCCMovement LOS 0.000.007.690.000.008.2211.3717.6318.5210.4517.6019.33d_M, Delay for Movement [s/veh] 0.000.000.010.000.000.070.060.040.030.000.050.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Version 4.00-00 Generated with 0.149Volume to Capacity (v/c): ELevel Of Service: 37.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 2: 7th South & 5th West Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00400.00100.00100.00400.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 001001000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 463221283823941746126855321Total Analysis Volume [veh/h] 1281321060101915721135Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 463221283823941746126855321Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 00201000020016165Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.101.101.001.001.101.101.101.001.101.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 422931082821737674124693716Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with EIntersection LOS 8.45d_I, Intersection Delay [s/veh] AADCApproach LOS 2.091.0527.9623.35d_A, Approach Delay [s/veh] 0.000.008.290.000.002.6869.0569.0569.0556.4156.4156.4195th-Percentile Queue Length [ft] 0.000.000.330.000.000.112.762.762.762.262.262.2695th-Percentile Queue Length [veh] AAAAAACDECDDMovement LOS 0.000.008.120.000.008.1420.8432.7237.0617.2129.4632.83d_M, Delay for Movement [s/veh] 0.000.000.100.000.000.030.090.280.150.100.240.11V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Version 4.00-00 Generated with 0.078Volume to Capacity (v/c): CLevel Of Service: 16.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 3: University Blvd & New Access Intersection Level Of Service Report YesYesYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 59341279612927Total Analysis Volume [veh/h] 1585701577Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 59341279612927Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 5937612927Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.101.101.101.101.101.10Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0307247000Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with CIntersection LOS 1.61d_I, Intersection Delay [s/veh] AABApproach LOS 0.001.4913.87d_A, Approach Delay [s/veh] 0.000.0030.7830.7810.2610.2695th-Percentile Queue Length [ft] 0.000.001.231.230.410.4195th-Percentile Queue Length [veh] AAAABCMovement LOS 0.000.000.008.2811.4016.51d_M, Delay for Movement [s/veh] 0.000.000.000.050.040.08V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Version 4.00-00 Generated with 0.070Volume to Capacity (v/c): BLevel Of Service: 10.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 4: Access Road & 5th West Intersection Level Of Service Report YesYesYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 245260409033Total Analysis Volume [veh/h] 6131510238Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 245260409033Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 1237500025Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 12151040908Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with BIntersection LOS 3.34d_I, Intersection Delay [s/veh] AAAApproach LOS 9.920.002.00d_A, Approach Delay [s/veh] 7.767.760.000.006.726.7295th-Percentile Queue Length [ft] 0.310.310.000.000.270.2795th-Percentile Queue Length [veh] ABAAAAMovement LOS 9.0910.300.000.000.007.47d_M, Delay for Movement [s/veh] 0.020.070.000.000.000.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Version 4.00-00 Generated with Turning Movement Volume: Summary 2/22/2017Report File: \...\2023 PM + Project(1).pdf Scenario 8: 2023 PM+ ProjectVistro File: \...\Eden Apartments.vistro 299 Total Volume 24 Right 52 Left Eastbound 60 Right 40 Thru Southbound 90 Thru 33 Left Northbound Access Road & 5th West4 Intersection NameID 796 Total Volume 59 Right 341 Thru Westbound 279 Thru 61 Left Eastbound 29 Right 27 Left Southbound University Blvd & New Access3 Intersection NameID 1134 Total Volume 46 Right 322 Thru 128 Left Westbound 38 Right 239 Thru 41 Left Eastbound 74 Right 61 Thru 26 Left Southbound 85 Right 53 Thru 21 Left Northbound 7th South & 5th West2 Intersection NameID 764 Total Volume 19 Right 341 Thru 9 Left Westbound 5 Right 216 Thru 81 Left Eastbound 41 Right 13 Thru 10 Left Southbound 4 Right 16 Thru 9 Left Northbound University Blvd & 5th West1 Intersection NameID Version 4.00-00 Generated with Turning Movement Volume: Detail 2/22/2017Report File: \...\2023 PM + Project(1).pdf Scenario 8: 2023 PM+ ProjectVistro File: \...\Eden Apartments.vistro 299 0 124 0 - 175 Total Volume 24 0 12 0 1.00 12 Right 52 0 37 0 1.00 15 Left Eastbound 60 0 50 0 1.00 10 Right 40 0 0 0 1.00 40 Thru Southbound 90 0 0 0 1.00 90 Thru 33 0 25 0 1.00 8 Left Northbound Future Total Other Net New Trips In Process Growth Rate Final Base Access Road & 5th West4 Volume TypeIntersection NameID 796 0 186 0 - 554 Total Volume 59 0 59 0 1.10 0 Right 341 0 3 0 1.10 307 Thru Westbound 279 0 7 0 1.10 247 Thru 61 0 61 0 1.10 0 Left Eastbound 29 0 29 0 1.10 0 Right 27 0 27 0 1.10 0 Left Southbound Future Total Other Net New Trips In Process Growth Rate Final Base University Blvd & New Access3 Volume TypeIntersection NameID 1134 0 87 0 - 979 Total Volume 46 0 0 0 1.10 42 Right 322 0 0 0 1.10 293 Thru 128 0 20 0 1.00 108 Left Westbound 38 0 10 0 1.00 28 Right 239 0 0 0 1.10 217 Thru 41 0 0 0 1.10 37 Left Eastbound 74 0 0 0 1.10 67 Right 61 0 20 0 1.00 41 Thru 26 0 0 0 1.10 24 Left Southbound 85 0 16 0 1.00 69 Right 53 0 16 0 1.00 37 Thru 21 0 5 0 1.00 16 Left Northbound Future Total Other Net New Trips In Process Growth Rate Final Base 7th South & 5thWest2 Volume TypeIntersection NameID 764 0 125 0 - 595 Total Volume 19 0 14 0 1.00 5 Right 341 0 54 0 1.10 261 Thru 9 0 0 0 1.10 8 Left Westbound 5 0 3 0 1.10 2 Right 216 0 25 0 1.10 174 Thru 81 0 7 0 1.00 74 Left Eastbound 41 0 3 0 1.00 38 Right 13 0 3 0 1.00 10 Thru 10 0 6 0 1.00 4 Left Southbound 4 0 0 0 1.10 4 Right 16 0 5 0 1.00 11 Thru 9 0 5 0 1.10 4 Left Northbound Future Total Other Net New Trips In Process Growth Rate Final Base University Blvd & 5th West1 Volume TypeIntersection NameID Version 4.00-00 Generated with Signal Warrants Report For Intersection 1: University Blvd & 5th West 642930236924 612829035423 602728434722 512324229521 492223028020 442020525119 401819023218 381718122117 311414517716 291313616615 291313616614 281213015913 251111814412 231010913311 231010913310 22101061299 13660748 7333417 6330376 3112155 219114 219113 11672 11671 NSWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph S, NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach NoNoTotal Volume Condition Met 44Number of Approaches on Intersection 764764Total Entering Volume on All Approaches During Same Hour NoNoHigh Minor Volume Condition Met 6429Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:140:08VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 11Number of Lanes on Minor Street Approach 13.817.2Total Stopped Delay Per Vehicle on Minor Approach (s) NSOrientation Warrant 3 Condition A 0053000000Hours Met NoNoYesYesNoNoNoNoNoNo932671524 NoNoYesYesNoNoNoNoNoNo892644523 NoNoYesYesNoNoNoNoNoNo872631522 NoNoYesNoNoNoNoNoNoNo742537521 NoNoYesNoNoNoNoNoNoNo712510520 NoNoNoNoNoNoNoNoNoNo642456519 NoNoNoNoNoNoNoNoNoNo582422518 NoNoNoNoNoNoNoNoNoNo552402517 NoNoNoNoNoNoNoNoNoNo452322516 NoNoNoNoNoNoNoNoNoNo422302515 NoNoNoNoNoNoNoNoNoNo422302514 NoNoNoNoNoNoNoNoNoNo402289513 NoNoNoNoNoNoNoNoNoNo362262512 NoNoNoNoNoNoNoNoNoNo332242511 NoNoNoNoNoNoNoNoNoNo332242510 NoNoNoNoNoNoNoNoNoNo32223559 NoNoNoNoNoNoNoNoNoNo19213458 NoNoNoNoNoNoNoNoNoNo1027457 NoNoNoNoNoNoNoNoNoNo926756 NoNoNoNoNoNoNoNoNoNo422755 NoNoNoNoNoNoNoNoNoNo322054 NoNoNoNoNoNoNoNoNoNo322053 NoNoNoNoNoNoNoNoNoNo221352 NoNoNoNoNoNoNoNoNoNo221351 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Signal Warrants Report For Intersection 2: 7th South & 5th West 3361024 3361023 55101522 55101521 66132020 1616325019 1718355518 3232649917 565611117416 575811417915 575811417914 626312419313 686913721312 727214322311 727214322310 76771532389 95971912988 1001012003127 1081092163376 1211222423775 1271292543974 1491512994663 1531553054762 1591613184961 SNWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph N, SMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 11341134Total Entering Volume on All Approaches During Same Hour YesYesHigh Minor Volume Condition Met 159161Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 1:011:15VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 11Number of Lanes on Minor Street Approach 23.428Total Stopped Delay Per Vehicle on Minor Approach (s) SNOrientation Warrant 3 Condition A 0374308653Hours Met NoNoNoNoNoNoNoNoNoNo6216624 NoNoNoNoNoNoNoNoNoNo6216623 NoNoNoNoNoNoNoNoNoNo10225622 NoNoNoNoNoNoNoNoNoNo10225621 NoNoNoNoNoNoNoNoNoNo12233620 NoNoNoNoNoNoNoNoNoNo32282619 NoNoNoNoNoNoNoNoNoNo35290618 NoNoNoNoNoNoNoNoNoNo642163617 NoNoNoNoNoNoNoNoNoNo1122285616 NoNoNoNoNoNoNoNoNoNo1152293615 NoNoNoNoNoNoNoNoNoNo1152293614 NoNoNoNoNoNoNoNoNoNo1252317613 NoNoNoNoNoNoNoNoNoNo1372350612 NoNoNoNoNoNoNoNoNoNo1442366611 NoNoNoNoNoNoNoNoNoNo1442366610 NoNoNoNoNoNoNoNoNoNo153239169 NoNoNoNoNoNoYesNoNoNo192248968 NoNoYesNoNoNoYesNoNoNo201251267 NoNoYesNoNoNoYesYesNoNo217255366 NoNoYesNoNoNoYesYesYesNo243261965 NoNoYesYesNoNoYesYesYesNo256265164 NoYesYesYesYesNoYesYesYesYes300276563 NoYesYesYesYesNoYesYesYesYes308278162 NoYesYesYesYesNoYesYesYesYes320281461 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Signal Warrants Report For Intersection 3: University Blvd & New Access 17824 17823 2101222 2101221 2141620 6344019 6374418 11688017 2011914016 2012214415 2012214414 2213315613 2414617212 2515318011 2515318010 271631929 342042408 352142527 382312726 432583045 452723204 533203763 543263842 563404001 NWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 796Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 56Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:12VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 13.9Total Stopped Delay Per Vehicle on Minor Approach (s) NOrientation Warrant 3 Condition A 0053000000Hours Met NoNoNoNoNoNoNoNoNoNo1115224 NoNoNoNoNoNoNoNoNoNo1115223 NoNoNoNoNoNoNoNoNoNo2122222 NoNoNoNoNoNoNoNoNoNo2122221 NoNoNoNoNoNoNoNoNoNo2130220 NoNoNoNoNoNoNoNoNoNo6174219 NoNoNoNoNoNoNoNoNoNo6181218 NoNoNoNoNoNoNoNoNoNo111148217 NoNoNoNoNoNoNoNoNoNo201259216 NoNoNoNoNoNoNoNoNoNo201266215 NoNoNoNoNoNoNoNoNoNo201266214 NoNoNoNoNoNoNoNoNoNo221289213 NoNoNoNoNoNoNoNoNoNo241318212 NoNoNoNoNoNoNoNoNoNo251333211 NoNoNoNoNoNoNoNoNoNo251333210 NoNoNoNoNoNoNoNoNoNo27135529 NoNoNoNoNoNoNoNoNoNo34144428 NoNoNoNoNoNoNoNoNoNo35146627 NoNoNoNoNoNoNoNoNoNo38150326 NoNoYesNoNoNoNoNoNoNo43156225 NoNoYesNoNoNoNoNoNoNo45159224 NoNoYesYesNoNoNoNoNoNo53169623 NoNoYesYesNoNoNoNoNoNo54171022 NoNoYesYesNoNoNoNoNoNo56174021 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Signal Warrants Report For Intersection 4: Access Road & 5th West 22224 22223 23422 23421 34520 8101219 8111418 15202517 27354316 27364415 27364414 30394813 33435312 34455511 34455510 3648599 4660748 4863777 5268846 5876935 6180984 71941163 73961182 761001231 WNS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph WMinor Approaches S, NMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach NoTotal Volume Condition Met 3Number of Approaches on Intersection 299Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 76Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:12VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 9.9Total Stopped Delay Per Vehicle on Minor Approach (s) WOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo214224 NoNoNoNoNoNoNoNoNoNo214223 NoNoNoNoNoNoNoNoNoNo217222 NoNoNoNoNoNoNoNoNoNo217221 NoNoNoNoNoNoNoNoNoNo319220 NoNoNoNoNoNoNoNoNoNo8122219 NoNoNoNoNoNoNoNoNoNo8125218 NoNoNoNoNoNoNoNoNoNo15145217 NoNoNoNoNoNoNoNoNoNo27178216 NoNoNoNoNoNoNoNoNoNo27180215 NoNoNoNoNoNoNoNoNoNo27180214 NoNoNoNoNoNoNoNoNoNo30187213 NoNoNoNoNoNoNoNoNoNo33196212 NoNoNoNoNoNoNoNoNoNo341100211 NoNoNoNoNoNoNoNoNoNo341100210 NoNoNoNoNoNoNoNoNoNo36110729 NoNoNoNoNoNoNoNoNoNo46113428 NoNoNoNoNoNoNoNoNoNo48114027 NoNoNoNoNoNoNoNoNoNo52115226 NoNoNoNoNoNoNoNoNoNo58116925 NoNoNoNoNoNoNoNoNoNo61117824 NoNoNoNoNoNoNoNoNoNo71121023 NoNoNoNoNoNoNoNoNoNo73121422 NoNoNoNoNoNoNoNoNoNo76122321 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Trip Generation summary 2/22/2017Report File: \...\2023 PM + Project(1).pdf Scenario 8: 2023 PM+ ProjectVistro File: \...\Eden Apartments.vistro 100.00300105195Added Trips Total 100.0030010519535.0065.00300.0001.000ITE 2207: Apartment % of Total Trips Total TripsTrips OutTrips In% Out% InQuantityRateInd. Var.CodeLand Use variablesZone ID: Name Added Trips Version 4.00-00 Generated with Trip Distribution summary 2/22/2017Report File: \...\2023 PM + Project(1).pdf Scenario 8: 2023 PM+ ProjectVistro File: \...\Eden Apartments.vistro 105100.00196100.00Total 55.00105.006: Gate 1615.002010.005: Gate 1615.002010.004: Gate 3130.006835.003: Gate 55.00105.002: Gate 3230.006835.001: Gate TripsShare %TripsShare %Zone / Gate From Apartment:To Apartment: Zone 7: Apartment Version 4.00-00 Generated with Study Intersections Version 4.00-00 Generated with Lane Configuration and Traffic Control Version 4.00-00 Generated with Traffic Volume - Base Volume Version 4.00-00 Generated with Traffic Volume - In-Process Volume Version 4.00-00 Generated with Traffic Volume - Net New Site Trips Version 4.00-00 Generated with Traffic Volume - Other Volume Version 4.00-00 Generated with Traffic Volume - Future Total Volume Version 4.00-00 Generated with Traffic Conditions Version 4.00-00 Generated with Intersection Analysis Summary 2/17/2017Report File: I:\...\2023 PM + Project.pdf Scenario 8: 2023 PM+ ProjectVistro File: I:\...\Eden Apartments.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. for all other control types, they are taken for the whole intersection. B10.30.070EB LeftHCM 2010Two-way stopKevin DR & 5th West4 C16.50.078SB LeftHCM 2010Two-way stopUniversity Blvd & New Access3 E37.10.149SB LeftHCM 2010Two-way stop7th South & 5th West2 C19.30.033NB LeftHCM 2010Two-way stopUniversity Blvd & 5th West1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Version 4.00-00 Generated with 0.033Volume to Capacity (v/c): CLevel Of Service: 19.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 1: University Blvd & 5th West Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 001101000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 1934195216814113104169Total Analysis Volume [veh/h] 5852154201033142Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 1934195216814113104169Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 145403257336055Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.101.101.101.101.001.001.001.001.101.001.10Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 52618217474381044114Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with CIntersection LOS 2.77d_I, Intersection Delay [s/veh] AABCApproach LOS 0.192.2013.7617.15d_A, Approach Delay [s/veh] 0.000.000.500.000.005.4311.5811.5811.587.297.297.2995th-Percentile Queue Length [ft] 0.000.000.020.000.000.220.460.460.460.290.290.2995th-Percentile Queue Length [veh] AAAAAABCCBCCMovement LOS 0.000.007.690.000.008.2211.3717.6318.5210.4517.6019.33d_M, Delay for Movement [s/veh] 0.000.000.010.000.000.070.060.040.030.000.050.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Version 4.00-00 Generated with 0.149Volume to Capacity (v/c): ELevel Of Service: 37.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 2: 7th South & 5th West Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00400.00100.00100.00400.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 001001000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Pedestrian Volume [ped/h] 463221283823941746126855321Total Analysis Volume [veh/h] 1281321060101915721135Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 463221283823941746126855321Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 00201000020016165Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.101.101.001.001.101.101.101.001.101.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 422931082821737674124693716Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with EIntersection LOS 8.45d_I, Intersection Delay [s/veh] AADCApproach LOS 2.091.0527.9623.35d_A, Approach Delay [s/veh] 0.000.008.290.000.002.6869.0569.0569.0556.4156.4156.4195th-Percentile Queue Length [ft] 0.000.000.330.000.000.112.762.762.762.262.262.2695th-Percentile Queue Length [veh] AAAAAACDECDDMovement LOS 0.000.008.120.000.008.1420.8432.7237.0617.2129.4632.83d_M, Delay for Movement [s/veh] 0.000.000.100.000.000.030.090.280.150.100.240.11V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane FreeFreeStopStopPriority Scheme Intersection Settings Version 4.00-00 Generated with 0.078Volume to Capacity (v/c): CLevel Of Service: 16.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 3: University Blvd & New Access Intersection Level Of Service Report YesYesYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 59341279612927Total Analysis Volume [veh/h] 1585701577Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 59341279612927Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 5937612927Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.101.101.101.101.101.10Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0307247000Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with CIntersection LOS 1.61d_I, Intersection Delay [s/veh] AABApproach LOS 0.001.4913.87d_A, Approach Delay [s/veh] 0.000.0030.7830.7810.2610.2695th-Percentile Queue Length [ft] 0.000.001.231.230.410.4195th-Percentile Queue Length [veh] AAAABCMovement LOS 0.000.000.008.2811.4016.51d_M, Delay for Movement [s/veh] 0.000.000.000.050.040.08V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Version 4.00-00 Generated with 0.070Volume to Capacity (v/c): BLevel Of Service: 10.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 2010Analysis Method: Two-way stopControl Type: Intersection 4: Kevin DR & 5th West Intersection Level Of Service Report YesYesYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 245260409033Total Analysis Volume [veh/h] 6131510238Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 245260409033Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 1237500025Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 12151040908Base Volume Input [veh/h] Name volumes Version 4.00-00 Generated with BIntersection LOS 3.34d_I, Intersection Delay [s/veh] AAAApproach LOS 9.920.002.00d_A, Approach Delay [s/veh] 7.767.760.000.006.726.7295th-Percentile Queue Length [ft] 0.310.310.000.000.270.2795th-Percentile Queue Length [veh] ABAAAAMovement LOS 9.0910.300.000.000.007.47d_M, Delay for Movement [s/veh] 0.020.070.000.000.000.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Version 4.00-00 Generated with Turning Movement Volume: Summary 2/17/2017Report File: I:\...\2023 PM + Project.pdf Scenario 8: 2023 PM+ ProjectVistro File: I:\...\Eden Apartments.vistro 299 Total Volume 24 Right 52 Left Eastbound 60 Right 40 Thru Southbound 90 Thru 33 Left Northbound Kevin DR & 5th West4 Intersection NameID 796 Total Volume 59 Right 341 Thru Westbound 279 Thru 61 Left Eastbound 29 Right 27 Left Southbound University Blvd & New Access3 Intersection NameID 1134 Total Volume 46 Right 322 Thru 128 Left Westbound 38 Right 239 Thru 41 Left Eastbound 74 Right 61 Thru 26 Left Southbound 85 Right 53 Thru 21 Left Northbound 7th South & 5th West2 Intersection NameID 764 Total Volume 19 Right 341 Thru 9 Left Westbound 5 Right 216 Thru 81 Left Eastbound 41 Right 13 Thru 10 Left Southbound 4 Right 16 Thru 9 Left Northbound University Blvd & 5th West1 Intersection NameID Version 4.00-00 Generated with Turning Movement Volume: Detail 2/17/2017Report File: I:\...\2023 PM + Project.pdf Scenario 8: 2023 PM+ ProjectVistro File: I:\...\Eden Apartments.vistro 299 0 124 0 - 175 Total Volume 24 0 12 0 1.00 12 Right 52 0 37 0 1.00 15 Left Eastbound 60 0 50 0 1.00 10 Right 40 0 0 0 1.00 40 Thru Southbound 90 0 0 0 1.00 90 Thru 33 0 25 0 1.00 8 Left Northbound Future Total Other Net New Trips In Process Growth Rate Final Base Kevin DR & 5th West4 Volume TypeIntersection NameID 796 0 186 0 - 554 Total Volume 59 0 59 0 1.10 0 Right 341 0 3 0 1.10 307 Thru Westbound 279 0 7 0 1.10 247 Thru 61 0 61 0 1.10 0 Left Eastbound 29 0 29 0 1.10 0 Right 27 0 27 0 1.10 0 Left Southbound Future Total Other Net New Trips In Process Growth Rate Final Base University Blvd & New Access3 Volume TypeIntersection NameID 1134 0 87 0 - 979 Total Volume 46 0 0 0 1.10 42 Right 322 0 0 0 1.10 293 Thru 128 0 20 0 1.00 108 Left Westbound 38 0 10 0 1.00 28 Right 239 0 0 0 1.10 217 Thru 41 0 0 0 1.10 37 Left Eastbound 74 0 0 0 1.10 67 Right 61 0 20 0 1.00 41 Thru 26 0 0 0 1.10 24 Left Southbound 85 0 16 0 1.00 69 Right 53 0 16 0 1.00 37 Thru 21 0 5 0 1.00 16 Left Northbound Future Total Other Net New Trips In Process Growth Rate Final Base 7th South & 5thWest2 Volume TypeIntersection NameID 764 0 125 0 - 595 Total Volume 19 0 14 0 1.00 5 Right 341 0 54 0 1.10 261 Thru 9 0 0 0 1.10 8 Left Westbound 5 0 3 0 1.10 2 Right 216 0 25 0 1.10 174 Thru 81 0 7 0 1.00 74 Left Eastbound 41 0 3 0 1.00 38 Right 13 0 3 0 1.00 10 Thru 10 0 6 0 1.00 4 Left Southbound 4 0 0 0 1.10 4 Right 16 0 5 0 1.00 11 Thru 9 0 5 0 1.10 4 Left Northbound Future Total Other Net New Trips In Process Growth Rate Final Base University Blvd & 5th West1 Volume TypeIntersection NameID Version 4.00-00 Generated with Fair Share Volumes 2/17/2017Report File: I:\...\2023 PM + Project.pdf Scenario 8: 2023 PM+ ProjectVistro File: I:\...\Eden Apartments.vistro 245260409033Total Analysis Volume 1237500026Total Volume 12512375000267: Apartment RightLeftRightThruThruLeft EastboundSouthboundNorthbound TotalZone ID: Name Intersection 4: Kevin DR & 5th West 59341279612927Total Analysis Volume 5937612928Total Volume 18759376129287: Apartment RightThruThruLeftRightLeft WestboundEastboundSouthbound TotalZone ID: Name Intersection 3: University Blvd & New Access 463221283823941746126855321Total Analysis Volume 00201000020016165Total Volume 87002010000200161657: Apartment RightThruLeftRightThruLeftRightThruLeftRightThruLeft WestboundEastboundSouthboundNorthbound TotalZone ID: Name Intersection 2: 7th South & 5th West 1934195216814113104169Total Analysis Volume 145403257336055Total Volume 1251454032573360557: Apartment RightThruLeftRightThruLeftRightThruLeftRightThruLeft WestboundEastboundSouthboundNorthbound TotalZone ID: Name Intersection 1: University Blvd & 5th West Version 4.00-00 Generated with Fair Share % of Net New Site 2/17/2017Report File: I:\...\2023 PM + Project.pdf Scenario 8: 2023 PM+ ProjectVistro File: I:\...\Eden Apartments.vistro 102.52%100.00%100.00%0.00%0.00%100.79%Total 100.00%102.52%100%100%00100.79%7: Apartment RightLeftRightThruThruLeft EastboundSouthboundNorthbound TotalZone ID: Name Intersection 4: Kevin DR & 5th West 100.00%100.00%100.00%100.00%100.00%101.83%Total 100.00%100%100%100%100%100%101.83%7: Apartment RightThruThruLeftRightLeft WestboundEastboundSouthbound TotalZone ID: Name Intersection 3: University Blvd & New Access 0.00%0.00%100.00%100.00%0.00%0.00%0.00%100.00%0.00%100.00%100.00%100.00%Total 100.00%00100%100%000100%0100%100%100%7: Apartment RightThruLeftRightThruLeftRightThruLeftRightThruLeft WestboundEastboundSouthboundNorthbound TotalZone ID: Name Intersection 2: 7th South & 5th West 100.00%100.00%0.00%100.00%100.00%100.00%100.00%100.00%100.00%0.00%100.00%100.00%Total 100.00%100%100%0100%100%100%100%100%100%0100%100%7: Apartment RightThruLeftRightThruLeftRightThruLeftRightThruLeft WestboundEastboundSouthboundNorthbound TotalZone ID: Name Intersection 1: University Blvd & 5th West Version 4.00-00 Generated with Fair Share % of Total Analysis 2/17/2017Report File: I:\...\2023 PM + Project.pdf Scenario 8: 2023 PM+ ProjectVistro File: I:\...\Eden Apartments.vistro 33.98%41.57%45.45%0.00%0.00%43.84%Total 55.13%33.98%41.57%45.45%0043.84%7: Apartment RightLeftRightThruThruLeft EastboundSouthboundNorthbound TotalZone ID: Name Intersection 4: Kevin DR & 5th West 50.17%0.93%2.38%50.08%49.83%51.20%Total 25.70%50.17%0.93%2.38%50.08%49.83%51.2%7: Apartment RightThruThruLeftRightLeft WestboundEastboundSouthbound TotalZone ID: Name Intersection 3: University Blvd & New Access 0.00%0.00%13.51%20.83%0.00%0.00%0.00%24.69%0.00%15.84%23.19%19.23%Total 10.34%0013.51%20.83%00024.69%015.84%23.19%19.23%7: Apartment RightThruLeftRightThruLeftRightThruLeftRightThruLeft WestboundEastboundSouthboundNorthbound TotalZone ID: Name Intersection 2: 7th South & 5th West 41.72%13.76%0.00%33.33%10.30%7.74%7.24%16.13%38.27%0.00%23.81%35.71%Total 29.84%41.72%13.76%033.33%10.3%7.74%7.24%16.13%38.27%023.81%35.71%7: Apartment RightThruLeftRightThruLeftRightThruLeftRightThruLeft WestboundEastboundSouthboundNorthbound TotalZone ID: Name Intersection 1: University Blvd & 5th West Version 4.00-00 Generated with Signal Warrants Report For Intersection 1: University Blvd & 5th West 642930236924 612829035423 602728434722 512324229521 492223028020 442020525119 401819023218 381718122117 311414517716 291313616615 291313616614 281213015913 251111814412 231010913311 231010913310 22101061299 13660748 7333417 6330376 3112155 219114 219113 11672 11671 NSWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph S, NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach NoNoTotal Volume Condition Met 44Number of Approaches on Intersection 764764Total Entering Volume on All Approaches During Same Hour NoNoHigh Minor Volume Condition Met 6429Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 0:140:08VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 11Number of Lanes on Minor Street Approach 13.817.2Total Stopped Delay Per Vehicle on Minor Approach (s) NSOrientation Warrant 3 Condition A 0053000000Hours Met NoNoYesYesNoNoNoNoNoNo932671524 NoNoYesYesNoNoNoNoNoNo892644523 NoNoYesYesNoNoNoNoNoNo872631522 NoNoYesNoNoNoNoNoNoNo742537521 NoNoYesNoNoNoNoNoNoNo712510520 NoNoNoNoNoNoNoNoNoNo642456519 NoNoNoNoNoNoNoNoNoNo582422518 NoNoNoNoNoNoNoNoNoNo552402517 NoNoNoNoNoNoNoNoNoNo452322516 NoNoNoNoNoNoNoNoNoNo422302515 NoNoNoNoNoNoNoNoNoNo422302514 NoNoNoNoNoNoNoNoNoNo402289513 NoNoNoNoNoNoNoNoNoNo362262512 NoNoNoNoNoNoNoNoNoNo332242511 NoNoNoNoNoNoNoNoNoNo332242510 NoNoNoNoNoNoNoNoNoNo32223559 NoNoNoNoNoNoNoNoNoNo19213458 NoNoNoNoNoNoNoNoNoNo1027457 NoNoNoNoNoNoNoNoNoNo926756 NoNoNoNoNoNoNoNoNoNo422755 NoNoNoNoNoNoNoNoNoNo322054 NoNoNoNoNoNoNoNoNoNo322053 NoNoNoNoNoNoNoNoNoNo221352 NoNoNoNoNoNoNoNoNoNo221351 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Signal Warrants Report For Intersection 2: 7th South & 5th West 3361024 3361023 55101522 55101521 66132020 1616325019 1718355518 3232649917 565611117416 575811417915 575811417914 626312419313 686913721312 727214322311 727214322310 76771532389 95971912988 1001012003127 1081092163376 1211222423775 1271292543974 1491512994663 1531553054762 1591613184961 SNWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph N, SMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoNoWarrant Met for Approach YesYesTotal Volume Condition Met 44Number of Approaches on Intersection 11341134Total Entering Volume on All Approaches During Same Hour YesYesHigh Minor Volume Condition Met 159161Volume on Minor Street Approach During Same Hour NoNoDelay Condition Met 1:011:15VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 11Number of Lanes on Minor Street Approach 23.428Total Stopped Delay Per Vehicle on Minor Approach (s) SNOrientation Warrant 3 Condition A 0374308653Hours Met NoNoNoNoNoNoNoNoNoNo6216624 NoNoNoNoNoNoNoNoNoNo6216623 NoNoNoNoNoNoNoNoNoNo10225622 NoNoNoNoNoNoNoNoNoNo10225621 NoNoNoNoNoNoNoNoNoNo12233620 NoNoNoNoNoNoNoNoNoNo32282619 NoNoNoNoNoNoNoNoNoNo35290618 NoNoNoNoNoNoNoNoNoNo642163617 NoNoNoNoNoNoNoNoNoNo1122285616 NoNoNoNoNoNoNoNoNoNo1152293615 NoNoNoNoNoNoNoNoNoNo1152293614 NoNoNoNoNoNoNoNoNoNo1252317613 NoNoNoNoNoNoNoNoNoNo1372350612 NoNoNoNoNoNoNoNoNoNo1442366611 NoNoNoNoNoNoNoNoNoNo1442366610 NoNoNoNoNoNoNoNoNoNo153239169 NoNoNoNoNoNoYesNoNoNo192248968 NoNoYesNoNoNoYesNoNoNo201251267 NoNoYesNoNoNoYesYesNoNo217255366 NoNoYesNoNoNoYesYesYesNo243261965 NoNoYesYesNoNoYesYesYesNo256265164 NoYesYesYesYesNoYesYesYesYes300276563 NoYesYesYesYesNoYesYesYesYes308278162 NoYesYesYesYesNoYesYesYesYes320281461 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Signal Warrants Report For Intersection 3: University Blvd & New Access 17824 17823 2101222 2101221 2141620 6344019 6374418 11688017 2011914016 2012214415 2012214414 2213315613 2414617212 2515318011 2515318010 271631929 342042408 352142527 382312726 432583045 452723204 533203763 543263842 563404001 NWE Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph NMinor Approaches E, WMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach YesTotal Volume Condition Met 3Number of Approaches on Intersection 796Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 56Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:12VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 13.9Total Stopped Delay Per Vehicle on Minor Approach (s) NOrientation Warrant 3 Condition A 0053000000Hours Met NoNoNoNoNoNoNoNoNoNo1115224 NoNoNoNoNoNoNoNoNoNo1115223 NoNoNoNoNoNoNoNoNoNo2122222 NoNoNoNoNoNoNoNoNoNo2122221 NoNoNoNoNoNoNoNoNoNo2130220 NoNoNoNoNoNoNoNoNoNo6174219 NoNoNoNoNoNoNoNoNoNo6181218 NoNoNoNoNoNoNoNoNoNo111148217 NoNoNoNoNoNoNoNoNoNo201259216 NoNoNoNoNoNoNoNoNoNo201266215 NoNoNoNoNoNoNoNoNoNo201266214 NoNoNoNoNoNoNoNoNoNo221289213 NoNoNoNoNoNoNoNoNoNo241318212 NoNoNoNoNoNoNoNoNoNo251333211 NoNoNoNoNoNoNoNoNoNo251333210 NoNoNoNoNoNoNoNoNoNo27135529 NoNoNoNoNoNoNoNoNoNo34144428 NoNoNoNoNoNoNoNoNoNo35146627 NoNoNoNoNoNoNoNoNoNo38150326 NoNoYesNoNoNoNoNoNoNo43156225 NoNoYesNoNoNoNoNoNoNo45159224 NoNoYesYesNoNoNoNoNoNo53169623 NoNoYesYesNoNoNoNoNoNo54171022 NoNoYesYesNoNoNoNoNoNo56174021 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Signal Warrants Report For Intersection 4: Kevin DR & 5th West 22224 22223 23422 23421 34520 8101219 8111418 15202517 27354316 27364415 27364414 30394813 33435312 34455511 34455510 3648599 4660748 4863777 5268846 5876935 6180984 71941163 73961182 761001231 WNS Minor StreetsMajor StreetsHour Warrant Analysis Traffic Volumes 100%Warrant Factor NoPopulation < 10,000 NoSpeed > 40mph WMinor Approaches S, NMajor Approaches Intersection Warrants Parameters NoPeak Hour#3 NoFour Hour Vehicular Volume#2 NoEight Hour Vehicular Volume#1 Met?NameWarrant Warrants Summary Version 4.00-00 Generated with NoWarrant Met for Intersection NoWarrant Met for Approach NoTotal Volume Condition Met 3Number of Approaches on Intersection 299Total Entering Volume on All Approaches During Same Hour NoHigh Minor Volume Condition Met 76Volume on Minor Street Approach During Same Hour NoDelay Condition Met 0:12VehicleHours of Stopped Delay on Minor Approach ([h]h:mm) 1Number of Lanes on Minor Street Approach 9.9Total Stopped Delay Per Vehicle on Minor Approach (s) WOrientation Warrant 3 Condition A 0000000000Hours Met NoNoNoNoNoNoNoNoNoNo214224 NoNoNoNoNoNoNoNoNoNo214223 NoNoNoNoNoNoNoNoNoNo217222 NoNoNoNoNoNoNoNoNoNo217221 NoNoNoNoNoNoNoNoNoNo319220 NoNoNoNoNoNoNoNoNoNo8122219 NoNoNoNoNoNoNoNoNoNo8125218 NoNoNoNoNoNoNoNoNoNo15145217 NoNoNoNoNoNoNoNoNoNo27178216 NoNoNoNoNoNoNoNoNoNo27180215 NoNoNoNoNoNoNoNoNoNo27180214 NoNoNoNoNoNoNoNoNoNo30187213 NoNoNoNoNoNoNoNoNoNo33196212 NoNoNoNoNoNoNoNoNoNo341100211 NoNoNoNoNoNoNoNoNoNo341100210 NoNoNoNoNoNoNoNoNoNo36110729 NoNoNoNoNoNoNoNoNoNo46113428 NoNoNoNoNoNoNoNoNoNo48114027 NoNoNoNoNoNoNoNoNoNo52115226 NoNoNoNoNoNoNoNoNoNo58116925 NoNoNoNoNoNoNoNoNoNo61117824 NoNoNoNoNoNoNoNoNoNo71121023 NoNoNoNoNoNoNoNoNoNo73121422 NoNoNoNoNoNoNoNoNoNo76122321 Condition B56%70%80%100%56%70%80%100%VolumeNumberVolumeNumber Warrant 3Warrant 2Warrant 1 Condition BWarrant 1 Condition AMinor LanesMajor LanesHour Warrant Analysis by Hour Version 4.00-00 Generated with Trip Generation summary 2/17/2017Report File: I:\...\2023 PM + Project.pdf Scenario 8: 2023 PM+ ProjectVistro File: I:\...\Eden Apartments.vistro 100.00300105195Added Trips Total 100.0030010519535.0065.00300.0001.000ITE 2207: Apartment % of Total Trips Total TripsTrips OutTrips In% Out% InQuantityRateInd. Var.CodeLand Use variablesZone ID: Name Added Trips Version 4.00-00 Generated with Trip Distribution summary 2/17/2017Report File: I:\...\2023 PM + Project.pdf Scenario 8: 2023 PM+ ProjectVistro File: I:\...\Eden Apartments.vistro 105100.00196100.00Total 55.00105.006: Gate 1615.002010.005: Gate 1615.002010.004: Gate 3130.006835.003: Gate 55.00105.002: Gate 3230.006835.001: Gate TripsShare %TripsShare %Zone / Gate From Apartment:To Apartment: Zone 7: Apartment