Loading...
HomeMy WebLinkAboutAPPROVED TRUSS SPECS - 23-00774 - YellowStone RV - BathhouseDescription : Address : 2125 W 2000 S Application Type : Document Filename : TRUSSES_4-02-24-Reviewed-Corrections-Required.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required # 23-00774 New Commercial Building Please digitally re-submit all pages of the plan set in response to requested revisions for our next review cycle, with noted items resolved. Report Date: 05.23.2024 Approval of plans does not constitute approval of variance from code Page 1 of 1 Author Name Author Email Author Phone No.: Cody Jones Cody.Jones@rexburg.org 208-372-2173 Description : Address : 2125 W 2000 S Application Type : Document Filename : TRUSSES_4-02-24.pdf Array Comment Author Contact Information: Corrections in the following table need to be applied before a permit can be issued Review Report Revisions Required Page Reference Annotation Type Author : Department Status Page Review Comments Applicant Response Comments 1 Free Text Cody Jones : Building Open 1 Need truss plans stamped by Engineer 1 Free Text Cody Jones : Building Open 1 One restroom to meet ADA requirements. # 23-00774 New Commercial Building Please digitally re-submit all pages of the plan set in response to requested revisions for our next review cycle, with noted items resolved. Report Date: 04.04.2024 Approval of plans does not constitute approval of variance from code Page 1 of 1 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary bracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have continuous lateral restraint (CLR), installed with diagonal bracing installed on the CLR per BCSI sections B3, B7, or B10, as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the truss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L #1&Bet.; Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 1-4-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent live load. Wind Member design based on both MWFRS and C&C. Right end vertical exposed to wind pressure. Deflection meets L/360. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A11515ENC160118, GBLLETIN0118, & GABRST160118 for gable wind bracing and other requirements. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL P* 153 /- /- /46 /22 /13 Wind reactions based on MWFRS P Brg Wid = 182 Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 27 -10 B - C 33 -209 C - D 32 -165 D - E 41 -153 Chords Tens. Comp. E - F 62 -132 F - G 82 -112 G - H 88 -107 H - I 0 -29 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - O 270 -27 O - N 277 -29 N - M 278 -29 Chords Tens. Comp. M - L 280 -30 L - K 282 -30 K - J 282 -30 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. C - O 303 -586 D - N 63 -98 E - M 146 -277 Gables Tens. Comp. F - L 135 -256 G - K 38 -141 H - J 249 -327 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 50.0 Ct: 1.0 CAT: II Pf: 35.0 Ce: 1.0 Lu: - Cs: 1.00 Snow Duration: 1.15 Building Code: IRC 2018 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.048 B 999 240 VERT(CL): 0.064 B 999 180 HORZ(LL): 0.009 B - - HORZ(TL): 0.012 B - - Creep Factor: 2.0 Max TC CSI: 0.460 Max BC CSI: 0.271 Max Web CSI: 0.095 Mfg Specified Camber: VIEW Ver: 23.02.04.0123.14 Job Number:J245331 Bath House -TRUMAN DEVELOPMENT Truss Label:A1 Ply: 1 Qty: 2 Wgt: 68.6 lbs SEQN: 199584 / T2 / GABL FROM: NK DRW: ... / ... 04/02/2024 T1 T2 B1 M1 M2 M3 M4 M5 M6 15'2" 6' 2' (TYP) 1'0"4 15'2" 15'2"1'4"1'4" 3"13 2' 1 0 " 2 3' 3 " 2 A B C D E F G H I J KLMNO P 2 12 2X4(A1T) 5X6 3X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary bracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have continuous lateral restraint (CLR), installed with diagonal bracing installed on the CLR per BCSI sections B3, B7, or B10, as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the truss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L #1&Bet.; Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 1-4-0 top chord outlookers and cladding load not to exceed 3.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Bottom chord checked for 10.00 psf non-concurrent live load. Wind Member design based on both MWFRS and C&C. Right end vertical exposed to wind pressure. Deflection meets L/360. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A11515ENC160118, GBLLETIN0118, & GABRST160118 for gable wind bracing and other requirements. Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL P* 153 /- /- /46 /22 /13 Wind reactions based on MWFRS P Brg Wid = 182 Min Req = - Bearing B Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 27 -10 B - C 33 -209 C - D 32 -165 D - E 41 -153 Chords Tens. Comp. E - F 62 -132 F - G 82 -112 G - H 88 -107 H - I 0 -29 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - O 270 -27 O - N 277 -29 N - M 278 -29 Chords Tens. Comp. M - L 280 -30 L - K 282 -30 K - J 282 -30 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. C - O 303 -586 D - N 63 -98 E - M 146 -277 Gables Tens. Comp. F - L 135 -256 G - K 38 -141 H - J 249 -327 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 50.0 Ct: 1.0 CAT: II Pf: 35.0 Ce: 1.0 Lu: - Cs: 1.00 Snow Duration: 1.15 Building Code: IRC 2018 TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.048 B 999 240 VERT(CL): 0.064 B 999 180 HORZ(LL): 0.009 B - - HORZ(TL): 0.012 B - - Creep Factor: 2.0 Max TC CSI: 0.460 Max BC CSI: 0.271 Max Web CSI: 0.095 Mfg Specified Camber: VIEW Ver: 23.02.04.0123.14 Job Number:J245331 Bath House -TRUMAN DEVELOPMENT Truss Label:A1 Ply: 1 Qty: 2 Wgt: 68.6 lbs SEQN: 199584 / T2 / GABL FROM: NK DRW: ... / ... 04/02/2024 T1 T2 B1 M1 M2 M3 M4 M5 M6 15'2" 6' 2' (TYP) 1'0"4 15'2" 15'2"1'4"1'4" 3"13 2' 1 0 " 2 3' 3 " 2 A B C D E F G H I J KLMNO P 2 12 2X4(A1T) 5X6 3X6 One restroom to meet ADA requirements. N eed truss p la ns sta mp ed b y E ng ineer **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary bracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have continuous lateral restraint (CLR), installed with diagonal bracing installed on the CLR per BCSI sections B3, B7, or B10, as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the truss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L #1&Bet.; Bracing (a) Continuous lateral restraint equally spaced on member. Loading Bottom chord checked for 10.00 psf non-concurrent live load. Wind Member design based on both MWFRS and C&C. Right end vertical exposed to wind pressure. Deflection meets L/360. Wind loading based on both gable and hip roof types. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL H 906 /- /- /296 /107 /116 F 883 /- /- /272 /97 /- Wind reactions based on MWFRS H Brg Wid = 5.5 Min Req = 1.5 (Truss) F Brg Wid = 5.5 Min Req = 1.5 (Truss) Bearings H & F Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 19 -4 B - C 788 -2435 Chords Tens. Comp. C - D 32 -84 D - E 0 -18 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 2365 -865 Chords Tens. Comp. G - F 2350 -869 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - C 305 0 C - F 852 -2377 Webs Tens. Comp. D - F 223 -349 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 50.0 Ct: 1.0 CAT: II Pf: 35.0 Ce: 1.0 Lu: - Cs: 1.00 Snow Duration: 1.15 Building Code: IRC 2018 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.157 B 999 240 VERT(CL): 0.227 B 795 180 HORZ(LL): 0.031 F - - HORZ(TL): 0.045 F - - Creep Factor: 2.0 Max TC CSI: 0.805 Max BC CSI: 0.695 Max Web CSI: 0.427 Mfg Specified Camber: VIEW Ver: 23.02.04.0123.14 Job Number:J245331 Bath House -TRUMAN DEVELOPMENT Truss Label:A2 Ply: 1 Qty: 12 Wgt: 70.0 lbs SEQN: 199581 / T1 / MONO FROM: NK DRW: ... / ... 04/02/2024 T1 T2 B1 W1 W2 W3 15'2" 8'4"12 8'4"12 15'2" 6'9"4 8'4"12 8'4"12 15'2" 6'9"41'4"1'4" 3"13 2' 1 0 " 2 3' 3 " 2 (a) A B C D E FGH 2 12 3X6(A1T) 2X4 5X8 2X4 5X6(R) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (Building Component Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporary bracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properly attached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have continuous lateral restraint (CLR), installed with diagonal bracing installed on the CLR per BCSI sections B3, B7, or B10, as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build the truss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover page listing this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org Lumber Top chord: 2x4 DF-L #1&Bet.; Bot chord: 2x4 DF-L #1&Bet.; Webs: 2x4 DF-L #1&Bet.; Bracing (a) Continuous lateral restraint equally spaced on member. Loading Bottom chord checked for 10.00 psf non-concurrent live load. Wind Member design based on both MWFRS and C&C. Right end vertical exposed to wind pressure. Deflection meets L/360. Wind loading based on both gable and hip roof types. Additional Notes Top Chord overhang(s) may be field trimmed. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL H 906 /- /- /296 /107 /116 F 883 /- /- /272 /97 /- Wind reactions based on MWFRS H Brg Wid = 5.5 Min Req = 1.5 (Truss) F Brg Wid = 5.5 Min Req = 1.5 (Truss) Bearings H & F Fcperp = 625psi. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 19 -4 B - C 788 -2435 Chords Tens. Comp. C - D 32 -84 D - E 0 -18 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 2365 -865 Chords Tens. Comp. G - F 2350 -869 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - C 305 0 C - F 852 -2377 Webs Tens. Comp. D - F 223 -349 Loading Criteria (psf) TCLL: 35.00 TCDL: 8.00 BCLL: 0.00 BCDL: 8.00 Des Ld: 51.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 115 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 4.8 psf BCDL: 4.8 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 50.0 Ct: 1.0 CAT: II Pf: 35.0 Ce: 1.0 Lu: - Cs: 1.00 Snow Duration: 1.15 Building Code: IRC 2018 TPI Std: 2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.157 B 999 240 VERT(CL): 0.227 B 795 180 HORZ(LL): 0.031 F - - HORZ(TL): 0.045 F - - Creep Factor: 2.0 Max TC CSI: 0.805 Max BC CSI: 0.695 Max Web CSI: 0.427 Mfg Specified Camber: VIEW Ver: 23.02.04.0123.14 Job Number:J245331 Bath House -TRUMAN DEVELOPMENT Truss Label:A2 Ply: 1 Qty: 12 Wgt: 70.0 lbs SEQN: 199581 / T1 / MONO FROM: NK DRW: ... / ... 04/02/2024 T1 T2 B1 W1 W2 W3 15'2" 8'4"12 8'4"12 15'2" 6'9"4 8'4"12 8'4"12 15'2" 6'9"41'4"1'4" 3"13 2' 1 0 " 2 3' 3 " 2 (a) A B C D E FGH 2 12 3X6(A1T) 2X4 5X8 2X4 5X6(R)