Loading...
HomeMy WebLinkAboutCONCRETE FIELD TESTS - 23-00170 - Rexburg 10th Ward LDS MeetinghousePRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D839A09B-9EE0-4436-81BD-6EBAA81F0273 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23255C0012023MM Compressive Strength of Concrete Test Specimens Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter- day Saints Contractor: Headwaters Construction Date: 08/01/2023 Start Time: 01:45 PM Supplier: Walters Concrete Mix Number: 4500AF-45 Concrete Member: Foundation Wall Required 28 day Strength (psi): 4,500.0 Admixtures: DELVO, MP322, MA AE 90 Entrained Air Spec. (%): 5.5 +- 1.5 Slump Spec. (inches): Max 6 Testing Results Testing: Set #:Cumulative Test Load Amount: Ticket Image: Ticket #: Time Tested: Test Location: Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Entrained Air Spec. (%): Slump (in): Slump Spec. (in): 1 10.0 06980 03:15 PM Southern foundation walls 87 35.000 140.6 73 5 5.5 +- 1.5 7 1/2 Max 6 Field Technician Information Date: 08/01/2023 Time on Project: 3.5 hours Total Trip Mileage: 22.00 Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation to be given in Observations and/ or Remarks.) Tested By: Mark Mansfield Signature: Observations and/or Remarks: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D839A09B-9EE0-4436-81BD-6EBAA81F0273 2 I reported to the job site and spoke with the foreman for Headwaters. We discussed the location of the pour and the amount of material that would be used. I parked my vehicle and began setting up my gear. We waited for the first truck to arrive. The first truck arrived just after 3:00 PM and I was able to grab the batch ticket. I recorded the information necessary for my testing and waited for the truck discharge about a yard of material. Once the truck reached that point I was able to grab a sample and begin testing. I tested both air content and slump, the results for each were within general conformance. I reported said results to the contractor and began pouring my cylinders. After I placed my cylinders and cleaned my gear, I observed the remainder of the pour. I began filling out my report and left the job site. Reviewed By: E. Vail Date: 08/02/2023 Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. D839A09B-9EE0-4436-81BD-6EBAA81F0273 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 90108E73-36E7-4DD9-B4F3-067390F6AA00 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23255C06052024TJ Compressive Strength of Concrete Test Specimens Date: 06/04/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time on Project: 2 Start Time: 08:00 AM Contractor: Alpha Concrete Supplier: Walter’s Ready Mix, Inc. Mix Number: 4500AF Concrete Member: Curb and Gutter Required 28 day Strength (psi): 3,000.0 Admixtures: N/A Entrained Air Spec. (%): 6 +- 1.5 Slump Spec. (inches): Max 6 Results Testing: Set #:Cumulative Test Load Amount: Ticket #: Time Tested: Test Location:Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Slump (in): 1 9.0 01450 08:40 AM Northeast corner of northeast utility pad. 71 35.000 140.6 69 4.9 2.75 Field Technician Information Truck: VENOM Total Trip Mileage: 18.00 Tested By: Tyler Jones Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 90108E73-36E7-4DD9-B4F3-067390F6AA00 2 Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation to be given in Observations and/or Remarks.) Observations and/or Remarks: Arrived on site and spoke with the contractor about today’s placement. I then started setting up equipment. I observed and tested the concrete being placed for the utility pads along the building. My results were reported to the contractor. I then cleaned up my equipment and headed out as they finished the last pad. Reviewed By: Luke Hammar Signature: Inspection Images: Testing: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 90108E73-36E7-4DD9-B4F3-067390F6AA00 3 Ticket Image: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 5DCF4DDE-668F-4793-8186-B05C237D8CB3 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23255C06262024JR Compressive Strength of Concrete Test Specimens Date: 06/26/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time on Project: 2 Start Time: 07:00 AM Contractor: Alpha Concrete Construction Supplier: Walters Ready Mix Mix Number: 4500AF 10WC187 Concrete Member: Sidewalk Required 28 day Strength (psi): 4,000.0 Admixtures: Air Entrained Air Spec. (%): 6 +- 1.5 Slump Spec. (inches): Max 6 Results Testing: Set #:Cumulative Test Load Amount: Ticket #: Time Tested: Test Location:Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Slump (in): 1 10.0 2105 07:15 AM Sidewalk curb 50 ft E of NE corner of bullding 62 34.370 138.0 77 6.4 2 3/4 Field Technician Information Truck: THOR Total Trip Mileage: 18.00 Tested By: James Russo Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 5DCF4DDE-668F-4793-8186-B05C237D8CB3 2 Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation to be given in Observations and/or Remarks.) Observations and/or Remarks: I arrived on site at 6:55 am and after checking in with the contract, I tested the first truck. I tested for air, slump, and temp. The tests passed specifications and I reported to the contractor the results. Reviewed By: E. Vail Signature: Inspection Images: Testing: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 5DCF4DDE-668F-4793-8186-B05C237D8CB3 3 Ticket Image: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8AB18B3E-582C-49BE-993A-CDE4A8419E9D 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23255C07022024LS Compressive Strength of Concrete Test Specimens Date: 07/02/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time on Project: 3 hours Start Time: 08:00 AM Contractor: Rad Crete Supplier: Walters Ready Mix Mix Number: 4500AF Concrete Member: Curb and Gutter Required 28 day Strength (psi): 3,000.0 Admixtures: Air entrainment Entrained Air Spec. (%): 6 +- 1.5 Slump Spec. (inches): Max 6 Results Testing: Set #:Cumulative Test Load Amount: Ticket #: Time Tested: Test Location:Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Slump (in): 1 9.0 02282 09:15 AM Curb on south west corner of building 61 35.260 141.6 70 5.0 2 1/2 Field Technician Information Truck: JARVIS Total Trip Mileage: 18.00 Tested By: Leland Steiner Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8AB18B3E-582C-49BE-993A-CDE4A8419E9D 2 Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation to be given in Observations and/or Remarks.) Observations and/or Remarks: I arrived on site at around 8:30am and began my inspection of the rebar that was placed inside of the forms. I then proceeded to set up my equipment to perform my field tests, and waiting for concrete to arrived. Concrete arrived on site at around 9:15am and I began my testing soon thereafter. After my testing, I cleaned my gear, and loaded my equipment back into my truck. I then observed the remainder of the pour before leaving the job site. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8AB18B3E-582C-49BE-993A-CDE4A8419E9D 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8AB18B3E-582C-49BE-993A-CDE4A8419E9D 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8AB18B3E-582C-49BE-993A-CDE4A8419E9D 5 Testing: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 8AB18B3E-582C-49BE-993A-CDE4A8419E9D 6 Ticket Image: File Name 23255C07202023MH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3E60D8A3-313E-4314-B7B5-5728FF669E33 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 Compressive Strength of Concrete Test Specimens Project Number: 23-255 Cumulative Test Load Amount: 7.0 Ticket #: 06629 Project Name: Married Student Second Stake Test Location: East side footings Concrete Member: Footings Client: The Church of Jesus Christ of Latter-day Saints Admixtures: MP 322 Required 28 day Strength (psi): 3,000.0 Contractor Richardson’s Concrete Supplier: Walter’s Ready Mix, Inc. Mix Number: W170-F 35 Date: 07/20/2023 Start Time 10:45 AM Time on Project 3 hours 30 minutes Tested By: Michael Hammar Testing: Set #:Cumulative Test Load Amount: Ticket Image: Ticket #: Time Tested: Test Location: Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Entrained Air Spec. (%): Slump (in): Slump Spec. (in): 1 7.0 06629 12:35 PM East side footings 90 35.800 143.8 78 2 N/A 2 Max 6 Observations/Remarks: I arrived on site at approximately 11:00 AM and began preparing my equipment for testing. The truck arrived at approximately 12:30 PM and immediately began preparing to place material. Once a sufficient amount of material had been placed, I collected a sample for testing. The tests I performed for this sample were in general conformance of project specifications and the results were reported to the contractor. I then cleaned my equipment and entered my vehicle to begin this report. Signature:Reviewed By: Luke Hammar File Name 23255C07202023MH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3E60D8A3-313E-4314-B7B5-5728FF669E33 2 Signature: Date: 07/20/2023 Inspection Images File Name 23255C07202023MH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3E60D8A3-313E-4314-B7B5-5728FF669E33 3 File Name 23255C07202023MH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3E60D8A3-313E-4314-B7B5-5728FF669E33 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 Compressive Strength of Concrete Test Specimens Project Number: 23-255 Cumulative Test Load Amount: 7.0 Ticket #: 06629 Project Name: Married Student Second Stake Test Location: East side footings Concrete Member: Footings Client: The Church of Jesus Christ of Latter-day Saints Admixtures: MP 322 Required 28 day Strength (psi): 3,000.0 Contractor Richardson’s Concrete Supplier: Walter’s Ready Mix, Inc. Mix Number: W170-F 35 Date: 07/20/2023 Start Time 10:45 AM Time on Project 3 hours 30 minutes Tested By: Michael Hammar Testing: Set #:Cumulative Test Load Amount: Ticket Image: Ticket #: Time Tested: Test Location: Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Entrained Air Spec. (%): Slump (in): Slump Spec. (in): 1 7.0 06629 12:35 PM East side footings 90 35.800 143.8 78 2 N/A 2 Max 6 Observations/Remarks: I arrived on site at approximately 11:00 AM and began preparing my equipment for testing. The truck arrived at approximately 12:30 PM and immediately began preparing to place material. Once a sufficient amount of material had been placed, I collected a sample for testing. The tests I performed for this sample were in general conformance of project specifications and the results were reported to the contractor. I then cleaned my equipment and entered my vehicle to begin this report. Signature:Reviewed By: Luke Hammar File Name 23255C07202023MH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3E60D8A3-313E-4314-B7B5-5728FF669E33 2 Signature: Date: 07/20/2023 Inspection Images File Name 23255C07202023MH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3E60D8A3-313E-4314-B7B5-5728FF669E33 3 File Name 23255C07202023MH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3E60D8A3-313E-4314-B7B5-5728FF669E33 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 Compressive Strength of Concrete Test Specimens Project Number: 23-255 Cumulative Test Load Amount: 7.0 Ticket #: 06629 Project Name: Married Student Second Stake Test Location: East side footings Concrete Member: Footings Client: The Church of Jesus Christ of Latter-day Saints Admixtures: MP 322 Required 28 day Strength (psi): 3,000.0 Contractor Richardson’s Concrete Supplier: Walter’s Ready Mix, Inc. Mix Number: W170-F 35 Date: 07/20/2023 Start Time 10:45 AM Time on Project 3 hours 30 minutes Tested By: Michael Hammar Testing: Set #:Cumulative Test Load Amount: Ticket Image: Ticket #: Time Tested: Test Location: Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Entrained Air Spec. (%): Slump (in): Slump Spec. (in): 1 7.0 06629 12:35 PM East side footings 90 35.800 143.8 78 2 N/A 2 Max 6 Observations/Remarks: I arrived on site at approximately 11:00 AM and began preparing my equipment for testing. The truck arrived at approximately 12:30 PM and immediately began preparing to place material. Once a sufficient amount of material had been placed, I collected a sample for testing. The tests I performed for this sample were in general conformance of project specifications and the results were reported to the contractor. I then cleaned my equipment and entered my vehicle to begin this report. Signature:Reviewed By: Luke Hammar File Name 23255C07202023MH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3E60D8A3-313E-4314-B7B5-5728FF669E33 2 Signature: Date: 07/20/2023 Inspection Images File Name 23255C07202023MH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 3E60D8A3-313E-4314-B7B5-5728FF669E33 3 File Name 23255C07252023BC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. EABD1FD1-2C2E-433A-A007-0D39BB64EE40 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 Compressive Strength of Concrete Test Specimens Project Number: 23-255 Cumulative Test Load Amount: 8.5 Ticket #: 06769 Project Name: Married Student Second Stake Test Location: F-1 Concrete Member: Footings Client: The Church of Jesus Christ of Latter-day Saints Admixtures: MP 322 Required 28 day Strength (psi): 3,000.0 Contractor Alpha Concrete Construction Supplier: Walters Ready Mix Mix Number: W170-F 35 Date: 07/25/2023 Start Time 03:30 PM Time on Project 2 hours Tested By: Bryce Choffin Testing: Set #:Cumulative Test Load Amount: Ticket Image: Ticket #: Time Tested: Test Location: Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Entrained Air Spec. (%): Slump (in): Slump Spec. (in): 1 8.5 06769 03:55 PM F-1 86 34.800 139.8 80 2 N/A 4 Max 6 Observations/Remarks: I arrived on site around 3:45 PM. The first truck was already on site when I arrived. So I quickly got my equipment ready and inspected the rebar placement inside the forms and found it to be within spec. Once about 1 yard had been offloaded by the first truck I grabbed my sample and proceeded to perform my tests. The results of my tests were satisfactory. I observed the contractor use mechanical vibration to ensure the material was consolidated. Signature:Reviewed By: Luke Hammar Signature: File Name 23255C07252023BC PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. EABD1FD1-2C2E-433A-A007-0D39BB64EE40 2 Date: 07/25/2023 Inspection Images PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. BC13C99E-89C1-4C11-8774-9C0EAE2F75E4 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23255C08032023MH Compressive Strength of Concrete Test Specimens Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter- day Saints Contractor: Alpha Concrete Construction Date: 08/03/2023 Start Time: 11:30 AM Supplier: Walter’s Ready Mix, Inc. Mix Number: 4500AF-45 Concrete Member: Foundation Wall Required 28 day Strength (psi): 4,500.0 Admixtures: DELVO, MP 322, MA AE 90 Entrained Air Spec. (%): 5.5 +- 1.5 Slump Spec. (inches): Max 6 Testing Results Testing: Set #:Cumulative Test Load Amount: Ticket Image: Ticket #: Time Tested: Test Location: Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Entrained Air Spec. (%): Slump (in): Slump Spec. (in): 1 9.8 07057 12:30 PM Southwest corner of building, foundation walls 70 34.520 138.6 80 5.5 5.5 +- 1.5 5 Max 6 Field Technician Information Date: 08/03/2023 Time on Project: 2 hours Total Trip Mileage: 24.00 Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation to be given in Observations and/ or Remarks.) Tested By: Michael Hammar Signature: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. BC13C99E-89C1-4C11-8774-9C0EAE2F75E4 2 Observations and/or Remarks: I arrived on site at approximately 11:55 AM and began preparing my equipment for testing. The truck arrived at approximately 12:25 PM and immediately prepared to place material. Once a sufficient amount of material had been placed, I collected a sample for testing. The tests I performed for this sample were in general conformance of project specifications and the results were reported to the contractor. I then cleaned my equipment and entered my vehicle to begin this report. Reviewed By: Luke Hammar Date: 08/03/2023 Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1949E40C-CBD1-411C-BC5F-1F24090FC339 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23255C08082023LS Compressive Strength of Concrete Test Specimens Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter- day Saints Contractor: Alpha Concrete Construction Date: 08/08/2023 Start Time: 05:30 PM Supplier: Walter’s Ready Mix, Inc. Mix Number: W170-F 35 Concrete Member: Footings Required 28 day Strength (psi): 3,000.0 Admixtures: Entrained Air Spec. (%): N/A Slump Spec. (inches): Max 6 Testing Results Testing: Set #:Cumulative Test Load Amount: Ticket Image: Ticket #: Time Tested: Test Location: Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Entrained Air Spec. (%): Slump (in): Slump Spec. (in): 1 11.0 07164 04:30 PM Footings on North edge of building 71 36.600 147.0 72 3 N/A 3.5 Max 6 Field Technician Information Date: 08/08/2023 Time on Project: 3 hours Total Trip Mileage: 16.00 Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation to be given in Observations and/ or Remarks.) Tested By: Leland Stiener Signature: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 1949E40C-CBD1-411C-BC5F-1F24090FC339 2 Observations and/or Remarks: I observed that the rebar and the concrete poured was within general conformance to project regulations Reviewed By: Luke Hammar Date: 08/09/2023 Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 855970F8-82C5-4793-9A49-53B27581004F 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23255C08222023LS Compressive Strength of Concrete Test Specimens Date: 08/22/2023 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time on Project: 2 hours Start Time: 11:30 AM Contractor: Alpha Concrete Supplier: Walter’s Ready Mix, Inc. Mix Number: W170-F 35 Concrete Member: Footings Required 28 day Strength (psi): 3000.0 Admixtures: MP 322 Entrained Air Spec. (%): N/A Slump Spec. (inches): Max 6 Results Testing: Set #:Cumulative Test Load Amount: Ticket #: Time Tested: Test Location:Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Slump (in): 1 10.0 07584 12:15 PM Footings for interior of building on south half 80 36.100 145.0 71 1.4 6 Field Technician Information Truck: THOR Total Trip Mileage: 16.00 Tested By: Leland Steiner Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 855970F8-82C5-4793-9A49-53B27581004F 2 Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation to be given in Observations and/or Remarks.) Observations and/or Remarks: I arrived on site at around 11:20 AM and began inspecting the forms and setting up my equipment for my field tests. Concrete showed up at around 12:15 PM and I began my testing with a sample from the first truck. The field tests I performed were within project specifications and results were reported to the contractor. I then cleaned my gear and observed the remainder of the pour. Reviewed By: Luke Hammar Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 855970F8-82C5-4793-9A49-53B27581004F 3 Testing: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 855970F8-82C5-4793-9A49-53B27581004F 4 Ticket Image: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E439A31D-6B7C-4072-8D61-7B240FD392E9 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23255C08282023MH Compressive Strength of Concrete Test Specimens Date: 08/28/2023 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time on Project: 4 Hours Start Time: 10:45 AM Contractor: Alpha Concrete Construction Supplier: Walters Ready Mix, Inc. Mix Number: W170-F 35 Concrete Member: Footings Required 28 day Strength (psi): 3000.0 Admixtures: MP 322 Entrained Air Spec. (%): N/A Slump Spec. (inches): Max 6 Results Testing: Set #:Cumulative Test Load Amount: Ticket #: Time Tested: Test Location:Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Slump (in): 1 8.0 07768 01:30 PM Footings, north side of building 80 37.000 148.6 77 1.2 5 Field Technician Information Truck: DRAX Total Trip Mileage: 18.00 Tested By: Michael Hammar Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E439A31D-6B7C-4072-8D61-7B240FD392E9 2 (Explanation to be given in Observations and/or Remarks.) Observations and/or Remarks: I arrived on site at approximately 11:00 AM and began preparing my equipment for testing. The truck arrived at approximately 1:25 PM and immediately prepared to place material. Once a sufficient amount of material had been placed, I collected a sample for testing. The tests I performed for this sample were in general conformance of project specifications and the results were reported to the contractor. I then cleaned my equipment and entered my vehicle to begin this report. Reviewed By: Luke Hammar Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E439A31D-6B7C-4072-8D61-7B240FD392E9 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E439A31D-6B7C-4072-8D61-7B240FD392E9 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E439A31D-6B7C-4072-8D61-7B240FD392E9 5 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E439A31D-6B7C-4072-8D61-7B240FD392E9 6 Testing: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E439A31D-6B7C-4072-8D61-7B240FD392E9 7 Ticket Image: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E439A31D-6B7C-4072-8D61-7B240FD392E9 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23255C08282023MH Compressive Strength of Concrete Test Specimens Date: 08/28/2023 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time on Project: 4 Hours Start Time: 10:45 AM Contractor: Alpha Concrete Construction Supplier: Walters Ready Mix, Inc. Mix Number: W170-F 35 Concrete Member: Footings Required 28 day Strength (psi): 3000.0 Admixtures: MP 322 Entrained Air Spec. (%): N/A Slump Spec. (inches): Max 6 Results Testing: Set #:Cumulative Test Load Amount: Ticket #: Time Tested: Test Location:Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Slump (in): 1 8.0 07768 01:30 PM Footings, north side of building 80 37.000 148.6 77 1.2 5 Field Technician Information Truck: DRAX Total Trip Mileage: 18.00 Tested By: Michael Hammar Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E439A31D-6B7C-4072-8D61-7B240FD392E9 2 (Explanation to be given in Observations and/or Remarks.) Observations and/or Remarks: I arrived on site at approximately 11:00 AM and began preparing my equipment for testing. The truck arrived at approximately 1:25 PM and immediately prepared to place material. Once a sufficient amount of material had been placed, I collected a sample for testing. The tests I performed for this sample were in general conformance of project specifications and the results were reported to the contractor. I then cleaned my equipment and entered my vehicle to begin this report. Reviewed By: Luke Hammar Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E439A31D-6B7C-4072-8D61-7B240FD392E9 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E439A31D-6B7C-4072-8D61-7B240FD392E9 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E439A31D-6B7C-4072-8D61-7B240FD392E9 5 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E439A31D-6B7C-4072-8D61-7B240FD392E9 6 Testing: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. E439A31D-6B7C-4072-8D61-7B240FD392E9 7 Ticket Image: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 86A27F53-EC6B-4FA7-816C-1BC15182A8D8 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23255C09062023LS Compressive Strength of Concrete Test Specimens Date: 09/06/2023 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time on Project: 2 hours Start Time: 04:15 AM Contractor: Alpha Concrete Supplier: Walter’s Ready Mix, Inc Mix Number: 170-3500 Concrete Member: Int. Slab on Grade Required 28 day Strength (psi): 3500.0 Admixtures: Map 322 Entrained Air Spec. (%): N/A Slump Spec. (inches): Max 6 Results Testing: Set #:Cumulative Test Load Amount: Ticket #: Time Tested: Test Location:Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Slump (in): 1 11.0 07973 05:00 AM Interior subfloor 45 36.860 148.0 71 1.5 7 1/2 2 33.0 07975 05:45 AM Interior subfloor 41 36.920 148.3 67 1.1 7 3/4 Field Technician Information Truck: THOR Total Trip Mileage: 16.00 Tested By: Leland Steiner Signature: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 86A27F53-EC6B-4FA7-816C-1BC15182A8D8 2 Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation to be given in Observations and/or Remarks.) Observations and/or Remarks: I arrived on site at around 4:15 AM and began my inspections. I then set up my gear and got ready for my field tests. I tested twice, and after my testing I cleaned my gear and left the job site. Reviewed By: Luke Hammar Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 86A27F53-EC6B-4FA7-816C-1BC15182A8D8 3 Testing: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 86A27F53-EC6B-4FA7-816C-1BC15182A8D8 4 Ticket Image: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 86A27F53-EC6B-4FA7-816C-1BC15182A8D8 5 Ticket Image: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1725634986383 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23255C09062024TH Compressive Strength of Concrete Test Specimens Date: 09/06/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time on Project: 3hrs Start Time: 06:30 AM Contractor: Alpha Concrete Supplier: Walters Ready Mix Mix Number: 506AF Concrete Member: Sidewalk Required 28 day Strength (psi): 4,000.0 Admixtures: Plastisides Entrained Air Spec. (%): 6 +- 1.5 Slump Spec. (inches): Max 6 Results Testing: Set #:Cumulative Test Load Amount: Ticket #: Time Tested: Test Location:Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Slump (in): 1 11.0 04235 08:15 AM Northwest sidewalk on S 5th W. 10 ft S of NW corner. 52 34.620 139.0 68 6.9 9¼ Field Technician Information Truck: STARLORD Total Trip Mileage: 18.00 Tested By: Travis Hutmacher Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1725634986383 2 Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation to be given in Observations and/or Remarks.) Observations and/or Remarks: Arrived on site at 6:45am. Unpacked my gear and prepared for the pour. Spoke with the concrete workers. The concrete truck showed up around 7:40am. I received the ticket and prepared to take a sample. The driver of the truck, Aaron Walt, stated that he was waiting for plasticizers to be dropped off. The pour started around 8:10am. He poured about a yard and I took my sample. I returned to my truck and performed an air entrainment test, temped the concrete, and performed a slump test. I started filling cylinders, Aaron came over and requested that I do a second slump test as the result the first time was a 9½ inch slump. The second test resulted in a 9¼ inch slump. I finished filling cylinders and cleaned up my gear. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1725634986383 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1725634986383 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1725634986383 5 Testing: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1725634986383 6 Ticket Image: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 0E466209-A479-41EF-8269-8B7E564F6D82 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23255C09122023BF Compressive Strength of Concrete Test Specimens Date: 09/12/2023 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time on Project: 3 hours Start Time: 06:57 AM Contractor: Headwaters Supplier: Walters Mix Number: 170-3500 Concrete Member: Int. Slab on Grade Required 28 day Strength (psi): 3500.0 Admixtures: N/A Entrained Air Spec. (%): N/A Slump Spec. (inches): Max 6 Results Testing: Set #:Cumulative Test Load Amount: Ticket #: Time Tested: Test Location:Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Slump (in): 1 11.0 08148 05:15 AM Slab on grade 65 36.920 148.3 73 7.5 7 2 65.0 08148 06:20 AM Slab on grade 68 36.500 146.6 69 1.5 7.75 Field Technician Information Truck: DEADPOOL Total Trip Mileage: 22.00 Tested By: Bryton Ferguson Signature: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 0E466209-A479-41EF-8269-8B7E564F6D82 2 Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation to be given in Observations and/or Remarks.) Observations and/or Remarks: I arrived on-site and located where the concrete placement was to take place. I set up my gear and sampled from the first truck. I performed a concrete field test and reported my results to the contractor. I then made strength specimens. I repeated this process on the 6th truck. Upon completion of making my second set of strength specimens. I cleaned my equipment and observed the remainder of the concrete placement. Reviewed By: Luke Hammar Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 0E466209-A479-41EF-8269-8B7E564F6D82 3 Testing: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 0E466209-A479-41EF-8269-8B7E564F6D82 4 Ticket Image: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 0E466209-A479-41EF-8269-8B7E564F6D82 5 Ticket Image: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 9BD41BB3-3012-4923-BDDF-84204EE0456A 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23255C09142023MDH Compressive Strength of Concrete Test Specimens Date: 09/14/2023 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time on Project: 3 hours Start Time: 04:30 AM Contractor: ALPHA CONCRETE CONSTRUCTION Supplier: WALTERS READY MIX INC. Mix Number: 170-3500 Concrete Member: Int. Slab on Grade Required 28 day Strength (psi): 3500.0 Admixtures: MP322 Entrained Air Spec. (%): N/A Slump Spec. (inches): Max 6 Results Testing: Set #:Cumulative Test Load Amount: Ticket #: Time Tested: Test Location:Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Slump (in): 1 11.0 08226 05:15 AM Referencing plans page S103. 11.5 - A6 42 36.600 147.0 69 2 6 2 11.0 08232 06:30 AM Referencing plans page S103. 8.5 - A6 45 36.700 147.4 67 2 6 Field Technician Information Truck: THOR Total Trip Mileage: 30.00 Tested By: Matthew Hammar Signature: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 9BD41BB3-3012-4923-BDDF-84204EE0456A 2 Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation to be given in Observations and/or Remarks.) Observations and/or Remarks: I arrived on site at approximately 4:30 AM and began preparing my equipment for testing. The truck arrived at approximately 5:00 AM and immediately prepared to place material. Once a sufficient amount of material had been placed, I collected a sample for testing. The tests I performed for this sample were in general conformance of project specifications and the results were reported to the contractor. I then cleaned my equipment and observed the remainder of material placement. Reviewed By: Luke Hammar Signature: Inspection Images: Testing: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 9BD41BB3-3012-4923-BDDF-84204EE0456A 3 Ticket Image: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 9BD41BB3-3012-4923-BDDF-84204EE0456A 4 Ticket Image: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 9BD41BB3-3012-4923-BDDF-84204EE0456A 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23255C09142023MDH Compressive Strength of Concrete Test Specimens Date: 09/14/2023 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time on Project: 3 hours Start Time: 04:30 AM Contractor: ALPHA CONCRETE CONSTRUCTION Supplier: WALTERS READY MIX INC. Mix Number: 170-3500 Concrete Member: Int. Slab on Grade Required 28 day Strength (psi): 3500.0 Admixtures: MP322 Entrained Air Spec. (%): N/A Slump Spec. (inches): Max 6 Results Testing: Set #:Cumulative Test Load Amount: Ticket #: Time Tested: Test Location:Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Slump (in): 1 11.0 08226 05:15 AM Referencing plans page S103. 11.5 - A6 42 36.600 147.0 69 2 6 2 11.0 08232 06:30 AM Referencing plans page S103. 8.5 - A6 45 36.700 147.4 67 2 6 Field Technician Information Truck: THOR Total Trip Mileage: 30.00 Tested By: Matthew Hammar Signature: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 9BD41BB3-3012-4923-BDDF-84204EE0456A 2 Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation to be given in Observations and/or Remarks.) Observations and/or Remarks: I arrived on site at approximately 4:30 AM and began preparing my equipment for testing. The truck arrived at approximately 5:00 AM and immediately prepared to place material. Once a sufficient amount of material had been placed, I collected a sample for testing. The tests I performed for this sample were in general conformance of project specifications and the results were reported to the contractor. I then cleaned my equipment and observed the remainder of material placement. Reviewed By: Luke Hammar Signature: Inspection Images: Testing: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 9BD41BB3-3012-4923-BDDF-84204EE0456A 3 Ticket Image: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 9BD41BB3-3012-4923-BDDF-84204EE0456A 4 Ticket Image: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 15304dddab85d4a6-1727102124649 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23255C09232024NLS Compressive Strength of Concrete Test Specimens Date: 09/23/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time on Project: 2 Hrs Start Time: 08:30 AM Contractor: Alpha Concrete Construction Supplier: Walters Ready Mix Mix Number: N/A Concrete Member: Sidewalk Required 28 day Strength (psi): 4,000.0 Admixtures: N/A Entrained Air Spec. (%): 6 +- 1.5 Slump Spec. (inches): Max 6 Results Testing: Set #:Cumulative Test Load Amount: Ticket #: Time Tested: Test Location:Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Slump (in): 1 0.0 0 08:30 AM N/A 51 0.000 0.0 0 N/A 0 Field Technician Information Truck: GAMORA Total Trip Mileage: 18.00 Tested By: Nathaniel Speas Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 15304dddab85d4a6-1727102124649 2 Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation to be given in Observations and/or Remarks.) Observations and/or Remarks: Arrived to the job site and started my report. Met with the concrete crew. I saw that they had already poured the sidewalk. I was told to be here by 9:00 a.m. for the pour and one of the crew guys said they started at 7:00 a.m. I did not make any cylinders and I did not test any concrete. I ended up filling out my report and leaving the job site. Reviewed By: E. Vail Signature: Inspection Images: Testing: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 15304dddab85d4a6-1727102124649 3 Ticket Image: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. CA57F520-56DA-4CD7-920E-0CDD0C049C65 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.932.4428 File Name: 23255C10122023BF Compressive Strength of Concrete Test Specimens Date: 10/12/2023 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time on Project: 3 Start Time: 11:18 AM Contractor: Alpha Supplier: Walters Mix Number: 4500-AF Concrete Member: Footings Required 28 day Strength (psi): 3,000.0 Admixtures: HP 322, MA AE 90 Entrained Air Spec. (%): N/A Slump Spec. (inches): Max 6 Results Testing: Set #:Cumulative Test Load Amount: Ticket #: Time Tested: Test Location:Ambient Temp. (°F): Weight of Concrete (lbs): Unit Weight (PCF): Concrete Temp. (°F): Entrained Air (%): Slump (in): 1 10.0 09030 11:00 AM Dumpster enclosure approximately south west corner of parking lot 46 34.480 138.5 63 5.5 6.5 Field Technician Information Truck: STARLORD Total Trip Mileage: 18.00 Tested By: Bryton Ferguson Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. CA57F520-56DA-4CD7-920E-0CDD0C049C65 2 Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation to be given in Observations and/or Remarks.) Observations and/or Remarks: I arrived onsite around 9:30 AM. I got my equipment setup and spoke with Dallas, the concrete truck arrived onsite at approximately 10:45 AM, I acquired my sample at the appropriate time and completed the test. My tests were reported to the contractor. Reviewed By: Luke Hammar Signature: Inspection Images: Testing: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. CA57F520-56DA-4CD7-920E-0CDD0C049C65 3 Ticket Image: