16176C76-6F4E-41E1-9C8F-9C694CFE0E00 1
4103 E 605 N Suite 1
Rigby, Idaho 83442
208.932.4428
File Name:
23255AD04262024LS
In Place Density of Asphalt by Nuclear Methods ASTM D2950
Date:
04/26/2024
Project Number:
23-255
Project Name:
Married Student Second Stake
Client:
The Church of Jesus Christ of Latter-day Saints
Total Time on Project
9
Time Start:
09:00 AM
Contractor:
HK Contractors
Ambient Temperature (°F):
50
Current Weather Conditions:
Drizzle
Wind:
Calm
Instrument ID
78653
Daily Standardization:
MS:
649
DS:
2460
Results
Details
Test
#:
Location:Lift: Material:Marshall
#:
Wet:%
Marshall:
Result
1 Eastern water road crossing, center
of road
Native
Material
143.7 134.9 94 Pass
2 Central road water crossing, center
of road
Native
Material
143.7 134.5 94 Pass
3 Western road water crossing, 5ft
west of manhole, 20ft south.
Native
Material
143.7 134.8 94 Pass
4 Western road water crossing, 5ft
south of manhole, 10ft west of man
hole
Native
Material
143.7 133.5 93 Pass
5 Western road water crossing, in line
with manhole cover, 25ft south of
northern edge
Native
Material
143.7 136.4 95 Pass
6 Western water road crossing, 10ft
north of southern manhole
Native
Material
143.7 131.9 92 Pass
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
16176C76-6F4E-41E1-9C8F-9C694CFE0E00 2
Field Technician Information
Number of Grout Bags Used:
Number of Ice bags used
0
Core Drill Used
No
Total Mileage
52736
Tested By:
Leland Steiner
Signature:
Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation given in
Observations and/or Remarks.)
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Observations and/or Remarks:
I arrived on site at around 9:00am and began my inspections of the site where asphalt was to be paved. After
my field tests where done and paving was complete, I loaded my truck and left the job site
Reviewed By:
E. Vail
Signature:
Inspection Images:
PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its
content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby
notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately.
16176C76-6F4E-41E1-9C8F-9C694CFE0E00 3