Loading...
HomeMy WebLinkAboutASPHALT DENSITY - 23-00170 - Rexburg 10th Ward LDS MeetinghousePRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 16176C76-6F4E-41E1-9C8F-9C694CFE0E00 1 4103 E 605 N Suite 1 Rigby, Idaho 83442 208.932.4428 File Name: 23255AD04262024LS In Place Density of Asphalt by Nuclear Methods ASTM D2950 Date: 04/26/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Total Time on Project 9 Time Start: 09:00 AM Contractor: HK Contractors Ambient Temperature (°F): 50 Current Weather Conditions: Drizzle Wind: Calm Instrument ID 78653 Daily Standardization: MS: 649 DS: 2460 Results Details Test #: Location:Lift: Material:Marshall #: Wet:% Marshall: Result 1 Eastern water road crossing, center of road Native Material 143.7 134.9 94 Pass 2 Central road water crossing, center of road Native Material 143.7 134.5 94 Pass 3 Western road water crossing, 5ft west of manhole, 20ft south. Native Material 143.7 134.8 94 Pass 4 Western road water crossing, 5ft south of manhole, 10ft west of man hole Native Material 143.7 133.5 93 Pass 5 Western road water crossing, in line with manhole cover, 25ft south of northern edge Native Material 143.7 136.4 95 Pass 6 Western water road crossing, 10ft north of southern manhole Native Material 143.7 131.9 92 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 16176C76-6F4E-41E1-9C8F-9C694CFE0E00 2 Field Technician Information Number of Grout Bags Used: Number of Ice bags used 0 Core Drill Used No Total Mileage 52736 Tested By: Leland Steiner Signature: Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. (Explanation given in Observations and/or Remarks.) Items observed are in general conformance with approved project documents and jurisdictional requirements. Observations and/or Remarks: I arrived on site at around 9:00am and began my inspections of the site where asphalt was to be paved. After my field tests where done and paving was complete, I loaded my truck and left the job site Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 16176C76-6F4E-41E1-9C8F-9C694CFE0E00 3