Loading...
HomeMy WebLinkAboutAGGREGATE DENSITY - 23-00170 - Rexburg 10th Ward LDS MeetinghousePRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ECD24A1E-A9F3-481C-96D9-9A3F5A5401D6 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D04232024LS In Place Density of Soils ASTM D2922 & D3017 Date: 04/23/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 07:30 AM Contractor: Hill and Sons Excavation Total Time on Project: 7 hours Current Weather Conditions: Sunny/Clear Wind: Calm Instrument ID 78653 MS: 644 Ambient Temperature (°F): 41 DS: 2416 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 East Water road crossing 1st lift 8 Pit Run 131.0 126.7 3.4 127.9 99 Pass 2 East Water Road Crossing, center of road 2nd lift 6 Pit Run 128.2 123.0 4.2 127.9 96 Pass 3 East Water Road Crossing, center of road 3rd Lift 6 Pit Run 129.4 122.8 5.4 127.9 96 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ECD24A1E-A9F3-481C-96D9-9A3F5A5401D6 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 4 East road water crossing 4th lift 6 Pit Run 130.5 123.1 6.0 127.9 96 Pass 5 Central Water Road Crossing 1st lift 6 Pit Run 131.3 125.6 4.6 127.9 98 Pass 6 Central Water Road Crossing 2nd lift 6 Pit Run 126.9 120.9 5.0 127.9 95 Pass 7 Central Water Road Crossing 3rd lift 6 Pit Run 126.8 122.4 3.6 127.9 96 Pass Field Technician Information Truck STARLORD Mileage from Lab to Project (One Way) 9 Total Mileage 52444.00 Tested By: Leland Steiner Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: I arrived on site and began testing for compaction on the waterlines in the road. I tested each lift, confirming that each one was compacted to meet required specifications. Once I tested all pit run lifts for both the eastern and central water crossings, I loaded my great into my truck and left the job site. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ECD24A1E-A9F3-481C-96D9-9A3F5A5401D6 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ECD24A1E-A9F3-481C-96D9-9A3F5A5401D6 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D04232024LS In Place Density of Soils ASTM D2922 & D3017 Date: 04/23/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 07:30 AM Contractor: Hill and Sons Excavation Total Time on Project: 7 hours Current Weather Conditions: Sunny/Clear Wind: Calm Instrument ID 78653 MS: 644 Ambient Temperature (°F): 41 DS: 2416 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 East Water road crossing 1st lift 8 Pit Run 131.0 126.7 3.4 127.9 99 Pass 2 East Water Road Crossing, center of road 2nd lift 6 Pit Run 128.2 123.0 4.2 127.9 96 Pass 3 East Water Road Crossing, center of road 3rd Lift 6 Pit Run 129.4 122.8 5.4 127.9 96 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ECD24A1E-A9F3-481C-96D9-9A3F5A5401D6 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 4 East road water crossing 4th lift 6 Pit Run 130.5 123.1 6.0 127.9 96 Pass 5 Central Water Road Crossing 1st lift 6 Pit Run 131.3 125.6 4.6 127.9 98 Pass 6 Central Water Road Crossing 2nd lift 6 Pit Run 126.9 120.9 5.0 127.9 95 Pass 7 Central Water Road Crossing 3rd lift 6 Pit Run 126.8 122.4 3.6 127.9 96 Pass Field Technician Information Truck STARLORD Mileage from Lab to Project (One Way) 9 Total Mileage 52444.00 Tested By: Leland Steiner Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: I arrived on site and began testing for compaction on the waterlines in the road. I tested each lift, confirming that each one was compacted to meet required specifications. Once I tested all pit run lifts for both the eastern and central water crossings, I loaded my great into my truck and left the job site. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ECD24A1E-A9F3-481C-96D9-9A3F5A5401D6 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ED96BB3F-F10E-4E4F-ADA8-62977B5BB1B6 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D04262024LS In Place Density of Soils ASTM D2922 & D3017 Date: 04/26/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 09:00 AM Contractor: Hill and Sons Excavation Total Time on Project: 9 hours Current Weather Conditions: Drizzle Wind: 5-15 mph Instrument ID 78653 MS: 649 Ambient Temperature (°F): 45 DS: 2460 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 Western road water crossing, 25ft south of manhole 1st lift 8 Pit Run 127.7 120.9 5.7 127.9 95 Pass 2 Western road water crossing, center of road 2nd lift 6 Pit Run 131.8 125.7 4.8 127.9 98 Pass 3 Western road water crossing, 3rd lift 6 Pit Run 132.7 124.0 7.0 127.9 97 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ED96BB3F-F10E-4E4F-ADA8-62977B5BB1B6 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 25ft south of manhole 4 Western water road crossing, 20ft south of manhole 4th lift 6 Pit Run 129.4 123.7 4.7 127.9 97 Pass 5 Western road water crossing, center of road 5th lift 6 Pit Run 129.2 123.8 4.4 127.9 97 Pass 6 Western road water crossing, 15ft north of southern manhole Top of grade 6 Pit Run 129.4 122.5 5.7 127.9 96 Pass 7 Western road water crossing, 20ft south of edge of road, in line with manhole Top of grade 6 3/4" Base 132.4 127.0 4.3 130.0 98 Pass Field Technician Information Truck STARLORD Mileage from Lab to Project (One Way) 9 Total Mileage 52727.00 Tested By: Leland Steiner Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ED96BB3F-F10E-4E4F-ADA8-62977B5BB1B6 3 Observations/Remarks: I arrived at the job site and began inspecting the backfilling and compaction of the remaining water crossing within the road. After my field tests where complete for the project, I loaded my gear into my truck and left the job site Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ED96BB3F-F10E-4E4F-ADA8-62977B5BB1B6 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ED96BB3F-F10E-4E4F-ADA8-62977B5BB1B6 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D04262024LS In Place Density of Soils ASTM D2922 & D3017 Date: 04/26/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 09:00 AM Contractor: Hill and Sons Excavation Total Time on Project: 9 hours Current Weather Conditions: Drizzle Wind: 5-15 mph Instrument ID 78653 MS: 649 Ambient Temperature (°F): 45 DS: 2460 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 Western road water crossing, 25ft south of manhole 1st lift 8 Pit Run 127.7 120.9 5.7 127.9 95 Pass 2 Western road water crossing, center of road 2nd lift 6 Pit Run 131.8 125.7 4.8 127.9 98 Pass 3 Western road water crossing, 3rd lift 6 Pit Run 132.7 124.0 7.0 127.9 97 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ED96BB3F-F10E-4E4F-ADA8-62977B5BB1B6 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 25ft south of manhole 4 Western water road crossing, 20ft south of manhole 4th lift 6 Pit Run 129.4 123.7 4.7 127.9 97 Pass 5 Western road water crossing, center of road 5th lift 6 Pit Run 129.2 123.8 4.4 127.9 97 Pass 6 Western road water crossing, 15ft north of southern manhole Top of grade 6 Pit Run 129.4 122.5 5.7 127.9 96 Pass 7 Western road water crossing, 20ft south of edge of road, in line with manhole Top of grade 6 3/4" Base 132.4 127.0 4.3 130.0 98 Pass Field Technician Information Truck STARLORD Mileage from Lab to Project (One Way) 9 Total Mileage 52727.00 Tested By: Leland Steiner Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ED96BB3F-F10E-4E4F-ADA8-62977B5BB1B6 3 Observations/Remarks: I arrived at the job site and began inspecting the backfilling and compaction of the remaining water crossing within the road. After my field tests where complete for the project, I loaded my gear into my truck and left the job site Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. ED96BB3F-F10E-4E4F-ADA8-62977B5BB1B6 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 48B83F0C-F41D-4566-9420-F6A070E39970 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D05142024LS In Place Density of Soils ASTM D2922 & D3017 Date: 05/14/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 08:00 AM Contractor: Hill and Son Excavation Total Time on Project: 9 hours Current Weather Conditions: Rain Wind: Calm Instrument ID 78653 MS: 655 Ambient Temperature (°F): 53 DS: 2461 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 East parking lot, 15ft east of souther gutter, 2ft south of southern gutter 2nd lift 6 Pit Run 129.8 124.8 4.0 127.9 98 Pass 2 East parking lot, 15ft east from northern gutter, 3ft 2nd lift 6 Pit Run 132.3 126.7 4.8 127.9 99 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 48B83F0C-F41D-4566-9420-F6A070E39970 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result south of same gutter 3 East parking lot, 15ft west of northern gutter, 3ft north of same gutter 2nd lift 6 Pit Run 132.9 125.9 5.6 127.9 98 Pass 4 East parking lot, 25ft north of southern edge of building, 50ft east from eastern side of building 2nd lift 6 Pit Run 128.0 122.8 4.2 127.9 96 Pass 5 East parking lot, 15ft east from building, in line with southern wall of building 2nd lift 6 Pit Run 127.6 121.1 5.4 127.9 95 Pass Field Technician Information Truck STARLORD Mileage from Lab to Project (One Way) 9 Total Mileage 53979.00 Tested By: Leland Steiner Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 48B83F0C-F41D-4566-9420-F6A070E39970 3 Observations/Remarks: I arrived on site at around 8:00am and set up to perform my field tests. I observed the placement and compaction of the dirt there on site and tested when the contractor was ready for me. I left the job site at around 4:30pm to head to another appointment. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. B9A932C0-866B-4C2D-9EAE-9B8AB25EE18A 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D06052024LS In Place Density of Soils ASTM D2922 & D3017 Date: 06/05/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 01:30 PM Contractor: Hill and Son Excavation Total Time on Project: 3 hours Current Weather Conditions: Partly Cloudy Wind: 5-15 mph Instrument ID 76562 MS: 684 Ambient Temperature (°F): 82 DS: 2559 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 Under curb on north side of east parking lot, 15ft west from eastern most curb line of parking lot Top of grade 4 3/4" Base 126.1 123.4 2.3 130.0 95 Pass 2 3/4 base under curb in center of Top of grade 4 3/4" Base 125.4 123.1 2.0 130.0 95 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. B9A932C0-866B-4C2D-9EAE-9B8AB25EE18A 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result parking lot, north side of center curb, 15ft south from north edge of central curbing, 2ft east 3 South east corner of parking lot, 20ft north of southern edge, 20ft west from eastern curb Top of grade (2nd lift) 6 Pit Run 132.0 128.5 2.7 127.9 100 Pass Field Technician Information Truck JARVIS Mileage from Lab to Project (One Way) 9 Total Mileage 45824.00 Tested By: Leland Steiner Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: I arrived on site at around 2:45pm and spoke with Dallas with Headwaters. I confirmed where I need to be with him as well as with the contractor and began my field compaction testing. After my testing, result were relayed to the contractor and I left the job site. Reviewed By: E. Vail Signature: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. B9A932C0-866B-4C2D-9EAE-9B8AB25EE18A 3 Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. B9A932C0-866B-4C2D-9EAE-9B8AB25EE18A 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. BC988821-9BD1-4F02-9009-253A2F2DE47C 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D06132024MJV In Place Density of Soils ASTM D2922 & D3017 Date: 06/13/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 03:00 PM Contractor: HSE Hill and Son Excavation Total Time on Project: 2 hours Current Weather Conditions: Sunny/Clear Wind: Calm Instrument ID 5286 MS: 689 Ambient Temperature (°F): 91 DS: 2149 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 Parking lot, 40’ west by 15’ south of NW corner of Stake Center 2’ below FG BS Pit Run 133.6 125.7 6.3 127.9 98 Pass 2 Parking lot, 30’ west by 25’ south of NW corner of Stake Center 2’ below FG BS Pit Run 128.4 122.1 6.0 127.9 95 Pass 3 Parking lot, 3’ BS Pit Run 128.1 121.5 5.4 127.9 95 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. BC988821-9BD1-4F02-9009-253A2F2DE47C 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 50’ west by 35’ south of NW corner of Stake Center below FG 4 Parking lot, 35’ west by 15’ north of SW corner of Stake Center 2’ below FG BS Pit Run 136.2 127.1 4.7 127.9 99 Pass 5 Parking lot, 20’ west by 5’ north of SW corner of Stake Center 2’ below FG BS Pit Run 135.2 129.2 4.6 127.9 101 Pass 6 Parking lot, 45’ west by 30’ north of SW corner of Stake Center 3’ below FG BS Pit Run 136.1 127.8 6.5 127.9 100 Pass Field Technician Information Truck THANOS Mileage from Lab to Project (One Way) 9 Total Mileage 51562.00 Tested By: Matthew Valinotti Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: Arrived at job site and met with Chad with HSE. Observed as trucks came in with pit run and unloaded the material onto the parking lot site. A dozer was used to distribute the material to reach specific lifts. Then a large, PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. BC988821-9BD1-4F02-9009-253A2F2DE47C 3 single drum roller made several passes over each lift. Between each pass, a water truck would periodically disperse water for pit run to meet optimum moisture and compact and consolidate more efficiently when the roller would make its pass. Used a nuclear gauge to take multiple shots at different lifts and relayed passing results to Chad with HSE. Cleaned equipment and left job site. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. BC988821-9BD1-4F02-9009-253A2F2DE47C 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 35ADA182-C0CF-40B0-AA39-72E8642F173B 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D06172024MJV In Place Density of Soils ASTM D2922 & D3017 Date: 06/17/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 01:30 PM Contractor: HSE Hill and Son Excavation Total Time on Project: 2 hours Current Weather Conditions: Overcast Wind: 5-15 mph Instrument ID 5286 MS: 700 Ambient Temperature (°F): 57 DS: 2130 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 30’ west by 60’ south of NW corner of Stake Center Building 1’ below FG BS Pit Run 131.3 125.1 4.9 127.9 98 Pass 2 20’ west by 85’ south of NW corner of Stake Center Building 1’ below FG BS Pit Run 127.8 125.2 2.0 127.9 98 Pass 3 70’ west by 1’ BS Pit Run 126.8 122.0 4.0 127.9 95 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 35ADA182-C0CF-40B0-AA39-72E8642F173B 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 25’ south of NW corner of Stake Center Building below FG 4 70’ west by 50’ south of NW corner of Stake Center Building 1’ below FG BS Pit Run 136.1 130.2 4.6 127.9 102 Pass 5 60’ west by 20’ north of SW corner of Stake Center Building 1’ below FG BS Pit Run 126.3 122.8 2.9 127.9 96 Pass 6 50’ west by 50’ south of NW corner of Stake Center Building 1’ below FG BS Pit Run 132.4 126.3 4.8 127.9 99 Pass Field Technician Information Truck THANOS Mileage from Lab to Project (One Way) 9 Total Mileage 51638.00 Tested By: Matthew Valinotti Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 35ADA182-C0CF-40B0-AA39-72E8642F173B 3 Arrived at job site at 1:30pm, and met with Cordell with HSE. Confirmed location that needed compaction testing. Used nuclear gauge to take several shots of last lift of the parking lot (1’ FG). Relayed passing results to the HSE team. Observed as last lift was rolled by a Ingersollrand SD100 large, single drum roller. Cleaned equipment and left job site. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 35ADA182-C0CF-40B0-AA39-72E8642F173B 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 171D9E6E-D076-40E4-901C-0D6A9A89E4BC 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D07102024BB In Place Density of Soils ASTM D2922 & D3017 Date: 07/10/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 07:00 AM Contractor: Hill & Son’s Excavation Total Time on Project: 2 Current Weather Conditions: Sunny/Clear Wind: Calm Instrument ID 76560 MS: 618 Ambient Temperature (°F): 62 DS: 2348 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 Married Student Second Stake Center sidewalk on east side of building approximately 40’ south of the north end. Top of base under sidewalk. 4 3/4" Base 124.6 123.1 1.2 130.0 95 Pass 2 Married Top of 4 3/4" Base 125.5 124.3 1.7 130.0 96 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 171D9E6E-D076-40E4-901C-0D6A9A89E4BC 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result Student Second Stake Center sidewalk on east side of building approximately 85’ south of the north end. base under sidewalk. Field Technician Information Truck PUNISHER Mileage from Lab to Project (One Way) 9 Total Mileage 64928.00 Tested By: Ben E Ball Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: Arrived on site at 7:20 AM. Alpha Concrete Construction was preparing to pour approximately 130 feet of sidewalk. Before I could get my gauge out, they started pouring. I managed to take two tests in front of the concrete, both of which passed. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 171D9E6E-D076-40E4-901C-0D6A9A89E4BC 3 File Name: 23255D08032023MH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 0F4F7897-86F1-4D12-B099-DF1A9605FD82 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 In Place Density of Soils ASTM D2922 & D3017 Project Number: 23-255 Project Name: Married Student Second Stake Contractor: Headwaters Construction Client: The Church of Jesus Christ of Latter-day Saints Date: 08/03/2023 Time Start: 01:15 PM Total Time on Project: 2 hours Instrument ID 76562 Daily Standardization: MS: 679 DS: 2664 Current Weather Conditions: Overcast Ambient Temperature (°F): 70 Wind: Calm Details Test #:Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor:Pass Fail 1 Southeast corner of building foundation Top of Subbase BS 128.2 121.7 5.1 127.9 Material Type Pit Run 95 2 Northeast corner of building foundation Top of Subbase BS 130.5 124.8 4.6 127.9 Material Type Pit Run 98 3 Northwest corner of building foundation Top of Subbase BS 128.4 122.2 5.1 127.9 Material Type Pit Run 96 4 Center of building foundation Top of Subbase BS 134.3 129.4 3.7 127.9 Material Type Pit Run 101 5 Southwest corner of building foundation Top of Subbase BS 130.6 124.1 5.2 127.9 Material Type Pit Run 97 File Name: 23255D08032023MH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 0F4F7897-86F1-4D12-B099-DF1A9605FD82 2 Observations/Remarks: I arrived on site at approximately 11:55 AM for a concrete placement at the same location. After completing my concrete tests and cleaning my equipment, I began preparing my gauge for testing. I performed five density tests on the aggregate at approximately 1:20 PM. The tests I performed for this sample were in general conformance of project specifications and the results were reported to the contractor. I then cleaned my equipment and entered my vehicle to begin this report. Tested By: Michael Hammar Signature: Reviewed By: E. Vail Signature: Date: 08/07/2023 Inspection Images: File Name: 23255D08032023MH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 0F4F7897-86F1-4D12-B099-DF1A9605FD82 3 File Name: 23255D08032023MH PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 0F4F7897-86F1-4D12-B099-DF1A9605FD82 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1723039389226 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D08072024TH In Place Density of Soils ASTM D2922 & D3017 Date: 08/07/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 07:30 AM Contractor: Headwaters Construction Total Time on Project: 2 hrs Current Weather Conditions: Sunny/Clear Wind: Calm Instrument ID 76562 MS: 677 Ambient Temperature (°F): 67 DS: 2759 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 S 5th W, west ditch along the road. 40’ S of University Blvd. 12" below FG 8 Pit Run 134.7 130.2 3.5 127.9 102 Pass 2 S 5th W, west ditch along the road. I00’ S of University Blvd. 12" below FG 8 Pit Run 133.6 129.5 3.2 127.9 101 Pass 3 S 5th W, 12" 8 Pit Run 124.9 121.5 2.8 127.9 95 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1723039389226 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result west ditch along the road. 120’ S of University Blvd. below FG Field Technician Information Truck STARLORD Mileage from Lab to Project (One Way) 9 Total Mileage 57331.00 Tested By: Travis Hutmacher Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: Arrived on site and unpacked the gauge. Standardized while waiting for the contractor to show up. Spoke with the contractor and determined where to take shots. Took multiple passing shots and observed as a loader moved material. Observed an excavator loading large rock into a dump truck. Communicated passing shots with the contractor and packed up. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1723039389226 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1723039389226 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1723039389226 5 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. DE45ABAA-BF5C-43E8-815D-3DFEAD03F803 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D08162023LS In Place Density of Soils ASTM D2922 & D3017 Date: 08/16/2023 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Total Time on Project: 2 Time Start: 03:15 PM Contractor: Hill and Sons Current Weather Conditions: Sunny/Clear Wind: Calm Instrument ID 23916 MS: 625 Ambient Temperature (°F): 94 DS: 1685 Results Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 North west side of inside building. 30ft from west wall, 50ft from north wall. Top of grade 4 133.2 128.4 5.6 127.9 Pit Run 100 2 North west side of interior of building, 10 ft from west wall, 20ft from north wall Top of grade 4 133.3 128.3 3.9 127.9 Pit Run 100 3 North east side of interior of building, 20ft west from east Top of grade 4 133.7 127.8 4.7 127.9 Pit Run 100 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. DE45ABAA-BF5C-43E8-815D-3DFEAD03F803 2 Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail wall, 50ft south from north wall Field Technician Information Tested By: Leland Stiener Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: I arrived on site at around 3:00pm and began preparing my equipment for density testing on aggregate. I spoke with the contractor and he requested shots taken on the north half of the interior of the building. The shots I was able to take passed compaction and were within specs and regulations for the project. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. DE45ABAA-BF5C-43E8-815D-3DFEAD03F803 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1724277938178 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D08212024TH In Place Density of Soils ASTM D2922 & D3017 Date: 08/21/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 04:00 PM Contractor: Headwaters Construction Total Time on Project: 2hrs Current Weather Conditions: Sunny/Clear Wind: 5-15 mph Instrument ID 23916 MS: 631 Ambient Temperature (°F): 89 DS: 1957 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 West parking lot/ Driveway 10' east of S 5th W 6" below FG BS 3/4" Base 137.8 132.8 3.7 130.0 102 Pass 2 West parking lot/ Driveway 15' East of S 5th W 6" below FG BS 3/4" Base 137.4 129.5 6.0 130.0 100 Pass 3 West parking lot/ Driveway 6" below FG BS 3/4" Base 134.4 131.2 2.3 130.0 101 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1724277938178 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 30' East of S 5th W 4 West parking lot/ Driveway 8' East of S 5th W 6" below FG BS 3/4" Base 131.7 128.0 2.8 130.0 98 Pass 5 West parking lot/ Driveway 4' East of S 5th W 6" below FG BS 3/4" Base 127.8 124.1 2.9 130.0 95 Pass Field Technician Information Truck STARLORD Mileage from Lab to Project (One Way) 9 Total Mileage 57910.00 Tested By: Travis Hutmacher Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: Arrived on site and unpacked the gauge. Observed a grader spreading ¾ “ base material. Took 5 passing shots. Communicated results to the contractor. Packed up gear. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1724277938178 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1724277938178 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1724277938178 5 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1724277938178 6 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1724267069210 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D08212024TH In Place Density of Soils ASTM D2922 & D3017 Date: 08/21/2024 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Time Start: 01:00 PM Contractor: Headwaters Construction Total Time on Project: 2hrs Current Weather Conditions: Sunny/Clear Wind: Calm Instrument ID 23916 MS: 631 Ambient Temperature (°F): 76 DS: 1957 Results Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result 1 West parking lot/ Driveway, Northside of parking spots. 90' East of S 5th W. 8" below FG BS 3/4" Base 130.1 127.3 2.2 130.0 98 Pass 2 West parking lot/ Driveway, Northside of parking 8" below FG BS 3/4" Base 130.6 127.9 2.1 130.0 98 Pass PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1724267069210 2 Test #: Location:Elevation: Depth:Material:Wet:Dry:% M:Proctor #: % Proctor: Result spots. 25' East of S 5th W. Field Technician Information Truck STARLORD Mileage from Lab to Project (One Way) 9 Total Mileage 57897.00 Tested By: Travis Hutmacher Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: Arrived on site at 1:00 pm. Observed a grader smoothing ¾ base material. Spoke with the contractor and determined where to take shots. Took multiple passing shots and communicated results with the contractor. Packed up gear. Reviewed By: E. Vail Signature: Inspection Images: PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1724267069210 3 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 19884116872ae642-1724267069210 4 PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 2533F2E5-C0FF-4CC2-8CA4-E1CC5433343B 1 4103 E. 605 N. Suite 1 Rigby ID, 83442 208.932.4428 File Name: 23255D08302023LS In Place Density of Soils ASTM D2922 & D3017 Date: 08/30/2023 Project Number: 23-255 Project Name: Married Student Second Stake Client: The Church of Jesus Christ of Latter-day Saints Total Time on Project: 2 Time Start: 12:00 PM Contractor: Hill and Sons Excavation Current Weather Conditions: Sunny/Clear Wind: 5-15 mph Instrument ID 78653 MS: 655 Ambient Temperature (°F): 73 DS: 2505 Results Details Test #: Location:Elevation: Depth:Wet:Dry:% M:Proctor #:% Proctor: Pass Fail 1 7ft north, 15ft east of south west corner of building Top of grade 4 128.7 124.4 3.5 130.0 3/4" Base 96 2 15ft west, 7ft north of south east corner of building Top of grade 6 130.1 125.1 4.0 130.0 3/4" Base 96 3 15ft west, 40ft north of south east corner of building Top of grade 4 128.9 123.6 4.1 130.0 3/4" Base 95 Field Technician Information Truck Mileage from Lab to Project (One Way)Total Mileage PRIVILEGED AND CONFIDENTIAL: This document and the information contained herein are confidential and protected from disclosure. This message and its content is intended only for the use of the addressee(s) and may contain sensitive, confidential information. If you are not the intended recipient, you are hereby notified that the use, dissemination, or copying of this information is strictly prohibited, please notify the sender immediately. 2533F2E5-C0FF-4CC2-8CA4-E1CC5433343B 2 THOR 8 32467.00 Tested By: Leland Steiner Signature: Items observed are in general conformance with approved project documents and jurisdictional requirements. Items observed are NOT in general conformance with approved project documents and jurisdictional requirements. Observations/Remarks: I arrived on site, spoke with the contractor about where he wanted tested, and began my field density tests. After testing I spoke with the contractor letting him know of my results, packed up my gear and left the job site. Reviewed By: E. Vail Signature: Inspection Images: