HomeMy WebLinkAboutLIGHT POLE ANCHORING - RESPONSE 2023.07.26 - 23-00170 - Rexburg 10th Ward LDS Meetinghouse223015HW Job No. REXBURG LDS MEETINGHOUSE Request For Information No. 3 Response 411 UNIVERSITY BOULEVARD, REXBURG, ID 83440 Coordination Date: To:PACKER ELECTRIC LLC From:KENT CARSON, Headwaters Construction Company Specification Section:265600 EXTERIOR LIGHTING Drawing Sheet(s):E101 Trade: Subject: LIGHT POLE ANCHORING Date Created: 6/29/2023 Yes No Possible Yes No Possible Cost Impact: Schedule Impact: The following RFI Response is transmitted to you for your review and use. Please notify me within seven calendar days, after receipt of this document, if there are any cost/credit changes as a result of this instruction. If I have not received a response within the specified time frame, Headwaters will interpret this as an agreement to perform the work at no increase to the contract sum. Your anticipated cooperation is appreciated. Request: On this project, we have found Lava rock, and the plans necessitate the light poles to be installed at a depth of 5 feet. In the event that we come across Lava rock during installation of the light poles, would it be feasible to reduce the length of the pole bases and anchor them to the lava, or would you suggest an alternative approach. If shortening the pole bases is indeed possible, what requirements must we meet? Response: In communication with Jeff Hansen, we have confirmed with the electrical engineer, the soils / geotechnical engineer, and the manufacturers Hilti and Simpson. There is no testing data available for this application because bedrock conditions are quite varied. In light of this, and because this is not a large installation, it is approvable in the following conditions: - The size of the rock that is being tied into shall be at least as large as the portion of concrete foundation that is being replaced. - The rock that is being tied into is a consolidated piece and not fractured into sizes smaller than noted above. If this is the case, please use #4 bars embedded 8" into the bedrock and epoxied. Lap each rebar 24" minimum. Please contact us further for any specific conditions that have complications for this. Request Reply By: 7/13/2023 Response Received On: 7/26/2023 Response By LAFE HARRIS, BHD ARCHITECTS Attachments Included: Attachments Included: Headwaters' Comments: Revision No. 900 JET STREAM DRIVE, REXBURG, ID 83440 P: (866) 496-9869 F: (866) 496-0209 www.HeadwatersCC.com Page 1 of 1 RFI No. 3 Response