Loading...
HomeMy WebLinkAboutPLANS 9-13-22 - 22-00642 - 859 S Yellowstone Hwy Suite 2701 - Henry's Fork Plaza Office SuitesAREA MAP PROJEC T SITE HENRY'S FORK PLAZA 859 SOUTH YELLOWSTONE REXBURG, ID 83440 LOT 27 HENRY'S FORK PLAZA S YELLOWSTONE HWY MI K A N DR LOT 27 DRAWING INDEX IBC 2018 ANALYSIS TYPE OF CONST. OCCUPANCY GROUP ALLOWABLE BLDG. SQFT ALLOWABLE BLDG. HT. ALLOWABLE BLDG. STORIES SNOW LOADS ROOF GROUND WIND SEISMIC RISK CATEGORY ACTUAL SQ FT MAIN LEVEL = ACTUAL BLDG. HT. ACTUAL BLDG. STORIES OCCUPANCY LOAD V-B 'B' NON SPRINKLED 18,000 SQFT 50' 3 35 PSF 50PSF 115 MPH D II 3,660 SQFT NON SPRINKLED 3,660 SQFT <18,000 = ACCEPTABLE 20' -1" 1 24 *PROVIDE DRINKIMG FOUNTAIN STATE OF IDAHO BRENT A. McFARLAND AR-2561 11 5 2 B O N D A V E N U E - S u i t e A RE X B U R G , I D A H O 8 3 4 4 0 VO I C E ( 2 0 8 ) 3 5 9 - 2 3 0 9 F A X ( 2 0 8 ) 3 5 9 - 2 2 7 1 WW W . J R W A . C O M Job Number: Date: Drawn By: Checked By: Plot Date: Consultants: Drawing Number: File: Revisions: Pr o j e c t : Dr a w i n g T i t l e : OF 9/13/2022 9:10:38 AM S:\Drawings\923 - Stevens Const Co Spas & Suites\BIM\Spas and Suites(Recovery).rvtG1.1 CO V E R S H E E T 923 HE N R Y ' S F O R K O F F I C E S U I T E S SEP. 2022 HJF RM 2 RE X B U R G ID A H O REXBURG IDAHO HENRY'S FORK OFFICE SUITES G1.1 COVER SHEET G1.2 GENERAL ACCESSIBILITY REQUIREMENTS SD1.1 SITE PLAN - LAYOUT A1.1 MAIN FLOOR PLAN A1.2 ROOF PLAN A2.1 EXTERIOR ELEVATIONS A3.1 BUILDING SECTIONS S1.1 FOOTING AND FOUNDATION PLAN GENERAL ARCHITECTURAL STRUCTURAL SITE CL LC CL LC LC LC CL LC #304 ROOM WASTE TOWELS TOWELS WASTE VEND. WASTE 48 " A F F M A X 48 " A F F M A X 48 " A F F M A X TO OP E R A B L E CO N T R O L S TY P TO D I S I P N S I N G OU T L E T T Y P TO D I S I P N S I N G OU T L E T T Y P 48 " A F F M A X TO D I S I P N S I N G OU T L E T T Y P 48 " A F F M A X TO OP E N I N G 19 " A F F M I N 27 " A F F M A X 19 A F F M I N 27 " A F F M A X TOWEL DISPENSER & WASTE RECEPTACLE TOWEL DISPENSER HAND DRYER SANITARY PRODUCTS VENDOR WASTE RECEPTACLE TISSUE DISPENSER NAPKIN DISPOSAL NOTE: PROVIDE A MIN CLEAR FLOOR SPACE OF 30"x48" AT APPROACH ALONG AN ACCESSIBLE ROUTE. 33" MIN 36" MAX 12" MAX 3'-8" MIN 36" MAX 39" - 41" 39" - 41" 18" MAX 17" - 19" 1 1/4" TO 1 1/2" O.D. GRAB BAR (TYP) 18" MIN 36" MIN 6" MAX TOILET TOILET 1 1/2" MIN CLEAR TO WALL OR DISPENSERS TO DISP. OUTLET 48" MAX TO MIRROR 38" MAX 9" MIN MIN CLR WIDTH 2' - 6" 29" MIN 34" MAX BO T T O M OF AP R O N TO P O F R I M INSULATE ALL EXPOSED PIPES NOTE: FLUSH VALVE HANDLE ON WIDE SIDE OF TOILET, 44" AFF MAX. NOTE: GRAB BARS MUST NOT ROTATE WITHIN THEIR FITTINGS. STANDARD ACCESSIBILITY: 1. ALL DOORS IN THE PUBLIC AND COMMON USE AREAS SHALL COMPLY WITH ANSI A117.1, INCLUDING NECESSARY MANEUVERING CLEARANCES AND ACCESSIBLE DOOR HARDWARE. THIS INCLUDES THE EXTERIOR SIDE OF THE MAIN ENTRY DOORS TO DWELLING UNITS. 2. ALL DOORS SHALL HAVE 32" MIN CLEAR WIDTH WHEN DOOR IS OPEN 90 DEGREES. 3. ALL PLUMBING FIXTURES AND APPLIANCES IN DWELLING UNITS SHALL HAVE MIN 30" x 48" CLEAR FLOOR SPACE AS REQUIRED BY FHA. 4. ALL PLUMBING FIXTURES, APPLIANCES, AND TELEPHONES IN PUBLIC AND COMMON USE AREAS SHALL COMPLY WITH ADA, IBC, AND ANSI 117.1. 6" MAX TOE 17" MIN 27" MIN 29" MIN BO T T O M OF A P R O N 34" MAX AF F T O TO P O F RI M 8" MINKNEE CLEARAN CE CLEARAN CE 9" MIN 6" MAX 8" MIN 27" MIN OF SPOUT 36" MAX TOP 17"-19" 5' - 0" AFF MOUNT SIGNS AT LATCH SIDE OF DOOR, OR NEAREST ADJACENT WALL. AT WALL 18" MIN CLR WIDTH 30" MIN TOP OF RIM 17" MAX FACE OF FINISHED WALL NOTES: 1. FLUSH VALVE HANDLE AT 44" AFF MAX. 2. 30" x 48" MIN CLR FLR SPACE AT APPROACH 3. 5 LBS MAX FORCE TO OPERATE FLUSH VALVE. 4. 14" MIN PROJECTION FROM WALL. 15" MIN 48" MAX ELEC. OUTLET SWITCHES, THERMOSTATS, ETC. LAVATORY, MIRROR, AND SOAP DISPENSER LAVATOR Y DRINKING FOUNTAIN PERMANENT ROOM SIGNAGE URINAL ELECTRICAL DEVICES NOTE: 18" MIN CLR FROM WALL TO OF LAVATORYLC NOTE: PROVIDE MIN CLEAR FLOOR SPACE OF 30" x 48" WITH 19" MAX EXTENDING UNDER LAV./D.F. TO INSULATED PIPING/PLUMBING. NOTE: FAUCETS MUST BE LEVER TYPE, ELECTRONICALLY ACTIVATED, OR APPROVED SELF-CLOSING VALVES (MIN 10 SEC. OPEN FLOW), AND BE OPERABLE w/ ONE HAND, NOT REQUIRING TIGHT GRASPING, PINCHING, OR TWISTING OF WRIST. 5 LBS. MAX FORCE REQUIRED TO ACTIVATE CONTROLS. FINISH FLOOR TYP. FINISH FLOOR TYP. FINISH FLOOR TYP. 0' - 9" 33" - 36"3" - 6" 1' - 6" CONTROL END ELEVATION BACK WALL ELEVATION PLAN VIEW 33" - 36" 33" - 36"3" - 6" 1' - 6" 1' - 0" 24" MAX 24" MIN 12" MAX 4" MAX 24" MIN BACK WALL HE A D E N D WA L L CO N T R O L EN D WA L L 15" MIN 48" MAX 20" MAX 48" MAX >20"-25" 44" MAX 10" MAX 48" MAX 15" MIN. 10" MAX 34" MAX 48" MAX 34" MAX 48" MAX >10"-24" 48" MIN 19" MAX 27" MIN 34" MAX 17" MIN 40" MAX 34" MAX 27" MIN 9" MIN 6" MAX8" MIN GUIDANCE FOR KNEE SPACES IN "A" BATHROOMS GUIDANCE FOR KNEE SPACES IN "B" BATHROOMS KNEE SPACE AT LAVATORIESOBSTRUCED HIGH SIDE REACH UNOBSTRUCTED SIDE REACHOBSTRUCTED HIGH FORWARD REACH UNOBSTRUCTED FORWARD REACH 11 5 2 B O N D A V E N U E - S u i t e A RE X B U R G , I D A H O 8 3 4 4 0 VO I C E ( 2 0 8 ) 3 5 9 - 2 3 0 9 F A X ( 2 0 8 ) 3 5 9 - 2 2 7 1 WW W . J R W A . C O M Job Number: Date: Drawn By: Checked By: Plot Date: Consultants: Drawing Number: File: Revisions: Pr o j e c t : Dr a w i n g T i t l e : ® J R W & A S S O C I A T E S , P L L C . D R A W I N G S A N D D E S I G N S A R E PR O T E C T E D B Y C O P Y R I G H T A N D T H E A R C H I T E C T R E T A I N S T O TA L O W N E R S H I P A N D C O N T R OL . A N Y U N A U T H O R I Z E D U S E O F D R A W I N G S , D E S I G N S O R I D EA S W I T H O U T W R I T T E N C O N S E N T O F T H E A R C H I T E C T I S P R O HI B I T E D OFPRELIMINARYNOT FOR CONSTRUCTION9/13/2022 9:10:39 AM S:\Drawings\923 - Stevens Const Co Spas & Suites\BIM\Spas and Suites(Recovery).rvt G1.2 GE N E R A L A C C E S S I B I L I T Y R E Q U I R E M E N T S 923 HE N R Y ' S F O R K O F F I C E S U I T E S SEP. 2022 HJF RM RE X B U R G ID A H O 2 SCALE:3/8" = 1'-0" Standard Accessibility Installation Requirements SCALE:1/2" = 1'-0" Typical Clearance Requirements A2.1 3 A2.1 2 A2.1 4 A2.1 1 A A3.1 42 ' - 0 " 90' - 0" 30' - 0"30' - 0"30' - 0" 12 ' - 5 1 / 2 " 11 ' - 6 1 / 2 " 18 ' - 0 " 18 ' - 0 " 11 ' - 6 1 / 2 " 12 ' - 5 1 / 2 " 42 ' - 0 " 6' - 0"31' - 0"16' - 0"31' - 0"6' - 0" 6' - 2 1/2"6' - 10 1/2"3' - 10"7' - 1"13' - 0"6' - 1"3' - 10"6' - 1"13' - 0"7' - 1"3' - 10"6' - 10 1/2"6' - 2 1/2" 1 2A AA A A B A A B A A A3A A B A3.1 DOOR SIZE 3'-0" X 7'-0" DOOR SIZE 3'-0" X 7'-0" DOOR SIZE 3'-0" X 7'-0" STATE OF IDAHO BRENT A. McFARLAND AR-2561 11 5 2 B O N D A V E N U E - S u i t e A RE X B U R G , I D A H O 8 3 4 4 0 VO I C E ( 2 0 8 ) 3 5 9 - 2 3 0 9 F A X ( 2 0 8 ) 3 5 9 - 2 2 7 1 WW W . J R W A . C O M Job Number: Date: Drawn By: Checked By: Plot Date: Consultants: Drawing Number: File: Revisions: Pr o j e c t : Dr a w i n g T i t l e : ® J R W & A S S O C I A T E S , P L L C . D R A W I N G S A N D D E S I G N S A R E PR O T E C T E D B Y C O P Y R I G H T A N D T H E A R C H I T E C T R E T A I N S T O TA L O W N E R S H I P A N D C O N T R OL . A N Y U N A U T H O R I Z E D U S E O F D R A W I N G S , D E S I G N S O R I D EA S W I T H O U T W R I T T E N C O N S E N T O F T H E A R C H I T E C T I S P R O HI B I T E D OF 9/13/2022 9:10:35 AM S:\Drawings\923 - Stevens Const Co Spas & Suites\BIM\Spas and Suites(Recovery).rvt A1.1 MA I N F L O O R P L A N 923 HE N R Y ' S F O R K O F F I C E S U I T E S SEP. 2022 HJF RM RE X B U R G ID A H O 4 SCALE:1/4" = 1'-0" MAIN FLOOR PLAN NORTH A2.1 3 A2.1 2 A2.1 4 A2.1 1 A A3.1 RIDG EVALLEYRI D G E RI D G ERIDGERIDGEVALLEYRI D G EVALLEYVALLEY2' - 0" 2' - 0 " 2' - 0 " 2' - 0 " 6" / 1 2 " 6" / 12" 6" / 1 2 " 6" / 12" 6" / 12" 6" / 12" 6" / 12"6" / 12" 2' - 0 " B A3.1 6' - 0 " 3' - 0" 3' - 0 " 3' - 0 " 6' - 0"3' - 0" 3' - 0 " RIDGE VENT ICE AND WATER SHIELD ASPHALT SHINGLES ASPHALT SHINGLES ASPHALT SHINGLES ASPHALT SHINGLES ICE AND WATER SHIELD STATE OF IDAHO BRENT A. McFARLAND AR-2561 11 5 2 B O N D A V E N U E - S u i t e A RE X B U R G , I D A H O 8 3 4 4 0 VO I C E ( 2 0 8 ) 3 5 9 - 2 3 0 9 F A X ( 2 0 8 ) 3 5 9 - 2 2 7 1 WW W . J R W A . C O M Job Number: Date: Drawn By: Checked By: Plot Date: Consultants: Drawing Number: File: Revisions: Pr o j e c t : Dr a w i n g T i t l e : ® J R W & A S S O C I A T E S , P L L C . D R A W I N G S A N D D E S I G N S A R E PR O T E C T E D B Y C O P Y R I G H T A N D T H E A R C H I T E C T R E T A I N S T O TA L O W N E R S H I P A N D C O N T R OL . A N Y U N A U T H O R I Z E D U S E O F D R A W I N G S , D E S I G N S O R I D EA S W I T H O U T W R I T T E N C O N S E N T O F T H E A R C H I T E C T I S P R O HI B I T E D OF 9/13/2022 9:10:36 AM S:\Drawings\923 - Stevens Const Co Spas & Suites\BIM\Spas and Suites(Recovery).rvt A1.2 RO O F P L A N 923 HE N R Y ' S F O R K O F F I C E S U I T E S SEP. 2022 HJF RM RE X B U R G ID A H O 4 SCALE:1/4" = 1'-0" ROOF PLAN NORTH GENERAL NOTES 1.ALUMINUM FASICA AND SOFFIT 2.WINDOWS TO BE VINYL LOW "E" WINDOWS 3.35 YR OR BETTER ASPHALT SHINGLE 4.GABLE VENTS elev100' -0" MAIN FLOOR PLAN elev110' -0" ROOF PLAN elev95' -9 3/4" FOOTING & FOUNDATION A A3.1 6" 12" elev120' -0 29/32" RIDGE ELEVATION 3 2 11 elev100' -0" MAIN FLOOR PLAN elev110' -0" ROOF PLAN elev95' -9 3/4" FOOTING & FOUNDATION A A3.1 STONE FINISH SIDING AS PER OWNER APPROVED 6" 12" 18' - 0 29/32" elev120' -0 29/32" RIDGE ELEVATION 4 2 3 4 11 elev100' -0" MAIN FLOOR PLAN elev110' -0" ROOF PLAN elev95' -9 3/4" FOOTING & FOUNDATION 6" 12" elev120' -0 29/32" RIDGE ELEVATION 2 3 11 elev100' -0" MAIN FLOOR PLAN elev110' -0" ROOF PLAN elev95' -9 3/4" FOOTING & FOUNDATION 6" 12" elev120' -0 29/32" RIDGE ELEVATION 2 3 11 GENERAL NOTES1.EAST AND WEST ELEVATIONS WINDOWS OPENINGS MAKE UP LESS THAN 10% FOR FIRE AREA OF WALL. 2.EAST AND WEST ELEVATION WALLS ARE TO RECIEVE CONSTRUCTION WALL TYPE OF UL/GA DESIGN LISTING OF A U356 (1HR) AND A U302 WP 8410 (2HR) MODIFY WP 8410 TO A (1HR) WITH ONLY ONE LAYER OF GYPSUM ON INTERIOR AND STONE EXTERIOR STATE OF IDAHO BRENT A. McFARLAND AR-2561 11 5 2 B O N D A V E N U E - S u i t e A RE X B U R G , I D A H O 8 3 4 4 0 VO I C E ( 2 0 8 ) 3 5 9 - 2 3 0 9 F A X ( 2 0 8 ) 3 5 9 - 2 2 7 1 WW W . J R W A . C O M Job Number: Date: Drawn By: Checked By: Plot Date: Consultants: Drawing Number: File: Revisions: Pr o j e c t : Dr a w i n g T i t l e : ® J R W & A S S O C I A T E S , P L L C . D R A W I N G S A N D D E S I G N S A R E PR O T E C T E D B Y C O P Y R I G H T A N D T H E A R C H I T E C T R E T A I N S T O TA L O W N E R S H I P A N D C O N T R OL . A N Y U N A U T H O R I Z E D U S E O F D R A W I N G S , D E S I G N S O R I D EA S W I T H O U T W R I T T E N C O N S E N T O F T H E A R C H I T E C T I S P R O HI B I T E D OF 9/13/2022 9:10:36 AM S:\Drawings\923 - Stevens Const Co Spas & Suites\BIM\Spas and Suites(Recovery).rvt A2.1 EX T E R I O R E L E V A T I O N S 923 HE N R Y ' S F O R K O F F I C E S U I T E S SEP. 2022 HJF RM RE X B U R G ID A H O 4 SCALE:1/8" = 1'-0" NORTH SCALE: 1/8" = 1'-0" SOUTH SCALE: 1/8" = 1'-0" EAST SCALE: 1/8" = 1'-0" WEST elev100' -0" MAIN FLOOR PLAN elev110' -0" ROOF PLAN elev95' -9 3/4" FOOTING & FOUNDATION PRE-MANUFACTURED TRUSS SYTEM R-49 BATT INSULATION R-21 BATT INSULATION MANUFACTURED STONE FINISH SIDING 6" 12" CRAWL SPACE BEARING PONY WALL(S) FRAMING @ 24" O.C. (TYPICAL) 11 7/8" FLOOR JOISTS TOUNGE AND GROOVE DECKING R-14 RIDGID INSULATION COMPACTED BACKFILL CONCRETE FOOTING CONCRETE FOUNDATION WALL SHEATHING 2 X 6 FRAMING AIR FILTRATION BARRIER CLASS C ASPHALT SHINGLES UNDERLAYMEN T ROOF SHEATHING 2 X 8 SUB- FACIA STEEL FACIA ALUMINUM SOFFIT B A3.1 elev120' -0 29/32" RIDGE ELEVATION R-38 BATT INSULATION WALL ATTACHMENT TO FOUNDATION AS PER NOTES elev100' -0" MAIN FLOOR PLAN elev110' -0" ROOF PLAN elev95' -9 3/4" FOOTING & FOUNDATION A A3.1 elev120' -0 29/32" RIDGE ELEVATION 3' - 0"CRAWL SPACE 3' - 0"CRAWL SPACE 6" 12" PRE-MANUFACTURED WOOD TRUSS SYTEM R-49 BATT INSULATION R-21 BATT INSULATIONMANUFACTURED STONE FINISH SIDING BEARING PONY WALL(S) FRAMING @ 24" O.C. (TYPICAL) 11 7/8" FLOOR JOISTS TOUNGE AND GROOVE DECKING R-14 RIDGID INSULATION COMPACTED BACKFILL CONCRETE FOOTING CONCRETE FOUNDATION WALL SHEATHING 2 X 6 FRAMING AIR FILTRATION BARRIER CLASS C ASPHALT SHINGLES UNDERLAYMEN T ROOF SHEATHING 2 X 8 SUB- FACIA STEEL FACIA ALUMINUM SOFFIT R-38 BATT INSULATION 2x4 PONY WALL WITH ONE SIDE 7/16" OSB DRAFT STOP WALL ATTACHEMENT TO FOPUNDATION AS PER NOTES GENERAL NOTES 1.CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI. 2.REINFORCING STEEL SHALL BE 60 GRADE. 3.ALL STRAPS AND HOLD DOWNS ARE SIMPSON STRONG TIE U.N.O. REQUIREMENTS FOR ATTACHMENT ARE AS PER SIMPSON. 4.FOUNDATION ANCHOR BOLTS SHALL BE 1/2" AND EMBEDDED MIN. OF 7" INTO CONCRETE. 5.A MINIMUM OF (2) ANCHOR BOLTS SHALL BE USED ON EACH SOLE PLATE PIECE. PROVIDE ANCHOR BOLTS WITHIN 9" OF EACH END. 6. REINFORCING STEEL AT ALL FOUNDATION CORNERS SHALL HAVE 32" OVERLAP IN EACH DIRECTION. STATE OF IDAHO BRENT A. McFARLAND AR-2561 11 5 2 B O N D A V E N U E - S u i t e A RE X B U R G , I D A H O 8 3 4 4 0 VO I C E ( 2 0 8 ) 3 5 9 - 2 3 0 9 F A X ( 2 0 8 ) 3 5 9 - 2 2 7 1 WW W . J R W A . C O M Job Number: Date: Drawn By: Checked By: Plot Date: Consultants: Drawing Number: File: Revisions: Pr o j e c t : Dr a w i n g T i t l e : ® J R W & A S S O C I A T E S , P L L C . D R A W I N G S A N D D E S I G N S A R E PR O T E C T E D B Y C O P Y R I G H T A N D T H E A R C H I T E C T R E T A I N S T O TA L O W N E R S H I P A N D C O N T R OL . A N Y U N A U T H O R I Z E D U S E O F D R A W I N G S , D E S I G N S O R I D EA S W I T H O U T W R I T T E N C O N S E N T O F T H E A R C H I T E C T I S P R O HI B I T E D OF 9/13/2022 9:10:37 AM S:\Drawings\923 - Stevens Const Co Spas & Suites\BIM\Spas and Suites(Recovery).rvt A3.1 BU I L D I N G S E C T I O N S 923 HE N R Y ' S F O R K O F F I C E S U I T E S SEP. 2022 HJF RM RE X B U R G ID A H O 4 SCALE:1/4" = 1'-0" BUILDING SECTION SCALE:1/4" = 1'-0" SECTION A2.1 3 A2.1 2 A2.1 4 A2.1 1 A A3.1 B A3.1 0' - 8" 2' - 0" 2' - 0 " 0' - 8 " 90' - 0" 91' - 4" 42 ' - 0 " 43 ' - 4 " 30' - 0"30' - 0"30' - 0" 31' - 4"28' - 8"31' - 4" EQ EQ EQ 88' - 8" 1' - 6 " 24" X 10" STRUCTURAL FOOTING FOUNDATION WALLS 18" X 10" STRUCTURAL FOOTING 2' - 0"6' - 4"2' - 0" F1 W1 W1 F2 W1 F2 W1 W1 W3W3 F3F3 W1 F2 F1 F1 F2 F2 F2 F2 W1 W1 FOOTING SCHEDULEMAR K F1 F2 F3 1'-6 " 2'- 0" 2'-6 " WIDTH SIZE CONT. CONT. 2'-6 " LENGTH 10 " 10 " 10 " THIC K (2) #4 CONT. (2) #4 L.W. (2) #4 L.W. BOTTOM REINF. WALL SCHEDULE MAR K W1 W2 W3 0'- 8" 0'- 6" 2'- 0" WIDTH SIZE CONT. CONT. 2'- 0" LENGTH 10 " THIC K #4 BAR 24" O.C. #4 BAR 24" O.C. (8) #4 BAR IN CORNERS & CENTER WALL REINFORCEMENT E.W. = EACHWAY L.W. = LENGTHWISE CONT. = CONTINUOUS #4 BAR 16" O.C. #4 BAR 16" O.C. #4 RINGS & 16" O.C. VERTICAL HORIZONTAL STATE OF IDAHO BRENT A. McFARLAND AR-2561 11 5 2 B O N D A V E N U E - S u i t e A RE X B U R G , I D A H O 8 3 4 4 0 VO I C E ( 2 0 8 ) 3 5 9 - 2 3 0 9 F A X ( 2 0 8 ) 3 5 9 - 2 2 7 1 WW W . J R W A . C O M Job Number: Date: Drawn By: Checked By: Plot Date: Consultants: Drawing Number: File: Revisions: Pr o j e c t : Dr a w i n g T i t l e : ® J R W & A S S O C I A T E S , P L L C . D R A W I N G S A N D D E S I G N S A R E PR O T E C T E D B Y C O P Y R I G H T A N D T H E A R C H I T E C T R E T A I N S T O TA L O W N E R S H I P A N D C O N T R OL . A N Y U N A U T H O R I Z E D U S E O F D R A W I N G S , D E S I G N S O R I D EA S W I T H O U T W R I T T E N C O N S E N T O F T H E A R C H I T E C T I S P R O HI B I T E D OF 9/13/2022 9:12:05 AM S:\Drawings\923 - Stevens Const Co Spas & Suites\BIM\Spas and Suites(Recovery).rvt S1.1 FO O T I N G A N D F O U N D A T I O N P L A N 923 HE N R Y ' S F O R K O F F I C E S U I T E S SEP. 2022 HJF RM RE X B U R G ID A H O 1 SCALE:1/4" = 1'-0" FOOTING & FOUNDATION