HomeMy WebLinkAboutCOMCHECK - 22-00372 - Thomson Farms the Grove - ClubhouseCOMcheck Software Version 4.1.1.0
Envelope Compliance Certificate
Project Title:
2018 IECC
Project Type:New Construction
Vertical Glazing / Wall Area:17%
Location:Rexburg, Idaho
Climate Zone:6b
Construction Site:
365 Thomson Farms Road
Rexburg, ID 83440
Owner/Agent:
Paul Bringhurst
Stillwater Equity Partners
160 W Canyon Crest Rd
ALpine, UT 84004
801.216.8850
paul@stillwatermail.com
Designer/Contractor:
Cory Ferguson
GOULD+ Architects, LLC
427 West 11950 South, Suite 201
Draper, UT 84020
801.245.0554
cory@gouldplus.com
Project Information
Energy Code:
Thomson Property CLUBHOUSE
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.
Additional Efficiency Package(s)
Building Area Floor Area
1-first floor (Exercise Center) : Nonresidential 3910
Envelope Assemblies
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Floor 1: Slab-On-Grade:Unheated, Vertical 2 ft., [Bldg. Use 1 - first
floor] (c)
305 ---15.0 0.520 0.540
Roof 1: Insulation Entirely Above Deck, [Bldg. Use 1 - first floor]1053 ---42.2 0.023 0.032
Roof 2: Insulation Entirely Above Deck, [Bldg. Use 1 - first floor]1843 ---42.2 0.023 0.032
Roof 3: Insulation Entirely Above Deck, [Bldg. Use 1 - first floor]1014 ---42.2 0.023 0.032
NORTH
Exterior Wall 1: Wood-Framed, 16" o.c., [Bldg. Use 1 - first floor]1560 21.0 0.0 0.062 0.051
Window 7: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID
3030, SHGC 0.34, [Bldg. Use 1 - first floor] (b)
27 ------0.310 0.360
Window 8: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID
4040, SHGC 0.34, [Bldg. Use 1 - first floor] (b)
32 ------0.310 0.360
Window 9: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID
3050, SHGC 0.37, [Bldg. Use 1 - first floor] (b)
45 ------0.310 0.360
Window 10: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID
4060, SHGC 0.37, [Bldg. Use 1 - first floor] (b)
96 ------0.310 0.360
Window 11: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID
6060, SHGC 0.36, [Bldg. Use 1 - first floor] (b)
108 ------0.300 0.360
Door 3: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Specs.: Product ID entrance storefront, SHGC 0.40, [Bldg. Use 1 - first
floor] (b)
24 ------0.450 0.770
Door 4: Insulated Metal, Swinging, [Bldg. Use 1 - first floor]48 ------0.160 0.370
EAST
Project Title:
Data filename:
Thomson Property CLUBHOUSE
X:\!18000\18006 - Rexburg Apartments\18006-Clubhouse\COMCHECK\Rexburg Clubhouse - 2018
IECC.cck
06/07/22Report date:
101 ofPage
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Exterior Wall 2: Wood-Framed, 16" o.c., [Bldg. Use 1 - first floor]916 21.0 0.0 0.062 0.051
Window 12: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID
3030, SHGC 0.34, [Bldg. Use 1 - first floor] (b)
45 ------0.310 0.360
Window 13: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID
3050, SHGC 0.37, [Bldg. Use 1 - first floor] (b)
60 ------0.310 0.360
Window 14: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID
4040, SHGC 0.34, [Bldg. Use 1 - first floor] (b)
16 ------0.310 0.360
Window 15: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID
4060, SHGC 0.37, [Bldg. Use 1 - first floor] (b)
48 ------0.310 0.360
SOUTH
Exterior Wall 3: Wood-Framed, 16" o.c., [Bldg. Use 1 - first floor]1560 21.0 0.0 0.062 0.051
Window 1: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID 3030
windows, SHGC 0.34, [Bldg. Use 1 - first floor] (b)
90 ------0.310 0.360
Window 2: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID
3050, SHGC 0.37, [Bldg. Use 1 - first floor] (b)
45 ------0.310 0.360
Window 3: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID storefont, SHGC 0.40, [Bldg. Use 1 - first floor] (b)
63 ------0.450 0.360
Door 1: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
Specs.: Product ID entrance storefront, SHGC 0.40, [Bldg. Use 1 - first
floor] (b)
48 ------0.450 0.770
Door 2: Insulated Metal, Swinging, [Bldg. Use 1 - first floor]24 ------0.160 0.370
WEST
Exterior Wall 4: Wood-Framed, 16" o.c., [Bldg. Use 1 - first floor]900 21.0 0.0 0.062 0.051
Window 4: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID
3030, SHGC 0.34, [Bldg. Use 1 - first floor] (b)
9 ------0.310 0.360
Window 5: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID
4040, SHGC 0.34, [Bldg. Use 1 - first floor] (b)
16 ------0.310 0.360
Window 6: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID
4060, SHGC 0.37, [Bldg. Use 1 - first floor] (b)
48 ------0.310 0.360
(a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors.
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2018 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Envelope PASSES: Design 8% better than code
Project Title:
Data filename:
Thomson Property CLUBHOUSE
X:\!18000\18006 - Rexburg Apartments\18006-Clubhouse\COMCHECK\Rexburg Clubhouse - 2018
IECC.cck
06/07/22Report date:
102 ofPage
Cory Ferguson - Architect June 7, 2022
Inspection Checklist
Requirements: 0.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.1.0
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2018 IECC
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
C103.2
[PR1]1
Plans and/or specifications provide all
information with which compliance
can be determined for the building
envelope and document where
exceptions to the standard are
claimed.
Complies
Does Not
Not Observable
Not Applicable
C402.4.1
[PR10]1
The vertical fenestration area <= 30
percent of the gross above-grade wall
area.
Complies
Does Not
Not Observable
Not Applicable
C402.4.1
[PR11]1
The skylight area <= 3 percent of the
gross roof area.
Complies
Does Not
Not Observable
Not Applicable
C406
[PR9]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the additional energy
efficiency package options.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Thomson Property CLUBHOUSE
X:\!18000\18006 - Rexburg Apartments\18006-Clubhouse\COMCHECK\Rexburg Clubhouse - 2018
IECC.cck
06/07/22Report date:
103 ofPage
Section
#
& Req.ID
Footing / Foundation Inspection Complies?Comments/Assumptions
C303.2
[FO4]2
Slab edge insulation installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
C303.2.1
[FO6]1
Exterior insulation protected against
damage, sunlight, moisture, wind,
landscaping and equipment
maintenance activities.
Complies
Does Not
Not Observable
Not Applicable
C402.2.4
[FO3]2
Slab edge insulation R-value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.4
[FO7]2
Slab edge insulation depth/length.
Slab insulation extending away from
building is covered by pavement or
>= 10 inches of soil.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.6
[FO12]3
Radiant heating systems panels
insulated to >=R-3.5 on face opposite
space being heated.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Thomson Property CLUBHOUSE
X:\!18000\18006 - Rexburg Apartments\18006-Clubhouse\COMCHECK\Rexburg Clubhouse - 2018
IECC.cck
06/07/22Report date:
104 ofPage
Section
#
& Req.ID
Framing / Rough-In Inspection Complies?Comments/Assumptions
C303.1.3
[FR12]2
Fenestration products rated in
accordance with NFRC.
Complies
Does Not
Not Observable
Not Applicable
C303.1.3
[FR13]1
Fenestration products are certified as
to performance labels or certificates
provided.
Complies
Does Not
Not Observable
Not Applicable
C402.4.3
[FR10]1
Vertical fenestration SHGC value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.4.3,
C402.4.3.
4
[FR8]1
Vertical fenestration U-Factor.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.4.4
[FR14]2
U-factor of opaque doors associated
with the building thermal envelope
meets requirements.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.5.1.
2.1
[FR19]1
The building envelope contains a
continuous air barrier that is sealed in
an approved manner and material
permeability <= 0.004 dfm/ft2. Air
barrier penetrations are sealed in an
approved manner.
Complies
Does Not
Not Observable
Not Applicable
C402.5.2,
C402.5.4
[FR18]3
Factory-built fenestration and doors
are labeled as meeting air leakage
requirements.
Complies
Does Not
Not Observable
Not Applicable
C402.5.7
[FR17]3
Vestibules are installed on all building
entrances. Doors have self-closing
devices.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Thomson Property CLUBHOUSE
X:\!18000\18006 - Rexburg Apartments\18006-Clubhouse\COMCHECK\Rexburg Clubhouse - 2018
IECC.cck
06/07/22Report date:
105 ofPage
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C402.5.5,
C403.2.4.
3
[ME3]3
Stair and elevator shaft vents have
motorized dampers that automatically
close. Refernece section C403.7.7 for
operational details.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Thomson Property CLUBHOUSE
X:\!18000\18006 - Rexburg Apartments\18006-Clubhouse\COMCHECK\Rexburg Clubhouse - 2018
IECC.cck
06/07/22Report date:
106 ofPage
Section
#
& Req.ID
Rough-In Electrical Inspection Complies?Comments/Assumptions
C405.6
[EL26]2
Low-voltage dry-type distribution
electric transformers meet the
minimum efficiency requirements of
Table C405.6.
Complies
Does Not
Not Observable
Not Applicable
C405.7
[EL27]2
Electric motors meet the minimum
efficiency requirements of Tables
C405.7(1) through C405.7(4).
Efficiency verified through certification
under an approved certification
program or the equipment efficiency
ratings shall be provided by motor
manufacturer (where certification
programs do not exist).
Complies
Does Not
Not Observable
Not Applicable
C405.8.2,
C405.8.2.
1
[EL28]2
Escalators and moving walks comply
with ASME A17.1/CSA B44 and have
automatic controls configured to
reduce speed to the minimum
permitted speed in accordance with
ASME A17.1/CSA B44 or applicable
local code when not conveying
passengers.
Complies
Does Not
Not Observable
Not Applicable
C405.9
[EL29]2
Total voltage drop across the
combination of feeders and branch
circuits <= 5%.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Thomson Property CLUBHOUSE
X:\!18000\18006 - Rexburg Apartments\18006-Clubhouse\COMCHECK\Rexburg Clubhouse - 2018
IECC.cck
06/07/22Report date:
107 ofPage
Section
#
& Req.ID
Insulation Inspection Complies?Comments/Assumptions
C303.1
[IN3]1
Roof insulation installed per
manufacturer’s instructions. Blown or
poured loose-fill insulation is installed
only where the roof slope is <=3 in
12.
Complies
Does Not
Not Observable
Not Applicable
C402.2.1
[IN20]1
Insulation installed on a suspended
ceiling having ceiling tiles is not being
specified for roor/ceiling assemblies.
Continuous insulation board installed
in 2 or more layers with edge joints
offset between layers.
Complies
Does Not
Not Observable
Not Applicable
C303.1
[IN10]2
Building envelope insulation is labeled
with R-value or insulation certificate
providing R-value and other relevant
data.
Complies
Does Not
Not Observable
Not Applicable
C303.2
[IN7]1
Above-grade wall insulation installed
per manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
C303.2.1
[IN14]2
Exterior insulation is protected from
damage with a protective material.
Verification for exposed foundation
insulation may need to occur during
Foundation Inspection.
Complies
Does Not
Not Observable
Not Applicable
C402.2.3
[IN6]1
Above-grade wall insulation R-value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.3
[IN8]2
Floor insulation R-value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.6
[IN18]3
Radiant panels and associated
components, designed for heat
transfer from the panel surfaces to the
occupants or indoor space are
insulated with a minimum of R-3.5.
Complies
Does Not
Not Observable
Not Applicable
C402.2.2
[IN2]1
Roof R-value. For some ceiling
systems, verification may need to
occur during Framing Inspection.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.5.1.
1
[IN1]1
All sources of air leakage in the
building thermal envelope are sealed,
caulked, gasketed, weather stripped
or wrapped with moisture vapor-
permeable wrapping material to
minimize air leakage.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Thomson Property CLUBHOUSE
X:\!18000\18006 - Rexburg Apartments\18006-Clubhouse\COMCHECK\Rexburg Clubhouse - 2018
IECC.cck
06/07/22Report date:
108 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C402.5.6
[FI37]1
Weatherseals installed on all loading
dock cargo door openings and provide
direct contact along the top and sides
of vehicles parked in the doorway.
Complies
Does Not
Not Observable
Not Applicable
C402.5.6
[FI37]1
Weatherseals installed on all loading
dock cargo door openings and provide
direct contact along the top and sides
of vehicles parked in the doorway.
Complies
Does Not
Not Observable
Not Applicable
C402.5.6
[FI37]1
Weatherseals installed on all loading
dock cargo door openings and provide
direct contact along the top and sides
of vehicles parked in the doorway.
Complies
Does Not
Not Observable
Not Applicable
C402.5.6
[FI37]1
Weatherseals installed on all loading
dock cargo door openings and provide
direct contact along the top and sides
of vehicles parked in the doorway.
Complies
Does Not
Not Observable
Not Applicable
C402.5.8
[FI26]3
Recessed luminaires in thermal
envelope to limit infiltration and be IC
rated and labeled. Seal between
interior finish and luminaire housing.
Complies
Does Not
Not Observable
Not Applicable
C408.1.1
[FI57]1
Building operations and maintenance
documents will be provided to the
owner. Documents will cover
manufacturers' information,
specifications, programming
procedures and means of illustrating
to owner how building, equipment and
systems are intended to be installed,
maintained, and operated.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Thomson Property CLUBHOUSE
X:\!18000\18006 - Rexburg Apartments\18006-Clubhouse\COMCHECK\Rexburg Clubhouse - 2018
IECC.cck
06/07/22Report date:
109 ofPage
Project Title:
Data filename:
Thomson Property CLUBHOUSE
X:\!18000\18006 - Rexburg Apartments\18006-Clubhouse\COMCHECK\Rexburg Clubhouse - 2018
IECC.cck
06/07/22Report date:
1010 ofPage