HomeMy WebLinkAbout22-559 Chung Chan - New Truck Well - 2022-11-14NEW CONCRETE TRUCK WELL 125 Volley River Drive Rexburg, ldoho 8,3440 Madison County, ldoho MATERIAL NOTES 1. Cast —in —place concrete: Class 40A, f'c = 4 ksi. 2. Steel reinforcement for WWR: ASTM A1064, fy = 70 ksi. J. Other reinforcement: ASTM A1064, Grade 60, fy = 60 ksi. 4. Structural steel: ASTM A36. 5. Dock leveler and bumpers: Edge of dock style, mechanically operated, 78" width, 30,000 lb capacity, standard bumpers. 6. Chain link fence: See Sheet 4. 7. Grout: ASTM C1107 Grade A non —shrink. 8. Install premanufactured items in accordance with manufacturer s recommendations. CONSTRUCTION NOTES 1. Construct in accordance with Idaho Standards for Public Work Construction, latest edtition. 2. Provide 2" concrete cover to all reinforcement except 3" for concrete surfaces cast against and permanently exposed to earth. J. Provide 3/4" chamfer to all exposed concrete edges. 4. Provide 18" separation between well drain line and potable water line. CONTRACTOR RESPONSIBILITIES 1. Earthwork Contractor 1.1. Provide utility locates. 1.2. Provide all pavement sawcutting. 1.3. Provide all excavation, including shoring as needed, and compacted backfill. 1.4. Provide and install the drain line from 8" outside the well to and through the retaining wall to the west. 2. Concrete Contractor 2.1. Provide and install all formwork, reinforcement, concrete, post blockouts, and trench drain to 8" outside of well. 2.2. Install the dock channel. 2.3. Remove post blackout pvc pipe forms and plastic. J. Welding Contractor 3.1. Provide the dock channel. 3.2. Provide and install the dock leveler and bumpers. 4. Fencing Contractor 4.1. Provide and install all fence material, including grout for post setting. 5. Paving Contractor 5.1. Provide and install all final pavement around the well and above the drain line. STRUCTURAL DESIGN NOTES 1. Designed in accordance with the 2018 International Building Code and American Concrete Institute 318. 2. Design Loads: 2.1. Permanent loads: 2.1.1. DC — Unit weight of reinforced concrete ........................................... 150 pcf. 2.1.2. EV — 4' max compacted layers of backfill at 130 pcf ................ 520 psf. 2.1.3. EH — Equivalent fluid pressures (pcf): Active = 34, At —Rest = 53, Passive = 460. 2.2. Transient loads: 2.2.1. LL — HL-93 2.2.2. LS — Live load surcharge.................................................................. 2.0 feet. SHEET INDEX General Notes, Vicinity Maps ..................... 1 Plan and Elevation .................................... 2 Sections and Details ................................. 3 Fence Details ............................................. 4 —� iRobure Cem ' orb 13 e� 1$ o 17 Joll@gjIf Pro ect -- \ J - a r4u Icy Ji �� y Al F Location ' 24 CAN L CANAL (/�y aa� L �1',, • a86a. 0711 4 � i� Fa 8 n •� n l Tid r ss ms l r Sth - l a o rlhouae I RE BU s wa•r 111# .... -i I ` • �I PeYh RICbYI D 'r - Fa of i �i, � � sass 25 ! a. a - asay �• 496>J i � I � r >� " h T I � I,�%� - .�� � � � �.�.i( �� • ail FN S5\0ML STF Q �J � o 0 thony 0 rl lIN) � goo N N N � N N � v� N O � W N W F U LLI w V � 0 0 � .a � 14 W Iz o "s L¢L O y a � 2 U W Q J O m a a U Y 0 a v o 0 DRAWN BY DESIGN BY CHECK BY AK AK JOB NO: 22.559 DATE: NOVEMBER, 2022 REVISIONS DATE C� G X Q U 70 ,U r L Q � �U O U C i= p Z mn UCo � Z `O N SHEET NO. 1 OF SHEETS � �Existing column footing, -typ Existing walk door Existing masonry wall _______ Existing overhead door ------- Existing footing I --►A I I I --- -- — �Sawcut asphalt pavement --------i i--------- 20' O O O i__--____ �/ 1 -------------------------- --------------------------------------- 15 W 0 o a o o e I — t — — — — — — — — — — — — — — — I I ------------------------------.- I o I I I I .N i 14'-4" ramp L N I L C() (Z I ---------------------— — — — — — — — — ------------------------------N I I I I I — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — I 55' fl 1 8" IG W W out W W 5' asphalt transition zone I G I G I G W W W W W 57'-1 " L*A 80' asphalt removal limits PLAN %8" = 1' (11 "x17" plans) %4" = 1' (22)(34" plans) Dock leveler & bumpers. 5' asphalt transition from Install per manufacturer's concrete to existing pavement recommendations. 52'-9" constant slope EL 100'-6" a W W Well drain pipe. Extend through concrete retaining wall. Existing concrete retaining wall. Existing overhead door 20' --------- ---- --------------------------------------------------------------------- - -------------------- -5.29--------------------- � — ------------I —---------------------T==-====T___—=___----�-- ----------------- - — — 1-------1 EL 94'-0" 6" reinforced 3'-6" 55' concrete slab 57'-1 " 5' asphalt transition zone from concrete to existing pavement Sowcut asphalt pavement I G W W Preserve and protect existing utilities, typ 2'-3" 5' asphalt transition from concrete to 14'-4" _ _ _ existing pavement EL 99'-9" EL -5.07. 100'-0" we W W Existing walk door _1�,= ___________________________________ ___________ 8» T— — —T — �— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —��- - L— — —L — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —I I_ New 6" concrete pad. Turn 8" at the edges down to provide a minimum 1' embedment. Trench drain. Install per manufacturer's recommendations. ELEVATION %8" = 1' (11 "x17" plans) %a" = 1(22"x341�22plans) FN SS\OML ST£ 6 thony �, O O Cl! r N N N � N N � W r W c _ v N W N W F' U LLI w V � 0 00 � N Q � M W N S O Q � `y J _ J �,r L¢L 0 y a 2 W Q U J O m Co a a U Y 0 a � s o DRAWN BY DESIGN BY CHECK BY AK AK JOB NO: 22.559 DATE: NOVEMBER, 2022 REVISIONS DATE 2- ^1 W x o o Y Co +— U Co aS - N L U (3) >` O -0 U O (6 U 2 0� C: O c o T) co U -a a > � Z N X Existing masonry wall Existing concrete floor Existing footing and pedestal at columns Typ. existing footing ---I' and stem wall Do not undermine existing footings. Provide shoring as needed. Fin. Floor El. 100'-0" 5' 18" 3" asphalt patch around truck well, typ 3" compacted 3/4" base, typ I 5» I 3" clr SECTION A -A 3/e" = 1' (11507" plans) 3/4" = 1' (22"x34" plans) 8" Dock leveler & bumpers---,, #4 on 12 "x 12" grid. Provide---,, standard hooks on verticals and embed in footing, typ. Make horizontals continuous - - _- around comers, typ_ --- ------------- - ---- O ----- 2, #4 as shown -5 Trench drain 24'-6 "f 22'f Fin. Wall El. 100'-6'; typ Chain link fence - see detail 13' 114 on 12"x12" grid. Provide standard hooks on verticals and embed in footing, typ. Make horizontals continuous around corners, typ. Cut top horizontals at post blockouts c aJ and add two 3' bars each side. Compacted °i' o �z 3/4" base c i Extend drain line to and through retaining wall that is - 21 ' to the west. 2'-5" 3'-6" 13 on 18 "x 18 " grid, or WWR 6x6 - W4.OxW4.0. Center in slab. 5, #4 continous Bot. Ftg. El-94'-0'; typ 114 © 12"1 typ. 14'-4" "J � #3 on 18"x18" grid, or- b f WWR 6x6 - W4.OxW4.0. Center in slab. I 5, #4 continous-1 3'-6" #4 ® 12'; typ. - -5» SECTION B-B 3/e" = 1 ' (11 "x 17" plans) 314" = 1' (22"x34" plans) -----------1 #4 continous 2'-5" 3'-6" 7 Fill annular space w/ highly flowable non -shrink grout. 8" Compact backfill to 957 f1 1 Proctor. ••h / V Gas depth not known. Under ine only at drain. Water - depth _ not known 5" u Excavated surface, typ 12 bent plates 1%27x14" Legs 7" & 1%27 Sp @ 10" o-c, alt. direction. 45° angle. %4" fillet welds C8x 1 1.5 x 10'. Center on dock. 4" Bumpers and dock �r leveler attached to channel per manufacturer's recommendations. DOCK LEVELER ATTACHMENT CHANNEL 3/4" = 1 ' (1 1 "x 17" plans) %/2" = 1' (22"x34" plans) F---1 i i i i i FN �5\0ML STF 6 OF o 0 thony 0 OCl! boo N N X N r � N N W W r W W W U LLI w V LL LL L O 00 N Q � M W N S o N � g o `y J _ J S,r L¢L Q y a O 2 U W Q 0 J mom co a a U Y 0 a V o 0 DRAWN BY DESIGN BY CHECK BY AK AK JOB NO: 22.559 DATE: NOVEMBER, 2022 REVISIONS DATE a- a� � X o co U 70 LL r L >` o U � U _ O C 0 o U �-a — CID > Cn Z N X 6" 0 0 0 0 0 Line post, typ D a� End, corner, or gate post, typ o, o, Drill hole for drop — rod into concrete after a minimum 3 days cure time. °o Q A O 0 0 0 0 0 0 O 5 sp ® 10' = 50' 4'-10" 55'-8" Cut top two horizontal bars at blockouts. Add two 3' bars each side of blockout. PLAN — FENCE POST LOCATIONS 3/a" = 1' (11 "x 17" plans) -114" = 1' (22'x34" plans) M 3" pvc pipe blockout (O.D. 3.5'). Wrap with plastic for removeability. Block ends with tape to prevent concrete or debris entry .Remove pipe and plastic wrap after concrete sets sufficiently to hold shape. POST HOLE BLOCKOUT DETAILS 3/8" = 1' (11'k17" plans) 3/4" = 1' (22"x34" plans) CHAIN LINK FENCE MATERIALS 1. Provide galvanized steel or aluminum parts. 2. Chain link fabric: 3' high, 2" x 9 GA. J. End, corner, and gate posts: 2318" OD, 15 or 20 WT. 4. Line posts: 1�18" OD, 15 or 20 WT. 5. Rails and gate frame: 1518" OD, 15 or 20 WT. 3' high chai link fence fabn Bottom ro Fence post. Set in blockout and fill annular space with highly flowable non —shrink grout. Size and length of post determined by location (end, corner, and gate posts larger and taller than line posts). Line post shown. FENCE DETAILS 3/e" = 1' (11 "x17" plans) 3/4" = 1' (22"x34" plans) Trim top bars to C 4 . --4. V at pc 4" FN �5\0ML STF 6 OF �� o 0 thony �0 OCl! o 0 N N N � N N W W r W W N W F U 6i w V LL L O 00 rc ' N Q � M W N S O Q `y J _ J Vr L¢L O y a O 2 U W Q 0 J � o m co a a � U Y 0 � � a � s o DRAWN BY DESIGN BY CHECK BY AK AK JOB NO: 22.559 DATE: NOVEMBER, 2022 REVISIONS DATE a- a� � x 0 a� co U (6 i > Q 0 — U R C ai C 0 � U �-a CID Z N SHEET NO. 4 4 OF SHEETS