Loading...
HomeMy WebLinkAboutFULL SET REVISIONS - 21-00694 - 240 E Moody - Wendy's - New Building0 1A 0 A2.1 11. 10. 9. 8. 6. 7. 5. REVIEW DOCUMENTS AND VERIFY DIMENSIONS AND FIELD CONDITIONS AND CONFIRM THAT WORK IS CONSTRUCTIBLE AS SHOWN. CONFLICTS OR OMISSIONS, ETC., SHALL BE IMMEDIATELY REPORTED TO THE ARCHITECT FOR CLARIFICATION PRIOR TO THE PERFORMANCE OF WORK IN QUESTION. WHEN CONTRACTOR ACCEPTS DELIVERY OF ALL ITEMS NOTED ON PLANS WHETHER IN CONTRACT OR NOT IN CONTRACT, HE SHALL BE RESPONSIBLE FOR LOSS AND/OR DAMAGE TO THESE ITEMS. THE CONTRACTOR SHALL MAINTAIN, FOR THE ENTIRE DURATION OF THE WORK, ALL EXITS, EXIT/ EGRESS LIGHTING, FIRE PROTECTION DEVICES AND ALARMS IN CONFORMANCE WITH ALL APPLICABLE CODES AND ORDINANCES. SAW CUTTING AND CORING LOCATIONS SHALL BE REVIEWED IN FIELD AND COORDINATED WITH THE OWNER'S REPRESENTATIVE PRIOR TO CUTTING/CORING. DURING ALL PHASES OF WORK, DO NOT DISTURB THE DELIVERIES AND FUNCTIONS OF ADJACENT AND NEIGHBORING TENANTS. 'TYP.' MEANS THAT THE CONDITION IS REPRESENTATIVE FOR SIMILAR CONDITIONS THROUGHOUT, UNLESS OTHERWISE NOTED. PROVIDE PORTABLE FIRE EXTINGUISHER(S) IN ACCORDANCE WITH NFPA 10, WITH U.L. LABEL AND A RATING OF NOT LESS THAN 2-A WITH 75 FT. TRAVEL DISTANCE TO ALL POSITIONS OF RESTAURANT OR AS DIRECTED BY THE FIRE DEPARTMENT FIELD INSPECTOR. PROVIDE CLASS K FIRE EXTINGUISHER WITHIN 20 FT. OF COMMERCIAL FOOD HEAT-PROCESSING EQUIPMENT. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN PARTITION LOCATIONS. IN CASE OF CONFLICT, NOTIFY THE ARCHITECT OF RECORD. FLOOR PLAN BY ARCHITECT OF RECORD SUPERSEDES OTHER PLANS. DIMENSIONS MARKED "CLEAR" SHALL BE MAINTAINED AND SHALL ALLOW FOR THICKNESS OF FINISHES INCLUDING CARPET, PAD, CERAMIC TILE, V.C.T., ETC INTERIOR DIMENSIONS ARE TO THE FACE OF STUD, UNLESS NOTED OTHERWISE. MARK LOCATIONS OF PARTITIONS AND DOORS FOR REVIEW BY THE OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION. REVIEW WILL BE FOR DESIGN INTENT. COORDINATE AND VERIFY CONDITIONS TO ENSURE PROPER FIT. 12. 13. IF REQUIRED BY LOCAL JURISDICTION - SPRINKLER, LIFE SAFETY, AND FIRE ALARM SYSTEMS ARE TO BE DESIGNED AND SUBMITTED FOR REVIEW AND APPROVAL BY LOCALLY LICENSED DESIGN PROFESSIONAL. THE DESIGN OF SYSTEM(S) MUST COMPLY TO LOCAL, STATE, AND NATIONAL CODES. 14. CONTRACTOR IS REQUIRED TO SCHEDULE A PRE-CONSTRUCTION MEETING WITH THE OWNER'S REPRESENTATIVE TO REVIEW SPECIFIC REQUIREMENTS. CONTRACTOR IS RESPONSIBLE TO FOLLOW LOCAL RULES AND REGULATIONS. EXTERIOR BUILDING SIGNS SHALL BE SUBMITTED UNDER SEPARATE PERMIT APPLICATION FOR REVIEW AND APPROVAL AS REQUIRED BY LOCAL AUTHORITIES. EXTERIOR SIGNS ARE NOT WITHIN THE SCOPE OF BUILDING DEPARTMENT APPROVAL. PRIOR TO COMMENCEMENT OF WORK - OBTAIN A COPY OF THE BUILDING CONSTRUCTION PERMIT FROM THE AUTHORITY HAVING JURISDICTION (AHJ) AND A COPY OF THE SET OF CONSTRUCTION DOCUMENTS SIGNED AND SEALED BY A LICENSED DESIGN PROFESSIONAL FOR ALL DISCIPLINES AS REQUIRED AND USED TO OBTAIN THE BUILDING PERMIT. BIDDERS REFER TO WENDY'S APPROVED SUPPLIER LIST TO OBTAIN NATIONAL ACCOUNT PHONE NUMBERS AND CONTACTS. 15. GC IS RESPONSIBLE FOR FINDING AND LOCATING ALL UNDERGROUND UTILITIES IN AREAS OF EXCAVATION PRIOR TO DIGGING. ACCIDENTAL INTERRUPTION OF THESE SERVICES DURING CONSTRUCTION WILL BE THE RESPONSIBILITY OF THE GC. PRIOR TO DIGGING, GC TO CALL LOCAL UTILITY LOCATION SERVICE. 16. RESTAURANT DESIGN MEP ENGINEER STRUCTURAL ENGINEER CIVIL ENGINEER 4. 3. 2. 1. 946 OXBOW LANE IDAHO FALLS, ID 83404 CONTACT: JEFF FREIBERG TEL: 208-529-8174 J. FREIBERG ENGINEERING COLUMN LINE DOOR MARK REVISION SYMBOL CEILING FINISH CODE CEILING HEIGHT ELEVATION REFERENCE SHEET NUMBER ELEVATION NUMBER & DIRECTION SHEET NUMBER ROOM NAME ROOM NUMBER REVISION CLOUD EQUIPMENT TAG WINDOW MARK FINISH TAG NORTH ARROW ELEVATION HEIGHT TARGET LOCATION IN SPACE WALL SECTION REFERENCE SHEET NUMBER DETAIL REFERENCE SHEET NUMBER CODED NOTE PARTITION TYPE REFERENCE SHEET A4.3 SECTION REFERENCE SHEET NUMBER XXXCT1 1 1 XXX ROOM NAME 123 X' - X" A.F.F X' - X" A.F.F A7.1 A B C DA7.1 A 2 1 1 0 A1 0 1A 10' - 0" A.F.F. CONTACT: - TEL: - FAX: - 1585 N. SKYLINE DR. IDAHO FALLS, ID 83402 CONTACT: TODD RICKS TEL: 208-390-4295 CLASSIC FOODS, INC. WENDY'S - (2.0) SMART 40+ MOODY RD & N 2ND E REXBURG, ID 83440 CENTERLINE ACOUSTIC CEILING TILE ADJUSTABLE ABOVE FINISH FLOOR ALUMINUM ARCHITECTURAL BOARD BUILDING BLOCKING BEAM BOTTOM CABINET CERAMIC CEILING CAULKING CLEAR COLUMN CONCRETE CONTINUOUS DOUBLE DETAIL DIAMETER DIMENSION DOOR DOWNSPOUT DRAWING EXISTING EACH ELEVATION ELECTRICAL EMERGENCY EQUAL FIRE EXTINGUISHER FACE OF FACE OF FINISH FACE OF STUDSF.O.S. F.O.F. F.O. F.E. EQ. EMER. ELEC. ELEV. EA. (E) DWG. DS. DR. DIM. DIA. DET. DBL. CONT. CONC. COL. CLR. CLKG. CLG. CER. CAB. BOT. BM. BLKG. BLDG. BD. ARCH. ALUM. A.F.F. ADJ. ACT LC FINISH TO FINISH FIRE RETARDANT FINISH FLOOR FLUORESCENT FOOT, FEET FIELD VERIFY GRAB BAR GENERAL CONTRACTOR GAUGE GLASS GYPSUMGYP. GL. GA. G.C. G.B. F.V. FT. FLUOR. FL. FIN. F.R. F/F H.M. HDWD. HORIZ. HGT. HVAC HOLLOW METAL HARDWOOD HORIZONTAL HEIGHT HEATING, VENTILATION, AIR CONDITIONING I.D.INSIDE DIAMETER INSUL. INSULATION JT. JOINT LAM LAMINATE MAX.MAXIMUM MECHANICAL MANUFACTURER MINIMUM MISCELLANEOUS METAL MECH. MFR. MIN. MISC MTL. MGR. MANAGER N.NORTH N.I.C. NOT IN CONTRACT N.T.S. NOT TO SCALE (N) NEW NO. NUMBER NOMINALNOM. O.D. OUTSIDE DIAMETER OPNG. OPENING OPPOSITEOPP. P.LAM.PLASTIC LAMINATE PL. PLATE PLAS. PLASTER PLWD.PLYWOOD PR.PAIR PT.POINT RAD.RADIUS REG.REGISTER REQ'D. REQUIRED RM. ROOM S. SOUTH S.C. SOLID CORE S.S.STAINLESS STEEL SCHED. SCHEDULE SHT. SHEET SIM. SIMILAR SPEC. SPECIFICATION SQ. SQUARE STD. STANDARD STL. STEEL STOR. STORAGE SUSP. SUSPENDED T.C. TIME CLOCK T.O. TOP OF TEL.TELEPHONE THK.THICK TYP.TYPICAL U.N.O. UNLESS NOTED OTHERWISE VERT.VERTICAL VERIFY IN FIELD WEST WITH WATER CLOSET WITHOUT WATER RESISTANT V.I.F. W. W/ W/C W/O W/R WOODWD. REF.REFERENCE LB(S).POUND(S) H.HIGH S.F. SQUARE FOOT FACE OF MASONRYF/MAS ALUMINUM COMPOSITE MATERIAL ACM ARCHITECT OF RECORDA.O.R. P.T. PRESSURE-TREATEDDNDDO NOT DISTURB KED FOUNDATIONFDN. PROV'D PROVIDED WALK-IN BOX (FREEZER/COOLER) WIB P.U.W.PICK UP WINDOW V.C.T.VINYL COMPOSITE TILE CONCRETE MASONRY UNITC.M.U. KITCHEN EQUIPMENT DISTRIBUTOR ABBREVIATIONSGENERAL NOTES CODE DATA AND SQUARE FOOTAGE PROJECT TEAM DIRECTORY ATTENTION ALL BIDDERS DESCRIPTIVE SUMMARY OF WORK CONSTRUCTION PRODUCT WARRANTY LEGEND APPLICABLE CODES: OCCUPANCY GROUP A-2 RESTAURANT ZONING - WIND SPEED REFER TO STRUCTURAL DRAWINGS USE SQUARE FOOTAGE OCCUPANT LOAD FACTOR NUMBER OF OCCUPANTS OCCUPANCY CALCULATIONS: GROSS BUILDING AREA: 2,319 SF. (INCLUDES 84 SF. OF CANOPIES/OVERHANGS) WIB: 583 SF. TOTAL FOOTPRINT AREA: 2,902 SF. TOTAL NUMBER OF OCCUPANTS: * NON-OCCUPIED AREA INCLUDES FREEZER / COOLER, RESTROOMS, CANOPIES/ OVERHANGS, WALLS, HALLWAYS, AND VESTIBULE CONSTRUCTION TYPE: COMBUSTIBLE VB FIRE RESISTIVE REQUIREMENTS: FIRE SPRINKLERS: MAX TRAVEL DISTANCE: RESTROOM REQUIREMENTS: EXTERIOR BEARING WALL................................................0 HR ROOF CONSTRUCTION......................................................0 HR CEILING.................................................................................0 HR NOT REQUIRED 200' PERMITED, 60' PROVIDED WATER CLOSETS:................2 LAVATORIES..........................2 URINALS.................................0 DRINKING FOUNTAINS.........0 PUBLIC ACCESS....................YES EGRESS WIDTH CALCULATIONS: 70 OCCUPANTS x 0.2 = 14" EGRESS WIDTH REQUIRED (32" MIN. CLEAR ACCESSIBLE WIDTH) 44" EGRESS WIDTH PROVIDED THE LOSS OF ONE REQUIRED MEANS OF EGRESS SHALL NOT REDUCE THE EGRESS CAPACITY TO LESS THAN 50% OF REQUIRED. DINING KITCHEN STANDING SPACE NON-OCC.* 743 SF. 1/15 50 (41 SEATS**) 1064 SF. 1/100 11 58 SF. 1/5 12 73 (41 SEATS**) TOTAL EXITS REQUIRED 1 TOTAL EXITS PROVIDED 2 1037 SF. INTERNATIONAL BUILDING CODE NATIONAL ELECTRICAL CODE INTERNATIONAL MECHANICAL CODE INTERNATIONAL FIRE CODE IDAHO PLUMBING CODE 2018 2017 2018 2018 2013 2017 NFPA 72 FIRE & ALARM SIGNALING CODE PATIO 1/15 GRAND TOTAL: ** TOTAL OCCUPANTS USING NUMBER OF SEATS, INCLUDING DINING ROOM OCCUPANTS (41 SEATS + 9 STANDING) = 50 VICINITY MAP 70 (41 SEATS**) 0 1A DETAIL REFERENCE SHEET NUMBER PLEASE CONSULT WENDY'S APPROVED SUPPLIER LIST AND APPROVED BUILDING MATERIALS CONSOLIDATOR. THE WORK INCLUDES ALL LABOR, MATERIALS, AND EQUIPMENT TO BUILD, FINISH, AND PROVIDE ALL SITE WORK AND UTILITIES, FOR A PROPOSED NEW RESTAURANT FOR THE "OWNER". THE WORK SHALL INCLUDE ALL ITEMS REQUIRED AS SHOWN ON THE DRAWINGS. IN ADDITION, ALL WORK ASSOCIATED WITH THE SITE DEVELOPMENT PAVING, PARKING, WALKWAYS, PATIO SLAB, AND SITE UTILITIES TO THE BUILDING ARE TO BE PROVIDED IN THIS CONTRACT. ALL MECHANICAL EQUIPMENT AND SYSTEMS, AS WELL AS ALL ELECTRICAL EQUIPMENT AND SYSTEMS ARE TO BE INCLUDED FOR A COMPLETE OPERATING SYSTEM WITH COORDINATION AND INSTALLATION INCLUDED. CONSTRUCTION / PRODUCT WARRANTIES THESE CONSTRUCTION DOCUMENTS NOTE SPECIFIC PRODUCTS, DETAILS AND SPECIFICATIONS THAT WILL PROVIDE CONSTRUCTION / PRODUCT WARRANTIES FOR THE FOLLOWING AREAS OF CONSTRUCTION: SIDING (KNOTWOOD) ROOFING (DURO-LAST) INTERIOR TILE (LATICRETE) ALTERING THESE DOCUMENTS MAY ALTER THE WARRANTY GUIDELINES. DURO-LAST AND LATICRETE WILL BE REQUIRED TO APPROVE THE DRAWINGS TO MAINTAIN THE WARRANTIES. THE CONTRACTOR IS ALSO RESPONSIBLE FOR CONTACTING, DURO-LAST AND LATICRETE FOR ON-SITE INSTALLATION INSPECTIONS OF EACH OF THE AREAS OF WORK. CLIENT ARCHITECT INTERNATIONAL ENERGY CONSERVATION CODE 2018 2902 SF. SHEET # SHEET NAME REVISION 123 G1.1 COVER SHEET X X G1.2 LIFE SAFETY PLAN X X G2.1 SUPPLIER LIST & RESPONSIBILITY SCHEDULE X A1.1 FLOOR PLAN X X A1.2 REFLECTED CEILING PLAN X X A1.3 ROOF PLAN X X A2.1 EXTERIOR ELEVATIONS X A2.2 EXTERIOR ELEVATIONS X A3.1 BUILDING SECTIONS X A3.2 BUILDING SECTIONS X X A3.3 WALL SECTIONS X A3.4 WALL SECTIONS X A3.5 WALL SECTIONS X A4.1 SECTION DETAILS X X A4.2 PLAN DETAILS X A4.3 ROOF DETAILS A5.1 FINISH PLAN X A5.2 FINISH DETAILS X A6.1 PAINT, TILE, BLDG INSULATION, & JOINT TREATMENT SCHEDULES X A6.2 FINISH SCHEDULE A6.3 DOOR SCHEDULE AND WINDOW ELEVATIONS X X X A7.1 INTERIOR ELEVATIONS DINING ROOM X A7.2 INTERIOR ELEVATIONS KITCHEN X X A7.3 INTERIOR ELEVATIONS RESTROOM X EQ1.1 EQUIPMENT PLAN XX EQ1.2 EQUIPMENT SCHEDULE XX S0.1 NOTES AND SECTIONS S1.1 FOUNDATION PLAN AND SECTIONS X X S1.2 FOUNDATION SECTIONS X S2.1 ROOF PLAN AND SECTIONS X S2.2 SECTIONS X S2.3 SECTIONS X P1.0 PLUMBING SCHEDULES AND NOTES X X P1.1 PLUMBING PLAN - SANITARY WASTE AND VENT X X P1.2 PLUMBING PLAN - DOMESTIC WATER X X P1.3 PLUMBING PLAN - NATURAL GAS P2.0 PLUMBING RISERS X X P3.0 PLUMBING DIMENSION PLAN X P4.0 PLUMBING DETAILS P4.1 PLUMBING DETAILS P5.0 PLUMBING SPECIFICATIONS M1.1 HVAC PLAN X X M2.0 HVAC DETAILS X M3.0 TRANE MECHANICAL SCHEDULES X X M4.0 MECHANICAL SPECIFICATIONS W1.1T TRANE CONTROL WIRING DIAGRAM W1.2 CONTROL WIRING NOTES & DETAILS H1.1 HOOD DETAILS X X H1.2 HOOD DETAILS X X H1.3 HOOD DETAILS X X E1.1 LIGHTING PLAN X E1.2 PHOTOMETRIC PLAN X E2.1 POWER PLAN X X E2.2 LOW VOLTAGE / IT PLAN X E2.3 POWER ROOF PLAN E3.1 ELECTRICAL DISTRIBUTION X X X E3.2 KITCHEN EQUIPMENT SCHEDULE XXX E4.1 SECURITY PLAN E5.1 ELECTRICAL ELEVATIONS X X E5.2 ELECTRICAL ELEVATIONS X E6.1 ELECTRICAL SPECIFICATIONS X SP1 SPECIFICATIONS SP2 SPECIFICATIONS SP3 SPECIFICATIONS C1.0 SITE / UTILITY PLAN C2.0 GRADING / DRAINAGE PLAN C3.0 PRIVATE DRIVE PROFILE C4.0 SITE DETAILS C5.1 MASONRY TRASH ENCLOSURE DETAILS C5.2 DRIVE-THRU ORDER STATION DETAILS C5.3 MISCELLANEOUS SITE DETAILS CSP1 CIVIL SPECIFICATIONS L1.00 LANDSCAPE PLAN L1.50 LANDSCAPE DETAILS SHEET INDEX 796 MERUS COURT ST. LOUIS, MO 63026 CONTACT: DARRELL R. CASE TEL: 636-349-1600 CASE ENGINEERING, INC. 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 CONTACT: EDIN CORALIC TEL: 314-578-4953 CORALIC, LLC ONE DAVE THOMAS BLVD. DUBLIN, OH. 43017 THE WENDY'S COMPANY 796 MERUS COURT ST. LOUIS, MO 63026 CONTACT: STEPHEN J. SACCO TEL: 636-349-1600 CASE ENGINEERING, INC. SITE ADDRESS 12 / 2 2 / 2 0 1 7 1 2 : 3 5 : 0 0 P M COVER SHEET G1.1 IT EC CITY/OWNER COMMTS01/12/20233 CITY COMMENTS11/26/20212 CITY COMMENTS10/20/20211 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 3 1.12.23 X EGRESS PATH COMMON PATH OF TRAVEL EGRESS TRAVEL PATH OCCUPANT AREA BOUNDARY LEGEND SEATING AT TABLES (1012.4) x EGRESS PATH: 44" x AISLE: 36" W. MIN. BETWEEN TABLES, NO CHAIRS x AISLE ACCESS WAY: 12" W. MIN. - 19" FOR ADJACENT CHAIR (EITHER SIDE) - 38" FOR CHAIRS BOTH SIDES - 1/2" FOR EA. FT. >12'; 30' MAX. LENGTH UNTIL CHOICE OF TWO EXIT PATHS. EXIT TRAVEL DISTANCE TRAVEL DISTANCE PERMITTED: 200' MAX. TRAVEL DISTANCE PROVIDED: 52'-0" COMMON PATH OF TRAVEL PERMITTED: 75' MAX COMMON PATH OF TRAVEL PROVIDED: 56'- 5" TRAVEL DISTANCE PERMITTED: 200' MAX. TRAVEL DISTANCE PROVIDED: 68'-1" COMMON PATH OF TRAVEL PERMITTED: 75' MAX COMMON PATH OF TRAVEL PROVIDED: 56'- 0" A B V2201 EX T . R A M P ENTRY 100 RECEIVING 112 COOLER 111 FREEZER 110 DRIVE THRU 105 PAY WINDOW 113 OFFICE 108 KITCHEN 106 FAMILY 103 FAMILY 102 DINING 101 DINING OCCUPANT LOAD: 763 S.F. / 15 =51 OCCUPANTS (41 SEATS) A B STANDING SPACE: OCCUPANT LOAD: 42 S.F. / 5 NET = 9 OCCUPANTS EXIT 01: OCCUPANT LOAD: 30 EGRESS WIDTH: 30* 0.2 = 6" 68" PROVIDED KITCHEN OCCUPANT LOAD: 1346 S.F. / 100(GROSS) = 14 OCCUPANTS EXIT 03: OCCUPANT LOAD: 14 EGRESS WIDTH: 5* 0.2 = 2" 40" PROVIDED 1LIFE SAFETY PLAN 1/4" = 1'-0" HOOD CONTROLS FIRE EXTINGUISHER - 5LB 3A-40B:C WALL HUNG FIRE EXTINGUISHER - 6 LITER TYPE K WALL HUNG TYPE ABC 5LB 6 LITER FIRE EXTINGUISHER IN SEMI-RECESSED CABINET EXIT 02: OCCUPANT LOAD: 25 EGRESS WIDTH: 30* 0.2 = 6" 36" PROVIDED GENERAL NOTE SEATING AT TABLES, COUNTERS AND WORK AREAS NEED TO COMPLY WITH IBC 2018 SECTION 1109.12 LIFE SAFETY PLAN G1.2 IT EC CITY COMMENTS10/20/21 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 1 APPROVED SUPPLIER LIST SHADING INDICATES PRODUCT IS AVAILABLE THROUGH CONSOLIDATOR PRODUCT CONTACT INFORMATION CONSOLIDATOR 3/30/2021 HJC HAINES, JONES AND CADBURY WENDY'S CSR TEAM 800-459-7099 WENDYS@HJCINC.COM DIVISION 3 - CONCRETE PRE-TINTED CONCRETE CHEMMASTERS MADISON, OHIO 800-486-7866 ATTN: CLAUDIA BENTLEY DIVISION 4 - MASONRY AND STONE FACE BRICK BOWERSTON SHALE COMPANY 740-269-2921 ATTN: CUSTOMER SERVICE FACE BRICK HAMILTON PARKER COLUMBUS, OH 614-358-7806 ATTN: JIM CAMPBELL JIMCAMPBELL@HAMILTONPARKER.COM MANUFACTURED STONE DUTCH QUALITY STONE MOUNT EATON, OHIO 330-401-2115 ATTN: WENDALL MAST MANUFACTURED STONE OWENS CORNING MASONRY PRODUCTS MEDINA, OHIO 866-315-5081 ATTN: KATHY MANNON (FOR NEAREST DISTRIBUTORS) DIVISION 5 - METALS DUMPSTER ENCLOSURE, GATES, AND HARDWARE (KNOTWOOD ENCLOSURE) KNOTWOOD 360-433-9403 ATTN: K'LEB SHIVVERS KSHIVVERS@OMNIMAX.COM TECHNICAL SUPPORT 888-488-8440 KNOTWOODTECH@OMNIMAX.COM DUMPSTER GATES AND HARDWARE (REFER TO PLANS - NOT USED WITH KNOTWOOD DUMPSTER) FORTIN WELDING COLUMBUS, OH 614-291-4342 ATTN: BOB FORTIN BOB@FORTINIRONWORKS.COM PEDESTRIAN SAFETY RAIL (REFER TO PLANS) HJC - REFER TO CONSOLIDATOR FORTRESS RAILING PRODUCTS WWW.FORTRESSRAILING.COM DIVISION 6 - WOOD, PLASTICS AND COMPOSITES ROOF JOISTS, MICRO-LAM BEAMS REDBUILT COLUMBUS, OH 614-595-3749 ATTN: JAKE SHEPHERD JSHEPHERD@REDBUILT.COM MILLWORK SEE "KITCHEN EQUIPMENT" DIVISON 7 - THERMAL AND MOISTURE PROTECTION ROOFING PRODUCTS DUROLAST ROOFING INC. SAGINAW, MI 614-370-5569 ATTN: MIKE SUMAN MSUMAN@DURO-LAST.COM ROOFING PRODUCTS SARNAFIL ROOFING SYSTEMS CANTON, MA 630-846-6022 ATTN: BEN BIEDRZYCKI BIEDRZYCKI.BEN@US.SIKA.COM KNOTWOOD KNOTWOOD 808-346-2188 ATTN: DAVID CARMACK DCARMACK@@OMNIMAX.COM TECH SUPPORT 888-488-8400 KNOTWOODTECH@OMNIMAX.COM EIFS STO CORP ATLANTA, GA 616-437-2230 ATTN: RAY REDMOND RREDMOND@STOCORP.COM EIFS DRYVIT SYSTEMS INC. WARWICK, RI 734-276-0404 ATTN: ROBERT DAZEL RDAZEL@DRYVITSYSTEMS.COM ACM (OPTIONAL)ALCOA BUILDING & CONSTRUCTION SYSTEMS MACON, GA 478-319-0139 ATTN: KEVIN JUEDEMAN KEVIN.JUEDEMAN@ARCONIC.COM CORRUGATED METAL ALCOA BUILDING & CONSTRUCTION SYSTEMS MACON, GA 478-319-0139 ATTN: KEVIN JUEDEMAN KEVIN.JUEDEMAN@ARCONIC.COM PREMANUFACTURED FASCIA AND SOFFITS (OPTIONAL) DIVISION 8 - DOORS AND WINDOWS DOORS AND HARDWARE HAMILTON PARKER COLUMBUS, OH 614-358-7806 ATTN: JIM CAMPBELL JIMCAMPBELL@HAMILTONPARKER.COM WOOD GRAIN EXTERIOR DOORS OLDCASTLE BUILDING ENVELOPE TERRELL, TX 651-253-5062 ATTN: MARK LEHMAN MLEHMAN@OBE.COM TUBELITE WALKER, MI 972-551-6386 ATTN: KENT BAUGMAN KBAUGMANN@TUBELITEINC.COM STOREFRONT OLDCASTLE BUILDING ENVELOPE TERRELL, TX 651-253-5062 ATTN: MARK LEHMAN MLEHMAN@OBE.COM TUBELITE WALKER, MI 972-551-6386 ATTN: KENT BAUGMAN KBAUMANN@TUBELITEINC.COM GLAZING GUARDIAN GLASS AUBURN HILLS, MI 810-964-0074 ATTN: KREG HATFIELD KHATFIELD@GUARDIAN.COM GLAZING VITRO ARCHITECTURAL GLASS (FORMERLY PPG GLASS) CHICAGO, IL 630-962-4800 ATTN: JOSEPH SENNESE JSENNESE@VITRO.COM PICK-UP WINDOW (PUW)QUIKSERV / EASI-SERV HOUSTON, TX BRIAN HANSON 800-388-8307 BRIAN.HANSON@EASI-SERV.COM DIVISION 9 - FINISHES SUSPENDED ACOUSTICAL CEILING ARMSTRONG ORDERING: HAINES, JONES AND CADBURY (HJC) FRP PANELING HJC - REFER TO CONSOLIDATOR LAMINATE PANOLAM ORDERING: HAINES, JONES AND CADBURY (HJC) PAINT AVAILABLE THROUGH LOCAL RETAIL LOCATIONS. CONTACT NATIONAL ACCOUNT REP'S BELOW FOR TECHNICAL QUESTIONS ONLY PREFERRED PITTSBURG PAINTS (PPG) (TECHNCIAL SUPPORT) ATTN: RICK GARLIN GARLIN@PPG.COM SHERWIN WILLIAMS (TECHNICAL SUPPORT) 614-841-7723 ATTN: PAUL FAUDREE PAUL.FAUDREE@SHERWIN.COM BENJAMIN MOORE & COMPANY (TECH SUPPORT) CLEVELAND, OH 330-353-3850 ATTN: DOROTHY HAZINSKI DOROTHY.HAZINSKI@BENJAMINMOORE.COM COATING STUCCO / EIFS REFINISH STO CORP ATLANTA, GA 616-437-2230 ATTN: RAY REDMOND RREDMOND@STOCORP.COM SIGN PAINT (REFER TO SIGN VENDORS) GROUT, THINSET, AND WATERPROOFING MEMBRANE LATICRETE INTERNATIONAL INC. ORDERING: HAINES, JONES AND CADBURY (HJC) TILE CROSSVILLE CERAMICS ORDERING: HAINES, JONES AND CADBURY (HJC) SILIKAL FLOORING (OPTIONAL BACK OF HOUSE FLOORING) SILIKAL FLOORING 770-830-1404 ATTN: ANDY MILLS ANDYMILLS@SILIKALAMERICA.COM CORNER GUARDS ORDERING: HAINES, JONES AND CADBURY (HJC) WALLCOVERINGS ORDERING: HAINES, JONES AND CADBURY (HJC) (SEE "CORNER GUARDS" ABOVE FOR SUPPLIER) SOLID SURFACE MATERIAL OHIO VALLEY SUPPLY CINCINNATI, OH 800-696-5608 x3310 ATTN: JEFF HEDGES JEFF.HEDGES@OVSCO.COM DIVISION 10 - SPECIALTIES DRIVE THRU CANOPY (PUW AWNINGS & ORDER POINT) GLOBAL AWNING MONROE, LA 318-699-0088 ATTN: TREY O'BRYANT TREY@GLOBALAWNINGS.COM NATIONAL SIGN SYSTEMS COLUMBUS, OH 614-850-2547 ATTN: JOSH JETT OR CUSTOMER SERVICE JJET@NATSIGNSYS.COM INTERIOR MENU BOARD (DIGITAL), INTERIOR QUEING BOARDS (DIGITAL) THE WENDY'S COMPANY; IT DEPARTMENT CUSTOMER ORDER KIOSKS & CUSTOMER ORDER PICKUP SCREEN THE WENDY'S COMPANY; IT DEPARTMENT COMMUNITY SINK AREA, ILLUMINATED MIRROR, MIRROR, FIXTURES ORDERING: HAINES, JONES AND CADBURY (HJC) EXTERIOR MENU BOARDS AND PRE-SELL BOARDS, PYLON / MONUMENT SIGNS, EXTERIOR BUILDING SIGNAGE, INTERIOR MENU AND QUEUING BOARDS (NON-DIGITAL), INTERIOR ILLUMINATED SIGNAGE CUSTOM SIGN CENTER COLUMBUS, OH 614-300-4270 ATTN: MICHAEL ANDERSON MICHAEL@CUSTOMSIGNCENTER.COM EVERBRITE, LLC GREENFIELD, WI 414-768-5466 ATTN: ROXANNE STEFFEK RSTEFFEK@EVERBRITE.COM ID ASSOCIATES DOTHAN, AL 888-303-5534 ATTN: BETHANY BROOKS BBROOKS@IDASSOCIATES.COM NATIONAL SIGN SYSTEMS COLUMBUS, OH 614-850-2547 ATTN: JOSH JETT OR CUSTOMER SERVICE JJET@NATSIGNSYS.COM PATTISON SIGN GROUP HEATH SPRINGS, SC 865-500-4848 ATTN: KEIRA CLARK KDCLARK@PATTISONSIGN.COM BIKE RACK CROW WORKS ORDERING: KED (SEE KITCHEN EQUIPMENT BELOW) RECYCLE DESIGN ANDERSON, IN 765-374-0316 ATTN: JOSH BOUTWELL JBOUTWELL@RECYCLEDESIGN.COM ART PACK ELEMENTS AND WAYFINDINGS CREATIVE PALETTE, INC COLUMBUS, OH 614-575-1515 CARLA ROHR CROHR@CREATIVEPALETTEINC.COM LADDER RECEIVER LADDERTECH, LLC BRIGHTON, MI 800-770-8851 ATTN: MICHELE ORAS OR CUSTOMER SERVICE MICHELE@LADDERPORT.COM RESTROOM ACCESSORIES ORDERING: HAINES, JONES AND CADBURY (HJC) HVAC SCREENING CITYSCAPES HILLIARD, OH 877-727-3367 WWW.CITYSCAPES.COM WINDOW SHADES **3 WEEK LEAD TIME** ROLL-A-SHADE LAKE ELSINORE, CA 951-245-5077 x120 ATTN: CARI McCOY WENDYS@ROLLASHADE.COM SAFETY EQUIPMENT AEI AYDELOTT EQUIPMENT INC. CENTERVILLE, OH 888-293-3568 OR 937-435-8220 ATTN: NICOLE AYDELOTT NAYDELOTT@AYDELOTT.COM FRONT LINE SALES (CORPORATE ONLY) 630-466-5606 ATTN: TIM HAYES TIM@FLSAFETY.COM BACK OF HOUSE CASH SAFE (N0508) AMPHION RANCHO CUCAMONGO, CA 844-996-9267 PAIG PARISH WENDY.SAFES@AMPHION.BIZ BASS SECURITY CLEVELAND, OH JASON MOYER 888-774-3400 ext. 1336 WENDYS@BASS-SECURITY.COM JMOYER@BASS-SECURITY.COM SMART SAFE (N0501) (OPTIONAL) ARMORED CAR SERVICE SECURITY CAMERA SYSTEM (OPTIONAL) SECURITY SOURCE ADRIAN COX 978-987-4011 ACOX@SECURITYSOURCE.COM ALARM SYSTEM ( OPTIONAL)ADT BILL ROSE CHARLOTTE, NC 704-791-7052 WILLIAMROSE@ADT.COM FIRE ALARM. (OPTIONAL)ADT / PROTECTION 1 BILL ROSE CHARLOTTE, NC 704-791-7052 WILLIAMROSE@ADT.COM CO2 MONITOR CO2METER, INC. MELYSSIA SANTIAGO OFFICE: 386-310-4933 EXT: 108 MELYSSIA.SANTIAGO@CO2METER.COM DIVISION 11 - EQUIPMENT KITCHEN EQUIPMENT DISTRIBUTOR (KED) AEI AYDELOTT EQUIPMENT INC. CENTERVILLE, OH 888-293-3568 OR 937-435-8220 ATTN: HERB AYDELOTT HAYDELOTT@AYDELOTT.COM N. WASSERSTROM AND SONS COLUMBUS, OH 614-737-8659 ATTN: CONOR KENNEDY CONORKENNEDY@WASSERSTROM.COM S & G DISTRIBUTING HILLIARD, OH 614-334-3636 ATTN: TAYLOR HEILBRONNER TAYLOR_HEILBRONNER@SGMGROUP.COM DIVISION 12 - FURNISHINGS DINING ROOM FURNITURE (SEE KITCHEN EQUIPMENT ABOVE) PATIO FURNITURE EMUAMERICAS, LCC 303-733-3385 X220 DANIEL FARROW NATIONALACCOUNTS@EMUAMERICAS.COM RECYCLE DESIGN ANDERSON, IN 765-374-0316 ATTN: JOSH BOUTWELL JBOUTWELL@RECYCLEDESIGN.COM DIVISION 13 - SPECIAL CONSTRUCTION WALK-IN COOLER / FREEZER INTERNATIONAL COLD STORAGE WICHITA, KS 316-218-4177 ATTN: LISA MOORE LISA.MOORE@ICSCO.COM IMPERIAL BROWN PORTLAND, OR 503-328-6806 ATTN: KRISTY HEATLEY KHEATLEY@IMPERIAL-BROWN.COM DIVISION 22 - PLUMBING WATER HEATERS ORDERING: HAINES, JONES AND CADBURY (HJC) PLUMBING FIXTURES ORDERING: HAINES, JONES AND CADBURY (HJC) FAUCETS ORDERING: HAINES, JONES AND CADBURY (HJC) COMMUNITY SINK / STAND DIVISION 23 - HVAC HVAC EQUIPMENT TRANE 866-986-4822 ATTN: MARTY CUSICK MJCUSICK@TRANE.COM CARRIER 630-920-9151 ATTN: MATT MURPHY MATT.MURPHY@CARRIER.UTC.COM AAON CORKEN APPLIED PRODUCTS 937-432-6099 ATTN: JIM PEED JIM@PREFERREDEQUIPMENT.NET YORK 405-419-6514 ATTN: JULIAN CAMPOS JULIAN.CAMPOS@JCI.COM EXHAUST HOODS / EXHAUST FANS CAPTIVEAIRE 800-825-3143 ATTN: STEVE LUDDY STEVE.LUDDY@CAPTIVEAIRE.COM HALTON (SIMPLE MISSION) SCOTTSVILLE, KY 770-598-0531 ATTN: BRENT COX BCOX.SIMPLEMISSION@GMAIL.COM AIR CURTAINS (ABOVE PUW, AS REQUIRED BY CODE) QUIKSERV CORP / EASI-SERV HOUSTON, TX BRIAN HANSON 800-388-8307 BRIAN.HANSON@EASI-SERV.COM DIFFUSERS ORDERING: HAINES, JONES AND CADBURY (HJC) TEST AND BALANCE PROVIDERS NATIONAL TAB 855-682-6822 X4, 4 ATTN: DON HERTENSTEIN DAN@NATIONALTAB.COM MELINK CORPORATION 513-965-7300 EXT. 501 ATTN: MEGAN PARKER WENDYS@MELINKCORP.COM AIRADIGM SOLUTIONS 603-262-9292 x709 ATTN: STEVE BUELTERMAN STEVE.BUELTERMAN@AIRADIGMSOLUTIONS.COM DIVISION 24 - ELECTRICAL SYSTEMS MODULAR ELECTRICAL PANEL SYSTEMS *ORDER IMMEDIATELY - LONG LEAD TIME ITEM* CAROLINA PRODUCTS INC. CHARLOTTE, NC 704-364-9029 ATTN: BRYAN STRYKER BRYANS@CPIPANELS.COM WESCO COLUMBUS, OH 614-934-6403 ATTN: BEN FACTOR BFACTOR@WESCO.COM PATIO HEATER (Optional)ORDERING: LOEB ELECTRIC PATIO FAN (Optional)ORDERING: LOEB ELECTRIC INTERIOR LIGHTS,BUILDING LIGHTS ORDERING: HAINES, JONES AND CADBURY (HJC) LOEB ELECTRIC COLUMBUS, OH 888-563-2669 ATTN: WENDY'S PROJECT TEAM WENDYSPROJECTS@LOEBELECTRIC.COM VILLA LIGHTING ST LOUIS, MO RONDA SCHRAGE 314-633-0536 WENDYS@VILLALIGHTING.COM SITE LIGHTING ORDERING: HAINES, JONES AND CADBURY (HJC) DESIGN & ORDERING: LSI INDUSTRIES CINCINNATI, OH LINDA McMULLEN 513-372-3101 LINDA.MCMULLEN@LSI-INDUSTRIES.COM DESIGN & ORDERING: LOEB ELECTRIC COLUMBUS, OH 888-563-2669 ATTN: WENDY'S PROJECT TEAM WENDYSPROJECTS@LOEBELECTRIC.COM DESIGN AND ORDERING: VILLA LIGHTING ST LOUIS, MO RONDA SCHRAGE 314-633-0536 WENDYS@VILLALIGHTING.COM DIVISION 32 - EXTERIOR IMPROVEMENTS BOLLARD COVERS ORDERING: HAINES, JONES AND CADBURY (HJC) POST GUARD OTHER VENDORS FREESTYLE MACHINE COCA-COLA MATT DOWHY 404-676-0451 MDOWHY@COCA-COLA.COM USED COOKING OIL TANK AND ENCLOSURE *TYPICALLY PROVIDED THROUGH USED COOKING OIL RECOVERY SUPPLIER* DAR PRO SOLUTIONS 248-214-2699 JIM SCHMIEDER JSCHMIEDER@DARPRO.COM MAHONEY ENVIROMENTAL 800-892-9392; 317-339-6282 JACK REEVES JACKR@MAHONEYES.COM VALLEY PROTEINS, LCC 800-871-3406 OR 540-877-2092 CUSTOMER SERVICE / RON ROGERS RROGERS@VALLEYPROTEIN.COM FLAG POLE (OPTIONAL) AMERICAN FLAGPOLE AND FLAG CO 800-426-6235 OR 651-777-0172 MATT KNOWLAN MKNOWLAN@AFLAG.COM GREASE INTERCEPTOR TANK (OPTIONAL) SCHIER GREASE INTERCEPTOR TANK 816-506-3203 SEAN MOLEN SEAN.MOLEN@SCHIERPRODUCTS.COM ZURN GREASE INTERCEPTOR TANK CONTACT HJC BULK CO2 STORAGE AIRGAS NATIONAL CARBONATION STEVE GREGG, STRATEGIC ACCOUNT MANAGER 719-434-1006 STEVEN.GREGG@AIRGAS.COM ARC3 GASES BRANDON LYONS 407-318-6743 BRANDON.LYONS@ARC3GASES.COM NUC02 DEBBIE OLIVER CUSTOMER SERVICE: 800-472-2855 DEBBIE.OLIVER@NUCO2.COM RESPONSIBILITY SCHEDULE O : OWNER 03.30.2021 KED : KITCHEN EQUIPMENT DISTRIBUTOR (CONTRACTED BY OWNER) S: SUPPLIER CONTRACTED THROUGH OWNER GC : GENERAL CONTRACTOR SHADING INDICATES ITEM IS AVAILABLE THROUGH CONSOLIDATOR. REFERENCE HJC ON SUPPLIER LIST ITEM SU P P L I E D IN S T A L L E D FI N A L U T I L I T Y CO N N E C T I O N COMMENTS EQUIPMENT (DEPICTED ON EQ SHEETS) KITCHEN EQUIPMENT / SHELVING KED KED GC REFER TO EQ1.1 & EQ1.2 FOR ADDITIONAL INFORMATION DINING ROOM PACKAGE KED KED N/A FREESTANDING DINING ROOM TABLES KED GC N/A GC TO ANCHOR TABLE BASES TO FLOOR ART PACK SGC N/A CONDIMENT / BEVERAGE BAR KED KED GC DOUBLE SIDED GRILL SS N/A FLY LIGHT SGC N/A EXTERIOR SIGNAGE S S GC MUST BE SUPPLIED BY APPROVED VENDOR LADDER DOCK & LADDER PORT GC GC N/A USED COOKING OIL (UCO) TANK & TANK SURROUND S S GC TYPICALLY PART OF U.C.O. CONTRACT BULK CO2 TANK & CO2 LINES S S S WALK-IN COOLER / FREEZER BOX S S GC PATIO FURNITURE GC GC N/A AOR TO INCLUDE IF PATIO IS INCLUDED PEDESTRIAN SAFETY RAIL & PATIO FENCE (IF REQUIRED)GC GC N/A BOLLARD SLEEVE (BL-1)GC GC N/A DRIVE THRU EXTERIOR MENU BOARDS (STATIC)SS GC ANCHOR BOLTS BY OWNER'S SIGN INSTALLER / FOUNDATION BY GC EXTERIOR PRE-SELL BOARDS (STATIC)SS GC ANCHOR BOLTS BY OWNER'S SIGN INSTALLER / FOUNDATION BY GC ORDER POINT CANOPY AND CANOPY SUPPORT POLE S S GC INCLUDES LIGHTS & HEAT TRACE. ANCHOR BOLTS SUPPLIER BY VENDOR / FOUNDATION BY GC PUW CANOPY S S GC INCLUDES LIGHTS & HEAT TRACE. BLOCKING BY GC ORDER CONFIRMATION DISPLAY (OCD)SS S INSTALLED BY OWNER'S IT INSTALLER / FOUNDATION BY GC DETECTOR LOOP S GC S SUPPLIED BY OWNER'S IT INSTALLER PICK-UP WINDOW GC GC GC INTERIOR TILE WINDOW SILLS GC GC N/A CORIAN CAP AT FRONT COUNTER / PLATFORM SEATING KED GC N/A MENU BOARD (U510)OO GC PREMIUM BEVERAGES BOARDS (D1703)OO GC WINDOW SHADES GC GC N/A FIRE EXTINGUISHER CABINET GC GC N/A SUPPLIED BY GC FIRE EXTINGUISHERS (FOH & BOH)GC GC N/A GC IS RESPONSIBLE FOR EXTINGUISHER TAGS STAINLESS STEEL CORNER GUARDS GC GC N/A WALL COVERINGS GC GC N/A CERAMIC / PORCELAIN TILE FLOOR, WALL & BASE GC GC N/A CEILING TILE & GRID GC GC N/A MECHANICAL RTU UNIT EQUIPMENT PACKAGE GC GC GC REFER TO MECHANICAL SHEETS FOR PACKAGE COMPONENTS RTU - START UP GC GC NA RTU - FACTORY COMMISSIONING GC S NA 7 BUSINESS DAY NOTICE REQUIRED. HVAC CONTROLS COMMISSIONING GC S GC 7 BUSINESS DAY NOTICE REQUIRED. HVAC TEST & BALANCE SS -T&B REQUIRED. APPROVED SUPPLIER RECOMMENDED REMOTE CONDENSER EQUIPMENT RAILS GC GC GC EXHAUST HOOD PACKAGE GC GC GC REFER TO MECHANICAL SHEETS FOR PACKAGE COMPONENTS AND ADDITIONAL INFORMATION RESTROOM ACCESSORIES RESTROOM HARDWARE GC GC N/A DISPENSERS ( PAPER TOWEL, TOILET PAPER)GC GC GC SOAP DISPENSERS KED GC N/A RESTROOM SOAP DISPENSER BY KED GRAB BARS & MIRRORS GC GC N/A COMMUNITY SINK & FIXTURES GC GC GC LIGHTED MIRROR FULL LENGTH MIRROR - COMMUNITY SINK AREA GC GC N/A FIXTURES (TOILETS, URINALS, LAVATORIES, VANITIES)GC GC GC PLUMBING WATER HEATER GC GC GC REFER TO PLUMBING SHEETS GAS COOKING EQUIPMENT SUPPLY MANIFOLD.GC GC GC REFER TO PLUMBING SHEETS - ORDER FROM KED USED COOKING OIL MANIFOLD S GC GC REFER TO PLUMBING SHEETS - PROVIDED UNDER COOKING OIL RECYCLE CONTRACT MOP SINK FAUCETS KED GC GC REFER TO EQUIPMENT SCHEDULE REVERSE OSMOSIS SYSTEM (RO)KED KED KED REFER TO EQUIPMENT SCHEDULE WATER FILTRATION SYSTEM S S S BY BEVERAGE EQUIPMENT INSTALLER ELECTRICAL MODULAR ELECTRICAL PANEL SYSTEM GC GC GC ORDER AT OR BEFORE PROJECT START LIGHT FIXTURES AND LAMPS (INTERIOR, EXTERIOR BUILDING & SITE)GC GC GC POINT OF SALE SYSTEM (POS)SS S REFERENCE ELECTRICAL SHEETS FOR ROUGH-INS BY GC CUSTOMER SELF ORDER KIOSK S S S CUSTOMER ORDER PICK-UP SCREEN (D1701)SS S SECURITY CAMERAS / MONITORS O O O REFERENCE ELECTRICAL SHEETS FOR WORK BY GC. PATIO HEATERS / PATIO FANS GC GC GC AOR TO DETERMINE IF PART OF SCOPE INTERNET SERVICE / CABLING O O O NOTES: 1 ALL ITEMS NOT SPECIFICALLY NOTED AS "BY OWNER" OR "BY KED" ARE FURNISHED AND INSTALLED BY THE GENERAL CONTRACTOR. 2 SEE EQUIPMENT SCHEDULE COMMENT SECTION FOR ADDITIONAL EQUIPMENT TO BE CONNECTED BY GC's PLUMBING AND ELECTRICAL SUB-CONTRACTORS. 3 GENERAL CONTRACTOR SHALL RECEIVE, STORE, AND MAKE SAFE ALL OWNER AND KED SUPPLIED ITEMS. 4 SEE APPROVED SUPPLIER LIST FOR SUPPLIER CONTACT INFORMATION. 5 ALL CONDUIT, WIRING, & PIPING DEPICTED ON DRAWINGS AND/OR REQUIRED TO MAKE FINAL CONNECTIONS ARE BY GC UNLESS NOTED OTHERWISE. 6 GC TO PROVIDE BACK UP SUPPORTS AS REQUIRED. NOTE: IN THE EVENT OF CONFLICT BETWEEN THIS SCHEDULE AND CONSTRUCTION DETAILS, THE CONSTRUCTION DETAILS PREVAIL. NOTE TO AOR AND GENERAL CONTRACTOR: DUE TO LONGER THAN USUAL LEAD TIMES FOR SEVERAL GENERAL CONTRACTOR (GC) PROVIDED PIECES OF EQUIPMENT, SUCH AS HVAC, ELECTRICAL PANELS, WALK-IN BOXES, IT HARDWARE AND SOME KITCHEN EQUIPMENT, WE STRONGLY ENCOURAGE YOU TO CONTACT VENDORS TO SECURE ORDERS FOR THIS EQUIPMENT WELL AHEAD OF TIME. AS OF Q2 2022 LEAD TIMES FOR SOME ITEMS ARE AS MUCH AS 28-30 WEEKS FOR DELIVERY SUPPLIER LIST & RESPONSIBILITY\PSCHEDULES G2.1 IT EC CITY/OWNER COMMTS01/12/20233 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 3 3 3 3 3 3 3 3 1.12.23 A B 1 EX T . R A M P 19'-5 1/2" 2" 40'-6 1/2"7'-4" R.O.3'-10" 6'-8"14'-0"12'-8" 10'-6"5'-6" R.O. 6 1/2" 8'-8 7/8" R.O.3'-4 5/8" 6 1/2" 4'-0 3/8" R.O.2'-1 1/8" 6 1 / 2 " 1' - 1 0 " R. O . 6 1 / 2 " 1' - 1 0 " R. O . 2' - 4 " 3' - 1 0 " 4' - 8 " 4' - 8 " 4' - 2 " 3' - 0 " 4' - 8 " 10 ' - 1 1 1 / 2 " R . O . 8" 8' - 8 1 / 4 " R . O . 6" 3' - 4 " 4' - 0 " 3' - 9 " 9' - 1 0 3 / 4 " 3 1 / 2 " 3' - 5 " 7" 2' - 3 1 / 4 " 10'-3 1/2"2'-5 1/2"7'-11" 3 1 / 2 " 4' - 4 " 2' - 9 1 / 2 " 3 1 / 2 " 6' - 0 1 / 4 " 3 1 / 2 " 11 ' - 1 " HO L D 4' - 8 " 12'-2 1/2"±2'-2" 3 1/2" 13'-0" HOLD 11'-8" HOLD 9'-4"± 3 1/2" 18'-0 1/2" HOLD 1'-9" HOLD 8' - 9 3 / 4 " 5'-5 7/8" 69'-4" 10 ' - 2 1 / 2 " 11 ' - 1 1 " F R A M I N G 7'-4"4'-1 1/2" 28'-6 1/2" 23 ' - 1 " 3' - 6 " DO O R 3' - 5 " 32 ' - 0 " 6" 6" 6" 31 ' - 0 " 5'-3 7/8" R.O. 3 A3.4 5 A3.5 4 A3.5 5 A3.3 1 A3.5 2 A3.2 2 A3.2 2 A3.4 1 A3.4 2 A3.3 1 A3.3 1 A3.1 1 A3.1 1 A3.2 1 A3.2 2 A3.1 2 A3.1 CREW 114 ENTRY 100 UTILITY 116 COOLER 111 FREEZER 110 RECEIVING 112 FAMILY 102 SERVICE 104 KITCHEN 106 DRIVE THRU 105 DINING 101 OFFICE 108 FAMILY 103 7 2 3 5 6 10 3A 2 9 1 7 6 5 4 A A C A C B AB B C A A A C A C C 1 10 11 12 12 14 14 15 15 15 16 17 19 2 20 21 2222 23 27 28 28 28 3 3 30 4 4 4 5 5 7 7 7 7 8 9 25 25 SIM. SIM WE POINT= F.O.S. 1FLOOR PLAN 1/4" = 1'-0" WIB LINES OMMITED IN THIS AREA FOR CLARITY. 02 A2.1 01 A2.1 01 A2.2 02 A2.2 SHADED AREA = SHEAR WALL DIAGONAL HATCH = METAL STUD WALLS STIPPLE = SOUND BATT INSULATION 26 GENERAL NOTES A. EXTERIOR DIMENSIONS ARE FROM FACE OF SHEATHING TO FACE OF SHEATHING U.N.O. INTERIOR DIMENSIONS ARE TO FACE OF STUD U.N.O. B. COORDINATE CURB CUTS AT DOORS WITH STOREFRONT MANUFACTURER PRODUCT DETAILS AND SHOP DRAWINGS. C. REFER TO FINISH PLAN AND INTERIOR ELEVATIONS FOR EXTENT OF INTERIOR FINISHES. D. THE CONTRACTOR SHALL PROVIDE SOLID WOOD BLOCKING FOR WALL MOUNTED ITEMS, EQUIPMENT, MILLWORK, ETC. COORDINATE LOCATIONS WITH OWNER'S CONSTRUCTION REPRESENTATIVE AS NECESSARY. E. REFER TO WALL TYPES ON SHEET A4.3. F. REFER TO DOOR AND WINDOW SCHEDULE ON SHEET A6.3. G. AN OPTIONAL PANELIZED EXTERIOR WALL SYSTEM IS AVAILABLE THROUGH RED-BUILT- SEE SUPPLIER LIST FOR CONTACT INFORMATION. G.C. MUST COORDINATE WITH AOR, OWNER, AND RED-BUILT TO VERIFY CODE COMPLIANCE, PERMITTING REQUIREMENTS, AND INSTALLATION CRITERIA. H. ANY CONCEALED SPACES NEED TO BE FIREBLOCKED/DRAFTSTOPPED PER IBC 2018 SECTION 718. LEGEND 3 1/2" 31 3B 8 17 ' - 7 3 / 4 " 6' - 2 1 / 4 " 70'-1 1/4" 8" 3 1/4"9 1/4" 10 ' - 8 3 / 4 " 11 ' - 9 " 9' - 6 1 / 4 " 8" CURB, REF. CIVIL DRAWINGS 20'-1 1/2" F.O. FDN TO F.O. FDN 5' - 1 0 3 / 4 " 12 10'-3 1/2" 2'-0" 2' - 0 1 / 4 " 4 A3.4 28'-8 3/4" SIM 1 A3.4 3 A2.1 PAY WINDOW 113 5 3 A3.5 2 A3.5 4 5 A4.2 6 A4.2 LOW 7 A4.2 LOW 2 A4.2HIGH 3 A4.211 A4.2 14 A4.2 10 A4.2 12 A4.2 SIM 13 A4.2 8 A4.2 9 A5.2 4 A4.2 A B C 2 X 4 FRAMING @ 16" O.C. 3 1 2" METAL STUD @ 16" O.C. 2 X 6 FRAMING @ 16" O.C. SEE A5.1 FOR ADDITIONAL INFORMATION **Tags updated in plan 1 A4.2 11 ' - 9 " A 4' - 4 1 / 2 " 3 1 / 2 " 3 1 / 2 " 5 1/2" 8A 4'-8"7'-8" R.O. 8'-2" R.O.9'-5 1/2" 1A 4A 5 1 / 2 " 36 ' - 8 " F. O . F D N T O F . O . F D N . 15 A4.2 1 32 32 32 3232 32 12 A4.2 33 #CODED NOTES:#CODED NOTES CONT.: 1. WALK-IN FREEZER/COOLER MANUFACTURER TO PROVIDE REINFORCED FRAMED OPENING FOR DOOR AS SCHEDULED. 2. APPROXIMATE LOCATION OF FRONT COUNTER. REF. SHEET A5.1 FOR LOCATION. 3. G.C. TO INSTALL STAINLESS STEEL CORNER GUARD, REFER TO FINISH PLAN SHEET FOR LOCATIONS AND TYPE OF CORNER GUARDS. 4. SHADED AREA INDICATES SHEAR WALL, REF. STRUCTURAL DRAWINGS. COORDINATE FINISHES WITH NUM. OF PLIES PROVIDED. EXTEND PLYWOOD AS REQUIRED TO MAINTAIN FINISH PLANE. 5. ROOF/ PARAPET OVERHANG ABOVE. REFER TO ROOF PLAN, SECTIONS,AND EXTERIOR ELEVATIONS FOR ADDITIONAL INFORMATION. 6. NOT USED. 7. SOFFIT / BULKHEAD ABOVE, REFER TO REFLECTED CEILING PLAN. 8. 6" DIA. CONCRETE FILLED METAL PIPE BOLLARD W/ BOLLARD SLEEVE. INSTALL BOLLARD PER CIVIL DRAWINGS. 9. ROOF ACCESS LADDER RECEIVER & SAFETY GATE. 10. RECESSED MOP SINK, INSTALL WATERPROOF MEMBRANE IN MOP SINK RECESS TO TIE INTO DRAIN. REF DETAIL ON A5.1. 11. EXHAUST HOOD, REF. MECHANICAL DRAWINGS. 12. STAINLESS STEEL PANELS BEHIND AND BESIDE FRYERS & GRILL. REFER TO INTERIOR ELEVATIONS & FINISH PLAN FOR EXTENTS. 13. NOT USED. 14. EQUIPMENT CURB BY KITCHEN EQUIPMENT DISTRIBUTOR. REF. SHEET A5.1 FOR LOCATIONS. REF. SHEET A5.2 FOR EQUIPMENT CURB DETAILS. 15. 6" C.M.U. CURB BELOW STOREFRONT. REFER TO SECTION AND STRUCTURAL DRAWINGS. 16. PARTIAL HEIGHT WALL, REFER TO INTERIOR ELEVATIONS AND SECTIONS. 17. STAINLESS STEEL CLOSURE TRIM / ANGLES BY GC. 18. NOT USED. 19. SEMI-RECESSED FIRE EXTINGUISHER CABINET AND FIRE EXTINGUISHER, SUPPLIED AND INSTALLED BY GC REFER TO INTERIOR ELEVATIONS. 20. PRE-MANUFACTURED SWITCHGEAR CABINET ON 6" CONC. CURB. REF. DETAILS 3/A1.1 & 6/A5.2. 21. CLEAR FLOOR AREA TO BE MAINTAINED IN FRONT OF ELECTRICAL PANELS MIN 3'-0" AS REQUIRED BY NEC. 22. PRE-FINISHED DOWNSPOUT. EXTEND 6" PVC W/ CAP UNDERGROUND & CONNECT TO STORM. SEE CIVIL AND EXTERIOR ELEVATIONS FOR ADDITIONAL INFORMATION. 23. HOT WATER TANK ON SHELF. TOP OF SHELF 4'-0" AFF. REFER STRUCTURAL DRAWINGS, DETAIL 04/S2.3. 24. NOT USED. 25. EDGE OF CONCRETE SLAB / FOUNDATION FOR WALK-IN BOX. REF. STRUCTURAL DRAWINGS. 26. RAMP BY WIB MANUFACTURER. 27. PROVIDE IN WALL BLOCKING FOR MOUNTING ARM OF CUSTOMER ORDER PICKUP SCREEN - COORDINATE WITH MOUNTING ARM SPEC. BOTTOM OF SCREEN TO BE MOUNTED 6'-10" AFF. 28. WALK-IN-BOX. FREEZER SUPPLIED WITH INSULATED FLOOR. 29. NOT USED. 30. HOLD DOWNS PROVIDED BY WIB MANUFACTURER G.C. TO DRILL AND EPOXY SET ANCHOR BOLTS AS REQUIRED. VERIFY LOCATIONS AND QUANTITY WITH MANUFACTURER. 31. C/T CABINET AND ELECTRIC METER AT THIS LOCATION. COORDINATE WITH LOCAL UTILITY COMPANY. REFER TO CIVIL DRAWINGS FOR ADDITIONAL INFORMATION. 32. FACE OF SHEATHING / FACE OF FOUNDATION. 33. INSTALL 1/2" PLYWOOD SHEATHING BEHIND GYPSUM BOARD TO MAINTAIN FINISH ALIGNMENT WITH BULKHEAD ABOVE. 34. WALL MOUNTED FIRE EXTINGUISHERS, SUPPLIED AND INSTALLED BY G.C. REFER TO INTERIOR ELEVATIONS 8 3' - 2 " R. O . 3 1/2" 6'-8" A 7'-0" 7' - 3 1 / 4 " C A A7.3 3 A3.3 10'-5" 18'-10" 4 A3.3 4 7'-4 1/2" 8 34 9 A4.2HIGH 3PLAN DETAIL 1/2" = 1'-0" CONC. CURB ELECTRICAL PANELS BASE 1'-1" WESCO 1'-1 1/2" CPI 5' - 5 1 / 2 " 6 A5.2 2KITCHEN DIMENSION PLAN 1/4" = 1'-0" 13'-0" R. FRM. 11 ' - 1 " R . F R M . 18'-0 1/2" R. FRM.9'-11" R. FRM. 19'-9 1/2" FIN. DIM.9'-10" FIN. DIM. 4' - 0 " R. F R M . 4' - 0 1 / 2 " R. F R M . 3' - 9 " FI N . D I M . 3' - 1 1 " FI N . D I M . 13'-0" FIN. DIM. 11 ' - 0 " F I N . D I M . W.E. POINT 1'-9"R. FRM. 11'-7" FIN. DIM. 11'-8" R. FRM. FLOOR PLAN A1.1 IT EC CITY/OWNER COMMTS01/12/20233 CITY COMMENTS10/20/20211 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 3 3 3 3 3 33 1.12.23 SP MAXLITE LED MAXLITE LED MAXLITE LED EX T . R A M P MA X L I T E LE D MAXLITE LED MA X L I T E LE D MAXLITE LED LCA672LCE6120 MAXLITE LED MAXLITE LED 1'-6" 1'-0"1'-6" 1'-0" EQ . EQ EQ 1'-0" EQ . EQ . 1' - 6 " 2'-9"2'-0"7" 1' - 6 " 2'-0" EQ . EQ . EQ . EQ EQ 3' - 4 " 3'-4" EQ EQ 4' - 2 " 3' - 4 " EQ EQ EQ EQ 1' - 6 " EQ EQ 1' - 0 " 3'-0" 5' - 5 " 1' - 6 " 1'-6" EQ. 3'-4" UTILITY 116 FAMILY 103 FAMILY 102 DINING 101 FREEZER 110 COOLER 111 RECEIVING 112 DRIVE THRU 105 OFFICE 108 SERVICE 104 CT4 CT1 CT1 GBGB CT1 CT4 TYP. TYP. SOFFIT @ 9'-0" AFF. SOFFIT @ 7'-1" AFF. SOFFIT @ 7'-1" AFF. SPSP 9'-4" AFF 9'-6" AFF 8'-0" AFF 8'-0" AFF 8'-4" AFF 8'-10" AFF 8'-10" AFF 10'-2" AFF CL CL GENERAL NOTES A. SEE INTERIOR FINISH SCHEDULE FOR ALL CEILING FINISHES. B. DO NOT SCREW THE CEILING GRID TO THE STAINLESS STEEL HOODS. REFER TO DETAIL 2/A1.2. C. REFER TO ELECTRICAL AND/OR HVAC DRAWINGS FOR ADDITIONAL INFORMATION REGARDING ALL FIXTURES, DEVICES AND EQUIPMENT SHOWN ON THIS PLAN. D. VERIFY CONFIGURATION OF MUSIC SYSTEM IN DINING ROOM. COORDINATE REQUIREMENTS WITH WENDY'S I.T. CONTACT. E. VERIFY CONFIGURATION OF WIFI SYSTEM. COORDINATE REQUIREMENTS WITH WENDY'S I.T. CONTACT. F. ALL LIGHT FIXTURES MOUNTED IN CEILING TILES ARE TO BE CENTERED IN THE TILE U.N.O. G. EXIT LIGHTING AND EXIT SIGNS TO COMPLY WITH IBC 2018 SECTIONS 1008 AND 1013. 1REFLECTED CEILING PLAN 1/4" = 1'-0" #CODED NOTES: 1. EXPOSED STRUCTURAL JOIST. REFER TO STRUCTURAL DRAWINGS. 2. TRACK LIGHTS. TRACK TO BE MOUNTED AT 12'-0" AF.F. REFER TO ELECTRICAL DRAWINGS FOR FIXTURE INFORMATION. 3. NOT USED. 4. SPEAKER. PROVIDE BLOCKING AS REQUIRED. 5. EXHAUST HOODS. REFER TO MECHANICAL DRAWINGS. 6. G.C. TO PROVIDE AND INSTALL LIGHTING FOR COOLER/FREEZER/RECEIVING UNITS W/ MOTION SENSOR. 7. REFER TO EXTERIOR ELEVATIONS FOR MOUNTING LOCATIONS OF WALL MOUNTED LIGHT FIXTURES (TYP.). 8. OPTIONAL OVERHEAD UNIT HEATER. REFER TO MECHANICAL DRAWINGS. 9. PAINT WALLS ABOVE 11'-6" (ABOVE TRIM), EXPOSED STRUCTURE, CONDUITS, J-BOXES, WIRING, PIPING, DUCTS AND REGISTERS , W/ PAINT INDICATED ON FINISH PLAN. 10. PENDANT LIGHTING, BOTTOM OF FIXTURE TO BE MOUNTED AT 12'-0" A.F.F. REFER TO ELECTRICAL DRAWINGS. 11. EQUIPMENT CHASE. REFER TO ELECTRICAL AND MECHANICAL DRAWINGS. 12. EXTEND GYP. BD. TIGHT TO DECK ABOVE. 13. FREEZER/COOLER EVAPORATOR, REFER TO MECHANICAL DRAWINGS. 14. NOT USED. 15. JOIST BRIDGING, REFER TO STRUCTURAL DRAWINGS. 16. NOT USED. 17. MONO POINT SPOT LIGHT FIXTURE TO BE MOUNTED AT BOTTOM OF JOIST & CENTERED ON TABLES BELOW. PROVIDE BLOCKING AS REQUIRED. REFER TO ELECTRICAL DRAWINGS 18. BOTTOM OF PENDANT GLOBE LIGHT TO BE MOUNTED AT 6'-0" A.F.F. CENTERED OVER TABLE U.N.O. REFER TO ELECTRICAL DRAWINGS AND INTERIOR ELEVATIONS 19. LED STRIP LIGHT AT CORNICE/PARAPET CAP. REFER TO ELECTRICAL DRAWINGS. 20. MAIN DUCT TO BE 2" BELOW BOTTOM OF JOIST 21. ROOF DRAIN, REFER TO ROOF PLAN. 22. OVERFLOW DRAIN, REFER TO ROOF PLAN. 23. GYPSUM BOARD SOFFIT ATTACHED TO STRUCTURE ABOVE. 24. STAINLESS STEEL CHASE TIED TO UNDERSIDE OF SOFFIT FOR DRINK LINES BY KED 25. G.C. TO PROVIDE 1/2" PLYWOOD SHEATHING BEHIND GYPSUM BOARD AT MENU BOARD BULKHEAD. SEE DETAIL ON THIS SHEET FOR MORE INFORMATION. EQ. TYP. 3' - 0 " 3' - 0 " 1'-9" 1' - 3 " SCUPPER & DOWNSPOUT SCUPPER & DOWNSPOUT 2 A3.5 CT-5 KITCHEN 106 2'-2 1/2" GB 3'-10 1/2" AFF SP SP10'-6 1/2" 8'-6" 5' - 1 0 " 3 A1.2 STRING LIGHT CEILING MOUNTED HEATER LED LIGHT FIXTURE EMERGENCY EGRESS LIGHT WIB LIGHT LEGEND SUSPENDED LIGHT FIXTURE DIRECTIONAL TRACK LIGHT AIR DIFFUSERS SW SUB WOOFER SPEAKER DIRECTIONAL LIGHT RECESSED CAN LIGHT EXIT LIGHT SP SP 1 10 10 10 10 11 11 12 12 12 19 19 19 15 9 2 2 2 2 7 77 777 13 12 10 18 17 7 4 15 15 5 5 11 4 4 20 EQ EQ 10 " 5'-9"5'-0" 3' - 0 " 10 10 EQ EQ 6 5' - 1 0 " 5'-03 4" 5'-0 3/16" 18 EQ EQ 18 18 5' - 1 1 " 7 7 1'-214" TYP. 17 10 TYP TYP TYP TYP 10 21 22 P-10 P-10 P-10P-10 8 9' - 0 " 9' - 0 " 7' - 2 " EQ.EQ. EQ EQ 1' - 2 " 2' - 0 " 2' - 0 " 2' - 9 3 / 4 " EQ.EQ. SOFFIT HEIGHT @ 8'-0" AFF. CT1 9'-4" AFF 8'-0"5'-0"1' - 9 1 / 2 " TYP. 17 TYP. 17 4' - 6 " 4' - 6 " 10 ' - 4 " 6 6 6 66 6 6 6 1'-6" 1' - 0 " 6' - 6 " 4' - 1 0 " 4' - 6 " 3' - 7 " EQ EQ EQ EQ EQ EQEQEQ 3' - 8 " 5' - 0 " 5' - 0 " 3' - 8 " 3' - 8 " 5' - 0 " 1' - 6 " 10'-5 7/8"23 24244 A1.2 GB 11'-2" +/- AFF P-6 8'-6 7/16" 2' - 9 3 / 4 " 1'-1 3/4" 3' - 0 1 / 2 " 3' - 0 1 / 2 " 5 A1.2 DO NOT FASTEN TO HOODS CEILING TILE. REFER TO REFLECTED CEILING PLAN HOOD 8 GA. HANGER WIRE AT 4'-0" O.C. G.C. TO SUSPEND TRACK FROM STRUCTURE ABOVE 2CEILING DETAIL @ HOOD 3" = 1'-0" NOTE: INSTALL PER MANUFACTURERS SPECIFICATIONS IF DIFFERENT THAN BELOW. 3SOFFIT - ELEC. PANELS 1-1/2" = 1'-0" EXTERIOR WALL PER SECTION 4/A3.3 FRP CORNER TRIM 1/2" PLYWOOD CEILING TILE, REFERENCE PLAN 2 X 4 FRAMING AT 16" O.C. EXTENDED TO STRUCTURE ABOVE 2 X 4 FRAMING AT 48" MAX ELECTRICAL PANELS 6" 1'-1" INSTALL GYP. TIGHT TO STRUCTURE. 1/2" PLYWOOD SHEATHING GYPSUM BOARD SHEATHING, PAINT I-JOIST KEEP SOFFIT OPEN TO RECEIVE DRINK LINES FOR FREESTYLE MACHINE 1'-6" CONT. 2X LEDGER WALL TILE, REF. INTERIOR ELEVATIONS 1/2" CEMENT BOARD SIMPSON HANGER PROVIDE METAL J-BEAD P-6 B.O. SOFFIT 11'-2" AFF 4SOFFIT - DRINK STATION 3/4" = 1'-0"5SOFFIT - MENU BOARD 3/4" = 1'-0" 1/2" PLYWOOD SHEATHING ATTACHED TO VERTICAL AND HORIZONTAL STUDS 1/2" GYPSUM BOARD FINISH CEILING, SEE RCP 2X4 DIAGONAL BRACING, SEE STRUCTURAL 1/2" GYPSUM BOARD CONTINUOUS LINE OF 2X6 BLOCKING, TYP. TOP AND BOTTOM OF SHEATHING. 2X6 BLOCKING @16" O.C. CONTINUOUS 2X6 BLOCKING, SEE STRUCTURAL FOR DETAILS. 2X6 BLOCKING ALL OTHER MENU BOARD ATTACHMENT POINTS, SEE STRUCTURAL (3) 2X6 BLOCKING WITH 1/2" FILLER PLATES AT EACH TOP & BOTTOM MENU BOARD ATTACHMENT POINTS. SEE STRUCTURAL FOR DETAILS 1" TO 1-1/2" NET FILLER BLOCKS. SEE STRUCTURAL SIMPSON LS30 EA. SIDE STAGGERED 1 (MIN) 1 SIMPSON LU26 HANGER, EACH END TYP. B.O. CELING 9'-6" A.F.F. B.O. CELING 8'-10" A.F.F. B.O. SOFFIT 7'-1" AFF MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 REFLECTED CEILING PLAN A1.2 IT EC CITY/OWNER CMMTS01/12/233 CITY COMMENTS10/20/211 3 3 3 3 3 3 3 3 3 3 3 1.12.23 SL O P E : 1 / 4 " P E R 1 ' - 0 " SL O P E : 1 / 4 " P E R 1 ' - 0 " SLOPE: 1/4" PER 1'-0" 3' - 0 " MI N . 3 A3.4 5 A3.3 1 A3.5 2 A3.2 2 A3.2 2 A3.5 2 A3.4 1 A3.4 4 A3.3 3 A3.3 2 A3.3 1 A3.1 1 A3.1 2 A3.1 1 A3.3 (OR RECTANGULAR SHAPE) = 2.75" = 3" DIA. = 2 3/4" x 41/4" = 2,930 S.F. = 4"x4" = 5,860 S.F. (SIZE OF VERTICAL CONDUCTORS & LEADERS) 100 YEAR, I-HOUR RAINFALL (IN.) REQUIRED VERTICAL LEADER SIZE (ROUND) SPECIFIED LEADER CAPACITY (SINGLE) REQUIRED OVERFLOW SCUPPER SIZE (SINGLE) VERTICAL LEADER (X2) CAPACITY PROVIDED GENERAL NOTES A. ROOF WORK TO BE INSTALLED WITH COMPATIBLE WENDY'S APPROVED ROOF MATERIAL SPECIFICATIONS. PROVIDE AND INSTALL ROOF INCLUDING BUT NOT LIMITED TO, INSULATION BOARD, EDGE FLASHING(S), COPINGS, SEALED TERMINATIONS AS REQUIRED BY THE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND SPECIFICATIONS. AT PENETRATIONS/ ATTACHMENTS IN THE ROOF, FLASH/ PROVIDE WEATHER TIGHT SEAL PER ROOFING SYSTEM MANUFACTURER'S WARRANTY REQUIREMENTS. THE ROOFING CONTRACTOR SHALL ENSURE THE ENTIRE ROOF SHALL BE WEATHER AND WATER TIGHT WITH POSITIVE DRAINAGE TO THE ROOF DRAINS AND NO PONDING. B. ROOFING CONTRACTOR SHALL INSTALL RIGID INSULATION (PER LOCAL ENERGY CODE AND IBC 2018 SECTION 15; ROOF FIRE CLASSIFICATION: C) AND PRIOR TO MEMBRANE INSTALLATION. SYSTEM TO BE COMPLETE WITH ALL ACCEPTABLE PRODUCTS AND INSTALLATION REQUIRED TO PROVIDE A FULL MANUFACTURER'S WARRANTY. ROOF SCREENS: CITYSCAPES UNIT-MOUNTED VERTICAL ROOF SCREEN SYSTEM WITH CORRGATED 7.2 RIB HORIZONTAL (METAL), NO TOP TRIM. COLOR : SHADOW GRAY. WWW.CITYSCAPESINC.COM CALCULATED ROOF AREA: = 2,432 S.F. = 322 S.F. = 2,754 S.F. HORIZONTAL ROOF AREA (S.F.) VERTICAL SURFACE 50% AREA (S.F.) TOTAL PROJECTED ROOF AREA (S.F.) DRAINGAGE CALCULATIONS: 1ROOF PLAN 1/4" = 1'-0" #CODED NOTES: 1. LINE OF EXTERIOR WALL BELOW. 2. PRE-MANUFACTURED 4" x 8" THRU-WALL SCUPPER, REFER TO DETAIL 12/A4.3. 3. EXTEND SINGLE-PLY MEMBRANE ROOF TO TERMINATION BAR UNDER COUNTER FLASHING TO PROVIDE WEATHER TIGHT SEAL. REFER TO DETAIL 8/A4.3. 4. EXTERIOR WALK-IN COOLER / FREEZER / RECEIVING UNIT SUPPLIED AND INSTALLED BY OTHERS. WALK-IN BOX PROVIDER IS RESPONSIBLE FOR INSTALLING ROOFING SYSTEM ON PANELIZED COOLER / FREEZER SYSTEM. MEMBRANE ROOF ON WIB BY MANUFACTURER. GC TO PROVIDE AND INSTALL COUNTER FLASHING. 5. PROVIDE POSITIVE DRAINAGE AROUND ALL ROOF CURBS. 6. INSTALL PIPE FLASHING FOR ROOF MOUNTED CONDENSERS LINES. REFER TO DETAIL 3/A4.3 AND 4/A4.3 7. ICE MACHINE CONDENSER FOR DINING ROOM FREESTYLE MACHINE. REFER TO DETAIL 5/A4.4 FOR CURB. 8. KITCHEN ICE MACHINE CONDENSER. REFER TO DETAIL 5/A4.4 FOR CURB. 9. PRE-FINISHED ALUMINUM COLLECTOR BOX (W/ OVERFLOW SLOT) & DOWNSPOUT TO STORM SEWER BELOW. REFER TO EXTERIOR ELEVATIONS. 10. PARAPET VENTING BY ROOF MEMBRANE MANUFACTURER. MIN. 1 VENT PER FIREBLOCKED AREA. 11. MECHANICALLY FASTEN SINGLE-PLY ROOF MEMBRANE OVER CONTINUOUS RIGID BOARD INSULATION OVER PLYWOOD SHEATHING. 12. PLUMBING VENT PIPE. REFER TO DETAIL 9/A4.3 FOR REQUIRED FLASHING REQUIREMENTS 13. WALK-IN FREEZER / COOLER REMOTE CONDENSER. REFER TO ELECTRICAL DRAWINGS. INSTALLED BY WALK-IN-BOX SUPPLIER. FINAL CONNECTIONS BY CONTRACTOR. 14. LADDER RECEIVER/HOOK & SAFETY GATE FOR ROOF ACCESS. REFER TO DETAIL 1/A4.3. 15. EXTEND ROOF MEMBRANE UP/OVER PARAPET & FLASH TO PRE-FINISHED ALUMINUM ROOF DRIP EDGE OR GRAVEL STOP. REFER TO WALL SECTIONS. 16. NOT USED. 17. NOT USED. 18. SHADED AREA INDICATES ARE OF ROOF TO RECEIVE WALKWAY PADS. 19. ROOFTOP UNIT. REFER TO DETAIL 6/A4.3 AND MECHANICAL DRAWINGS 20. PRE-FINISHED ALUMINUM DRIP EDGE, REFER TO WALL SECTIONS. 21. HATCH PATTERN INDICATES AREAS OF TAPERED INSULATION OVER SPECIFIED RIGID THERMAL INSULATION AS REQUIRED TO PROVIDE ROOF DRAINAGE. G.C. TO COORDINATE ACTUAL EXTENTS OF TAPERED INSULATION MATERIALS WITH ROOF INSTALLER PROPER COUNTER SLOPE AS REQUIRED BY CODE. 22. DASHED LINE INDICATES CLEAR AREA REQUIRED FOR THE HVAC UNIT AIR INTAKE. LOCATE ALL EXHAUST AIR DEVICES OUTSIDE OF 10'-0" RADIUS (TYP). 23. COOK CENTER CONDENSER. SUPPLIED AND INSTALLED BY KED. FINAL CONNECTION BY CONTRACTOR. 24. NOT USED. 25. EXHAUST FAN, REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION. 26. OVERFLOW DRAIN. REF. DETAIL 13/A4.3. FIELD LOCATE TO BE 2" HIGHER THAN THE MAIN DRAIN. 27. ROOF DRAIN. REF. DETAIL 13/A4.3. CONNECT LEADER TO UNDERGROUND STORM SYSTEM. 28. PRE-MANUFACTURED THRU-WALL SCUPPER, 6" (H) x 12" (W) MINIMUM. BASE TO ALIGN WITH ROOF MEMBRANE TO ALLOW WATER TO "PASS THRU" 29. NOT USED. 30. FIRE BLOCKING AT 20'-0" MAX. INTERVALS HORIZONTALLY, TYP. 31. FIRE BLOCKING AT 10'-0" MAX. INTERVALS HORIZONTALLY, TYP. 2 A3.1 3 A3.5 RTU-1 1 A3.2 1 A3.2 1 1 1 10 10 10 11 11 12 1313 14 15 15 15 15 15 15 15 19 22 20 20 20 20 21 21 21 21 22 23 25 25 25 28 3 4 5 5 6 6 9 9 30 30 30 31 31 31 10 31SLOPE 26 15 6 8 7 27 ALTERNATE EF-2 LOCATION 5 5 18 SLOPE: 1/4" PER 1'-0" 3'-9" 5 10'-10 5/8" 9' - 5 3 / 4 " 1 0 ' - 0 " M I N . 10' -0" MIN. 4' - 5 " 5 19 RTU-2 1 0 ' - 0 " M I N . 10' -0" MIN. ROOF PLAN A1.3 IT EC CITY/OWNER CMMTS01/12/233 CITY COMMENTS10/20/211 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 3 1.12.23 EQ EQ CL 8" 6' - 3 " 3 A3.4 1 A3.5 2 A3.2 1 A3.2 4 A3.3 1 A3.2 4 A2.1 M-4 E-8 M-5 E-8 M-7 M-1 SF-1 M-3 E-2 E-7 M-1 M-4 M-7 SF-1 BL-1 E-8 E-7 M-1 SF-1 BL-1 M-7 E-7 COLLECTOR BOX & DOWNSPOUT PREFINISHED TO MATCH PEX-12. DOWNSPOUT CONNECTED TO STORM WATER SYSTEM. REFER TO 12/A4.3 FOR ATTACHMENT DETAILS. ROOF LINE. WALL MOUNTED LIGHT FIXTURE, TYP. BLADE BEYOND EIFS REVEAL, TYP. LADDER RECEIVER W/ SAFETY GATE. PAINT PEX-10. REFER TO DETAIL 1/A4.3 ROOF LINE WALL MOUNTED LIGHT FIXTURE TYP. SERVICE DOOR, REFER TO DOOR SCHEDULE. PAINT PEX-1. FLUSH MOUNTED 54" WENDY'S SIGNAGE PROVIDED BY SIGN SUPPLIER. G.C. TO PROVIDE BLOCKING AND ELECTRICAL AS REQUIRED. EIFS REVEAL, TYP. 6' - 3 " 2REAR ELEVATION 1/4" = 1'-0" 1FRONT ELEVATION 1/4" = 1'-0"3REAR DRIVE-THRU ELEVATION 1/4" = 1'-0" SURFACE-MOUNT SPEAKER, CENTER ON DOOR. STREET NUMBER TO BE LOCATED PER LOCAL JURISDICTION REQUIREMENTS. 6" HIGH NON-REFLECTIVE DARK BRONZE NUMERALS U.N.O. M-4 M-5 BLADE LIGHTING, REFER TO ELECTRICAL 3'-0"3'-0" 2 A3.2 EIFS REVEAL, TYP. EIFS REVEAL, TYP. BEYOND BEYOND SF-1 STOREFRONT -"DARK BRONZE" PUW PICK-UP WINDOW TO MATCH STOREFRONT M-1 PARAPET CAP/ BRAKE METAL - "DARK BRONZE" M-3 EXCEPTIONAL METALS - "BRIGHT RED" M-4 EXCEPTIONAL METALS - "SILVER METALLIC" M-5 BRAKE METAL - "CLEAR ANNODIZED" M-7 EXCEPTIONAL METALS - "CUSTOM DARK GREY" KW-1 KNOTWOOD PREFINISHED ALUMINUM SIDING MATERIAL "LIGHT OAK" KW-2 KNOTWOOD PREFINISHED ALUMINUM SIDING MATERIAL "KNIGHTS ARMOUR" KW-3 KNOTWOOD PREFINISHED ALUMINUM SIDING MATERIAL "BRITE RED MATT" E-2 EIFS - "WENDY'S RED" E-7 EIFS - "DARK GREY" E-8 EIFS - "TAN" E-9 EIFS - "SILVER" (SMOOTH FINISH) BL-1 BOLLARD SLEEVE - "YELLOW" PEX-1 PAINT - DARK BRONZE (SEE PAINT SCHEDULE) PEX-3 PRE-FINISHED DARK BRONZE SIGN CABINETS (SEE PAINT SCHEDULE) PEX-6 PRE-FINISHED WALK-IN FREEZER / COOLER DARK BRONZE (SEE PAINT SCHEDULE) PEX-10 PAINT / POWDER COAT- BLACK (SEE PAINT SCHEDULE) PEX-12 PAINT- DARK GREY (SEE PAINT SCHEDULE) PEX-6 EXTERIOR FINISH SCHEDULE EQ.EQ.EQ.EQ. T.O. BLADE FRAMING 21' - 0" T.O. PARAPET FRAMING 18' - 3" T.O. DINING PARAPET 14' - 10" T.O. GLAZING 11' - 6" T.O. CONC. SLAB 0' - 0" T.O. TOWER FRAMING 18' - 3" T.O. TOWER FRAMING 18' - 3" T.O. CONC. SLAB 0' - 0" T.O. CONC. SLAB 0' - 0" T.O. FRAMING 18' - 3" 6' - 3 " 6' - 3 " 4'-8" PEX-1 @ DOWN SPOUT @ COLUMN LED STRIP LIGHTING IN CORNICE WALL BEYOND, REFER TO BUILDING SECTIONS FOR MORE INFO M-4 WENDY'S SIGNAGE TO BE PROVIDED BY SIGN SUPPLIER. G.C. TO PROVIDE BLOCKING AND ELECTRICAL AS REQUIRED. ALTERNATE RACEWAY BLADE LIGHTING. EQ EQ 8" 3' - 0 " 2' - 0 " 4' - 4 " CL CLCL 4WIRING HOLE PLACEMENT DIAGRAM 3/8" = 1'-0" INTERNALLY ILLUMINATED SIGNAGE, SEE EXTERIOR ELEVATIONS COORDINATE BLOCKING REQUIREMENTS AND LOCATIONS WITH SIGN VENDOR ELECTRICAL CONDUIT RACEWAY STAND OFF PROVIDED BY SIGN MFR. 14 A4.3 54" WENDY'S SIGNAGE TO BE PROVIDED BY SIGN SUPPLIER. G.C. TO PROVIDE BLOCKING AND ELECTRICAL AS REQUIRED. EQ EQ CL 8" M-3 E-2 ALTERNATE RACEWAY BLADE LIGHTING. EXTERIOR ELEVATIONS A2.1 IT EC CITY/OWNER CMMTS01/12/233 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 5ALT. RACEWAY BLADE LIGHTING 3/4" = 1'-0" 6ALT. RACEWAY BLADE LIGHTING ELEVATION 3/8" = 1'-0" 3 3 3 3 3 1.12.23 3' - 3 1 / 4 " 8' - 1 0 " EQEQ CL 1' - 8 " EQ.EQ. EQ.6'-2"EQ. 8' - 1 0 " 2'-0" 8' - 1 0 " T Y P . WALL HYDRANT, REF. PLUMBING SHEETS. ROOF LINE BEYOND LADDER RECEIVER W/ SAFETY GATE. PAINT PEX-10. REFER TO DETAIL 1/A4.4 WENDY'S SIGNAGE PROVIDED BY SIGN SUPPLIER. G.C. TO PROVIDE BLOCKING AS REQUIRED. WALL MOUNTED LIGHT FIXTURE EIFS REVEAL, TYP. ROOF LINE COLLECTOR BOX & DOWNSPOUT PREFINISHED TO MATCH PEX-12 (TYP.) DOWNSPOUT CONNECTED TO STORM WATER SYSTEM. REFER TO 12/A4.4 FOR ATTACHMENT DETAILS. FLUSH-MOUNT 42" WENDY'S SIGNAGE (WHITE LETTERS) PROVIDED BY SIGN SUPPLIER. G.C. TO PROVIDE BLOCKING AND ELECTRICAL AS REQUIRED. WALL MOUNTED LIGHT FIXTURE, TYP. WALL MOUNTED LIGHT FIXTURE, TYP. WENDY'S SIGNAGE PROVIDED BY SIGN SUPPLIER. G.C. TO PROVIDE BLOCKING AS REQUIRED. EIFS REVEAL, TYP. FLUSH-MOUNT 42" WENDY'S SIGNAGE (WHITE LETTERS) PROVIDED BY SIGN SUPPLIER. G.C. TO PROVIDE BLOCKING AND ELECTRICAL AS REQUIRED. C/T CABINET & ELECTRIC METER, PEX-1 1LEFT SIDE ELEVATION 1/4" = 1'-0" 2RIGHT SIDE ELEVATION 1/4" = 1'-0" 5 A3.3 2 A3.4 1 A3.4 1 A3.1 3 A3.3 2 A3.3 1'-4" BLADE LIGHTING, REFER TO ELECTRICAL 1 A3.3 1 A3.1 EQ.EQ. ALIGN WALL HYDRANT, REF. PLUMBING SHEETS. SIM. 2'-5" 1 A3.4 2 A3.1 6' - 3 " 6' - 3 " 6' - 3 " 6' - 3 " SF-1 STOREFRONT -"DARK BRONZE" PUW PICK-UP WINDOW TO MATCH STOREFRONT M-1 PARAPET CAP/ BRAKE METAL - "DARK BRONZE" M-3 EXCEPTIONAL METALS - "BRIGHT RED" M-4 EXCEPTIONAL METALS - "SILVER METALLIC" M-5 BRAKE METAL - "CLEAR ANNODIZED" M-7 EXCEPTIONAL METALS - "CUSTOM DARK GREY" KW-1 KNOTWOOD PREFINISHED ALUMINUM SIDING MATERIAL "LIGHT OAK" KW-2 KNOTWOOD PREFINISHED ALUMINUM SIDING MATERIAL "KNIGHTS ARMOUR" KW-3 KNOTWOOD PREFINISHED ALUMINUM SIDING MATERIAL "BRITE RED MATTE" E-2 EIFS - "WENDY'S RED" E-7 EIFS - "DARK GREY" E-8 EIFS - "TAN" E-9 EIFS - "SILVER" (SMOOTH FINISH) BL-1 BOLLARD SLEEVE - "YELLOW" PEX-1 PAINT - DARK BRONZE (SEE PAINT SCHEDULE) PEX-3 PRE-FINISHED DARK BRONZE SIGN CABINETS (SEE PAINT SCHEDULE) PEX-6 PRE-FINISHED WALK-IN FREEZER / COOLER DARK BRONZE (SEE PAINT SCHEDULE) PEX-10 PAINT / POWDER COAT- BLACK (SEE PAINT SCHEDULE) PEX-12 PAINT- DARK GREY (SEE PAINT SCHEDULE) EXTERIOR FINISH SCHEDULE BEYOND BEYOND M-1 M-1 M-3 E-2 M-5 M-7 E-8BL-1 BL-1 E-8 E-7 E-7 M-5 SF-1 E-2 M-4 M-4 M-4 SF-1 PEX-6 PEX-6 E-8 M-3 M-4M-7 12 A4.2 T.O. BLADE FRAMING 21' - 0" T.O. PARAPET FRAMING 18' - 3" T.O. DINING PARAPET 14' - 10" T.O. GLAZING 11' - 6" T.O. CONC. SLAB 0' - 0" T.O. CONC. SLAB 0' - 0" T.O. PARAPET FRAMING 18' - 3" T.O. BLADE FRAMING 21' - 0" T.O. DINING PARAPET 14' - 10" T.O. GLAZING 11' - 6" E-8 E-8 8'-43 4"CL LED TAPE LIGHTING IN CORNICE LED TAPE LIGHTING IN CORNICE P.U.W. REFER TO WINDOW SCHEDULE. P.U.W. REFER TO WINDOW SCHEDULE SF-1 SF-1 SF-1 EQ.EQ. 2'-4"2'-4" M-4 E-8 WENDY'S SIGNAGE PROVIDED BY SIGN SUPPLIER. G.C. TO PROVIDE BLOCKING AS REQUIRED. EQ.EQ. WENDY'S SIGNAGE PROVIDED BY SIGN SUPPLIER. G.C. TO PROVIDE BLOCKING AS REQUIRED. SF-1 THIS DOOR TO RECEIVE "EXIT ONLY" SIGN UNLESS REQUIRED BY CODE. ALIGN WITH CIVIL GUIDELINE SETS, UPDATE DOOR SCHEDULE AS REQUIRED. FROSTED GLAZING AT BANQUETTE WALL, SEE WINDOW SCHEDULE, TYP. EXTERIOR ELEVATIONS A2.2 IT EC CITY/OWNER CMMTS01/12/233 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 3 3 3 3 3 1.12.23 3 A3.5 2 A3.2 1 A3.2 2 A3.2 1 A3.2 1 A3.3 SIM 1 A3.4 2BUILDING SECTION 1/4" = 1'-0" 1BUILDING SECTION 1/4" = 1'-0" BUILDING SECTION GENERAL NOTES A. SEAL EXTERIOR WALL AND ROOF PENETRATIONS AND JOINTS BETWEEN DISSIMILAR MATERIALS TO ENSURE A COMPLETELY WEATHER-TIGHT SEAL. SEALANT LOCATIONS INCLUDE BUT ARE NOT LIMITED TO : LIGHT FIXTURE MOUNTS, DOOR AND WINDOW FRAMES, FASCIA EDGES, SIGNAGE MOUNTS, CONDUIT PENETRATIONS, SCUPPERS, ELECTRICAL OUTLETS, HOSE BIBS, AND UTILITY SERVICE ENTRANCES. REFER TO JOINT TREATMENT SCHEDULE. B. PROVIDE CONTINUOUS WEATHER BARRIER BEHIND ALL EXTERIOR FINISHES. UTILIZE COMMERCIAL GRADE BUILDING WRAP AT CORRUGATED METAL PANELS. UTILIZE FLUID APPLIED OR SELF ADHERING WEATHER BARRIER AT MASONRY, EIFS, TILE FIBER CEMENT PANELS AND ACM. LAP & TAPE ALL SEAMS. LAP OVER ALL FLASHING. COORDINATE TRANSITIONS PER MFR'S RECOMMENDATIONS. APPROVED ALTERNATE: PROVIDE FLUID APPLIED OR SELF ADHERING WEATHER BARRIER BEHIND ALL EXTERIOR FINISHES. C. EXTERIOR SIDEWALKS AND PAVING ARE SHOWN FOR DESIGN INTENT ONLY. G.C. SHALL BE RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH OWNER'S REPRESENTATIVE AND/OR CIVIL DRAWINGS. D. GRADES SHALL BE 2" MIN. BELOW FLOOR SLAB AND SHALL SLOPE AWAY FROM BUILDING @ 5% SLOPE EXCEPT @ PEDESTRIAN PATHS WHICH SHALL BE SLOPED AWAY FROM BUILDING @ 1/8" PER FOOT MIN. AND 1/4" PER FOOT MAX. E. ITEMS MOUNTED ON TOP OF THE PARAPET ARE TO BE SET IN A FULL BED OF SEALANT AND HAVE FULL DEPTH BLOCKING IMMEDIATELY BELOW CAP, FASCIA, AND DRIP EDGE. F. REFER TO STRUCTURAL PLAN AND DETAILS FOR ADDITIONAL FRAMING REQUIREMENTS. G. PROVIDE CONTINUOUS CLASS 1 OR CLASS 2 VAPOR RETARDER ON THE INTERIOR SIDE OF THE WALL FRAMING AND BEHIND APPLIED WALL FINISH SHEATHING IN ASHRAE ZONES MARINE 4 AND 5 THROUGH 8. LAP AND TAPE ALL SEAMS TO ACHIEVE CONTINUOUS COVERAGE OVER THE ENTIRE UNFENESTRATED BUILDING ENVELOPE. H. INSULATION AND VAPOR RETARDER IN EXPOSED AREAS TO HAVE A FLAME SPREAD OF 25 AND A SMOKE DEVELOPMENT OF 450 OR BETTER. I. VAPOR RETARDER SHALL BE INSTALLED IN CONTINUOUS SHEETS FROM FLOOR TO UNDERSIDE OF ROOF DECK. ALL SEAMS AND PENETRATIONS SHALL BE SEALED PER MANUFACTURER'S DIRECTION. EQ.EQ.EQ.EQ. E-8 2 A3.5 5 A3.3 SIM. OPP. T.O. PARAPET FRAMING 18' - 3" T.O. CONCRETE SLAB 0' - 0" REF. STRUCTURAL T.O. PARAPET FRAMING 18' - 3" B.O. HEADER 11' - 6" T.O. CONCRETE SLAB 0' - 0" REF. STRUCTURAL E-7 M-7 M-4 4'-8" ALIGN REVEAL WITH FACE BELOW BUILDING SECTIONS A3.1 IT EC CITY COMMENTS10/20/211 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 1 1 11 1 A3.1 1 A3.1 3 A3.4 2 A3.5 2 A3.5 4 A3.3 FREEZER 110 CREW 114 HALLWAY 109 DINING 101 SERVICE 104KITCHEN 106 KITCHEN 106 2BUILDING SECTION 1/4" = 1'-0" 1BUILDING SECTION 1/4" = 1'-0" DINING 101 BUILDING SECTION GENERAL NOTES A. SEAL EXTERIOR WALL AND ROOF PENETRATIONS AND JOINTS BETWEEN DISSIMILAR MATERIALS TO ENSURE A COMPLETELY WEATHER-TIGHT SEAL. SEALANT LOCATIONS INCLUDE BUT ARE NOT LIMITED TO : LIGHT FIXTURE MOUNTS, DOOR AND WINDOW FRAMES, FASCIA EDGES, SIGNAGE MOUNTS, CONDUIT PENETRATIONS, SCUPPERS, ELECTRICAL OUTLETS, HOSE BIBS, AND UTILITY SERVICE ENTRANCES. REFER TO JOINT TREATMENT SCHEDULE. B. PROVIDE CONTINUOUS WEATHER BARRIER BEHIND ALL EXTERIOR FINISHES. UTILIZE COMMERCIAL GRADE BUILDING WRAP AT CORRUGATED METAL PANELS. UTILIZE FLUID APPLIED OR SELF ADHERING WEATHER BARRIER AT MASONRY, EIFS, TILE FIBER CEMENT PANELS AND ACM. LAP & TAPE ALL SEAMS. LAP OVER ALL FLASHING. COORDINATE TRANSITIONS PER MFR'S RECOMMENDATIONS. APPROVED ALTERNATE: PROVIDE FLUID APPLIED OR SELF ADHERING WEATHER BARRIER BEHIND ALL EXTERIOR FINISHES. C. EXTERIOR SIDEWALKS AND PAVING ARE SHOWN FOR DESIGN INTENT ONLY. G.C. SHALL BE RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH OWNER'S REPRESENTATIVE AND/OR CIVIL DRAWINGS. D. GRADES SHALL BE 2" MIN. BELOW FLOOR SLAB AND SHALL SLOPE AWAY FROM BUILDING @ 5% SLOPE EXCEPT @ PEDESTRIAN PATHS WHICH SHALL BE SLOPED AWAY FROM BUILDING @ 1/8" PER FOOT MIN. AND 1/4" PER FOOT MAX. E. ITEMS MOUNTED ON TOP OF THE PARAPET ARE TO BE SET IN A FULL BED OF SEALANT AND HAVE FULL DEPTH BLOCKING IMMEDIATELY BELOW CAP, FASCIA, AND DRIP EDGE. F. REFER TO STRUCTURAL PLAN AND DETAILS FOR ADDITIONAL FRAMING REQUIREMENTS. G. PROVIDE CONTINUOUS CLASS 1 OR CLASS 2 VAPOR RETARDER ON THE INTERIOR SIDE OF THE WALL FRAMING AND BEHIND APPLIED WALL FINISH SHEATHING IN ASHRAE ZONES MARINE 4 AND 5 THROUGH 8. LAP AND TAPE ALL SEAMS TO ACHIEVE CONTINUOUS COVERAGE OVER THE ENTIRE UNFENESTRATED BUILDING ENVELOPE. H. INSULATION AND VAPOR RETARDER IN EXPOSED AREAS TO HAVE A FLAME SPREAD OF 25 AND A SMOKE DEVELOPMENT OF 450 OR BETTER. I. VAPOR RETARDER SHALL BE INSTALLED IN CONTINUOUS SHEETS FROM FLOOR TO UNDERSIDE OF ROOF DECK. ALL SEAMS AND PENETRATIONS SHALL BE SEALED PER MANUFACTURER'S DIRECTION. SIM 4 A3.3 2 A3.1 2 A3.1 REF STRUCTURAL T.O. CONC. SLAB 0' - 0" T.O. BLADE FRAMING 21' - 0" T.O. PARAPET FRAMING 18' - 3" T.O. PARAPET FRAMING 18' - 3" JOIST BEARING (BOH-HI) 12' - 3" REF STRUCTURAL T.O. CONC. SLAB 0' - 0" B.O. HEADER 11' - 6" JOSIT BEARING (FOH-HI) 12' - 7" T.O. DINING PARAPET 14' - 10" MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 BUILDING SECTIONS A3.2 IT EC CITY/OWNER CMMTS01/12/233 CITY COMMENTS10/20/211 3 3 1.12.23 2 A4.1 1 A4.1 2 A4.1 5 A4.1 2 A4.1 4 A4.1 7 A4.1 SIM. 3 A4.1 1SECTION 3/4" = 1'-0"2SECTION 3/4" = 1'-0"3SECTION 3/4" = 1'-0"4SECTION 3/4" = 1'-0"5SECTION 3/4" = 1'-0" SIM. SIM OPP. SECTION GENERAL NOTES A. SEAL ALL EXTERIOR WALL AND ROOF PENETRATIONS AND JOINTS BETWEEN DISSIMILAR MATERIALS TO ENSURE A COMPLETELY WEATHER-TIGHT SEAL. SEALANT LOCATIONS INCLUDE BUT ARE NOT LIMITED TO : LIGHT FIXTURE MOUNTS, DOOR AND WINDOW FRAMES, FASCIA EDGES, SIGNAGE MOUNTS, CONDUIT PENETRATIONS, SCUPPERS, ELECTRICAL OUTLETS, HOSE BIBS, AND UTILITY SERVICE ENTRANCES. REFER TO JOINT TREATMENT SCHEDULE. B. PROVIDE CONTINUOUS WEATHER BARRIER BEHIND ALL EXTERIOR FINISHES. UTILIZE COMMERCIAL GRADE BUILDING WRAP. UTILIZE FLUID APPLIED WEATHER BARRIER AT METAL SIDING, AND EIFS. LAP & TAPE ALL SEAMS. LAP OVER ALL FLASHING. COORDINATE TRANSITIONS PER MFR'S RECOMMENDATIONS. APPROVED ALTERNATE: PROVIDE FLUID APPLIED OR SELF ADHERING WEATHER BARRIER BEHIND ALL EXTERIOR FINISHES. C. EXTERIOR SIDEWALKS AND PAVING ARE SHOWN FOR DESIGN INTENT ONLY. G.C. SHALL BE RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH OWNER'S REPRESENTATIVE AND/OR CIVIL DRAWINGS. D. GRADES SHALL BE 2" MIN. BELOW FLOOR SLAB AND SHALL SLOPE AWAY FROM BUILDING @ 5% SLOPE. HARDSCAPE AND SHALL SLOPE AWAY FROM BUILDING @ 1/8" PER FOOT MIN. AND 1/4" PER FOOT MAX. E. REFER TO STRUCTURAL PLAN AND DETAILS FOR ADDITIONAL FRAMING REQUIREMENTS. F. VAPOR RETARDER SHALL BE INSTALLED IN CONTINUOUS SHEETS FROM FLOOR TO UNDERSIDE OF ROOF DECK. ALL SEAMS AND PENETRATIONS SHALL BE SEALED PER MANUFACTURER'S DIRECTION. PROVIDE CONTINUOUS CLASS 1 OR CLASS 2 VAPOR RETARDER ON THE INTERIOR SIDE OF THE WALL FRAMING AND BEHIND APPLIED WALL FINISH SHEATHING IN ASHRAE ZONES MARINE 4 AND 5 THROUGH 8. LAP AND TAPE ALL SEAMS TO ACHIEVE CONTINUOUS COVERAGE OVER THE ENTIRE UNFENESTRATED BUILDING ENVELOPE. G. INSULATION AND VAPOR RETARDER IN EXPOSED AREAS TO HAVE A FLAME SPREAD OF 25 AND A SMOKE DEVELOPMENT OF 450 OR BETTER. OPP 5 A4.1 SIM REF. STRUCTURAL T.O. CONC. SLAB 0'-0" T.O. DINING PARAPET 14' - 10" T.O. DINING PARAPET 14' - 10" B.O. HEADER 11' - 6" REF. STRUCTURAL T.O. CONC. SLAB 0'-0" 3 A4.1 1 A4.1 REF. STRUCTURAL T.O. CONC. SLAB 0'-0" T.O. CONC. SLAB 0'-0" T.O. CONC. SLAB 0'-0" REF. STRUCTURAL JOIST BEARING (BOH-HI) 12' - 3" T.O. PARAPET FRAMING 18' - 3" T.O. PARAPET FRAMING 18' - 3" B.O. HEADER 11' - 6" T.O. DINING PARAPET 14' - 10" I-JOIST, REF. STRUCTURAL DRAWINGS VAPOR RETARDER TYP 2X6 FRAMING, REF. STRUCTURAL DRAWINGS. TILE, REF. FINISH PLAN & INTERIOR ELEVATIONS. CONCRETE SLAB ON GRADE, REF STRUCTURAL DRAWINGS RIGID PERIMETER INSULATION, REF. INSULATION SCHEDULE STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. BATT INSULATION, REF. INSULATION SCHEDULE WEATHER BARRIER FLOOR FINISH, REF. FINISH PLAN. CONCRETE SLAB ON GRADE, REF STRUCTURAL DRAWINGS RIGID PERIMETER INSULATION, REF. INSULATION SCHEDULE CONCRETE FOOTING, REF. STRUCTURAL DRAWINGS SINGLE PLY MEMBRANE ROOF P.T. WOOD BLOCKING, FULL DEPTH OF INSULATION. SINGLE PLY MEMBRANE ROOF FIRE BLOCKING AS REQUIRED FINISH CEILING, REF. REFLECTED CEILING PLANS BATT INSULATION, REF. INSULATION SCHEDULE VAPOR RETARDER TYP WEATHER BARRIER 2X6 FRAMING, REF. STRUCTURAL DRAWINGS. STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. WALL FINISH, REF. FINISH PLAN & INTERIOR ELEVATIONS. BASE, REF. FINISH PLAN & INTERIOR ELEVATIONS. FLOOR FINISH, REF. FINISH PLAN. CONCRETE SLAB ON GRADE, REF STRUCTURAL DRAWINGS CONCRETE FOOTING, REF. STRUCTURAL DRAWINGS FREEZER/COOLER INSULATED PANEL WALL ASSEMBLY BY OTHERS. SINGLE PLY MEMBRANE ROOF RIGID ROOF INSULATION, REF. INSULATION SCHEDULE STRUCTURAL ROOF SHEATHING, REF. STRUCTURAL DRAWINGS. FINISH CEILING, REF. REFLECTED CEILING PLANS FIRE BLOCKING AS REQUIRED VAPOR RETARDER TYP 1/2" PLYWOOD SHEATHING BATT INSULATION, REF. INSULATION SCHEDULE WALL FINISH, REF. FINISH PLAN & INTERIOR ELEVATIONS. 2X6 FRAMING, REF. STRUCTURAL DRAWINGS. FLOOR FINISH, REF. FINISH PLAN. RIGID PERIMETER INSULATION, REF. INSULATION SCHEDULE CONCRETE FOOTING, REF. STRUCTURAL DRAWINGS I-JOIST, REF. STRUCTURAL DRAWINGS LEDGER & HANGER, REF. STRUCTURAL DRAWINGS. STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. FIRE BLOCKING AS REQUIRED P.T. WOOD BLOCKING, FULL DEPTH OF INSULATION. WEATHER BARRIER 2X6 FRAMING, REF. STRUCTURAL DRAWINGS. ALUMINUM STOREFRONT, REF. WINDOW SCHEDULE FLOOR FINISH, REF. FINISH PLAN. CONCRETE SLAB ON GRADE, REF STRUCTURAL DRAWINGS CONCRETE FOOTING, REF. STRUCTURAL DRAWINGS CONCRETE SLAB ON GRADE, REF STRUCTURAL DRAWINGS CONCRETE SLAB ON GRADE, REF STRUCTURAL DRAWINGS RIGID PERIMETER INSULATION, REF. INSULATION SCHEDULE RIGID ROOF INSULATION, REF. INSULATION SCHEDULE STRUCTURAL ROOF SHEATHING, REF. STRUCTURAL DRAWINGS. FIRE BLOCKING AS REQUIRED LEDGER, REF. STRUCTURAL DRAWINGS. 1x4 WOOD TRIM, PAINTED. REF. INTERIOR ELEVATIONS 1/2" CEMENT BOARD 1/2" GYPSUM BOARD RIGID PERIMETER INSULATION, REF. INSULATION SCHEDULE CONCRETE FOOTING, REF. STRUCTURAL DRAWINGS SINGLE PLY MEMBRANE ROOF VAPOR RETARDER TYP RIGID PERIMETER INSULATION, REF. INSULATION SCHEDULE 1x4 WOOD TRIM, PAINTED. REF. INTERIOR ELEVATIONS ALUMINUM STOREFRONT, REF. WINDOW SCHEDULE 1/2" PLYWOOD SHEATHING SINGLE PLY MEMBRANE ROOF RIGID ROOF INSULATION, REF. INSULATION SCHEDULE STRUCTURAL ROOF SHEATHING, REF. STRUCTURAL DRAWINGS. VAPOR RETARDER, TYP. I-JOIST, REF. STRUCTURAL DRAWINGS STRUCTURAL ROOF SHEATHING, REF. STRUCTURAL DRAWINGS. I-JOIST, REF. STRUCTURAL DRAWINGS RIGID ROOF INSULATION, REF. INSULATION SCHEDULE RIGID ROOF INSULATION, REF. INSULATION SCHEDULE STRUCTURAL ROOF SHEATHING, REF. STRUCTURAL DRAWINGS. 6" MI N . 12 ' - 6 3 / 4 " T.O. CMU CURB 0'-6" OPP T.O. CMU CURB 0'-6" SIM LED TAPE LIGHTING, REF. ELECTRICAL DRAWINGS LED STRIP LIGHTING, REF. ELECTRICAL DRAWINGS LED STRIP LIGHTING, REF. ELECTRICAL DRAWINGS CONCRETE FOOTING, REF. STRUCTURAL DRAWINGS 12 / 2 2 / 2 0 1 7 1 2 : 2 9 : 0 3 P M WALL SECTIONS A3.3 IT EC CITY COMMENTS10/20/211 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 1 1 1 1 1 12 A4.1 5 A4.1 10 A4.1 9 A4.1 13 A4.1 1SECTION 3/4" = 1'-0"2SECTION 3/4" = 1'-0"3SECTION 3/4" = 1'-0" 2X6 FRAMING, REF. STRUCTURAL DRAWINGS. DRAINABLE EIFS WITH FINISHED DRIP EDGE PROFILE WEATHER BARRIER FIRE BLOCKING AS REQUIRED METAL FLASHING W/ DRIP ALUMINUM STOREFRONT, REF. WINDOW SCHEDULE BATT INSULATION, REF. INSULATION SCHEDULE 2X6 FRAMING, REF. STRUCTURAL DRAWINGS. WEATHER BARRIER STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. CONCRETE SLAB ON GRADE, REF STRUCTURAL DRAWINGS CONCRETE CURB, REF. CIVIL DRAWINGS CONCRETE FOOTING, REF. STRUCTURAL DRAWINGS RIGID PERIMETER INSULATION, REF. INSULATION SCHEDULE CONCRETE SLAB ON GRADE, REF STRUCTURAL DRAWINGS FLOOR FINISH, REF. FINISH PLAN. BASE, REF. FINISH PLAN & INTERIOR ELEVATIONS. VAPOR RETARDER TYP WALL FINISH, REF. FINISH PLAN & INTERIOR ELEVATIONS. VAPOR RETARDER TYP. FINISH CEILING, REF. REFLECTED CEILING PLANS LEDGER & HANGER, REF. STRUCTURAL DRAWINGS. I-JOIST, REF. STRUCTURAL DRAWINGS STRUCTURAL ROOF SHEATHING, REF. STRUCTURAL DRAWINGS. RIGID ROOF INSULATION, REF. INSULATION SCHEDULE P.T. WOOD BLOCKING, FULL DEPTH OF INSULATION. SINGLE PLY MEMBRANE ROOF STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. SINGLE PLY MEMBRANE ROOF P.T. WOOD BLOCKING, FULL DEPTH OF INSULATION. SINGLE PLY MEMBRANE ROOF RIGID ROOF INSULATION, REF. INSULATION SCHEDULE STRUCTURAL ROOF SHEATHING, REF. TO STRUCTURAL DRAWINGS. VAPOR RETARDER TYP 5 1/2" METAL STUDS REF. STRUCTURAL DRAWINGS MINERAL WOOL INSULATION. REF. INSULATION SCHEDULE. 1/2" GYPSUM BOARD, WALL FINISH, REF. FINISH PLAN & INTERIOR ELEVATIONS. FLOOR FINISH, REF. FINISH PLAN. CONCRETE SLAB ON GRADE, REF STRUCTURAL DRAWINGS 1/2" EXTERIOR GRADE GYPSUM BOARD. WEATHER BARRIER DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. FIRE BLOCKING AS REQUIRED WEATHER BARRIER SINGLE PLY MEMBRANE ROOF RIGID ROOF INSULATION, REF. INSULATION SCHEDULE I-JOIST, REF. STRUCTURAL DRAWINGS STRUCTURAL ROOF SHEATHING, REF. STRUCTURAL DRAWINGS. 2X6 FRAMING, REF. STRUCTURAL DRAWINGS. TILE, REF. FINISH PLAN & INTERIOR ELEVATIONS. VAPOR RETARDER TYP FLOOR FINISH, REF. FINISH PLAN. CONCRETE SLAB ON GRADE, REF STRUCTURAL DRAWINGS RIGID PERIMETER INSULATION, REF. INSULATION SCHEDULE MOUNTED WENDY'S SIGNAGE TO BE PROVIDED AND INSTALLED BY SIGN SUPPLIER. PROVIDE BLOCKING AS REQUIRED. STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. LEDGER & HANGER, REF. STRUCTURAL DRAWINGS. LEDGER & HANGER, REF. STRUCTURAL DRAWINGS. WEATHER BARRIER DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. 1/2" GYPSUM BOARD 1/2" GYPSUM BOARD CONCRETE FOOTING, REF. STRUCTURAL DRAWINGS OPP. SIM. SECTION GENERAL NOTES CONCRETE FOOTING, REF. STRUCTURAL DRAWINGS 2'-3 1/2"BLADE LIGHTING, REF. ELECTRICAL 3' - 1 1 " R . O . 2'-0 1/4"1'-0 3/4" FINISH CEILING, REF. REFLECTED CEILNG PLAN 1X4 WOOD TRIM, PAINTED. REF. INTERIOR ELEVATIONS 1/2" GYPSUM BOARD 2X4 FRAMING @ 16" O.C. 1X4 WOOD TRIM, PAINTED. REF. INTERIOR ELEVATIONS FLOOR FINISH, REF. FINISH PLAN. CONCRETE SLAB ON GRADE, REF. STRUCTURAL DRAWINGS. TILE BASE, REF. FINISH PLAN & INTERIOR ELEVATIONS. TILE, REF. FINISH PLAN & INTERIOR ELEVATIONS. 1/2" CEMENT BOARD 2X4 FRAMING @16" O.C. 2X4 WOOD BLOCKING TILE, REF. FINISH PLAN & INTERIOR ELEVATIONS. 2X4 FRAMING @16" O.C. FINISH CEILING, REF. REFLECTED CEILNG PLAN 1/2" GYP BOARD PAINTED, REF. REFLECTED CEILING PLAN 4SECTION 3/4" = 1'-0" BATT INSULATION, REF. INSULATION SCHEDULE ALTERNATE BLADE LIGHTING 1/2" CEMENT BOARD 1X4 WOOD TRIM, PAINTED. REF. INTERIOR ELEVATIONS 1X4 WOOD TRIM, PAINTED. REF. FINISH PLAN & INTERIOR ELEVATIONS A. SEAL ALL EXTERIOR WALL AND ROOF PENETRATIONS AND JOINTS BETWEEN DISSIMILAR MATERIALS TO ENSURE A COMPLETELY WEATHER-TIGHT SEAL. SEALANT LOCATIONS INCLUDE BUT ARE NOT LIMITED TO : LIGHT FIXTURE MOUNTS, DOOR AND WINDOW FRAMES, FASCIA EDGES, SIGNAGE MOUNTS, CONDUIT PENETRATIONS, SCUPPERS, ELECTRICAL OUTLETS, HOSE BIBS, AND UTILITY SERVICE ENTRANCES. REFER TO JOINT TREATMENT SCHEDULE. B. PROVIDE CONTINUOUS WEATHER BARRIER BEHIND ALL EXTERIOR FINISHES. UTILIZE COMMERCIAL GRADE BUILDING WRAP. UTILIZE FLUID APPLIED WEATHER BARRIER AT METAL SIDING, AND EIFS. LAP & TAPE ALL SEAMS. LAP OVER ALL FLASHING. COORDINATE TRANSITIONS PER MFR'S RECOMMENDATIONS. APPROVED ALTERNATE: PROVIDE FLUID APPLIED OR SELF ADHERING WEATHER BARRIER BEHIND ALL EXTERIOR FINISHES. C. EXTERIOR SIDEWALKS AND PAVING ARE SHOWN FOR DESIGN INTENT ONLY. G.C. SHALL BE RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH OWNER'S REPRESENTATIVE AND/OR CIVIL DRAWINGS. D. GRADES SHALL BE 2" MIN. BELOW FLOOR SLAB AND SHALL SLOPE AWAY FROM BUILDING @ 5% SLOPE EXCEPT @ PEDESTRIAN PATHS WHICH SHALL BE SLOPED AWAY FROM BUILDING @ 1/8" PER FOOT MIN. AND 1/4" PER FOOT MAX. E. REFER TO STRUCTURAL PLAN AND DETAILS FOR ADDITIONAL FRAMING REQUIREMENTS. F. VAPOR RETARDER SHALL BE INSTALLED IN CONTINUOUS SHEETS FROM FLOOR TO UNDERSIDE OF ROOF DECK. ALL SEAMS AND PENETRATIONS SHALL BE SEALED PER MANUFACTURER'S DIRECTION. PROVIDE CONTINUOUS CLASS 1 OR CLASS 2 VAPOR RETARDER ON THE INTERIOR SIDE OF THE WALL FRAMING AND BEHIND APPLIED WALL FINISH SHEATHING IN ASHRAE ZONES MARINE 4 AND 5 THROUGH 8. LAP AND TAPE ALL SEAMS TO ACHIEVE CONTINUOUS COVERAGE OVER THE ENTIRE UNFENESTRATED BUILDING ENVELOPE. G. INSULATION AND VAPOR RETARDER IN EXPOSED AREAS TO HAVE A FLAME SPREAD OF 25 AND A SMOKE DEVELOPMENT OF 450 OR BETTER. MOUNTED WENDY'S SIGNAGE TO BE PROVIDED AND INSTALLED BY SIGN SUPPLIER. PROVIDE BLOCKING AS REQUIRED. LEDGER & HANGER, REF. STRUCTURAL DRAWINGS. HOOD BATT INSULATION, REF. INSULATION SCHEDULE 5 A4.1 OPP. 11 A4.1 6 A4.1 REF. STRUCTURAL T.O. CONC. SLAB 0'-0" JOIST BEARING (BOH) 11' - 6" T.O. P.U.W. FRAMING 18' - 3" T.O. PARAPET FRAMING 18' - 3" REF. STRUCTURAL T.O. CONC. SLAB 0'-0" REF. STRUCTURAL T.O. CONC. SLAB 0'-0" T.O. CONC. SLAB 0'-0" T.O. BLADE FRAMING 21' - 0" HATCHED AREA INDICATES FIREBLOCKING AT 10'-0" O.C. MAX. 2X4 NAILER 2X4 FRAMING @ 16" O.C. RIGID PERIMETER INSULATION, REF. INSULATION SCHEDULE WALL SECTIONS A3.4 IT EC CITY COMMENTS10/20/211 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 1 1 1 5 A4.1 2 A4.1 5 A4.1 8 A4.3 14 A4.1 SIM. SIM.SIM. GENERAL NOTES 1SECTION 3/4" = 1'-0"2SECTION 3/4" = 1'-0"3SECTION 3/4" = 1'-0"4SECTION 3/4" = 1'-0" 1' - 4 1 / 2 " 9' - 0 " 4' - 7 1 / 2 " DOUBLE TOP PLATE STL. TUBE IN WALL, REF. STRUCTURAL DRAWINGS THICKENED SLAB, REF. STRUCTURAL DRAWINGS PARAPET VENTING BY ROOF MFG, REF. ROOF PLAN FOR LOCATION 2X BRACING AT EACH STUD. REF. STRUCTURAL DRAWINGS. GLASS DIVIDER AND GLASS MOUNTING BRACKET PROVIDED AND INSTALLED BY KED SOLID SURFACE CAP, REF. INTERIOR ELEVATIONS WALL FINISH, REF. FINISH PLAN & INTERIOR ELEVATIONS. FLOOR FINISH, REF. FINISH PLAN. CONCRETE SLAB ON GRADE, REF STRUCTURAL DRAWINGS TILE BASE, REF. FINISH PLAN & INTERIOR ELEVATIONS. TILE, REF. FINISH PLAN & INTERIOR ELEVATIONS. 1X4 WOOD TRIM, PAINTED. REF. INTERIOR ELEVATIONS. DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. WEATHER BARRIER SINGLE PLY MEMBRANE ROOF RIGID ROOF INSULATION, REF. INSULATION SCHEDULE STRUCTURAL ROOF SHEATHING, REF. STRUCTURAL DRAWINGS. 1" INSULATED GLASS IN ALUMINUM STOREFRONT FRAME, REF. WINDOW SCHEDULE 2X6 FRAMING REF. STRUCTURAL DRAWINGS. ALUMINUM STOREFRONT REF. WINDOW SCHEDULE CONCRETE SLAB ON GRADE, REF STRUCTURAL DRAWINGS FLOOR FINISH, REF. FINISH PLAN. RIGID PERIMETER INSULATION, REF. INSULATION SCHEDULE CONCRETE FOOTING, REF. STRUCTURAL DRAWINGS CONCRETE SLAB ON GRADE, REF STRUCTURAL DRAWINGS PARAPET VENTING BY ROOF MFG, REF. ROOF PLAN FOR LOCATION 2X6 FRAMING, REF. STRUCTURAL DRAWINGS. SINGLE PLY MEMBRANE ROOF 2x6 WOOD BLOCKING FINISH CEILING, REF. REFLECTED CEILING PLANS FRP WALL PANEL, REF. FINISH PLAN 1/2" PLYWOOD SHEATHING 3/8" CEMENT BOARD FLOOR FINISH, REF. FINISH PLAN. CONCRETE SLAB ON GRADE, REF STRUCTURAL DRAWINGS WEATHER BARRIER STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. DRAINABLE EIFS WITH FINISHED DRIP EDGE PROFILE SEALANT AND BACKER ROD W/ WEEPS METAL FLASHING 1X4 WOOD TRIM, PAINTED. REF. INTERIOR ELEVATIONS. FIRE BLOCKING AS REQUIRED 1/2" GYPSUM BOARD TO DECK ABOVE WALL FINISH, REF. FINISH PLAN & INTERIOR ELEVATIONS. 1/2" CEMENT BOARD, REF. PARTITION TYPES FOR HEIGHT. TILE, REF. FINISH PLAN & INTERIOR ELEVATIONS. TILE BASE, REF. FINISH PLAN & INTERIOR ELEVATIONS. SINGLE PLY MEMBRANE ROOF 1/4" GLASS, BUTT JOINTED, REF. INTERIOR ELEVATIONS SOLID SURFACE CAP, REF. FINISH SCHEDULE. 2X4 FRAMING @ 16" O.C. WALL FINISH, REF. FINISH PLAN & INTERIOR ELEVATIONS. 1/2" CEMENT BOARD TILE BASE, REF. FINISH PLAN & INTERIOR ELEVATIONS. 1/2" GYPSUM BOARD FIREBLOCKING AS REQUIRED 2x6 WOOD BLOCKING RIGID ROOF INSULATION, REF. INSULATION SCHEDULE STRUCTURAL ROOF SHEATHING, REF. STRUCTURAL DRAWINGS. BATT INSULATION, REF. INSULATION SCHEDULE SINGLE PLY MEMBRANE ROOF HATCHED AREA INDICATES FIRE BLOCKING REQUIRED EVERY 10'-0" MAX. HORIZONTALLY SINGLE PLY MEMBRANE ROOF 6" x 12" PRE-FRABRICATED THRU-WALL SCUPPER BY ROOF MEMBRANE MANUFACTURER. REF TO ROOF PLAN 1/2" PLYWOOD SHEATHING I-JOIST, REF. STRUCTURAL DRAWINGS 1X4 WOOD TRIM, PAINTED. REF. INTERIOR ELEVATIONS. I-JOIST, REF. STRUCTURAL DRAWINGS A. SEAL ALL EXTERIOR WALL AND ROOF PENETRATIONS AND JOINTS BETWEEN DISSIMILAR MATERIALS TO ENSURE A COMPLETELY WEATHER-TIGHT SEAL. SEALANT LOCATIONS INCLUDE BUT ARE NOT LIMITED TO : LIGHT FIXTURE MOUNTS, DOOR AND WINDOW FRAMES, FASCIA EDGES, SIGNAGE MOUNTS, CONDUIT PENETRATIONS, SCUPPERS, ELECTRICAL OUTLETS, HOSE BIBS, AND UTILITY SERVICE ENTRANCES. REFER TO JOINT TREATMENT SCHEDULE. B. PROVIDE CONTINUOUS WEATHER BARRIER BEHIND ALL EXTERIOR FINISHES. UTILIZE COMMERCIAL GRADE BUILDING WRAP. UTILIZE FLUID APPLIED WEATHER BARRIER AT METAL SIDING, AND EIFS. LAP & TAPE ALL SEAMS. LAP OVER ALL FLASHING. COORDINATE TRANSITIONS PER MFR'S RECOMMENDATIONS. APPROVED ALTERNATE: PROVIDE FLUID APPLIED OR SELF ADHERING WEATHER BARRIER BEHIND ALL EXTERIOR FINISHES. C. EXTERIOR SIDEWALKS AND PAVING ARE SHOWN FOR DESIGN INTENT ONLY. G.C. SHALL BE RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH OWNER'S REPRESENTATIVE AND/OR CIVIL DRAWINGS. D. GRADES SHALL BE 2" MIN. BELOW FLOOR SLAB AND SHALL SLOPE AWAY FROM BUILDING @ 5% SLOPE EXCEPT @ PEDESTRIAN PATHS WHICH SHALL BE SLOPED AWAY FROM BUILDING @ 1/8" PER FOOT MIN. AND 1/4" PER FOOT MAX. E. REFER TO STRUCTURAL PLAN AND DETAILS FOR ADDITIONAL FRAMING REQUIREMENTS. F. VAPOR RETARDER SHALL BE INSTALLED IN CONTINUOUS SHEETS FROM FLOOR TO UNDERSIDE OF ROOF DECK. ALL SEAMS AND PENETRATIONS SHALL BE SEALED PER MANUFACTURER'S DIRECTION. PROVIDE CONTINUOUS CLASS 1 OR CLASS 2 VAPOR RETARDER ON THE INTERIOR SIDE OF THE WALL FRAMING AND BEHIND APPLIED WALL FINISH SHEATHING IN ASHRAE ZONES MARINE 4 AND 5 THROUGH 8. LAP AND TAPE ALL SEAMS TO ACHIEVE CONTINUOUS COVERAGE OVER THE ENTIRE UNFENESTRATED BUILDING ENVELOPE. G. INSULATION AND VAPOR RETARDER IN EXPOSED AREAS TO HAVE A FLAME SPREAD OF 25 AND A SMOKE DEVELOPMENT OF 450 OR BETTER. I-JOIST, REF. STRUCTURAL DRAWINGS I-JOIST, REF. STRUCTURAL DRAWINGS 7 1 / 4 " CONTINUE FINISH BEHIND SOLID SURFACE CAP. REF. STRUCTURAL T.O. CONC. SLAB 0'-0" T.O. GLAZING 11' - 6" T.O. FRAMING 14' - 10" T.O. CONC. SLAB 0'-0" T.O. CONC. SLAB 0'-0" T.O. CONC. SLAB 0'-0" T.O. PARAPET FRAMING 18' - 3" T.O. PARAPET FRAMING 18' - 3" 1/2" PLYWOOD SHEATHING 10 A5.2 11 1/8" MIN. 9' - 0 " A . F . F M A X . 7' - 0 " A . F . F M I N . UNISTRUT BY G.C. 3/8" THREADED ROD BY G.C. MOUNTING BRACKET BY HEATER MFR. OPTIONAL ELECTRIC UNIT HEATER INSTALLED FOR VERTICAL AIR DELIVERY. REFER TO MFR SPECS FOR INSTALLATION REQUIREMENTS 6" 6" LED TAPE LIGHTING, REF. ELECTRICAL DRAWINGS 5DETAIL 1 1/2" = 1'-0"6DETAIL 1 1/2" = 1'-0" 4X4 WOOD POST EDGE OF GLASS 4 1/2" 1/2" (3) 3" LONG STX CONST SCREWS INTO EACH END OF 4X4 POST. TYP. EACH END 1/4" GLAZING PREFINISHED END BY STOREFRONT MFG 4" EXTRUDED ALUM STOREFRONT TOP RAIL 4X4 WOOD POST BEYOND (3) 3" LONG STX CONST SCREWS INTO EACH END. 1/4" GLAZING 4" EXTRUDED ALUM STOREFRONT EXTENDED TO FRONT WALL 4" EXTRUDED ALUM STOREFRONT TOP RAIL SCREWED TO TOP OF 4X4 POSTS EACH END. 12 / 2 2 / 2 0 1 7 1 2 : 2 9 : 2 7 P M WALL SECTIONS A3.5 IT EC CITY COMMENTS10/20/211 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 1 BASE TILE, REF. FINISH SCHEDULE (ALIGN WITH BASE BEYOND) T.O. CONC. SLAB 0' - 0" T.O. CONC. SLAB 0' - 0" NOTE: PRE-FABRICATED CANOPY. DESIGN OF CANOPY AND CANOPY CONNECTION TO WALL BY CANOPY MANUFACTURER . COORDINATE BACK-WALL BLOCKING REQUIREMENTS WITH CANOPY MANUFACTURER REF. STRUCTURAL 10 A4.3 2" M-1 M-5 2'-2 3/4" 6" 2X8 FRAMING REF. TO STRUCTURAL DRAWINGS. MEMBRANE ROOFING. LINE OF WALL BEYOND. SCHLUTER 'QUADEC' TRIM, REF. FINISH SCHEDULE BASE TILE, REF. FINISH SCHEDULE (ALIGN WITH BASE BEYOND) 1/2" CEMENT BOARD FLOOR FINISH, REF. TO FINISH PLAN. RIGID PERIMETER INSULATION, REF. INSULATION SCHEDULE ALIGN STOREFRONT WITH FACE OF CMU BELOW SILL FLASHING W/ END DAMS SET ON FULL BED OF SEALANT. CONCRETE FOUNDATION , REF. TO STRUCTURAL DRAWINGS 1/2" GYPSUM BOARD BEAM, REF. STRUCTURAL DRAWINGS PRE-FINISHED TWO-PIECE METAL COMPRESSION EDGE WITH DRIP EDGE STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. BRAKE METAL, REF. EXTERIOR ELEVATIONS. LED STRIP LIGHTING, REF. ELECTRICAL DRAWINGS WEATHER BARRIER CONTINUOUS JOINT SEALANT WITH BACKER ROD,TYP. WALL FINISH, REF. TO FINISH PLAN & INTERIOR ELEVATIONS. VAPOR RETARDER TYP BASE, REF. FINISH PLAN & INTERIOR ELEVATIONS. FLOOR FINISH, REF. TO FINISH PLAN. 2X6 FRAMING, REF. TO STRUCTURAL DRAWINGS. STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. BATT INSULATION, REF. INSULATION SCHEDULE DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. DRAINABLE EIFS STARTER STRIP W/ WEEP HOLES CONCRETE FOUNDATION, REF. TO STRUCTURAL DRAWINGS GRADE ISOLATION JOINT STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. WEATHER BARRIER 1/2" ISOLATION JOINT WITH SEALANT. REF. JOINT TREATMENT SCHEDULE. CONCRETE FOUNDATION, REF. TO STRUCTURAL DRAWINGS WALL FINISH, REF. TO FINISH PLAN & INTERIOR ELEVATIONS. VAPOR RETARDER TYP. 2X P.T. WOOD SILL PLATE OVER SILL SEALER. REF. STRUCTURAL DRAWINGS FOR ANCHORING REQUIREMENT. CONCRETE SLAB ON GRADE. RIGID PERIMETER INSULATION, REF. INSULATION SCHEDULE 2X10 TOP CAP SINGLE PLY MEMBRANE ROOF 2X6 FRAMING, REF. STRUCTURAL DRAWINGS. PRE-FINISHED TWO-PIECE METAL COMPRESSION EDGE WITH DRIP EDGE BRAKE METAL, COLOR TO MATCH STOREFRONT DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. WEATHER BARRIER STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. WEATHER BARRIER 2X P.T. WOOD SILL PLATE OVER SILL SEALER. REF. STRUCTURAL DRAWINGS FOR ANCHORING REQUIREMENT. DRAINABLE EIFS STARTER STRIP W/ WEEP HOLES METAL FLASHING WALL FINISH, REF. TO FINISH PLAN & INTERIOR ELEVATIONS. VAPOR RETARDER TYP BATT INSULATION, REF. INSULATION SCHEDULE TILE BASE, REF. FINISH PLAN & INTERIOR ELEVATIONS. FLOOR FINISH, REF. TO FINISH PLAN. VAPOR RETARDER TYP STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. 1/2" GYPSUM BOARD . COUNTER FLASHING, EXTEND UP 4" BEHIND WALL FINISH WEATHER BARRIER 2X6 FRAMING, REF. TO STRUCTURAL DRAWINGS. BATT INSULATION, REF. INSULATION SCHEDULE FLOOR FINISH, REF. TO FINISH PLAN. RIGID PERIMETER INSULATION, REF. INSULATION SCHEDULE DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. 2X P.T. WOOD SILL PLATE OVER SILL SEALER. REF. STRUCTURAL DRAWINGS FOR ANCHORING REQUIREMENT. TAPERED INSULATION. SLOPE 1/2" PER FOOT DURO-LAST "T-EDGE PLUS" STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. WEATHER BARRIER 2X6 FRAMING, REF. TO STRUCTURAL DRAWINGS. CONTINUOUS PRE-FINISHED ONE-PIECE METAL CAP SET IN MASTIC, REF. FINISH SCHEDULE DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. 2X8 FRAMING REF. TO STRUCTURAL DRAWINGS. WEATHER BARRIER WEATHER BARRIER TAPE DRAINABLE EIFS WITH FINISHED DRIP EDGE PROFILE DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. 2X8 FRAMING REF. TO STRUCTURAL DRAWINGS. WEATHER BARRIER STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. PICK UP WINDOW, REF. SCHEDULE SILL FLASHING W/ END DAMS SET ON FULL BED OF SEALANT. STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. WEATHER BARRIER 2x6 FRAMING VAPOR RETARDER TYP 5 1/2" METAL STUDS OVER SILL SEALER REF. STRUCTURAL DRAWINGS STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. WEATHER BARRIER DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. DRAINABLE EIFS STARTER STRIP W/ WEEP HOLES MINERAL WOOL INSULATION, REF. INSULATION SCHEDULE VAPOR RETARDER TYP TILE BASE, REF. FINISH PLAN & INTERIOR ELEVATIONS. FLOOR FINISH, REF. TO FINISH PLAN. CONCRETE SLAB ON GRADE, REF STRUCTURAL DRAWINGS RIGID PERIMETER INSULATION, REF. INSULATION SCHEDULE STAINLESS STEEL SURROUND DRAINABLE EIFS WITH FINISHED DRIP EDGE PROFILE COUNTER FLASHING WEATHER BARRIER CANOPY FLASHING BY PREFABRICATED CANOPY MFR./INSTALLER. WEATHER BARRIER METAL FLASHING DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. SEALANT AND BACKER ROD METAL FLASHING 2X6 FRAMING, REF. TO STRUCTURAL DRAWINGS. BATT INSULATION, REF. INSULATION SCHEDULE VAPOR RETARDER STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. ALUMINUM STOREFRONT, REF. WINDOW SCHEDULE TILE BASE, REF. FINISH PLAN & INTERIOR ELEVATIONS. ALUMINUM STOREFRONT, REF. WINDOW SCHEDULE WEATHER BARRIER TYP DRAINABLE EIFS STARTER STRIP W/ WEEP HOLES METAL FLASHING CONCRETE FOUNDATION, REF. TO STRUCTURAL DRAWINGS COUNTER FLASHING, EXTEND UP 4" BEHIND WALL PANELS MEMBRANE FLASHING BLOCKING AS REQUIRED DRAINABLE EIFS WITH FINISHED DRIP EDGE PROFILE PARGE COAT ALUMINUM STOREFRONT REF. WINDOW SCHEDULE ISOLATION JOINT CONCRETE SLAB ON GRADE, REF STRUCTURAL DRAWINGS RIGID PERIMETER INSULATION, REF. INSULATION SCHEDULE WALK-IN-BOX BATT INSULATION, REF. INSULATION SCHEDULE CONCRETE SLAB ON GRADE, REF STRUCTURAL DRAWINGS 1/2" ISOLATION JOINT WITH SEALANT. REF. JOINT TREATMENT SCHEDULE. BATT INSULATION, REF. INSULATION SCHEDULE VAPOR RETARDER CONCRETE SLAB ON GRADE, REF STRUCTURAL DRAWINGS 1/2" CEMENT BOARD TILE, REF. FINISH PLAN & INTERIOR ELEVATIONS FINISH GRADE CONCRETE FOUNDATION, REF. TO STRUCTURAL DRAWINGS ALUMINUM STOREFRONT, REF. WINDOW SCHEDULE CONTINUOUS SEALANT JOINT WITH BACKER ROD WHERE REQUIRED, TYP. VAPOR RETARDER TYP CONTINUOUS SEALANT JOINT WITH BACKER ROD WHERE REQUIRED, TYP. WEATHER BARRIER SINGLE PLY MEMBRANE ROOF PRE-FINISHED TWO-PIECE METAL COMPRESSION EDGE WITH DRIP EDGE RIGID ROOF INSULATION, REF. INSULATION SCHEDULE STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS LVL, REF. STRUCTURAL DRAWINGS P.T. WOOD BLOCKING, FULL DEPTH OF INSULATION. 2X P.T. WOOD SILL PLATE OVER SILL SEALER. REF. STRUCTURAL DRAWINGS FOR ANCHORING REQUIREMENT. TWO-PIECE FLASHING AND COUNTER FLASHING BY WIB MFR COLOR TO MATCH COOLER ROOF 2X6 FRAMING REF. STRUCTURAL DRAWINGS WEATHER BARRIER. PARGE COAT RIGID PERIMETER INSULATION, REF. INSULATION SCHEDULE BASE TILE, REF. FINISH SCHEDULE SINGLE PLY MEMBRANE ROOF LEDGER, REF. STRUCTURAL DRAWINGS. BATT INSULATION, REF. INSULATION SCHEDULE 2X6 FRAMING, REF. TO STRUCTURAL DRAWINGS. 1/2" PLYWOOD SHEATHING VAPOR RETARDER TYP WALL FINISH, REF. FINISH PLAN & INTERIOR ELEVATIONS. STAINLESS STEEL CORNER TRIM RETURN FINISH TO STOREFRONT P.T. WOOD BLOCKING. VAPOR RETARDER LEDGER AND HANGER, REF. STRUCTURAL DRAWINGS VAPOR RETARDER TYP BATT INSULATION, REF. INSULATION SCHEDULE CONT. 2x6 WOOD FRAMING DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. BRAKE METAL FLASHING EXTERIOR GRADE SHEATHING CONTINUOUS JOINT SEALANT WITH BACKER ROD,TYP. CONCRETE CURB, REF. CIVIL DRAWINGS CONCRETE FOUNDATION, REF. TO STRUCTURAL DRAWINGS HATCHED AREA INDICATES FIRE BLOCKING REQUIRED EVERY 10'-0" MAX ALUMINUM STOREFRONT, REF. WINDOW SCHEDULE 1/2" GYPSUM BOARD INSTALL SHEATHING AS REQUIRED TO MAINTAIN FINISH ALIGNMENT LVL. REF. STRUCTURAL DRAWINGS RIGID ROOF INSULATION, REF. INSULATION SCHEDULE STRUCTURAL ROOF SHEATHING, REF. TO STRUCTURAL DRAWINGS. SILL FLASHING W/ END DAMS SET ON FULL BED OF SEALANT. BRAKE METAL TO MATCH STOREFRONT. (4) 2X6 P.T. BUILT UP CURB OVER SILL SEALER. SEE ABOVE FOR ALTERNATE CURB CONSTRUCTION ALTERNATE CURB - 1 ALTERNATE CURB - 2 CONTINUOUS CLEAT FOR BRAKE METAL. 3/ 4 " ICE/WATER SHIELD TO EXTEND 2" HORIZONTAL AT TOP AND BOTTOM 11 1 / 2 " 6" 4" 8" 1'-3 3/4" 8" MI N . 2" 7 1/4" 1'-3 1/4" 6" 2" 4" 7 3/4" 1" 1 3 / 8 " SILL FLASHING W/ END DAMS SET ON FULL BED OF SEALANT. PARGE COAT FORMED CONC. CURB STAINLESS STEEL CORNER GUARD, (CP-8) 1SECTION DETAIL 1 1/2" = 1'-0" 2SECTION DETAIL 1 1/2" = 1'-0" 3SECTION DETAIL 1 1/2" = 1'-0" 4SECTION DETAIL 1 1/2" = 1'-0" 5SECTION DETAIL 1 1/2" = 1'-0" 6SECTION DETAIL 1 1/2" = 1'-0" 7SECTION DETAIL 1 1/2" = 1'-0" 10SECTION DETAIL 1 1/2" = 1'-0" 12SECTION DETAIL 1 1/2" = 1'-0" 9SECTION DETAIL 1 1/2" = 1'-0" 13SECTION DETAIL 1 1/2" = 1'-0" 14SECTION DETAIL 1 1/2" = 1'-0" 11SECTION DETAIL 1 1/2" = 1'-0" 3/8" RIGID INSULATION LINE OF WALL BEYOND. SCHLUTER 'QUADEC' TRIM, REF. FINISH SCHEDULE BASE TILE, REF. FINISH SCHEDULE (ALIGN WITH BASE BEYOND) 1/2" CEMENT BOARD 3/8" RIGID INSULATION LINE OF WALL BEYOND. SCHLUTER 'QUADEC' TRIM, REF. FINISH SCHEDULE 1/2" CEMENT BOARD 6" 6" FRP, STOP AT TOP OF INTERIOR SHEATHING SEALANT VAPOR RETARDER 2X6 FRAMING REFER TO STRUCTURAL DRAWINGS 6" 6" LSL LEDGER. REF STRUCTURAL DRAWINGS WEATHER BARRIER FIRE BLOCKING AS REQUIRED SINGLE PLY MEMBRANE ROOF RIGID ROOF INSULATION, REF. INSULATION SCHEDULE STRUCTURAL ROOF SHEATHING, REF. TO STRUCTURAL DRAWINGS. 1' - 1 1 / 2 " 1' - 4 " 2X SOLID FIRE STOPPING @ 20'-0" O.C. CONT. 2x8 WOOD FRAMING 2X4 FRAMING CONT. 2X4 FRAMING 2X10 @ 24" O.C. 3 1 / 2 " 11 " 11 1/4" CONT. 2x6 WOOD FRAMING NOTCH INTO 2X10 FRAMING SIMPSON HANGERS, REF. STRUCTURAL 8 A4.1 WEATHER BARRIER LED LIGHTING, REF. ELECTRICAL DRAWINGS BRAKE METAL, REF. EXTERIOR ELEVATIONS 8LED FIXTURE @ CORNICE 1 1/2" = 1'-0" SECTION DETAILS A4.1 IT EC CITY/OWNER CMMTS01/12/233 CITY COMMENTS10/20/211 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 3 3 1.12.23 B A 1PLAN DETAIL - BLADE 1 1/2" = 1'-0"4PLAN DETAIL 1 1/2" = 1'-0"8PLAN DETAIL 1 1/2" = 1'-0"12PLAN DETAIL 1 1/2" = 1'-0" 13PLAN DETAIL 1 1/2" = 1'-0" 5PLAN DETAIL 1 1/2" = 1'-0" 6PLAN DETAIL - ENTRY(LOW) 1 1/2" = 1'-0" 2PLAN DETAIL 1 1/2" = 1'-0" 3PLAN DETAIL 1 1/2" = 1'-0" 11PLAN DETAIL 1 1/2" = 1'-0" 10PLAN DETAIL 1 1/2" = 1'-0"14PLAN DETAIL 1 1/2" = 1'-0" 15PLAN DETAIL 1 1/2" = 1'-0" 6 1/2"6 1/4" 6 1 / 2 " 1 1 / 2 " 1/2"4 1/2"1/2" 1/2" 4 1/2" 1/2" 4 1/2" 9 1/4" 8" 8" 1'-3 3/4" 2" SE E F L O O R P L A N R.O. 7PLAN DETAIL 1 1/2" = 1'-0" A 4 1 / 4 " R.O. R.O. R. O . R.O. R.O. R. O . R. O . 6" R. O . R. O . R. O . 8" R.O. 1" 4" 8" 1 3 / 8 " 1 1 2" 7 A4.1 1 "T" FLASHING, COLOR TO MATCH STOREFRONT STOREFRONT EXTENSION SOLID SURFACE CAP ABOVE CONTINUOUS SEALANT W/ BACKER ROD AS REQUIRED. REFER TO JOINT TREATMENT SCHEDULE 2X6 FRAMING, REF. TO STRUCTURAL DRAWINGS. WALL FINISH, REF. TO FINISH PLAN & INTERIOR ELEVATIONS. VAPOR RETARDER BATT INSULATION, REF. INSULATION SCHEDULE STRUCTURAL SHEATHING, REF. TO STRUCTURAL DRAWINGS. DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. FLASHING PROVIDED AND INSTALLED BY WIB MANUFACTURER P.T. WOOD BLOCKING AS REQD. CONT. AROUND PERIMETER. WEATHER BARRIER 2X6 FRAMING, REF. TO STRUCTURAL DRAWINGS. 1/2" PLYWOOD SHEATHING VAPOR RETARDER TYP WALL FINISH, REF. FINISH PLAN & INTERIOR ELEVATIONS. COLUMN, REF. STRUCTURAL DRAWINGS. STAINLESS STEEL CORNER TRIM WEATHER BARRIER 2X6 FRAMING, REF. TO STRUCTURAL DRAWINGS. 1/2" GYPSUM BOARD VAPOR RETARDER TYP 1X4 WOOD TRIM, PAINTED. REF. INTERIOR ELEVATIONS. WEATHER BARRIER ALUMINUM STORE FRONT, REF. WINDOW SCHEDULE STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. WEATHER BARRIER STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. CONTINUOUS SEALANT W/ BACKER ROD AS REQUIRED. REFER TO JOINT TREATMENT SCHEDULE SHIM CONTINUOUS SEALANT W/ BACKER ROD AS REQUIRED. REFER TO JOINT TREATMENT SCHEDULE BRAKE METAL, COLOR TO MATCH STOREFRONT CONTINUOUS SEALANT W/ BACKER ROD AS REQUIRED. TYP. EACH SIDES REFER TO JOINT TREATMENT SCHEDULE ALUMINUM STOREFRONT REFER TO WINDOW SCHEDULE ALUMINUM STOREFRONT REF. WINDOW SCHEDULE BRAKE METAL, COLOR TO MATCH STOREFRONT STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. COLUMN, REF. STRUCTURAL DRAWINGS. WEATHER BARRIER SHIM BRAKE METAL, COLOR TO MATCH STOREFRONT ALUMINUM STOREFRONT, REF. WINDOW SCHEDULE COLUMN, REF. STRUCTURAL DRAWINGS. VAPOR RETARDER TYP 2X6 FRAMING, REF. TO STRUCTURAL DRAWINGS. 1/2" CEMENT BOARD VAPOR RETARDER TYP BRAKE METAL, COLOR TO MATCH STOREFRONT ALUMINUM STOREFRONT, REF. WINDOW SCHEDULE CONTINUOUS SEALANT W/ BACKER ROD AS REQUIRED. REFER TO JOINT TREATMENT SCHEDULE DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. ALUMINUM STOREFRONT, REF. WINDOW SCHEDULE CONTINUOUS SEALANT W/ BACKER ROD AS REQUIRED. TYP. EACH SIDES REFER TO JOINT TREATMENT SCHEDULE WEATHER BARRIER DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. WEATHER BARRIER STRUCTURAL SHEATHING, REF. TO STRUCTURAL DRAWINGS. 2X8 FRAMING REF. TO STRUCTURAL DRAWINGS. 2X6 FRAMING, REF. TO STRUCTURAL DRAWINGS. 2X8 FRAMING REF. TO STRUCTURAL DRAWINGS. DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. WEATHER BARRIER 2x6 WOOD BLOCKING STRUCTURAL SHEATHING, REF. TO STRUCTURAL DRAWINGS. TILE, REF. FINISH PLAN & INTERIOR ELEVATIONS. COLUMN, REF. STRUCTURAL DRAWINGS. ALUMINUM STOREFRONT, REF. WINDOW SCHEDULE CONTINUOUS SEALANT W/ BACKER ROD AS REQUIRED. TYP. EACH SIDE REFER TO JOINT TREATMENT SCHEDULE 5 1/2" METAL STUDS REF. STRUCTURAL DRAWINGS CONTINUOUS SEALANT W/ BACKER ROD AS REQUIRED. TYP. EACH SIDE REFER TO JOINT TREATMENT SCHEDULE 1/2" PLYWOOD SHEATHING WALL FINISH, REF. TO FINISH PLAN & INTERIOR ELEVATIONS. VAPOR RETARDER TYP COLUMN, REF. STRUCTURAL DRAWINGS. ALUMINUM STOREFRONT, REF. WINDOW SCHEDULE STAINLESS STEEL CORNER PROTECTION (CP-8). GC TO PROVIDE AND INSTALL. CONTINUOUS SEALANT W/ BACKER ROD AS REQUIRED. TYP. EACH SIDE. REFER TO JOINT TREATMENT SCHEDULE WALL FINISH, REF. TO FINISH PLAN & INTERIOR ELEVATIONS. 1/2" PLYWOOD SHEATHING 2X6 FRAMING, REF. TO STRUCTURAL DRAWINGS. WEATHER BARRIER DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. SHIM STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. WEATHER BARRIER BRAKE METAL, COLOR TO MATCH STOREFRONT COLUMN, REF. STRUCTURAL DRAWINGS. ALUMINUM STOREFRONT, REF. WINDOW SCHEDULE FRP WITH CORNER TRIM AT JAMBS AND SILLS STOREFRONT SILL BELOW BRAKE METAL, REF. INTERIOR ELEVATIONS 4X4 POST, EXTEND TO 9'-0" A.F.F. 2x4 FRAMING AT 16" O.C. BELOW 1/2" PLYWOOD SHEATHING SOLID SURFACE CAP, REF. INTERIOR ELEVATIONS 1/4" GLASS, BUTT JOINTED, REF. INTERIOR ELEVATIONS DOOR FRAME, REF. TO SCHEUDLE SHIM CONTINUOUS SEALANT W/ BACKER ROD AS REQUIRED. REFER TO JOINT TREATMENT SCHEDULE 1/2" CEMENT BOARD 2x4 FRAMING AT 16" O.C. WALL FINISH, REF. FINISH PLAN & INTERIOR ELEVATIONS. STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. COLUMN, REF. STRUCTURAL DRAWINGS. CONTINUOUS SEALANT JOINT WITH BACKER ROD WHERE REQUIRED, TYP. 1/2" CEMENT BOARD 1/2" CEMENT BOARD 2X6 FRAMING AT 16" O.C. COLUMN, REF. STRUCTURAL DRAWINGS. WEATHER BARRIER DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. 1/2" PLYWOOD SHEATHING WALL FINISH, REF. TO FINISH PLAN & INTERIOR ELEVATIONS. VAPOR RETARDER TYP 2x6 WOOD BLOCKING BATT INSULATION, REF. INSULATION SCHEDULE BATT INSULATION, REF. INSULATION SCHEDULE STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. 1/2" CEMENT BOARD VAPOR RETARDER TYP 2X6 FRAMING, REF. TO STRUCTURAL DRAWINGS. BATT INSULATION, REF. INSULATION SCHEDULE STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. WEATHER BARRIER DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. PICK UP WINDOW, REF. SCHEDULE ALUMINUM STOREFRONT, REF. WINDOW SCHEDULE DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. WEATHER BARRIER BATT INSULATION, REF. INSULATION SCHEDULE 2X6 FRAMING, REF. TO STRUCTURAL DRAWINGS. 1/2" PLYWOOD SHEATHING CONTINUOUS SEALANT W/ BACKER ROD AS REQUIRED. TYP. EACH SIDE REFER TO JOINT TREATMENT SCHEDULE ALUMINUM STOREFRONT, REF. WINDOW SCHEDULE CONTINUOUS SEALANT W/ BACKER ROD AS REQUIRED. REFER TO JOINT TREATMENT SCHEDULE FLASHING PROVIDED AND INSTALLED BY WIB MANUFACTURER P.T. WOOD BLOCKING AS REQD. CONT. AROUND PERIMETER 2X6 FRAMING, REF. TO STRUCTURAL DRAWINGS. BATT INSULATION, REF. INSULATION SCHEDULE TILE, REF. FINISH PLAN & INTERIOR ELEVATIONS. 1/2" CEMENT BOARD TILE BASE, REF. FINISH PLAN & INTERIOR ELEVATIONS NOTCH SHEATHING AND 2X TO ALLOW FOR INSTALLATION OF FACE SHELL RETURN WOOD TRIM & TILE WAINSCOT BELOW TO STOREFRONT, TYP. WALL FINISH, REF. FINISH PLAN & INTERIOR ELEVATIONS RETURN WOOD TRIM & TILE WAINSCOT BELOW TO STOREFRONT, TYP. HOLD DOWN, REF. STRUCTURAL DRAWINGS HOLD DOWN, REF. STRUCTURAL DRAWINGS HOLD DOWN, REF. STRUCTURAL DRAWINGS BASE, REF. FINISH PLAN & INTERIOR ELEVATIONS TILE, REF. FINISH PLAN & INTERIOR ELEVATIONS. COLUMN, REF. STRUCTURAL DRAWINGS. "T" FLASHING, COLOR TO MATCH STOREFRONT "T" FLASHING, COLOR TO MATCH STOREFRONT "T" FLASHING, COLOR TO MATCH STOREFRONT VAPOR RETARDER TYP STRUCTURAL SHEATHING, REF. STRUCTURAL DRAWINGS. QUADEC SCHLUTER TRIM QUADEC SCHLUTER TRIM ABOVE INSTALL SHEATHING AS REQUIRED TO MAINTAIN FINISH ALIGNMENT WEATHER BARRIER "T" FLASHING, COLOR TO MATCH STOREFRONT BATT INSULATION, REF. INSULATION SCHEDULE 1/2" PLYWOOD SHEATHING DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. WEATHER BARRIER "T" FLASHING, COLOR TO MATCH STOREFRONT WEATHER BARRIER 2" BOLLARD FRP WITH CORNER TRIM AT JAMBS AND SILLS STAINLESS STEEL CORNER PROTECTION (CP-8). GC TO PROVIDE AND INSTALL. FRP WITH CORNER TRIM AT JAMB FRP WITH CORNER TRIM AT JAMBS AND SILLS FRP WITH CORNER TRIM AT JAMB BATT INSULATION, REF. INSULATION SCHEDULE R. O . 7" 9PLAN DETAIL 1 1/2" = 1'-0" 1/2" 4 1/2" 1/2" 4 1/2" STOREFRONT EXTENSION STOREFRONT SILL BELOW BRAKE METAL, REF. INTERIOR ELEVATIONS 2X4 POST 1/2" PLYWOOD SHEATHING SOLID SURFACE CAP, REF. INTERIOR ELEVATIONS 1/4" GLASS, BUTT JOINTED, REF. INTERIOR ELEVATIONS DOOR FRAME, REF. TO SCHEUDLE SHIM CONTINUOUS SEALANT W/ BACKER ROD AS REQUIRED. REFER TO JOINT TREATMENT SCHEDULE QUADEC SCHLUTER TRIM 4X4 POST, EXTEND TO 9'-0" A.F.F. PLAN DETAILS A4.2 IT EC CITY/OWNER CMMTS01/12/233 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 3 1.12.23 JAMB (3 STUD S P A C E S ) SE C T I O N APPROX. 3 ' - 6 " C L E A R AP P R O X . 3 ' - 6 " C L E A R 4 1 / 2 " 5 1 / 2 " 1' - 4 3 / 4 " 1' - 5 3 / 4 " LADDER RECEIVER GALVANIZED SAFETY GATE (FALL PROTECTION USA, LSG-44 OR EQUIVALENT). SEALANT GALVANIZED SAFETY GATE (FALL PROTECTION USA, LSG-44 OR EQUIVALENT). SAFETY GATE SEALANT SEALANT SEALANT HOLD OPENING ELEVATION 1 1/2" MIN. ABOVE ROOF DECK. THRU-BOLT PER LADDERPORT INSTRUCTIONS SWING OPENPLAN VIEW ELEVATION 2"x 2"x 3/16" ANGLE MEASUREMENTS FOR FACE MOUNTING LADDER SAFETY GATE DETAIL THIS DETAIL IS BASED ON MANUFACTURER STANDARD DETAIL ALUM. CLOSER BY FASCIA TRIM MFR. STD. ALUM PARAPET TRIM SEALANT REF. WALL FINISH MATERIAL MFG. REQUIREMENTS FOR MTG. PROVIDE BLOCKING AS REQ'D METAL OR VINYL FLASHING FACTORY WELDED TO ROOF MEMBRANE FLASHING SHEET. ROOF MEMBRANE TO EXTEND THROUGH OPENING & WRAP DOWN 2" MIN. OVER EDGE 2x10 (TREATED) INSUL. CANT DBL. 2x6 (TREATED) ROOF INSUL. ROOF DECK DBL. 2x8 REF. STRUCT. MET. OR VINYL CAP FLASHING WELDED TO MEMBRANE FLASHING PROVIDE 2x8 BLOCKING SPANNING OVER NEXT STUD PAST EACH ANCHOR BOLT. SEALANT MIN. (2) CONTINUOUS FULL-HEIGHT STUDS AT EACH JAMB UNIVERSAL MOUNTING HINGE. 1/16 " DIA. TYP. 4PL. UNIVERSAL MOUNTING HINGE. 4' - 0 " J A M B - J A M B 1" 4" G.C. TO ROUTE DATA FEED FROM DIRECT TV THROUGH CURB AND ENSURE WEATHERPROOFED RUBBER BOOT WITH STAINLESS STEEL CLAMPS FURNISHED WITH CURB, TYP. PREFABRICATED CUSTOM CURB FLASHING CONTINUOUS WEATHER BARRIER OVER WALL SHEATHING, FLASH/SEAL TO SCUPPER MEMBRANE AS REQ'D BY MFR.'S WARRANTY 4"H x 8"W MIN. SCUPPER OPENING THRU WALL, TYP. SEAL MEMBRANE FLASHING TO METAL DRIP EDGE FLASHING AS SPEC'D BY MFR. PREFINISHED ALUMINUM COLLECTION BOX, SEE ELEVATIONS FOR FINISHES PROVIDE TIEBACKS @ 4'-0" O.C. WEATHER BARRIER THIS DETAIL IS BASED ON DURO-LAST DETAIL 4020 DRAINABLE EIFS SYSTEM, REF. EXTERIOR ELEVATIONS. LAP & SEAL PRE-MANUFACTURED SCUPPER TO ROOF MEMBRANE AS RECOMMENDED BY MFR. WOOD BLOCKING AS REQUIRED PRE-FABRICATED INSULATED PIPE CURB BY G.C. MINIMUM 8"x15"x15" O.D. ACRYLIC CLAD THERMOPLASTIC COVER WITH PROPER SIZE AND NUMBER OPENINGS. 8" M I N . THIS DETAIL IS BASED ON DURO-LAST DETAIL 4070 8" M I N . 3 PIECE PVC DURO-LAST CHILLER STACK KIT DURO-LAST CAULK STAINLESS STEEL BAND POSITIONED 1/4" FROM THE TOP OF THE STACK FLASHING DURO-LAST PREFABRICATED VENT STACK FLASHING INSULATION. REFER TO INSULATION SCHEDULE ROOF DECK THIS DETAIL IS BASED ON DURO-LAST DETAIL 4070 8" MI N . STAINLESS STEEL BAND POSITIONED 1/4" FROM THE TOP OF THE STACK FLASHING DURO-LAST PREFABRICATED VENT STACK FLASHING INSULATION. REFER TO INSULATION SCHEDULE ROOF SHEATHING, REF. STRUCTURAL DURO-LAST CAULK TYPICAL VENT PIPE PREFINISHED ALUMINUM DOWNSPOUT, 4" CIRCULAR LEADER OR 4" x 3 1 2" RECTANGULAR LEADER, SEE ELEVATIONS FOR FINISHES ADD ADDITIONAL BLOCKING BELOW INSULATION AS NEEDED. THIS DETAIL IS BASED ON DURO-LAST DETAIL 4090 WOOD SLEEPER TO RUN PARALLEL WITH ROOF SLOPE DURO-LAST WALK WAY PAD OR MEMBRANE DURO-LAST CUSTOM PREFABRICATED CURB WOOD SLEEPER MECHANICAL UNIT DURO-LAST CAULK INSULATION, REF. INSULATION SCHEDULE ROOF SHEATHING, REF. STRUCTURAL 8" M I N . RE F E R T O M E C H A N I C A L D R A W I N G S FO R C U R B H E I G H T RTU THIS DETAIL IS BASED ON DURO-LAST DETAIL 4020 GALVANIZED NAILS 6" ON CENTER DURO-LAST PRE-FABRICATED CUSTOM CURB FLASHING INSULATION, REF. INSULATION SCHEDULE ROOF SHEATHING, REF. STRUCTURAL BLOCKING 8" 2" THIS DETAIL IS BASED ON DURO-LAST DETAIL 6020 WEATHER BARRIER TWO PIECE FLASHING AND COUNTER FLASHING TERMINATION BAR W/ SEALANT MEMBRANE FLASHING FASTENER AND FASTENING PLATE RIGID INSULATION TAPERED FOR POSITIVE DRAINAGE ROOF SHEATHING, REF. STRUCTURAL 1 1/4" GALV. ROOF NAILS @ 6" O.C. MAX. ROOF MEMBRANE TO CONTINUE 3" DOWN VERTICAL SEALANT & BACKER ROD WEATHER BARRIER CONTINUOUS PRE-FINISHED, ONE PIECE METAL CAP SET IN MASTIC. REF. FINISH SCHEDULE 4" ROOF MEMBRANE 2X6 WOOD BLOCKING ROOF MEMBRANE TO CONTINUE 3" DOWN VERTICAL AND TUCKED BACK TO SHEATHING. END CAP TOP TRIM ILLUMINATED BOX TRIM #10 SMS. SEE MANUFACTURER'S CUT SHEET FOR ADDITIONAL INFORMATION SEALANT W/ BACKER ROD EXTERIOR WALL FINISH SYSTEM STRUCTURAL SHEATHING. REFER TO STRUCTURAL DRAWINGS. DETAIL BASED ON ZURN Z180 CORNICE DRAIN INSTALLATION DETAIL. ZURN Z180 CORNICE DRAIN FLASHING CLAMP ROOF MEMBRANE ROOF SHEATHING, REF. STRUCTURAL 12 / 2 2 / 2 0 1 7 1 2 : 3 0 : 1 8 P M ROOF DETAILS A4.3 IT EC MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 1ROOF DETAIL-LADDER RECEIVER 3/4" = 1'-0" 9ROOF DETAIL-TYPICAL PIPE PENETRATION 1 1/2" = 1'-0" 12ROOF DETAIL-SCUPPER DETAIL 1 1/2" = 1'-0" 3ROOF DETAIL-CONDENSER PIPE DETAIL (A) 1 1/2" = 1'-0" 8ROOF DETAIL-TERMINATION BAR DETAIL 3" = 1'-0" 6ROOF DETAIL-RTU CURB DETAIL 3" = 1'-0" 5CONDENSER UNIT DETAIL 3" = 1'-0" 4CONDENSER PIPE DETAIL 1 1/2" = 1'-0" 10ROOF DETAIL-BLADE CAP (M-3) 3" = 1'-0" 13ROOR DETAIL-ROOF DRAIN / OVERFLOW 3" = 1'-0" 14ALTERNATE BLADE LIGHT 3" = 1'-0" 2NOT USED 3/4" = 1'-0" 7NOT USED 3" = 1'-0" EX T . R A M P EX T . R A M P 1'-6" 9 A5.2 - QUADEC BY SCHLUTER - SHIENE BY SCHLUTER - SHIENE BY SCHLUTER OUTSIDE CORNER EXPOSED EDGE ADJACENT FINISH THINNER THAN TILE TILE ACCESSORIES *PROVIDE TRIM FOR CONDITIONS NOTED BELOW: GENERAL NOTES A. PROVIDE AND INSTALL CRACK ISOLATION MEMBRANE AT CONTROL JOINT LOCATIONS TILES. CRACK ISOLATION MEMBER TO BE "HYDRO-BAN" BY LATICRETE. REFER TO TCNA FOR JOINT STANDARDS. CONTACT LATICRETE AT (203) 376-8113. REFER TO STRUCTURAL SHEET S1.1, FOUNDATION PLAN. B. PAINTER IS RESPONSIBLE FOR REMOVING HARDWARE, SWITCH AND OUTLET COVERS PRIOR TO PAINTING. PAINTER TO REINSTALL AFTER PAINT IS DRY. C. RETOUCH OR REFINISH SURFACES DAMAGED BY SUBSEQUENT WORK. THE COST OF SUCH RESTORATION WORK SHALL BE BORNE BY THE CONTRACTOR. D. PROVIDE PROPER PROTECTION AGAINST DAMAGE TO FURNITURE, ADJACENT FINISHED WORK, FLOORING, ETC. IF APPLICABLE. E. FLOOR TRANSITIONS MUST BE FLUSH AND LEVEL. VINYL OR RUBBER REDUCER STRIPS NOT PERMITTED IN CUSTOMER AREA. NIBBLE SLAB AND FEATHER AS REQUIRED TO PROVIDE IMPERCEPTIBLE TRANSITION. F. REFER TO REFLECTED CEILING PLAN FOR ALL CEILING HEIGHTS. G. PROVIDE SCHLUTER CORNER TRIM AT ALL TILE CORNERS PER DETAIL ON SHEET A5.2. LEGEND ROOM FINISH REFER TO FINISH SCHEDULE FINISH TAG REFER TO FINISH SCHEDULE FLOOR TRANSITION WALL BASE DESCRIPTIONSYMBOL CLG FLOOR X-X FT-3 FT-4 2FINISH PLAN 1/4" = 1'-0" 2" #CODED NOTES: 1 2 3 4 5 6 SEE RCP FRP-1 FT-4 B-4 SEE RCP FRP-2 FT-4 B-4 SEE RCP SEE ELEV FT-4 B-4 SEE RCP SEE ELEV FT-4 B-4 N/A N/A FT-4 SS SEE RCP SEE ELEV FT-4 B-4 SEE RCP FRP-1 FT-4 B-4 N/A N/A FT-4 SS 12 A5.2 1'-6" A7.3 8 7 6 5 A7.3 4 3 2 1 A7.2 10 11 A7.29 A7.2 5 8 6 7 A7.2 4 1 2 3 A7.1 2 3 4 A7.1 8 7 9 A7.1 1 24 A7.1 6 5 8 FAMILY OFFICE DINING DRIVE THRU KITCHEN PAY WINDOW SERVICE FAMILY RECEIVING FREEZER COOLER UTILITY PREP. AREA CREW 114 ENTRY 100 106 101 111 104 110 112 113 108 107 102 103 116 105 N/A N/A SS SS P-9 SEE ELEV FT-3 B-5 P-10 SEE ELEV FT-3 B-5 SEE RCP FRP-1 FT-3 B-5 P-10 SEE ELEV FT-3 B-5 9 10 11 12 STAINLESS STL. STAINLESS STL. FRP-2 P-6 WT-3 WT-3 B-3 WT-3 P-6WT-7 P-10 FRP-1 FRP-1 P-6 P-9 WT-3 P-9 P-6 P-9 WT-3 WC-6P-6 P-9 P-9 WT-3 FRP-1 FRP-2 SOFFIT FACE, BACK, & UNDERSIDE P-10 SOFFIT FACE, BACK & UNDERSIDE GYP. GYP. GYP. C.B. C.B. GYP. GYP. FRP-1 PLY. PLY. C.B.C.B. C.B. WT-7C.B. WT-6C.B. P-10 WT-6 GYP. C.B. P-10 WT-6 GYP. C.B. WT-6 WT-7C.B. FRP-1 BACK & UNDERSIDE OF SOFFIT PLY. PLY. PLY. PLY. GYP. GYP. GYP. C.B. GYP. GYP.C.B. C.B. P-6 P-9 GYP. GYP. P-9GYP. P-6 P-9 GYP. GYP. WT-3 C.B. FRP-1 PLY. PLY. CP-1 FRP-1 - GYP.7 CP-8 CP-8 CP-8 CP-8 CP-8 13 FRP-1 31 4" 4 A5.2 1. 6" CONCRETE CURB. 1/2" LESS @ EXPOSED SIDES THAN IFS PANEL. PROVIDE BASE ON FACE OF CURB. SEE DETAIL 6/A5.2 2. PROVIDE WATERPROOFING MEMBRANE AS SCHEDULED AND AT ALL WET AREAS, TYP. REFER TO DETAIL 01/A5.1 FOR INSTALLATION OF MEMBRANE AT MOP SINK. 3. CONTINUE FLOOR TILE UNDER FIXTURES, CASEWORK, AND FREESTANDING EQUIPMENT. 4. LINE OF SOFFIT ABOVE. 5. STAINLESS STEEL COVE BASE PROVIDED BY COOLER BOX PROVIDER 6. RAMP BY COOLER BOX PROVIDER 7. NOT USED. 8. SOLID SURFACE CAP AND END CAP, REFER TO INTERIOR ELEVATIONS AND EQUIPMENT SCHEDULE. 9. BEVERAGE / CONDIMENT CURB SET ON FLOOR FINISH. REFER DETAIL 1/A5.2 10. COOKLINE CURB SET DIRECTLY ON SLAB. REFER TO DETAIL 3/A5.2 11. ALIGN TILE TRANSITION WITH FACE OF EQUIPMENT CURB 12. INSTALL FRP CORNER TRIM AT EDGE OF BULKHEAD. 13. FRONT COUNTER CURB SET DIRECTLY ON SLAB. REFER TO DETAIL 3/A5.2. * * NOTE: CONTRACTOR TO CONTACT KED TO ARRANGE EARLY DELIVERY OF STAINLESS STEEL WALL PANELS. G.C. IS RESPONSIBLE FOR INSTALLATION OF STAINLESS STEEL WALL PANELS PRIOR TO HOOD INSTALLATION. * FT-3 FT-4 WT-3 C.B. P-9 GYP. P-6 GYP. WT-3 C.B. P-9 GYP. P-9 GYP.P-6 P-9 WT-3 GYP. GYP. C.B.P-9GYP. A7.1 10 10 A5.2 4 A5.2 SIM 6 A5.2 5 FRP-1 - PLY. CP-8 1'-6"FRP-1 - PLY. FRP-1 PLY. FRP-1 - PLY. C2 X 6 1" = 1'-0"B3 1/2" METAL STUD 1" = 1'-0" HOLD TILE SUBSTRATE SHORT OF T.O. TILE WALL FINISH AS SCHEDULED BASE AS SCHEDULED SUBSTRATE PER PLAN 1' - 0 " A . F . F . M I N . CE M E N T B O A R D 6" FIRE BLOCKING ALIGNED WITH FINISH CEILING BRACE TOP OF WALL TO STRUCTURE ABOVE AT 48" O.C. MAX FINISH CEILING AS SCHEDULED WALL FINISH AS SCHEDULED BASE AS SCHEDULED SUBSTRATE PER PLAN WALL FINISH AS SCHEDULED BASE AS SCHEDULED SUBSTRATE PER PLAN CONT. GALV. METAL TRACK 2X4 FRAMING @ 16" O.C. 2X6 FRAMING AT 16" O.C. 1" HOLD TILE SUBSTRATE SHORT OF T.O. TILE 1" HOLD TILE SUBSTRATE SHORT OF T.O. TILE 1" FINISH CEILING AS SCHEDULED 6" NON-COMBUSTABLE FIRE BLOCKING 3 1/2" METAL STUDS @ 16" O.C. BRACE TOP OF WALL TO STRUCTURE ABOVE AT 48" O.C. MAX 20 GA BLOCKING WHERE SHOWN ON PLAN 6" 2X6 FRAMING AT 16" O.C. FIRE BLOCKING BRACE TOP OF WALL TO STRUCTURE ABOVE AT 48" O.C. MAX A2 X 4 1" = 1'-0" 1' - 0 " A . F . F . M I N . CE M E N T B O A R D 1' - 0 " A . F . F . M I N . CE M E N T B O A R D ROOF JOIST EXTEND FRAMING TO BOTTOM OF JOIST ROOF DECK WALL TYPES MOP SINK. INSTALL WATERPROOF MEMBRANE, TIE INTO DRAIN AND WRAP UP WALLS 12" OR ONTO FLOOR 12". SET MOP SINK IN BED OF SEALANT ON FINISH FLOOR. 1MOP SINK DETAIL 3/4" = 1'-0" 8" 3' - 0 " INSTALL WATER PROVING MEMBRANE FULL HEIGHT OF FRP PANELS SEALANT FRP PANELS MOP SINK MOP SINK SLAB MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 FINISH PLAN A5.1 IT EC CITY/OWNER CMMTS01/12/233 3 3 3 3 3 3 3 3 1.12.23 1/ 2 " MA X . 1" 1/2" THERMAL BREAK THIS DETAIL IS BASED ON LATICRETE DETAIL W244C-12 REFERENCE FINISH SCHEDULE FOR ADDITIONAL INFORMATION EXTERIORINTERIOR ALUMINUM 1/2 SADDLE (PEMKO 1700 (OR EQUAL) W/ WATER TIGHT SEALANT WALL BEYOND CONCRETE SIDEWALK THIS DETAIL IS BASED ON LATICRETE DETAIL F113-12 REFERENCE FINISH SCHEDULE FOR ADDITIONAL INFORMATION RIGID INSULATION 10 MIL. VAPOR BARRIER MORTAR TILE FLOORING PER SCHEDULE CRACK BRIDGE MEMBRANE GROUT CONCRETE WATERPROOF MEMBRANE MORTAR TILE - REFERENCE FINISH SCHEDULE GROUT FLOOR SLAB TAPCON ANCHOR FILL CURB RAILS WITH GROUT TO MINIMUM HEIGHT OF LEVELING TABS BASE TILE. CUT FLUSH WITH TOP OF CURB LEVELING BOLT 1/4" CEMENT BOARD ATTACHED TO CURB EQUIPMENT CURB (PROVIDED BY SUPPLIER INSTALLED BY GC) WOOD/ MTL STUD CEMENT BOARD WATERPROOF MEMBRANE TO EXTEND 12" UP WALL MORTAR GROUT TILE 1FINISH DETAIL - CURB AT CONDIMENT STAND 3" = 1'-0" 2TILE FINISH DETAIL 3" = 1'-0"6FINISH DETAIL - CURB AT ELECTRICAL PANEL 3" = 1'-0" 4FINISH DETAIL - TILE AT EXTERIOR THRESHOLD 3" = 1'-0" 7FINISH DETAIL - TILE GROUT 3" = 1'-0" FINISH FLOOR LEVELING BOLT FRONT COUNTER / COOK CENTER CURB (PROVIDED BY SUPPLIER INSTALLED BY GC) BASE TILE AS SCHEDULED FILL CURB RAILS WITH GROUT TO MINIMUM HEIGHT OF LEVELING TABS TAPCON ANCHOR FLOOR SLAB 3 FINISH DETAIL - CURB AT FRONT COUNTER/ COOK CENTER 3" = 1'-0" NOTE: WATERPROOF MEMBRANE IS 24" AROUND THE PERIMETER OF WET AREA: KITCHEN & RESTROOMS. COVE BASE CUT FLUSH WITH TOP OF CURB ELECTRICAL PANELS, REF. ELECTRICAL DRAWINGS FLOOR SLAB CONCRETE CURB WM-1 1"3/4" 1 1 / 2 " 1/2 " SOLID SURFACE, REFER TO FINISH SCHEDULE WC-6 1/2" GYPSUM BOARD 2 X 4 FRAMING AT 16" O.C. 9FINISH DETAIL-CURB @ FRONT COUNTER 3" = 1'-0" 10FINISH DETAIL 3" = 1'-0" CONTINUE FINISH BEHIND SOLID SURFACE CAP, TYP. 12FINISH DETAIL 3" = 1'-0" FRP 1/2 " PLYWOOD 1/2" GYP PAINT P-6 WOOD TRIM, PAINT P-6 SOLID SURFACE CAP BELOW INSTALL 1X "CAP" TO CREATE UNIFORM END WALL FINISH, PAINT P-6 J-MOLD MITER CUT FLOOR TILE AS SCHEDULED 8FINISH DETAIL - BASE AT KITCHEN 3" = 1'-0" 1' - 0 " 6" WATERPROOF MEMBRANE FLOOR TILE COVE BASE TILE CONTINUE FRP BEHIND BASE 1" CEMENT BOARD FRP 11 1/2" 1 1 / 2 " 1/2" SOLID SURFACE END CAP TO BE FLUSH WITH SOLID SURFACE TOP CAP, REFER TO INTERIOR ELEVATIONS WALL TILE 1/2" CEMENT BOARD FRONT COUNTER FRP 1/2 " PLYWOOD 2x6 FRAMING FLOOR TILE TRANSITION STACKED 1" CONDUITS (1) PWER, (1) DATA WITH PULL STRINGS JUNCTION BOX FOR COUNTER - (2) 2X4 STACKED FOR POWER & DATA. MOUNT TO WALL 1' - 0 " 6" WATERPROOF MEMBRANE FLOOR TILE COVE BASE TILE CONTINUE FRP BEHIND BASE 1" CEMENT BOARD FRP SUBSTRATE SCHLUTER QUADEC TRIM 5FINISH DETAIL - TRIM AT OUTSIDE CORNER 12" = 1'-0" WALL TILE/ FLOOR TILE WALL TILE / BASE TILE K & V HEAVY WEIGHT 14" 250LB SHELF BRACKET (OR EQUAL), TYP. K & V HEAVY WEIGHT STEEL WALL STANDARD HANGING SYSTEM (OR EQUAL) INSTALLED PER MFR SPECIFICATIONS. 14" LAMINATE SHELVING, G.C. TO VERIFY LENGTH REQUIRED , TYP. STOCK 6'-0" LAMINATE COUNTER TOP. HAMPTON BAY "FROSTY WHITE" W/ TEMPO EDGE & INTEGRATED BACKSPLASH (OR SIMILAR). INSTALL 1 1/2" ALUMINUM ANGLE BAR W/ 1/4" DIA. LAG SCREWS @ 8" O.C. 2' - 9 1 / 2 " M A X . TO P O F D E S K 2' - 9 1 / 2 " M A X TO P O F D E S K 2'-0" AREA RESERVED FOR I.T. CABINET. VERIFY REQUIREMENTS W/ OWNER 11MANAGER'S DESK DETAIL 1" = 1'-0" INSTALL RICHELIEU HARDWARE 28" CHROME ADJUSTABLE TABLE LEG (OR EQUAL). 5'-7" G.C. TO SOURCE COUNTER TOP, SHELVING SYSTEM, & HARDWARE FOR MANAGER'S DESK. G.C. TO VERIFY FINAL CONFIGURATION OF MANAGER'S DESK WITH OWNER. 2' - 9 1 / 2 " M A X . TO P O F D E S K 2' - 9 1 / 2 " M A X . TO P O F D E S K STOCK LAMINATE COUNTER TOP. HAMPTON BAY "FROSTY WHITE" W/ TEMPO EDGE & INTEGRATED BACKSPLASH (OR SIMILAR). INSTALL 1 1/2" ALUMINUM ANGLE BAR W/ 1/4" DIA. LAG SCREWS @ 8" O.C. 3'-3 1/2" G.C. TO SOURCE COUNTER TOP, SHELVING SYSTEM, & HARDWARE FOR MANAGER'S DESK. 13EMPLOYEE DESK DETAIL 1" = 1'-0" MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 FINISH DETAILS A5.2 IT EC CITY/OWNER COMMTS01/12/233 3 3 3 1.12.23 JOINT TREATMENT SCHEDULE (SEE SPECIFICATIONS - DIVISION 7 FOR CLARIFICATION OF TYPES) BUILDING INSULATION GENERAL NOTES BLDG. INSULATION SCHED. GENERAL FLASHING REQUIREMENTS DIAGRAM 'C' VINYL, WOOD, OR METAL EX T E R I O R NO SEALANT, U.N.O. PARTITION TYPES A. PROPERLY WEEP FLASHING POINTS AND NORMAL DRAINAGE POINTS WITH WEEPS @ 1'-4" O.C. MAX. SPACING. WEEP POINTS ARE TO BE LOCATED DIRECTLY ON TOP OF FLASHING. B. WHERE FLASHING IS LOCATED TERMINATE AND/OR SEPARATES MATERIALS, DO NO SEAL (U.N.O.) - REFER TO DIAGRAM "C" WHERE IT IS DETERMINED BY THE MATERIAL MANUFACTURER OR OTHERWISE THAT SEALING IS REQUIRED (TO PREVENT WATER PENETRATION BEYOND FLASHING DUE TO WIND DRIVEN RAIN), THEN SEALANT MUST BE WEEPED IN ACCORDANCE WITH NOTE "A" ABOVE. C. UNLESS NOTED OTHERWISE, TURN FLASHING UP A MIN. OF 4" BEHIND APPROPRIATE MATERIALS. D. FLASHING CONDITIONS, WHETHER DETAILED OR NOT, ARE TO BE IN ACCORDANCE WITH S.M.A.C.N.A. SPECIFICATIONS. WHERE ATYPICAL CONDITIONS OCCUR THAT ARE NOT DETAILED, FLASHING IS TO BE INSTALLED AS CLOSELY AS POSSIBLE TO THE S.M.A.C.M.A. DETAIL THAT IS MOST CLOSELY APPROXIMATES THE ACTUAL CONDITION. E. UNLESS NOTED OTHERWISE, AT FLASHING HIGH POINTS SEAL WATER TIGHT TO BACK-UP SUBSTRATE. A. INSULATION LOCATIONS SHOWN IN SCHEDULE ARE INTENDED ONLY FOR CLARIFICATION PURPOSES AND ARE NOT INTENDED TO BE ALL-ENCOMPASSING. PROVIDE EACH INSULATION TYPE AS REQUIRED TO FULLY MAINTAIN THE THERMAL INTEGRITY OF THE CONSTRUCTION ASSEMBLIES RELATED TO THE ENTIRE BUILDING ENVELOPE. DESCRIPTION THICKNESS (TOTAL R-VALUE)LOCATION RIGID PERIMETER FOUNDATION INSULATION (EXTRUDED POLYSTYRENE) R-10 PERIMETER FOUNDATION TO FROST LINE DEPTH BATT INSULATION 5 1/2" (R-20)EXTERIOR WALL CAVITY FIBERGLASS BATT INSULATION (FOIL FACE FSK-25)5 1/2" (R-20)EXTERIOR WALL CAVITY AT EXPOSED AREAS ABOVE CEILING RIGID ROOF INSULATION (POLYISOCYANURATE)(R=30ci)ABOVE ROOF DECK, TAPERED TO DRAIN SOUND ATTENUATION BATT INSULATION 3 1/2" U.N.O.INTERIOR WALL CAVITIES - SEE PARTITION TYPES EXT: "E" INT: "I"CONDITION TYPE E PERIMETER JOINTS OF DOOR FRAMES, WINDOW FRAMES, STOREFRONT, AND/OR WINDOW WALL FRAME ASSEMBLIES, LOUVERS, FIXTURES, AND OTHER PENETRATIONS IN THE BUILDING ENCLOSURES NOT OTHERWISE SEALED WATERTIGHT, U.N.O. PROVIDE CONTINUOUS SEALANT UNDER EXTERIOR DOOR THRESHOLDS AND WINDOW SYSTEMS THAT REST DIRECTLY ON THE FLOOR SLAB JS-1 E MASONRY / CONCRETE CONTROL JOINTS IN WALLS JS-1 E E.I.F.S. JOINTS IN WALLS JS-1 E EXPANSION JOINTS IN AND AROUND CONCRETE PAVEMENT, UNIT PAVEMENT, CURBS, OR OTHER HORIZONTAL SURFACES JS-3 E PERIMETER JOINTS AND OTHER OPEN JOINTS AT EXTERIOR SOFFITS JS-1 E INTERSECTION OF DISSIMILAR MATERIALS THAT ALLOW AIR OR WATER INFILTRATION JS-1 E INTERSECTION OF DISSIMILAR MATERIALS IN WHICH INSTALLATION IS NOT UNIFORM OR WHERE WORKMANSHIP DOES NOT MEET ACCEPTABLE CONSTRUCTION TOLERANCES, BUT SUCH WORKMANSHIP IS ACCEPTED BY THE ARCHITECT JS-1 I PERIMETER JOINTS ON INTERIOR SIDE OF DOOR FRAMES, WINDOW FRAMES, AND OTHER FRAMED MATERIALS IN WALLS WITH NO FINISHED EDGE FLANGE JS-2 I OPEN JOINTS AT PENETRATIONS THROUGH WALLS, CONCRETE, PLASTER, OR GYPSUM BOARD CEILINGS WHERE INTENDED TO BE TIGHT SEALED JOINTS JS-2 I OPEN JOINT BETWEEN DISSIMILAR MATERIALS WHERE INTENDED TO BE TIGHT SEALED JOINTS.JS-2 I JOINTS WHERE EDGE TRIM OF GYPSUM BOARD ABUTS IRREGULAR SURFACES OR OTHER SURFACES AND LEAVES OPEN JOINTS JS-2 I EXPOSED JOINTS AT JUNCTURES OF COUNTERTOPS, CABINETS, OR OTHER "BUILT-IN" WORK WITH IRREGULAR SURFACES INTENDED TO BE TIGHT SEALED JOINT JS-2 I EXPOSED JOINTS AT JUNCTURES OF WALL MOUNTED PLUMBING FIXTURES AND/OR TOILET ACCESSORIES WITH IRREGULAR SURFACES AND INTENDED TO BE TIGHT SEALED JOINT JS-5 I CONTROL JOINTS SAWN JOINTS AND OPEN JOINTS IN AND AROUND CONCRETE SLABS AND CURBS JS-4 JOINT TREATMENT NOTES A. THE JOINT TREATMENT SCHEDULE IS INTENDED TO ILLUSTRATE ALL JOINT CONDITIONS WHICH ARE MEANT TO BE SEALED WHETHER REFERENCED FROM OTHER DETAILS OR NOT. B. AT METAL FRAME LOCATIONS (DOORS, WINDOWS, ETC.) HOLD FRAME BACK FROM SUBSTRATE 3/8" @ HEAD & SILL AND 3/16" @ JAMB TO ALLOW FOR SEALANT, TYPICAL U.N.O. THIS INCLUDES DIMENSIONS FOR STEEL LINTELS WHERE APPLICABLE. C. PROVIDE PROPER SEALERS AS REQUIRED TO FULLY CLOSE JOINTS THAT ARE INTENDED TO BE TIGHT AND AS SHOWN ON THE DRAWINGS. D. PROVIDE CLOSED CELL BACKER ROD AS REQUIRED TO ACHIEVE PROPER SEALANT THICKNESS PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. E. CAUTION, DO NO SEAL WEEPS AND DRAINAGE CHANNELS IN STOREFRONT OR OTHER ASSEMBLIES. PAINT SCHEDULE EXTERIOR 03/10/2022 COLOR PPG SHERWIN WILLIAMS BENJAMIN MOORE PEX-1 WENDYS DARK BRONZE PPG 1002-7 "PHANTOM MIST" BRONZETONE CUSTOM COLORS: "MISSISSIPPI BRONZE" "BRONZETONE" PEX-2 RED PPG 13-16 "BLAZE" SW 6321 "RED BAY" HC 181 "HERITAGE RED" PEX-3 PRE-FINISHED- DARK BRONZE SIGN CABINETS - MATCHES PEX-1 NO SUBSTITUTIONS AVAILABLE (THROUGH SIGN VENDOR ONLY) SIGN CABINETS - MATCHES PEX-1 NO SUBSTITUTIONS AVAILABLE (THROUGH SIGN VENDOR ONLY) SIGN CABINETS - MATCHES PEX-1 NO SUBSTITUTIONS AVAILABLE (THROUGH SIGN VENDOR ONLY) PEX- 4 LIGHT GRAY PPG 1025 3 "WHISKERS" SW 7022 "ALPACA" OC-28 "COLLINGWOOD" PEX-5 SAFETY YELLOW "SAFETY YELLOW" "SAFETY YELLOW" "SAFETY YELLOW" PEX-6 PRE-FINISHED- DARK BRONZE WALK-IN COOLER / FREEZER - MATCHES PEX-1 PRE-FINISHED BY MANUFACTURER, NO SUBSTITUTIONS WALK-IN COOLER / FREEZER - MATCHES PEX-1 PRE-FINISHED BY MANUFACTURER, NO SUBSTITUTIONS WALK-IN COOLER / FREEZER - MATCHES PEX-1 PRE-FINISHED BY MANUFACTURER, NO SUBSTITUTIONS PEX-7 WENDY'S FIELD BROWN PPG 160-07 "SOUTHERN WOOD" SW 6061 "TANBARK" 1223 "BRENTWOOD" PEX-8 WENDY'S ACCENT BROWN PPG 16 23 "TAMPICO BROWN" SW 6068 "BREVITY BROWN" 1224 "COYOTE TRAIL" PEX-9 SILVER - SATIN PPG-6-230 "BRIGHT ALUMINUM" "SILVER BRIGHT" ALUMINUM PAINT P22 78 "SILVER URETHANE ALKYD" PEX-10 POWDER COAT "BLACK" PPG 1001-7 "BLACK MAGIC" SW 6258 "TRICORN BLACK" HC-19 "BLACK" PEX-11 TAN PPG 1085 5 "SAUTEED MUSHROOM" SW 6109 "HOPSACK" 1055 "ALCONQUIN TRAIL" PEX-12 DARK GRAY PPG 1001-6 "KNIGHTS ARMOUR" SW 7674 "PEPPERCORN" 2121-10 "GRAY" PEX-13 LIGHT TAN (ACCENT FOR PEX-11)PPG 14-17 "ARMADILLO" SW 6106 "KILIM BEIGE" BM 1128 "ARMADILLO" EXTERIOR PRIMER BASE SHEEN PPG SHERWIN WILLIAMS BENJAMIN MOORE STUCCO / EIFS SATIN PRIME: PPG SEAL GRIP 17-921XI ACRYLIC UNIVERSIAL PRIMER FINISH: PPG SPEED HIDE 6-2045XI EXTERIOR SATIN ACRYLIC PRIME: LOXON CONCRETE & MASONARY PRIMER FINISH: A-100 EXTERIOR LATEX SATIN PRIME: 023 FRESH START ALL PURPOSE PRIMER FINISH: 631 AURA WATERBORNE EXTERIOR SATIN FINISH METAL RAILING SEMI-GLOSS PRIME: PPG PITT-TECH PLUS 4020PF DTM ACRYLIC METAL PRIMER FINISH: SPEEDHIDE EXTERIOR 6-900XI 100% ACRYLIC LATEX SEMI-GLOSS PRIME: PROCRYL UNIVERSAL METAL FINISH: SHER-CRYL HPA (SEMI-GLOSS) PRIME: HP04 METAL PRIMER OR SELF PRIME HP29 METAL PRIMER FINISH: HP29 DTM ACRYLIC SEMI-GLOSS ENAMEL WOOD SATIN PRIME: PPG SEAL GRIP 17-921XI ACRYLIC UNIVERSIAL PRIMER FINISH: PPG SPEED HIDE 6-2045XI EXTERIOR SATIN ACRYLIC PRIME: A100 ALKYD EXTERIOR WOOD PRIMER FINISH: A-100 EXTERIOR LATEX SATIN Prime: 023 Fresh Start All Purpuse Primer Finish: 631 Aura Waterborne Exterior Satin Finish PLASTIC (HERITAGE II) SATIN PRIME: PPG SEAL GRIP 17-921XI ACRYLIC UNIVERSIAL PRIMER FINISH: PPG SPEED HIDE 6-2045XI EXTERIOR SATIN ACRYLIC PRIME: EXTREME BOND PRIMER FINISH: SHER-CRYL HPA (SEMI-GLOSS) PRIME: 023 FRESH START ALL PURPOSE PRIMER FINISH: 631 AURA WATERBORNE EXTERIOR SATIN FINISH WROUGHT IRON GLOSS PRIME: PPG PITT-TECH PLUS 4020PF ACRYLIC METAL PRIMER FINISH: PPG PITT-TECH PLUS 90-1306 SAFETY YELLOW DTM GLOSS PRIME: PROCRYL UNIVERSAL METAL FINISH: SHER-CRYL HPA (GLOSS) PRIME: 023 FRESH START ALL PURPUSE PRIMER FINISH: 631 AURA WATERBORNE EXTERIOR SATIN FINISH ALUMINUM / METAL STOREFRONT PRIMER ALUMINUM STOREFRONT GLOSS COLOR: PPG "STATUARY BROWN" RECOMMENDED PRIME: PPG PITT-TECH PLUS 4020 PF ACRYLIC METAL PRIMER RECOMMENDED FINISH: PPG PITT-TECH PLUS 4216HD SEMI-GLOSS DTM ACRYLIC RECOMMENDED TO USE PPG PRIME: PROCRYL UNIVERSAL METAL PRIMER FINISH: SHER-CRYL HPA (SEMI-GLOSS OR GLOSS) HP04 ACRYLIC METAL PRIMER ALTERNATE PRIME: V175 WATERBORNE BONDING PRIMER ALTERNATE FINISH: P22-64 BRONZETONE URETHANE GLOSS ENAMEL METAL SATIN RECOMMENDED PRIME: PPG PITT-TECH PLUS 4020 PF ACRYLIC METAL PRIMER RECOMMENDED FINISH: PPG PITT-TECH PLUS 4216HD SEMI-GLOSS DTM ACRYLIC RECOMMENDED TO USE PPG PRIME: PROCRYL UNIVERSAL METAL PRIMER FINISH: SHER-CRYL HPA (SEMI-GLOSS) HP04 ACRYLIC METAL PRIMER ALTERNATE PRIME: SELF PRIME WITH P23-60 ALTERNATE FINISH: P23-60 DTM ALKYD LOW LUSTER ENAMEL PEX-9 PRIMER METAL SATIN PRIME: PPG PITT-TECH PLUS 4020PF ACRYLIC METAL PRIMER FINISH: PPG PITT-TECH 90-474 DTM SATIN ACRYLIC ENAMEL PRIME: PROCRYL UNIVERSAL METAL PRIMER FINISH: SILVER-BRITE ALUMINUM PAINT (2 COATS) #B59S11 PRIME: HP04 ALKYD METAL PRIMER FINISH: HP25 DTM ACRYLIC LOW LUSTER ENAMEL WOOD SATIN PRIME: PPG SEAL GRIP 17-921XI ACRYLIC UNIVERSAL PRIMER FINISH: PPG SPEEDHIDE 6-2045XI EXTERIOR SATIN ACRYLIC PRIME: A100 ALKYD WOOD PRIMER FINISH: SILVER-BRITE ALUMINUM PAINT (2 COATS) #B59S11 PRIME: 023 FRESH START ALL PURPOSE PRIMER FINISH: 631 AURA WATERBORNE EXTERIOR SATIN FINISH INTERIOR COLOR PPG SHERWIN WILLIAMS BENJAMIN MOORE P-1 BEIGE - EGGSHELL PPG 1024-4 "MOTH GRAY" SW7036 "ACCESSIBLE BEIGE" OC-15 "BABY FAWN" P-2 RED - EGGSHELL PPG 13-16 "BLAZE" SW 6321 "RED BAY" CPS-1195 "FLAMENCO" P-3 CEILING WHITE - FLAT PPG 1001-1 "DELICATE WHITE" SW 7006 "EXTRA WHITE" PM-1 "SUPER WHITE" P-4 TAUPE - EGGSHELL PPG 1024-6 "PATCHES" SW 7039 "VIRTUAL TAUPE" 999 "RUSTIC TAUPE" P-5 LIGHT GRAY - EGGSHELL PPG 1009-4 "GRAY STONE" SW 7065 "ARGOS" 2134-50 "GULL WING GRAY" P-6 WHITE - EGGSHELL PPG 18-09 "GARLIC CLOVE" SW 8917 "SHELL WHITE" OC-17 "WHITE DOVE" P-7 GRAY - EGGSHELL PPG 1009-5 "PHOENIX FOSSIL" SW 7067 "CITY SCAPE" 2134-40 "WHALE GRAY" P-8 WOOD STAIN DFT259 SATIN- DEFT INTERIOR POLYURETHANE WATER BASED SW MINWAX PERFORMANCE SERIES WATER BASED POLYURETHANE N423 STAYS CLEAR ACRYLIC POLYURETHANE LOW LUSTER P-9 DARK GRAY - FLAT PPG 1001-6 "KNIGHTS ARMOUR" SW 7674 "PEPPERCORN" 2121-10 "GRAY" P-10 BLUE - EGGSHELL PPG 1037-3 "SPECIAL DELIVERY" SHERWIN WILLIAMS: SW 9138 "STARDEW" AF-545 "SOLITUDE" P-11 BRONZE - EGGSHELL PPG 1002-7 "PHANTOM MIST" SHERWIN WILLIAMS: BRONZETONE CUSTOM COLOR: MISSISSIPPI BRONZE BENJAMIN MOORE: P23-60 BRONZETONE INTERIOR PRIMER BASE SHEEN PPG SHERWIN WILLIAMS BENJAMIN MOORE GYPSUM BOARD EGGSHELL PRIME: PPG SPEEDHIDE 6-2 INTERIOR QD ACRYLIC PRIMER FINISH: PPG SPEEDHIDE 6-411 INTERIOR EGGSHELL PRIME: PROMAR 200 ZERO VOC PRIMER FINISH: PROMAR 200 ZERO EGGSHELL PRIME: 023 FRESH START ALL PURPOSE PRIMER FINISH: 485 ULTRA SPEC SCUFF-X EGGSHELL METAL DECK FLAT PRIME: SELF PRIMING, RUST INHIBITIVE, PPG PITT-TECH 90-472 DTM SATIN FINISH PRIME: SELF PRIMING, RUST INHIBITIVE PRO INDUSTRIAL DTM ACRYLIC PRIME: SELF PRIMING, RUST INHIBITIVE, HP 25 DTM LOW LUSTRE WOOD DECK FLAT PRIME: PPG SEAL GRIP PRIMER AS BASE COAT, TINT PRIMER TO "KNIGHTS ARMOUR" FINISH: PPG SPEEDHIDE ZERO VOC FLAT PRIME: 1 COAT SW PREMIUM WALL & WOOD PRIMER FINISH: 2 COATS SW PROMAR 200 ZERO VOC FLAT PRIME: 023 FRESH START ALL PURPOSE RESTROOM & KITCHEN GYPSUM BOARD SEMI-GLOSS PRIME: PPG SPEEDHIDE 6-2 INTERIOR QD ACRYLIC PRIMER FINISH: PPG SPEEDHIDE 6-500 INTERIOR SEMI-GLOSS PRIME: PROMAR 200 VOC PRIMER FINISH: PROMAR 200 VOC SEMI-GLOSS PRIME: 023 FRESH START ALL PURPOSE PRIMER FINISH: 487 ULTRA SPEC SCUFF-X SEMI GLOSS 12 / 2 2 / 2 0 1 7 1 2 : 3 0 : 4 2 P M PAINT, FURN, BLDG INSUL. & JOINT TREATMENT SCHEDULE A6.1 IT EC CITY/OWNER COMMTS01/12/233 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 3 3 1.12.23 INTERIOR FINISH SCHEDULE EXTERIOR FINISH SCHEDULE SYMBOL DESCRIPTION PRODUCT INFO 3/30/2021 FLOORS FT-3 FLOOR TILE (DINING, RESTROOM)PRODUCT: CROSSVILLE; "CEMENTED RELATIONSHIP" SWCR/.12424UPS; MATTE FINISH SIZE: 24" x 24" GROUT: GR-7 (GR-10 AT RESTROOM FLOORS) MORTAR: MR-1 WATERPROOFING: WM-1; EXTEND 6" UP & 6" OUT PERIMETER WALLS (RESTROOM AREAS ONLY) JOINTS: 1/8" TRIM: SCHLUTER; QUADEC (SATIN NICKLE ANOD. ALUM.) FT-4 FLOOR TILE (BACK OF HOUSE) PRODUCT: CROSSVILLE; CROSS-TREAD (CTS); R001 "GREY MINGLE" SIZE: 8" x 8" GROUT: GR-5 MORTAR: MR-1 WATERPROOFING: WM-1; EXTEND 6" UP & 6" OUT PERIMETER WALLS AND UNDER FULL EXTENT OF MOP SINK JOINTS: 1/8" FC-2 QUARTZ FLOORING (BACK OF HOUSE) PRODUCT: SILIKAL; CUSTOM COLOR QUARTZ FLOORING; "WENDYS UM BRIGHT BLEND"; MATCHES FT-3 COLOR: 10% FWN, 30% LGRY, 30% SGRY, 30% SNDY FINISH: SILIKAL R-71 WALL BASE B-3 TILE BASE (DINING, RESTROOM) PRODUCT: CROSSVILLE; BASE TILE; "GRILLE MARKS" SWGM/.10612UPS SIZE: 6: x 12" GROUT: GR-7 MORTAR: MR-1 WATERPROOFING: WM-1; EXTEND 6" UP & 6" OUT PERIMETER WALLS (RESTROOM AREAS ONLY) JOINTS: 1/8" TRIM: SCHLUTER; QUADEC w/ CORNER INSERTS (SATIN NICKEL ANOD. ALUM.) B-4 TILE COVE BASE (KITCHEN) PRODUCT: CROSSVILLE; COVE BASE; R001 "GREY MINGLE"; CROSS SHEEN FINISH SIZE: 6" x 8"; PROVIDE COVE BASE CORNERS, LEFT, RIGHT, AND INSIDE AS REQUIRED GROUT: GR-5 MORTAR: MR-1 WATERPROOFING: WM-1; EXTEND 6" UP & 6" OUT PERIMETER WALLS JOINTS: 1/8" B-5 TILE BASE (DINING, RESTROOM) PRODUCT: CROSSVILLE; COLOR BOX 2.0; "I SEE THE MOON"; CBX17.0612UPS SIZE: 6" x 12" GROUT: GR-7 MORTAR: MR-1 WATERPROOFING: WM-1; EXTEND 6" UP & 6" OUT PERIMETER WALLS JOINTS: 1/8" TRIM: SCHLUTER; QUADEC w/ CORNER INSERTS (SATIN NICKEL ANOD. ALUM) B-6 TILE COVE BASE (DINING, RESTROOM - USE ONLY WHEN COVED BASE TILE IS REQUIRED) PRODUCT: CROSSVILLE; COLOR BOX 2.0; "I SEE THE MOON"; CBX17.0612CBS SIZE: 6" x 12" GROUT: GR-7 MORTAR: MR-1 WATERPROOFING: WM-1; EXTEND 6" UP & 6" OUT PERIMETER WALLS JOINTS: 1/8" TRIM: SCHLUTER; QUADEC w/ CORNER INSERTS (SATIN NICKEL ANOD. ALUM) WALLS ACM-1 ALUMINUM COMPOSITE MATERIAL (SEE EXTERIOR FINISH SCHEDULE FOR PRODUCT INFORMATION) FRP-1 FRP (BACK OF HOUSE) PRODUCT: MARLITE; FRP; CLASS C (CLASS A, WHERE REQUIRED) SIZE: 4' x 9' FINISH: PEBBLED; WHITE TRIM: WHITE PVC (STANDARD TRIM PROFILES TO MATCH) FRP-2 FRP (BACK OF HOUSE) PRODUCT: MARLITE; ENVUE FRP; CLASS C SIZE: 4' x 9' FINISH: SMOOTH; HI-RES PRINT; 8"x8" STACKED TILE PATTERN (WHITE TILE, GRAY GROUT) TRIM: WHITE PVC (STANDARD TRIM PROFILES TO MATCH) WT-3 WALL TILE (DINING, HALLWAY) PRODUCT: CROSSVILLE; "WIND WHIPPED" (SWWW/.10508S) SIZE: 4" x 8" PATTERN: SEE INTERIOR ELEVATIONS GROUT: GR-7 MORTAR: MR-1 JOINTS: 1/8" TRIM: SCHLUTER; QUADEC (SATIN NICKEL ANOD. ALUM.) WT-3 WALL TILE PRODUCT: DALTILE; P125; MATCH POINT COLOR: PURE WHITE UNPOLISHED SIZE: 24" x 24" GROUT: GR-4 MORTAR: MR-2 JOINTS: 1/8" WT-6 WALL TILE (RESTROOM) PRODUCT: CROSSVILLE; "FROST CALIBRATED" (AV241.11224UPSC) SIZE: 12" x 24" PATTERN: STACK BOND GROUT: GR-7 MORTAR: MR-1 JOINTS: 1/8" TRIM (HORIZONTAL): SCHLUTER; SHEINE (SATIN NICKEL ANOD. ALUM.) TRIM (OUTSIDE CORNER): SCHLUTER; QUADEC w/ CORNER INSERTS (STAIN NICKEL ANOD. ALUM.) WT-7 WALL TILE (RESTROOM, HALLWAY, DINING) PRODUCT: CROSSVILLE; "START A FIRE" (SWSF/.10412UPS) SIZE: 4" x 12" PATTERN: STACK BOND GROUT: GR-7 MORTAR: MR-1 JOINTS: 1/8" TRIM: SCHLUTER; QUADEC (SATIN NICKEL ANOD. ALUM.) WT-8 WALL TILE PRODUCT: CROSSVILLE; COLORS BY NUMBERS "TEA FOR TWO" (WT02/.10808S) SIZE: 8" x 8" FINISH: SATIN PATTERN: STACK BOND GROUT: GR-7 MORTAR: MR-1 JOINTS: 1/8" TRIM: SCHLUTER; QUADEC (SATIN NICKEL ANOD. ALUM.) CP-5 CORNER PROTECTION PRODUCT: KOROGARD ACG07 CORNER GUARD; 3/4" x 3/4"; COLOR: BRONZE ANOD. ALUM. CP-8 CORNER PROTECTION (BACK OF HOUSE) PRODUCT: STAINLESS STEEL CORNER GUARD SIZE: 2" X 2" WITH 1/4" OR 3/8" SLIGHT BEND TOWARDS WALL AT EACH LEG MATERIAL: MIN 18GA; TYPE 304 #4 SATIN STAINLESS STEEL NOTE: INSTALL WITH "TIGHTBOND PROVANTAGE" HEAVY DUTY CONSTRUCTION ADHESIVE (OR APPROVED EQUAL) GROUT, MORTAR, WATERPROOFING MEMBRANE GR-5 GROUT PRODUCT: LATICRETE; #2000 SPECTRALOCK GROUT IG #4 COMMERCIAL LIQUID (S-2000-SL-03) & SPECTRALOCK PART C (1245-0409-2); PART A&B, 4 PART C COLOR: "RAVEN" #45 JOINTS: 1/8" *ALTERNATE* PRODUCT: MAPEI; KERAPOXY IEG CQ (49936 LARGE UNIT CONTAINS 4 PART A & 4 PART B LIQUIDS, SCRUB PAD AND INSTRUCTIONS SHEET) ALSO NEED (4) 9.29 BAGS OF 4XX10 POWDER PURCHASED SEPARATELY *ALTERNATE* COLOR: "CHARCOAL" #47 JOINTS: 1/8" GR-7 GROUT PRODUCT: LATICRETE; PERMACOLOR (25LBS) COLOR: "MOCHA" #35 JOINTS: 1/8" *ALTERNATE* PRODUCT: MAPEI; ULTRACOLOR PLUS FA (25 LBS.) *ALTERNATE* COLOR: "GRAY" #09 JOINTS: 1/8" (OPTIONAL) SEALER: ULTRACARE PENETRATING PLUS SB STONE, TILE AND GROUT SEALER MR-1 MORTAR PRODUCT: LATICRETEL TITANIUM THINSET MORTAR (#257) *ALTERNATE* PRODUCT: MAPEI; KERAFLEX SUPER (44 LBS.) WM-1 WATERPROOFING MEMBRANE PRODUCT: LATICRETE; HYDROBAN (9255-0005-2) *ALTERNATE* PRODUCT:MAPEI; MAPELASTIC AQUADEFENCE 5 GALLON (01968) CEILING CT-1 CEILING TILE (KITCHEN / FOOD PREP AREAS) PRODUCT: ARMSTRONG VINYLCLAD SQUARE LAY-IN; BP670: 24" x 48" x 1/2"; COLOR: WHITE GRID: PRELUDE 15/16"; WHITE CT-2 CEILING TILE (DINING ROOM PERIMETER) PRODUCT: ARMSTRONG; ULTIMA 1911: 24" x 24" x 3/4" OR ULTIMA 1914: 24" x 48" x 3/4"; COLOR: WHITE GRID: PRELUDE 15/16"; WHITE CT-3 CEILING TILE (DINING ROOM - CENTRAL ACCENT AREA) PRODUCT: ARMSTRONG; CIRRUS TEGULAR 584CM: 24" x 24" x 3/4"; COLOR: CAMEL GRID: PRELUDE 15/16", CAMEL CT-4 CEILING TILE (SERVING AREA; CONDIMENT AREA (ONLY IF REQUIRED BY HEALTH DEPT.)) PRODUCT: ARMSTRONG VINYLCLAD SQUARE LAY-IN; BP671: 24" x 24" x 1/2"; COLOR: WHITE GRID: PRELUDE 15/16", WHITE CT-5 CEILING TILE (KITCHEN FRYER AREA; WASHABLE NON-COMBUSTABLE) PRODUCT: ARMSTRONG; CERAMAGUARD 605: 24" X 48" X 5/8"; COLOR: WHITE GRID: PRELUDE 15/16", WHITE SURFACE FINISH: SCRUBBABLE FACTORY-APPLIED PAINT FINISH (WITHIN 18" OF GREASE HOODS ONLY, WHERE NON-COMBUSTABLE MATERIALS ARE REQUIRED) LAMINATE L-5 LAMINATE PRODUCT: PIONITE; COLOR: "MORCHELLA HUNT"; TEXTURE: LINE Z; WO740-LZ-G49 SOLID SURFACE SS-4 SOLID SURFACE PRODUCT: CORIAN; CONCRETE; "NEUTRAL CONCRETE" (C1) MISCELLANEOUS TP-1 TOILET PARTITIONS & DOORS FINISH: SATIN FINISH STAINLESS STEEL WS-1 DINING ROOM WINDOW SHADES (OPTIONAL) PRODUCT: ROLL-A-SHADE SIGNATURE SERIES 5% OPENNESS; COLOR: 1241 CHARCOAL/BRONZE SIZE: 4" FASCIA AND BRACKETS TO MATCH STOREFRONT NOTE: INCLUDE STAINLESS STEEL BEADED ADJUSTMENT CHAIN WITH SAFETY TENSION DEVICE SYMBOL DESCRIPTION PRODUCT INFO 3/30/2021 ST0REFR0NT & GLAZING SF-1 STOREFRONT PRODUCT: TUBELITE T14000 2" x 4 1/2" CLASS 1 "DARK BRONZE" ANODIZED ALUMINUM ALTERNATE: KAWNEER TRIFAB VG 451T/451; #40 "DARK BRONZE" ANODIZED ALUMINUM EQUALS BY OLDCASTLE STOREFRONT (IMPACT RATED)PRODUCT: TUBELITE T34000 2 1/2" X 5" CLASS 1 DARK BRONZE ANODIZED ALUMINUM ALTERNATE: KAWNEER IR 501UT; #40 "DARK BRONZE" ANODIZED ALUMINUM EQUALS BY OLDCASTLE SF-2 STOREFRONT PRODUCT: TUBELITE T14000 2" X 4 1/2" CLASS 1 CLEAR ANODIZED ALUMINUM ALTERNATE: KAWNEER TRIFAB VG 451T/451; #14 "CLEAR" ANODIZED ALUMINUM EQUALS BY TUBELITE & OLDCASTLE STOREFRONT (IMPACT RATED)PRODUCT: TUBELITE T34000 2 1/2" X 5" CLASS 1 CLEAR ANODIZED ALUMINUM ALTERNATE: KAWNEER IR 501UT; #14 "CLEAR" ANODIZED ALUMINUM EQUALS BY TUBELITE & OLDCASTLE SF-3 STOREFRONT (REFINISH)PRODUCT: REFINISH EXISTING STOREFRONT (REMODEL ONLY, OPTIONAL FOR REFRESH & REFRESH LITE) OPTION #1: PAINT: 'PEX-1' (SEE PAINT SCHEDULE) OPTION #2: BREAK METAL CAP; AMERICAN PRODUCT, INC. SF-5 STOREFRONT (CENTER GLAZED) PRODUCT: TUBELITE VERSTHERM 2" X 2 1/4" CLASS 1 CLEAR ANODIZED ALUMINUM ALTERNATE: KAWNEER TRIFAB VG 450 (2" SIGHTLINE, 2-1/4" FRAME DEPTH); CLEAR ANODIZED ALUMINUM EQUALS BY TUBELITE & OLDCASTLE CW-1 CURTAIN WALL PRODUCT: TUBELITE 400T SERIES 2" X 7 1/4" CLASS 1 DARK BRONZE ANODIZED ALUMINUM ALTERNATE: KAWNEER 1600 L-R; 7.25" DEEP; #40 "DARK BRONZE" EQUALS BY TUBELITE & OLDCASTLE CURTAIN WALL (IMPACT RATED) PRODUCT: TUBELITE FORCEFRONT STORM 2 1/2" X 7 13/16" CLASS 1 DARK BRONZE ANODIZED ALTERNATE: KAWNEER 1600 WALL SYSTEM 1; 7.5" DEEP; #40 "DARK BRONZE" EQUALS BY TUBELITE & OLDCASTLE G-1 1" INSULATED GLASS IECC CLIMATE ZONES 4-8 (NORTH) OPTION #1: GUARDIAN GLASS (HEAT STRENGTHENED AS REQUIRED, TEMPERED WHERE INDICATED) OUTBOARD LITE: GUARDIAN "SN 68" (#2) ON 1/4" CLEAR INBOARD LITE: GUARDIAN 1/4" CLEAR SPACE: 1/2" AIR OPTION #2: VITRO (PPG) ARCHITECTURAL GLASS (HEAT STRENGTHENED AS REQUIRED, TEMPERED WHERE INDICATED) OUTBOARD LITE: VITRO ARCHITECTURAL GLASS "SOLARBAN 60" (#2) ON 1/4" CLEAR GLASS INBOARD LITE: VITRO ARCHITECTURAL GLASS 1/4" CLEAR SPACE: 1/2" AIR" 1" INSULATED GLASS IECC CLIMATE ZONES 1-3 (SOUTH) OPTION #1: GUARDIAN GLASS (HEAT STRENGTHENED AS REQUIRED, TEMPERED WHERE INDICATED) OUTBOARD LITE: GUARDIAN "SNX 51/23" (#2) ON 1/4" CLEAR GLASS INBOARD LITE: GUARDIAN 1/4" CLEAR SPACE: 1/2" AIR OPTION #2: VITRO (PPG) ARCHITECTURAL GLASS (HEAT STRENGTHENED AS REQUIRED, TEMPERED WHERE INDICATED) OUTBOARD LITE: VITRO ARCHITECTURAL GLASS "SOLARBAN 67" (#2) ON 1/4" VITRO ARCHITECTURAL GLASS "SOLEXIA" INBOARD LITE: VITRO ARCHITECTURAL GLASS 1/4" CLEAR SPACE: 1/2" AIR OPTION #3: GUARDIAN GLASS (HEAT STRENGTHENED AS REQUIRED, TEMPERED WHERE INDICATED) OUTBOARD LITE: GUARDIAN "SNX 62/27" (#2) ON 1/4" GREEN GLASS INBOARD LITE: GUARDIAN 1/4" CLEAR SPACE: 1/2" AIR IMPACT-RATED ALTERNATE PRODUCT: LAMINATED GLASS OUTBOARD LITE: SEE ABOVE INBOARD LITE #3: INSIDE LITE: LAMINATED: 3/16"" CLEAR LAMINATION: DUPONT BUTACITE 0.090"/0.100" 3/16" CLEAR (ARCHITECT TO VERIFY REQUIRED THICKNESS) INBOARD LITE #4: INSIDE LITE: LAMINATED: 3/16"" CLEAR" SPACE: 1/2" AIR NOTE: COORDINATE TOTAL THICKNESS WITH STOREFRONT / CURTAIN WALL SYSTEM G-2 1" INSULATED SPANDREL GLASS IECC CLIMATE ZONES 4-8 (NORTH) OPTION #1: GUARDIAN GLASS (HEAT STRENGTHENED AS REQUIRED) OUTBOARD LITE: GUARDIAN "SN 68" (#2) ON 1/4" CLEAR GLASS INBOARD LITE: GUARDIAN 1/4" CLEAR, OLDCASTLE BLACK FRIT (#4) SPACE: 1/2" AIR OPTION #2: VITRO (PPG) ARCHITECTURAL GLASS (HEAT STRENGTHENED AS REQUIRED) OUTBOARD LITE: VITRO ARCHITECTURAL GLASS "SOLARBAN 60" (#2) ON 1/4" CLEAR GLASS INBOARD LITE: PPG 1/4" CLEAR, OLDCASTLE BLACK FRIT (#4) SPACE: 1/2" AIR 1" INSULATED SPANDREL GLASS IECC CLIMATE ZONES 1-3 (SOUTH) OPTION #1: GUARDIAN GLASS (HEAT STRENGTHENED AS REQUIRED) OUTBOARD LITE: GUARDIAN "SNX 51/23" (#2) ON 1/4" CLEAR GLASS INBOARD LITE: GUARDIAN 1/4" CLEAR, OLDCASTLE BLACK FRIT (#4) SPACE: SPACE: 1/2" AIR OPTION #2: VITRO (PPG) ARCHITECTURAL GLASS (HEAT STRENGTHENED AS REQUIRED) OUTBOARD LITE: VITRO ARCHITECTURAL GLASS "SOLARBAN 67" (#2) ON 1/4" VITRO ARCHITECTURAL GLASS "SOLEXIA" GLASS INBOARD LITE: PPG 1/4" CLEAR, OLDCASTLE BLACK FRIT (#4) SPACE: 1/2" AIR OPTION #3: GUARDIAN GLASS (HEAT STRENGTHENED AS REQUIRED) OUTBOARD LITE: GUARDIAN "SNX 62/27" (#2) ON 1/4" GREEN GLASS INBOARD LITE: GUARDIAN 1/4" CLEAR, OLDCASTLE BLACK FRIT (#4) SPACE: 1/2" AIR IMPACT-RATED ALTERNATE(SPANDREL) PRODUCT: LAMINATED GLASS OUTBOARD LITE: SEE ABOVE INBOARD LITE: LAMINATED: 3/16" CLEAR; 0.090"/0.100" DUPONT BUTACITE PVB; 3/16" CLEAR NOTE: ARCHITECT TO COORD. IMPACT RATING OF SYSTEM & REQUIRED PVB THICKNESS WITH STOREFRONT/CURTAIN WALL PROVIDER G-3 1/4" CLEAR GLASS PRODUCT: 1/4" CLEAR FLOAT GLASS; EQUALS THRU GUARDIAN & VITRO (PPG) ARCHITECTURAL GLASS (HEAT STRENGTHENED AS REQUIRED, TEMPERED WHERE INDICATED) G-4 1/4" SPANDREL GLASS IECC CLIMATE ZONES 4-8 (NORTH) OPTION #1: GUARDIAN GLASS (HEAT STRENGTHENED AS REQUIRED) GLAZING: 1/4" CLEAR, OLDCASTLE BLACK FRIT (#4) OPTION #2: VITRO (PPG) ARCHITECTURAL GLASS (HEAT STRENGTHENED AS REQUIRED) GLAZING: 1/4" CLEAR, OLDCASTLE BLACK FRIT (#4) 1/4" SAPNDREL GLASS IECC CLIMATE ZONES 1-3 (SOUTH) OPTION #1: GUARDIAN GLASS (HEAT STRENGTHENED AS REQUIRED) GLAZING: 1/4" CLEAR, OLDCASTLE BLACK FRIT (#4) OPTION #2: VITRO (PPG) ARCHITECTURAL GLASS (HEAT STRENGTHENED AS REQUIRED) GLAZING: 1/4" VITRO ARCHITECTURAL GLASS "SOLEXIA" GLASS, OLDCASTLE BLACK FRIT (#4) OPTION #3: GUARDIAN GLASS (HEAT STRENGTHENED AS REQUIRED) GLAZING: 1/4" CLEAR, OLDCASTLE BLACK FRIT (#4) G-5 1" INSULATED GLASS (FROSTED) IECC CLIMATE ZONES 4-8 (NORTH) OPTION #1: GUARDIAN GLASS (HEAT STRENGTHENED AS REQUIRED, TEMPERED WHERE INDICATED) OUTBOARD LITE: GUARDIAN "SN 68" (#2) ON 1/4" CLEAR GLASS INBOARD LITE: GUARDIAN "SATIN DECO" (ACID ETCHED) (#3) ON 1/4" "EXTRACLEAR" SPACE: 1/2" AIR OPTION #2: VITRO (PPG) ARCHITECTURAL GLASS (HEAT STRENGTHENED AS REQUIRED, TEMPERED WHERE INDICATED) OUTBOARD LITE: VITRO ARCHITECTURAL GLASS "SOLARBAN 60" (#2) ON 1/4" CLEAR GLASS INBOARD LITE: WALKER TEXTURES "VELOUR" (ACID ETCHED) (#3) ON 1/4" CLEAR GLASS SPACE: 1/2" AIR 1" INSULATED GLASS (FROSTED) IECC CLIMATE ZONES 1-3 (SOUTH) OPTION #1: GUARDIAN GLASS (HEAT STRENGTHENED AS REQUIRED, TEMPERED WHERE INDICATED) OUTBOARD LITE: GUARDIAN "SNX 51/23" (#2) ON 1/4" CLEAR GLASS INBOARD LITE: GUARDIAN "SATIN DECO" (ACID ETCHED) (#3) ON 1/4" "EXTRACLEAR" SPACE: 1/2" AIR OPTION #2: VITRO (PPG) ARCHITECTURAL GLASS (HEAT STRENGTHENED AS REQUIRED, TEMPERED WHERE INDICATED) OUTBOARD LITE: VITRO ARCHITECTURAL GLASS "SOLARBAN 67" (#2) ON 1/4" VITRO ARCHITECTURAL GLASS "SOLEXIA" INBOARD LITE: WALKER TEXTURES "VELOUR" (ACID ETCHED) (#3) ON 1/4" CLEAR GLASS SPACE: 1/2" AIR OPTION #3: GUARDIAN GLASS (HEAT STRENGTHENED AS REQUIRED, TEMPERED WHERE INDICATED) OUTBOARD LITE: GUARDIAN "SNX 62/27" (#2) ON 1/4" GREEN GLASS INBOARD LITE: GUARDIAN "SATIN DECO" (ACID ETCHED) (#3) ON 1/4" "EXTRACLEAR" SPACE: 1/2" AIR PUW PICK-UP WINDOW FINISH: MATCH STOREFRONT METALS M-1 PARAPET CAP PRODUCT: EXCEPTIONAL METALS SPECIFICATION: 24 GA GALVALUME STEEL COLOR: PREFINISHED, "DARK BRONZE" REFINISH: 'PEX-1' (SEE PAINT SCHEDULE) BREAK METAL (FASCIA, TRIM, CANOPY ETC.) PRODUCT: EXCEPTIONAL METALS SPECIFICATIONS: 24 GA GALVALUME STEEL COLOR: MATCH SF-1/CW-1 (PREFINISHED) REFINISH: 'PEX-1' (SEE PAINT SCHEDULE) M-3 DRIP EDGE PRODUCT: EXCEPTIONAL METALS SPECIFICATIONS: 24 GA GALVALUME STEEL COLOR: PRE-FINISHED, "BRIGHT RED" M-4 PARAPET CAP PRODUCT: EXCEPTIONAL METALS SPECIFICATIONS: 24 GA GALVALUME STEEL COLOR: MILL FINISH, "SILVER METALLIC" M-5 ALTERNATE FOR ACM-4 PRODUCT: BRAKE METAL COLOR: CLEAR ANODIZED M-7 COPING PRODUCT: EXCEPTIONAL METALS COLOR: CUSTOM DARK GREY EXTERIOR CLADDING NP-1 NICHIHA - FIBER CEMENT PANEL PRODUCT: NICHIHA; VINTAGE WOOD SERIES COLOR: CEDAR SIZE: 18" x 10' x 5/8" SEALANT: ADFAST ADSEAL 4580 SERIES NP-2 NICHIHA - FIBER CEMENT PANEL PRODUCT: NICHIHA; ILLUMINATION SERIES COLOR: BLAZE (RED) SIZE: 18" x 6' x 5/8" SEALANT: ADFAST ADSEAL 4580 SERIES NP-3 NICHIHA - FIBER CEMENT PANEL PRODUCT: NICHIHA; ILLUMINATION SERIES COLOR: KNIGHTS ARMOR (GRAY) SIZE: 18" x 6' x 5/8" SEALANT: ADFAST ADSEAL 4580 SERIES KW-1 PREFINISHED ALUMINUM CLADDING MATERIAL PRODUCT: KNOTWOOD COLOR: LIGHT OAK SIMULATED WOOD NOTE: REFER TO FINISH DETAILS SHEET FOR PENETRATION DETAILS. KW-2 PREFINISHED ALUMINUM CLADDING MATERIAL PRODUCT: KNOTWOOD COLOR: ARMOUR GREY (17PD218/2) NOTE: REFER TO FINISH DETAILS SHEET FOR PENETRATION DETAILS. KW-3 PREFINISHED ALUMINUM CLADDING MATERIAL PRODUCT: KNOTWOOD COLOR: BRITE RED MATT (17PD217/2) NOTE: REFER TO FINISH DETAILS SHEET FOR PENETRATION DETAILS. KW-4 PREFINISHED ALUMINUM CLADDING MATERIAL PRODUCT: KNOTWOOD COLOR: WHITE NOTE: REFER TO FINISH DETAILS SHEET FOR PENETRATION DETAILS. ACM SYSTEMS ACM-1 ALUM. COMPOSITE MATERIAL PRODUCT: ALCOA, REYNOBOND PE, 4MM, ROUTE & RETURN COLOR: PRE-FINISHED; COLORWELD 300; "BRITE RED"; (RB4CW3BR) ALTERNATE: ALUCOBOND PE; 1" ROUTE & RETURN COLOR: PVDF-3; "RED FIRE COOL"; GLOSS LEVEL: 30 ACM-4 ALUM. COMPOSITE MATERIAL PRODUCT: ALCOA, REYNOBOND PE, 4MM, ROUTE & RETURN COLOR: PRE-FINISHED; COLORWELD 500; COLOR: "ANODIC CLEAR " ALTERNATE: ALUCOBOND PE; 1" ROUTE & RETURN COLOR: MATCH ALCOA SPEC (ABOVE) ACM-5 ALUM. COMPOSITE MATERIAL REYNOBOND PE, 4MM, ROUTE & RETURN COLOR: PRE-FINISHED, COLORWELD 300; COLOR STORMY GRAY ALTERNATE: ALUCOBOND PE ; 1" ROUTE & RETURN COLOR: MATCH ALCOA SPEC ABOVE EIFS SYSTEMS E-1 THRU E- 9 EIFS (EXTERIOR INSULATION FINISH SYSTEM) PRODUCT: STO; StoTHERM ESSENCE NExT SYSTEM TEXTURE: FINE SAND (U.N.O.); SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION COATING: TOP COAT WITH 2 COATS OF STO COATACRYL PLUS IN SPECIFIED COLOR; TWO ADDITIONAL COATS OF STO COAT ACRYL PLUS CLEAR MATT; IMPACT PROVISO "ARMOR MAT" REINFORCING MESH UP TO 6'-9" ABOVE GRADE COLORS: E-1: (OBSOLETE) E-2: WENDY'S RED (STO #NA13-0040); SEE 'ACM-1' FOR APPROVED ALTERNATE E-3: (OBSOLETE) E-4: (OBSOLETE) E-5: (OBSOLETE) E-6: (OBSOLETE) E-7: DARK GREY (STO #NA18-0004) E-8: TAN (STO #NA17-0047) E-9: (OBSOLETE) ALTERNATE (AS APPROVED BY OWNER): DRYVIT, "OUTSULATION PLUS MD SYSTEM" TEXTURE: SANDPEBBLE FINE (U.N.O.) COATING: OUTSULATION PLUS MD SYSTEM; HIGH- IMPACT "PANZER MESH" REINFORCING COLORS: MATCH STO COLORS (ABOVE) MASONRY BR-0 FACE BRICK EXISTING BRICK TO REMAIN BR-1 FACE BRICK OPTION #1: BOWERSTON SHALE COMPANY SERIES: "OLD ENGLISH" (MODULAR) OPTION #2: GLEN-GARY SERIES: "OLDE DETRIOT" (MODULAR) OPTION #3: BELDEN SERIES: "BELCREST" 560A (MODULAR) MORTAR PRODUCT: CEMEX RICHCOLOR 56-H "LIMESTONE" (OR APPROVED EQUAL) EIFS ALTERNATE PRODUCT: STO; StoTHERM ESSENCE NExT SYSTEM FIELD COLOR: STO - NA 14-0011 DRYVIT - WEND-09-1085 ACCENT COLOR: STO - NA 140012 DRYVIT - WEND-08-1085 ALTERNATE (AS APPROVED BY OWNER): DRYVIT, "OUTSULATION PLUS MD SYSTEM" EXTERIOR MISC. BL-1 BOLLARD SLEEVE PRODUCT: PAWLING, PROTEK COLOR: SAFETY YELLOW SIZE: 6" DIA, 48" HEIGHT NOTE: CONTACT HJC CF-1 CONCRETE FINISH (PATIO) PRODUCT: SCOFIELD; LITHOCHROME COLOR HARDENER; STAMPED CONCRETE COLOR: SCOFIELD; LITHOCHROME; A-33 "CLASSIC GREY" FINISH: ARCHITECTURAL CONCRETE DESIGN; 24" x 24" SLATE, LIGHT TEXTURE (OR APPROVED EQUAL) SEALER: SCOFIELD; CEMENTONE; CLEAR SEALER CF-2 CONCRETE FINISH (PATIO) PRODUCT: SCOFIELD; LITHOCHROME COLOR HARDENER COLOR: A-55 "PECAN TAN" FINISH: BROOM; APPLY TWO COATS SCOFIELD CURESEAL-W CF-3 CONCRETE FINISH (PUW, TRASH ENCLOSURE, ORDER STATION CANOPY) PRODUCT: SCOFIELD COLOR (OPTIONAL): SCOFIELD; LITHOCHROME; A-33 "CLASSIC GREY" SEALER: SCOFIELD; CEMENTONE; CLEAR SEALER SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 FINISH SCHEDULE A6.2 IT EC CITY/OWNER COMMTS01/12/20233 3 3 3 3 3 3 1.12.23 ALUM FRAME:(SF-1)P.U.W.:ALUM FRAME:(SF-1)P.U.W.: SS-4035E ALUM FRAME:ALUM FRAME:(SF-1) 2" 2" 5' - 6 " R . O . 2"2" 1'-10" R.O. 3' - 2 " 8'-8 7/8" R.O. 3' - 5 1 / 4 " R . O . 5' - 6 " R . O . 3' - 2 " 2" 2" 2"4'-0 3/8" R.O. 2"2" 4'-0 3/8" R.O. 2"2" 8' - 8 " 5' - 6 " R . O . 2" 3' - 5 1 / 4 " R . O . 2" 2" 1' - 6 " 2" 2" 6" 8' - 1 0 " R . O . 1' - 2 " 1' - 6 " R . O . 2" 2" 10'-11 1/2" R.O. 2"EQ.2"6'-0"2"EQ.2" 3B 3A 5 689 TT G-1G-1 G-1 G-1 G-1 G-1 G-1 G-1 G-1 G-1 G-1 G-1 G-3G-3 G-3G-3 7' - 0 " T = TEMPERED GLASS WINDOW ELEVATION GENERAL NOTE: A. ALL EXTERIOR WINDOW FRAMES TO BE THERMALLY BROKEN STOREFRONT WITH 1" INSULATED GLAZING. B. WINDOW CONTRACTOR SHALL FIELD VERIFY ROUGH OPENING DIMENSIONS FOR ALL SCHEDULED WINDOWS PRIOR TO PREPARATIONS OF SHOP DRAWINGS. C. REFER TO FINISH SCHEDULE ON SHEET A6.2 FOR GLAZING AND FRAME TYPE DESIGNATION DESCRIPTIONS. D. REFER TO EXTERIOR ELEVATIONS FOR LOCATION OF PANES TO RECEIVE FROSTED GLAZING (G-5) E. P.U.W.: USE SS4035E-IP WHERE IMPACT RATED IS REQUIRED. F. PROVIDE LEFT HANDED OPERATION AS INDICATED BY "L". G. PROVIDE RIGHT HANDED OPERATION AS INDICATED BY "R". H.PICK-UP WINDOW 6'-0" OPTION. QUIKSERV BI-PARTING BP7525E OR BP-7241E-IP (IMPACT RESISTANT) OPEN WINDOW ELEVATIONS 7 ALUM FRAME: (SF-1) L R ALT.ALT.SS-4035EALUM FRAME:(SF-1)10 8A 9' - 0 " 4" OPEN ALUM FRAME:(SF-1) 5'-3 7/8" R.O. 3' - 1 0 1 / 2 " 1" 2" 4' - 6 1 / 2 " 11'-3" EQ EQ EQ BUTT JOINT TTTG-3 G-3 G-3 4 1/2"4 1/2" 4" 9' - 0 " (SF-1) 7' - 0 " 2" 2"2"3'-0"2" 9' - 0 " R . O . 6" 2" 5'-3 7/8" R.O. 4" 2" T OPEN G-3 G-3 G-3 SOLID SURFACE CAP 6" 11 ' - 0 " R . O . 7'-4" R.O. 2"3'-10"2" 1 TG-1 G-1 G-1 G-1 2' - 6 1 / 2 " 2" 2" ALUM FRAME: (SF-1) EQ . 2" EQ . 2" EQ . 2" EQ . 2" 2" 1' - 5 1 / 2 " 2" 7' - 0 " 11 ' - 6 " OPEN G-1 G-1 6" 11 ' - 0 " R . O . EQ . EQ . EQ . 8'-2" R.O. 2"EQ.2"EQ.2" 1A T TG-1 G-1 G-1 G-1 G-1 G-1 G-1 G-1 EQ . 2" 2" 2" 2" 2" ALUM FRAME: (SF-1) 6" 11 ' - 0 " R . O . EQ . EQ . EQ . 8'-8 1/4" R.O. 2"EQ.2"EQ.2" 2 T TG-1 G-1 G-1 G-1 G-1 G-1 G-1 G-1 EQ . 2" 2" 2" 2" 2" ALUM FRAME: (SF-1) 6" 11 ' - 0 " R . O . EQ . EQ . EQ . 7'-8" R.O. 2"EQ.2"EQ.2" 4 T TG-1 G-1 G-1 G-1 G-1 G-1 G-1 G-1 EQ . 2" 2" 2" 2" 2" ALUM FRAME: (SF-1) 4'-4 1/2"2" T 2"3'-0" 9.74 SQ.FT. 9.74 SQ.FT. 9.74 SQ.FT. 9.74 SQ.FT. 7.62 SQ.FT. 4.37 SQ.FT. 9.74 SQ.FT. 9.74 SQ.FT. 9.74 SQ.FT. 9.74 SQ.FT. 9.74 SQ.FT. 9.74 SQ.FT. 9.74 SQ.FT. 9.74 SQ.FT. 10.40 SQ.FT. 10.40 SQ.FT. 10.40 SQ.FT. 10.40 SQ.FT. 10.40 SQ.FT. 10.40 SQ.FT. 10.40 SQ.FT. 10.40 SQ.FT. 13.59 SQ.FT. 13.59 SQ.FT. 3.21 SQ.FT. 3.21 SQ.FT. 9.0 SQ.FT. 2.50 SQ.FT. 2.50 SQ.FT.7.0 SQ.FT.9.10 SQ.FT. 9.10 SQ.FT. 9.10 SQ.FT. 9.10 SQ.FT. 9.10 SQ.FT. 9.10 SQ.FT. 9.10 SQ.FT. 9.10 SQ.FT. 7.75 SQ.FT. 22.60 SQ.FT. 6.68 SQ.FT. 10.48 SQ.FT. 2.48 SQ.FT. 4.50 SQ.FT.6.39 SQ.FT. 16.74 SQ.FT. 16.74 SQ.FT. 16.74 SQ.FT. 6" 11 ' - 0 " R . O . EQ . EQ . EQ . 5'-6" R.O. 2"EQ.2"EQ.2" 4A T TG-1 G-1 G-1 G-1 G-1 G-1 G-1 G-1 EQ . 2" 2" 2" 2" 2" ALUM FRAME: (SF-1) 9.10 SQ.FT. 9.10 SQ.FT. 9.10 SQ.FT. 9.10 SQ.FT. 9.10 SQ.FT. 9.10 SQ.FT. 9.10 SQ.FT. 9.10 SQ.FT. SEE SCHED. SE E S C H E D . 2" 2"2" SEE SCHED. SE E S C H E D . 4" 2"2" 3' - 4 " 3' - 4 " 3 1/2"2'-5"3 1/2" 10 " 5' - 1 0 1 / 2 " 3 1 / 2 " 2' - 1 0 " 7" 7" 1'-10" 7" 5' - 0 " EQ EQ 10 " 5' - 8 1 / 2 " 5 1 / 2 " NOT U S E D 7' - 0 " 6'-0" 5' - 6 " LA D D E R P U L L S 0100TYPE D EXTERIOR HM TYPE C INTERIOR PLASTIC LAMINATE TYPE E INTERIOR PLASTIC LAMINATE TYPE B INTERIOR PLASTIC LAMINATE TT TYPE F EXTERIOR ALUM/GLASS T TYPE A EXTERIOR ALUM/GLASS T C/L T ® T.O. PUSH BAR EXIT DEVICE EXIT DEVICE LOCKSET T.O. GRIPPING SURFACE LOCKSET DOOR MARK ROOM DOOR FRAME REMARKS SIZE HDW GROUP GLAZ TYPE TYPE MATLTYPEMATLWIDTHHGTTHK 2 6' - 0" 3 3' - 0" 5 FAMILY 3' - 0" 6 3' - 0" 7 2' - 10" DOOR GENERAL NOTES: A. USE 3-1/2" SCREWS ON ALL DOOR HINGES B. COORDINATE LOCK SET CORE REQUIREMENTS WITH OWNER. C. DOOR SUPPLIER IS HAMILTON PARKER, REFER TO SUPPLIERS LIST FOR ORDERING INFORMATION D. ALL EXIT DEVICES SHALL HAVE ELECTRONIC LOCKING SYSTEM PER IBC 2018 1010.1.9.10 DOOR SCHEDULE REMARKS: 1. MARLITE AAA SERIES 50 DOOR AND FRAME; WENDY'S WOOD LAMINATE. 2."FAMILY" TOILET ROOM SIGN. 3."EMPLOYEES ONLY" SIGN 4."EMERGENCY EXIT ONLY ALARM WILL SOUND" SIGN. 5. PROVIDE KICKPLATE BOTH SIDES. 6. "EXIT ONLY" APPLIED TO INTERIOR FACE AND LEGIBLE TO EXTERIOR. 7. DOOR SPECIFICATION: -OLD CASTLE - WS-500 WIDE STILE DOORS; FINISH: NATURA (MAIN ENTRANCE ONLY) -TUBELITE (ALTERNATE) - 6070 WIDE STILE ENTRANCE; TOP RAIL 5", VERTICAL STILE 5"; BOTTOM RAIL 10"x1 3/4" THICK; HARDWARE GROUP 10 PROVIDED IN TUBELITE CAPPUCCINO WOOD GRAIN FINISH. 7' - 0" 7' - 0" 6' - 8" 6' - 8" 6' - 8" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 1 3/4" 11 02 07 07 05 G-1 G-3 - - - F A B B B ALUM ALUM PL PL PL 3A 00 00 00 ALUM ALUM ALUM ALUM 7 1 1 1 DOOR TYPES DOOR SCHEDULE FRAME TYPES HDWR MOUNTING HTS.DOOR HARDWARE SCHEDULE 4 3' - 6"6' - 8" 1 3/4" 03 G-1 D HM 00 HM STAINLESS STEEL TRIM ENTRY ENTRY UTILITY RECEIVING 8ALUM KICK PLATE QTY.DESCRIPTION MODEL FINISH MFG. SET 01 - EXTERIOR STOREFRONT ENTRANCE 3 EA.HINGES BB1191 4 1/2" X 4 1/2" X NRP BUTT HINGE US10B HAGER 1 EA.EXIT DEVICE 1792NL-HBOP 26D/626 FALCON 1 EA.PULL BF153 OFFSET PULL 26D/626 ROCKWOOD 1 EA.PULL (HOT CLMT.)908.02.8 8 HAFELE 1 EA.CLOSER SC70-18 DBRZ FALCON 1 EA.FLOOR STOP 441 10B HAGER 1 EA.THRESHOLD 350 32D HAGER 1 EA.DOOR SWEEP 200N 32D HAGER SET 02 - INTERIOR STOREFRONT ENTRANCE 1 1/2 PR. HINGES BB1279 4 1/2" x 4 1/2" US10B HAGER 1 EA. EXIT DEVICE 1792NL-HBOP 26D/626 FALCON 1 EA. PULL BF153 OFFSET PULL 26D/626 ROCKWOOD 1 EA. CLOSER SC70-18 DBRZ FALCON 1 EA. FLOOR STOP 438 US10B ROCKWOOD SET 03 - STANDARD REAR SERVICE DOOR - (BY WIB SUPPLIER) 1 EA. ROTON HINGE SURFACE MOUNT 70-210HD-84 ALUM ROTON 1 EA. EXIT DEVICE RIM SURFACE MOUNT 4501-48-26D 26D/626 HAGER 1 EA. CLOSER 5100 HOLD OPEN STOP 5100-HDHOS-ALUM ALUM HAGER 1 EA. ARMOR PLATE 20"x40" S.S.190S-20X40-32D 32D HAGER 1 EA. WEATHER STRIPPING NEOPRENE 873S-N-4284-MILL ML HAGER 1 EA. DOOR BOTTOM SWEEP NEOPRENE 750SN-42-CLR CL HAGER 1 EA. NGP STEEL SECURITY ASTRAGAL 83" 1392SP-USP-83 PRIME COAT NGP 1 EA. DOOR LITE 9x5 (6"x2" VISION)L-VGLF-WD-GPZ PRIME COAT NGP 1 EA. HALF SADDLE THRESHOLD 5"x1/2"x42" 431S-42-MIL MIL HAGER 1 EA.OVERHEAD RAIN DRIP GUARD 810S-46-MIL AL HAGER QTY.DESCRIPTION MODEL FINISH MFG. NOTE: NO EXTERIOR KEY OR HANDLE ON THE DOOR, G.C. TO PROVIDE DOOR AND HARDWARE FOR LOCATIONS WITH SIDE PATIO CONFIGURATION SET 04 - OFFICE DOOR 1 1/2 PR. HINGES BB1279 4 12" X 4 12"USD226D/ 626 HAGAR 1 EA. OFFICE LOCKSET B511GD 626 FALCON 1 EA. KICKPLATE K1050 8" X 2" LESS DOOR WIDTH US32D/630 ROCKWOOD 1 EA. WALL STOP 406 US10B/613 ROCKWOOD SET 05 - CLOSET DOOR 1 1/2 PR HINGES EC00 1100 4-1/2"x4-1/2" 26D/626 HAGER 1 EA. STOREROOM LOCK 3580 WTN F80 SFIC 3580 26D WTN SFIC 26D/626 HAGER 1 EA. SFIC COMBINATED 7 PIN KD 3982 C KA 26D/626 HAGER 2 EA. 3984 CONTROL KEY 3984 BRASS HAGER 1 EA. CONCAVE WALL STOP 236W 32D HAGER SET 06 - RESTROOM DOOR (MULTIPLE USER) - NOT USED SET 07 - RESTROOM DOOR (SINGLE USER) 1 1/2 PR HINGES ECBB 1100 4-1/2"x4-1/2" 26D/626 HAGER 1 EA. HAGER 3550 OFFICE LOCK - GRADE 2 - LESS SFIC 3550 WTN IC 2D/626 HAGER 1 EA. SFIC CORE, COMBINATED, 7-PIN, US26D 3982 C KD 26D/626 HAGER 2 EA. 3984 CONTROL KEY 3984 BASS HAGER 1 EA. CLOSER 5200 ALUMINUM ADA 1-4 5200 ALM HAGER 1 EA.CONCAVE WALL STOP 236W 32D HAGER QTY.DESCRIPTION MODEL FINISH MFG. OPTION BELOW IS FOR USE OF PRIVACY LOCK IN LIEU OF KEYED RESTROOM LOCK 1 EA. HAGER PRIVACY 3540 WTN 26D/626 HAGER NOTE: THE ITEM BELOW IS IF A DEADLOCK IS REQUIRED AT CERTAIN LOCATIONS 1 EA. DEADLOCK THUMB-TURN BY OCCUPANCY INDICATOR 3216 32D HAGER SET 08 - KITCHEN DOOR - NOT USED SET 09 - EGRESS DOOR - NOT USED SET 10 - SERVING AREA BARN DOOR - NOT USED SET 11 - EXTERIOR STOREFRONT ENTRANCE - DOUBLE 3 PR. HINGES BB1191 4 1/2" X 4 1/2" NRP US10B HAGER 1 EA. EXIT DEVICE 1692 DC13 FALCON 1 EA. EXIT DEVICE 1690 DC13 FALCON 2 EA.66" LADDER PULL 66LPBS US26/626 CRL 2 EA. CLOSER SC-17-18 DC13 FALCON 2 EA. OH STOP 100S SP313 GLY 1 EA. THRESHOLD 350 DKB NGP 2 EA. DOOR SWEEP 200NA DKB NGP 1 EA. PERIMETER SEAL 160S DKB NGP 1 EA. ASTRAGAL 672 DKB NGP 1 3' - 0" 7' - 0" 1 3/4" 01 G-1 A ALUM ALUMDINING ROOM 1A FAMILY 8 3' - 0"6' - 8" 1 3/4" 04 -CPL00ALUM1OFFICE DOOR SCHEDULE AND WINDOW ELEVATIONS A6.3 IT EC CITY/OWNER COMMTS01/12/233 CITY COMMENTS11/26/212 CITY COMMENTS10/20/211 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 3 3 1.12.23 2' - 1 0 " 3' - 2 " 6' - 6 " 3' - 6 " 6' - 0 " 4' - 0 " 3' - 7 " TYP. 3' - 1 0 " 3' - 1 0 " A F F . EQ.EQ. 1DINING 1/4" = 1'-0"2DINING 1/4" = 1'-0"3DINING 1/4" = 1'-0" 9DINING 1/4" = 1'-0" 7ENTRY 1/4" = 1'-0"6HALLWAY 1/4" = 1'-0" 8ENTRY 1/4" = 1'-0"10DINING 1/4" = 1'-0" 4FRONT COUNTER & DRINK STAND 1/4" = 1'-0"5WASH STATION 1/4" = 1'-0" EQ.EQ. 11 A7.1 11 A7.1 P-9 SF-1 WT-7 PORCELAIN COMMUNITY SINK WT-3 P-6 P-6 B-5WT-3 2X6 WALL W / WT-3 BOTH SIDES M M L N S MARK QTY DESCRIPTION MODEL FINISH NOTES 1 WASTE RECEPTACLE (4" PROJECTION, 4" RECESSED) - SEMI-RECESSED, 12 GALLONS ASI 0458 1 AUTOMATIC ROLL PAPER TOWEL DISPENSER, BATTERY OPERATED - RECESSED ASI 646924A NOTE: GC RESPONSIBLE FOR INITIAL TAGGING AND INSPECTION OF FIRE EXTINGUISHERS. REFER TO SUPPLIER SHEET FOR BUILDING MATERIAL CONSOLIDATOR INFORMATION. ACCESSORY SCHEDULE 1 36"x36" ML3010 LIGHTED 1 FIRE EXTINGUISHER CABINET; SEMI-RECESSED POTTER ROEMER: 7032 GC PROVIDED AND INSTALLED 2 FIRE EXTINGUISHER 5LB - 3A-40:BC DRY CHEMICAL EXTINGUISHER GC PROVIDED 1 TOUCHFREE SOAP DISPENSER (C0204)SUPPLIED BY KED. GC INSTALLED 41" MOUNTING HEIGHT 1 73"x 21.5" M0208 (1/4" CLEAN CUT W/ CAT.2 MOUNTING TAPE) L M N P Q R S 1 FIRE EXTINGUISHER 6 LITER TYPE-K WET CHEMICAL GC PROVIDEDT TYP. ALL ITEMS ABOVE STORE FRONT HEAD (INCLUDING DUCTWORK) 3' - 1 0 " 60 " 7' - 8 " 3' - 3 " P-9 B-5 P-6 P-6 B-5 P-6 WT-3 P Q R 1' - 6 " P-6 WT-3 R3302 SF-1 EXIT SIGN ARTPACK & WAYFINDING LEGEND REFER TO RESPONSIBILITY SCHEDULE FOR ARTPACK INFORMATION WENDY'S LOCAL LOVE (3 PIECES AND A STAR) WINK WALL FRAMED GRAPHIC CAUSE WALL ART PACK FAMILY ROOM SIGN ACCESSIBLE (BRAILLE) MARK DESCRIPTION WF-20 AP-23 AP-24 AP-26 WF-22 INTERIOR READER BOARDAP-25 ORDER THIS WAY VINYLWF-29 MOBILE PICK UP VINYLWF-30 "QUALITY IS OUR RECIPE"AP-27 EQ EQ NP-S 60 " R N U 6' - 4 " A F F . 1 FLY LIGHTU GILBER 20000GT (WHITE) OPP. WT-3 LIGHTED MIRROR - SIDELIGHT FROSTED EDGE SENTRY 5 . MODEL AA05S-1 (#442257) FULL-LENGTH MIRROR ANSUL K GUARD MODEL K01-3 (#434909) W/ BRACKET AP-25 OPEN TO BEYOND 5 A3.5 SIM. 5 A3.5 OPP. M-1 M-1 B-5 SF-1 OUTLET, REFER TO ELECTRICAL RE F E R T O R C P M-1 SF-1 OPEN TO BEYOND 5 A3.5 P-6 M-1 R0105 WF-20 QUADEC SCHLUTER TRIM FROM EDGE OF SOLID SURFACE CAP AROUND COLUMN 10" SE E R C P 5' - 0 " 3' - 1 0 " 4' - 6 " P-6 P-9 WT-3 B-5B-5 WT-3 4' - 7 1 / 2 " EQ.EQ.EQ. OPEN TO BEYOND OPEN TO BEYOND 5 A3.5 5 A3.5 SIM. OPP. SF-1 SF-1 P-9 1'-10" EQ.EQ. 5" TYP.TYP. ALL ITEMS ABOVE STORE FRONT HEAD (INCLUDING DUCTWORK)P-9 P-9 SF-1 P-6 WT-3 WF-20 M-1 AP-23 AP-28 OUTLET, REFER TO ELECTRICAL P-9 D3002 R3302 P-11M-1 3' - 1 0 " EQ EQ 60 " M A X . 48 " M I N . 5' - 4 " 10" QP0222 G1402 A0202 OPEN TO BEYOND 3' - 1 0 " 4" 4" EQEQ A0202 P-6 WT-3 x4 AP-30 "FRESH SINCE DAY ONE"AP-30 D1701 P-6 WT-3 SF-1 P-6 BEYOND B-5B-5 4' - 1 0 " 3' - 1 0 " OP E N (2 4 " D E E P ) A0202 GYP BD. SOFFIT INSTALLED TIGHT TO STRUCTURE, PAINT .P-6 TYP. ALL ITEMS ABOVE STORE FRONT HEAD (INCLUDING DUCTWORK)P-9 P-6 60 " L-5 CP-5CP-5 P-6 ALIGN FACE OF SOFFIT WITH STOREFRONT OPENING 11 ' - 2 " B. O . S O F F I T QP0222G1402 AP-24 QP0222G1402 GYP.BD SOFFIT, SEE DETAIL 4/A1.2, PAINT WT-3 B-5 NOTE: CHASE HEIGHT TO BE 11'-2" MIN., TYP. AIM DIRECTIONAL LIGHTS TO LIGHT TOP 2/3 AND 1/3 FROM EDGES OF ART PACK WF-22 WF-22 60 " TY P . 9"9" RP0307B-5 5' - 4 " AIM DIRECTIONAL LIGHTS TO CENTER OF TOP ART PACK IMAGES 3' - 1 0 " STATIC MENU BOARD AND SOFFIT BEYOND U0512 7' - 1 " AIM DIRECTIONAL LIGHT TO LIGHT TOP 2/3 OF ART D1703 WF-29.R WF-30L CP-5 L-5 PANELS BY HAMILTON PARKER B-5 AIM DIRECTIONAL FIXTURES TO THE CENTER POINT BETWEEN ART PACK ELEMENTS EQEQ B-5D3002 DECORATIVE TRIM AT MIRROR RABBET CUT TOP AND BOTTOM TRIM PIECES TO ALLOW OVERLAP OF MIRROR MAINTAIN ALIGNMENT WITH ADJACENT TRIM MIRROR 11DETAIL NTS INTERIOR ELEVATIONS DINING ROOM A7.1 IT EC CITY/OWNER COMMNTS01/12/233 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 1.12.23 1SERVICE AREA ELEVATION 1/4" = 1'-0"2KITCHEN 1/4" = 1'-0"3BACK COUNTER 1/4" = 1'-0" 4GRILL LINE 1/4" = 1'-0"5PREP AREA 1/4" = 1'-0" 7UTILITY 1/4" = 1'-0" 6PREP AREA 1/4" = 1'-0" 8UTILITY 1/4" = 1'-0"9UTILITY 1/4" = 1'-0"10OFFICE 1/4" = 1'-0" 11OFFICE / EMPLOYEE / KITCHEN 1/4" = 1'-0" FIELD BUILT MANAGER'S DESK. REFER TO DETAIL 11/5.2 FOR DETAILS 6' - 8 " 6" 5' - 6 " TYP. OPEN TO BEYOND OPEN TO BEYOND OPEN TO BEYOND OPEN TO BEYOND BUG LIGHT OPEN TO BEYOND 2' - 1 0 " MA X . 5' - 0 " 9' - 0 " FIRE RATED FIRE RATED 4' - 0 " 2'-3 5/8" D0101D0101 E1527 V0608 V0105 V0105 Q0605 V1903 V1902 V0403 EP1528 S7417 T0602 T1212 T2213 S9204 N1901 N0601 N0601 C0304 C0206 G4111 D0101 G5501C0304 C0206 E1527 V1902 G3200 K0502 V1902 E1529 V1903 V0608 V0403 V1903 V0105 EP1528 G3221 A1301 E0603 A0513 A0105 Q0807 S9712 K1401 Q0406 N0701 N0601 N0102 A0803 T2212 A0801 QP0909 C0206 V0105 T1213 C0304 T2051G4421 T0902 T2021 T2061 T2011 S6201 C0206 N0202 N0101 E4302 Q0607 Q0807 A1301 A0513 D0201 EP4709 N0202 D0600 E0924 T2212 D0201 N2701 A0304 T2011 L0308 L0504 L0308 L0308 L0504 E2302 T0304 T0303 T2703 E4006 A0608 T2703 E2302 T2703 N0508 N0508 B-4 WT-3 FRP-2 P-10 FRP-1 B-4 FRP-1 B-4 FRP-1 B-4 B-4 FRP-1 P-10 B-4 B-4 B-4 FRP-2 P-10 FRP-1 B-4 FRP-1 FRP-1 B-4 FRP-1 B-4 B-4 P-6 FRP-1 B-4 FRP-1 EXTENT OF STAINLESS STEEL @ GRILLE EXTENT OF STAINLESS STEEL @ FRYER EP1416 L0207 K1402 N0901 G3200 MODULAR ELECTRICAL PANEL G3200 GC TO FABRICATE SOFFIT ABOVE ELECTRICAL PANEL. REFER TO DETAIL 3/A1.2 FRP-1 CLOSE GAP WITH EDGING AS REQUIRED. FINSH WITH FRP-1. FRP-2 A0105 GC TO FABRICATE SOFFIT ABOVE ELECTRICAL PANEL. REFER TO DETAIL 3/A1.2 FRP-1 G3200 S9313 FRP-1 UNDERSIDE OF SOFFIT FRP-1 FRP-2 INSTALL FRP CORNER TRIM AT EDGE OF BULKHEAD FRP-1 L0206 USED COOKING OIL ALARM HOOD SYSTEM ANSUL PULL EMERGENCY SHUT-OFF SWITCH. REFER TO ELECTRICAL WH-2 QT D1701 EXIT SIGN ARTPACK & WAYFINDING LEGEND REFER TO RESPONSIBILITY SCHEDULE FOR ARTPACK INFORMATION WENDY'S LOCAL LOVE (3 PIECES AND A STAR) WINK WALL FRAMED GRAPHIC CAUSE WALL ART PACK FAMILY ROOM SIGN ACCESSIBLE (BRAILLE) MARK DESCRIPTION WF-20 AP-23 AP-24 AP-26 WF-22 INTERIOR READER BOARDAP-25 ORDER THIS WAY VINYLWF-29 MOBILE PICK UP VINYLWF-30 "QUALITY IS OUR RECIPE"AP-27 ANSUL PULL EMERGENCY SHUT-OFF SWITCH, REFER TO ELECTRICAL DRAWINGS APPROXIMATE LOCATION OF PLUMBING WATER MANIFOLD/ SUPPLY. REFER TO PLUMBING DRAWINGS D0101 D1701 J1004 S9509 HEADSET HOLDER E0924 N1201 X2 6' - 8 " D1703 "FRESH SINCE DAY ONE"AP-30 D1702 OPEN TO BEYOND P-10 T0802 A0608 D0201 E0708 V0105 G3808 Q0608 D0201 S9509 V1801 V1503 V2201 D2201 D0101 D0101 1'-6" MIN. D0600 E0924 S940X A1301 C1805 FRP-1 S940X OPEN TO BEYOND S9204 S940X S9105S9204 FRP-1FRP-1 B-4B-4 V0105 E2302 FRP-1 A0401 X1510 S940XS940X F0703 S9105 S940X X1510 FRP-1 B-4X1510A0401 V0105 S9204 QP0909 B-4 B-4B-4 T2061 S6201 T2051 WH-2 FRP-1 B-4 B-4 FRP-2 C0206 C0304 B-4 FRP-2 K0824 K0821 OPEN TO BEYOND 12OFFICE 1/4" = 1'-0" N0601 N0508 FRP-1 B-4 WALL MOUNTED IT RACK. G.C TO PROVIDE SOLID WOOD BLOCKING AS REQUIRED BY IT RACK MANUFACTURER'S SPECIFICATIONS FIELD BUILT MANAGER'S DESK. REFER TO DETAIL 11/5.2 FOR DETAILS C0142C0143 FRP-1 FIELD BUILT EMPLOYEE'S DESK. REFER TO DETAIL 13/5.2 FOR DETAILS WALL MOUNTED IT RACK. G.C TO PROVIDE SOLID WOOD BLOCKING AS REQUIRED BY IT RACK MANUFACTURER'S SPECIFICATIONS S5501 INTERIOR ELEVATIONS KITCHEN A7.2 IT EC 01/12/23 CITY/OWNER CMMNTS3 CITY COMMENTS10/20/211 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 3 3 3 3 3 3 33 1.12.23 34 1 / 2 " 17 " - 1 9 " 18 " MARK QTY DESCRIPTION MODEL FINISH NOTES 2 SEMI- RECESSED PAPER TOWEL & WASTE RECEPTACLE ASI 646924A (SEMI RECESSED) PAPER ROLL AUTOMATIC DISPENSING STAINLESS STEEL 2 TWO WALL TOILET COMPARTMENT GRAB BAR 1 1/4" DIAMETER ASI MODEL 3857 SATIN 2 TOILET PAPER DISPENSER - SURFACE MOUNTED JUMBO ROLL TOILET TISSUE DISPENSER ASI MODEL 0042 SATIN OUTER CABINET - STAINLESS STEEL 2 COAT HOOK ASI-7340-S SATIN 2 WALL MOUNTED VERTICAL BABY CHANGING STATION FOUNDATIONS-100-EV CREAM 2 MIRROR MEEK M2513 SATIN STAINLESS STEEL - ANGLE FRAMED W/WELDED CORNERS 2 18" VERTICAL GRAB BAR ASI MODEL 3800-18 SATIN STAINLESS STEEL W/ EXPOSED MOUNTING, FURNISHED COMPLETE W/MOUNTING KIT 1 WASTE RECEPTACLE (4" PROJECTION, 4" RECESSED) - SEMI-RECESSED, 12 GALLONS ASI 0458 1 AUTOMATIC ROLL PAPER TOWEL DISPENSER, BATTERY OPERATED - RECESSED ASI 045224A NOTE: REFER TO SUPPLIER SHEET FOR BUILDING MATERIAL CONSOLIDATOR INFORMATION. MI N . 2" C L R 34 1 / 2 " 40 " 1 8 " HO L D HO L D 30 " 29 " M I N . 33 " 34 " M A X . 44 " M A X . 3' - 0 " 44 " M A X . 30 " M A X TA B L E HE I G H T 47 " 48 " M A X . 47 " 48 " M A X . 47 " 48 " M A X . 39 " M I R R O R 40 " M A X 39 " M I R R O R 40 " M A X RE F L E C T I N G SU R F A C E RE F L E C T I N G SU R F A C E TO C O N T R O L S HAND DRYER DISPENSER PAPER TOWEL AND WASTE BABY CHANGE TABLE SURFACE MOUNTED WATER CLOSET - GRAB BARS - TOILET TISSUE DISPENSER CD COAT HOOK K SOAP EA 1'-4" LAVATORY 8" SEAT TRIM 24"12" 17" 40" 54" SIDE WALL OR STALL PARTITION 2'-0" H MIRROR B CL CL CL CL ACCESSORY SCHEDULE 2 SOAP DISPENSER - TOUCHLESS (C0204) CUSTOMER RESTROOM SUPPLIED BY KED *GC TO COORDINATE ACCESSORIES AVAILABLE THROUGH HJC, REFER TO SUPPLIER SHEET EXIT SIGN ARTPACK & WAYFINDING LEGEND REFER TO RESPONSIBILITY SCHEDULE FOR ARTPACK INFORMATION WENDY'S LOCAL LOVE (3 PIECES AND A STAR) WINK WALL FRAMED GRAPHIC FAMILY ROOM SIGN ACCESSIBLE (BRAILLE) MARK DESCRIPTION ORDER THIS WAY VINYL MOBILE PICK UP VINYL "QUALITY IS OUR RECIPE" "FRESH SINCE DAY ONE" CREW MUST WASH HANDS SIGNAGE V MIRROR. SEE SPECIFICATIONS FOR MORE INFORMATION FIT DRYWALL W/ "J" BEAD AND TILE TIGHT TO ANCHOR PLATE, TYP. INSULATE DRAIN AND SUPPLY LINES A B C D E H J L M K WF-20 AP-23 AP-24 WF-22 WF-29R WF-30L AP-27 AP-30 WF-21 1' - 5 " 3' - 1 1 / 2 " 7'-9"1'-4 3/8" 7'-7 1/8"1'-4 3/8" 2' - 1 0 " 1' - 6 " 1'-7 1/2" 2'-7 1/4"3'-2" R.O. 3'-2"3'-2" R.O. 4'-6 3/4"3'-0" R.O. 1'-0 1/2" 1'-7 1/2" 2'-1 1/2" CLEAR UTILITY 116 FAMILY 103FAMILY 102 31 75 4 A7.3 2 8 A7.3 6 1 1/2" 5 A7.1 6 LM F.E.K WF-22 WF-22 1'-5 3/8" EQ.EQ EQ EQ DOOR STOP PROVIDE EXTENDER AS REQ'D DOOR STOP DOOR STOP 6' - 4 " 6' - 4 " B E H A C H D E A C J B D A HB J C E D H A E C B-5 P-10 WT-6 WT-6 P-10 B-5 B-5 WT-6 P-10 P-10 B-5 WT-6 B-5 WT-6 WT-6 P-10 P-10 B-5 WT-6 P-10 WT-7 J WF-21 WF-21 K K K K WF-21 H J B P-10 WT-6 WT-7 P-10 B-5 B-5 2' - 1 0 " MA X . 2' - 6 1 / 2 " (2 ' - 6 " M I N . ) 9" M I N . CL E A R A N C E 2' - 3 " (2 ' - 2 " M I N . ) K N E E C L E A R A N C E 3' - 4 " MA X T O R E F L E C T I V E S U R F A C E 11" MIN. 1'-5" MIN. / 2'-1" MAX. 6" MAX. MIRROR WALL TILE . REFER TO FINISH SCHEDULE ON SHEET A6.2. INTERIOR ELEVATIONS RESTROOM A7.3 IT EC CITY/OWNER CMMNTS01/12/233 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 1FAMILY RESTROOM 3/8" = 1'-0"AENLARGED RESTROOM PLAN 1/2" = 1'-0"2FAMILY RESTROOM 3/8" = 1'-0"3FAMILY RESTROOM 3/8" = 1'-0"4FAMILY RESTROOM 3/8" = 1'-0" 8FAMILY RESTROOM 3/8" = 1'-0" 9RESTROOM - LAVATORY SECTION DETAIL 1" = 1'-0" 7FAMILY RESTROOM 3/8" = 1'-0"6FAMILY RESTROOM 3/8" = 1'-0"5FAMILY RESTROOM 3/8" = 1'-0" 3 3 3 3 3 3 3 3 3 3 1.12.23 V2201 A B 1 MAXLITE LED MAXLITE LED MAXLITE LED EX T . R A M P MA X L I T E LE D MAXLITE LED MA X L I T E LE D MAXLITE LED LCA672LCE6120 MAXLITE LED MAXLITE LED 1EQUIPMENT PLAN 1/4" = 1'-0" V1503 S7413 K1402 D0101 V1902 N2701 N0901 G4111 D0101 D0600 F0703 C0304 C0206 N1901 G5501 D0201 G3221 E1527 V1903 V1902 V0105 G1402 N0501* T2011 T2213 N1201 A1301 S9204 Q0605 T0602 A0105 A1301 Q0807 K1401 J1004K0502E1529 T0902 V0403V0105 T2212 K0821 A0801 T2021 T2061T1213 T1212 C0304 C0206 T2051 S9712 L0206 V0608 N0601 G4421 Q0607 N0701 S940X Q0406 EP1416 S9313S6201 S940X N0302 N0601 A0304 S7417 QP0909 G3200 V1903 E0603 EP4709 A0513 EP1528 L0308 L0504 T2703 E2302 T0304 T0303 X1520 S6102 N0508* R2016S R2016 R2002 R2109 R2133 R2133 R2310 R2310 QP0222 A0202 RP0312 R3302 D3002 D0101 D1702 R2703 R2016 R2111 R0510 R0510 R0105 D0201 D0101 L0207 R2313 C0204 N0202 6" E0924 N0202 R2440 D1701E1536 D2201 G3200 #CODED NOTES: 1. FRONT OF HOUSE FIRE EXTINGUISHER. 2. BACK OF HOUSE FIRE EXTINGUISHER. 3. WATER HEATERS. 3 1 3 2 HEADSET HOLDER E0924 X2 R0510 2'-3" 17'-11" 2" R2016 R2113 R0510 R0510R0510 R2016 R2113 R0102 6'-2 1/2" D0201 D0201 E4302 N0202 N0202 D1703 R3105 U0511 R2016 R2111 2'-3"2'-3" R3404 R3405 R3405 R3404 RP2714 X1510 A0401 X3 R2002 R2109 R0510 QP0222 A0202 G1402 S9009 S9006 S9006 S9006 S9006 S9006 S9006 S9006 S9006 S9006 S9104 S9102 S9213 S9102 S9105S9204 S9213 S9213 S9213 S9213 S9212 S9212 S9204 S9105 S940X S9509 EP0916 D0201 V0105 A05XX S9006 R2002 R2109 R2002 R2109 R0510 R0510 R0510 R0510 R2027 R2114 R0512 R0512 R0512 R0512 R2027 R2114 R2027 R2114 R1603 R1705 X2 X2 C0204 A0803 A608 T0802 S5501 V1801 Q0608 V0702 V2201 G3808 E0708 R3405 R3405 R3405 R3405 K0824 C0143 C0142 EQUIPMENT PLAN NARROW FROZEN BUN EQ1.1 IT EC CITY/OWNER CMMNTS01/12/233 CITY COMMENTS10/20/211 MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 3 33 3 3 3 1.12.23 EQUIPMENT SCHEDULE EQ1.2 IT EC CITY/OWNER CMMNTS01/12/233 CITY COMMENTS10/20/211 EQUIPMENT SCHEDULE # Name Remarks Furnished By Installed By WC2505 - OFFICE/EMPLOYEE AND SAFETY N0302 1 Employee Desk KED KED N0501* 1 Smart Safe (Optional) O GC N0508* 1 Back Office Safe (Optional) KED KED N0601 2 Office Chair KED KED N0701 1 Training Material Hooks KED KED N0802 2 Employee Lockers (Optional) KED KED N0901 1 Coat Hooks KED KED N1201 2 Bulletin Board KED KED N1901 1 Cash Scales KED KED N2701 1 PPE Fryer Cleaning Kit KED KED WC3017 - SEATING/DINING ROOM FIXTURES WC3207 - DRINK STAND A0202 2 Beverage System, Dining Room - Freestyle OO QP0222 2 KED KED RP0307 1 Drink Stand Package KED KED WC3308 - POS SYSTEM AND KIOSK - SINGLE-LINE D0101 6 POS Monitor D0201 5 POS Terminal O O D0600 1 Headset O O D3002 3 Self Order Station Kiosk O O N0202 4 Cash Drop Safe KED KED O=OWNER GC=GENERAL CONTRACTOR KED= KITCHEN EQUIPMENT DISTRIBUTER Armored Car Service Ice Maker Package - Freestyle WC5006 - SMALLWARES (PARTIAL) 2 Booster Seat R1603 2 High Chair WC2101 - SAFETY - U.S. (PARTIAL) F0703 1 6' Step Ladder KED KED KED KED KED KED R0105 1 Trash Receptacle (2-Bin Enclosure) KED KED R0510 18 Chair: Standard KED KED R2002 4 Table Top: 24" x 24" KED KED R2016 5 Table Top: 24" x 42" KED KED R2109 2 Table Base: Fixed 2-Top KED KED R2110 1 Table Base: Fixed 4-Top KED KED R2111 2 Table Base: Fixed 4-Top(Accessible) KED KED R2310 2 42" Single Booth - Standard (Wood) KED KED R2313 1 42" Double Booth - Standard (Wood) KED KED R2714 1 Banquette Seating 17'-11 WC6004 - FABRICATED ACCESSORIES - U.S. (PARTIAL) C0204 3 Soap Dispenser - Touchfree KED KEDCustomer RR EQUIPMENT SCHEDULE # Name Remarks Furnished By Installed By WC0205 - FRONT COUNTER C0206 1 Soap Dispenser - Manual EcoLab EcoLab C0304 1 Paper Towel Dispenser (Z Fold) KED KED E2302 1 Back Counter w/ Sink KED KED E4302 1 Bakery Display KED KED EP14XX 1 Package- Front Counter KED KED Q0607 INC Refrigerator - Front Counter Part of EP14XX KED KED WC0411 - BEVERAGE LINE - FREESTYLE A0105 1 Beverage System, PUW - Freestyle KED KED A0513 2 Stand, Beverage Urn 2 Tier Stacked KED KED A0608 1 Brewer, Coffee - Axiom A1301 2 Beverage Dispenser - (Bubbler) KED KED KED EP4709 1 Package, PUW to Freestyle KED KED Q0807 1 Frosty Machine - Dual Head KED GC WC0703 - SINGLE LINE COOK CENTER DSG2 E1527 INC Cook Counter- Salad Station Part of EP1528 KED KED E1529 Cook Counter - Meat Refrigerator Part of EP1528 KED KED EP1528 1 Package, Sandwich Station - Single Line w/ Salad Station KED KED G4111 Night Cover Holder Part of EP1528 KED KED G5501 Bun Storage - Bun Holding Box Part of EP1528 KED KED K0502 1 Microwave - Medium Duty KED KED K0821 1 DSG2 KED KED L0206 1 Wall Panel Kit - Cook Center KED KED L0308 1 Exhaust Hood, DSG2 - Single Line O GC V0105 2 Cooker/Warmer, Countertop - Full Size KED KED V0403 1 Toaster, Bun - Horizontal KED KED V0608 1 2' Bun Warmer KED KED V1902 2 Holding Cabinet, Single Sided - 1 Large Drawer Pan KED KED V1903 3 Holding Cabinet, Single Sided - 4 Shallow Drawer Pans KED KED O=OWNER GC=GENERAL CONTRACTOR KED= KITCHEN EQUIPMENT DISTRIBUTER KED KED XPE36 DELTA INC INC INC EQUIPMENT SCHEDULE # Name Remarks Furnished By Installed By WC1409 - BACON AND CHILI S9509 1 Stand, Equipment - Bacon/Chili Consolidation KED KED V0105 2 Cooker/Warmer, Countertop - Full Size KED KED WC1511 - PREP AREA - WAREWASH A0801 1 Brewer, Tea - 4 Button Programmable KED KED A0803 1 Bracket, Wall - Brewer KED KED G4421 1 Knife Holder KED KEDS6201 1 Warewash Shelving Rack KED KEDS7413 1 Wall Mount & Grid Components KED KED S9313 1 Prep Sink Shelving Rack KED KED S940X 3 Mobile Prep Table - Vegetable Prep KED KED T1213 1 Chemical Blend Station - 3 compartment sink OO T0902 1 Prep Sink, 1 Compartment KED GC T2011 1 Three (3) Compartment Sink KED GC T2051 1 Water Heater Shelf KED GC T2061 1 Warewash Machine KED KED WC1608 - HAND SINK C0206 1 Soap Dispenser - Manual EcoLab EcoLab C0304 1 Paper Towel Dispenser KED KED G3200 3 Holder, Glove Box KED KED T2703 1 Hand Sink - Faucet KED GC WC1703 - DRINK EQUIPMENT A0304 1 Rack, BIB Soda - Freestyle KED KED A0401 Tank, Bulk C02 KED KED QP0909 1 KED KED T2212 1 Water Treatment Unit, Standard Use KED KED WC1803 - WALK IN BOX STORAGE - CUSTOM S9006 10 Storage Unit, 24" x 48" x 80" KED KED S9009 1 Storage Unit, 18" x 30" x 35.5" KED KED S9102 2 Storage Unit: Cooler, 24" x 42" x 80" KED KED S9103 1 Storage Unit: Cooler, 24" x 48" x 80" KED KED S9104 1 Storage Unit: Cooler, 24" x 72" x 80" KED KED S9105 1 Thaw Rack, 24" x 30" x 80" KED KED S9204 2 Freezer Storage Unit 18" x 48" x 69" KED KED S9212 2 Freezer Storage Dunnage Rack (Pallatier) 22" x 36" x 12" KED KED S9213 5 Freezer/Cooler Storage Dunnage Rack (Pallatier) 22" x 48" x 12" KED KED WC1903 - MOP SINK/CLEANING EQUIPMENT S6102 1 Closet Storage Wall Shelves KED KED S7417 1 Wall Mount & Grid Components KED KED T0304 1 Faucet, Wall Mount - Service Sink KED KED T0602 1 Mop Sink - Splashes on Back and Left KED KED T1212 1 Chemical Blend Center - Mop Sink Area KED KED T2213 1 Reverse Osmosis System KED KED O=OWNER GC=GENERAL CONTRACTOR KED= KITCHEN EQUIPMENT DISTRIBUTER S9010 2 Storage Unit, 21" x 48" x 80" Package, Ice Maker, and Bin Leased Unit (typ.) KED KED T0303 1 Faucet, Wall Mount w/ Support Bracket KED KED T2021 Dishtable 1 A0501 INC 4 Unit Surface Mount Tea Urn Stand Part of RP0307 KED KED C1805 Lid Dispenser Part of RP0307 KED KED C0180 Drink Stand Package Part of RP0307 C0181 Drink Stand Package Part of RP0307 G1402 Freestyle Chase Assembly Part of RP0307 KED KED KED KED KED KED INC INC INC INC 4 x 10 Sheets E1536 1 Cook Center Curb KED GC D1701 1 Customer Order Pick Up Screen O O R3302 1 3 Kiosk Station Counter KED KED R0102 1 Trash Receptacle (1-Bin Enclosure) KED KED R1705 D1702 1 Order Runner Screen O O D1703 1 Premium Beverage Screen O O U0512 1 Static Menu Board - Curved O O R2016S 1 Table Top: 24" x 42" KED KED"We Don't Cut Corners" KED KED R3105 1 Cap KED KED R2440 1 C-Wall KED KED KED KED R3404 2 Short Pillow - Part of R2703 KED KED R3405 6 Long Pillow - Part of R2703 KED KED R2133 2 Cantilever Bracket (4 Top) KED KED WC1107 - FRYLINE WITH 2 PICK-UP WINDOWS (N. WASSERSTROM FRY HOLDING MODULE) E0603 INC Shelf for Drink Carrier Part of EP0916 KED KED E0924 2 Counter, Drive-thru KED KED EP0916 1 Package, Standard Fry Line KED KED G3221 1 Holder, Glove Box - Plastic KED KED J1004 1 Open Fryer, 4 Well O KED K1401 1 Oven, Combi KED KED K1402 1 Oven, High Speed KED KED L0207 1 Wall Panel Kit - Fry Line KED KED L0504 1 108" Exhaust Hood, Fry Line - Single Line OGC Q0406 1 Freezer, Upright - 1 Door, R/H Hinged KED KED Q0605 1 Refrigerator, Undercounter - 1 Door, L/H Hinged, W/Salad Dressing Rack KED KED S9712 1 Stand, Equipment - Combi and High Speed Ovens KED KED V0105 1 Cooker/Warmer, Countertop - Full Size KED KED X1518 INC Used Cooking Oil Enclosure Part of XP1512 O GC X1519 Used Oil Control Panel Part of XP1512 O GC XP1512 1 Used Cooking Oil Tank Package O GC 4 Vat Fryer Only UCO Vendor INC X1510 INC Used Cooking Oil TANK Part of XP1512 O GC 4 x 10 Sheets D2201 1 Fry Line Timer KED KED G3808 1 Bag Holder KED KED E0708 1 Bagging Station KED KED V1503 1 Holding Cabinet KED KED V2201 1 Fry Holding Module- KED KED V1801 1 Fry Staging Warmer, 24" KED KED V0702 1 Food Warmer, 3-Lane KED KED Q0608 1 Under-counter Freezer - 60" KED KED MODULAR FRY LINE EQUIPMENT ( N. WASSERSTROM FRY HOLDING MODULE) 30" N. Wasserstrom OPTION AVAILABLE KED A1301 2 Beverage Dispenser - (Bubbler) A05XX Tea Urn KED KED1 KED GCT2703 1 Sink, Hand - Manual Faucet (2) 60" and (1) 72" KED KED S9105 1 S9204 1 KED KED Storage Unit, 18" x 48" Storage Unit, 24" x 30" MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 R0512 9 Stool: 24" High KED KED 3 Table Top: 30" DiameterR2027 R2112 Table Base: 22" X-Base Freestanding KED KED R2113 Table Base: 22" T-Base (Accessible)2 Bases Req. Per Table KED KED R2114 3 Table Base: 22" X-Base (Counter Height 34" Freestanding) KED KEDK0824 1 Staging Griddle KED KEDGSL6S CSA 3 S5501 1 Beverage Stand 30"x 48" T0802 1 Dump Sink C0142 1 Cup Dispenser - 4 Hole Horizontal C1043 2 Use with S5501 Use with S5501 KED KED KED GC KED KED KED KED 3 3 3 1.12.23 GENERAL NOTES A. PAY ALL FEES AND ARRANGE FOR EXECUTION OF ALL TAPS, METERS WITH REQUIRED ENCLOSURES (IF ANY), AND APPURTENANCES INHERENT TO THE INSTALLATION OF PLUMBING SERVICE. B. PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO EXECUTE THE PLUMBING WORK INDICATED ON THE DRAWINGS AS SPECIFIED, AND AS REQUIRED BY LOCAL CODES AND ORDINANCES. PLUMBING WORK SHALL INCLUDE ALL PIPING FOR DOMESTIC HOT AND COLD WATER LINES, VENT AND SANITARY LINES, HOOK-UP OF ALL FIXTURES SCHEDULED ON THE DRAWINGS, AND INSULATION OF DESIGNATED PIPING. WORK SHALL ALSO INCLUDE ALL GAS PIPING AND EQUIPMENT CONNECTIONS WHERE REQUIRED. INCLUDE ALL ITEMS SUCH AS FITTINGS NOT MENTIONED BUT UNDERSTOOD TO BE NECESSARY TO COMPLETE THE PLUMBING SYSTEM. COORDINATE ALL WORK WITH OTHER CONTRACTORS. C. PROVIDE FOR DRAINING WATER SYSTEM AND CAP ALL STUBS UNTIL FINISH WORK IS INSTALLED. INSTALL DRAIN VALVE AT WATER METER WITH 3/4" HOSE THREAD AND VACUUM BREAKER. D. PROVIDE VALVES ON WATER SUPPLIES TO EACH FIXTURE & EQUIPMENT. VALVES SHALL BE 1/4 TURN SHUT-OFF VALVES. E. INSULATE ALL PIPING PER SPECIFICATIONS. F. PLUMBING FIXTURES SHALL BE PROVIDED WHERE SHOWN ON DRAWINGS. FIXTURE FITTINGS AND EXPOSED FIXTURE PIPING SHALL BE BRASS CHROMIUM PLATED. TRAPS SHALL BE CAST BRASS. FIXTURES SHALL BE EQUAL IN ALL RESPECTS TO FIXTURES SPECIFIED. G. PROVIDE ROUGH-IN AND FINAL CONNECTIONS OF REQUIRED WASTE, VENT, AND WATER SUPPLY PIPING. H. THIS CONTRACTOR SHALL GUARANTEE ALL WORK INSTALLED UNDER THE CONTRACT TO BE FREE FROM DEFECTIVE WORKMANSHIP AND MATERIALS, (USUAL WEAR IS EXPECTED), AND SHOULD DEFECTS DEVELOP WITHIN A PERIOD OF ONE YEAR AFTER ACCEPTANCE OF THE BUILDING BY THE OWNER, THIS CONTRACTOR SHALL REPAIR AND/OR REPLACE DEFECTIVE ITEMS AND ALL DAMAGE RESULTING FROM FAILURE OF THESE ITEMS, AT NO EXPENSE WHATSOEVER TO THE OWNER I. THE DIRECTION OF THE SANITARY MAIN AND THE LOCATION OF THE GREASE INTERCEPTOR SHALL BE COORDINATED WITH CIVIL DRAWINGS PRIOR TO ROUGH-IN. J. PROVIDE PROVENT TRAP GUARD (OR APPROVED EQUAL) AT ALL FLOOR DRAINS. PROVIDE TRAP PRIMERS ON FLOOR DRAINS ONLY IF REQUIRED BY AUTHORITY HAVING JURISDICTION (AHJ). IF AHJ REQUIRES TRAP PRIMERS, LAYOUT DISTRIBUTION TO CONNECT MULTIPLE FLOOR DRAINS TO ONE TRAP PRIMER. K. COORDINATE LOCATION AND ROUGH-IN HEIGHT OF KITCHEN EQUIPMENT WITH OWNER AND MILLWORK PRIOR TO ROUGH-IN. L. PROVIDE WATER HAMMER ARRESTORS AT END RUN OF ALL WATER PIPING. SIZE AND LOCATE AS RECOMMENDED BY PLUMBING AND DRAINAGE INSTITUTE STANDARD PDI-WH201, AND AS RECOMMENDED BY THE MANUFACTURER. M. ALL PIPING (GAS AND WATER) SHALL BE CONCEALED IN WALL SPACE WHEN POSSIBLE, UNLESS NOTED OTHERWISE. N. DAMAGES TO EXISTING WALLS, FLOORS, FINISHES ETC. BY THIS CONTRACTOR SHALL BE REPAIRED AT THIS CONTRACTOR'S EXPENSE. O. WATER HEATER, WATER METER AND BACKFLOW PREVENTER SHALL BE INSTALLED TO MEET ALL STATE, COUNTY AND LOCAL JURISDICTION CODES. P. ON ALL SYNFLEX LINE INSTALLATIONS (EXCEPT DRINK STATIONS AND COFFEE BREWER) TRANSITION TO COPPER AT TOP OF WALL, AND ROUTE DOWN INSIDE WALL AND THEN THROUGH WALL TO EXPOSED SHUT OFF VALVE. DRINK STATIONS WILL HAVE SYNFLEX LINES FROM FILTER TO UNIT INSTALLED BY BEVERAGE SYSTEM INSTALLER. Q. 3 COMP SINK, COMBI OVEN AND 2 AREA FLOOR DRAINS BETWEEN HOOD AREA SHALL BE ROUTED TO GREASE WASTE LINE. ALL OTHER DRAINS SHALL BE ROUTED TO BUILDING SANITARY. R. ALL WATER SUPPLY LINES, VENT STACK LINES, SANITARY LINES, AND OTHER EXPOSED PLUMBING LINES SHALL BE COMPLETELY SEALED AT ALL WALL PENETRATIONS. PROVIDE CHROME ESCUTCHEON PLATE SEALED TO WALL WITH SILICONE SEALANT. S. SEE CONNECTION SCHEDULE FOR ALL INDIVIDUAL PIPE SIZES. WATER CALCULATION CRITICAL ELEVATIONS AND DISTANCES: FEET ELEVATION OF CONTROLLING FIXTURE (WATER CLOSET)4.0 ELEVATION OF FINISHED FLOOR 0.0 ELEVATION OF WATER MAIN -4.0 ELEVATION OF WATER ENTRY -4.0 VERTICAL DIST. FROM WATER MAIN TO CONTROLLING FIXTURE 8.0 SYSTEM PRESSURE REQUIREMENTS:PSI ELEVATION (VERTICAL DISTANCE) X 0.434 PSI/FT 3.5 PRESSURE NEEDED AT CONTROLLING FIXTURE 20.0 BACKFLOW PREVENTER: 1-1/2" AT 66 GPM 8.0 WATER METER: 1-1/2" AT 66 GPM 10.0 TOTAL 41.5 PIPE RUNS:FEET EXTERIOR, MAIN TO BUILDING ENTRY 100.0 EXTERIOR, VERTICAL RISE 0.0 INTERIOR, ENTRY TO CONTROLLING FIXTURE 60.0 INTERIOR, VERTICAL RISE 8.0 ALLOWANCE FOR FITTINGS, ETC. (LENGTH X 0.25)42.0 TOTAL 210.0 SYSTEM PRESSURE DATA: PSI STREET PRESSURE 80.0 SYSTEM PRESSURE REQUIRED 41.5 PRESSURE AVAILABLE FOR (PIPING) FRICTION LOSS 38.5 PIPE SIZING:PSI/100' PRESSURE AVAILABLE X 100 / (TOTAL PIPE RUN)18.3 * NOTE: ALL PIPING IS SIZED FOR 5 PSI/100' PRESSURE LOSS REFER TO WENDY'S CONSOLIDATOR LIST TO OBTAIN BUILDING MATERIAL QUOTES. REFER TO WENDY'S APPROVED SUPPLIER LIST FOR PHONE NUMBERS AND CONTACTS. ATTENTION ALL BIDDERS REMARKS (#) FIXTURE & EQUIPMENT CONNECTION SCHEDULE SY M B O L QU A N T I T Y GENERAL FIXTURE DESCRIPTION DOMESTIC WATER SANITARY NATURAL GAS US E D C O O K I N G O I L REMARKS (#) FI L T E R E D W A T E R - F C W 1 FI L T E R E D W A T E R - F C W 2 FI L T E R E D W A T E R - F C W 3 FI L T E R E D W A T E R - F C W 4 CO L D W A T E R HO T W A T E R ( 1 4 0 ° ) HO T W A T E R ( 1 1 0 ° ) MO U N T I N G H E I G H T DR A I N L I N E S I Z E TR A P FI X T U R E D R A I N DI R E C T / I N D I R E C T ( D / I ) SA N I T A R Y / G R E A S E ( S / G ) VE N T MO U N T I N G H E I G H T CO N N E C T I O N S I Z E BT U L O A D PLUMBING FIXTURES WC 2 WATER CLOSET (ACCESSIBLE)114"(1)4" INT 4" D S 2" FL (3), (6) LAV-1 2 LAVATORY 12"12"(1)112"112"112"D S1 12"(1) (3), (6) LAV-2 1 LAVATORY 12"12"(1)112"112"112"D S1 12"(1) (3), (6) MS 1 MOP SINK 12"12"36" 54"3" 3" 3"DS112"FL (3), (6) FPWH 2 FROST PROOF WALL HYDRANT 3 4"18"(3), (6) PLUMBING DRAINS FD 11 FLOOR DRAIN 3" 3"*112"FL (3), (8), (9) FS-1 4 FLOOR SINK 3" 3"*112"FL (3), (8), (9) FS-2 1 FLOOR SINK 3" 3" * 1 12"FL (3), (8), (9) HD 1 HUB DRAIN 3" 3" * 1 12" 12" (3), (8), (9) KITCHEN EQUIPMENT - FRONT COUNTER E2302 1 BACK COUNTER HAND SINK 12"12" 14" 2" 1 12"112"D S1 12" 12" (4), (6), (8), (9) KITCHEN EQUIPMENT - BEVERAGE LINE A0105 1 BEVERAGE SYSTEM (DRIVE-THRU)12"14"IS (4), (14), (15) A0608 1 COFFEE BREWER 12"14"(4), (10), (11) E4006 1 DRIVE-THRU HAND SINK ASSEMBLY 12"12" 14" 2" 1 12"112"D S1 12"(4), (8), (9) KITCHEN EQUIPMENT - FRYLINE K1401 1 COMBI OVEN 12"12"30" 3" 3"IG112"(5), (10), (11) J1004 1 OPEN FRYER - 4 WELL 1" 300K *(4) KITCHEN EQUIPMENT - PREP AREA / WAREWASH A0801 1 TEA BREWER * 12" 72" (4), (10), (11) T1213 1 CHEMICAL BLEND STATION (FOR T2011)12"12"54"(4) T0902 1 1 COMP PREP SINK 12"12"14"(4), (6), (7), (8), (9) T2011 1 3 COMP SINK 12"12"14"(4), (6), (7), (8), (9) T2061 1 WAREWASH MACHINE 12"3 4" 61.75" 3" 3" 2" I G 1 12"(4), (6), (7), (8), (9), (10) KITCHEN EQUIPMENT - HAND SINK T2703 1 HAND SINK 12"12" 14" 2" 1 12"112"D S1 12" 12" (4), (6), (8), (9) KITCHEN EQUIPMENT - DRINK EQUIPMENT QP0909 1 ICE MAKER - KITCHEN 12" 72" 3" 3" 3 4"I S1 12"(4), (6), (7), (10) T2212 1 WATER TREATMENT UNIT 3 4"85"(4), (11), (13) KITCHEN EQUIPMENT - MOP SINK / CLEANING EQUIPMENT T0303 1 MOP SINK FAUCET (FOR T0602 - LOWER)12"12"36"(4), (6) T0304 1 MOP SINK FAUCET (FOR T0602 - UPPER BLEND CENTER)12"12" 54" (4), (6) T0602 1 MOP SINK 3" 3" 3" D S 1 12"FL (4), (6) T1212 1 CHEMICAL BLEND CENTER 12"12"54"(4) T2213 1 REVERSE OSMOSIS SYSTEM 12"12" 85" (5) A0304 1 BAG-IN-BOX 12" 85" (5), (11), (12) KITCHEN EQUIPMENT - DRINK STAND A0202 2 BEVERAGE SYSTEM (SELF-SERVE - DINING ROOM)12"14"IS (4), (14), (15) QP0222 2 ICE MAKER (CUBER) - DINING ROOM 12"96" 3" 3" 3 4"I S1 12"(4), (6), (7), (10) *VERIFY QUANTITIES WITH ARCHITECTURAL EQUIPMENT PLAN AND SCHEDULE.* 1. REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS. 2. PLUMBING FIXTURE PROVIDED BY PLUMBING INSTALLER. REFER TO PLUMBING FIXTURE SCHEDULE 3. EQUIPMENT FURNISHED BY OTHERS. 4. PLUMBING INSTALLER TO MAKE FINAL CONNECTIONS TO EQUIPMENT. 5. FINAL CONNECTION TO EQUIPMENT BY OTHERS. 6. PROVIDE VALVE AT EACH CONNECTION TO EQUIPMENT. 7. PLUMBING CONTRACTOR TO PROVIDE INDIRECT DRAIN TO FLOOR DRAIN OR SINK. 8. VERIFY DIRECT OR INDIRECT WASTE CONNECTION PER LOCAL CODE REQUIREMENTS. 9. VERIFY SANITARY OR GREASE WASTE CONNECTION PER LOCAL CODE REQUIREMENTS. 10. SHUTOFF VALVE AND FLEX CONNECTOR LINES TO PRE-RINSE ARE PROVIDED WITH FIXTURE. 11. PROVIDE WITH BACKFLOW PROTECTION PER BACKFLOW PREVENTOR SCHEDULE. COORDINATE BACKFLOW INSTALLATION WITH KITCHEN EQUIPMENT PROVIDER AND BEVERAGE INSTALLER. 12. PROVIDE WITH WATTS NO. SS009 BACKFLOW PREVENTER WHEN LOCAL JURISDICTION REQUIRES A HIGHER LEVEL OF PROTECTION THAN PROVIDED BY THE INTEGRAL ASSE 1022 DOUBLE CHECK VALVE. 13. PLUMBING INSTALLER TO RUN WATER LINE TO FILTRATION SYSTEM WITH FINAL CONNECTIONS BY BEVERAGE INSTALLER. 14. BEVERAGE INSTALLER TO ROUTE LINE TO POINT OF USE AND PLUMBING INSTALLER TO MAKE FINAL CONNECTION. 15. WATER SUPPLY LINE IS PART OF THE BEVERAGE BUNDLE. PUMP SCHEDULE SYMBOL MANUF.MODEL GPM HEAD (FT)VPHA W NOTES (#) RCP GRUNDFOS ALPHA2 5 12 115 1 0.65 5 - 65 (1) NOTES: 1.RECIRCULATING PUMP: BRONZE BODY RECIRCULATING PUMP WITH "AUTOADAPT" VARIABLE SPEED MOTOR, INSTALL NEAR WATER HEATER PER MANUFACTURER'S INSTRUCTIONS. PROVIDE WITH ALPHA 3-PRONG PLUG AND COORDINATE CONNECTION WITH ELECTRICAL CONTRACTOR. PROVIDE WITH HONEYWELL L6006C SURFACE MOUNT AQUASTAT SET TO 5°F BELOW WATER HEATER OPERATING TEMPERATURE. WSFU CALCULATIONS FIXTURE QTY.WSFU TOTAL WATER CLOSET (FLUSH)21020 LAVATORY 3 2 6 MOP BASIN 1 33 HAND SINK 3 2 6 1-COMP SINK 1 4 4 3-COMP SINK 1 44 WAREWASH 1 3 3 BEVERAGE STATION 3 1 3 BAG-N-BOX 1 33 ICE MAKER 3 1 3 COMBI-OVEN 1 1 1 COFFEE BREWER 1 0.5 0.5 TEA BREWER 1 0.5 0.5 HOSE BIBB 2 36.0 *WSFU VALUES GIVEN PER IPC* WSFU TOTAL 63.00 DFU CALCULATIONS FIXTURE QTY.DFU TOTAL WATER CLOSET (FLUSH)248 LAVATORY 3 1 3 MOP BASIN 1 2 2 HAND SINK 3 1 3 3" HUB DRAIN 1 55 3" FLOOR SINK 7 535 3" FLOOR DRAIN (EMERGENCY)9 -- *DFU VALUES GIVEN PER IPC* DFU TOTAL 56.0 EXPANSION TANK SCHEDULE SYMBOL MANUF. MODEL GAL. ACCEPT. GAL. CONN. LOC. CONN. SIZE MOUNTING NOTES (#) ET-1 AMTROL ST-8 4.4 3.2 TOP 3 4"ABOVE WH-1 (1), (2) NOTES: 1.EXPANSION TANK: STEEL SHELL, HEAVY DUTY BUTYL NSF/ANSI 61, FACTORY PRECHARGED TO 50 PSIG. MAX OPERATING TEMPERATURE 200°, MAX OPERATING PRESSURE 150 PSI, 1 YEAR MANUFACTURER'S WARRANTY. INSTALL PER MANUFACTURER'S INSTRUCTIONS. 2. FIELD CHARGE EXPANSION TANK TO SYSTEM PRESSURE BEFORE CONNECTION TO DOMESTIC WATER SYSTEM. FIELD VERIFY PRESSURE REQUIREMENTS. GREASE INTERCEPTOR SIZING FIXTURE QTY.FLOW RATE (2 MIN) FLOW RATE (1 MIN) FLOOR DRAIN 3 0.00 0.00 FLOOR SINK 8 0.00 0.00 MOP BASIN 1 9.35 18.70 THREE COMP SINK 1 30.00 60.00 DISHWASHER 1 5.00 10.00 TOTAL FIXTURE FLOW RATE 44.35 CALCULATED FLOW RATE (GPM) PIPE SIZE FLOW RATE (4 IN)75 44.35 [(CU IN / 231) = GAL X 0.75 / 2 MIN = 2 MIN FLOW RATE] NUMBER OF SEATS 55 GREASE PRODUCTION (LBS OF FOG) AVG. MEALS PER SEAT PER DAY 4 693.0 FAST FOOD - FULL PREP (HIGH / NO FLATWARE: 0.035 LBS PER SERVING)0.035 DAYS BETWEEN PUMP OUTS 90 [SERVINGS PER DAY X GREASE PRODUCTION VALUE X DAYS BETWEEN PUMP-OUTS = GREASE OUTPUT] BACKFLOW PREVENTER SCHEDULE LOCATION TAG MODEL ASSE MAIN WATER SUPPLY RPZ WATTS LF009-QT-S 1013 CARBONATOR DCV-1 WATTS SD-3 1022 SODA DISPENSORS DCV-2 WATTS SD-2 1022 CHEMICAL FEED DCV-3 WATTS SD-2 1022 OTHER EQUIPMENT DCV-3 WATTS SERIES 7 1024 NOTE: VERIFY BACKFLOW VALVE REQUIREMENTS AND APPROVAL FOR ALL EQUIPMENT WITH AUTHORITIES HAVING JURISDICTION PRIOR TO INSTALLATION. GAS FIRED WATER HEATER SCHEDULE SYMBOL MANUF.MODEL GAL.BTU GAS PRESSURE RECOVERY (GPH/100°F) SET POINT (°F) NOTES (#) WH-1 BRAFDORD WHITE EF-100T-1 99E-3N 100 199,999 7" W.C. 235 140 (1), (2) NOTES: 1. GAS FIRED WATER HEATER: THREE YEAR TANK/PARTS WARRANTY, GLASS LINED STEEL TANK, 150 PSI WORKING PRESSURE, THERMAL EFFICIENCY OF 97% MEETING CURRENT EDITION OF ASHRAE 90.1B AND LOCAL ENERGY CONSERVATION REQUIREMENTS. PROVIDE T&P RELIEF VALVE. 2. FURNISH WITH EXPANSION TANK AS SPECIFIED ON PLANS. ELECTRIC WATER HEATER SCHEDULE SYMBOL MANUF.MODEL GAL. KW V PH FLA RECOVERY (GPH/90°F) SET POINT (°F) NOTES (#) WH-2 BRADFORD WHITE LE16U3 6 6 208 1 28.8 25 140 (1), (2) NOTES: 1.ELECTRIC WATER HEATER: THREE YEAR TANK/PARTS WARRANTY, GLASS LINED STEEL TANK, 150 PSI WORKING PRESSURE, MEETING CURRENT EDITION OF ASHRAE 90.1B AND LOCAL ENERGY CONSERVATION REQUIREMENTS (SMALL TANK WATER HEATERS BELOW 20 GALLONS ARE EXEMPT FROM NAECA REQUIREMENTS AND ASHRAE 90.1). PROVIDE T&P RELIEF VALVE. 2.FURNISH WITH EXPANSION TANK AS SPECIFIED ON PLANS. BV BALL VALVE GW D G UCO FW SANITARY WASTE (SAN) - BELOW SLAB/GRADE PLUMBING VENT (V) - BELOW SLAB/GRADE GREASE WASTE (GW) - BELOW SLAB/GRADE USED COOKING OIL (UCO) PLUMBING VENT (V) CONDENSATE LINE (D) HOT WATER RETURN (HWR) 140°, 120° GAS LINE (G) NSF 61 TUBING (NSF) [BY OTHERS] FILTERED WATER SUPPLY (FW) HOT WATER (HW) 140°, 120° COLD WATER (CW) - BELOW SLAB/GRADE COLD WATER (CW) NSF BFP RI BACKFLOW PREVENTER ROUGH-IN AFF/AFG FCO/ECO VTR IW WCO/CO ABOVE FINISHED FLOOR/GRADE FLOOR/EXTERIOR CLEANOUT WALL CLEANOUT/ CLEANOUT VENT THRU ROOF INDIRECT WASTE TYPICALTYP AHJ UNO AUTHORITY HAVING JURISDICTION UNLESS NOTED OTHERWISE ABBREVIATIONS: LINETYPES: END CAP SHUTOFF VALVE (BALL TYPE) TEE TURNING UP/DOWN PIPE TURNING UP/DOWN CHECK VALVE BALANCING VALVE PIPE SYMBOLS: WALL HYDRANT RO REVERSE OSMOSIS WATER SUPPLY (RO) *NOT ALL SYMBOLS OR LINETYPES ARE NECESSARILY USED*PLUMBING SYMBOLS LEGEND GREASE INTERCEPTOR SCHEDULE SYMBOL MANUF. MODEL FLOW RATE (GPM) GREASE CAPACITY (LBS.) LIQUID CAPACITY (GAL.)NOTES (#) GI SCHIER GB-250 100 1,895 277 (1), (2), (3) NOTES: 1. CONTRACTOR SHALL SUBMIT PROPOSED GREASE INTERCEPTOR INSTALLATION PLANS AND SPECIFICATIONS TO LOCAL AUTHORITIES FOR THEIR APPROVAL BEFORE ACQUISITION. SEE MANUFACTURER INSTALLATION MANUAL FOR ADDITIONAL INSTRUCTIONS. 2.PROVIDE WITH C24HP H20 LOAD RATED PICKABLE CAST IRON LIDS WITH "SAFE MANWAY" FALL PROTECTION COVER. 3. PROVIDE WITH AK1 ANCHOR KIT. PLUMBING FIXTURE SCHEDULE SYMBOL FIXTURE TYPE MANUF.MODEL DESCRIPTION ACCESSORIES/OPTIONS NOTES (#) WC WATER CLOSET (ACCESSIBLE)SLOAN ST-2029 (2102029) FLOOR MOUNT, WHITE VITREOUS CHINA, 1.1-1.6 GPF ELONGATED SIPHON JET BOWL, 1-1/2" TOP SPUD, & RIM HEIGHT 17" A.F.F. TOTO #TMT1LN32#CP 1.28 GPF MANUAL WATER CLOSET FLUSH VALVE. MAINLINE #ML1055SSC00 WHITE OPEN FRONT ELONGATED TOILET SEAT LESS COVER. (1), (4) LAV-1 LAVATORY (ACCESSIBLE) AMERICAN STANDARD #0356.421.020 LUCERNE WALL HUNG, 2012"x1814", WHITE VITREOUS CHINA.TOTO #TL210DD12#CP POLISHED CHROME, LAVATORY FAUCET, 1.2 GPM FLOW RATE (1), (2), (3), (4) LAV-2 LAVATORY (ACCESSIBLE)DURAVIT D17511 (#0454120060) VERO WALL HUNG WASHBASIN, 4714"x1812", WHITE VITREOUS CHINA,WITH CHROME METAL CONSOLE AND NO FAUCET HOLES, SINGLE HOLE FOR FAUCET, & BACK OVERFLOW. ROHL A1423LMAPC-2 "ACQUI WALL MOUNT BRIDGE FAUCET", POLISHED CHROME, 8" WALL MOUNT, 10" SWIVEL SPOUT, 1.2 GPM AERATOR. PROVIDE WITH CROW WORKS 27" HIGH GUNMETAL SINK STAND (1), (2), (4), (5) MS MOP SINK FIAT MSB-2424 24"X24"X10" ONE-PIECE MOLDED STONE CONSTRUCTION WITH 3" STAINLESS STEEL DRAIN. SUPPLY WITH TWO #830-AA SERVICE FAUCETS MOUNTED AT 36" AND 54" A.F.F. REFER TO ARCHITECTURAL ELEVATIONS. SUPPLY WITH #MSG-2424 STAINLESS STEEL WALL GUARD ON TWO SIDES, #E-88-AA STAINLESS STEEL BUMPER GUARDS ON TWO SIDES, AND ONE #832-AA 30" HOSE AND HOSE BRACKET. (5) WB COMBI OVEN WATER BOX SIOUX CHIEF 696-G2403WF WHITE ABS WATER SUPPLY BOX WITH 3/4" HOSE THREAD, AND PEX-A F1960 CONENCTIONS.INSTALL PER "COMBI OVEN SUPPLY BOX ROUGH-IN" DETIAL. FPWH FROST PROOF WALL HYDRANT WOODFORD MODEL 65 ANTI-SIPHON, AUTOMATIC DRAINING, WALL HYDRANT, NON-FREEZE INTEGRAL VACUUM BREAKER, ALL BRONZE INTERIOR PARTS, KEY OPERATED, 3/4" SOLDER INLET. MOUNT 18" ABOVE FINISHED GRADE. PROVIDE APPROPRIATE MODEL FOR WALL THICKNESS AND SITE SPECIFIC TEMPERATURE REQUIREMENTS. (4) FD FLOOR DRAIN SIOUX CHIEF / ZURN 832-35D-NR / #ZN415-B-3NH FLOOR DRAIN WITH 5" ROUND NICKEL BRONZE ADJUSTABLE STRAINER AND CAST IRON BODY & 3" BOTTOM OUTLET. PROVIDE WITH ASSE 1072 APPROVED TRAP SEAL DEVICE. TRAP SEAL DEVICE SHALL BE TRAP PROSET TRAPGUARD OR APPROVED EQUAL. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE DRAINS IN CUSTOMER AREAS WITH VANDAL RESISTANT SCREWS. (4) FS-1 FLOOR SINK SIOUX CHIEF / ZURN #861-3PN-D / #Z1900-3NH-K-4 12" SQUARE TOP FLOOR SINK W/8" DEEP PVC/CAST IRON BODY & 3" BOTTOM OUTLET (CAST IRON OPTIONAL)(4) FS-2 FLOOR SINK SIOUX CHIEF / ZURN #861-23X-N2 / #Z1900-3NH-2NB 12" SQUARE TOP FLOOR SINK WITH 6" DEEP ACID RESISTANT ENAMEL CAST IRON BODY AND 3"OUTLET WITH 12 NICKEL BRONZE GRATE. SET FLOOR SINK LEVEL WITH FINISH FLOOR.(4) HD HUB DRAIN N/A N/A STUB 3" WASTE LINE 12" ABOVE FINISHED FLOOR SLAB FOR FUTURE CONNECTIONS BY OTHERS. PROVIDE WITH ASSE 1072 APPROVED TRAP SEAL DEVICE. TRAP SEAL DEVICE SHALL BE TRAP PROSET TRAPGUARD OR APPROVED EQUAL. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. (4) MV MIXING VALVE ZURN ZW3870XLT / ZW1070XL THERMOSTATIC CONTROLLER WITH INTEGRAL CHECKS, ALL BRASS BODY WITH DUAL STAINLESS STEEL STRAINER, VANDAL RESISTANT TEMPERATURE ADJUSTMENT HANDLE. SET TO 105°F. MOUNT IN ACCESSIBLE LOCATION.(4) NOTES: 1. INSTALL IN ACCORDANCE TO ADA ACCESSIBILITY REQUIREMENTS. 2. PROVIDE WITH QUARTER TURN BRASS ANGLE COMPRESSION STOPS WITH LOOSE KEY HANDLES, STAINLESS BRAIDED SUPPLIES, CHROME SUPPLY AND DRAIN ESCUTCHEONS, CHROME GRID STRAINER DRAIN WITH TAILPIECE, CHROME PLATED CAST BODY P-TRAP WITH CLEANOUT. INSULATE WASTE AND WATER PIPING WITH TRUEBRO "LAV-GUARD2" #101-EZ. 3. FURNISH WITH ZURN #Z-1231-81 LAVATORY CARRIER. 4.REFER TO ARCHITECTURAL SUPPLIER PAGE FOR WENDY'S NATIONAL VENDOR PRICING CONTACTS. VERIFY PRIOR TO BID IF GENERAL CONTRACTOR OR OWNER WILL PROVIDE EQUIPMENT. PLUMBING SCHEDULE AND NOTES P1.0 AUTHOR CHECKER 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments EX T . R A M P LCA672LCE6120 V2201 1PLUMBING PLAN - SANITARY WASTE & VENT 1/4" = 1'-0" SEE SITE PLAN FOR CONTINUATION GW UTILITY 116 1 2 3 3 T2061 QP0909 A0105 T2011 T0902 T0602 T2703 T2703 E2302 ECO 4" ECO FD FCO FD 4" 4" 3" 4" 3" 2" FCO FD 2 4" 4" 4" 3" 4" FS-1 FD FD FCO 3 FD WCO 3" 4"4"3" 3" 3" 3" 3" 3" 4" 2"2" GW GW GW 4" 4" 4" 3" 3" UC O 3 4" 6 INSTALL USED OIL SYSTEM PER VENDOR INSTRUCTIONS.WC WC LAV-1 LAV-1 3 3"3" 3" 4"4"4" 3" 2"2" 2" 3" 112" 2" 2" 112" 112" 112"2" WCO WCO FS-1 FS-1 WH-18 4" QP0222 FS-1 FCO 3" GW 9 5 1" CO 1" 3" HD 4" 3" A0202 4" GI FDFD 3" K1401 J1004 43"VTR FD WC 2" 3" 2" 2" 9 3 3" 3" 4 7 MAINTAIN SEPARATION BETWEEN UCO, SANITARY LINES, VENT LINES, AND WATER LINES IN THIS WALL. MAINTAIN SEPARATION BETWEEN THE USED COOKING OIL LINE, VENT LINES, AND DOMESTIC WATER LINES. ROUTE HOSE BIBB BELOW USED COOKING OIL LINE. 3"VTR 3"3" 3 4" UCO FS-2 #CODED NOTES: 1. EXTEND SANITARY LINE TO MAIN. FIELD VERIFY EXACT LOCATION WITH LOCAL UTILITY COMPANY PRIOR TO BID. 2. PROVIDE GB-250 KITCHEN GREASE INTERCEPTOR. LOCATE CLEAR OF DRIVE-THRU LANE. REFER TO CIVIL DRAWINGS FOR FINAL LOCATION. REFER TO "GREASE INTERCEPTOR" DETAIL. 3. VENT RISER FROM UNDER FLOOR PIPING. REFER TO SANITARY ISOMETRIC FOR CONTINUATION. 4. PROVIDE SANITARY VENT THROUGH ROOF PER "VENT THRU ROOF (VTR)" DETAIL. LOCATE VENT MINIMUM OF 10'-0" AWAY FROM AIR INTAKES ON ROOF, UNLESS APPROVED BY ENGINEER PRIOR TO INSTALLATION. VTR SHALL BE EXTENDED HIGHER THAN ANY AIR INTAKES. LOCATE PER ROOF PLAN. 5. ROUTE CONDENSATE FROM FREEZER/COOLER TO FLOOR DRAIN. PROVIDE RAYCHEM GUARDIAN GM-51-IM HEAT TRACED LINE FROM INSIDE OF COOLER TO FLOOR DRAIN. (COORDINATE POWER FOR HEAT TRACE WITH ELECTRICAL PLANS.) REFER TO "COOLER/FREEZER CONDENSATE" DETAIL. 6. ROUTE USED COOKING OIL LINE BEHIND EQUIPMENT. EXTEND LINE TO USED COOKING OIL TANK AS SHOWN. REFER TO "USED OIL RECOVERY" DETAIL. 7. ROUTE USED COOKING OIL LINE MINIMUM OF 6" ABOVE CEILING FROM EQUIPMENT TO RECOVERY TANK AS SHOWN PER PLAN. SLOPE PIPING TO BACK OF BUILDING. REFER TO INSTALLATION MANUAL FOR EXACT PITCH. LINE CANNOT HAVE ANY TRAPS. USE ONLY BACK TO BACK 45 DEGREE ELBOW TO CHANGE DIRECTION. 8. PROVIDE THREADED BLACK IRON PIPE DOWN WALL. COVER UCO LINE FROM WALL ENTRY TO POINT OF CONNECTION AT TANK WITH 1" THICK FIBERGLASS PIPE INSULATION WITH ASJ. PROVIDE EXTERIOR PIPE INSULATION WITH STAINLESS STEEL PIPE COVER THAT IS BANDED AND SEALED THROUGHOUT WITH CLEAR UV RESISTANT SILICONE CAULK. PROVIDE WALL PENETRATOIN WITH STAINLESS STEEL ESCUTCHEON. DO NOT RUN PIPE THROUGH REFRIGERATED BOXES OR SERVICES SPACES. TURN INTO TANK SHED AT 89" A.F.F. STUB OUT EXTERIOR SIDE OF WALL. 9. EMERGENCY DRAIN IN RESTROOM SHALL BE INSTALLED FLUSH TO GRADE WITH NO SLOPE. COORDINATE INSTALLATION HEIGHT WITH GENERAL CONTRACTOR TO ENSURE PROPER INSTALLATION. 2-WAY GCO 2-WAY GCO VENT PIPING BELOW GRADE 5'-0" 5'-0" FD D VENT PIPING BELOW GRADE FCO 3" 1" 2" WCO LAV-2 VENT PIPING BELOW GRADE WCO QP0222 PLUMBING PLAN - SANITARY WASTE & VENT P1.1 AUTHOR CHECKER 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments 1 13 13 2 2 8 66 K1401 QP0909 T0602 A0304 A0801 A0105 T0902T2011 FCW-3 1/2" CW, 1/2" HW, AND (2) 1/2" FW DROP DOWN IN WALL AND EXTEND THRU MILLWORK TO E4003, A0608, A0105, A0202, & (2) QP0222. FIELD VERIFY ROUTING. FCW-3 FCW-4 FCW-1 FCW-2 FCW-3 FPWH FPWH E2302 5 5 T2703 1PLUMBING PLAN - DOMESTIC WATER 1/4" = 1'-0" WC LAV-1 LAV-1 WC 4 4 4 MV MV MV MV RCP T0303 T0304 WH-1 1" 112"112" 112" 112"112" 112" 12" 12" 12" 3 4" 3 4" 3 4" 1" 1" 1" 12"12" T2213 4 T1213 ET-1 2 3 1 T2061 3 4" 1" 1" 1" FW RO WB FW RO FW RO MAINTAIN SEPARATION BETWEEN UCO, SANITARY LINES, VENT LINES, AND WATER LINES IN THIS WALL. MAINTAIN SEPARATION BETWEEN THE USED COOKING OIL LINE, VENT LINES, AND DOMESTIC WATER LINES. ROUTE HOSE BIBB BELOW USED COOKING OIL LINE. BEVERAGE EQUIPMENT NOTES 1. BEVERAGE EQUIPMENT SUPPLIER TO RUN NSF 61 TUBING FOR SODA DISPENSOR(S) AND SELF SERVE ICE MAKER(S). 2. GC, OR PLUMBING CONTRACTOR, TO MAKE FINAL CONNECTIONS FOR ICE MAKER(S). 2. GC, OR PLUMBING CONTRACTOR, TO PROVIDE OETIKER CLAMPS FOR CONNECTING BEVERAGE HOSES. 3. BEVERAGE EQUIPMENT SUPPLIER TO INSTALL SODA DISPENSERS AND ANCILLARY EQUIPMENT INCLUDING RACK, WATER BOOSTER, ETC. 4. BEVERAGE EQUIPMENT SUPPLIER TO INSTALL STAINLESS STEEL CHASE COVERS FOR NSF 61 TUBING. 5. BEVERAGE EQUIPMENT SUPPLIER TO CLEAN, SEAL, AND CAP CHASE. 6. BEVERAGE EQUIPMENT SUPPLIER TO INSTALL STAINLESS STEEL CHASE COVERS FOR NSF 61 TUBING. #CODED NOTES: 1. CHEMICAL FEED UNITS AND INSTALLATION KITS SUPPLIED BY OWNER'S REPRESENTATIVE AND INSTALLED BY CONTRACTOR. FEED STATION LOCATIONS ARE TO BE VERIFIED WITH OWNER. PROVIDE BACKFLOW PROTECTION AS REQUIRED BY LOCAL CODE AND PER BACKFLOW PREVENTER SCHEDULE. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 2. PLUMBING CONTRACTOR TO PROVIDE 1/2" INSULATED COPPER LINES IN WALL WITH BALL VALVE AT CONNECTION LOCATION AND MALE THREAD ADAPTOR ABOVE CEILING FOR CONNECTION BY BEVERAGE EQUIPMENT INSTALLER TO NSF 61 TUBING LINES. 3. BEVERAGE EQUIPMENT INSTALLER TO PROVIDE 1/2" NSF 61 TUBING FILTERED COLD WATER LINE FROM WATER FILTER TO CARBONATOR. BEVERAGE EQUIPMENT INSTALLER SHALL PROVIDE REQUIRED CODE APPROVED STAINLESS STEEL BACKFLOW PREVENTOR PRIOR TO CARBONATOR EQUIPMENT. NO COPPER WATER LINES SHALL BE USED FOR CARBONATED WATER LINES AFTER THE BACKFLOW PREVENTOR. 4. PROVIDE INDIVIDUAL MIXING VALVE FOR ALL HAND SINKS AND LAVATORIES IN AN ACCESSIBLE LOCATION. 5. ROUTE PEX-A FILTERED AND REVERSE OSMOSIS WATER LINES TO SERVE THE COMBI OVEN. 6. ROUTE 1 14" COLD WATER COPPER LINE FROM ABOVE CEILING DOWN TO APPROXIMATELY 30"+/- AFF FOR THE WATER CLOSET FLUSH VALVE. SEE RISER DIAGRAMS FOR DETAILS AND ARCHITECTURAL SHEETS FOR MORE INFORMATION. COORDINATE EXACT LOCATION WITH THE MANUFACTURER'S EQUIPMENT PRIOR TO ROUGH-IN. 7. EXTEND 3 4" COLD WATER LINE TO WATER FILTRATION SYSTEM IN UTILITY AREA. PROVIDE ALL CHECK VALVES AND SHUT-OFF VALVES REQUIRED. HOOK UP AND COMMISSION WATER FILTRATION SYSTEMS, BOOSTER PUMP, AND REVERSE OSMOSIS (RO) SYSTEM PER MANUFACTURER'S RECOMMENDATIONS. VERIFY ALL RESPONSIBILITIES WITH OWNER AND PLUMBING FIXTURE SCHEDULE. REFER TO "WATER FILTRATION SYSTEM" DETAIL. 8. DROP 1" HW AND CW AND 12" HWR LINES TO WATER HEATER, EXPANSION TANK, AND RECIRCULATING PUMP. CONTRACTOR TO FURNISH AND INSTALL WATER HEATER. REFER TO "LARGE WATER HEATER", "RECIRCULATION PUMP", AND "SMALL EXPANSION TANK" DETAILS. DISCHARGE T&P RELIEF VALVE AND OVERFLOW TO DRAIN. PROVIDE VALVE AND UNION ON INLET AND OUTLET. PROVIDE BALANCING VALVES AS REQUIRED FOR RECIRCULATING SYSTEM. 9. BEVERAGE EQUIPMENT SUPPLIER TO RUN 1/2" COLD WATER NSF 61 TUBING LINE ABOVE CEILING TO DINING ROOM FOR CONNECTION TO BEVERAGE SYSTEM. PROVIDE SHUT OFF VALVES AND BACK-FLOW PREVENTERS AS REQUIRED TO MAKE FINAL CONNECTION. COORDINATE WITH OWNER'S REPRESENTATIVE. BEVERAGE BUNDLE WHICH INCLUDES SYRUP AND FILTERED WATER LINES TO RUN OVERHEAD ABOVE CEILING, EXTEND FROM FILTER SYSTEM AND THRU 6" ESCUTCHEON PLATE IN CEILING, EXTEND OVERHEAD TO DRINK UNITS THEN DOWN THRU CEILING AND THROUGH CHASE BEHIND BEVERAGE UNIT. VERIFY RESPONSIBILITIES WITH OWNER AND FIXTURE SCHEDULE. 10. EXTEND 3/4" HOT AND COLD WATER COPPER LINES DOWN FOR THE MOP SINK/FAUCET FROM MAIN. MAKE ALL FINAL CONNECTIONS. COORDINATE EXACT LOCATION PRIOR TO ROUGH-IN. MOP SINK AREA HAS 2 FAUCETS MOUNTED DIRECTLY ABOVE EACH OTHER. REFER TO CONNECTION SCHEDULE FO0R MOUNTING HEIGHTS. 11. BEVERAGE EQUIPMENT INSTALLER SHALL PROVIDE NSF 61 TUBING LINES, FOR COLD WATER SERVING BEVERAGE EQUIPMENT. LINES ARE SHOWN ARE SHOWN FOR REFERENCE ONLY. COORDINATE WITH OWNER'S REPRESENTATIVE. 12. ROUTE 3/4" HW TO SMALL WATER HEATER SERVING WAREWASH MACHINE. REFER TO "SMALL WATER HEATER ON PLATFORM" AND "WAREWASH W/ WATER HEATER" DETAILS. 13. EXTEND COPPER PIPING DOWN IN WALL TO FREEZE-PROOF WALL HYDRANT-WOODFORD MODEL 65 OR EQUAL, MOUNT 18" ABOVE FINISHED GRADE. VERIFY EXACT LOCATION WITH ARCHITECTURAL ELEVATIONS. 14. 1 12" WATER METER AT FLOOR WITH RPZ BACKFLOW PREVENTER, PIPE DISCHARGE TO FLOOR DRAIN. EXTEND LINE TO MAIN. FIELD VERIFY EXACT LOCATION WITH WATER COMPANY. 15. PROVIDE WATER BOX FOR FILTERED AND REVERSE OSMOSIS WATER LINES SERVING THE COMBI OVEN PER THE "COMBI OVEN WATER ROUGH-IN" DETAIL. EX T . R A M P LCA672LCE6120 V2201 15 15 4 T2703 MV MV ABOVE CEILING LAV-2 4 9 9A0202 QP0222 FCW-3 FCW-1 1" 1" 1" 14 7 11 T2212 T1212 12 9QP0222 FCW-1 WH-2 12 10 PLUMBING PLAN - DOMESTIC WATER P1.2 AUTHOR CHECKER 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments EX T . R A M P LCA672LCE6120 V2201 1PLUMBING PLAN - NATURAL GAS 1/4" = 1'-0" 1 2WH-1 1 3 3 RTU-2 RTU-1 G G G G 2" 114" 1 14" 114" 112" 112" 2WH-1 #CODED NOTES: 1. GAS SERVICE AND METER SETTING SIZED PER GAS COMPANY REQUIREMENTS FOR MAX CONNECTED LOADS AS SHOWN IN "NATURAL GAS CALCULATIONS" TABLE WITH TOTAL DEVELOPED LENGTH, INCLUDING FITTINGS, VALVES, ETC. OF 100 LINEAR FEET AND A TOTAL SYSTEM PRESSURE DROP OF 0.3" W.C. WITH 14" W.C. DELIVERED AT THE METER. HOLD GAS METER AND NATURAL GAS LINES TIGHT TO BUILDING. REFER TO "GAS SERVICE" DETAIL. 2. ROUTE NATURAL GAS LINE DOWN TO WATER HEATER AS SHOWN PER PLAN. COORDINATE EXACT LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO INSTALLATION. REFER TO "LARGE WATER HEATER" DETAIL. 3. ROUTE NATURAL GAS UP THROUGH ROOF TO TO ROOFTOP EQUIPMENT AS SHOWN PER PLAN. COORDINATE EXACT LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO INSTALLATION. REFER TO "ROOFTOP UNIT GAS CONNECTION" DETAIL. GAS LINES ON ROOF ARE TO BE PAINTED SAFETY YELLOW. GAS LINES MUST BE ROUTED TO ALLOW FULL ACCESS TO RTU EQUIPMENT. GAS LINE BEHIND EQUIPMENT 4GAS LINE AUTO SHUT-OFF VALVE 112"112"G 5 J1004 NATURAL GAS CALCULATIONS EQUIPMENT MBH ROOFTOP EQUIPMENT: RTU-1 270 RTU-2 270 WATER HEATING WH-1 199 KITCHEN EQUIPMENT OPEN FRYER 4 WELL 300 TOTAL GAS LOAD (MBH)1039.0 PLUMBING PLAN - NATURAL GAS P1.3 AUTHOR CHECKER 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments 1PLUMBING RISER - SANITARY WASTE & VENT NTS 2PLUMBING RISER - DOMESTIC WATER NTS T0902 T2011 T2061 FCW-2 E2302 T2703 T2703 T2703 T2703 E2302 4" 3" 3" FD 4"4" 4" 4" 4" 4" 4" 4" 3" 3" 3" 4" 4" 4" 4" 4" 3" 3" 3" 3"3" 3" ECO FCO FCO FCO FCO ECO FS-2 FS-1 FS-1 FS-1 FD FD FD FD FD FD FCO 4" 3" 3" 3" 2" 2" 2" 2" 2" 2" 2" 2" FD WCO WCO WC WC LAV-1 LAV-1 4" 4" 4" 4" 4"4" 3" 2" 2" 2"2" 2" 2" 2" 2" 2" 2" 2" 112" 112" 112" 112" 112" 112" 112" 112" 112" 112" 112" 112" 3" 3" M REFER TO WATER FILTRATION SYSTEM DETAIL 114" 3 4" 3 4" T1212 T0304 3 4" HW&CW LAV-1 WC FPWH WC 114" FPWH 3 4" 3 4" 3 4"3 4" 12"12" 12"12" 12" 12" 12" 12" 12" 12" 3 4" 3 4" 12" 112" FCW-3 FCW-4 K1401 MV LAV-1 MV MV MV 3 4" MV ET-1 WH-1 QP0909 A0304 A0801 FCW-1 FCW-2 FCW-3 12" 12" 12" 12"12" 12" 3 4" 1" 12" 3 4" CW1" 1" 1" 1" 112" 112" 112" 112" 112" 112" 112" 3 4" HW 1" 1" 1" T2213 GW GW GW GW GW GW RCP FD FCO 4" GW GW 3" T06024" 3" 3" A0105 T1213 1" WB 3 4" 12" 12" 12" 12" 12" FW RO FW RO GI 3" HD A0202 QP0222 4" 4" WCO 3" FD 3" FD 3"VTR 2" 2" 3" 112"2" 3"VTR 3" 3" 3" 3"3" 112" 2- WAY FCO 2- WAY FCO 112" 112" 3" FS-1 112" LAV-2 MV 112" 2" LAV-2 WH-2 A0608 FCW-2 FCW-3 A0202 QP0222 FCW-3 FCW-1 12" 12"A0105 12" MS MS PLUMBING RISERS P2.0 AUTHOR CHECKER 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments 3'-5 1/4" 6'-6 1/2" 1'-10 1/4" 5'-8 1/4" 12'-11 1/4" 11 ' - 5 3 / 4 " 20 ' - 1 0 1 / 2 " 10 ' - 4 1 / 4 " 2' - 7 " 13 ' - 7 3 / 4 " 12 ' - 6 3 / 4 " 17 ' - 7 1 / 2 " 11 ' - 2 1 / 4 " 9' - 6 1 / 4 " 8' - 1 1 / 2 " 9' - 6 " 6' - 1 " 6' - 1 1 1 / 4 " 20'-9" 5'-7 1/2" 9'-5" 2'-2" 13'-0" 9 1 / 4 " 8' - 0 " 3' - 2 1 / 2 " 11 ' - 9 " 15'-9 1/4" 3' - 6 1 / 2 " 3' - 2 1 / 2 " 8 3 / 4 " 12 ' - 7 " 22'-9 3/4" 24'-4 1/4" 29'-9 1/4" 30'-8" 29'-9 1/4" 30'-7 1/2" 13'-4 1/2" 11'-4 1/2" 25'-5 1/4" 1' - 2 1 / 4 " 8' - 5 1 / 2 " 9' - 6 " 2' - 2 " 6' - 5 1 / 4 " 6'-10 1/2" 1PLUMBING PLAN - DIMENSION CALLOUT 1/4" = 1'-0" DIMENSIONS ARE FOR REFERENCE ONLY. GENERAL CONTRACTOR TO VERIFY LAYOUT WITH WENDY'S REPRESENTATIVE. 28'-0 3/4" 0" 0"0" 0" 5' - 1 1 / 4 " REFERENCE POINT OUTSIDE FACE OF SHEATHING 15 ' - 9 3 / 4 " 1'-2 1/2" 2'-5 1/4" EX T . R A M P LCA672LCE6120 V2201 15 ' - 5 " 16'-10 3/4" 8'-6" PLUMBING DIMENSION PLAN P3.0 AUTHOR CHECKER 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments BLOCKING BY GENERAL CONTRACTOR WOOD BLOCKING CONTINUOUS INSULATION THROUGH PIPE SUPPORT WATER LINE INSULATION/PIPE SUPPORT NOT TO SCALE PIPE SUPPORT (IN-WALL)15 CW G VENT/INTAKE PIPE PROVIDED BY PLUMBING CONTRACTOR. PROVIDE 3" INTAKE PIPE AND 3" EXHAUST PIPE FROM WATER HEATER TO CONCENTRIC VENT INTAKE AIR WALL TERMINATION KIT. MAKE ALL FINAL INTAKE/ EXHAUST CONNECTIONS. COORDINATE LOCATION OF WALL OPENING WITH ARCHITECT PRIOR TO ROUGH-IN. MAINTAIN 10' CLEARANCE FROM ALL OUTSIDE AIR INTAKES. INSTALL PER MANUFACTURER'S RECOMMENDATION. CHECK VALVE 1" A.S.M.E. APPROVED TEMPERATURE AND PRESSURE RELIEF VALVE SIZE GAS PER PLAN EXTEND FULL SIZE TO DRAIN DRAIN VALVE 3/4" 1" 1"140° HW THERMOMETER WITH GAGE COCK (TYP.) - EQUAL TO WATTS #TB-1-1/2-1 SEE FLOOR PLAN FOR CONTINUATION VACUUM RELIEF VALVE 1" 1" TO EXPANSION TANK 3/4"TO RECIRC PUMP NOT TO SCALE LARGE WATER HEATER 12 INSTALL PIPE HIGH AS POSSIBLE, ANCHORED TO WALL OF BOX WITH SUPPORTS AT MAXIMUM SIX FOOT CENTERS. USE TYPE "M" HARD COPPER TUBE AND FITTINGS WITH LEAD-FREE SOLDER JOINTS. SLOPE HORIZONTAL PIPE AT MINIMUM TWO PERCENT. REFER TO LOCAL CODE FOR INDIRECT DRAIN REQUIREMENTS. ELECTRICAL AND PLUMBING CONTRACTORS TO COORDINATE WORK. ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL HEAT TRACING. FLOOR 1"DX COIL CO CO NO INSULATION ON PIPE RISER SEE FLOOR PLAN FOR RECEPTACLE LOCATION. WALK-IN COOLER OR FREEZER BOX PROVIDE TRAP AT BOTTOM OF RISER AND DISCHARGE INTO FLOOR DRAIN OR FLOOR SINK WITH AIR GAP OF TWO PIPE DIAMETERS SILICONE SEAL AROUND PIPE PENETRATION PROVIDE 1" ELASTOMERIC INSULATION OVER FREEZE PROTECTION ON CONDENSATE LINE - IF/WHEN FREEZER BOX ONLY - (PROVIDE ELECTRIC HEAT TRACE CABLE PER PLAN. COORDINATE POWER REQUIREMENTS) PROVIDE CLEANOUT IN TURNS AND ENDS OF PIPE MAKE CONNECTION TO COIL AS REQUIRED NOT TO SCALE COOLER/FREEZER CONDENSATE 8 PROVIDE FIBERGLASS INSULATION WITH ALL-SERVICE JACKET WITH VAPOR BARRIER ON ALL COLD/HOT WATER PIPING AND CONDENSATE DRAIN PIPE. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION REGARDING INSULATION. INSTALL ALL ITEMS PER SPECIFICATIONS AND MANUFACTURERS INSTRUCTIONS. MAINTAIN VAPOR BARRIER ON COLD PIPING BY MEANS OF SEALANT AND TAPE. FLAME-SPREAD AND SMOKE-DEVELOPED INDEXES SHALL NOT EXCEED 25/50. SEAL EXPOSED ENDS OF FIBERGLASS INSULATION WITH ADHESIVE MASTIC. REFER TO OTHER DETAILS FOR TREATMENT OF INSULATION AT PENETRATION OF WALLS AND FIREWALLS PROVIDE INSULATION ON DOMESTIC HOT/COLD WATER PIPES, STORM WATER PIPES, AND CONDENSATE DRAIN PIPING IN WALLS AND CHASES MITER THE INSULATION AT TEES AND ELBOWS SO THAT THERE ARE NO GAPS AT JOINTS. PROVIDE ONE-PIECE PRE-MOULDED PVC FITTING COVERS PROVIDE A ONE FOOT LENGTH OF NON-COMPRESSIBLE INSULATION AT HANGERS FOR ALL PIPE 2" AND LARGER COVER VALVE BODIES WITH INSULATION, BUT NOT UNIONS TAPE JOINTS OF FIBERGLASS INSULATION FLOOR NOT TO SCALE PIPE INSULATION 4 AI R G A P 2" M I N . FINISHED FLOOR PVC PIPE (SIZE WILL VARY) 3" SANITARY LINE (SEE PLUMBING PLAN) FLOOR SINK (BY PLUMBING CONTRACTOR) NOT TO SCALE INDIRECT DRAIN 19 PROVIDE ONE PIECE SPUN ALUMINUM BASE WITH, GRADUATED STEPPED PVC BOOT, AND ADJUSTABLE STAINLESS STEEL CLAMPS. SET BASE IN BED OF MASTIC MINIMUM 12" BELOW ROOF ROOF INSULATION ROOF DECK REFER TO ARCHITECT'S DRAWING FOR APPLICATION OF VENT PIPE BOOT INSTALLATION WITH ROOFING MATERIAL PROVIDE SLEEVE IF REQUIRED BY TYPE OF ROOF DECK PROVIDE PIPE INCREASER WHERE REQUIRED TO MAKE MINIMUM 3" VENT THRU ROOF ANCHOR PIPE TO ROOF DECK OR JOISTS WITH U-BOLT AROUND PIPE AND ANGLE IRON WELDED OR SCREWED TO DECK OR JOIST HUBLESS PIPE CONNECTORS ON CAST IRON PIPE REFER TO PLANS FOR VTR PIPE SIZES AND LOCATIONS. LOCATE VTR A MINIMUM OF 10 FEET HORIZONTAL (UNLESS APPROVED BY ENGINEER PRIOR TO INSTALLATION) OR THREE FEET VERTICAL ABOVE ANY BUILDING OPENING OR FRESH AIR INTAKE, AND ONE FOOT FROM ANY VERTICAL SURFACE. PROVIDE 1" FIBERGLASS INSULATION WITH ALL-SERVICE JACKET ON VENT PIPE INSIDE BUILDING WITHIN SIX FEET OF VENT THRU ROOF LOCATION. VERIFY FLASHING AND COUNTERFLASHING WITH ROOFING CONTRACTOR. TERMINATE VENT FLUSH WITH TOP OF PARAPET WALL. NOT TO SCALE VENT THRU ROOF (VTR)18 BALL VALVE: BRONZE BODY, FULL PORT, SCREWED ENDS (TYP) FULL SIZED REDUCED PRESSURE TYPE BACKFLOW PREVENTION DEVICE STRAINER: BRONZE BODY, STAINLESS SCREEN. 24 " M I N . 3" MIN. 6" MIN. PRV SET AT 75PSI SLEEVE AND CAULK CITY WATER METER DETAIL SHOWS GENERAL SCHEMATIC REQUIREMENTS. PROVIDE BACKFLOW PREVENTER OF TYPE AND MANUFACTURER APPROVED BY LOCAL AUTHORITIES. PROVIDE PRESSURE REDUCING VALVE ONLY IF PRESSURE EXCEEDS 80 PSI - VERIFY. STRAINER AND REDUCING VALVE MAY BE INSTALLED IN VERTICAL PIPE IF SPACE LIMITATIONS REQUIRE IT. CLEAN STRAINER BEFORE TURNING BUILDING OVER TO OWNER. PROVIDE ANY REQUIRED CERTIFICATION OF TEST OF BACKFLOW PREVENTER TO LOCAL AUTHORITIES. FLOOR TO FIXTURES NOT TO SCALE DOMESTIC WATER SERVICE ENTRY 14 MOP SINK PC TO PROVIDE WATER HAMMER ARRESTERS BY SIOUX CHIEF, PRECISION PLUMBING PRODUCTS, WATTS OR APPROVED EQUIVALENT WITH PISTON AND 0-RING CONSTRUCTION, HAVING PDI #WH-201, ASSE #1010 OR ANSI #A112.26.1M CERTIFICATION. SIZE AND INSTALL PER PDI #WH-201 STANDARD OR MANUFACTURER'S INSTRUCTION. THE TABLES ABOVE ARE BASED ON THE SIOUX CHIEF PRODUCT LINE. IF PRESSURE IS IN EXCESS OF 65 PSIG THEN UPSIZE THE ARRESTER BY ONE (EXAMPLE: AN 'A' ARRESTER WOULD BECOME A 'B' ARRESTER.) UNIT LOAD FIXTUREPDI SIZE SINGLE FIXTURE KITCHEN SINKS 2.252.25 MULTIPLE FIXTURES FIXTURE UNIT TABULATION FIXTURE 3 HOT - 3 COLD 10AA A B C D 1-3 4-11 12-32 33-60 61-113 ON HORIZONTAL BRANCH LINE LESS THAN 20 FEET LONG, PLACE ONE WITHIN SIX FEET OF THE LAST FIXTURE SERVED ON BRANCH LINE GREATER THAN 20 FEET LONG, PLACE ANOTHER ARRESTER IN THE MIDDLE, EACH IS SIZED FOR HALF THE FIXTURE UNITS LAVATORY WATER CLOSET (VALVE) HW OR CW ARRESTER WITHIN SIX FEET OF FIXTURE SERVED HAND SINKS 1.51.5 WALL HYDRANT/HOSE BIB 22 1.51.5 NOT TO SCALE WATER HAMMER ARRESTORS 6 ENTER BUILDING ABOVE GRADE WITH SLEEVE. SEAL ENTRANCE INTO BUILDING WEATHER-TIGHT SIZE AS SHOWN ON PLAN - USE BLACK STEEL PIPE GAS METER - CFH CAPACITY PER PLAN SHUT-OFF VALVE GRADE OR PAVEMENT PRESSURE REGULATOR (7" W.C.) EXTERIOR BUILDING WALL BY GAS COMPANY (VERIFY) FLOOR BY PLUMBING CONTRACTOR STRAINER PRESSURE TEST COCK PIPE INCREASER VERIFY REQUIREMENTS FOR METERING AND PIPING WITH GAS COMPANY. GAS COMPANY SHALL EXCAVATE, BACKFILL, AND REPAIR PAVING AND SOD FOR GAS SERVICE LINE INSTALLATION FROM MAIN TO BUILDING. PLUMBING CONTRACTOR TO PAY ALL GAS COMPANY FEES FOR THIS INSTALLATION. USE WELDED OR SCREWED PIPE AND FITTINGS PER SPECIFICATIONS. PAINT EXPOSED METAL GAS PIPE, FITTINGS AND ITEMS TO MATCH BUILDING. 6" DEEP SEDIMENT TRAP NOT TO SCALE GAS SERVICE 2 SANITARY LINE (SEE PLUMBING PLAN) FINISH FLOOR VENT LINE (SEE PLUMBING PLAN) 3" CAPPED PVC PIPE STUBBED 1'-0" AFF NOT TO SCALE HUB DRAIN 9 PIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD CONDITIONS. MAKE PIPE SAME SIZE AS TANK FITTING. FOLLOW MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION PROCEDURE. VERIFY PROPER OPERATION WHEN INSTALLED. EXPANSION TANK INSTALLATION SHALL OCCUR ONLY WHEN THERE IS A BACKFLOW PREVENTION DEVICE INSTALLED WITHIN THE BUILDING WATER SYSTEM. WELDED STEEL THEN OPEN VALVE WATER PRESSURE, PRESSURE TO MATCH FILL TANK WITH AIR AIR CHARGING VALVE BUTYL DIAPHRAGM POLYPROPYLENE LINING EXPANSION TANK WITH DISSIMILAR METALS DIELECTRIC IF TO WATER HEATER COLD WATER SUPPLY PIPE UNION: NEXT TO PIPE TEE PIPE HANGER NOT TO SCALE SMALL EXPANSION TANK 3 TO EXPANSION TANK IF REQUIRED, SEE DETAIL STRAP-ON AQUASTAT SET 5 DEGREES LOWER THAN HEATER TEMPERATURE H.W. C.W. STRAINER RECIRCULATION PUMP CHECK VALVE WATER HEATER PIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD CONDITIONS. REFER TO "LARGE WATER HEATER" DETAIL FOR MORE INFORMATION. 19RECIRCULATION PUMP NOT TO SCALE GB-250 - 100 GPM - 277 GALLON CAPACITY: DETAIL SHOWS GENERAL SCHEMATIC REQUIREMENTS. CONTRACTOR SHALL SUBMIT PROPOSED GREASE INTERCEPTOR INSTALLATION PLANS AND SPECIFICATIONS TO LOCAL AUTHORITIES FOR THEIR APPROVAL BEFORE ACQUISITION. SEE MANUFACTURER INSTALLATION MANUAL FOR ADDITIONAL INSTRUCTIONS. BED OF UNDISTURBED EARTH OR COMPACTED SAND BACKFILL: 4" - 6" 24" DIAMETER HEAVY DUTY MANHOLES 4"4" INLET DIFFUSER OUTLET DIFFUSER WATER LINE NOT TO SCALE GREASE INTERCEPTOR 15 PIPE OVER FOUR INCH CLEVIS HANGER FOR PROVIDE UPPER ATTACHMENT AS REQUIRED FOR CASES NOT SHOWN HERE. DO NOT INSTALL HANGER INSIDE INSULATION OR OTHERWISE PENETRATE VAPOR BARRIER. DO NOT HANG ONE PIPE FROM ANOTHER EXCEPT IN CHASES. TRAPEZE HANGERS MAY BE USED FOR MULTIPLE PARALLEL PIPES. HANGER SPACING FOR PIPE SIZE: COPPER: 4"=12'-0"; 3"=11'-0"; 212"=10'-0"; 2"=9'-0"; 112"=8'-0"; 114"=7'-0"; 1" & 3 4"=6'-0"; 12"=5'-0". CAST IRON: 10'-0" AND ONE NEAR ALL JOINTS. STEEL: 4"=14'-0"; 3"=12'-0"; 212"=11'-0"; 2"=10'-0"; 112"=9'-0"; 1"=7'-0"; 3 4"=6'-0"; 12"=5'-0". LOCATE HANGERS AS CLOSE AS POSSIBLE TO TURNS AND TEES OF PIPE. PROVIDE SUPPLEMENTARY STEEL STRUTS BETWEEN JOISTS IF REQUIRED. LOCATE HANGERS TO TAKE LOAD OFF OF EQUIPMENT CONNECTIONS. ANCHOR WATER PIPE AGAINST SWAYING DUE TO CHANGES IN WATER VELOCITY. PROVIDE SEISMIC BRACING IF/AS REQUIRED BY LOCAL AUTHORITIES. CHAINS OR PERFORATED STRAP IRON OR STEEL IS NOT ACCEPTABLE. REFER TO CODES FOR FURTHER INFORMATION. PROVIDE GALVANIZED STEEL SADDLE FOR ALL INSULATED PIPE LARGER THAN 3 4". VERIFY INSULATION THICKNESS WHEN SIZING HANGERS. ADJUSTABLE BAND HANGER FOR PIPING FOUR INCH OR LESS TOP BEAM C-CLAMP IF STEEL BAR JOIST STEEL DECK ALL-THREAD ROD. LENGTH AS REQ'D FOR PIPE SLOPE PROVIDE COPPER OR NON-METALLIC COATING WHERE HANGERS CONTACT BARE COPPER PIPE DO NOT HANG PIPE LARGER THAN 3" FROM BOTTOM OF JOISTS. NOT TO SCALE PIPE HANGERS 5 BA C K R O O M I C E M A K E R FI L T E R BACKFLOW PREVENTER FC W - 2 FC W - 2 CO F F E E TE A FI L T E R FI L T E R BOOSTER PUMP PRV SCALE STICK 3/4" CW PR E S S U R E G A U G E P S B FILTER LINES TO EQUIPMENT (BY OTHERS) FILTER MANIFOLD MOUNTED ON WALL E^&ϲϭ TUBING WATER LINE PLAN OVERVIEW LAYOUT SEE DIAGRAM FOR COMPLETE DETAILS MANIFOLDS ON DRINK RACK 3/4" COLD WATER LINE F FF AUTOMATIC BY-PASS MODULE 1/2" FCW-3 1/2" FCW-4 COMBI OVEN (CLEANING CYCLE) COMBI OVEN (STEAM CYCLE) RO SYSTEM (MOUNTED AT MOP SINK) 1/ 2 " C W FC W - 1 FC W - 1 FC W - 1 FC W - 1 FR O N T R O O M I C E M A K E R (D I N I N G R O O M B E V E R A G E U N I T ) FC W - 3 FC W - 3 FC W - 3 FC W - 3 1/ 2 " F C W 1/2" 1/2" ICE MACHINE MANIFOLD BEVERAGE LINE MANIFOLD EQUIPMENT MANIFOLD E^&ϲϭ TUBING E^&ϲϭ TUBING BE V E R A G E L I N E (D R I V E - T H R U ) BE V E R A G E L I N E (D I N I N G R O O M ) CA R B O N A T O R (U T I L I T Y A R E A ) FILTER LINES TO EQUIPMENT (BY OTHERS) FILTER LINES TO EQUIPMENT (BY OTHERS) SP A R E 24 " A F F . OI L FRYERS CAP 24" UNION WALL PENETRATION 3/4" USED OIL RECOVERY LINE MOUNTED TO WALL WITH STANDOFF ANCHORS, ALL THREAD, AND SPLIT RING HANGERS. COORDINATE WITH ARCHITECTURAL AND VENDOR DRAWINGS FOR INSTALLATION. USED COOKING OIL LINE CANNOT PROTRUDE MORE THAN 3" FROM THE WALL. PITCH DOWN 1/4" PER FOOT TO USED COOKING OIL TANK 3" MAX.OIL PROVIDE STAINLESS STEEL ESCUTCHEON AT WALL 7USED OIL RECOVERY LINE NOT TO SCALE NOT TO SCALE WATER FILTRATION SYSTEM 1 HOT WATER TO WAREWASH AS SHOWN ON PLANS REFER TO SPECIFICATIONS AND SCHEDULE SET WATER HEATER ON PLATFORM (BY OTHERS). PIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD CONDITIONS. REFER TO FLOOR PLAN FOR PIPE SIZES. SET WATER HEATER THERMOSTAT AT 140° FAHRENHEIT. PROVIDE SEISMIC STRAP OR BRACING AND FLEXIBLE CONNECTORS TO WATER AND GAS CONNECTIONS IF/AS REQUIRED BY LOCAL AUTHORITIES. SHUT-OFF VALVE PIPE UNIONS, (DIELECTRIC REQUIRED FOR DISSIMILAR METALS) VALVE DRAIN PROVIDE A 210° F TEMPERATURE AND 150 PSI PRESSURE RELIEF VALVE WITH TEST LEVER SIZED WITH AGA TEMPERATURE RATING 10% OVER HEATING INPUT HARD COPPER RELIEF DISCHARGE LINE. FULL SIZE OF VALVE OUTLET TO END OVER FLOOR SINK WITH 6 INCH AIR GAP 140° FC HOT WATER SUPPLY TO WATER HEATER NOT TO SCALE SMALL WATER HEATER ON PLATFORM 10 GAS 36 " A F F . GA S 1" FRYERS 1-1/2" 1" NPT TO FRYER 1-1/2" GAS LINE. EXTEND THROUGH WALL TO AUTOMATIC GAS SHUTOFF VALVE BELOW FINISHED CEILING WALL PENETRATIONS 3" MAX. QUICK DISCONNECT (TYP.) 1-1/2" GAS LINE MOUNTED TO WALL WITH STANDOFF ANCHORS, ALL THREAD, AND SPLIT RING HANGERS. COORDINATE WITH ARCHITECTURAL AND VENDOR DRAWINGS FOR INSTALLATION. LINE TO EXTEND COMPLETELY THROUGH WALL AND UP TO VALVE LOCATED BELOW CEILING. GAS LINE CANNOT PROTRUDE MORE THAN 3" FROM THE WALL. 3" DEEP SEDIMENT TRAP 11NATURAL GAS COOKING LINE NOT TO SCALE FR O N T R O O M I C E M A K E R (D I N I N G R O O M B E V E R A G E U N I T ) BE V E R A G E L I N E (D I N I N G R O O M ) PLUMBING DETAILS P4.0 AUTHOR CHECKER 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments ANCHOR TANK LEGS TO FLOOR OR PLATFORM OR AS REQUIRED BY LOCAL CODE AUTHORITIES. SET TANK AS CLOSE TO WALL AS POSSIBLE. PROVIDE WOOD BLOCKS FOR SPACERS BETWEEN WALL AND TANK IF REQUIRED. ATTACH TO WALL AS REQUIRED (TYP FOR 2) PROVIDE 1"x18" STEEL BAND DOWN 1/3 FROM THE TOP, AND UP 1/3 FROM THE BOTTOM OF TANK. BEND ENDS OF STRAP AND ANCHOR SECURELY TO WALL AS REQUIRED. (TYP FOR 2) WATER HEATER OR TANK NOT TO SCALE TANK SEISMIC RESTRAINT 3 SUPPLY PIPE 4" LONG SEDIMENT TRAP G SHUT-OFF VALVE.PRESSURE REGULATOR AS REQUIRED UNION. BLACK IRON. PAINT LINES SAFETY YELLOW. ROUTE LINES TO AVOID CONFLICTS ROOF TO EQUIPMENT NOT TO SCALE ROOFTOP UNIT GAS CONNECTION 1 PIPE SIZE SPACING TRANSVERSE BRACE LONGITUDINAL BRACE BOLT SIZE ROD SIZE MAX ROD LENGTH VERTICAL BRACETR. LO. 1"-2" 20' 20' 2"X2"X18GA 2"X2"X18GA 14"3 8" 20" 2"X2"X18GA 212"-3" 40' 40' 2 12"X212"X16GA 2 12"X212"X16GA 3 8"12"25" 2"X2"X16GA 4"-5" 40' 40' 2 12"X212"X16GA 2 12"X212"X16GA 12"5 8" 31" 2"X2"X16GA 6" 40' 40' 2 12"X212"X12GA 2 12"X212"X12GA 12"3 4" 37" 2 12"X212"X16GA 8" 40' 40'212"X212"X12GA 2 12"X212"X12GA 5 8"7 8"43" 2 12"X212"X12GA 10" 20' 20' 2 12"X212"X12GA 2 12"X212"X12GA 3 4"7 8" 43" 2 12"X212"X12GA DO NOT BRACE ANY PIPES WHERE TOP OF PIPE TO BOTTOM OF UPPER ATTACHMENT IS LESS THAN 12". BRACE GAS, OIL AND AIR PIPES 1" AND LARGER. BRACE ALL PIPES IN EQUIPMENT ROOMS 1-1/4" AND LARGER. BRACE ALL OTHER PIPE 2-1/2" AND LARGER. BRACE HUBLESS CAST IRON PIPE ON EACH SIDE OF ANY CHANGE IN DIRECTION OF 90 DEGREES OR MORE. MAXIMUM HANGER ROD LENGTH IS 6 FEET. WHERE LENGTH OF RUN EXCEEDS LONGITUDINAL BRACE SPACING, PROVIDE 2 FEET OFFSET IN PIPE AND LOCATE BRACE AT MID RUNS. REFER TO CURRENT EDITION OF SMACNA "SEISMIC RESTRAINT MANUAL" FOR ALTERNATIVE ATTACHMENTS AND ADDITIONAL INFORMATION AND REQUIREMENTS. (THIS DETAIL APPLIES IN THE ABSENCE OF OTHER LOCAL CODE REQUIREMENTS.) STANDARD STEEL PIPE CLAMP TRANSVERSE BRACE 4" MAXIMUM TYPICAL ALL BRACES 2 MAX. 1 MIN. 1 LONGITUDINAL BRACE 1 MIN. 2 MAX. WELD 1/8" 1"-24" STEEL BEAM CONCRETE 1 WOOD BEAM PROVIDE ROD SIZE TABULATED, WITH VERTICAL BRACE IF ROD LENGTH EXCEEDS TABULATION. ANGLE IRON BRACE AND BOLTS PER TABLE (TYP.) STEEL JOIST PIPE HANGER DRILLED IN THREADED INSERT. DO NOT USE SHOT-IN INSERTS. BOLT (WITH TWO WASHERS) BETWEEN JOIST MEMBERS BOLT (WITH TWO WASHERS) NEAR TOP OF BEAM BOLT (WITH TWO WASHERS) NEAR TOP OF BEAM UPC ZONE 3 OR 4; SMACNA SHL-A NOT TO SCALE SEISMIC BRACING FOR PIPE 4 7' - 1 1 " 12" NSF 61 TUBING CARBONATOR RACK NOT TO SCALE CARBONATOR RACK ROUGH-IN 7 3" MAX. 2' - 0 " 3' - 0 " 1' - 0 " WHEEL CHOCK (BY OTHERS) GAS MANIFOLD USED COOKING OIL LINE RESTRAINING CABLE (BY OTHERS) REFER TO HOOD DRAWINGS 9GAS FRYER INSTALLATION NOT TO SCALE 2' - 6 " 2'-6" WB WATER BOX WITH CAPPED DRAIN OUTLET. MARK SUPPLY OUTLETS WITH R.O. AND F.W. STICKERS. 12" PEX-A FW TUBING IN WALL COMBI OVEN 12" PEX-A RO TUBING WALL NOT TO SCALE COMBI OVEN WATER ROUGH-IN 6 7' - 4 3 / 4 " T.O.F.F. CEILING 8'-10" WH-2 5' - 1 3 / 4 " T2061 3 4"HW 3 4"HW 5WAREWASH W/ WATER HEATER NOT TO SCALE PLUMBING DETAILS P4.1 AUTHOR CHECKER 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments PLUMBING SPECIFICATIONS 20500 GENERAL PROVISIONS A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL A PLUMBING SYSTEM, COMPLETE AS INDICATED ON THE DRAWINGS, AS REQUIRED BY CODE AND AS SPECIFIED HEREIN. B. WITHOUT RESTRICTING THE GENERALITY OF THE FIRST STATEMENT, THE WORK TO BE PERFORMED UNDER THIS DIVISION SHALL INCLUDE, BUT IS NOT LIMITED TO, THE FOLLOWING: 1. PLUMBING WORK AS DESCRIBED IN SECTIONS 220500 THROUGH 224000. C. THE ELECTRICAL CONTRACTOR, UNLESS OTHERWISE NOTED, IS TO PROVIDE POWER WIRING FOR EACH ITEM OF ELECTRICAL EQUIPMENT AND MAKE FINAL CONNECTIONS TO MOTORS. D. ALL FINISH PAINTING IS TO BE PERFORMED BY THE GENERAL CONTRACTOR, EXCEPT AS NOTED ELSEWHERE. THIS CONTRACTOR SHALL RESTORE TO ORIGINAL CONDITION ANY PAINTING DEFACED BY THIS CONTRACTOR AFTER ORIGINAL PAINTING. E. ALL WORK SHALL CONFORM TO CODES, RULES, AND REGULATIONS: 1. STATE PLUMBING CODE. 2. LOCAL BUILDING CODE. 3. NATIONAL FIRE PROTECTION ASSOCIATION. 4. CERTAIN CODES AND STANDARDS AS SET UP BY VARIOUS TECHNICAL SOCIETIES SUCH AS ASME, ASHRAE, ASTM, SMACNA, ARI, AABC, OR IEEE. 5. FEDERAL OCCUPATIONAL SAFETY AND HEALTH STANDARDS. 6. LOCAL INSPECTOR'S REQUIREMENTS. 7. STATE INDUSTRIAL COMMISSION REQUIREMENTS. 8. BUILDING INSURING AGENCY REQUIREMENTS. F. ALL PERMITS REQUIRED BY LAWS, ORDINANCES AND BUILDING CODES HAVING JURISDICTION SHALL BE OBTAINED AT THE PROPER TIME BY AND AT THE EXPENSE OF THIS CONTRACTOR. G. THIS CONTRACTOR SHALL OBTAIN ALL INSPECTIONS REQUIRED BY ALL LAWS, ORDINANCES AND PUBLIC AUTHORITY HAVING JURISDICTION AND SHALL OBTAIN CERTIFICATES OF SUCH INSPECTIONS AND SUBMIT SAME TO THE ARCHITECT AND SHALL PAY ALL FEES, CHARGES, ASSESSMENTS AND OTHER EXPENSES IN CONNECTION THEREWITH. H. PIPING AND EQUIPMENT LAYOUT IS SCHEMATIC. EXACT LOCATIONS ARE DETERMINED BY STRUCTURAL AND OTHER CONDITIONS. DESIGN OF SYSTEM MAY NOT BE CHANGED. ONLY EXACT LOCATION OF PIPING MAY BE REVISED TO SUIT CONSTRUCTION CONDITIONS AND AID IN COORDINATION WITH WORK OF OTHER CONTRACTORS. I. THE MATERIALS AND EQUIPMENT INSTALLED IN THE WORK SHALL MEET THE REQUIREMENTS OF THE CONTRACT DOCUMENTS AND NO MATERIALS OR EQUIPMENT SHALL BE ORDERED UNTIL REVIEWED BY THE ENGINEER AND/ OR ARCHITECT. J. THIS CONTRACTOR SHALL SUBMIT SHOP DRAWINGS PER THE DOCUMENTS PROVIDED BY THE OWNER/ARCHITECT/CONTRACTOR. 1. EXPANSION TANK 2. DRAINS AND CLEANOUTS 3. VALVES 4. ALL PLUMBING FIXTURES, FAUCETS AND FITTINGS 5. WATER HEATER 6. PIPE INSULATION 7. GREASE INTERCEPTOR K. CATALOG DATA FOR EQUIPMENT REVIEWED BY THE ARCHITECT SHALL NOT SUPERSEDE THE ENGINEER'S CONTRACT DOCUMENTS. THE REVIEW OF THE ENGINEER SHALL NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR DEVIATIONS FROM DRAWINGS OR SPECIFICATIONS, PROVIDING PROPER CLEARANCE FABRICATION PROCESS AND COORDINATION WITH OTHER TRADES. L. WHEN SUBMITTED FOR THE ARCHITECT'S REVIEW, SHOP DRAWINGS SHALL BEAR THE CONTRACTOR'S CERTIFICATION THAT THEY HAVE REVIEWED, CHECKED AND APPROVED THE SHOP DRAWINGS, THAT THEY ARE IN HARMONY WITH THE REQUIREMENTS OF THE PROJECT AND WITH THE PROVISIONS OF THE CONTRACT DOCUMENTS AND THAT THEY HAVE VERIFIED ALL FIELD MEASUREMENTS AND CONSTRUCTION CRITERIA, MATERIALS, CATALOG NUMBERS AND SIMILAR DATA. CONTRACTOR SHALL ALSO CERTIFY THAT THE WORK REPRESENTED BY THE SHOP DRAWINGS IS RECOMMENDED BY THE CONTRACTOR AND THE CONTRACTOR'S GUARANTEE WILL FULLY APPLY. M. ALL CONTRACTORS SUBMITTING PROPOSALS FOR THIS WORK SHALL FIRST EXAMINE THE SITE AND ALL CONDITIONS THEREIN. ALL PROPOSALS SHALL TAKE INTO CONSIDERATION ALL SUCH CONDITIONS AS MAY AFFECT THE WORK UNDER THIS CONTRACT. THE SUBMITTING OF A BID AUTOMATICALLY IMPLIES THAT THIS EXAMINATION OF SITE HAS BEEN DONE. N. CONTRACTOR SHALL VERIFY LOCATION OF UTILITIES AND NOTE CONDITIONS WHICH WOULD AFFECT THE WORK. ALL DISCREPANCIES SHALL THEN BE REPORTED PRIOR TO THE BID AWARD. O. PROVIDE INSTRUCTION TO OWNER'S OPERATING PERSONNEL AS NECESSARY, SHOWING LOCATIONS AND PROPER OPERATION OF MAJOR ITEMS OF EQUIPMENT AND SYSTEM COMPONENTS AND REFERRING TO THE OPERATING INSTRUCTION MANUAL DESCRIBED BELOW AS A GUIDE. P. COMPILE A WRITTEN MANUAL OF OPERATING INSTRUCTIONS INCLUDING COPIES OF SHOP DRAWINGS AND A LISTING OF EQUIPMENT SUPPLIERS. ASSEMBLE IN 8-1/2" X 11" HARD BACKED INDEXED BINDER. MATERIAL SHALL BE AS FOLLOWS: 1. TITLE PAGE: TITLE OF JOB, TENANT, ADDRESS, DATE OF SUBMISSION, CONTRACTOR AND ENGINEER. 2. INDEX. 3. ST OF MAJOR EQUIPMENT USED IN PROJECT ACCOMPANIED BY CONTRACTOR PURCHASE ORDER NUMBERS AND SUPPLIERS NAMES AND ADDRESSES. 4. ONE COPY OF EACH SHOP DRAWING GROUPED BY TYPES OF EQUIPMENT, I.E., PLUMBING FIXTURES, VALVES, ETC. 5. SECTION FOR EACH SYSTEM INCLUDING: 5.1. BRIEF DESCRIPTION OF SYSTEM OPERATION WITH LOCATION OF MAJOR COMPONENTS. 5.2. LIST OF ITEMS IN SYSTEM REQUIRING PERIODIC SERVICE. Q. SUBMIT A COMPLETED COPY TITLED "PLUMBING OPERATING INSTRUCTION MANUAL" ON THE BINDING EDGE OF BINDER TO ARCHITECT FOR APPROVAL. AFTER ARCHITECT'S REVIEW AND ANY CORRECTIONS REQUIRED ARE COMPLETED, SUBMIT A COPY OF THE MANUAL, TO THE OWNER. 220502 FIRESTOPPING A. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR FIRESTOPPING AROUND ALL OPENINGS FOR PIPES, DUCTS, CONDUITS ETC., INSTALLED BY CONTRACTOR AT ALL FIRE WALLS. FIRESTOPPING SHALL BE PERFORMED BY AN INSTALLER WHO HAS BEEN TRAINED BY THE MANUFACTURER, OR MANUFACTURER'S REPRESENTATIVE, IN THE INSTALLATION PROCEDURES BASED ON PUBLISHED UL TESTED FIRE STOP SYSTEMS. B. FIRESTOPPING SHALL MEET THE REQUIREMENTS OF ASTM E-814 OR UL 1479 FIRE TESTS BY A RECOGNIZED TESTING AGENCY. FIRESTOPPING SHALL ALSO CONFORM TO THE FOLLOWING GOVERNING CODES: INTERNATIONAL BUILDING CODE, NFPA 101- LIFE SAFETY CODE & NFPA 70 - NATIONAL ELECTRIC CODE. C. PENETRATION 1. CLEAN PENETRATION HOLES OF DIRT, LOOSE MATERIALS AND FOREIGN MATTER WHICH MAY AFFECT BOND OR INSTALLATION. 2. REMOVE COATINGS SUCH AS PAINT, CURING COMPOUNDS, WATER REPELLENT & SEALERS AS REQUIRED. 3. INSTALL BACKING MATERIALS TO PREVENT LIQUID MATERIAL LEAKAGE. D. APPLICATION 1. PREPARE AND APPLY PENETRATION SEALING SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S PRINTED INSTRUCTIONS. 2. EMPLOY INSTALLATION TECHNIQUES WHICH WILL ENSURE THAT FIRESTOPPING IS DEPOSITED TO FILL AND SEAL HOLES AND OPENINGS. 3. TOOL EXPOSED SURFACES OF APPLIED SEALANT TO SMOOTH FINISH. 4. PROTECT MATERIALS FROM DAMAGE ON SURFACES SUBJECTED TO TRAFFIC. E. PROVIDE INTUMESCENT SEALANTS AND COLLARS AT OPENINGS INVOLVING PLASTIC OR INSULATED PIPE SIMILAR TO THE METACAULK SERIES 880 AND 950. F. FIRESTOPPING BY DOW CORNING, 3M, HILTI OR METACAULK MAY FURNISHED AT THE CONTRACTOR'S OPTION. 220529 PIPE ANCHORS, HANGERS AND SUPPORTS A. ALL PIPING SHALL BE SEPARATELY HUNG AND SUPPORTED FROM APPROVED STRUCTURAL MEMBERS OR CONCRETE OVERHEAD STRUCTURE ONLY. NO PIPE SHALL BE HUNG FROM ROOF DECK, PIPE, DUCTS OR OTHER COMPONENTS OR EQUIPMENT OF OTHER TRADES. B. PROVIDE LISTED/APPROVED ADJUSTABLE HANGERS, INSERTS, BRACKETS, CLAMPS, SUPPLEMENTARY STEEL AND OTHER DEVICES REQUIRED FOR PROPER SUPPORT OF ALL PIPE LINES. C. HANGERS SHALL BE DESIGNED TO ALLOW FOR EXPANSION AND CONTRACTION AND TO ALLOW INSULATION (WHERE APPLICABLE) TO RUN CONTINUOUSLY THROUGH HANGERS. D. WIRE OR STRAP HANGERS ARE NOT PERMITTED. ADJUST HANGERS SO AS TO DISTRIBUTE WEIGHT LOAD EQUALLY ON ATTACHMENTS. 220548 PLUMBING SYSTEM TESTING A. SYSTEM TESTING SHALL PROVIDE FOR THE FOLLOWING: 1. TEST NEW INTERIOR DOMESTIC WATER SYSTEM. 2. TEST ALL SOIL, WASTE, AND VENT PIPING. 3. FURNISH ALL PUMPS FOR AIR AND WATER PRESSURE TESTS ALONG WITH GAUGES AND ANY OTHER REQUIRED TEST EQUIPMENT. 4. UNDERGROUND LINES TO BE TESTED BEFORE BEING CONCEALED. CONTRACTOR SHALL REPAIR ANY LEAKS AND ALL DAMAGE RESULTING THEREFROM. 5. CHANGES IN AMBIENT TEMPERATURE WILL BE TAKEN INTO ACCOUNT WHEN TESTING UNDERGROUND PIPING, HOWEVER, THE VARIOUS SYSTEMS SHALL BE THOROUGHLY INSPECTED FOR LEAKS BEFORE HYDROSTATIC PRESSURE TESTS ARE CONCLUDED. 6. INTERIOR WATER PIPING: HYDROSTATIC TEST AT 125 PSI AWWA PROCEDURES AND TO THE SATISFACTION OF LOCAL AUTHORITY HAVING JURISDICTION. 7. SOIL, WASTE, AND VENT PIPING SHALL BE WATER AND SMOKE OR AIR TIGHT (STATE PLUMBING CODE). B. MEASURE LEAKAGE BY METERING WATER REQUIRED TO MAINTAIN LINE PRESSURE. REMOVE AIR BEFORE TESTING. C. REPAIR ANY LEAKING JOINTS AND DEMONSTRATE ACCEPTABLE LEAKAGE TO SATISFACTION OF OWNER'S REPRESENTATIVE AND APPROVING AUTHORITY. FLUSH ALL PIPING BEFORE PLACING INTO OPERATION. 220550 STERILIZATION A. STERILIZE NEW DOMESTIC WATER LINES AFTER INSTALLATION. B. FURNISH A CERTIFICATE OF STERILIZATION AND APPROVAL FOR HUMAN CONSUMPTION TO BE SIGNED BY A PROFESSIONAL ENGINEER REGISTERED IN THIS STATE, REGULARLY EMPLOYED BY THE TESTING LABORATORY. CERTIFICATE MUST BE GIVEN TO THE ARCHITECT AND OWNER BEFORE FINAL PAYMENT WILL BE MADE. C. STERILIZATION SHALL BE BY MEANS OF CHLORINE INJECTED INTO THE WATER SYSTEM NEAR THE SOURCE AND OUTLETS THROUGHOUT THE SYSTEM SHALL BE TESTED TO PROVE PRESENCE OF MINIMUM REQUIREMENTS. LEAVE CHLORINE IN FOR 24 HOURS AND FLUSH OUT SYSTEM UPON COMPLETION OF WORK. STERILIZATION PROCEDURE SHALL BE WITNESSED BY THE OWNER'S REPRESENTATIVE. D. STERILIZATION SHALL BE PERFORMED UNDER THE IMMEDIATE SUPERVISION OF A WATER TESTING LABORATORY REGULARLY ENGAGED IN THE SERVICE AND SHALL BE DONE ACCORDING TO THEIR INSTRUCTIONS. 220560 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT A. STENCILS, LABELS, TAGS, AND COLOR CODES SHALL CONFORM TO ANSI A13. B. PRODUCTS SHALL BE SETON. EQUAL PRODUCTS BY BRADY MAY BE FURNISHED AT CONTRACTOR'S OPTION. C. STENCILS FOR EQUIPMENT SHALL BE REUSABLE AND HAVE 1" HIGH CHARACTERS. CHARACTERS SHALL BE PAINTED WHITE OVER A BLACK BACKGROUND. STENCIL ONLY AFTER FINAL PAINTING IS COMPLETE. CHARACTERS SHALL BE LEGIBLE FROM FLOOR. APPLY CLEAR ACRYLIC, LACQUER, OR VARNISH OVER THE FINISHED STENCIL. D. FOR PIPING PROVIDE ANSI STANDARD COLOR FLEXIBLE VINYL LABELS WITH PERMANENT PRESSURE SENSITIVE ADHESIVE BACK. LABEL SHALL BE OF SUFFICIENT LENGTH TO ENCIRCLE THE PIPE (AND INSULATION WHEN APPLICABLE) AND OVERLAP ON ITSELF. EACH LABEL SHALL HAVE AT LEAST ONE FLOW DIRECTION ARROW AND SHALL BE PERMANENTLY LABELED WITH PIPE CONTENT. E. SYSTEM PIPING TO LABLED SHALL INCLUDE THE FOLLOWING: 1. DOMESTIC WATER (INCLUDING COLD, HOT, RECIRCULATING, FILTERED, AND REVERSE OSMISIS) 2. SANITARY WASTE AND VENT (ABOVE GRADE ONLY) 3. NATURAL GAS 4. USED COOKING OIL F. DOMESTIC WATER PIPING SHALL BE LABLED ON EXTEROR OF INSULATION IN ACCORDANCE WITH ANSI A13. G. PIPING, VALVES, DRAINS, CONTROL PANELS AND SIMILAR EQUIPMENT SHALL BE IDENTIFIED AS TO FUNCTION AND SYSTEM NUMBER AS DIRECTED BY THE OWNER'S REPRESENTATIVE AND AS LISTED BELOW: IDENTIFICATION ITEM : TYPE PIPING : STENCIL OR PIPE LABEL VALVES : TAG PIPING SPECIALTY : TAG WATER HEATER AND OTHER EQUIPMENT : STENCIL H. IDENTIFY PIPE LINES WITH STENCIL OR PIPE LABEL WITH COLOR CODED BANDS AT THE FOLLOWING LOCATIONS: 1. AT EQUIPMENT CONNECTION AT EACH VALVE. 2. AT BOTH SIDES OF WALLS THROUGH WHICH PIPE PASSES. 3. AT EVERY 20 FT. INTERVAL ON CONTINUOUS PIPE LINES. 4. AT EACH BRANCH CONNECTION. 5. SHOW FLOW DIRECTION ARROWS AT EACH IDENTIFICATION POINT. 220700 INSULATION A. PIPE INSULATION AND APPURTENANCES AND COVERINGS ON PIPES USED IN CHASES, SHAFTS OR OTHER CONCEALED SPACES IN TYPES 1 AND 2 CONSTRUCTION SHALL HAVE A FLAME SPREAD RATING NOT EXCEEDING TWENTY-FIVE (25) AND IN TYPE 3 AND 4 CONSTRUCTION NOT EXCEEDING SEVENTY-FIVE (75) AND A SMOKE DEVELOPED RATING NOT EXCEEDING FIFTY (50). B. INSULATION SHALL BE RIDGE ONE-PIECE FIBERGLASS PIPE INSULATION WITH REQUIREMENTS COMPLYING WITH ASTM C 547, SELF-SEALING ADHESIVE LAP LONGITUDINAL JOINTS AND BUTT STRIPS FOR TRANSVERSE JOINTS. JACKETING SHALL CONFORM TO ASTM C 1136, TYPE I, MAXIMUM VAPOR TRANSMISSION RATING OF 0.02 PERM WHEN TESTED ACCORDING TO ASTM E 96, PROCEDURE A. (K VALVE) 0.25 BTU/IN./HR. * FT2 * °F AT 75°F MEAN TEMPERATURE WITH A MINIMUM R-VALVE OF R4. PROVIDE INSULATION THICKNESS AS INDICATED: DOMESTIC COLD WATER PIPING 1" AND SMALLER: 1/2" THICKNESS DOMESTIC COLD WATER PIPING 1-1/4" - 1-1/2": 3/4" THICKNESS DOMESTIC COLD WATER 2" AND LARGER: 1" THICKNESS DOMESTIC HOT WATER PIPING 3/4" AND SMALLER: 1" THICKNESS DOMESTIC HOT WATER PIPING 1" - 1-1/2: 1-1/2" THICKNESS PLUMBING VENT PIPING WITHIN 6 FEET OF ROOF OUTLET: 1" THICKNESS CONDENSATE PIPING: 1/2" THICKNESS USED COOKING OIL : 1" THICKNESS C. GLUE IN PLACE WITH SCHULLER U-GLUE. D. THE FITTINGS SHALL BE INSULATED WITH SCHULLER ZESTON INSULATION AND HAVE FACTORY PREMOLDED PVC COVERS. BUTT THE JOINTS TOGETHER AND WRAP WITH 3" WIDE STRIP TAPE, SEAL IN PLACE WITH SCHULLER U-GLUE. E. INSULATION SHALL NOT BE APPLIED UNTIL THE GENERAL CONSTRUCTION HAS PROGRESSED SUFFICIENTLY TO INSURE AGAINST PHYSICAL OR MOISTURE DAMAGE TO THE INSULATION. ALL INSULATION DAMAGED THROUGH FAILURE TO OBSERVE THIS DIRECTIVE SHALL BE REPLACED AT PLUMBING CONTRACTOR'S EXPENSE. F. INSTALL ALL INSULATION ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. G. INSULATION SHALL NOT BE APPLIED OVER FLANGES, JOINTS AND SEAMS IN PIPING. H. INSULATION SHALL BE SCHULLER. EQUAL PRODUCT BY ARMSTRONG, CERTAINTEED, OWENS-CORNING OR KNAUF MAY BE FURNISHED AT THE CONTRACTOR'S OPTION. 221113 PLUMBING BASIC MATERIALS AND METHODS A. PROVIDE AND ERECT THE FOLLOWING PIPING AS SHOWN ON THE DRAWINGS AND/OR AS REQUIRED. 1. SANITARY BUILDING DRAIN AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON SOIL PIPE. 2. SCHEDULE 40 PVC PIPING MAY BE USED FOR SANITARY WASTE AND VENT PIPING AT THE CONTRACTOR'S OPTION IF CEILING SPACE IS NOT USED AS A RETURN AIR PLENUM SPACE. 3. DOMESTIC HOT AND COLD WATER USE TYPE "L" HARD COPPER PIPE. 4. CAST IRON - NON-COMBUSTIBLE PIPING REQUIRED IN WALL AT HOODS. B. THIS CONTRACTOR IS TO BECOME INFORMED OF THE EXACT DIMENSIONS OF FINISHED WORK WHERE PIPES ARE TO BE PLACED AND WILL ARRANGE THE WORK ACCORDINGLY, ASSUMING ALL RESPONSIBILITY FOR PROPER LOCATION. IN THE ERECTION OF THE MAINS, SPECIAL CARE SHALL BE USED PROVIDING SUPPORT AND PROPER ALLOWANCES SHALL BE MADE FOR EXPANSION. C. ALL PIPE LINES MUST BE PROVIDED WITH A SUFFICIENT NUMBER OF FITTINGS OR UNIONS TO MAKE POSSIBLE DISASSEMBLY WITHOUT BREAKAGE OF FITTINGS. D. ALL EXPOSED PIPING SHALL BE NEAT AND CAREFULLY ALIGNED WITH THE STRUCTURAL ELEMENTS OF THE BUILDING. NO OFFSETS OR OBLIQUE BENDS WILL BE PERMITTED. DRAWINGS ARE DIAGRAMMATIC AND SHOULD NOT BE USED FOR LAYOUT WORK. E. ALL LOW POINTS IN WATER PIPING TO HAVE DRAIN VALVES WITH STANDARD HOSE ATTACHMENTS. HOT AND COLD WATER PIPING IS TO PITCH TOWARD THE NEAREST DRAIN VALVE. F. ALL PIPES TO BE INSTALLED SHALL BE LOCATED AT SUFFICIENT DISTANCE FROM WALLS, OTHER PIPES, CONDUIT, DUCTWORK AND OTHER OBSTACLES TO AVOID INTERFERENCE AND TO PERMIT THE APPLICATION OF FULL THICKNESS OF INSULATION SPECIFIED. G. MECHANICAL JOINT TYPE PIPING SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. THERMOMETERS BY TRERICE, ASHCROFT, MARSHALLTOWN, AND WEISS ARE ACCEPTABLE. 221000 PLUMBING SYSTEMS A. SANITARY BUILDING DRAIN, SOIL, WASTE AND VENT LINES SHALL BE SERVICE WEIGHT CAST IRON HUBLESS PIPE WITH STAINLESS STEEL AT COUPLINGS. SCHEDULE 40 PVC MAY BE USED FOR SANITARY WASTE AND VENT PIPING IF CEILING SPACE IS NOT USED AS A RETURN AIR PLENUM. TYPE NO. S1110-4 MAY BE USED IN LIEU OF FIELD FABRICATED FLASHINGS. B. VENT STACKS SHALL EXTEND THROUGH THE BUILDING, TERMINATING 12" ABOVE THE ROOF. STANDARD FLASHING SHALL BE EXTENDED 12" IN ALL DIRECTIONS FROM THE VENT TERMINAL AND TURNED DOWN INTO VENT. FLASHING UNITS AS MADE BY STONEMAN CAULK TYPE NO. S1110-4 MAY BE USED IN LIEU OF FIELD FABRICATED FLASHINGS. C. HORIZONTAL RUNS SHALL BE GIVEN AS STEEP A PITCH TOWARD THE OUTLET AS CONDITIONS WILL PERMIT BUT NOT LESS THAN 1/8" PER FOOT. D. FULL "Y" BRANCH FITTINGS AND EXTENSION WITH BRASS NIPPLES AND FINISHED SCREW PLUGS FOR CLEANOUTS SHALL BE PLACED IN ACCESSIBLE POSITIONS AT ENDS OF HORIZONTAL LINES OF PIPE AND AT FOOT OF ALL VERTICAL LINES OF PIPE OR ELSEWHERE, AS MAY BE REQUIRED BY THE CODE. E. WHERE CLEANOUTS OCCUR IN FINISHED AREAS, THEY SHALL BE RECESSED AND COVERS TO BE FLUSH WITH THE FLOOR OR WALL. F. HOT AND COLD WATER PIPING SHALL BE PROVIDED AS FOLLOWS: 1. TYPE "L" HARD COPPER TUBE WITH SOLDER FITTINGS. COPPER TUBING SHALL HAVE SWEAT JOINTS AND BE CLEAN OF SCALE AND FOREIGN MATTER BEFORE INSTALLATION. ALL ENDS OF TUBING TO BE SWEATED SHALL BE REAMED, CLEANED AND BURNISHED TO REMOVE DIRT AND OXIDE. HARD 95-5 LEAD-FREE SOLDER SHALL BE USED AND APPLIED TO THE JOINTS ACCORDING TO STANDARD PRACTICE AND/OR MANUFACTURER'S RECOMMENDATIONS. COMPRESSION STOPS AND BRAIDED SUPPLIES SHALL BE USED AT CONNECTION TO EQUIPMENT. 2. PEX-A TUBING WITH ASTM F1960 FITTINGS. PEX TUBING SHALL BE SUPPORTED WITH ADDITIONAL PEX-A PIPE CHANNEL PER MANUFACTURER'S RECOMENDATIONS. PEX PIPING SHALL BE TERMINATED AT FIXTURES WITH PREMANUFACTURERED COPPER STUBOUTS. COMPRESSION STOPS, AND BRAIDED SUPPLIES SHALL BE USED AT CONNECTION TO EQUIPMENT. PROVIDE RED TUBING FOR HOT WATER, BLUE TUBING FOR COLD WATER, AND WHITE/TRANSLUCENT TUBING FOR ALL OTHER DOMESTIC WATER. G. EACH HOT AND COLD WATER BRANCH SHALL BE PROVIDED WITH A BALL VALVE SHUT-OFF. H. GREASE INTERCEPTOR - SHALL BE AS SPECIFIED ON DRAWINGS. 221118 GAS PIPING A. ASTM A-53 SCHEDULE 40 STEEL PIPE PAINTED WITH YELLOW ANTI-CORROSIVE PAINT, SCREWED OR WELDED IN ACCORDANCE WITH CODE REQUIREMENT (FITTINGS FOR LINES LARGER THAN 2" SHALL BE WELDED STEEL. FITTINGS FOR LINES 2" AND SMALLER, EXCEPT WHEN LOCATED IN AIR PLENUMS, SHALL BE SCREWED. STANDARD WEIGHT BLACK MALLEABLE). NO VALVES ARE TO BE LOCATED IN AIR PLENUMS. B. GAS COCK'S 1-1/2" AND SMALLER SHALL BE ALL BRONZE, SCREWED, FLAT HEAD, BRASS PLUG AND WASHER 200 LB. NOG. PROVIDE LINE SIZE 6" LONG DIRT LEG DOWN STREAM OF GAS COCK AT ALL EQUIPMENT CONNECTIONS. C. PROVIDE AND INSTALL THE NATURAL GAS MANIFOLD FOR COOKING EQUIPMENT WHEN NATURAL GAS IS USED FOR FRYERS. D. ALL EQUIPMENT SHALL SHALL BE CONNECTED WITH RIGID PIPING AS SPECIFIED ABOVE, FLEXIBLE CONNECTORS ARE NOT ACCEPTABLE. E. PROVIDE UNION AT ALL EQUIPMENT CONNECTIONS. F. PROVIDE GAS PIPE SUPPORTS IN ACCORDANCE WITH CODE REQUIREMENTS. 221120 DRAIN PIPING A. FURNISH AND INSTALL A GRAVITY DRAIN PIPING SYSTEM FROM WATER HEATER, TERMINATING AT THE MOP SINK. B. PIPING IS TO BE SCHEDULE 40 PVC WITH DRAINAGE PATTERN FITTINGS, BONDED ACCORDING TO THE MANUFACTURERS RECOMMENDATIONS. C. PIPING IS TO BE SECURED TO PIPE HANGERS, USING PROPER SPACING AND THE APPROPRIATE HEIGHT TO ALLOW THE PIPE TO PITCH PROPERLY. 221140 PLUMBING PIPING SPECIALTIES - USED COOKING OIL A. ASTM A-53 SCHEDULE 40 STEEL PIPE THRESED AND SCREWED OR WELDED WITH STANDARD WEIGHT BLACK MALLEABLE FITTINGS. B. PROVIDE UNION AT ALL EQUIPMENT CONNECTIONS. C. PROVIDE PIPE SUPPORTS AND STANDOFF HANGERS IN ACCORDANCE WITH CODE REQUIREMENTS. D. EXTERIOR UCO PIPING WITH INSULATION TO THE EXTERIOR TANK REQUIRES A STAINLESS STEEL INSULATION JACKET WITH ALL JOINTS AND SEAMS SEALED WATER TIGHT USING WATERPROOF UV RESISTANT CLEAR SEALANT (3M CLEAR HYBRID 730 UV OR EQUAL RATED TO 194 DEGREE F) WITH THE ENDS COVERED TO PREVENT WATER INTRUSION AND SEAL. PROVIDE A PIPE ESCUTCHEON AT THE WALL. 223300 WATER HEATER ELECTRIC WATER HEATERS: A. PROVIDE WATER HEATER, SIZE, LOCATION AND CAPACITY AND MANUFACTURER AS INDICATED ON THE DRAWINGS. B. TANK TYPE ELECTRIC WATER HEATER WITH GLASS-LINED TANK RATED AT 150 PSI WORKING PRESSURE, MAGNESIUM ANODE PROTECTION, BRONZE DRAIN VALVE, HIGH TEMPERATURE CUT-OFF SWITCH AND IMMERSION THERMOSTAT. TANK TO HAVE A MINIMUM R-VALUE OF 10. C. FURNISH AND INSTALL A WATTS NO. 40L, 3/4" TEMPERATURE AND PRESSURE RELIEF VALVE AND EXTEND DISCHARGE PIPE, FULL SIZE, TO WITHIN 6" ABOVE THE MOP SINK OR FLOOR DRAIN. D. PROVIDE AMTROL EXPANSION TANK AS SIZED ON THE DRAWINGS. EQUAL PRODUCTS BY BELL AND GOSSETT OR ADAMSON MAY BE PROVIDED AT THE CONTRACTOR'S OPTION. FUEL FIRED WATER HEATERS A. FURNISH AND INSTALL HIGH EFFICIENCY, 96% THERMAL EFFICIENCY OR BETTER, GAS FIRED, STORAGE WATER HEATER, SIZE, LOCATION AND CAPACITY AS INDICATED ON THE DRAWINGS. B. WATER HEATER SHALL BE RHEEM RUUD WITH INTELLIGENT CONTROL SYSTEM/LCD DISPLAY. EQUAL HEATERS BY A.O. SMITH, OR LOCHINVAR MAY BE FURNISHED AT THE CONTRACTOR'S OPTION. C. TANK TYPE GAS FIRED WATER HEATER WITH GLASS-LINED TANK RATED AT 150 PSI WORKING PRESSURE, POWERED ANODES PROTECTION, BRONZE DRAIN VALVE. TANK TO HAVE A MINIMUM R-VALUE OF 10. D. FACTORY-INSTALLED TEMPERATURE AND PRESSURE RELIEF VALVE. EXTEND DISCHARGE PIPE, FULL SIZE, TO WITHIN 6" ABOVE THE MOP SINK OR FLOOR DRAIN. E. PROVIDE WATTS, POTABLE WATER EXPANSION TANK AS SIZED ON THE DRAWINGS. EQUAL PRODUCTS BY AMTROL BELL & GOSSETT MAY BE PROVIDED AT THE CONTRACTOR'S OPTION. 224000 PLUMBING FIXTURES AND EQUIPMENT A. WATER CLOSETS AND LAVATORIES SHALL BE VITREOUS CHINA AND SHALL ALL BE BY THE SAM MANUFACTURER. B. ALL WALL HUNG LAVATORIES, FLUSH VALVES, ETC., SHALL BE PER DRAWINGS AND MOUNTED AT THE MANUFACTURER'S RECOMMENDED ROUGHING IN MEASUREMENTS, UNLESS NOTED OTHERWISE. C. VALVES TO BE AS FOLLOWS: 125 LB. S.W.P. GATE, GLOBE AND CHECK VALVES: 2. GATE (2-1/2" AND SMALLER) - ALL BRONZE, SCREWED, TAPERED, SOLID WEDGE DISC, SCREWED BONNET, RISING STEM. 3. BALL (2-1/2" AND SMALLER) - ALL BRONZE, TEFLON STEM SEALS AND SEAT, 1/4 TURN SHUT-OFF, VINYL COVERED HANDLES. 4. GLOBE (2-1/2" AND SMALLER) - ALL BRONZE, SCREWED, TAPERED, SOLID WEDGE DISC, SCREWED BONNET, RISING STEM. 5. CHECK (2-1/2" AND SMALLER) - ALL BRONZE, SCREWED, HORIZONTAL SWING CHECK WITH BRONZE DISC. C. VALVES SHALL BE MILWAUKEE. EQUAL PRODUCTS BY CRANE, HAMMOND, POWELL, WALWORTH, NORTHERN INDIANA BRASS COMPANY OR STOCKHAM MAY BE FURNISHED AT THE CONTRACTOR'S OPTION. D. UNIONS TO BE AS FOLLOWS: 1. UNIONS FOR COPPER PIPE TO BE 150LB., ALL BRONZE, SOLDER END TYPE BY CHASE. EQUAL PRODUCTS BY CRANE, MUELLER OR NORTHERN INDIANA BRASS COMPANY MAY BE FURNISHED AT THE CONTRACTOR'S OPTION. 2. DIELECTRIC UNIONS BETWEEN FERROUS AND COPPER SHALL BE INSULATED TO PREVENT METAL-TO-METAL CONTACT AND SHALL BE MANUFACTURED BY CAPITAL MANUFACTURING COMPANY OF COLUMBUS, OHIO. EQUAL PRODUCTS BY PATROL OR PECO SALES COMPANY. E. CLEANOUTS TO BE AS FOLLOWS: 1. FLOOR TYPE TO BE ADJUSTABLE CAST IRON WITH NICKEL BRONZE TOP. TOP TO BE FLUSH WITH FLOOR. SEE DRAWINGS FOR MODEL AND MANUFACTURER. 2. WALL TYPE TO BE CAST IRON TEE WITH ROUND POLISHED STAINLESS STEEL ACCESS COVER AND THREADED PLUG. SEE DRAWINGS FOR MODEL AND MANUFACTURER. F. FLOOR DRAINS TO BE AS FOLLOWS: 1. CAST IRON BODY SHALLOW SUMP DRAIN WITH DOUBLE DRAINAGE FLANGE AND WEEPHOLES, FLASHING CLAMP, BOTTOM OUTLET WITH NEOPRENE GASKET INSIDE CONNECTOR, 6" DIAMETER ADJUSTABLE GRATE. FRAME AND GRATE TO HAVE POLISHED NICKEL-BRONZE FINISH. SEE DRAWINGS FOR MODEL AND MANUFACTURER. EQUAL PRODUCT MAY BE SUPPLIED AT THE CONTRACTOR'S OPTION. PLUMBING SPECIFICATIONS P5.0 AUTHOR CHECKER 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments 1.PROVIDE WARRANTY TO INCLUDE LABOR AND MATERIALS TO REPAIR OR REPLACE DEFECTIVE PARTS AND MATERIALS AS REQUIRED FOR ONE YEAR AFTER SUBSTANTIAL COMPLETION OR OWNER ACCEPTANCE OF COMPLETED PROJECT, WHICHEVER IS LATER. 2. COMPLETED INSTALLATION SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND ORDINANCES, INCLUDING NFPA-90A, NFPA-96 AND NFPA-101. 3. DUCTWORK SHALL BE MANUFACTURED AND INSTALLED PER SMACNA 1" PRESSURE CLASS GUIDELINES AND DETAILS. DUCTWORK SIZES SHOWN INDICATE INSIDE CLEAR DIMENSIONS. CONCEALED DUCTWORK SHALL BE INSULATED WITH 2" THICK DUCT WRAP (R-8 MIN). INSULATE CEILING MOUNTED DIFFUSER BACKS. VAPOR BARRIER SHALL BE MAINTAINED CONTINUOUS AND SEAMS SHALL BE SEALED. DUCTWORK SHALL BE INSTALLED ABOVE SUSPENDED CEILING WHERE PROVIDED. EXPOSED DUCTWORK SHALL BE G90 GALVANIZED STEEL. CLEAN OFF MARKS, APPLIED STICKERS AND RESIDUAL OIL. VINEGAR WASH BEFORE PAINTING OF DUCT. 4. CONNECT DUCTS TO FANS AND OTHER AIR DISTRIBUTION EQUIPMENT USING MECHANICAL FASTENERS WITH SEALS, MASTIC OR GASKETS. 5. SUPPLY AND RETURN AIR DUCT DROPS FROM HVAC EQUIPMENT SHALL BE ISOLATED FROM UNIT VIBRATION WITH FLEXIBLE DUCT CONNECTORS. 6. INSULATED FLEXIBLE DUCT MAY BE USED IN MAXIMUM LENGTHS AS SPECIFIED FROM RIGID METAL DUCT TO DIFFUSER CONNECTION. FLEXIBLE DUCT SHALL BE CLASS 1 FLEXIBLE AIR DUCT WITH INSULATION AND VAPOR BARRIER, AND SHALL MEET UL 181. 7. WHERE PLENUM DIFFUSERS ARE CHOSEN WITH INTEGRAL BALANCING DAMPERS SPIN-IN CONNECTIONS MAY EXCLUDE DAMPERS. 8. CONTRACTOR SHALL RECEIVE AND INSTALL ROOF MOUNTED CONDENSING UNITS. PROVIDE MOUNTING RAILS. REFER TO STRUCTURAL PLANS FOR LOCATIONS OF ROOF MOUNTED EQUIPMENT, CURB, AND RAIL DETAILS. EQUIPMENT SHALL BE MECHANICALLY FASTENED TO RAILS. RAILS SHALL BE FASTENED TO STRUCTURE. STRUCTURE, CONNECTIONS, AND SUPPORTS SHALL MEET STRUCTURAL WIND LOAD REQUIREMENTS. CONSULT STRUCTURAL ENGINEER AS NEEDED TO DETERMINE REQUIREMENTS. 9. CURBS SHALL BE ONE PIECE WELDED AND INSULATED 18 GAUGE STEEL, WITH RIGID INSULATION GLUED TO INSIDE OF CURB. REFER TO SHEET M2.0 FOR ADDITIONAL INFORMATION. 10. RETURN DUCTWORK FROM HVAC EQUIPMENT SHALL BE LINED WITH 1" DUCT LINER. 11. PROVIDE STENCIL LABELS ON HVAC EQUIPMENT AND EXHAUST FANS. LABELS SHALL HAVE 2” HIGH LETTERS ON UNIT SIDE ACCESS PANEL. EXPOSED GAS PIPING AND FITTINGS SHALL BE PAINTED WITH SAFETY YELLOW PAINT DESIGNED FOR BLACK IRON. 12. ENSURE GAS LINES AND CONDENSATE DRAIN LINES DO NOT IMPEDE HVAC EQUIPMENT DOORS/PANELS. FOLLOW MANUFACTURER GUIDELINES FOR REQUIRED CLEARANCES. 13. REFER TO "H" AND "W" SHEETS FOR SPECIFIC HOOD AND FAN INFORMATION AND FIELD WIRING DIAGRAMS. CONTRACTOR SHALL PROVIDE LOW VOLTAGE WIRING FROM FAN CONTROL PANEL TO HVAC EQUIPMENT, REMOTE SENSORS AND SMOKE DETECTORS. CONTRACTOR SHALL PROGRAM THERMOSTAT FOLLOWING WENDY'S STANDARDS. REFER TO PROGRAMMING INSTRUCTIONS PROVIDED WITH MODULAR PANEL SYSTEM. 14. CONTRACTOR SHALL TEST, CHECK, AND BALANCE HVAC EQUIPMENT , EXHAUST HOODS, AND EXHAUST FANS. SET EXHAUST FANS AND DIFFUSERS TO SPECIFIED AIR FLOW RATES. CONTRACTOR SHALL COMPLETE WENDY’S REQUIRED TEST FORMS FOR HVAC EQUIPMENT, HOODS, AND FAN CONTROL SYSTEM. 15. CONTRACTOR SHALL COMPLETE ROOFTOP UNIT START UP HVAC EQUIPMENT FORMS AND RETURN TO MANUFACTURER TO SCHEDULE EQUIPMENT OPERATION CHECK (EOC). CONSULT CONTACT OR ALLOW 5 BUSINESS DAYS TO SCHEDULE EOC. CONTRACTOR IS RESPONSIBLE FOR CORRECTING DEFICIENCIES NOTED IN EOC PRIOR TO START OF TESTING AND BALANCING. 16. CONTRACTOR SHALL VERIFY THAT BUILDING IS WEATHER TIGHT, HVAC EQUIPMENT POWERED AND CALIBRATED, THERMOSTATS PROGRAMMED, FANS OPERATIONAL, EOC COMPLETE, DIFFUSERS AND CEILING TILE INSTALLED, EXHAUST FAN SPEEDS CALIBRATED, AND NEW FILTERS INSTALLED IN HVAC EQUIPMENT PRIOR TO TESTING AND BALANCING. CONTRACTOR SHALL CORRECT OPERATIONAL OR PERFORMANCE DEFICIENCIES FOUND DURING TESTING AND BALANCING. 17. KITCHEN EQUIPMENT DISTRIBUTORS SHALL INSTALL REFRIGERANT PIPING FOR ROOF MOUNTED CONDENSING UNITS TO FOOD SERVICE EQUIPMENT INCLUDING THERMOSTATIC EXPANSION VALVES, SOLENOID VALVE, TEMPERATURE CONTROL WIRING, SIGHT GLASS, FILTER DRIERS, PRESSURE CONTROLS, CRANKCASE HEATERS, LOW AMBIENT CONTROLS, AND WEATHERPROOF HOUSINGS. TRAP AND SLOPE CONDENSATE LINES PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE HEAT TRACING ON CONDENSATE LINES INSIDE FREEZER. CONTRACTOR SHALL PROVIDE PIPE CURB ASSEMBLY FOR ROOF PENETRATIONS. REFER TO ARCHITECTURAL ROOF PLAN FOR ADDITIONAL INFORMATION AND DETAILS FOR PIPE CURB ASSEMBLY AND RAIL INSTALLATION. 18. COMPLETE SMOKE CAPTURE TEST(S), AS REQUIRED, IN ACCORDANCE WITH INTERNATIONAL MECHANICAL CODE IMC 507, ASHRAE 154 VENTILATION FOR COMMERCIAL COOKING OPERATIONS, AND HOOD MANUFACTURER STANDARDS. KITCHEN EQUIPMENT SHALL BE AT OPERATING TEMPERATURES WITH HVAC EQUIPMENT OPERATIONAL. TEST USING SMOKE CANDLES OR SMOKE PUFFERS. SMOKE BOMBS SHALL NOT BE USED. 19. EQUIPMENT WITH SYMBOL TAGS ON PLANS, REFER TO ASSOCIATED EQUIPMENT SCHEDULES FOR REQUIREMENTS. TAGGED EQUIPMENT IS RESPONSIBILITY OF CONTRACTOR TO PROVIDE UNLESS OTHERWISE NOTED. 20. CONTRACTOR IS RESPONSIBLE FOR PROVIDING MANUAL BALANCE DAMPERS IN DUCT BRANCHES IN ACCESSIBLE LOCATION ABOVE CEILING. GENERAL NOTES HVAC BIDDING AND EQUIPMENT NOTES FOR QUOTATION ON THIS EQUIPMENT, REFER TO APPROVED VENDOR LIST ON SHEET G2.1: EQUIPMENT PACKAGE: RTU-1 AND RTU-2 WITH ACCESSORIES AND CURBS : GENERAL CONTRACTOR TO CONTACT APPROVED VENDOR ON SHEET G2.1 FOR PRICING INFORMATION. IF DESIGN CONDITIONS DIFFER FROM THOSE LISTED, CONTACT SUPPLIER FOR APPROPRIATE EQUIPMENT. HOODS, FANS AND FAN CURBS PACKAGE: GENERAL CONTRACTOR TO CONTACT APPROVED VENDOR ON SHEET G2.1 FOR PRICING INFORMATION. CURBS SHALL BE INSULATED AND TO COMPLY WITH NFPA 96 REQUIREMENTS FOR HEIGHT. CURBS PROVIDED FOR EF-1 AND EF-2 MUST BE HINGED. AIR DISTRIBUTION PACKAGE: PACKAGE TO INCLUDE SCHEDULED AIR DEVICES AND ACCESSORIES. EQUIPMENT AND MATERIAL PACKAGES ARE IN STOCK AND SHOULD BE ORDERED IMMEDIATELY UPON RECEIPT OF HVAC CONTRACT TO AVOID CONSTRUCTION DELAY. CONTACT HJC CONSOLIDATOR FOR DIFFUSER PACKAGE. #CODED NOTES: 1. INSTALL GREASE EXHAUST HOOD. SUPPORT HOOD PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. TRANSITION FROM HOOD COLLAR TO DUCT SIZE SHOWN. TWO METHODS LISTED BELOW ARE ALLOWED FOR GREASE DUCTWORK ASSEMBLIES. PLEASE NOTE THAT BOTH OPTIONS REQUIRE CLEANOUT ACCESS DOORS AT EVERY CHANGE IN DUCT DIRECTION WITH 3 FOOT CLEARANCE IN FRONT OF ACCESS DOORS. 1.1.PREFERRED METHOD: FACTORY MANUFACTURED UL2221 LISTED INSULATED GREASE EXHAUST DUCT SYSTEM WITH MANUFACTURER CLEANOUT ACCESS DOORS. REFER TO SHEET M2.0 FOR ADDITIONAL INFORMATION. COORDINATE WITH GREASE DUCT MANUFACTURER IF FIRE WRAP IS REQUIRED. 1.2. PROVIDE 16 GAGE CARBON STEEL GREASE EXHAUST DUCTWORK WELDED LIQUID TIGHT UP TO EXHAUST FAN. WRAP GREASE DUCT WITH COMPOSITE GREASE DUCT ENCLOSURE ASSEMBLY PER DETAIL 01/M2.0. GREASE DUCT ENCLOSURE SHALL HAVE AT LEAST AN F OR T RATING OF ONE HOUR. INSTALL EXHAUST DUCT WRAP PER MANUFACTURER'S INSTRUCTIONS. PROVIDE "FASTDOOR XL" GREASE DUCT CLEANOUT ACCESS DOORS (C.O.D) MANUFACTURED BY THERMAL CERAMICS (OR EQUIVALENT) AT EVERY CHANGE OF DIRECTION IN DUCT. PROVIDE MINIMUM 3 FEET CLEARANCE IN FRONT OF ACCESS DOORS. INSULATE ACCESS DOORS TO MAINTAIN RATINGS OF GREASE DUCT ENCLOSURE PER FIRE PROTECTION INSULATION MANUFACTURER'S INSTRUCTIONS. 2. PROVIDE COMBINATION AUDIO/VISUAL ALARM AND REMOTE TEST STATION (SYSTEM SENSOR RTS2). MOUNT 54" ABOVE FINISHED FLOOR AND PROVIDE LABEL NAMEPLATE WITH 1/2 HEIGHT LETTERING (BLACK ON WHITE) FOR WHICH UNIT IT MONITORS. INSTALLATION SHALL MEET CRITERIA AS PRESCRIBED IN NFPA 90A AND NFPA 72. 3. PROVIDE ROOFTOP UNIT AND CURB COORDINATED WITH STRUCTURE. SHIM UNIT AND CURB LEVEL FOR PROPER CONDENSATE DRAINAGE. PROVIDE FLEXIBLE CONNECTORS ON SUPPLY AND RETURN AIR DUCT CONNECTIONS. TRANSITION TO DUCT SIZES SHOWN. SECURE EQUIPMENT TO CURBS PER MANUFACTURER'S RECOMMENDATIONS AND AS DETAILED. REFER TO SHEET M2.0 FOR ADDITIONAL INFORMATION. 4. INSTALL THERMOSTATS AND REMOTE SENSORS. THERMOSTATS AND REMOTE SENSORS ARE FURNISHED WITH FAN LIGHTING CONTROL PANEL SYSTEM. CONTRACTOR IS RESPONSIBLE FOR WIRING AND INSTALLING REMOTE SENSORS WHERE INDICATED ON DRAWINGS. MOUNT SENSOR 60" ABOVE FINISHED FLOOR. 5. PROVIDE DUCT MOUNTED SMOKE DETECTOR AND SENSING TUBE, AND INTERLOCK TO SHUT DOWN ROOFTOP UNIT ON DETECTION OF SMOKE. 6. PROVIDE CURB AND ROOF MOUNTED EXHAUST FAN. ENSURE THAT TOP OF EXHAUST FAN IS MINIMUM 40” ABOVE ROOF SURFACE. REFER TO SHEET M2.0 FOR ADDITIONAL INFORMATION. 7. PROVIDE CURB AND ROOF MOUNTED EXHAUST FAN. REFER TO SHEET M2.0 FOR ADDITIONAL INFORMATION. 8. UNDERCUT DOOR 1" FOR TRANSFER AIR. SP V2201 2MECHANICAL ROOF PLAN 1/4" = 1'-0" UH-1 3.3kW 16"Ø SD-3 100 SD-4 100 12 " Ø SD-1 500 12"Ø 4 SD-1 500 ROUTE DUCTS BETWEEN JOIST SPACE ROUTE DUCTS BETWEEN JOIST SPACE RTU-1 18 ' Ø 6" Ø 10"Ø SD-4 100 DINING 101 S OFFSET DUCTWORK UP TIGHT TO BOTTOM OF JOISTS RG-1 -1000 SD-5 1600 SD-5 1600 12 " Ø 18 " Ø 24"Ø RG-2 -150 RG-2 -150 10"X10" 8"Ø 8"Ø 22 " X 2 2 " 16"Ø(TYPICAL OF 3) 4T4T 22 6" Ø 6" Ø RG-1 -1000 RG-1 -1000 20"X20" 20"X20" 20" 26 " 16"Ø SD-3 200 SD-3 400 SD-3 450 SD-3 500 H-1 11001 H-2 15001 SD-2 300 12"Ø 12"Ø 10"Ø 12"Ø 10"Ø 10"Ø 20"Ø RT RT 16 " Ø SD-2 300 SD-2 300 SD-2 300 SD-2 300 SD-2 300 SD-2 300 RG-1 -1000 10"Ø 10"Ø SD-3 450 (TYPICAL OF 3) 42 " 18"24" 24 " 10"Ø12"Ø SD-2 300 (TYPICAL OF 3) 5 14 " Ø 4 RTU-2 S 22 10 " Ø 16 " Ø 10"Ø 10"Ø 10"Ø 12 " Ø 88 5 KITCHEN 106 SERVICE 104 PAY WINDOW 113 DRIVE THRU 105 OFFICE 108 IVING 12 FAMILY 103 FAMILY 102 DINING 101 ENTRY 100 10 " Ø SD-3 100 4500 CFM4500 CFM RTU-2 RTU-1 3000 CFM 300 CFM EF-3 1500 CFM EF-2 1100 CFM EF-1 1500 CFM 1500 CFM 3000 CFM AIR FLOW SCHEMATIC AIR BALANCE SCHEDULE MARK SUPPLY AIR RETURN AIR EXHAUST AIR OUTSIDE AIR RESULTING PRESSURE EF-1 1100 CFM -1100 CFM EF-2 -1500 CFM EF-3 300 CFM -300 CFM RTU-1 4500 CFM +1500 CFM RTU-2 4500 CFM 3000 CFM 1500 CFM +1500 CFM AIR BALANCE REPORT REQUIRED. SEE SPECIFICATIONS.+100 CFM 1500 CFM 3000 CFM 1500 CFM 1MECHANICAL ROOF PLAN 1/4" = 1'-0" RTU-2 4500 CFM3 RTU-1 4500 CFM 2' - 0 " 3' - 0 " EF-2 1500 CFM CLEARANCE TO OUTSIDE AIR INTAKES 6 6 LOCATE UNIT HINGE ON THIS SIDE OF CURB EF-1 1100 CFM 10'-0" CLEARANCE TO OUTSIDE AIR INTAKES 10'-0" 3 EF-3 300 CFM7 12 / 2 2 / 2 0 1 7 4 : 1 1 : 4 2 P M 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments HVAC PLAN HALTON M1.1 OM DRC 03EXPOSED BRANCH DUCT INSTALLATION DETAIL NOT TO SCALE DIFFUSER STARTER COLLAR 90° 1.5R SPIRAL ELBOW BEADED SLEEVE JOINT (TYPICAL) SPIRAL BRANCH DUCT. SUPPORT WITH GALVANIZED STEEL STRAPS ROUND BALANCING DAMPER SPIRAL SUPPLY DUCT BALANCING HANDLE. LOCK INTO POSITION AND MARK PERMANENTLY MOUNT DIFFUSER TIGHT TO BOTTOM OF 90° ELBOW 1" DIAMETER CONDENSATE DRAIN PIPE WITH SUPPORT AT MAXIMUM 2 FOOT INTERVALS. TERMINATE AT SCUPPER. STRUCTURE BELOW SLOPES DOWN AT 1/4" PER 1'-0" 5.5" THICK R-30 ROOF INSULATION ROOF SHEATHING SINGLE PLY ROOF MEMBRANE CURB MOUNTED RTU LEVELING OF CURB BY CONTRACTOR EF-2 EF-13'-0" 3' - 0 " 3' - 0 " PROVIDE 2" DEEP WATER TRAP MINIMUM. 2X6 BLOCKING DUCT DROP INSULATION STRIP PROVIDE MANUFACTURER REQUIRED CLEARANCE FROM RTU TO FAN AND MINIMUM OF 2'-0" BETWEEN EF-1 AND EF-2 APPROX. 53" ABOVE ROOF SURFACE TO FAN DISCHARGE. DISCHARGE SHALL BE SLIGHTLY ABOVE ADJACENT PARAPET. MAINTAIN 40 INCHES ABOVE ROOF TO FAN DISCHARGE MINIMUM AND AT LEAST 18 INCHES CLEAR OF COMBUSTIBLE MATERIAL. INSTALLATION OF KITCHEN EXHAUST FANS SHALL PROVIDE 18 INCHES CLEAR OF FAN AND FAN BASE TO COMBUSTIBLE MATERIALS INCLUDING ROOF MEMBRANE MATERIAL ALONG BASE OF CURB. FAN DISCHARGE ELEVATION SHALL BE MINIMUM 40 INCHES ABOVE ADJACENT ROOF. DISCHARGE SHALL BE 60 INCHES CLEAR OF ADJACENT PARAPET IF FAN DISCHARGE IS BELOW PARAPET HEIGHT. DISCHARGE SHALL BE TEN FEET FROM ADJACENT BUILDING. EQUIPMENT SHALL BE FASTENED AND CURBS PERMANENTLY AFFIXED. FINAL INSTALLATION SHALL BE SUITABLE FOR WIND LOADS AT SITE. REQUIREMENTS SHALL BE REVIEWED AND APPROVED BY LICENSED PROFESSIONAL ENGINEER. REFER TO STRUCTURAL FRAMING DETAILS AND/OR STRUCTURAL REVIEW LETTER FOR ROOF CURB STRUCTURAL FRAMING DETAILS. 08EXHAUST FAN AND RTU CURB DETAIL NOT TO SCALE 6' - 6 " CO PROVIDE CLEARANCE REDUCTION METHOD WITH A 6" MINIMUM CLEARANCE IN SHAFT.6" KITCHEN CEILING 18" 22 GAUGE METAL COMBUSTIBLE MATERIAL 1" NON COMBUSTIBLE SPACER 1" MINERAL WOOL BATT SCREW WEATHER PROTECTED OPENING. NO 90° BENDS IN GREASE DUCT ALLOWED UNLESS RADIUS ELBOWS WITH ACCESS PANELS ARE PROVIDED WITH CONSTRUCTION MANAGER APPROVAL. CONTRACTOR TO PROVIDE AIR BALANCING IN DUCTWORK FOR KITCHEN EXHAUST FANS. CURB AS SUPPLIED BY FAN MANUFACTURER LISTED ACCESS OPENING ROOF KITCHEN HOOD DUCTWORK SHALL BE 16 GAUGE CARBON STEEL OR 18 GAUGE STAINLESS STEEL. DUCTWORK SHALL BE CONTINUOUSLY EXTERNALLY WELDED LIQUID TIGHT. PORTIONS OF WELDED DUCTWORK SHALL BE SLOPED BACK TO HOOD FOR DRAINAGE WITH NO TRAPS. CONTRACTOR SHALL COORDINATE AT SITE WITH OTHER TRADES TO ENSURE THIS CAN BE DONE. OPERATION OF KITCHEN HOOD SHALL BE INTERLOCKED WITH ASSOCIATED EXHAUST FAN, MOTORIZED DAMPERS, ASSOCIATED UNITS BRINGING IN MAKE UP-AIR AND REMOTE APPLIANCE WHERE FLUE IS DISCHARGING INTO HOOD. UPON ACTIVATION OF FIRE SUPPRESSION SYSTEM, MAKE-UP AIR SYSTEM AND APPLIANCES SHALL SHUT DOWN AND KITCHEN EXHAUST SYSTEM SHALL CONTINUE TO OPERATE. GAS PIPING SHALL FOLLOW APPLICABLE GAS CODES AND INSTALLED BY LICENSED CONTRACTOR FAMILIAR WITH THESE CODES. PROVIDE AUTOMATICALLY ELECTRICALLY OPERATED GAS VALVE SERVING GAS FIRED COOKING EQUIPMENT BEING SERVED BY AUTOMATIC FIRE EXTINGUISHING SYSTEM. PROVIDE INTERLOCK SO THAT COOKING EQUIPMENT SHALL SHUT-DOWN ON ACTIVATION OF FIRE SUPPRESSION SYSTEM. VALVE SHALL BE LABELED, WITH INSTRUCTIONS AND LOCATED OUTSIDE OF PROTECTED AREA. ADDITIONAL MANUAL SHUT-OFF VALVE SHALL BE ACCESSIBLE AND LOCATED IMMEDIATELY UPSTREAM OF AUTOMATIC VALVE.PROVIDE MAIN GAS VALVE TO SHUT DOWN COOK LINE. LOCATE VALVE NEAR COOK LINE SO EMPLOYEE CAN MANUALLY SHUT DOWN WITHOUT HAVING TO USE LADDER, ETC. EMERGENCY PULL STATION SHALL BE ACCESSIBLY LOCATED 42" TO 48" OFF FLOOR AT POINT OF EXIT DURING FIRE. SEE POWER PLAN FOR LOCATION. CLEARANCE AND CLEARANCE REDUCTION METHODS NFPA 96 1-3.2 CLEARANCE NOTE: HOODS, GREASE EXTRACTORS, DUCTS, ECOLOGY UNITS, FANS SHALL HAVE MINIMUM CLEARANCE: 18" TO COMBUSTIBLES 3" TO LIMITED COMBUSTIBLES, 6" IN SHAFT 0" TO NON COMBUSTIBLES, 6" IN SHAFT WHERE SPACE DOES NOT ALLOW FOR NOTED CLEARANCES AS IT PERTAINS TO TYPE OF CONSTRUCTION, CLEARANCE REDUCTION METHOD MAY BE APPLIED. OPTION 1 : AS ILLUSTRATED BELOW OPTION 2 : USE LISTED 3M FIRE DUCT WRAP 615+ MANUFACTURER PREFABRICATED UL APPROVED INSULATED GREASE EXHAUST DUCT IS PERMITTED IF PROVIDED BY HOOD SUPPLIER AS PART OF COMPLETE HOOD AND FAN PACKAGED SYSTEM. COMPLETE ERECTION DOCUMENTS DETAILING REQUIRED INSTALLATION PROCEDURES SHALL BE PROVIDED FOR CODE OFFICIAL AND INSTALLING CONTRACTOR. DUCT SHALL CONFORM TO NFPA 96 REQUIREMENTS AND UL LISTING. PROVIDE ACCESSIBLE CLEANOUTS AT EVERY 90 DEGREE CHANGE IN DIRECTION AND AT TOP OF VERTICAL RISER UNDER ROOF.CO 01MECHANICAL EXHAUST DUCT DETAIL NOT TO SCALE D (2) D D D 04RADIUS ELBOW NOT TO SCALE 8" M I N . 3 PIECE PVC DURO-LAST CHILLER STACK KIT DURO-LAST CAULK DURO-LAST PREFABRICATED VENT STACK FLASHING REFRIGERATION LINESROOF DECK COUNTERFLASHING DRIP SHIELD AND EXPOSED DUCTWORK SHALL BE 18 GA. GALVANIZED SHEETMETAL SOLDERED AIR-TIGHT CONSTRUCTION STAINLESS STEEL BAND POSITIONED 1/4" FROM TOP OF STACK FLASHING INSULATION MEMBRANE NOT TO SCALE GOOSENECK WEATHERHOOD ROOF PENETRATION DETAIL 09 CB FE L L WHEN SHOWNTAPS TO TRUNK ONLY ECCENTRIC TRANSITION CONCENTRIC TRANSITION RECTANGULAR TO ROUND RECTANGULAR TO ROUND RECTANGULAR TO RECTANGULAR ROUND TO ROUND 45° ROUND DUCT BRANCH DUCT MAIN DUCT AIR FLOW AIR FLOW RECTANGULAR DUCT AIR FLOW 45 RECTANGULAR DUCT CONICAL FITTING. SEAL AIRTIGHT WITH MASTIC Ø-MAX.45° DIVERGING, 60° CONVERGING Ø-MAX. Ø Ø ° NOTE: USE PLAN AS GUIDE TO FITTING TYPE. A D 02DUCT FITTING DETAILS NOT TO SCALE 1-1/2" NOTE: FOR DUCT SUPPORT AND SEISMIC REQUIREMENTS, REFER TO SMACNA GUIDELINES AND LOCAL CODE REQUIREMENTS. STRAP 1/4" BOLT STRAP 05ROUND DUCT HANGER DETAIL NOT TO SCALE METAL BAND SUPPORT NYLON DRAW BAND (TYP) SUPPLY AIR DIFFUSER WITH ROUND NECK PROVIDE 1" BLANKET INSULATION COVERING AIR DEVICE BACK FLEX DUCT WITH 2" EXTERNAL INSULATION MAX. LENGTH 6'-0" T-BAR TYPE/GYP SUSPENDED CEILING RIGID ROUND INSULATED DUCT JOINT SCREWED AND SEALED INSULATED SHEETMETAL SUPPLY DUCT. SEAL PER SPECIFICATIONS TIE OFF TO ROOF STRUCTURE 06CEILING DIFFUSER DETAIL NOT TO SCALE NOTES: 1. DETAIL IS FOR CONDENSATE DRAIN CONNECTIONS LOCATED ON FAN INLET SIDE ONLY. 2. SLOPE CONDENSATE DRAIN AS MUCH AS POSSIBLE TOWARD DISCHARGE POINT BUT NO LESS THAN 1/4" PER FOOT. PROVIDE CLEANOUTS AT TURNS AND WHERE INDICATED. USE SCHEDULE 40 PVC PIPE AND FITTINGS WITH PRIMED AND SOLVENT WELDED JOINTS. USE DWV FITTINGS FOR SIZES 1-1/4" DIAMETER AND LARGER PIPE. SUPPORT PIPING AT FOUR FOOT INTERVALS MAXIMUM. 3. PIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST AS REQUIRED TO SUIT SITE CONDITION. REFER TO LOCAL CODE REQUIREMENTS FOR INDIRECT DRAIN REQUIREMENTS. 4. PROVIDE 6" HIGH PIPE VENT OPEN TO ATMOSPHERE IF REQUIRED BY LOCAL CODES. TYPICAL ROOFTOP AIR CONDITIONING UNIT CONDENSATE CONNECTION. TRAP SIZE SHALL BE EQUAL TO OR LARGER THAN CONNECTION SIZE BUT NO LESS THAN 3/4" PROVIDE MIRO INDUSTRIES MODEL 3-RAH ADJUSTABLE PIPE SUPPORTS AND PADS, OR EQUIVALENT. PROVIDE SUPPORTS TO PREVENT PIPE SAGGING AND ALLOW FOR SLOPE. UNION CONNECTION2" 1" ROUTE TO NEAREST SCUPPER CLEANOUT TEE WITH PLUG (TYP.) DIMENSION SHALL BE EQUAL TO OR GREATER THAN FAN INLET PRESSURE IN INCHES PLUS ONE INCH THEN DIVIDED BY TWO (MINIMUM DIMENSION IS ONE INCH). DIMENSION SHALL BE EQUAL TO OR GREATER THAN FAN INLET PRESSURE IN INCHES PLUS ONE INCH (MINIMUM DIMENSION ALLOWED IS TWO INCHES). ROOF 10ROOFTOP UNIT CONDENSATE NOT TO SCALE 22 GAUGE GALVANIZED SHEET METAL PLENUM WITH EXTERNALLY APPLIED 2" THICK EXTERNAL DUCT WRAP PERFORATED SD-2 DIFFUSER 07DUMP BOX DETAIL NOT TO SCALE CEILING INSULATED FLEXIBLE DUCT WITH BAND FASTENER ROUND SPIN-IN DUCT COLLAR 10" 22" 16"FASTEN TO DIFFUSER IN EIGHT PLACES WITH SHEETMETAL SCREWS (TWO ON EACH CORNER SIDE OF PLENUM BOX) 2" NOTES: 1. DOVETAIL COLLARS ARE NOT ALLOWED. 2. SEAL COLLAR WITH SEAL CLASS 'A' DUCT SEALANT. 3. DO NOT CRUSH OR MODIFY DUMP BOX SIZE TO FIT OTHER MECHANICAL EQUIPMENT IN CEILING CAVITY. SUPPORT TO STUCTURE WITH SHEETMETAL STRAPS DROP FROM HVAC EQUIPMENT RECTANGULAR TRUNK DUCT ROUND TRUNK DUCT MANUAL DAMPER (TYPICAL) 45° ENTRY FITTING (TYPICAL) FLEXIBLE DUCT CONNECTOR NOT TO SCALE ROOFTOP EQUIPMENT DUCT DROP DETAIL 11 EXHAUST FAN ROOF STRUCTURE ROOF INSULATION ROOFING SEAL ALL MINIMUM 14" HIGH FACTORY FABRICATED INSULATED ROOF CURB COMPATIBLE WITH ROOF. FLASH AND COUNTERFLASH ROOF CURB BACKDRAFT DAMPER BIRD SCREENSECURE EXHAUST FAN TO ROOF CURB (MINIMUM 2 FASTENERS PER SIDE) INTERNALLY LINED EXHAUST DUCT DROP. REFER TO PLANS FOR DUCT SIZES. JOINTS FRAME ROOF OPENING NOT TO SCALE EXHAUST FAN DETAIL 12 12 / 2 2 / 2 0 1 7 4 : 1 1 : 5 2 P M 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments HVAC DETAILS M2.0 OM DRC AIR DEVICE SCHEDULE DI F F U S E R M A R K NE C K S I Z E FA C E S I Z E TYPE ACCESSORY MOUNT PATTERN DUTY AMER. LOUVER MODEL NO. TITUS MODEL NO. NOTES DI F F U S E R RE G I S T E R GR I L L E OB D ST R LA Y - I N SU R F A C E SU P P L Y RE T U R N EX H A U S T RG-1 24"x24" X X X PERFORATED X RG-2 8" 12"x12" X X X X PERFORATED X -PAR-AA 1,2 DRYWALL CEILING MOUNT EXHAUST SD-3 24"x24" X X 4 WAY SD-4 6" 12"x12" X X X 4 WAY X -PAS-AA 1,2 DRYWALL CEILING MOUNTED SUPPLY PAR-AA - - PRICE MODEL NO. APDDR APDN APDDR SD-1 10" 22"TMR-AA 3,4 DINING SUPPLYROUND CONE XX -ARCD SD-5 20"x20" 22"x22" X X LOUVERED -300RL 4520X AIR DEVICE SCHEDULE NOTES ACCESSORY NOTE: OBD-OPPOSED BLADE DAMPER, STR-SQUARE TO ROUND TRANSITION 1. WHITE 2. ROUND NECK 3. DUCT MOUNTED 4. CLEAR ANODIZED 5. SUPPLY DIFFUSERS AT HOOD LOCATION USE SHOP OR FIELD FABRICATED DUMP BOXES, WHICH CONSIST OF PERFORATED DIFFUSER WITH NO PATTERN CONTROLLERS, AND SQUARE PLENUM BOX THAT CAN ACCEPT ROUND DUCT CONNECTION. 4 WAY DIFFUSERS ARE PROHIBITED AROUND THE HOODS. 6. REFER TO DUMP BOX DETAIL ON DRAWING M2.0. SD-2 24"x24" X X PERFORATED X 1,5,6 CEILING MOUNTED HOOD SUPPLY DUMP BOX-PAR-AA APDDR22"x22" 1 SD-2a 24"x24" X X PERFORATED X 1,5 CEILING MOUNTED HOOD SUPPLY DUMP BOX (CAPTIVEAIRE MODEL DI-PSP)-22"x22" SD-2b 24"x24" X X PERFORATED X 1,5 CEILING MOUNTED HOOD SUPPLY DUMP BOX (HALTON MODEL KCD)-22"x22"-- -- X PAS-AA APDNPER PLAN PER PLAN FAN SCHEDULE MA R K AI R F L O W ( C F M ) ST A T I C P R E S S U R E (I N . W C . ) MO T O R H O R S E P O W E R ( H P ) EL E C T R I C A L (V O L T A G E / P H A S E ) ACCESSORIES MO D E L RE M A R K S BA C K D R A F T D A M P E R BI R D S C R E E N DI S C O N N E C T S W I T C H SP E E D C O N T R . DI R E C T D R I V E EF-1 1100 1.25 3/4 208/1 X X DU85H 1,2,3 EF-2 1500 1.25 208/1 X X DU85H 1,2,3 EF-3 300 0.375 115/1 X X X X X DR10H 1,4 1. FANS, CURBS, AND NFPA FAN HINGES AS APPLICABLE WILL BE SUPPLIED AS PART OF THE EXHAUST HOOD PACKAGE. 2. PROVIDE UL APPROVED GREASE RATING. 3. EXHAUST FAN IS CONNECTED TO THE HOOD ON SWITCH. FAN SHALL OPERATE AT ALL TIMES WHILE RESTAURANT IS OPEN. 4. FAN TO OPERATE FROM SMART BREAKER IN FCLC SYSTEM. SYMBOLS & ABBREVIATIONS LEGEND COMMERCIAL KITCHEN NOTES HVAC, FIRE PROTECTION AND PLUMBING NEW EQUIPMENT, PIPING, ETC. SHALL BE INSPECTED AND LOCATED BEFORE AND AFTER NEW CONSTRUCTION. DETAILS OF PERFORMANCE/CONDITION/SIZING AND LOCATION SHALL BE SUPPLIED TO ENGINEER AND OWNER. AIR CAPACITIES FOR SUPPLY AND EXHAUST SYSTEMS SHALL BE MEASURED AT GRILLES TO DETERMINE IF DESIGN AIR FLOW RATES NOTED ON PLANS CAN BE MET. EXTRA WORK REQUIRED TO ABOVE MENTIONED SHALL BE DETERMINED PRIOR TO NEW CONSTRUCTION. CONTRACTOR TO ALLOW FOR INSPECTION IN THEIR PRICE INCLUDING WELD INSPECTIONS, AIR FLOW RATE MEASUREMENT, SCANNING AND CAMERA SCOPE TO EXISTING BURIED DRAINS. NO EXTRAS SHALL BE ALLOWED ONCE NEW CONSTRUCTION STARTS. CONTRACTOR SHALL OBTAIN LATEST SPREAD SHEETS/SHOP DRAWINGS FROM KITCHEN CONSULTANT FOR APPLIANCE AND HVAC REQUIREMENTS PRIOR TO ROUGH-IN WORK. CONTRACTOR SHALL PROVIDE WIRING AND CONTROLS AS NOTED ON WIRING NOTES IN EQUIPMENT SCHEDULE. CONTRACTOR SHALL: 1. CONSTRUCT ENTIRE KITCHEN HOOD EXHAUST SYSTEM TO NFPA 96 STANDARDS. 2. REFER TO ARCHITECTURAL AND/OR INTERIOR DESIGN DRAWINGS FOR HOOD LOCATION AND APPROVED KITCHEN HOOD SHOP DRAWINGS FOR EXACT LOCATION OF EXHAUST DUCT CONNECTIONS. 3. REFER TO LATEST KITCHEN EQUIPMENT DRAWINGS AND APPROVED SHOP DRAWINGS FOR FINAL GAS, PLUMBING AND DRAINAGE HOOK UP SIZES AND LOCATIONS. CONTRACTOR TO REFER TO MANUFACTURERS INSTALLATION MANUALS AND RECOMMENDATIONS AND PROVIDE NECESSARY EQUIPMENT, VALVES, PIPING, ETC. TO SUIT. EXACT LOCATION OF EQUIPMENT ROUGH-INS SHALL BE DETERMINED AT SITE. CHANGES TO KITCHEN EQUIPMENT LINE UP MUST BE REPORTED TO ENGINEER, FOOD SERVICES VENDOR, AND ARCHITECT PRIOR TO INSTALLATION. 4. USE ONLY APPROVED HALTON/CAPTIVEAIRE FAN AND HOOD PACKAGE. 5. ROOF MOUNTED FANS SHALL BE ACCESSIBLE ON SIDES ACCESSIBLE WITHOUT LADDER. REFER TO DETAILS. ANSUL NOTES THIS INSTALLATION SHALL BE PROVIDED IN ACCORDANCE WITH R-102 INSTALLATION MANUAL AND IN ACCORDANCE WITH STATE AND LOCAL CODES. WIRE ROPE FOR DETECTOR AND REMOTE PULL STATION SHALL BE INSTALLED BY AN AUTHORIZED, FACTORY TRAINED DISTRIBUTOR OR SERVICE REPRESENTATIVE. THIS INSTALLATION SHALL BE INSPECTED, PUT INTO OPERATION AND CERTIFIED BY AN AUTHORIZED, FACTORY TRAINED DISTRIBUTOR OR SERVICE REPRESENTATIVE. ELECTRICAL CONTACTS AND WIRING FOR APPLIANCE SHUT OFF SHALL BE PROVIDED BY ELECTRICAL CONTRACTOR. ANSUL R-102 RESTAURANT FIRE SUPPRESSION SYSTEMS HAVE BEEN TESTED AND ARE LISTED BY UNDERWRITERS' LABORATORIES INC. AS PRE-ENGINEERED SYSTEMS; SHALL COMPLY WITH RELEVANT ANSUL INSTALLATION RECHARGE INSPECTION AND MAINTENANCE MANUALS; SHALL COMPLY WITH NFPA 96 WHEN INSTALLED AND CERTIFIED BY AUTHORIZED TRAINED ANSUL DISTRIBUTORS. AGENT DISTRIBUTION PIPING AND DETECTION CONDUIT HOOD PENETRATIONS SHALL BE PROPERLY SEALED IN ACCORDANCE WITH NFPA 96. 1/6 X X 3/4 RT S T DUCT SMOKE DETECTOR REMOTE TEST STATION TEMPERATURE/HUMIDITY SENSOR THERMOSTAT RETURN DUCT EXHAUST DUCT SUPPLY DUCT MANUAL BALANCE DAMPER SUPPLY DIFFUSER RETURN GRILLE EXHAUST GRILLE ABOVE FINISHED FLOORAFF AHJ AUTHORITY HAVING JURISDICTION CFM CUBIC FEET PER MINUTE EA EXHAUST AIR ESP EXTERNAL STATIC PRESSURE HZ FREQUENCY NFPA NATIONAL FIRE PROTECTION ASSOCIATION NC NOISE CRITERIA OA OUTSIDE AIR FTU FAN TERMINAL UNIT SA SUPPLY AIR TYP TYPICAL WC WATER COLUMN MOCP MAXIMUM OVERCURRENT PROTECTION DUMP BOX DIFFUSER OAU OUTDOOR AIR UNIT SIDE WALL MOUNTED SUPPLY REGISTER FCLC FAN CONTROL LIGHTING CONTROL UNIT HEATER SCHEDULE MA R K EL E C T R I C I N P U T (K W ) FA N M O T O R HO R S E P O W E R ( H P ) EL E C T R I C A L (V O L T A G E / P H A S E ) ACC. MO D E L RE M A R K S DI S C O N N E C T S W I T C H UH-1 3.3 1/125208/1 X TRANE - UHEC-032 1,2,3 1. UNIT HEATER TO BE MOUNTED OVERHEAD AT ENTRY. VERTICAL AIR DELIVERY MOUNT AT 9' AFF. 2. PAINT TO MATCH DINING ROOM DUCTWORK. 3. PROVIDE WITH UNIT-MOUNTED THERMOSTAT. MO C P ( A ) 20 1 HVAC SYSTEM DESIGN: OUTSIDE AIR TEMPERATURE: 88°F SUMMER, -4°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e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments TRANE MECHANICAL SCHEDULES M3.0 OM DRC MECHANICAL SPECIFICATIONS 230500 COMMON WORK RESULTS FOR HVAC A. PROVIDE MATERIALS AND EQUIPMENT AND LABOR REQUIRED TO INSTALL HEATING, VENTILATING AND AIR CONDITIONING SYSTEM, COMPLETE AS INDICATED ON DRAWINGS, AS REQUIRED BY CODE AND AS SPECIFIED HEREIN. B. WITHOUT RESTRICTING THE GENERALITY OF THE FIRST STATEMENT, THE WORK TO BE PERFORMED UNDER THIS DIVISION SHALL INCLUDE, BUT IS NOT LIMITED TO, THE FOLLOWING: 1. HVAC WORK AS DESCRIBED IN SECTIONS 230500 THROUGH 233813. C. ELECTRICAL CONTRACTOR, UNLESS OTHERWISE NOTED, SHALL PROVIDE POWER WIRING FOR EACH ITEM OF ELECTRICAL EQUIPMENT AND MAKE FINAL CONNECTION TO MOTORS. D. FINISH PAINTING SHALL BE PERFORMED BY GENERAL CONTRACTOR, EXCEPT AS NOTED ELSEWHERE. CONTRACTOR SHALL RESTORE TO ORIGINAL CONDITION PAINTING DEFACED BY CONTRACTOR AFTER ORIGINAL PAINTING. E. ALL WORK SHALL CONFORM TO CODES, RULES, AND REGULATIONS: 1. NATIONAL ELECTRICAL CODE. 2. STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATING SYSTEMS, NFPA 90A. 3. CODE FOR SAFETY TO LIFE FROM FIRE IN BUILDINGS AND STRUCTURES, NFPA 101. 4. FEDERAL OCCUPATIONAL SAFETY AND HEALTH STANDARDS. 5. STATE MECHANICAL CODE. 6. STATE BUILDING CODE 7. STATE INDUSTRIAL COMMISSION REQUIREMENTS. 8. LOCAL BUILDING CODE REQUIREMENTS. 9. BUILDING INSURING AGENCY REQUIREMENTS. F. PERMITS REQUIRED BY LAWS, ORDINANCES AND BUILDING CODES HAVING JURISDICTION SHALL BE OBTAINED AT THE PROPER TIME BY AND AT EXPENSE OF CONTRACTOR. G. CONTRACTOR SHALL OBTAIN INSPECTIONS REQUIRED BY LAWS, ORDINANCES AND PUBLIC AUTHORITY HAVING JURISDICTION AND SHALL OBTAIN CERTIFICATES OF SUCH INSPECTIONS AND SUBMIT SAME TO ARCHITECT AND SHALL PAY FEES, CHARGES, ASSESSMENTS AND OTHER EXPENSES IN CONNECTION THEREWITH. H. PIPING AND EQUIPMENT LAYOUT ARE SCHEMATIC. EXACT LOCATIONS ARE DETERMINED BY STRUCTURAL AND OTHER CONDITIONS. DESIGN OF SYSTEM MAY NOT BE CHANGED. ONLY EXACT LOCATION OF PIPING AND DUCTS MAY BE REVISED TO SUIT CONSTRUCTION CONDITIONS AND AID IN COORDINATION WITH WORK OF OTHER CONTRACTORS. I. MATERIALS AND EQUIPMENT INSTALLED AS PART OF THE WORK SHALL MEET REQUIREMENTS OF THE CONTRACT DOCUMENTS AND NO MATERIALS OR EQUIPMENT SHALL BE ORDERED UNTIL REVIEWED BY OWNER. ARCHITECT OF RECORD IS RESPONSIBLE FOR REVIEWING AND APPROVING HVAC SUBMITTALS. HVAC UNITS SHALL NOT BE CONSIDERED AS ORDERED AND IN PROGRESS UNTIL SUBMITTALS ARE FORMALLY APPROVED AND RETURNED TO HVAC SUPPLIER. J. CATALOG DATA FOR EQUIPMENT REVIEWED BY OWNER SHALL NOT SUPERSEDE CONTRACT DOCUMENTS. REVIEW OF PRODUCTS SHALL NOT RELIEVE CONTRACTOR FROM RESPONSIBILITY FOR DEVIATIONS FROM DRAWINGS OR SPECIFICATIONS, PROVIDING PROPER CLEARANCE, FABRICATION PROCESS AND COORDINATION WITH OTHER TRADES. K. WHEN SUBMITTED FOR REVIEW, SHOP DRAWINGS SHALL BEAR CONTRACTOR'S CERTIFICATION THAT CONTRACTOR HAS REVIEWED, CHECKED AND APPROVED SHOP DRAWINGS, THAT THEY ARE IN HARMONY WITH REQUIREMENTS OF THE PROJECT AND WITH THE PROVISIONS OF CONTRACT DOCUMENTS AND THAT CONTRACTOR HAS VERIFIED ALL FIELD MEASUREMENTS AND CONSTRUCTION CRITERIA, MATERIALS, CATALOG NUMBERS AND SIMILAR DATA. CONTRACTOR SHALL ALSO CERTIFY THAT WORK REPRESENTED BY THE SHOP DRAWINGS IS RECOMMENDED BY CONTRACTOR AND THE CONTRACTOR'S GUARANTEE WILL FULLY APPLY. L. CONTRACTOR SHALL VERIFY LOCATION OF UTILITIES AND NOTE CONDITIONS WHICH WOULD AFFECT THE WORK. DISCREPANCIES SHALL BE REPORTED PRIOR TO BID AWARD. M. PROVIDE INSTRUCTION TO OWNER'S OPERATING PERSONNEL AS NECESSARY, SHOWING LOCATIONS AND PROPER OPERATION OF MAJOR ITEMS OF EQUIPMENT AND SYSTEM COMPONENTS AND REFERRING TO OPERATING INSTRUCTION MANUAL DESCRIBED BELOW AS A GUIDE. N. COMPILE WRITTEN MANUAL OF OPERATING INSTRUCTIONS INCLUDING COPIES OF SHOP DRAWINGS AND LISTING OF EQUIPMENT SUPPLIERS. ASSEMBLE IN 8-1/2" X 11" HARD BACKED INDEXED BINDER. MATERIAL SHALL BE AS FOLLOWS: 1. TITLE PAGE: TITLE OF JOB, OWNER, ADDRESS, DATE OF SUBMISSION, CONTRACTOR AND ENGINEER. 2. INDEX. 3. LIST OF MAJOR EQUIPMENT USED IN PROJECT ACCOMPANIED BY CONTRACTOR PURCHASE ORDER NUMBERS AND SUPPLIERS NAMES AND ADDRESSES. 4. ONE COPY OF EACH SHOP DRAWING GROUPED BY TYPES OF EQUIPMENT, I.E., ROOFTOP UNITS, FANS, ETC. 5. SECTION FOR EACH SYSTEM INCLUDING: a. BRIEF DESCRIPTION OF SYSTEM OPERATION WITH LOCATION OF MAJOR COMPONENTS. b. HVAC SYSTEM MAINTENANCE AND CALIBRATION INFORMATION, INCLUDING WIRING DIAGRAMS AND SCHEMATICS. O. SUBMIT A COMPLETED COPY TITLED "HVAC OPERATING INSTRUCTION MANUAL" ON BINDING EDGE OF BINDER TO ARCHITECT FOR APPROVAL. AFTER ARCHITECT'S REVIEW AND ANY CORRECTIONS REQUIRED ARE COMPLETED, SUBMIT A COPY OF THE MANUAL TO OWNER. P. WITHIN 90 DAYS AFTER DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF ACTUAL INSTALLATION SHALL BE PROVIDED TO BUILDING OWNER. RECORD DRAWINGS SHALL INCLUDE AT A MINIMUM LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF DUCT DISTRIBUTION SYSTEM INCLUDING SIZES, AND AIR DESIGN FLOW RATES. Q. CONTRACTOR IS TO BECOME INFORMED OF EXACT DIMENSIONS OF FINISHED WORK WHERE PIPES, DUCTS AND EQUIPMENT ARE TO BE PLACED AND WILL ARRANGE THE WORK ACCORDINGLY, ASSUMING ALL RESPONSIBILITY FOR PROPER LOCATION AND COORDINATION OF THE WORK. R. IN ERECTION OF DUCTWORK, SPECIAL CARE SHALL BE USED PROVIDING SUPPORT. S. DUCTWORK SHALL BE PLACED SO AS TO AVOID INTERFERENCES WITH PLUMBING PIPES, ELECTRIC CONDUITS OR PIPES OF OTHER CONTRACTORS. T. DUCTWORK SHALL BE PROVIDED WITH SUFFICIENT DISTANCE FROM WALLS, PIPES, AND OTHER OBSTACLES TO PERMIT APPLICATION OF FULL THICKNESS OF INSULATION SPECIFIED. 230593 TESTING, ADJUSTING, & BALANCING HVAC A. CONTRACTOR SHALL COMPLETE INSTALLATION OF HOOD SYSTEM, ROOFTOP EQUIPMENT, AND CONTROL SYSTEM IN ACCORDANCE WITH DRAWINGS PRIOR TO PERFORMING TAB. CONTRACTOR SHALL PROGRAM THERMOSTATS IN ACCORDANCE WITH REQUIREMENTS LISTED AND FOLLOWING STATUS AS INDICATED IN TAB CONFIRMATION FORM. CONTRACTOR SHALL UTILIZE PERSONNEL AND SUBCONTRACTORS THAT ARE FULLY TRAINED AND CERTIFIED BY MANUFACTURER FOR EQUIPMENT BEING INSTALLED. B. CONTRACTOR SHALL COMPLETE CALIBRATIONS AND TESTS OUTLINED IN WENDY'S TEST PROTOCOLS AND DOCUMENT RESULTS ON DESIGNATED FORMS. COPIES OF FORMS ARE AVAILABLE ONLINE: HTTP://WWW.IGNITORLABS.COM/WRVT-DOC-HOME/ C. CONTRACTORS WORKING ON PROJECT ARE REQUIRED TO HAVE COMPLETED WENDY'S RESTAURANT VENTILATION COURSE FROM IGNITOR LABS WITHIN PAST 12 MONTHS: HTTPS://PORTAL.IGNITORLABS.COM A COMPLETION CERTIFICATE FROM IGNITOR LABS WITH A SCORE OF 80% OR HIGHER IS REQUIRED. CONTRACTOR IS RESPONSIBLE FOR THE NOMINAL COSTS REQUIRED FOR PROJECT PERSONNEL TO TAKE THE COURSE. D. PROCEDURES/CHECKLISTS: CHECKLIST PROCEDURE TROUBLESHOOTING BREAKER PANELS WESCO RQC-2017-013 RQC-2017-014 RQC-2017-015 CPI RQC-2017-043 RQC-2017-044 RQC-2017-045 ROOFTOP UNITS AAON RQC-2020-075 RQC-2020-076 RQC-2020-077 TRANE RQC-2020-025 RQC-2020-026 RQC-2020-027 YORK/CAPTIVE-AIR RQC-2020-105 RQC-2020-106 RQC-2020-107 HOOD SYSTEM HALTON (CAPTUREJET) RQC-2020-052 RQC-2020-053 HALTON (STANDARD FILTER HOOD) RQC-2020-054 RQC-2020-055 CAPTIVE-AIRE RQC-2020-062 RQC-2020-063 E. QUALIFICATIONS: 1. BALANCER SHALL BE A MEMBER IN GOOD STANDING AND CERTIFIED WITH THE ASSOCIATED AIR BALANCE COUNCIL (AABC), OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB). BALANCER SHALL BE TOTALLY INDEPENDENT, HAVING NO AFFILIATION WITH ANY PROJECT CONTRACTOR, DESIGN PROFESSIONAL, EQUIPMENT MANUFACTURER OR SUPPLIER OF HVAC RELATED EQUIPMENT. BALANCER SHALL HAVE BEEN REGULARLY ENGAGED IN TAB OF HEATING, VENTILATING, AND AIR CONDITIONING SYSTEMS FOR RESTAURANTS. BALANCER SHALL PROVIDE PROOF THAT PERSONNEL PERFORMING WORK HAVE SUCCESSFULLY COMPLETED AT LEAST FIVE RESTAURANT PROJECTS OF SIMILAR SIZE AND SCOPE. A COMPLETE LIST OF REFERENCE PROJECTS, INCLUDING NAME AND PHONE NUMBER OF CONFIRMING CONTACTS, SHALL BE SUBMITTED WITH QUOTE, IF REQUESTED. 2. INSTRUMENTS USED FOR TAB SHALL BE ACCURATELY CALIBRATED WITHIN TWELVE (12) MONTHS OF BALANCING AND MAINTAINED IN GOOD WORKING ORDER. PROVIDE RECORDS OF LAST CALIBRATION (AS REQUESTED) AND INCLUDE THIS SUMMARY IN THE FINAL TAB REPORT. ENGINEER OF RECORD, OR THEIR REPRESENTATIVE, MAY OBSERVE TAB ACTIVITIES. 3. UNLESS OTHERWISE NOTED RESTAURATEUR SHALL PROCURE SERVICES OF AND CONTRACT DIRECTLY WITH AN INDEPENDENT TAB CONTRACTOR (BALANCER) MEETING QUALIFICATIONS OF THIS SECTION. BALANCER SHALL TEST, BALANCE, AND ADJUST ALL AIR MOVING EQUIPMENT (RTUS AND FANS), AIR DISTRIBUTION DUCTS AND AIR DEVICES, EXHAUST SYSTEMS, AND TEMPERATURE CONTROL SYSTEMS. 4. IF CONTRACTOR IS REQUIRED TO PROCURE TAB SERVICES DIRECTLY, CONTRACTOR SHALL PROVIDE QUALIFICATIONS OF BALANCER TO RESTAURATEUR OR THEIR REPRESENTATIVE FOR APPROVAL. CONTRACTOR SHALL CONTRACT BALANCER AS SOON AS POSSIBLE AFTER CONSTRUCTION START TO COORDINATE THEIR WORK WITH OTHER TRADES, WHILE MEETING COMPLETION DATE. CONTRACTOR SHALL PREPARE A CRITICAL PATH SCHEDULE, COORDINATED WITH SUBCONTRACTORS, TO ACCOMPLISH ALL TASKS REQUIRED OF BALANCER. 5. CONTRACTORS SHALL COOPERATE AND ASSIST BALANCER AS REQUIRED. BALANCER SHALL INSPECT MECHANICAL, EXHAUST, AND CONTROL SYSTEM WORK. ANY DEVIATIONS FROM PLANS AND SPECIFICATIONS THAT MAY AFFECT PERFORMANCE OF THE SYSTEM SHALL BE REPORTED IN WRITING TO CONTRACTOR, ARCHITECT OF RECORD, ENGINEER AND RESTAURATEUR. F. CONTRACTOR SHALL COMPLETE THE FOLLOWING PRIOR TO TAB: PERMANENT POWER SHALL BE PROVIDED, ROOFTOP UNIT FULL INSTALLED AND STARTED, HOOD SYSTEMS AND FANS STARTED, COMPLETE CONTROLS OPERATIONAL AND PROGRAMMED, DUCTWORK, DIFFUSER AND CEILING INSTALLATION COMPLETED. ADDITIONAL TAB COSTS ARE THE CONTRACTOR'S RESPONSIBILITY IF REQUIRED ITEMS ARE NOT COMPLETE AT START OF TAB PROCEDURES. G. DESIGN BALANCE DEVIATION TOLERANCES: 1. KITCHEN HOODS ARE UL LISTED AND SHALL BE BALANCED FROM 100% TO 105% OF DESIGN AIRFLOW. DO NOT SET EXHAUST RATE BELOW THAT SCHEDULED. INCREASE RTU AIRFLOW AS NEEDED TO ACHIEVE POSITIVE PRESSURE IN THE RESTAURANT. 2. TOTAL OF ALL AIR DISTRIBUTION DEVICES ON SAME ROOFTOP UNIT DUCT SYSTEM SHALL BE BALANCED TO 100% TO 105% OF DESIGN. 3. ROOFTOP UNITS SHALL PROVIDE OUTDOOR AIR CFM BETWEEN 100% TO 105% OF DESIGN FOR ALL SUPPLY FAN SPEEDS DURING REGULAR HOURS AND SHALL BE SET TO TRACK AIR VOLUME WITH THE SUPPLY FAN FOR THE FAN SPEED PROVIDED BY THE UNITS. 4. ECONOMIZERS SHALL PROVIDE REQUIRED OUTDOOR AIR WHEN CLOSED FOR BUSINESS (MINIMUM ONLY). 5. OVERALL SYSTEM SHALL BE BALANCED TO POSITIVE CFM AS SHOWN ON THE VENTILATION SCHEDULE WITH SUPPLY AND EXHAUST FANS IN OPERATION. 6. CONTACT RTU MANUFACTURER TO RESOLVE AIRFLOW DELIVERY IF ROOFTOP UNIT AIRFLOWS ARE BELOW DESIGN. THIS INCLUDES VERIFICATION OF DUCTWORK STATIC PRESSURE, ADJUSTMENT OF FAN RPM, REPLACEMENT OF DRIVES, ETC. RESTAURANT SHALL BE LEFT IN A POSITIVE AIR PRESSURE STATE. H. PLAN REVIEW: PROVIDE WRITTEN TESTING AND BALANCING PLAN REVIEW WITHIN FIVE (5) BUSINESS DAYS UPON RECEIPT OF CONTRACT. PLAN REVIEW SHALL INCLUDE RECOMMENDATIONS TO IMPROVE TESTING AND BALANCING. TRANSMIT THESE COMMENTS DIRECTLY TO CONTRACTOR. REVIEW WENDY'S RESTAURANT VENTILATION EQUIPMENT PRE-START AND START-UP FORMS. I. EQUIPMENT SUBMITTAL DATA: CONTRACTOR SHALL PROVIDE RESTAURANT EQUIPMENT SUBMITTAL DATA TO BALANCER. COMPLETED EQUIPMENT STARTUP AND CALIBRATION FORMS SHALL BE PROVIDED TO BALANCER PRIOR TO PERFORMING TAB. J. UPDATED DESIGN REQUIREMENTS: IF ANY, SHALL BE PROVIDED TO BALANCER PRIOR TO TAB. DESIGN REQUIREMENT CHANGES SHALL INCLUDE DATE OF THE CHANGE AND REFERENCES TO THE CONTRACT DOCUMENTS (ADDENDA, CHANGE ORDER, OR CONSTRUCTION CHANGE DIRECTIVE), WHICH DIRECTED THE CHANGE. CHANGES MADE WITHOUT RESTAURATEUR WRITTEN APPROVAL ARE INVALID. K. BALANCER TEST AND BALANCE REPORT: 1. PERFORM TAB WORK ASSOCIATED WITH THE RESTAURANT VENTILATION SYSTEM PER DESIGN DOCUMENTS. SUBMIT AN ELECTRONIC PDF COPY OF TABULATED REPORTS IN NEATLY ORGANIZED TYPED FORMS (WITH NUMBERED PAGES) WITH AABC OR NEBB FULLY COMPLETED, STAMPED AND SEALED REPORTS. REPORT SHALL BE PROVIDED WITHIN SEVEN (7) DAYS OF COMPLETION OF TESTS TO ARCHITECT OF RECORD, ENGINEER, CONTRACTOR AND RESTAURATEUR. REPORT SHALL INCLUDE START-UP CHECKLIST FORMS AND REPORTS PROVIDED TO BALANCER BY CONTRACTOR, EQUIPMENT TEST DATA AND DRAWINGS TO COINCIDE WITH TEST REPORT. IN ADDITION, REPORTS SHALL INCORPORATE: 2. A SUMMARY THAT SHALL INCLUDE A GENERAL DESCRIPTION OF PROJECT (BUILDING TYPE, SYSTEM TYPE, AND EQUIPMENT DESCRIPTION). 3. A DESCRIPTIVE LIST OF ALL EQUIPMENT AND TEST RESULTS THAT DO NOT MEET PLANS AND SPECIFICATIONS (INCLUDE PHOTOGRAPHS). 4. COPIES OF REDUCED PLAN DRAWINGS THAT UNIQUELY IDENTIFY AND CROSS REFERENCE AIR DEVICES AND HVAC EQUIPMENT. 5. PROVIDE BUILDING PRESSURE TABLES THAT INDICATE DESIGN AND ACTUAL RESULTS. 6. REPORTS THAT ARCHITECT AND/OR ENGINEER DETERMINES IS INACCURATE, OR INCOMPLETE, SHALL BE RETURNED FOR CORRECTION, COMPLETION, OR RE-TESTING AT BALANCERS COST. REVISED REPORTS SHALL BE SUBMITTED IN THEIR ENTIRETY. EACH REVISION SHALL BE HIGHLIGHTED AND SHALL INDICATE REVISION DATE. COVER PAGE SHALL INDICATE DATE OF FIRST EDITION AND REVISION DATE. L. TEST & BALANCE CONFIRMATION FORM: BALANCER SHALL COMPLETE A WENDY'S TEST & BALANCE CONFIRMATION FORM WHILE PERFORMING SYSTEM TESTING. IT SHALL BE SIGNED OFF WHEN TAB IS COMPLETE AND INCLUDED AT THE END OF THE TEST AND BALANCE REPORT. A DIGITAL VERSION OF THIS FORM CAN BE FOUND UNDER TEST AND BALANCE REPORTS AT: HTTP://WWW.IGNITORLABS.COM/WRVT-DOC-HOME/ M. CONTRACTOR'S RESPONSIBILITIES FOR TAB: 1. CONTRACTOR SHALL BE COMPLETELY FAMILIAR WITH ALL PROVISIONS AND RESPONSIBILITIES OF BALANCER AND SHALL PROVIDE COOPERATION AND SUPPORT REQUIRED. 2. CONTRACTOR SHALL CORRECT OR REPAIR DEFICIENCIES NOTED BY BALANCER IMMEDIATELY. IF DEFICIENCIES ARE NOT CORRECTED WHILE BALANCER IS ON SITE, AND DEFICIENCIES PREVENT COMPLETION OF TAB WORK, CONTRACTOR SHALL ASSUME COSTS FOR EXTENDING TAB, OR FOR FOLLOW UP TAB VISITS. 3. CONTRACTOR SHALL PROVIDE DOCUMENTATION OF CORRECTION OF ANY OPEN ISSUES PRIOR TO SUBMISSION OF FINAL REPORT. SHOULD ANY OPEN HVAC SYSTEM ITEMS BE INCAPABLE OF CORRECTION WITHIN SEVEN DAY PERIOD FOR THE FINAL BALANCING REPORT, CONTRACTOR SHALL INFORM BALANCER AND OWNER IMMEDIATELY AND CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS, DELAYS, AND RESCHEDULING REQUIRED. 4. CONTRACTOR IS RESPONSIBLE FOR CORRECTION OF IDENTIFIED ITEMS AND FOR SUBSEQUENT TESTS IN EVENT OF THE FOLLOWING: a. NO PERMANENT POWER FOR THE RESTAURANT. b. DIFFUSERS NOT INSTALLED FOR TEST. c. CEILING TILES NOT INSTALLED. d. PASSWORD FOR RTU THERMOSTATS NOT PROVIDED. e. INOPERABLE EQUIPMENT. f. THERMOSTATS NOT PROGRAMMED. 5. ADDITIONAL RESPONSIBILITIES INCLUDE; PROVIDE REQUIRED SHOP DRAWINGS AND EQUIPMENT DATA INCLUDING ANY APPROVALS OF DESIGN MODIFICATIONS, PROVIDE SAFE AND CLEAR ACCESS TO ALL HVAC SYSTEMS AS NEEDED TO PERFORM TAB WORK (LADDERS, LIFTS, ROOF ACCESS, ACCESS PANELS AND THE LIKE), PROVIDE TEST OPENINGS AS REQUIRED FOR TESTING AND BALANCING HVAC SYSTEMS, PROVIDE UPDATED JOB SCHEDULE AND TIMELY NOTICE PRIOR TO SCHEDULED EVENTS. MAKE TESTS AND CALIBRATION TO ESTABLISH ADEQUACY, QUALITY, SAFETY, COMPLETED STATUS, AND SATISFACTORY OPERATION OF HVAC SYSTEMS AND COMPONENTS. 6. DURING TAB PERIOD, OPERATE HVAC EQUIPMENT AS NECESSARY TO PERMIT SYSTEMS TO BE TESTED AND BALANCED AS FULLY OPERATING FUNCTIONAL SYSTEMS. WORK HARMONIOUSLY WITH BALANCER TO EXPEDITE THE WORK. REMOVE AND REPLACE CEILINGS AS NECESSARY TO PERMIT TAB OPERATIONS. REMOVE AND REPLACE EQUIPMENT, LIGHTS, OR OTHER ITEMS WHICH OBSTRUCT TESTING AND BALANCING OPERATIONS (WHERE EQUIPMENT, LIGHTS, OR OTHER ITEMS INTERFERE WITH FUTURE ADJUSTMENTS OF HVAC SYSTEM. SUCH EQUIPMENT, LIGHTS, OR OTHER ITEMS SHALL BE RELOCATED BY CONTRACTOR AS DIRECTED BY ENGINEER OF RECORD. 7. REPLACE BELTS AND DRIVES AS REQUIRED FOR PROPER BALANCING - DRIVES SHALL BE ADJUSTED AND ALIGNED BY CONTRACTOR TO PREVENT ABNORMAL BELT WEAR AND VIBRATION. ADJUST FAN SPEED AS REQUIRED NOT TO EXCEED MOTOR CAPACITY. CONTRACTOR SHALL ADJUST DAMPERS FOR THE BALANCER DURING TAB WORK. IDENTIFY CONCEALED DAMPER LOCATIONS WITH ORANGE TAPE. MANUALLY OPEN AND TEST DAMPERS FOR SMOOTH VIBRATION-FREE OPERATION AND TIGHTEN PRIOR TO COMMENCEMENT OF TAB WORK. VERIFY THAT ALL CONTROLS ARE INSTALLED AND OPERATING AS REQUIRED IN BOTH STORE OPEN AND CLOSED MODES. BEFORE REQUESTING FINAL TESTING AND BALANCING, SUBMIT SIGNED STATEMENT THAT HVAC SYSTEMS ARE INSTALLED, ADJUSTED, SERVICED, OPERATING SATISFACTORILY, AND ARE READY FOR USE. N. SYSTEM READY NOTICE: ALLOW ADEQUATE TIME TO PERFORM TESTING AND BALANCING WORK. TAB IS REQUIRED TO BE PERFORMED PRIOR TO RESTAURANT OPENING. NOTIFY BALANCER UPON COMMENCEMENT OF WORK RELATED TO HVAC SYSTEM AND COORDINATE PROPER TIME FOR NOTICE TO SCHEDULE TRAVEL AND PROVIDE THE DURATION REQUIRED FOR TEST AND BALANCING AND FOR ANY POSSIBLE CORRECTIONS. O. BALANCER RESPONSIBILITIES: 1. RECORD DATA REQUIRED BY AABC OR NEBB FORMS. TEST AND ADJUST SYSTEMS FOR DESIGN CFM OF SUPPLY, OUTSIDE AIR (IN MULTIPLE FAN SPEEDS), AND EXHAUST AIR. KITCHEN APPLIANCES SHOULD BE OPERATIONAL WHILE MAKING ADJUSTMENTS. HOOD SIDE SKIRTS SHALL BE IN PLACE ON THE CORRECT ENDS OF HOODS (FRY HOOD DUMP SKIRT HAS A CUT OUT). TEST AND RECORD SYSTEM STATIC PRESSURE PROFILES. ADJUST SUPPLY AND RETURN DUCTS TO DESIGN AIRFLOW. TEST AND ADJUST FANS. ADJUST ALL DIFFUSERS, GRILLES, AND REGISTERS TO MINIMIZE DRAFTS. PROVIDE BUILDING DIFFERENTIAL PRESSURE (INSIDE TO OUTSIDE) AT ALL OPERATIONAL CONDITIONS AND INCLUDE IN THE FINAL REPORT. 2. PROVIDE TABLE IN THE REPORT THAT ITEMIZES ALL SUPPLY AND EXHAUST AIR CFM (SPECIFIED AND ACTUAL) TO SHOW THAT BUILDING SHOULD BE UNDER POSITIVE PRESSURE. SIZE, Ak CATALOG FACTORS OF DIFFUSERS, GRILLES, REGISTERS, AND ALL TESTED EQUIPMENT SHALL BE IDENTIFIED AND LISTED. READINGS AND TEST OF DIFFUSERS, GRILLES, AND REGISTERS SHALL INCLUDE REQUIRED VELOCITY (FPM), REQUIRED CFM, AND RESULTANT CFM. WHEN DIRECT CFM MEASURING INSTRUMENTS ARE USED, VELOCITIES ARE NOT REQUIRED. 3. BALANCER SHALL COMPLETE A WENDY'S TEST & BALANCE CONFIRMATION FORM WHILE PERFORMING SYSTEM TESTING. FORM SHALL BE SIGNED OFF WHEN TAB IS COMPLETE AND INCLUDED AT THE END OF TAB REPORT. 230700 HVAC INSULATION A. DUCT INSULATION AND APPURTENANCES SHALL HAVE FLAME SPREAD RATING NOT EXCEEDING TWENTY-FIVE (25) AND SMOKE DEVELOPED RATING NOT EXCEEDING FIFTY (50). DUCT INSULATION SHALL HAVE AN INSTALLED R-VALUE OF 6. B. CONCEALED SUPPLY DUCTWORK SHALL HAVE FLEXIBLE FIBERGLASS DUCT WRAP LAMINATED TO FOIL REINFORCED KRAFT VAPOR BARRIER FACING WITH 2" STAPLING FLANGE OF SUFFICIENT DENSITY AND THICKNESS TO MEET LOCAL CODE REQUIREMENTS. ONLY COMMERCIAL GRADE INSULATION PRODUCTS MAY BE USED. C. INSULATION SHALL NOT BE APPLIED UNTIL CONSTRUCTION HAS PROGRESSED SUFFICIENTLY TO ENSURE AGAINST PHYSICAL OR MOISTURE DAMAGE TO INSULATION. INSULATION DAMAGED THROUGH FAILURE TO OBSERVE THIS DIRECTIVE SHALL BE REPLACED AT THIS CONTRACTOR'S EXPENSE. D. HANGER RODS SHALL BE PERPENDICULAR TO DUCTWORK BEFORE INSULATION IS INSTALLED. E. INSTALL INSULATION ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. F. INSULATION SHALL BE APPLIED OVER FLANGES, JOINTS AND SEAMS IN PIPING AND DUCTWORK. G. JOINTS AND SEAMS IN INSULATION SHALL BE PROPERLY SEALED TO MAINTAIN VAPOR BARRIER. H. INSULATION SHALL BE OWENS-CORNING. EQUAL PRODUCT BY ARMSTRONG, CERTAINTEED, SCHULLER OR KNAUF MAY BE PROVIDED AT CONTRACTOR'S OPTION. 230800 COMMISSIONING OF HVAC A. THIS CONTRACTOR SHALL COORDINATE COMMISSIONING OF HVAC SYSTEMS AND SHALL ASSIST OWNERS TAB CONTRACTOR TO COMPLETION. CONTRACTOR IS RESPONSIBLE FOR CORRECTING DEFICIENCIES NOTED IN THE TAB REPORT. C. CONTRACTOR SHALL PROVIDE DOCUMENTATION OF TESTING AND COMMISSIONING TO BE INCLUDED IN OPERATING INSTRUCTIONS MANUAL (SEE GENERAL REQUIREMENTS). DOCUMENTATION SHALL INCLUDE: 1. CONSTRUCTION AND SYSTEM CHECKLISTS. 2. CERTIFICATE OF READINESS. 3. INTERIM AND FINAL TEST AND INSPECTION REPORTS AND CERTIFICATES. 4. APPROVED SUBMITTALS. 5. CERTIFICATE OF COMPLETION. 6. AS-BUILT DOCUMENTATION. 233133 METAL DUCTS A. THIS SECTION INCLUDES SPECIFICATIONS FOR DUCTWORK EXCEPT 'GREASE DUCT' (EXHAUST DUCT CONNECTED TO TYPE I HOODS WHERE GREASE LADEN VAPORS MAY BE PRESENT). REFER TO PLANS AND DETAILS FOR INFORMATION ON 'GREASE DUCT'. B. CONTRACTOR SHALL PROVIDE COMPLETE DUCT SYSTEM CONSISTING OF DUCTWORK, PLENUMS, FITTINGS AND CONNECTORS OF SIZE AND LOCATION AS INDICATED ON DRAWINGS. C. ALL PORTIONS OF DUCT SYSTEM SHALL BE DESIGNED, FABRICATED AND INSTALLED PER THE FOLLOWING REQUIREMENTS: 1. LATEST EDITION OF SMACNA “HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE”. 2. RIGID GALVANIZED SHEET METAL OF THICKNESS AND WITH STIFFENERS AS INDICATED IN SMACNA PER 2” WATER COLUMN CHART. 3. AIR VELOCITIES NO MORE THAN 2000 FPM AND STATIC PRESSURE IN DUCT OF 2” OR LESS. 4. SEALING PER SMACNA 'CLASS B' OR AS REQUIRED TO MEET AIR BALANCE. 5. CROSS-BREAKING, STIFFENING, BRACES, TOES, ANGLES AND OTHER BRACING AND SUPPORT REQUIRED TO MAINTAIN DUCT CONFORMITY (TRUE TO SHAPE, PREVENT BUCKLING OR CAVITATION). 6. ALL VERTICAL DUCTS SHALL BE ABLE TO CARRY AN ADDITIONAL 100 LBS. SUSPENDED LOAD FROM HANGERS WITHOUT BUCKLING. 7. SEAMS OF ALL DUCTS AND JOINTS SHALL BE HAMMERED TO A SMOOTH SURFACE ON THE INSIDE. D. FLEXIBLE CONNECTIONS SHALL BE INSTALLED AT ROOFTOP UNIT SUPPLY AND RETURN AIR CONNECTIONS. CONNECTIONS SHALL BE AT LEAST 6" LONG, MADE OF NFPA 90A APPROVED FLAMEPROOF FABRIC. E. INSTALL HANGERS AND SUPPORTS WITHIN 24 INCHES OF EACH ELBOW AND WITHIN 48 INCHES OF EVERY BRANCH CONNECTION. HANGERS EXPOSED TO VEIW SHALL BE THREADED ROD AND ANGLE OR CHANNEL SUPPORTS. F. ROUND SHEET METAL DUCT: PROVIDE SPIRAL SEAM (ALL SIZES) OR SNAP LOCK (DUCT CONCEALED ABOVE CEILINGS SIZES UP TO 10") GALVANIZED STEEL COMPLYING WITH SMACNA STANDARDS. SPIRAL SEAM DUCTWORK SHALL HAVE SMACNA SEAM TYPE RL-1. ROUND EXPOSED DUCTWORK SHALL BE SPIRAL SEAM (ALL SIZES). G. EXPOSED DUCTWORK: EXPOSED DUCTWORK SHALL BE CLEANED OF DEBRIS AND OIL, THEN WIPED DOWN WITH VINEGAR OR OTHER SURFACE PREPARING CHEMICAL TO PREPARE DUCT FOR PAINT. H. PROVIDE VOLUME CONTROLLER AND EXTRACTOR AT BRANCH TAKEOFFS IN SUPPLY AND RETURN AND AT OTHER LOCATIONS IN SUPPLY AND RETURN MAIN DUCTS AS REQUIRED TO PROPERLY BALANCE SYSTEMS. DAMPER SHALL BE AS SPECIFIED IN SECTION 233300. I. PROVIDE TURNING VANES IN ELBOWS OF RECTANGULAR SUPPLY DUCTS. BLADES SHALL BE HOLLOW-FORMED DOUBLE THICKNESS VANES. J. PROVIDE SUPPLY, RETURN, AND EXHAUST REGISTERS, GRILLES AND DIFFUSERS AS INDICATED ON DRAWINGS AND/OR SCHEDULES. VERIFY AIR DEVICE REQUIREMENTS WITH GENERAL CONTRACTOR PRIOR TO ORDERING. K. PROVIDE FLEXIBLE SUPPLY AIR DUCTWORK UL 181, CLASS 1, TWO-PLY VINYL FILM SUPPORTED BY HELICALLY WOUND SPRING-STEEL WIRE, R-6 FIBERGLASS BLANKET INSULATION WITH METALIZED FILM VAPOR BARRIER OUTER JACKET IN LENGTHS THAT DO NOT EXCEED SIX FEET, AT AIR DEVICE CONNECTIONS (GRILLES, REGISTERS AND DIFFUSERS). 233300 DAMPERS A. CONTRACTOR SHALL PROVIDE RECTANGULAR AND ROUND GALVANIZED STEEL MANUAL AND/OR MOTORIZED VOLUME CONTROL DAMPERS THAT SHALL BE: 1. NO MORE THAN 6" IN ONE DIMENSION (LARGER DAMPERS SHALL BE OPPOSED-BLADE WITH EACH BLADE BEING NO MORE THAN 6”), 2. MINIMUM OF 16 GAUGE AND AT LEAST 2 GAUGES HEAVIER THAN DUCT INSTALLED IN, 3. CHANNEL FRAME WITH BRACED CORNERS, CONCEALED LINKAGE, TEFLON FILLED BEARINGS, BLADE STOPS 4. REPLACEABLE BUTYL RUBBER SEALS INSTALLED ALONG TOP, BOTTOM AND SIDES OF FRAME AS WELL AS ALONG ALL SIDES OF EACH BLADE 5. 6" LONG CONTROL SHAFT WITH INSULATION STAND-OFF, 6. LOCKING QUADRANT MANUAL HANDLES OR MOTORIZED OPERATORS COMPATIBLE WITH CONTROL SYSTEM, 7. OPERATE FROM FULL OPEN TO FULL CLOSED. B. PROVIDE ACCESS AND PROPER CLEARANCES AS REQUIRED TO OPERATE DAMPERS. C. CHECK DAMPERS FOR PROPER OPERATION BEFORE AND AFTER INSTALLATION. D. INSTALL BALANCE DAMPERS WHERE INDICATED ON DRAWINGS AND ELSEWHERE AS NECESSARY TO OBTAIN PROPER SYSTEM BALANCE. 233418 ROOF EXHAUST FAN A. ROOF MOUNTED UP BLAST EXHAUST FAN SHALL BE CENTRIFUGAL DIRECT DRIVE TYPE. FAN SHALL BE CONSTRUCTED OF SPUN ALUMINUM WITH STRUCTURAL ELEMENTS OF MINIMUM 16 GAUGE MARINE ALLOY ALUMINUM. B. INTEGRAL MOTOR SHALL BE HEAVY DUTY TYPE WITH PERMANENTLY LUBRICATED SEALED BEARINGS ENCLOSED IN WEATHER-TIGHT COMPARTMENT AND SEPARATED FROM THE EXHAUST AIR STREAM. C. THE WHEEL SHALL BE CENTRIFUGAL BACKWARD INCLINED TYPE WITH COMPLETELY ALUMINUM CONSTRUCTION WITH CONE INLET AND DYNAMICALLY BALANCED TO MINIMIZE VIBRATION. D. FANS SHALL BEAR THE AMCA CERTIFIED RATINGS SEAL FOR SOUND AND AIR PERFORMANCE AND SHALL BE UL LISTED AND CSA APPROVED. CAPACITIES AS SHOWN ON THE DRAWINGS. E. WIRING SHALL BE BY ELECTRICAL CONTRACTOR. F. VERIFY MANUFACTURER MAKE AND MODEL OF EXHAUST FANS WITH HOOD DRAWINGS. 233713 AIR DISTRIBUTION DEVICES A. DIFFUSERS, REGISTERS AND GRILLES SHALL BE PROVIDED BY CONTRACTOR. B. COORDINATE AIR DISTRIBUTION DEVICE LOCATIONS WITH AFFECTED CONTRACTORS BEFORE INSTALLING DUCTWORK. CHANGES IN LOCATION FROM THE DRAWINGS MUST BE APPROVED BY OWNER BEFORE INSTALLATION. C. SUSPEND CEILING AIR DEVICES FROM STRUCTURE ON WIRE HANGERS OR FROM RIGID DUCTWORK. CEILING MUST NOT BE USED TO SUPPORT AIR DISTRIBUTION DEVICES. D. SECURELY FASTEN SIDE WALL AIR DEVICES TO RIGID DUCTWORK OR STRUCTURE. 233813 - COMMERCIAL-KITCHEN HOODS A. PROVIDE SUBMITTALS ON TYPE I HOODS, FILTERS AND BAFFLES, AND LIGHTING FIXTURES. B. COORDINATE WITH KITCHEN EQUIPMENT LAYOUT, LIGHTING FIXTURES, HVAC EQUIPMENT, PLUMBING, SPRINKLER SYSTEM, AND FIRE-SUPPRESSION SYSTEM COMPONENTS. C. TYPE I HOOD SHALL BE MANUFACTURED OF STAINLESS STEEL ASTM A 666, TYPE 304 STEEL WITH MINIMUM THICKNESS OF 0.050". D. TYPE I HOODS SHALL BE WELDED AT ALL JOINTS EXPOSED TO GREASE WITH CONTINUOUS WELDS, HAVE EASILY ACCESSIBLE FILTERS/BAFFLES, AND MAKE-UP AIR DIFFUSERS EASILY ACCESSIBLE FOR CLEANING. HOODS SHALL BE FABRICATED ACCORDING TO FSF2 AND UL 710 LISTED AND LABELED. E. PROVIDE ACCESS PANELS FOR FIRE DAMPERS AND FUSIBLE LINKS. F. DUCT-COLLAR FIRE DAMPERS - COLLAR AND DAMPER SHALL COMPLY WITH UL 710 TESTING AND LISTING REQUIRED FOR THE ENTIRE HOOD. G. LIGHTING FIXTURES - LIGHTING FIXTURES ARE PROVIDED IN THE LIGHTING PACKAGE. LED HEAT RATED LAMPS AT 3500K ARE REQUIRED. SUBSTITUTION OF CFL OR INCANDESCENT LAMPS IS NOT AUTHORIZED. H. HOOD CONTROLS - HOOD CONTROLS SHALL BE ENCLOSED WITHIN A WALL MOUNTED CONTROL PANEL, FACTORY WIRED AND FABRICATED OF STAINLESS STEEL. ON-OFF SWITCHES SHALL START AND STOP THE EXHAUST FAN WITH AN INTERLOCK FOR THE SUPPLY FAN TO OPERATE SIMULTANEOUSLY. INTERLOCK EXHAUST FAN WITH FIRE-SUPPRESSION SYSTEM TO OPERATE FAN DURING FIRE-SUPPESSION-AGENT RELEASE AND TO REMAIN IN OPERATION UNTIL MANUALLY STOPPED. 12 / 2 2 / 2 0 1 7 4 : 1 3 : 4 7 P M 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments MECHANICAL SPECIFICATIONS M4.0 OM DRC AC-K 1 3 2 4 5 6 7 8 9 10 11 11 13 14 12 8 9 6 7 5 10 4 TRANE Baysens924 KITCHEN UNIT FIELD WIRED TERMINALS RTRM J6  FIELD WIRED (REFER TO PROVIDED DIAGRAM FOR ADDITIONAL INFORMATION) ELECTRICAL CONTRACTOR: THESE WIRING DETAILS FOR FAN CONTROL LIGHTING CONTROL PANEL INCLUDED IN MODULAR PANEL SYSTEM. MECHANICAL CONTRACTOR TO ENSURE JUMPER IS IN CORRECT POSITION TO DISPLAY EXTERNAL SENSOR TEMPERATURE READING. REFER TO MANUFACTURER'S INSTRUCTIONS FOR ADDITIONAL INFORMATION. (TYP) 15 A 120/1/60 MECHANICAL CONTRACTOR TO EXTEND 120V POWER TO EACH HOOD FOR CAPTUREJET FAN. REMOTE HEAT SENSOR FURNISHED WITH HOOD, EC TO FURNISH AND INSTALL TWO CONDUCTORS FROM SENSOR TO TERMINALS #1 AND #2 IN PANEL FOR 'REMOTE HEAT SENSOR' PRE-WIRED WITHIN SWITCHBOARD (UNLESS OTHERWISE NOTED) RS SC TRANE REMOTE SENSOR (REFER TO M1.1 DRAWING FOR LOCATION OF REMOTE SENSOR ON WALL) FCLC SWITCHBOARD (VERIFY LOCATION WITH PLANS) ALL 120V WIRING FURNISHED AND INSTALLED BY EC. ALL LOW VOLTAGE WIRING (24V) FURNISHED BY EC AND INSTALLED BY MC. (UNLESS OTHERWISE NOTED) AT ROOFTOP UNIT (RTU) CONTROL BOX. VERIFY LOCATION OF RTU WITH PLANS TO GRILL CONTROL CONTACT (24V)-OPTIONAL AS REQUIRED BY LOCAL CODE FROM GRILL CONTROL CONTACT (24V RETURN)-OPTIONAL AS REQUIRED BY LOCAL CODE 24 VOLT - #18 SHIELDED THERMOSTAT WIRE OR BACNET WIRE 120 VOLT - #12 THHN in 1/2" EMT CONDUIT 3 2 1 FIELD WIRING PROVIDED BY THIS CONTRACTOR. MOUNTED AND WIRED IN THE FCLC BY THE FCLC SUPPLIER. 1 2 BCI-R (REFER TO DRAWINGS FOR LOCATION) AC-D 1 3 2 4 5 6 7 8 9 10 11 11 13 14 12 8 9 6 7 5 10 4 TRANE Baysens924 DINING UNIT FIELD WIRED TERMINALS RTRM J6  (REFER TO PROVIDED DIAGRAM FOR ADDITIONAL INFORMATION) PRE-WIRED WITHIN SWITCHBOARD (UNLESS OTHERWISE NOTED) RS SC TRANE REMOTE SENSOR (REFER TO M1.1 DRAWING FOR LOCATION OF REMOTE SENSOR ON WALL) 3 2 1 FIELD WIRING PROVIDED BY THIS CONTRACTOR. 1 2 BCI-R (REFER TO DRAWINGS FOR LOCATION)BACNET BACNET BACNET BACNET COM SHIELD 13 14 15 16 17 18 LOAD SHED COMMON LOAD SHED INPUT 24 VOLT AC J6 24 VOLT COMMON 456 1 2 3 4 5 6 7 8 9 10 11 12 14 LINK WCI BACNET BCI-R RTRM ZONE SENSOR J4 BACNET+ BACNET- 12 34 12 TX2Y2W2GW1 /0 J7 Y1R SUGGESTED SUPPLIER: WINDY CITY WIRE x PLENUM RATED P/N:043005AL x NON-PLENUM RATED P/N:108760 ELECTRICAL CONTRACTOR MUST INCLUDE COST OF WIRING, INTERLOCKS, FINAL CONNECTIONS, CONDUITS, PLUS MISCELLANEOUS MATERIALS AND LABOR REQUIRED TO COMPLETE CONTROLS SYSTEMS AS INDICATED, SPECIFIED, DETAILED OR OTHERWISE NOTED IN THIS CONSTRUCTION DOCUMENT SET, AND AS WOULD NORMALLY BE REQUIRED FOR SIMILAR WORK, AND AS REQUIRED BY LOCAL CODE REQUIREMENTS AS LINE ITEM ADD IN BASE BID. FIELD VERIFY AND COORDINATE WORK WITH EQUIPMENT VENDORS, OTHER TRADES, OWNER AND LOCAL INSPECTORS PRIOR TO START OF WORK. MECHANICAL CONTRACTOR MUST INCLUDE COST OF PROGRAMMING, COMMISSIONING, CONTROLS, ETC. PLUS MISCELLANEOUS MATERIALS AND LABOR REQUIRED TO COMPLETE CONTROLS SYSTEMS AS INDICATED, SPECIFIED, DETAILED OR OTHERWISE NOTED IN THIS CONSTRUCTION DOCUMENT SET, AND AS WOULD NORMALLY BE REQUIRED FOR SIMILAR WORK, AND AS REQUIRED BY LOCAL CODE AS LINE ITEM ADD IN BASE BID. FIELD VERIFY AND COORDINATE WORK WITH EQUIPMENT VENDORS, OTHER TRADES, OWNER AND LOCAL INSPECTORS PRIOR TO START OF WORK. 1. CONTRACTOR TO PROGRAM BAYSENS924 THERMOSTAT PER TRANE INSTALLER GUIDE AND WENDY'S QUICK REFERENCE GUIDE. 2. CONTRACTOR TO COMPLETE AND RECORD RESULTS FROM THESE TEST AND CALIBRATIONS: A. HOOD SYSTEM B. FAN CONTROL LIGHTING CONTROL SYSTEM C. RTU SYSTEM PROCEDURES AND FORMS ARE PROVIDED FOR THESE TESTS IN FAN CONTROL LIGHTING CONTROL PANEL BOOK SEQUENCE OF OPERATIONS - FAN CONTROL LIGHTING CONTROL SYSTEM. NOTE TO THE MECHANICAL CONTRACTOR: 1. CHOOSE FAHRENHEIT AND WHOLE DEGREES (1.0) 2. DUAL SETPOINT 3. DEADBAND - 2 DEGREES 4. SELECT HEAT/COOL/AUTO/OFF 5. FAN - OFF/HIGH (ON) 6. OCCUPANCY (TIMED OVERRIDE) ENABLED 7. SETTINGS SUMMARY 8. PRESS CONFIGURATION BUTTON ON REAR OF ZONE SENSOR TO RETURN TO OPERATING MODE. ENSURE DISCHARGE TEMPERATURE LIMIT POTENTIOMETER IS SET UP 9 O CLOCK / 55 DEGREES CONTACT TRANE 866-986-4822 FOR MORE INFORMATION ZONE SENSOR AND BCI-R FORMA TWO NODE BACNET MS/TP NETWORK. WIRE SYSTEM AS SHOWN IN SCHEMATIC BELOW WHILE ADHERING TO THESE RECOMMENDATIONS: x BACNET WIRE: SHIELDED TWISTED PAIR, 22 AWG OR LARGER. x AT RTRM BOARD, TERMINATE SHIELD WIRE AT J7-COM TERMINAL. SHIELD WIRE MAY NEED TO BE EXTENDED TO MAKE THIS CONNECTION. USE AN INSULATED EXTENSION WIRE TO PREVENT CONTACT WITH METAL ENCLOSURE AND CIRCUIT BOARDS. x AT ZONE SENSOR, REMOVE OR INSULATE SHIELD WIRE TO PREVENT CONTACT WITH CIRCUIT BOARD. x SET LINK SWITCH ON BCI-R TO BACNET. TO MICRO-SWITCH IN GRILL ANSUL FROM MICRO-SWITCH IN GRILL ANSUL TO PHOTOCELL TO PHOTOCELL (REFER TO PROVIDED DIAGRAM FOR ADDITIONAL INFORMATION) PRE-WIRED WITHIN SWITCHBOARD (UNLESS OTHERWISE NOTED) TO MICRO-SWITCH IN FRYER ANSUL FROM MICRO-SWITCH IN FRYER ANSUL REMOTE PUSHBUTTON POWER KILL SWITCH. REFER TO POWER PLAN SHEET E2.1 FOR LOCATIONS 24VAC FROM RTU-1 (IF REQUIRED) OCC SIGNAL TO RTU-1 (IF REQUIRED) 24VAC FROM RTU-2 (IF REQUIRED) OCC SIGNAL TO RTU-2 (IF REQUIRED) WIRING LEGEND TRANE NOTES POWER AND COMMUNICATION WIRING NOTE TO ELECTRICAL CONTRACTOR NOTE TO MECHANICAL CONTRACTOR FIELD WIRING PROVIDED BY THIS CONTRACTOR. 1 3 2 4 1 TB-2 TB-2 10 9 SHD TB-1 TB-2 MS 1 MS 2 MS 2 MS 2 ST 1 ST 3 ST 1 OC 1 OC 2 OC 2 OC 12 / 2 2 / 2 0 1 7 4 : 1 3 : 5 6 P M 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments TRANE CONTROL WIRING DIAGRAM W1.1T AUTHOR CHECKER IN ALL CLIMATES WHERE HUMIDITY IS CONTROLLED, SET POINT OF 55% RH IS REASONABLE. DO NOT SET BELOW THIS CONDITION AND NOT ABOVE 60% RH. AS OUTDOOR HUMIDITY LOWERS SPACE HUMIDITY SHALL DROP BELOW SET POINT AS NO HUMIDIFICATION IS PROVIDED. COMFORTABLE TEMPERATURES CAN VARY BASED ON LOCALE AND SEASON. HOTTER CLIMATES MAY REQUIRE HIGHER DINING ROOM TEMPERATURES IN SUMMER SUCH AS 75 DEGREES F, WHERE COLDER REGIONS MAY PERMIT COLDER TEMPERATURES SUCH AS 68 DEGREES F IN WINTER. MUCH IS DEPENDENT ON CLOTHING BEING WORN AND HUMIDITY. IN CLIMATES WHERE HUMIDITY IS HIGHER SUCH AS TROPICAL AND SUB-TROPICAL REGIONS, SOUTHERN STATES AND MUCH OF MIDWEST UNITED STATES, IT CAN FEEL COLD AND DAMP WHERE LOW TEMPERATURES ARE PRESENT WITH HIGHER HUMIDITY. AS TEMPERATURE IS LOWERED RELATIVE HUMIDITY SHALL RISE CAUSING COLD AND DAMP CONDITION. RAISING ROOM TEMPERATURE SHALL IMPROVE THIS CONDITION, LOWERING IT SHALL MAKE IT WORSE. USING THESE TEMPERATURES SHALL HANDLE MOST CONDITIONS, THOUGH SHOULDER SEASONS (SPRING AND FALL) HAVE VARIABLE TEMPERATURES FROM DAY TO DAY AND MAY OCCASIONALLY CAUSE SOME LESS THAN PERFECT SPACE CONDITIONS AS HEATING AND COOLING EQUIPMENT SHIFTS FROM HEATING TO COOLING SET POINT CONDITIONS AND BACK. DO NOT SET COOLING TEMPERATURES BELOW 72 DEGREES F. DO NOT SET UNOCCUPIED TEMPERATURES FOR COOLING ABOVE 78 DEGREES F OR FOR HEATING BELOW 65 DEGREES F. THIS CAN AFFECT PERFORMANCE OF HVAC SYSTEM REACHING TEMPERATURES WHEN DESIRED. KITCHEN STATUS RECOMMEDED SET POINT SET POINT UNOCCUPIED COOLING 78°F ____ OCCUPIED COOLING 73°F ____ OCCUPIED HEATING 70°F ____ UNOCCUPIED HEATING 65°F ____ RESPONSIBILITY SCHEDULE S: SUPPLIED & PREWIRED BY VENDOR MC : MECHANICAL CONTRACTOR EC: ELECTRICAL CONTRACTOR GC : GENERAL CONTRACTOR ITEM SU P P L I E D IN S T A L L E D FI N A L U T I L I T Y CO N N E C T I O N COMMENTS MODULAR ELECTRICAL PANEL SYSTEM POWER TO MODULAR ELECTRICAL PANEL EC EC EC REFER TO E3.1 FOR ADDITIONAL INFORMATION ROOFTOP UNITS POWER WIRING TO ELECTRICAL PANEL EC EC EC REFER TO E3.1 FOR ADDITIONAL INFORMATION LOW VOLTAGE CONTROL WIRING FROM FCLC TO RTU CABINET EC MC LOW VOLTAGE CONTROL WIRING FROM FCLC OR RTU CABINET TO REMOTE SENSORS EC MC MC KITCHEN HOODS 120V POWER TO HOODS EC EC EC REFER TO E3.1 FOR ADDITIONAL INFORMATION LOW VOLTAGE CONTROL WIRING FROM FCLC TO HOOD TEMPERATURE SENSORS EC EC PHOTOCELL PHOTOCELL ASSEMBLY KIT S EC N/A PHOTOCELL WIRING TO FCLC EC EC EC NOTES: 1 2 3 CONDUIT, WIRING, AND PIPING DEPICTED ON DRAWINGS AND/OR REQUIRED TO MAKE FINAL CONNECTIONS ARE BY GC UNLESS NOTED OTHERWISE. NOTE: IN EVENT OF CONFLICT BETWEEN THIS SCHEDULE AND CONSTRUCTION DETAILS, CONSTRUCTION DETAILS PREVAIL. WIRING INSIDE MODULAR PANEL (FCLC)S S S REFER TO VENDOR'S SHOP DRAWINGS MC EC WIRING FROM FCLC TO MICROSWITCH IN ANSUL FOR GRILL HOOD AND FRYER HOOD EC EC 120V WIRING BETWEEN HOODS EC EC 120V PUSHBUTTON 'POWER KILL SWITCH' WIRING EC EC EC EC EC REFER TO E3.1 FOR ADDITIONAL INFORMATION REFER TO E2.1 FOR ADDITIONAL INFORMATION REFER TO E2.2 FOR ADDITIONAL INFORMATION OPERATION SCHEDULE EXPANDED LIGHTING CONTROLS DESCRIPTION (AS APPLICABLE) ZONE 1 KITCHEN: a. MANUAL SWITCH REQUIRED AND USED FOR KITCHEN LIGHTS. OPERATOR CAN TURN ON/OFF, KITCHEN LIGHTING USING MANUAL SWITCH. b. LIGHTING CONTROL PROVIDES REQUIRED AUTOMATIC OFF. LIGHTING CONTROL SYSTEM TURNS OFF LIGHTING AT DRIVE THROUGH CLOSING PLUS 2 HOURS. ZONE 2 DINING ROOM - GENERAL LIGHTING: a. SYSTEM USES MANUAL BI-LEVEL SWITCH AND AUTOMATIC SHUT OFF. b. GENERAL OPERATIONAL STANDARD IS FOR MANAGER TO TURN ON GENERAL LIGHTING AT 100% DURING MORNING PREPARATION AND AT CLEAN UP. c. GENERAL LIGHTS ARE TURNED DOWN 90% (10%) APPROXIMATELY 30 MINUTES PRIOR TO DINING ROOM OPENING. d. LIGHTING CONTROL SYSTEM PROVIDES REQUIRED AUTOMATIC OFF AT DRIVE THROUGH CLOSING PLUS 1 HOUR. DINING ROOM - DECORATIVE LIGHTING: a. GENERAL OPERATIONAL STANDARD IS TO TURN OFF DECORATIVE LIGHTING DURING MORNING PREPARATION AND AFTER DINING ROOM IS CLOSED. b. OPERATOR CAN TURN ON OR OFF DECORATIVE LIGHTING USING MANUAL SWITCH. c. LIGHTING CONTROL SYSTEM PROVIDES REQUIRED AUTOMATIC OFF AT DRIVE THROUGH CLOSING PLUS 2 HOURS. ZONE 4 EXTERIOR PARKING LOT LIGHTS: a. EXTERIOR LIGHTS ARE CONTROLLED VIA EXTERIOR PHOTOCELL, ASTRONOMICAL TIME CLOCK, RESTAURANT OPEN SWITCH, AND OVERRIDE BUTTON. b. EXTERIOR LIGHTS SHALL NOT TURN ON UNLESS IT IS DARK AND RESTAURANT OPEN SWITCH IS ACTIVATED OR MANUAL OVERRIDE BUTTON IS PRESSED. c. GENERAL OPERATIONAL STANDARD IS TO HAVE RESTAURANT OPEN SWITCH IN OFF POSITION UNLESS DRIVE THROUGH WINDOW IS OPEN. d. LIGHTING CONTROL PROVIDES REQUIRED AUTOMATIC OFF. SYSTEM IS SET TO AUTOMATICALLY TURN OFF EXTERIOR LIGHTS AT PICK UP WINDOW CLOSE PLUS 2 HOURS ZONE 5: BUILDING SIGNS / EXTERIOR SIGNS: a. EXTERIOR BUILDING SIGNS, EXTERIOR SIGNS ARE CONTROLLED VIA EXTERIOR PHOTOCELL, ASTRONOMICAL TIME CLOCK, RESTAURANT OPEN SWITCH, AND OVERRIDE BUTTON. b. EXTERIOR LIGHTS SHALL NOT TURN ON UNLESS IT IS DARK AND RESTAURANT OPEN SWITCH IS ACTIVATED OR MANUAL OVERRIDE BUTTON IS PRESSED. c. GENERAL OPERATIONAL STANDARD IS TO HAVE SIGNS OFF UNLESS RESTAURANT IS OPEN (DRIVE THROUGH IS OPEN). d. LIGHTING CONTROL PROVIDES REQUIRED AUTOMATIC OFF. SYSTEM IS SET TO AUTOMATICALLY TURN OFF EXTERIOR LIGHTS AT DRIVE THROUGH CLOSE PLUS 2 HOURS. EXTERIOR MENU BOARD / PRE-SALE BOARD: a. EXTERIOR MENU BOARD AND PRE-SALE BOARD (NON-DIGITAL DRIVE THROUGH SIGNS) ARE CONTROLLED BY ASTRONOMICAL TIME CLOCK, RESTAURANT OPEN SWITCH, AND OVERRIDE BUTTON. b. MENU BOARD SIGNS ARE ON WHEN RESTAURANT OPEN SWITCH IS ACTIVATED. c. GENERAL OPERATIONAL STANDARD IS TO HAVE RESTAURANT OPEN SWITCH IN OFF POSITION UNLESS DRIVE THROUGH IS OPEN. d. LIGHTING CONTROLLER PROVIDES REQUIRED AUTOMATIC OFF. SYSTEM IS SET TO AUTOMATICALLY TURN OFF EXTERIOR LIGHTS AT DRIVE THROUGH CLOSE PLUS 2 HOURS. NON-ZONE LIGHTS RESTROOMS: a. LIGHTS ARE CONTROLLED BY MANUAL ON/AUTO OFF WALL MOUNTED MOTION SENSOR. b. RESTROOM EXHAUST FAN RUNS DURING ALL OCCUPIED TIME PERIODS. c. MOTION SENSOR IS SET TO TURN OFF LIGHTS AFTER 30 MINUTES WITH NO MOTION DETECTED. OFFICE AREA: a. LIGHTS ARE CONTROLLED BY MANUAL ON/AUTO OFF WALL MOUNTED MOTION SENSOR. b. MOTION SENSOR IS SET TO TURN OFF LIGHTS AFTER 30 MINUTES OF INACTIVITY. WALK IN COOLER / FREEZER / DRY STORAGE : a. LIGHTS IN COOLER, FREEZER, AND DRY STORAGE ARE CONTROLLED BY CEILING MOTION SENSOR IN EACH AREA. b. MOTION SENSOR IS SET TO TURN OFF LIGHTS AFTER 30 MINUTES OF INACTIVITY. c. NO WALL SWITCH IS PROVIDED. WENDY'S SEQUENCE OF OPERATION PUSHBUTTON CONTROL ZONE ACTION COMMENTS 1 HOODS ON/OFF ZONE 1, 2, 3, 6 AND 7 xTURN ZONES ON/OFF (OFF WITH SCHEDULE) xENABLE/DISABLE RTU THERMOSTAT OCCUPIED MODE RTUS REVERT TO UNOCCUPIED OPERATION WHEN OFF 2 RESTAURANT OPEN/CLOSE ZONE 4 AND 5 xTURN ZONES ON/OFF (OFF WITH SCHEDULE) xPHOTOCELL CONTROLLED DURING RESTAURANT OPEN 3 LOT LIGHT OVERRIDE ZONE 4 xTURN ZONE ON FOR ONE HOUR (OFF WITH SCHEDULE) 4 RESTAURANT OVERRIDE ZONE 1, 2, 3 xTURN ZONES ON FOR TEMPORARY OVERIDE (OFF WITH SCHEDULE) xENABLE/DISABLE RTU THERMOSTAT OCCUPIED MODE RTUS REVERT TO UNOCCUPIED OPERATION WHEN OFF ADDITIONAL INFORMATION 1. SEE EXPANDED LIGHTING ZONE FOR ADDITIONAL INFORMATION. 2. PUSH BUTTON 4 OVERRIDE TIME IS PROGRAMMABLE. FOR OPERATIONAL REQUIREMENTS IT IS SET TO ONE HOUR. HOOD CONTROLS: 1. HOODS, AND ASSOCIATED KITCHEN FANS EF-1 AND EF-2, ARE ACTIVATED THROUGH HOOD PUSHBUTTON. 2. GRILL HOOD CURRENT CT: WHEN GRILL CT SENSES CURRENT, EXHAUST FANS ARE ACTIVATED. THESE ARE SAFETY FEATURES AND NOT DESIGNED METHOD FOR ACTIVATING EXHAUST FANS. PROPER PROCEDURE FOR TURNING ON EXHAUST FANS IS USE OF HOODS ON BUTTON. 3. GRILL HOOD HEAT SENSOR: WHEN GRILL HOOD TEMPERATURE SENSOR EXCEEDS PRESET TEMPERATURE, EXHAUST FANS ARE ACTIVATED. NOTE: THESE ARE SAFETY FEATURES AND NOT DESIGNED METHOD FOR ACTIVATING EXHAUST FANS. PROPER PROCEDURE FOR TURNING ON EXHAUST FANS IS USE OF HOODS ON BUTTON. 4. FRYER HOOD HEAT SENSOR: WHEN FRYER HOOD TEMPERATURE SENSOR EXCEEDS PRE-SET TEMPERATURE, EXHAUST FANS ARE ACTIVATED. NOTE: THESE ARE SAFETY FEATURES AND NOT DESIGNED METHOD FOR ACTIVATING EXHAUST FANS. PROPER PROCEDURE FOR TURNING ON EXHAUST FANS IS USE OF HOODS ON BUTTON. 5. DURING FIRE EVENT EACH HOOD HAS MICROSWITCH, WIRED TO MODULAR PANEL SYSTEM TO INDICATE NORMAL OR FIRE OPERATION. DURING FIRE, SHUNT TRIPS ARE ACTIVATED FOR COOKING EQUIPMENT PANELS AND OAU, RTU, AND EXHAUST FANS ARE FORCED ON. 6. HOODS/EXHAUST FANS ARE AUTOMATICALLY TURNED OFF BY AUTOMATIC SHUT OFF SYSTEM AFTER HOURS. HVAC CONTROLS: 1. THERMOSTATS ARE FACTORY INSTALLED IN MODULAR PANEL SYSTEM AND PROGRAMMED FOR OCCUPIED/UNOCCUPIED CONDITIONS BY MECHANICAL CONTRACTOR. 2. FANS SHALL RUN CONTINUOUSLY IN OCCUPIED MODE WITH OUTDOOR AIR DAMPERS PROVIDING REQUIRED MAKE-UP AIR TO HOODS WITH AUTOMATIC HEATING, COOLING AND DEHUMIDIFICATION BASED ON ROOM SENSORS, ONE FOR OAU AND ONE FOR RTU. 3. DURING UNOCCUPIED MODE, OUTDOOR AIR DAMPERS SHALL FULLY CLOSE. 4. SIGNAL FROM MODULAR PANEL SYSTEM SHALL CLOSE TWO CONTACTORS, ONE FOR OAU AND ONE FOR RTU, THAT SHALL ENABLE OCCUPIED MODE AT EACH OF TWO SENSORS REVERTING OPERATION FOR OAU AND RTU FROM UNOCCUPIED TO OCCUPIED MODE COINCIDING WITH HOOD OPERATION. CONTROL ZONE 1. INTERIOR LIGHTS: ON WITH HOODS BUTTON 1; OFF WITH HOODS BUTTON 1 OR SCHEDULE. 2. DINING LIGHTS: ON WITH HOODS BUTTON 1; OFF WITH HOODS BUTTON 1 OR SCHEDULE. 3. HOODS: ON WITH HOODS BUTTON 1; OFF WITH HOODS BUTTON 1 OR SCHEDULE. 4. LOT LIGHTS: ON WITH RESTAURANT BUTTON 2; OFF WITH RESTAURANT BUTTON 2 OR SCHEDULE; PHOTOCELL CONTROLLED WHEN "OPEN." 5. EXTERIOR BUILDING LIGHTS & SIGNS: ON WITH RESTAURANT BUTTON 2; OFF WITH RESTAURANT BUTTON 2 OR SCHEDULE; PHOTOCELL CONTROLLED WHEN "OPEN." x ARCHITECT OF RECORD TO OBTAIN OPERATING TIMES FOR SITE SPECIFIC LOCATION. x DOES RESTAURANT HAVE SAME SCHEDULE OVER 7 DAYS PER PER WEEK OR DIFFERENT SCHEDULE ON WEEKENDS (5+2)? 7 DAY / 5+2 DAY xx FOR 7 DAY SCHEDULE, FILL OUT ONE FORM. xx FOR 5+2 SCHEDULE, FILL OUT 2 FORMS - ONE FOR WEEKDAY, ONE FOR WEEKEND. ADDITIONAL SET POINT RECOMMENDATION: KITCHEN EVENT TYPICAL TIME PREP START 5:00 AM ____ AM DRIVE THRU OPEN 6:30 AM ____ AM DRIVE THRU CLOSED 1:00 AM ____ AM/PM CLEAN UP COMPLETE 2:30 AM ____ AM/PM DINING ROOM STATUS RECOMMEDED SET POINT SET POINT UNOCCUPIED COOLING 78°F ____ OCCUPIED COOLING 73°F ____ OCCUPIED HEATING 70°F ____ UNOCCUPIED HEATING 65°F ____ DINING ROOM EVENT TYPICAL TIME DINING ROOM OPEN 9:30 PM ____ AM DINING ROOM CLOSED 10:00 PM ____ AM DINING ROOM CLEAN UP COMPLETE 11:00 AM ____ AM/PM COMPLETION OF CHECKLIST FORM SET HOOD SPEED/ EXHAUST SPEED COMPLETION OF CHECKLIST FORM FINAL CALIBRATION - T&B MC MC MC MC MC MC MC MC MC INITIAL RTU CALIBRATION MC MC MC INITIAL RTU CALIBRATION MC MC MC EC EC EC 12 / 2 2 / 2 0 1 7 4 : 1 3 : 5 6 P M 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments CONTROL WIRING NOTES & DETAILS W1.2 AUTHOR CHECKER TOTAL EXH. CFM = 20" 11"L0502 EO 1500 0.30" 0.18" 1 5 - 20" 20"EXP 18GA. 430 S.S. 495 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments HOOD DETAILS H1.1 HALTON HALTON THIS ENTIRE SHEET WAS UPDATED DURING REVISIONS 3 TOTAL EXH. CFM = 20" 11"L0307 EO 1100 0.28" .16" 1 3 - 13" 13"EXPO 18 GA. 430 S.S. 385 ALUM. BAFFLE 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments HOOD DETAILS H1.2 HALTON HALTON THIS ENTIRE SHEET WAS UPDATED DURING REVISIONS 3THIS ENTIRE SHEET WAS UPDATED DURING REVISIONS 3 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments HOOD DETAILS H1.3 HALTON HALTON THIS ENTIRE SHEET WAS UPDATED DURING REVISIONS 3 SP MAXLITE LED MAXLITE LED MAXLITE LED EX T . R A M P MA X L I T E LE D MAXLITE LED MA X L I T E LE D MAXLITE LED LCA672LCE6120 MAXLITE LED MAXLITE LED 1LIGHTING PLAN 1/4" = 1'-0" DINING 101 A- 6 A7 T2 T2 EX1B A7 6' P4L P4L EX1B T2 T2 6' A- 2 SWITCH E A7 4' T2 2' T2 EM2B A7 EM2B A7 A7 8 6 2 J J J #10 A7/NL A7/NL SWITCH C TL1 EX1RB T2T T2T T2T T2T T2 A7 A7 A7 A-12 SWITCH B A6 T1 T1 P4L P4L SWITCH D SWITCH C A7/NL T1 T1 T1 SWITCH D K12A-2 #10 T1 A6 A-2 TL1 8 8 TL1 K12 K12 K12A-2 #10 K12K12 K12 2 A-4 J 7 A-2#10 A1 OS1 EM2WEM2W A-17 OS1 OS OS OS1 OS A1 A1 A1 A1 EM2W A1 A1 A1 A1A1 A1 5 A1/NL A-33 SWITCH A A1/NL J EM2W 4 NL B4B4 B4 EM2W NL B4B4 B4 B4 EM2W 1 1 33 3 HL1HL1HL1 3 HL1 3 HL1 J J C-21 2 B4/NL A-8 J #10 NL B4 NL B4 NL B4 B4 B4B4 B4 B4B4 B4 B4 OS EM2W A-13 B4 B4 EX1W D EX1RB WP4 WB1 EX1W OS2OS A-11 OS2 OS WB1 WB1 WB1 WB1 WB1 WB1 WB1WB1 K12 K12 A-2 OS2 OS T1 T1 B4 T1 K12 A- 16 2 J #10 EM2W EM2W FAMILY 103 FAMILY 102OFFICE 108 FREEZER 110 RECEIVING 112 COOLER 111 CREW 114 KITCHEN 106 DRIVE THRU 105 PAY WINDOW 113 SERVICE 104 UTILITY 116 ENTRY 100 A-25 G1 G1 12 / 2 2 / 2 0 1 7 4 : 0 9 : 5 0 P M LIGHTING PLAN E1.1 KH MJ 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments A-2 B1 RECESSED CAN LIGHT FIXTURE RECESSED CAN NIGHT LIGHT FIXTURE LED LIGHT FIXTURE LED NIGHT LIGHT FIXTURE HANGING LIGHT FIXTURE MONO POINT LIGHT FIXTURE EMERGENCY REMOTE EGRESS HEAD CIRCUIT NUMBER FIXTURE SYMBOL OCCUPANCY SENSOR (WALL MOUNTED OR CEILING MOUNTED) SINGLE POLE WALL SWITCH AT 4'-6" A.F.F. EMERGENCY FLOOR LIGHT (WALL MOUNTED OR CEILING SURFACE MOUNTED) DIMMER SWITCH, (LEVITON #IP710-DLZ-WH)D OS LIGHTING LEGEND LED TAPE LIGHT GLOBE PENDANT LIGHT PENDANT LIGHT TRACK HEAD BUILDING MOUNTED DECORATIVE LIGHT OS LIGHTING TRACK A. COORDINATE WORK WITH MECHANICAL, REFRIGERATION AND EQUIPMENT CONTRACTORS, INCLUDING COOLER/FREEZER WORK AND ICE MACHINE CONDENSING UNITS. B. VERIFY ROUGH-IN DIMENSIONS AND POWER REQUIREMENTS WITH KITCHEN EQUIPMENT DISTRIBUTOR PRIOR TO ROUGH-IN. C. PROVIDE FINAL CONNECTIONS WITHIN FRONT COUNTER, COOKCENTER PANEL, REMOTE REFRIGERATION UNITS, AND ICE MACHINE REMOTE UNIT WHEN INSTALLED BY VENDOR. D. VERIFY AVAILABLE FAULT CURRENT AT PRIMARY SERVICE AND COMPATIBILITY WITH MODULAR PANEL SYSTEM. E. ENSURE ADEQUATE CONDUIT SIZE FOR ELECTRICAL AND COMMUNICATION WIRING ON SITE AND INTO BUILDING. F. CIRCUITS MAY BE GROUPED WITHIN COMMON CONDUITS PER NEC REQUIREMENTS UNLESS NOTED OTHERWISE. G. PROVIDE WALL BOX WITH 1/2" CONDUIT WITH PULLSTRING AND NYLON BUSHING STUBBED ABOVE NEAREST ACCESSIBLE CEILING FOR THERMOSTATS, TEMPERATURE SENSORS, CARBON DIOXIDE SENSOR, AND HUMIDISTATS UNLESS OTHERWISE NOTED. H. WIRE ROOF TOP UNIT CONTROL CIRCUIT THROUGH AUXILIARY CONTACTS IN SMOKE DETECTOR AND MAKE ALL FINAL CONNECTIONS. (TYPICAL OF ALL ROOF TOP UNITS) I. COOKCENTER IS ASSEMBLED AND PREWIRED AT THE FACTORY. WIRING IS PROVIDED IN THE PRE- INSTALLED SPLICE BOX, COILED AND TAGGED. A LENGTH OF CONDUIT WITH WIRES IS PROVIDED FOR THE REMOTE CONDENSING ROOFTOP UNIT. RUNS POWER FROM THE SPLICE BOX TO THE COOKCENTER PANEL. J. ROOFTOP UNIT IS FACTORY PROVIDED WITH DISCONNECT AND UNPOWERED SERVICE RECEPTACLE. K. IN AREAS WITHOUT CEILINGS OR WHERE ANY CONDUITS, CONDUCTORS, FEEDERS. OR LOW- VOLTAGE WALL EMT CONDUIT. CABLING IS VISIBLE, ALL WIRING SHALL BE IN RIGID GALVANIZED STEEL (RGSC) OR THIN WALL EMT CONDUIT. BX, AC, AND MC CABLE ARE NOT PERMITTED. CONDUITS ARE TO BE RUN TIGHT TO DECK EITHER PARALLEL OR PERPENDICULAR TO BUILDING LINES AND ONLY DROP AT POINT OF CONNECTION. JUNCTION BOXES SHALL HAVE CIRCUIT NUMBERS WRITTEN ON THE INSIDE OF THE JUNCTION BOX COVER. L. SEAL ROOF PENETRATIONS PER ROOFING MANUFACTURER'S INSTRUCTIONS. M. COORDINATE WORK ABOVE THE CEILING WITH OTHER TRADES TO PROVIDE THE GREATEST POSSIBLE CLEARANCE.CONDUITS SHALL BE ROUTED IN THE DIRECTION OF THE TRUSSES. N. ONLY EMT CONDUITS ARE ALLOWED IN RECEIVING/DRY STORAGE. O. DEFINITIONS: FURNISH MEANS TO SUPPLY AND DELIVER TO PROJECT SITE, READY FOR INSTALLATION. INSTALL MEANS TO PLAN IN POSITION AND MAKE CONNECTIONS FOR SERVICE OR USE. PROVIDE MEANS TO FURNISH AND INSTALL, COMPLETE AND READY FOR INTENDED USE. 1. JUNCTION BOX ABOVE CEILING FOR HOOD LIGHTS AND EXHAUST HOOD. 2. PROVIDE WEATHERPROOF JUNCTION BOX AND TOGGLE TYPE 20A-1P DISCONNECT FOR SIGNAGE. COORDINATE EXACT REQUIREMENTS WITH SIGN CONTRACTOR. VERIFY LOCATION PRIOR TO ROUGH IN. 3. PROVIDE LAMP FOR HOOD LIGHT. SUBSTITUTION OF CFL OR INCANDESCENT LAMP IS PROHIBITED. 4. LOCATION OF LIGHTING SWITCH BANK. REFER TO SWITCH AND HOOD SUPPRESSION ELEVATION ON SHEET E5.2 FOR ADDITIONAL INFORMATION. 5. PROVIDE JUNCTION BOX AND SWITCH FOR ILLUMINATED MIRROR AT 4'-0" AFF AND CONNECT TO CIRCUIT SHOWN. REFER TO ARCHITECTURAL ELEVATIONS FOR EXACT MOUNTING LOCATION. 6. LED TAPE LIGHTING DRIVER MUST BE INSTALLED INSIDE OF BUILDING DUE TO TEMPERATURE RATING OF DRIVER. REFER TO LED DRIVER MOUNTING DETAIL, SHEET E5.2. 7. LIGHTS IN CANOPY PROVIDED BY CANOPY MANUFACTURER. 8. EXTERIOR LED TAPE LIGHTING 'TL1'. REFER TO ARCHITECTURAL SHEETS FOR MORE INFORMATION. VERIFY LENGTHS AND DRIVER REQUIREMENTS PRIOR TO INSTALLATION. REFER TO WALL PENETRATION DETAIL, SHEET E5.2. CODED NOTES:LIGHTING GENERAL NOTES A. CONNECT EXIT/EMERGENCY/NIGHT FIXTURES TO UNSWITCHED HOT CONDUCTOR AHEAD OF ANY LIGHTING CONTROLS. B. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN AND DETAILS FOR THE LOCATION OF ALL LIGHTING FIXTURES AND ALL OTHER CEILING MOUNTED EQUIPMENT. VERIFY MOUNTING HEIGHTS AND FINISHES WITH ARCHITECT PRIOR TO ROUGH-IN. C. REFER TO THE POWER PLANS FOR LOCATION OF ELECTRICAL EQUIPMENT. D. PROVIDE INDICATED CONDUCTOR SIZE FOR ENTIRE CIRCUIT WHERE CONDUCTOR SIZES ARE SHOWN ON HOMERUNS. E. PROVIDE A DEDICATED NEUTRAL WITH ALL DIMMING SYSTEM CIRCUITS. NO COMMON NEUTRALS SHALL BE ALLOWED. F. PROVIDE (2) ADDITIONAL #12 CONDUCTORS FOR ALL 0-10V DIMMING CIRCUITS. 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments 12 / 2 2 / 2 0 1 7 4 : 0 9 : 5 0 P M PHOTOMETRIC PLAN E1.2 KH MJ CT CABINET AND METER #CODED NOTES: 1 2POWER PLAN (ENLARGED PUW) 1/2" = 1'-0" RECEPTACLE AND COVER PLATE LEGEND AREA RECEPTACLE COVER RECEPTACLE USB PORTS SPECIAL NOTES KITCHEN & GENERAL AREA STAINLESS STEEL WHITE NO GFI AS NOTED DEDICATED IT CIRCUITS STAINLESS STEEL ORANGE (IG)NO CIRCUIT MARKED AS SPG OR IG DINING ROOM BLACK BLACK YES TAMPER RESISITANT DINING ROOM- CUSTOMER VIEW WHITE WHITE YES TAMPER RESISITANT JUNCTION BOX * = A-H AS COOKLINE JUNCTION BOXES REFER TO DETAIL #3 ON SHEET E4.2 20 AMP 120V-1PH SIMPLEX RECEPTACLE +16" AFF OR AS NOTED 20 AMP 120V-1PH DUPLEX RECEPTACLE +16" AFF OR AS NOTED 120V-1PH QUADRUPLEX RECEPTACLE SPECIAL RECEPTACLE, SEE KITCHEN EQUIPMENT SCHEDULE 20 AMP QUADRUPLEX 120V-1PH HUBBELL # USB20X2W (QTY 2) DISCONNECT SWITCH BY ELECTRICAL CONTRACTOR DATA CONNECTION REMOTE PIEZO ALERT FROM RTU-1 & RTU-2 SMOKE DETECTORS (96" A.F.F.) EMERGENCY POWER KILL SWITCH (48" AFF) 120 VOLT MOMENTARY CONTACT NORMALLY OPEN EMERGENCY OFF SWITCH, EATON 10250T WITH SHROUD. REFER SHUNT TRIP CIRCUIT DETAIL, SHEET E3.1 REMOTE FIRE SUPPRESSION PULL STATION (48") VOLUME CONTROL ELECTRIC MOTOR TELEPHONE CONNECTION TELEPHONE/DATA CONNECTION REMOTE TEST STATION (54")20 AMP 120V-1PH HUBBELL #USB20X2BK RECEPTACLE PARTIAL CIRCUIT 20 AMP 120V-1PH HUBBELL #IG5362 ISOLATED GROUND RECEPTACLE 20 AMP QUAD HUBBELL #IG5362 (QTY 2) ISOLATED GROUND RECEPTACLE F RT W VC RT J THERMOSTAT, TEMPERATURE SENSOR AND HUMIDISTAT BY MECHANICAL CONTRACTOR ST S/T ELECTRICAL LEGEND GFI WP 20 AMP 120V-1PH GROUND FAULT INTERRUPTING RECEPTACLE 20 AMP 120V-1PH WEATHERPROOF RECEPTACLE 3 15 HOME RUN TO PANEL. CIRCUIT NUMBERS, PHASE, NEUTRAL & GROUND CONDUCTORS INDICATED ALONG WITH ISOLATED GROUND CONDUCTOR IF APPLICABLE. DISCONNECT SWITCH SUPPLIED WITH EQUIPMENT * R 20 AMP 120V-1PH RECESSED RECEPTACLE 1. IN AREAS WITHOUT CEILINGS OR WHERE ANY CONDUITS, CONDUCTORS, FEEDERS. OR LOW-VOLTAGE CABLING IS VISIBLE, ALL WRITING SHALL BE IN RIGID GALVANIZED STEEL (RGSC) OR THIN WALL EMT CONDUIT. BX, AC, AND MC CABLE ARE NOT PERMITTED. CONDUITS ARE TO BE RUN TIGHT TO DECK EITHER PARALLEL OR PERPENDICULAR TO BUILDING LINES AND ONLY DROP AT POINT OF CONNECTION. WHERE EXPOSED TO VIEW, ALL MATERIALS (CONDUITS. JUNCTION BOXES, ETC.) SHALL BE INSTALLED IN AN ORDERLY FASHION AND SHALL BE CLEAN AND FREE FROM ALL VISIBLE MARKING. JUNCTION BOXES SHALL HAVE CIRCUIT NUMBERS WRITTEN ON THE INSIDE OF THE JUNCTION BOX COVER. 2. ELECTRICAL CONTRACTOR TO COORDINATE WORK WITH MECHANICAL, REFRIGERATION AND EQUIPMENT CONTRACTORS, INCLUDING COOLER/FREEZER WORK AND ICE MACHINE CONDENSING UNIT. 3. ELECTRICAL CONTRACTOR TO VERIFY ALL ROUGH-IN DIMENSIONS AND POWER REQUIREMENTS WITH KITCHEN EQUIPMENT DISTRIBUTOR PRIOR TO ROUGH-IN. 4. ELECTRICAL CONTRACTOR TO HOOK UP FIELD CONNECTIONS WITHIN FRONT COUNTER, COOKCENTER PANEL CIRCUITS, REMOTE REFRIGERATION (ON ROOF) AND ICE MACHINE REMOTE UNIT (ON ROOF) AT TIME OF INSTALLATION. 5. GENERAL CONTRACTOR IS TO VERIFY SIZE OF FAULT CURRENT COMING OFF PRIMARY SERVICE AND IS TO INSURE ITS COMPATIBILITY w/WENDY'S DISTRIBUTION PANEL. 6. GENERAL CONTRACTOR IS TO INSURE ADEQUATE CONDUIT SIZE FOR ELECTRICAL AND PHONE WIRING ON SITE AND INTO BUILDING. 7. HEIGHTS INDICATED FOR RECEPTACLES AND JUNCTION BOXES ARE MEASURED FROM FINISH FLOOR TO THE CENTER OF THE BOX. 8. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL TELEPHONE LINES AND TERMINATIONS. VERIFY QUANTITY AND LOCATIONS WITH OWNER PRIOR TO BIDDING. 9. ALL CIRCUITS MAY BE CORRECTED TO THE LEAST AMOUNT OF CONDUIT RUN UNLESS NOTED OTHERWISE. 10. ALL COVER PLATES TO BE SATIN FINISH STAINLESS STEEL IN BACK OF HOUSE AREA. DINING AREA COVER PLATES SHALL BE WHITE UNLESS OTHERWISE NOTED. 11. ALL 120V RECEPTACLES IN KITCHEN AND RESTROOMS TO HAVE GROUND-FAULT CIRCUIT INTERRUPTER PROTECTION PROVIDED IN ELECTRICAL PANELS. 12. COOKCENTER IS ASSEMBLED AND PREWIRED AT THE FACTORY. A LENGTH OF CONDUIT W/WIRES IS PROVIDED FOR THE REMOTE CONDENSING ROOFTOP UNIT. 13. POWER DISCONNECT, UNPOWERED SERVICE OUTLET AND SMOKE DETECTOR ARE PART OF ROOFTOP UNIT IF SUPPLIED BY AN APPROVED HVAC SUPPLIER. ELECTRICIAN MUST PROVIDE WITH ALL OTHER MODELS (TYPICAL AT ALL RTU'S UNITS). 14. THERMOSTATS, TEMPERATURE SENSORS, CARBON DIOXIDE SENSORS AND HUMIDISTATS: UNLESS NOTED OTHERWISE, PROVIDE WALL BOX WITH 1/2" CONDUIT STUBBED OUT TO ABOVE ACCESSIBLE CEILING WITH NYLON BUSHINGS AND PULLSTRING. 15. MECHANICAL CONTRACTOR TO FURNISH REMOTE TEST STATION/ALARM. ELECTRICAL CONTRACTOR TO WIRE ROOF TOP UNIT CONTROL CIRCUIT THRU AUXILIARY CONTACTS IN SMOKE DETECTOR AND MAKE ALL FINAL CONNECTIONS. (TYPICAL OF ALL ROOF TOP UNITS) 16. REFER TO SHEET E5.1 ELECTRICAL ELEVATIONS FOR RECEPTACLE AND COVER PLATE LEGEND TO ENSURE PROPER RECEPTACLE TYPE, COLOR, AND COVER PLATE. 17. ALL ROOF PENETRATIONS NEED TO BE SEALED ACCORDING TO ROOFING MANUFACTURER'S INSTRUCTIONS. 18. COORDINATE WORK ABOVE THE CEILING WITH OTHER TRADES TO PROVIDE THE GREATEST POSSIBLE CLEARANCE.CONDUITS SHALL BE ROUTED IN THE DIRECTION OF THE TRUSSES. 19. ONLY EMT CONDUITS ARE ALLOWED IN RECEIVING/DRY STORAGE. 20. PROVIDE WALL BOX WITH 1/2" CONDUIT STUBBED OUT TO ABOVE ACCESSIBLE CEILING WITH NYLON BUSHINGS AND PULLSTRING FOR ALL LOW VOLTAGE DEVICES. 21. REFER TO SHEET E2.2 FOR DATA AND POS SYSTEM REQUIREMENTS. GENERAL NOTES 2 E5.1 5 1 A-3 A0105 10 B-1 E5.1 A-31 N0508 16" 40" 4 16" 100" 100" A-1 A-37 OFFICE 108 RT 15 RT A-15 5 40" A-35 A-21 +38" CREW 114 B-39 14 S +16" +16" 13 +86"R B-15 A-23 GFI +60" 17 B-33 WH-1 RTU-1 WP B-38 +16" FAMILY 102 FAMILY 103 HALLWAY 109 UTILITY 116 +38" A-21 +78" C-24,26 A0801 +48" B-23 QP0909 KITCHEN 106 J 2 B-30 V0105 19 +40" J A-32 A-1 A-35 WPB-38 +16" PAY WINDOW 113 V0105 V0105 B-13 B-17 J 21 FREEZER 110 16 WPB-22 J 21 COOLER 111 RECEIVING 112 WPB-38 +16" J 10 J 10 B-22 B-41 +72" +38" +38" 4 B-32 19 +40" J J A-24 A-30 B-3 +36" A-19 33" 33" T T T B-5 11 A-9 DINING 101 ENTRY 100 A-29 C-28,30 UH-1 20 J D0201 A-3 B-24 B-21 V0105 Q0605 9 D0101 J 18 DRIVE-THRU 105 2 E2.1 D3002 K1401 C-7,9 C-1,3,5 J C-21 J 3 L0504 L0308 5 E5.1 1 8'-9" CENTER OF GRILL RECEPTACLES. A B E F G LKJ 6 6 CC-25,27,29 CC-26,28,30 +65" A-1 +65"K0821 K0824 EP1537 D0101 C-2,4 +18" 22 J C-6 WH-2 UTILITY 116 3 C-8,10 A0608 C-20 A1301 A-1 Q0606 B-29 A-1 B-7,9,11 Q0807 A-3 D1701 D1703 D1702 12 4 4 U0510 7 A-7 J PAY WINDOW A-7 J B-31 A-3 V1503 D0101 V2201 V1801 C-39C-34 Q0608 V2201 V0702 C-36 C-37 1. MODULAR PANEL SYSTEM. SEE DETAIL #1 ON SHEET E3.1 FOR MORE INFORMATION. 2. JUNCTION BOX ABOVE CEILING FOR FOR USED COOKING OIL TANK ALARM. PROVIDE 1" CONDUIT WITH PULL STRING FOR SUPPLIER FOR INSTALLATION OF ALARM. COORDINATE REQUIREMENTS WITH SUPPLIER. 3. 120 VOLT NORMALLY OPEN MOMENTARY CONTACT MICROSWITCH MOUNTED IN HOOD EXTINGUISHING SYSTEM SUCH THAT OPERATION OF EXTINGUISHING SYSTEM SHALL CAUSE MICROSWITCH TO CLOSE (TYPICAL OF 2) REFER TO SHEET M1.1. REFER TO DETAIL 2, SHEET E3.1. 4. RECEPTACLES PREWIRED IN MODULAR COUNTER. RUN CIRCUIT WIRING TO THE WALL AND RUN ABOVE CEILING. COORDINATE WITH COUNTER SHOP DRAWINGS. PROVIDE 1" CONDUIT WITH PULLSTRING FOR POS DATA BOXES. 5. PROVIDE RECEPTACLE FOR IRRIGATION SYSTEM CONTROLLER. COORDINATE REQUIREMENT AND LOCATION WITH ARCHITECT. 6. REFER TO GRILL LINE ELEVATION DETAIL, SHEET E5.1 FOR CIRCUIT CONNECTIONS TO PREWIRED JUNCTION BOXES IN KITCHEN EQUIPMENT SUPPLIED CHASE. REFER TO KITCHEN EQUIPMENT CONNECTION SCHEDULE, SHEET E3.2 FOR ADDITIONAL INFORMATION. 7. PROVIDE POWER CONNECTION TO JUNCTION BOX ABOVE CEILING IN THIS AREA FOR STATIC MENU BOARD. CONNECTION TO LED SPINNER MENU TRANSFORMER. MAKE CONNECTIONS FROM TRANSFORMER TO (7) MENU PANELS. NO OTHER ELECTRICAL OR DATA DEVICES ARE NEEDED FOR MENU BOARDS.. 8. NOT USED. 9. ONE (1) POWER AND ONE (1) DATA 1" CONDUITS WITH PULL STRING UNDER SLAB. COORDINATE EXACT PLACEMENT & LOCATE CONDUITS ACCORDINGLY PRIOR TO ROUGH-IN. REFER TO ARCHITECTURAL PLANS. REFER TO DETAIL #10 ON SHEET E5.1. 10. PROVIDE POWER CONNECTION TO DOOR HEATER & EMERGENCY DOOR ALARM. REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS. 11. PROVIDE RECEPTACLE FOR ICE MACHINE AND FREESTYLE MACHINE IN KITCHEN EQUIPMENT SUPPLIED CHASE G1402. WIRE THROUGH JUNCTION BOXES SUPPLIED IN CHASE. COORDINATE MOUNTING LOCATION WITH KITCHEN EQUIPMENT SUPPLIER. 12. MOUNT RECEPTACLE FOR BEVERAGE SCREEN IN CEILING BULKHEAD. REFER TO SERVICE AREA ELEVATION, SHEET E5.1. 13. RECESSED RECEPTACLE FOR FLY LIGHT. COORDINATE FINAL LOCATION WITH ARCHITECT PRIOR TO ROUGH-IN. 14. PROVIDE RECEPTACLE AT 18" AFF FOR CARBON DIOXIDE METER. PROVIDE CAT 5 CABLE BACK TO MANAGERS OFFICE FOR REMOTE DISPLAY UNIT. COORDINATE FINAL LOCATIONS WITH ARCHITECT. COORDINATE ALL REQUIREMENTS WITH VENDOR. 15. PROVIDE BOX AND CONDUIT RUN ABOVE CEILING FOR RTU REMOTE TEST SWITCH. 16. PROVIDE HEAT TRACE AND REQUIRED RECEPTACLE FOR CONDENSATION LINE, COORDINATE WITH PLUMBING CONTRACTOR THE EXACT LOCATION PRIOR TO ROUGH-IN. 17. PROVIDE OUTLET FOR RE-CIRC PUMP. COORDINATE EXACT LOCATION AND REQUIREMENT WITH PLUMBING CONTRACTOR. PLACE ON KITCHEN LIGHT CONTROL ZONE.. 18. PROVIDE FLEXIBLE CONDUIT FROM FURNITURE MOUNTED POWER AND DATA OUTLET TO JUNCTION BOX ON THE WALL FOR CUSTOMER SELF ORDER STATION, UPS AND POS. COORDINATE EXACT LOCATION PRIOR TO ROUGH-IN.. 19. MOUNT RECEPTACLE HORIZONTAL TO ENSURE CLEARANCE WITH COUNTER TOP AND BACK SPLASH. 20. PROVIDE POWER CONNECTION TO UNIT HEATER. COORDINATE REQUIREMENTS WITH MECHANICAL CONTRACTOR. 21. PROVIDE CONNECTION TO EVAPORATOR POWERED BY ROOF MOUNTED CONDENSER UNIT. 22. PROVIDE 60A 2-POLE 208V NON-FUSED DISCONNECT SWITCH FOR DISHWASHER WATER HEATER. MOUNT 96" ABOVE FINISH FLOOR IN ACCESSIBLE LOCATION. COORDINATE WORK WITH PLUMBING AND KITCHEN EQUIPMENT SUPPLIER. 23. PANIC HARDWARE SHALL BE INSTALLED AS PER IBC SECTION 1010.10. 24. PROVIDE RECEPTACLES FOR FUTURE DIGITAL MENUBOARD. COORDINATE EXACT MOUNTING LOCATION PRIOR TO ROUGH-IN. 25. 1" CONDUIT WITH 1-120V CIRCUIT TO PRE-SELL BOARD. 26. PROVIDE (3) 3/4" CONDUITS FOR POWER FROM ELECTRICAL PANEL (UNDERGROUND) TO MENU BOARD WITH THREE (3) 120V CIRCUIT FOR MENU BOARD AND PRE-SELL MENUBOARD. 27. 1" CONDUIT FORM ELECTRICAL PANEL A (UNDERGROUND) TO ORDER CANOPY WITH TWO (2) 120V POWER FOR CANOPY LIGHTING AND LCD AND ONE (1) FOR OPTIONAL CANOPY HEAT TAPE. 28. ENSURE CONDUIT STUBS ARE WITHIN THE 5"X5" OPEN AREA IN THE BOTTOM OF EACH CANOPY SUPPORT. A- 7 8 J DRIVE THRU WINDOW WF E5.1 7 N0501 D0201 +38" C-33 B-27 Q0406 B-35 B-37 11 D0200 E1417 Q0606 B-19 4 C-41 +84" CC-19,21,23 K0821 EP1529 J B-35 20 AMP 120V-1PH CEILING MOUNTED RECEPTACLE DATA CONNECTION - CEILING MOUNTED 3 108" 108" 108" 108" 24 TYPICAL A-32A-27 V0105 28 25 26 REFER TO CIVIL SITE SHEETS FOR MORE INFORMATION PRE-SELL MENU BOARD MENU BOARD ORDER CONFIRMATION BOARD 27A-20 A-22 J J J A-18 A-40 A-42 J J A-34 J CANOPY 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments POWER PLAN E2.1 KH MJ 1 1IT PLAN 1/4" = 1'-0" 1. VOLUME CONTROL AT 48" A.F.F. PROVIDE 3/4" CONDUIT TO JUNCTION BOX AT MUSIC SYSTEM. 2. 2'x4'x3/4" FIRE RESISTANT PLYWOOD BACKBOARD FOR INCOMING TELEPHONE SERVICE. 3. PROVIDE (2) 1" DATA CONDUIT WITH PULL STRING TO NETWORK HUB. PROVIDE CONNECTION TO FURNITURE MOUNTED DATA OUTLET. COORDINATE REQUIREMENT PRIOR TO ROUGH-IN. 4. ONE (1) 1" CONDUIT WITH PULL STRING IN SLAB FOR DRIVE-THRU WINDOW. COORDINATE EXACT LOCATION PRIOR TO ROUGH-IN. REFER TO ARCHITECTURAL PLANS. REFER TO CONDUIT IN SLAB DETAIL, SHEET E5.1. 5. ONE (1) DATA 1" CONDUITS WITH PULL STRING UNDER SLAB. COORDINATE EXACT PLACEMENT & LOCATE CONDUITS ACCORDINGLY PRIOR TO ROUGH-IN. REFER TO ARCHITECTURAL PLANS. REFER TO DETAIL #10 ON SHEET E5.1. 6. SOUND SPEAKER, REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHT AND ORIENTATION. SPEAKERS CAN BE DAISY-CHAINED SPEAKER TO SPEAKER AND WIRED BACK TO JUNCTION BOX IN MANAGER'S OFFICE. 7. RUN (1) 3/4"CONDUIT FROM SOUND SYSTEM JUNCTION BOX IN WALL IN MANAGER'S OFFICE ABOVE CEILING TO DINING AREA (AND PATIO) FOR SPEAKERS WITH PULL STRING. 8. PROVIDE WIRING FROM TELEPHONE BOX TO DEMARCATION POINT. 9. PROVIDE CAT 5 CABLE BACK TO MANAGERS OFFICE FOR CARBON DIOXIDE METER REMOTE DISPLAY UNIT. COORDINATE FINAL LOCATIONS WITH ARCHITECT. COORDINATE ALL REQUIREMENTS WITH VENDOR. 10. FRONT COUNTER REGISTER DATA OUTLETS PREWIRED IN MODULAR COUNTER. PROVIDE 1-1/2" CONDUIT WITH PULL STRING FOR POS DATA BOXES. 11. PROVIDE JUNCTION BOX WITH 1' CONDUIT WITH PULL STRING THROUGH CURB TO 2" BELOW PAVEMENT LINE FOR CAR SENSOR DETECTOR LOOP. COORDINATE WITH CIVIL PLANS AND COORDINATE INSTALLATION IN FIELD WITH SUPPLIER. 12. (1) 1" CONDUIT FOR DATA & (1) 1" CONDUIT FOR AUDIO AND TIMER SIGNAL UNDERGROUND TO ORDER CONFIRMATION DISPLAY. 13. PROVIDE 1" CONDUIT WITH PULL STRING FOR FUTURE DIGITAL MENUBOARD DATA CONNECTION. STUB UP AND CAP. COORDINATE FINAL LOCATION OF STUB-UP IN THE FIELD. 14. PROVIDE (1) 2" CONDUIT FOR DATA FROM BUILDING ABOVE CEILING TO MENUBOARD. 15. PROVIDE 1" CONDUIT WITH PULL STRING THROUGH CURB TO 2" BELOW PAVEMENT LINE FOR DETECTOR LOOP. 16. PROVIDE 4" PVC CONDUIT/CHASE ABOVE CEILING FOR DATA DROPS FROM IT RACK. PROVIDE AS STRAIGHT A RUN AS FEASIBLE, WITH 45DEG MAXIMUM BENDS. COORDINATE WITH OTHER UTILITIES ABOVE CEILING. #CODED NOTES: A. THE CONDUITS, JUNCTION BOXES AND OUTLETS SHOWN ARE INSTALLED BY ELECTRICAL CONTRACTOR AND ARE IN ADDITION TO THOSE INDICATED ON SHEET E2.1. ALL ITEMS SHOWN ARE TO CLARIFY AND EMPHASIZE THE IMPORTANCE OF PROPER PLACEMENT. B. ALL CONDUITS SHOULD BE STEEL STUBBED OUT ABOVE THE CEILING LINE AND TERMINATED INTO A J-BOX AS NOTED AND CAPABLE OF ACCEPTING A FACEPLATE COVER. C. ALL J-BOXES SHOULD BE INSTALLED IN SUCH A WAY THAT THEY ARE NOT BLOCKED BY OTHER EQUIPMENT OR STRUCTURAL COMPONENTS. D. ALL CABLE ACCESS OPENINGS THRU S/S MUST HAVE RUBBER OR PLASTIC GROMMETS INSTALLED. E. TELEPHONE, DATA AND CATV CABLING SHALL BE PROVIDED BY OTHERS. F. PROVIDED NYLON BUSHINGS ON ALL CONDUITS. G. REFER TO SHEET E1.1 FOR GENERAL ELECTRICAL NOTES. H. MOUNT DEVICES INSTALLED ON EQUIPMENT ON NON-REMOVABLE PANEL. COORDINATE LOCATION PRIOR TO COMMENCING ROUGH-IN WORK. I. HEIGHTS INDICATED FOR RECEPTACLES AND JUNCTION BOXES ARE MEASURED FROM FINISH FLOOR TO THE CENTER OF THE BOX. LOW VOLTAGE/IT GENERAL NOTES 6 6 ENTRY 100 J 3 +65" CHASE #3 BY KED KITCHEN 106 DRIVE-THRU 105 E5.1 DRIVE THRU 105 J J 11 CHASE #4 BY KED PAY WINDOW 113 J +16" 11 1 N0508 E5.1 4 VC VC 40" 100" 2 8 9 +16" 100"+16" +16" +16" J OFFICE 108 CREW 114 66 FAMILY 102 FAMILY 103 HALLWAY 109 UTILITY 116 7 10 COOLER 111 FREEZER 110 RECEIVING 112 93" D1702 D1703 D1701 D0200 D0101 +65" +65" 5 1 3 D0201 DRIVE THRU WINDOW J 4 +65" D0101 2 E5.1 5 6 E5.1 +108" +108" +108" +108" CEILING MOUNTED SECURITY MONITOR 16 14 15 REFER TO CIVIL SITE SHEETS FOR MORE INFORMATION PRE-SELL MENU BOARD MENU BOARD CANOPY J J J J J 12 13 ORDER CONFIRMATION BOARD J J J 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments LOW VOLTAGE / IT PLAN E2.2 KH MJ 1ROOF POWER PLAN 1/4" = 1'-0" PHOTO CONTROLS, MOUNT ON ROOF TO PARAPET WALL. SEE DETAIL 02 ON THIS SHEET KITCHEN ICE MACHINE CONDENSING UNIT FREESTYLE ICE MACHINE CONDENSING UNIT WALK - IN COOLER CONDENSING UNIT B-34,36 EF-3 A-26 CC-12 B-26,28 EF-2 EF-1 1 SANDWICH LINE CONDENSING UNIT A. REFER TO SHEET E1.1 FOR GENERAL ELECTRICAL NOTES AND SHEET E2.1 FOR ELECTRICAL LEGEND. B. VERIFY EXACT LOCATIONS OF HVAC AND PLUMBING EQUIPMENT, CONDUIT STUB-UPS AND POWER CONNECTIONS PRIOR TO ROUGH-IN. C. WIRE ROOF TOP UNIT CONTROL CIRCUIT THROUGH AUXILIARY CONTACTS IN SMOKE DETECTOR AND MAKE ALL FINAL CONNECTIONS. (TYPICAL OF ALL ROOF TOP UNITS) D. PROVIDE NEMA 3R DISCONNECT SWITCH IF EQUIPMENT MANUFACTURER DOES NOT PROVIDE ONE WITH EQUIPMENT. VERIFY DISCONNECT REQUIREMENTS WITH MANUFACTURER. E. DISCONNECTS ARE SHOWN FOR REFERENCE ONLY. ACTUAL LOCATION OF DISCONNECTS SHALL BE COORDINATED AND VERIFIED WITH EQUIPMENT MANUFACTURER AND FINAL ORIENTATION OF EQUIPMENT ONCE PLACED ON ROOF. 1. PROVIDE CONNECTION TO ASSOCIATED HOOD ON SWITCH. COORDINATE ALL REQUIREMENTS WITH MECHANICAL DRAWING AND HOOD WIRING DIAGRAM PRIOR TO ROUGH-IN. 2. PROVIDE 30A 208V 3P DISCONNECT SWITCH FUSED AT 15A IN NEMA 3R ENCLOSURE. PROVIDE (2)#10 AND (1)#10 GROUND IN 3/4" CONDUIT FROM EQUIPMENT TO REMOTE UNIT. VERIFY ALL OTHER REQUIRED WIRING. COORDINATE EXACT REQUIREMENTS WITH MANUFACTURER AND MAKE ALL FINAL CONNECTIONS REQUIRED FOR PROPER OPERATION. 3. WEATHERPROOF RECEPTACLE PROVIDED WITH ROOF UNIT. PROVIDE POWER AS INDICATED. 4. PROVIDE 30A 208V 2P DISCONNECT SWITCH IN NEMA 3R ENCLOSURE FOR ICE MACHINE CONDENSING UNITS. MAKE ALL CONNECTIONS TO ASSOCIATED UNIT PER MANUFACTURER'S INSTRUCTIONS. ROOF 4" 3/4" CONDUIT TO CONTROL SECTION OF FCLC. SINGLE-GANG WEATHERPROOF JUNCTION BOX MOUNTED HORIZONTALLY WITH ROOF SURFACE (TYPICAL). PHOTO SENSOR PROVIDED BY FAN CONTROL/LIGHTING CONTROL PANEL SUPPLIER. INSTALL ON SIDE OF PARAPET WALL FACING NORTH, 4" DOWN FROM THE TOP. INSTALL PER MANUFACTURER'S INSTRUCTIONS. ENSURE THAT NO SHADOWS CAST DIRECTLY ON PHOTOCELL. TOP OF PARAPET WALL ROOF PLAN GENERAL NOTES #CODED NOTES:*HVAC MOTORS & EQUIPMENT CONNECTIONS MARK SERVING MOCP V/P UNIT LOCATION FEEDER CO N D U C T O R S (G R O U N D N O T IN C L U D E D ) WI R E S I Z E GR O U N D S I Z E EF-1 GRILL EXHAUST 20 208/1 ROOF 2 10 10 EF-2 FRYER EXHAUST 20 208/1 ROOF 2 10 10 EF-3 RESTROOM EXHAUST 20 120/1 ROOF 21212 DISCONNECT STARTER CONTROL FA C T O R Y I N S T A L L E D DI S C O N N E C T WP . D I S C O N N E C T SW I T C H ST A R T E R - IN T E G R A L WI T H E Q U I P M E N T LOCATION SW I T C H O R BR E A K E R IN T E R L O C K W/ T H E R M O S T A T WI R I N G B Y NE A R U N I T EQ U I P M E N T PA N E L RO O M N U M B E R XEC XEC EC X X X CO N D U I T 3/4" 3/4" 3/4" X X X 108 108 108 X 2 PHOTOCELL CONTROL MOUNTING DETAIL NOT TO SCALE C-17,19 4B-14,16 4 WALK - IN FREEZER CONDENSING UNIT B-2,4,6 2 C- 31 RTU-1 MDP-3 RTU-2 MDP-4 WP 3 3 WP B-8,10,12 2 TRANE - NATURAL GAS TRANE - NATURAL GAS 80 208/3 ROOF 3 3 8 80 208/3 ROOF 3 3 8 RTU-1 RTU-2 XXX XEC XXX XEC 1-1/4"X X 108 1081-1/4" WP C- 31 3 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments ROOF POWER PLAN E2.3 KH MJ NEUTRAL SHUNT TRIP BREAKERS IN 'MDP' RED BLACK CIRCUIT A-5 MICRO SWITCH IN HOOD POWER KILL SWITCHES NOT TO SCALE SHUNT TRIP CIRCUIT DETAIL 2 SERIES RATED NOTES MAIN BREAKERS IN MDP TO BE "FULLY" RATED TO WITHSTAND THE AVAILABLE FAULT CURRENT AT M.D.P. OF 65,000 AMPS R.M.S. 2. THE DISTRIBUTION SYSTEM IS TO BE A "SERIES" RATED, TWO-TIER, 65/10 SYSTEM. 3. MOTOR LOAD CONTRIBUTION TO THESE PANELBOARDS SHALL NOT EXCEED 1.0% OF THE PANELBOARD A.I.C. RATING. 4. WHERE "SERIES" RATING IS USED, PANELBOARDS AND DISTRIBUTION PANELS ARE TO BE LEGIBLY MARKED TO INDICATE THE EQUIPMENT HAS BEEN APPLIED WITH A "SERIES" COMBINATION RATING. LABELS CAN BE FACTORY INSTALLED OR ENGRAVED PLASTIC-LAMINATE CARD. MARKING SHALL COMPLY WITH ARTICLE 110-22 OF N.E.C. CONTROL ZONES ZONE 1 KITCHEN LIGHTS & WORK LIGHTS ZONE 2 DINING ROOM - GENERAL LIGHTS ZONE 3 HOODS ZONE 4 PARKING LOT LIGHTS ZONE 5 EXTERIOR BUILDING LIGHTS/ BUILDING SIGNS/ MENU BOARDS ZONE 6 NOT USED ZONE 7 NOT USED *SEE SHEET W1.1 FOR LIGHT ZONE CONTROL INFORMATION. ARC FLASH LABELING A. SWITCHBOARDS, PANELBOARDS AND BUSWAY SHALL HAVE A COMMERCIALLY PRODUCED PERMANENT LABEL APPLIED, SIMILAR TO IMAGE BELOW, TO WARN OF POTENTIAL ARC FLASH HAZARDS IN ACCORDANCE WITH NEC 110.16 AND NFPA 70E B. LABELING MAY BE COMPLETED BY THE CONTRACTOR. THE CONTRACTOR SHALL VERIFY THAT SWITCHBOARDS AND PANELBOARDS ARE PROPERLY LABELED IN THE FIELD. C. PROVIDE AND INSTALL A LABEL SIMILAR TO BELOW TO COMPLY WITH NEC 110.16 AND NFPA 70E. THE MARKING SHALL BE LOCATED SO AS TO BE CLEARLY TO QUALIFIED PERSONS BEFORE EXAMINATION, ADJUSTMENT, SERVICING OR MAINTENANCE OF THE EQUIPMENT. LABEL SHALL NOT BE LOCATED ON A HINGED DOOR, OR A MOVABLE SERVICE. PANEL 'C' PANEL 'A' PANEL 'B' 'COOK- CENTER' PANEL PANEL 'MDP' EXTERIOR WALL POWER COMPANY METER WP C/T EQUIPMENT CABINET REFER TO SHEET W1.2 FOR MORE INFORMATION ON 'FC/LC' 'LC' LIGHTING CONTROL 'FC' FAN CONTROL CONTACT SUPPLIER FOR SEISMIC BRACING. SEE ARCHITECTURAL SHEETS FOR CURB AT SWITCHGEAR NOTE: CONTRACTOR TO ORDER ELECTRICAL PANEL SYSTEM AT THE START OF CONSTRUCTION GIVEN THE 6 WEEK LEAD TIME FOR THE MODULAR PANEL SYSTEM. CONTRACTOR TO PROVIDE MECHANICAL AND ELECTRICAL PLANS WHEN PLACING ORDER. SURGE PROTECTION DEVICE SPD NOTE: CONTRACTOR TO DOWNLOAD AND EXECUTE MODULAR PANEL SYSTEM'S START UP AND SYSTEM CHECK LIST REQUIREMENTS FROM WENDY'S. PANEL B RTU #2 * 208V 3PH, 3W *SHUNT-TRIP BREAKER CONTROLLED BY ANSUL SYSTEM. SHUTDOWN OF POWER ON LOAD SIDE OF BREAKER SHALL OCCUR ON ACTIVATION OF FIRE SUPPRESSION SYSTEM OR UPON MOMENTARY CONTACT OF ELECTRICAL SHUT DOWN SWITCH "W" SUB FEEDERS TO PANELS "A", "B", "C" AND "COOKCENTER" ARE PREWIRED AND PREINSTALLED INSIDE THE MODULAR PANEL SYSTEM. GND. 2/0 AWG, CU. 1 200/3 6 200/3* SHUNT TRIP 3 80/3* SHUNT TRIP 5 225/3* SHUNT TRIP 2/0 AWG, CU. PANEL A MDP 208/120V, 3 PHASE, 4 WIRE 65K AIC PANEL COOKCENTER* MAIN WATER SERVICE PIPE REFER TO HVAC CONNECTION SCHEDULE IN SHEET E3.2 C.T. METER 800A. BUS 2 200/3 E.C. TO PROVIDE NEW WEATHERPROOF C/T CABINET WITH 8OOA C/T IN ACCORDANCE WITH UTILITY COMPANY REQUIREMENTS. 80/3* SHUNT TRIP PANEL C * EC TO PROVIDE NEW 120/208V, 800A METER SOCKET IN LANDLORD PROVIDED METER BASE IN ACCORDANCE WITH UTILITY COMPANY REQUIREMENTS. NEUT. ISOLATED GROUND 2/0 AWG, CU. BUILDING STEEL 2/0 AWG, CU. #6 AWG, CU. 10'-0" COPPER CLAD GND. ROD G.C. AND UTILITY TO VERIFY CAPACITY OF EXISTING TRANSFORMER. IF EXISTING TRANSFORMER ISN'T LARGE ENOUGH FOR UPGRADED SERVICE SIZE, UTILITY TO UPGRADE TRANSFORMER. E.C. TO PROVIDE TWO PARALLEL SETS OF FOUR 600MCM EACH IN 4"CONDUIT 4 RTU #1 * 208V 3PH, 3W ELECTRICAL DISTRIBUTION GENERAL NOTES 1. PANELS "A", "B" , "C" AND "COOKCENTER" SHALL BE CIRCUITED AS SHOWN. 2. THERMOSTATS TO BE PROVIDED WITH "FC/LC" FAN CONTROL/LIGHTING CONTROL PANEL ALONG WITH REMOTE SENSORS. 3. SYSTEM IS DESIGNED TO FORCE EXHAUST FANS ON WHEN ANSUL SYSTEM ACTIVATES TO MEET CODE REQUIREMENTS. NEW PRE-PACKAGED, PRE-WIRED SWITCHGEAR MODULAR PANEL SYSTEM 800/3P MAIN CIRCUIT BREAKER NOT TO SCALE ELECTRICAL ONE-LINE DIAGRAM 1NOT TO SCALE ELECTRICAL DISTRIBUTION ELEVATION (CPI)3 GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFIGFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI FI FI EC IS RESPONSIBLE FOR FIELD VERIFICATION OF SITE CONDITIONS AND REPORTING ANY DIFFERENCES OR DISCREPANCIES TO ELECTRICAL ENGINEER PRIOR TO BID. NO EXTRAS OR CHANGE ORDERS SHALL BE GIVEN FOR CONTRACTOR'S FAILURE TO VERIFY SITE CONDITIONS PRIOR TO BIDDING. UNLESS SPECIFICALLY DETERMINED IN THE LEASE, IT IS THE RESPONSIBILITY OF THE TENANT TO INSTALL A UTILITY OR SUB METER PER LANDLORD SPECIFICATIONS. ALL SUB METERS MUST BE FUNCTIONING PROPERLY BEFORE TENANT OPENS FOR BUSINESS. THE TOTAL TENANT CONNECTED LOAD CANNOT EXCEED THE LANDLORD SUPPLIED UTILITY. ELECTRICAL CONTRACTOR SHALL VERIFY ALL EQUIPMENT VOLTAGE AND AMPERAGE REQUIREMENTS PRIOR TO FINAL CONNECTION AND REPORT ANY DIFFERENCES TO ENGINEER. DO NOT MAKE ANY FINAL CONNECTIONS IF VOLTAGES SHOWN ON PLANS DO NOT MATCH EQUIPMENT DELIVERED. x ALL KITCHEN 120V, SINGLE PHASE, 15A AND 20A RECEPTACLES SHALL BE GFI TYPE PER NEC SECTION 210.8 (B). x ALL GFCI RECEPTACLES SHALL BE INSTALLED IN A READILY ACCESSIBLE LOCATION OR A GFCI CIRCUIT BREAKER SHALL BE USED TO FEED THE CIRCUIT NOTED. x ALL 125V, 15A AND 20A CIRCUITS TO KITCHEN EQUIPMENT SHALL BE FED WITH A DEDICATED NEUTRAL WIRE. FI GFI GFI GFI GFI GFI GFI GFI GFI E.C. TO PROVIDE TWO PARALLEL SETS OF FOUR 600MCM EACH IN 4"CONDUIT FI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI GFI MINIMUM OF 20',00" OF 1/2" REBAR IN BUILDING WALL FOOTING 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments ELECTRIC DISTRIBUTION (GAS HEAT/GAS COOKING) E3.1 KH MJ GENERAL NOTES FIXTURE & EQUIPMENT CONNECTION SCHEDULE SYMBOL QUANTI TY GENERAL FIXTURE DESCRIPTION CONNECTIONS FEEDER REMARKSKILOWATT S VOLTAGE/PHA SE TYPE PLUG CORD FURNIS HED * CONDU CTORS* * WIRE SIZE GROUN D SIZE CONDUI T SIZE FRONT COUNTER - HOCKEY STICK Q0606 1 REFRIGERATOR - FRONT COUNTER .888 120V/1PH DUPLEX RECEPTACLE ES 2 #12 #12 12" E1417 1 FRONT COUNTER (PRE-WIRED)120V/1PH PRE-WIRED DUPLEX RECEPTACLE BEVERAGE LINE - FREESTYLE A0105 1 BEVERAGE SYSTEM, PUW - FREESTYLE .800 120V-1PH DUPLEX RECEPTACLE EC 2 #12 #12 12" A0608 1 COFFEE BREWER 2.680 120/208V-1PH L14-20R RECEPTACLE EC 3 #12 #12 12" A1302 1 BEVERAGE DISPENSER (BUBBLER).396 120V/1PH DUPLEXRECEPTACLE EC 2 #12 #12 12" Q0807 1 FROSTY MACHINE - DUAL HEAD 5.8A 208V/3PH L 15-30R RECEPTACLE EC 3 #8 #10 1-1/4" (1) SINGLE LINE COOK CENTER EP1528 L0308 1 EXHAUST HOOD DSG2-SINGLE LINE 1.92 120V/1PH JUNCTION BOX MOUNTED IN THE HOOD EC 2 #12 #12 12" E1528 1 SANDWICH STATION REFRIGERATOR .690 120V/1PH JUNCTION BOX 'A' IN CHASE #EP1528 ES 2 #12 #12 12" E1528 1 SANDWICH STATION CONDENSING UNIT .172 120V/1PH JUNCTION BOX 'A' IN CHASE #EP1528 ES 2 #12 #12 12" 2 HMP6 WARMER .756 120V/1PH JUNCTION BOX 'B' IN CHASE #EP1528 ES 2 #12 #12 12" V0608 1 BUN WARMER .600 120V/1PH JUNCTION BOX 'E' IN CHASE #EP1528 ES 2 #12 #12 12" V1903 1 MPC-22 - WARMER .399 120V/1PH JUNCTION BOX 'E' IN CHASE #EP1528 ES 2 #12 #12 12" V1902 1 MPC-1L - WARMER .110 120V/1PH JUNCTION BOX 'E' IN CHASE #EP1528 ES 2 #12 #12 12" V0608 1 BUN WARMER .600 120V/1PH JUNCTION BOX 'E' IN CHASE #EP1528 ES 2 #12 #12 12" D0201 1 POS TERMINAL .1 120V/1PH JUNCTION BOX 'F' IN CHASE #EP1528 ES 2 #12 #12 12"(2) V0304 1 TOASTER 2.8 208V/1PH JUNCTION BOX 'G' IN CHASE #EP1528 ES 2 #12 #12 12" V1902 1 MPC-1L - WARMER .110 120V/1PH JUNCTION BOX 'G' IN CHASE #EP1528 ES 2 #12 #12 12" V1903 1 MPC-22 - WARMER .399 120V/1PH JUNCTION BOX 'G' IN CHASE #EP1528 ES 2 #12 #12 12" V1903 1 MPC-22 - WARMER .399 120V/1PH JUNCTION BOX 'G' IN CHASE #EP1528 ES 2 #12 #12 12" E1527 1 SALAD STATION 1.726 120V/1PH JUNCTION BOX 'H' IN CHASE #EP1528 ES 2 #12 #12 12" K0502 1 MICROWAVE 1.726 208V/1PH JUNCTION BOX 'J' IN CHASE #EP1528 ES 2 #12 #12 12" E1529 1 MEATWELL REFRIGERATION 1.726 120V/1PH JUNCTION BOX 'K' IN CHASE #EP1528 ES 2 #12 #12 12" V1902 1 MPC-1L - WARMER .110 120V/1PH JUNCTION BOX 'L' IN CHASE #EP1528 ES 2 #12 #12 12" K0824 1 ELECTRIC STAGING GRILL 7.2 208V/3PH SPECIAL RECEPTACLE NEMA 15-30 EC 3 #10 #10 3/4" K0821 1 GRILL - LEFT SIDE 17.0 208V/3PH SPECIAL RECEPTACLE NEMA 15-60 EC 3 #6 #10 1" K0821 1 GRILL - RIGHT SIDE 8.5 208V/3PH SPECIAL RECEPTACLE NEMA 15-30 EC 3 #10 #10 3/4" KITCHEN EQUIPMENT - FRYLINE L0504 1 EXHAUST HOOD FRYLINE 1.0 120V/1PH JUNCTION BOX MOUNTED IN THE HOOD EC 2 #12 #12 12" J1004 1 OPEN FRYER - 4 WELL 1.0 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 12" K1401 1 COMBI OVEN 6.8 208V/3PH SPECIAL RECEPTACLE NEMA 15-30 EC 3 #10 #10 3 4" K1402 1 OVEN, HIGH SPEED 5.7 208V/1PH SPECIAL RECEPTACLE NEMA 6-30 EC 2 #10 #10 3 4" Q0406 1 FREEZER, UPRIGHT - 1 DOOR 1.08 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 12" Q0605 1 REFRIGERATOR, UNDERCOUNTER - 1 DOOR .480 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 12" V0105 4 COOKER/WARMER 1.4 120V/1PH SIMPLEX RECEPTACLE EC 2 #12 #12 12" V2201 1 FRY HOLDING MOLDULE 1.0 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 12" D2201 1 FRY LINE TIMER 0.2 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 12" V0702 1 FOOD WARMER, 3-LANE 0.5 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 12" V1503 1 NUGGET WARMER HOLDING CABINET 1.2 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 12" V1801 1 FRY STAGING WARMER 0.350 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 12" Q0608 1 FREEZER, UNDERCOUNTER - 2 DOOR 0.572 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 12" KITCHEN EQUIPMENT - PREP AREA / WAREWASH A0801 1 TEA BREWER 1.7 120/1PH DUPLEX RECEPTACLE NEMA 5-20 EC 2 #12 #12 12" WH-2 1 WATER HEATER (FOR T2061)6.0 208V/1PH WP DISCONNECT AT UNIT EC 2 #8 #10 3 4" T2062 1 WAREWASH MACHINE W/BOOSTER 5.0 208V/1PH HARDWIRED EC 2 #10 #10 3 4" KITCHEN EQUIPMENT - DRINK EQUIPMENT QP0909 1 ICE MAKER WITH BIN - KITCHEN 0.4 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 3 4" Q01##1 ICE MAKER REMOTE 1.260 208V/1PH WP DISCONNECT AT UNIT EC 3 #12 #12 3 4" OFFICE/EMPLOYEE AND SAFETY N0508 1 BACK OFFICE SAFE .18 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 12" DINING ROOM - DRINK STAND A0202 2 FREESTYLE BEVERAGE SYSTEM (SELF-SERVE - DINING ROOM).800 120V/1PH DUPLEX RECEPTACLE ES 2 #12 #12 12" QP0222 2 ICE MAKER - DINING ROOM 0.4 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 3 4" Q01##1 ICE MAKER REMOTE 1.260 208V/1PH WP DISCONNECT AT UNIT EC 3 #12 #12 3 4" POS SYSTEM AND KIOSK D0101 5 POS MONITOR .1 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 12"(2) D0201 4 POS MONITOR .1 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 12"(2) D1701 1 CUSROMER ORDER PICK UP SCREEN .1 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 12"(2) D1702 1 ORDER RUNNER SCREEN .1 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 12"(2) D1703 1 BEVERAGE SCREEN .1 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 12"(2) U0510 1 STATIC MENUBOARD .1 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 12"(2) D1701 1 SELF ORDER STATION KIOSK .1 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12 12"(2) A. EC - EQUIPMENT FURNISHED BY ELECTRICAL CONTRACTOR. ES - EQUIPMENT SHALL BE PREWIRED BY EQUIPMENT SUPPLIER, SUPPLIER, FIELD CONNECTIONS BY ELECTRICIAN. B. ELECTRICAL CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS TO KITCHEN EQUIPMENT. C. ALL HARDWIRED CONNECTIONS TO BE MADE WITH SEAL-TIGHT FLEXIBLE METAL CONDUIT WITH INSULATED GROUND WIRE INSTALLED WITH PHASE AND NEUTRAL CONDUCTORS. GROUND WIRE TO BE BONDED AT BOTH ENDS. D. ELECTRICAL CONTRACTOR SHALL VERIFY ALL EQUIPMENT REQUIREMENTS (INCLUDING THOSE SCHEDULED) WITH SUPPLIER PRIOR TO ROUGH-IN. E. THE FOLLOWING KITCHEN RECEPTACLES SHALL HAVE GFI PROTECTION BY MEANS OF BREAKERS OR SEPARATE UL 943C DEVICES: - 120V AND 208V, SINGLE PHASE, RATED LESS THAN 50A. - 208V THREE-PHASE, RATED LESS THAN 100A. F. PROVIDE (2)#10 AND (1)#10 GROUND IN 3/4" CONDUIT FROM EQUIPMENT TO REMOTE UNIT. COORDINATE EXACT REQUIREMENTS WITH MANUFACTURER AND MAKE ALL FINAL CONNECTIONS REQUIRED FOR PROPER OPERATION. *VERIFY QUANTITIES WITH ARCHITECTURAL EQUIPMENT PLAN AND SCHEDULE.* REMARKS (#) 1. CORD WITH NEMA 15-30 PLUG PROVIDED BY KED. 2. DEDICATED CIRCUIT WITH ISOLATED GROUND. 3. REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS. 4. MOUNTING HEIGHT AS DIRECTED BY EQUIPMENT SUPPLIER. Kitchen Equipment Schedule E3.2 KH MJ 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments A B 1 'TIMELOCK' SAFE DECAL - PART OF MARKETING DECALS. SUPPLIED AND INSTALLED BY OTHERS. DROP BOX N0202 SECURITY MONITOR 'TIMELOCK' SAFE DECAL - PART OF MARKETING DECALS. SUPPLIED AND INSTALLED BY OTHERS. 'TIMELOCK' SAFE DECAL - PART OF MARKETING DECALS. SUPPLIED AND INSTALLED BY OTHERS. DROP BOX N0202 E4.1 4 'DO NOT OPEN' DOOR STICKER 48" A.F.F. (INSIDE) E4.1 E4.1 5 2 18" E4.1 E4.1 6 3 INSTALL NON-CONDUCTIVE 1/2" CONDUIT WITH PULL LINE FROM UTILITY ROOM TO J-BOX. REFER TO DETAILS #3 & #6. "TIMELOCK" SAFE DECAL 48" A.F.F. (OUTSIDE) SMART SAFE LOCATION N0501 DROP BOX N0202 OFFICE SAFE N0508 AIM TO VIEW ORDERING AREA 1SECURITY PLAN 1/4" = 1'-0" DC DC DC MD KP CP AS DB DB DB OS C1 C7 C2 C6 C5 C4 C8 WP C11 C3 C9 C10 18"WP MD DR 48 " TIME CLOCK SECURITY KEYPAD 48" A.F.F. 5 SECURITY KEYPAD LOCATION NOT TO SCALE 18 " INTERIOR ELEVATION OF COOLER/FREEZER J-BOX WITH PULL LINE INTERIOR WALL OF WIC/WIF BOX DOOR FROM COOLER/FREEZER 1/2" PVC CONDUIT NOT TO SCALE WALK-IN PANIC BUTTON 6 INTERIOR ELEVATION "TIMELOCK" SAFE DECAL - PART OF MARKETING DECALS. SUPPLIED AND INSTALLED BY OTHERS. OF PICK-UP WINDOW NOT TO SCALE PUW DECALS 4 1" COOLER CEILING WIRING BY OTHERS TERMINATE CONDUIT IN J-BOX 12" CONDUIT WITH PULL STRING SEAL PENETRATIONS OF CONDUIT WIRING BY OTHERS FINISHED CEILING GC NEED TO SEAL INTERIOR AND EXTERIOR CONDUIT ONCE LOW VOLTAGE WIRING IS RUN. NOT TO SCALE SECURITY WIRING DETAIL 3 STOP ALTO! STOP ALTO! NO ABRIR SIN ESTAR UN GERENTE PRESENTE Y NUNCA DESPUES DE ANOCHECER. DO NOT OPEN WITHOUT MANAGER BEING PRESENT AND NEVER AFTER DARK 5' - 0 " H E I G H T O F M O S T S E C U R I T Y WI N D O W S O R D O O R S C O P E S RED (BACKGROUND) WHITE (LETTERS) DOOR CONTACTS BACK DOOR VIEWER MOUNT STICKER BELOW WINDOW OR SCOPE ON INSIDE FACE OF REAR DOOR EXITING STORE NOT TO SCALE SECURITY SIGN LOCATION 2 A. THE SAFE IS PROVIDED WITH A 3/4" DIAMETER ANCHOR HOLE IN THE BOTTOM. ALONG WITH A LEAD SHIELD ANCHOR ASSEMBLY FOR FIELD INSTALLATION. B. SAFE ANCHORING TO BE DONE BY LOCKSMITH. C. THE SAFE IS TO BE ANCHORED TO THE FLOOR TO MAXIMIZE SECURITY. D. FOR PROPER INSTALLATION FOLLOW STEPS BELOW:(ANCHOR ASSEMBLY 1/2-13 THREAD) 1. MARK THE AREA DESIRED FOR ANCHORING 2. DRILL INTO FLOOR WITH A 1" DIAMETER MASONRY BIT 1" DEEP 3. DIS-ASSEMBLE THE ANCHORING BOLT/WASHER FROM THE LEAD SHIELD ASSEMBLY 4. TAP THE LEAD SHIELD ANCHOR IN THE FLOOR FLUSH WITH THE SURFACE 5. LOCATE AND ALIGN THE HOLE IN THE BOTTOM OF THE SAFE WITH THE LEAD SHIELD ANCHOR IN THE FLOOR. 6. INSTALL THE FLAT WASHER/BOLT THROUGH THE BOTTOM OF THE SAFE AND TIGHTEN SECURELY. BY DOING SO, THE SLEEVE ON THE ANCHOR ASSEMBLY WILL SWELL, WEDGING THE ANCHOR TO THE FLOOR. SAFE NOTES DINING ROOM #1 FRONT COUNTER PICK-UP WINDOW PAY WINDOW BACK DOOR/OFFICE RESTROOM HALLWAY LEVEL RECOMMENDED LEVEL 1 THRU 3 LEVEL 2 THRU 3 LEVEL 2 & 3 LEVEL 3 LEVEL 3 CAMERAL LOCATION C7 PATIO (IF EXISTING) C8 EXTERIOR MENUBOARD C9 DRIVE THRU #1 C10 DRIVE THRU #2 C11 MAIN ENTRANCE DOOR LEVEL RECOMMENDED LEVEL 1 THRU 3 LEVEL 1 THRU 3 LEVEL 1 THRU 3 LEVEL 1 THRU 3 LEVEL 1 THRU 3 LEVEL 1 THRU 3 CAMERAL LOCATION C1 C2 C3 C4 C5 C6 SECURITY CAMERA LOCATION MOUNTING NOTES IN FRAME HEAD ON LATCH SIDE OF OPENING CEILING MOUNT WALL MOUNT 12" TO 18" A.F.F. WALL MOUNT 65" A.F.F. WALL MOUNT ABOVE DOOR SIREN JUST ABOVE CEILING STROBE SURFACE MOUNTED ON CEILING SEE SAFE INSTRUCTION BOLTED DOWN UNDER REGISTER WALL MOUNT 8" BELOW CEILING -OR- CEILING MOUNT POST MOUNTED TIGHT TO UNDERSIDE OF STRUCTURE ADDITIONAL 120 VAC POWER REQUIRED MOUNTED INSIDE UPPER CABINET IN MANAGERS OFFICE. ADDIATIONAL 120 VAC AC POWER REQUIRED ITEM DOOR CONTACT MOTION DETECTOR (360 DEGREE CEILING MOUNTED) WALK-IN PANIC BUTTON KEYPAD CONTROL PANEL SIREN / STROBE OFFICE SAFE DROPBOX CAMERA SECURITY MONITOR DVR MARK BOLTED DOWN UNDER REGISTER(S)SMART SAFE SECURITY LEGEND DC KP CP SS OS DB CX AS MD WP DR ENTRY 100 SERVICE DINING 101 PREP. AREA 107 DRIVE THRU 105 KITCHEN 106 SERVICE 104 UTILITY 116 FAMILY 103FAMILY 102 OFFICE 108 RECEIVING 112 COOLER 111 FREEZER 110 PAY WINDOW 113 CREW 114 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments SECURITY PLAN E4.1 KH MJ E FG AB LJK 4' - 6 " D0101 E1537 V1902 V1902 E1529 V1903 V1903 V0105 EP1537 NOTE: THE COOKCENTER IS UL LISTED. STANDARD RECEPTACLE IN COOKCENTER WITH GFI BREAKERS. CHASES ARE PRE-WIRED. PULL WIRES TO CONNECT PANEL CIRCUITS TO CORRESPONDING EQUIPMENT IN THE CHASE J-BOXES. REFER TO SEPARATE FEEDS JUNCTION BOX SCHEDULE AND KITCHEN EQUIPMENT SCHEDULE. VERIFY CONFIGURATIONS WITH SHOP DRAWINGS. L0307 K0821 V0608 V0403 V0601 5' - 5 " 6"1'-4"3"3" 8'-8" V1903 V1902 V1902 V1902 SEPARATE FEED JUNCTIONS BOX SCHEDULE SINGLE LINE COOK CENTER EQ. NO.DESCRIPTION CONNECTED THROUGH CIRCUIT NO. E1528 SANDWICH STATION REFRIGERATOR JUNCTION BOX 'A' CC-8 E1528 SANDWICH STATION CONDENSING UNIT (ROOF)JUNCTION BOX 'A' CC-12 HMP6 BUILT IN WARMER JUNCTION BOX 'B' CC-6 HMP6 BUILT IN WARMER JUNCTION BOX 'B' CC-17 V0608 BUN WARMER JUNCTION BOX 'E' CC-4 V1903 MPC-22 - WARMER JUNCTION BOX 'E' CC-10 V1902 MPC-1L - WARMER JUNCTION BOX 'E' CC-11 D0201 KITCHEN VIDEO SCREEN JUNCTION BOX 'F' A-1 V0403 TOASTER JUNCTION BOX 'G' CC-1,3 V1902 MPC-1L - WARMER JUNCTION BOX 'G' CC-16 V1903 MPC-22 - WARMER JUNCTION BOX 'G' CC-18 K0502 MICROWAVE JUNCTION BOX 'J' CC-13,15 E1529 MEATWELL REFRIGERATION JUNCTION BOX 'K' CC-2 V1902 MPC-1L - WARMER JUNCTION BOX 'L' CC-20 K0821 GRILL - LEFT SIDE SPECIAL RECEPTACLE NEMA 15-60 CC-25,27,29 K0821 GRILL - RIGHT SIDE SPECIAL RECEPTACLE NEMA 15-30 CC-26,28,30 K0824 ELECTRIC STAGING GRILL SPECIAL RECEPTACLE NEMA 15-30 CC-5,7,9 DRY STORAGE ONLY 6" D0101 INSTALL WITH GROUND PIN UP 15-60R 15-30R 15-30R 6" K0824 OPEN TO BEYOND 1' - 4 " 8' - 4 " 3' - 2 " V0105 ANSUL PULL STATION EMERGENCY SHUT-FF SWITCH USED COOKING OIL ALARM D0201 D0600 N0501 N0202 HEADSET HOLDER 2'-0"3'-5"1'-2" 2'-2" 1'-6" NOT TO SCALE PAY WINDOW COUNTER ELEVATION 6 4' - 0 " 2'-3" SWITCH 'E' DIMMER SWITCH 'F' SWITCH 'D' UNDER HOOD POWER KILL BUTTON SWITCH 'B' SWITCH 'A' SWITCH 'C' SWITCH NOTES x ENGRAVE COVERPLATE PER CONTROL ZONE x DIMMER SHALL HAVE INDIVIDUAL NEUTRAL CONDUCTOR x DIMMER SWITCHES SHALL BE INSTALLED PER MANUFACTURE REQUIREMENTS CONTROL ZONE A SERVICE/HALLWAY B DISPLAY LIGHTS C TRACK LIGHTS D MONOPOINT LIGHTS E DINING LIGHTS F KITCHEN LIGHTS HOOD SYSTEM ANSUL PULL A0801 QP0909 3' - 1 " 3' - 1 " 1' - 4 " 3'-0"2'-7"2'-1"2'-6"4'-7" 1/2" = 1'-0" SWITCH AND HOOD FIRE SUPPRESSION ELEVATION 7 NOT TO SCALE GRILL LINE ELEVATION 5 1' - 4 " 5' - 5 " 11" 1'-3" 1'-7" 2'-3" 1'-11" FINISH FLOOR COORDINATOR SCREEN POWER COORDINATOR SCREEN DATA PRINTER CABLE BOX PROVIDE 1 12" CONDUIT TO ABOVE CEILING. V0105 Q0605 3' - 6 " PRINTER POWER D0101 POS DATA POS POWER 1" DATA CONDUIT TO ABOVE CEILING WITH BUSHING AND PULL WIRE 1' - 4 " 11" 1'-6" 3'-2" 4'-0" 4'-8" 3' - 4 " 8' - 4 " 3'-6" FINISH FLOOR NETWORK HUB DATA SOUND SYSTEM POWER SOUND SYSTEM DATA OFFICE POWER OFFICE DATA OFFICE POWER QUAD RECEPTACLE NETWORK HUB TELEPHONE J-BOX. GC TO PULL TELEPHONE WIRE FROM D-MARC TO J-BOX. N0508 1" DATA CONDUIT TO ABOVE CEILING WITH BUSHING AND PULL WIRE 1/2" = 1'-0" OFFICE WALL DETAIL 4 2DRIVE THRU BACK COUNTER 1/2" = 1'-0" Q0606 Q0807 D0201 D1701 D0101D1703 D1702 E1417 2'-10" 1' - 4 " 6' - 1 0 " TIMER POWER TIMER DATA POS POWER POS DATA PRINTER CABLE BOX PROVIDE 1 12" CONDUIT TO ABOVE CEILING. A0105 A1301 A0608 2'-8" 7'-11" 7' - 9 " OPEN TO BEYOND 3'-2"1'-0"1'-9" 9' - 3 " 3'-2" 4" 9' - 0 " 3'-7"4" OUTLET PROVIDED IN THE MODULAR COUNTER 1'-6"3'-2" 1-1/2" CONDUIT WITH PULL STRING FOR DATA, AND 1" CONDUIT FOR POWER Q0606 JUNCTION BOX IN WALL TO TIE INTO POS COUNTER 3' - 0 " 3' - 4 " 1" DATA CONDUIT TO ABOVE CEILING WITH BUSHING AND PULL WIRE 1/4" = 1'-0" SERVICE AREA ELEVATION 3 J1004 D0101 K1401 Q0406 K1402 N0501 4' - 0 " 2' - 6 " 1' - 4 " CAR DETECTOR LOOP JUNCTION BOX DRIVE THROUGH POWER 6' - 1 0 " 2' - 3 " A1301 A0513 A0105 Q0807 D0201 L0504 D1701 CAR DETECTOR LOOP JUNCTION BOX DRIVE THROUGH POWER 1' - 4 " 8"8"8"8"2'-10"6"11 1/4" 4" 8" V1801 V0702 V1503 Q0608 D2201 V2201 J1004 1'-4" 2'-11" 1'-4"1'-4" 3' - 3 " 1FRYER LINE ELEVATION NOT TO SCALE 12 / 2 2 / 2 0 1 7 4 : 1 0 : 5 6 P M ELECTRICAL ELEVATIONS E5.1 KH MJ 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments EXTEND CONDUIT 6" BEYOND FLOOR FLOOR SEALANT APPLIED WITHIN ANNULUS FLUSH WITH TOP SURFACE OF FLOOR(TYP) 1CONDUIT FLOOR PENETRATION NOT TO SCALE EXTEND CONDUIT 6" BEYOND FLOOR FLOOR NEW CONCRETE PATCH NOT TO SCALE CONDUIT IN SLAB 2 GALVANIZED RIGID CONDUIT EXTEND CONDUIT 6" BEYOND WALL CAULK AROUND BOTH END OF SLEEVE WITH WEATHER PROOF CAULK (TYP) 1/2" (TYP) WALL SEAL BOTH ENDS OF CONDUIT ONCE WIRE HAS BEEN INSTALLED 3CONDUIT WALL PENETRATION NOT TO SCALE MOUNT LED DRIVER IN ACCESSIBLE LOCATION AND AS INCONSPICUOUS AS POSSIBLE CEILING JOIST ROOF EXTERIOR WALL NOT TO SCALE LED DRIVER MOUNTING DETAIL 4 FINISH FLOOR D3002 2' - 5 " 2'-6"2'-6" D3002 D3002 1'-3" 1" DATA CONDUIT TO ABOVE CEILING WITH BUSHING AND PULL WIRE 5CUSTOMER SELF ORDER STATION NOT TO SCALE 12 / 2 2 / 2 0 1 7 4 : 1 0 : 5 6 P M ELECTRICAL ELEVATIONS E5.2 KH MJ 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments 260500 - COMMON WORK RESULTS FOR ELECTRICAL A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL NEW COMPLETE ELECTRICAL SYSTEM AS INDICATED ON DRAWINGS, AS REQUIRED BY CODE AND AS SPECIFIED HEREIN, IN SECTIONS 260500 THROUGH 270511. 1. TEMPORARY SERVICE AS REQUIRED. 2. PRIMARY DISTRIBUTION BY ELECTRIC COMPANY. 3. SECONDARY SERVICE AND METERING INSTALLATION BY CONTRACTOR. 4. EMERGENCY AND EXIT LIGHTING SYSTEMS. 5. TELEPHONE SYSTEM CONDUIT AND CABLES AS SHOWN ON THE DRAWINGS. 6. LIGHTING, HEATING AND POWER PANELS AND BRANCH CIRCUIT WIRING. 7. WIRING DEVICES AND PLATES. 8. INTERIOR AND EXTERIOR LIGHTING FIXTURES AND LAMPS, INSTALLATION AND WIRING. 9. LIGHTING CONTROLS. 10. CONNECTIONS TO EQUIPMENT FURNISHED BY OTHERS. B. WORK WHICH SHALL BE PERFORMED BY OTHERS INCLUDES THE FOLLOWING: 1. FINAL CONNECTIONS OF MISCELLANEOUS EQUIPMENT BY ELECTRICAL CONTRACTOR. 2. CONTROL WIRING THAT IS FURNISHED BY OTHERS PRE-WIRED IN UNITS. 3. TELEPHONES AND FINAL CONNECTION OF WIRING THERETO. 4. INTERNAL WIRING OF EQUIPMENT FURNISHED AND PRE-WIRED BY OTHERS. 5. SECURITY SYSTEM FURNISHED AND INSTALLED BY SECURITY CONTRACTOR. C. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND EQUIPMENT NECESSARY TO INSTALL ALL OF THE 208/120 VOLT ELECTRICAL SERVICE FROM THE UTILITY COMPANY TRANSFORMER TO THE SERVICE ENTRANCE EQUIPMENT, INCLUDING CABLES, CONDUIT, PULL WIRE, AND GROUND ROD AND SLEEVE. CONTRACTOR SHALL COORDINATE INSTALLATION OF THE MAIN ELECTRICAL DISCONNECT WITH THIS WORK. D. ELECTRICAL EQUIPMENT FURNISHED BY OTHER TRADES OR BY THIS CONTRACTOR AND SPECIFIED IN OR SHOWN ON CONTRACT DOCUMENTS SHALL BE INSTALLED AND CONNECTED BY THIS CONTRACTOR, EXCEPT AS OTHERWISE NOTED. PROVIDE BRANCH CIRCUIT CONNECTIONS TO ELECTRICALLY OPERATED EQUIPMENT FURNISHED BY OTHERS AS SPECIFIED IN OR SHOWN ON THE CONTRACT DOCUMENTS. TEMPORARY WIRING FOR OTHER CONTRACTORS SHALL BE FURNISHED AND INSTALLED BY THIS CONTRACTOR WHO SHALL BE ENTIRELY RESPONSIBLE FOR THE SAFE AND SATISFACTORY OPERATION OF SAID TEMPORARY WIRING. COMPLY WITH LATEST REQUIREMENTS OF OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA). PROVIDE PERSONNEL GROUND FAULT PROTECTION ON ALL TEMPORARY POWER AND LIGHTING CIRCUITS 30 AMPERES OR LESS. GROUND FAULT CIRCUIT INTERRUPTERS ON CONSTRUCTION CIRCUITS ARE NOT REQUIRED WHERE CIRCUIT IS A PERMANENT CIRCUIT TO BE A PART OF THE COMPLETED BUILDING. HOWEVER, CONTRACTOR SHALL PROVIDE APPROVED CORD SETS INCORPORATING GFCI PROTECTION FOR PERSONNEL. REFER TO THE NEC. E. ALL FINISH PAINTING IS TO BE PERFORMED BY GENERAL CONTRACTOR EXCEPT THAT THIS CONTRACTOR SHALL RESTORE TO ORIGINAL CONDITION ANY PAINTING DEFACED BY THIS CONTRACTOR AFTER ORIGINAL PAINTING. F. ALL WORK SHALL BE DONE IN ACCORDANCE WITH: 1. 2017 NATIONAL ELECTRICAL CODE. 2. CODES: STATE, CITY AND COUNTY BUILDING CODES AND ORDINANCES. 3. NATIONAL BOARD OF FIRE UNDERWRITERS. 4. CERTAIN CODES AND STANDARDS AS SET UP BY VARIOUS TECHNICAL SOCIETIES SUCH AS UL, NEMA, NECA, IEEE, ASTM, IES, IPCEA, AND ANSI. 5. THIS WORK SHALL BE GOVERNED ALSO BY LOCAL INSPECTOR'S REQUIREMENTS. 6. FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT STANDARDS. 7. AMERICANS WITH DISABILITIES ACT. G. ALL PERMITS REQUIRED BY LAWS, ORDINANCES AND BUILDING CODES HAVING JURISDICTION SHALL BE OBTAINED AT PROPER TIME BY AND AT THE EXPENSE OF THIS CONTRACTOR. H. ALL ELECTRICAL WORK SHALL BE INSPECTED BY THE GOVERNMENTAL AGENCY HAVING JURISDICTION, INCLUDING LOCAL INSPECTION AUTHORITIES. I. UPON COMPLETION OF THE WORK, THIS CONTRACTOR SHALL FURNISH TO THE ARCHITECT A CERTIFICATE OF INSPECTION AND APPROVAL FROM THE ABOVE DEPARTMENT BEFORE FINAL PAYMENT ON CONTRACT WILL BE ALLOWED. J. TEST ALL WIRING AND CONNECTIONS FOR CONTINUITY AND GROUNDING BEFORE ANY EQUIPMENT IS CONNECTED. WHEN DIRECTED BY ARCHITECT, DEMONSTRATE BY PROPER VOLTAGE MEGGER TEST OF INSULATION RESISTANCE OF ANY CONDUCTORS AND REPLACE ALL CONDUCTORS WHICH FAIL SAID TESTS UNTIL ALL CONDUCTORS ARE FREE FROM INSULATION FAULTS. K. ELECTRICAL LAYOUTS ARE SCHEMATIC. EXACT LOCATIONS ARE DETERMINED BY EXACT LOCATION OF EQUIPMENT, ETC., AND MAY BE REVISED TO SUIT THE CONSTRUCTION CONDITIONS AND AID IN COORDINATION WITH WORK OF OTHER CONTRACTORS. L. ELECTRICAL DRAWINGS ARE INTENDED TO INDICATE APPROXIMATE LOCATIONS OF SWITCHES, RECEPTACLES, LIGHTING FIXTURES AND OTHER ITEMS OF VARIOUS ELECTRICAL SYSTEMS OF PROJECT. EXACT LOCATIONS AND ROUGH-IN DIMENSIONS FOR ALL WORK AND EQUIPMENT SHALL BE OBTAINED FROM ARCHITECT OR OWNER AS WORK PROGRESSES. SHOULD THE ELECTRICAL CONTRACTOR FAIL TO PROPERLY OBTAIN SUCH LOCATIONS OR DIMENSIONS, THE CONTRACTOR SHALL REVISED THE LOCATIONS AT THE CONTRACTOR'S EXPENSE WHEN REQUESTED BY ARCHITECT OR OWNER. ARCHITECT AND OWNER RESERVE THE RIGHT TO MAKE MINOR CHANGES IN LOCATION OF ELECTRICAL WORK OR EQUIPMENT PRIOR TO ROUGHING IN WITH NO ADDITIONAL COST. M. OWNER RESERVES THE RIGHT TO DIRECT REMOVAL AND REPLACEMENT OF ANY ITEM WHICH DO NOT PRESENT AN ORDERLY OR REASONABLY NEAT OR WORKMANLIKE APPEARANCE, PROVIDED THAT SUCH ITEM CAN BE PROPERLY INSTALLED IN SUCH ORDERLY WAY BY METHODS USUAL IN SUCH WORK. ADDITIONALLY, OWNER WILL DIRECT REMOVAL AND REPLACEMENT OF ANY ITEM WHICH DOES NOT COMPLY WITH CONTRACT DRAWINGS OR SPECIFICATIONS. SUCH REMOVALS OR REPLACEMENTS SHALL BE AT THE SOLE DISCRETION OF THE OWNER AND SHALL BE DONE BY CONTRACTOR, AT THE CONTRACTOR'S EXPENSE, WHEN SO DIRECTED IN WRITING BY THE OWNER. N. THE MATERIALS AND EQUIPMENT INSTALLED IN THE WORK SHALL MEET THE REQUIREMENTS OF THE CONTRACT DOCUMENTS AND NO MATERIALS OR EQUIPMENT SHALL BE ORDERED UNTIL REVIEWED BY THE OWNER. O. MANUFACTURER'S CATALOG CUTS MAY BE SUBMITTED FOR STANDARD CATALOG LIGHTING FIXTURES AND OTHER EQUIPMENT. CATALOG CUTS MAY BE MARKED UP TO MEET THE PROJECT SPECIFICATIONS. CUTS SHALL BE MARKED TO INDICATE MODEL NUMBER, SIZE, TYPE, COLOR, RATING, ETC., OF THE ITEM TO BE FURNISHED. P. PROVIDE INSTRUCTION TO OWNER'S OPERATING PERSONNEL AS NECESSARY, SHOWING LOCATIONS AND PROPER OPERATION OF MAJOR ITEMS OF EQUIPMENT AND SYSTEM COMPONENTS AND REFERRING TO THE OPERATING INSTRUCTION MANUAL DESCRIBED BELOW AS A GUIDE. Q. COMPILE TWO (2) WRITTEN MANUALS OF OPERATING INSTRUCTIONS INCLUDING COPIES OF SHOP DRAWINGS AND A LISTING OF EQUIPMENT SUPPLIERS. ASSEMBLE IN 8-1/2" X 11" HARD BACKED INDEXED BINDER. MATERIAL SHALL BE AS FOLLOWS: 1. TITLE PAGE: TITLE OF JOB, TENANT, ADDRESS, DATE OF SUBMISSION, CONTRACTOR, AND ENGINEER. 2. INDEX. 3. LIST OF MAJOR EQUIPMENT USED IN PROJECT ACCOMPANIED BY CONTRACTOR PURCHASE ORDER NUMBERS AND SUPPLIERS' NAMES AND ADDRESSES. 4. ONE COPY OF EACH SHOP DRAWING GROUPED BY TYPES OF EQUIPMENT, I.E., LIGHTING FIXTURES, PANELBOARDS, ETC. 5. SECTION FOR EACH SYSTEM, INCLUDING: a. BRIEF DESCRIPTION OF SYSTEM OPERATION WITH LOCATION OF MAJOR COMPONENTS. b. LIST OF ITEMS IN SYSTEM REQUIRING PERIODIC SERVICE. REQUIRES SEPARATE SECTION FOR EACH OF: ELECTRICAL DISTRIBUTION SYSTEM FROM THE SERVICE ENTRANCE TO EACH LIGHTING AND POWER PANEL AND OTHER SYSTEMS (I.E. CONTROL SYSTEMS AND ANY OTHER ELECTRICAL CONTRACTOR SYSTEM LISTED IN THESE SPECIFICATIONS.) R. ELECTRICAL CONTRACTOR SHALL GUARANTEE HIS WORKMANSHIP AND MATERIAL FOR A PERIOD OF ONE YEAR FROM DATE OF SUBSTANTIAL COMPLETION AND LEAVE HIS WORK IN PERFECT ORDER AT COMPLETION. S. SHOULD DEFECTS DEVELOP WITHIN GUARANTEE PERIOD, THIS CONTRACTOR SHALL, UPON NOTICE OF SAME, REMEDY DEFECTS AND HAVE DAMAGES TO OTHER WORK OR FURNISHINGS CAUSED BY DEFECTS OR WORK OR CORRECTING SAME REPAIRED AND/OR REPLACED AT HIS EXPENSE TO CONDITION BEFORE SUCH DAMAGE. T. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION SHALL BE PROVIDED TO THE BUILDING OWNER. RECORD DRAWINGS SHALL INCLUDE AS A MINIMUM THE LOCATION AND RATING OF EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF WIRE AND CONDUITS INCLUDING SIZES AND ROUTING, ETC. 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES A. CONDUCTORS SHALL BE COPPER. UNLESS NOTED OTHERWISE ON THE DRAWINGS, THE MINIMUM COPPER WIRE SIZES FOR WET AND DRY AREAS AS DEFINED BY THE NEC. B. CONDUCTORS USED FOR EMERGENCY LIGHTING CIRCUITS SHALL BE #10 AWG, MINIMUM, AND SHALL BE RUN IN SEPARATE CONDUIT USED FOR NO OTHER PURPOSE. C. THE FOLLOWING COLOR CODE SHALL BE USED: 208/120 VOLT PHASE A BLACK PHASE B RED PHASE C BLUE NEUTRAL WHITE GROUND GREEN ISOLATED GROUND GREEN/YELLOW TRACER 260526 - GROUNDING AND BONDING A. FURNISH AND INSTALL A COMPLETE GROUNDING SYSTEM IN COMPLIANCE WITH ALL REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE. B. BOND ALL STRUCTURAL STEEL TO EARTH, GROUND RODS OR PLATES, OR WATER SYSTEM AND ISOLATED GROUND FOR IT. C. BOND ALL ROOF MOUNTED EQUIPMENT TO NEC ACCEPTABLE GROUNDS ONLY. D. A SEPARATE EQUIPMENT GROUNDING CONDUCTOR, MINIMUM SIZE PER NEC TABLE 250.122, SHALL BE INSTALLED IN ALL FEEDERS, BRANCH CIRCUITS AND CONTROL CIRCUITS. CONDUCTOR INSULATION SHALL BE GREEN. E. CONDUIT SYSTEM SHALL BE ELECTRICALLY CONTINUOUS. ALL ENCLOSURES AND NON-CURRENT CARRYING METALS TO BE GROUNDED. ALL LOCK NUTS MUST CUT THROUGH ENAMELED OR PAINTED SURFACES ON ENCLOSURES. WHERE ENCLOSURES AND NON-CURRENT CARRYING METALS ARE ISOLATED FROM THE CONDUIT SYSTEM, USE BONDING JUMPERS WITH APPROVED CLAMPS. F. ALL RECEPTACLES SHALL BE BONDED TO A GROUND CONDUCTOR USING A #12 AWG MINIMUM BONDING JUMPER BETWEEN RECEPTACLE TERMINAL AND GROUND CONDUCTOR. METAL-TO-METAL CONTACT BETWEEN THE DEVICE YOKE AND THE OUTLET BOX IS NOT ACCEPTABLE FOR EITHER SURFACE MOUNTED BOXES OR FLUSH TYPE BOXES. G. LIGHTING FIXTURES SHALL BE GROUNDED BY THE USE OF A PIGTAIL FASTENED ON BARE METAL THAT IS FREE OF PAINT. 260533 - RACEWAY AND BOXES A. ELECTRICAL CONDUCTORS SHALL BE ENCLOSED IN CONTINUOUS GROUNDED EMT CONDUIT RACEWAY SYSTEM EXCEPT AS OTHERWISE NOTED. B. RACEWAY AND ENCLOSURE SIZES SHALL BE AS SHOWN ON DRAWINGS OR, IF NOT SHOWN, SHALL BE SIZED TO COMPLY WITH NEC FILL REQUIREMENTS FOR CONDUCTORS ENCLOSED. C. PULL OR JUNCTION BOXES SHALL BE PROVIDED IN ALL RACEWAY SYSTEMS AT MAXIMUM OF 100 FOOT INTERVALS AND WHERE REQUIRED TO AVOID EXCESSIVE NUMBER OF BENDS, TO FACILITATE WIRE PULLING OR TO PROVIDE ACCESS TO RACEWAY SYSTEM. D. RACEWAYS AND ENCLOSURES SHALL BE ADEQUATELY SUPPORTED FROM BUILDING STRUCTURE WITH APPROVED SUPPORT RODS AND/OR CLAMPS. E. ALL CONDUIT SHALL BE RIGID HEAVYWALL GALVANIZED STEEL OR THIN WALL EMT WHERE PERMITTED BY CODE OR AS HEREINAFTER SPECIFIED. PVC SCHEDULE 80 CONDUIT WITH RIGID GALVANIZED STEEL ELBOWS MAY BE USED UNDER FLOOR SLAB. MINIMUM CONDUIT SIZE SHALL BE 1", UNLESS NOTED OTHERWISE ON PLANS OR DETAILS. F. ALL CONDUIT FITTINGS SHALL BE GALVANIZED MALLEABLE IRON OR STEEL. CONNECTORS AND COUPLINGS SHALL BE THREADED OR CUPPED SET SCREW TYPE, CONCRETE TIGHT. CONDUIT BODIES SHALL BE MALLEABLE IRON, THREADED FOR HEAVYWALL CONDUIT AND CUPPED SET SCREW TYPE FOR EMT, WITH CADMIUM FINISH AND CADMIUM PLATED SHEET STEEL COVERS. SYNTHETIC RUBBER GASKETS SHALL BE USED UNDER BODY COVERS EXPOSED TO WEATHER. EMT CONNECTORS SHALL BE INSULATED THROAT TYPE. G. EMT THIN WALL CONDUIT MAY BE USED INSIDE HOLLOW PARTITIONS, AND ABOVE SUSPENDED CEILINGS AND EXPOSED ABOVE 8'-0" ABOVE FINISHED FLOOR OR ABOVE PANELBOARDS. EMT CONDUIT MAY NOT BE USED BURIED IN EARTH OR FILL, IN OR UNDER CONCRETE FLOOR OR IN POURED CONCRETE CONSTRUCTION. PVC CONDUIT USED UNDER FLOOR SLABS SHALL HAVE RIGID GALVANIZED STEEL ELLS AND METALLIC CONDUIT ABOVE FLOOR SLAB. H. CONDUIT SHALL GENERALLY BE CONCEALED WHERE POSSIBLE. NO CONDUIT SHALL BE RUN IN SLAB, EXCEPT AS REQUIRED FOR FLOOR-MOUNTED DEVICES. I. EXPOSED CONDUIT WILL BE PERMITTED IN ELECTRIC ROOMS, AND SIMILAR UNFINISHED SPACES, OVERHEAD IN AREAS WITHOUT CEILINGS AND ELSEWHERE AT THE DISCRETION OF THE OWNER. J. DURING ROUGHING-IN, CAP ALL CONDUITS WHICH MAY BECOME FOULED WITH FOREIGN MATERIAL. 1. FLEXIBLE CONDUIT SHALL BE USED FOR "MAKEUP" CONNECTIONS TO VIBRATING EQUIPMENT, MOTORS, AND AS OTHERWISE NECESSARY OR PERMITTED BY CODE. LIGHTING FIXTURES MAY BE SUPPLIED WITH SHORT LENGTHS (MAX. 6'-0") OF FLEXIBLE CONDUIT. GROUNDING SHALL BE GREEN GROUNDING CONDUCTOR AS SPECIFIED IN "GROUNDING". 2. FLEXIBLE CONDUIT SHALL BE UL APPROVED 1/2" MINIMUM TRADE SIZE. 3. LIQUID-TIGHT FLEXIBLE CONDUIT AND LIQUID-TIGHT FITTINGS SHALL BE USED IN AREAS EXPOSED TO THE WEATHER OR EXCESSIVE MOISTURE. K. NO MORE THAN FOUR (4) 90-DEGREE BENDS WILL BE ALLOWED IN ANY ONE CONDUIT RUN. WHERE MORE BENDS ARE NECESSARY IN ANY SINGLE RUN, A PULL BOX SHALL BE INSTALLED. PULL BOXES SHALL ALSO BE INSTALLED IN LONG RUNS AT A MAXIMUM SEPARATION OF 100'-0". ALL CONDUIT EXCEPT IN CONCRETE SLAB OR EARTH SHALL BE ROUTED PARALLEL OR PERPENDICULAR TO THE LINES OF THE BUILDING, AND NO OUT-OF-PLUMB OR DIAGONAL LINES WILL BE ACCEPTED. L. OUTLETS SHALL BE PROVIDED FOR DEVICES, LIGHTING FIXTURES, MOTORS AND EQUIPMENT CONNECTIONS, SYSTEMS EQUIPMENT CONNECTIONS, SPECIAL OUTLETS, AND AS OTHERWISE REQUIRED. 260553 - IDENTIFICATION A. PROVIDE NAMEPLATES ON THE FOLLOWING EQUIPMENT: PANEL BOARDS, DISCONNECTS SWITCHES, MOTOR STARTERS, AND CONTROL PANEL ENCLOSURES. B. NAMEPLATES SHALL INDICATE FUNCTION OF EACH DEVICE. NAMEPLATES SHALL BE LAMINATED PHENOLIC WITH A WHITE SURFACE AND BLACK CORE. USE 1/16" THICK MATERIAL FOR PLATES UP TO 2" X 4". FOR LARGER SIZES, USE 1/8" THICK MATERIAL. C. LETTERING SHALL BE CONDENSED GOTHIC. THE SPACE BETWEEN LINES SHALL BE EQUAL TO THE WIDTH OF THE LETTERS. USE 1/4" MINIMUM HEIGHT LETTERS WHICH OCCUPY FOUR TO THE INCH. INCREASE LETTER SIZE TO 3/4" ON LARGER PLATES. D. FASTEN NAMEPLATES TO EQUIPMENT USING ADHESIVE MATERIAL THAT IS INTENDED FOR USE ON ENAMELED SURFACES. ADHESIVE SHALL BE NON_AGING FOR AN APPLICATION AND USAGE TEMPERATURE RANGE OF 0 TO 50 DEGREES CELSIUS. 262416 - PANELBOARDS A. INSTALL MODULAR SWITCHGEAR WHICH INCLUDES PANELBOARDS WITH ALL CIRCUIT BREAKERS, PLUS CONTROL SYSTEMS FOR HOODS, HVAC AND LIGHTING AS SHOWN ON THE DRAWINGS. SUBSTITUTIONS OF LOOSE PANELS INSTEAD OF MODULAR SWITCHGEAR IS NOT ALLOWED. MODULAR SWITCHGEAR SHALL BE LISTED/LABLED BY A RECOGNIZED TESTING LABORATORY. B. MODULAR SWITCHGEAR SHALL BE PURCHASED FROM ONE OF THE 'SUPPLIER LIST' COMPANIES (REFER TO ARCHITECTURAL DRAWINGS). NO SUBSTITUTIONS ARE ALLOWED. THIS CONTRACTOR MUST VERIFY ALL REQUIREMENTS OF MODULAR SWITCHGEAR WITH SUPPLIER PRIOR TO ORDERING. AT MINIMUM, THIS CONTRACTOR SHALL VERIFY THE FOLLOWING: 1. ANY BREAKER MODIFICATIONS (AMPACITY, NUMBER OF POLES, CONTROL, RATINGS, GFCI, HACR, SWITCHING DUTY, SHUNT TRIP, ETC.). 2. RELOCATION OF ANY CIRCUITS. 3. AIC RATING REQUIRED, AFTER COORDINATING THIS WITH THE LOCAL UTILITY COMPANY. 4. HVAC (RTU AND HOOD FANS) CONTROL PACKAGE INCLUDED. 5. ANY OTHER SITE SPECIFIC MODIFICATIONS. C. CIRCUIT BREAKERS SHALL BE QUICK MAKE, QUICK BREAK, BOLT ON, THERMAL MAGNETIC TRIP (ENCLOSURE COMPENSATED), MOLDED CASE TYPE, UL LISTED. 15 AND 20 AMP SINGLE POLE BREAKERS SHALL CARRY THE UL "SWD" MARKING. D. REFER TO PANEL SCHEDULES ON PLANS FOR ADDITIONAL INFORMATION. E. THIS CONTRACTOR SHALL PROVIDE A TYPED CIRCUIT DIRECTORY CARD MOUNTED IN A FRAME WITH A CLEAR PLASTIC PROTECTIVE COVER ON INSIDE OF PANEL DOORS. 262713 - ELECTRICAL SERVICE AND METERING A.METERING EQUIPMENT SHALL BE FURNISHED BY ELECTRICAL UTILITY COMPANY, AND INSTALLED BY THIS CONTRACTOR. COORDINATE WITH ELECTRIC COMPANY. EQUIPMENT SHALL BE INSTALLED AS INDICATED IN ONE-LINE DIAGRAM ON THE DRAWINGS. 262726 - WIRING DEVICES A. FURNISH AND INSTALL WIRING DEVICES, INCLUDING SWITCHES, RECEPTACLES AND POWER RECEPTACLES, TELEPHONE OUTLET BOXES, COVERPLATES AND BLANK OUTLET PLATES AS SHOWN OR DESCRIBED ON DRAWINGS. WIRING DEVICES SHALL BE HUBBELL OR EQUIVALENT PREMIUM SPECIFICATION GRADE AS MANUFACTURED BY BRYANT, EAGLE, SLATER, PASS & SEYMOUR, OR LEVITON. COLOR SHALL BE AS DIRECTED BY ARCHITECT OR OWNER. B. RECESSED OUTLET BOXES SHALL BE STAMPED STEEL SUITABLE FOR THE DEVICE INSTALLED. C. SURFACE MOUNTED OUTLET BOXES SHALL BE CAST IRON SUITABLE FOR THE DEVICE INSTALLED. D. DUPLEX RECEPTACLES SHALL BE A MINIMUM OF 20 AMPERE RATING. E. COVERPLATES SHALL BE PLASTIC UNLESS OTHERWISE NOTED. COLOR SHALL BE AS DIRECTED BY ARCHITECT OR OWNER. F. COVERPLATES FOR SURFACE MOUNTED BOXES SHALL BE STAMPED STEEL SUITABLE FOR THE PARTICULAR BOX AND DEVICE CONFIGURATION. G. WIRING DEVICES UNLESS OTHERWISE PROPERLY AUTHORIZED, SHALL BE SAME MANUFACTURERS ONLY; NO ADDITIONAL MANUFACTURERS SHALL BE PERMITTED UNLESS SPECIFICALLY AUTHORIZED BY THE OWNER. H. LOW VOLTAGE CONTROL DEVICES SHALL BE AS NOTED ON DRAWINGS OR AS REQUIRED. I. THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL MOTOR CONTROLS, INCLUDING STARTERS, SAFETY DEVICES AND REMOTE CONTROL STATIONS, UNLESS FURNISHED BY EQUIPMENT MANUFACTURER IN PRE-WIRED ASSEMBLIES. J. FURNISH AND INSTALL CONTACTORS, CONTROL RELAYS, PUSHBUTTON STATIONS, SELECTOR SWITCHES, PILOT LIGHTS, FUSES AND SIMILAR CONTROL AUXILIARIES AS SHOWN ON DRAWINGS AND/OR REQUIRED TO PROVIDE PROPER CONTROL AND ISOLATION BETWEEN VARIOUS AUTOMATIC CONTROLLERS AND EQUIPMENT SHOWN ON THE DRAWINGS. K. ALL CIRCUIT BREAKERS FEEDING MOTOR LOADS SHALL BE HACR TYPE. L. EQUIPMENT SHALL BE SAME MAKE AS MOTOR STARTERS. PUSHBUTTON STATIONS, SELECTOR SWITCHES, PILOT LIGHTS: HEAVY DUTY, OIL TIGHT, STANDARD SIZE, WITH TRANSFORMER TYPE PILOT LIGHTS, FLUSH MOUNTED WHERE PRACTICAL. M. ANY ACCESS PANELS REQUIRED BUT NOT SPECIFIED OR SHOWN ON DRAWINGS SHALL BE FURNISHED BY THIS CONTRACTOR WITH DESIGN TO BE APPROVED BY ARCHITECT BEFORE INSTALLATION. N. ALL WIRING MUST MEET 2017 NEC STANDARDS. 262813 - FUSES A. ALL FUSES SHALL BE BUSSMANN, SIZES AS NOTED ON DRAWINGS. B. ALL FUSES SHALL BE UL LISTED, CURRENT-LIMITING TYPE, MINIMUM 200,000 AMPS INTERRUPTING CAPACITY. C. FUSES 1 AMP AND ABOVE SHALL BE BUSSMANN "LOW PEAK" RK-1. 250 VOLT FUSES SHALL BE USED ON 208/120 VOLT SYSTEMS. D. CONTROL FUSES FOR MOTOR STARTERS, CONTACTORS, AND CONTROL PANEL TRANSFORMERS SHALL BE BUSSMANN FNQ-R SIZED AT 500% RATED CURRENT. E. FURNISH SPARE FUSES TO THE OWNER IN THE FOLLOWING QUANTITIES: 10% OF TOTAL PROJECT QUANTITY (BUT NOT LESS THAN THREE (3) FOR EACH TYPE AND RATING OF FUSES). F. TYPED LIST OF ALL SPARES SHALL ALSO BE INCLUDED. 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS A. DISCONNECT SWITCHES SHALL BE HEAVY-DUTY TYPE, UL LISTED. B. ALL SWITCHES SHALL HAVE SWITCH BLADES WHICH ARE FULLY VISIBLE IN THE "OFF" POSITION WHEN THE SWITCH DOOR IS OPEN. SWITCHES SHALL HAVE REMOVABLE ARC SUPPRESSORS WHERE NECESSARY TO PERMIT EASY ACCESS TO LINE SIDE LUGS. LUGS SHALL BE FRONT REMOVABLE AND UL LISTED FOR 75 DEGREES C., ALUMINUM OR COPPER WIRES. C. SWITCHES SHALL BE QUICK-MAKE, QUICK-BREAK. THE OPERATING HANDLE SHALL BE AN INTEGRAL PART OF THE BOX, NOT THE COVER. PROVISIONS FOR PADLOCKING THE SWITCH IN THE "OFF" POSITION WITH AT LEAST THREE LOCKS SHALL BE PROVIDED. SWITCHES SHALL HAVE A DUAL COVER INTERLOCK TO PREVENT UNAUTHORIZED OPENING OF THE SWITCH DOOR WHEN THE HANDLE IS IN THE "ON" POSITION, AND TO PREVENT CLOSING OF THE SWITCH MECHANISM WITH THE DOOR OPEN. THE HANDLE POSITION SHALL INDICATE WHETHER THE SWITCH IS "ON" OR "OFF". D. SWITCHES SHALL BE FURNISHED IN NEMA 1 GENERAL PURPOSE ENCLOSURE EXCEPT ALL SWITCHES LOCATED OUTDOORS SHALL BE NEMA 3R WEATHERPROOF (WP). NEMA 3R ENCLOSURE SHALL BE MANUFACTURED FROM GALVANIZED STEEL. ENCLOSURES SHALL HAVE A GRAY BAKED ENAMEL FINISH, ELECTRODEPOSITED, ON CLEANED, PHOSPHATIZED STEEL. E. SWITCHES SHALL BE RATED FOR AC. FUSIBLE SWITCHES MUST ACCEPT CLASS R FUSES AND HAVE PROVISIONS TO REJECT ALL FUSES EXCEPT CLASS R. THE UL LISTED SHORT CIRCUIT RATING OF THE SWITCHES SHALL BE 200,000 RMS SYMMETRICAL AMPERES WHEN CLASS R FUSES ARE USED. 265100 - INTERIOR LIGHTING A. INSTALL LIGHTING FIXTURES AS SHOWN ON THE DRAWINGS. B. ALL FIXTURES SHALL BE LISTED AND LABELED BY UNDERWRITERS LABORATORIES AND ENERGY STAR AND/OR DLC LISTING. C. FIXTURES ARE TO BE PROVIDED COMPLETE WITH END AND TRIM PLATES AND ALL MOUNTING ACCESSORIES REQUIRED FOR A COMPLETE FIXTURE INSTALLATION. D. USE STEEL WIRE HANGERS FASTENED TO THE BUILDING STRUCTURE TO SUPPORT RECESSED FIXTURES AT EACH CORNER. (FOUR-CORNER SUSPENDED). FIXTURES TO FIT TIGHT AGAINST CONSTRUCTION TO ELIMINATE LIGHT LEAKS. E. WALL-MOUNTED FIXTURES SHALL BE MOUNTED PLUMB WITH BUILDING LINES AND INSTALLED WITH LIGHTING CONTROL PROPER BOX AND COVER HARDWARE. F. SURFACE-MOUNTED FIXTURES SHALL COVER MOUNTING HARDWARE. USE A CANOPY THAT IS NO LONGER THAN THE LENGTH AND WIDTH OF THE FIXTURE AND AT A HEIGHT THAT IS NO HIGHER THAN REQUIRED TO MOUNT FIXTURE ABSOLUTELY VERTICAL. CANOPY FINISH SHALL MATCH FIXTURE FINISH. G. STEM-MOUNTED FIXTURES SHALL BE MOUNTED SO AS TO BE ABSOLUTELY VERTICAL AND HORIZONTAL. INSTALL AND SUPPORT AS SHOWN ON DRAWINGS. 270510 - TELEPHONE CONDUIT SYSTEM A. CONDUIT FOR TELEPHONE WALL OUTLETS SHALL BE A MINIMUM OF 3/4" UNLESS NOTED OTHERWISE. B. TELEPHONE OUTLET BOXES SHALL BE SINGLE GANG. PLATES SHALL BE FURNISHED AND INSTALLED BY THIS CONTRACTOR. C. FURNISH AND INSTALL A 3/4" THICK TELEPHONE BACKBOARD AT LOCATION SHOWN ON THE DRAWINGS. THE PLYWOOD BACKBOARD SHALL BE SECURELY ATTACHED TO THE BUILDING WALLS TO SUPPORT RELAY PANELS, TERMINAL BLOCKS AND OTHER HARDWARE WEIGHING APPROXIMATELY 10 POUNDS PER SQUARE FOOT. PRIME AND PAINT THE BACKBOARD SIDES AND EDGES WITH TWO COATS OF GRAY FLAMEPROOF PAINT. D. CONDUIT SYSTEM SHALL BE CONTINUOUS FROM OUTLETS TO TELEPHONE BACKBOARD. INSTALL PULL STRING IN EMPTY CONDUITS. E. INSTALL #6 GROUND WIRE FROM TELEPHONE BACKBOARD TO SERVICE ENTRANCE GROUND PER TELEPHONE COMPANY'S REQUIREMENTS. 270511 - IT INSTALLATION A. THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING AND UNDERSTANDING WENDY'S REQUIREMENTS AND FORMS TO ENSURE A TIMELY INSTALLATION OF IT EQUIPMENT. THE CONTRACTOR SHALL COMPLETE, SIGN, AND RETURN THE IT READINESS FORM AS REQUIRED. B. THE FOLLOWING ARE THE SITE READINESS MINIMUM REQUIREMENTS. 1. THE INSTALLATION OF ALL KITCHEN EQUIPMENT IS COMPLETE. 2. THE BUILDING HAS PERMANENT POWER. 3. ALL ISOLATED GROUND (IG RECEPTACLES) ARE INSTALLED AND ENERGIZED. 4. THE FRONT COUNTERS ARE COMPLETE AND ENERGIZED. 6. INTERIOR WALLS ARE COMPLETED FOR KIOSKS. ELECTRICAL EQUIP IS INSTALLED & OPERATIONAL. 7. ELECTRICAL IS INSTALLED AND ENERGIZED & WALLS ARE COMPLETED & READY FOR QUEUING BOARDS. 8. DRIVE THRU LOOPS ARE INSTALLED TO HME'S SPECIFICATIONS. 9. BUN WARMERS ARE INSTALLED. 10. MWS CART IS ONSITE. 11. HME LOOPS (DRIVE THRU LOOPS) ARE VISIBLE. C. THE CONTRACTOR SHALL COORDINATE WITH WENDY'S CONSTRUCTION MANAGER, WENDY'S IT MANAGER, AND WENDY'S IT INSTALLATION CONTRACTOR TO SCHEDULE THE INSTALLATION IN A TIMELY MANNER. ELECTRICAL SPECIFICATIONS 12 / 2 2 / 2 0 1 7 4 : 1 3 : 5 2 P M 79 6 M e r u s C o u r t St . L o u i s , M O 6 3 0 2 6 T 6 3 6 . 3 4 9 . 1 6 0 0 F 6 3 6 . 3 4 9 . 1 7 3 0 CE R T I F I C A T E O F A U T H O R I T Y N O . 3 8 0 0 01/19/2023 SEAL DESCRIPTIONDATEREV. ISSUE DATE: 08/17/2021 PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ 1 10/20/2021 City Comments 2 11/26/2021 City Comments 3 01/12/2023 City/Owner Comments ELECTRICAL SPECIFICATIONS E6.1 KH MJ 1 DIVISION 1 - GENERAL SPECIFICATIONS (OMITTED) DIVISION 3 - CONCRETE FOOTINGS SLABS AND FOOTINGS SIDEWALKS AND RAMPS PAVING CONCRETE PADS CONCRETE PAD - WALK IN BOX - COOLER / FREEZER / DRY STORAGE DIVISION 4 - MASONRY GENERAL CMU MORTAR FOR FACE BRICK FACE BRICK DIVISION 6 - WOOD, PLASTICS, AND COMPOSITES ROUGH CARPENTRY STRUCTURAL LUMBER FINISH CARPENTRY SOLID SURFACING MATERIAL BUILDING WEATHER BARRIER DIVISION 7 - THERMAL AND MOISTURE PROTECTION BUILDING INSULATION ROOFING INSULATION GENERAL ROOFING ROOFING HANDLING ROOFING STORAGE ROOFING OVERNIGHT COVER ROOFING AND SHEET METAL ROOFING SURFACE PREPARATION ROOFING WOOD DECKS ROOFING MEMBRANE FLASHING ROOFING PERIMETER LAPS ROOFING PROJECT / SITE CLEAN-UP ROOFING INSPECTIONS ROOFING CONTRACTOR QUALIFICATION ASSURANCE ROOF METAL TRIMS SEALANT SEALANT MATERIALS KNOTWOOD DIVISION 8 - OPENINGS ALUMINUM ENTRANCE DOORS AND STOREFRONT & CURTAINWALL GLAZING STEEL SERVICE DOORS AND FRAMES PREFINISHED DOORS PICK-UP WINDOW ACCESS DOOR WALL LOUVER DIVISION 9 - FINISHES FLOOR AND WALL TILE INSTALLATION GYPSUM DRYWALL SUSPENDED CEILING SYSTEM NON-TILE FIBERGLASS REINFORCED POLYESTER (FRP) PANELS PAINTING PAINT SCHEDULE PATIO CONCRETE SLAB DIVISION 10 - SPECIALTIES EXTERIOR TRASH ENCLOSURE GENERAL SIGNAGE ROOM IDENTIFICATION SIGN RESTROOM IDENTIFICATION SIGN PUBLIC RESTROOM ACCESSORIES WALL DECOR HEIGHT WARNING DEVICE ORDER STATION CANOPY SMOKELESS SNUFFER STAINLESS STEEL CORNERS KITCHEN EQUIPMENT HOOD FIRE SUPPRESSION SYSTEM AND PORTABLE FIRE EXTINGUISHERS FIRE EXTINGUISHER CABINETS WALK-IN COOLER/FREEZER/DRY STORAGE (PRE-FABRICATED) WALK-IN COOLER/FREEZER/DRY STORAGE (FIELD ERECTED) COMMUNICATION SYSTEM A. B. C. A. B. C. D. 1. A. B. A. A. A. B. C. D. E. F. G. H. I. J. DIVISION 3 - CONCRETE NOTE: FURNISH LABOR, MATERIALS AND EQUIPMENT NECESSARY TO COMPLETE CONCRETE WORK INCLUDING EXCAVATION, TRENCHING, FORM WORK, REINFORCING, CEMENT FINISH AND PRECAST CONCRETE. FOOTINGS REFER TO DRAWINGS FOR SIZES, DEPTHS, AND REINFORCEMENT. EARTH TRENCH WILL BE PERMITTED FOR FOOTINGS IF CONDITIONS ARE FAVORABLE. SIDES OF TRENCHES SHALL BE CLEAN, EVEN, VERTICAL AND TRUE, AND BOTTOMS SHALL BE LEVEL, CLEAN AND WITHOUT FILL. BREINFORCING SHALL BE UNPAINTED AND UNCOATED, FREE FROM RUST OR SCALE, AND SHALL BE CLEANED AND STRAIGHTENED BEFORE BEING SHAPED AND PLACED IN POSITION, ACCURATELY POSITION REINFORCEMENT AND SECURED AGAINST DISPLACEMENT, WHERE THERE IS DELAY IN POURING, RE-INSPECT REINFORCEMENT AND CLEAN OFF ANY DRIED CEMENT, MORTAR OR RUST. REINFORCEMENT SHALL BE OF SIZE AND SPACING AS NOTED ON THE DRAWINGS OR AS PER LOCAL CODES. SLABS AND FOOTINGS REFER TO DRAWINGS FOR CONCRETE STRENGTH, THICKNESS AND REINFORCING. 1. ALTERNATE: "FIBERMESH" OR EQUAL, A 100% HOMOPOLYMER VIRGIN POLYPROPYLENE FIBRILLATED FIBERS CONTAINING NO REPROCESSED OLEFIN MATERIALS AND ARE SPECIFICALLY ENGINEERED AND MANUFACTURED TO AN OPTIMUM GRADUATION FOR USE AS FIBROUS REINFORCEMENT FOR CONCRETE. PROVIDE CONTINUOUS 6 MIL 'VISQUEEN' VAPOR BARRIER ON LEVEL 4" GRAVEL BASE UNDER BUILDING SLABS. LAP EDGES 6" AND SEAL (TURN UP AT WALLS). POUR CONCRETE FLOORS LEVEL, EXCEPT WHERE FLOOR DRAINS OCCUR, IN WHICH CASE THEY SHALL HAVE A 36" TO 48" RADIUS SLOPED TO DRAIN. TOTAL SLOPE IS NOT TO EXCEED 3/4" BELOW FLOOR LEVEL. SECURE AND BUILD INTO CONCRETE WORK THE FOLLOWING MATERIALS: PLUMBING AND SYRUP LINES, ELECTRIC CONDUIT, CONCRETE INSERTS, HANGERS, ANCHORS, FLOOR CLIPS, SLEEVES FOR PIPING, ETC., AND WHEN REQUIRED FOR ANCHOR BOLTS, PLATES, ETC., FOR EQUIPMENT. SIDEWALKS AND RAMPS 3,000 PSI AIR ENTRAINED CONCRETE, 4" THICK, BROOM FINISH SCORE WITH 3/4" DEEP CONTRACTION JOINTS INTO APPROXIMATELY 4'-0" SQUARES AS SHOWN ON DETAIL ON THE FOUNDATION PLAN. SIDEWALKS AND RAMPS TO MEET LOCAL CODES ALONG WITH REQUIRED SLOPES AND CROSS SLOPES IN THE AMERICANS WITH DISABILITIES ACT FOR ACCESSIBLE DESIGN. PAVING SPECIFICATIONS FOR CONCRETE PAVING REQUIRED TO BE VERIFIED BY OWNER'S CONSTRUCTION ENGINEER. CONCRETE PADS CONCRETE PADS AT PICK-UP WINDOW, ORDER STATION AND TRASH ENCLOSURE (REFER TO SITE PLAN): COLOR TREATED AS NOTED IN EXTERIOR FINISHES SCHEDULE ON DRAWINGS. A TRIAL SLAB SHALL BE MADE, USING THE SAME MATERIALS THAT ARE TO BE USED ON THE JOB TO ASSURE OWNER ACCEPTANCE. CONCRETE PAD - WALK IN BOX - COOLER / FREEZER / DRY STORAGE A. A LEVEL CONCRETE PAD IS REQUIRED FOR THE WALK IN BOX. THE PAD CAN NOT DEVIATE MORE THAN 1/4" OVER 10' IN ANY DRIECTION. B. A SQUARE CONCRETE PAD IS REQUIRED FOR THE WALK IN BOX. THE PAD CAN NOT DEVIATE MORE THAN 1/2" ON DIAGONAL MEASUREMENTS. C. A MINIMUM OF 6" OF CONCRETE IS REQUIRED AROUND THE PERIMETER OF THE WALK IN BOX. NO CONTROL JOINTS ARE ALLOWED IN THE SLAB FOR THE WALK IN BOX. DIVISION 4 - MASONRY NOTE: FURNISH LABOR, MATERIALS AND EQUIPMENT NECESSARY TO COMPLETE MASONRY WORK INCLUDING STRUCTURAL STEEL, WALL TIES, MASONRY REINFORCING , ETC. GENERAL WORK TO BE LAID TRUE TO DIMENSIONS, PLUMB, SQUARE, AND IN BOND AND PROPERLY ANCHORED. COURSES SHALL BE LEVEL WITH JOINTS OF UNIFORM WIDTH, NO JOINTS SHALL EXCEED SPECIFIED SIZE, AND IF NECESSARY, CLIPPED COURSES SHALL BE PROVIDED TO LEVEL OFF. PERFORM MASONRY WORK IN ACCORDANCE WITH ESTABLISHED TRADE PRACTICES. BRACE "GREEN" WALLS AND PROTECT MORTAR FROM "WASHING-OUT" AT END OF DAYS WORK USING PLANKS, WEIGHTED CANVAS, OR SIMILAR MEANS TO COVER WALL. COOPERATE WITH OTHER TRADES IN JOINTLY EXECUTED WORK AND BUILT-IN ITEMS. PATCH OPENINGS AS REQUIRED FOR PASSAGE OF MECHANICAL AND ELECTRICAL WORK. "UNCORED" UNITS MUST BE USED AT ALL EXPOSED AND OR SEMI-EXPOSED CONDITIONS OF BRICK ROWLOCK CAPS, SILLS, ETC. SIZE AND LOCATION SHOWN ON CONSTRUCTION DOCUMENTS. LINTELS SHALL BE OF SIZE AND SHAPE AS SHOWN OR NOTED ON THE DRAWINGS AND SHALL BE STRUCTURALLY SOUND FOR THE SPANS AND LOADS INVOLVED. COORDINATE INSTALLATION OF OTHERS WORK ITEMS, SUCH AS ANGLES, ANCHOR BOLTS, FLASHING, STEEL LINTELS AND FRAMING, VENTS, SLEEVES, DOOR FRAMES, MISCELLANEOUS STEEL WORK WITH ANCHORS, ETC. CMU TO BE LAID IN A RUNNING BOND. CMU TO BE LAID WITH FULL MORTAR IN THE BED AND HEAD JOINTS. 1. CONCAVE TOOLED JOINT USING A TOOL OF LARGER THAN 1/2" DIAMETER.. FLASHING TO BE PLASTIC COATED ALUMINUM BY HOHMANN & BARNARD, OR THIN COATED COPPER BY YORK FLASHING. THE FLASHING SHOULD PENETRATE THE BRICKWORK AND BE TRIMMED AT THE COMPLETION OF THE MASONRY WORK. CLEAN AND POINT CONCRETE BLOCK WORK AT END OF EACH WORKING DAY. AT THE COMPLETION OF WORK AS AN ENTIRETY. CMU: ASTM C90, MEDIMUM WEIGHT. REFER TO STRUCTURAL DWGS. FOR MORE INFORMATION. A. A. B. C. D. A. A. A. A. A. A. B. ROOFING INSULATION WHERE NOTED ON PLAN, INSULATION SHALL BE INSTALLED IN THE FOLLOWING MANNER: 1. MECHANICALLY FASTENED - THE ROOF INSULATION BOARDS SHALL BE INSTALLED WITH FACTORY APPROVED FASTENERS AND STRESS DISTRIBUTION PLATES. LENGTH WILL VARY TO MEET THE JOB CONDITIONS. MINIMUM FASTENER PENETRATION THROUGH THE ROOF DECK PER MANUFACTURER'S RECOMMENDATIONS. CUT SCREWS AND PAINT TO MATCH SURROUNDING CONDITIONS. 2. GLUE DOWN -THE ROOF INSULATION BOARDS SHALL BE INSTALLED WITH FACTORY APPROVED ADHESIVES. COVERAGE RATES PER MANUFACTURER'S RECOMMENDATIONS. GENERAL ROOFING COMPONENTS OF THE MANUFACTURERS ROOFING SYSTEM SHALL BE PRODUCTS OF THAT MANUFACTURER. SUBSTITUTES OF THEIR RELATED MATERIALS MUST HAVE PRIOR ACCEPTANCE BY THE MANUFACTURER. DEVIATION FROM MANUFACTURERS SPECIFICATIONS AND INSTALLATION INSTRUCTIONS SHALL VOID WARRANTY ISSUANCE UNLESS THE DEVIATION IS APPROVED BY A DULY AUTHORIZED REPRESENTATIVE OF THE MANUFACTURER IN WRITING. SHOP DRAWINGS ARE REQUIRED FOR ORDERING, MANUFACTURING, AND FINAL INSPECTION OF THE ROOFING SYSTEM. SHOP DRAWINGS SHALL INCLUDE ROOF OUTLINE, SIZE, ROOF PENETRATIONS, INSULATION TYPE AND THICKNESS, PIECE LAYOUT AND PARAPET LOCATION. ORDERS AND SHOP DRAWINGS SHALL BE APPROVED BY ROOFING MANUFACTURER AND ASSIGNED A MANUFACTURER NUMBER. WARRANTY: MANUFACTURERS STANDARD 15 YEAR, NO DOLLAR LIMIT WARRANTY. ROOFING DELIVERY ROOFING AND RELATED MATERIALS SHALL BE DELIVERED TO JOB SITE IN ORIGINAL PACKAGING WITH SHIPPING LABELS INTACT. IF SHORTAGES OR DAMAGES ARE DISCOVERED UPON DELIVERY, DO NOT ACCEPT THEM UNTIL THE FREIGHT AGENT MAKES A DAMAGED OR SHORT NOTATION ON YOUR FREIGHT BILL. IN CASE OF CONCEALED LOSS OR DAMAGE, IT IS NECESSARY TO NOTIFY YOUR FREIGHT AGENT AT ONCE. ROOFING HANDLING THERE SHALL BE ADEQUATE PERSONNEL AND EQUIPMENT TO LIFT ROOFING MATERIAL FOR PLACEMENT ON THE ROOF TO PREVENT DAMAGE TO MATERIAL. THE MATERIAL SHALL BE DEPOSITED ON THE ROOF NEAR THE ENDS OF JOISTS OR OTHER ROOF LOAD BEARING MEMBERS OF THE BUILDING FRAME AND CONVENIENTLY LOCATED FOR FINAL PLACEMENT. ROOFING STORAGE ROOFING MATERIAL SHALL BE STORED IN ORIGINAL PACKAGING TO PROTECT MEMBRANE FROM GETTING WET OR BEING DAMAGED AND SOILED. ADHESIVES AND SEALANTS SHALL BE PROPERLY STORED AND PROTECTED AS RECOMMENDED BY THEIR MANUFACTURERS. ROOFING OVERNIGHT COVER A TEMPORARY WATER SEAL SHALL BE PERFORMED EACH NIGHT TO AVOID WATER PENETRATING UNDERNEATH THE INSTALLED MEMBRANE AND CAUSING DAMAGE TO THE BUILDING AND THE INSULATION BEING USED. 1. INSTALLATION: WITH THE MEMBRANE EXTENDED OVER EXPOSED INSULATION (IF USED), SET INTO A WATER RESISTANT, NON-BITUMINOUS SEALANT, GENEROUSLY APPLIED OVER A DUST, GREASE, AND MOISTURE FREE SUBSTRATE. FASTEN 12" ON CENTER USING TERMINATION BAR. ROOFING AND SHEET METAL FURNISH AND COMPLETELY INSTALL THE ROOFING SYSTEM PER OWNER'S APPROVED SUPPLIER SPECIFICATIONS AND DIAGRAMS AS OUTLINED AND FURNISHED BY THE SUPPLIER. THE ROOFING SYSTEM SHALL BE INSTALLED EXCLUSIVELY BY A OWNER'S APPROVED MANUFACTURER INSTALLER. FINAL INSPECTION PRIOR TO WARRANTY ISSUANCE SHALL BE PERFORMED BY AN AUTHORIZED QUALITY CONTROL FIELD INSPECTOR AS PER CURRENT SPECIFICATIONS, INSTALLATION AND INSPECTION POLICIES. ROOFING SURFACE PREPARATION THE ROOF SHALL HAVE AN ADEQUATELY PREPARED SURFACE TO RECEIVE THE INSULATION, ROOFING AND FLASHING. PRIOR TO ONSET OF WORK, THE APPLICATOR SHALL INSPECT THE ENTIRE AREA TO BE ROOFED, AND DEFECTS AND IMPROPER CONDITIONS AFFECTING THE ROOF INSTALLATION SHALL BE CORRECTED BEFORE APPLICATION OF THE INSULATION. NSTALL 1/2" DENS-DECK PRIME ROOF BOARD OVER RIGID INSULATION PRIOR TO MEMBRANE INSTALLATION. A. B. C. D. A. A. A. A. A. A. B. A. B. C. D. E. F. FLASHING FLASHING ON PARAPET WALLS SHALL BE FASTENED 12" ON CENTER ALONG BOTTOM ON MAIN DECK WITH A MINIMUM 6" LAP WELDABLE TO DECK MEMBRANE, COVERING APPROVED FASTENERS. PARAPET WALLS SHALL BE COVERED MINIMUM OF 12" HIGH. PROVIDE AND INSTALL FLASHING FOR PARAPET WALLS AND WALK IN BOX. (FINISH AS NOTED ON EXTERIOR ELEVATIONS AND SCHEDULES.) FLASH AND COUNTER-FLASH ITEMS THAT PASS THROUGH THE ROOF PROVIDE "PITCH POCKETS" AS REQUIRED TO FORM A COMPLETE JOB. PROVIDE NECESSARY MOUNTING CLIPS, CLOSURES, FASTENINGS, ETC., REQUIRED TO COMPLETE THE COUNTER-FLASHING, GRAVEL STOPS, CAPS AND COPINGS, INDICATED ON THE DRAWINGS. ROOFING PERIMETER LAPS ANY TIME A ROOF EDGE DOES NOT HAVE A PARAPET WALL OR ROOF TIE-IN, (I.E. DRIP EDGE, WATER/GRAVEL STOP, TERMINATION BAR ON EDGE, GUTTER, ETC.) THEN THE ROOF SECTION MUST HAVE A LAP 27" IN FROM THE EDGE AND REVERSED. THIS HELPS REDUCE WIND UP-LIFT AROUND PERIMETERS AND REVERSING THE LAP, ALLOWS CONTRACTOR APPLICATOR TO PLACE ROOF SECTION AWAY FROM THE EDGE. ROOFING PROJECT/SITE CLEAN-UP UPON COMPLETION, THE ROOFING CONTRACTOR SHALL REMOVE RUBBISH, WASTE MATERIALS, ETC. FROM THE ROOF, LEAVING THE ROOF IN A CLEAN CONDITION AND FURTHER REMOVING SUCH ROOFING DEBRIS FROM THE WORK SITE. A RIGOROUS INSPECTION FOR WATERTIGHT FIELD SEAMS SHALL BE MADE AFTER COMPLETION OF JOB. ROOFING INSPECTIONS UPON COMPLETION OF EACH ROOFING JOB, CONTRACTOR SHALL FILL OUT INSPECTION CARD AND RETURN TO MANUFACTURER. EACH ROOF SHALL BE INSPECTED BY AN AUTHORIZED QUALITY CONTROL FIELD INSPECTOR TO MAKE SURE APPLICATION MEETS MANUFACTURERS SPECIFICATIONS, BEFORE ISSUANCE OF WARRANTY. CONTRACTOR SHALL ACCOMPANY INSPECTOR ON INSPECTIONS AND OBTAIN SIGNED WARRANTY FROM CUSTOMER AND RETURN TO MANUFACTURER, WITH NO FINAL PAYMENT BEING MADE UNTIL AN OWNER'S REPRESENTATIVE HAS WARRANTY. ROOFING CONTRACTOR QUALIFICATION ASSURANCE THE ROOFING CONTRACTOR SHALL BE DULY CERTIFIED BY ROOFING MANUFACTURER FOR COMPLETE APPLICATION AND INSTALLATION OF THIS ROOFING SYSTEM. TO MAINTAIN ROOF WARRANTY, FUTURE REPAIRS AND ALTERATIONS SHALL BE MADE BY PERSONNEL DULY CERTIFIED BY ROOFING MANUFACTURER. ROOF METAL TRIMS THIS SECTION INCLUDES METAL TRIM AT PARAPET CAPS, WALL CAPS, BREAK METAL TRIMS, AND THE BOTTOM TRIM ON THE FASCIAS. TRIM MATERIAL SHALL CONSIST OF PREFINISHED (REFER TO FINISH SCHEDULE FOR COLOR), .040" ALUMINUM SHEETS OR 24 GA. GALVALUME STEEL, FORMED TO THE PROFILES SHOWN ON THE DRAWINGS. ATTACHMENT TO THE SUB STRUCTURE SHALL BE BY NON-FERROUS FASTENERS THAT ARE CONCEALED FROM VIEW WHERE POSSIBLE. FASTENERS NOT CONCEALED FROM VIEW MUST MATCH THE COLOR OF THE TRIM BEING FASTENED. SEALANT SURFACES TO RECEIVE SEALANT ARE TO BE DRY AND THOROUGHLY CLEANED OF LOOSE PARTICLES OF DIRT AND DUST, OIL, GREASE, OR OTHER FOREIGN MATTER. SEAL AT EXTERIOR DOOR FRAMES, WINDOW FRAMES, AND OPENINGS FOR PLUMBING, ELECTRICAL REFRIGERANT AND GAS LINES IN EXTERIOR WALLS, FLOORS AND ROOFS. SEALANT MATERIALS JOINT LOCATIONS AND JOINT SEALANT TYPES ARE NOTES ON DRAWINGS. ACCEPTABLE MANUFACTURER/TYPE PER EACH JOINT TREATMENT TYPE IS AS FOLLOWS: (JS-1) POLYSULFIDE POLYMER BASE COMPOUND SHALL CONFORM TO AMERICAN STANDARD SPECIFICATION A-116 , 1960 CLASS A OR B, AND EQUAL TO THAT MANUFACTURED BY SONNEBORN OR PECORA. (JS-2) BYTYL SEALANT SHALL BE BUTYL RUBBER BASE COMPOUND EQUAL TO THAT MANUFACTURED BY SONNEBORN OR PECORA. (JS-3) LATEX JOINT SEALANT. ACRYLIC LATEX OR SILICONE LATEX., ASTM C834, TYPE OP, GRADE NF. EQUAL TO THAT MANUFACTURED BY BOSTIK, INC., PECORA OR TREMCO. (JS-4) SINGLE-COMPONENT, PURABLE, MOISTURE CURING POLYURETHANE JOINT SEALANT: ASTM C920, TYPE S, GRADE P, CLASS 100/50. EQUAL TO THAT MANUFACTURED BY PECORA, TREMCO OR GE. (JS-5) SINGLE-COMPONENT, MILDEW RESISTANT, NEUTRAL CURING SILICONE JOINT SEALANT: ASTM C920, TYPE S, GRADE NS, CLASS 25. EQUAL TO THAT MANUFACTURED BY PECORA, TREMCO OR GE. INDEX TO SPECIFICATIONS KNOTWOOD ALUMINUM SIDING, SOFFITS, AND ACCESSORIES GENERAL SECTION INCLUDES A. ALUMINUM SIDING. B. ALUMINUM SOFFITS. C. ALUMINUM TRIM AND ACCESSORIES. D. 88MM SHUTTER BLADE. E. FIXED ROUTED LOUVER SECTIONS. F. 65MM SLAT. G. SMALL INFILL. RELATED SECTIONS A. COLD-FORMED METAL FRAMING: METAL FRAMING FOR SUPPORT OF ALUMINUM SOFFITS. B. ROUGH CARPENTRY: WOOD STUD FRAMING, FURRING AND SHEATHING FOR SUPPORT OF ALUMINUM SOFFITS. C. BUILDING INSULATION: RIGID THERMAL INSULATION INSTALLED BEHIND SIDING. D. FLASHING AND SHEET METAL: SHEET METAL GUTTERS AND DOWNSPOUTS. E. JOINT SEALANTS: SEALANTS USED IN CONJUNCTION WITH ALUMINUM SIDING INSTALLATION. DELIVERY, STORAGE, AND HANDLING A. PACKAGE AND STORE PRODUCTS UNDER COVER IN MANUFACTURER'S UNOPENED PACKAGING UNTIL READY FOR TRANSPORT AND INSTALLATION. B. PROTECT PANELS FROM ACCELERATED WEATHERING BY REMOVING OR VENTING SHEET PLASTIC SHIPPING WRAP. C. STORE PREFINISHED MATERIAL OFF GROUND PROTECTED FROM WEATHER, TO PREVENT TWISTING, BENDING, OR ABRASION, AND PROVIDE VENTILATION. SLOP METAL SHEETS TO ENSURE DRAINAGE. D. PREVENT CONTACT WITH MATERIALS CAPABLE OF CAUSING DISCOLORATION OR STAINING. PROJECT CONDITIONS A. MAINTAIN ENVIRONMENTAL CONDITIONS (TEMPERATURE, HUMIDITY, AND VENTILATION) WITHIN LIMITS RECOMMENDED BY MANUFACTURER FOR OPTIMUM RESULTS. DO NOT FABRICATE PRODUCTS UNDER ENVIRONMENTAL CONDITIONS OUTSIDE MANUFACTURER'S ABSOLUTE LIMITS. COORDINATION A. COORDINATE WORK WITH INSTALLATION OF WINDOWS, LOUVERS, AND ADJACENT COMPONENTS OR MATERIALS. WARRANTY A. KNOTWOOD'S LIMITED LIFETIME WARRANTY AGAINST CRACKING, PEELING AND GLOSS/COLOR RETENTION WITHIN THE GUIDELINES STATED BY THE AMERICAN ALUMINUM MANUFACTURERS ASSOCIATION (AAMA). 1. STANDARD COLORS a. DULUX DURATEC - AAMA 2604 (5 YEAR FLORIDA) 15 YEAR MANUFACTURER'S WARRANTY. b. DULUX FLUOROSET - AAMA 2605 (10 YEAR FLORIDA) 20 YEAR MANUFACTURER'S WARRANTY. 2. WOOD GRAINS a. AMMA 2064 (5 YEAR FLORIDA) 15 YEAR MANUFACTURER'S WARRANTY. PRODUCTS MANUFACTURERS A. ACCEPTABLE MANUFACTURER: KNOTWOOD LLC. , WHICH IS LOCATED AT: 10914 NE 39TH STREET SUITE B-3 VANCOUVER, WA 98682: INFO AT HYPERLINK "MAILTO:SALES@KNOTWOOD.COM"SALES@KNOTWOOD.COM WEB: HYPERLINK "HTTP://WWW.KNOTWOOD.COM"WWW.KNOTWOOD.COM ; B. SUBSTITUTIONS: NOT PERMITTED MATERIALS A. EXTRUDED ALUMINUM SIDING AND SOFFITS: KNOTWOOD WOOD GRAIN ALUMINUM SIDING AND SOFFITS WITH ALLUMINATE BONDED FILM FINISH IS EXTRUDED ALUMINUM. EXDC90- 3-3/4" X 5/8" X 18'6" CLADDING BOARD SMOOTH EXDC100R- 4" X 5/8" X 18'6" CLADDING BOARD RIBBED EXDC100S- 4" 5/8" X 18'6" CLADDING BOARD SMOOTH EXDC150- 6" X 5/8" X 18'6" CLADDING BOARD SMOOTH EXSM3816- 1-1/2" X 5/8" X 18'6" SELF MATING SLAT (2-PART) EXSM6516- 2-1/2" X 5/8 X 18'6" SELF MATING SLAT (2-PART) EXSM10016- 4" X 5/8" X 18'6" SELF MATING SLAT (2-PART) ESM15016- 6" X 5/8" X 18'6" SELF MATING SLAT (2-PART) B. EXTRUDED ALUMINUM VENTED SOFFIT: KNOTWOOD WOOD GRAIN ALUMINUM VENTED SOFFITS WITH ALLUMINATE BONDED FILM FINISH IS EXTRUDED ALUMINUM. KWCV150- 6" X 5/8" X 18'6" CLADDING VENTED BOARD C. EXTRUDED ALUMINUM ACCESSORIES AND TRIM: KNOTWOOD WOOD GRAIN ALUMINUM TRIM AND ACCESSORIES WITH ALLUMINATE BONDED FILM FINISH IS EXTRUDED ALUMINUM. EXDCST- STARTER PIECE FOR CLADDING AND DECKING 18'6" KWCFB- CLADDING FLASHING BASE 16'4" (USED WITH KWCFTCL OR KWCFTCS) KWCFTCL- CLADDING TOP CLIP 16'4" KWCFTCS- CLADDING TOP BLIP SMALL 16'4" KWCBJ- CLADDING BOTTOM JOINER 16'4" (USED WITH KWCTJ) KWCTJ- CLADDING TOP JOINER 16'4" KWCTF- CLADDING WINDOW AND DOOR TOP FLASHING 16'4" KWCIEFC- CLADDING INTERNAL/EXTERNAL FEMALE CORNER 16'4" KWCIEMC- CLADDING INTERNAL/EXTERNAL MALE CORNER 16'4" D. EXTRUDED ALUMINUM SHUTTER BLADE, SLAT, SMALL INFILL, AND FIXED LOUVER SECTIONS: KNOTWOOD WOOD GRAIN ALUMINUM TRIM AND ACCESSORIES WITH ALLUMINATE BONDED FILM FINISH IS EXTRUDED ALUMINUM. EXS88- 3-7/16" (88MM) X 18'6" SHUTTER BLADE. EXS6516- 2-1/2" X 5/8" X 18'6" SLAT EXINFS- SMALL INFILL LENGTH: 18'6" KWRF65L- ROUTERED LOUVER FRAME LEFT TO FIT 2-1/2" SLAT LENGTH: 17'8" KWRF65R- ROUTERED LOUVER FRAME RIGHT TO FIT 2-1/2" SLAT LENGTH: 17'8" KWRF65M- ROUTERED LOUVER FRAME MID-RAIL TO 2-1/2" SLAT LENGTH: 17'8" KWRF88L- ROUTERED LOUVER FRAME LEFT TO FIT EXS88 LENGTH: 17'8" KWRF88R- ROUTERED LOUVER FRAME RIGHT TO FIT EXS88 LENGTH: 17'8" KWRF88M- ROUTERED LOUVER FRAME MID-RAIL TO FIT EXS88 LENGTH: 17'8" KWRF- ROUTERED TOP BOTTOM FRAME LENGTH: 17'8" FINISHES A. PRETREATMENT: E-CLPS CHROME FREE FIVE STAGER ALUMINUM PRETREATMENT SYSTEM. COMPLIES WITH, AAMA 2604, AND AAMA 2605 SUPERIOR PERFORMANCE STANDARD AND MEETS EPA, OSHA, STATE AND LOCAL ENVIRONMENTAL REQUIREMENTS AND CONTAINS NO CHROMATES, CYANIDES, OR OTHER HEAVY METALS. WASTE TREATMENT IS USUALLY A SIMPLE PH NEUTRALIZATION AND DISPOSAL TO THE SANITARY SEWER. B. DULUX GROUP MANNEX BASE COAT AND DURATEC SERIES ELECTROSTATIC APPLIED ARCHITECTURAL POWDER COATINGS ARE APPROVED TO AAMA 2604 PERFORMANCE STANDARD. 1. GLOSS LEVEL: STANDARD GLOSS IS 30 PERCENT, PLUS OR MINUS 5 PERCENT. C. SUPER DURABLE POWDER COATINGS: ALLUMINATE PREMIUM WOOD FINISHES USE A POLYURETHANE POWDER COAT WITH INK BASED WOOD GRAIN PATTERNS SUBLIMATED INTO THE BASE POWDER EFFECTIVELY TATTOOING THE POWDER. THE COMBINED EFFECT CREATES ALL THE AESTHETIC ASPECTS OF REAL WOOD WHILE OFFERING THE SAME ENVIRONMENTAL ADVANTAGES OF POWDER COATED FINISHES. 1. WOOD GRAINED a. LIGHT OAK FABRICATION A. PREPARE SURFACES, PRE-TREAT AND COAT COMPONENTS IN ACCORDANCE WITH AAMA 2604 AND 2605 QUALITY STANDARDS AND APPLICABLE EUROPEAN STANDARDS FOR THE COATING MATERIAL SPECIFIED. B. WRAP AND PACKAGE COATED COMPONENTS USING METHODS SUITABLE FOR TRANSIT AND COVERED SITE STORAGE WITHOUT DAMAGE. A. B. C. A. A. B. A. B. DIVISION 6 - WOOD, PLASTICS, AND COMPOSITES FURNISH LABOR, TOOLS, EQUIPMENT AND MATERIALS TO COMPLETE WORK UNDER THIS HEADING AS INDICATED ON THE DRAWINGS AND DESCRIBED IN THE SPECIFICATIONS. ROUGH CARPENTRY PROVIDE AND MAINTAIN TEMPORARY ENCLOSURES, AND BARRICADES AS REQUIRED BY GOVERNING LOCAL ORDINANCES. PROVIDE TEMPORARY DOOR AND WINDOW ENCLOSURES AS REQUIRED. HEADERS TO BE SIZED AS DETAILED IN THE STRUCTURAL DRAWINGS. STRUCTURAL LUMBER REFER TO STRUCTURAL DRAWINGS FOR INFORMATION ON STRUCTURAL LUMBER, SHEATHING, PRE-FABRICATED WOOD JOISTS, FASTENING AND ATTACHMENT. FINISH CARPENTRY FURNISH LABOR AND MATERIALS TO COMPLETE WORK UNDER THIS SECTION AS INDICATED ON DRAWINGS AND DESCRIBED IN THESE SPECIFICATIONS. HARDWARE DIMENSIONS ARE TO BE NET SIZE AND NOT NOMINAL SIZE. MATERIAL FOR INTERIOR FINISH SHALL BE AS FOLLOWS: 1. DINING ROOM TRIM - REFER TO FINISH SCHEDULE & DETAILED DRAWINGS. 2. COUNTERTOPS TO BE FURNISHED AND INSTALLED BY KITCHEN EQUIPMENT SUPPLIER. SOLID SURFACING MATERIAL VANITY TOPS AND WINDOW SILLS: DUPONT CORIAN, COLORS AS NOTED ON DRAWINGS. PROVIDE IN THICKNESS, FINISH AND EDGE TREATMENT AS REQUIRED AND COORDINATED WITH THE OWNER'S REPRESENTATIVE. A. A. B. ROOFING WOOD DECKS ROOF SHALL BE CLEAN, SMOOTH AND SUITABLE FOR ACCEPTANCE OF THE ROOFING SYSTEM. REMOVE AND REPLACE DETERIORATED WOOD NAILERS, ROOF CURBS AND SOURED OR BADLY DETERIORATED ROOF INSULATION. JOINT OR CRACKS GREATER THAN 1/4" SHALL BE REPAIRED. ROOFING MEMBRANE THE MEMBRANE MATERIAL SHALL BE IN ACCORDANCE WITH APPROVED MANUFACTURER SPECIFICATIONS. MEMBRANE: (BASE BID) PRECISION FABRICATED, FLEXIBLE, SINGLE-PLY,40 MIL PVC ROOFING SYSTEM. BASIS OF DESIGN: DURO-LAST ROOFING INC. (ALTERNATE BID) SAME AS LISTED ABOVE BUT 50 MIL. 1. ALL ASHRAE ZONES: COLOR WHITE RELATED MATERIALS: 1. DRIP EDGES, GRAVEL STOPS, COPINGS AND COUNTER FLASHINGS TO BE COMPATIBLE AND INSTALLED ACCORDING TO ROOF MANUFACTURERS SPECIFICATION. IF PRODUCTS USED ARE SHEET METAL, IT MUST BE A 26 GA (MIN) GALVANIZED. METAL COUNTER FLASHING, COPING, DRIP EDGES AND GRAVEL STOPS SHALL HAVE A 3" OVERLAP FOR EXPANSION AND CONTRACTING. CONTRACTOR TO CONSIDER UTILIZING EXCEPTIONAL METALS PRODUCTS TO ENSURE A FULL SYSTEM WARRANTY. 2. ROOF SCUPPER LININGS: CUT ROOF SCUPPER LINING TO FIT ROOF SCUPPERS, ALLOWING ADEQUATE MATERIAL FOR FIELD WELDING TO ROOF COVER AND BASE FLASHING. APPLY APPROVED ADHESIVE TO SCUPPER, INSTALL LINING IN SCUPPER AND MAKE FIELD WELDS TO ROOF COVER AND BASE FLASHING. APPLY APPROVED SEALANT TO EXTERIOR EDGES OF LINING ON EXTERIOR OF WALL, UNDER AND ON TOP OF THE TERMINATION BAR SURROUNDING THE EDGES. CONTRACTOR MUST UTILIZE DURO-LAST PREFABRICATED SCUPPER FLASHING PER DURO-LAST DETAIL 2061. 3. WOOD MEMBERS: LUMBER SHALL BE #2 SOUTHERN YELLOW PINE, DOUGLAS FIR OR OTHER APPROVED SPECIES, AND IT SHALL BE FREE FROM WARPING, EXCESSIVE KNOTS AND GRADE MARKED. IT SHALL BE "WOLMANIZED" (CCA) PRESSURE-TREATED AND SHALL BEAR THE TRADE MARK "WOLMANIZED" OR AN APPROVED EQUAL TREATMENT. 4. ROOF DRAINS AND OVERFLOW DRAINS TO BE INSTALLED ACCORDING TO ZURN Z180 CORNICE DRAIN INSTALLATION GUIDE. REFERENCES A. ASTM D 958 - PRACTICE FOR DETERMINING TEMPERATURES OF STANDARD ASTM MOLDS FOR TEST SPECIMENS OF PLASTICS. B. AAMA 2605-05 - VOLUNTARY SPECIFICATION, PERFORMANCE REQUIREMENTS AND TEST PROCEDURES FOR SUPERIOR PERFORMING ORGANIC COATINGS ON ALUMINUM EXTRUSIONS AND PANELS. C. AAMA 2604 - VOLUNTARY SPECIFICATION, PERFORMANCE REQUIREMENTS AND TEST PROCEDURES FOR HIGH PERFORMING ORGANIC COATINGS ON ALUMINUM EXTRUSIONS AND PANELS. D. AAMA 2603 - VOLUNTARY SPECIFICATION, PERFORMANCE REQUIREMENTS AND TEST PROCEDURES FOR HIGH PERFORMING ORGANIC COATINGS ON ALUMINUM EXTRUSIONS AND PANELS. PERFORMANCE REQUIREMENTS A. COMPONENTS: DESIGN AND SIZE COMPONENTS TO WITHSTAND DEAD AND LIVE LOADS CAUSED BY POSITIVE AND NEGATIVE WIND PRESSURE ACTING NORMAL TO PLANE OF WALLS AS CALCULATED IN ACCORDANCE WITH APPLICABLE CODE. B. MOVEMENT: ACCOMMODATE MOVEMENT WITHIN SYSTEM WITHOUT DAMAGE TO COMPONENTS OR MOVEMENT WITHIN SYSTEM: MOVEMENT BETWEEN SYSTEM AND PERIMETER COMPONENTS WHEN SUBJECT TO SEASONAL TEMPERATURE CYCLING: DYNAMIC LOADING AND RELEASE OF LOADS: DEFLECTION OF STRUCTURAL SUPPORT FRAMING. C. DRAINAGE: PROVIDE POSITIVE DRAINAGE TO EXTERIOR FOR MOISTURE ENTERING OR CONDENSATION OCCURRING WITHIN PANEL SYSTEM. SUBMITTALS A. PRODUCT DATA: MANUFACTURER'S DATA SHEETS ON EACH PRODUCT TO BE USED, INCLUDING: 1. PREPARATION INSTRUCTIONS AND RECOMMENDATIONS. 2. STORAGE AND HANDLING REQUIREMENTS AND RECOMMENDATIONS. 3. INSTALLATION METHODS. B. SHOP DRAWINGS: INDICATE DIMENSIONS, LAYOUT, JOINTS, EXPANSION JOINTS, CONSTRUCTION DETAILS, METHODS OF ANCHORAGE, AND INTERFACE WITH ADJACENT MATERIALS. A. B. C. D. E. DIVISION 7 - THERMAL AND MOISTURE PROTECTION BUILDING INSULATION FURNISH LABOR, MATERIALS AND EQUIPMENT NECESSARY TO COMPLETE WORK AS INDICATED ON THE CONSTRUCTION DOCUMENTS AND DESCRIBED IN THE SPECIFICATIONS. EXTERIOR WALL INSULATION: REFER TO INSULATION SCHEDULE ON DRAWINGS. VAPOR BARRIER SHALL BE GRIFFOLYN T-65 BY REEF INDUSTRIES, INC. OR EQUAL. THE MATERIAL SHALL HAVE A 3-PLY, HIGH DENSITY POLYETHYLENE AND NYLON YARN LAMINATE. MATERIAL SHALL HAVE A REINFORCED NON-WOVEN GRID WITH A PPT TEAR STRENGTH OF AT LEAST 15.0 LBS. VAPOR BARRIER SHALL BE APPLIED IN THE WIDEST PRACTICAL WIDTHS. SIDE AND END JOINTS SHALL BE LAPPED AT LEAST 6". LAPS SHALL BE SEALED USING FAB TAPE. PUNCTURES OR TEARS ARE TO BE REPAIRED USING GRIFFOLYN'S GRIFF TAPE, FAB TAPE OR EQUAL. VAPOR BARRIER MUST PROVIDE A COMPLETE SEAL TO PREVENT MOISTURE TRANSFER. NOTE: FOR SOUTHERN COASTAL AREAS, THE VAPOR BARRIER SHOULD BE USED ON THE EXTERIOR OF THE WALL. WHERE THERE IS UNCERTAINTY, FOLLOW LOCAL PRACTICE. RIGID ROOF INSULATION: FURNISHED AND INSTALLED BY THE ROOFING CONTRACTOR. INSULATION TO BE MINIMUM OF (2) LAYERS OF ROOF MANUFACTURER'S RECOMMENDED INSULATION BOARDS. INSTALL IN THICKNESS REQUIRED TO MEET THE R-VALUES INDICATED IN THE INSULATION SCHEDULE ON DRAWINGS. CONTRACTOR TO PROVIDE BID UTILIZING DURO-GUARD ISO II BOARDS. 'ENRGY 3' INSULATION BOARDS BY JOHNS MANVILLE ARE AN ACCEPTABLE EQUAL. PERIMETER INSULATION: REFER TO INSULATION SCHEDULE ON DRAWINGS.. C. SELECTION SAMPLES: FOR EACH FINISH PRODUCT SPECIFIED, TWO COMPLETE SETS OF COLOR CHIPS REPRESENTING THE MANUFACTURER'S FULL RANGE OF AVAILABLE COLORS AND PATTERNS. D. VERIFICATION SAMPLES: FOR EACH FINISH PRODUCT SPECIFIED, TWO SAMPLES, MINIMUM SIZE 2 INCHES (51MM) BY 3-1/2 INCHES (89MM), REPRESENTING ACTUAL PRODUCT, COLOR AND GLOSS. E. MANUFACTURER'S CERTIFICATES: CERTIFY PRODUCTS MEET OR EXCEED SPECIFIED REQUIREMENTS. F. CLOSEOUT SUBMITTALS: PROVIDE MANUFACTURER'S MAINTENANCE INSTRUCTIONS THAT INCLUDE RECOMMENDATIONS FOR PERIODIC CLEANING AND MAINTENANCE OF COMPONENTS. QUALITY ASSURANCE A. MANUFACTURER'S QUALIFICATIONS: MINIMUM TEN YEARS' EXPERIENCE PRODUCING ALUMINUM FINISHES OF THE TYPES SPECIFIED IN AAMA 2604 AND 2605 CERTIFIED. B. INSTALLER: COMPANY SPECIALIZING IN PERFORMING WORK OF THIS SECTION WITH MINIMUM THREE YEARS DOCUMENTED EXPERIENCE. C. MOCK-UP: PROVIDE A MOCK-UP FOR EVALUATION OF SURFACE PREPARATION TECHNIQUES AND APPLICATION WORKMANSHIP. 1. FINISH AREAS DESIGNED BY ARCHITECT. 2. DO NOT PROCEED WITH REMAINING WORK UNTIL WORKMANSHIP, COLOR, AND GLOSS ARE APPROVED BY ARCHITECT. REFINISH MOCK-UP AREA AS REQUIRED TO PRODUCE ACCEPTABLE WORK. BUILDING WEATHER BARRIER PROVIDE WHEATHER BARRIER AS NOTED ON PLANS, SECTIONS, DETAILS, ETC. A. FLUID APPLIED 1. ASTM E1677 : DUPONT TYVEK FLUID APPLIED WB 2. BUILDING-WRAP COMPOUND: TYVEK FLUID APPLIED FLASHING & JOINT COMPOUND AND DUPONT SEALANT FOR TYVEK FLUID APPLIED SYSTEM. B. BUILDING WRAP: 1. ASTM E1677: DOPONT TYVEK COMMERCIAL WRAP 2. BUILDING WRAP TAPE: PRESSURE SENSITIVE PLASTIC TAPE REMCOMENED BY BUILDING WRAP MANUFACTURER FOR SEALING JOINTS ADN PENETRATIONS IN BUILDING WRAP. C. FLUID APPLIED AT E.I.F.S. 1. AS NOTED IN E.I.F.S. SECTION OF THESE SPECIFIICATIONS 12 / 2 2 / 2 0 1 7 1 2 : 3 7 : 5 9 P M SPECIFICATIONS SP1 IT EC MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 NO T U S E D NO T U S E D NO T U S E D A. B. C. D. E. F. A. DIVISION 8 - OPENINGS ALUMINUM ENTRANCE DOORS, STOREFRONT & CURTAINWALL DOORS AND WINDOWS SHALL HAVE PRODUCT LABELS INDICATING U-VALUE, SHGC AND AIR LEAKAGE RATE IN COMPLIANCE WITH LATEST ENERGY CODES. ALLOWED AIR LEAKAGE SHALL NOT EXCEED 1.0 CFM/FT2 FOR GLAZED DOORS AND 0.3 CFM/FT2 FOR WINDOWS. SYSTEMS: REFER TO EXTERIOR MATERIALS AND FINISHES SCHEDULE ON DRAWINGS. DOORS SHALL BE "350 MEDIUM STILE" DOOR, MANUFACTURED BY US ALUMINUM. HARDWARE FOR ENTRANCE DOORS: SEE HARDWARE SCHEDULE ON DRAWINGS. EXPOSED ALUMINUM MATERIAL SHALL BE CLEAR ANODIZED ALUMINUM. HARDWARE SHALL MATCH. MISCELLANEOUS TRIMS, SHAPES, SPACERS, AND ADAPTERS AS REQUIRED. GLAZING EXTERIOR GLASS SHALL BE 1" INSULATED (UNLESS NOTED OTHERWISE). SEE THE FINISH SCHEDULE. GLAZING MUST MEET SAFETY CODES AS REQUIRED. GLASS MUST HAVE 5-YEAR WARRANTY AGAINST SEAL FAILURE. 1. GLASS THICKNESSES: SELECT MIN. GLASS THICKNESSES PER ASTM E 1300, PER FOLLOWING REQUIREMENTS: a. SPECIFIED DESIGN WIND LOADS: DESIGN WIND LOADS APPLICABLE TO PROJECT FROM BASIC WIND SPEED - IN MILES PER HOUR (METERS PER SECOND) AT 33 FEET (10 M) ABOVE GRADE, ACCORDING TO ASCE 7, "MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES": SECTION 6.4.2, "ANALYTIC PROCEDURE," BASED ON MEAN ROOF HEIGHTS ABOVE GRADE INDICATED ON DRAWINGS. b. PROBABILITY OF BREAKAGE FOR VERTICAL GLAZING: 8 LITES PER 1000 FOR LITES SET VERTICALLY OR NOT MORE THAN 15 DEGREES OFF VERTICAL AND UNDER WIND ACTION. 1) LOAD DURATION: 60 SECONDS OR LESS. c. MIN. GLASS THICKNESS FOR EXTERIOR LITES: NOT LESS THAN 6 MM. d. THICKNESS OF TINTED AND HEAT-ABSORBING GLASS: 1) PROVIDE THE SAME THICKNESS FOR EACH TINT COLOR INDICATED THROUGHOUT PROJECT. B. PRODUCTS AND MANUFACTURERS 1. AVAILABLE PRODUCTS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PRODUCTS THAT MAY BE INCORPORATED INTO THE WORK INCLUDE, BUT ARE NOT LIMITED TO, THE PRODUCTS INDICATED IN SCHEDULES ON THE DRAWINGS. C. PRIMARY FLOAT GLASS 1. ASTM C 1036, TYPE I (TRANSPARENT GLASS, FLAT), QUALITY Q3 (GLAZING SELECT); CLASS I (CLEAR). D. HEAT-TREATED FLOAT GLASS 1. ASTM C 1048; TYPE I (TRANSPARENT GLASS, FLAT); QUALITY Q3 (GLAZING SELECT); CLASS, KIND, AND CONDITION AS INDICATED. A. B. A. J. PREPARATION 1. CLEAN GLAZING CHANNELS AND OTHER FRAMING MEMBERS RECEIVING GLASS IMMEDIATELY BEFORE GLAZING. REMOVE COATINGS NOT FIRMLY BONDED TO SUBSTRATES. K. GLAZING, GENERAL 1. COMPLY WITH COMBINED WRITTEN INSTRUCTIONS OF MANUFACTURERS OF GLASS, SEALANTS, GASKETS, AND OTHER GLAZING MATERIALS, UNLESS MORE STRINGENT REQUIREMENTS ARE INDICATED, INCLUDING THOSE IN REFERENCED GLAZING PUBLICATIONS. 2. GLAZING CHANNEL DIMENSIONS, AS INDICATED ON DRAWINGS, PROVIDE NECESSARY BITE ON GLASS, MINIMUM EDGE AND FACE CLEARANCES, AND ADEQUATE SEALANT THICKNESSES, WITH REASONABLE TOLERANCES. ADJUST AS REQUIRED BY PROJECT CONDITIONS DURING INSTALLATION. 3. PROTECT GLASS EDGES FROM DAMAGE DURING HANDLING AND INSTALLATION. REMOVE DAMAGED GLASS FROM PROJECT SITE AND LEGALLY DISPOSE OF OFF PROJECT SITE. DAMAGED GLASS IS GLASS WITH EDGE DAMAGE OR OTHER IMPERFECTIONS THAT, WHEN INSTALLED, COULD WEAKEN GLASS AND IMPAIR PERFORMANCE AND APPEARANCE. 4. APPLY PRIMERS TO JOINT SURFACES WHERE REQUIRED FOR ADHESION OF SEALANTS, AS DETERMINED BY PRECONSTRUCTION SEALANT-SUBSTRATE TESTING. 5. INSTALL SETTING BLOCKS IN SILL RABBETS, SIZED AND LOCATED TO COMPLY WITH REFERENCED GLAZING PUBLICATIONS, UNLESS OTHERWISE REQUIRED BY GLASS MANUFACTURER. SET BLOCKS IN THIN COURSE OF COMPATIBLE SEALANT SUITABLE FOR HEEL BEAD. 6. DO NOT EXCEED EDGE PRESSURES PER GLASS MANUFACTURERS FOR INSTALLING GLASS LITES. a. PROVIDE SPACERS FOR GLASS LITES WHERE THE LENGTH PLUS WIDTH IS LARGER THAN 50 INCHES: LOCATE SPACERS DIRECTLY OPPOSITE EACH OTHER ON BOTH INSIDE AND OUTSIDE FACES OF GLASS. INSTALL CORRECT SIZE AND SPACING TO PRESERVE REQUIRED FACE CLEARANCES, UNLESS GASKETS AND GLAZING TAPES ARE USED THAT HAVE DEMONSTRATED ABILITY TO MAINTAIN REQUIRED FACE CLEARANCES AND TO COMPLY WITH SYSTEM PERFORMANCE REQUIREMENTS. b. PROVIDE 1/8-INCH (3-MM) MINIMUM BITE OF SPACERS ON GLASS AND USE THICKNESS EQUAL TO SEALANT WIDTH. WITH GLAZING TAPE, USE THICKNESS LESS THAN FINAL THICKNESS OF TAPE. 7. PROVIDE EDGE BLOCKING WHERE INDICATED OR NEEDED TO PREVENT GLASS LITES FROM MOVING SIDEWAYS IN GLAZING CHANNEL, AS RECOMMENDED IN WRITING BY GLASS MANUFACTURER AND ACCORDING TO REQUIREMENTS IN REFERENCED GLAZING PUBLICATIONS. 8. SET GLASS LITES IN EACH SERIES WITH UNIFORM PATTERN, DRAW, BOW, AND SIMILAR CHARACTERISTICS. 9. GLASS STOPS ARE EXTRUDED ALUMINUM SNAP-IN TYPE FOR INTERIOR GLAZING OF GLASS OF PANELS 5/8" THICK (CUSTOM STOPS FOR THICKNESSES UP TO AN 1" ARE AVAILABLE) AND HAVE A FIXED GASKET OF HIGH QUALITY ELASTOMERIC MATERIAL PERIMETER WOOL PILE AND ELASTOMERIC WEATHER-STRIP IS FACTORY APPLIED. 10. GLASS MUST HAVE (5) FIVE YEAR WARRANTY AGAINST SEAL FAILURE. L. GLASS TYPES: REFER TO EXTERIOR MATERIALS AND FINISHES SCHEDULE ON DRAWINGS. STEEL SERVICE DOOR AND FRAME STEEL DOOR FRAMES: SHALL BE 18 GUAGE STEEL WELDED VERTICAL EDGE, MECHANICAL INTERLOCK NOT ACCEPTED, AS NOTED IN THE DOOR SCHEDULE ON THE DRAWINGS AND AS MANUFACTURED BY BLACK MOUNTAIN, DOOR, SERIES 400, OR EQUAL IF APPROVED BY ARCHITECT. 1. SEE THE FINISH SCHEDULE, EXTERIOR SCHEDULE AND THIS SHEET FOR APPLICABLE PAINT. C. STEEL HOLLOW METAL DOOR: SHALL BE 1 3/4" THICK, FLUSH TYPE, MINIMUM 18 GAUGE STEEL FACE DOOR WITH POLYSTYRENE CORE, INSULATION, ETC, AND MANUFACTURED AS FRAMES ABOVE, REFER TO DRAWINGS. 1. SEE THE FINISH SCHEDULE, EXTERIOR SCHEDULE AND THIS SHEET FOR APPLICABLE PAINT. D. FINISH HARDWARE: DOORS SHALL BE PREPARED TO RECEIVE HEAVY-DUTY HARDWARE. SEE HARDWARE SCHEDULE ON DRAWINGS FOR HARDWARE SPECIFICATIONS. PREFINISHED DOORS LAMINATED DOORS: TO BE 1 3/4" SOLID CORE PRE-HUNG DOORS AS MANUFACTURED BY MARLITE PRODUCTS. DOORS OF THIS TYPE TO BE FINISHED IN HIGH PRESSURE LAMINATE FURNISHED COMPLETE WITH ADJUSTABLE ALUMINUM FRAME AND HARDWARE. 1. SEE DOOR SCHEDULE FOR HARDWARE SPECIFICATIONS. A. A. A. B. C. D. E. PICK-UP WINDOW A. ANODIZED ALUMINUM, CLEAR ANODIZED ALUMINUM FINISH. B. VERIFY CONSTRUCTION IS READY TO RECEIVE PICK UP WINDOW. VERIFY ROUGH OPENINGS ARE CORRECT SIZE AND IN CORRECT LOCATION. ORIENT PICK UP WINDOW SO THAT THE OPENING MATCHES THE BUILDING ELEVATION. EXAMINE ROUGHING-IN FOR EMBEDDED AND BUILT-IN ANCHORS TO VERIFY ACTUAL LOCATIONS OF SECURITY WINDOW CONNECTIONS BEFORE SECURITY WINDOW INSTALLATION. CONTRACTOR TO PROVIDE ANCHOR SCREWS. INSPECT BUILT-IN AND CAST-IN ANCHOR INSTALLATIONS, BEFORE INSTALLING SECURITY WINDOWS, TO VERIFY THAT ANCHOR INSTALLATIONS COMPLY WITH REQUIREMENTS. REMOVE AND REPLACE ANCHORS WHERE INSPECTIONS INDICATE THAT THEY DO NOT COMPLY WITH SPECIFIED REQUIREMENTS. REINSPECT AFTER REPAIRS OR REPLACEMENTS ARE MADE. FOR GLAZING MATERIALS WHOSE ORIENTATION IS CRITICAL FOR PERFORMANCE, VERIFY INSTALLATION ORIENTATION. PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. FURNISH FRAMES AND ANCHORS TO OTHER SECTIONS AS REQUIRED FOR INSTALLATION IN SURROUNDING PARTITION AND CASEWORK CONSTRUCTION. INSTALL PICK UP WINDOW IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. ALIGN PICK UP WINDOW PLUMB, LEVEL AND SQUARE. RIGIDLY SECURE PICK UP WINDOW TO ADJACENT SUPPORTING CONSTRUCTION. GLAZE WINDOWS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS SEAL PERIMETER JOINTS CONNECT ELECTRICAL COMPONENTS TO POWER SOURCE. PROTECTION: WHERE DISSIMILAR METALS WILL CONTACT EACH OTHER, PROTECT AGAINST GALVANIC ACTION BY PAINTING CONTACT SURFACES WITH PRIMER OR BY APPLYING SEALANT OR TAPE RECOMMENDED IN WRITING BY MANUFACTURER FOR THIS PURPOSE. WHERE ALUMINUM WILL CONTACT CONCRETE OR MASONRY, PROTECT AGAINST CORROSION BY PAINTING CONTACT SURFACES WITH BITUMINOUS PAINT. ACCESS DOOR GALVANIZED STEEL, 16 GA., 24"X24" GREY ENAMEL PRIMED DOOR AND FRAME, INSULATED DOOR; THE WILLIAMS BROS. MODEL EXT 1300 WITH CONTINUOUS HINGE, GASKET AND KEYED CYLINDER LOCK WITH TEE HANDLE. WALL LOUVER STATIONARY WIND-DRIVEN RESISTANT LOUVER: RUSKIN (816-761-7476), MODEL EME220DD, 6"X6", MILL FINISH ALUMINUM, OR APPROVED EQUAL. FIELD PAINTED AS NOTED ON DRAWINGS. DIVISION 9 - FINISHES NOTE: IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE USE OF "CLASS A" OR "CLASS C" MATERIAL. FLOOR AND WALL TILE INSTALLATION PROVIDE TILE WORK COMPLETE IN PLACE AS INDICATED ON DRAWINGS, SPECIFIED HEREIN. TILE WORK SHALL BE SUBJECT TO PERFORMANCE STANDARDS AS SET BY THE AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) SPECIFICATION A-137J-80 FOR CERAMIC TILE OR CTI-69-5 FOR SPECIAL PURPOSE TILE AND THE TILE COUNCIL OF AMERICA (TCA) CURRENT HANDBOOK FOR CERAMIC TILE INSTALLATION. DELIVER MATERIAL TO THE JOB SITE AND STORE IN ORIGINAL UNOPENED CARTONS WITH LABELS INTACT AND LEGIBLE. TILE SHOULD BE STORED IN A DRY COVERED AREA. TILE SHALL BE STANDARD GRADE IN ACCORDANCE WITH SPECIFICATIONS PUBLISHED BY ANSI A-137J-80 FOR CERAMIC TILE OR CTI-69-5 FOR SPECIAL PURPOSE TILE. 1. EXTERIOR DECORATIVE WALL TILE: SEE FINISH SCHEDULE. 2. INTERIOR FLOOR TILE: SEE FINISH SCHEDULE. A. B. A. B. A. B. C. A. B. A. B. A. B. C. D. F. TILE SETTING, GROUTING MATERIALS, AND WATERPROOFING MEMBRANE: 1. BASIS-OF-DESIGN: LATICRETE INTERNATIONAL, INC. 2. APPROVED EQUAL: MAPEI CORPORATION. G. [MR-1] MODIFIED-PORTLAND CEMENT THIN SET MORTAR: ISO 13007: C2EP1 / C2TES1PA AND ANSI A118.15. 1. PRODUCTS: LATICRETE: 254 PLATIUM THINSET OR MAPEI: ULTRA FLEX 2. H. [MR-2] MEDIUM BED, MODIFIED-PORTLAND CEMENT THIN SET MORTAR: ISO 13007: C2EP1 / C2TES1PA AND ANSI A118.15 AND CAPABLE OF BEING INSTALLED UP TO 1/4 INCH THICK. 1. PRODUCTS: LATICRETE: 4XLT OR MAPEI: ULTRA FLEX LFT. I. [GR-1] POLYMER-MODIFIED HIGH PERFORMANCE CEMENT TILE GROUT: ISO 13007: CG-2WAF AND ANSI A118.7. 1. PRODUCTS: FOR JOINTS 1/8-INCH OR WIDER (SANDED GROUT): LATICRETE: PERMACOLOR: ULTRACOLOR PLUS. 2. COLORS: SEE INTERIOR AND EXTERIOR FINISH SCHEDULES.. J. [WM-1] INTERIOR WATERPROOFING MEMBRANE: COMPLY WITH ANSI A118.10. ADJOINING FLOOR AND WALL AREAS AT MOP SINK LOCATIONS OR WHERE INDICATED ON DRAWINGS, AND ELSEWHERE AS REQUIRED FOR WATERPROOFING TILE ASSEMBLY AS SPECIFIED IN ANSI A108.13. 1. PRODUCTS: LATICRETE: HYDROBAN OR MAPEI: AQUA DEFENSE. K. THRESHOLDS: PROVIDE THRESHOLDS TO ADJUST BETWEEN TILE AND OTHER FLOOR FINISHES. L. ACCEPTABILITY OF SURFACES: SURFACES TO BE TILED SHALL BE SMOOTH AND LEVEL FOR MORTAR BED AT THE REQUIRED FINISH ELEVATION, AND A STEEL TROWEL FINISH WITH A LIGHT BROOM TEXTURED FINISH WITHOUT MORE THAN THE FOLLOWING MAXIMUM VARIATIONS: 1. PORTLAND CEMENT MORTAR: WALLS AND CEILINGS - 1/4" IN 8"; FLOORS - 1/8" IN 10'-0". 2. DRY SET, LATEX AND CEMENT MORTARS: WALLS AND CEILINGS - 1/8" IN 8"; FLOORS - 1/8" IN 10'-0". M. PREPARATION: PRIOR TO THE START OF LAYING TILE, SWEEP OR VACUUM AND WASH SURFACES TO BE COVERED. SURFACE SHOULD BE FREE FROM COATING, CURING COMPOUNDS, OIL, GREASE, WAX AND DUST. N. JOB CONDITIONS: A MINIMUM TEMPERATURE OF 50 DEGREES F (10 DEGREES C) SHOULD BE MAINTAINED DURING TILE WORK AND FOR SEVEN (7) DAYS THEREAFTER. PROVIDE ADEQUATE LIGHTING FOR GOOD GROUTING AND CLEAN- UP. O. LAYOUT OF WORK: INTERIOR WALL AND FLOOR FINISH LAYOUTS AND PATTERNS FOR KITCHEN, RESTROOMS AND DINING ROOM SHALL BE AS SHOWN ON INTERIOR ELEVATIONS AND FLOOR TILE PLAN. REFER TO THE FINISH SCHEDULE. DETERMINE LOCATIONS OF MOVEMENT (EXPANSION) JOINTS BEFORE STARTING TILE WORK. LAYOUT TILE WORK SO AS TO MINIMIZE CUTS LESS THAN ONE HALF TILE IN SIZE. LOCATE CUTS IN BOTH WALLS AND FLOORS SO AS TO BE LEAST CONSPICUOUS. P. SETTING METHODS: SET TO TILE COUNCIL OF AMERICA SPECIFICATIONS WALLS W242-98 AND FLOORS F113-98. Q. GROUTING: FOLLOW MANUFACTURER'S RECOMMENDATIONS AS TO GROUTING PROCEDURES AND PRECAUTIONS. REMOVE GROUT HAZE, OBSERVING GROUT MANUFACTURER'S RECOMMENDATIONS AS TO THE USE OF VARIOUS CLEANERS. FLOOR TILE GROUT TO BE 1/4" WIDE; WALL TILE GROUT TO BE 1/16" WIDE. R. FINISHING: THOROUGHLY RINSE TILE WORK. USE NEUTRAL CLEANER WITH ABRASIVE ADDITIVE (WALTER G. LEGGE'S "TEXSPAR" OR EQUAL) FOR FINAL CLEANING. ACID CLEANERS ARE NOT RECOMMENDED EXCEPT AS NOTED. 1. USE MIXTURE OF 75% WATER AND 25% MAPEI KARACLEAN TO CLEAN TILE SURFACE (EQUAL LATICRETE TILE CLEANER 1:3 DILUTION RATIO). APPLY AND BUFF. 2. USE PHOSPHORIC ACID OR SULFAMIC ACID ONLY FOR REMOVAL OF GROUT RESIDUE. DO NOT USE MURIATIC ACID. GYPSUM DRYWALL FURNISH MATERIAL AND LABOR NECESSARY TO PROVIDE FINISHED DRYWALL SURFACES IN AREAS SCHEDULED TO RECEIVE THIS FINISH ON THE DRAWINGS. TAPE, SPACKLE AND SAND SURFACES TO RECEIVE PAINT. REPEAT AS REQUIRED. DRYWALL OVER FURRING AND WOOD STUDS SHALL BE 5/8" FIRECODE GYPSUM. MATERIALS SHALL BE STANDARD PRODUCTS MANUFACTURED BY US GYPSUM, NATIONAL GYPSUM OR GOLD BOND GYPSUM COMPANY. SUSPENDED CEILING SYSTEM FURNISH MATERIALS AND LABOR TO PROVIDE A COMPLETE SUSPENDED CEILING INCLUDING CEILING TILE, HANGERS, GRID TEES, AND MOLDINGS. ACOUSTICAL CEILING MATERIALS IN CORRIDOR AT RESTROOMS, RE: CT-2 ON FINISH SCHEDULE. C. CEILING IN THE KITCHEN, RE: CT-1 ON FINISH SCHEDULE D. THE CEILING IN THE RESTROOMS SHALL BE SMOOTH, PAINTED GYPSUM DRYWALL. 1. COLOR: SEE THE FINISH SCHEDULE. NON-TILE FIBERGLASS REINFORCED POLYESTER (FRP) PANELS NON TILE WALL FINISH FRP (FOOD PREP AREA): SEE FINISH SCHEDULE. TEXTURED FIBERGLASS REINFORCED POLYESTER (FRP) PANELS SANITARY WALL SYSTEMS TO BE FRP PANEL. INSTALL 4'X9'X1/8 PANEL WITH HARMONIZING PVC MOLDINGS, ADHESIVE AND SEALANTS IN STRICT ACCORDANCE WITH MANUFACTURERS WRITTEN INSTALLATION INSTRUCTIONS. NON-TILE WALL FINISH (DINING ROOM AREA): SEE FINISH SCHEDULE. PAINTING PROVIDE MATERIALS, LABOR, TOOLS AND EQUIPMENT REQUIRED TO COMPLETE THE PAINTING OF BUILDING AS SPECIFIED. WORKMANSHIP: 1. MATERIALS SHALL BE APPLIED FREE FROM RUNS, SAGS, WRINKLES, STREAKS, SHINERS AND BRUSH MARKS. 2. MATERIALS SHALL BE APPLIED UNIFORMLY. IF REDUCTION OF THE COATINGS VISCOSITY IS NECESSARY, IT SHALL BE DONE IN ACCORDANCE WITH THE MANUFACTURER'S LABEL DIRECTIONS. 3. NEW PLASTER AND OTHER MASONRY SURFACES SHALL NOT BE PRIMED UNTIL IT HAS BEEN DETERMINED THESE SUBSTRATES HAVE DRIED SUFFICIENTLY TO SAFELY ACCEPT PAINT. A RELIABLE ELECTRONIC MOISTURE METER SHOULD BE USED TO MAKE THIS DETERMINATION. UNACCEPTABLE MOISTURE CONTENT SHOULD BE REPORTED TO THE ARCHITECT OR HIS REPRESENTATIVE. 4. A MINIMUM INTERIOR TEMPERATURE OF 65 DEGREES F SHALL BE MAINTAINED DURING THE ACTUAL APPLICATION AND DRYING OF THE PAINT, AND UNTIL OCCUPANCY OF THE BUILDING OCCURS. ADEQUATE VENTILATION SHALL BE MAINTAINED TO CONTROL EXCESSIVE HUMIDITY WHICH WILL ADVERSELY AFFECT THE CURING OF COATINGS. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR MAINTAINING SUITABLE TEMPERATURES AND VENTILATION. 5. BEFORE PAINTING BEGINS, VERIFY WORK THAT CREATES DUST OR DEBRIS HAS BEEN COMPLETED. THE ROOMS OR AREAS ARE TO BE LEFT IN BROOM CLEAN CONDITION. 6. ENAMEL AND VARNISH UNDERCOATS ARE TO BE SANDED PRIOR TO THE RECOATING. TOP AND BOTTOMS OF DOORS ARE TO BE FINISHED IN THE SAME MANNER AS DOOR FACING. 7. NO EXTERIOR PAINTING SHALL BE UNDERTAKEN IF AIR OR SURFACE TEMPERATURE IS BELOW 50 DEGREES F, NOR IMMEDIATELY FOLLOWING RAIN OR UNTIL FROST, DEW OR CONDENSATION HAS EVAPORATED. SURFACES SHOULD ALWAYS BE TESTED WITH MOISTURE METER BEFORE PROCEEDING. C. PREPARATION OF SURFACES: 1. DO NOT COMMENCE WORK UNTIL SURFACE IS IN PROPER CONDITION. 2. SURFACES ARE TO BE CLEAN. IF FOR ANY REASON THE SURFACE CANNOT BE CLEANED, THIS CONDITION SHALL BE PROMPTLY REPORTED TO THE GENERAL CONTRACTOR AND OWNER. 3. THE PRIME COAT SHOULD BE APPLIED SOON AFTER SURFACE PREPARATION HAS BEEN COMPLETED, TO PREVENT CONTAMINATION OF THE SUBSTRATE. D. INSPECTION: WORK NOT CONFORMING TO THE SPECIFICATIONS OR NOT MEETING WITH THE APPROVAL OF THE OWNER, SHALL BE REMOVED OR CORRECTED AND/OR REPAINTED AS APPROVED BY THE OWNER. PAINT SCHEDULE EXTERIOR ITEMS: REFER TO EXTERIOR FINISH SCHEDULE. INTERIOR WOOD TRIM: REFER TO FINISH SCHEDULE PATIO CONCRETE SLAB CONCRETE SLAB TO BE A MINIMUM OF 5" THICK - VERIFY SLAB REQUIREMENTS WITH GEOTECHNICAL REPORT. BROOM FINISHED CONCRETE WITH TROWELED EDGES. CONCRETE SEALER: 'SCOFIELD' CEMENTONE CLEAR SEALER. APPLY PER MANUFACTURER'S RECOMMENDATIONS. CONCRETE COLOR HARDENER: 'SCOFIELD' LITHOCHROME, A33 "CLASSIC GREY" APPLY PER MANUFACTURER'S RECOMMENDATIONS. EXECUTION EXAMINATION A. DO NOT BEGIN INSTALLATION UNTIL COLORS HAVE BEEN VERIFIED. B. VERIFY FRAMING MEMBERS ARE READY TO RECEIVE PANEL SYSTEM. C. IF PREPARATION IS THE RESPONSIBILITY OF ANOTHER INSTALLER, NOTIFY ARCHITECT OF UNSATISFACTORY PREPARATION BEFORE PROCEEDING. PREPARATION A. CLEAN SURFACES THOROUGHLY PRIOR TO INSTALLATION. B. PREPARE SURFACES USING METHODS RECOMMENDED BY THE MANUFACTURER. INSTALLATION A. INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. B. BARRIER PROTECTION: DO NOT INSTALL OVER CEMENTITIOUS MATERIALS, DISSIMILAR METALS OR PRESSURE TREATED MATERIAL WITHOUT ADEQUATE BARRIER PROTECTION. 1. INSTALL BUILDING PAPER HORIZONTALLY ON WALLS TO RECEIVE METAL SIDING. 2. WEATHER LAP EDGES 6 INCHES (150MM) AND ENDS MINIMUM 6 INCHES (150MM). 3. STAGGER VERTICAL JOINTS F EACH LAYER. 4. SECURELY STAPLE, NAIL IN PLACE. C. FASTEN SIDING TO STRUCTURAL SUPPORTS; ALIGNED, LEVEL, AND PLUMB. D. LOCATE JOINTS OVER SUPPORTS. E. INSTALL EXPANSION CONTROL JOINTS WHERE NEEDED. F. USE CONCEALED FASTENERS UNLESS OTHERWISE APPROVED BY ARCHITECT. G. INSTALL SOFFITS, AND ACCESSORIES IN ACCORDANCE WITH BEST PRACTICE, WITH ALL JOINT MEMBERS PLUMB AND TRUE. FIELD QUALITY CONTROL A. AFTER INSTALLATION OF SOFFITS, CHECK ENTIRE SURFACE FOR OBVIOUS FLAWS OR DEFECTS. B. REPLACE AND REPAIR ANY PROBLEM AREAS, PAYING CLOSE ATTENTION TO THE SUBSTRATE FOR CAUSES OF THE PROBLEM. CLEANING A. UPON COMPLETION OF SOFFIT APPLICATION, CLEAN ENTIRE AREA, REMOVING ALL SCRAP METAL, PACKAGING AND UNUSED MATERIALS RELATED TO THE INSTALLATION. CLEAN PANELS AS NECESSARY TO REMOVE ALL FINGERPRINTS AND SOILED AREAS. PROTECTION A. PROTECT INSTALLED PRODUCTS UNTIL COMPLETION OF PROJECT TOUCH-UP, REPAIR OR REPLACE DAMAGED PRODUCTS BEFORE SUBSTANTIAL COMPLETION. E. INSULATING GLASS 1. PREASSEMBLED UNITS CONSISTING OF SEALED LITES OF GLASS SEPARATED BY A DEHYDRATED INTERSPACE, AND COMPLYING WITH ASTM E 774 FOR CLASS CBA UNITS AND WITH REQUIREMENTS SPECIFIED IN THIS ARTICLE. a. PROVIDE KIND HS (HEAT-STRENGTHENED) FLOAT GLASS IN PLACE OF ANNEALED GLASS WHERE NEEDED TO RESIST THERMAL STRESSES INDUCED BY DIFFERENTIAL SHADING OF INDIVIDUAL GLASS LITES AND TO COMPLY WITH GLASS DESIGN REQUIREMENTS SPECIFIED IN "PERFORMANCE REQUIREMENTS" ARTICLE. PROVIDE KIND FT (FULLY TEMPERED) WHERE SAFETY GLASS IS INDICATED. 2. OVERALL UNIT THICKNESS AND THICKNESS OF EACH LITE: DIMENSIONS INDICATED IN THE GLASS SCHEDULE ARE NOMINAL AND THE OVERALL THICKNESSES OF UNITS MEASURED PERPENDICULARLY FROM OUTER SURFACES OF GLASS LITES AT UNIT'S EDGE. 3. SEALING SYSTEM: DUAL SEAL, WITH PRIMARY AND SECONDARY SEALANTS AS FOLLOWS: a. RETAIN ONE SEALANT SYSTEM BELOW OR REVISE TO INSERT OTHER COMBINATIONS; CORRELATE WITH PRODUCTS/MANUFACTURERS SELECTED. 1) MANUFACTURER'S STANDARD SEALANTS. 4. SPACER SPECIFICATIONS: MANUFACTURER'S STANDARD SPACER MATERIAL AND CONSTRUCTION COMPLYING WITH THE FOLLOWING REQUIREMENTS: a. ALUMINUM WITH CLEAR ANODIZED ALUMINUM FINISH. b. DESICCANT: MOLECULAR SIEVE OR SILICA GEL, OR BLEND OF BOTH. c. CORNER CONSTRUCTION: MANUFACTURER'S STANDARD CORNER CONSTRUCTION. 5. LOW E - SPUTTER-COATED FLOAT GLASS; ASTM C1376 APPLIED TO SURFACE #2. F. SPANDREL GLASS: REFER TO EXTERIOR MATERIALS AND FINISHES SCHEDULE ON DRAWINGS. G. MISCELLANEOUS GLAZING MATERIALS 1. GENERAL: PROVIDE PRODUCTS OF MATERIAL, SIZE, AND SHAPE COMPLYING WITH REFERENCED GLAZING STANDARD, REQUIREMENTS OF MANUFACTURERS OF GLASS AND OTHER GLAZING MATERIALS FOR APPLICATION INDICATED, AND WITH A PROVEN RECORD OF COMPATIBILITY WITH SURFACES CONTACTED IN INSTALLATION. 2. CLEANERS, PRIMERS, AND SEALERS: TYPES RECOMMENDED BY SEALANT OR GASKET MANUFACTURER. 3. SETTING BLOCKS: ELASTOMERIC MATERIAL WITH A SHORE TYPE A DUROMETER HARDNESS OF 85, +/- 5. 4. SPACERS: ELASTOMERIC BLOCKS OR CONTINUOUS EXTRUSIONS WITH A SHORE TYPE A DUROMETER HARDNESS REQUIRED BY GLASS MANUFACTURER TO MAINTAIN GLASS LITES IN PLACE FOR INSTALLATION INDICATED. 5. EDGE BLOCKS: ELASTOMERIC MATERIAL OF HARDNESS NEEDED TO LIMIT GLASS LATERAL MOVEMENT (SIDE WALKING). H. FABRICATION OF GLASS AND OTHER GLAZING PRODUCTS 1. FABRICATE GLASS AND OTHER GLAZING PRODUCTS IN SIZES REQUIRED TO GLAZE OPENINGS INDICATED FOR PROJECT, WITH EDGE AND FACE CLEARANCES, EDGE AND SURFACE CONDITIONS, AND BITE COMPLYING WITH WRITTEN INSTRUCTIONS OF PRODUCT MANUFACTURER AND REFERENCED GLAZING STANDARD, TO COMPLY WITH SYSTEM PERFORMANCE REQUIREMENTS. 2. GRIND SMOOTH AND POLISH EXPOSED GLASS EDGES. I. EXAMINATION 1. EXAMINE FRAMING GLAZING, WITH INSTALLER PRESENT, FOR COMPLIANCE WITH THE FOLLOWING: a. MANUFACTURING AND INSTALLATION TOLERANCES, INCLUDING THOSE FOR SIZE, SQUARENESS, AND OFFSETS AT CORNERS. b. PRESENCE AND FUNCTIONING OF WEEP SYSTEM. c. MINIMUM REQUIRED FACE OR EDGE CLEARANCES. d. EFFECTIVE SEALING BETWEEN JOINTS OF GLASS-FRAMING MEMBERS. 2. PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. KNOTWOOD (CONTINUED) “ NO T U S E D 12 / 2 2 / 2 0 1 7 1 2 : 3 8 : 0 9 P M SPECIFICATIONS SP2 IT EC MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 A. A. A. B. A. B. A. A. A. B. C. A. DIVISION 10 - SPECIALTIES GENERAL SIGNAGE A. FOR BUILDING, FREE-STANDING PYLON, AND GROUND AND DIRECTIONAL SIGNS: 1. NEW STORES: WHITE WENDY'S LETTERS ON RED BACKGROUND, POLES AND HARDWARE PAINTED PPG "BRILLIANT RED." 2. REMODEL STORES: NEW SIGN FACE, BODY REPAINTED PPG "BRILLIANT RED." B. SIGNAGE INCLUDING MENU AND SPEAKER SIGNS SHALL BE FURNISHED BY OWNER AND INSTALLED BY LICENSED SIGN ERECTOR. SEE APPROVED SIGN MANUFACTURERS LIST. C. BUILDING SIGNS: 1. COORDINATE BUILDING IDENTITY SIGNS WITH OWNERS REPRESENTATIVE. 2. SIGNS TO BE PROVIDED AND INSTALLED BY MANUFACTURER FROM APPROVED SIGN MANUFACTURERS LIST. D. MENU BOARDS (INTERIOR AND EXTERIOR): SEE LISTING OF APPROVED SIGN MANUFACTURERS. 1. BUILDINGS REQUIRE: a. ONE EXTERIOR BRONZE MENU BOARD WITH ORDER CONFIRMATION SYSTEM WITHIN SPEAKER PEDESTAL. ROOM IDENTIFICATION SIGN A. SIGN IS DESIGNED WITH CONTRASTING COLORS, RAISED LETTERS, AND GRADE II BRAILLE CONFORMING WITH THE AMERICANS WITH DISABILITIES ACT STANDARDS FOR ACCESSIBLE DESIGN. RESTROOM IDENTIFICATION SIGN SIGN IS DESIGNED WITH CONTRASTING COLORS, RAISED LETTERS, AND GRADE II BRAILLE CONFORMING WITH THE AMERICANS WITH DISABILITIES ACT STANDARDS FOR ACCESSIBLE DESIGN. FURNISHED BY OWNER AND INSTALLED BY CONTRACTOR. SIGN IS MOUNTED ON WALL (LATCH SIDE OF DOOR) PER THE DRAWINGS. PUBLIC RESTROOM ACCESSORIES TOILET ROOM ACCESSORIES TO BE PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR. SEE PROJECT DRAWINGS FOR ACCESSORY SPECIFICATION AND LOCATIONS. WALL DECOR A. ARTWORK TO BE MOUNTED TO WALLS WITH CONCEALED SECURITY HARDWARE SUPPLIED WITH DECOR. REFER TO "MISCELLANEOUS-FINISH SCHEDULE" MISCELLANEOUS ITEMS: FURNISHINGS: VERIFY ALL MATERIALS AND FINISHES WITH THE FINISH SCHEDULE AND OWNER'S REPRESENTATIVE. HEIGHT WARNING DEVICE HEIGHT WARNING DEVICES, IF USED ARE TO BE STEEL PIPE CONSTRUCTION WITH A SELF RETURNING 6' MIN. LENGTH HORIZONTAL WARNING BAR MOUNTED AT A HEIGHT AT OR BELOW THE HEIGHT OF ANY AWNINGS THEY ARE MEANT TO PROTECT. WARNING DEVICE SHALL BE EQUIPPED WITH A SIGN INDICATING THE SAFE VEHICLE HEIGHT. WARNING DEVICES SHOULD BE INSTALLED WHEREVER DRIVE-THRU AWNINGS ARE INSTALLED AND THERE IS NO OTHER MEANS OF WARNING THAT THE VEHICLE IS IN DANGER OF CONTACTING THOSE AWNINGS. VERIFY EXACT LOCATION OF WARNING DEVICES WITH OWNER PRIOR TO INSTALLATION. FOR APPROVED WARNING DEVICE MANUFACTURERS: SEE APPROVED SUPPLIERS LIST. ORDER STATION CANOPY THE CANOPY SUPPLIER IS RESPONSIBLE FOR THE DESIGN, CONSTRUCTION AND MOUNTING DETAILS NECESSARY TO PROVIDE A SAFE AND STRUCTURALLY SOUND INSTALLATION FOR THE GEOGRAPHICAL LOCATION IN WHICH THE CANOPY IS INSTALLED. WIND LOADS SHOULD BE PER THE LOCAL BUILDING CODES. IF REQUESTED BY THE LOCAL BUILDING AUTHORITY, THE CANOPY SUPPLIER SHALL SHOW COMPLIANCE WITH THE BUILDING CODE BY SUPPLYING DETAILED DRAWINGS SIGNED AND SEALED BY AN ENGINEER REGISTERED IN THE STATE IN WHICH THE CANOPY IS BEING INSTALLED. THE CANOPY SUPPLIER WILL PROVIDE THERMOSTATICALLY CONTROLLED HEAT TRACE SNOW MELTING UNITS ON THE ORDER STATION CANOPY IN ASHRAE ZONES 4 AND HIGHER. SNOW HEAT TRACE UNITS ARE OPTIONAL IN ZONE 3. THE ARCHITECT OF RECORD AND ENGINEER OF RECORD ARE RESPONSIBLE FOR DETERMINING IF THE HEAT TRACE IS WARRANTED. KITCHEN EQUIPMENT KITCHEN EQUIPMENT SERVICEMAN WILL SET UP EQUIPMENT WITH GENERAL CONTRACTOR MAKING FINAL HOOK-UPS. (THIS WILL ALSO INCLUDE PURCHASED KITCHEN EQUIPMENT ITEMS). HOOD FIRE SUPPRESSION SYSTEM AND PORTABLE FIRE EXTINGUISHERS HOOD FIRE SUPPRESSION SYSTEM SHALL BE AS PER SPECIFICATIONS AND DRAWINGS MANUFACTURED BY PYRO-CHEM OR ANSUL (NO SUBSTITUTES). SYSTEM SHALL BE FURNISHED AND INSTALLED BY HOOD MANUFACTURER UNLESS OTHERWISE INSTRUCTED BY OWNER (VERIFY WITH OWNER BEFORE CONSTRUCTION). PORTABLE EXTINGUISHERS SHALL BE FURNISHED BY GC AND SHALL BE INSTALLED AS DIRECTED BY LOCAL FIRE CONTROL AUTHORITY. FIRE EXTINGUISHER CABINETS FIRE EXTINGUISHER CABINET: CONSULT BUILDING MATERIAL CONSOLIDATOR REFER TO DRAWINGS FOR INSTALLATION LOCATION. BLOCKING: G.C. SHALL PROVIDE IN-WALL WOOD BLOCKING AS REQUIRED FOR INSTALLATION OF CABINET FINISH SPECIFICATIONS: 1. DOOR STYLE: FULL GLAZING (STYLE F) 2. DOOR GLAZING: CLEAR TEMPERED GLASS. 3. CABINET FINISH: STANDARD CLEAR ANODIZED ALUMINUM WALK-IN FREEZER/COOLER/DRY STORAGE (PRE-FABRICATED) A. PLACEMENT OF PRE-FABRICATED, WALK-IN FREEZER/COOLER/DRY STORAGE SHALL BE PART OF THIS CONTRACT. UNIT WILL BE SUPPLIED BY OWNER AND WILL BE SHIPPED DIRECT TO STORE LOCATION WITH ALL UNCRATING AND ERECTION COORDINATED BY GENERAL CONTRACTOR AND WALK-IN MANUFACTURER. UNIT WILL BE SHIPPED COMPLETE WITH HARDWARE AND INSTRUCTIONS. B. FLOOR IN FREEZER IS PREFABRICATED. FLOORING IN COOLER AND DRY STORAGE IS CERAMIC TILE WITH STAINLESS STEEL COVE BASE BY GENERAL CONTRACTOR. INSTALLATION OF REFRIGERATION TO BE COORDINATED BY GENERAL CONTRACTOR AND WALK-IN MANUFACTURER. C. GENERAL CONTRACTOR SCOPE OF WORK. REFER TO DRAWINGS 1. ELECTRICAL CONNECTION OF WALK IN BOX LIGHTS AND CONDENSERS. 2. INSTALL CONDENSATE DRAIN LINE FROM WALK IN BOX TO DESIGNATED FLOOR SINK. 3. SECURITY SYSTEM CONDUITS FOR SECURITY ALARM IN COOLER / FREEZER. 4. SUPPLY AND INSTALL COUNTER FLASHING FOR WALK IN BOX / BUILDING INTERFACE WALK-IN FREEZER/COOLER/DRY STORAGE (FIELD ERECTED) A. INSTALLATION OF FIELD ERECTED WALK-IN FREEZER/COOLER/DRY STORAGE IS NOT PART OF THIS CONTRACT. UNIT WILL BE SUPPLIED BY OWNER. WALK IN BOX SUPPLIER INSTALLS PANELS, REFRIGERATION SYSTEM, AND MEMBRANE ROOF. B. FLOOR IN FREEZER IS INSTALLED BY WALK IN BOX SUPPLIER. FLOORING IN COOLER AND DRY STORAGE IS CERAMIC TILE BY GENERAL CONTRACTOR. I SEE EQUIPMENT PLAN OF THE CONSTRUCTION DOCUMENTS. C. GENERAL CONTRACTOR SCOPE OF WORK. REFER TO DRAWINGS. 1. PROVIDE AND INSTALL CONDUITS AND WIRING FOR LIGHTS 2. CONNECT ELECTRICAL FOR REFRIGERATION SYSTEM 3. INSTALL CONDUITS FOR SECURITY ALARM IN COOLER / FREEZER 4. INSTALL CONDENSATE DRAIN LINE SYSTEM INSIDE WALK IN BOX TO DESIGNATED FLOOR SINK. 5. SUPPLY AND INSTALL COUNTER FLASHING FOR WALK IN BOX / BUILDING INTERFACE COMMUNICATION SYSTEM TOTAL COMMUNICATION SYSTEM AS INDICATED ON DRAWINGS. SYSTEM SHALL BE AS MANUFACTURED BY H.M.E. SYSTEM SHALL BE FURNISHED AND INSTALLED BY OWNER. CONTRACTOR TO FURNISH CONDUIT, ELECTRICAL CONNECTION AND CO- ORDINATE INSTALLATION. C. APPROVED CANOPY MANUFACTURES: SEE APPROVED SUPPLIERS LISTS. 12 / 2 2 / 2 0 1 7 1 2 : 3 8 : 1 5 P M SPECIFICATIONS SP3 IT EC MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ EDIN CORALIC, R.A., NCARB 2643 CAROUSEL DRIVE ST. LOUIS, MO 63125 (314)578-4953 FUTURE BEE HIVE CREDIT UNION SEAL DESCRIPTIONDATEREV. ISSUE DATE: **/**/**** PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ GREBEIFRFF J E E R E E N I G NEONALSI E S ROF P  01 EXIST. SANITARY SEWER 02 EXIST. 16" WATER LINE 03 EXIST. FIRE HYDRANT 04 EXIST. WATER VALVE 05 EXIST. POWER POLE 06 EXIST. CURB & GUTTER, RETAIN & PROTECT 07 16" x 8" HOT TAP WITH 8" GATE VALVE (SEE SHEET 4) 08 8" CLASS 50 DUCTILE IRON WATER LINE (SEE SHEET 3.0) 09 20' - 8" CLASS 50 D.I. WATER LINE STUB 10 8" GATE VALVE 11 STD. FIRE HYDRANT RE: ISPWC SD-404 12 1 12" WATER SERVICE CONNECTION RE: CITY OF REXBURG STD. DWG. 402 13 1 12" INTERIOR WATER METER RE: CITY OF REXBURG STD. DWG. 402 14 1 12" HDPE WATER SERVICE LINE 15 1 12" HDPE LANDSCAPE WATER LINE 16 CITY APPROVED BACKFLOW PREVENTOR 17 4" x 8" SANITARY SEWER TEE 18 8" PVC SANITARY SEWER LINE (SEE SHEET C3.0) 19 SANITARY SEWER MANHOLE (SEE SHEET C3.0) 20 20' - 8" PVC SANITARY SEWER STUB @0.40% 21 4" PVC SDR35 SANITARY SEWER SERVICE LINE 22 1500 GALLON TRAFFIC RATED GREASE TRAP 23 4" TRAFFIC RATED CLEAN-OUT RE: ISPWC SD-506A 24 RMP TRANSFORMER RE: ELECTRICAL SITE PLAN 25 UNDERGROUND ELECTRICAL CONDUIT RE: ELECTRICAL SITE PLAN 26 GAS LINE - TRENCH BY SITE CONTRACTOR, GAS LINE AND METER BY IMG. 27 DELIVERY ACCESS RAMP 28 ADA RAMP; RE: B2 / C4.0 29 4" YELLOW PAVEMENT MARKING 30 WHITE PAVEMENT MARKING WHERE SHOWN 31 ADA PARKING PAVEMENT MARKINGS WITH RESERVED PARKING SIGN 32 4' WIDE TRUNCATED DOME PANEL 33 WHITE PAINTED CROSSWALK 34 4" WIDE YELLOW PARKING STRIPE 35 DUMPSTER ENCLOSURE RE: ARCHITECTURAL PLANS (NO GATES) 36 PEDESTAL SIGN RE: ELECTRICAL SITE PLAN 37 SITE LIGHTING RE: ELECTRICAL SITE PLAN 38 PRE-SELL BOARD 39 ORDER STATION 40 2" CALIPER DECIDUOUS TREES @ 30' O.C. (5 EACH) (SEE LANDSCAPING PLAN L1.00) 41 TURF SEEDING / SOD (SEE LANDSCAPING PLAN L1.00) 42 LARGE SHRUB / SCREENING SHRUB (SEE LANDSCAPING PLAN L1.00) 43 SMALL SHRUB (SEE LANDSCAPING PLAN L1.00) 44 4" GREASE LINE 45 4" WASTE LINE 46 8" THICK CONCRETE PAD 47 FUTURE BEEHIVE CREDIT UNION SERVICE LINES 48 SNOW STORAGE 49 SAFETY RAILING RE: 9/C5.3 50 STEEL BOLLARDS RE: 12/C5.3 51 PEDISTRIAN AREA AND BENCH 52 CITY STREET LIGHT (LOCATION TO BE DETERMINED) # SITE/UTILITY PLAN 01 02 03 0405 06 07 08 10 09 11 12 13 14 15 17 18 18 19 19 19 20 20 21 22 23 24 25 26 27 28 08 2930 31 32 33 34 29 2929 34 35 36 37 38 38 39 39 40 41 41 42 42 43 43 43 43 44 45 46 47 SITE INFORMATION SNOW STORAGE SURFACE AREA - 14,350 SQ. FT. STORAGE AREA REQUIRED - 1,435 SQ. FT. STORAGE AREA PROVIDED - 2,492 SQ. FT. SNOW STORAGE FOR PRIVATE ROAD WILL BE ALONG THE EAST AND SOUTH SIDE RESPECTIVELY LANDSCAPE LOT AREA - 29,666 SQ. FT. LANDSCAPE REQUIRED - 2,967 SQ. FT. (10%) LANDSCAPE PROVIDED - 5,020 SQ. FT. 48 48 48 48 48 48 49 50 50 51 16 52 FUTURE BEE HIVE CREDIT UNION SEAL DESCRIPTIONDATEREV. ISSUE DATE: **/**/**** PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ GREBEIFRFF J E E R E E N I G NEONALSI E S ROF P  STORMWATER NOTE REQUIRED STORM WATER TO RETAIN ON SITE WAS CALCULATED USING THE FOLLOWING VALUES: EAST SIDE C (weighted) = 0.83 INTENSITY (i) = 0.9 in/hr AREA (A) West = 0.49 acres Q = CiA = 0.37 cfs T (Storm Duration) = 1 hr = 3600 seconds V = CiAT = 1,318 cu. ft. SITE STORM WATER RETENTION REQ'D - 1,318 cu. ft. INFILTRATOR STORAGE PROV'D - 1,525 cu. ft. WEST SIDE C (weighted) = 0.83 INTENSITY (i) = 0.9 in/hr AREA (A) East = 0.40 acres Q = CiA = 0.30 cfs T (Storm Duration) = 1 hr = 3600 seconds V = CiAT = 1,076 cu. ft. SITE STORM WATER RETENTION REQ'D - 1,076 cu. ft. INFILTRATOR STORAGE PROV'D - 1,346 cu. ft. 01 A.C. PAVEMENT SECTION RE: C3 / C4.0 02 CURB TYPE INLET BOX RE: A2 / C4.0 03 AREA TYPE INLET BOX RE: A3 / C4.0 04 12" HDPE STORM DRAIN 05 6" PVC ROOF DRAIN 06 STORM SEWER MANHOLE RE: ISPWC SD-501 07 STORMTECH MC-3500 CHAMBERS (7 UNITS WEST SIDE, 8 UNITS EAST SIDE) 08 4" TRAFFIC RATED CLEAN-OUT RE: ISPWC SD-506A 09 6" x 12" INSERTA-TEE 10 CONCRETE DRIVEWAY APRON RE: B3 / C4.0 11 PRIVATE CONCRETE SIDEWALK RE: B4 / C4.0 12 CITY OF REXBURG CONCRETE SIDEWALK RE: REXBURG STANDARD DRAWING SHT. 3 13 NORTH - SOUTH PRIVATE ROAD RE: C1 / C4.0 14 EAST - WEST PRIVATE ROAD RE: C2 / C4.0 15 COMMERCIAL DRIVEWAY RE: REXBURG STANDARD DRAWING SHT. 7 16 DEPRESS CURB AT ADA RAMP 17 DITCH WATER DIVERSION BERM RE: C1 / C4.0 18 FUTURE CITY OF REXBURG SIDEWALK # GRADING/DRAINAGE PLAN 01 01 01 02 02 03 03 03 04 04 04 04 05 05 06 07 07 08 05 08 09 10 10 11 10 12 14 13 15 15 16 17 04 ROLLED CURB AND GUTTER RE: A1 / C4 FLAT CURB AND GUTTER RE: A1 / C4 CATCH CURB AND GUTTER RE: A1 / C4 18 11 11 11 11 4860 4870 4880 4860 4870 4880 4850 4850 SEAL DESCRIPTIONDATEREV. ISSUE DATE: **/**/**** PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ GREBEIFRFF J E E R E E N I G NEONALSI E S ROF P  PRIVATE DRIVE PROFILE 01 STANDARD MANHOLE TYPE A RE: ISPWC SD 501 02 8" PVC SDR35 SANITARY SEWER MAIN LINE 03 CONNECT EXISTING SEWER LINE TO NEW MANHOLE 04 8" CLASS 50 DUCTILE IRON WATER LINE (6' MIN. BURY) 05 GATE VALVE (SEE SHT. C1.0 FOR OTHER LOCATIONS) 06 16" x 8" HOT TAP WITH 8" GATE VALVE 07 CAP WITH THRUST BLOCK # 01 0101 01 02 03 04 05 06 07 SEAL DESCRIPTIONDATEREV. ISSUE DATE: **/**/**** PROJECT NUMBER: 21-008 DRAWN BY: CHECKED BY: SHEET NAME SHEET NUMBER MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 PROJECT TYPE: SITE NUMBER: BUILDING TYPE: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: DESIGN TYPE: #13487 (2.0) SMART 40+ FREESTANDING NEW FRANCHISE 2020 NEW BUILD 2021 (2.0) UM BRITE SUMMER NEW SMART 40+ GREBEIFRFF J E E R E E N I G NEONALSI E S ROF P  A2 CURB TYPE INLET BOX PRIVATE DRIVE SECTION (NORTH-SOUTH) AREA TYPE INLET BOXA3 C1 TYPICAL CURB SECTIONSA1 ROLLED CURB & GUTTER SECTION NOTES: FLAT CURB & GUTTER SECTION DETECTABLE WARNING PAVERS 6" MIN. 3' - 0 " 5' - 0 " M A X . . W I T H O U T S H O R I N G 666"66"MMMMMIMINNINNNNN66666"6666666666 MMMMMMMMMMMMMMMMIINNNNNNNNNMMIINNNNNNN...NNNNNNNNMMMIIINNNNNNNN..MMMMMMMMIIIIN""""""""""MMMMMMMMMMMM6666666MM6666666666666666666666 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN.........MMMMMMMMMMMMMMMMMMMIIMMIIMIIIIIIIINNNIIINNNNNNNNNNNN""""""""MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM666666666666666666666666 66666666 6" M I N . SIDEWALK DETAILB4B2ADA RAMP DETAIL PROJECT PAVEMENT SECTIONC3 STANDARD BACK FILL TRENCH & RESURFACINGB1 12"MIN EACH SIDEPI P E S I Z E VA R I E S PE R VA R I E S P E R TR E N C H DE P T H CONCRETE DRIVEWAY APRONB3 SURFACE REPAIR WIDTH (1/2 OF TRENCH DEPTH ALLOWED PER SIDE - MAXIMUM)NOTES: 1. TRENCH EXCAVATION PER SECTION 301 2. BACKFILL AND COMPACTION CLASS A-1 SITE DETAILS PRIVATE DRIVE SECTION (EAST-WEST)C2 CATCH CURB & GUTTER SECTION TRASH ENCLOSURE ELEVATIONS SCALE: 3/8"=1'-0" TRASH ENCLOSURE PLAN SCALE: 3/8"=1'-0" WALL SECTION-ALT. SPLIT FACE CMU SCALE: 3/4"=1'-0" DROP PIN DETAIL SCALE: 3/4"=1'-0" SEAL DESCRIPTIONDATEREV. ISSUE DATE: **/**/**** PROJECT NUMBER: ***** DRAWN BY: *** CHECKED BY: *** SHEET NAME SHEET NUMBER SITE NUMBER: BASE MODEL: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: FURNITURE PACKAGE: PROJECT TYPE: 3 business days prior to excavation: Know what's below. Call before you dig. 00000 CIVIL/SITE PROTO COMPANY NEW COMPANY 2020 NEW BUILD 2020 XXX SUMMER 2020 CIVIL/SITE PROTOTYPE MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 MASONRY TRASH ENCLOSURE DETAILS SEAL DESCRIPTIONDATEREV. ISSUE DATE: **/**/**** PROJECT NUMBER: ***** DRAWN BY: *** CHECKED BY: *** SHEET NAME SHEET NUMBER SITE NUMBER: BASE MODEL: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: FURNITURE PACKAGE: PROJECT TYPE: 3 business days prior to excavation: Know what's below. Call before you dig. 00000 CIVIL/SITE PROTO COMPANY NEW COMPANY 2020 NEW BUILD 2020 XXX SUMMER 2020 CIVIL/SITE PROTOTYPE MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 DRIVE-THRU ORDER STATION DETAILS 2 CANOPY FOOTING SECTION 5 MENU BOARD FOOTING CLEARANCE 9'-0" 4 ORDER STATION CANOPY FOOTING1ORDER STATION PLAN VIEW 3 ORDER STATION CANOPY 6 CANOPY PROTECTION BAR 7 PRE-SELL BOARD FOOTING SEAL DESCRIPTIONDATEREV. ISSUE DATE: **/**/**** PROJECT NUMBER: ***** DRAWN BY: *** CHECKED BY: *** SHEET NAME SHEET NUMBER SITE NUMBER: BASE MODEL: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: FURNITURE PACKAGE: PROJECT TYPE: 3 business days prior to excavation: Know what's below. Call before you dig. 00000 CIVIL/SITE PROTO COMPANY NEW COMPANY 2020 NEW BUILD 2020 XXX SUMMER 2020 CIVIL/SITE PROTOTYPE MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 MISCELLANEOUS SITE DETAILS SUMMER RELEASE 20208/31/20R3 SPRING RELEASE 20194/22/19R1 1 FROSTY BIKE RACK DETAIL 5 FLAG POLE DETAIL 10 VAN ACCESSIBLEBARRIER FREE PARKING SIGN 6 STOP SIGN DETAIL 11 PERFORATED UNDERDRAIN DETAIL 2 PAVEMENT MARKING DETAIL 7 STANDARD BARRIER FREE PARKING SPACE DETAIL 4 BIKE RACK DETAIL 3 PAVEMENT MARKING DETAIL 9 SAFETY RAILING DETAIL 8 PATIO RAILING DETAIL 12 BOLLARD DETAIL SEAL DESCRIPTIONDATEREV. ISSUE DATE: **/**/**** PROJECT NUMBER: ***** DRAWN BY: *** CHECKED BY: *** SHEET NAME SHEET NUMBER SITE NUMBER: BASE MODEL: OWNER: BASE VERSION: DRAWING RELEASE: PROJECT YEAR: ASSET TYPE: CLASSIFICATION: UPGRADE CLASSIFICATION: FURNITURE PACKAGE: PROJECT TYPE: 3 business days prior to excavation: Know what's below. Call before you dig. 00000 CIVIL/SITE PROTO COMPANY NEW COMPANY 2020 NEW BUILD 2020 XXX SUMMER 2020 CIVIL/SITE PROTOTYPE MO O D Y R D & N 2 N D E RE X B U R G , I D 8 3 4 4 0 CIVIL SPECIFICATIONS ” PART 1 - GENERAL PART 2 - EARTHWORK PART 3 - UTILITIES PART 4 - PAVING PART 5 - LANDSCAPING MATERIALS PART 7 - SOIL EROSION AND SEDIMENTATION PART 6 - ELECTRICAL FUTURE BEE HIVE CREDIT UNION 4 CV 5 RA 3 EA 5 CV 3 HS 7 EA 6 PV 5 EA 6 PV 5 EA 3 JS 4 RA 6 HS 3 WF 4 EA 9 RA 3 JS 5 SR 5 EA 5 CV 5 CV 3 EA6 PV 10 BU 4 PV 6 BU 5 CV 5 MA 5 PV LANDSCAPE LEGEND QUANTITY PLANT IDENTIFICATION KEY PLANTS TO BE INSTALLED CUT EDGE AS DETAILED PROPERTY LINE (VERIFY) 2 QC MAINTAINED LAWN AREAS TURF SOD AND TOPSOIL AS SPECIFIED 1" MINUS BLACK AND TAN PERMABARK MULCH AT 3" DEPTH OVER TOPSOIL AS SPECIFIED PLANT SCHEDULE QTY KEY BOTANICAL NAME COMMON NAME SIZE NOTES DECIDUOUS SHADE TREES 5 MA Malus "Spring Snow" Springsnow Flowering Crabapple 2" CAL. B&B Class I - 15' H x 15' W SHRUBS/PERENNIALS/ORNAMENTAL GRASSES 16 BU Buxus x 'Glencoe'Chicagoland Green® Boxwood 1 gal. 2' H x 2' W; pruned to hedge in future 24 CV Coreopsis verticillata 'Moonbeam' Moonbeam Coreopsis 1 gal.2' H x 2' W 37 EA Euonymus alatus 'Compactus' Compact Burning Bush 5 gal.5' H x 5' W 9 HS Helictotrichon sempervirens Blue Oat Grass 1 gal.3' H x 3' W 6JSJuniperus sabina 'Broadmoor' Broadmoor Juniper 2 fgal.2.5' H x 6' W 27 PV Panicum virgatum 'Heavy Metal'Heavy Metal Switch Grass 2 gal.5' H x 2' W 18 RA Rhus aromatica "Gro-Low" Gro-Low Sumac 2 gal.2' H x 6' W 5 SR Saccharum ravennae Ravenna Grass 5 gal.12' H x 6' W 3 WF Weigela florida 'Red Prince'Red Prince Weigela 5 gal.6' H x 6' W LA-238 S T A T E O F IDA H O L I C E N S E D LANDSCA P E ARCHITEC T RODN EY P . EVA N S J R . L1.00 WENDY'S MOODY RD. & N 2ND E REXBURG, ID 83440 City Review 21077 BSS RE 08/18/2021 - - - - - - - - - - - - LANDSCAPE PLAN 123456789101112131415 A B C D E F G H J K L M DRAWN BY CHECKED BY PROJECT DATE SHEET REVISION/ISSUENO. DATE CALL 2 BUSINESS DAYSIN ADVANCE BEFOREYOU DIG, GRADE, OREXCAVATE FOR THEMARKING OFUNDERGROUNDMEMBER UTILITIES Co p y r i g h t 2 0 2 1 Al l r i g h t s r e s e r v e d . R e p r o d u c t i o n o r u s e i n a n y f o r m o r b y a n y m e a n s w i t h o u t w r i t t e n p e r m i s s i o n o f R o d n e y E v a n s + P a r t n e r s , P L LC . i s u n l a w f u l a n d s u b j e c t t o c r i m i n a l p r o s e c u t i o n . reandpartners.com + 208-514-3300 + 1450 W. Bannock Street, Boise, Idaho 83702 LA N D S C A P E A R C H I T E C T U R E + U R B A N D E S I G N + L A N D P L A N N I N G + G R A P H I C C O M M U N I C A T I O N + P R O J E C T M A N A G E M E N T SCALE: 0 1"= 20'-0" 20 40 6020 LANDSCAPE PLAN LANDSCAPE NOTES: 1. CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR AND/OR PREVENT THE PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK. 2. NO MATERIAL SUBSTITUTIONS SHALL BE MADE WITHOUT THE LANDSCAPE ARCHITECT'S PRIOR WRITTEN APPROVAL. ALTERNATE MATERIALS OF SIMILAR SIZE AND CHARACTER MAY BE CONSIDERED IF SPECIFIED PLANT MATERIALS CAN NOT BE OBTAINED. 3. COORDINATE ALL WORK WITH ALL OTHER SITE RELATED DEVELOPMENT DRAWINGS. 4. COORDINATE WORK SCHEDULE AND OBSERVATIONS WITH LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION START-UP. 5. ALL PLANT MATERIAL SHALL BE INSTALLED AS PER DETAILS. 6. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION. 7. IN THE EVENT OF A PLANT COUNT DISCREPANCY, PLANT SYMBOLS SHALL OVERRIDE SCHEDULE QUANTITIES AND CALL OUT SYMBOL NUMBERS. 8. ALL PLANTING BEDS SHALL BE COVERED WITH A MINIMUM OF 3" DEPTH OF 1" MINUS BLACK AND TAN PERMA-BARK ROCK MULCH OVER DEWITT PRO-5 WEED BARRIER LANDSCAPE FABRIC. SUBMIT SAMPLE FOR APPROVAL. 9. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF ACCEPTANCE BY THE OWNER. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY CONDITION IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO COST TO THE OWNER. 10. FINISH GRADES SHALL PROVIDE A SMOOTH TRANSITION WITH ADJACENT SURFACES AND ENSURE POSITIVE DRAINAGE IN ACCORDANCE WITH THE SITE CIVIL GRADING PLAN. 11. AMEND EXISTING APPROVED TOPSOIL AT A RATIO OF THREE CUBIC YARDS OF APPROVED COMPOST PER 1000 SQUARE FEET. ROTO-TILL ORGANIC MATTER A MINIMUM OF 6 INCHES INTO TOPSOIL. 12. FERTILIZE ALL TREES AND SHRUBS WITH 'AGRIFORM' PLANTING TABLETS. QUANTITY PER MANUFACTURER'S RECOMMENDATIONS. 13. ALL PLANTING BEDS SHALL HAVE A MINIMUM 18" DEPTH OF TOPSOIL. LAWN AREAS SHALL HAVE A MINIMUM 12" DEPTH OF TOPSOIL. SPREAD, COMPACT, AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE 3" BELOW ADJACENT SURFACES OF PLANTER BED AREAS, 1-1/2" BELOW ADJACENT SURFACES OF TURF SOD AREAS, AND 1" BELOW ADJACENT SURFACES OF TURF SEED AREAS. 14. REUSE EXISTING TOPSOIL STOCKPILED ON THE SITE. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. VERIFY SUITABILITY AND CONDITION OF TOPSOIL AS A GROWING MEDIUM. PERFORM SOIL TEST/ ANALYSIS AND PROVIDE ADDITIONAL AMENDMENT AS DETERMINED BY SOIL TESTS. TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS WEEDS, WEED SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A HAVE A PH OF 5.5 TO 7.0. IF ONSITE TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTOR IS RESPONSIBLE TO EITHER: A) PROVIDE APPROVED IMPORTED TOPSOIL, OR B) IMPROVE ON-SITE TOPSOIL WITH METHODS APPROVED BY THE LANDSCAPE ARCHITECT. 15. IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, ENSURE IT IS FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. A) OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS TO THOSE FOUND ON THE PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY, WELL-DRAINED SITES WHERE TOPSOIL OCCURS AT A DEPTH OF NOT LESS THAN 4 INCHES. B) REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY, TOXICITY, AND GENERAL TEXTURE BY A RECOGNIZED COMMERCIAL OR GOVERNMENT AGENCY AND COPIES OF THE TESTING AGENCY'S FINDINGS AND RECOMMENDATIONS SHALL BE FURNISHED TO THE OWNER'S REPRESENTATIVE BY THE CONTRACTOR. NO TOPSOIL SHALL BE DELIVERED IN A FROZEN OR MUDDY CONDITION. ACIDITY/ALKALINITY RANGE - PH. 5.5 TO 7.6. 16. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE OPERATIONS AND DISPOSE OF PROPERLY OFF SITE. 17. TREES SHALL NOT BE PLANTED WITHIN THE 10'-0" CLEAR ZONE OF ALL STORM DRAIN PIPE, STRUCTURES, OR FACILITIES. 18. STORM DRAINAGE FACILITIES MUST BE PROTECTED FROM ANY AND ALL CONTAMINATION DURING THE CONSTRUCTION AND INSTALLATION OF THE LANDSCAPE IRRIGATION SYSTEM. 19. IN THE EVENT OF A DISCREPANCY, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. 1. ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDERGROUND SPRINKLER SYSTEM WHICH INSURES COMPLETE COVERAGE AND PROPERLY ZONED FOR REQUIRED WATER USES. EACH HYDROZONE IS TO BE IRRIGATED WITH SEPARATE INDIVIDUAL STATIONS. 2. PLANTER BEDS AND LAWN AREAS ARE TO HAVE SEPARATE HYDRO-ZONES. 3. POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OF 4 INCHES AT LAWN AREAS, 6 -12 INCHES IN UN-MAINTAINED LAWNS AREAS. 4. PLANTER BEDS ARE TO HAVE IN-LINE EMITTER DRIP TUBING IRRIGATION LAID OUT IN A LATERAL PATTERN PER MANUFACTURER'S RECOMMENDATIONS. 5. ELECTRONIC WATER DISTRIBUTION/ TIMING CONTROLLERS ARE TO BE PROVIDED. MINIMUM CONTROLLER REQUIREMENTS ARE AS FOLLOWS: a. PRECISE INDIVIDUAL STATION TIMING b. RUN TIME CAPABILITIES FOR EXTREMES IN PRECIPITATION RATES c. AT LEAST ONE PROGRAM FOR EACH HYDROZONE d. SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN-OFF e. POWER FAILURE BACKUP FOR ALL PROGRAMED INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO-ZONES. f. WIFI ENABLED CONTROLLER IF POSSIBLE WITH BUILDING SERVICES AVAILABLE. 6. INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO-ZONES. 7. THE POP-UP OR ROTOE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% HEAD TO HEAD COVERAGE WITH TRIANGULAR SPACING. 8. SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVERSPRAY ONTO IMPERVIOUS SURFACES (BUILDINGS, SIDEWALKS, DRIVEWAYS, AND ASPHALT AREAS). 9. PROVIDE MINIMUM (1) QUICK COUPLER VALVE PER EACH (6) AUTOMATIC VALVE ZONES. APPROVE Q.C.V. LOCATIONS WITH LANDSCAPE ARCHITECT. IRRIGATION NOTES: 1. ALL AREAS TO BE PLANTED OR HYDROSEEDED SHALL HAVE WEED ABATEMENT OPERATIONS PERFORMED ON THEM PRIOR TO PLANTING OR HYDROSEEDING. 2. CONTRACTOR SHALL SPRAY ALL EXPOSED WEEDS WITH “ROUND-UP” (CONTACT HERBICIDE) OR APPROVED EQUAL. 3. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE EXPOSED WEEDS FROM THE SITE. 4. CONTRACTOR SHALL OPERATE THE AUTOMATIC IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN (14) DAYS. AT CONCLUSION OF THIS WATERING PERIOD, DISCONTINUE WATERING FOR THREE TO FIVE (3-5) DAYS. 5. APPLY SECOND APPLICATION OF “ROUND-UP” TO ALL EXPOSED WEEDS. APPLY IN STRICT CONFORMANCE WITH MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE WEEDS FROM THE SITE. 6. IF ANY EVIDENCE OF WEED GERMINATION EXISTS AFTER TWO (2) APPLICATIONS, CONTRACTOR SHALL BE DIRECTED TO PERFORM A THIRD APPLICATION. 7. AT THE TIME OF PLANTING AND HYDROSEEDING, ALL PLANTING AREAS SHALL BE WEED FREE. WEED ABATEMENT NOTES: PROJECT INFORMATION LANDSCAPE REQUIREMENTS 1. DUMPSTER ENCLOSURE 2. VISION TRIANGLE 3. EXISTING POWER POLE 4. SITE LIGHTING - SEE SITE ELECTRICAL PLANS 5. 1-1/2" HDPE LANDSCAPE WATER LINE 6. PEDESTAL SIGN LOCATION - SAVE AND PROTECT 7. LANDSCAPE BY ADJACENT OWNER 8. SNOW STORAGE CALLOUT NOTES #CALLOUT NUMBERS REFER TO NUMBERED NOTES BELOW CITY OF REXBURG CODE: TOTAL SITE AREA: 29,666 S.F. TOTAL LANDSCAPE AREA: 5,020 S.F. (17% OF SITE) CBC ZONE REQUIRES 10% MINUMUM SITE LANDSCAPE STREET LANDSCAPE BUFFER REQUIREMENTS: a. SCREENING REQUIREMENTS. THE BUFFER SHALL CONSIST OF A MINIMUM FIVE (5') FEET WIDE LANDSCAPED STRIP TO BE PLANTED WITH GROUND COVER, ONE (1) TWO (2”) INCH DECIDUOUS TREE AND FIVE (5) FIVE-GALLON SHRUBS PER THIRTY (30') LINEAL FEET. LANDSCAPING MUST BE MAINTAINED AS IN ITS ORIGINAL DESIGN AND PURPOSE. i. PARKING AREAS. AN EFFECTIVE BUFFER SHALL BE PROVIDED BETWEEN PARKING AREAS FOR FIVE (5) OR MORE VEHICLES AND EXISTING RESIDENTIAL USES, SCHOOLS, HOSPITALS, NURSING HOMES AND OTHER INSTITUTIONS FOR LONG- TERM HUMAN CARE. COMMERCIAL PARKING LOTS SHALL BE SEPARATED FROM THE CITY RIGHT-OF-WAY WITH A MINIMUM TEN (10') FEET WIDE BUFFER. A SIX (6') FEET VINYL OR MASONRY FENCE MAY BE SUBSTITUTED FOR THE LANDSCAPE BUFFER, BUT NOT IN THE FRONT YARD OR FRONT YARD SETBACKS, SEE PARAGRAPH B. BELOW. LANDSCAPING MUST BE MAINTAINED AS IN ITS ORIGINAL DESIGN AND PURPOSE. NORTH BOUNDARY STREET BUFFER: 162 LIN. FT. (MOODY HIGHWAY) TREES REQUIRED- 5 TREES PROVIDED- 5 SHRUBS REQUIRED - 27 SHRUBS PROVIDED - XX WIDTH OF BUFFERS REQUIRED: 5'-0" MINIMUM WIDTH OF BUFFERS PROVIDED: 10'-0" EAST BOUNDARY STREET BUFFER: 154 LIN. FT. (PRIVATE DR.) TREES REQUIRED - NOT CITY RIGHT OF WAY TREES PROVIDED- 0 WIDTH OF BUFFERS REQUIRED:0' WIDTH OF BUFFERS PROVIDED: VARIES 7'-8' SOUTH BOUNDARY BUFFER: 151 LIN. FT. (UNDEVELOPED-SAME CBC ZONING) TREES REQUIRED- 0 TREES PROVIDED- 0 WIDTH OF BUFFERS REQUIRED: 0' WIDTH OF BUFFERS PROVIDED: VARIES 8'-20' WEST BOUNDARY BUFFER: 182 LIN. FT. (UNDEVELOPED-FUTURE-SAME CBC ZONING) TREES REQUIRED- 0 TREES PROVIDED- 0 WIDTH OF BUFFERS REQUIRED: 0' WIDTH OF BUFFERS PROVIDED: 5' MINIMUM REQUIRED PLANT MATERIAL SIZES DECIDUOUS TREES - 2" CAL. MIN. - PROVIDED 2" CAL. EVERGREEN TREES - 7' HT. MIN. - PROVIDED 7'-8' HT. SHRUBS - 5 GAL, MIN. - PROVIDED 5 GAL. 1 23 6 5 7 8 8 8 4 1. LIMIT TURF SUBGRADE PREPARATION TO AREAS TO BE PLANTED. 2. NEWLY GRADED SUBGRADES: LOOSEN SUBGRADE TO A MINIMUM DEPTH OF 4 INCHES. REMOVE STONES LARGER THAN 1 INCH IN ANY DIMENSION AND STICKS, ROOTS, RUBBISH, AND OTHER EXTRANEOUS MATTER AND LEGALLY DISPOSE OF THEM OFF OWNER'S PROPERTY. 3. SPREAD PLANTING SOIL OVER LOOSENED SUBGRADE. 4. REDUCE ELEVATION OF PLANTING SOIL TO ALLOW FOR SOIL THICKNESS OF SOD. 5. UNCHANGED SUBGRADES: IF TURF IS TO BE PLANTED IN AREAS UNALTERED OR UNDISTURBED BY EXCAVATING, GRADING, OR SURFACE-SOIL STRIPPING OPERATIONS, PREPARE SURFACE SOIL AS FOLLOWS: A. REMOVE EXISTING GRASS, VEGETATION, AND TURF. DO NOT MIX INTO SURFACE SOIL. B. LOOSEN SURFACE SOIL TO A DEPTH OF AT LEAST 6 INCHES. APPLY SOIL AMENDMENTS AND FERTILIZERS ACCORDING TO PLANTING SOIL MIX PROPORTIONS AND MIX THOROUGHLY INTO TOP 6 INCHES OF SOIL. TILL SOIL TO A HOMOGENEOUS MIXTURE OF FINE TEXTURE. 6. APPLY SOIL AMENDMENTS DIRECTLY TO SURFACE SOIL BEFORE LOOSENING. A. REMOVE STONES LARGER THAN 1 INCH IN ANY DIMENSION AND STICKS, ROOTS, TRASH, AND OTHER EXTRANEOUS MATTER. B. LEGALLY DISPOSE OF WASTE MATERIAL, INCLUDING GRASS, VEGETATION, AND TURF, OFF OWNER'S PROPERTY. 7. FINISH GRADING: GRADE PLANTING AREAS TO A SMOOTH, UNIFORM SURFACE PLANE WITH LOOSE, UNIFORMLY FINE TEXTURE. GRADE TO WITHIN PLUS OR MINUS 1/2 INCH OF FINISH ELEVATION. ROLL AND RAKE, REMOVE RIDGES, AND FILL DEPRESSIONS TO MEET FINISH GRADES. LIMIT FINISH GRADING TO AREAS THAT CAN BE PLANTED IN THE IMMEDIATE FUTURE. 8. MOISTEN PREPARED AREA BEFORE PLANTING IF SOIL IS DRY. WATER THOROUGHLY AND ALLOW SURFACE TO DRY BEFORE PLANTING. DO NOT CREATE MUDDY SOIL. 9. BEFORE PLANTING, OBTAIN LANDSCAPE ARCHITECT'S ACCEPTANCE OF FINISH GRADING; RESTORE PLANTING AREAS IF ERODED OR OTHERWISE DISTURBED AFTER FINISH GRADING. TURF AREA PREPARATION NOTES: LA-238 S T ATT T E O F IDADD H AA O E N EE S E DLARAA CHCCITEC T RODNDD ENNYE P .EVEAVV N AA SJ R . 8/19/2021 LA-238 S T A T E O F IDA H O L I C E N S E D LANDSCA P E ARCHITEC T RODN EY P . EVA N S J R . L1.50 LANDSCAPE DETAILS 123456789101112131415 A B C D E F G H J K L M DRAWN BY CHECKED BY PROJECT DATE SHEET REVISION/ISSUENO. DATE CALL 2 BUSINESS DAYSIN ADVANCE BEFOREYOU DIG, GRADE, OREXCAVATE FOR THEMARKING OFUNDERGROUNDMEMBER UTILITIES Co p y r i g h t 2 0 2 1 Al l r i g h t s r e s e r v e d . R e p r o d u c t i o n o r u s e i n a n y f o r m o r b y a n y m e a n s w i t h o u t w r i t t e n p e r m i s s i o n o f R o d n e y E v a n s + P a r t n e r s , P L LC . i s u n l a w f u l a n d s u b j e c t t o c r i m i n a l p r o s e c u t i o n . reandpartners.com + 208-514-3300 + 1450 W. Bannock Street, Boise, Idaho 83702 LA N D S C A P E A R C H I T E C T U R E + U R B A N D E S I G N + L A N D P L A N N I N G + G R A P H I C C O M M U N I C A T I O N + P R O J E C T M A N A G E M E N T WENDY'S MOODY RD. & N 2ND E REXBURG, ID 83440 City Review 21077 BSS RE 08/18/2021 - - - - - - - - - - - - CALLOUT NUMBERS REFER TO NUMBERED NOTES BELOW DECIDUOUS TREE PLANTING3 NOT TO SCALE SOIL LINE ROOT FLARE TO BE AT SOIL LINE NOTES: 1. REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP 2 3 OF ROOTBALL. REMOVE ALL NAILS, TIES, AND PLASTIC FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY BIODEGRADABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. 2. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD. 3. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. 4. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 5. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 6. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. 7. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. 8. FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8'-0" IN WIDTH, PROVIDE TREE ROOT BARRIER (DEEPROOT #24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND EDGE OF SIDEWALK. ALL TREE INSTALLATIONS SHALL CONFORM TO ALL AGENCY APPROVAL REQUIREMENTS, CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS. REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS; IMPROPERLY PRUNED TREES (AS DETERMINED BY THE LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. DO NOT REMOVE MAIN LEADER!! RUBBER CINCH TIE 2"x 2" WOOD STAKE (LENGTH AS REQUIRED)-DO NOT PENETRATE ROOTBALL. SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. REMOVE TREE WRAP TRUNK PROTECTION, AFTER INSTALLATION CONSTRUCT 2" EARTH BERM AT EDGE OF ROOTBALL, FILL TREE RING W/ MULCH, AS SPECIFIED. 3" THICK MULCH LAYER, KEEP MULCH 3" AWAY FROM TRUNK. FINISH GRADE PREVAILING WIND DIRECTION COMMERCIAL SLOW RELEASE FERTILIZER TABLETS SIDES OF HOLE ROUGH & UNEVEN BACKFILL WITH APPROVED TOPSOIL AND SOIL AMENDMENTS AS SPECIFIED. BACKFILL IN 6" LIFTS, WATER EACH LAYER, TAMP LIGHTLY AS REQUIRED, BACKFILL SOIL EVEN W/ TOP OF ROOTBALL, DO NOT OVER COMPACT!! SET ROOTBALL ON NATIVE, UNDISTURBED SOIL SHRUB PLANTING4 NOT TO SCALE 1. SHRUB SHALL BEAR SAME RELATIONSHIP TO GRADE AS IT DID IN NURSERY. 2. WATER SHRUB TWICE WITHIN FIRST 24 HOURS. 3. THIN BRANCHES AND FOLIAGE BY 13. 4. DO NOT CUT LEADERS TO RETAIN NATURAL SHRUB SHAPE. 5. FOR CONTAINER GROWN PLANTS THAT ARE ROOTBOUND, SPLIT THE ROOTBALL WITH 3 EQUAL SPACED VERTICAL CUTS. NOTES: REMOVE ANY PLASTIC, BURLAP, NAILS, OR OTHER MATERIALS FROM THE ROOTBALL WHICH MAY LIMIT ROOT GROWTH CONSTRUCT 2" EARTH BERM TO FORM A WATER RETENTION BASIN, FILL BERM WITH MULCH, AS SPECIFIED MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO NOT COVER CROWNS OF PLANTS PROVIDE COMMERCIAL FERTILIZER TABLETS AND BIOSTIMULANT, AS SPECIFIED, FOR EACH SHRUB BACKFILL WITH APPROVED TOPSOIL AND SOIL AMENDMENTS, AS SPECIFIED. BACKFILL IN 6" LIFTS, WATER EACH LAYER, DO NOT TAMP OR OVER COMPACT. CONSTRUCT 6" MOUND OF TOPSOIL GROUNDCOVER PLANTING2 NOT TO SCALE SECTION PLAN VIEW 1. ALL GROUNDCOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIANGULAR PATTERN. 2. APPLY SPECIFIED PRE-EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL GROUNDCOVER BEDS. NOTES: FINISH GRADE PER PLANS GROUNDCOVER PLANTING PER PLANTING PLAN MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO NOT COVER CROWNS OF PLANTS TILL SOIL TO A DEPTH OF 12", BACKFILL WITH APPROVED TOPSOIL AND SOIL AMENDMENTS, AS SPECIFIED. SUBGRADE A = LENGTH, AS SPECIFIED OR PER PLANT SCHEDULE B = 85% OF 'A' PLANTER BED CUT EDGE (TYPICAL AT TREES IN TURF AREAS)1 NOT TO SCALE APPROVED TOPSOIL AND SOIL AMENDMENTS AS SPECIFIED 3" DEPTH OF MULCH AT PLANTER BEDS FINISH GRADE, PER PLANS LA-2383838383833838383333333 S TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAATTTTTTTTT T E O F IIDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAADD HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH AA O E N EE S E DLAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAARRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRAAAAAA CHCCITEC T RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRROOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOODDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNDDDDDDDDDDDDD EEEEEEEEEEEEEEEEEEEEEEENNYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYEEEEEEEEEEEEE PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP .EVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVEAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVV NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN AA SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJ RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR ............... 8/19/2021