HomeMy WebLinkAboutFULL SET REVISIONS - 21-00694 - 240 E Moody - Wendy's - New Building0
1A
0
A2.1
11.
10.
9.
8.
6.
7.
5.
REVIEW DOCUMENTS AND VERIFY DIMENSIONS AND FIELD CONDITIONS AND
CONFIRM THAT WORK IS CONSTRUCTIBLE AS SHOWN. CONFLICTS OR
OMISSIONS, ETC., SHALL BE IMMEDIATELY REPORTED TO THE ARCHITECT
FOR CLARIFICATION PRIOR TO THE PERFORMANCE OF WORK IN QUESTION.
WHEN CONTRACTOR ACCEPTS DELIVERY OF ALL ITEMS NOTED ON PLANS
WHETHER IN CONTRACT OR NOT IN CONTRACT, HE SHALL BE RESPONSIBLE
FOR LOSS AND/OR DAMAGE TO THESE ITEMS.
THE CONTRACTOR SHALL MAINTAIN, FOR THE ENTIRE DURATION OF THE
WORK, ALL EXITS, EXIT/ EGRESS LIGHTING, FIRE PROTECTION DEVICES AND
ALARMS IN CONFORMANCE WITH ALL APPLICABLE CODES AND ORDINANCES.
SAW CUTTING AND CORING LOCATIONS SHALL BE REVIEWED IN FIELD AND
COORDINATED WITH THE OWNER'S REPRESENTATIVE PRIOR TO
CUTTING/CORING.
DURING ALL PHASES OF WORK, DO NOT DISTURB THE DELIVERIES AND
FUNCTIONS OF ADJACENT AND NEIGHBORING TENANTS.
'TYP.' MEANS THAT THE CONDITION IS REPRESENTATIVE FOR SIMILAR
CONDITIONS THROUGHOUT, UNLESS OTHERWISE NOTED.
PROVIDE PORTABLE FIRE EXTINGUISHER(S) IN ACCORDANCE WITH NFPA 10,
WITH U.L. LABEL AND A RATING OF NOT LESS THAN 2-A WITH 75 FT. TRAVEL
DISTANCE TO ALL POSITIONS OF RESTAURANT OR AS DIRECTED BY THE FIRE
DEPARTMENT FIELD INSPECTOR. PROVIDE CLASS K FIRE EXTINGUISHER
WITHIN 20 FT. OF COMMERCIAL FOOD HEAT-PROCESSING EQUIPMENT.
DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN PARTITION
LOCATIONS. IN CASE OF CONFLICT, NOTIFY THE ARCHITECT OF RECORD.
FLOOR PLAN BY ARCHITECT OF RECORD SUPERSEDES OTHER PLANS.
DIMENSIONS MARKED "CLEAR" SHALL BE MAINTAINED AND SHALL ALLOW
FOR THICKNESS OF FINISHES INCLUDING CARPET, PAD, CERAMIC TILE, V.C.T.,
ETC
INTERIOR DIMENSIONS ARE TO THE FACE OF STUD, UNLESS NOTED
OTHERWISE.
MARK LOCATIONS OF PARTITIONS AND DOORS FOR REVIEW BY THE OWNER'S
REPRESENTATIVE PRIOR TO INSTALLATION. REVIEW WILL BE FOR DESIGN
INTENT. COORDINATE AND VERIFY CONDITIONS TO ENSURE PROPER FIT.
12.
13.
IF REQUIRED BY LOCAL JURISDICTION - SPRINKLER, LIFE SAFETY, AND FIRE
ALARM SYSTEMS ARE TO BE DESIGNED AND SUBMITTED FOR REVIEW AND
APPROVAL BY LOCALLY LICENSED DESIGN PROFESSIONAL. THE DESIGN OF
SYSTEM(S) MUST COMPLY TO LOCAL, STATE, AND NATIONAL CODES.
14.
CONTRACTOR IS REQUIRED TO SCHEDULE A PRE-CONSTRUCTION MEETING
WITH THE OWNER'S REPRESENTATIVE TO REVIEW SPECIFIC REQUIREMENTS.
CONTRACTOR IS RESPONSIBLE TO FOLLOW LOCAL RULES AND
REGULATIONS.
EXTERIOR BUILDING SIGNS SHALL BE SUBMITTED UNDER SEPARATE PERMIT
APPLICATION FOR REVIEW AND APPROVAL AS REQUIRED BY LOCAL
AUTHORITIES. EXTERIOR SIGNS ARE NOT WITHIN THE SCOPE OF BUILDING
DEPARTMENT APPROVAL.
PRIOR TO COMMENCEMENT OF WORK - OBTAIN A COPY OF THE BUILDING
CONSTRUCTION PERMIT FROM THE AUTHORITY HAVING JURISDICTION (AHJ)
AND A COPY OF THE SET OF CONSTRUCTION DOCUMENTS SIGNED AND
SEALED BY A LICENSED DESIGN PROFESSIONAL FOR ALL DISCIPLINES AS
REQUIRED AND USED TO OBTAIN THE BUILDING PERMIT.
BIDDERS REFER TO WENDY'S APPROVED SUPPLIER LIST TO
OBTAIN NATIONAL ACCOUNT PHONE NUMBERS AND CONTACTS.
15.
GC IS RESPONSIBLE FOR FINDING AND LOCATING ALL UNDERGROUND
UTILITIES IN AREAS OF EXCAVATION PRIOR TO DIGGING. ACCIDENTAL
INTERRUPTION OF THESE SERVICES DURING CONSTRUCTION WILL BE THE
RESPONSIBILITY OF THE GC. PRIOR TO DIGGING, GC TO CALL LOCAL UTILITY
LOCATION SERVICE.
16.
RESTAURANT DESIGN
MEP ENGINEER
STRUCTURAL ENGINEER
CIVIL ENGINEER
4.
3.
2.
1.
946 OXBOW LANE
IDAHO FALLS, ID 83404
CONTACT: JEFF FREIBERG
TEL: 208-529-8174
J. FREIBERG ENGINEERING
COLUMN LINE
DOOR MARK
REVISION SYMBOL
CEILING FINISH CODE
CEILING HEIGHT
ELEVATION REFERENCE
SHEET NUMBER
ELEVATION NUMBER & DIRECTION
SHEET NUMBER
ROOM NAME
ROOM NUMBER
REVISION CLOUD
EQUIPMENT TAG
WINDOW MARK
FINISH TAG
NORTH ARROW
ELEVATION HEIGHT TARGET
LOCATION IN SPACE
WALL SECTION REFERENCE
SHEET NUMBER
DETAIL REFERENCE
SHEET NUMBER
CODED NOTE
PARTITION TYPE
REFERENCE SHEET
A4.3
SECTION REFERENCE
SHEET NUMBER
XXXCT1
1
1
XXX
ROOM NAME
123
X' - X" A.F.F
X' - X" A.F.F
A7.1
A
B
C
DA7.1
A
2
1
1
0
A1
0
1A
10' - 0" A.F.F.
CONTACT: -
TEL: -
FAX: -
1585 N. SKYLINE DR.
IDAHO FALLS, ID 83402
CONTACT: TODD RICKS
TEL: 208-390-4295
CLASSIC FOODS, INC.
WENDY'S - (2.0) SMART 40+
MOODY RD & N 2ND E
REXBURG, ID 83440
CENTERLINE
ACOUSTIC CEILING TILE
ADJUSTABLE
ABOVE FINISH FLOOR
ALUMINUM
ARCHITECTURAL
BOARD
BUILDING
BLOCKING
BEAM
BOTTOM
CABINET
CERAMIC
CEILING
CAULKING
CLEAR
COLUMN
CONCRETE
CONTINUOUS
DOUBLE
DETAIL
DIAMETER
DIMENSION
DOOR
DOWNSPOUT
DRAWING
EXISTING
EACH
ELEVATION
ELECTRICAL
EMERGENCY
EQUAL
FIRE EXTINGUISHER
FACE OF
FACE OF FINISH
FACE OF STUDSF.O.S.
F.O.F.
F.O.
F.E.
EQ.
EMER.
ELEC.
ELEV.
EA.
(E)
DWG.
DS.
DR.
DIM.
DIA.
DET.
DBL.
CONT.
CONC.
COL.
CLR.
CLKG.
CLG.
CER.
CAB.
BOT.
BM.
BLKG.
BLDG.
BD.
ARCH.
ALUM.
A.F.F.
ADJ.
ACT
LC
FINISH TO FINISH
FIRE RETARDANT
FINISH
FLOOR
FLUORESCENT
FOOT, FEET
FIELD VERIFY
GRAB BAR
GENERAL CONTRACTOR
GAUGE
GLASS
GYPSUMGYP.
GL.
GA.
G.C.
G.B.
F.V.
FT.
FLUOR.
FL.
FIN.
F.R.
F/F
H.M.
HDWD.
HORIZ.
HGT.
HVAC
HOLLOW METAL
HARDWOOD
HORIZONTAL
HEIGHT
HEATING, VENTILATION,
AIR CONDITIONING
I.D.INSIDE DIAMETER
INSUL. INSULATION
JT. JOINT
LAM LAMINATE
MAX.MAXIMUM
MECHANICAL
MANUFACTURER
MINIMUM
MISCELLANEOUS
METAL
MECH.
MFR.
MIN.
MISC
MTL.
MGR. MANAGER
N.NORTH
N.I.C. NOT IN CONTRACT
N.T.S. NOT TO SCALE
(N) NEW
NO. NUMBER
NOMINALNOM.
O.D. OUTSIDE DIAMETER
OPNG. OPENING
OPPOSITEOPP.
P.LAM.PLASTIC LAMINATE
PL. PLATE
PLAS. PLASTER
PLWD.PLYWOOD
PR.PAIR
PT.POINT
RAD.RADIUS
REG.REGISTER
REQ'D. REQUIRED
RM. ROOM
S. SOUTH
S.C. SOLID CORE
S.S.STAINLESS STEEL
SCHED. SCHEDULE
SHT. SHEET
SIM. SIMILAR
SPEC. SPECIFICATION
SQ. SQUARE
STD. STANDARD
STL. STEEL
STOR. STORAGE
SUSP. SUSPENDED
T.C. TIME CLOCK
T.O. TOP OF
TEL.TELEPHONE
THK.THICK
TYP.TYPICAL
U.N.O. UNLESS NOTED
OTHERWISE
VERT.VERTICAL
VERIFY IN FIELD
WEST
WITH
WATER CLOSET
WITHOUT
WATER RESISTANT
V.I.F.
W.
W/
W/C
W/O
W/R
WOODWD.
REF.REFERENCE
LB(S).POUND(S)
H.HIGH
S.F. SQUARE FOOT
FACE OF MASONRYF/MAS
ALUMINUM COMPOSITE
MATERIAL
ACM
ARCHITECT OF RECORDA.O.R.
P.T. PRESSURE-TREATEDDNDDO NOT DISTURB
KED
FOUNDATIONFDN.
PROV'D PROVIDED
WALK-IN BOX
(FREEZER/COOLER)
WIB
P.U.W.PICK UP WINDOW
V.C.T.VINYL COMPOSITE TILE
CONCRETE MASONRY UNITC.M.U.
KITCHEN EQUIPMENT
DISTRIBUTOR
ABBREVIATIONSGENERAL NOTES CODE DATA AND SQUARE FOOTAGE PROJECT TEAM DIRECTORY
ATTENTION ALL BIDDERS
DESCRIPTIVE SUMMARY OF WORK
CONSTRUCTION PRODUCT WARRANTY
LEGEND
APPLICABLE
CODES:
OCCUPANCY
GROUP A-2 RESTAURANT
ZONING -
WIND SPEED REFER TO STRUCTURAL DRAWINGS
USE SQUARE
FOOTAGE
OCCUPANT
LOAD
FACTOR
NUMBER OF
OCCUPANTS
OCCUPANCY CALCULATIONS:
GROSS BUILDING AREA: 2,319 SF. (INCLUDES 84 SF. OF CANOPIES/OVERHANGS)
WIB: 583 SF.
TOTAL FOOTPRINT AREA: 2,902 SF.
TOTAL NUMBER OF OCCUPANTS:
* NON-OCCUPIED AREA INCLUDES FREEZER / COOLER, RESTROOMS, CANOPIES/
OVERHANGS, WALLS, HALLWAYS, AND VESTIBULE
CONSTRUCTION
TYPE:
COMBUSTIBLE
VB
FIRE RESISTIVE
REQUIREMENTS:
FIRE
SPRINKLERS:
MAX TRAVEL
DISTANCE:
RESTROOM
REQUIREMENTS:
EXTERIOR BEARING WALL................................................0 HR
ROOF CONSTRUCTION......................................................0 HR
CEILING.................................................................................0 HR
NOT REQUIRED
200' PERMITED, 60' PROVIDED
WATER CLOSETS:................2
LAVATORIES..........................2
URINALS.................................0
DRINKING FOUNTAINS.........0
PUBLIC ACCESS....................YES
EGRESS WIDTH CALCULATIONS:
70 OCCUPANTS x 0.2 = 14" EGRESS WIDTH REQUIRED
(32" MIN. CLEAR ACCESSIBLE WIDTH)
44" EGRESS WIDTH PROVIDED
THE LOSS OF ONE REQUIRED MEANS OF EGRESS SHALL NOT REDUCE THE EGRESS
CAPACITY TO LESS THAN 50% OF REQUIRED.
DINING
KITCHEN
STANDING
SPACE
NON-OCC.*
743 SF. 1/15 50 (41 SEATS**)
1064 SF. 1/100 11
58 SF. 1/5 12
73 (41 SEATS**)
TOTAL EXITS
REQUIRED 1
TOTAL EXITS
PROVIDED 2
1037 SF.
INTERNATIONAL BUILDING CODE
NATIONAL ELECTRICAL CODE
INTERNATIONAL MECHANICAL CODE
INTERNATIONAL FIRE CODE
IDAHO PLUMBING CODE
2018
2017
2018
2018
2013
2017
NFPA 72 FIRE & ALARM SIGNALING CODE
PATIO 1/15
GRAND TOTAL:
** TOTAL OCCUPANTS USING NUMBER OF SEATS, INCLUDING DINING ROOM OCCUPANTS
(41 SEATS + 9 STANDING) = 50
VICINITY MAP
70 (41 SEATS**)
0
1A
DETAIL REFERENCE
SHEET NUMBER
PLEASE CONSULT WENDY'S APPROVED
SUPPLIER LIST AND APPROVED BUILDING
MATERIALS CONSOLIDATOR.
THE WORK INCLUDES ALL LABOR, MATERIALS, AND EQUIPMENT TO BUILD, FINISH, AND
PROVIDE ALL SITE WORK AND UTILITIES, FOR A PROPOSED NEW RESTAURANT FOR THE
"OWNER". THE WORK SHALL INCLUDE ALL ITEMS REQUIRED AS SHOWN ON THE DRAWINGS.
IN ADDITION, ALL WORK ASSOCIATED WITH THE SITE DEVELOPMENT PAVING, PARKING,
WALKWAYS, PATIO SLAB, AND SITE UTILITIES TO THE BUILDING ARE TO BE PROVIDED IN THIS
CONTRACT. ALL MECHANICAL EQUIPMENT AND SYSTEMS, AS WELL AS ALL ELECTRICAL
EQUIPMENT AND SYSTEMS ARE TO BE INCLUDED FOR A COMPLETE OPERATING SYSTEM
WITH COORDINATION AND INSTALLATION INCLUDED.
CONSTRUCTION / PRODUCT WARRANTIES THESE CONSTRUCTION DOCUMENTS NOTE
SPECIFIC PRODUCTS, DETAILS AND SPECIFICATIONS THAT WILL PROVIDE
CONSTRUCTION / PRODUCT WARRANTIES FOR THE FOLLOWING AREAS OF
CONSTRUCTION:
SIDING (KNOTWOOD)
ROOFING (DURO-LAST)
INTERIOR TILE (LATICRETE)
ALTERING THESE DOCUMENTS MAY ALTER THE WARRANTY GUIDELINES. DURO-LAST
AND LATICRETE WILL BE REQUIRED TO APPROVE THE DRAWINGS TO MAINTAIN THE
WARRANTIES. THE CONTRACTOR IS ALSO RESPONSIBLE FOR CONTACTING, DURO-LAST
AND LATICRETE FOR ON-SITE INSTALLATION INSPECTIONS OF EACH OF THE AREAS OF
WORK.
CLIENT
ARCHITECT
INTERNATIONAL ENERGY CONSERVATION CODE 2018
2902 SF.
SHEET # SHEET NAME REVISION
123
G1.1 COVER SHEET X X
G1.2 LIFE SAFETY PLAN X X
G2.1 SUPPLIER LIST & RESPONSIBILITY SCHEDULE X
A1.1 FLOOR PLAN X X
A1.2 REFLECTED CEILING PLAN X X
A1.3 ROOF PLAN X X
A2.1 EXTERIOR ELEVATIONS X
A2.2 EXTERIOR ELEVATIONS X
A3.1 BUILDING SECTIONS X
A3.2 BUILDING SECTIONS X X
A3.3 WALL SECTIONS X
A3.4 WALL SECTIONS X
A3.5 WALL SECTIONS X
A4.1 SECTION DETAILS X X
A4.2 PLAN DETAILS X
A4.3 ROOF DETAILS
A5.1 FINISH PLAN X
A5.2 FINISH DETAILS X
A6.1 PAINT, TILE, BLDG INSULATION, & JOINT TREATMENT
SCHEDULES X
A6.2 FINISH SCHEDULE
A6.3 DOOR SCHEDULE AND WINDOW ELEVATIONS X X X
A7.1 INTERIOR ELEVATIONS DINING ROOM X
A7.2 INTERIOR ELEVATIONS KITCHEN X X
A7.3 INTERIOR ELEVATIONS RESTROOM X
EQ1.1 EQUIPMENT PLAN XX
EQ1.2 EQUIPMENT SCHEDULE XX
S0.1 NOTES AND SECTIONS
S1.1 FOUNDATION PLAN AND SECTIONS X X
S1.2 FOUNDATION SECTIONS X
S2.1 ROOF PLAN AND SECTIONS X
S2.2 SECTIONS X
S2.3 SECTIONS X
P1.0 PLUMBING SCHEDULES AND NOTES X X
P1.1 PLUMBING PLAN - SANITARY WASTE AND VENT X X
P1.2 PLUMBING PLAN - DOMESTIC WATER X X
P1.3 PLUMBING PLAN - NATURAL GAS
P2.0 PLUMBING RISERS X X
P3.0 PLUMBING DIMENSION PLAN X
P4.0 PLUMBING DETAILS
P4.1 PLUMBING DETAILS
P5.0 PLUMBING SPECIFICATIONS
M1.1 HVAC PLAN X X
M2.0 HVAC DETAILS X
M3.0 TRANE MECHANICAL SCHEDULES X X
M4.0 MECHANICAL SPECIFICATIONS
W1.1T TRANE CONTROL WIRING DIAGRAM
W1.2 CONTROL WIRING NOTES & DETAILS
H1.1 HOOD DETAILS X X
H1.2 HOOD DETAILS X X
H1.3 HOOD DETAILS X X
E1.1 LIGHTING PLAN X
E1.2 PHOTOMETRIC PLAN X
E2.1 POWER PLAN X X
E2.2 LOW VOLTAGE / IT PLAN X
E2.3 POWER ROOF PLAN
E3.1 ELECTRICAL DISTRIBUTION X X X
E3.2 KITCHEN EQUIPMENT SCHEDULE XXX
E4.1 SECURITY PLAN
E5.1 ELECTRICAL ELEVATIONS X X
E5.2 ELECTRICAL ELEVATIONS X
E6.1 ELECTRICAL SPECIFICATIONS X
SP1 SPECIFICATIONS
SP2 SPECIFICATIONS
SP3 SPECIFICATIONS
C1.0 SITE / UTILITY PLAN
C2.0 GRADING / DRAINAGE PLAN
C3.0 PRIVATE DRIVE PROFILE
C4.0 SITE DETAILS
C5.1 MASONRY TRASH ENCLOSURE DETAILS
C5.2 DRIVE-THRU ORDER STATION DETAILS
C5.3 MISCELLANEOUS SITE DETAILS
CSP1 CIVIL SPECIFICATIONS
L1.00 LANDSCAPE PLAN
L1.50 LANDSCAPE DETAILS
SHEET INDEX
796 MERUS COURT
ST. LOUIS, MO 63026
CONTACT: DARRELL R. CASE
TEL: 636-349-1600
CASE ENGINEERING, INC.
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
CONTACT: EDIN CORALIC
TEL: 314-578-4953
CORALIC, LLC
ONE DAVE THOMAS BLVD.
DUBLIN, OH. 43017
THE WENDY'S COMPANY
796 MERUS COURT
ST. LOUIS, MO 63026
CONTACT: STEPHEN J. SACCO
TEL: 636-349-1600
CASE ENGINEERING, INC.
SITE ADDRESS
12
/
2
2
/
2
0
1
7
1
2
:
3
5
:
0
0
P
M
COVER SHEET
G1.1
IT
EC
CITY/OWNER COMMTS01/12/20233
CITY COMMENTS11/26/20212
CITY COMMENTS10/20/20211
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
3
1.12.23
X
EGRESS PATH
COMMON PATH OF TRAVEL
EGRESS TRAVEL PATH
OCCUPANT AREA BOUNDARY
LEGEND
SEATING AT TABLES (1012.4)
x EGRESS PATH: 44"
x AISLE: 36" W. MIN. BETWEEN TABLES, NO CHAIRS
x AISLE ACCESS WAY: 12" W. MIN.
- 19" FOR ADJACENT CHAIR (EITHER SIDE)
- 38" FOR CHAIRS BOTH SIDES
- 1/2" FOR EA. FT. >12'; 30' MAX. LENGTH UNTIL
CHOICE OF TWO EXIT PATHS.
EXIT TRAVEL DISTANCE
TRAVEL DISTANCE PERMITTED: 200' MAX.
TRAVEL DISTANCE PROVIDED: 52'-0" COMMON
PATH OF TRAVEL PERMITTED: 75' MAX COMMON
PATH OF TRAVEL PROVIDED: 56'- 5"
TRAVEL DISTANCE PERMITTED: 200' MAX.
TRAVEL DISTANCE PROVIDED: 68'-1" COMMON
PATH OF TRAVEL PERMITTED: 75' MAX COMMON
PATH OF TRAVEL PROVIDED: 56'- 0"
A
B
V2201
EX
T
.
R
A
M
P
ENTRY
100
RECEIVING
112
COOLER
111
FREEZER
110
DRIVE THRU
105
PAY WINDOW
113
OFFICE
108
KITCHEN
106
FAMILY
103
FAMILY
102
DINING
101
DINING OCCUPANT LOAD:
763 S.F. / 15 =51
OCCUPANTS (41 SEATS)
A
B
STANDING SPACE:
OCCUPANT LOAD:
42 S.F. / 5 NET =
9 OCCUPANTS
EXIT 01: OCCUPANT LOAD: 30
EGRESS WIDTH: 30* 0.2 = 6"
68" PROVIDED
KITCHEN OCCUPANT LOAD:
1346 S.F. / 100(GROSS) =
14 OCCUPANTS
EXIT 03:
OCCUPANT LOAD: 14
EGRESS WIDTH: 5* 0.2 = 2"
40" PROVIDED
1LIFE SAFETY PLAN
1/4" = 1'-0"
HOOD
CONTROLS
FIRE EXTINGUISHER -
5LB 3A-40B:C WALL
HUNG
FIRE EXTINGUISHER -
6 LITER TYPE K WALL
HUNG
TYPE ABC 5LB 6 LITER
FIRE EXTINGUISHER
IN SEMI-RECESSED
CABINET
EXIT 02: OCCUPANT LOAD: 25
EGRESS WIDTH: 30* 0.2 = 6"
36" PROVIDED
GENERAL NOTE
SEATING AT TABLES, COUNTERS AND WORK AREAS NEED
TO COMPLY WITH IBC 2018 SECTION 1109.12
LIFE SAFETY PLAN
G1.2
IT
EC
CITY COMMENTS10/20/21
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
1
APPROVED SUPPLIER LIST SHADING INDICATES PRODUCT IS
AVAILABLE THROUGH CONSOLIDATOR
PRODUCT CONTACT INFORMATION
CONSOLIDATOR 3/30/2021
HJC
HAINES, JONES AND CADBURY
WENDY'S CSR TEAM
800-459-7099
WENDYS@HJCINC.COM
DIVISION 3 - CONCRETE
PRE-TINTED CONCRETE CHEMMASTERS
MADISON, OHIO
800-486-7866
ATTN: CLAUDIA BENTLEY
DIVISION 4 - MASONRY AND STONE
FACE BRICK BOWERSTON SHALE COMPANY
740-269-2921
ATTN: CUSTOMER SERVICE
FACE BRICK HAMILTON PARKER
COLUMBUS, OH
614-358-7806
ATTN: JIM CAMPBELL
JIMCAMPBELL@HAMILTONPARKER.COM
MANUFACTURED STONE DUTCH QUALITY STONE
MOUNT EATON, OHIO
330-401-2115
ATTN: WENDALL MAST
MANUFACTURED STONE OWENS CORNING MASONRY PRODUCTS
MEDINA, OHIO
866-315-5081
ATTN: KATHY MANNON
(FOR NEAREST DISTRIBUTORS)
DIVISION 5 - METALS
DUMPSTER ENCLOSURE, GATES,
AND HARDWARE
(KNOTWOOD ENCLOSURE)
KNOTWOOD
360-433-9403
ATTN: K'LEB SHIVVERS
KSHIVVERS@OMNIMAX.COM
TECHNICAL SUPPORT
888-488-8440
KNOTWOODTECH@OMNIMAX.COM
DUMPSTER GATES AND
HARDWARE (REFER TO PLANS -
NOT USED WITH KNOTWOOD
DUMPSTER)
FORTIN WELDING
COLUMBUS, OH
614-291-4342
ATTN: BOB FORTIN
BOB@FORTINIRONWORKS.COM
PEDESTRIAN SAFETY RAIL (REFER
TO PLANS)
HJC - REFER TO CONSOLIDATOR
FORTRESS RAILING PRODUCTS
WWW.FORTRESSRAILING.COM
DIVISION 6 - WOOD, PLASTICS AND COMPOSITES
ROOF JOISTS, MICRO-LAM
BEAMS
REDBUILT
COLUMBUS, OH
614-595-3749
ATTN: JAKE SHEPHERD
JSHEPHERD@REDBUILT.COM
MILLWORK SEE "KITCHEN EQUIPMENT"
DIVISON 7 - THERMAL AND MOISTURE PROTECTION
ROOFING PRODUCTS DUROLAST ROOFING INC.
SAGINAW, MI
614-370-5569
ATTN: MIKE SUMAN
MSUMAN@DURO-LAST.COM
ROOFING PRODUCTS SARNAFIL ROOFING SYSTEMS
CANTON, MA
630-846-6022
ATTN: BEN BIEDRZYCKI
BIEDRZYCKI.BEN@US.SIKA.COM
KNOTWOOD KNOTWOOD
808-346-2188
ATTN: DAVID CARMACK
DCARMACK@@OMNIMAX.COM
TECH SUPPORT
888-488-8400
KNOTWOODTECH@OMNIMAX.COM
EIFS STO CORP
ATLANTA, GA
616-437-2230
ATTN: RAY REDMOND
RREDMOND@STOCORP.COM
EIFS DRYVIT SYSTEMS INC.
WARWICK, RI
734-276-0404
ATTN: ROBERT DAZEL
RDAZEL@DRYVITSYSTEMS.COM
ACM (OPTIONAL)ALCOA BUILDING & CONSTRUCTION SYSTEMS
MACON, GA
478-319-0139
ATTN: KEVIN JUEDEMAN
KEVIN.JUEDEMAN@ARCONIC.COM
CORRUGATED METAL ALCOA BUILDING & CONSTRUCTION SYSTEMS
MACON, GA
478-319-0139
ATTN: KEVIN JUEDEMAN
KEVIN.JUEDEMAN@ARCONIC.COM
PREMANUFACTURED FASCIA AND SOFFITS (OPTIONAL)
DIVISION 8 - DOORS AND WINDOWS
DOORS AND HARDWARE HAMILTON PARKER
COLUMBUS, OH
614-358-7806
ATTN: JIM CAMPBELL
JIMCAMPBELL@HAMILTONPARKER.COM
WOOD GRAIN EXTERIOR DOORS OLDCASTLE BUILDING ENVELOPE
TERRELL, TX
651-253-5062
ATTN: MARK LEHMAN
MLEHMAN@OBE.COM
TUBELITE
WALKER, MI
972-551-6386
ATTN: KENT BAUGMAN
KBAUGMANN@TUBELITEINC.COM
STOREFRONT OLDCASTLE BUILDING ENVELOPE
TERRELL, TX
651-253-5062
ATTN: MARK LEHMAN
MLEHMAN@OBE.COM
TUBELITE
WALKER, MI
972-551-6386
ATTN: KENT BAUGMAN
KBAUMANN@TUBELITEINC.COM
GLAZING GUARDIAN GLASS
AUBURN HILLS, MI
810-964-0074
ATTN: KREG HATFIELD
KHATFIELD@GUARDIAN.COM
GLAZING VITRO ARCHITECTURAL GLASS (FORMERLY PPG
GLASS)
CHICAGO, IL
630-962-4800
ATTN: JOSEPH SENNESE
JSENNESE@VITRO.COM
PICK-UP WINDOW (PUW)QUIKSERV / EASI-SERV
HOUSTON, TX
BRIAN HANSON
800-388-8307
BRIAN.HANSON@EASI-SERV.COM
DIVISION 9 - FINISHES
SUSPENDED ACOUSTICAL
CEILING
ARMSTRONG
ORDERING: HAINES, JONES AND CADBURY (HJC)
FRP PANELING HJC - REFER TO CONSOLIDATOR
LAMINATE PANOLAM
ORDERING: HAINES, JONES AND CADBURY (HJC)
PAINT AVAILABLE THROUGH LOCAL RETAIL LOCATIONS.
CONTACT NATIONAL ACCOUNT REP'S BELOW FOR
TECHNICAL QUESTIONS ONLY
PREFERRED
PITTSBURG PAINTS (PPG) (TECHNCIAL SUPPORT)
ATTN: RICK GARLIN
GARLIN@PPG.COM
SHERWIN WILLIAMS (TECHNICAL SUPPORT)
614-841-7723
ATTN: PAUL FAUDREE
PAUL.FAUDREE@SHERWIN.COM
BENJAMIN MOORE & COMPANY (TECH SUPPORT)
CLEVELAND, OH
330-353-3850
ATTN: DOROTHY HAZINSKI
DOROTHY.HAZINSKI@BENJAMINMOORE.COM
COATING
STUCCO / EIFS REFINISH
STO CORP
ATLANTA, GA
616-437-2230
ATTN: RAY REDMOND
RREDMOND@STOCORP.COM
SIGN PAINT (REFER TO SIGN VENDORS)
GROUT, THINSET, AND
WATERPROOFING MEMBRANE
LATICRETE INTERNATIONAL INC.
ORDERING: HAINES, JONES AND CADBURY (HJC)
TILE CROSSVILLE CERAMICS
ORDERING: HAINES, JONES AND CADBURY (HJC)
SILIKAL FLOORING
(OPTIONAL BACK OF HOUSE
FLOORING)
SILIKAL FLOORING
770-830-1404
ATTN: ANDY MILLS
ANDYMILLS@SILIKALAMERICA.COM
CORNER GUARDS ORDERING: HAINES, JONES AND CADBURY (HJC)
WALLCOVERINGS ORDERING: HAINES, JONES AND CADBURY (HJC)
(SEE "CORNER GUARDS" ABOVE FOR SUPPLIER)
SOLID SURFACE MATERIAL OHIO VALLEY SUPPLY
CINCINNATI, OH
800-696-5608 x3310
ATTN: JEFF HEDGES
JEFF.HEDGES@OVSCO.COM
DIVISION 10 - SPECIALTIES
DRIVE THRU CANOPY (PUW
AWNINGS & ORDER POINT)
GLOBAL AWNING
MONROE, LA
318-699-0088
ATTN: TREY O'BRYANT
TREY@GLOBALAWNINGS.COM
NATIONAL SIGN SYSTEMS
COLUMBUS, OH
614-850-2547
ATTN: JOSH JETT OR CUSTOMER SERVICE
JJET@NATSIGNSYS.COM
INTERIOR MENU BOARD
(DIGITAL), INTERIOR QUEING
BOARDS (DIGITAL)
THE WENDY'S COMPANY; IT DEPARTMENT
CUSTOMER ORDER KIOSKS &
CUSTOMER ORDER PICKUP
SCREEN
THE WENDY'S COMPANY; IT DEPARTMENT
COMMUNITY SINK AREA,
ILLUMINATED MIRROR, MIRROR,
FIXTURES
ORDERING: HAINES, JONES AND CADBURY (HJC)
EXTERIOR MENU BOARDS AND
PRE-SELL BOARDS, PYLON /
MONUMENT SIGNS, EXTERIOR
BUILDING SIGNAGE, INTERIOR
MENU AND QUEUING BOARDS
(NON-DIGITAL), INTERIOR
ILLUMINATED SIGNAGE
CUSTOM SIGN CENTER
COLUMBUS, OH
614-300-4270
ATTN: MICHAEL ANDERSON
MICHAEL@CUSTOMSIGNCENTER.COM
EVERBRITE, LLC
GREENFIELD, WI
414-768-5466
ATTN: ROXANNE STEFFEK
RSTEFFEK@EVERBRITE.COM
ID ASSOCIATES
DOTHAN, AL
888-303-5534
ATTN: BETHANY BROOKS
BBROOKS@IDASSOCIATES.COM
NATIONAL SIGN SYSTEMS
COLUMBUS, OH
614-850-2547
ATTN: JOSH JETT OR CUSTOMER SERVICE
JJET@NATSIGNSYS.COM
PATTISON SIGN GROUP
HEATH SPRINGS, SC
865-500-4848
ATTN: KEIRA CLARK
KDCLARK@PATTISONSIGN.COM
BIKE RACK CROW WORKS
ORDERING: KED (SEE KITCHEN EQUIPMENT BELOW)
RECYCLE DESIGN
ANDERSON, IN
765-374-0316
ATTN: JOSH BOUTWELL
JBOUTWELL@RECYCLEDESIGN.COM
ART PACK ELEMENTS AND
WAYFINDINGS
CREATIVE PALETTE, INC
COLUMBUS, OH
614-575-1515
CARLA ROHR
CROHR@CREATIVEPALETTEINC.COM
LADDER RECEIVER LADDERTECH, LLC
BRIGHTON, MI
800-770-8851
ATTN: MICHELE ORAS OR CUSTOMER SERVICE
MICHELE@LADDERPORT.COM
RESTROOM ACCESSORIES ORDERING: HAINES, JONES AND CADBURY (HJC)
HVAC SCREENING CITYSCAPES
HILLIARD, OH
877-727-3367
WWW.CITYSCAPES.COM
WINDOW SHADES
**3 WEEK LEAD TIME**
ROLL-A-SHADE
LAKE ELSINORE, CA
951-245-5077 x120
ATTN: CARI McCOY
WENDYS@ROLLASHADE.COM
SAFETY EQUIPMENT AEI AYDELOTT EQUIPMENT INC.
CENTERVILLE, OH
888-293-3568 OR 937-435-8220
ATTN: NICOLE AYDELOTT
NAYDELOTT@AYDELOTT.COM
FRONT LINE SALES (CORPORATE ONLY)
630-466-5606
ATTN: TIM HAYES
TIM@FLSAFETY.COM
BACK OF HOUSE CASH SAFE
(N0508)
AMPHION
RANCHO CUCAMONGO, CA
844-996-9267
PAIG PARISH
WENDY.SAFES@AMPHION.BIZ
BASS SECURITY
CLEVELAND, OH
JASON MOYER
888-774-3400 ext. 1336
WENDYS@BASS-SECURITY.COM
JMOYER@BASS-SECURITY.COM
SMART SAFE (N0501)
(OPTIONAL)
ARMORED CAR SERVICE
SECURITY CAMERA SYSTEM
(OPTIONAL)
SECURITY SOURCE
ADRIAN COX
978-987-4011
ACOX@SECURITYSOURCE.COM
ALARM SYSTEM ( OPTIONAL)ADT
BILL ROSE
CHARLOTTE, NC
704-791-7052
WILLIAMROSE@ADT.COM
FIRE ALARM. (OPTIONAL)ADT / PROTECTION 1
BILL ROSE
CHARLOTTE, NC
704-791-7052
WILLIAMROSE@ADT.COM
CO2 MONITOR CO2METER, INC.
MELYSSIA SANTIAGO
OFFICE: 386-310-4933 EXT: 108
MELYSSIA.SANTIAGO@CO2METER.COM
DIVISION 11 - EQUIPMENT
KITCHEN EQUIPMENT
DISTRIBUTOR (KED)
AEI AYDELOTT EQUIPMENT INC.
CENTERVILLE, OH
888-293-3568 OR 937-435-8220
ATTN: HERB AYDELOTT
HAYDELOTT@AYDELOTT.COM
N. WASSERSTROM AND SONS
COLUMBUS, OH
614-737-8659
ATTN: CONOR KENNEDY
CONORKENNEDY@WASSERSTROM.COM
S & G DISTRIBUTING
HILLIARD, OH
614-334-3636
ATTN: TAYLOR HEILBRONNER
TAYLOR_HEILBRONNER@SGMGROUP.COM
DIVISION 12 - FURNISHINGS
DINING ROOM FURNITURE (SEE KITCHEN EQUIPMENT ABOVE)
PATIO FURNITURE EMUAMERICAS, LCC
303-733-3385 X220
DANIEL FARROW
NATIONALACCOUNTS@EMUAMERICAS.COM
RECYCLE DESIGN
ANDERSON, IN
765-374-0316
ATTN: JOSH BOUTWELL
JBOUTWELL@RECYCLEDESIGN.COM
DIVISION 13 - SPECIAL CONSTRUCTION
WALK-IN COOLER / FREEZER INTERNATIONAL COLD STORAGE
WICHITA, KS
316-218-4177
ATTN: LISA MOORE
LISA.MOORE@ICSCO.COM
IMPERIAL BROWN
PORTLAND, OR
503-328-6806
ATTN: KRISTY HEATLEY
KHEATLEY@IMPERIAL-BROWN.COM
DIVISION 22 - PLUMBING
WATER HEATERS ORDERING: HAINES, JONES AND CADBURY (HJC)
PLUMBING FIXTURES ORDERING: HAINES, JONES AND CADBURY (HJC)
FAUCETS ORDERING: HAINES, JONES AND CADBURY (HJC)
COMMUNITY SINK / STAND
DIVISION 23 - HVAC
HVAC EQUIPMENT TRANE
866-986-4822
ATTN: MARTY CUSICK
MJCUSICK@TRANE.COM
CARRIER
630-920-9151
ATTN: MATT MURPHY
MATT.MURPHY@CARRIER.UTC.COM
AAON
CORKEN APPLIED PRODUCTS
937-432-6099
ATTN: JIM PEED
JIM@PREFERREDEQUIPMENT.NET
YORK
405-419-6514
ATTN: JULIAN CAMPOS
JULIAN.CAMPOS@JCI.COM
EXHAUST HOODS / EXHAUST
FANS
CAPTIVEAIRE
800-825-3143
ATTN: STEVE LUDDY
STEVE.LUDDY@CAPTIVEAIRE.COM
HALTON (SIMPLE MISSION)
SCOTTSVILLE, KY
770-598-0531
ATTN: BRENT COX
BCOX.SIMPLEMISSION@GMAIL.COM
AIR CURTAINS (ABOVE PUW, AS
REQUIRED BY CODE)
QUIKSERV CORP / EASI-SERV
HOUSTON, TX
BRIAN HANSON
800-388-8307
BRIAN.HANSON@EASI-SERV.COM
DIFFUSERS ORDERING: HAINES, JONES AND CADBURY (HJC)
TEST AND BALANCE PROVIDERS NATIONAL TAB
855-682-6822 X4, 4
ATTN: DON HERTENSTEIN
DAN@NATIONALTAB.COM
MELINK CORPORATION
513-965-7300 EXT. 501
ATTN: MEGAN PARKER
WENDYS@MELINKCORP.COM
AIRADIGM SOLUTIONS
603-262-9292 x709
ATTN: STEVE BUELTERMAN
STEVE.BUELTERMAN@AIRADIGMSOLUTIONS.COM
DIVISION 24 - ELECTRICAL SYSTEMS
MODULAR ELECTRICAL PANEL
SYSTEMS
*ORDER IMMEDIATELY - LONG
LEAD TIME ITEM*
CAROLINA PRODUCTS INC.
CHARLOTTE, NC
704-364-9029
ATTN: BRYAN STRYKER
BRYANS@CPIPANELS.COM
WESCO
COLUMBUS, OH
614-934-6403
ATTN: BEN FACTOR
BFACTOR@WESCO.COM
PATIO HEATER (Optional)ORDERING: LOEB ELECTRIC
PATIO FAN (Optional)ORDERING: LOEB ELECTRIC
INTERIOR LIGHTS,BUILDING
LIGHTS
ORDERING: HAINES, JONES AND CADBURY (HJC)
LOEB ELECTRIC
COLUMBUS, OH
888-563-2669
ATTN: WENDY'S PROJECT TEAM
WENDYSPROJECTS@LOEBELECTRIC.COM
VILLA LIGHTING
ST LOUIS, MO
RONDA SCHRAGE
314-633-0536
WENDYS@VILLALIGHTING.COM
SITE LIGHTING ORDERING: HAINES, JONES AND CADBURY (HJC)
DESIGN & ORDERING: LSI INDUSTRIES
CINCINNATI, OH
LINDA McMULLEN
513-372-3101
LINDA.MCMULLEN@LSI-INDUSTRIES.COM
DESIGN & ORDERING: LOEB ELECTRIC
COLUMBUS, OH
888-563-2669
ATTN: WENDY'S PROJECT TEAM
WENDYSPROJECTS@LOEBELECTRIC.COM
DESIGN AND ORDERING: VILLA LIGHTING
ST LOUIS, MO
RONDA SCHRAGE
314-633-0536
WENDYS@VILLALIGHTING.COM
DIVISION 32 - EXTERIOR IMPROVEMENTS
BOLLARD COVERS ORDERING: HAINES, JONES AND CADBURY (HJC)
POST GUARD
OTHER VENDORS
FREESTYLE MACHINE COCA-COLA
MATT DOWHY
404-676-0451
MDOWHY@COCA-COLA.COM
USED COOKING OIL TANK AND
ENCLOSURE
*TYPICALLY PROVIDED THROUGH
USED COOKING OIL RECOVERY
SUPPLIER*
DAR PRO SOLUTIONS
248-214-2699
JIM SCHMIEDER
JSCHMIEDER@DARPRO.COM
MAHONEY ENVIROMENTAL
800-892-9392; 317-339-6282
JACK REEVES
JACKR@MAHONEYES.COM
VALLEY PROTEINS, LCC
800-871-3406 OR 540-877-2092
CUSTOMER SERVICE / RON ROGERS
RROGERS@VALLEYPROTEIN.COM
FLAG POLE
(OPTIONAL)
AMERICAN FLAGPOLE AND FLAG CO
800-426-6235 OR 651-777-0172
MATT KNOWLAN
MKNOWLAN@AFLAG.COM
GREASE INTERCEPTOR TANK
(OPTIONAL)
SCHIER GREASE INTERCEPTOR TANK
816-506-3203
SEAN MOLEN
SEAN.MOLEN@SCHIERPRODUCTS.COM
ZURN GREASE INTERCEPTOR TANK
CONTACT HJC
BULK CO2 STORAGE AIRGAS NATIONAL CARBONATION
STEVE GREGG, STRATEGIC ACCOUNT MANAGER
719-434-1006
STEVEN.GREGG@AIRGAS.COM
ARC3 GASES
BRANDON LYONS
407-318-6743
BRANDON.LYONS@ARC3GASES.COM
NUC02
DEBBIE OLIVER
CUSTOMER SERVICE: 800-472-2855
DEBBIE.OLIVER@NUCO2.COM
RESPONSIBILITY SCHEDULE
O : OWNER 03.30.2021
KED : KITCHEN EQUIPMENT DISTRIBUTOR (CONTRACTED BY OWNER)
S: SUPPLIER CONTRACTED THROUGH OWNER GC : GENERAL CONTRACTOR
SHADING INDICATES ITEM IS AVAILABLE THROUGH CONSOLIDATOR. REFERENCE HJC ON SUPPLIER LIST
ITEM SU
P
P
L
I
E
D
IN
S
T
A
L
L
E
D
FI
N
A
L
U
T
I
L
I
T
Y
CO
N
N
E
C
T
I
O
N
COMMENTS
EQUIPMENT (DEPICTED ON EQ SHEETS)
KITCHEN EQUIPMENT / SHELVING KED KED GC REFER TO EQ1.1 & EQ1.2 FOR ADDITIONAL INFORMATION
DINING ROOM PACKAGE KED KED N/A
FREESTANDING DINING ROOM TABLES KED GC N/A GC TO ANCHOR TABLE BASES TO FLOOR
ART PACK SGC N/A
CONDIMENT / BEVERAGE BAR KED KED GC
DOUBLE SIDED GRILL SS N/A
FLY LIGHT SGC N/A
EXTERIOR
SIGNAGE S S GC MUST BE SUPPLIED BY APPROVED VENDOR
LADDER DOCK & LADDER PORT GC GC N/A
USED COOKING OIL (UCO) TANK & TANK SURROUND S S GC TYPICALLY PART OF U.C.O. CONTRACT
BULK CO2 TANK & CO2 LINES S S S
WALK-IN COOLER / FREEZER BOX S S GC
PATIO FURNITURE GC GC N/A AOR TO INCLUDE IF PATIO IS INCLUDED
PEDESTRIAN SAFETY RAIL & PATIO FENCE (IF REQUIRED)GC GC N/A
BOLLARD SLEEVE (BL-1)GC GC N/A
DRIVE THRU
EXTERIOR MENU BOARDS (STATIC)SS GC
ANCHOR BOLTS BY OWNER'S SIGN INSTALLER /
FOUNDATION BY GC
EXTERIOR PRE-SELL BOARDS (STATIC)SS GC
ANCHOR BOLTS BY OWNER'S SIGN INSTALLER /
FOUNDATION BY GC
ORDER POINT CANOPY AND CANOPY SUPPORT POLE S S GC
INCLUDES LIGHTS & HEAT TRACE. ANCHOR BOLTS
SUPPLIER BY VENDOR / FOUNDATION BY GC
PUW CANOPY S S GC INCLUDES LIGHTS & HEAT TRACE. BLOCKING BY GC
ORDER CONFIRMATION DISPLAY (OCD)SS S
INSTALLED BY OWNER'S IT INSTALLER / FOUNDATION BY
GC
DETECTOR LOOP S GC S SUPPLIED BY OWNER'S IT INSTALLER
PICK-UP WINDOW GC GC GC
INTERIOR
TILE WINDOW SILLS GC GC N/A
CORIAN CAP AT FRONT COUNTER / PLATFORM SEATING KED GC N/A
MENU BOARD (U510)OO GC
PREMIUM BEVERAGES BOARDS (D1703)OO GC
WINDOW SHADES GC GC N/A
FIRE EXTINGUISHER CABINET GC GC N/A SUPPLIED BY GC
FIRE EXTINGUISHERS (FOH & BOH)GC GC N/A GC IS RESPONSIBLE FOR EXTINGUISHER TAGS
STAINLESS STEEL CORNER GUARDS GC GC N/A
WALL COVERINGS GC GC N/A
CERAMIC / PORCELAIN TILE FLOOR, WALL & BASE GC GC N/A
CEILING TILE & GRID GC GC N/A
MECHANICAL
RTU UNIT EQUIPMENT PACKAGE GC GC GC
REFER TO MECHANICAL SHEETS FOR PACKAGE
COMPONENTS
RTU - START UP GC GC NA
RTU - FACTORY COMMISSIONING GC S NA 7 BUSINESS DAY NOTICE REQUIRED.
HVAC CONTROLS COMMISSIONING GC S GC 7 BUSINESS DAY NOTICE REQUIRED.
HVAC TEST & BALANCE SS -T&B REQUIRED. APPROVED SUPPLIER RECOMMENDED
REMOTE CONDENSER EQUIPMENT RAILS GC GC GC
EXHAUST HOOD PACKAGE GC GC GC
REFER TO MECHANICAL SHEETS FOR PACKAGE
COMPONENTS AND ADDITIONAL INFORMATION
RESTROOM ACCESSORIES
RESTROOM HARDWARE GC GC N/A
DISPENSERS ( PAPER TOWEL, TOILET PAPER)GC GC GC
SOAP DISPENSERS KED GC N/A RESTROOM SOAP DISPENSER BY KED
GRAB BARS & MIRRORS GC GC N/A
COMMUNITY SINK & FIXTURES GC GC GC
LIGHTED MIRROR FULL LENGTH MIRROR - COMMUNITY SINK AREA GC GC N/A
FIXTURES (TOILETS, URINALS, LAVATORIES, VANITIES)GC GC GC
PLUMBING
WATER HEATER GC GC GC REFER TO PLUMBING SHEETS
GAS COOKING EQUIPMENT SUPPLY MANIFOLD.GC GC GC REFER TO PLUMBING SHEETS - ORDER FROM KED
USED COOKING OIL MANIFOLD S GC GC
REFER TO PLUMBING SHEETS - PROVIDED UNDER
COOKING OIL RECYCLE CONTRACT
MOP SINK FAUCETS KED GC GC REFER TO EQUIPMENT SCHEDULE
REVERSE OSMOSIS SYSTEM (RO)KED KED KED REFER TO EQUIPMENT SCHEDULE
WATER FILTRATION SYSTEM S S S BY BEVERAGE EQUIPMENT INSTALLER
ELECTRICAL
MODULAR ELECTRICAL PANEL SYSTEM GC GC GC ORDER AT OR BEFORE PROJECT START
LIGHT FIXTURES AND LAMPS (INTERIOR, EXTERIOR BUILDING & SITE)GC GC GC
POINT OF SALE SYSTEM (POS)SS S
REFERENCE ELECTRICAL SHEETS FOR ROUGH-INS BY
GC
CUSTOMER SELF ORDER KIOSK S S S
CUSTOMER ORDER PICK-UP SCREEN (D1701)SS S
SECURITY CAMERAS / MONITORS O O O REFERENCE ELECTRICAL SHEETS FOR WORK BY GC.
PATIO HEATERS / PATIO FANS GC GC GC AOR TO DETERMINE IF PART OF SCOPE
INTERNET SERVICE / CABLING O O O
NOTES:
1 ALL ITEMS NOT SPECIFICALLY NOTED AS "BY OWNER" OR "BY KED" ARE FURNISHED AND INSTALLED BY THE GENERAL CONTRACTOR.
2 SEE EQUIPMENT SCHEDULE COMMENT SECTION FOR ADDITIONAL EQUIPMENT TO BE CONNECTED BY GC's PLUMBING AND ELECTRICAL SUB-CONTRACTORS.
3 GENERAL CONTRACTOR SHALL RECEIVE, STORE, AND MAKE SAFE ALL OWNER AND KED SUPPLIED ITEMS.
4 SEE APPROVED SUPPLIER LIST FOR SUPPLIER CONTACT INFORMATION.
5 ALL CONDUIT, WIRING, & PIPING DEPICTED ON DRAWINGS AND/OR REQUIRED TO MAKE FINAL CONNECTIONS ARE BY GC UNLESS NOTED OTHERWISE.
6 GC TO PROVIDE BACK UP SUPPORTS AS REQUIRED.
NOTE: IN THE EVENT OF CONFLICT BETWEEN THIS SCHEDULE AND CONSTRUCTION DETAILS, THE CONSTRUCTION DETAILS PREVAIL.
NOTE TO AOR AND GENERAL CONTRACTOR:
DUE TO LONGER THAN USUAL LEAD TIMES FOR SEVERAL
GENERAL CONTRACTOR (GC) PROVIDED PIECES OF
EQUIPMENT, SUCH AS HVAC, ELECTRICAL PANELS, WALK-IN
BOXES, IT HARDWARE AND SOME KITCHEN EQUIPMENT, WE
STRONGLY ENCOURAGE YOU TO CONTACT VENDORS TO
SECURE ORDERS FOR THIS EQUIPMENT WELL AHEAD OF
TIME. AS OF Q2 2022 LEAD TIMES FOR SOME ITEMS ARE AS
MUCH AS 28-30 WEEKS FOR DELIVERY
SUPPLIER LIST &
RESPONSIBILITY\PSCHEDULES
G2.1
IT
EC
CITY/OWNER COMMTS01/12/20233
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
3
3
3
3
3
3
3
3
1.12.23
A
B
1
EX
T
.
R
A
M
P
19'-5 1/2"
2"
40'-6 1/2"7'-4" R.O.3'-10"
6'-8"14'-0"12'-8"
10'-6"5'-6" R.O.
6 1/2"
8'-8 7/8" R.O.3'-4 5/8"
6 1/2"
4'-0 3/8" R.O.2'-1 1/8"
6
1
/
2
"
1'
-
1
0
"
R.
O
.
6
1
/
2
"
1'
-
1
0
"
R.
O
.
2'
-
4
"
3'
-
1
0
"
4'
-
8
"
4'
-
8
"
4'
-
2
"
3'
-
0
"
4'
-
8
"
10
'
-
1
1
1
/
2
"
R
.
O
.
8"
8'
-
8
1
/
4
"
R
.
O
.
6"
3'
-
4
"
4'
-
0
"
3'
-
9
"
9'
-
1
0
3
/
4
"
3
1
/
2
"
3'
-
5
"
7"
2'
-
3
1
/
4
"
10'-3 1/2"2'-5 1/2"7'-11"
3
1
/
2
"
4'
-
4
"
2'
-
9
1
/
2
"
3
1
/
2
"
6'
-
0
1
/
4
"
3
1
/
2
"
11
'
-
1
"
HO
L
D
4'
-
8
"
12'-2 1/2"±2'-2"
3 1/2"
13'-0"
HOLD
11'-8"
HOLD
9'-4"±
3 1/2"
18'-0 1/2"
HOLD 1'-9"
HOLD
8'
-
9
3
/
4
"
5'-5 7/8"
69'-4"
10
'
-
2
1
/
2
"
11
'
-
1
1
"
F
R
A
M
I
N
G
7'-4"4'-1 1/2"
28'-6 1/2"
23
'
-
1
"
3'
-
6
"
DO
O
R
3'
-
5
"
32
'
-
0
"
6"
6"
6"
31
'
-
0
"
5'-3 7/8" R.O.
3
A3.4
5
A3.5
4
A3.5
5
A3.3
1
A3.5
2
A3.2
2
A3.2
2
A3.4
1
A3.4
2
A3.3
1
A3.3
1
A3.1
1
A3.1
1
A3.2
1
A3.2
2
A3.1
2
A3.1
CREW
114
ENTRY
100
UTILITY
116
COOLER
111
FREEZER
110
RECEIVING
112
FAMILY
102
SERVICE
104
KITCHEN
106
DRIVE THRU
105
DINING
101
OFFICE
108
FAMILY
103
7
2
3
5
6
10
3A
2
9
1
7 6
5
4
A
A
C
A
C
B
AB
B
C
A
A
A
C
A
C
C
1
10
11
12
12
14
14
15
15
15
16
17
19
2
20
21
2222
23
27
28
28
28
3
3
30
4
4
4
5
5
7
7
7
7
8
9
25
25
SIM.
SIM
WE POINT=
F.O.S.
1FLOOR PLAN
1/4" = 1'-0"
WIB LINES
OMMITED IN THIS
AREA FOR
CLARITY.
02
A2.1
01
A2.1
01
A2.2
02
A2.2
SHADED AREA = SHEAR WALL
DIAGONAL HATCH = METAL STUD WALLS
STIPPLE = SOUND BATT INSULATION
26
GENERAL NOTES
A. EXTERIOR DIMENSIONS ARE FROM FACE OF SHEATHING TO FACE OF
SHEATHING U.N.O. INTERIOR DIMENSIONS ARE TO FACE OF STUD U.N.O.
B. COORDINATE CURB CUTS AT DOORS WITH STOREFRONT MANUFACTURER
PRODUCT DETAILS AND SHOP DRAWINGS.
C. REFER TO FINISH PLAN AND INTERIOR ELEVATIONS FOR EXTENT OF INTERIOR
FINISHES.
D. THE CONTRACTOR SHALL PROVIDE SOLID WOOD BLOCKING FOR WALL
MOUNTED ITEMS, EQUIPMENT, MILLWORK, ETC. COORDINATE LOCATIONS
WITH OWNER'S CONSTRUCTION REPRESENTATIVE AS NECESSARY.
E. REFER TO WALL TYPES ON SHEET A4.3.
F. REFER TO DOOR AND WINDOW SCHEDULE ON SHEET A6.3.
G. AN OPTIONAL PANELIZED EXTERIOR WALL SYSTEM IS AVAILABLE THROUGH
RED-BUILT- SEE SUPPLIER LIST FOR CONTACT INFORMATION. G.C. MUST
COORDINATE WITH AOR, OWNER, AND RED-BUILT TO VERIFY CODE COMPLIANCE,
PERMITTING REQUIREMENTS, AND INSTALLATION CRITERIA.
H. ANY CONCEALED SPACES NEED TO BE FIREBLOCKED/DRAFTSTOPPED PER IBC
2018 SECTION 718.
LEGEND
3 1/2"
31
3B
8
17
'
-
7
3
/
4
"
6'
-
2
1
/
4
"
70'-1 1/4"
8"
3 1/4"9 1/4"
10
'
-
8
3
/
4
"
11
'
-
9
"
9'
-
6
1
/
4
"
8"
CURB, REF. CIVIL
DRAWINGS
20'-1 1/2" F.O. FDN TO F.O. FDN
5'
-
1
0
3
/
4
"
12
10'-3 1/2"
2'-0"
2'
-
0
1
/
4
"
4
A3.4
28'-8 3/4"
SIM
1
A3.4
3
A2.1
PAY WINDOW
113
5
3
A3.5
2
A3.5
4
5
A4.2
6
A4.2
LOW
7
A4.2
LOW
2
A4.2HIGH
3
A4.211
A4.2
14
A4.2
10
A4.2
12
A4.2
SIM
13
A4.2
8
A4.2
9
A5.2
4
A4.2
A
B
C
2 X 4 FRAMING @ 16" O.C.
3 1
2" METAL STUD @ 16" O.C.
2 X 6 FRAMING @ 16" O.C.
SEE A5.1 FOR ADDITIONAL INFORMATION
**Tags updated in plan
1
A4.2
11
'
-
9
"
A
4'
-
4
1
/
2
"
3
1
/
2
"
3
1
/
2
"
5 1/2"
8A
4'-8"7'-8" R.O.
8'-2" R.O.9'-5 1/2"
1A
4A
5
1
/
2
"
36
'
-
8
"
F.
O
.
F
D
N
T
O
F
.
O
.
F
D
N
.
15
A4.2 1
32
32
32
3232
32
12
A4.2
33
#CODED NOTES:#CODED NOTES CONT.:
1. WALK-IN FREEZER/COOLER MANUFACTURER TO PROVIDE REINFORCED FRAMED
OPENING FOR DOOR AS SCHEDULED.
2. APPROXIMATE LOCATION OF FRONT COUNTER. REF. SHEET A5.1 FOR LOCATION.
3. G.C. TO INSTALL STAINLESS STEEL CORNER GUARD, REFER TO FINISH PLAN
SHEET FOR LOCATIONS AND TYPE OF CORNER GUARDS.
4. SHADED AREA INDICATES SHEAR WALL, REF. STRUCTURAL DRAWINGS.
COORDINATE FINISHES WITH NUM. OF PLIES PROVIDED. EXTEND PLYWOOD AS
REQUIRED TO MAINTAIN FINISH PLANE.
5. ROOF/ PARAPET OVERHANG ABOVE. REFER TO ROOF PLAN, SECTIONS,AND
EXTERIOR ELEVATIONS FOR ADDITIONAL INFORMATION.
6. NOT USED.
7. SOFFIT / BULKHEAD ABOVE, REFER TO REFLECTED CEILING PLAN.
8. 6" DIA. CONCRETE FILLED METAL PIPE BOLLARD W/ BOLLARD SLEEVE. INSTALL
BOLLARD PER CIVIL DRAWINGS.
9. ROOF ACCESS LADDER RECEIVER & SAFETY GATE.
10. RECESSED MOP SINK, INSTALL WATERPROOF MEMBRANE IN MOP SINK RECESS
TO TIE INTO DRAIN. REF DETAIL ON A5.1.
11. EXHAUST HOOD, REF. MECHANICAL DRAWINGS.
12. STAINLESS STEEL PANELS BEHIND AND BESIDE FRYERS & GRILL. REFER TO
INTERIOR ELEVATIONS & FINISH PLAN FOR EXTENTS.
13. NOT USED.
14. EQUIPMENT CURB BY KITCHEN EQUIPMENT DISTRIBUTOR. REF. SHEET A5.1 FOR
LOCATIONS. REF. SHEET A5.2 FOR EQUIPMENT CURB DETAILS.
15. 6" C.M.U. CURB BELOW STOREFRONT. REFER TO SECTION AND STRUCTURAL
DRAWINGS.
16. PARTIAL HEIGHT WALL, REFER TO INTERIOR ELEVATIONS AND SECTIONS.
17. STAINLESS STEEL CLOSURE TRIM / ANGLES BY GC.
18. NOT USED.
19. SEMI-RECESSED FIRE EXTINGUISHER CABINET AND FIRE EXTINGUISHER,
SUPPLIED AND INSTALLED BY GC REFER TO INTERIOR ELEVATIONS.
20. PRE-MANUFACTURED SWITCHGEAR CABINET ON 6" CONC. CURB. REF. DETAILS
3/A1.1 & 6/A5.2.
21. CLEAR FLOOR AREA TO BE MAINTAINED IN FRONT OF ELECTRICAL PANELS MIN
3'-0" AS REQUIRED BY NEC.
22. PRE-FINISHED DOWNSPOUT. EXTEND 6" PVC W/ CAP UNDERGROUND & CONNECT
TO STORM. SEE CIVIL AND EXTERIOR ELEVATIONS FOR ADDITIONAL INFORMATION.
23. HOT WATER TANK ON SHELF. TOP OF SHELF 4'-0" AFF. REFER STRUCTURAL
DRAWINGS, DETAIL 04/S2.3.
24. NOT USED.
25. EDGE OF CONCRETE SLAB / FOUNDATION FOR WALK-IN BOX. REF. STRUCTURAL
DRAWINGS.
26. RAMP BY WIB MANUFACTURER.
27. PROVIDE IN WALL BLOCKING FOR MOUNTING ARM OF CUSTOMER ORDER PICKUP
SCREEN - COORDINATE WITH MOUNTING ARM SPEC. BOTTOM OF SCREEN TO BE
MOUNTED 6'-10" AFF.
28. WALK-IN-BOX. FREEZER SUPPLIED WITH INSULATED FLOOR.
29. NOT USED.
30. HOLD DOWNS PROVIDED BY WIB MANUFACTURER G.C. TO DRILL AND EPOXY SET
ANCHOR BOLTS AS REQUIRED. VERIFY LOCATIONS AND QUANTITY WITH
MANUFACTURER.
31. C/T CABINET AND ELECTRIC METER AT THIS LOCATION. COORDINATE WITH LOCAL
UTILITY COMPANY. REFER TO CIVIL DRAWINGS FOR ADDITIONAL INFORMATION.
32. FACE OF SHEATHING / FACE OF FOUNDATION.
33. INSTALL 1/2" PLYWOOD SHEATHING BEHIND GYPSUM BOARD TO MAINTAIN FINISH
ALIGNMENT WITH BULKHEAD ABOVE.
34. WALL MOUNTED FIRE EXTINGUISHERS, SUPPLIED AND INSTALLED BY G.C. REFER
TO INTERIOR ELEVATIONS
8
3'
-
2
"
R.
O
.
3 1/2"
6'-8"
A
7'-0"
7'
-
3
1
/
4
"
C
A
A7.3
3
A3.3
10'-5"
18'-10"
4
A3.3 4
7'-4 1/2"
8
34
9
A4.2HIGH
3PLAN DETAIL
1/2" = 1'-0"
CONC. CURB
ELECTRICAL
PANELS
BASE
1'-1"
WESCO
1'-1 1/2"
CPI
5'
-
5
1
/
2
"
6
A5.2
2KITCHEN DIMENSION PLAN
1/4" = 1'-0"
13'-0" R. FRM.
11
'
-
1
"
R
.
F
R
M
.
18'-0 1/2" R. FRM.9'-11" R. FRM.
19'-9 1/2" FIN. DIM.9'-10" FIN. DIM.
4'
-
0
"
R.
F
R
M
.
4'
-
0
1
/
2
"
R.
F
R
M
.
3'
-
9
"
FI
N
.
D
I
M
.
3'
-
1
1
"
FI
N
.
D
I
M
.
13'-0" FIN. DIM.
11
'
-
0
"
F
I
N
.
D
I
M
.
W.E. POINT
1'-9"R. FRM.
11'-7" FIN. DIM.
11'-8" R. FRM.
FLOOR PLAN
A1.1
IT
EC
CITY/OWNER COMMTS01/12/20233
CITY COMMENTS10/20/20211
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
3
3
3
3
3
33
1.12.23
SP
MAXLITE
LED
MAXLITE
LED
MAXLITE
LED
EX
T
.
R
A
M
P
MA
X
L
I
T
E
LE
D
MAXLITE
LED
MA
X
L
I
T
E
LE
D
MAXLITE
LED
LCA672LCE6120
MAXLITE
LED
MAXLITE
LED
1'-6"
1'-0"1'-6"
1'-0"
EQ
.
EQ
EQ
1'-0"
EQ
.
EQ
.
1'
-
6
"
2'-9"2'-0"7"
1'
-
6
"
2'-0"
EQ
.
EQ
.
EQ
.
EQ EQ
3'
-
4
"
3'-4"
EQ EQ
4'
-
2
"
3'
-
4
"
EQ EQ
EQ EQ
1'
-
6
"
EQ EQ
1'
-
0
"
3'-0"
5'
-
5
"
1'
-
6
"
1'-6"
EQ.
3'-4"
UTILITY
116
FAMILY
103
FAMILY
102
DINING
101
FREEZER
110
COOLER
111
RECEIVING
112
DRIVE THRU
105
OFFICE
108
SERVICE
104
CT4
CT1
CT1
GBGB
CT1
CT4
TYP.
TYP.
SOFFIT @
9'-0" AFF.
SOFFIT @
7'-1" AFF.
SOFFIT
@ 7'-1"
AFF.
SPSP
9'-4" AFF
9'-6" AFF
8'-0" AFF 8'-0" AFF
8'-4" AFF
8'-10" AFF
8'-10" AFF
10'-2" AFF
CL
CL
GENERAL NOTES
A. SEE INTERIOR FINISH SCHEDULE FOR ALL CEILING FINISHES.
B. DO NOT SCREW THE CEILING GRID TO THE STAINLESS STEEL HOODS. REFER TO
DETAIL 2/A1.2.
C. REFER TO ELECTRICAL AND/OR HVAC DRAWINGS FOR ADDITIONAL INFORMATION
REGARDING ALL FIXTURES, DEVICES AND EQUIPMENT SHOWN ON THIS PLAN.
D. VERIFY CONFIGURATION OF MUSIC SYSTEM IN DINING ROOM. COORDINATE
REQUIREMENTS WITH WENDY'S I.T. CONTACT.
E. VERIFY CONFIGURATION OF WIFI SYSTEM. COORDINATE REQUIREMENTS WITH
WENDY'S I.T. CONTACT.
F. ALL LIGHT FIXTURES MOUNTED IN CEILING TILES ARE TO BE CENTERED IN THE
TILE U.N.O.
G. EXIT LIGHTING AND EXIT SIGNS TO COMPLY WITH IBC 2018 SECTIONS 1008 AND
1013.
1REFLECTED CEILING PLAN
1/4" = 1'-0"
#CODED NOTES:
1. EXPOSED STRUCTURAL JOIST. REFER TO STRUCTURAL DRAWINGS.
2. TRACK LIGHTS. TRACK TO BE MOUNTED AT 12'-0" AF.F. REFER TO ELECTRICAL
DRAWINGS FOR FIXTURE INFORMATION.
3. NOT USED.
4. SPEAKER. PROVIDE BLOCKING AS REQUIRED.
5. EXHAUST HOODS. REFER TO MECHANICAL DRAWINGS.
6. G.C. TO PROVIDE AND INSTALL LIGHTING FOR COOLER/FREEZER/RECEIVING UNITS
W/ MOTION SENSOR.
7. REFER TO EXTERIOR ELEVATIONS FOR MOUNTING LOCATIONS OF WALL MOUNTED
LIGHT FIXTURES (TYP.).
8. OPTIONAL OVERHEAD UNIT HEATER. REFER TO MECHANICAL DRAWINGS.
9. PAINT WALLS ABOVE 11'-6" (ABOVE TRIM), EXPOSED STRUCTURE, CONDUITS,
J-BOXES, WIRING, PIPING, DUCTS AND REGISTERS , W/ PAINT INDICATED ON FINISH
PLAN.
10. PENDANT LIGHTING, BOTTOM OF FIXTURE TO BE MOUNTED AT 12'-0" A.F.F. REFER
TO ELECTRICAL DRAWINGS.
11. EQUIPMENT CHASE. REFER TO ELECTRICAL AND MECHANICAL DRAWINGS.
12. EXTEND GYP. BD. TIGHT TO DECK ABOVE.
13. FREEZER/COOLER EVAPORATOR, REFER TO MECHANICAL DRAWINGS.
14. NOT USED.
15. JOIST BRIDGING, REFER TO STRUCTURAL DRAWINGS.
16. NOT USED.
17. MONO POINT SPOT LIGHT FIXTURE TO BE MOUNTED AT BOTTOM OF JOIST &
CENTERED ON TABLES BELOW. PROVIDE BLOCKING AS REQUIRED. REFER TO
ELECTRICAL DRAWINGS
18. BOTTOM OF PENDANT GLOBE LIGHT TO BE MOUNTED AT 6'-0" A.F.F. CENTERED
OVER TABLE U.N.O. REFER TO ELECTRICAL DRAWINGS AND INTERIOR
ELEVATIONS
19. LED STRIP LIGHT AT CORNICE/PARAPET CAP. REFER TO ELECTRICAL DRAWINGS.
20. MAIN DUCT TO BE 2" BELOW BOTTOM OF JOIST
21. ROOF DRAIN, REFER TO ROOF PLAN.
22. OVERFLOW DRAIN, REFER TO ROOF PLAN.
23. GYPSUM BOARD SOFFIT ATTACHED TO STRUCTURE ABOVE.
24. STAINLESS STEEL CHASE TIED TO UNDERSIDE OF SOFFIT FOR DRINK LINES BY
KED
25. G.C. TO PROVIDE 1/2" PLYWOOD SHEATHING BEHIND GYPSUM BOARD AT MENU
BOARD BULKHEAD. SEE DETAIL ON THIS SHEET FOR MORE INFORMATION.
EQ.
TYP.
3'
-
0
"
3'
-
0
"
1'-9"
1'
-
3
"
SCUPPER &
DOWNSPOUT
SCUPPER &
DOWNSPOUT
2
A3.5
CT-5
KITCHEN
106
2'-2 1/2"
GB
3'-10 1/2" AFF
SP
SP10'-6 1/2"
8'-6"
5'
-
1
0
"
3
A1.2
STRING LIGHT
CEILING MOUNTED
HEATER
LED LIGHT
FIXTURE
EMERGENCY
EGRESS LIGHT
WIB LIGHT
LEGEND
SUSPENDED
LIGHT FIXTURE
DIRECTIONAL
TRACK LIGHT
AIR DIFFUSERS
SW SUB WOOFER
SPEAKER
DIRECTIONAL LIGHT
RECESSED CAN LIGHT
EXIT LIGHT
SP SP
1
10
10
10
10
11
11
12
12
12
19
19
19
15
9
2
2
2 2
7 77
777
13
12
10
18
17
7
4
15
15
5
5
11
4
4
20
EQ EQ
10
"
5'-9"5'-0"
3'
-
0
"
10
10
EQ EQ
6
5'
-
1
0
"
5'-03 4"
5'-0 3/16"
18
EQ EQ
18
18
5'
-
1
1
"
7
7
1'-214"
TYP.
17
10
TYP
TYP
TYP
TYP
10
21
22
P-10
P-10
P-10P-10
8
9'
-
0
"
9'
-
0
"
7'
-
2
"
EQ.EQ.
EQ EQ
1'
-
2
"
2'
-
0
"
2'
-
0
"
2'
-
9
3
/
4
"
EQ.EQ.
SOFFIT
HEIGHT
@ 8'-0"
AFF.
CT1
9'-4" AFF
8'-0"5'-0"1'
-
9
1
/
2
"
TYP.
17
TYP.
17
4'
-
6
"
4'
-
6
"
10
'
-
4
"
6
6
6
66
6 6
6
1'-6"
1'
-
0
"
6'
-
6
"
4'
-
1
0
"
4'
-
6
"
3'
-
7
"
EQ EQ
EQ EQ
EQ EQEQEQ 3'
-
8
"
5'
-
0
"
5'
-
0
"
3'
-
8
"
3'
-
8
"
5'
-
0
"
1'
-
6
"
10'-5 7/8"23
24244
A1.2 GB
11'-2" +/- AFF
P-6
8'-6 7/16"
2'
-
9
3
/
4
"
1'-1 3/4"
3'
-
0
1
/
2
"
3'
-
0
1
/
2
"
5
A1.2
DO NOT FASTEN TO HOODS
CEILING TILE.
REFER TO
REFLECTED
CEILING PLAN
HOOD
8 GA. HANGER WIRE AT
4'-0" O.C. G.C. TO
SUSPEND TRACK FROM
STRUCTURE ABOVE
2CEILING DETAIL @ HOOD
3" = 1'-0"
NOTE: INSTALL PER
MANUFACTURERS SPECIFICATIONS
IF DIFFERENT THAN BELOW.
3SOFFIT - ELEC. PANELS
1-1/2" = 1'-0"
EXTERIOR WALL PER
SECTION 4/A3.3
FRP CORNER TRIM
1/2" PLYWOOD
CEILING TILE,
REFERENCE
PLAN
2 X 4 FRAMING AT
16" O.C. EXTENDED
TO STRUCTURE
ABOVE
2 X 4 FRAMING AT 48"
MAX
ELECTRICAL PANELS
6"
1'-1"
INSTALL GYP. TIGHT
TO STRUCTURE.
1/2" PLYWOOD
SHEATHING
GYPSUM BOARD
SHEATHING,
PAINT
I-JOIST
KEEP SOFFIT OPEN TO
RECEIVE DRINK LINES
FOR FREESTYLE
MACHINE
1'-6"
CONT. 2X LEDGER
WALL TILE, REF.
INTERIOR
ELEVATIONS
1/2" CEMENT
BOARD
SIMPSON
HANGER
PROVIDE METAL J-BEAD
P-6
B.O. SOFFIT
11'-2" AFF
4SOFFIT - DRINK STATION
3/4" = 1'-0"5SOFFIT - MENU BOARD
3/4" = 1'-0"
1/2" PLYWOOD SHEATHING
ATTACHED TO VERTICAL AND
HORIZONTAL STUDS
1/2" GYPSUM
BOARD
FINISH CEILING,
SEE RCP
2X4 DIAGONAL
BRACING, SEE
STRUCTURAL
1/2" GYPSUM
BOARD
CONTINUOUS LINE OF 2X6 BLOCKING,
TYP. TOP AND BOTTOM OF SHEATHING.
2X6 BLOCKING
@16" O.C.
CONTINUOUS 2X6
BLOCKING, SEE
STRUCTURAL
FOR DETAILS.
2X6 BLOCKING ALL OTHER
MENU BOARD ATTACHMENT
POINTS, SEE STRUCTURAL
(3) 2X6 BLOCKING WITH 1/2"
FILLER PLATES AT EACH
TOP & BOTTOM MENU
BOARD ATTACHMENT
POINTS. SEE STRUCTURAL
FOR DETAILS
1" TO 1-1/2" NET
FILLER BLOCKS.
SEE STRUCTURAL
SIMPSON LS30
EA. SIDE
STAGGERED
1 (MIN)
1
SIMPSON LU26 HANGER,
EACH END TYP.
B.O. CELING
9'-6" A.F.F.
B.O. CELING
8'-10" A.F.F.
B.O. SOFFIT
7'-1" AFF
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
REFLECTED CEILING PLAN
A1.2
IT
EC
CITY/OWNER CMMTS01/12/233
CITY COMMENTS10/20/211
3
3 3 3 3
3
3
3
3
3
3
1.12.23
SL
O
P
E
:
1
/
4
"
P
E
R
1
'
-
0
"
SL
O
P
E
:
1
/
4
"
P
E
R
1
'
-
0
"
SLOPE: 1/4" PER 1'-0"
3'
-
0
"
MI
N
.
3
A3.4
5
A3.3
1
A3.5
2
A3.2
2
A3.2
2
A3.5
2
A3.4
1
A3.4
4
A3.3
3
A3.3
2
A3.3
1
A3.1
1
A3.1
2
A3.1
1
A3.3 (OR RECTANGULAR SHAPE)
= 2.75"
= 3" DIA.
= 2 3/4" x 41/4"
= 2,930 S.F.
= 4"x4"
= 5,860 S.F.
(SIZE OF VERTICAL CONDUCTORS & LEADERS)
100 YEAR, I-HOUR RAINFALL (IN.)
REQUIRED VERTICAL LEADER SIZE (ROUND)
SPECIFIED LEADER CAPACITY (SINGLE)
REQUIRED OVERFLOW SCUPPER SIZE (SINGLE)
VERTICAL LEADER (X2) CAPACITY PROVIDED
GENERAL NOTES
A. ROOF WORK TO BE INSTALLED WITH COMPATIBLE WENDY'S APPROVED ROOF
MATERIAL SPECIFICATIONS. PROVIDE AND INSTALL ROOF INCLUDING BUT NOT
LIMITED TO, INSULATION BOARD, EDGE FLASHING(S), COPINGS, SEALED
TERMINATIONS AS REQUIRED BY THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS AND SPECIFICATIONS. AT PENETRATIONS/ ATTACHMENTS IN THE
ROOF, FLASH/ PROVIDE WEATHER TIGHT SEAL PER ROOFING SYSTEM
MANUFACTURER'S WARRANTY REQUIREMENTS. THE ROOFING CONTRACTOR SHALL
ENSURE THE ENTIRE ROOF SHALL BE WEATHER AND WATER TIGHT WITH POSITIVE
DRAINAGE TO THE ROOF DRAINS AND NO PONDING.
B. ROOFING CONTRACTOR SHALL INSTALL RIGID INSULATION (PER LOCAL ENERGY
CODE AND IBC 2018 SECTION 15; ROOF FIRE CLASSIFICATION: C) AND PRIOR TO
MEMBRANE INSTALLATION. SYSTEM TO BE COMPLETE WITH ALL ACCEPTABLE
PRODUCTS AND INSTALLATION REQUIRED TO PROVIDE A FULL MANUFACTURER'S
WARRANTY.
ROOF SCREENS:
CITYSCAPES UNIT-MOUNTED VERTICAL ROOF SCREEN SYSTEM WITH
CORRGATED 7.2 RIB HORIZONTAL (METAL), NO TOP TRIM. COLOR :
SHADOW GRAY.
WWW.CITYSCAPESINC.COM
CALCULATED ROOF AREA:
= 2,432 S.F.
= 322 S.F.
= 2,754 S.F.
HORIZONTAL ROOF AREA (S.F.)
VERTICAL SURFACE 50% AREA (S.F.)
TOTAL PROJECTED ROOF AREA (S.F.)
DRAINGAGE CALCULATIONS:
1ROOF PLAN
1/4" = 1'-0"
#CODED NOTES:
1. LINE OF EXTERIOR WALL BELOW.
2. PRE-MANUFACTURED 4" x 8" THRU-WALL SCUPPER, REFER TO DETAIL 12/A4.3.
3. EXTEND SINGLE-PLY MEMBRANE ROOF TO TERMINATION BAR UNDER COUNTER
FLASHING TO PROVIDE WEATHER TIGHT SEAL. REFER TO DETAIL 8/A4.3.
4. EXTERIOR WALK-IN COOLER / FREEZER / RECEIVING UNIT SUPPLIED AND
INSTALLED BY OTHERS. WALK-IN BOX PROVIDER IS RESPONSIBLE FOR
INSTALLING ROOFING SYSTEM ON PANELIZED COOLER / FREEZER SYSTEM.
MEMBRANE ROOF ON WIB BY MANUFACTURER. GC TO PROVIDE AND INSTALL
COUNTER FLASHING.
5. PROVIDE POSITIVE DRAINAGE AROUND ALL ROOF CURBS.
6. INSTALL PIPE FLASHING FOR ROOF MOUNTED CONDENSERS LINES. REFER TO
DETAIL 3/A4.3 AND 4/A4.3
7. ICE MACHINE CONDENSER FOR DINING ROOM FREESTYLE MACHINE. REFER TO
DETAIL 5/A4.4 FOR CURB.
8. KITCHEN ICE MACHINE CONDENSER. REFER TO DETAIL 5/A4.4 FOR CURB.
9. PRE-FINISHED ALUMINUM COLLECTOR BOX (W/ OVERFLOW SLOT) & DOWNSPOUT
TO STORM SEWER BELOW. REFER TO EXTERIOR ELEVATIONS.
10. PARAPET VENTING BY ROOF MEMBRANE MANUFACTURER. MIN. 1 VENT PER
FIREBLOCKED AREA.
11. MECHANICALLY FASTEN SINGLE-PLY ROOF MEMBRANE OVER CONTINUOUS RIGID
BOARD INSULATION OVER PLYWOOD SHEATHING.
12. PLUMBING VENT PIPE. REFER TO DETAIL 9/A4.3 FOR REQUIRED FLASHING
REQUIREMENTS
13. WALK-IN FREEZER / COOLER REMOTE CONDENSER. REFER TO ELECTRICAL
DRAWINGS. INSTALLED BY WALK-IN-BOX SUPPLIER. FINAL CONNECTIONS BY
CONTRACTOR.
14. LADDER RECEIVER/HOOK & SAFETY GATE FOR ROOF ACCESS. REFER TO DETAIL
1/A4.3.
15. EXTEND ROOF MEMBRANE UP/OVER PARAPET & FLASH TO PRE-FINISHED
ALUMINUM ROOF DRIP EDGE OR GRAVEL STOP. REFER TO WALL SECTIONS.
16. NOT USED.
17. NOT USED.
18. SHADED AREA INDICATES ARE OF ROOF TO RECEIVE WALKWAY PADS.
19. ROOFTOP UNIT. REFER TO DETAIL 6/A4.3 AND MECHANICAL DRAWINGS
20. PRE-FINISHED ALUMINUM DRIP EDGE, REFER TO WALL SECTIONS.
21. HATCH PATTERN INDICATES AREAS OF TAPERED INSULATION OVER SPECIFIED
RIGID THERMAL INSULATION AS REQUIRED TO PROVIDE ROOF DRAINAGE. G.C. TO
COORDINATE ACTUAL EXTENTS OF TAPERED INSULATION MATERIALS WITH ROOF
INSTALLER PROPER COUNTER SLOPE AS REQUIRED BY CODE.
22. DASHED LINE INDICATES CLEAR AREA REQUIRED FOR THE HVAC UNIT AIR INTAKE.
LOCATE ALL EXHAUST AIR DEVICES OUTSIDE OF 10'-0" RADIUS (TYP).
23. COOK CENTER CONDENSER. SUPPLIED AND INSTALLED BY KED. FINAL
CONNECTION BY CONTRACTOR.
24. NOT USED.
25. EXHAUST FAN, REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION.
26. OVERFLOW DRAIN. REF. DETAIL 13/A4.3. FIELD LOCATE TO BE 2" HIGHER THAN THE
MAIN DRAIN.
27. ROOF DRAIN. REF. DETAIL 13/A4.3. CONNECT LEADER TO UNDERGROUND STORM
SYSTEM.
28. PRE-MANUFACTURED THRU-WALL SCUPPER, 6" (H) x 12" (W) MINIMUM. BASE TO
ALIGN WITH ROOF MEMBRANE TO ALLOW WATER TO "PASS THRU"
29. NOT USED.
30. FIRE BLOCKING AT 20'-0" MAX. INTERVALS HORIZONTALLY, TYP.
31. FIRE BLOCKING AT 10'-0" MAX. INTERVALS HORIZONTALLY, TYP.
2
A3.1
3
A3.5
RTU-1
1
A3.2
1
A3.2
1
1
1
10
10
10
11
11
12
1313
14
15
15
15
15
15
15
15
19
22
20
20
20
20
21
21
21
21
22
23
25
25
25
28
3
4
5
5
6
6
9 9
30
30
30
31
31
31
10
31SLOPE
26
15
6
8 7
27
ALTERNATE
EF-2 LOCATION
5
5
18
SLOPE: 1/4" PER 1'-0"
3'-9"
5
10'-10 5/8"
9'
-
5
3
/
4
"
1
0
'
-
0
"
M
I
N
.
10' -0" MIN.
4'
-
5
"
5
19
RTU-2
1
0
'
-
0
"
M
I
N
.
10' -0" MIN.
ROOF PLAN
A1.3
IT
EC
CITY/OWNER CMMTS01/12/233
CITY COMMENTS10/20/211
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
3
1.12.23
EQ EQ
CL
8"
6'
-
3
"
3
A3.4
1
A3.5
2
A3.2
1
A3.2
4
A3.3
1
A3.2
4
A2.1
M-4
E-8
M-5
E-8
M-7
M-1 SF-1
M-3
E-2
E-7
M-1
M-4
M-7
SF-1
BL-1
E-8
E-7
M-1
SF-1
BL-1
M-7
E-7
COLLECTOR BOX & DOWNSPOUT
PREFINISHED TO MATCH PEX-12.
DOWNSPOUT CONNECTED TO
STORM WATER SYSTEM. REFER
TO 12/A4.3 FOR ATTACHMENT
DETAILS.
ROOF LINE.
WALL MOUNTED LIGHT
FIXTURE, TYP.
BLADE BEYOND
EIFS REVEAL, TYP.
LADDER RECEIVER
W/ SAFETY GATE.
PAINT PEX-10.
REFER TO DETAIL
1/A4.3
ROOF LINE
WALL MOUNTED
LIGHT FIXTURE
TYP.
SERVICE DOOR, REFER
TO DOOR SCHEDULE.
PAINT PEX-1.
FLUSH MOUNTED 54" WENDY'S
SIGNAGE PROVIDED BY SIGN
SUPPLIER. G.C. TO PROVIDE
BLOCKING AND ELECTRICAL AS
REQUIRED.
EIFS REVEAL, TYP.
6'
-
3
"
2REAR ELEVATION
1/4" = 1'-0"
1FRONT ELEVATION
1/4" = 1'-0"3REAR DRIVE-THRU ELEVATION
1/4" = 1'-0"
SURFACE-MOUNT
SPEAKER, CENTER
ON DOOR.
STREET NUMBER TO BE
LOCATED PER LOCAL
JURISDICTION REQUIREMENTS.
6" HIGH NON-REFLECTIVE DARK
BRONZE NUMERALS U.N.O.
M-4
M-5
BLADE LIGHTING,
REFER TO ELECTRICAL
3'-0"3'-0"
2
A3.2
EIFS REVEAL, TYP.
EIFS REVEAL, TYP.
BEYOND
BEYOND
SF-1 STOREFRONT -"DARK BRONZE"
PUW PICK-UP WINDOW TO MATCH STOREFRONT
M-1 PARAPET CAP/ BRAKE METAL - "DARK BRONZE"
M-3 EXCEPTIONAL METALS - "BRIGHT RED"
M-4 EXCEPTIONAL METALS - "SILVER METALLIC"
M-5 BRAKE METAL - "CLEAR ANNODIZED"
M-7 EXCEPTIONAL METALS - "CUSTOM DARK GREY"
KW-1 KNOTWOOD PREFINISHED ALUMINUM SIDING MATERIAL
"LIGHT OAK"
KW-2 KNOTWOOD PREFINISHED ALUMINUM SIDING MATERIAL
"KNIGHTS ARMOUR"
KW-3 KNOTWOOD PREFINISHED ALUMINUM SIDING MATERIAL
"BRITE RED MATT"
E-2 EIFS - "WENDY'S RED"
E-7 EIFS - "DARK GREY"
E-8 EIFS - "TAN"
E-9 EIFS - "SILVER" (SMOOTH FINISH)
BL-1 BOLLARD SLEEVE - "YELLOW"
PEX-1 PAINT - DARK BRONZE (SEE PAINT SCHEDULE)
PEX-3 PRE-FINISHED DARK BRONZE SIGN CABINETS (SEE PAINT
SCHEDULE)
PEX-6 PRE-FINISHED WALK-IN FREEZER / COOLER DARK BRONZE
(SEE PAINT SCHEDULE)
PEX-10 PAINT / POWDER COAT- BLACK (SEE PAINT SCHEDULE)
PEX-12 PAINT- DARK GREY (SEE PAINT SCHEDULE)
PEX-6
EXTERIOR FINISH SCHEDULE
EQ.EQ.EQ.EQ.
T.O. BLADE FRAMING
21' - 0"
T.O. PARAPET FRAMING
18' - 3"
T.O. DINING PARAPET
14' - 10"
T.O. GLAZING
11' - 6"
T.O. CONC. SLAB
0' - 0"
T.O. TOWER FRAMING
18' - 3"
T.O. TOWER FRAMING
18' - 3"
T.O. CONC. SLAB
0' - 0"
T.O. CONC. SLAB
0' - 0"
T.O. FRAMING
18' - 3"
6'
-
3
"
6'
-
3
"
4'-8"
PEX-1
@ DOWN
SPOUT
@ COLUMN
LED STRIP LIGHTING
IN CORNICE
WALL BEYOND, REFER
TO BUILDING SECTIONS
FOR MORE INFO
M-4
WENDY'S SIGNAGE TO
BE PROVIDED BY SIGN
SUPPLIER. G.C. TO
PROVIDE BLOCKING
AND ELECTRICAL AS
REQUIRED.
ALTERNATE
RACEWAY BLADE
LIGHTING.
EQ EQ
8"
3'
-
0
"
2'
-
0
"
4'
-
4
"
CL
CLCL
4WIRING HOLE PLACEMENT DIAGRAM
3/8" = 1'-0"
INTERNALLY ILLUMINATED
SIGNAGE, SEE EXTERIOR
ELEVATIONS
COORDINATE
BLOCKING
REQUIREMENTS AND
LOCATIONS WITH SIGN
VENDOR
ELECTRICAL
CONDUIT
RACEWAY STAND
OFF PROVIDED BY
SIGN MFR.
14
A4.3
54" WENDY'S SIGNAGE
TO BE PROVIDED BY
SIGN SUPPLIER. G.C.
TO PROVIDE BLOCKING
AND ELECTRICAL AS
REQUIRED.
EQ EQ
CL
8"
M-3
E-2
ALTERNATE
RACEWAY BLADE
LIGHTING.
EXTERIOR ELEVATIONS
A2.1
IT
EC
CITY/OWNER CMMTS01/12/233
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
5ALT. RACEWAY BLADE LIGHTING
3/4" = 1'-0"
6ALT. RACEWAY BLADE LIGHTING ELEVATION
3/8" = 1'-0"
3
3
3
3
3
1.12.23
3'
-
3
1
/
4
"
8'
-
1
0
"
EQEQ
CL
1'
-
8
"
EQ.EQ.
EQ.6'-2"EQ.
8'
-
1
0
"
2'-0"
8'
-
1
0
"
T
Y
P
.
WALL HYDRANT, REF.
PLUMBING SHEETS.
ROOF LINE BEYOND
LADDER RECEIVER W/
SAFETY GATE. PAINT
PEX-10. REFER TO
DETAIL 1/A4.4
WENDY'S SIGNAGE
PROVIDED BY SIGN
SUPPLIER. G.C. TO
PROVIDE BLOCKING AS
REQUIRED.
WALL MOUNTED
LIGHT FIXTURE
EIFS REVEAL,
TYP.
ROOF LINE
COLLECTOR BOX & DOWNSPOUT PREFINISHED
TO MATCH PEX-12 (TYP.) DOWNSPOUT
CONNECTED TO STORM WATER SYSTEM.
REFER TO 12/A4.4 FOR ATTACHMENT DETAILS.
FLUSH-MOUNT 42" WENDY'S
SIGNAGE (WHITE LETTERS)
PROVIDED BY SIGN SUPPLIER.
G.C. TO PROVIDE BLOCKING AND
ELECTRICAL AS REQUIRED.
WALL MOUNTED
LIGHT FIXTURE, TYP.
WALL MOUNTED
LIGHT FIXTURE, TYP.
WENDY'S SIGNAGE PROVIDED BY
SIGN SUPPLIER. G.C. TO PROVIDE
BLOCKING AS REQUIRED.
EIFS REVEAL,
TYP.
FLUSH-MOUNT 42" WENDY'S
SIGNAGE (WHITE LETTERS)
PROVIDED BY SIGN
SUPPLIER. G.C. TO
PROVIDE BLOCKING AND
ELECTRICAL AS REQUIRED.
C/T CABINET & ELECTRIC
METER, PEX-1
1LEFT SIDE ELEVATION
1/4" = 1'-0"
2RIGHT SIDE ELEVATION
1/4" = 1'-0"
5
A3.3
2
A3.4
1
A3.4
1
A3.1
3
A3.3
2
A3.3
1'-4"
BLADE LIGHTING,
REFER TO ELECTRICAL
1
A3.3
1
A3.1
EQ.EQ.
ALIGN
WALL HYDRANT, REF.
PLUMBING SHEETS.
SIM.
2'-5"
1
A3.4
2
A3.1
6'
-
3
"
6'
-
3
"
6'
-
3
"
6'
-
3
"
SF-1 STOREFRONT -"DARK BRONZE"
PUW PICK-UP WINDOW TO MATCH STOREFRONT
M-1 PARAPET CAP/ BRAKE METAL - "DARK BRONZE"
M-3 EXCEPTIONAL METALS - "BRIGHT RED"
M-4 EXCEPTIONAL METALS - "SILVER METALLIC"
M-5 BRAKE METAL - "CLEAR ANNODIZED"
M-7 EXCEPTIONAL METALS - "CUSTOM DARK GREY"
KW-1 KNOTWOOD PREFINISHED ALUMINUM SIDING MATERIAL
"LIGHT OAK"
KW-2 KNOTWOOD PREFINISHED ALUMINUM SIDING MATERIAL
"KNIGHTS ARMOUR"
KW-3 KNOTWOOD PREFINISHED ALUMINUM SIDING MATERIAL
"BRITE RED MATTE"
E-2 EIFS - "WENDY'S RED"
E-7 EIFS - "DARK GREY"
E-8 EIFS - "TAN"
E-9 EIFS - "SILVER" (SMOOTH FINISH)
BL-1 BOLLARD SLEEVE - "YELLOW"
PEX-1 PAINT - DARK BRONZE (SEE PAINT SCHEDULE)
PEX-3 PRE-FINISHED DARK BRONZE SIGN CABINETS (SEE PAINT
SCHEDULE)
PEX-6 PRE-FINISHED WALK-IN FREEZER / COOLER DARK BRONZE
(SEE PAINT SCHEDULE)
PEX-10 PAINT / POWDER COAT- BLACK (SEE PAINT SCHEDULE)
PEX-12 PAINT- DARK GREY (SEE PAINT SCHEDULE)
EXTERIOR FINISH SCHEDULE
BEYOND
BEYOND
M-1
M-1
M-3
E-2
M-5
M-7
E-8BL-1 BL-1 E-8
E-7
E-7
M-5
SF-1
E-2
M-4
M-4
M-4
SF-1
PEX-6
PEX-6
E-8
M-3
M-4M-7
12
A4.2
T.O. BLADE FRAMING
21' - 0"
T.O. PARAPET FRAMING
18' - 3"
T.O. DINING PARAPET
14' - 10"
T.O. GLAZING
11' - 6"
T.O. CONC. SLAB
0' - 0"
T.O. CONC. SLAB
0' - 0"
T.O. PARAPET FRAMING
18' - 3"
T.O. BLADE FRAMING
21' - 0"
T.O. DINING PARAPET
14' - 10"
T.O. GLAZING
11' - 6"
E-8
E-8
8'-43 4"CL
LED TAPE LIGHTING
IN CORNICE
LED TAPE LIGHTING
IN CORNICE
P.U.W. REFER TO
WINDOW SCHEDULE.
P.U.W. REFER TO
WINDOW SCHEDULE
SF-1 SF-1
SF-1
EQ.EQ.
2'-4"2'-4"
M-4
E-8
WENDY'S SIGNAGE
PROVIDED BY SIGN
SUPPLIER. G.C. TO
PROVIDE BLOCKING AS
REQUIRED.
EQ.EQ.
WENDY'S SIGNAGE PROVIDED BY
SIGN SUPPLIER. G.C. TO PROVIDE
BLOCKING AS REQUIRED.
SF-1
THIS DOOR TO RECEIVE "EXIT
ONLY" SIGN UNLESS REQUIRED
BY CODE. ALIGN WITH CIVIL
GUIDELINE SETS, UPDATE DOOR
SCHEDULE AS REQUIRED.
FROSTED GLAZING AT
BANQUETTE WALL, SEE
WINDOW SCHEDULE, TYP.
EXTERIOR ELEVATIONS
A2.2
IT
EC
CITY/OWNER CMMTS01/12/233
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
3
3
3
3
3
1.12.23
3
A3.5
2
A3.2
1
A3.2
2
A3.2
1
A3.2
1
A3.3
SIM
1
A3.4
2BUILDING SECTION
1/4" = 1'-0"
1BUILDING SECTION
1/4" = 1'-0"
BUILDING SECTION GENERAL NOTES
A. SEAL EXTERIOR WALL AND ROOF PENETRATIONS AND JOINTS BETWEEN
DISSIMILAR MATERIALS TO ENSURE A COMPLETELY WEATHER-TIGHT SEAL.
SEALANT LOCATIONS INCLUDE BUT ARE NOT LIMITED TO : LIGHT FIXTURE
MOUNTS, DOOR AND WINDOW FRAMES, FASCIA EDGES, SIGNAGE MOUNTS,
CONDUIT PENETRATIONS, SCUPPERS, ELECTRICAL OUTLETS, HOSE BIBS, AND
UTILITY SERVICE ENTRANCES. REFER TO JOINT TREATMENT SCHEDULE.
B. PROVIDE CONTINUOUS WEATHER BARRIER BEHIND ALL EXTERIOR FINISHES.
UTILIZE COMMERCIAL GRADE BUILDING WRAP AT CORRUGATED METAL PANELS.
UTILIZE FLUID APPLIED OR SELF ADHERING WEATHER BARRIER AT MASONRY,
EIFS, TILE FIBER CEMENT PANELS AND ACM. LAP & TAPE ALL SEAMS. LAP OVER
ALL FLASHING. COORDINATE TRANSITIONS PER MFR'S RECOMMENDATIONS.
APPROVED ALTERNATE: PROVIDE FLUID APPLIED OR SELF ADHERING WEATHER
BARRIER BEHIND ALL EXTERIOR FINISHES.
C. EXTERIOR SIDEWALKS AND PAVING ARE SHOWN FOR DESIGN INTENT ONLY. G.C.
SHALL BE RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH OWNER'S
REPRESENTATIVE AND/OR CIVIL DRAWINGS.
D. GRADES SHALL BE 2" MIN. BELOW FLOOR SLAB AND SHALL SLOPE AWAY FROM
BUILDING @ 5% SLOPE EXCEPT @ PEDESTRIAN PATHS WHICH SHALL BE SLOPED
AWAY FROM BUILDING @ 1/8" PER FOOT MIN. AND 1/4" PER FOOT MAX.
E. ITEMS MOUNTED ON TOP OF THE PARAPET ARE TO BE SET IN A FULL BED OF
SEALANT AND HAVE FULL DEPTH BLOCKING IMMEDIATELY BELOW CAP, FASCIA,
AND DRIP EDGE.
F. REFER TO STRUCTURAL PLAN AND DETAILS FOR ADDITIONAL FRAMING
REQUIREMENTS.
G. PROVIDE CONTINUOUS CLASS 1 OR CLASS 2 VAPOR RETARDER ON THE
INTERIOR SIDE OF THE WALL FRAMING AND BEHIND APPLIED WALL FINISH
SHEATHING IN ASHRAE ZONES MARINE 4 AND 5 THROUGH 8. LAP AND TAPE ALL
SEAMS TO ACHIEVE CONTINUOUS COVERAGE OVER THE ENTIRE
UNFENESTRATED BUILDING ENVELOPE.
H. INSULATION AND VAPOR RETARDER IN EXPOSED AREAS TO HAVE A FLAME
SPREAD OF 25 AND A SMOKE DEVELOPMENT OF 450 OR BETTER.
I. VAPOR RETARDER SHALL BE INSTALLED IN CONTINUOUS SHEETS FROM FLOOR
TO UNDERSIDE OF ROOF DECK. ALL SEAMS AND PENETRATIONS SHALL BE
SEALED PER MANUFACTURER'S DIRECTION.
EQ.EQ.EQ.EQ.
E-8
2
A3.5
5
A3.3
SIM.
OPP.
T.O. PARAPET FRAMING
18' - 3"
T.O. CONCRETE SLAB
0' - 0"
REF.
STRUCTURAL
T.O. PARAPET FRAMING
18' - 3"
B.O. HEADER
11' - 6"
T.O. CONCRETE SLAB
0' - 0"
REF.
STRUCTURAL
E-7
M-7
M-4
4'-8"
ALIGN REVEAL
WITH FACE
BELOW
BUILDING SECTIONS
A3.1
IT
EC
CITY COMMENTS10/20/211
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
1
1
11
1
A3.1
1
A3.1
3
A3.4
2
A3.5
2
A3.5
4
A3.3
FREEZER
110
CREW
114
HALLWAY
109
DINING
101
SERVICE
104KITCHEN
106
KITCHEN
106
2BUILDING SECTION
1/4" = 1'-0"
1BUILDING SECTION
1/4" = 1'-0"
DINING
101
BUILDING SECTION GENERAL NOTES
A. SEAL EXTERIOR WALL AND ROOF PENETRATIONS AND JOINTS BETWEEN DISSIMILAR
MATERIALS TO ENSURE A COMPLETELY WEATHER-TIGHT SEAL. SEALANT LOCATIONS
INCLUDE BUT ARE NOT LIMITED TO : LIGHT FIXTURE MOUNTS, DOOR AND WINDOW FRAMES,
FASCIA EDGES, SIGNAGE MOUNTS, CONDUIT PENETRATIONS, SCUPPERS, ELECTRICAL
OUTLETS, HOSE BIBS, AND UTILITY SERVICE ENTRANCES. REFER TO JOINT TREATMENT
SCHEDULE.
B. PROVIDE CONTINUOUS WEATHER BARRIER BEHIND ALL EXTERIOR FINISHES. UTILIZE
COMMERCIAL GRADE BUILDING WRAP AT CORRUGATED METAL PANELS. UTILIZE FLUID
APPLIED OR SELF ADHERING WEATHER BARRIER AT MASONRY, EIFS, TILE FIBER CEMENT
PANELS AND ACM. LAP & TAPE ALL SEAMS. LAP OVER ALL FLASHING. COORDINATE
TRANSITIONS PER MFR'S RECOMMENDATIONS. APPROVED ALTERNATE: PROVIDE FLUID
APPLIED OR SELF ADHERING WEATHER BARRIER BEHIND ALL EXTERIOR FINISHES.
C. EXTERIOR SIDEWALKS AND PAVING ARE SHOWN FOR DESIGN INTENT ONLY. G.C. SHALL BE
RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH OWNER'S REPRESENTATIVE
AND/OR CIVIL DRAWINGS.
D. GRADES SHALL BE 2" MIN. BELOW FLOOR SLAB AND SHALL SLOPE AWAY FROM BUILDING @
5% SLOPE EXCEPT @ PEDESTRIAN PATHS WHICH SHALL BE SLOPED AWAY FROM BUILDING
@ 1/8" PER FOOT MIN. AND 1/4" PER FOOT MAX.
E. ITEMS MOUNTED ON TOP OF THE PARAPET ARE TO BE SET IN A FULL BED OF
SEALANT AND HAVE FULL DEPTH BLOCKING IMMEDIATELY BELOW CAP, FASCIA, AND
DRIP EDGE.
F. REFER TO STRUCTURAL PLAN AND DETAILS FOR ADDITIONAL FRAMING REQUIREMENTS.
G. PROVIDE CONTINUOUS CLASS 1 OR CLASS 2 VAPOR RETARDER ON THE INTERIOR
SIDE OF THE WALL FRAMING AND BEHIND APPLIED WALL FINISH SHEATHING IN
ASHRAE ZONES MARINE 4 AND 5 THROUGH 8. LAP AND TAPE ALL SEAMS TO ACHIEVE
CONTINUOUS COVERAGE OVER THE ENTIRE UNFENESTRATED BUILDING ENVELOPE.
H. INSULATION AND VAPOR RETARDER IN EXPOSED AREAS TO HAVE A FLAME SPREAD OF 25
AND A SMOKE DEVELOPMENT OF 450 OR BETTER.
I. VAPOR RETARDER SHALL BE INSTALLED IN CONTINUOUS SHEETS FROM FLOOR TO
UNDERSIDE OF ROOF DECK. ALL SEAMS AND PENETRATIONS SHALL BE SEALED PER
MANUFACTURER'S DIRECTION.
SIM
4
A3.3
2
A3.1
2
A3.1
REF
STRUCTURAL
T.O. CONC. SLAB
0' - 0"
T.O. BLADE FRAMING
21' - 0"
T.O. PARAPET FRAMING
18' - 3"
T.O. PARAPET FRAMING
18' - 3"
JOIST BEARING (BOH-HI)
12' - 3"
REF
STRUCTURAL
T.O. CONC. SLAB
0' - 0"
B.O. HEADER
11' - 6"
JOSIT BEARING (FOH-HI)
12' - 7"
T.O. DINING PARAPET
14' - 10"
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
BUILDING SECTIONS
A3.2
IT
EC
CITY/OWNER CMMTS01/12/233
CITY COMMENTS10/20/211
3
3
1.12.23
2
A4.1
1
A4.1
2
A4.1
5
A4.1
2
A4.1
4
A4.1
7
A4.1
SIM.
3
A4.1
1SECTION
3/4" = 1'-0"2SECTION
3/4" = 1'-0"3SECTION
3/4" = 1'-0"4SECTION
3/4" = 1'-0"5SECTION
3/4" = 1'-0"
SIM.
SIM
OPP.
SECTION GENERAL NOTES
A. SEAL ALL EXTERIOR WALL AND ROOF PENETRATIONS AND JOINTS BETWEEN
DISSIMILAR MATERIALS TO ENSURE A COMPLETELY WEATHER-TIGHT SEAL.
SEALANT LOCATIONS INCLUDE BUT ARE NOT LIMITED TO : LIGHT FIXTURE
MOUNTS, DOOR AND WINDOW FRAMES, FASCIA EDGES, SIGNAGE MOUNTS,
CONDUIT PENETRATIONS, SCUPPERS, ELECTRICAL OUTLETS, HOSE BIBS, AND
UTILITY SERVICE ENTRANCES. REFER TO JOINT TREATMENT SCHEDULE.
B. PROVIDE CONTINUOUS WEATHER BARRIER BEHIND ALL EXTERIOR FINISHES.
UTILIZE COMMERCIAL GRADE BUILDING WRAP. UTILIZE FLUID APPLIED WEATHER
BARRIER AT METAL SIDING, AND EIFS. LAP & TAPE ALL SEAMS. LAP OVER ALL
FLASHING. COORDINATE TRANSITIONS PER MFR'S RECOMMENDATIONS.
APPROVED ALTERNATE: PROVIDE FLUID APPLIED OR SELF ADHERING WEATHER
BARRIER BEHIND ALL EXTERIOR FINISHES.
C. EXTERIOR SIDEWALKS AND PAVING ARE SHOWN FOR DESIGN INTENT ONLY. G.C.
SHALL BE RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH OWNER'S
REPRESENTATIVE AND/OR CIVIL DRAWINGS.
D. GRADES SHALL BE 2" MIN. BELOW FLOOR SLAB AND SHALL SLOPE AWAY FROM
BUILDING @ 5% SLOPE. HARDSCAPE AND SHALL SLOPE AWAY FROM BUILDING @
1/8" PER FOOT MIN. AND 1/4" PER FOOT MAX.
E. REFER TO STRUCTURAL PLAN AND DETAILS FOR ADDITIONAL FRAMING
REQUIREMENTS.
F. VAPOR RETARDER SHALL BE INSTALLED IN CONTINUOUS SHEETS FROM FLOOR
TO UNDERSIDE OF ROOF DECK. ALL SEAMS AND PENETRATIONS SHALL BE
SEALED PER MANUFACTURER'S DIRECTION. PROVIDE CONTINUOUS CLASS 1 OR
CLASS 2 VAPOR RETARDER ON THE INTERIOR SIDE OF THE WALL FRAMING AND
BEHIND APPLIED WALL FINISH SHEATHING IN ASHRAE ZONES MARINE 4 AND 5
THROUGH 8. LAP AND TAPE ALL SEAMS TO ACHIEVE CONTINUOUS COVERAGE
OVER THE ENTIRE UNFENESTRATED BUILDING ENVELOPE.
G. INSULATION AND VAPOR RETARDER IN EXPOSED AREAS TO HAVE A FLAME
SPREAD OF 25 AND A SMOKE DEVELOPMENT OF 450 OR BETTER.
OPP
5
A4.1
SIM
REF.
STRUCTURAL
T.O. CONC. SLAB
0'-0"
T.O. DINING PARAPET
14' - 10"
T.O. DINING PARAPET
14' - 10"
B.O. HEADER
11' - 6"
REF.
STRUCTURAL
T.O. CONC. SLAB
0'-0"
3
A4.1
1
A4.1
REF.
STRUCTURAL
T.O. CONC. SLAB
0'-0"
T.O. CONC. SLAB
0'-0"
T.O. CONC. SLAB
0'-0"
REF.
STRUCTURAL
JOIST BEARING (BOH-HI)
12' - 3"
T.O. PARAPET FRAMING
18' - 3"
T.O. PARAPET FRAMING
18' - 3"
B.O. HEADER
11' - 6"
T.O. DINING PARAPET
14' - 10"
I-JOIST, REF.
STRUCTURAL
DRAWINGS
VAPOR RETARDER
TYP
2X6 FRAMING, REF.
STRUCTURAL
DRAWINGS.
TILE, REF. FINISH
PLAN & INTERIOR
ELEVATIONS.
CONCRETE SLAB ON
GRADE, REF
STRUCTURAL
DRAWINGS
RIGID PERIMETER
INSULATION, REF.
INSULATION
SCHEDULE
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
BATT INSULATION, REF.
INSULATION SCHEDULE
WEATHER BARRIER
FLOOR FINISH, REF.
FINISH PLAN.
CONCRETE SLAB ON
GRADE, REF
STRUCTURAL
DRAWINGS
RIGID PERIMETER
INSULATION, REF.
INSULATION
SCHEDULE
CONCRETE
FOOTING, REF.
STRUCTURAL
DRAWINGS
SINGLE PLY
MEMBRANE ROOF
P.T. WOOD
BLOCKING, FULL
DEPTH OF
INSULATION.
SINGLE PLY
MEMBRANE ROOF
FIRE BLOCKING
AS REQUIRED
FINISH CEILING,
REF. REFLECTED
CEILING PLANS
BATT INSULATION,
REF. INSULATION
SCHEDULE
VAPOR RETARDER
TYP
WEATHER BARRIER
2X6 FRAMING, REF.
STRUCTURAL
DRAWINGS.
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
WALL FINISH, REF.
FINISH PLAN &
INTERIOR
ELEVATIONS.
BASE, REF.
FINISH PLAN &
INTERIOR
ELEVATIONS.
FLOOR FINISH, REF.
FINISH PLAN.
CONCRETE SLAB ON
GRADE, REF
STRUCTURAL
DRAWINGS
CONCRETE
FOOTING, REF.
STRUCTURAL
DRAWINGS
FREEZER/COOLER
INSULATED PANEL
WALL ASSEMBLY
BY OTHERS.
SINGLE PLY
MEMBRANE ROOF
RIGID ROOF
INSULATION, REF.
INSULATION
SCHEDULE
STRUCTURAL ROOF
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
FINISH CEILING, REF.
REFLECTED CEILING
PLANS
FIRE BLOCKING
AS REQUIRED
VAPOR RETARDER
TYP
1/2" PLYWOOD
SHEATHING
BATT INSULATION,
REF. INSULATION
SCHEDULE
WALL FINISH, REF.
FINISH PLAN &
INTERIOR
ELEVATIONS.
2X6 FRAMING, REF.
STRUCTURAL
DRAWINGS.
FLOOR FINISH, REF.
FINISH PLAN.
RIGID PERIMETER
INSULATION, REF.
INSULATION
SCHEDULE
CONCRETE
FOOTING, REF.
STRUCTURAL
DRAWINGS
I-JOIST, REF.
STRUCTURAL
DRAWINGS
LEDGER & HANGER,
REF. STRUCTURAL
DRAWINGS.
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
FIRE BLOCKING
AS REQUIRED
P.T. WOOD
BLOCKING, FULL
DEPTH OF
INSULATION.
WEATHER BARRIER
2X6 FRAMING, REF.
STRUCTURAL
DRAWINGS.
ALUMINUM
STOREFRONT, REF.
WINDOW SCHEDULE
FLOOR FINISH, REF.
FINISH PLAN.
CONCRETE SLAB ON
GRADE, REF
STRUCTURAL
DRAWINGS
CONCRETE
FOOTING, REF.
STRUCTURAL
DRAWINGS
CONCRETE SLAB ON
GRADE, REF
STRUCTURAL
DRAWINGS
CONCRETE SLAB ON
GRADE, REF
STRUCTURAL
DRAWINGS
RIGID PERIMETER
INSULATION, REF.
INSULATION
SCHEDULE
RIGID ROOF
INSULATION, REF.
INSULATION
SCHEDULE
STRUCTURAL ROOF
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
FIRE BLOCKING
AS REQUIRED
LEDGER, REF.
STRUCTURAL
DRAWINGS.
1x4 WOOD TRIM,
PAINTED. REF.
INTERIOR
ELEVATIONS
1/2" CEMENT BOARD
1/2" GYPSUM BOARD
RIGID PERIMETER
INSULATION, REF.
INSULATION
SCHEDULE
CONCRETE
FOOTING, REF.
STRUCTURAL
DRAWINGS
SINGLE PLY
MEMBRANE ROOF
VAPOR RETARDER
TYP
RIGID PERIMETER
INSULATION, REF.
INSULATION
SCHEDULE
1x4 WOOD TRIM,
PAINTED. REF.
INTERIOR
ELEVATIONS
ALUMINUM
STOREFRONT, REF.
WINDOW SCHEDULE
1/2" PLYWOOD
SHEATHING
SINGLE PLY
MEMBRANE ROOF
RIGID ROOF
INSULATION, REF.
INSULATION SCHEDULE
STRUCTURAL ROOF
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
VAPOR RETARDER, TYP.
I-JOIST, REF.
STRUCTURAL
DRAWINGS
STRUCTURAL ROOF
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
I-JOIST, REF.
STRUCTURAL
DRAWINGS
RIGID ROOF
INSULATION, REF.
INSULATION
SCHEDULE RIGID ROOF
INSULATION, REF.
INSULATION
SCHEDULE
STRUCTURAL ROOF
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
6"
MI
N
.
12
'
-
6
3
/
4
"
T.O. CMU CURB
0'-6"
OPP
T.O. CMU CURB
0'-6"
SIM
LED TAPE LIGHTING, REF.
ELECTRICAL DRAWINGS
LED STRIP LIGHTING, REF.
ELECTRICAL DRAWINGS
LED STRIP LIGHTING, REF.
ELECTRICAL DRAWINGS
CONCRETE
FOOTING, REF.
STRUCTURAL
DRAWINGS
12
/
2
2
/
2
0
1
7
1
2
:
2
9
:
0
3
P
M
WALL SECTIONS
A3.3
IT
EC
CITY COMMENTS10/20/211
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
1
1 1
1
1
12
A4.1
5
A4.1
10
A4.1
9
A4.1
13
A4.1
1SECTION
3/4" = 1'-0"2SECTION
3/4" = 1'-0"3SECTION
3/4" = 1'-0"
2X6 FRAMING, REF.
STRUCTURAL
DRAWINGS.
DRAINABLE EIFS WITH
FINISHED DRIP EDGE
PROFILE
WEATHER BARRIER
FIRE BLOCKING
AS REQUIRED
METAL FLASHING
W/ DRIP
ALUMINUM
STOREFRONT, REF.
WINDOW SCHEDULE
BATT INSULATION,
REF. INSULATION
SCHEDULE
2X6 FRAMING, REF.
STRUCTURAL
DRAWINGS.
WEATHER BARRIER
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
DRAINABLE EIFS
SYSTEM, REF. EXTERIOR
ELEVATIONS.
CONCRETE SLAB
ON GRADE, REF
STRUCTURAL
DRAWINGS
CONCRETE CURB,
REF. CIVIL
DRAWINGS
CONCRETE
FOOTING, REF.
STRUCTURAL
DRAWINGS
RIGID PERIMETER
INSULATION, REF.
INSULATION
SCHEDULE
CONCRETE SLAB ON
GRADE, REF
STRUCTURAL
DRAWINGS
FLOOR FINISH, REF.
FINISH PLAN.
BASE, REF. FINISH
PLAN & INTERIOR
ELEVATIONS.
VAPOR RETARDER
TYP
WALL FINISH, REF.
FINISH PLAN &
INTERIOR ELEVATIONS.
VAPOR RETARDER
TYP.
FINISH CEILING, REF.
REFLECTED CEILING
PLANS
LEDGER & HANGER,
REF. STRUCTURAL
DRAWINGS.
I-JOIST, REF.
STRUCTURAL
DRAWINGS
STRUCTURAL ROOF
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
RIGID ROOF
INSULATION, REF.
INSULATION
SCHEDULE
P.T. WOOD BLOCKING,
FULL DEPTH OF
INSULATION.
SINGLE PLY
MEMBRANE ROOF
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
SINGLE PLY
MEMBRANE ROOF
P.T. WOOD
BLOCKING, FULL
DEPTH OF
INSULATION.
SINGLE PLY
MEMBRANE ROOF
RIGID ROOF
INSULATION, REF.
INSULATION
SCHEDULE
STRUCTURAL ROOF
SHEATHING, REF.
TO STRUCTURAL
DRAWINGS.
VAPOR RETARDER
TYP
5 1/2" METAL STUDS
REF. STRUCTURAL
DRAWINGS
MINERAL WOOL
INSULATION. REF.
INSULATION SCHEDULE.
1/2" GYPSUM BOARD,
WALL FINISH, REF.
FINISH PLAN &
INTERIOR
ELEVATIONS.
FLOOR FINISH, REF.
FINISH PLAN.
CONCRETE SLAB ON
GRADE, REF
STRUCTURAL
DRAWINGS
1/2" EXTERIOR
GRADE GYPSUM
BOARD.
WEATHER BARRIER
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
FIRE BLOCKING
AS REQUIRED
WEATHER BARRIER
SINGLE PLY
MEMBRANE ROOF
RIGID ROOF
INSULATION, REF.
INSULATION
SCHEDULE
I-JOIST, REF.
STRUCTURAL
DRAWINGS
STRUCTURAL ROOF
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
2X6 FRAMING, REF.
STRUCTURAL
DRAWINGS.
TILE, REF. FINISH
PLAN & INTERIOR
ELEVATIONS.
VAPOR RETARDER
TYP
FLOOR FINISH, REF.
FINISH PLAN.
CONCRETE SLAB ON
GRADE, REF
STRUCTURAL
DRAWINGS
RIGID PERIMETER
INSULATION, REF.
INSULATION
SCHEDULE
MOUNTED WENDY'S
SIGNAGE TO BE
PROVIDED AND
INSTALLED BY SIGN
SUPPLIER. PROVIDE
BLOCKING AS
REQUIRED.
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
LEDGER & HANGER,
REF. STRUCTURAL
DRAWINGS.
LEDGER & HANGER,
REF. STRUCTURAL
DRAWINGS.
WEATHER BARRIER
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
1/2" GYPSUM BOARD
1/2" GYPSUM BOARD
CONCRETE
FOOTING, REF.
STRUCTURAL
DRAWINGS
OPP.
SIM.
SECTION GENERAL NOTES
CONCRETE
FOOTING, REF.
STRUCTURAL
DRAWINGS
2'-3 1/2"BLADE LIGHTING,
REF. ELECTRICAL
3'
-
1
1
"
R
.
O
.
2'-0 1/4"1'-0 3/4"
FINISH CEILING,
REF. REFLECTED
CEILNG PLAN
1X4 WOOD TRIM,
PAINTED. REF.
INTERIOR
ELEVATIONS
1/2" GYPSUM BOARD
2X4 FRAMING
@ 16" O.C.
1X4 WOOD TRIM,
PAINTED. REF.
INTERIOR
ELEVATIONS
FLOOR FINISH, REF.
FINISH PLAN.
CONCRETE SLAB ON
GRADE, REF.
STRUCTURAL
DRAWINGS.
TILE BASE, REF.
FINISH PLAN &
INTERIOR
ELEVATIONS.
TILE, REF. FINISH
PLAN & INTERIOR
ELEVATIONS.
1/2" CEMENT BOARD
2X4 FRAMING @16"
O.C.
2X4 WOOD
BLOCKING
TILE, REF. FINISH
PLAN & INTERIOR
ELEVATIONS.
2X4 FRAMING @16"
O.C.
FINISH CEILING,
REF. REFLECTED
CEILNG PLAN
1/2" GYP BOARD
PAINTED, REF.
REFLECTED CEILING
PLAN
4SECTION
3/4" = 1'-0"
BATT
INSULATION,
REF. INSULATION
SCHEDULE
ALTERNATE
BLADE LIGHTING
1/2" CEMENT BOARD
1X4 WOOD TRIM,
PAINTED. REF.
INTERIOR
ELEVATIONS
1X4 WOOD TRIM,
PAINTED. REF.
FINISH PLAN &
INTERIOR
ELEVATIONS
A. SEAL ALL EXTERIOR WALL AND ROOF PENETRATIONS AND JOINTS BETWEEN
DISSIMILAR MATERIALS TO ENSURE A COMPLETELY WEATHER-TIGHT SEAL.
SEALANT LOCATIONS INCLUDE BUT ARE NOT LIMITED TO : LIGHT FIXTURE
MOUNTS, DOOR AND WINDOW FRAMES, FASCIA EDGES, SIGNAGE MOUNTS,
CONDUIT PENETRATIONS, SCUPPERS, ELECTRICAL OUTLETS, HOSE BIBS, AND
UTILITY SERVICE ENTRANCES. REFER TO JOINT TREATMENT SCHEDULE.
B. PROVIDE CONTINUOUS WEATHER BARRIER BEHIND ALL EXTERIOR FINISHES.
UTILIZE COMMERCIAL GRADE BUILDING WRAP. UTILIZE FLUID APPLIED WEATHER
BARRIER AT METAL SIDING, AND EIFS. LAP & TAPE ALL SEAMS. LAP OVER ALL
FLASHING. COORDINATE TRANSITIONS PER MFR'S RECOMMENDATIONS.
APPROVED ALTERNATE: PROVIDE FLUID APPLIED OR SELF ADHERING WEATHER
BARRIER BEHIND ALL EXTERIOR FINISHES.
C. EXTERIOR SIDEWALKS AND PAVING ARE SHOWN FOR DESIGN INTENT ONLY. G.C.
SHALL BE RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH OWNER'S
REPRESENTATIVE AND/OR CIVIL DRAWINGS.
D. GRADES SHALL BE 2" MIN. BELOW FLOOR SLAB AND SHALL SLOPE AWAY FROM
BUILDING @ 5% SLOPE EXCEPT @ PEDESTRIAN PATHS WHICH SHALL BE SLOPED
AWAY FROM BUILDING @ 1/8" PER FOOT MIN. AND 1/4" PER FOOT MAX.
E. REFER TO STRUCTURAL PLAN AND DETAILS FOR ADDITIONAL FRAMING
REQUIREMENTS.
F. VAPOR RETARDER SHALL BE INSTALLED IN CONTINUOUS SHEETS FROM FLOOR
TO UNDERSIDE OF ROOF DECK. ALL SEAMS AND PENETRATIONS SHALL BE
SEALED PER MANUFACTURER'S DIRECTION. PROVIDE CONTINUOUS CLASS 1 OR
CLASS 2 VAPOR RETARDER ON THE INTERIOR SIDE OF THE WALL FRAMING AND
BEHIND APPLIED WALL FINISH SHEATHING IN ASHRAE ZONES MARINE 4 AND 5
THROUGH 8. LAP AND TAPE ALL SEAMS TO ACHIEVE CONTINUOUS COVERAGE
OVER THE ENTIRE UNFENESTRATED BUILDING ENVELOPE.
G. INSULATION AND VAPOR RETARDER IN EXPOSED AREAS TO HAVE A FLAME
SPREAD OF 25 AND A SMOKE DEVELOPMENT OF 450 OR BETTER.
MOUNTED WENDY'S
SIGNAGE TO BE
PROVIDED AND
INSTALLED BY SIGN
SUPPLIER. PROVIDE
BLOCKING AS
REQUIRED.
LEDGER & HANGER,
REF. STRUCTURAL
DRAWINGS.
HOOD
BATT INSULATION,
REF. INSULATION
SCHEDULE
5
A4.1
OPP.
11
A4.1
6
A4.1
REF.
STRUCTURAL
T.O. CONC. SLAB
0'-0"
JOIST BEARING (BOH)
11' - 6"
T.O. P.U.W. FRAMING
18' - 3"
T.O. PARAPET FRAMING
18' - 3"
REF.
STRUCTURAL
T.O. CONC. SLAB
0'-0"
REF.
STRUCTURAL
T.O. CONC. SLAB
0'-0"
T.O. CONC. SLAB
0'-0"
T.O. BLADE FRAMING
21' - 0"
HATCHED AREA
INDICATES
FIREBLOCKING AT
10'-0" O.C. MAX.
2X4 NAILER
2X4 FRAMING @ 16"
O.C.
RIGID PERIMETER
INSULATION, REF.
INSULATION
SCHEDULE
WALL SECTIONS
A3.4
IT
EC
CITY COMMENTS10/20/211
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
1
1
1
5
A4.1
2
A4.1
5
A4.1
8
A4.3
14
A4.1
SIM.
SIM.SIM.
GENERAL NOTES
1SECTION
3/4" = 1'-0"2SECTION
3/4" = 1'-0"3SECTION
3/4" = 1'-0"4SECTION
3/4" = 1'-0"
1'
-
4
1
/
2
"
9'
-
0
"
4'
-
7
1
/
2
"
DOUBLE TOP PLATE
STL. TUBE IN WALL, REF.
STRUCTURAL DRAWINGS
THICKENED SLAB, REF.
STRUCTURAL DRAWINGS
PARAPET VENTING
BY ROOF MFG, REF.
ROOF PLAN FOR
LOCATION
2X BRACING AT
EACH STUD. REF.
STRUCTURAL
DRAWINGS.
GLASS DIVIDER AND
GLASS MOUNTING
BRACKET PROVIDED
AND INSTALLED BY
KED
SOLID SURFACE
CAP, REF. INTERIOR
ELEVATIONS
WALL FINISH, REF.
FINISH PLAN &
INTERIOR
ELEVATIONS.
FLOOR FINISH, REF.
FINISH PLAN.
CONCRETE SLAB ON
GRADE, REF
STRUCTURAL
DRAWINGS
TILE BASE, REF.
FINISH PLAN &
INTERIOR
ELEVATIONS.
TILE, REF. FINISH PLAN
& INTERIOR
ELEVATIONS.
1X4 WOOD TRIM,
PAINTED. REF.
INTERIOR
ELEVATIONS.
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
WEATHER BARRIER
SINGLE PLY
MEMBRANE ROOF
RIGID ROOF
INSULATION, REF.
INSULATION
SCHEDULE
STRUCTURAL ROOF
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
1" INSULATED
GLASS IN ALUMINUM
STOREFRONT
FRAME, REF.
WINDOW SCHEDULE
2X6 FRAMING REF.
STRUCTURAL
DRAWINGS.
ALUMINUM
STOREFRONT REF.
WINDOW SCHEDULE
CONCRETE SLAB ON
GRADE, REF
STRUCTURAL
DRAWINGS
FLOOR FINISH, REF.
FINISH PLAN.
RIGID PERIMETER
INSULATION, REF.
INSULATION
SCHEDULE
CONCRETE
FOOTING, REF.
STRUCTURAL
DRAWINGS
CONCRETE SLAB ON
GRADE, REF
STRUCTURAL
DRAWINGS
PARAPET VENTING
BY ROOF MFG, REF.
ROOF PLAN FOR
LOCATION
2X6 FRAMING, REF.
STRUCTURAL
DRAWINGS.
SINGLE PLY
MEMBRANE ROOF
2x6 WOOD
BLOCKING
FINISH CEILING, REF.
REFLECTED CEILING
PLANS
FRP WALL PANEL,
REF. FINISH PLAN
1/2" PLYWOOD
SHEATHING
3/8" CEMENT BOARD
FLOOR FINISH, REF.
FINISH PLAN.
CONCRETE SLAB ON
GRADE, REF
STRUCTURAL
DRAWINGS
WEATHER BARRIER
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
DRAINABLE EIFS
WITH FINISHED DRIP
EDGE PROFILE
SEALANT AND BACKER
ROD W/ WEEPS
METAL FLASHING
1X4 WOOD TRIM,
PAINTED. REF.
INTERIOR
ELEVATIONS.
FIRE BLOCKING
AS REQUIRED
1/2" GYPSUM BOARD
TO DECK ABOVE
WALL FINISH, REF.
FINISH PLAN &
INTERIOR
ELEVATIONS.
1/2" CEMENT BOARD,
REF. PARTITION
TYPES FOR HEIGHT.
TILE, REF. FINISH
PLAN & INTERIOR
ELEVATIONS.
TILE BASE, REF.
FINISH PLAN &
INTERIOR
ELEVATIONS.
SINGLE PLY
MEMBRANE ROOF
1/4" GLASS, BUTT
JOINTED, REF.
INTERIOR
ELEVATIONS
SOLID SURFACE
CAP, REF. FINISH
SCHEDULE.
2X4 FRAMING
@ 16" O.C.
WALL FINISH, REF.
FINISH PLAN &
INTERIOR
ELEVATIONS.
1/2" CEMENT BOARD
TILE BASE, REF.
FINISH PLAN &
INTERIOR
ELEVATIONS.
1/2" GYPSUM
BOARD
FIREBLOCKING
AS REQUIRED
2x6 WOOD
BLOCKING
RIGID ROOF
INSULATION, REF.
INSULATION SCHEDULE
STRUCTURAL ROOF
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
BATT INSULATION,
REF. INSULATION
SCHEDULE
SINGLE PLY
MEMBRANE ROOF
HATCHED AREA
INDICATES FIRE
BLOCKING
REQUIRED
EVERY 10'-0" MAX.
HORIZONTALLY
SINGLE PLY
MEMBRANE ROOF
6" x 12"
PRE-FRABRICATED
THRU-WALL
SCUPPER BY ROOF
MEMBRANE
MANUFACTURER.
REF TO ROOF PLAN
1/2" PLYWOOD
SHEATHING
I-JOIST, REF.
STRUCTURAL
DRAWINGS
1X4 WOOD TRIM,
PAINTED. REF.
INTERIOR
ELEVATIONS.
I-JOIST, REF.
STRUCTURAL
DRAWINGS
A. SEAL ALL EXTERIOR WALL AND ROOF PENETRATIONS AND JOINTS BETWEEN
DISSIMILAR MATERIALS TO ENSURE A COMPLETELY WEATHER-TIGHT SEAL.
SEALANT LOCATIONS INCLUDE BUT ARE NOT LIMITED TO : LIGHT FIXTURE
MOUNTS, DOOR AND WINDOW FRAMES, FASCIA EDGES, SIGNAGE MOUNTS,
CONDUIT PENETRATIONS, SCUPPERS, ELECTRICAL OUTLETS, HOSE BIBS, AND
UTILITY SERVICE ENTRANCES. REFER TO JOINT TREATMENT SCHEDULE.
B. PROVIDE CONTINUOUS WEATHER BARRIER BEHIND ALL EXTERIOR FINISHES.
UTILIZE COMMERCIAL GRADE BUILDING WRAP. UTILIZE FLUID APPLIED WEATHER
BARRIER AT METAL SIDING, AND EIFS. LAP & TAPE ALL SEAMS. LAP OVER ALL
FLASHING. COORDINATE TRANSITIONS PER MFR'S RECOMMENDATIONS.
APPROVED ALTERNATE: PROVIDE FLUID APPLIED OR SELF ADHERING WEATHER
BARRIER BEHIND ALL EXTERIOR FINISHES.
C. EXTERIOR SIDEWALKS AND PAVING ARE SHOWN FOR DESIGN INTENT ONLY. G.C.
SHALL BE RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH OWNER'S
REPRESENTATIVE AND/OR CIVIL DRAWINGS.
D. GRADES SHALL BE 2" MIN. BELOW FLOOR SLAB AND SHALL SLOPE AWAY FROM
BUILDING @ 5% SLOPE EXCEPT @ PEDESTRIAN PATHS WHICH SHALL BE SLOPED
AWAY FROM BUILDING @ 1/8" PER FOOT MIN. AND 1/4" PER FOOT MAX.
E. REFER TO STRUCTURAL PLAN AND DETAILS FOR ADDITIONAL FRAMING
REQUIREMENTS.
F. VAPOR RETARDER SHALL BE INSTALLED IN CONTINUOUS SHEETS FROM FLOOR
TO UNDERSIDE OF ROOF DECK. ALL SEAMS AND PENETRATIONS SHALL BE
SEALED PER MANUFACTURER'S DIRECTION. PROVIDE CONTINUOUS CLASS 1 OR
CLASS 2 VAPOR RETARDER ON THE INTERIOR SIDE OF THE WALL FRAMING AND
BEHIND APPLIED WALL FINISH SHEATHING IN ASHRAE ZONES MARINE 4 AND 5
THROUGH 8. LAP AND TAPE ALL SEAMS TO ACHIEVE CONTINUOUS COVERAGE
OVER THE ENTIRE UNFENESTRATED BUILDING ENVELOPE.
G. INSULATION AND VAPOR RETARDER IN EXPOSED AREAS TO HAVE A FLAME
SPREAD OF 25 AND A SMOKE DEVELOPMENT OF 450 OR BETTER.
I-JOIST, REF.
STRUCTURAL
DRAWINGS
I-JOIST, REF.
STRUCTURAL
DRAWINGS
7
1
/
4
"
CONTINUE FINISH
BEHIND SOLID
SURFACE CAP.
REF.
STRUCTURAL
T.O. CONC. SLAB
0'-0"
T.O. GLAZING
11' - 6"
T.O. FRAMING
14' - 10"
T.O. CONC. SLAB
0'-0"
T.O. CONC. SLAB
0'-0"
T.O. CONC. SLAB
0'-0"
T.O. PARAPET FRAMING
18' - 3"
T.O. PARAPET FRAMING
18' - 3"
1/2" PLYWOOD
SHEATHING
10
A5.2
11 1/8"
MIN.
9'
-
0
"
A
.
F
.
F
M
A
X
.
7'
-
0
"
A
.
F
.
F
M
I
N
.
UNISTRUT BY G.C.
3/8" THREADED
ROD BY G.C.
MOUNTING
BRACKET BY
HEATER MFR.
OPTIONAL
ELECTRIC UNIT
HEATER INSTALLED
FOR VERTICAL AIR
DELIVERY. REFER
TO MFR SPECS FOR
INSTALLATION
REQUIREMENTS
6"
6"
LED TAPE LIGHTING, REF.
ELECTRICAL DRAWINGS
5DETAIL
1 1/2" = 1'-0"6DETAIL
1 1/2" = 1'-0"
4X4 WOOD POST
EDGE OF GLASS
4 1/2"
1/2"
(3) 3" LONG STX CONST
SCREWS INTO EACH END OF
4X4 POST. TYP. EACH END
1/4" GLAZING
PREFINISHED END BY
STOREFRONT MFG
4" EXTRUDED ALUM
STOREFRONT TOP RAIL
4X4 WOOD POST BEYOND
(3) 3" LONG STX CONST
SCREWS INTO EACH END.
1/4" GLAZING
4" EXTRUDED ALUM
STOREFRONT EXTENDED TO
FRONT WALL
4" EXTRUDED ALUM
STOREFRONT TOP RAIL
SCREWED TO TOP OF 4X4
POSTS EACH END.
12
/
2
2
/
2
0
1
7
1
2
:
2
9
:
2
7
P
M
WALL SECTIONS
A3.5
IT
EC
CITY COMMENTS10/20/211
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
1
BASE TILE, REF. FINISH
SCHEDULE (ALIGN WITH
BASE BEYOND)
T.O. CONC. SLAB
0' - 0"
T.O. CONC. SLAB
0' - 0"
NOTE: PRE-FABRICATED CANOPY.
DESIGN OF CANOPY AND CANOPY
CONNECTION TO WALL BY CANOPY
MANUFACTURER . COORDINATE
BACK-WALL BLOCKING REQUIREMENTS
WITH CANOPY MANUFACTURER
REF. STRUCTURAL
10
A4.3
2"
M-1 M-5
2'-2 3/4"
6"
2X8 FRAMING REF.
TO STRUCTURAL
DRAWINGS.
MEMBRANE ROOFING.
LINE OF WALL BEYOND.
SCHLUTER 'QUADEC' TRIM,
REF. FINISH SCHEDULE
BASE TILE, REF. FINISH
SCHEDULE (ALIGN WITH
BASE BEYOND)
1/2" CEMENT BOARD
FLOOR FINISH, REF. TO
FINISH PLAN.
RIGID PERIMETER
INSULATION, REF.
INSULATION SCHEDULE
ALIGN STOREFRONT WITH
FACE OF CMU BELOW
SILL FLASHING W/ END
DAMS SET ON FULL BED
OF SEALANT.
CONCRETE FOUNDATION ,
REF. TO STRUCTURAL
DRAWINGS
1/2" GYPSUM BOARD
BEAM, REF. STRUCTURAL
DRAWINGS
PRE-FINISHED TWO-PIECE
METAL COMPRESSION
EDGE WITH DRIP EDGE
STRUCTURAL SHEATHING,
REF. STRUCTURAL
DRAWINGS.
BRAKE METAL, REF.
EXTERIOR ELEVATIONS.
LED STRIP LIGHTING, REF.
ELECTRICAL DRAWINGS
WEATHER BARRIER
CONTINUOUS JOINT
SEALANT WITH BACKER
ROD,TYP.
WALL FINISH, REF. TO
FINISH PLAN & INTERIOR
ELEVATIONS.
VAPOR RETARDER TYP
BASE, REF. FINISH PLAN &
INTERIOR ELEVATIONS.
FLOOR FINISH, REF. TO
FINISH PLAN.
2X6 FRAMING, REF. TO
STRUCTURAL DRAWINGS.
STRUCTURAL SHEATHING,
REF. STRUCTURAL
DRAWINGS.
BATT INSULATION, REF.
INSULATION SCHEDULE
DRAINABLE EIFS SYSTEM,
REF. EXTERIOR
ELEVATIONS.
DRAINABLE EIFS STARTER
STRIP W/ WEEP HOLES
CONCRETE FOUNDATION,
REF. TO STRUCTURAL
DRAWINGS
GRADE
ISOLATION JOINT
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
WEATHER BARRIER
1/2" ISOLATION
JOINT WITH
SEALANT. REF.
JOINT TREATMENT
SCHEDULE.
CONCRETE
FOUNDATION, REF.
TO STRUCTURAL
DRAWINGS
WALL FINISH, REF.
TO FINISH PLAN &
INTERIOR
ELEVATIONS.
VAPOR RETARDER
TYP.
2X P.T. WOOD SILL
PLATE OVER SILL
SEALER. REF.
STRUCTURAL
DRAWINGS FOR
ANCHORING
REQUIREMENT.
CONCRETE SLAB
ON GRADE.
RIGID PERIMETER
INSULATION, REF.
INSULATION
SCHEDULE
2X10 TOP CAP
SINGLE PLY
MEMBRANE ROOF
2X6 FRAMING,
REF.
STRUCTURAL
DRAWINGS.
PRE-FINISHED
TWO-PIECE METAL
COMPRESSION
EDGE WITH DRIP
EDGE
BRAKE METAL,
COLOR TO MATCH
STOREFRONT
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
WEATHER BARRIER
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
WEATHER BARRIER
2X P.T. WOOD SILL
PLATE OVER SILL
SEALER. REF.
STRUCTURAL
DRAWINGS FOR
ANCHORING
REQUIREMENT.
DRAINABLE EIFS
STARTER STRIP W/
WEEP HOLES
METAL FLASHING
WALL FINISH, REF.
TO FINISH PLAN &
INTERIOR
ELEVATIONS.
VAPOR RETARDER
TYP
BATT INSULATION,
REF. INSULATION
SCHEDULE
TILE BASE, REF.
FINISH PLAN &
INTERIOR
ELEVATIONS.
FLOOR FINISH, REF.
TO FINISH PLAN.
VAPOR RETARDER
TYP
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
1/2" GYPSUM BOARD .
COUNTER
FLASHING, EXTEND
UP 4" BEHIND WALL
FINISH
WEATHER BARRIER
2X6 FRAMING, REF.
TO STRUCTURAL
DRAWINGS.
BATT INSULATION,
REF. INSULATION
SCHEDULE
FLOOR FINISH, REF.
TO FINISH PLAN.
RIGID PERIMETER
INSULATION, REF.
INSULATION
SCHEDULE
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
2X P.T. WOOD SILL
PLATE OVER SILL
SEALER. REF.
STRUCTURAL
DRAWINGS FOR
ANCHORING
REQUIREMENT.
TAPERED
INSULATION. SLOPE
1/2" PER FOOT
DURO-LAST
"T-EDGE PLUS"
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
WEATHER BARRIER
2X6 FRAMING, REF.
TO STRUCTURAL
DRAWINGS.
CONTINUOUS
PRE-FINISHED
ONE-PIECE METAL
CAP SET IN MASTIC,
REF. FINISH
SCHEDULE
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
2X8 FRAMING REF.
TO STRUCTURAL
DRAWINGS.
WEATHER BARRIER
WEATHER BARRIER
TAPE
DRAINABLE EIFS
WITH FINISHED DRIP
EDGE PROFILE
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
2X8 FRAMING REF.
TO STRUCTURAL
DRAWINGS.
WEATHER BARRIER
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
PICK UP WINDOW,
REF. SCHEDULE
SILL FLASHING W/
END DAMS SET ON
FULL BED OF
SEALANT.
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
WEATHER BARRIER 2x6 FRAMING
VAPOR RETARDER TYP
5 1/2" METAL STUDS
OVER SILL SEALER
REF. STRUCTURAL
DRAWINGS
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
WEATHER BARRIER
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
DRAINABLE EIFS
STARTER STRIP W/
WEEP HOLES
MINERAL WOOL
INSULATION, REF.
INSULATION SCHEDULE
VAPOR RETARDER
TYP
TILE BASE, REF.
FINISH PLAN &
INTERIOR
ELEVATIONS.
FLOOR FINISH, REF.
TO FINISH PLAN.
CONCRETE SLAB ON
GRADE, REF
STRUCTURAL
DRAWINGS
RIGID PERIMETER
INSULATION, REF.
INSULATION
SCHEDULE
STAINLESS STEEL
SURROUND
DRAINABLE EIFS
WITH FINISHED DRIP
EDGE PROFILE
COUNTER FLASHING
WEATHER BARRIER
CANOPY FLASHING
BY PREFABRICATED
CANOPY
MFR./INSTALLER.
WEATHER BARRIER
METAL FLASHING
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
SEALANT AND
BACKER ROD
METAL FLASHING
2X6 FRAMING, REF.
TO STRUCTURAL
DRAWINGS.
BATT INSULATION,
REF. INSULATION
SCHEDULE
VAPOR RETARDER
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
ALUMINUM
STOREFRONT,
REF.
WINDOW SCHEDULE
TILE BASE, REF.
FINISH PLAN &
INTERIOR
ELEVATIONS.
ALUMINUM STOREFRONT,
REF. WINDOW SCHEDULE
WEATHER BARRIER
TYP
DRAINABLE EIFS
STARTER STRIP W/
WEEP HOLES
METAL FLASHING
CONCRETE FOUNDATION, REF.
TO STRUCTURAL
DRAWINGS
COUNTER
FLASHING, EXTEND
UP 4" BEHIND WALL
PANELS
MEMBRANE
FLASHING
BLOCKING AS
REQUIRED
DRAINABLE EIFS
WITH FINISHED DRIP
EDGE PROFILE
PARGE COAT
ALUMINUM STOREFRONT
REF. WINDOW SCHEDULE
ISOLATION JOINT
CONCRETE SLAB ON
GRADE, REF STRUCTURAL
DRAWINGS
RIGID PERIMETER
INSULATION, REF.
INSULATION SCHEDULE
WALK-IN-BOX
BATT INSULATION,
REF. INSULATION
SCHEDULE
CONCRETE SLAB ON
GRADE, REF
STRUCTURAL
DRAWINGS
1/2" ISOLATION
JOINT WITH
SEALANT. REF.
JOINT TREATMENT
SCHEDULE.
BATT INSULATION,
REF. INSULATION
SCHEDULE
VAPOR RETARDER
CONCRETE SLAB ON
GRADE, REF
STRUCTURAL
DRAWINGS
1/2" CEMENT
BOARD
TILE, REF. FINISH
PLAN & INTERIOR
ELEVATIONS
FINISH GRADE
CONCRETE
FOUNDATION, REF.
TO STRUCTURAL
DRAWINGS
ALUMINUM
STOREFRONT, REF.
WINDOW SCHEDULE
CONTINUOUS
SEALANT JOINT
WITH BACKER ROD
WHERE REQUIRED,
TYP.
VAPOR RETARDER
TYP
CONTINUOUS
SEALANT JOINT
WITH BACKER ROD
WHERE REQUIRED,
TYP.
WEATHER BARRIER
SINGLE PLY
MEMBRANE ROOF
PRE-FINISHED
TWO-PIECE METAL
COMPRESSION
EDGE WITH DRIP
EDGE
RIGID ROOF
INSULATION, REF.
INSULATION
SCHEDULE
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS
LVL, REF.
STRUCTURAL
DRAWINGS
P.T. WOOD BLOCKING,
FULL DEPTH OF
INSULATION.
2X P.T. WOOD SILL PLATE
OVER SILL SEALER. REF.
STRUCTURAL DRAWINGS
FOR ANCHORING
REQUIREMENT.
TWO-PIECE
FLASHING AND
COUNTER FLASHING
BY WIB MFR COLOR
TO MATCH COOLER
ROOF
2X6 FRAMING REF.
STRUCTURAL
DRAWINGS
WEATHER BARRIER.
PARGE COAT
RIGID PERIMETER
INSULATION, REF.
INSULATION
SCHEDULE
BASE TILE, REF. FINISH
SCHEDULE
SINGLE PLY
MEMBRANE ROOF
LEDGER, REF.
STRUCTURAL
DRAWINGS.
BATT INSULATION,
REF. INSULATION
SCHEDULE
2X6 FRAMING, REF.
TO STRUCTURAL
DRAWINGS.
1/2" PLYWOOD
SHEATHING
VAPOR RETARDER
TYP
WALL FINISH, REF.
FINISH PLAN &
INTERIOR ELEVATIONS.
STAINLESS STEEL
CORNER TRIM
RETURN FINISH
TO STOREFRONT
P.T. WOOD
BLOCKING.
VAPOR RETARDER
LEDGER AND HANGER,
REF. STRUCTURAL
DRAWINGS
VAPOR RETARDER TYP
BATT INSULATION, REF.
INSULATION SCHEDULE
CONT. 2x6 WOOD FRAMING
DRAINABLE EIFS SYSTEM,
REF. EXTERIOR
ELEVATIONS.
BRAKE METAL FLASHING
EXTERIOR GRADE
SHEATHING
CONTINUOUS JOINT
SEALANT WITH BACKER
ROD,TYP.
CONCRETE CURB,
REF. CIVIL
DRAWINGS
CONCRETE
FOUNDATION, REF.
TO STRUCTURAL
DRAWINGS
HATCHED AREA
INDICATES FIRE
BLOCKING
REQUIRED EVERY
10'-0" MAX
ALUMINUM
STOREFRONT, REF.
WINDOW SCHEDULE
1/2" GYPSUM BOARD
INSTALL SHEATHING
AS REQUIRED TO
MAINTAIN FINISH
ALIGNMENT
LVL. REF.
STRUCTURAL
DRAWINGS
RIGID ROOF
INSULATION, REF.
INSULATION
SCHEDULE
STRUCTURAL ROOF
SHEATHING, REF.
TO STRUCTURAL
DRAWINGS.
SILL FLASHING W/ END
DAMS SET ON FULL BED
OF SEALANT.
BRAKE METAL TO MATCH
STOREFRONT.
(4) 2X6 P.T. BUILT UP CURB
OVER SILL SEALER.
SEE ABOVE FOR ALTERNATE
CURB CONSTRUCTION
ALTERNATE CURB - 1
ALTERNATE CURB - 2
CONTINUOUS CLEAT FOR
BRAKE METAL.
3/
4
"
ICE/WATER SHIELD TO
EXTEND 2" HORIZONTAL
AT TOP AND BOTTOM
11
1
/
2
"
6"
4"
8"
1'-3 3/4"
8"
MI
N
.
2"
7 1/4"
1'-3 1/4"
6"
2"
4"
7 3/4"
1"
1
3
/
8
"
SILL FLASHING W/ END
DAMS SET ON FULL BED
OF SEALANT.
PARGE COAT
FORMED CONC. CURB
STAINLESS STEEL CORNER
GUARD, (CP-8)
1SECTION DETAIL
1 1/2" = 1'-0"
2SECTION DETAIL
1 1/2" = 1'-0"
3SECTION DETAIL
1 1/2" = 1'-0"
4SECTION DETAIL
1 1/2" = 1'-0"
5SECTION DETAIL
1 1/2" = 1'-0"
6SECTION DETAIL
1 1/2" = 1'-0"
7SECTION DETAIL
1 1/2" = 1'-0"
10SECTION DETAIL
1 1/2" = 1'-0"
12SECTION DETAIL
1 1/2" = 1'-0"
9SECTION DETAIL
1 1/2" = 1'-0"
13SECTION DETAIL
1 1/2" = 1'-0"
14SECTION DETAIL
1 1/2" = 1'-0"
11SECTION DETAIL
1 1/2" = 1'-0"
3/8" RIGID INSULATION
LINE OF WALL BEYOND.
SCHLUTER 'QUADEC' TRIM,
REF. FINISH SCHEDULE
BASE TILE, REF. FINISH
SCHEDULE (ALIGN WITH
BASE BEYOND)
1/2" CEMENT BOARD
3/8" RIGID INSULATION
LINE OF WALL BEYOND.
SCHLUTER 'QUADEC' TRIM,
REF. FINISH SCHEDULE
1/2" CEMENT BOARD
6"
6"
FRP, STOP AT TOP OF
INTERIOR SHEATHING
SEALANT
VAPOR RETARDER
2X6 FRAMING REFER TO
STRUCTURAL DRAWINGS
6"
6"
LSL LEDGER. REF
STRUCTURAL
DRAWINGS
WEATHER
BARRIER
FIRE BLOCKING AS
REQUIRED
SINGLE PLY MEMBRANE
ROOF
RIGID ROOF INSULATION,
REF. INSULATION
SCHEDULE
STRUCTURAL ROOF
SHEATHING, REF. TO
STRUCTURAL DRAWINGS.
1'
-
1
1
/
2
"
1'
-
4
"
2X SOLID FIRE STOPPING
@ 20'-0" O.C.
CONT. 2x8 WOOD FRAMING
2X4 FRAMING
CONT. 2X4 FRAMING
2X10 @ 24" O.C.
3
1
/
2
"
11
"
11 1/4"
CONT. 2x6 WOOD FRAMING
NOTCH INTO 2X10
FRAMING
SIMPSON HANGERS, REF.
STRUCTURAL
8
A4.1
WEATHER
BARRIER
LED LIGHTING,
REF. ELECTRICAL
DRAWINGS
BRAKE METAL,
REF. EXTERIOR
ELEVATIONS
8LED FIXTURE @ CORNICE
1 1/2" = 1'-0"
SECTION DETAILS
A4.1
IT
EC
CITY/OWNER CMMTS01/12/233
CITY COMMENTS10/20/211
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
3
3
1.12.23
B
A
1PLAN DETAIL - BLADE
1 1/2" = 1'-0"4PLAN DETAIL
1 1/2" = 1'-0"8PLAN DETAIL
1 1/2" = 1'-0"12PLAN DETAIL
1 1/2" = 1'-0"
13PLAN DETAIL
1 1/2" = 1'-0"
5PLAN DETAIL
1 1/2" = 1'-0"
6PLAN DETAIL - ENTRY(LOW)
1 1/2" = 1'-0"
2PLAN DETAIL
1 1/2" = 1'-0"
3PLAN DETAIL
1 1/2" = 1'-0"
11PLAN DETAIL
1 1/2" = 1'-0"
10PLAN DETAIL
1 1/2" = 1'-0"14PLAN DETAIL
1 1/2" = 1'-0"
15PLAN DETAIL
1 1/2" = 1'-0"
6 1/2"6 1/4"
6
1
/
2
"
1
1
/
2
"
1/2"4 1/2"1/2"
1/2"
4 1/2"
1/2"
4 1/2"
9 1/4"
8"
8"
1'-3 3/4"
2"
SE
E
F
L
O
O
R
P
L
A
N
R.O.
7PLAN DETAIL
1 1/2" = 1'-0"
A
4
1
/
4
"
R.O.
R.O.
R.
O
.
R.O.
R.O.
R.
O
.
R.
O
.
6"
R.
O
.
R.
O
.
R.
O
.
8"
R.O.
1"
4"
8"
1
3
/
8
"
1
1
2"
7
A4.1
1
"T" FLASHING,
COLOR TO MATCH
STOREFRONT
STOREFRONT EXTENSION
SOLID SURFACE
CAP ABOVE
CONTINUOUS
SEALANT W/
BACKER ROD AS
REQUIRED. REFER
TO JOINT
TREATMENT
SCHEDULE
2X6 FRAMING, REF.
TO STRUCTURAL
DRAWINGS.
WALL FINISH, REF.
TO FINISH PLAN &
INTERIOR
ELEVATIONS.
VAPOR RETARDER
BATT INSULATION,
REF. INSULATION
SCHEDULE
STRUCTURAL
SHEATHING, REF.
TO STRUCTURAL
DRAWINGS.
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
FLASHING PROVIDED
AND INSTALLED BY
WIB MANUFACTURER
P.T. WOOD
BLOCKING AS
REQD. CONT.
AROUND
PERIMETER.
WEATHER BARRIER
2X6 FRAMING, REF.
TO STRUCTURAL
DRAWINGS.
1/2" PLYWOOD
SHEATHING
VAPOR RETARDER
TYP
WALL FINISH, REF. FINISH PLAN
& INTERIOR ELEVATIONS.
COLUMN, REF.
STRUCTURAL
DRAWINGS.
STAINLESS STEEL
CORNER TRIM
WEATHER BARRIER
2X6 FRAMING, REF.
TO STRUCTURAL
DRAWINGS.
1/2" GYPSUM BOARD
VAPOR RETARDER
TYP
1X4 WOOD TRIM,
PAINTED. REF.
INTERIOR
ELEVATIONS.
WEATHER BARRIER
ALUMINUM STORE
FRONT, REF.
WINDOW SCHEDULE
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
WEATHER BARRIER
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
CONTINUOUS
SEALANT W/
BACKER ROD AS
REQUIRED. REFER
TO JOINT
TREATMENT
SCHEDULE
SHIM
CONTINUOUS
SEALANT W/
BACKER ROD AS
REQUIRED. REFER
TO JOINT
TREATMENT
SCHEDULE
BRAKE METAL,
COLOR TO MATCH
STOREFRONT
CONTINUOUS
SEALANT W/
BACKER ROD AS
REQUIRED. TYP. EACH SIDES
REFER TO JOINT TREATMENT
SCHEDULE
ALUMINUM
STOREFRONT REFER
TO WINDOW SCHEDULE
ALUMINUM
STOREFRONT REF.
WINDOW SCHEDULE
BRAKE METAL,
COLOR TO MATCH
STOREFRONT
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
COLUMN, REF.
STRUCTURAL
DRAWINGS.
WEATHER BARRIER
SHIM
BRAKE METAL,
COLOR TO MATCH
STOREFRONT
ALUMINUM
STOREFRONT, REF.
WINDOW
SCHEDULE
COLUMN, REF.
STRUCTURAL
DRAWINGS.
VAPOR RETARDER
TYP
2X6 FRAMING, REF.
TO STRUCTURAL
DRAWINGS.
1/2" CEMENT BOARD
VAPOR RETARDER
TYP
BRAKE METAL,
COLOR TO MATCH
STOREFRONT
ALUMINUM
STOREFRONT, REF.
WINDOW SCHEDULE
CONTINUOUS
SEALANT W/
BACKER ROD AS
REQUIRED. REFER
TO JOINT
TREATMENT
SCHEDULE
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
ALUMINUM
STOREFRONT, REF.
WINDOW SCHEDULE
CONTINUOUS SEALANT W/
BACKER ROD AS
REQUIRED. TYP. EACH
SIDES REFER TO JOINT
TREATMENT SCHEDULE
WEATHER BARRIER
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
WEATHER BARRIER
STRUCTURAL
SHEATHING, REF.
TO STRUCTURAL
DRAWINGS.
2X8 FRAMING REF.
TO STRUCTURAL
DRAWINGS.
2X6 FRAMING, REF.
TO STRUCTURAL
DRAWINGS.
2X8 FRAMING REF.
TO STRUCTURAL
DRAWINGS.
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
WEATHER BARRIER
2x6 WOOD
BLOCKING
STRUCTURAL
SHEATHING, REF.
TO STRUCTURAL
DRAWINGS.
TILE, REF. FINISH
PLAN & INTERIOR
ELEVATIONS.
COLUMN, REF.
STRUCTURAL
DRAWINGS.
ALUMINUM
STOREFRONT, REF.
WINDOW SCHEDULE
CONTINUOUS
SEALANT W/
BACKER ROD AS
REQUIRED. TYP. EACH SIDE
REFER TO JOINT
TREATMENT SCHEDULE
5 1/2" METAL STUDS
REF.
STRUCTURAL
DRAWINGS
CONTINUOUS
SEALANT W/ BACKER ROD
AS REQUIRED. TYP. EACH SIDE
REFER TO JOINT TREATMENT
SCHEDULE
1/2" PLYWOOD
SHEATHING
WALL FINISH, REF.
TO FINISH PLAN &
INTERIOR
ELEVATIONS.
VAPOR RETARDER
TYP
COLUMN, REF.
STRUCTURAL
DRAWINGS.
ALUMINUM
STOREFRONT, REF.
WINDOW SCHEDULE
STAINLESS STEEL
CORNER PROTECTION
(CP-8). GC TO PROVIDE
AND INSTALL.
CONTINUOUS SEALANT W/
BACKER ROD AS REQUIRED.
TYP. EACH SIDE. REFER TO
JOINT TREATMENT
SCHEDULE
WALL FINISH, REF. TO
FINISH PLAN & INTERIOR
ELEVATIONS.
1/2" PLYWOOD SHEATHING
2X6 FRAMING, REF. TO
STRUCTURAL DRAWINGS.
WEATHER BARRIER
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
SHIM
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
WEATHER BARRIER
BRAKE METAL,
COLOR TO MATCH
STOREFRONT
COLUMN, REF.
STRUCTURAL
DRAWINGS.
ALUMINUM
STOREFRONT, REF.
WINDOW SCHEDULE
FRP WITH CORNER
TRIM AT JAMBS AND
SILLS
STOREFRONT
SILL BELOW
BRAKE METAL, REF.
INTERIOR
ELEVATIONS
4X4 POST, EXTEND
TO 9'-0" A.F.F.
2x4 FRAMING AT 16"
O.C. BELOW
1/2" PLYWOOD
SHEATHING
SOLID SURFACE
CAP, REF. INTERIOR
ELEVATIONS
1/4" GLASS, BUTT
JOINTED, REF.
INTERIOR
ELEVATIONS
DOOR FRAME, REF.
TO SCHEUDLE
SHIM
CONTINUOUS
SEALANT W/
BACKER ROD AS
REQUIRED. REFER
TO JOINT
TREATMENT
SCHEDULE
1/2" CEMENT BOARD
2x4 FRAMING AT 16"
O.C.
WALL FINISH, REF.
FINISH PLAN &
INTERIOR
ELEVATIONS.
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
COLUMN, REF.
STRUCTURAL
DRAWINGS.
CONTINUOUS
SEALANT JOINT
WITH BACKER ROD
WHERE REQUIRED,
TYP.
1/2" CEMENT BOARD
1/2" CEMENT BOARD
2X6 FRAMING AT 16"
O.C.
COLUMN, REF.
STRUCTURAL
DRAWINGS.
WEATHER BARRIER
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
1/2" PLYWOOD
SHEATHING
WALL FINISH, REF.
TO FINISH PLAN &
INTERIOR
ELEVATIONS.
VAPOR RETARDER
TYP
2x6 WOOD
BLOCKING
BATT INSULATION,
REF. INSULATION
SCHEDULE
BATT INSULATION, REF.
INSULATION SCHEDULE
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
1/2" CEMENT BOARD
VAPOR RETARDER
TYP
2X6 FRAMING, REF.
TO STRUCTURAL
DRAWINGS.
BATT INSULATION,
REF. INSULATION
SCHEDULE
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
WEATHER BARRIER
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
PICK UP WINDOW,
REF. SCHEDULE
ALUMINUM
STOREFRONT, REF.
WINDOW SCHEDULE
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
WEATHER BARRIER
BATT INSULATION,
REF. INSULATION
SCHEDULE
2X6 FRAMING, REF.
TO STRUCTURAL
DRAWINGS.
1/2" PLYWOOD
SHEATHING
CONTINUOUS SEALANT W/
BACKER ROD AS REQUIRED.
TYP. EACH SIDE REFER TO
JOINT TREATMENT SCHEDULE
ALUMINUM STOREFRONT,
REF. WINDOW SCHEDULE
CONTINUOUS
SEALANT W/
BACKER ROD AS
REQUIRED. REFER
TO JOINT
TREATMENT
SCHEDULE
FLASHING PROVIDED
AND INSTALLED BY
WIB MANUFACTURER
P.T. WOOD BLOCKING
AS REQD. CONT.
AROUND PERIMETER
2X6 FRAMING, REF.
TO STRUCTURAL
DRAWINGS.
BATT INSULATION,
REF. INSULATION
SCHEDULE
TILE, REF.
FINISH PLAN &
INTERIOR
ELEVATIONS.
1/2" CEMENT BOARD
TILE BASE, REF.
FINISH PLAN &
INTERIOR
ELEVATIONS
NOTCH SHEATHING
AND 2X TO ALLOW
FOR INSTALLATION OF
FACE SHELL
RETURN WOOD TRIM
& TILE WAINSCOT
BELOW TO
STOREFRONT, TYP.
WALL FINISH, REF.
FINISH PLAN &
INTERIOR
ELEVATIONS
RETURN WOOD TRIM
& TILE WAINSCOT
BELOW TO
STOREFRONT, TYP.
HOLD DOWN, REF.
STRUCTURAL
DRAWINGS
HOLD DOWN, REF.
STRUCTURAL
DRAWINGS
HOLD DOWN, REF.
STRUCTURAL
DRAWINGS
BASE, REF. FINISH PLAN &
INTERIOR ELEVATIONS
TILE, REF. FINISH
PLAN & INTERIOR
ELEVATIONS.
COLUMN, REF.
STRUCTURAL
DRAWINGS.
"T" FLASHING,
COLOR TO MATCH
STOREFRONT
"T" FLASHING,
COLOR TO MATCH
STOREFRONT
"T" FLASHING,
COLOR TO MATCH
STOREFRONT
VAPOR RETARDER
TYP
STRUCTURAL
SHEATHING, REF.
STRUCTURAL
DRAWINGS.
QUADEC
SCHLUTER TRIM
QUADEC
SCHLUTER TRIM
ABOVE
INSTALL SHEATHING
AS REQUIRED TO
MAINTAIN FINISH
ALIGNMENT
WEATHER BARRIER
"T" FLASHING,
COLOR TO MATCH
STOREFRONT
BATT INSULATION,
REF. INSULATION
SCHEDULE
1/2" PLYWOOD
SHEATHING
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
WEATHER BARRIER
"T" FLASHING,
COLOR TO MATCH
STOREFRONT
WEATHER BARRIER
2"
BOLLARD
FRP WITH CORNER
TRIM AT JAMBS AND
SILLS
STAINLESS STEEL CORNER
PROTECTION (CP-8). GC TO
PROVIDE AND INSTALL.
FRP WITH CORNER TRIM
AT JAMB
FRP WITH CORNER
TRIM AT JAMBS AND
SILLS
FRP WITH CORNER
TRIM AT JAMB
BATT INSULATION,
REF. INSULATION
SCHEDULE
R.
O
.
7"
9PLAN DETAIL
1 1/2" = 1'-0"
1/2"
4 1/2"
1/2"
4 1/2"
STOREFRONT EXTENSION
STOREFRONT
SILL BELOW
BRAKE METAL, REF.
INTERIOR
ELEVATIONS
2X4 POST
1/2" PLYWOOD
SHEATHING
SOLID SURFACE
CAP, REF. INTERIOR
ELEVATIONS
1/4" GLASS, BUTT
JOINTED, REF.
INTERIOR
ELEVATIONS
DOOR FRAME, REF.
TO SCHEUDLE
SHIM
CONTINUOUS SEALANT W/
BACKER ROD AS
REQUIRED. REFER
TO JOINT TREATMENT
SCHEDULE
QUADEC
SCHLUTER TRIM
4X4 POST, EXTEND
TO 9'-0" A.F.F.
PLAN DETAILS
A4.2
IT
EC
CITY/OWNER CMMTS01/12/233
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
3
1.12.23
JAMB
(3 STUD S
P
A
C
E
S
)
SE
C
T
I
O
N
APPROX.
3
'
-
6
"
C
L
E
A
R
AP
P
R
O
X
.
3
'
-
6
"
C
L
E
A
R
4
1
/
2
"
5
1
/
2
"
1'
-
4
3
/
4
"
1'
-
5
3
/
4
"
LADDER RECEIVER
GALVANIZED SAFETY GATE
(FALL PROTECTION USA,
LSG-44 OR EQUIVALENT).
SEALANT
GALVANIZED SAFETY GATE
(FALL PROTECTION USA,
LSG-44 OR EQUIVALENT).
SAFETY GATE
SEALANT
SEALANT
SEALANT
HOLD OPENING
ELEVATION 1 1/2"
MIN. ABOVE
ROOF DECK.
THRU-BOLT PER
LADDERPORT
INSTRUCTIONS
SWING OPENPLAN VIEW
ELEVATION
2"x 2"x 3/16" ANGLE
MEASUREMENTS FOR FACE MOUNTING
LADDER SAFETY GATE DETAIL
THIS DETAIL IS BASED ON MANUFACTURER STANDARD DETAIL
ALUM. CLOSER BY
FASCIA TRIM MFR.
STD. ALUM
PARAPET TRIM
SEALANT
REF. WALL FINISH
MATERIAL MFG.
REQUIREMENTS FOR
MTG. PROVIDE
BLOCKING AS REQ'D
METAL OR VINYL FLASHING
FACTORY WELDED TO ROOF
MEMBRANE FLASHING
SHEET.
ROOF MEMBRANE TO EXTEND
THROUGH OPENING & WRAP
DOWN 2" MIN. OVER EDGE
2x10 (TREATED)
INSUL. CANT
DBL. 2x6 (TREATED)
ROOF INSUL.
ROOF DECK
DBL. 2x8 REF.
STRUCT.
MET. OR VINYL CAP
FLASHING WELDED TO
MEMBRANE FLASHING
PROVIDE 2x8 BLOCKING
SPANNING OVER NEXT STUD
PAST EACH ANCHOR BOLT.
SEALANT
MIN. (2) CONTINUOUS
FULL-HEIGHT STUDS AT
EACH JAMB
UNIVERSAL MOUNTING HINGE.
1/16 " DIA. TYP. 4PL.
UNIVERSAL MOUNTING HINGE.
4'
-
0
"
J
A
M
B
-
J
A
M
B
1"
4"
G.C. TO ROUTE DATA FEED FROM
DIRECT TV THROUGH CURB AND
ENSURE WEATHERPROOFED
RUBBER BOOT WITH
STAINLESS STEEL CLAMPS
FURNISHED WITH CURB,
TYP.
PREFABRICATED
CUSTOM CURB
FLASHING
CONTINUOUS WEATHER BARRIER OVER WALL
SHEATHING, FLASH/SEAL TO SCUPPER
MEMBRANE AS REQ'D BY MFR.'S WARRANTY
4"H x 8"W MIN. SCUPPER
OPENING THRU WALL, TYP.
SEAL MEMBRANE FLASHING TO
METAL DRIP EDGE FLASHING
AS SPEC'D BY MFR.
PREFINISHED ALUMINUM
COLLECTION BOX, SEE
ELEVATIONS FOR
FINISHES
PROVIDE TIEBACKS @
4'-0" O.C.
WEATHER BARRIER
THIS DETAIL IS BASED ON DURO-LAST DETAIL 4020
DRAINABLE EIFS
SYSTEM, REF.
EXTERIOR
ELEVATIONS.
LAP & SEAL PRE-MANUFACTURED
SCUPPER TO ROOF MEMBRANE AS
RECOMMENDED BY MFR.
WOOD BLOCKING
AS REQUIRED
PRE-FABRICATED
INSULATED PIPE
CURB BY G.C.
MINIMUM
8"x15"x15" O.D.
ACRYLIC CLAD
THERMOPLASTIC
COVER WITH
PROPER SIZE AND
NUMBER OPENINGS.
8"
M
I
N
.
THIS DETAIL IS BASED ON DURO-LAST DETAIL 4070
8"
M
I
N
.
3 PIECE PVC DURO-LAST
CHILLER STACK KIT
DURO-LAST CAULK
STAINLESS STEEL BAND
POSITIONED 1/4" FROM
THE TOP OF THE STACK
FLASHING
DURO-LAST
PREFABRICATED VENT
STACK FLASHING
INSULATION.
REFER TO
INSULATION
SCHEDULE
ROOF DECK
THIS DETAIL IS BASED ON DURO-LAST DETAIL 4070
8"
MI
N
.
STAINLESS STEEL BAND
POSITIONED 1/4" FROM THE
TOP OF THE STACK FLASHING
DURO-LAST PREFABRICATED
VENT STACK FLASHING
INSULATION.
REFER TO
INSULATION
SCHEDULE
ROOF
SHEATHING, REF.
STRUCTURAL
DURO-LAST CAULK
TYPICAL VENT PIPE
PREFINISHED ALUMINUM
DOWNSPOUT, 4" CIRCULAR
LEADER OR 4" x 3 1
2"
RECTANGULAR LEADER, SEE
ELEVATIONS FOR FINISHES
ADD ADDITIONAL
BLOCKING BELOW
INSULATION AS NEEDED.
THIS DETAIL IS BASED ON DURO-LAST DETAIL 4090
WOOD SLEEPER TO
RUN PARALLEL WITH
ROOF SLOPE
DURO-LAST WALK WAY
PAD OR MEMBRANE
DURO-LAST CUSTOM
PREFABRICATED CURB
WOOD SLEEPER
MECHANICAL UNIT
DURO-LAST CAULK
INSULATION, REF.
INSULATION
SCHEDULE
ROOF SHEATHING,
REF. STRUCTURAL
8"
M
I
N
.
RE
F
E
R
T
O
M
E
C
H
A
N
I
C
A
L
D
R
A
W
I
N
G
S
FO
R
C
U
R
B
H
E
I
G
H
T
RTU
THIS DETAIL IS BASED ON DURO-LAST DETAIL 4020
GALVANIZED NAILS
6" ON CENTER
DURO-LAST
PRE-FABRICATED
CUSTOM CURB
FLASHING
INSULATION, REF.
INSULATION SCHEDULE
ROOF SHEATHING,
REF. STRUCTURAL
BLOCKING
8"
2"
THIS DETAIL IS BASED ON DURO-LAST DETAIL 6020
WEATHER BARRIER
TWO PIECE FLASHING
AND COUNTER FLASHING
TERMINATION BAR
W/ SEALANT
MEMBRANE FLASHING
FASTENER AND
FASTENING PLATE
RIGID INSULATION
TAPERED FOR
POSITIVE DRAINAGE
ROOF SHEATHING,
REF. STRUCTURAL
1 1/4" GALV. ROOF
NAILS @ 6" O.C.
MAX.
ROOF MEMBRANE TO
CONTINUE 3" DOWN
VERTICAL
SEALANT & BACKER ROD
WEATHER BARRIER
CONTINUOUS PRE-FINISHED,
ONE PIECE METAL CAP SET IN
MASTIC. REF. FINISH
SCHEDULE
4"
ROOF MEMBRANE
2X6 WOOD
BLOCKING ROOF MEMBRANE TO
CONTINUE 3" DOWN
VERTICAL AND TUCKED
BACK TO SHEATHING.
END CAP TOP TRIM
ILLUMINATED BOX
TRIM
#10 SMS. SEE
MANUFACTURER'S CUT
SHEET FOR ADDITIONAL
INFORMATION
SEALANT W/
BACKER ROD
EXTERIOR WALL
FINISH SYSTEM
STRUCTURAL
SHEATHING. REFER TO
STRUCTURAL DRAWINGS.
DETAIL BASED ON ZURN Z180 CORNICE DRAIN INSTALLATION DETAIL.
ZURN Z180
CORNICE DRAIN
FLASHING CLAMP
ROOF MEMBRANE
ROOF
SHEATHING, REF.
STRUCTURAL
12
/
2
2
/
2
0
1
7
1
2
:
3
0
:
1
8
P
M
ROOF DETAILS
A4.3
IT
EC
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
1ROOF DETAIL-LADDER RECEIVER
3/4" = 1'-0"
9ROOF DETAIL-TYPICAL PIPE PENETRATION
1 1/2" = 1'-0"
12ROOF DETAIL-SCUPPER DETAIL
1 1/2" = 1'-0"
3ROOF DETAIL-CONDENSER PIPE DETAIL (A)
1 1/2" = 1'-0"
8ROOF DETAIL-TERMINATION BAR DETAIL
3" = 1'-0"
6ROOF DETAIL-RTU CURB DETAIL
3" = 1'-0"
5CONDENSER UNIT DETAIL
3" = 1'-0"
4CONDENSER PIPE DETAIL
1 1/2" = 1'-0"
10ROOF DETAIL-BLADE CAP (M-3)
3" = 1'-0"
13ROOR DETAIL-ROOF DRAIN / OVERFLOW
3" = 1'-0"
14ALTERNATE BLADE LIGHT
3" = 1'-0"
2NOT USED
3/4" = 1'-0"
7NOT USED
3" = 1'-0"
EX
T
.
R
A
M
P
EX
T
.
R
A
M
P
1'-6"
9
A5.2
- QUADEC BY SCHLUTER
- SHIENE BY SCHLUTER
- SHIENE BY SCHLUTER
OUTSIDE CORNER
EXPOSED EDGE
ADJACENT FINISH THINNER THAN TILE
TILE ACCESSORIES
*PROVIDE TRIM FOR CONDITIONS NOTED BELOW:
GENERAL NOTES
A. PROVIDE AND INSTALL CRACK ISOLATION MEMBRANE AT CONTROL JOINT
LOCATIONS TILES. CRACK ISOLATION MEMBER TO BE "HYDRO-BAN" BY LATICRETE.
REFER TO TCNA FOR JOINT STANDARDS. CONTACT LATICRETE AT (203) 376-8113.
REFER TO STRUCTURAL SHEET S1.1, FOUNDATION PLAN.
B. PAINTER IS RESPONSIBLE FOR REMOVING HARDWARE, SWITCH AND OUTLET
COVERS PRIOR TO PAINTING. PAINTER TO REINSTALL AFTER PAINT IS DRY.
C. RETOUCH OR REFINISH SURFACES DAMAGED BY SUBSEQUENT WORK. THE COST
OF SUCH RESTORATION WORK SHALL BE BORNE BY THE CONTRACTOR.
D. PROVIDE PROPER PROTECTION AGAINST DAMAGE TO FURNITURE, ADJACENT
FINISHED WORK, FLOORING, ETC. IF APPLICABLE.
E. FLOOR TRANSITIONS MUST BE FLUSH AND LEVEL. VINYL OR RUBBER REDUCER
STRIPS NOT PERMITTED IN CUSTOMER AREA. NIBBLE SLAB AND FEATHER AS
REQUIRED TO PROVIDE IMPERCEPTIBLE TRANSITION.
F. REFER TO REFLECTED CEILING PLAN FOR ALL CEILING HEIGHTS.
G. PROVIDE SCHLUTER CORNER TRIM AT ALL TILE CORNERS PER DETAIL ON SHEET
A5.2.
LEGEND
ROOM FINISH REFER TO
FINISH SCHEDULE
FINISH TAG REFER TO FINISH
SCHEDULE
FLOOR TRANSITION
WALL
BASE
DESCRIPTIONSYMBOL
CLG
FLOOR
X-X
FT-3
FT-4
2FINISH PLAN
1/4" = 1'-0"
2"
#CODED NOTES:
1
2
3
4
5
6
SEE RCP FRP-1
FT-4 B-4
SEE RCP FRP-2
FT-4 B-4
SEE RCP SEE ELEV
FT-4 B-4
SEE RCP SEE ELEV
FT-4 B-4
N/A N/A
FT-4 SS
SEE RCP SEE ELEV
FT-4 B-4
SEE RCP FRP-1
FT-4 B-4
N/A N/A
FT-4 SS
12
A5.2
1'-6"
A7.3
8
7
6
5 A7.3
4
3
2
1
A7.2
10
11
A7.29
A7.2
5
8
6
7
A7.2
4
1
2
3
A7.1 2
3
4
A7.1 8
7
9
A7.1
1
24
A7.1
6
5
8
FAMILY
OFFICE
DINING
DRIVE THRU
KITCHEN
PAY WINDOW
SERVICE
FAMILY
RECEIVING
FREEZER
COOLER
UTILITY
PREP. AREA
CREW
114
ENTRY
100
106
101
111
104
110
112
113
108
107
102
103
116
105
N/A N/A
SS SS
P-9 SEE ELEV
FT-3 B-5
P-10 SEE ELEV
FT-3 B-5
SEE RCP FRP-1
FT-3 B-5
P-10 SEE ELEV
FT-3 B-5
9
10
11
12
STAINLESS STL.
STAINLESS STL.
FRP-2
P-6
WT-3
WT-3
B-3
WT-3
P-6WT-7
P-10
FRP-1
FRP-1
P-6
P-9
WT-3
P-9
P-6
P-9
WT-3
WC-6P-6
P-9
P-9 WT-3
FRP-1
FRP-2
SOFFIT
FACE,
BACK, &
UNDERSIDE
P-10
SOFFIT FACE,
BACK &
UNDERSIDE
GYP.
GYP.
GYP.
C.B.
C.B.
GYP.
GYP.
FRP-1
PLY.
PLY.
C.B.C.B.
C.B.
WT-7C.B.
WT-6C.B.
P-10
WT-6
GYP.
C.B.
P-10
WT-6
GYP.
C.B.
WT-6 WT-7C.B.
FRP-1
BACK &
UNDERSIDE
OF SOFFIT
PLY.
PLY.
PLY.
PLY.
GYP.
GYP.
GYP.
C.B.
GYP.
GYP.C.B.
C.B.
P-6
P-9 GYP.
GYP.
P-9GYP.
P-6
P-9 GYP.
GYP.
WT-3 C.B.
FRP-1
PLY.
PLY.
CP-1
FRP-1 - GYP.7
CP-8
CP-8
CP-8
CP-8
CP-8
13
FRP-1
31
4"
4
A5.2
1. 6" CONCRETE CURB. 1/2" LESS @ EXPOSED SIDES THAN IFS PANEL. PROVIDE BASE
ON FACE OF CURB. SEE DETAIL 6/A5.2
2. PROVIDE WATERPROOFING MEMBRANE AS SCHEDULED AND AT ALL WET AREAS,
TYP. REFER TO DETAIL 01/A5.1 FOR INSTALLATION OF MEMBRANE AT MOP SINK.
3. CONTINUE FLOOR TILE UNDER FIXTURES, CASEWORK, AND FREESTANDING
EQUIPMENT.
4. LINE OF SOFFIT ABOVE.
5. STAINLESS STEEL COVE BASE PROVIDED BY COOLER BOX PROVIDER
6. RAMP BY COOLER BOX PROVIDER
7. NOT USED.
8. SOLID SURFACE CAP AND END CAP, REFER TO INTERIOR ELEVATIONS AND
EQUIPMENT SCHEDULE.
9. BEVERAGE / CONDIMENT CURB SET ON FLOOR FINISH. REFER DETAIL 1/A5.2
10. COOKLINE CURB SET DIRECTLY ON SLAB. REFER TO DETAIL 3/A5.2
11. ALIGN TILE TRANSITION WITH FACE OF EQUIPMENT CURB
12. INSTALL FRP CORNER TRIM AT EDGE OF BULKHEAD.
13. FRONT COUNTER CURB SET DIRECTLY ON SLAB. REFER TO DETAIL 3/A5.2.
*
* NOTE: CONTRACTOR TO CONTACT
KED TO ARRANGE EARLY DELIVERY
OF STAINLESS STEEL WALL PANELS.
G.C. IS RESPONSIBLE FOR
INSTALLATION OF STAINLESS STEEL
WALL PANELS PRIOR TO HOOD
INSTALLATION.
*
FT-3
FT-4
WT-3 C.B.
P-9 GYP.
P-6 GYP.
WT-3 C.B.
P-9 GYP.
P-9 GYP.P-6
P-9
WT-3
GYP.
GYP.
C.B.P-9GYP.
A7.1
10
10
A5.2
4
A5.2
SIM
6
A5.2
5
FRP-1 - PLY.
CP-8
1'-6"FRP-1 - PLY.
FRP-1 PLY.
FRP-1 - PLY.
C2 X 6
1" = 1'-0"B3 1/2" METAL STUD
1" = 1'-0"
HOLD TILE SUBSTRATE
SHORT OF T.O. TILE
WALL FINISH AS
SCHEDULED
BASE AS
SCHEDULED
SUBSTRATE PER PLAN
1'
-
0
"
A
.
F
.
F
.
M
I
N
.
CE
M
E
N
T
B
O
A
R
D
6"
FIRE BLOCKING ALIGNED
WITH FINISH CEILING
BRACE TOP OF WALL
TO STRUCTURE ABOVE
AT 48" O.C. MAX
FINISH CEILING AS
SCHEDULED
WALL FINISH AS
SCHEDULED
BASE AS
SCHEDULED
SUBSTRATE PER PLAN
WALL FINISH AS
SCHEDULED
BASE AS
SCHEDULED
SUBSTRATE PER PLAN
CONT. GALV.
METAL TRACK
2X4 FRAMING @ 16"
O.C.
2X6 FRAMING AT 16"
O.C.
1"
HOLD TILE SUBSTRATE
SHORT OF T.O. TILE
1"
HOLD TILE SUBSTRATE
SHORT OF T.O. TILE
1"
FINISH CEILING AS
SCHEDULED
6"
NON-COMBUSTABLE
FIRE BLOCKING
3 1/2" METAL STUDS
@ 16" O.C.
BRACE TOP OF WALL
TO STRUCTURE ABOVE
AT 48" O.C. MAX
20 GA BLOCKING
WHERE SHOWN ON
PLAN
6"
2X6 FRAMING AT 16"
O.C.
FIRE BLOCKING
BRACE TOP OF WALL
TO STRUCTURE ABOVE
AT 48" O.C. MAX
A2 X 4
1" = 1'-0"
1'
-
0
"
A
.
F
.
F
.
M
I
N
.
CE
M
E
N
T
B
O
A
R
D
1'
-
0
"
A
.
F
.
F
.
M
I
N
.
CE
M
E
N
T
B
O
A
R
D
ROOF JOIST
EXTEND FRAMING
TO BOTTOM OF
JOIST
ROOF DECK
WALL TYPES
MOP SINK. INSTALL WATERPROOF
MEMBRANE, TIE INTO DRAIN AND
WRAP UP WALLS 12" OR ONTO
FLOOR 12". SET MOP SINK IN BED
OF SEALANT ON FINISH FLOOR.
1MOP SINK DETAIL
3/4" = 1'-0"
8"
3'
-
0
"
INSTALL WATER
PROVING MEMBRANE
FULL HEIGHT OF FRP
PANELS
SEALANT
FRP PANELS
MOP SINK
MOP SINK
SLAB
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
FINISH PLAN
A5.1
IT
EC
CITY/OWNER CMMTS01/12/233
3
3
3
3
3
3
3
3
1.12.23
1/
2
"
MA
X
.
1"
1/2"
THERMAL
BREAK
THIS DETAIL IS BASED ON LATICRETE DETAIL W244C-12
REFERENCE FINISH SCHEDULE FOR ADDITIONAL INFORMATION
EXTERIORINTERIOR
ALUMINUM 1/2
SADDLE (PEMKO
1700 (OR EQUAL) W/
WATER TIGHT
SEALANT
WALL BEYOND
CONCRETE
SIDEWALK
THIS DETAIL IS BASED ON LATICRETE DETAIL F113-12
REFERENCE FINISH SCHEDULE FOR ADDITIONAL INFORMATION
RIGID INSULATION
10 MIL. VAPOR
BARRIER
MORTAR
TILE FLOORING
PER SCHEDULE
CRACK BRIDGE
MEMBRANE
GROUT
CONCRETE
WATERPROOF
MEMBRANE
MORTAR
TILE - REFERENCE
FINISH SCHEDULE
GROUT
FLOOR SLAB
TAPCON ANCHOR
FILL CURB RAILS
WITH GROUT TO
MINIMUM HEIGHT
OF LEVELING TABS
BASE TILE. CUT FLUSH
WITH TOP OF CURB
LEVELING BOLT
1/4" CEMENT BOARD
ATTACHED TO CURB
EQUIPMENT CURB
(PROVIDED BY SUPPLIER
INSTALLED BY GC)
WOOD/ MTL STUD
CEMENT BOARD
WATERPROOF
MEMBRANE TO
EXTEND 12" UP WALL
MORTAR
GROUT
TILE
1FINISH DETAIL - CURB AT CONDIMENT STAND
3" = 1'-0"
2TILE FINISH DETAIL
3" = 1'-0"6FINISH DETAIL - CURB AT ELECTRICAL PANEL
3" = 1'-0"
4FINISH DETAIL - TILE AT EXTERIOR THRESHOLD
3" = 1'-0"
7FINISH DETAIL - TILE GROUT
3" = 1'-0"
FINISH FLOOR
LEVELING BOLT
FRONT COUNTER /
COOK CENTER
CURB (PROVIDED BY
SUPPLIER
INSTALLED BY GC)
BASE TILE AS
SCHEDULED
FILL CURB RAILS WITH
GROUT TO MINIMUM
HEIGHT OF LEVELING
TABS
TAPCON ANCHOR
FLOOR SLAB
3
FINISH DETAIL - CURB AT FRONT
COUNTER/ COOK CENTER
3" = 1'-0"
NOTE: WATERPROOF MEMBRANE IS 24" AROUND THE
PERIMETER OF WET AREA: KITCHEN & RESTROOMS.
COVE BASE
CUT FLUSH
WITH TOP OF
CURB
ELECTRICAL
PANELS, REF.
ELECTRICAL
DRAWINGS
FLOOR SLAB
CONCRETE CURB
WM-1
1"3/4"
1
1
/
2
"
1/2 " SOLID
SURFACE, REFER TO
FINISH SCHEDULE
WC-6
1/2" GYPSUM BOARD
2 X 4 FRAMING AT
16" O.C.
9FINISH DETAIL-CURB @ FRONT COUNTER
3" = 1'-0"
10FINISH DETAIL
3" = 1'-0"
CONTINUE FINISH
BEHIND SOLID
SURFACE CAP, TYP.
12FINISH DETAIL
3" = 1'-0"
FRP
1/2 " PLYWOOD 1/2" GYP
PAINT P-6
WOOD TRIM,
PAINT P-6
SOLID SURFACE
CAP BELOW
INSTALL 1X "CAP" TO
CREATE UNIFORM
END WALL FINISH,
PAINT P-6
J-MOLD
MITER CUT
FLOOR TILE AS
SCHEDULED
8FINISH DETAIL - BASE AT KITCHEN
3" = 1'-0"
1'
-
0
"
6"
WATERPROOF
MEMBRANE
FLOOR TILE
COVE BASE TILE
CONTINUE FRP
BEHIND BASE 1"
CEMENT BOARD
FRP
11 1/2"
1
1
/
2
"
1/2" SOLID SURFACE END
CAP TO BE FLUSH WITH
SOLID SURFACE TOP CAP,
REFER TO INTERIOR
ELEVATIONS
WALL TILE
1/2" CEMENT BOARD
FRONT COUNTER
FRP
1/2 " PLYWOOD 2x6 FRAMING
FLOOR TILE
TRANSITION
STACKED 1" CONDUITS
(1) PWER, (1) DATA
WITH PULL STRINGS
JUNCTION BOX FOR
COUNTER - (2) 2X4
STACKED FOR POWER &
DATA. MOUNT TO WALL
1'
-
0
"
6"
WATERPROOF
MEMBRANE
FLOOR TILE
COVE BASE TILE
CONTINUE FRP
BEHIND BASE 1"
CEMENT BOARD
FRP
SUBSTRATE
SCHLUTER
QUADEC TRIM
5FINISH DETAIL - TRIM AT OUTSIDE CORNER
12" = 1'-0"
WALL TILE/
FLOOR TILE
WALL TILE /
BASE TILE
K & V HEAVY
WEIGHT 14" 250LB
SHELF BRACKET
(OR EQUAL), TYP.
K & V HEAVY WEIGHT STEEL
WALL STANDARD HANGING
SYSTEM (OR EQUAL)
INSTALLED PER MFR
SPECIFICATIONS.
14" LAMINATE SHELVING, G.C. TO
VERIFY LENGTH REQUIRED , TYP.
STOCK 6'-0" LAMINATE
COUNTER TOP. HAMPTON
BAY "FROSTY WHITE" W/
TEMPO EDGE &
INTEGRATED BACKSPLASH
(OR SIMILAR).
INSTALL 1 1/2" ALUMINUM
ANGLE BAR W/ 1/4" DIA. LAG
SCREWS @ 8" O.C.
2'
-
9
1
/
2
"
M
A
X
.
TO
P
O
F
D
E
S
K
2'
-
9
1
/
2
"
M
A
X
TO
P
O
F
D
E
S
K
2'-0"
AREA RESERVED FOR
I.T. CABINET. VERIFY
REQUIREMENTS W/
OWNER
11MANAGER'S DESK DETAIL
1" = 1'-0"
INSTALL RICHELIEU
HARDWARE 28" CHROME
ADJUSTABLE TABLE LEG
(OR EQUAL).
5'-7"
G.C. TO SOURCE COUNTER TOP,
SHELVING SYSTEM, & HARDWARE
FOR MANAGER'S DESK.
G.C. TO VERIFY FINAL
CONFIGURATION OF MANAGER'S
DESK WITH OWNER.
2'
-
9
1
/
2
"
M
A
X
.
TO
P
O
F
D
E
S
K
2'
-
9
1
/
2
"
M
A
X
.
TO
P
O
F
D
E
S
K
STOCK LAMINATE
COUNTER TOP. HAMPTON
BAY "FROSTY WHITE" W/
TEMPO EDGE &
INTEGRATED BACKSPLASH
(OR SIMILAR).
INSTALL 1 1/2" ALUMINUM
ANGLE BAR W/ 1/4" DIA. LAG
SCREWS @ 8" O.C.
3'-3 1/2"
G.C. TO SOURCE COUNTER TOP,
SHELVING SYSTEM, & HARDWARE
FOR MANAGER'S DESK.
13EMPLOYEE DESK DETAIL
1" = 1'-0"
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
FINISH DETAILS
A5.2
IT
EC
CITY/OWNER COMMTS01/12/233
3
3
3
1.12.23
JOINT TREATMENT SCHEDULE (SEE SPECIFICATIONS - DIVISION 7 FOR CLARIFICATION OF TYPES)
BUILDING INSULATION GENERAL NOTES
BLDG. INSULATION SCHED. GENERAL FLASHING REQUIREMENTS
DIAGRAM 'C'
VINYL, WOOD, OR METAL
EX
T
E
R
I
O
R
NO
SEALANT,
U.N.O.
PARTITION TYPES
A. PROPERLY WEEP FLASHING POINTS AND NORMAL DRAINAGE POINTS WITH WEEPS @ 1'-4" O.C. MAX.
SPACING. WEEP POINTS ARE TO BE LOCATED DIRECTLY ON TOP OF FLASHING.
B. WHERE FLASHING IS LOCATED TERMINATE AND/OR SEPARATES MATERIALS, DO NO SEAL (U.N.O.) -
REFER TO DIAGRAM "C" WHERE IT IS DETERMINED BY THE MATERIAL MANUFACTURER OR OTHERWISE
THAT SEALING IS REQUIRED (TO PREVENT WATER PENETRATION BEYOND FLASHING DUE TO WIND
DRIVEN RAIN), THEN SEALANT MUST BE WEEPED IN ACCORDANCE WITH NOTE "A" ABOVE.
C. UNLESS NOTED OTHERWISE, TURN FLASHING UP A MIN. OF 4" BEHIND APPROPRIATE MATERIALS.
D. FLASHING CONDITIONS, WHETHER DETAILED OR NOT, ARE TO BE IN ACCORDANCE WITH S.M.A.C.N.A.
SPECIFICATIONS. WHERE ATYPICAL CONDITIONS OCCUR THAT ARE NOT DETAILED, FLASHING IS TO BE
INSTALLED AS CLOSELY AS POSSIBLE TO THE S.M.A.C.M.A. DETAIL THAT IS MOST CLOSELY
APPROXIMATES THE ACTUAL CONDITION.
E. UNLESS NOTED OTHERWISE, AT FLASHING HIGH POINTS SEAL WATER TIGHT TO BACK-UP SUBSTRATE.
A. INSULATION LOCATIONS SHOWN IN SCHEDULE ARE INTENDED ONLY FOR CLARIFICATION PURPOSES
AND ARE NOT INTENDED TO BE ALL-ENCOMPASSING. PROVIDE EACH INSULATION TYPE AS REQUIRED
TO FULLY MAINTAIN THE THERMAL INTEGRITY OF THE CONSTRUCTION ASSEMBLIES RELATED TO THE
ENTIRE BUILDING ENVELOPE.
DESCRIPTION THICKNESS (TOTAL R-VALUE)LOCATION
RIGID PERIMETER FOUNDATION
INSULATION (EXTRUDED
POLYSTYRENE)
R-10 PERIMETER FOUNDATION TO FROST
LINE DEPTH
BATT INSULATION 5 1/2" (R-20)EXTERIOR WALL CAVITY
FIBERGLASS BATT INSULATION (FOIL
FACE FSK-25)5 1/2" (R-20)EXTERIOR WALL CAVITY AT
EXPOSED AREAS ABOVE CEILING
RIGID ROOF INSULATION
(POLYISOCYANURATE)(R=30ci)ABOVE ROOF DECK, TAPERED TO
DRAIN
SOUND ATTENUATION BATT
INSULATION 3 1/2" U.N.O.INTERIOR WALL CAVITIES - SEE
PARTITION TYPES
EXT: "E"
INT: "I"CONDITION TYPE
E PERIMETER JOINTS OF DOOR FRAMES, WINDOW FRAMES, STOREFRONT, AND/OR WINDOW WALL FRAME ASSEMBLIES, LOUVERS, FIXTURES, AND OTHER PENETRATIONS IN THE BUILDING ENCLOSURES NOT OTHERWISE SEALED WATERTIGHT, U.N.O. PROVIDE CONTINUOUS SEALANT UNDER
EXTERIOR DOOR THRESHOLDS AND WINDOW SYSTEMS THAT REST DIRECTLY ON THE FLOOR SLAB JS-1
E MASONRY / CONCRETE CONTROL JOINTS IN WALLS JS-1
E E.I.F.S. JOINTS IN WALLS JS-1
E EXPANSION JOINTS IN AND AROUND CONCRETE PAVEMENT, UNIT PAVEMENT, CURBS, OR OTHER HORIZONTAL SURFACES JS-3
E PERIMETER JOINTS AND OTHER OPEN JOINTS AT EXTERIOR SOFFITS JS-1
E INTERSECTION OF DISSIMILAR MATERIALS THAT ALLOW AIR OR WATER INFILTRATION JS-1
E INTERSECTION OF DISSIMILAR MATERIALS IN WHICH INSTALLATION IS NOT UNIFORM OR WHERE WORKMANSHIP DOES NOT MEET ACCEPTABLE CONSTRUCTION TOLERANCES, BUT SUCH WORKMANSHIP IS ACCEPTED BY THE ARCHITECT JS-1
I PERIMETER JOINTS ON INTERIOR SIDE OF DOOR FRAMES, WINDOW FRAMES, AND OTHER FRAMED MATERIALS IN WALLS WITH NO FINISHED EDGE FLANGE JS-2
I OPEN JOINTS AT PENETRATIONS THROUGH WALLS, CONCRETE, PLASTER, OR GYPSUM BOARD CEILINGS WHERE INTENDED TO BE TIGHT SEALED JOINTS JS-2
I OPEN JOINT BETWEEN DISSIMILAR MATERIALS WHERE INTENDED TO BE TIGHT SEALED JOINTS.JS-2
I JOINTS WHERE EDGE TRIM OF GYPSUM BOARD ABUTS IRREGULAR SURFACES OR OTHER SURFACES AND LEAVES OPEN JOINTS JS-2
I EXPOSED JOINTS AT JUNCTURES OF COUNTERTOPS, CABINETS, OR OTHER "BUILT-IN" WORK WITH IRREGULAR SURFACES INTENDED TO BE TIGHT SEALED JOINT JS-2
I EXPOSED JOINTS AT JUNCTURES OF WALL MOUNTED PLUMBING FIXTURES AND/OR TOILET ACCESSORIES WITH IRREGULAR SURFACES AND INTENDED TO BE TIGHT SEALED JOINT JS-5
I CONTROL JOINTS SAWN JOINTS AND OPEN JOINTS IN AND AROUND CONCRETE SLABS AND CURBS JS-4
JOINT TREATMENT NOTES
A. THE JOINT TREATMENT SCHEDULE IS INTENDED TO ILLUSTRATE ALL JOINT CONDITIONS WHICH ARE MEANT TO BE SEALED WHETHER REFERENCED FROM OTHER DETAILS OR NOT.
B. AT METAL FRAME LOCATIONS (DOORS, WINDOWS, ETC.) HOLD FRAME BACK FROM SUBSTRATE 3/8" @ HEAD & SILL AND 3/16" @ JAMB TO ALLOW FOR SEALANT, TYPICAL U.N.O. THIS INCLUDES DIMENSIONS FOR STEEL LINTELS WHERE APPLICABLE.
C. PROVIDE PROPER SEALERS AS REQUIRED TO FULLY CLOSE JOINTS THAT ARE INTENDED TO BE TIGHT AND AS SHOWN ON THE DRAWINGS.
D. PROVIDE CLOSED CELL BACKER ROD AS REQUIRED TO ACHIEVE PROPER SEALANT THICKNESS PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.
E. CAUTION, DO NO SEAL WEEPS AND DRAINAGE CHANNELS IN STOREFRONT OR OTHER ASSEMBLIES.
PAINT SCHEDULE
EXTERIOR 03/10/2022
COLOR PPG SHERWIN WILLIAMS BENJAMIN MOORE
PEX-1 WENDYS DARK BRONZE PPG 1002-7 "PHANTOM MIST" BRONZETONE CUSTOM COLORS: "MISSISSIPPI BRONZE" "BRONZETONE"
PEX-2 RED PPG 13-16 "BLAZE" SW 6321 "RED BAY" HC 181 "HERITAGE RED"
PEX-3 PRE-FINISHED- DARK BRONZE SIGN CABINETS - MATCHES PEX-1
NO SUBSTITUTIONS AVAILABLE (THROUGH SIGN VENDOR ONLY)
SIGN CABINETS - MATCHES PEX-1
NO SUBSTITUTIONS AVAILABLE (THROUGH SIGN VENDOR ONLY)
SIGN CABINETS - MATCHES PEX-1
NO SUBSTITUTIONS AVAILABLE (THROUGH SIGN VENDOR ONLY)
PEX- 4 LIGHT GRAY PPG 1025 3 "WHISKERS" SW 7022 "ALPACA" OC-28 "COLLINGWOOD"
PEX-5 SAFETY YELLOW "SAFETY YELLOW" "SAFETY YELLOW" "SAFETY YELLOW"
PEX-6 PRE-FINISHED- DARK BRONZE WALK-IN COOLER / FREEZER - MATCHES PEX-1
PRE-FINISHED BY MANUFACTURER, NO SUBSTITUTIONS
WALK-IN COOLER / FREEZER - MATCHES PEX-1
PRE-FINISHED BY MANUFACTURER, NO SUBSTITUTIONS
WALK-IN COOLER / FREEZER - MATCHES PEX-1
PRE-FINISHED BY MANUFACTURER, NO SUBSTITUTIONS
PEX-7 WENDY'S FIELD BROWN PPG 160-07 "SOUTHERN WOOD" SW 6061 "TANBARK" 1223 "BRENTWOOD"
PEX-8 WENDY'S ACCENT BROWN PPG 16 23 "TAMPICO BROWN" SW 6068 "BREVITY BROWN" 1224 "COYOTE TRAIL"
PEX-9 SILVER - SATIN PPG-6-230 "BRIGHT ALUMINUM" "SILVER BRIGHT" ALUMINUM PAINT P22 78 "SILVER URETHANE ALKYD"
PEX-10 POWDER COAT "BLACK" PPG 1001-7 "BLACK MAGIC" SW 6258 "TRICORN BLACK" HC-19 "BLACK"
PEX-11 TAN PPG 1085 5 "SAUTEED MUSHROOM" SW 6109 "HOPSACK" 1055 "ALCONQUIN TRAIL"
PEX-12 DARK GRAY PPG 1001-6 "KNIGHTS ARMOUR" SW 7674 "PEPPERCORN" 2121-10 "GRAY"
PEX-13 LIGHT TAN (ACCENT FOR PEX-11)PPG 14-17 "ARMADILLO" SW 6106 "KILIM BEIGE" BM 1128 "ARMADILLO"
EXTERIOR PRIMER
BASE SHEEN PPG SHERWIN WILLIAMS BENJAMIN MOORE
STUCCO / EIFS SATIN PRIME: PPG SEAL GRIP 17-921XI ACRYLIC UNIVERSIAL PRIMER
FINISH: PPG SPEED HIDE 6-2045XI EXTERIOR SATIN ACRYLIC
PRIME: LOXON CONCRETE & MASONARY PRIMER
FINISH: A-100 EXTERIOR LATEX SATIN
PRIME: 023 FRESH START ALL PURPOSE PRIMER FINISH: 631 AURA
WATERBORNE EXTERIOR SATIN FINISH
METAL RAILING SEMI-GLOSS PRIME: PPG PITT-TECH PLUS 4020PF DTM ACRYLIC METAL PRIMER
FINISH: SPEEDHIDE EXTERIOR 6-900XI 100% ACRYLIC LATEX
SEMI-GLOSS
PRIME: PROCRYL UNIVERSAL METAL
FINISH: SHER-CRYL HPA (SEMI-GLOSS)
PRIME: HP04 METAL PRIMER OR SELF PRIME HP29 METAL PRIMER
FINISH: HP29 DTM ACRYLIC SEMI-GLOSS ENAMEL
WOOD SATIN PRIME: PPG SEAL GRIP 17-921XI ACRYLIC UNIVERSIAL PRIMER
FINISH: PPG SPEED HIDE 6-2045XI EXTERIOR SATIN ACRYLIC
PRIME: A100 ALKYD EXTERIOR WOOD PRIMER
FINISH: A-100 EXTERIOR LATEX SATIN
Prime: 023 Fresh Start All Purpuse Primer Finish: 631 Aura
Waterborne Exterior Satin Finish
PLASTIC (HERITAGE
II)
SATIN PRIME: PPG SEAL GRIP 17-921XI ACRYLIC UNIVERSIAL PRIMER
FINISH: PPG SPEED HIDE 6-2045XI EXTERIOR SATIN ACRYLIC
PRIME: EXTREME BOND PRIMER
FINISH: SHER-CRYL HPA (SEMI-GLOSS)
PRIME: 023 FRESH START ALL PURPOSE PRIMER FINISH: 631 AURA
WATERBORNE EXTERIOR SATIN FINISH
WROUGHT IRON GLOSS PRIME: PPG PITT-TECH PLUS 4020PF ACRYLIC METAL PRIMER
FINISH: PPG PITT-TECH PLUS 90-1306 SAFETY YELLOW DTM GLOSS
PRIME: PROCRYL UNIVERSAL METAL
FINISH: SHER-CRYL HPA (GLOSS)
PRIME: 023 FRESH START ALL PURPUSE PRIMER FINISH: 631 AURA
WATERBORNE EXTERIOR SATIN FINISH
ALUMINUM / METAL STOREFRONT PRIMER
ALUMINUM
STOREFRONT
GLOSS COLOR: PPG "STATUARY BROWN"
RECOMMENDED PRIME: PPG PITT-TECH PLUS 4020 PF ACRYLIC METAL
PRIMER
RECOMMENDED FINISH: PPG PITT-TECH PLUS 4216HD SEMI-GLOSS
DTM ACRYLIC
RECOMMENDED TO USE PPG
PRIME: PROCRYL UNIVERSAL METAL PRIMER
FINISH: SHER-CRYL HPA (SEMI-GLOSS OR GLOSS)
HP04 ACRYLIC METAL PRIMER ALTERNATE PRIME: V175
WATERBORNE BONDING PRIMER ALTERNATE FINISH: P22-64
BRONZETONE URETHANE GLOSS ENAMEL
METAL SATIN RECOMMENDED PRIME: PPG PITT-TECH PLUS 4020 PF ACRYLIC METAL
PRIMER
RECOMMENDED FINISH: PPG PITT-TECH PLUS 4216HD SEMI-GLOSS
DTM ACRYLIC
RECOMMENDED TO USE PPG
PRIME: PROCRYL UNIVERSAL METAL PRIMER
FINISH: SHER-CRYL HPA (SEMI-GLOSS)
HP04 ACRYLIC METAL PRIMER ALTERNATE PRIME: SELF PRIME
WITH P23-60 ALTERNATE FINISH: P23-60 DTM ALKYD LOW LUSTER
ENAMEL
PEX-9 PRIMER
METAL SATIN PRIME: PPG PITT-TECH PLUS 4020PF ACRYLIC METAL PRIMER
FINISH: PPG PITT-TECH 90-474 DTM SATIN ACRYLIC ENAMEL
PRIME: PROCRYL UNIVERSAL METAL PRIMER
FINISH: SILVER-BRITE ALUMINUM PAINT (2 COATS) #B59S11
PRIME: HP04 ALKYD METAL PRIMER FINISH: HP25 DTM ACRYLIC
LOW LUSTER ENAMEL
WOOD SATIN PRIME: PPG SEAL GRIP 17-921XI ACRYLIC UNIVERSAL PRIMER
FINISH: PPG SPEEDHIDE 6-2045XI EXTERIOR SATIN ACRYLIC
PRIME: A100 ALKYD WOOD PRIMER
FINISH: SILVER-BRITE ALUMINUM PAINT (2 COATS) #B59S11
PRIME: 023 FRESH START ALL PURPOSE PRIMER FINISH: 631 AURA
WATERBORNE EXTERIOR SATIN FINISH
INTERIOR
COLOR PPG SHERWIN WILLIAMS BENJAMIN MOORE
P-1 BEIGE - EGGSHELL PPG 1024-4 "MOTH GRAY" SW7036 "ACCESSIBLE BEIGE" OC-15 "BABY FAWN"
P-2 RED - EGGSHELL PPG 13-16 "BLAZE" SW 6321 "RED BAY" CPS-1195 "FLAMENCO"
P-3 CEILING WHITE - FLAT PPG 1001-1 "DELICATE WHITE" SW 7006 "EXTRA WHITE" PM-1 "SUPER WHITE"
P-4 TAUPE - EGGSHELL PPG 1024-6 "PATCHES" SW 7039 "VIRTUAL TAUPE" 999 "RUSTIC TAUPE"
P-5 LIGHT GRAY - EGGSHELL PPG 1009-4 "GRAY STONE" SW 7065 "ARGOS" 2134-50 "GULL WING GRAY"
P-6 WHITE - EGGSHELL PPG 18-09 "GARLIC CLOVE" SW 8917 "SHELL WHITE" OC-17 "WHITE DOVE"
P-7 GRAY - EGGSHELL PPG 1009-5 "PHOENIX FOSSIL" SW 7067 "CITY SCAPE" 2134-40 "WHALE GRAY"
P-8 WOOD STAIN DFT259 SATIN- DEFT INTERIOR POLYURETHANE WATER BASED SW MINWAX PERFORMANCE SERIES WATER BASED POLYURETHANE N423 STAYS CLEAR ACRYLIC POLYURETHANE LOW LUSTER
P-9 DARK GRAY - FLAT PPG 1001-6 "KNIGHTS ARMOUR" SW 7674 "PEPPERCORN" 2121-10 "GRAY"
P-10 BLUE - EGGSHELL PPG 1037-3 "SPECIAL DELIVERY" SHERWIN WILLIAMS: SW 9138 "STARDEW" AF-545 "SOLITUDE"
P-11 BRONZE - EGGSHELL PPG 1002-7 "PHANTOM MIST" SHERWIN WILLIAMS: BRONZETONE CUSTOM
COLOR: MISSISSIPPI BRONZE
BENJAMIN MOORE: P23-60 BRONZETONE
INTERIOR PRIMER
BASE SHEEN PPG SHERWIN WILLIAMS BENJAMIN MOORE
GYPSUM BOARD EGGSHELL PRIME: PPG SPEEDHIDE 6-2 INTERIOR QD ACRYLIC PRIMER
FINISH: PPG SPEEDHIDE 6-411 INTERIOR EGGSHELL
PRIME: PROMAR 200 ZERO VOC PRIMER
FINISH: PROMAR 200 ZERO EGGSHELL
PRIME: 023 FRESH START ALL PURPOSE PRIMER
FINISH: 485 ULTRA SPEC SCUFF-X EGGSHELL
METAL DECK FLAT PRIME: SELF PRIMING, RUST INHIBITIVE, PPG PITT-TECH 90-472 DTM
SATIN FINISH
PRIME: SELF PRIMING, RUST INHIBITIVE PRO INDUSTRIAL DTM
ACRYLIC
PRIME: SELF PRIMING, RUST INHIBITIVE, HP 25 DTM LOW LUSTRE
WOOD DECK FLAT PRIME: PPG SEAL GRIP PRIMER AS BASE COAT, TINT PRIMER TO
"KNIGHTS ARMOUR"
FINISH: PPG SPEEDHIDE ZERO VOC FLAT
PRIME: 1 COAT SW PREMIUM WALL & WOOD PRIMER
FINISH: 2 COATS SW PROMAR 200 ZERO VOC FLAT
PRIME: 023 FRESH START ALL PURPOSE
RESTROOM &
KITCHEN GYPSUM
BOARD
SEMI-GLOSS PRIME: PPG SPEEDHIDE 6-2 INTERIOR QD ACRYLIC PRIMER
FINISH: PPG SPEEDHIDE 6-500 INTERIOR SEMI-GLOSS
PRIME: PROMAR 200 VOC PRIMER
FINISH: PROMAR 200 VOC SEMI-GLOSS
PRIME: 023 FRESH START ALL PURPOSE PRIMER
FINISH: 487 ULTRA SPEC SCUFF-X SEMI GLOSS
12
/
2
2
/
2
0
1
7
1
2
:
3
0
:
4
2
P
M
PAINT, FURN, BLDG INSUL. &
JOINT TREATMENT SCHEDULE
A6.1
IT
EC
CITY/OWNER COMMTS01/12/233
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
3
3
1.12.23
INTERIOR FINISH SCHEDULE EXTERIOR FINISH SCHEDULE
SYMBOL DESCRIPTION PRODUCT INFO
3/30/2021
FLOORS
FT-3 FLOOR TILE (DINING, RESTROOM)PRODUCT: CROSSVILLE; "CEMENTED RELATIONSHIP" SWCR/.12424UPS; MATTE FINISH
SIZE: 24" x 24"
GROUT: GR-7 (GR-10 AT RESTROOM FLOORS)
MORTAR: MR-1
WATERPROOFING: WM-1; EXTEND 6" UP & 6" OUT PERIMETER WALLS (RESTROOM AREAS ONLY)
JOINTS: 1/8"
TRIM: SCHLUTER; QUADEC (SATIN NICKLE ANOD. ALUM.)
FT-4 FLOOR TILE (BACK OF HOUSE) PRODUCT: CROSSVILLE; CROSS-TREAD (CTS); R001 "GREY MINGLE"
SIZE: 8" x 8"
GROUT: GR-5
MORTAR: MR-1
WATERPROOFING: WM-1; EXTEND 6" UP & 6" OUT PERIMETER WALLS AND UNDER FULL EXTENT
OF MOP SINK
JOINTS: 1/8"
FC-2 QUARTZ FLOORING (BACK OF
HOUSE)
PRODUCT: SILIKAL; CUSTOM COLOR QUARTZ FLOORING; "WENDYS UM BRIGHT BLEND"; MATCHES
FT-3
COLOR: 10% FWN, 30% LGRY, 30% SGRY, 30% SNDY
FINISH: SILIKAL R-71
WALL BASE
B-3 TILE BASE (DINING, RESTROOM) PRODUCT: CROSSVILLE; BASE TILE; "GRILLE MARKS" SWGM/.10612UPS
SIZE: 6: x 12"
GROUT: GR-7
MORTAR: MR-1
WATERPROOFING: WM-1; EXTEND 6" UP & 6" OUT PERIMETER WALLS (RESTROOM AREAS ONLY)
JOINTS: 1/8"
TRIM: SCHLUTER; QUADEC w/ CORNER INSERTS (SATIN NICKEL ANOD. ALUM.)
B-4 TILE COVE BASE (KITCHEN) PRODUCT: CROSSVILLE; COVE BASE; R001 "GREY MINGLE"; CROSS SHEEN FINISH
SIZE: 6" x 8"; PROVIDE COVE BASE CORNERS, LEFT, RIGHT, AND INSIDE AS REQUIRED
GROUT: GR-5
MORTAR: MR-1
WATERPROOFING: WM-1; EXTEND 6" UP & 6" OUT PERIMETER WALLS
JOINTS: 1/8"
B-5 TILE BASE (DINING, RESTROOM) PRODUCT: CROSSVILLE; COLOR BOX 2.0; "I SEE THE MOON"; CBX17.0612UPS
SIZE: 6" x 12"
GROUT: GR-7
MORTAR: MR-1
WATERPROOFING: WM-1; EXTEND 6" UP & 6" OUT PERIMETER WALLS
JOINTS: 1/8"
TRIM: SCHLUTER; QUADEC w/ CORNER INSERTS (SATIN NICKEL ANOD. ALUM)
B-6 TILE COVE BASE (DINING,
RESTROOM - USE ONLY WHEN
COVED BASE TILE IS REQUIRED)
PRODUCT: CROSSVILLE; COLOR BOX 2.0; "I SEE THE MOON"; CBX17.0612CBS
SIZE: 6" x 12"
GROUT: GR-7
MORTAR: MR-1
WATERPROOFING: WM-1; EXTEND 6" UP & 6" OUT PERIMETER WALLS
JOINTS: 1/8"
TRIM: SCHLUTER; QUADEC w/ CORNER INSERTS (SATIN NICKEL ANOD. ALUM)
WALLS
ACM-1 ALUMINUM COMPOSITE MATERIAL (SEE EXTERIOR FINISH SCHEDULE FOR PRODUCT INFORMATION)
FRP-1 FRP (BACK OF HOUSE) PRODUCT: MARLITE; FRP; CLASS C (CLASS A, WHERE REQUIRED)
SIZE: 4' x 9'
FINISH: PEBBLED; WHITE
TRIM: WHITE PVC (STANDARD TRIM PROFILES TO MATCH)
FRP-2 FRP (BACK OF HOUSE) PRODUCT: MARLITE; ENVUE FRP; CLASS C
SIZE: 4' x 9'
FINISH: SMOOTH; HI-RES PRINT; 8"x8" STACKED TILE PATTERN (WHITE TILE, GRAY GROUT)
TRIM: WHITE PVC (STANDARD TRIM PROFILES TO MATCH)
WT-3 WALL TILE (DINING, HALLWAY) PRODUCT: CROSSVILLE; "WIND WHIPPED" (SWWW/.10508S)
SIZE: 4" x 8"
PATTERN: SEE INTERIOR ELEVATIONS
GROUT: GR-7
MORTAR: MR-1
JOINTS: 1/8"
TRIM: SCHLUTER; QUADEC (SATIN NICKEL ANOD. ALUM.)
WT-3 WALL TILE PRODUCT: DALTILE; P125; MATCH POINT COLOR: PURE WHITE UNPOLISHED
SIZE: 24" x 24"
GROUT: GR-4
MORTAR: MR-2
JOINTS: 1/8"
WT-6 WALL TILE (RESTROOM) PRODUCT: CROSSVILLE; "FROST CALIBRATED" (AV241.11224UPSC)
SIZE: 12" x 24"
PATTERN: STACK BOND
GROUT: GR-7
MORTAR: MR-1
JOINTS: 1/8"
TRIM (HORIZONTAL): SCHLUTER; SHEINE (SATIN NICKEL ANOD. ALUM.)
TRIM (OUTSIDE CORNER): SCHLUTER; QUADEC w/ CORNER INSERTS (STAIN NICKEL ANOD. ALUM.)
WT-7 WALL TILE (RESTROOM, HALLWAY,
DINING)
PRODUCT: CROSSVILLE; "START A FIRE" (SWSF/.10412UPS)
SIZE: 4" x 12"
PATTERN: STACK BOND
GROUT: GR-7
MORTAR: MR-1
JOINTS: 1/8"
TRIM: SCHLUTER; QUADEC (SATIN NICKEL ANOD. ALUM.)
WT-8 WALL TILE PRODUCT: CROSSVILLE; COLORS BY NUMBERS "TEA FOR TWO" (WT02/.10808S)
SIZE: 8" x 8"
FINISH: SATIN
PATTERN: STACK BOND
GROUT: GR-7
MORTAR: MR-1
JOINTS: 1/8"
TRIM: SCHLUTER; QUADEC (SATIN NICKEL ANOD. ALUM.)
CP-5 CORNER PROTECTION PRODUCT: KOROGARD ACG07 CORNER GUARD; 3/4" x 3/4"; COLOR: BRONZE ANOD. ALUM.
CP-8 CORNER PROTECTION (BACK OF
HOUSE)
PRODUCT: STAINLESS STEEL CORNER GUARD
SIZE: 2" X 2" WITH 1/4" OR 3/8" SLIGHT BEND TOWARDS WALL AT EACH LEG
MATERIAL: MIN 18GA; TYPE 304 #4 SATIN STAINLESS STEEL
NOTE: INSTALL WITH "TIGHTBOND PROVANTAGE" HEAVY DUTY CONSTRUCTION ADHESIVE (OR
APPROVED EQUAL)
GROUT, MORTAR, WATERPROOFING MEMBRANE
GR-5 GROUT PRODUCT: LATICRETE; #2000 SPECTRALOCK GROUT IG #4 COMMERCIAL LIQUID (S-2000-SL-03) &
SPECTRALOCK PART C (1245-0409-2); PART A&B, 4 PART C
COLOR: "RAVEN" #45
JOINTS: 1/8"
*ALTERNATE*
PRODUCT: MAPEI; KERAPOXY IEG CQ (49936 LARGE UNIT CONTAINS 4 PART A & 4 PART B LIQUIDS,
SCRUB PAD AND INSTRUCTIONS SHEET) ALSO NEED (4) 9.29 BAGS OF 4XX10 POWDER
PURCHASED SEPARATELY
*ALTERNATE*
COLOR: "CHARCOAL" #47
JOINTS: 1/8"
GR-7 GROUT PRODUCT: LATICRETE; PERMACOLOR (25LBS)
COLOR: "MOCHA" #35
JOINTS: 1/8"
*ALTERNATE*
PRODUCT: MAPEI; ULTRACOLOR PLUS FA (25 LBS.)
*ALTERNATE*
COLOR: "GRAY" #09
JOINTS: 1/8"
(OPTIONAL) SEALER: ULTRACARE PENETRATING PLUS SB STONE, TILE AND GROUT SEALER
MR-1 MORTAR PRODUCT: LATICRETEL TITANIUM THINSET MORTAR (#257)
*ALTERNATE*
PRODUCT: MAPEI; KERAFLEX SUPER (44 LBS.)
WM-1 WATERPROOFING MEMBRANE PRODUCT: LATICRETE; HYDROBAN (9255-0005-2)
*ALTERNATE*
PRODUCT:MAPEI; MAPELASTIC AQUADEFENCE 5 GALLON (01968)
CEILING
CT-1 CEILING TILE (KITCHEN / FOOD
PREP AREAS)
PRODUCT: ARMSTRONG VINYLCLAD SQUARE LAY-IN; BP670: 24" x 48" x 1/2";
COLOR: WHITE
GRID: PRELUDE 15/16"; WHITE
CT-2 CEILING TILE (DINING ROOM
PERIMETER)
PRODUCT: ARMSTRONG; ULTIMA 1911: 24" x 24" x 3/4" OR ULTIMA 1914: 24" x 48" x 3/4";
COLOR: WHITE
GRID: PRELUDE 15/16"; WHITE
CT-3 CEILING TILE (DINING ROOM -
CENTRAL ACCENT AREA)
PRODUCT: ARMSTRONG; CIRRUS TEGULAR 584CM: 24" x 24" x 3/4";
COLOR: CAMEL
GRID: PRELUDE 15/16", CAMEL
CT-4 CEILING TILE (SERVING AREA;
CONDIMENT AREA (ONLY IF
REQUIRED BY HEALTH DEPT.))
PRODUCT: ARMSTRONG VINYLCLAD SQUARE LAY-IN; BP671: 24" x 24" x 1/2";
COLOR: WHITE
GRID: PRELUDE 15/16", WHITE
CT-5 CEILING TILE (KITCHEN FRYER
AREA; WASHABLE
NON-COMBUSTABLE)
PRODUCT: ARMSTRONG; CERAMAGUARD 605: 24" X 48" X 5/8";
COLOR: WHITE
GRID: PRELUDE 15/16", WHITE
SURFACE FINISH: SCRUBBABLE FACTORY-APPLIED PAINT FINISH (WITHIN 18" OF GREASE HOODS
ONLY, WHERE NON-COMBUSTABLE MATERIALS ARE REQUIRED)
LAMINATE
L-5 LAMINATE PRODUCT: PIONITE; COLOR: "MORCHELLA HUNT"; TEXTURE: LINE Z; WO740-LZ-G49
SOLID SURFACE
SS-4 SOLID SURFACE PRODUCT: CORIAN; CONCRETE; "NEUTRAL CONCRETE" (C1)
MISCELLANEOUS
TP-1 TOILET PARTITIONS & DOORS FINISH: SATIN FINISH STAINLESS STEEL
WS-1 DINING ROOM WINDOW SHADES
(OPTIONAL)
PRODUCT: ROLL-A-SHADE SIGNATURE SERIES 5% OPENNESS; COLOR: 1241 CHARCOAL/BRONZE
SIZE: 4" FASCIA AND BRACKETS TO MATCH STOREFRONT
NOTE: INCLUDE STAINLESS STEEL BEADED ADJUSTMENT CHAIN WITH SAFETY TENSION DEVICE
SYMBOL DESCRIPTION
PRODUCT INFO
3/30/2021
ST0REFR0NT & GLAZING
SF-1 STOREFRONT PRODUCT: TUBELITE T14000 2" x 4 1/2" CLASS 1 "DARK
BRONZE" ANODIZED ALUMINUM
ALTERNATE: KAWNEER TRIFAB VG 451T/451; #40 "DARK
BRONZE" ANODIZED ALUMINUM EQUALS BY OLDCASTLE
STOREFRONT (IMPACT RATED)PRODUCT: TUBELITE T34000 2 1/2" X 5"
CLASS 1 DARK BRONZE ANODIZED ALUMINUM
ALTERNATE: KAWNEER IR 501UT; #40 "DARK BRONZE"
ANODIZED ALUMINUM EQUALS BY OLDCASTLE
SF-2 STOREFRONT PRODUCT: TUBELITE T14000 2" X 4 1/2"
CLASS 1 CLEAR ANODIZED ALUMINUM
ALTERNATE: KAWNEER TRIFAB VG 451T/451; #14 "CLEAR"
ANODIZED ALUMINUM EQUALS BY TUBELITE & OLDCASTLE
STOREFRONT (IMPACT RATED)PRODUCT: TUBELITE T34000 2 1/2" X 5" CLASS 1
CLEAR ANODIZED ALUMINUM
ALTERNATE: KAWNEER IR 501UT; #14 "CLEAR" ANODIZED
ALUMINUM EQUALS BY TUBELITE & OLDCASTLE
SF-3 STOREFRONT (REFINISH)PRODUCT: REFINISH EXISTING STOREFRONT (REMODEL
ONLY, OPTIONAL FOR REFRESH & REFRESH LITE)
OPTION #1: PAINT: 'PEX-1' (SEE PAINT SCHEDULE)
OPTION #2: BREAK METAL CAP; AMERICAN PRODUCT, INC.
SF-5 STOREFRONT (CENTER
GLAZED)
PRODUCT: TUBELITE VERSTHERM 2" X 2 1/4"
CLASS 1 CLEAR ANODIZED ALUMINUM
ALTERNATE: KAWNEER TRIFAB VG 450 (2" SIGHTLINE, 2-1/4"
FRAME DEPTH); CLEAR ANODIZED ALUMINUM EQUALS BY
TUBELITE & OLDCASTLE
CW-1 CURTAIN WALL PRODUCT: TUBELITE 400T SERIES 2" X 7 1/4"
CLASS 1 DARK BRONZE ANODIZED ALUMINUM
ALTERNATE: KAWNEER 1600 L-R; 7.25" DEEP; #40 "DARK
BRONZE" EQUALS BY TUBELITE & OLDCASTLE
CURTAIN WALL (IMPACT
RATED)
PRODUCT: TUBELITE FORCEFRONT STORM
2 1/2" X 7 13/16" CLASS 1 DARK BRONZE ANODIZED
ALTERNATE: KAWNEER 1600 WALL SYSTEM 1; 7.5" DEEP; #40
"DARK BRONZE" EQUALS BY TUBELITE & OLDCASTLE
G-1 1" INSULATED GLASS
IECC CLIMATE ZONES 4-8
(NORTH)
OPTION #1: GUARDIAN GLASS (HEAT STRENGTHENED AS
REQUIRED, TEMPERED WHERE INDICATED)
OUTBOARD LITE: GUARDIAN "SN 68" (#2) ON 1/4" CLEAR
INBOARD LITE: GUARDIAN 1/4" CLEAR
SPACE: 1/2" AIR
OPTION #2: VITRO (PPG) ARCHITECTURAL GLASS (HEAT
STRENGTHENED AS REQUIRED, TEMPERED WHERE
INDICATED)
OUTBOARD LITE: VITRO ARCHITECTURAL GLASS
"SOLARBAN 60" (#2) ON 1/4" CLEAR GLASS
INBOARD LITE: VITRO ARCHITECTURAL GLASS 1/4" CLEAR
SPACE: 1/2" AIR"
1" INSULATED GLASS
IECC CLIMATE ZONES 1-3
(SOUTH)
OPTION #1: GUARDIAN GLASS (HEAT STRENGTHENED AS
REQUIRED, TEMPERED WHERE INDICATED)
OUTBOARD LITE: GUARDIAN "SNX 51/23" (#2) ON 1/4" CLEAR
GLASS
INBOARD LITE: GUARDIAN 1/4" CLEAR
SPACE: 1/2" AIR
OPTION #2: VITRO (PPG) ARCHITECTURAL GLASS (HEAT
STRENGTHENED AS REQUIRED, TEMPERED WHERE INDICATED)
OUTBOARD LITE: VITRO ARCHITECTURAL GLASS "SOLARBAN 67"
(#2) ON 1/4" VITRO ARCHITECTURAL GLASS "SOLEXIA"
INBOARD LITE: VITRO ARCHITECTURAL GLASS 1/4" CLEAR
SPACE: 1/2" AIR
OPTION #3: GUARDIAN GLASS (HEAT STRENGTHENED AS
REQUIRED, TEMPERED WHERE INDICATED)
OUTBOARD LITE: GUARDIAN "SNX 62/27" (#2) ON 1/4" GREEN
GLASS
INBOARD LITE: GUARDIAN 1/4" CLEAR
SPACE: 1/2" AIR
IMPACT-RATED ALTERNATE
PRODUCT: LAMINATED GLASS
OUTBOARD LITE: SEE ABOVE
INBOARD LITE #3: INSIDE LITE: LAMINATED: 3/16"" CLEAR
LAMINATION: DUPONT BUTACITE 0.090"/0.100" 3/16" CLEAR
(ARCHITECT TO VERIFY REQUIRED THICKNESS)
INBOARD LITE #4: INSIDE LITE: LAMINATED: 3/16"" CLEAR"
SPACE: 1/2" AIR
NOTE: COORDINATE TOTAL THICKNESS WITH STOREFRONT /
CURTAIN WALL SYSTEM
G-2
1" INSULATED SPANDREL
GLASS
IECC CLIMATE ZONES 4-8
(NORTH)
OPTION #1: GUARDIAN GLASS (HEAT STRENGTHENED AS
REQUIRED)
OUTBOARD LITE: GUARDIAN "SN 68" (#2) ON 1/4" CLEAR GLASS
INBOARD LITE: GUARDIAN 1/4" CLEAR, OLDCASTLE BLACK FRIT
(#4)
SPACE: 1/2" AIR
OPTION #2: VITRO (PPG) ARCHITECTURAL GLASS (HEAT
STRENGTHENED AS REQUIRED)
OUTBOARD LITE: VITRO ARCHITECTURAL GLASS "SOLARBAN 60"
(#2) ON 1/4" CLEAR GLASS
INBOARD LITE: PPG 1/4" CLEAR, OLDCASTLE BLACK FRIT (#4)
SPACE: 1/2" AIR
1" INSULATED SPANDREL
GLASS IECC CLIMATE
ZONES 1-3 (SOUTH)
OPTION #1: GUARDIAN GLASS (HEAT STRENGTHENED AS
REQUIRED)
OUTBOARD LITE: GUARDIAN "SNX 51/23" (#2) ON 1/4" CLEAR
GLASS
INBOARD LITE: GUARDIAN 1/4" CLEAR, OLDCASTLE BLACK FRIT
(#4)
SPACE: SPACE: 1/2" AIR
OPTION #2: VITRO (PPG) ARCHITECTURAL GLASS (HEAT
STRENGTHENED AS REQUIRED)
OUTBOARD LITE: VITRO ARCHITECTURAL GLASS "SOLARBAN
67" (#2) ON 1/4" VITRO ARCHITECTURAL GLASS "SOLEXIA"
GLASS
INBOARD LITE: PPG 1/4" CLEAR, OLDCASTLE BLACK FRIT (#4)
SPACE: 1/2" AIR
OPTION #3: GUARDIAN GLASS (HEAT STRENGTHENED AS
REQUIRED)
OUTBOARD LITE: GUARDIAN "SNX 62/27" (#2) ON 1/4" GREEN
GLASS
INBOARD LITE: GUARDIAN 1/4" CLEAR, OLDCASTLE BLACK FRIT
(#4)
SPACE: 1/2" AIR
IMPACT-RATED
ALTERNATE(SPANDREL)
PRODUCT: LAMINATED GLASS
OUTBOARD LITE: SEE ABOVE
INBOARD LITE: LAMINATED: 3/16" CLEAR; 0.090"/0.100" DUPONT
BUTACITE PVB; 3/16" CLEAR
NOTE: ARCHITECT TO COORD. IMPACT RATING OF SYSTEM &
REQUIRED PVB THICKNESS WITH STOREFRONT/CURTAIN WALL
PROVIDER
G-3 1/4" CLEAR GLASS
PRODUCT: 1/4" CLEAR FLOAT GLASS; EQUALS THRU GUARDIAN
& VITRO (PPG) ARCHITECTURAL GLASS (HEAT STRENGTHENED
AS REQUIRED, TEMPERED WHERE INDICATED)
G-4
1/4" SPANDREL GLASS
IECC CLIMATE ZONES 4-8
(NORTH)
OPTION #1: GUARDIAN GLASS (HEAT STRENGTHENED AS
REQUIRED)
GLAZING: 1/4" CLEAR, OLDCASTLE BLACK FRIT (#4)
OPTION #2: VITRO (PPG) ARCHITECTURAL GLASS (HEAT
STRENGTHENED AS REQUIRED)
GLAZING: 1/4" CLEAR, OLDCASTLE BLACK FRIT (#4)
1/4" SAPNDREL GLASS
IECC CLIMATE ZONES 1-3
(SOUTH)
OPTION #1: GUARDIAN GLASS (HEAT STRENGTHENED AS
REQUIRED)
GLAZING: 1/4" CLEAR, OLDCASTLE BLACK FRIT (#4)
OPTION #2: VITRO (PPG) ARCHITECTURAL GLASS (HEAT
STRENGTHENED AS REQUIRED)
GLAZING: 1/4" VITRO ARCHITECTURAL GLASS "SOLEXIA" GLASS,
OLDCASTLE BLACK FRIT (#4)
OPTION #3: GUARDIAN GLASS (HEAT STRENGTHENED AS
REQUIRED)
GLAZING: 1/4" CLEAR, OLDCASTLE BLACK FRIT (#4)
G-5
1" INSULATED GLASS
(FROSTED)
IECC CLIMATE ZONES 4-8
(NORTH)
OPTION #1: GUARDIAN GLASS (HEAT STRENGTHENED AS
REQUIRED, TEMPERED WHERE INDICATED)
OUTBOARD LITE: GUARDIAN "SN 68" (#2) ON 1/4" CLEAR GLASS
INBOARD LITE: GUARDIAN "SATIN DECO" (ACID ETCHED) (#3) ON
1/4" "EXTRACLEAR"
SPACE: 1/2" AIR
OPTION #2: VITRO (PPG) ARCHITECTURAL GLASS (HEAT
STRENGTHENED AS REQUIRED, TEMPERED WHERE INDICATED)
OUTBOARD LITE: VITRO ARCHITECTURAL GLASS "SOLARBAN 60"
(#2) ON 1/4" CLEAR GLASS
INBOARD LITE: WALKER TEXTURES "VELOUR" (ACID ETCHED)
(#3) ON 1/4" CLEAR GLASS
SPACE: 1/2" AIR
1" INSULATED GLASS
(FROSTED)
IECC CLIMATE ZONES 1-3
(SOUTH)
OPTION #1: GUARDIAN GLASS (HEAT STRENGTHENED AS
REQUIRED, TEMPERED WHERE INDICATED)
OUTBOARD LITE: GUARDIAN "SNX 51/23" (#2) ON 1/4" CLEAR
GLASS
INBOARD LITE: GUARDIAN "SATIN DECO" (ACID ETCHED) (#3) ON
1/4" "EXTRACLEAR"
SPACE: 1/2" AIR
OPTION #2: VITRO (PPG) ARCHITECTURAL GLASS (HEAT
STRENGTHENED AS REQUIRED, TEMPERED WHERE INDICATED)
OUTBOARD LITE: VITRO ARCHITECTURAL GLASS "SOLARBAN 67"
(#2) ON 1/4" VITRO ARCHITECTURAL GLASS "SOLEXIA"
INBOARD LITE: WALKER TEXTURES "VELOUR" (ACID ETCHED)
(#3) ON 1/4" CLEAR GLASS
SPACE: 1/2" AIR
OPTION #3: GUARDIAN GLASS (HEAT STRENGTHENED AS
REQUIRED, TEMPERED WHERE INDICATED)
OUTBOARD LITE: GUARDIAN "SNX 62/27" (#2) ON 1/4" GREEN
GLASS
INBOARD LITE: GUARDIAN "SATIN DECO" (ACID ETCHED) (#3) ON
1/4" "EXTRACLEAR"
SPACE: 1/2" AIR
PUW PICK-UP WINDOW FINISH: MATCH STOREFRONT
METALS
M-1
PARAPET CAP
PRODUCT: EXCEPTIONAL METALS
SPECIFICATION: 24 GA GALVALUME STEEL
COLOR: PREFINISHED, "DARK BRONZE"
REFINISH: 'PEX-1' (SEE PAINT SCHEDULE)
BREAK METAL (FASCIA,
TRIM, CANOPY ETC.)
PRODUCT: EXCEPTIONAL METALS
SPECIFICATIONS: 24 GA GALVALUME STEEL
COLOR: MATCH SF-1/CW-1 (PREFINISHED)
REFINISH: 'PEX-1' (SEE PAINT SCHEDULE)
M-3 DRIP EDGE
PRODUCT: EXCEPTIONAL METALS
SPECIFICATIONS: 24 GA GALVALUME STEEL
COLOR: PRE-FINISHED, "BRIGHT RED"
M-4 PARAPET CAP
PRODUCT: EXCEPTIONAL METALS
SPECIFICATIONS: 24 GA GALVALUME STEEL
COLOR: MILL FINISH, "SILVER METALLIC"
M-5 ALTERNATE FOR ACM-4
PRODUCT: BRAKE METAL
COLOR: CLEAR ANODIZED
M-7 COPING
PRODUCT: EXCEPTIONAL METALS
COLOR: CUSTOM DARK GREY
EXTERIOR CLADDING
NP-1 NICHIHA - FIBER CEMENT
PANEL
PRODUCT: NICHIHA; VINTAGE WOOD SERIES
COLOR: CEDAR
SIZE: 18" x 10' x 5/8"
SEALANT: ADFAST ADSEAL 4580 SERIES
NP-2 NICHIHA - FIBER CEMENT
PANEL
PRODUCT: NICHIHA; ILLUMINATION SERIES
COLOR: BLAZE (RED)
SIZE: 18" x 6' x 5/8"
SEALANT: ADFAST ADSEAL 4580 SERIES
NP-3 NICHIHA - FIBER CEMENT
PANEL
PRODUCT: NICHIHA; ILLUMINATION SERIES
COLOR: KNIGHTS ARMOR (GRAY)
SIZE: 18" x 6' x 5/8"
SEALANT: ADFAST ADSEAL 4580 SERIES
KW-1 PREFINISHED ALUMINUM
CLADDING MATERIAL
PRODUCT: KNOTWOOD
COLOR: LIGHT OAK SIMULATED WOOD
NOTE: REFER TO FINISH DETAILS SHEET FOR PENETRATION
DETAILS.
KW-2 PREFINISHED ALUMINUM
CLADDING MATERIAL
PRODUCT: KNOTWOOD
COLOR: ARMOUR GREY (17PD218/2)
NOTE: REFER TO FINISH DETAILS SHEET FOR PENETRATION
DETAILS.
KW-3 PREFINISHED ALUMINUM
CLADDING MATERIAL
PRODUCT: KNOTWOOD
COLOR: BRITE RED MATT (17PD217/2)
NOTE: REFER TO FINISH DETAILS SHEET FOR PENETRATION
DETAILS.
KW-4 PREFINISHED ALUMINUM
CLADDING MATERIAL
PRODUCT: KNOTWOOD
COLOR: WHITE
NOTE: REFER TO FINISH DETAILS SHEET FOR PENETRATION
DETAILS.
ACM SYSTEMS
ACM-1 ALUM. COMPOSITE
MATERIAL
PRODUCT: ALCOA, REYNOBOND PE, 4MM, ROUTE & RETURN
COLOR: PRE-FINISHED; COLORWELD 300; "BRITE RED";
(RB4CW3BR)
ALTERNATE: ALUCOBOND PE; 1" ROUTE & RETURN
COLOR: PVDF-3; "RED FIRE COOL"; GLOSS LEVEL: 30
ACM-4 ALUM. COMPOSITE
MATERIAL
PRODUCT: ALCOA, REYNOBOND PE, 4MM, ROUTE & RETURN
COLOR: PRE-FINISHED; COLORWELD 500; COLOR: "ANODIC
CLEAR "
ALTERNATE: ALUCOBOND PE; 1" ROUTE & RETURN
COLOR: MATCH ALCOA SPEC (ABOVE)
ACM-5 ALUM. COMPOSITE
MATERIAL
REYNOBOND PE, 4MM, ROUTE & RETURN
COLOR: PRE-FINISHED, COLORWELD 300; COLOR
STORMY GRAY
ALTERNATE: ALUCOBOND PE ; 1" ROUTE & RETURN
COLOR: MATCH ALCOA SPEC ABOVE
EIFS SYSTEMS
E-1 THRU E- 9
EIFS (EXTERIOR
INSULATION FINISH
SYSTEM)
PRODUCT: STO; StoTHERM ESSENCE NExT SYSTEM
TEXTURE: FINE SAND (U.N.O.); SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION
COATING: TOP COAT WITH 2 COATS OF STO COATACRYL PLUS
IN SPECIFIED COLOR; TWO ADDITIONAL COATS OF STO COAT
ACRYL PLUS CLEAR MATT; IMPACT PROVISO "ARMOR MAT"
REINFORCING MESH UP TO 6'-9" ABOVE GRADE
COLORS:
E-1: (OBSOLETE)
E-2: WENDY'S RED (STO #NA13-0040); SEE 'ACM-1' FOR
APPROVED ALTERNATE
E-3: (OBSOLETE)
E-4: (OBSOLETE)
E-5: (OBSOLETE)
E-6: (OBSOLETE)
E-7: DARK GREY (STO #NA18-0004)
E-8: TAN (STO #NA17-0047)
E-9: (OBSOLETE)
ALTERNATE (AS APPROVED BY OWNER): DRYVIT,
"OUTSULATION PLUS MD SYSTEM"
TEXTURE: SANDPEBBLE FINE (U.N.O.)
COATING: OUTSULATION PLUS MD SYSTEM; HIGH- IMPACT
"PANZER MESH" REINFORCING
COLORS: MATCH STO COLORS (ABOVE)
MASONRY
BR-0 FACE BRICK EXISTING BRICK TO REMAIN
BR-1
FACE BRICK
OPTION #1: BOWERSTON SHALE COMPANY
SERIES: "OLD ENGLISH" (MODULAR)
OPTION #2: GLEN-GARY
SERIES: "OLDE DETRIOT" (MODULAR)
OPTION #3: BELDEN
SERIES: "BELCREST" 560A (MODULAR)
MORTAR PRODUCT: CEMEX RICHCOLOR 56-H "LIMESTONE" (OR
APPROVED EQUAL)
EIFS ALTERNATE
PRODUCT: STO; StoTHERM ESSENCE NExT SYSTEM
FIELD COLOR: STO - NA 14-0011 DRYVIT - WEND-09-1085
ACCENT COLOR: STO - NA 140012 DRYVIT - WEND-08-1085
ALTERNATE (AS APPROVED BY OWNER): DRYVIT,
"OUTSULATION PLUS MD SYSTEM"
EXTERIOR MISC.
BL-1 BOLLARD SLEEVE
PRODUCT: PAWLING, PROTEK
COLOR: SAFETY YELLOW
SIZE: 6" DIA, 48" HEIGHT
NOTE: CONTACT HJC
CF-1 CONCRETE FINISH (PATIO)
PRODUCT: SCOFIELD; LITHOCHROME COLOR HARDENER;
STAMPED CONCRETE
COLOR: SCOFIELD; LITHOCHROME; A-33 "CLASSIC GREY"
FINISH: ARCHITECTURAL CONCRETE DESIGN; 24" x 24" SLATE,
LIGHT TEXTURE (OR APPROVED EQUAL)
SEALER: SCOFIELD; CEMENTONE; CLEAR SEALER
CF-2 CONCRETE FINISH (PATIO)
PRODUCT: SCOFIELD; LITHOCHROME COLOR HARDENER
COLOR: A-55 "PECAN TAN"
FINISH: BROOM; APPLY TWO COATS SCOFIELD CURESEAL-W
CF-3
CONCRETE FINISH (PUW,
TRASH ENCLOSURE,
ORDER STATION CANOPY)
PRODUCT: SCOFIELD
COLOR (OPTIONAL): SCOFIELD; LITHOCHROME; A-33 "CLASSIC
GREY"
SEALER: SCOFIELD; CEMENTONE; CLEAR SEALER
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
FINISH SCHEDULE
A6.2
IT
EC
CITY/OWNER COMMTS01/12/20233
3
3
3
3
3
3
1.12.23
ALUM FRAME:(SF-1)P.U.W.:ALUM FRAME:(SF-1)P.U.W.: SS-4035E
ALUM FRAME:ALUM FRAME:(SF-1)
2"
2"
5'
-
6
"
R
.
O
.
2"2"
1'-10" R.O.
3'
-
2
"
8'-8 7/8" R.O.
3'
-
5
1
/
4
"
R
.
O
.
5'
-
6
"
R
.
O
.
3'
-
2
"
2"
2"
2"4'-0 3/8" R.O.
2"2"
4'-0 3/8" R.O.
2"2"
8'
-
8
"
5'
-
6
"
R
.
O
.
2"
3'
-
5
1
/
4
"
R
.
O
.
2"
2"
1'
-
6
"
2"
2"
6"
8'
-
1
0
"
R
.
O
.
1'
-
2
"
1'
-
6
"
R
.
O
.
2"
2"
10'-11 1/2" R.O.
2"EQ.2"6'-0"2"EQ.2"
3B
3A
5 689
TT
G-1G-1
G-1
G-1 G-1
G-1 G-1 G-1
G-1 G-1 G-1
G-1
G-3G-3 G-3G-3
7'
-
0
"
T = TEMPERED GLASS
WINDOW ELEVATION GENERAL NOTE:
A. ALL EXTERIOR WINDOW FRAMES
TO BE THERMALLY BROKEN
STOREFRONT WITH 1"
INSULATED GLAZING.
B. WINDOW CONTRACTOR SHALL
FIELD VERIFY ROUGH OPENING
DIMENSIONS FOR ALL
SCHEDULED WINDOWS PRIOR
TO PREPARATIONS OF SHOP
DRAWINGS.
C. REFER TO FINISH SCHEDULE ON
SHEET A6.2 FOR GLAZING AND
FRAME TYPE DESIGNATION
DESCRIPTIONS.
D. REFER TO EXTERIOR
ELEVATIONS FOR LOCATION OF
PANES TO RECEIVE FROSTED
GLAZING (G-5)
E. P.U.W.: USE SS4035E-IP WHERE
IMPACT RATED IS REQUIRED.
F. PROVIDE LEFT HANDED
OPERATION AS INDICATED BY
"L".
G. PROVIDE RIGHT HANDED
OPERATION AS INDICATED BY
"R".
H.PICK-UP WINDOW 6'-0" OPTION.
QUIKSERV BI-PARTING BP7525E
OR BP-7241E-IP (IMPACT
RESISTANT)
OPEN
WINDOW ELEVATIONS
7
ALUM FRAME: (SF-1)
L R
ALT.ALT.SS-4035EALUM FRAME:(SF-1)10 8A
9'
-
0
"
4"
OPEN
ALUM FRAME:(SF-1)
5'-3 7/8" R.O.
3'
-
1
0
1
/
2
"
1"
2"
4'
-
6
1
/
2
"
11'-3"
EQ EQ EQ
BUTT JOINT
TTTG-3 G-3 G-3
4 1/2"4 1/2"
4"
9'
-
0
"
(SF-1)
7'
-
0
"
2"
2"2"3'-0"2"
9'
-
0
"
R
.
O
.
6"
2"
5'-3 7/8" R.O.
4"
2"
T
OPEN
G-3
G-3 G-3
SOLID SURFACE CAP
6"
11
'
-
0
"
R
.
O
.
7'-4" R.O.
2"3'-10"2"
1
TG-1
G-1
G-1
G-1
2'
-
6
1
/
2
"
2"
2"
ALUM FRAME: (SF-1)
EQ
.
2"
EQ
.
2"
EQ
.
2"
EQ
.
2"
2"
1'
-
5
1
/
2
"
2"
7'
-
0
"
11
'
-
6
"
OPEN
G-1
G-1
6"
11
'
-
0
"
R
.
O
.
EQ
.
EQ
.
EQ
.
8'-2" R.O.
2"EQ.2"EQ.2"
1A
T TG-1 G-1
G-1 G-1
G-1 G-1
G-1 G-1
EQ
.
2"
2"
2"
2"
2"
ALUM FRAME: (SF-1)
6"
11
'
-
0
"
R
.
O
.
EQ
.
EQ
.
EQ
.
8'-8 1/4" R.O.
2"EQ.2"EQ.2"
2
T TG-1 G-1
G-1 G-1
G-1 G-1
G-1 G-1
EQ
.
2"
2"
2"
2"
2"
ALUM FRAME: (SF-1)
6"
11
'
-
0
"
R
.
O
.
EQ
.
EQ
.
EQ
.
7'-8" R.O.
2"EQ.2"EQ.2"
4
T TG-1 G-1
G-1 G-1
G-1 G-1
G-1 G-1
EQ
.
2"
2"
2"
2"
2"
ALUM FRAME: (SF-1)
4'-4 1/2"2"
T
2"3'-0"
9.74
SQ.FT.
9.74
SQ.FT.
9.74
SQ.FT.
9.74
SQ.FT.
7.62
SQ.FT.
4.37 SQ.FT.
9.74
SQ.FT.
9.74
SQ.FT.
9.74
SQ.FT.
9.74
SQ.FT.
9.74
SQ.FT.
9.74
SQ.FT.
9.74
SQ.FT.
9.74
SQ.FT.
10.40
SQ.FT.
10.40
SQ.FT.
10.40
SQ.FT.
10.40
SQ.FT.
10.40
SQ.FT.
10.40
SQ.FT.
10.40
SQ.FT.
10.40
SQ.FT.
13.59
SQ.FT.
13.59
SQ.FT.
3.21
SQ.FT.
3.21
SQ.FT.
9.0
SQ.FT.
2.50 SQ.FT. 2.50 SQ.FT.7.0 SQ.FT.9.10
SQ.FT.
9.10
SQ.FT.
9.10
SQ.FT.
9.10
SQ.FT.
9.10
SQ.FT.
9.10
SQ.FT.
9.10
SQ.FT.
9.10
SQ.FT.
7.75
SQ.FT.
22.60
SQ.FT.
6.68
SQ.FT.
10.48
SQ.FT.
2.48
SQ.FT.
4.50
SQ.FT.6.39
SQ.FT.
16.74
SQ.FT.
16.74
SQ.FT.
16.74
SQ.FT.
6"
11
'
-
0
"
R
.
O
.
EQ
.
EQ
.
EQ
.
5'-6" R.O.
2"EQ.2"EQ.2"
4A
T TG-1 G-1
G-1 G-1
G-1 G-1
G-1 G-1
EQ
.
2"
2"
2"
2"
2"
ALUM FRAME: (SF-1)
9.10
SQ.FT.
9.10
SQ.FT.
9.10
SQ.FT.
9.10
SQ.FT.
9.10
SQ.FT.
9.10
SQ.FT.
9.10
SQ.FT.
9.10
SQ.FT.
SEE SCHED.
SE
E
S
C
H
E
D
.
2"
2"2"
SEE SCHED.
SE
E
S
C
H
E
D
.
4"
2"2"
3'
-
4
"
3'
-
4
"
3 1/2"2'-5"3 1/2"
10
"
5'
-
1
0
1
/
2
"
3
1
/
2
"
2'
-
1
0
"
7"
7"
1'-10"
7"
5'
-
0
"
EQ EQ
10
"
5'
-
8
1
/
2
"
5
1
/
2
"
NOT
U
S
E
D
7'
-
0
"
6'-0"
5'
-
6
"
LA
D
D
E
R
P
U
L
L
S
0100TYPE D
EXTERIOR
HM
TYPE C
INTERIOR
PLASTIC
LAMINATE
TYPE E
INTERIOR
PLASTIC
LAMINATE
TYPE B
INTERIOR
PLASTIC
LAMINATE
TT
TYPE F
EXTERIOR
ALUM/GLASS
T
TYPE A
EXTERIOR
ALUM/GLASS
T
C/L T
®
T.O.
PUSH
BAR
EXIT
DEVICE
EXIT DEVICE
LOCKSET
T.O.
GRIPPING
SURFACE
LOCKSET
DOOR MARK ROOM
DOOR FRAME
REMARKS
SIZE HDW
GROUP
GLAZ
TYPE TYPE MATLTYPEMATLWIDTHHGTTHK
2 6' - 0"
3 3' - 0"
5 FAMILY 3' - 0"
6 3' - 0"
7 2' - 10"
DOOR GENERAL NOTES:
A. USE 3-1/2" SCREWS ON ALL DOOR HINGES
B. COORDINATE LOCK SET CORE REQUIREMENTS WITH OWNER.
C. DOOR SUPPLIER IS HAMILTON PARKER, REFER TO SUPPLIERS
LIST FOR ORDERING INFORMATION
D. ALL EXIT DEVICES SHALL HAVE ELECTRONIC LOCKING
SYSTEM PER IBC 2018 1010.1.9.10
DOOR SCHEDULE REMARKS:
1. MARLITE AAA SERIES 50 DOOR AND FRAME; WENDY'S WOOD
LAMINATE.
2."FAMILY" TOILET ROOM SIGN.
3."EMPLOYEES ONLY" SIGN
4."EMERGENCY EXIT ONLY ALARM WILL SOUND" SIGN.
5. PROVIDE KICKPLATE BOTH SIDES.
6. "EXIT ONLY" APPLIED TO INTERIOR FACE AND LEGIBLE TO
EXTERIOR.
7. DOOR SPECIFICATION:
-OLD CASTLE - WS-500 WIDE STILE DOORS; FINISH: NATURA
(MAIN ENTRANCE ONLY)
-TUBELITE (ALTERNATE) - 6070 WIDE STILE ENTRANCE; TOP
RAIL 5", VERTICAL STILE 5"; BOTTOM RAIL 10"x1 3/4" THICK;
HARDWARE GROUP 10 PROVIDED IN TUBELITE CAPPUCCINO
WOOD GRAIN FINISH.
7' - 0"
7' - 0"
6' - 8"
6' - 8"
6' - 8"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
11
02
07
07
05
G-1
G-3
-
-
-
F
A
B
B
B
ALUM
ALUM
PL
PL
PL
3A
00
00
00
ALUM
ALUM
ALUM
ALUM
7
1
1
1
DOOR TYPES
DOOR SCHEDULE
FRAME TYPES
HDWR MOUNTING HTS.DOOR HARDWARE SCHEDULE
4 3' - 6"6' - 8" 1 3/4" 03 G-1 D HM 00 HM
STAINLESS
STEEL TRIM
ENTRY
ENTRY
UTILITY
RECEIVING
8ALUM
KICK PLATE
QTY.DESCRIPTION MODEL FINISH MFG.
SET 01 - EXTERIOR STOREFRONT ENTRANCE
3 EA.HINGES BB1191 4 1/2" X 4 1/2" X NRP
BUTT HINGE US10B HAGER
1 EA.EXIT DEVICE 1792NL-HBOP 26D/626 FALCON
1 EA.PULL BF153 OFFSET PULL 26D/626 ROCKWOOD
1 EA.PULL (HOT CLMT.)908.02.8 8 HAFELE
1 EA.CLOSER SC70-18 DBRZ FALCON
1 EA.FLOOR STOP 441 10B HAGER
1 EA.THRESHOLD 350 32D HAGER
1 EA.DOOR SWEEP 200N 32D HAGER
SET 02 - INTERIOR STOREFRONT ENTRANCE
1 1/2 PR. HINGES BB1279 4 1/2" x 4 1/2" US10B HAGER
1 EA. EXIT DEVICE 1792NL-HBOP 26D/626 FALCON
1 EA. PULL BF153 OFFSET PULL 26D/626 ROCKWOOD
1 EA. CLOSER SC70-18 DBRZ FALCON
1 EA. FLOOR STOP 438 US10B ROCKWOOD
SET 03 - STANDARD REAR SERVICE DOOR - (BY WIB SUPPLIER)
1 EA.
ROTON HINGE
SURFACE MOUNT 70-210HD-84 ALUM ROTON
1 EA.
EXIT DEVICE RIM
SURFACE MOUNT 4501-48-26D 26D/626 HAGER
1 EA.
CLOSER 5100
HOLD OPEN STOP 5100-HDHOS-ALUM ALUM HAGER
1 EA.
ARMOR PLATE
20"x40" S.S.190S-20X40-32D 32D HAGER
1 EA.
WEATHER
STRIPPING
NEOPRENE
873S-N-4284-MILL ML HAGER
1 EA.
DOOR BOTTOM
SWEEP
NEOPRENE
750SN-42-CLR CL HAGER
1 EA.
NGP STEEL
SECURITY
ASTRAGAL 83"
1392SP-USP-83 PRIME
COAT NGP
1 EA.
DOOR LITE 9x5
(6"x2" VISION)L-VGLF-WD-GPZ PRIME
COAT NGP
1 EA.
HALF SADDLE
THRESHOLD
5"x1/2"x42"
431S-42-MIL MIL HAGER
1 EA.OVERHEAD RAIN
DRIP GUARD 810S-46-MIL AL HAGER
QTY.DESCRIPTION MODEL FINISH MFG.
NOTE: NO EXTERIOR KEY OR HANDLE ON THE DOOR, G.C. TO PROVIDE DOOR AND
HARDWARE FOR LOCATIONS WITH SIDE PATIO CONFIGURATION
SET 04 - OFFICE DOOR
1 1/2 PR. HINGES BB1279 4
12" X 4 12"USD226D/
626 HAGAR
1 EA. OFFICE LOCKSET B511GD 626 FALCON
1 EA. KICKPLATE K1050 8" X 2" LESS DOOR WIDTH US32D/630 ROCKWOOD
1 EA. WALL STOP 406 US10B/613 ROCKWOOD
SET 05 - CLOSET DOOR
1 1/2 PR HINGES EC00 1100 4-1/2"x4-1/2" 26D/626 HAGER
1 EA.
STOREROOM
LOCK 3580 WTN
F80 SFIC
3580 26D WTN SFIC 26D/626 HAGER
1 EA.
SFIC COMBINATED
7 PIN KD 3982 C KA 26D/626 HAGER
2 EA.
3984 CONTROL
KEY 3984 BRASS HAGER
1 EA.
CONCAVE WALL
STOP 236W 32D HAGER
SET 06 - RESTROOM DOOR (MULTIPLE USER) - NOT USED
SET 07 - RESTROOM DOOR (SINGLE USER)
1 1/2 PR HINGES ECBB 1100 4-1/2"x4-1/2" 26D/626 HAGER
1 EA.
HAGER 3550
OFFICE LOCK -
GRADE 2 - LESS
SFIC
3550 WTN IC 2D/626 HAGER
1 EA.
SFIC CORE,
COMBINATED,
7-PIN, US26D
3982 C KD 26D/626 HAGER
2 EA.
3984 CONTROL
KEY 3984 BASS HAGER
1 EA.
CLOSER 5200
ALUMINUM ADA 1-4 5200 ALM HAGER
1 EA.CONCAVE WALL
STOP 236W 32D HAGER
QTY.DESCRIPTION MODEL FINISH MFG.
OPTION BELOW IS FOR USE OF PRIVACY LOCK IN LIEU OF KEYED RESTROOM LOCK
1 EA. HAGER PRIVACY 3540 WTN 26D/626 HAGER
NOTE: THE ITEM BELOW IS IF A DEADLOCK IS REQUIRED AT CERTAIN LOCATIONS
1 EA.
DEADLOCK
THUMB-TURN BY
OCCUPANCY
INDICATOR
3216 32D HAGER
SET 08 - KITCHEN DOOR - NOT USED
SET 09 - EGRESS DOOR - NOT USED
SET 10 - SERVING AREA BARN DOOR - NOT USED
SET 11 - EXTERIOR STOREFRONT ENTRANCE - DOUBLE
3 PR. HINGES BB1191 4 1/2" X 4 1/2" NRP US10B HAGER
1 EA. EXIT DEVICE 1692 DC13 FALCON
1 EA. EXIT DEVICE 1690 DC13 FALCON
2 EA.66" LADDER PULL 66LPBS US26/626 CRL
2 EA. CLOSER SC-17-18 DC13 FALCON
2 EA. OH STOP 100S SP313 GLY
1 EA. THRESHOLD 350 DKB NGP
2 EA. DOOR SWEEP 200NA DKB NGP
1 EA. PERIMETER SEAL 160S DKB NGP
1 EA. ASTRAGAL 672 DKB NGP
1 3' - 0" 7' - 0" 1 3/4" 01 G-1 A ALUM ALUMDINING ROOM 1A
FAMILY
8 3' - 0"6' - 8" 1 3/4" 04
-CPL00ALUM1OFFICE
DOOR SCHEDULE AND
WINDOW ELEVATIONS
A6.3
IT
EC
CITY/OWNER COMMTS01/12/233
CITY COMMENTS11/26/212
CITY COMMENTS10/20/211
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
3
3
1.12.23
2'
-
1
0
"
3'
-
2
"
6'
-
6
"
3'
-
6
"
6'
-
0
"
4'
-
0
"
3'
-
7
"
TYP.
3'
-
1
0
"
3'
-
1
0
"
A
F
F
.
EQ.EQ.
1DINING
1/4" = 1'-0"2DINING
1/4" = 1'-0"3DINING
1/4" = 1'-0"
9DINING
1/4" = 1'-0"
7ENTRY
1/4" = 1'-0"6HALLWAY
1/4" = 1'-0"
8ENTRY
1/4" = 1'-0"10DINING
1/4" = 1'-0"
4FRONT COUNTER & DRINK STAND
1/4" = 1'-0"5WASH STATION
1/4" = 1'-0"
EQ.EQ.
11
A7.1
11
A7.1
P-9
SF-1
WT-7
PORCELAIN
COMMUNITY SINK
WT-3
P-6
P-6
B-5WT-3
2X6 WALL W / WT-3
BOTH SIDES
M
M
L
N
S
MARK QTY DESCRIPTION MODEL FINISH NOTES
1 WASTE RECEPTACLE (4" PROJECTION, 4"
RECESSED) - SEMI-RECESSED, 12 GALLONS ASI 0458
1 AUTOMATIC ROLL PAPER TOWEL DISPENSER,
BATTERY OPERATED - RECESSED ASI 646924A
NOTE: GC RESPONSIBLE FOR INITIAL TAGGING AND INSPECTION OF FIRE EXTINGUISHERS.
REFER TO SUPPLIER SHEET FOR BUILDING MATERIAL CONSOLIDATOR INFORMATION.
ACCESSORY SCHEDULE
1 36"x36" ML3010 LIGHTED
1 FIRE EXTINGUISHER CABINET;
SEMI-RECESSED POTTER ROEMER: 7032 GC PROVIDED AND INSTALLED
2 FIRE EXTINGUISHER 5LB - 3A-40:BC
DRY CHEMICAL EXTINGUISHER GC PROVIDED
1 TOUCHFREE SOAP DISPENSER (C0204)SUPPLIED BY KED. GC INSTALLED
41" MOUNTING HEIGHT
1 73"x 21.5" M0208
(1/4" CLEAN CUT W/ CAT.2
MOUNTING TAPE)
L
M
N
P
Q
R
S
1 FIRE EXTINGUISHER 6 LITER TYPE-K WET
CHEMICAL GC PROVIDEDT
TYP.
ALL ITEMS ABOVE
STORE FRONT
HEAD (INCLUDING
DUCTWORK)
3'
-
1
0
"
60
"
7'
-
8
"
3'
-
3
"
P-9
B-5
P-6
P-6
B-5
P-6
WT-3
P
Q
R
1'
-
6
"
P-6
WT-3
R3302
SF-1
EXIT SIGN
ARTPACK & WAYFINDING LEGEND
REFER TO RESPONSIBILITY SCHEDULE FOR ARTPACK INFORMATION
WENDY'S LOCAL LOVE (3 PIECES AND A STAR)
WINK WALL FRAMED GRAPHIC
CAUSE WALL ART PACK
FAMILY ROOM SIGN ACCESSIBLE (BRAILLE)
MARK DESCRIPTION
WF-20
AP-23
AP-24
AP-26
WF-22
INTERIOR READER BOARDAP-25
ORDER THIS WAY VINYLWF-29
MOBILE PICK UP VINYLWF-30
"QUALITY IS OUR RECIPE"AP-27
EQ EQ
NP-S
60
"
R
N
U
6'
-
4
"
A
F
F
.
1 FLY LIGHTU GILBER 20000GT (WHITE)
OPP.
WT-3
LIGHTED MIRROR - SIDELIGHT FROSTED
EDGE
SENTRY 5 . MODEL
AA05S-1 (#442257)
FULL-LENGTH MIRROR
ANSUL K GUARD MODEL
K01-3 (#434909) W/
BRACKET
AP-25
OPEN TO
BEYOND
5
A3.5
SIM.
5
A3.5
OPP.
M-1 M-1
B-5
SF-1
OUTLET,
REFER TO
ELECTRICAL
RE
F
E
R
T
O
R
C
P
M-1 SF-1
OPEN
TO
BEYOND
5
A3.5
P-6
M-1
R0105
WF-20
QUADEC
SCHLUTER TRIM
FROM EDGE OF
SOLID SURFACE
CAP AROUND
COLUMN
10"
SE
E
R
C
P
5'
-
0
"
3'
-
1
0
"
4'
-
6
"
P-6
P-9
WT-3 B-5B-5
WT-3
4'
-
7
1
/
2
"
EQ.EQ.EQ.
OPEN TO
BEYOND
OPEN TO
BEYOND
5
A3.5
5
A3.5
SIM.
OPP.
SF-1
SF-1 P-9
1'-10"
EQ.EQ.
5"
TYP.TYP.
ALL ITEMS ABOVE
STORE FRONT
HEAD (INCLUDING
DUCTWORK)P-9 P-9
SF-1
P-6
WT-3
WF-20
M-1
AP-23
AP-28
OUTLET, REFER
TO ELECTRICAL
P-9
D3002
R3302
P-11M-1
3'
-
1
0
"
EQ EQ
60
"
M
A
X
.
48
"
M
I
N
.
5'
-
4
"
10"
QP0222
G1402
A0202
OPEN
TO
BEYOND
3'
-
1
0
"
4"
4"
EQEQ
A0202
P-6
WT-3
x4
AP-30
"FRESH SINCE DAY ONE"AP-30
D1701
P-6
WT-3
SF-1
P-6
BEYOND
B-5B-5
4'
-
1
0
"
3'
-
1
0
"
OP
E
N
(2
4
"
D
E
E
P
)
A0202
GYP BD. SOFFIT
INSTALLED TIGHT
TO STRUCTURE,
PAINT .P-6
TYP.
ALL ITEMS ABOVE
STORE FRONT
HEAD (INCLUDING
DUCTWORK)P-9
P-6
60
"
L-5
CP-5CP-5
P-6
ALIGN FACE OF SOFFIT WITH
STOREFRONT OPENING
11
'
-
2
"
B.
O
.
S
O
F
F
I
T
QP0222G1402
AP-24
QP0222G1402
GYP.BD
SOFFIT, SEE
DETAIL 4/A1.2,
PAINT
WT-3
B-5
NOTE: CHASE
HEIGHT TO BE
11'-2" MIN., TYP.
AIM DIRECTIONAL
LIGHTS TO LIGHT TOP
2/3 AND 1/3 FROM EDGES
OF ART PACK
WF-22 WF-22
60
"
TY
P
.
9"9"
RP0307B-5
5'
-
4
"
AIM DIRECTIONAL LIGHTS TO CENTER
OF TOP ART PACK IMAGES
3'
-
1
0
"
STATIC MENU
BOARD AND
SOFFIT BEYOND
U0512
7'
-
1
"
AIM DIRECTIONAL LIGHT
TO LIGHT TOP 2/3 OF ART
D1703
WF-29.R WF-30L
CP-5
L-5
PANELS BY
HAMILTON
PARKER
B-5
AIM DIRECTIONAL FIXTURES TO
THE CENTER POINT BETWEEN
ART PACK ELEMENTS
EQEQ
B-5D3002
DECORATIVE TRIM AT
MIRROR
RABBET CUT TOP AND
BOTTOM TRIM PIECES
TO ALLOW OVERLAP OF
MIRROR
MAINTAIN ALIGNMENT
WITH ADJACENT TRIM
MIRROR
11DETAIL
NTS
INTERIOR ELEVATIONS
DINING ROOM
A7.1
IT
EC
CITY/OWNER COMMNTS01/12/233
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
3 3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
1.12.23
1SERVICE AREA ELEVATION
1/4" = 1'-0"2KITCHEN
1/4" = 1'-0"3BACK COUNTER
1/4" = 1'-0"
4GRILL LINE
1/4" = 1'-0"5PREP AREA
1/4" = 1'-0"
7UTILITY
1/4" = 1'-0"
6PREP AREA
1/4" = 1'-0"
8UTILITY
1/4" = 1'-0"9UTILITY
1/4" = 1'-0"10OFFICE
1/4" = 1'-0"
11OFFICE / EMPLOYEE / KITCHEN
1/4" = 1'-0"
FIELD BUILT
MANAGER'S DESK.
REFER TO DETAIL
11/5.2 FOR DETAILS
6'
-
8
"
6"
5'
-
6
"
TYP.
OPEN
TO
BEYOND
OPEN
TO
BEYOND
OPEN TO
BEYOND
OPEN TO
BEYOND
BUG LIGHT
OPEN
TO
BEYOND
2'
-
1
0
"
MA
X
.
5'
-
0
"
9'
-
0
"
FIRE RATED
FIRE RATED
4'
-
0
"
2'-3 5/8"
D0101D0101
E1527
V0608 V0105
V0105
Q0605
V1903
V1902
V0403
EP1528
S7417
T0602
T1212
T2213
S9204
N1901
N0601 N0601
C0304
C0206
G4111 D0101
G5501C0304
C0206
E1527
V1902
G3200
K0502 V1902
E1529 V1903
V0608
V0403
V1903
V0105
EP1528
G3221
A1301
E0603
A0513
A0105
Q0807
S9712
K1401
Q0406
N0701
N0601
N0102
A0803
T2212
A0801
QP0909
C0206
V0105
T1213
C0304
T2051G4421
T0902
T2021
T2061 T2011
S6201
C0206
N0202
N0101
E4302
Q0607 Q0807
A1301
A0513
D0201
EP4709
N0202
D0600
E0924
T2212
D0201
N2701
A0304
T2011
L0308
L0504
L0308
L0308
L0504
E2302
T0304
T0303
T2703
E4006
A0608
T2703
E2302 T2703
N0508
N0508
B-4 WT-3
FRP-2 P-10
FRP-1
B-4
FRP-1
B-4
FRP-1
B-4 B-4
FRP-1
P-10
B-4
B-4 B-4
FRP-2
P-10
FRP-1
B-4
FRP-1
FRP-1
B-4
FRP-1
B-4
B-4
P-6
FRP-1
B-4
FRP-1
EXTENT OF STAINLESS
STEEL @ GRILLE
EXTENT OF STAINLESS
STEEL @ FRYER
EP1416
L0207
K1402
N0901
G3200
MODULAR
ELECTRICAL
PANEL
G3200
GC TO FABRICATE
SOFFIT ABOVE
ELECTRICAL
PANEL. REFER TO
DETAIL 3/A1.2
FRP-1
CLOSE GAP WITH
EDGING AS
REQUIRED. FINSH
WITH FRP-1.
FRP-2
A0105
GC TO FABRICATE
SOFFIT ABOVE
ELECTRICAL
PANEL. REFER TO
DETAIL 3/A1.2
FRP-1
G3200
S9313
FRP-1
UNDERSIDE OF SOFFIT
FRP-1
FRP-2
INSTALL FRP
CORNER TRIM AT
EDGE OF
BULKHEAD
FRP-1
L0206
USED COOKING
OIL ALARM
HOOD SYSTEM
ANSUL PULL
EMERGENCY
SHUT-OFF
SWITCH. REFER
TO ELECTRICAL
WH-2
QT
D1701
EXIT SIGN
ARTPACK & WAYFINDING LEGEND
REFER TO RESPONSIBILITY SCHEDULE FOR ARTPACK INFORMATION
WENDY'S LOCAL LOVE (3 PIECES AND A STAR)
WINK WALL FRAMED GRAPHIC
CAUSE WALL ART PACK
FAMILY ROOM SIGN ACCESSIBLE (BRAILLE)
MARK DESCRIPTION
WF-20
AP-23
AP-24
AP-26
WF-22
INTERIOR READER BOARDAP-25
ORDER THIS WAY VINYLWF-29
MOBILE PICK UP VINYLWF-30
"QUALITY IS OUR RECIPE"AP-27
ANSUL PULL
EMERGENCY SHUT-OFF
SWITCH, REFER TO
ELECTRICAL DRAWINGS
APPROXIMATE LOCATION OF
PLUMBING WATER MANIFOLD/
SUPPLY. REFER TO PLUMBING
DRAWINGS
D0101
D1701
J1004
S9509
HEADSET
HOLDER
E0924
N1201
X2
6'
-
8
"
D1703
"FRESH SINCE DAY ONE"AP-30
D1702
OPEN
TO
BEYOND
P-10
T0802
A0608
D0201
E0708
V0105
G3808
Q0608
D0201
S9509
V1801
V1503
V2201
D2201
D0101
D0101
1'-6" MIN.
D0600
E0924
S940X
A1301
C1805
FRP-1
S940X
OPEN TO
BEYOND
S9204 S940X
S9105S9204
FRP-1FRP-1
B-4B-4
V0105
E2302
FRP-1
A0401 X1510
S940XS940X
F0703
S9105 S940X
X1510
FRP-1
B-4X1510A0401
V0105
S9204
QP0909
B-4 B-4B-4
T2061
S6201
T2051
WH-2
FRP-1
B-4 B-4
FRP-2
C0206
C0304
B-4
FRP-2
K0824
K0821
OPEN
TO
BEYOND
12OFFICE
1/4" = 1'-0"
N0601
N0508
FRP-1
B-4
WALL MOUNTED IT RACK.
G.C TO PROVIDE SOLID
WOOD BLOCKING AS
REQUIRED BY IT RACK
MANUFACTURER'S
SPECIFICATIONS
FIELD BUILT
MANAGER'S DESK.
REFER TO DETAIL
11/5.2 FOR DETAILS
C0142C0143
FRP-1
FIELD BUILT
EMPLOYEE'S DESK.
REFER TO DETAIL
13/5.2 FOR DETAILS
WALL MOUNTED IT RACK. G.C TO PROVIDE
SOLID WOOD BLOCKING AS REQUIRED BY IT
RACK MANUFACTURER'S SPECIFICATIONS
S5501
INTERIOR ELEVATIONS
KITCHEN
A7.2
IT
EC
01/12/23 CITY/OWNER CMMNTS3
CITY COMMENTS10/20/211
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
3
3
3
3
3
3
33
1.12.23
34
1
/
2
"
17
"
-
1
9
"
18
"
MARK QTY DESCRIPTION MODEL FINISH NOTES
2 SEMI- RECESSED PAPER TOWEL & WASTE
RECEPTACLE
ASI 646924A (SEMI RECESSED) PAPER ROLL AUTOMATIC
DISPENSING
STAINLESS
STEEL
2 TWO WALL TOILET COMPARTMENT GRAB BAR
1 1/4" DIAMETER
ASI MODEL 3857 SATIN
2 TOILET PAPER DISPENSER - SURFACE
MOUNTED JUMBO ROLL TOILET TISSUE
DISPENSER
ASI MODEL 0042 SATIN OUTER CABINET - STAINLESS STEEL
2 COAT HOOK ASI-7340-S SATIN
2 WALL MOUNTED VERTICAL BABY CHANGING
STATION
FOUNDATIONS-100-EV CREAM
2 MIRROR MEEK M2513 SATIN STAINLESS STEEL - ANGLE FRAMED W/WELDED
CORNERS
2 18" VERTICAL GRAB BAR ASI MODEL 3800-18 SATIN STAINLESS STEEL W/ EXPOSED MOUNTING, FURNISHED
COMPLETE W/MOUNTING KIT
1 WASTE RECEPTACLE (4" PROJECTION, 4"
RECESSED) - SEMI-RECESSED, 12 GALLONS
ASI 0458
1 AUTOMATIC ROLL PAPER TOWEL DISPENSER,
BATTERY OPERATED - RECESSED
ASI 045224A
NOTE: REFER TO SUPPLIER SHEET FOR BUILDING MATERIAL CONSOLIDATOR INFORMATION.
MI
N
.
2"
C
L
R
34
1
/
2
"
40
"
1
8
"
HO
L
D
HO
L
D
30
"
29
"
M
I
N
.
33
"
34
"
M
A
X
.
44
"
M
A
X
.
3'
-
0
"
44
"
M
A
X
.
30
"
M
A
X
TA
B
L
E
HE
I
G
H
T
47
"
48
"
M
A
X
.
47
"
48
"
M
A
X
.
47
"
48
"
M
A
X
.
39
"
M
I
R
R
O
R
40
"
M
A
X
39
"
M
I
R
R
O
R
40
"
M
A
X
RE
F
L
E
C
T
I
N
G
SU
R
F
A
C
E
RE
F
L
E
C
T
I
N
G
SU
R
F
A
C
E
TO
C
O
N
T
R
O
L
S
HAND
DRYER
DISPENSER
PAPER TOWEL
AND WASTE
BABY CHANGE
TABLE
SURFACE
MOUNTED
WATER CLOSET - GRAB BARS - TOILET TISSUE DISPENSER
CD
COAT HOOK
K
SOAP
EA 1'-4"
LAVATORY
8"
SEAT TRIM
24"12"
17"
40"
54"
SIDE WALL OR
STALL PARTITION
2'-0"
H
MIRROR
B
CL
CL
CL
CL
ACCESSORY SCHEDULE
2 SOAP DISPENSER - TOUCHLESS (C0204)
CUSTOMER RESTROOM
SUPPLIED BY KED
*GC TO COORDINATE ACCESSORIES AVAILABLE THROUGH HJC, REFER TO SUPPLIER SHEET
EXIT SIGN
ARTPACK & WAYFINDING LEGEND
REFER TO RESPONSIBILITY SCHEDULE FOR ARTPACK INFORMATION
WENDY'S LOCAL LOVE (3 PIECES AND A STAR)
WINK WALL FRAMED GRAPHIC
FAMILY ROOM SIGN ACCESSIBLE (BRAILLE)
MARK DESCRIPTION
ORDER THIS WAY VINYL
MOBILE PICK UP VINYL
"QUALITY IS OUR RECIPE"
"FRESH SINCE DAY ONE"
CREW MUST WASH HANDS SIGNAGE
V
MIRROR. SEE SPECIFICATIONS
FOR MORE INFORMATION
FIT DRYWALL W/ "J" BEAD AND
TILE TIGHT TO ANCHOR PLATE,
TYP.
INSULATE DRAIN AND
SUPPLY LINES
A
B
C
D
E
H
J
L
M
K
WF-20
AP-23
AP-24
WF-22
WF-29R
WF-30L
AP-27
AP-30
WF-21
1'
-
5
"
3'
-
1
1
/
2
"
7'-9"1'-4 3/8"
7'-7 1/8"1'-4 3/8"
2'
-
1
0
"
1'
-
6
"
1'-7 1/2"
2'-7 1/4"3'-2"
R.O.
3'-2"3'-2"
R.O.
4'-6 3/4"3'-0"
R.O.
1'-0 1/2"
1'-7 1/2"
2'-1 1/2"
CLEAR
UTILITY
116
FAMILY
103FAMILY
102
31
75
4
A7.3
2
8
A7.3
6
1 1/2"
5 A7.1
6 LM
F.E.K
WF-22 WF-22
1'-5 3/8"
EQ.EQ
EQ EQ
DOOR STOP
PROVIDE
EXTENDER
AS REQ'D
DOOR STOP
DOOR STOP
6'
-
4
"
6'
-
4
"
B
E
H
A
C
H
D
E
A
C
J
B
D
A
HB
J
C
E
D
H
A
E
C
B-5
P-10
WT-6
WT-6
P-10
B-5
B-5
WT-6
P-10
P-10
B-5
WT-6
B-5
WT-6
WT-6
P-10
P-10
B-5
WT-6
P-10
WT-7
J
WF-21
WF-21
K
K
K K
WF-21
H
J
B
P-10
WT-6
WT-7
P-10
B-5
B-5
2'
-
1
0
"
MA
X
.
2'
-
6
1
/
2
"
(2
'
-
6
"
M
I
N
.
)
9"
M
I
N
.
CL
E
A
R
A
N
C
E
2'
-
3
"
(2
'
-
2
"
M
I
N
.
)
K
N
E
E
C
L
E
A
R
A
N
C
E
3'
-
4
"
MA
X
T
O
R
E
F
L
E
C
T
I
V
E
S
U
R
F
A
C
E
11" MIN.
1'-5" MIN. / 2'-1" MAX.
6" MAX.
MIRROR
WALL TILE . REFER
TO FINISH
SCHEDULE ON
SHEET A6.2.
INTERIOR ELEVATIONS
RESTROOM
A7.3
IT
EC
CITY/OWNER CMMNTS01/12/233
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
1FAMILY RESTROOM
3/8" = 1'-0"AENLARGED RESTROOM PLAN
1/2" = 1'-0"2FAMILY RESTROOM
3/8" = 1'-0"3FAMILY RESTROOM
3/8" = 1'-0"4FAMILY RESTROOM
3/8" = 1'-0"
8FAMILY RESTROOM
3/8" = 1'-0"
9RESTROOM - LAVATORY SECTION DETAIL
1" = 1'-0"
7FAMILY RESTROOM
3/8" = 1'-0"6FAMILY RESTROOM
3/8" = 1'-0"5FAMILY RESTROOM
3/8" = 1'-0"
3
3
3
3
3
3
3
3
3
3
1.12.23
V2201
A
B
1
MAXLITE
LED
MAXLITE
LED
MAXLITE
LED
EX
T
.
R
A
M
P
MA
X
L
I
T
E
LE
D
MAXLITE
LED
MA
X
L
I
T
E
LE
D
MAXLITE
LED
LCA672LCE6120
MAXLITE
LED
MAXLITE
LED
1EQUIPMENT PLAN
1/4" = 1'-0"
V1503
S7413
K1402
D0101
V1902
N2701
N0901
G4111
D0101
D0600
F0703 C0304
C0206
N1901
G5501
D0201
G3221
E1527
V1903
V1902
V0105
G1402
N0501*
T2011
T2213
N1201
A1301
S9204
Q0605
T0602
A0105
A1301
Q0807
K1401
J1004K0502E1529
T0902
V0403V0105
T2212
K0821
A0801
T2021
T2061T1213
T1212
C0304
C0206
T2051
S9712
L0206
V0608
N0601
G4421
Q0607
N0701
S940X
Q0406
EP1416
S9313S6201
S940X
N0302
N0601
A0304
S7417
QP0909
G3200
V1903
E0603 EP4709
A0513
EP1528
L0308 L0504
T2703
E2302
T0304
T0303
X1520
S6102
N0508*
R2016S
R2016
R2002
R2109
R2133
R2133
R2310
R2310
QP0222
A0202
RP0312
R3302
D3002
D0101
D1702
R2703
R2016
R2111
R0510 R0510
R0105
D0201
D0101
L0207
R2313
C0204
N0202
6"
E0924
N0202
R2440
D1701E1536
D2201
G3200
#CODED NOTES:
1. FRONT OF HOUSE FIRE EXTINGUISHER.
2. BACK OF HOUSE FIRE EXTINGUISHER.
3. WATER HEATERS.
3
1
3
2
HEADSET
HOLDER
E0924
X2
R0510
2'-3"
17'-11"
2"
R2016
R2113 R0510
R0510R0510
R2016
R2113
R0102
6'-2 1/2"
D0201
D0201
E4302
N0202
N0202
D1703
R3105
U0511
R2016
R2111
2'-3"2'-3"
R3404 R3405 R3405
R3404
RP2714
X1510
A0401 X3
R2002
R2109
R0510
QP0222
A0202
G1402
S9009
S9006 S9006 S9006
S9006 S9006
S9006
S9006 S9006
S9006
S9104
S9102
S9213
S9102
S9105S9204
S9213
S9213
S9213
S9213
S9212
S9212
S9204
S9105
S940X
S9509
EP0916 D0201
V0105
A05XX
S9006
R2002
R2109
R2002
R2109
R0510
R0510
R0510
R0510
R2027
R2114
R0512
R0512
R0512
R0512
R2027
R2114
R2027
R2114
R1603
R1705
X2
X2
C0204
A0803
A608
T0802
S5501
V1801
Q0608
V0702
V2201
G3808
E0708
R3405
R3405
R3405
R3405
K0824
C0143
C0142
EQUIPMENT PLAN
NARROW FROZEN BUN
EQ1.1
IT
EC
CITY/OWNER CMMNTS01/12/233
CITY COMMENTS10/20/211
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
3
33
3
3
3
1.12.23
EQUIPMENT SCHEDULE
EQ1.2
IT
EC
CITY/OWNER CMMNTS01/12/233
CITY COMMENTS10/20/211
EQUIPMENT SCHEDULE
# Name Remarks Furnished By Installed By
WC2505 - OFFICE/EMPLOYEE AND SAFETY
N0302 1 Employee Desk KED KED
N0501* 1 Smart Safe (Optional) O GC
N0508* 1 Back Office Safe (Optional) KED KED
N0601 2 Office Chair KED KED
N0701 1 Training Material Hooks KED KED
N0802 2 Employee Lockers (Optional) KED KED
N0901 1 Coat Hooks KED KED
N1201 2 Bulletin Board KED KED
N1901 1 Cash Scales KED KED
N2701 1 PPE Fryer Cleaning Kit KED KED
WC3017 - SEATING/DINING ROOM FIXTURES
WC3207 - DRINK STAND
A0202 2 Beverage System, Dining Room -
Freestyle
OO
QP0222 2 KED KED
RP0307 1 Drink Stand Package KED KED
WC3308 - POS SYSTEM AND KIOSK - SINGLE-LINE
D0101 6 POS Monitor
D0201 5 POS Terminal O O
D0600 1 Headset O O
D3002 3 Self Order Station Kiosk O O
N0202 4 Cash Drop Safe KED KED
O=OWNER
GC=GENERAL CONTRACTOR
KED= KITCHEN EQUIPMENT DISTRIBUTER
Armored Car Service
Ice Maker Package - Freestyle
WC5006 - SMALLWARES (PARTIAL)
2 Booster Seat
R1603 2 High Chair
WC2101 - SAFETY - U.S. (PARTIAL)
F0703 1 6' Step Ladder
KED KED
KED KED
KED KED
R0105 1 Trash Receptacle (2-Bin Enclosure) KED KED
R0510 18 Chair: Standard KED KED
R2002 4 Table Top: 24" x 24" KED KED
R2016 5 Table Top: 24" x 42" KED KED
R2109 2 Table Base: Fixed 2-Top KED KED
R2110 1 Table Base: Fixed 4-Top KED KED
R2111 2 Table Base: Fixed 4-Top(Accessible) KED KED
R2310 2 42" Single Booth - Standard (Wood) KED KED
R2313 1 42" Double Booth - Standard (Wood) KED KED
R2714 1 Banquette Seating 17'-11
WC6004 - FABRICATED ACCESSORIES - U.S. (PARTIAL)
C0204 3 Soap Dispenser - Touchfree KED KEDCustomer RR
EQUIPMENT SCHEDULE
# Name Remarks Furnished By Installed By
WC0205 - FRONT COUNTER
C0206 1 Soap Dispenser - Manual EcoLab EcoLab
C0304 1 Paper Towel Dispenser (Z Fold) KED KED
E2302 1 Back Counter w/ Sink KED KED
E4302 1 Bakery Display KED KED
EP14XX 1 Package- Front Counter KED KED
Q0607 INC Refrigerator - Front Counter Part of EP14XX KED KED
WC0411 - BEVERAGE LINE - FREESTYLE
A0105 1 Beverage System, PUW - Freestyle
KED KED
A0513 2 Stand, Beverage Urn 2 Tier Stacked KED KED
A0608 1 Brewer, Coffee - Axiom
A1301 2 Beverage Dispenser - (Bubbler)
KED KED
KED
EP4709 1 Package, PUW to Freestyle KED KED
Q0807 1 Frosty Machine - Dual Head KED GC
WC0703 - SINGLE LINE COOK CENTER DSG2
E1527 INC Cook Counter- Salad Station Part of EP1528 KED KED
E1529 Cook Counter - Meat Refrigerator Part of EP1528 KED KED
EP1528 1 Package, Sandwich Station - Single
Line w/ Salad Station
KED KED
G4111 Night Cover Holder Part of EP1528 KED KED
G5501 Bun Storage - Bun Holding Box Part of EP1528 KED KED
K0502 1 Microwave - Medium Duty KED KED
K0821 1 DSG2 KED KED
L0206 1 Wall Panel Kit - Cook Center KED KED
L0308 1 Exhaust Hood, DSG2 - Single Line O GC
V0105 2 Cooker/Warmer, Countertop - Full Size KED KED
V0403 1 Toaster, Bun - Horizontal KED KED
V0608 1 2' Bun Warmer KED KED
V1902 2 Holding Cabinet, Single Sided - 1 Large
Drawer Pan
KED KED
V1903 3 Holding Cabinet, Single Sided - 4
Shallow Drawer Pans
KED KED
O=OWNER
GC=GENERAL CONTRACTOR
KED= KITCHEN EQUIPMENT DISTRIBUTER
KED KED
XPE36 DELTA
INC
INC
INC
EQUIPMENT SCHEDULE
# Name Remarks Furnished By Installed By
WC1409 - BACON AND CHILI
S9509 1 Stand, Equipment - Bacon/Chili
Consolidation
KED KED
V0105 2 Cooker/Warmer, Countertop - Full Size KED KED
WC1511 - PREP AREA - WAREWASH
A0801 1 Brewer, Tea - 4 Button Programmable KED KED
A0803 1 Bracket, Wall - Brewer KED KED
G4421 1 Knife Holder
KED KEDS6201 1 Warewash Shelving Rack
KED KEDS7413 1 Wall Mount & Grid Components
KED KED
S9313 1 Prep Sink Shelving Rack KED KED
S940X 3 Mobile Prep Table - Vegetable Prep KED KED
T1213 1 Chemical Blend Station
- 3 compartment sink
OO
T0902 1 Prep Sink, 1 Compartment KED GC
T2011 1 Three (3) Compartment Sink KED GC
T2051 1 Water Heater Shelf KED GC
T2061 1 Warewash Machine KED KED
WC1608 - HAND SINK
C0206 1 Soap Dispenser - Manual EcoLab EcoLab
C0304 1 Paper Towel Dispenser KED KED
G3200 3 Holder, Glove Box KED KED
T2703 1 Hand Sink - Faucet KED GC
WC1703 - DRINK EQUIPMENT
A0304 1 Rack, BIB Soda - Freestyle KED KED
A0401 Tank, Bulk C02 KED KED
QP0909 1 KED KED
T2212 1 Water Treatment Unit, Standard Use KED KED
WC1803 - WALK IN BOX STORAGE - CUSTOM
S9006 10 Storage Unit, 24" x 48" x 80" KED KED
S9009 1 Storage Unit, 18" x 30" x 35.5" KED KED
S9102 2 Storage Unit: Cooler, 24" x 42" x 80" KED KED
S9103 1 Storage Unit: Cooler, 24" x 48" x 80" KED KED
S9104 1 Storage Unit: Cooler, 24" x 72" x 80" KED KED
S9105 1 Thaw Rack, 24" x 30" x 80" KED KED
S9204 2 Freezer Storage Unit 18" x 48" x 69" KED KED
S9212 2 Freezer Storage Dunnage Rack
(Pallatier) 22" x 36" x 12"
KED KED
S9213 5 Freezer/Cooler Storage Dunnage Rack
(Pallatier) 22" x 48" x 12"
KED KED
WC1903 - MOP SINK/CLEANING EQUIPMENT
S6102 1 Closet Storage Wall Shelves KED KED
S7417 1 Wall Mount & Grid Components KED KED
T0304 1 Faucet, Wall Mount - Service Sink KED KED
T0602 1 Mop Sink - Splashes on Back and Left KED KED
T1212 1 Chemical Blend Center - Mop Sink
Area
KED KED
T2213 1 Reverse Osmosis System KED KED
O=OWNER
GC=GENERAL CONTRACTOR
KED= KITCHEN EQUIPMENT DISTRIBUTER
S9010 2 Storage Unit, 21" x 48" x 80"
Package, Ice Maker, and Bin
Leased Unit (typ.)
KED KED
T0303 1 Faucet, Wall Mount w/ Support Bracket KED KED
T2021 Dishtable
1
A0501 INC 4 Unit Surface Mount Tea Urn Stand Part of RP0307 KED KED
C1805 Lid Dispenser Part of RP0307 KED KED
C0180 Drink Stand Package Part of RP0307
C0181 Drink Stand Package Part of RP0307
G1402 Freestyle Chase Assembly Part of RP0307 KED KED
KED KED
KED KED
INC
INC
INC
INC
4 x 10 Sheets
E1536 1 Cook Center Curb KED GC
D1701 1 Customer Order Pick Up Screen O O
R3302 1 3 Kiosk Station Counter KED KED
R0102 1 Trash Receptacle (1-Bin Enclosure) KED KED
R1705
D1702 1 Order Runner Screen O O
D1703 1 Premium Beverage Screen O O
U0512 1 Static Menu Board - Curved O O
R2016S 1 Table Top: 24" x 42" KED KED"We Don't Cut Corners"
KED KED
R3105 1 Cap
KED KED
R2440 1 C-Wall
KED KED
KED KED
R3404 2 Short Pillow - Part of R2703 KED KED
R3405 6 Long Pillow - Part of R2703 KED KED
R2133 2 Cantilever Bracket (4 Top) KED KED
WC1107 - FRYLINE WITH 2 PICK-UP WINDOWS (N. WASSERSTROM FRY HOLDING MODULE)
E0603 INC Shelf for Drink Carrier Part of EP0916 KED KED
E0924 2 Counter, Drive-thru KED KED
EP0916 1 Package, Standard Fry Line KED KED
G3221 1 Holder, Glove Box - Plastic KED KED
J1004 1 Open Fryer, 4 Well O KED
K1401 1 Oven, Combi KED KED
K1402 1 Oven, High Speed KED KED
L0207 1 Wall Panel Kit - Fry Line KED KED
L0504 1 108" Exhaust Hood, Fry Line -
Single Line
OGC
Q0406 1 Freezer, Upright - 1 Door, R/H Hinged KED KED
Q0605 1 Refrigerator, Undercounter - 1 Door,
L/H Hinged, W/Salad Dressing Rack
KED KED
S9712 1 Stand, Equipment - Combi and High
Speed Ovens
KED KED
V0105 1 Cooker/Warmer, Countertop - Full Size KED KED
X1518 INC Used Cooking Oil Enclosure Part of XP1512 O GC
X1519 Used Oil Control Panel Part of XP1512 O GC
XP1512 1 Used Cooking Oil Tank Package O GC
4 Vat Fryer Only
UCO Vendor
INC
X1510 INC Used Cooking Oil TANK Part of XP1512 O GC
4 x 10 Sheets
D2201 1 Fry Line Timer KED KED
G3808 1 Bag Holder KED KED
E0708 1 Bagging Station KED KED
V1503 1 Holding Cabinet KED KED
V2201 1 Fry Holding Module- KED KED
V1801 1 Fry Staging Warmer, 24" KED KED
V0702 1 Food Warmer, 3-Lane KED KED
Q0608 1 Under-counter Freezer - 60" KED KED
MODULAR FRY LINE EQUIPMENT ( N. WASSERSTROM FRY HOLDING MODULE)
30" N. Wasserstrom OPTION AVAILABLE
KED
A1301 2 Beverage Dispenser - (Bubbler)
A05XX Tea Urn KED KED1
KED GCT2703 1 Sink, Hand - Manual Faucet
(2) 60" and (1) 72"
KED KED
S9105 1
S9204 1 KED KED
Storage Unit, 18" x 48"
Storage Unit, 24" x 30"
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
R0512 9 Stool: 24" High KED KED
3 Table Top: 30" DiameterR2027
R2112 Table Base: 22" X-Base Freestanding KED KED
R2113 Table Base: 22" T-Base (Accessible)2 Bases Req. Per Table KED KED
R2114 3 Table Base: 22" X-Base (Counter Height 34" Freestanding) KED KEDK0824 1 Staging Griddle KED KEDGSL6S CSA
3 S5501 1 Beverage Stand 30"x 48"
T0802 1 Dump Sink
C0142 1 Cup Dispenser - 4 Hole Horizontal
C1043 2
Use with S5501
Use with S5501
KED KED
KED GC
KED KED
KED KED
3
3
3
1.12.23
GENERAL NOTES
A. PAY ALL FEES AND ARRANGE FOR EXECUTION OF ALL TAPS, METERS WITH REQUIRED
ENCLOSURES (IF ANY), AND APPURTENANCES INHERENT TO THE INSTALLATION OF PLUMBING
SERVICE.
B. PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO EXECUTE THE PLUMBING
WORK INDICATED ON THE DRAWINGS AS SPECIFIED, AND AS REQUIRED BY LOCAL CODES AND
ORDINANCES. PLUMBING WORK SHALL INCLUDE ALL PIPING FOR DOMESTIC HOT AND COLD
WATER LINES, VENT AND SANITARY LINES, HOOK-UP OF ALL FIXTURES SCHEDULED ON THE
DRAWINGS, AND INSULATION OF DESIGNATED PIPING. WORK SHALL ALSO INCLUDE ALL GAS
PIPING AND EQUIPMENT CONNECTIONS WHERE REQUIRED. INCLUDE ALL ITEMS SUCH AS
FITTINGS NOT MENTIONED BUT UNDERSTOOD TO BE NECESSARY TO COMPLETE THE
PLUMBING SYSTEM. COORDINATE ALL WORK WITH OTHER CONTRACTORS.
C. PROVIDE FOR DRAINING WATER SYSTEM AND CAP ALL STUBS UNTIL FINISH WORK IS
INSTALLED. INSTALL DRAIN VALVE AT WATER METER WITH 3/4" HOSE THREAD AND VACUUM
BREAKER.
D. PROVIDE VALVES ON WATER SUPPLIES TO EACH FIXTURE & EQUIPMENT. VALVES SHALL BE 1/4
TURN SHUT-OFF VALVES.
E. INSULATE ALL PIPING PER SPECIFICATIONS.
F. PLUMBING FIXTURES SHALL BE PROVIDED WHERE SHOWN ON DRAWINGS. FIXTURE FITTINGS
AND EXPOSED FIXTURE PIPING SHALL BE BRASS CHROMIUM PLATED. TRAPS SHALL BE CAST
BRASS. FIXTURES SHALL BE EQUAL IN ALL RESPECTS TO FIXTURES SPECIFIED.
G. PROVIDE ROUGH-IN AND FINAL CONNECTIONS OF REQUIRED WASTE, VENT, AND WATER
SUPPLY PIPING.
H. THIS CONTRACTOR SHALL GUARANTEE ALL WORK INSTALLED UNDER THE CONTRACT TO BE
FREE FROM DEFECTIVE WORKMANSHIP AND MATERIALS, (USUAL WEAR IS EXPECTED), AND
SHOULD DEFECTS DEVELOP WITHIN A PERIOD OF ONE YEAR AFTER ACCEPTANCE OF THE
BUILDING BY THE OWNER, THIS CONTRACTOR SHALL REPAIR AND/OR REPLACE DEFECTIVE
ITEMS AND ALL DAMAGE RESULTING FROM FAILURE OF THESE ITEMS, AT NO EXPENSE
WHATSOEVER TO THE OWNER
I. THE DIRECTION OF THE SANITARY MAIN AND THE LOCATION OF THE GREASE INTERCEPTOR
SHALL BE COORDINATED WITH CIVIL DRAWINGS PRIOR TO ROUGH-IN.
J. PROVIDE PROVENT TRAP GUARD (OR APPROVED EQUAL) AT ALL FLOOR DRAINS. PROVIDE
TRAP PRIMERS ON FLOOR DRAINS ONLY IF REQUIRED BY AUTHORITY HAVING JURISDICTION
(AHJ). IF AHJ REQUIRES TRAP PRIMERS, LAYOUT DISTRIBUTION TO CONNECT MULTIPLE FLOOR
DRAINS TO ONE TRAP PRIMER.
K. COORDINATE LOCATION AND ROUGH-IN HEIGHT OF KITCHEN EQUIPMENT WITH OWNER AND
MILLWORK PRIOR TO ROUGH-IN.
L. PROVIDE WATER HAMMER ARRESTORS AT END RUN OF ALL WATER PIPING. SIZE AND LOCATE
AS RECOMMENDED BY PLUMBING AND DRAINAGE INSTITUTE STANDARD PDI-WH201, AND AS
RECOMMENDED BY THE MANUFACTURER.
M. ALL PIPING (GAS AND WATER) SHALL BE CONCEALED IN WALL SPACE WHEN POSSIBLE,
UNLESS NOTED OTHERWISE.
N. DAMAGES TO EXISTING WALLS, FLOORS, FINISHES ETC. BY THIS CONTRACTOR SHALL BE
REPAIRED AT THIS CONTRACTOR'S EXPENSE.
O. WATER HEATER, WATER METER AND BACKFLOW PREVENTER SHALL BE INSTALLED TO MEET
ALL STATE, COUNTY AND LOCAL JURISDICTION CODES.
P. ON ALL SYNFLEX LINE INSTALLATIONS (EXCEPT DRINK STATIONS AND COFFEE BREWER)
TRANSITION TO COPPER AT TOP OF WALL, AND ROUTE DOWN INSIDE WALL AND THEN
THROUGH WALL TO EXPOSED SHUT OFF VALVE. DRINK STATIONS WILL HAVE SYNFLEX LINES
FROM FILTER TO UNIT INSTALLED BY BEVERAGE SYSTEM INSTALLER.
Q. 3 COMP SINK, COMBI OVEN AND 2 AREA FLOOR DRAINS BETWEEN HOOD AREA SHALL BE
ROUTED TO GREASE WASTE LINE. ALL OTHER DRAINS SHALL BE ROUTED TO BUILDING
SANITARY.
R. ALL WATER SUPPLY LINES, VENT STACK LINES, SANITARY LINES, AND OTHER EXPOSED
PLUMBING LINES SHALL BE COMPLETELY SEALED AT ALL WALL PENETRATIONS. PROVIDE
CHROME ESCUTCHEON PLATE SEALED TO WALL WITH SILICONE SEALANT.
S. SEE CONNECTION SCHEDULE FOR ALL INDIVIDUAL PIPE SIZES.
WATER CALCULATION
CRITICAL ELEVATIONS AND DISTANCES: FEET
ELEVATION OF CONTROLLING FIXTURE (WATER CLOSET)4.0
ELEVATION OF FINISHED FLOOR 0.0
ELEVATION OF WATER MAIN -4.0
ELEVATION OF WATER ENTRY -4.0
VERTICAL DIST. FROM WATER MAIN TO CONTROLLING FIXTURE 8.0
SYSTEM PRESSURE REQUIREMENTS:PSI
ELEVATION (VERTICAL DISTANCE) X 0.434 PSI/FT 3.5
PRESSURE NEEDED AT CONTROLLING FIXTURE 20.0
BACKFLOW PREVENTER: 1-1/2" AT 66 GPM 8.0
WATER METER: 1-1/2" AT 66 GPM 10.0
TOTAL 41.5
PIPE RUNS:FEET
EXTERIOR, MAIN TO BUILDING ENTRY 100.0
EXTERIOR, VERTICAL RISE 0.0
INTERIOR, ENTRY TO CONTROLLING FIXTURE 60.0
INTERIOR, VERTICAL RISE 8.0
ALLOWANCE FOR FITTINGS, ETC. (LENGTH X 0.25)42.0
TOTAL 210.0
SYSTEM PRESSURE DATA: PSI
STREET PRESSURE 80.0
SYSTEM PRESSURE REQUIRED 41.5
PRESSURE AVAILABLE FOR (PIPING) FRICTION LOSS 38.5
PIPE SIZING:PSI/100'
PRESSURE AVAILABLE X 100 / (TOTAL PIPE RUN)18.3
* NOTE: ALL PIPING IS SIZED FOR 5 PSI/100' PRESSURE LOSS
REFER TO WENDY'S CONSOLIDATOR LIST
TO OBTAIN BUILDING MATERIAL QUOTES.
REFER TO WENDY'S APPROVED SUPPLIER
LIST FOR PHONE NUMBERS AND CONTACTS.
ATTENTION ALL BIDDERS
REMARKS (#)
FIXTURE & EQUIPMENT CONNECTION SCHEDULE
SY
M
B
O
L
QU
A
N
T
I
T
Y
GENERAL FIXTURE DESCRIPTION
DOMESTIC WATER SANITARY
NATURAL
GAS
US
E
D
C
O
O
K
I
N
G
O
I
L
REMARKS (#)
FI
L
T
E
R
E
D
W
A
T
E
R
-
F
C
W
1
FI
L
T
E
R
E
D
W
A
T
E
R
-
F
C
W
2
FI
L
T
E
R
E
D
W
A
T
E
R
-
F
C
W
3
FI
L
T
E
R
E
D
W
A
T
E
R
-
F
C
W
4
CO
L
D
W
A
T
E
R
HO
T
W
A
T
E
R
(
1
4
0
°
)
HO
T
W
A
T
E
R
(
1
1
0
°
)
MO
U
N
T
I
N
G
H
E
I
G
H
T
DR
A
I
N
L
I
N
E
S
I
Z
E
TR
A
P
FI
X
T
U
R
E
D
R
A
I
N
DI
R
E
C
T
/
I
N
D
I
R
E
C
T
(
D
/
I
)
SA
N
I
T
A
R
Y
/
G
R
E
A
S
E
(
S
/
G
)
VE
N
T
MO
U
N
T
I
N
G
H
E
I
G
H
T
CO
N
N
E
C
T
I
O
N
S
I
Z
E
BT
U
L
O
A
D
PLUMBING FIXTURES
WC 2 WATER CLOSET (ACCESSIBLE)114"(1)4" INT 4" D S 2" FL
(3), (6)
LAV-1 2 LAVATORY
12"12"(1)112"112"112"D S1
12"(1) (3), (6)
LAV-2 1 LAVATORY 12"12"(1)112"112"112"D S1
12"(1) (3), (6)
MS 1 MOP SINK
12"12"36"
54"3" 3" 3"DS112"FL (3), (6)
FPWH 2 FROST PROOF WALL HYDRANT
3 4"18"(3), (6)
PLUMBING DRAINS
FD 11 FLOOR DRAIN 3" 3"*112"FL (3), (8), (9)
FS-1 4 FLOOR SINK 3" 3"*112"FL (3), (8), (9)
FS-2 1 FLOOR SINK 3" 3" * 1
12"FL (3), (8), (9)
HD 1 HUB DRAIN 3" 3" * 1
12" 12"
(3), (8), (9)
KITCHEN EQUIPMENT - FRONT COUNTER
E2302 1 BACK COUNTER HAND SINK
12"12" 14" 2" 1
12"112"D S1
12" 12"
(4), (6), (8), (9)
KITCHEN EQUIPMENT - BEVERAGE LINE
A0105 1
BEVERAGE SYSTEM (DRIVE-THRU)12"14"IS (4), (14), (15)
A0608 1 COFFEE BREWER
12"14"(4), (10), (11)
E4006 1 DRIVE-THRU HAND SINK ASSEMBLY
12"12" 14" 2" 1
12"112"D S1
12"(4), (8), (9)
KITCHEN EQUIPMENT - FRYLINE
K1401 1 COMBI OVEN
12"12"30" 3" 3"IG112"(5), (10), (11)
J1004 1 OPEN FRYER - 4 WELL 1" 300K
*(4)
KITCHEN EQUIPMENT - PREP AREA / WAREWASH
A0801 1 TEA BREWER *
12" 72"
(4), (10), (11)
T1213 1 CHEMICAL BLEND STATION (FOR
T2011)12"12"54"(4)
T0902 1 1 COMP PREP SINK
12"12"14"(4), (6), (7), (8),
(9)
T2011 1 3 COMP SINK
12"12"14"(4), (6), (7), (8),
(9)
T2061 1 WAREWASH MACHINE
12"3 4" 61.75" 3" 3" 2" I G 1
12"(4), (6), (7), (8),
(9), (10)
KITCHEN EQUIPMENT - HAND SINK
T2703 1 HAND SINK
12"12" 14" 2" 1
12"112"D S1
12" 12"
(4), (6), (8), (9)
KITCHEN EQUIPMENT - DRINK EQUIPMENT
QP0909 1 ICE MAKER - KITCHEN
12" 72" 3" 3"
3 4"I S1
12"(4), (6), (7),
(10)
T2212 1 WATER TREATMENT UNIT 3 4"85"(4), (11), (13)
KITCHEN EQUIPMENT - MOP SINK / CLEANING EQUIPMENT
T0303 1 MOP SINK FAUCET (FOR T0602 -
LOWER)12"12"36"(4), (6)
T0304 1
MOP SINK FAUCET (FOR T0602 -
UPPER BLEND CENTER)12"12" 54"
(4), (6)
T0602 1 MOP SINK 3" 3" 3" D S 1
12"FL (4), (6)
T1212 1 CHEMICAL BLEND CENTER
12"12"54"(4)
T2213 1 REVERSE OSMOSIS SYSTEM
12"12" 85"
(5)
A0304 1 BAG-IN-BOX
12" 85"
(5), (11), (12)
KITCHEN EQUIPMENT - DRINK STAND
A0202 2
BEVERAGE SYSTEM (SELF-SERVE -
DINING ROOM)12"14"IS (4), (14), (15)
QP0222 2 ICE MAKER (CUBER) - DINING ROOM 12"96" 3" 3"
3 4"I S1
12"(4), (6), (7),
(10)
*VERIFY QUANTITIES WITH ARCHITECTURAL EQUIPMENT PLAN AND SCHEDULE.*
1. REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS.
2. PLUMBING FIXTURE PROVIDED BY PLUMBING INSTALLER.
REFER TO PLUMBING FIXTURE SCHEDULE
3. EQUIPMENT FURNISHED BY OTHERS.
4. PLUMBING INSTALLER TO MAKE FINAL CONNECTIONS TO
EQUIPMENT.
5. FINAL CONNECTION TO EQUIPMENT BY OTHERS.
6. PROVIDE VALVE AT EACH CONNECTION TO EQUIPMENT.
7. PLUMBING CONTRACTOR TO PROVIDE INDIRECT DRAIN TO
FLOOR DRAIN OR SINK.
8. VERIFY DIRECT OR INDIRECT WASTE CONNECTION PER
LOCAL CODE REQUIREMENTS.
9. VERIFY SANITARY OR GREASE WASTE CONNECTION PER
LOCAL CODE REQUIREMENTS.
10. SHUTOFF VALVE AND FLEX CONNECTOR LINES TO
PRE-RINSE ARE PROVIDED WITH FIXTURE.
11. PROVIDE WITH BACKFLOW PROTECTION PER BACKFLOW
PREVENTOR SCHEDULE. COORDINATE BACKFLOW
INSTALLATION WITH KITCHEN EQUIPMENT PROVIDER AND
BEVERAGE INSTALLER.
12. PROVIDE WITH WATTS NO. SS009 BACKFLOW PREVENTER
WHEN LOCAL JURISDICTION REQUIRES A HIGHER LEVEL OF
PROTECTION THAN PROVIDED BY THE INTEGRAL ASSE 1022
DOUBLE CHECK VALVE.
13. PLUMBING INSTALLER TO RUN WATER LINE TO FILTRATION
SYSTEM WITH FINAL CONNECTIONS BY BEVERAGE
INSTALLER.
14. BEVERAGE INSTALLER TO ROUTE LINE TO POINT OF USE
AND PLUMBING INSTALLER TO MAKE FINAL CONNECTION.
15. WATER SUPPLY LINE IS PART OF THE BEVERAGE BUNDLE.
PUMP SCHEDULE
SYMBOL MANUF.MODEL GPM
HEAD
(FT)VPHA W
NOTES
(#)
RCP GRUNDFOS ALPHA2 5 12 115 1 0.65 5 - 65
(1)
NOTES:
1.RECIRCULATING PUMP: BRONZE BODY RECIRCULATING PUMP WITH "AUTOADAPT" VARIABLE
SPEED MOTOR, INSTALL NEAR WATER HEATER PER MANUFACTURER'S INSTRUCTIONS. PROVIDE
WITH ALPHA 3-PRONG PLUG AND COORDINATE CONNECTION WITH ELECTRICAL CONTRACTOR.
PROVIDE WITH HONEYWELL L6006C SURFACE MOUNT AQUASTAT SET TO 5°F BELOW WATER
HEATER OPERATING TEMPERATURE.
WSFU CALCULATIONS
FIXTURE QTY.WSFU TOTAL
WATER CLOSET (FLUSH)21020
LAVATORY 3 2 6
MOP BASIN 1 33
HAND SINK 3 2 6
1-COMP SINK 1 4 4
3-COMP SINK 1 44
WAREWASH 1 3 3
BEVERAGE STATION 3 1 3
BAG-N-BOX 1 33
ICE MAKER 3 1 3
COMBI-OVEN 1 1 1
COFFEE BREWER 1 0.5 0.5
TEA BREWER 1 0.5 0.5
HOSE BIBB 2 36.0
*WSFU VALUES GIVEN PER IPC* WSFU TOTAL 63.00
DFU CALCULATIONS
FIXTURE QTY.DFU TOTAL
WATER CLOSET (FLUSH)248
LAVATORY 3 1 3
MOP BASIN 1 2 2
HAND SINK 3 1 3
3" HUB DRAIN 1 55
3" FLOOR SINK 7 535
3" FLOOR DRAIN
(EMERGENCY)9 --
*DFU VALUES GIVEN PER IPC* DFU TOTAL 56.0
EXPANSION TANK SCHEDULE
SYMBOL MANUF. MODEL GAL.
ACCEPT.
GAL.
CONN.
LOC.
CONN.
SIZE MOUNTING NOTES
(#)
ET-1 AMTROL ST-8 4.4 3.2 TOP
3 4"ABOVE WH-1 (1), (2)
NOTES:
1.EXPANSION TANK: STEEL SHELL, HEAVY DUTY BUTYL NSF/ANSI 61, FACTORY PRECHARGED TO
50 PSIG. MAX OPERATING TEMPERATURE 200°, MAX OPERATING PRESSURE 150 PSI, 1 YEAR
MANUFACTURER'S WARRANTY. INSTALL PER MANUFACTURER'S INSTRUCTIONS.
2. FIELD CHARGE EXPANSION TANK TO SYSTEM PRESSURE BEFORE CONNECTION TO DOMESTIC
WATER SYSTEM. FIELD VERIFY PRESSURE REQUIREMENTS.
GREASE INTERCEPTOR SIZING
FIXTURE QTY.FLOW RATE
(2 MIN)
FLOW RATE
(1 MIN)
FLOOR DRAIN 3 0.00 0.00
FLOOR SINK 8 0.00 0.00
MOP BASIN 1 9.35 18.70
THREE COMP SINK 1 30.00 60.00
DISHWASHER 1 5.00 10.00
TOTAL FIXTURE FLOW RATE 44.35
CALCULATED FLOW
RATE
(GPM)
PIPE SIZE FLOW RATE (4 IN)75 44.35
[(CU IN / 231) = GAL X 0.75 / 2 MIN = 2 MIN FLOW RATE]
NUMBER OF SEATS 55
GREASE PRODUCTION
(LBS OF FOG)
AVG. MEALS PER SEAT PER DAY 4 693.0
FAST FOOD - FULL PREP
(HIGH / NO FLATWARE: 0.035 LBS PER SERVING)0.035
DAYS BETWEEN PUMP OUTS 90
[SERVINGS PER DAY X GREASE PRODUCTION VALUE X DAYS BETWEEN PUMP-OUTS = GREASE
OUTPUT]
BACKFLOW PREVENTER SCHEDULE
LOCATION TAG MODEL ASSE
MAIN WATER SUPPLY RPZ WATTS LF009-QT-S 1013
CARBONATOR DCV-1 WATTS SD-3 1022
SODA DISPENSORS DCV-2 WATTS SD-2 1022
CHEMICAL FEED DCV-3 WATTS SD-2 1022
OTHER EQUIPMENT DCV-3 WATTS SERIES 7 1024
NOTE:
VERIFY BACKFLOW VALVE REQUIREMENTS AND APPROVAL FOR ALL EQUIPMENT WITH AUTHORITIES
HAVING JURISDICTION PRIOR TO INSTALLATION.
GAS FIRED WATER HEATER SCHEDULE
SYMBOL MANUF.MODEL GAL.BTU GAS
PRESSURE
RECOVERY
(GPH/100°F)
SET POINT
(°F)
NOTES
(#)
WH-1 BRAFDORD
WHITE
EF-100T-1
99E-3N 100 199,999 7" W.C. 235 140
(1), (2)
NOTES:
1. GAS FIRED WATER HEATER: THREE YEAR TANK/PARTS WARRANTY, GLASS LINED STEEL TANK,
150 PSI WORKING PRESSURE, THERMAL EFFICIENCY OF 97% MEETING CURRENT EDITION OF
ASHRAE 90.1B AND LOCAL ENERGY CONSERVATION REQUIREMENTS. PROVIDE T&P RELIEF
VALVE.
2. FURNISH WITH EXPANSION TANK AS SPECIFIED ON PLANS.
ELECTRIC WATER HEATER SCHEDULE
SYMBOL MANUF.MODEL GAL. KW V PH FLA
RECOVERY
(GPH/90°F)
SET POINT
(°F)
NOTES
(#)
WH-2 BRADFORD
WHITE LE16U3 6 6 208 1 28.8 25 140 (1), (2)
NOTES:
1.ELECTRIC WATER HEATER: THREE YEAR TANK/PARTS WARRANTY, GLASS LINED STEEL TANK,
150 PSI WORKING PRESSURE, MEETING CURRENT EDITION OF ASHRAE 90.1B AND LOCAL
ENERGY CONSERVATION REQUIREMENTS (SMALL TANK WATER HEATERS BELOW 20 GALLONS
ARE EXEMPT FROM NAECA REQUIREMENTS AND ASHRAE 90.1). PROVIDE T&P RELIEF VALVE.
2.FURNISH WITH EXPANSION TANK AS SPECIFIED ON PLANS.
BV BALL VALVE
GW
D
G
UCO
FW
SANITARY WASTE (SAN) - BELOW SLAB/GRADE
PLUMBING VENT (V) - BELOW SLAB/GRADE
GREASE WASTE (GW) - BELOW SLAB/GRADE
USED COOKING OIL (UCO)
PLUMBING VENT (V)
CONDENSATE LINE (D)
HOT WATER RETURN (HWR) 140°, 120°
GAS LINE (G)
NSF 61 TUBING (NSF) [BY OTHERS]
FILTERED WATER SUPPLY (FW)
HOT WATER (HW) 140°, 120°
COLD WATER (CW) - BELOW SLAB/GRADE
COLD WATER (CW)
NSF
BFP
RI
BACKFLOW PREVENTER
ROUGH-IN
AFF/AFG
FCO/ECO
VTR
IW
WCO/CO
ABOVE FINISHED FLOOR/GRADE
FLOOR/EXTERIOR CLEANOUT
WALL CLEANOUT/ CLEANOUT
VENT THRU ROOF
INDIRECT WASTE
TYPICALTYP
AHJ
UNO
AUTHORITY HAVING JURISDICTION
UNLESS NOTED OTHERWISE
ABBREVIATIONS: LINETYPES:
END CAP
SHUTOFF VALVE (BALL TYPE)
TEE TURNING UP/DOWN
PIPE TURNING UP/DOWN
CHECK VALVE
BALANCING VALVE
PIPE SYMBOLS:
WALL HYDRANT
RO REVERSE OSMOSIS WATER SUPPLY (RO)
*NOT ALL SYMBOLS OR LINETYPES ARE NECESSARILY USED*PLUMBING SYMBOLS LEGEND
GREASE INTERCEPTOR SCHEDULE
SYMBOL MANUF. MODEL
FLOW RATE
(GPM)
GREASE
CAPACITY (LBS.)
LIQUID CAPACITY
(GAL.)NOTES (#)
GI SCHIER GB-250 100
1,895 277 (1), (2), (3)
NOTES:
1. CONTRACTOR SHALL SUBMIT PROPOSED GREASE INTERCEPTOR INSTALLATION PLANS AND
SPECIFICATIONS TO LOCAL AUTHORITIES FOR THEIR APPROVAL BEFORE ACQUISITION. SEE
MANUFACTURER INSTALLATION MANUAL FOR ADDITIONAL INSTRUCTIONS.
2.PROVIDE WITH C24HP H20 LOAD RATED PICKABLE CAST IRON LIDS WITH "SAFE MANWAY" FALL
PROTECTION COVER.
3. PROVIDE WITH AK1 ANCHOR KIT.
PLUMBING FIXTURE SCHEDULE
SYMBOL FIXTURE TYPE MANUF.MODEL DESCRIPTION ACCESSORIES/OPTIONS
NOTES (#)
WC WATER CLOSET
(ACCESSIBLE)SLOAN ST-2029
(2102029)
FLOOR MOUNT, WHITE VITREOUS CHINA, 1.1-1.6 GPF
ELONGATED SIPHON JET BOWL, 1-1/2" TOP SPUD, & RIM
HEIGHT 17" A.F.F.
TOTO #TMT1LN32#CP 1.28 GPF MANUAL WATER CLOSET
FLUSH VALVE. MAINLINE #ML1055SSC00 WHITE OPEN FRONT
ELONGATED TOILET SEAT LESS COVER.
(1), (4)
LAV-1 LAVATORY
(ACCESSIBLE)
AMERICAN
STANDARD
#0356.421.020
LUCERNE WALL HUNG, 2012"x1814", WHITE VITREOUS CHINA.TOTO #TL210DD12#CP POLISHED CHROME, LAVATORY
FAUCET, 1.2 GPM FLOW RATE (1), (2), (3), (4)
LAV-2 LAVATORY
(ACCESSIBLE)DURAVIT
D17511
(#0454120060)
VERO
WALL HUNG WASHBASIN, 4714"x1812", WHITE VITREOUS
CHINA,WITH CHROME METAL CONSOLE AND NO FAUCET
HOLES, SINGLE HOLE FOR FAUCET, & BACK OVERFLOW.
ROHL A1423LMAPC-2 "ACQUI WALL MOUNT BRIDGE
FAUCET", POLISHED CHROME, 8" WALL MOUNT, 10" SWIVEL
SPOUT, 1.2 GPM AERATOR. PROVIDE WITH CROW WORKS
27" HIGH GUNMETAL SINK STAND
(1), (2), (4), (5)
MS MOP SINK FIAT MSB-2424
24"X24"X10" ONE-PIECE MOLDED STONE CONSTRUCTION
WITH 3" STAINLESS STEEL DRAIN. SUPPLY WITH TWO
#830-AA SERVICE FAUCETS MOUNTED AT 36" AND 54" A.F.F.
REFER TO ARCHITECTURAL ELEVATIONS.
SUPPLY WITH #MSG-2424 STAINLESS STEEL WALL GUARD
ON TWO SIDES, #E-88-AA STAINLESS STEEL BUMPER
GUARDS ON TWO SIDES, AND ONE #832-AA 30" HOSE AND
HOSE BRACKET.
(5)
WB COMBI OVEN
WATER BOX SIOUX CHIEF 696-G2403WF WHITE ABS WATER SUPPLY BOX WITH 3/4" HOSE THREAD,
AND PEX-A F1960 CONENCTIONS.INSTALL PER "COMBI OVEN SUPPLY BOX ROUGH-IN" DETIAL.
FPWH FROST PROOF
WALL HYDRANT WOODFORD MODEL 65
ANTI-SIPHON, AUTOMATIC DRAINING, WALL HYDRANT,
NON-FREEZE INTEGRAL VACUUM BREAKER, ALL BRONZE
INTERIOR PARTS, KEY OPERATED, 3/4" SOLDER INLET.
MOUNT 18" ABOVE FINISHED GRADE. PROVIDE
APPROPRIATE MODEL FOR WALL THICKNESS AND SITE
SPECIFIC TEMPERATURE REQUIREMENTS.
(4)
FD FLOOR DRAIN SIOUX CHIEF /
ZURN
832-35D-NR /
#ZN415-B-3NH
FLOOR DRAIN WITH 5" ROUND NICKEL BRONZE ADJUSTABLE
STRAINER AND CAST IRON BODY & 3" BOTTOM OUTLET.
PROVIDE WITH ASSE 1072 APPROVED TRAP SEAL DEVICE.
TRAP SEAL DEVICE SHALL BE TRAP PROSET TRAPGUARD
OR APPROVED EQUAL. INSTALL PER MANUFACTURER'S
RECOMMENDATIONS. PROVIDE DRAINS IN CUSTOMER
AREAS WITH VANDAL RESISTANT SCREWS.
(4)
FS-1 FLOOR SINK SIOUX CHIEF /
ZURN
#861-3PN-D /
#Z1900-3NH-K-4
12" SQUARE TOP FLOOR SINK W/8" DEEP PVC/CAST IRON
BODY & 3" BOTTOM OUTLET (CAST IRON OPTIONAL)(4)
FS-2 FLOOR SINK SIOUX CHIEF /
ZURN
#861-23X-N2 /
#Z1900-3NH-2NB
12" SQUARE TOP FLOOR SINK WITH 6" DEEP ACID
RESISTANT ENAMEL CAST IRON BODY AND 3"OUTLET WITH
12 NICKEL BRONZE GRATE.
SET FLOOR SINK LEVEL WITH FINISH FLOOR.(4)
HD HUB DRAIN N/A N/A
STUB 3" WASTE LINE 12" ABOVE FINISHED FLOOR SLAB FOR
FUTURE CONNECTIONS BY OTHERS.
PROVIDE WITH ASSE 1072 APPROVED TRAP SEAL DEVICE.
TRAP SEAL DEVICE SHALL BE TRAP PROSET TRAPGUARD
OR APPROVED EQUAL. INSTALL PER MANUFACTURER'S
RECOMMENDATIONS.
(4)
MV MIXING VALVE ZURN
ZW3870XLT /
ZW1070XL
THERMOSTATIC CONTROLLER WITH INTEGRAL CHECKS, ALL
BRASS BODY WITH DUAL STAINLESS STEEL STRAINER,
VANDAL RESISTANT TEMPERATURE ADJUSTMENT HANDLE.
SET TO 105°F. MOUNT IN ACCESSIBLE LOCATION.(4)
NOTES:
1. INSTALL IN ACCORDANCE TO ADA ACCESSIBILITY REQUIREMENTS.
2. PROVIDE WITH QUARTER TURN BRASS ANGLE COMPRESSION STOPS WITH LOOSE KEY HANDLES, STAINLESS BRAIDED SUPPLIES, CHROME SUPPLY AND DRAIN ESCUTCHEONS, CHROME GRID STRAINER
DRAIN WITH TAILPIECE, CHROME PLATED CAST BODY P-TRAP WITH CLEANOUT. INSULATE WASTE AND WATER PIPING WITH TRUEBRO "LAV-GUARD2" #101-EZ.
3. FURNISH WITH ZURN #Z-1231-81 LAVATORY CARRIER.
4.REFER TO ARCHITECTURAL SUPPLIER PAGE FOR WENDY'S NATIONAL VENDOR PRICING CONTACTS. VERIFY PRIOR TO BID IF GENERAL CONTRACTOR OR OWNER WILL PROVIDE EQUIPMENT.
PLUMBING SCHEDULE
AND NOTES
P1.0
AUTHOR
CHECKER
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
EX
T
.
R
A
M
P
LCA672LCE6120
V2201
1PLUMBING PLAN - SANITARY WASTE & VENT
1/4" = 1'-0"
SEE SITE PLAN FOR
CONTINUATION
GW
UTILITY
116
1
2
3
3
T2061
QP0909
A0105
T2011
T0902
T0602
T2703
T2703
E2302
ECO
4"
ECO
FD
FCO
FD
4"
4"
3"
4"
3"
2"
FCO
FD
2
4"
4"
4"
3"
4"
FS-1
FD
FD
FCO
3
FD
WCO
3"
4"4"3"
3"
3"
3"
3"
3"
4"
2"2"
GW
GW
GW
4"
4"
4"
3"
3"
UC
O
3 4"
6
INSTALL USED OIL
SYSTEM PER VENDOR
INSTRUCTIONS.WC
WC
LAV-1
LAV-1
3
3"3"
3"
4"4"4"
3"
2"2"
2"
3"
112"
2"
2"
112"
112"
112"2"
WCO
WCO
FS-1 FS-1
WH-18
4"
QP0222
FS-1
FCO
3"
GW
9
5
1"
CO
1"
3" HD
4"
3"
A0202
4"
GI
FDFD
3"
K1401 J1004
43"VTR
FD
WC
2"
3"
2"
2"
9
3
3"
3"
4
7
MAINTAIN SEPARATION BETWEEN UCO, SANITARY
LINES, VENT LINES, AND WATER LINES IN THIS
WALL. MAINTAIN SEPARATION BETWEEN THE
USED COOKING OIL LINE, VENT LINES, AND
DOMESTIC WATER LINES. ROUTE HOSE BIBB
BELOW USED COOKING OIL LINE.
3"VTR
3"3"
3 4"
UCO FS-2
#CODED NOTES:
1. EXTEND SANITARY LINE TO MAIN. FIELD VERIFY EXACT LOCATION WITH LOCAL UTILITY
COMPANY PRIOR TO BID.
2. PROVIDE GB-250 KITCHEN GREASE INTERCEPTOR. LOCATE CLEAR OF DRIVE-THRU LANE.
REFER TO CIVIL DRAWINGS FOR FINAL LOCATION. REFER TO "GREASE INTERCEPTOR" DETAIL.
3. VENT RISER FROM UNDER FLOOR PIPING. REFER TO SANITARY ISOMETRIC FOR
CONTINUATION.
4. PROVIDE SANITARY VENT THROUGH ROOF PER "VENT THRU ROOF (VTR)" DETAIL. LOCATE
VENT MINIMUM OF 10'-0" AWAY FROM AIR INTAKES ON ROOF, UNLESS APPROVED BY ENGINEER
PRIOR TO INSTALLATION. VTR SHALL BE EXTENDED HIGHER THAN ANY AIR INTAKES. LOCATE
PER ROOF PLAN.
5. ROUTE CONDENSATE FROM FREEZER/COOLER TO FLOOR DRAIN. PROVIDE RAYCHEM
GUARDIAN GM-51-IM HEAT TRACED LINE FROM INSIDE OF COOLER TO FLOOR DRAIN.
(COORDINATE POWER FOR HEAT TRACE WITH ELECTRICAL PLANS.) REFER TO
"COOLER/FREEZER CONDENSATE" DETAIL.
6. ROUTE USED COOKING OIL LINE BEHIND EQUIPMENT. EXTEND LINE TO USED COOKING OIL
TANK AS SHOWN. REFER TO "USED OIL RECOVERY" DETAIL.
7. ROUTE USED COOKING OIL LINE MINIMUM OF 6" ABOVE CEILING FROM EQUIPMENT TO
RECOVERY TANK AS SHOWN PER PLAN. SLOPE PIPING TO BACK OF BUILDING. REFER TO
INSTALLATION MANUAL FOR EXACT PITCH. LINE CANNOT HAVE ANY TRAPS. USE ONLY BACK
TO BACK 45 DEGREE ELBOW TO CHANGE DIRECTION.
8. PROVIDE THREADED BLACK IRON PIPE DOWN WALL. COVER UCO LINE FROM WALL ENTRY TO
POINT OF CONNECTION AT TANK WITH 1" THICK FIBERGLASS PIPE INSULATION WITH ASJ.
PROVIDE EXTERIOR PIPE INSULATION WITH STAINLESS STEEL PIPE COVER THAT IS BANDED
AND SEALED THROUGHOUT WITH CLEAR UV RESISTANT SILICONE CAULK. PROVIDE WALL
PENETRATOIN WITH STAINLESS STEEL ESCUTCHEON. DO NOT RUN PIPE THROUGH
REFRIGERATED BOXES OR SERVICES SPACES. TURN INTO TANK SHED AT 89" A.F.F. STUB OUT
EXTERIOR SIDE OF WALL.
9. EMERGENCY DRAIN IN RESTROOM SHALL BE INSTALLED FLUSH TO GRADE WITH NO SLOPE.
COORDINATE INSTALLATION HEIGHT WITH GENERAL CONTRACTOR TO ENSURE PROPER
INSTALLATION.
2-WAY
GCO
2-WAY
GCO
VENT PIPING
BELOW GRADE
5'-0"
5'-0"
FD
D
VENT PIPING
BELOW GRADE
FCO
3"
1"
2"
WCO
LAV-2
VENT PIPING
BELOW GRADE
WCO
QP0222
PLUMBING PLAN -
SANITARY WASTE & VENT
P1.1
AUTHOR
CHECKER
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
1
13
13
2
2
8
66
K1401
QP0909
T0602
A0304
A0801
A0105
T0902T2011
FCW-3
1/2" CW, 1/2" HW, AND (2) 1/2" FW DROP DOWN
IN WALL AND EXTEND THRU MILLWORK TO
E4003, A0608, A0105, A0202, & (2) QP0222.
FIELD VERIFY ROUTING.
FCW-3
FCW-4
FCW-1
FCW-2
FCW-3
FPWH
FPWH
E2302
5
5
T2703
1PLUMBING PLAN - DOMESTIC WATER
1/4" = 1'-0"
WC
LAV-1
LAV-1
WC
4
4
4
MV
MV
MV
MV
RCP
T0303
T0304
WH-1
1"
112"112"
112"
112"112"
112"
12"
12"
12"
3 4"
3 4"
3 4"
1"
1"
1"
12"12"
T2213
4
T1213
ET-1
2
3
1 T2061
3 4"
1"
1"
1"
FW
RO
WB
FW
RO
FW RO
MAINTAIN SEPARATION BETWEEN UCO, SANITARY
LINES, VENT LINES, AND WATER LINES IN THIS
WALL. MAINTAIN SEPARATION BETWEEN THE
USED COOKING OIL LINE, VENT LINES, AND
DOMESTIC WATER LINES. ROUTE HOSE BIBB
BELOW USED COOKING OIL LINE.
BEVERAGE EQUIPMENT NOTES
1. BEVERAGE EQUIPMENT SUPPLIER TO RUN NSF 61 TUBING FOR SODA DISPENSOR(S) AND SELF
SERVE ICE MAKER(S).
2. GC, OR PLUMBING CONTRACTOR, TO MAKE FINAL CONNECTIONS FOR ICE MAKER(S).
2. GC, OR PLUMBING CONTRACTOR, TO PROVIDE OETIKER CLAMPS FOR CONNECTING
BEVERAGE HOSES.
3. BEVERAGE EQUIPMENT SUPPLIER TO INSTALL SODA DISPENSERS AND ANCILLARY
EQUIPMENT INCLUDING RACK, WATER BOOSTER, ETC.
4. BEVERAGE EQUIPMENT SUPPLIER TO INSTALL STAINLESS STEEL CHASE COVERS FOR NSF 61
TUBING.
5. BEVERAGE EQUIPMENT SUPPLIER TO CLEAN, SEAL, AND CAP CHASE.
6. BEVERAGE EQUIPMENT SUPPLIER TO INSTALL STAINLESS STEEL CHASE COVERS FOR NSF 61
TUBING.
#CODED NOTES:
1. CHEMICAL FEED UNITS AND INSTALLATION KITS SUPPLIED BY OWNER'S REPRESENTATIVE AND
INSTALLED BY CONTRACTOR. FEED STATION LOCATIONS ARE TO BE VERIFIED WITH OWNER.
PROVIDE BACKFLOW PROTECTION AS REQUIRED BY LOCAL CODE AND PER BACKFLOW
PREVENTER SCHEDULE. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. PLUMBING CONTRACTOR TO PROVIDE 1/2" INSULATED COPPER LINES IN WALL WITH BALL VALVE
AT CONNECTION LOCATION AND MALE THREAD ADAPTOR ABOVE CEILING FOR CONNECTION BY
BEVERAGE EQUIPMENT INSTALLER TO NSF 61 TUBING LINES.
3. BEVERAGE EQUIPMENT INSTALLER TO PROVIDE 1/2" NSF 61 TUBING FILTERED COLD WATER LINE
FROM WATER FILTER TO CARBONATOR. BEVERAGE EQUIPMENT INSTALLER SHALL PROVIDE
REQUIRED CODE APPROVED STAINLESS STEEL BACKFLOW PREVENTOR PRIOR TO CARBONATOR
EQUIPMENT. NO COPPER WATER LINES SHALL BE USED FOR CARBONATED WATER LINES AFTER
THE BACKFLOW PREVENTOR.
4. PROVIDE INDIVIDUAL MIXING VALVE FOR ALL HAND SINKS AND LAVATORIES IN AN ACCESSIBLE
LOCATION.
5. ROUTE PEX-A FILTERED AND REVERSE OSMOSIS WATER LINES TO SERVE THE COMBI OVEN.
6. ROUTE 1
14" COLD WATER COPPER LINE FROM ABOVE CEILING DOWN TO APPROXIMATELY 30"+/-
AFF FOR THE WATER CLOSET FLUSH VALVE. SEE RISER DIAGRAMS FOR DETAILS AND
ARCHITECTURAL SHEETS FOR MORE INFORMATION. COORDINATE EXACT LOCATION WITH THE
MANUFACTURER'S EQUIPMENT PRIOR TO ROUGH-IN.
7. EXTEND
3 4" COLD WATER LINE TO WATER FILTRATION SYSTEM IN UTILITY AREA. PROVIDE ALL
CHECK VALVES AND SHUT-OFF VALVES REQUIRED. HOOK UP AND COMMISSION WATER
FILTRATION SYSTEMS, BOOSTER PUMP, AND REVERSE OSMOSIS (RO) SYSTEM PER
MANUFACTURER'S RECOMMENDATIONS. VERIFY ALL RESPONSIBILITIES WITH OWNER AND
PLUMBING FIXTURE SCHEDULE. REFER TO "WATER FILTRATION SYSTEM" DETAIL.
8. DROP 1" HW AND CW AND
12" HWR LINES TO WATER HEATER, EXPANSION TANK, AND
RECIRCULATING PUMP. CONTRACTOR TO FURNISH AND INSTALL WATER HEATER. REFER TO
"LARGE WATER HEATER", "RECIRCULATION PUMP", AND "SMALL EXPANSION TANK" DETAILS.
DISCHARGE T&P RELIEF VALVE AND OVERFLOW TO DRAIN. PROVIDE VALVE AND UNION ON INLET
AND OUTLET. PROVIDE BALANCING VALVES AS REQUIRED FOR RECIRCULATING SYSTEM.
9. BEVERAGE EQUIPMENT SUPPLIER TO RUN 1/2" COLD WATER NSF 61 TUBING LINE ABOVE CEILING
TO DINING ROOM FOR CONNECTION TO BEVERAGE SYSTEM. PROVIDE SHUT OFF VALVES AND
BACK-FLOW PREVENTERS AS REQUIRED TO MAKE FINAL CONNECTION. COORDINATE WITH
OWNER'S REPRESENTATIVE. BEVERAGE BUNDLE WHICH INCLUDES SYRUP AND FILTERED
WATER LINES TO RUN OVERHEAD ABOVE CEILING, EXTEND FROM FILTER SYSTEM AND THRU 6"
ESCUTCHEON PLATE IN CEILING, EXTEND OVERHEAD TO DRINK UNITS THEN DOWN THRU CEILING
AND THROUGH CHASE BEHIND BEVERAGE UNIT. VERIFY RESPONSIBILITIES WITH OWNER AND
FIXTURE SCHEDULE.
10. EXTEND 3/4" HOT AND COLD WATER COPPER LINES DOWN FOR THE MOP SINK/FAUCET FROM
MAIN. MAKE ALL FINAL CONNECTIONS. COORDINATE EXACT LOCATION PRIOR TO ROUGH-IN. MOP
SINK AREA HAS 2 FAUCETS MOUNTED DIRECTLY ABOVE EACH OTHER. REFER TO CONNECTION
SCHEDULE FO0R MOUNTING HEIGHTS.
11. BEVERAGE EQUIPMENT INSTALLER SHALL PROVIDE NSF 61 TUBING LINES, FOR COLD WATER
SERVING BEVERAGE EQUIPMENT. LINES ARE SHOWN ARE SHOWN FOR REFERENCE ONLY.
COORDINATE WITH OWNER'S REPRESENTATIVE.
12. ROUTE 3/4" HW TO SMALL WATER HEATER SERVING WAREWASH MACHINE. REFER TO "SMALL
WATER HEATER ON PLATFORM" AND "WAREWASH W/ WATER HEATER" DETAILS.
13. EXTEND COPPER PIPING DOWN IN WALL TO FREEZE-PROOF WALL HYDRANT-WOODFORD MODEL
65 OR EQUAL, MOUNT 18" ABOVE FINISHED GRADE. VERIFY EXACT LOCATION WITH
ARCHITECTURAL ELEVATIONS.
14. 1
12" WATER METER AT FLOOR WITH RPZ BACKFLOW PREVENTER, PIPE DISCHARGE TO FLOOR
DRAIN. EXTEND LINE TO MAIN. FIELD VERIFY EXACT LOCATION WITH WATER COMPANY.
15. PROVIDE WATER BOX FOR FILTERED AND REVERSE OSMOSIS WATER LINES SERVING THE COMBI
OVEN PER THE "COMBI OVEN WATER ROUGH-IN" DETAIL.
EX
T
.
R
A
M
P
LCA672LCE6120
V2201
15
15
4 T2703
MV
MV ABOVE
CEILING
LAV-2 4
9
9A0202
QP0222
FCW-3
FCW-1
1"
1"
1"
14
7
11
T2212
T1212
12
9QP0222 FCW-1
WH-2
12
10
PLUMBING PLAN -
DOMESTIC WATER
P1.2
AUTHOR
CHECKER
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
EX
T
.
R
A
M
P
LCA672LCE6120
V2201
1PLUMBING PLAN - NATURAL GAS
1/4" = 1'-0"
1
2WH-1
1
3
3
RTU-2
RTU-1
G G
G
G
2"
114"
1 14"
114"
112"
112"
2WH-1
#CODED NOTES:
1. GAS SERVICE AND METER SETTING SIZED PER GAS COMPANY REQUIREMENTS FOR MAX
CONNECTED LOADS AS SHOWN IN "NATURAL GAS CALCULATIONS" TABLE WITH TOTAL
DEVELOPED LENGTH, INCLUDING FITTINGS, VALVES, ETC. OF 100 LINEAR FEET AND A TOTAL
SYSTEM PRESSURE DROP OF 0.3" W.C. WITH 14" W.C. DELIVERED AT THE METER. HOLD GAS
METER AND NATURAL GAS LINES TIGHT TO BUILDING. REFER TO "GAS SERVICE" DETAIL.
2. ROUTE NATURAL GAS LINE DOWN TO WATER HEATER AS SHOWN PER PLAN. COORDINATE
EXACT LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO INSTALLATION. REFER TO
"LARGE WATER HEATER" DETAIL.
3. ROUTE NATURAL GAS UP THROUGH ROOF TO TO ROOFTOP EQUIPMENT AS SHOWN PER PLAN.
COORDINATE EXACT LOCATION WITH MECHANICAL CONTRACTOR PRIOR TO INSTALLATION.
REFER TO "ROOFTOP UNIT GAS CONNECTION" DETAIL. GAS LINES ON ROOF ARE TO BE
PAINTED SAFETY YELLOW. GAS LINES MUST BE ROUTED TO ALLOW FULL ACCESS TO RTU
EQUIPMENT.
GAS LINE BEHIND EQUIPMENT
4GAS LINE AUTO
SHUT-OFF VALVE
112"112"G
5
J1004
NATURAL GAS CALCULATIONS
EQUIPMENT MBH
ROOFTOP EQUIPMENT:
RTU-1 270
RTU-2 270
WATER HEATING
WH-1 199
KITCHEN EQUIPMENT
OPEN FRYER 4 WELL 300
TOTAL GAS LOAD (MBH)1039.0
PLUMBING PLAN -
NATURAL GAS
P1.3
AUTHOR
CHECKER
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
1PLUMBING RISER - SANITARY WASTE & VENT
NTS
2PLUMBING RISER - DOMESTIC WATER
NTS
T0902
T2011
T2061
FCW-2
E2302
T2703
T2703
T2703
T2703
E2302
4"
3"
3"
FD
4"4"
4"
4"
4"
4"
4"
4"
3"
3"
3"
4"
4"
4"
4"
4"
3"
3"
3"
3"3"
3"
ECO
FCO
FCO
FCO
FCO
ECO
FS-2
FS-1
FS-1
FS-1
FD
FD
FD
FD
FD
FD
FCO
4"
3"
3"
3"
2"
2"
2"
2"
2"
2"
2"
2"
FD
WCO
WCO
WC
WC
LAV-1
LAV-1
4"
4"
4"
4"
4"4"
3"
2"
2"
2"2"
2"
2"
2"
2"
2"
2"
2"
112"
112"
112"
112"
112"
112"
112"
112"
112"
112"
112"
112"
3"
3"
M
REFER TO WATER
FILTRATION SYSTEM
DETAIL
114"
3 4"
3 4"
T1212
T0304
3 4" HW&CW
LAV-1
WC FPWH
WC
114"
FPWH
3 4"
3 4"
3 4"3 4"
12"12"
12"12"
12"
12"
12"
12"
12"
12"
3 4"
3 4"
12"
112"
FCW-3
FCW-4
K1401
MV
LAV-1
MV
MV
MV
3 4"
MV
ET-1
WH-1
QP0909 A0304
A0801
FCW-1
FCW-2
FCW-3
12"
12"
12"
12"12"
12"
3 4"
1"
12"
3 4" CW1"
1"
1"
1"
112"
112"
112"
112"
112"
112"
112"
3 4" HW
1"
1"
1"
T2213
GW
GW GW
GW
GW
GW
RCP
FD
FCO
4"
GW
GW 3"
T06024"
3"
3"
A0105
T1213
1"
WB
3 4"
12"
12"
12"
12"
12"
FW
RO
FW
RO
GI
3"
HD
A0202
QP0222
4"
4"
WCO
3"
FD
3"
FD
3"VTR
2"
2"
3"
112"2"
3"VTR
3"
3"
3"
3"3"
112"
2- WAY
FCO
2- WAY
FCO
112"
112"
3"
FS-1
112"
LAV-2
MV
112"
2"
LAV-2
WH-2
A0608
FCW-2
FCW-3
A0202
QP0222
FCW-3
FCW-1
12"
12"A0105
12"
MS
MS
PLUMBING RISERS
P2.0
AUTHOR
CHECKER
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
3'-5 1/4"
6'-6 1/2"
1'-10 1/4"
5'-8 1/4"
12'-11 1/4"
11
'
-
5
3
/
4
"
20
'
-
1
0
1
/
2
"
10
'
-
4
1
/
4
"
2'
-
7
"
13
'
-
7
3
/
4
"
12
'
-
6
3
/
4
"
17
'
-
7
1
/
2
"
11
'
-
2
1
/
4
"
9'
-
6
1
/
4
"
8'
-
1
1
/
2
"
9'
-
6
"
6'
-
1
"
6'
-
1
1
1
/
4
"
20'-9"
5'-7 1/2"
9'-5"
2'-2"
13'-0"
9
1
/
4
"
8'
-
0
"
3'
-
2
1
/
2
"
11
'
-
9
"
15'-9 1/4"
3'
-
6
1
/
2
"
3'
-
2
1
/
2
"
8
3
/
4
"
12
'
-
7
"
22'-9 3/4"
24'-4 1/4"
29'-9 1/4"
30'-8"
29'-9 1/4"
30'-7 1/2"
13'-4 1/2"
11'-4 1/2"
25'-5 1/4"
1'
-
2
1
/
4
"
8'
-
5
1
/
2
"
9'
-
6
"
2'
-
2
"
6'
-
5
1
/
4
"
6'-10 1/2"
1PLUMBING PLAN - DIMENSION CALLOUT
1/4" = 1'-0"
DIMENSIONS ARE FOR REFERENCE ONLY.
GENERAL CONTRACTOR TO VERIFY LAYOUT
WITH WENDY'S REPRESENTATIVE.
28'-0 3/4"
0"
0"0"
0"
5'
-
1
1
/
4
"
REFERENCE POINT
OUTSIDE FACE OF
SHEATHING
15
'
-
9
3
/
4
"
1'-2 1/2"
2'-5 1/4"
EX
T
.
R
A
M
P
LCA672LCE6120
V2201
15
'
-
5
"
16'-10 3/4"
8'-6"
PLUMBING DIMENSION
PLAN
P3.0
AUTHOR
CHECKER
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
BLOCKING BY GENERAL
CONTRACTOR
WOOD BLOCKING
CONTINUOUS
INSULATION
THROUGH PIPE
SUPPORT
WATER LINE INSULATION/PIPE SUPPORT
NOT TO SCALE
PIPE SUPPORT (IN-WALL)15
CW
G
VENT/INTAKE PIPE PROVIDED BY PLUMBING CONTRACTOR. PROVIDE 3" INTAKE PIPE AND 3" EXHAUST
PIPE FROM WATER HEATER TO CONCENTRIC VENT INTAKE AIR WALL TERMINATION KIT. MAKE ALL FINAL
INTAKE/ EXHAUST CONNECTIONS. COORDINATE LOCATION OF WALL OPENING WITH ARCHITECT PRIOR
TO ROUGH-IN. MAINTAIN 10' CLEARANCE FROM ALL OUTSIDE AIR INTAKES. INSTALL PER
MANUFACTURER'S RECOMMENDATION.
CHECK VALVE 1"
A.S.M.E. APPROVED
TEMPERATURE AND
PRESSURE RELIEF VALVE
SIZE GAS PER PLAN
EXTEND FULL SIZE TO
DRAIN
DRAIN VALVE
3/4"
1"
1"140° HW
THERMOMETER WITH
GAGE COCK (TYP.) -
EQUAL TO WATTS
#TB-1-1/2-1
SEE FLOOR PLAN FOR
CONTINUATION
VACUUM RELIEF VALVE
1"
1"
TO EXPANSION
TANK
3/4"TO RECIRC
PUMP
NOT TO SCALE
LARGE WATER HEATER 12
INSTALL PIPE HIGH AS POSSIBLE, ANCHORED TO WALL OF BOX WITH SUPPORTS AT MAXIMUM SIX FOOT
CENTERS. USE TYPE "M" HARD COPPER TUBE AND FITTINGS WITH LEAD-FREE SOLDER JOINTS. SLOPE
HORIZONTAL PIPE AT MINIMUM TWO PERCENT. REFER TO LOCAL CODE FOR INDIRECT DRAIN
REQUIREMENTS. ELECTRICAL AND PLUMBING CONTRACTORS TO COORDINATE WORK. ELECTRICAL
CONTRACTOR TO PROVIDE AND INSTALL HEAT TRACING.
FLOOR
1"DX COIL
CO
CO
NO INSULATION ON PIPE RISER
SEE FLOOR PLAN FOR RECEPTACLE LOCATION.
WALK-IN COOLER OR FREEZER BOX
PROVIDE TRAP AT
BOTTOM OF RISER AND
DISCHARGE INTO FLOOR
DRAIN OR FLOOR SINK
WITH AIR GAP OF TWO
PIPE DIAMETERS
SILICONE SEAL AROUND
PIPE PENETRATION
PROVIDE 1" ELASTOMERIC INSULATION OVER
FREEZE PROTECTION ON CONDENSATE LINE -
IF/WHEN FREEZER BOX ONLY - (PROVIDE
ELECTRIC HEAT TRACE CABLE PER PLAN.
COORDINATE POWER REQUIREMENTS)
PROVIDE CLEANOUT
IN TURNS AND ENDS
OF PIPE
MAKE CONNECTION TO
COIL AS REQUIRED
NOT TO SCALE
COOLER/FREEZER CONDENSATE 8
PROVIDE FIBERGLASS INSULATION WITH ALL-SERVICE JACKET WITH VAPOR BARRIER ON ALL COLD/HOT
WATER PIPING AND CONDENSATE DRAIN PIPE. REFER TO SPECIFICATIONS FOR FURTHER
INFORMATION REGARDING INSULATION. INSTALL ALL ITEMS PER SPECIFICATIONS AND
MANUFACTURERS INSTRUCTIONS. MAINTAIN VAPOR BARRIER ON COLD PIPING BY MEANS OF SEALANT
AND TAPE. FLAME-SPREAD AND SMOKE-DEVELOPED INDEXES SHALL NOT EXCEED 25/50. SEAL
EXPOSED ENDS OF FIBERGLASS INSULATION WITH ADHESIVE MASTIC.
REFER TO OTHER DETAILS
FOR TREATMENT OF
INSULATION AT PENETRATION
OF WALLS AND FIREWALLS
PROVIDE INSULATION ON DOMESTIC
HOT/COLD WATER PIPES, STORM WATER
PIPES, AND CONDENSATE DRAIN PIPING
IN WALLS AND CHASES
MITER THE INSULATION AT TEES AND
ELBOWS SO THAT THERE ARE NO GAPS
AT JOINTS. PROVIDE ONE-PIECE
PRE-MOULDED PVC FITTING COVERS
PROVIDE A ONE FOOT LENGTH OF
NON-COMPRESSIBLE INSULATION AT
HANGERS FOR ALL PIPE 2" AND
LARGER
COVER VALVE BODIES WITH INSULATION, BUT NOT UNIONS
TAPE JOINTS OF
FIBERGLASS
INSULATION
FLOOR
NOT TO SCALE
PIPE INSULATION 4
AI
R
G
A
P
2"
M
I
N
.
FINISHED
FLOOR
PVC PIPE (SIZE
WILL VARY)
3" SANITARY LINE (SEE
PLUMBING PLAN)
FLOOR SINK (BY PLUMBING
CONTRACTOR)
NOT TO SCALE
INDIRECT DRAIN 19
PROVIDE ONE PIECE SPUN ALUMINUM BASE
WITH, GRADUATED STEPPED PVC BOOT,
AND ADJUSTABLE STAINLESS STEEL
CLAMPS. SET BASE IN BED OF MASTIC
MINIMUM 12" BELOW ROOF
ROOF INSULATION
ROOF DECK
REFER TO ARCHITECT'S DRAWING
FOR APPLICATION OF VENT PIPE
BOOT INSTALLATION WITH
ROOFING MATERIAL
PROVIDE SLEEVE IF
REQUIRED BY TYPE
OF ROOF DECK
PROVIDE PIPE INCREASER
WHERE REQUIRED TO MAKE
MINIMUM 3" VENT THRU ROOF
ANCHOR PIPE TO ROOF DECK OR JOISTS
WITH U-BOLT AROUND PIPE AND ANGLE
IRON WELDED OR SCREWED TO DECK OR
JOIST
HUBLESS PIPE CONNECTORS ON CAST
IRON PIPE
REFER TO PLANS FOR VTR PIPE SIZES AND LOCATIONS. LOCATE VTR A MINIMUM OF 10 FEET
HORIZONTAL (UNLESS APPROVED BY ENGINEER PRIOR TO INSTALLATION) OR THREE FEET VERTICAL
ABOVE ANY BUILDING OPENING OR FRESH AIR INTAKE, AND ONE FOOT FROM ANY VERTICAL SURFACE.
PROVIDE 1" FIBERGLASS INSULATION WITH ALL-SERVICE JACKET ON VENT PIPE INSIDE BUILDING
WITHIN SIX FEET OF VENT THRU ROOF LOCATION. VERIFY FLASHING AND COUNTERFLASHING WITH
ROOFING CONTRACTOR.
TERMINATE VENT FLUSH WITH
TOP OF PARAPET WALL.
NOT TO SCALE
VENT THRU ROOF (VTR)18
BALL VALVE:
BRONZE BODY,
FULL PORT,
SCREWED ENDS
(TYP)
FULL SIZED REDUCED
PRESSURE TYPE BACKFLOW
PREVENTION DEVICE
STRAINER: BRONZE BODY, STAINLESS SCREEN.
24
"
M
I
N
.
3" MIN.
6" MIN.
PRV SET AT
75PSI
SLEEVE AND CAULK
CITY WATER
METER
DETAIL SHOWS GENERAL SCHEMATIC REQUIREMENTS. PROVIDE BACKFLOW PREVENTER OF TYPE AND
MANUFACTURER APPROVED BY LOCAL AUTHORITIES. PROVIDE PRESSURE REDUCING VALVE ONLY IF
PRESSURE EXCEEDS 80 PSI - VERIFY. STRAINER AND REDUCING VALVE MAY BE INSTALLED IN VERTICAL
PIPE IF SPACE LIMITATIONS REQUIRE IT. CLEAN STRAINER BEFORE TURNING BUILDING OVER TO
OWNER. PROVIDE ANY REQUIRED CERTIFICATION OF TEST OF BACKFLOW PREVENTER TO LOCAL
AUTHORITIES.
FLOOR
TO FIXTURES
NOT TO SCALE
DOMESTIC WATER SERVICE ENTRY 14
MOP SINK
PC TO PROVIDE WATER HAMMER ARRESTERS BY SIOUX CHIEF, PRECISION PLUMBING PRODUCTS,
WATTS OR APPROVED EQUIVALENT WITH PISTON AND 0-RING CONSTRUCTION, HAVING PDI #WH-201,
ASSE #1010 OR ANSI #A112.26.1M CERTIFICATION. SIZE AND INSTALL PER PDI #WH-201 STANDARD OR
MANUFACTURER'S INSTRUCTION. THE TABLES ABOVE ARE BASED ON THE SIOUX CHIEF PRODUCT LINE.
IF PRESSURE IS IN EXCESS OF 65 PSIG THEN UPSIZE THE ARRESTER BY ONE (EXAMPLE: AN 'A'
ARRESTER WOULD BECOME A 'B' ARRESTER.)
UNIT LOAD
FIXTUREPDI
SIZE
SINGLE FIXTURE
KITCHEN SINKS
2.252.25
MULTIPLE FIXTURES
FIXTURE UNIT TABULATION
FIXTURE
3
HOT
-
3
COLD
10AA
A
B
C
D
1-3
4-11
12-32
33-60
61-113
ON HORIZONTAL BRANCH LINE LESS
THAN 20 FEET LONG, PLACE ONE WITHIN
SIX FEET OF THE LAST FIXTURE SERVED
ON BRANCH LINE GREATER THAN 20
FEET LONG, PLACE ANOTHER ARRESTER
IN THE MIDDLE, EACH IS SIZED FOR HALF
THE FIXTURE UNITS
LAVATORY
WATER CLOSET (VALVE)
HW OR
CW
ARRESTER
WITHIN SIX
FEET OF
FIXTURE
SERVED
HAND SINKS 1.51.5
WALL HYDRANT/HOSE BIB 22
1.51.5
NOT TO SCALE
WATER HAMMER ARRESTORS 6
ENTER BUILDING ABOVE GRADE WITH
SLEEVE. SEAL ENTRANCE INTO BUILDING
WEATHER-TIGHT
SIZE AS SHOWN ON PLAN - USE BLACK
STEEL PIPE
GAS METER - CFH
CAPACITY PER PLAN
SHUT-OFF
VALVE
GRADE OR
PAVEMENT
PRESSURE
REGULATOR (7"
W.C.)
EXTERIOR BUILDING WALL
BY GAS COMPANY (VERIFY)
FLOOR
BY PLUMBING CONTRACTOR
STRAINER
PRESSURE TEST COCK
PIPE INCREASER
VERIFY REQUIREMENTS FOR METERING AND PIPING WITH GAS COMPANY. GAS COMPANY SHALL
EXCAVATE, BACKFILL, AND REPAIR PAVING AND SOD FOR GAS SERVICE LINE INSTALLATION FROM MAIN
TO BUILDING. PLUMBING CONTRACTOR TO PAY ALL GAS COMPANY FEES FOR THIS INSTALLATION. USE
WELDED OR SCREWED PIPE AND FITTINGS PER SPECIFICATIONS. PAINT EXPOSED METAL GAS PIPE,
FITTINGS AND ITEMS TO MATCH BUILDING.
6" DEEP SEDIMENT TRAP
NOT TO SCALE
GAS SERVICE 2
SANITARY LINE (SEE
PLUMBING PLAN)
FINISH FLOOR
VENT LINE (SEE
PLUMBING PLAN)
3" CAPPED PVC PIPE
STUBBED 1'-0" AFF
NOT TO SCALE
HUB DRAIN 9
PIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD CONDITIONS. MAKE PIPE SAME
SIZE AS TANK FITTING. FOLLOW MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION PROCEDURE.
VERIFY PROPER OPERATION WHEN INSTALLED.
EXPANSION TANK INSTALLATION SHALL OCCUR ONLY WHEN THERE IS A BACKFLOW PREVENTION
DEVICE INSTALLED WITHIN THE BUILDING WATER SYSTEM.
WELDED STEEL
THEN OPEN VALVE
WATER PRESSURE,
PRESSURE TO MATCH
FILL TANK WITH AIR
AIR CHARGING VALVE
BUTYL DIAPHRAGM
POLYPROPYLENE LINING
EXPANSION TANK WITH
DISSIMILAR METALS
DIELECTRIC IF
TO WATER HEATER
COLD WATER SUPPLY
PIPE UNION:
NEXT TO PIPE TEE
PIPE HANGER
NOT TO SCALE
SMALL EXPANSION TANK 3
TO EXPANSION TANK IF
REQUIRED, SEE DETAIL
STRAP-ON AQUASTAT SET 5
DEGREES LOWER THAN
HEATER TEMPERATURE
H.W.
C.W.
STRAINER
RECIRCULATION PUMP
CHECK VALVE
WATER HEATER
PIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD CONDITIONS. REFER TO "LARGE
WATER HEATER" DETAIL FOR MORE INFORMATION.
19RECIRCULATION PUMP
NOT TO SCALE
GB-250 - 100 GPM - 277 GALLON CAPACITY:
DETAIL SHOWS GENERAL SCHEMATIC REQUIREMENTS. CONTRACTOR SHALL SUBMIT PROPOSED
GREASE INTERCEPTOR INSTALLATION PLANS AND SPECIFICATIONS TO LOCAL AUTHORITIES FOR THEIR
APPROVAL BEFORE ACQUISITION. SEE MANUFACTURER INSTALLATION MANUAL FOR ADDITIONAL
INSTRUCTIONS.
BED OF UNDISTURBED EARTH OR COMPACTED SAND BACKFILL: 4" - 6"
24" DIAMETER HEAVY DUTY MANHOLES
4"4"
INLET DIFFUSER
OUTLET DIFFUSER
WATER LINE
NOT TO SCALE
GREASE INTERCEPTOR 15
PIPE OVER FOUR INCH
CLEVIS HANGER FOR
PROVIDE UPPER ATTACHMENT AS REQUIRED FOR CASES NOT SHOWN HERE. DO NOT INSTALL HANGER
INSIDE INSULATION OR OTHERWISE PENETRATE VAPOR BARRIER. DO NOT HANG ONE PIPE FROM
ANOTHER EXCEPT IN CHASES. TRAPEZE HANGERS MAY BE USED FOR MULTIPLE PARALLEL PIPES.
HANGER SPACING FOR PIPE SIZE: COPPER: 4"=12'-0"; 3"=11'-0"; 212"=10'-0"; 2"=9'-0"; 112"=8'-0"; 114"=7'-0"; 1" &
3 4"=6'-0"; 12"=5'-0". CAST IRON: 10'-0" AND ONE NEAR ALL JOINTS. STEEL: 4"=14'-0"; 3"=12'-0"; 212"=11'-0";
2"=10'-0"; 112"=9'-0"; 1"=7'-0"; 3 4"=6'-0"; 12"=5'-0". LOCATE HANGERS AS CLOSE AS POSSIBLE TO TURNS AND
TEES OF PIPE. PROVIDE SUPPLEMENTARY STEEL STRUTS BETWEEN JOISTS IF REQUIRED. LOCATE
HANGERS TO TAKE LOAD OFF OF EQUIPMENT CONNECTIONS. ANCHOR WATER PIPE AGAINST SWAYING
DUE TO CHANGES IN WATER VELOCITY. PROVIDE SEISMIC BRACING IF/AS REQUIRED BY LOCAL
AUTHORITIES. CHAINS OR PERFORATED STRAP IRON OR STEEL IS NOT ACCEPTABLE. REFER TO
CODES FOR FURTHER INFORMATION.
PROVIDE GALVANIZED STEEL SADDLE FOR ALL INSULATED PIPE
LARGER THAN 3 4". VERIFY INSULATION THICKNESS WHEN SIZING
HANGERS.
ADJUSTABLE
BAND HANGER
FOR PIPING
FOUR INCH OR
LESS
TOP BEAM
C-CLAMP IF
STEEL BAR
JOIST
STEEL
DECK
ALL-THREAD ROD.
LENGTH AS REQ'D
FOR PIPE SLOPE
PROVIDE COPPER
OR NON-METALLIC
COATING WHERE
HANGERS CONTACT
BARE COPPER PIPE
DO NOT HANG PIPE
LARGER THAN 3" FROM
BOTTOM OF JOISTS.
NOT TO SCALE
PIPE HANGERS 5
BA
C
K
R
O
O
M
I
C
E
M
A
K
E
R
FI
L
T
E
R
BACKFLOW
PREVENTER
FC
W
-
2
FC
W
-
2
CO
F
F
E
E
TE
A
FI
L
T
E
R
FI
L
T
E
R
BOOSTER
PUMP
PRV
SCALE
STICK
3/4" CW
PR
E
S
S
U
R
E
G
A
U
G
E
P
S
B
FILTER LINES TO EQUIPMENT (BY OTHERS)
FILTER MANIFOLD MOUNTED ON WALL
E^&ϲϭ
TUBING
WATER LINE
PLAN OVERVIEW LAYOUT SEE DIAGRAM FOR COMPLETE DETAILS
MANIFOLDS ON DRINK RACK
3/4" COLD WATER LINE
F FF
AUTOMATIC
BY-PASS
MODULE
1/2" FCW-3
1/2" FCW-4
COMBI OVEN
(CLEANING CYCLE)
COMBI OVEN
(STEAM CYCLE)
RO SYSTEM
(MOUNTED AT MOP SINK)
1/
2
"
C
W
FC
W
-
1
FC
W
-
1
FC
W
-
1
FC
W
-
1
FR
O
N
T
R
O
O
M
I
C
E
M
A
K
E
R
(D
I
N
I
N
G
R
O
O
M
B
E
V
E
R
A
G
E
U
N
I
T
)
FC
W
-
3
FC
W
-
3
FC
W
-
3
FC
W
-
3
1/
2
"
F
C
W
1/2"
1/2"
ICE MACHINE MANIFOLD
BEVERAGE LINE MANIFOLD
EQUIPMENT
MANIFOLD
E^&ϲϭ
TUBING
E^&ϲϭ
TUBING
BE
V
E
R
A
G
E
L
I
N
E
(D
R
I
V
E
-
T
H
R
U
)
BE
V
E
R
A
G
E
L
I
N
E
(D
I
N
I
N
G
R
O
O
M
)
CA
R
B
O
N
A
T
O
R
(U
T
I
L
I
T
Y
A
R
E
A
)
FILTER LINES
TO EQUIPMENT
(BY OTHERS)
FILTER LINES TO
EQUIPMENT (BY
OTHERS)
SP
A
R
E
24
"
A
F
F
.
OI
L
FRYERS
CAP
24"
UNION
WALL PENETRATION
3/4" USED OIL RECOVERY LINE MOUNTED TO WALL WITH
STANDOFF ANCHORS, ALL THREAD, AND SPLIT RING HANGERS.
COORDINATE WITH ARCHITECTURAL AND VENDOR DRAWINGS
FOR INSTALLATION. USED COOKING OIL LINE CANNOT
PROTRUDE MORE THAN 3" FROM THE WALL.
PITCH DOWN 1/4"
PER FOOT TO
USED COOKING
OIL TANK
3"
MAX.OIL
PROVIDE STAINLESS
STEEL ESCUTCHEON
AT WALL
7USED OIL RECOVERY LINE
NOT TO SCALE
NOT TO SCALE
WATER FILTRATION SYSTEM 1
HOT WATER TO WAREWASH AS
SHOWN ON PLANS
REFER TO SPECIFICATIONS AND
SCHEDULE
SET WATER HEATER ON PLATFORM
(BY OTHERS).
PIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD CONDITIONS. REFER TO FLOOR
PLAN FOR PIPE SIZES. SET WATER HEATER THERMOSTAT AT 140° FAHRENHEIT. PROVIDE SEISMIC
STRAP OR BRACING AND FLEXIBLE CONNECTORS TO WATER AND GAS CONNECTIONS IF/AS REQUIRED
BY LOCAL AUTHORITIES.
SHUT-OFF VALVE PIPE UNIONS,
(DIELECTRIC REQUIRED FOR
DISSIMILAR METALS)
VALVE
DRAIN
PROVIDE A 210° F TEMPERATURE
AND 150 PSI PRESSURE RELIEF
VALVE WITH TEST LEVER SIZED WITH
AGA TEMPERATURE RATING 10%
OVER HEATING INPUT
HARD COPPER RELIEF DISCHARGE
LINE. FULL SIZE OF VALVE OUTLET TO
END OVER FLOOR SINK WITH 6 INCH
AIR GAP
140° FC HOT WATER SUPPLY TO
WATER HEATER
NOT TO SCALE
SMALL WATER HEATER ON PLATFORM 10
GAS
36
"
A
F
F
.
GA
S
1"
FRYERS
1-1/2"
1" NPT TO FRYER
1-1/2" GAS LINE. EXTEND THROUGH WALL TO AUTOMATIC
GAS SHUTOFF VALVE BELOW FINISHED CEILING
WALL
PENETRATIONS
3"
MAX.
QUICK DISCONNECT (TYP.)
1-1/2" GAS LINE MOUNTED TO WALL WITH STANDOFF ANCHORS,
ALL THREAD, AND SPLIT RING HANGERS. COORDINATE WITH
ARCHITECTURAL AND VENDOR DRAWINGS FOR INSTALLATION.
LINE TO EXTEND COMPLETELY THROUGH WALL AND UP TO VALVE
LOCATED BELOW CEILING. GAS LINE CANNOT PROTRUDE MORE
THAN 3" FROM THE WALL.
3" DEEP
SEDIMENT TRAP
11NATURAL GAS COOKING LINE
NOT TO SCALE
FR
O
N
T
R
O
O
M
I
C
E
M
A
K
E
R
(D
I
N
I
N
G
R
O
O
M
B
E
V
E
R
A
G
E
U
N
I
T
)
BE
V
E
R
A
G
E
L
I
N
E
(D
I
N
I
N
G
R
O
O
M
)
PLUMBING DETAILS
P4.0
AUTHOR
CHECKER
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
ANCHOR TANK LEGS TO FLOOR OR PLATFORM OR AS REQUIRED BY LOCAL CODE AUTHORITIES.
SET TANK AS CLOSE TO WALL AS POSSIBLE.
PROVIDE WOOD BLOCKS FOR SPACERS BETWEEN
WALL AND TANK IF REQUIRED. ATTACH TO WALL AS
REQUIRED (TYP FOR 2)
PROVIDE 1"x18" STEEL BAND DOWN 1/3 FROM THE
TOP, AND UP 1/3 FROM THE BOTTOM OF TANK. BEND
ENDS OF STRAP AND ANCHOR SECURELY TO WALL
AS REQUIRED. (TYP FOR 2)
WATER
HEATER
OR TANK
NOT TO SCALE
TANK SEISMIC RESTRAINT 3
SUPPLY PIPE
4" LONG
SEDIMENT TRAP
G
SHUT-OFF VALVE.PRESSURE REGULATOR AS
REQUIRED
UNION.
BLACK IRON. PAINT LINES
SAFETY YELLOW. ROUTE
LINES TO AVOID CONFLICTS ROOF
TO EQUIPMENT
NOT TO SCALE
ROOFTOP UNIT GAS CONNECTION 1
PIPE
SIZE
SPACING TRANSVERSE
BRACE
LONGITUDINAL
BRACE
BOLT
SIZE
ROD
SIZE
MAX
ROD
LENGTH
VERTICAL
BRACETR. LO.
1"-2" 20' 20' 2"X2"X18GA 2"X2"X18GA
14"3 8" 20" 2"X2"X18GA
212"-3" 40' 40' 2
12"X212"X16GA 2
12"X212"X16GA 3 8"12"25" 2"X2"X16GA
4"-5" 40' 40' 2
12"X212"X16GA 2
12"X212"X16GA 12"5 8" 31" 2"X2"X16GA
6" 40' 40' 2
12"X212"X12GA 2
12"X212"X12GA 12"3 4" 37" 2
12"X212"X16GA
8" 40' 40'212"X212"X12GA 2
12"X212"X12GA 5 8"7 8"43" 2
12"X212"X12GA
10" 20' 20' 2
12"X212"X12GA 2
12"X212"X12GA 3 4"7 8" 43" 2
12"X212"X12GA
DO NOT BRACE ANY PIPES WHERE TOP OF PIPE TO BOTTOM OF UPPER ATTACHMENT IS LESS THAN 12". BRACE GAS, OIL AND AIR PIPES 1" AND LARGER. BRACE ALL PIPES IN EQUIPMENT ROOMS 1-1/4" AND
LARGER. BRACE ALL OTHER PIPE 2-1/2" AND LARGER. BRACE HUBLESS CAST IRON PIPE ON EACH SIDE OF ANY CHANGE IN DIRECTION OF 90 DEGREES OR MORE. MAXIMUM HANGER ROD LENGTH IS 6 FEET.
WHERE LENGTH OF RUN EXCEEDS LONGITUDINAL BRACE SPACING, PROVIDE 2 FEET OFFSET IN PIPE AND LOCATE BRACE AT MID RUNS. REFER TO CURRENT EDITION OF SMACNA "SEISMIC RESTRAINT MANUAL" FOR
ALTERNATIVE ATTACHMENTS AND ADDITIONAL INFORMATION AND REQUIREMENTS. (THIS DETAIL APPLIES IN THE ABSENCE OF OTHER LOCAL CODE REQUIREMENTS.)
STANDARD STEEL PIPE CLAMP
TRANSVERSE BRACE
4" MAXIMUM TYPICAL ALL BRACES
2 MAX.
1 MIN.
1
LONGITUDINAL BRACE
1 MIN.
2 MAX.
WELD
1/8" 1"-24"
STEEL
BEAM
CONCRETE
1
WOOD BEAM
PROVIDE ROD SIZE TABULATED,
WITH VERTICAL BRACE IF ROD
LENGTH EXCEEDS TABULATION.
ANGLE IRON BRACE AND
BOLTS PER TABLE (TYP.)
STEEL JOIST
PIPE
HANGER
DRILLED IN THREADED INSERT.
DO NOT USE SHOT-IN INSERTS.
BOLT (WITH TWO
WASHERS)
BETWEEN JOIST
MEMBERS
BOLT (WITH TWO
WASHERS) NEAR
TOP OF BEAM
BOLT (WITH TWO
WASHERS) NEAR
TOP OF BEAM
UPC ZONE 3 OR
4; SMACNA
SHL-A
NOT TO SCALE
SEISMIC BRACING FOR PIPE 4
7'
-
1
1
"
12" NSF 61 TUBING
CARBONATOR
RACK
NOT TO SCALE
CARBONATOR RACK ROUGH-IN 7
3" MAX.
2'
-
0
"
3'
-
0
"
1'
-
0
"
WHEEL CHOCK (BY OTHERS)
GAS MANIFOLD
USED COOKING OIL LINE
RESTRAINING CABLE (BY OTHERS)
REFER TO HOOD DRAWINGS
9GAS FRYER INSTALLATION
NOT TO SCALE
2'
-
6
"
2'-6"
WB WATER BOX WITH CAPPED DRAIN OUTLET. MARK
SUPPLY OUTLETS WITH R.O. AND F.W. STICKERS.
12" PEX-A FW TUBING IN WALL
COMBI
OVEN
12" PEX-A RO TUBING WALL
NOT TO SCALE
COMBI OVEN WATER ROUGH-IN 6
7'
-
4
3
/
4
"
T.O.F.F.
CEILING
8'-10"
WH-2
5'
-
1
3
/
4
"
T2061
3 4"HW
3 4"HW
5WAREWASH W/ WATER HEATER
NOT TO SCALE
PLUMBING DETAILS
P4.1
AUTHOR
CHECKER
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
PLUMBING SPECIFICATIONS
20500 GENERAL PROVISIONS
A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL A
PLUMBING SYSTEM, COMPLETE AS INDICATED ON THE DRAWINGS, AS REQUIRED BY CODE AND AS
SPECIFIED HEREIN.
B. WITHOUT RESTRICTING THE GENERALITY OF THE FIRST STATEMENT, THE WORK TO BE
PERFORMED UNDER THIS DIVISION SHALL INCLUDE, BUT IS NOT LIMITED TO, THE FOLLOWING:
1. PLUMBING WORK AS DESCRIBED IN SECTIONS 220500 THROUGH 224000.
C. THE ELECTRICAL CONTRACTOR, UNLESS OTHERWISE NOTED, IS TO PROVIDE POWER WIRING FOR
EACH ITEM OF ELECTRICAL EQUIPMENT AND MAKE FINAL CONNECTIONS TO MOTORS.
D. ALL FINISH PAINTING IS TO BE PERFORMED BY THE GENERAL CONTRACTOR, EXCEPT AS NOTED
ELSEWHERE. THIS CONTRACTOR SHALL RESTORE TO ORIGINAL CONDITION ANY PAINTING
DEFACED BY THIS CONTRACTOR AFTER ORIGINAL PAINTING.
E. ALL WORK SHALL CONFORM TO CODES, RULES, AND REGULATIONS:
1. STATE PLUMBING CODE.
2. LOCAL BUILDING CODE.
3. NATIONAL FIRE PROTECTION ASSOCIATION.
4. CERTAIN CODES AND STANDARDS AS SET UP BY VARIOUS TECHNICAL SOCIETIES SUCH AS
ASME, ASHRAE, ASTM, SMACNA, ARI, AABC, OR IEEE.
5. FEDERAL OCCUPATIONAL SAFETY AND HEALTH STANDARDS.
6. LOCAL INSPECTOR'S REQUIREMENTS.
7. STATE INDUSTRIAL COMMISSION REQUIREMENTS.
8. BUILDING INSURING AGENCY REQUIREMENTS.
F. ALL PERMITS REQUIRED BY LAWS, ORDINANCES AND BUILDING CODES HAVING JURISDICTION
SHALL BE OBTAINED AT THE PROPER TIME BY AND AT THE EXPENSE OF THIS CONTRACTOR.
G. THIS CONTRACTOR SHALL OBTAIN ALL INSPECTIONS REQUIRED BY ALL LAWS, ORDINANCES AND
PUBLIC AUTHORITY HAVING JURISDICTION AND SHALL OBTAIN CERTIFICATES OF SUCH
INSPECTIONS AND SUBMIT SAME TO THE ARCHITECT AND SHALL PAY ALL FEES, CHARGES,
ASSESSMENTS AND OTHER EXPENSES IN CONNECTION THEREWITH.
H. PIPING AND EQUIPMENT LAYOUT IS SCHEMATIC. EXACT LOCATIONS ARE DETERMINED BY
STRUCTURAL AND OTHER CONDITIONS. DESIGN OF SYSTEM MAY NOT BE CHANGED. ONLY EXACT
LOCATION OF PIPING MAY BE REVISED TO SUIT CONSTRUCTION CONDITIONS AND AID IN
COORDINATION WITH WORK OF OTHER CONTRACTORS.
I. THE MATERIALS AND EQUIPMENT INSTALLED IN THE WORK SHALL MEET THE REQUIREMENTS OF
THE CONTRACT DOCUMENTS AND NO MATERIALS OR EQUIPMENT SHALL BE ORDERED UNTIL
REVIEWED BY THE ENGINEER AND/ OR ARCHITECT.
J. THIS CONTRACTOR SHALL SUBMIT SHOP DRAWINGS PER THE DOCUMENTS PROVIDED BY THE
OWNER/ARCHITECT/CONTRACTOR.
1. EXPANSION TANK
2. DRAINS AND CLEANOUTS
3. VALVES
4. ALL PLUMBING FIXTURES, FAUCETS AND FITTINGS
5. WATER HEATER
6. PIPE INSULATION
7. GREASE INTERCEPTOR
K. CATALOG DATA FOR EQUIPMENT REVIEWED BY THE ARCHITECT SHALL NOT SUPERSEDE THE
ENGINEER'S CONTRACT DOCUMENTS. THE REVIEW OF THE ENGINEER SHALL NOT RELIEVE THE
CONTRACTOR FROM RESPONSIBILITY FOR DEVIATIONS FROM DRAWINGS OR SPECIFICATIONS,
PROVIDING PROPER CLEARANCE FABRICATION PROCESS AND COORDINATION WITH OTHER
TRADES.
L. WHEN SUBMITTED FOR THE ARCHITECT'S REVIEW, SHOP DRAWINGS SHALL BEAR THE
CONTRACTOR'S CERTIFICATION THAT THEY HAVE REVIEWED, CHECKED AND APPROVED THE SHOP
DRAWINGS, THAT THEY ARE IN HARMONY WITH THE REQUIREMENTS OF THE PROJECT AND WITH
THE PROVISIONS OF THE CONTRACT DOCUMENTS AND THAT THEY HAVE VERIFIED ALL FIELD
MEASUREMENTS AND CONSTRUCTION CRITERIA, MATERIALS, CATALOG NUMBERS AND SIMILAR
DATA. CONTRACTOR SHALL ALSO CERTIFY THAT THE WORK REPRESENTED BY THE SHOP
DRAWINGS IS RECOMMENDED BY THE CONTRACTOR AND THE CONTRACTOR'S GUARANTEE WILL
FULLY APPLY.
M. ALL CONTRACTORS SUBMITTING PROPOSALS FOR THIS WORK SHALL FIRST EXAMINE THE SITE
AND ALL CONDITIONS THEREIN. ALL PROPOSALS SHALL TAKE INTO CONSIDERATION ALL SUCH
CONDITIONS AS MAY AFFECT THE WORK UNDER THIS CONTRACT. THE SUBMITTING OF A BID
AUTOMATICALLY IMPLIES THAT THIS EXAMINATION OF SITE HAS BEEN DONE.
N. CONTRACTOR SHALL VERIFY LOCATION OF UTILITIES AND NOTE CONDITIONS WHICH WOULD
AFFECT THE WORK. ALL DISCREPANCIES SHALL THEN BE REPORTED PRIOR TO THE BID AWARD.
O. PROVIDE INSTRUCTION TO OWNER'S OPERATING PERSONNEL AS NECESSARY, SHOWING
LOCATIONS AND PROPER OPERATION OF MAJOR ITEMS OF EQUIPMENT AND SYSTEM
COMPONENTS AND REFERRING TO THE OPERATING INSTRUCTION MANUAL DESCRIBED BELOW AS
A GUIDE.
P. COMPILE A WRITTEN MANUAL OF OPERATING INSTRUCTIONS INCLUDING COPIES OF SHOP
DRAWINGS AND A LISTING OF EQUIPMENT SUPPLIERS. ASSEMBLE IN 8-1/2" X 11" HARD BACKED
INDEXED BINDER. MATERIAL SHALL BE AS FOLLOWS:
1. TITLE PAGE: TITLE OF JOB, TENANT, ADDRESS, DATE OF SUBMISSION, CONTRACTOR AND
ENGINEER.
2. INDEX.
3. ST OF MAJOR EQUIPMENT USED IN PROJECT ACCOMPANIED BY CONTRACTOR PURCHASE
ORDER NUMBERS AND SUPPLIERS NAMES AND ADDRESSES.
4. ONE COPY OF EACH SHOP DRAWING GROUPED BY TYPES OF EQUIPMENT, I.E., PLUMBING
FIXTURES, VALVES, ETC.
5. SECTION FOR EACH SYSTEM INCLUDING:
5.1. BRIEF DESCRIPTION OF SYSTEM OPERATION WITH LOCATION OF MAJOR COMPONENTS.
5.2. LIST OF ITEMS IN SYSTEM REQUIRING PERIODIC SERVICE.
Q. SUBMIT A COMPLETED COPY TITLED "PLUMBING OPERATING INSTRUCTION MANUAL" ON THE
BINDING EDGE OF BINDER TO ARCHITECT FOR APPROVAL. AFTER ARCHITECT'S REVIEW AND ANY
CORRECTIONS REQUIRED ARE COMPLETED, SUBMIT A COPY OF THE MANUAL, TO THE OWNER.
220502 FIRESTOPPING
A. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR FIRESTOPPING AROUND ALL OPENINGS FOR
PIPES, DUCTS, CONDUITS ETC., INSTALLED BY CONTRACTOR AT ALL FIRE WALLS. FIRESTOPPING
SHALL BE PERFORMED BY AN INSTALLER WHO HAS BEEN TRAINED BY THE MANUFACTURER, OR
MANUFACTURER'S REPRESENTATIVE, IN THE INSTALLATION PROCEDURES BASED ON PUBLISHED
UL TESTED FIRE STOP SYSTEMS.
B. FIRESTOPPING SHALL MEET THE REQUIREMENTS OF ASTM E-814 OR UL 1479 FIRE TESTS BY A
RECOGNIZED TESTING AGENCY. FIRESTOPPING SHALL ALSO CONFORM TO THE FOLLOWING
GOVERNING CODES: INTERNATIONAL BUILDING CODE, NFPA 101- LIFE SAFETY CODE & NFPA 70 -
NATIONAL ELECTRIC CODE.
C. PENETRATION
1. CLEAN PENETRATION HOLES OF DIRT, LOOSE MATERIALS AND FOREIGN MATTER WHICH MAY
AFFECT BOND OR INSTALLATION.
2. REMOVE COATINGS SUCH AS PAINT, CURING COMPOUNDS, WATER REPELLENT & SEALERS
AS REQUIRED.
3. INSTALL BACKING MATERIALS TO PREVENT LIQUID MATERIAL LEAKAGE.
D. APPLICATION
1. PREPARE AND APPLY PENETRATION SEALING SYSTEMS IN ACCORDANCE WITH
MANUFACTURER'S PRINTED INSTRUCTIONS.
2. EMPLOY INSTALLATION TECHNIQUES WHICH WILL ENSURE THAT FIRESTOPPING IS
DEPOSITED TO FILL AND SEAL HOLES AND OPENINGS.
3. TOOL EXPOSED SURFACES OF APPLIED SEALANT TO SMOOTH FINISH.
4. PROTECT MATERIALS FROM DAMAGE ON SURFACES SUBJECTED TO TRAFFIC.
E. PROVIDE INTUMESCENT SEALANTS AND COLLARS AT OPENINGS INVOLVING PLASTIC OR
INSULATED PIPE SIMILAR TO THE METACAULK SERIES 880 AND 950.
F. FIRESTOPPING BY DOW CORNING, 3M, HILTI OR METACAULK MAY FURNISHED AT THE
CONTRACTOR'S OPTION.
220529 PIPE ANCHORS, HANGERS AND SUPPORTS
A. ALL PIPING SHALL BE SEPARATELY HUNG AND SUPPORTED FROM APPROVED STRUCTURAL
MEMBERS OR CONCRETE OVERHEAD STRUCTURE ONLY. NO PIPE SHALL BE HUNG FROM ROOF
DECK, PIPE, DUCTS OR OTHER COMPONENTS OR EQUIPMENT OF OTHER TRADES.
B. PROVIDE LISTED/APPROVED ADJUSTABLE HANGERS, INSERTS, BRACKETS, CLAMPS,
SUPPLEMENTARY STEEL AND OTHER DEVICES REQUIRED FOR PROPER SUPPORT OF ALL PIPE
LINES.
C. HANGERS SHALL BE DESIGNED TO ALLOW FOR EXPANSION AND CONTRACTION AND TO ALLOW
INSULATION (WHERE APPLICABLE) TO RUN CONTINUOUSLY THROUGH HANGERS.
D. WIRE OR STRAP HANGERS ARE NOT PERMITTED. ADJUST HANGERS SO AS TO DISTRIBUTE WEIGHT
LOAD EQUALLY ON ATTACHMENTS.
220548 PLUMBING SYSTEM TESTING
A. SYSTEM TESTING SHALL PROVIDE FOR THE FOLLOWING:
1. TEST NEW INTERIOR DOMESTIC WATER SYSTEM.
2. TEST ALL SOIL, WASTE, AND VENT PIPING.
3. FURNISH ALL PUMPS FOR AIR AND WATER PRESSURE TESTS ALONG WITH GAUGES AND ANY
OTHER REQUIRED TEST EQUIPMENT.
4. UNDERGROUND LINES TO BE TESTED BEFORE BEING CONCEALED. CONTRACTOR SHALL
REPAIR ANY LEAKS AND ALL DAMAGE RESULTING THEREFROM.
5. CHANGES IN AMBIENT TEMPERATURE WILL BE TAKEN INTO ACCOUNT WHEN TESTING
UNDERGROUND PIPING, HOWEVER, THE VARIOUS SYSTEMS SHALL BE THOROUGHLY
INSPECTED FOR LEAKS BEFORE HYDROSTATIC PRESSURE TESTS ARE CONCLUDED.
6. INTERIOR WATER PIPING: HYDROSTATIC TEST AT 125 PSI AWWA PROCEDURES AND TO THE
SATISFACTION OF LOCAL AUTHORITY HAVING JURISDICTION.
7. SOIL, WASTE, AND VENT PIPING SHALL BE WATER AND SMOKE OR AIR TIGHT (STATE
PLUMBING CODE).
B. MEASURE LEAKAGE BY METERING WATER REQUIRED TO MAINTAIN LINE PRESSURE. REMOVE AIR
BEFORE TESTING.
C. REPAIR ANY LEAKING JOINTS AND DEMONSTRATE ACCEPTABLE LEAKAGE TO SATISFACTION OF
OWNER'S REPRESENTATIVE AND APPROVING AUTHORITY. FLUSH ALL PIPING BEFORE PLACING
INTO OPERATION.
220550 STERILIZATION
A. STERILIZE NEW DOMESTIC WATER LINES AFTER INSTALLATION.
B. FURNISH A CERTIFICATE OF STERILIZATION AND APPROVAL FOR HUMAN CONSUMPTION TO BE
SIGNED BY A PROFESSIONAL ENGINEER REGISTERED IN THIS STATE, REGULARLY EMPLOYED BY
THE TESTING LABORATORY. CERTIFICATE MUST BE GIVEN TO THE ARCHITECT AND OWNER
BEFORE FINAL PAYMENT WILL BE MADE.
C. STERILIZATION SHALL BE BY MEANS OF CHLORINE INJECTED INTO THE WATER SYSTEM NEAR THE
SOURCE AND OUTLETS THROUGHOUT THE SYSTEM SHALL BE TESTED TO PROVE PRESENCE OF
MINIMUM REQUIREMENTS. LEAVE CHLORINE IN FOR 24 HOURS AND FLUSH OUT SYSTEM UPON
COMPLETION OF WORK. STERILIZATION PROCEDURE SHALL BE WITNESSED BY THE OWNER'S
REPRESENTATIVE.
D. STERILIZATION SHALL BE PERFORMED UNDER THE IMMEDIATE SUPERVISION OF A WATER TESTING
LABORATORY REGULARLY ENGAGED IN THE SERVICE AND SHALL BE DONE ACCORDING TO THEIR
INSTRUCTIONS.
220560 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
A. STENCILS, LABELS, TAGS, AND COLOR CODES SHALL CONFORM TO ANSI A13.
B. PRODUCTS SHALL BE SETON. EQUAL PRODUCTS BY BRADY MAY BE FURNISHED AT
CONTRACTOR'S OPTION.
C. STENCILS FOR EQUIPMENT SHALL BE REUSABLE AND HAVE 1" HIGH CHARACTERS. CHARACTERS
SHALL BE PAINTED WHITE OVER A BLACK BACKGROUND. STENCIL ONLY AFTER FINAL PAINTING IS
COMPLETE. CHARACTERS SHALL BE LEGIBLE FROM FLOOR. APPLY CLEAR ACRYLIC, LACQUER, OR
VARNISH OVER THE FINISHED STENCIL.
D. FOR PIPING PROVIDE ANSI STANDARD COLOR FLEXIBLE VINYL LABELS WITH PERMANENT
PRESSURE SENSITIVE ADHESIVE BACK. LABEL SHALL BE OF SUFFICIENT LENGTH TO ENCIRCLE
THE PIPE (AND INSULATION WHEN APPLICABLE) AND OVERLAP ON ITSELF. EACH LABEL SHALL
HAVE AT LEAST ONE FLOW DIRECTION ARROW AND SHALL BE PERMANENTLY LABELED WITH PIPE
CONTENT.
E. SYSTEM PIPING TO LABLED SHALL INCLUDE THE FOLLOWING:
1. DOMESTIC WATER (INCLUDING COLD, HOT, RECIRCULATING, FILTERED, AND REVERSE
OSMISIS)
2. SANITARY WASTE AND VENT (ABOVE GRADE ONLY)
3. NATURAL GAS
4. USED COOKING OIL
F. DOMESTIC WATER PIPING SHALL BE LABLED ON EXTEROR OF INSULATION IN ACCORDANCE WITH
ANSI A13.
G. PIPING, VALVES, DRAINS, CONTROL PANELS AND SIMILAR EQUIPMENT SHALL BE IDENTIFIED AS TO
FUNCTION AND SYSTEM NUMBER AS DIRECTED BY THE OWNER'S REPRESENTATIVE AND AS LISTED
BELOW:
IDENTIFICATION ITEM : TYPE
PIPING : STENCIL OR PIPE LABEL
VALVES : TAG
PIPING SPECIALTY : TAG
WATER HEATER AND OTHER EQUIPMENT : STENCIL
H. IDENTIFY PIPE LINES WITH STENCIL OR PIPE LABEL WITH COLOR CODED BANDS AT THE
FOLLOWING LOCATIONS:
1. AT EQUIPMENT CONNECTION AT EACH VALVE.
2. AT BOTH SIDES OF WALLS THROUGH WHICH PIPE PASSES.
3. AT EVERY 20 FT. INTERVAL ON CONTINUOUS PIPE LINES.
4. AT EACH BRANCH CONNECTION.
5. SHOW FLOW DIRECTION ARROWS AT EACH IDENTIFICATION POINT.
220700 INSULATION
A. PIPE INSULATION AND APPURTENANCES AND COVERINGS ON PIPES USED IN CHASES, SHAFTS OR
OTHER CONCEALED SPACES IN TYPES 1 AND 2 CONSTRUCTION SHALL HAVE A FLAME SPREAD
RATING NOT EXCEEDING TWENTY-FIVE (25) AND IN TYPE 3 AND 4 CONSTRUCTION NOT EXCEEDING
SEVENTY-FIVE (75) AND A SMOKE DEVELOPED RATING NOT EXCEEDING FIFTY (50).
B. INSULATION SHALL BE RIDGE ONE-PIECE FIBERGLASS PIPE INSULATION WITH REQUIREMENTS
COMPLYING WITH ASTM C 547, SELF-SEALING ADHESIVE LAP LONGITUDINAL JOINTS AND BUTT
STRIPS FOR TRANSVERSE JOINTS. JACKETING SHALL CONFORM TO ASTM C 1136, TYPE I,
MAXIMUM VAPOR TRANSMISSION RATING OF 0.02 PERM WHEN TESTED ACCORDING TO ASTM E 96,
PROCEDURE A. (K VALVE) 0.25 BTU/IN./HR. * FT2 * °F AT 75°F MEAN TEMPERATURE WITH A MINIMUM
R-VALVE OF R4.
PROVIDE INSULATION THICKNESS AS INDICATED:
DOMESTIC COLD WATER PIPING 1" AND SMALLER: 1/2" THICKNESS
DOMESTIC COLD WATER PIPING 1-1/4" - 1-1/2": 3/4" THICKNESS
DOMESTIC COLD WATER 2" AND LARGER: 1" THICKNESS
DOMESTIC HOT WATER PIPING 3/4" AND SMALLER: 1" THICKNESS
DOMESTIC HOT WATER PIPING 1" - 1-1/2: 1-1/2" THICKNESS
PLUMBING VENT PIPING WITHIN 6 FEET OF ROOF OUTLET: 1" THICKNESS
CONDENSATE PIPING: 1/2" THICKNESS
USED COOKING OIL : 1" THICKNESS
C. GLUE IN PLACE WITH SCHULLER U-GLUE.
D. THE FITTINGS SHALL BE INSULATED WITH SCHULLER ZESTON INSULATION AND HAVE FACTORY
PREMOLDED PVC COVERS. BUTT THE JOINTS TOGETHER AND WRAP WITH 3" WIDE STRIP TAPE,
SEAL IN PLACE WITH SCHULLER U-GLUE.
E. INSULATION SHALL NOT BE APPLIED UNTIL THE GENERAL CONSTRUCTION HAS PROGRESSED
SUFFICIENTLY TO INSURE AGAINST PHYSICAL OR MOISTURE DAMAGE TO THE INSULATION. ALL
INSULATION DAMAGED THROUGH FAILURE TO OBSERVE THIS DIRECTIVE SHALL BE REPLACED AT
PLUMBING CONTRACTOR'S EXPENSE.
F. INSTALL ALL INSULATION ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.
G. INSULATION SHALL NOT BE APPLIED OVER FLANGES, JOINTS AND SEAMS IN PIPING.
H. INSULATION SHALL BE SCHULLER. EQUAL PRODUCT BY ARMSTRONG, CERTAINTEED,
OWENS-CORNING OR KNAUF MAY BE FURNISHED AT THE CONTRACTOR'S OPTION.
221113 PLUMBING BASIC MATERIALS AND METHODS
A. PROVIDE AND ERECT THE FOLLOWING PIPING AS SHOWN ON THE DRAWINGS AND/OR AS
REQUIRED.
1. SANITARY BUILDING DRAIN AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON SOIL
PIPE.
2. SCHEDULE 40 PVC PIPING MAY BE USED FOR SANITARY WASTE AND VENT PIPING AT THE
CONTRACTOR'S OPTION IF CEILING SPACE IS NOT USED AS A RETURN AIR PLENUM SPACE.
3. DOMESTIC HOT AND COLD WATER USE TYPE "L" HARD COPPER PIPE.
4. CAST IRON - NON-COMBUSTIBLE PIPING REQUIRED IN WALL AT HOODS.
B. THIS CONTRACTOR IS TO BECOME INFORMED OF THE EXACT DIMENSIONS OF FINISHED WORK
WHERE PIPES ARE TO BE PLACED AND WILL ARRANGE THE WORK ACCORDINGLY, ASSUMING ALL
RESPONSIBILITY FOR PROPER LOCATION. IN THE ERECTION OF THE MAINS, SPECIAL CARE SHALL
BE USED PROVIDING SUPPORT AND PROPER ALLOWANCES SHALL BE MADE FOR EXPANSION.
C. ALL PIPE LINES MUST BE PROVIDED WITH A SUFFICIENT NUMBER OF FITTINGS OR UNIONS TO
MAKE POSSIBLE DISASSEMBLY WITHOUT BREAKAGE OF FITTINGS.
D. ALL EXPOSED PIPING SHALL BE NEAT AND CAREFULLY ALIGNED WITH THE STRUCTURAL
ELEMENTS OF THE BUILDING. NO OFFSETS OR OBLIQUE BENDS WILL BE PERMITTED. DRAWINGS
ARE DIAGRAMMATIC AND SHOULD NOT BE USED FOR LAYOUT WORK.
E. ALL LOW POINTS IN WATER PIPING TO HAVE DRAIN VALVES WITH STANDARD HOSE ATTACHMENTS.
HOT AND COLD WATER PIPING IS TO PITCH TOWARD THE NEAREST DRAIN VALVE.
F. ALL PIPES TO BE INSTALLED SHALL BE LOCATED AT SUFFICIENT DISTANCE FROM WALLS, OTHER
PIPES, CONDUIT, DUCTWORK AND OTHER OBSTACLES TO AVOID INTERFERENCE AND TO PERMIT
THE APPLICATION OF FULL THICKNESS OF INSULATION SPECIFIED.
G. MECHANICAL JOINT TYPE PIPING SHALL BE INSTALLED PER MANUFACTURER'S
RECOMMENDATIONS. THERMOMETERS BY TRERICE, ASHCROFT, MARSHALLTOWN, AND WEISS
ARE ACCEPTABLE.
221000 PLUMBING SYSTEMS
A. SANITARY BUILDING DRAIN, SOIL, WASTE AND VENT LINES SHALL BE SERVICE WEIGHT CAST IRON
HUBLESS PIPE WITH STAINLESS STEEL AT COUPLINGS. SCHEDULE 40 PVC MAY BE USED FOR
SANITARY WASTE AND VENT PIPING IF CEILING SPACE IS NOT USED AS A RETURN AIR PLENUM.
TYPE NO. S1110-4 MAY BE USED IN LIEU OF FIELD FABRICATED FLASHINGS.
B. VENT STACKS SHALL EXTEND THROUGH THE BUILDING, TERMINATING 12" ABOVE THE ROOF.
STANDARD FLASHING SHALL BE EXTENDED 12" IN ALL DIRECTIONS FROM THE VENT TERMINAL AND
TURNED DOWN INTO VENT. FLASHING UNITS AS MADE BY STONEMAN CAULK TYPE NO. S1110-4 MAY
BE USED IN LIEU OF FIELD FABRICATED FLASHINGS.
C. HORIZONTAL RUNS SHALL BE GIVEN AS STEEP A PITCH TOWARD THE OUTLET AS CONDITIONS WILL
PERMIT BUT NOT LESS THAN 1/8" PER FOOT.
D. FULL "Y" BRANCH FITTINGS AND EXTENSION WITH BRASS NIPPLES AND FINISHED SCREW PLUGS
FOR CLEANOUTS SHALL BE PLACED IN ACCESSIBLE POSITIONS AT ENDS OF HORIZONTAL LINES OF
PIPE AND AT FOOT OF ALL VERTICAL LINES OF PIPE OR ELSEWHERE, AS MAY BE REQUIRED BY THE
CODE.
E. WHERE CLEANOUTS OCCUR IN FINISHED AREAS, THEY SHALL BE RECESSED AND COVERS TO BE
FLUSH WITH THE FLOOR OR WALL.
F. HOT AND COLD WATER PIPING SHALL BE PROVIDED AS FOLLOWS:
1. TYPE "L" HARD COPPER TUBE WITH SOLDER FITTINGS. COPPER TUBING SHALL HAVE SWEAT
JOINTS AND BE CLEAN OF SCALE AND FOREIGN MATTER BEFORE INSTALLATION. ALL ENDS
OF TUBING TO BE SWEATED SHALL BE REAMED, CLEANED AND BURNISHED TO REMOVE DIRT
AND OXIDE. HARD 95-5 LEAD-FREE SOLDER SHALL BE USED AND APPLIED TO THE JOINTS
ACCORDING TO STANDARD PRACTICE AND/OR MANUFACTURER'S RECOMMENDATIONS.
COMPRESSION STOPS AND BRAIDED SUPPLIES SHALL BE USED AT CONNECTION TO
EQUIPMENT.
2. PEX-A TUBING WITH ASTM F1960 FITTINGS. PEX TUBING SHALL BE SUPPORTED WITH
ADDITIONAL PEX-A PIPE CHANNEL PER MANUFACTURER'S RECOMENDATIONS. PEX PIPING
SHALL BE TERMINATED AT FIXTURES WITH PREMANUFACTURERED COPPER STUBOUTS.
COMPRESSION STOPS, AND BRAIDED SUPPLIES SHALL BE USED AT CONNECTION TO
EQUIPMENT. PROVIDE RED TUBING FOR HOT WATER, BLUE TUBING FOR COLD WATER, AND
WHITE/TRANSLUCENT TUBING FOR ALL OTHER DOMESTIC WATER.
G. EACH HOT AND COLD WATER BRANCH SHALL BE PROVIDED WITH A BALL VALVE SHUT-OFF.
H. GREASE INTERCEPTOR - SHALL BE AS SPECIFIED ON DRAWINGS.
221118 GAS PIPING
A. ASTM A-53 SCHEDULE 40 STEEL PIPE PAINTED WITH YELLOW ANTI-CORROSIVE PAINT, SCREWED
OR WELDED IN ACCORDANCE WITH CODE REQUIREMENT (FITTINGS FOR LINES LARGER THAN 2"
SHALL BE WELDED STEEL. FITTINGS FOR LINES 2" AND SMALLER, EXCEPT WHEN LOCATED IN AIR
PLENUMS, SHALL BE SCREWED. STANDARD WEIGHT BLACK MALLEABLE). NO VALVES ARE TO BE
LOCATED IN AIR PLENUMS.
B. GAS COCK'S 1-1/2" AND SMALLER SHALL BE ALL BRONZE, SCREWED, FLAT HEAD, BRASS PLUG AND
WASHER 200 LB. NOG. PROVIDE LINE SIZE 6" LONG DIRT LEG DOWN STREAM OF GAS COCK AT ALL
EQUIPMENT CONNECTIONS.
C. PROVIDE AND INSTALL THE NATURAL GAS MANIFOLD FOR COOKING EQUIPMENT WHEN NATURAL
GAS IS USED FOR FRYERS.
D. ALL EQUIPMENT SHALL SHALL BE CONNECTED WITH RIGID PIPING AS SPECIFIED ABOVE, FLEXIBLE
CONNECTORS ARE NOT ACCEPTABLE.
E. PROVIDE UNION AT ALL EQUIPMENT CONNECTIONS.
F. PROVIDE GAS PIPE SUPPORTS IN ACCORDANCE WITH CODE REQUIREMENTS.
221120 DRAIN PIPING
A. FURNISH AND INSTALL A GRAVITY DRAIN PIPING SYSTEM FROM WATER HEATER, TERMINATING AT
THE MOP SINK.
B. PIPING IS TO BE SCHEDULE 40 PVC WITH DRAINAGE PATTERN FITTINGS, BONDED ACCORDING TO
THE MANUFACTURERS RECOMMENDATIONS.
C. PIPING IS TO BE SECURED TO PIPE HANGERS, USING PROPER SPACING AND THE APPROPRIATE
HEIGHT TO ALLOW THE PIPE TO PITCH PROPERLY.
221140 PLUMBING PIPING SPECIALTIES - USED COOKING OIL
A. ASTM A-53 SCHEDULE 40 STEEL PIPE THRESED AND SCREWED OR WELDED WITH STANDARD
WEIGHT BLACK MALLEABLE FITTINGS.
B. PROVIDE UNION AT ALL EQUIPMENT CONNECTIONS.
C. PROVIDE PIPE SUPPORTS AND STANDOFF HANGERS IN ACCORDANCE WITH CODE
REQUIREMENTS.
D. EXTERIOR UCO PIPING WITH INSULATION TO THE EXTERIOR TANK REQUIRES A STAINLESS STEEL
INSULATION JACKET WITH ALL JOINTS AND SEAMS SEALED WATER TIGHT USING WATERPROOF UV
RESISTANT CLEAR SEALANT (3M CLEAR HYBRID 730 UV OR EQUAL RATED TO 194 DEGREE F) WITH
THE ENDS COVERED TO PREVENT WATER INTRUSION AND SEAL. PROVIDE A PIPE ESCUTCHEON AT
THE WALL.
223300 WATER HEATER
ELECTRIC WATER HEATERS:
A. PROVIDE WATER HEATER, SIZE, LOCATION AND CAPACITY AND MANUFACTURER AS INDICATED ON
THE DRAWINGS.
B. TANK TYPE ELECTRIC WATER HEATER WITH GLASS-LINED TANK RATED AT 150 PSI WORKING
PRESSURE, MAGNESIUM ANODE PROTECTION, BRONZE DRAIN VALVE, HIGH TEMPERATURE
CUT-OFF SWITCH AND IMMERSION THERMOSTAT. TANK TO HAVE A MINIMUM R-VALUE OF 10.
C. FURNISH AND INSTALL A WATTS NO. 40L, 3/4" TEMPERATURE AND PRESSURE RELIEF VALVE AND
EXTEND DISCHARGE PIPE, FULL SIZE, TO WITHIN 6" ABOVE THE MOP SINK OR FLOOR DRAIN.
D. PROVIDE AMTROL EXPANSION TANK AS SIZED ON THE DRAWINGS. EQUAL PRODUCTS BY BELL AND
GOSSETT OR ADAMSON MAY BE PROVIDED AT THE CONTRACTOR'S OPTION.
FUEL FIRED WATER HEATERS
A. FURNISH AND INSTALL HIGH EFFICIENCY, 96% THERMAL EFFICIENCY OR BETTER, GAS FIRED,
STORAGE WATER HEATER, SIZE, LOCATION AND CAPACITY AS INDICATED ON THE DRAWINGS.
B. WATER HEATER SHALL BE RHEEM RUUD WITH INTELLIGENT CONTROL SYSTEM/LCD DISPLAY.
EQUAL HEATERS BY A.O. SMITH, OR LOCHINVAR MAY BE FURNISHED AT THE CONTRACTOR'S
OPTION.
C. TANK TYPE GAS FIRED WATER HEATER WITH GLASS-LINED TANK RATED AT 150 PSI WORKING
PRESSURE, POWERED ANODES PROTECTION, BRONZE DRAIN VALVE. TANK TO HAVE A MINIMUM
R-VALUE OF 10.
D. FACTORY-INSTALLED TEMPERATURE AND PRESSURE RELIEF VALVE. EXTEND DISCHARGE PIPE,
FULL SIZE, TO WITHIN 6" ABOVE THE MOP SINK OR FLOOR DRAIN.
E. PROVIDE WATTS, POTABLE WATER EXPANSION TANK AS SIZED ON THE DRAWINGS. EQUAL
PRODUCTS BY AMTROL BELL & GOSSETT MAY BE PROVIDED AT THE CONTRACTOR'S OPTION.
224000 PLUMBING FIXTURES AND EQUIPMENT
A. WATER CLOSETS AND LAVATORIES SHALL BE VITREOUS CHINA AND SHALL ALL BE BY THE SAM
MANUFACTURER.
B. ALL WALL HUNG LAVATORIES, FLUSH VALVES, ETC., SHALL BE PER DRAWINGS AND MOUNTED AT
THE MANUFACTURER'S RECOMMENDED ROUGHING IN MEASUREMENTS, UNLESS NOTED
OTHERWISE.
C. VALVES TO BE AS FOLLOWS:
125 LB. S.W.P. GATE, GLOBE AND CHECK VALVES:
2. GATE (2-1/2" AND SMALLER) - ALL BRONZE, SCREWED, TAPERED, SOLID WEDGE DISC,
SCREWED BONNET, RISING STEM.
3. BALL (2-1/2" AND SMALLER) - ALL BRONZE, TEFLON STEM SEALS AND SEAT, 1/4 TURN
SHUT-OFF, VINYL COVERED HANDLES.
4. GLOBE (2-1/2" AND SMALLER) - ALL BRONZE, SCREWED, TAPERED, SOLID WEDGE DISC,
SCREWED BONNET, RISING STEM.
5. CHECK (2-1/2" AND SMALLER) - ALL BRONZE, SCREWED, HORIZONTAL SWING CHECK WITH
BRONZE DISC.
C. VALVES SHALL BE MILWAUKEE. EQUAL PRODUCTS BY CRANE, HAMMOND, POWELL, WALWORTH,
NORTHERN INDIANA BRASS COMPANY OR STOCKHAM MAY BE FURNISHED AT THE CONTRACTOR'S
OPTION.
D. UNIONS TO BE AS FOLLOWS:
1. UNIONS FOR COPPER PIPE TO BE 150LB., ALL BRONZE, SOLDER END TYPE BY CHASE. EQUAL
PRODUCTS BY CRANE, MUELLER OR NORTHERN INDIANA BRASS COMPANY MAY BE
FURNISHED AT THE CONTRACTOR'S OPTION.
2. DIELECTRIC UNIONS BETWEEN FERROUS AND COPPER SHALL BE INSULATED TO PREVENT
METAL-TO-METAL CONTACT AND SHALL BE MANUFACTURED BY CAPITAL MANUFACTURING
COMPANY OF COLUMBUS, OHIO. EQUAL PRODUCTS BY PATROL OR PECO SALES COMPANY.
E. CLEANOUTS TO BE AS FOLLOWS:
1. FLOOR TYPE TO BE ADJUSTABLE CAST IRON WITH NICKEL BRONZE TOP. TOP TO BE FLUSH
WITH FLOOR. SEE DRAWINGS FOR MODEL AND MANUFACTURER.
2. WALL TYPE TO BE CAST IRON TEE WITH ROUND POLISHED STAINLESS STEEL ACCESS COVER
AND THREADED PLUG. SEE DRAWINGS FOR MODEL AND MANUFACTURER.
F. FLOOR DRAINS TO BE AS FOLLOWS:
1. CAST IRON BODY SHALLOW SUMP DRAIN WITH DOUBLE DRAINAGE FLANGE AND
WEEPHOLES, FLASHING CLAMP, BOTTOM OUTLET WITH NEOPRENE GASKET INSIDE
CONNECTOR, 6" DIAMETER ADJUSTABLE GRATE. FRAME AND GRATE TO HAVE POLISHED
NICKEL-BRONZE FINISH. SEE DRAWINGS FOR MODEL AND MANUFACTURER. EQUAL PRODUCT
MAY BE SUPPLIED AT THE CONTRACTOR'S OPTION.
PLUMBING
SPECIFICATIONS
P5.0
AUTHOR
CHECKER
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
1.PROVIDE WARRANTY TO INCLUDE LABOR AND MATERIALS TO REPAIR OR REPLACE DEFECTIVE
PARTS AND MATERIALS AS REQUIRED FOR ONE YEAR AFTER SUBSTANTIAL COMPLETION OR
OWNER ACCEPTANCE OF COMPLETED PROJECT, WHICHEVER IS LATER.
2. COMPLETED INSTALLATION SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND FEDERAL
CODES AND ORDINANCES, INCLUDING NFPA-90A, NFPA-96 AND NFPA-101.
3. DUCTWORK SHALL BE MANUFACTURED AND INSTALLED PER SMACNA 1" PRESSURE CLASS
GUIDELINES AND DETAILS. DUCTWORK SIZES SHOWN INDICATE INSIDE CLEAR DIMENSIONS.
CONCEALED DUCTWORK SHALL BE INSULATED WITH 2" THICK DUCT WRAP (R-8 MIN). INSULATE
CEILING MOUNTED DIFFUSER BACKS. VAPOR BARRIER SHALL BE MAINTAINED CONTINUOUS AND
SEAMS SHALL BE SEALED. DUCTWORK SHALL BE INSTALLED ABOVE SUSPENDED CEILING
WHERE PROVIDED. EXPOSED DUCTWORK SHALL BE G90 GALVANIZED STEEL. CLEAN OFF
MARKS, APPLIED STICKERS AND RESIDUAL OIL. VINEGAR WASH BEFORE PAINTING OF DUCT.
4. CONNECT DUCTS TO FANS AND OTHER AIR DISTRIBUTION EQUIPMENT USING MECHANICAL
FASTENERS WITH SEALS, MASTIC OR GASKETS.
5. SUPPLY AND RETURN AIR DUCT DROPS FROM HVAC EQUIPMENT SHALL BE ISOLATED FROM
UNIT VIBRATION WITH FLEXIBLE DUCT CONNECTORS.
6. INSULATED FLEXIBLE DUCT MAY BE USED IN MAXIMUM LENGTHS AS SPECIFIED FROM RIGID
METAL DUCT TO DIFFUSER CONNECTION. FLEXIBLE DUCT SHALL BE CLASS 1 FLEXIBLE AIR DUCT
WITH INSULATION AND VAPOR BARRIER, AND SHALL MEET UL 181.
7. WHERE PLENUM DIFFUSERS ARE CHOSEN WITH INTEGRAL BALANCING DAMPERS SPIN-IN
CONNECTIONS MAY EXCLUDE DAMPERS.
8. CONTRACTOR SHALL RECEIVE AND INSTALL ROOF MOUNTED CONDENSING UNITS. PROVIDE
MOUNTING RAILS. REFER TO STRUCTURAL PLANS FOR LOCATIONS OF ROOF MOUNTED
EQUIPMENT, CURB, AND RAIL DETAILS. EQUIPMENT SHALL BE MECHANICALLY FASTENED TO
RAILS. RAILS SHALL BE FASTENED TO STRUCTURE. STRUCTURE, CONNECTIONS, AND
SUPPORTS SHALL MEET STRUCTURAL WIND LOAD REQUIREMENTS. CONSULT STRUCTURAL
ENGINEER AS NEEDED TO DETERMINE REQUIREMENTS.
9. CURBS SHALL BE ONE PIECE WELDED AND INSULATED 18 GAUGE STEEL, WITH RIGID
INSULATION GLUED TO INSIDE OF CURB. REFER TO SHEET M2.0 FOR ADDITIONAL INFORMATION.
10. RETURN DUCTWORK FROM HVAC EQUIPMENT SHALL BE LINED WITH 1" DUCT LINER.
11. PROVIDE STENCIL LABELS ON HVAC EQUIPMENT AND EXHAUST FANS. LABELS SHALL HAVE 2”
HIGH LETTERS ON UNIT SIDE ACCESS PANEL. EXPOSED GAS PIPING AND FITTINGS SHALL BE
PAINTED WITH SAFETY YELLOW PAINT DESIGNED FOR BLACK IRON.
12. ENSURE GAS LINES AND CONDENSATE DRAIN LINES DO NOT IMPEDE HVAC EQUIPMENT
DOORS/PANELS. FOLLOW MANUFACTURER GUIDELINES FOR REQUIRED CLEARANCES.
13. REFER TO "H" AND "W" SHEETS FOR SPECIFIC HOOD AND FAN INFORMATION AND FIELD WIRING
DIAGRAMS. CONTRACTOR SHALL PROVIDE LOW VOLTAGE WIRING FROM FAN CONTROL PANEL
TO HVAC EQUIPMENT, REMOTE SENSORS AND SMOKE DETECTORS. CONTRACTOR SHALL
PROGRAM THERMOSTAT FOLLOWING WENDY'S STANDARDS. REFER TO PROGRAMMING
INSTRUCTIONS PROVIDED WITH MODULAR PANEL SYSTEM.
14. CONTRACTOR SHALL TEST, CHECK, AND BALANCE HVAC EQUIPMENT , EXHAUST HOODS, AND
EXHAUST FANS. SET EXHAUST FANS AND DIFFUSERS TO SPECIFIED AIR FLOW RATES.
CONTRACTOR SHALL COMPLETE WENDY’S REQUIRED TEST FORMS FOR HVAC EQUIPMENT,
HOODS, AND FAN CONTROL SYSTEM.
15. CONTRACTOR SHALL COMPLETE ROOFTOP UNIT START UP HVAC EQUIPMENT FORMS AND
RETURN TO MANUFACTURER TO SCHEDULE EQUIPMENT OPERATION CHECK (EOC). CONSULT
CONTACT OR ALLOW 5 BUSINESS DAYS TO SCHEDULE EOC. CONTRACTOR IS RESPONSIBLE FOR
CORRECTING DEFICIENCIES NOTED IN EOC PRIOR TO START OF TESTING AND BALANCING.
16. CONTRACTOR SHALL VERIFY THAT BUILDING IS WEATHER TIGHT, HVAC EQUIPMENT POWERED
AND CALIBRATED, THERMOSTATS PROGRAMMED, FANS OPERATIONAL, EOC COMPLETE,
DIFFUSERS AND CEILING TILE INSTALLED, EXHAUST FAN SPEEDS CALIBRATED, AND NEW
FILTERS INSTALLED IN HVAC EQUIPMENT PRIOR TO TESTING AND BALANCING. CONTRACTOR
SHALL CORRECT OPERATIONAL OR PERFORMANCE DEFICIENCIES FOUND DURING TESTING AND
BALANCING.
17. KITCHEN EQUIPMENT DISTRIBUTORS SHALL INSTALL REFRIGERANT PIPING FOR ROOF MOUNTED
CONDENSING UNITS TO FOOD SERVICE EQUIPMENT INCLUDING THERMOSTATIC EXPANSION
VALVES, SOLENOID VALVE, TEMPERATURE CONTROL WIRING, SIGHT GLASS, FILTER DRIERS,
PRESSURE CONTROLS, CRANKCASE HEATERS, LOW AMBIENT CONTROLS, AND WEATHERPROOF
HOUSINGS. TRAP AND SLOPE CONDENSATE LINES PER MANUFACTURER'S RECOMMENDATIONS.
PROVIDE HEAT TRACING ON CONDENSATE LINES INSIDE FREEZER. CONTRACTOR SHALL
PROVIDE PIPE CURB ASSEMBLY FOR ROOF PENETRATIONS. REFER TO ARCHITECTURAL ROOF
PLAN FOR ADDITIONAL INFORMATION AND DETAILS FOR PIPE CURB ASSEMBLY AND RAIL
INSTALLATION.
18. COMPLETE SMOKE CAPTURE TEST(S), AS REQUIRED, IN ACCORDANCE WITH INTERNATIONAL
MECHANICAL CODE IMC 507, ASHRAE 154 VENTILATION FOR COMMERCIAL COOKING
OPERATIONS, AND HOOD MANUFACTURER STANDARDS. KITCHEN EQUIPMENT SHALL BE AT
OPERATING TEMPERATURES WITH HVAC EQUIPMENT OPERATIONAL. TEST USING SMOKE
CANDLES OR SMOKE PUFFERS. SMOKE BOMBS SHALL NOT BE USED.
19. EQUIPMENT WITH SYMBOL TAGS ON PLANS, REFER TO ASSOCIATED EQUIPMENT SCHEDULES
FOR REQUIREMENTS. TAGGED EQUIPMENT IS RESPONSIBILITY OF CONTRACTOR TO PROVIDE
UNLESS OTHERWISE NOTED.
20. CONTRACTOR IS RESPONSIBLE FOR PROVIDING MANUAL BALANCE DAMPERS IN DUCT
BRANCHES IN ACCESSIBLE LOCATION ABOVE CEILING.
GENERAL NOTES
HVAC BIDDING AND EQUIPMENT NOTES
FOR QUOTATION ON THIS EQUIPMENT, REFER TO APPROVED VENDOR LIST ON SHEET G2.1:
EQUIPMENT PACKAGE:
RTU-1 AND RTU-2 WITH ACCESSORIES AND CURBS :
GENERAL CONTRACTOR TO CONTACT APPROVED VENDOR ON SHEET G2.1 FOR PRICING
INFORMATION. IF DESIGN CONDITIONS DIFFER FROM THOSE LISTED, CONTACT SUPPLIER
FOR APPROPRIATE EQUIPMENT.
HOODS, FANS AND FAN CURBS PACKAGE:
GENERAL CONTRACTOR TO CONTACT APPROVED VENDOR ON SHEET G2.1 FOR PRICING
INFORMATION. CURBS SHALL BE INSULATED AND TO COMPLY WITH NFPA 96
REQUIREMENTS FOR HEIGHT. CURBS PROVIDED FOR EF-1 AND EF-2 MUST BE HINGED.
AIR DISTRIBUTION PACKAGE:
PACKAGE TO INCLUDE SCHEDULED AIR DEVICES AND ACCESSORIES. EQUIPMENT AND
MATERIAL PACKAGES ARE IN STOCK AND SHOULD BE ORDERED IMMEDIATELY UPON
RECEIPT OF HVAC CONTRACT TO AVOID CONSTRUCTION DELAY. CONTACT HJC CONSOLIDATOR
FOR DIFFUSER PACKAGE.
#CODED NOTES:
1. INSTALL GREASE EXHAUST HOOD. SUPPORT HOOD PER MANUFACTURER'S INSTALLATION
INSTRUCTIONS. TRANSITION FROM HOOD COLLAR TO DUCT SIZE SHOWN. TWO METHODS
LISTED BELOW ARE ALLOWED FOR GREASE DUCTWORK ASSEMBLIES. PLEASE NOTE THAT
BOTH OPTIONS REQUIRE CLEANOUT ACCESS DOORS AT EVERY CHANGE IN DUCT DIRECTION
WITH 3 FOOT CLEARANCE IN FRONT OF ACCESS DOORS.
1.1.PREFERRED METHOD: FACTORY MANUFACTURED UL2221 LISTED INSULATED GREASE
EXHAUST DUCT SYSTEM WITH MANUFACTURER CLEANOUT ACCESS DOORS. REFER TO
SHEET M2.0 FOR ADDITIONAL INFORMATION. COORDINATE WITH GREASE DUCT
MANUFACTURER IF FIRE WRAP IS REQUIRED.
1.2. PROVIDE 16 GAGE CARBON STEEL GREASE EXHAUST DUCTWORK WELDED LIQUID TIGHT
UP TO EXHAUST FAN. WRAP GREASE DUCT WITH COMPOSITE GREASE DUCT ENCLOSURE
ASSEMBLY PER DETAIL 01/M2.0. GREASE DUCT ENCLOSURE SHALL HAVE AT LEAST AN F
OR T RATING OF ONE HOUR. INSTALL EXHAUST DUCT WRAP PER MANUFACTURER'S
INSTRUCTIONS. PROVIDE "FASTDOOR XL" GREASE DUCT CLEANOUT ACCESS DOORS
(C.O.D) MANUFACTURED BY THERMAL CERAMICS (OR EQUIVALENT) AT EVERY CHANGE OF
DIRECTION IN DUCT. PROVIDE MINIMUM 3 FEET CLEARANCE IN FRONT OF ACCESS DOORS.
INSULATE ACCESS DOORS TO MAINTAIN RATINGS OF GREASE DUCT ENCLOSURE PER
FIRE PROTECTION INSULATION MANUFACTURER'S INSTRUCTIONS.
2. PROVIDE COMBINATION AUDIO/VISUAL ALARM AND REMOTE TEST STATION (SYSTEM SENSOR
RTS2). MOUNT 54" ABOVE FINISHED FLOOR AND PROVIDE LABEL NAMEPLATE WITH 1/2 HEIGHT
LETTERING (BLACK ON WHITE) FOR WHICH UNIT IT MONITORS. INSTALLATION SHALL MEET
CRITERIA AS PRESCRIBED IN NFPA 90A AND NFPA 72.
3. PROVIDE ROOFTOP UNIT AND CURB COORDINATED WITH STRUCTURE. SHIM UNIT AND CURB
LEVEL FOR PROPER CONDENSATE DRAINAGE. PROVIDE FLEXIBLE CONNECTORS ON SUPPLY
AND RETURN AIR DUCT CONNECTIONS. TRANSITION TO DUCT SIZES SHOWN. SECURE
EQUIPMENT TO CURBS PER MANUFACTURER'S RECOMMENDATIONS AND AS DETAILED. REFER
TO SHEET M2.0 FOR ADDITIONAL INFORMATION.
4. INSTALL THERMOSTATS AND REMOTE SENSORS. THERMOSTATS AND REMOTE SENSORS ARE
FURNISHED WITH FAN LIGHTING CONTROL PANEL SYSTEM. CONTRACTOR IS RESPONSIBLE
FOR WIRING AND INSTALLING REMOTE SENSORS WHERE INDICATED ON DRAWINGS. MOUNT
SENSOR 60" ABOVE FINISHED FLOOR.
5. PROVIDE DUCT MOUNTED SMOKE DETECTOR AND SENSING TUBE, AND INTERLOCK TO SHUT
DOWN ROOFTOP UNIT ON DETECTION OF SMOKE.
6. PROVIDE CURB AND ROOF MOUNTED EXHAUST FAN. ENSURE THAT TOP OF EXHAUST FAN IS
MINIMUM 40” ABOVE ROOF SURFACE. REFER TO SHEET M2.0 FOR ADDITIONAL INFORMATION.
7. PROVIDE CURB AND ROOF MOUNTED EXHAUST FAN. REFER TO SHEET M2.0 FOR ADDITIONAL
INFORMATION.
8. UNDERCUT DOOR 1" FOR TRANSFER AIR.
SP
V2201
2MECHANICAL ROOF PLAN
1/4" = 1'-0"
UH-1
3.3kW
16"Ø
SD-3
100
SD-4
100
12
"
Ø
SD-1
500
12"Ø
4
SD-1
500
ROUTE DUCTS
BETWEEN
JOIST SPACE
ROUTE DUCTS
BETWEEN
JOIST SPACE
RTU-1
18
'
Ø
6"
Ø
10"Ø
SD-4
100
DINING
101
S
OFFSET DUCTWORK UP
TIGHT TO BOTTOM OF JOISTS
RG-1
-1000
SD-5
1600
SD-5
1600
12
"
Ø
18
"
Ø
24"Ø
RG-2
-150
RG-2
-150
10"X10"
8"Ø 8"Ø
22
"
X
2
2
"
16"Ø(TYPICAL OF 3)
4T4T
22
6"
Ø
6"
Ø
RG-1
-1000
RG-1
-1000
20"X20"
20"X20"
20"
26
"
16"Ø
SD-3
200
SD-3
400
SD-3
450
SD-3
500
H-1
11001
H-2
15001
SD-2
300
12"Ø
12"Ø
10"Ø
12"Ø
10"Ø
10"Ø
20"Ø
RT
RT
16
"
Ø
SD-2
300
SD-2
300
SD-2
300
SD-2
300
SD-2
300
SD-2
300
RG-1
-1000
10"Ø
10"Ø
SD-3
450
(TYPICAL OF 3)
42
"
18"24"
24
"
10"Ø12"Ø
SD-2
300
(TYPICAL OF 3)
5
14
"
Ø
4
RTU-2
S
22
10
"
Ø
16
"
Ø
10"Ø
10"Ø
10"Ø
12
"
Ø
88
5
KITCHEN
106
SERVICE
104
PAY WINDOW
113
DRIVE THRU
105
OFFICE
108
IVING
12
FAMILY
103
FAMILY
102 DINING
101
ENTRY
100
10
"
Ø
SD-3
100
4500 CFM4500 CFM
RTU-2 RTU-1
3000 CFM
300 CFM
EF-3
1500 CFM
EF-2
1100 CFM
EF-1
1500 CFM 1500 CFM
3000 CFM
AIR FLOW SCHEMATIC
AIR BALANCE SCHEDULE
MARK SUPPLY
AIR
RETURN
AIR
EXHAUST
AIR
OUTSIDE
AIR
RESULTING
PRESSURE
EF-1 1100 CFM -1100 CFM
EF-2 -1500 CFM
EF-3 300 CFM -300 CFM
RTU-1 4500 CFM +1500 CFM
RTU-2 4500 CFM 3000 CFM 1500 CFM +1500 CFM
AIR BALANCE REPORT REQUIRED. SEE SPECIFICATIONS.+100 CFM
1500 CFM
3000 CFM 1500 CFM
1MECHANICAL ROOF PLAN
1/4" = 1'-0"
RTU-2
4500 CFM3
RTU-1
4500 CFM
2'
-
0
"
3'
-
0
"
EF-2
1500 CFM
CLEARANCE TO
OUTSIDE AIR INTAKES
6
6
LOCATE UNIT HINGE ON
THIS SIDE OF CURB
EF-1
1100 CFM
10'-0"
CLEARANCE TO
OUTSIDE AIR INTAKES
10'-0"
3
EF-3
300 CFM7
12
/
2
2
/
2
0
1
7
4
:
1
1
:
4
2
P
M
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
HVAC PLAN
HALTON
M1.1
OM
DRC
03EXPOSED BRANCH DUCT INSTALLATION DETAIL
NOT TO SCALE
DIFFUSER STARTER COLLAR
90° 1.5R SPIRAL ELBOW
BEADED SLEEVE JOINT (TYPICAL)
SPIRAL BRANCH DUCT. SUPPORT WITH GALVANIZED STEEL STRAPS
ROUND BALANCING DAMPER
SPIRAL SUPPLY DUCT
BALANCING HANDLE. LOCK INTO
POSITION AND MARK PERMANENTLY
MOUNT DIFFUSER TIGHT
TO BOTTOM OF 90° ELBOW
1" DIAMETER CONDENSATE
DRAIN PIPE WITH SUPPORT AT
MAXIMUM 2 FOOT INTERVALS.
TERMINATE AT SCUPPER.
STRUCTURE BELOW SLOPES DOWN
AT 1/4" PER 1'-0"
5.5" THICK R-30
ROOF INSULATION
ROOF SHEATHING
SINGLE PLY ROOF
MEMBRANE
CURB MOUNTED RTU
LEVELING OF CURB
BY CONTRACTOR
EF-2 EF-13'-0"
3'
-
0
"
3'
-
0
"
PROVIDE 2" DEEP WATER
TRAP MINIMUM.
2X6 BLOCKING
DUCT DROP
INSULATION
STRIP
PROVIDE MANUFACTURER
REQUIRED CLEARANCE FROM RTU
TO FAN AND MINIMUM OF 2'-0"
BETWEEN EF-1 AND EF-2
APPROX. 53" ABOVE ROOF
SURFACE TO FAN DISCHARGE.
DISCHARGE SHALL BE
SLIGHTLY ABOVE ADJACENT
PARAPET. MAINTAIN 40 INCHES
ABOVE ROOF TO FAN
DISCHARGE MINIMUM AND AT
LEAST 18 INCHES CLEAR OF
COMBUSTIBLE MATERIAL.
INSTALLATION OF KITCHEN EXHAUST FANS
SHALL PROVIDE 18 INCHES CLEAR OF FAN
AND FAN BASE TO COMBUSTIBLE MATERIALS
INCLUDING ROOF MEMBRANE MATERIAL
ALONG BASE OF CURB. FAN DISCHARGE
ELEVATION SHALL BE MINIMUM 40 INCHES
ABOVE ADJACENT ROOF. DISCHARGE SHALL
BE 60 INCHES CLEAR OF ADJACENT PARAPET
IF FAN DISCHARGE IS BELOW PARAPET
HEIGHT. DISCHARGE SHALL BE TEN FEET
FROM ADJACENT BUILDING.
EQUIPMENT SHALL BE FASTENED AND CURBS
PERMANENTLY AFFIXED. FINAL INSTALLATION
SHALL BE SUITABLE FOR WIND LOADS AT
SITE. REQUIREMENTS SHALL BE REVIEWED
AND APPROVED BY LICENSED PROFESSIONAL
ENGINEER.
REFER TO STRUCTURAL FRAMING DETAILS
AND/OR STRUCTURAL REVIEW LETTER FOR
ROOF CURB STRUCTURAL FRAMING DETAILS.
08EXHAUST FAN AND RTU CURB DETAIL
NOT TO SCALE
6'
-
6
"
CO
PROVIDE CLEARANCE REDUCTION METHOD WITH A 6" MINIMUM
CLEARANCE IN SHAFT.6"
KITCHEN CEILING
18"
22 GAUGE METAL
COMBUSTIBLE MATERIAL
1" NON COMBUSTIBLE SPACER
1" MINERAL WOOL BATT
SCREW
WEATHER PROTECTED OPENING.
NO 90° BENDS IN GREASE DUCT ALLOWED UNLESS RADIUS
ELBOWS WITH ACCESS PANELS ARE PROVIDED WITH
CONSTRUCTION MANAGER APPROVAL.
CONTRACTOR TO PROVIDE AIR
BALANCING IN DUCTWORK FOR
KITCHEN EXHAUST FANS.
CURB AS SUPPLIED
BY FAN MANUFACTURER
LISTED ACCESS
OPENING ROOF
KITCHEN HOOD DUCTWORK SHALL BE 16 GAUGE CARBON
STEEL OR 18 GAUGE STAINLESS STEEL. DUCTWORK SHALL BE
CONTINUOUSLY EXTERNALLY WELDED LIQUID TIGHT.
PORTIONS OF WELDED DUCTWORK SHALL BE SLOPED BACK
TO HOOD FOR DRAINAGE WITH NO TRAPS. CONTRACTOR
SHALL COORDINATE AT SITE WITH OTHER TRADES TO
ENSURE THIS CAN BE DONE.
OPERATION OF KITCHEN HOOD SHALL BE INTERLOCKED WITH
ASSOCIATED EXHAUST FAN, MOTORIZED DAMPERS,
ASSOCIATED UNITS BRINGING IN MAKE UP-AIR AND REMOTE
APPLIANCE WHERE FLUE IS DISCHARGING INTO HOOD. UPON
ACTIVATION OF FIRE SUPPRESSION SYSTEM, MAKE-UP AIR
SYSTEM AND APPLIANCES SHALL SHUT DOWN AND KITCHEN
EXHAUST SYSTEM SHALL CONTINUE TO OPERATE.
GAS PIPING SHALL FOLLOW APPLICABLE GAS CODES AND
INSTALLED BY LICENSED CONTRACTOR FAMILIAR WITH
THESE CODES.
PROVIDE AUTOMATICALLY ELECTRICALLY OPERATED GAS
VALVE SERVING GAS FIRED COOKING EQUIPMENT BEING
SERVED BY AUTOMATIC FIRE EXTINGUISHING SYSTEM.
PROVIDE INTERLOCK SO THAT COOKING EQUIPMENT SHALL
SHUT-DOWN ON ACTIVATION OF FIRE SUPPRESSION SYSTEM.
VALVE SHALL BE LABELED, WITH INSTRUCTIONS AND
LOCATED OUTSIDE OF PROTECTED AREA. ADDITIONAL
MANUAL SHUT-OFF VALVE SHALL BE ACCESSIBLE AND
LOCATED IMMEDIATELY UPSTREAM OF AUTOMATIC VALVE.PROVIDE MAIN GAS VALVE TO
SHUT DOWN COOK LINE.
LOCATE VALVE NEAR COOK
LINE SO EMPLOYEE CAN
MANUALLY SHUT DOWN
WITHOUT HAVING TO USE
LADDER, ETC.
EMERGENCY PULL
STATION SHALL BE
ACCESSIBLY
LOCATED 42" TO 48"
OFF FLOOR AT
POINT OF EXIT
DURING FIRE. SEE
POWER PLAN FOR
LOCATION.
CLEARANCE AND CLEARANCE REDUCTION METHODS
NFPA 96 1-3.2 CLEARANCE NOTE:
HOODS, GREASE EXTRACTORS, DUCTS, ECOLOGY UNITS,
FANS SHALL HAVE MINIMUM CLEARANCE:
18" TO COMBUSTIBLES
3" TO LIMITED COMBUSTIBLES, 6" IN SHAFT
0" TO NON COMBUSTIBLES, 6" IN SHAFT
WHERE SPACE DOES NOT ALLOW FOR NOTED CLEARANCES
AS IT PERTAINS TO TYPE OF CONSTRUCTION, CLEARANCE
REDUCTION METHOD MAY BE APPLIED.
OPTION 1 : AS ILLUSTRATED BELOW
OPTION 2 : USE LISTED 3M FIRE DUCT WRAP 615+
MANUFACTURER PREFABRICATED UL APPROVED
INSULATED GREASE EXHAUST DUCT IS PERMITTED
IF PROVIDED BY HOOD SUPPLIER AS PART OF
COMPLETE HOOD AND FAN PACKAGED SYSTEM.
COMPLETE ERECTION DOCUMENTS DETAILING
REQUIRED INSTALLATION PROCEDURES SHALL BE
PROVIDED FOR CODE OFFICIAL AND INSTALLING
CONTRACTOR. DUCT SHALL CONFORM TO NFPA 96
REQUIREMENTS AND UL LISTING.
PROVIDE ACCESSIBLE CLEANOUTS
AT EVERY 90 DEGREE CHANGE IN
DIRECTION AND AT TOP OF
VERTICAL RISER UNDER ROOF.CO
01MECHANICAL EXHAUST DUCT DETAIL
NOT TO SCALE
D
(2) D
D
D
04RADIUS ELBOW
NOT TO SCALE
8"
M
I
N
.
3 PIECE PVC DURO-LAST CHILLER STACK KIT
DURO-LAST CAULK
DURO-LAST PREFABRICATED VENT STACK FLASHING
REFRIGERATION LINESROOF DECK
COUNTERFLASHING DRIP SHIELD AND EXPOSED
DUCTWORK SHALL BE 18 GA. GALVANIZED SHEETMETAL
SOLDERED AIR-TIGHT CONSTRUCTION
STAINLESS STEEL BAND POSITIONED 1/4"
FROM TOP OF STACK FLASHING
INSULATION
MEMBRANE
NOT TO SCALE
GOOSENECK WEATHERHOOD ROOF PENETRATION DETAIL 09
CB
FE
L
L
WHEN SHOWNTAPS TO TRUNK ONLY
ECCENTRIC
TRANSITION
CONCENTRIC
TRANSITION
RECTANGULAR TO ROUND
RECTANGULAR TO ROUND RECTANGULAR TO RECTANGULAR
ROUND TO ROUND
45°
ROUND DUCT BRANCH DUCT
MAIN DUCT
AIR FLOW
AIR FLOW
RECTANGULAR DUCT
AIR FLOW
45
RECTANGULAR DUCT
CONICAL FITTING. SEAL
AIRTIGHT WITH MASTIC
Ø-MAX.45° DIVERGING,
60° CONVERGING
Ø-MAX.
Ø
Ø
°
NOTE: USE PLAN AS GUIDE
TO FITTING TYPE.
A
D
02DUCT FITTING DETAILS
NOT TO SCALE
1-1/2"
NOTE:
FOR DUCT SUPPORT
AND SEISMIC
REQUIREMENTS, REFER
TO SMACNA GUIDELINES
AND LOCAL CODE
REQUIREMENTS.
STRAP
1/4" BOLT
STRAP
05ROUND DUCT HANGER DETAIL
NOT TO SCALE
METAL BAND SUPPORT
NYLON DRAW BAND (TYP)
SUPPLY AIR
DIFFUSER WITH
ROUND NECK
PROVIDE 1" BLANKET
INSULATION COVERING
AIR DEVICE BACK
FLEX DUCT
WITH 2"
EXTERNAL
INSULATION
MAX. LENGTH
6'-0"
T-BAR TYPE/GYP
SUSPENDED CEILING
RIGID ROUND
INSULATED DUCT JOINT
SCREWED AND SEALED
INSULATED SHEETMETAL
SUPPLY DUCT. SEAL PER
SPECIFICATIONS
TIE OFF TO ROOF
STRUCTURE
06CEILING DIFFUSER DETAIL
NOT TO SCALE
NOTES:
1. DETAIL IS FOR CONDENSATE DRAIN CONNECTIONS LOCATED ON FAN INLET SIDE ONLY.
2. SLOPE CONDENSATE DRAIN AS MUCH AS POSSIBLE TOWARD DISCHARGE POINT BUT NO
LESS THAN 1/4" PER FOOT. PROVIDE CLEANOUTS AT TURNS AND WHERE INDICATED. USE
SCHEDULE 40 PVC PIPE AND FITTINGS WITH PRIMED AND SOLVENT WELDED JOINTS. USE
DWV FITTINGS FOR SIZES 1-1/4" DIAMETER AND LARGER PIPE. SUPPORT PIPING AT FOUR
FOOT INTERVALS MAXIMUM.
3. PIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST AS REQUIRED TO SUIT SITE
CONDITION. REFER TO LOCAL CODE REQUIREMENTS FOR INDIRECT DRAIN REQUIREMENTS.
4. PROVIDE 6" HIGH PIPE VENT OPEN TO ATMOSPHERE IF REQUIRED BY LOCAL CODES.
TYPICAL ROOFTOP AIR
CONDITIONING UNIT
CONDENSATE CONNECTION. TRAP SIZE SHALL BE
EQUAL TO OR LARGER THAN CONNECTION SIZE BUT
NO LESS THAN 3/4"
PROVIDE MIRO INDUSTRIES MODEL 3-RAH ADJUSTABLE PIPE SUPPORTS AND PADS, OR
EQUIVALENT. PROVIDE SUPPORTS TO PREVENT PIPE SAGGING AND ALLOW FOR SLOPE.
UNION CONNECTION2"
1"
ROUTE TO NEAREST SCUPPER
CLEANOUT TEE WITH PLUG (TYP.)
DIMENSION SHALL BE EQUAL TO OR
GREATER THAN FAN INLET PRESSURE IN
INCHES PLUS ONE INCH THEN DIVIDED BY
TWO (MINIMUM DIMENSION IS ONE INCH).
DIMENSION SHALL BE EQUAL TO OR
GREATER THAN FAN INLET PRESSURE IN
INCHES PLUS ONE INCH (MINIMUM
DIMENSION ALLOWED IS TWO INCHES).
ROOF
10ROOFTOP UNIT CONDENSATE
NOT TO SCALE
22 GAUGE GALVANIZED SHEET
METAL PLENUM WITH
EXTERNALLY APPLIED 2" THICK
EXTERNAL DUCT WRAP
PERFORATED SD-2 DIFFUSER
07DUMP BOX DETAIL
NOT TO SCALE
CEILING
INSULATED FLEXIBLE DUCT
WITH BAND FASTENER
ROUND SPIN-IN
DUCT COLLAR
10"
22"
16"FASTEN TO DIFFUSER IN
EIGHT PLACES WITH
SHEETMETAL SCREWS
(TWO ON EACH CORNER
SIDE OF PLENUM BOX)
2"
NOTES:
1. DOVETAIL COLLARS ARE NOT ALLOWED.
2. SEAL COLLAR WITH SEAL CLASS 'A' DUCT SEALANT.
3. DO NOT CRUSH OR MODIFY DUMP BOX SIZE TO FIT OTHER
MECHANICAL EQUIPMENT IN CEILING CAVITY.
SUPPORT TO STUCTURE
WITH SHEETMETAL STRAPS
DROP FROM
HVAC EQUIPMENT
RECTANGULAR
TRUNK DUCT ROUND TRUNK DUCT
MANUAL DAMPER
(TYPICAL)
45° ENTRY
FITTING (TYPICAL)
FLEXIBLE DUCT
CONNECTOR
NOT TO SCALE
ROOFTOP EQUIPMENT DUCT DROP DETAIL 11
EXHAUST FAN
ROOF STRUCTURE
ROOF INSULATION
ROOFING SEAL ALL MINIMUM 14"
HIGH FACTORY
FABRICATED
INSULATED ROOF
CURB COMPATIBLE
WITH ROOF.
FLASH AND
COUNTERFLASH
ROOF CURB
BACKDRAFT
DAMPER
BIRD SCREENSECURE EXHAUST FAN
TO ROOF CURB
(MINIMUM 2 FASTENERS
PER SIDE)
INTERNALLY LINED EXHAUST
DUCT DROP. REFER TO
PLANS FOR DUCT SIZES.
JOINTS
FRAME ROOF OPENING
NOT TO SCALE
EXHAUST FAN DETAIL 12
12
/
2
2
/
2
0
1
7
4
:
1
1
:
5
2
P
M
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
HVAC DETAILS
M2.0
OM
DRC
AIR DEVICE SCHEDULE
DI
F
F
U
S
E
R
M
A
R
K
NE
C
K
S
I
Z
E
FA
C
E
S
I
Z
E
TYPE ACCESSORY MOUNT PATTERN DUTY
AMER.
LOUVER
MODEL
NO.
TITUS
MODEL
NO.
NOTES
DI
F
F
U
S
E
R
RE
G
I
S
T
E
R
GR
I
L
L
E
OB
D
ST
R
LA
Y
-
I
N
SU
R
F
A
C
E
SU
P
P
L
Y
RE
T
U
R
N
EX
H
A
U
S
T
RG-1 24"x24" X X X PERFORATED X
RG-2 8" 12"x12" X X X X PERFORATED X -PAR-AA 1,2 DRYWALL CEILING MOUNT EXHAUST
SD-3 24"x24" X X 4 WAY
SD-4 6" 12"x12" X X X 4 WAY X -PAS-AA 1,2 DRYWALL CEILING MOUNTED SUPPLY
PAR-AA -
-
PRICE
MODEL
NO.
APDDR
APDN
APDDR
SD-1 10" 22"TMR-AA 3,4 DINING SUPPLYROUND CONE XX -ARCD
SD-5 20"x20" 22"x22" X X LOUVERED -300RL 4520X
AIR DEVICE SCHEDULE NOTES
ACCESSORY NOTE: OBD-OPPOSED BLADE DAMPER, STR-SQUARE TO ROUND TRANSITION
1. WHITE
2. ROUND NECK
3. DUCT MOUNTED
4. CLEAR ANODIZED
5. SUPPLY DIFFUSERS AT HOOD LOCATION USE SHOP OR FIELD FABRICATED DUMP BOXES, WHICH CONSIST OF PERFORATED DIFFUSER WITH NO PATTERN CONTROLLERS, AND
SQUARE PLENUM BOX THAT CAN ACCEPT ROUND DUCT CONNECTION. 4 WAY DIFFUSERS ARE PROHIBITED AROUND THE HOODS.
6. REFER TO DUMP BOX DETAIL ON DRAWING M2.0.
SD-2 24"x24" X X PERFORATED X
1,5,6 CEILING MOUNTED HOOD
SUPPLY DUMP BOX-PAR-AA APDDR22"x22"
1
SD-2a 24"x24" X X PERFORATED X
1,5 CEILING MOUNTED HOOD SUPPLY
DUMP BOX (CAPTIVEAIRE MODEL DI-PSP)-22"x22"
SD-2b 24"x24" X X PERFORATED X
1,5 CEILING MOUNTED HOOD SUPPLY
DUMP BOX (HALTON MODEL KCD)-22"x22"--
--
X PAS-AA APDNPER PLAN
PER PLAN
FAN SCHEDULE
MA
R
K
AI
R
F
L
O
W
(
C
F
M
)
ST
A
T
I
C
P
R
E
S
S
U
R
E
(I
N
.
W
C
.
)
MO
T
O
R
H
O
R
S
E
P
O
W
E
R
(
H
P
)
EL
E
C
T
R
I
C
A
L
(V
O
L
T
A
G
E
/
P
H
A
S
E
)
ACCESSORIES
MO
D
E
L
RE
M
A
R
K
S
BA
C
K
D
R
A
F
T
D
A
M
P
E
R
BI
R
D
S
C
R
E
E
N
DI
S
C
O
N
N
E
C
T
S
W
I
T
C
H
SP
E
E
D
C
O
N
T
R
.
DI
R
E
C
T
D
R
I
V
E
EF-1 1100 1.25 3/4 208/1 X X DU85H 1,2,3
EF-2 1500 1.25 208/1 X X DU85H 1,2,3
EF-3 300 0.375 115/1 X X X X X DR10H 1,4
1. FANS, CURBS, AND NFPA FAN HINGES AS APPLICABLE WILL BE SUPPLIED
AS PART OF THE EXHAUST HOOD PACKAGE.
2. PROVIDE UL APPROVED GREASE RATING.
3. EXHAUST FAN IS CONNECTED TO THE HOOD ON SWITCH. FAN SHALL
OPERATE AT ALL TIMES WHILE RESTAURANT IS OPEN.
4. FAN TO OPERATE FROM SMART BREAKER IN FCLC SYSTEM.
SYMBOLS & ABBREVIATIONS LEGEND
COMMERCIAL KITCHEN NOTES
HVAC, FIRE PROTECTION AND PLUMBING
NEW EQUIPMENT, PIPING, ETC. SHALL BE INSPECTED AND LOCATED BEFORE AND AFTER NEW CONSTRUCTION. DETAILS OF
PERFORMANCE/CONDITION/SIZING AND LOCATION SHALL BE SUPPLIED TO ENGINEER AND OWNER. AIR CAPACITIES FOR SUPPLY AND
EXHAUST SYSTEMS SHALL BE MEASURED AT GRILLES TO DETERMINE IF DESIGN AIR FLOW RATES NOTED ON PLANS CAN BE MET.
EXTRA WORK REQUIRED TO ABOVE MENTIONED SHALL BE DETERMINED PRIOR TO NEW CONSTRUCTION. CONTRACTOR TO ALLOW
FOR INSPECTION IN THEIR PRICE INCLUDING WELD INSPECTIONS, AIR FLOW RATE MEASUREMENT, SCANNING AND CAMERA SCOPE
TO EXISTING BURIED DRAINS. NO EXTRAS SHALL BE ALLOWED ONCE NEW CONSTRUCTION STARTS.
CONTRACTOR SHALL OBTAIN LATEST SPREAD SHEETS/SHOP DRAWINGS FROM KITCHEN CONSULTANT FOR APPLIANCE AND HVAC
REQUIREMENTS PRIOR TO ROUGH-IN WORK.
CONTRACTOR SHALL PROVIDE WIRING AND CONTROLS AS NOTED ON WIRING NOTES IN EQUIPMENT SCHEDULE.
CONTRACTOR SHALL:
1. CONSTRUCT ENTIRE KITCHEN HOOD EXHAUST SYSTEM TO NFPA 96 STANDARDS.
2. REFER TO ARCHITECTURAL AND/OR INTERIOR DESIGN DRAWINGS FOR HOOD LOCATION AND APPROVED KITCHEN HOOD SHOP
DRAWINGS FOR EXACT LOCATION OF EXHAUST DUCT CONNECTIONS.
3. REFER TO LATEST KITCHEN EQUIPMENT DRAWINGS AND APPROVED SHOP DRAWINGS FOR FINAL GAS, PLUMBING AND DRAINAGE
HOOK UP SIZES AND LOCATIONS. CONTRACTOR TO REFER TO MANUFACTURERS INSTALLATION MANUALS AND
RECOMMENDATIONS AND PROVIDE NECESSARY EQUIPMENT, VALVES, PIPING, ETC. TO SUIT. EXACT LOCATION OF EQUIPMENT
ROUGH-INS SHALL BE DETERMINED AT SITE. CHANGES TO KITCHEN EQUIPMENT LINE UP MUST BE REPORTED TO ENGINEER,
FOOD SERVICES VENDOR, AND ARCHITECT PRIOR TO INSTALLATION.
4. USE ONLY APPROVED HALTON/CAPTIVEAIRE FAN AND HOOD PACKAGE.
5. ROOF MOUNTED FANS SHALL BE ACCESSIBLE ON SIDES ACCESSIBLE WITHOUT LADDER. REFER TO DETAILS.
ANSUL NOTES
THIS INSTALLATION SHALL BE PROVIDED IN ACCORDANCE WITH R-102 INSTALLATION MANUAL AND IN ACCORDANCE WITH STATE AND
LOCAL CODES. WIRE ROPE FOR DETECTOR AND REMOTE PULL STATION SHALL BE INSTALLED BY AN AUTHORIZED, FACTORY
TRAINED DISTRIBUTOR OR SERVICE REPRESENTATIVE. THIS INSTALLATION SHALL BE INSPECTED, PUT INTO OPERATION AND
CERTIFIED BY AN AUTHORIZED, FACTORY TRAINED DISTRIBUTOR OR SERVICE REPRESENTATIVE. ELECTRICAL CONTACTS AND
WIRING FOR APPLIANCE SHUT OFF SHALL BE PROVIDED BY ELECTRICAL CONTRACTOR. ANSUL R-102 RESTAURANT FIRE
SUPPRESSION SYSTEMS HAVE BEEN TESTED AND ARE LISTED BY UNDERWRITERS' LABORATORIES INC. AS PRE-ENGINEERED
SYSTEMS; SHALL COMPLY WITH RELEVANT ANSUL INSTALLATION RECHARGE INSPECTION AND MAINTENANCE MANUALS; SHALL
COMPLY WITH NFPA 96 WHEN INSTALLED AND CERTIFIED BY AUTHORIZED TRAINED ANSUL DISTRIBUTORS. AGENT DISTRIBUTION
PIPING AND DETECTION CONDUIT HOOD PENETRATIONS SHALL BE PROPERLY SEALED IN ACCORDANCE WITH NFPA 96.
1/6
X
X
3/4
RT
S
T
DUCT SMOKE DETECTOR
REMOTE TEST STATION
TEMPERATURE/HUMIDITY SENSOR
THERMOSTAT
RETURN DUCT
EXHAUST DUCT
SUPPLY DUCT
MANUAL BALANCE DAMPER
SUPPLY DIFFUSER
RETURN GRILLE
EXHAUST GRILLE
ABOVE FINISHED FLOORAFF
AHJ AUTHORITY HAVING JURISDICTION
CFM CUBIC FEET PER MINUTE
EA EXHAUST AIR
ESP EXTERNAL STATIC PRESSURE
HZ FREQUENCY
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NC NOISE CRITERIA
OA OUTSIDE AIR
FTU FAN TERMINAL UNIT
SA SUPPLY AIR
TYP TYPICAL
WC WATER COLUMN
MOCP MAXIMUM OVERCURRENT PROTECTION
DUMP BOX DIFFUSER
OAU OUTDOOR AIR UNIT
SIDE WALL MOUNTED SUPPLY REGISTER
FCLC FAN CONTROL LIGHTING CONTROL
UNIT HEATER SCHEDULE
MA
R
K
EL
E
C
T
R
I
C
I
N
P
U
T
(K
W
)
FA
N
M
O
T
O
R
HO
R
S
E
P
O
W
E
R
(
H
P
)
EL
E
C
T
R
I
C
A
L
(V
O
L
T
A
G
E
/
P
H
A
S
E
)
ACC.
MO
D
E
L
RE
M
A
R
K
S
DI
S
C
O
N
N
E
C
T
S
W
I
T
C
H
UH-1 3.3 1/125208/1 X TRANE - UHEC-032 1,2,3
1. UNIT HEATER TO BE MOUNTED OVERHEAD AT ENTRY. VERTICAL AIR
DELIVERY MOUNT AT 9' AFF.
2. PAINT TO MATCH DINING ROOM DUCTWORK.
3. PROVIDE WITH UNIT-MOUNTED THERMOSTAT.
MO
C
P
(
A
)
20
1
HVAC SYSTEM DESIGN:
OUTSIDE AIR TEMPERATURE: 88°F SUMMER, -4°F WINTER
UNITS ARE TO BE COMPLETE WITH THE FOLLOWING:
1. FACTORY CURBS FOR CONTRACTOR TO INSTALL. CURB HEIGHTS SHALL PROVIDE FOR LOCAL SNOW ACCUMULATION.
CURBS SHALL BE 14 INCHES HIGH MINIMUM. CONTRACTOR TO CONFIRM CURB HEIGHTS AND STRENGTH WITH
STRUCTURAL ENGINEER TO CONFORM TO LOCAL SNOW ACCUMULATION, SEISMIC AND WIND LOADS, INCLUDING
FASTENER CONSTRUCTION AND INSTALLATION METHODS.
2. FACTORY MOUNTED AND WIRED NON-FUSED DISCONNECT.
3. WEATHER HOOD WITH BIRD SCREEN AT UNIT OUTDOOR AIR INLET.
4. SET MINIMUM OUTDOOR AIR AS SPECIFIED ABOVE. OUTDOOR AIR DAMPER SHALL FULLY CLOSE ON UNIT SHUTDOWN.
5. SINGLE ZONE VARIABLE AIR VOLUME CONTROL WITH OUTDOOR AIR CFM COMPENSATION.
6. FACTORY MOUNTED AND WIRED DRAIN PAN CONDENSATE OVERFLOW SWITCH.
7. OUTDOOR AIR ECONOMIZER WITH SINGLE ENTHALPY CONTROL AND ECONOMIZER FAULT DETECTION AND
DIAGNOSTICS. PROVIDE UNIT WITH BAROMETRIC RELIEF. PROVIDE POWER RELIEF WHERE LOCAL AHJ REQUIRES.
8. FACTORY INSTALLED NON POWERED CONVENIENCE OUTLET.
9. STAINLESS STEEL HEAT EXCHANGERS AND FULLY MODULATING GAS BURNERS.
10. LOUVERED CONDENSER COIL HAIL GUARD.
11. FACTORY INSTALLED HOT GAS REHEAT COIL FOR DEHUMIDIFICATION CONTROL.
12. REFER TO DRAWINGS G2.1 FOR MANUFACTURER CONTACT INFORMATION.
13. PROVIDE MERV13 FILTERS.
ROOFTOP UNIT SCHEDULE
OACFM NOTES
1500 ALL AS
APPLICABLE
TRANE
GAS HEAT
MOCPTOTAL
COOLING
HEATING
OUTPUT
HEATING
INPUT
VOLTTONSS/A FAN
HP CFM ESP
MODEL NO.UNITMANUFACTURER
RTU-1&2 YZD150F3 4500 0.75 208/3/60 200 MBH250 MBH 80151 MBH2.7512.5
12
/
2
2
/
2
0
1
7
4
:
1
2
:
0
6
P
M
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
TRANE
MECHANICAL SCHEDULES
M3.0
OM
DRC
MECHANICAL SPECIFICATIONS
230500 COMMON WORK RESULTS FOR HVAC
A. PROVIDE MATERIALS AND EQUIPMENT AND LABOR REQUIRED TO INSTALL HEATING, VENTILATING
AND AIR CONDITIONING SYSTEM, COMPLETE AS INDICATED ON DRAWINGS, AS REQUIRED BY CODE
AND AS SPECIFIED HEREIN.
B. WITHOUT RESTRICTING THE GENERALITY OF THE FIRST STATEMENT, THE WORK TO BE
PERFORMED UNDER THIS DIVISION SHALL INCLUDE, BUT IS NOT LIMITED TO, THE FOLLOWING:
1. HVAC WORK AS DESCRIBED IN SECTIONS 230500 THROUGH 233813.
C. ELECTRICAL CONTRACTOR, UNLESS OTHERWISE NOTED, SHALL PROVIDE POWER WIRING FOR
EACH ITEM OF ELECTRICAL EQUIPMENT AND MAKE FINAL CONNECTION TO MOTORS.
D. FINISH PAINTING SHALL BE PERFORMED BY GENERAL CONTRACTOR, EXCEPT AS NOTED
ELSEWHERE. CONTRACTOR SHALL RESTORE TO ORIGINAL CONDITION PAINTING DEFACED BY
CONTRACTOR AFTER ORIGINAL PAINTING.
E. ALL WORK SHALL CONFORM TO CODES, RULES, AND REGULATIONS:
1. NATIONAL ELECTRICAL CODE.
2. STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATING SYSTEMS, NFPA
90A.
3. CODE FOR SAFETY TO LIFE FROM FIRE IN BUILDINGS AND STRUCTURES, NFPA 101.
4. FEDERAL OCCUPATIONAL SAFETY AND HEALTH STANDARDS.
5. STATE MECHANICAL CODE.
6. STATE BUILDING CODE
7. STATE INDUSTRIAL COMMISSION REQUIREMENTS.
8. LOCAL BUILDING CODE REQUIREMENTS.
9. BUILDING INSURING AGENCY REQUIREMENTS.
F. PERMITS REQUIRED BY LAWS, ORDINANCES AND BUILDING CODES HAVING JURISDICTION SHALL
BE OBTAINED AT THE PROPER TIME BY AND AT EXPENSE OF CONTRACTOR.
G. CONTRACTOR SHALL OBTAIN INSPECTIONS REQUIRED BY LAWS, ORDINANCES AND PUBLIC
AUTHORITY HAVING JURISDICTION AND SHALL OBTAIN CERTIFICATES OF SUCH INSPECTIONS AND
SUBMIT SAME TO ARCHITECT AND SHALL PAY FEES, CHARGES, ASSESSMENTS AND OTHER
EXPENSES IN CONNECTION THEREWITH.
H. PIPING AND EQUIPMENT LAYOUT ARE SCHEMATIC. EXACT LOCATIONS ARE DETERMINED BY
STRUCTURAL AND OTHER CONDITIONS. DESIGN OF SYSTEM MAY NOT BE CHANGED. ONLY EXACT
LOCATION OF PIPING AND DUCTS MAY BE REVISED TO SUIT CONSTRUCTION CONDITIONS AND AID
IN COORDINATION WITH WORK OF OTHER CONTRACTORS.
I. MATERIALS AND EQUIPMENT INSTALLED AS PART OF THE WORK SHALL MEET REQUIREMENTS OF
THE CONTRACT DOCUMENTS AND NO MATERIALS OR EQUIPMENT SHALL BE ORDERED UNTIL
REVIEWED BY OWNER. ARCHITECT OF RECORD IS RESPONSIBLE FOR REVIEWING AND APPROVING
HVAC SUBMITTALS. HVAC UNITS SHALL NOT BE CONSIDERED AS ORDERED AND IN PROGRESS
UNTIL SUBMITTALS ARE FORMALLY APPROVED AND RETURNED TO HVAC SUPPLIER.
J. CATALOG DATA FOR EQUIPMENT REVIEWED BY OWNER SHALL NOT SUPERSEDE CONTRACT
DOCUMENTS. REVIEW OF PRODUCTS SHALL NOT RELIEVE CONTRACTOR FROM RESPONSIBILITY
FOR DEVIATIONS FROM DRAWINGS OR SPECIFICATIONS, PROVIDING PROPER CLEARANCE,
FABRICATION PROCESS AND COORDINATION WITH OTHER TRADES.
K. WHEN SUBMITTED FOR REVIEW, SHOP DRAWINGS SHALL BEAR CONTRACTOR'S CERTIFICATION
THAT CONTRACTOR HAS REVIEWED, CHECKED AND APPROVED SHOP DRAWINGS, THAT THEY ARE
IN HARMONY WITH REQUIREMENTS OF THE PROJECT AND WITH THE PROVISIONS OF CONTRACT
DOCUMENTS AND THAT CONTRACTOR HAS VERIFIED ALL FIELD MEASUREMENTS AND
CONSTRUCTION CRITERIA, MATERIALS, CATALOG NUMBERS AND SIMILAR DATA. CONTRACTOR
SHALL ALSO CERTIFY THAT WORK REPRESENTED BY THE SHOP DRAWINGS IS RECOMMENDED BY
CONTRACTOR AND THE CONTRACTOR'S GUARANTEE WILL FULLY APPLY.
L. CONTRACTOR SHALL VERIFY LOCATION OF UTILITIES AND NOTE CONDITIONS WHICH WOULD
AFFECT THE WORK. DISCREPANCIES SHALL BE REPORTED PRIOR TO BID AWARD.
M. PROVIDE INSTRUCTION TO OWNER'S OPERATING PERSONNEL AS NECESSARY, SHOWING
LOCATIONS AND PROPER OPERATION OF MAJOR ITEMS OF EQUIPMENT AND SYSTEM
COMPONENTS AND REFERRING TO OPERATING INSTRUCTION MANUAL DESCRIBED BELOW AS A
GUIDE.
N. COMPILE WRITTEN MANUAL OF OPERATING INSTRUCTIONS INCLUDING COPIES OF SHOP
DRAWINGS AND LISTING OF EQUIPMENT SUPPLIERS. ASSEMBLE IN 8-1/2" X 11" HARD BACKED
INDEXED BINDER. MATERIAL SHALL BE AS FOLLOWS:
1. TITLE PAGE: TITLE OF JOB, OWNER, ADDRESS, DATE OF SUBMISSION, CONTRACTOR AND
ENGINEER.
2. INDEX.
3. LIST OF MAJOR EQUIPMENT USED IN PROJECT ACCOMPANIED BY CONTRACTOR PURCHASE
ORDER NUMBERS AND SUPPLIERS NAMES AND ADDRESSES.
4. ONE COPY OF EACH SHOP DRAWING GROUPED BY TYPES OF EQUIPMENT, I.E., ROOFTOP UNITS,
FANS, ETC.
5. SECTION FOR EACH SYSTEM INCLUDING:
a. BRIEF DESCRIPTION OF SYSTEM OPERATION WITH LOCATION OF MAJOR COMPONENTS.
b. HVAC SYSTEM MAINTENANCE AND CALIBRATION INFORMATION, INCLUDING WIRING
DIAGRAMS AND SCHEMATICS.
O. SUBMIT A COMPLETED COPY TITLED "HVAC OPERATING INSTRUCTION MANUAL" ON BINDING EDGE
OF BINDER TO ARCHITECT FOR APPROVAL. AFTER ARCHITECT'S REVIEW AND ANY CORRECTIONS
REQUIRED ARE COMPLETED, SUBMIT A COPY OF THE MANUAL TO OWNER.
P. WITHIN 90 DAYS AFTER DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF ACTUAL
INSTALLATION SHALL BE PROVIDED TO BUILDING OWNER. RECORD DRAWINGS SHALL INCLUDE AT
A MINIMUM LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL
CONFIGURATION OF DUCT DISTRIBUTION SYSTEM INCLUDING SIZES, AND AIR DESIGN FLOW
RATES.
Q. CONTRACTOR IS TO BECOME INFORMED OF EXACT DIMENSIONS OF FINISHED WORK WHERE
PIPES, DUCTS AND EQUIPMENT ARE TO BE PLACED AND WILL ARRANGE THE WORK ACCORDINGLY,
ASSUMING ALL RESPONSIBILITY FOR PROPER LOCATION AND COORDINATION OF THE WORK.
R. IN ERECTION OF DUCTWORK, SPECIAL CARE SHALL BE USED PROVIDING SUPPORT.
S. DUCTWORK SHALL BE PLACED SO AS TO AVOID INTERFERENCES WITH PLUMBING PIPES, ELECTRIC
CONDUITS OR PIPES OF OTHER CONTRACTORS.
T. DUCTWORK SHALL BE PROVIDED WITH SUFFICIENT DISTANCE FROM WALLS, PIPES, AND OTHER
OBSTACLES TO PERMIT APPLICATION OF FULL THICKNESS OF INSULATION SPECIFIED.
230593 TESTING, ADJUSTING, & BALANCING HVAC
A. CONTRACTOR SHALL COMPLETE INSTALLATION OF HOOD SYSTEM, ROOFTOP EQUIPMENT, AND
CONTROL SYSTEM IN ACCORDANCE WITH DRAWINGS PRIOR TO PERFORMING TAB. CONTRACTOR
SHALL PROGRAM THERMOSTATS IN ACCORDANCE WITH REQUIREMENTS LISTED AND FOLLOWING
STATUS AS INDICATED IN TAB CONFIRMATION FORM. CONTRACTOR SHALL UTILIZE PERSONNEL
AND SUBCONTRACTORS THAT ARE FULLY TRAINED AND CERTIFIED BY MANUFACTURER FOR
EQUIPMENT BEING INSTALLED.
B. CONTRACTOR SHALL COMPLETE CALIBRATIONS AND TESTS OUTLINED IN WENDY'S TEST
PROTOCOLS AND DOCUMENT RESULTS ON DESIGNATED FORMS. COPIES OF FORMS ARE
AVAILABLE ONLINE:
HTTP://WWW.IGNITORLABS.COM/WRVT-DOC-HOME/
C. CONTRACTORS WORKING ON PROJECT ARE REQUIRED TO HAVE COMPLETED WENDY'S
RESTAURANT VENTILATION COURSE FROM IGNITOR LABS WITHIN PAST 12 MONTHS:
HTTPS://PORTAL.IGNITORLABS.COM
A COMPLETION CERTIFICATE FROM IGNITOR LABS WITH A SCORE OF 80% OR HIGHER IS REQUIRED.
CONTRACTOR IS RESPONSIBLE FOR THE NOMINAL COSTS REQUIRED FOR PROJECT PERSONNEL TO
TAKE THE COURSE.
D. PROCEDURES/CHECKLISTS:
CHECKLIST PROCEDURE TROUBLESHOOTING
BREAKER PANELS
WESCO RQC-2017-013 RQC-2017-014 RQC-2017-015
CPI RQC-2017-043 RQC-2017-044 RQC-2017-045
ROOFTOP UNITS
AAON RQC-2020-075 RQC-2020-076 RQC-2020-077
TRANE RQC-2020-025 RQC-2020-026 RQC-2020-027
YORK/CAPTIVE-AIR RQC-2020-105 RQC-2020-106 RQC-2020-107
HOOD SYSTEM
HALTON (CAPTUREJET) RQC-2020-052 RQC-2020-053
HALTON (STANDARD FILTER HOOD) RQC-2020-054 RQC-2020-055
CAPTIVE-AIRE RQC-2020-062 RQC-2020-063
E. QUALIFICATIONS:
1. BALANCER SHALL BE A MEMBER IN GOOD STANDING AND CERTIFIED WITH THE ASSOCIATED AIR
BALANCE COUNCIL (AABC), OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB).
BALANCER SHALL BE TOTALLY INDEPENDENT, HAVING NO AFFILIATION WITH ANY PROJECT
CONTRACTOR, DESIGN PROFESSIONAL, EQUIPMENT MANUFACTURER OR SUPPLIER OF HVAC
RELATED EQUIPMENT. BALANCER SHALL HAVE BEEN REGULARLY ENGAGED IN TAB OF HEATING,
VENTILATING, AND AIR CONDITIONING SYSTEMS FOR RESTAURANTS. BALANCER SHALL
PROVIDE PROOF THAT PERSONNEL PERFORMING WORK HAVE SUCCESSFULLY COMPLETED AT
LEAST FIVE RESTAURANT PROJECTS OF SIMILAR SIZE AND SCOPE. A COMPLETE LIST OF
REFERENCE PROJECTS, INCLUDING NAME AND PHONE NUMBER OF CONFIRMING CONTACTS,
SHALL BE SUBMITTED WITH QUOTE, IF REQUESTED.
2. INSTRUMENTS USED FOR TAB SHALL BE ACCURATELY CALIBRATED WITHIN TWELVE (12)
MONTHS OF BALANCING AND MAINTAINED IN GOOD WORKING ORDER. PROVIDE RECORDS OF
LAST CALIBRATION (AS REQUESTED) AND INCLUDE THIS SUMMARY IN THE FINAL TAB REPORT.
ENGINEER OF RECORD, OR THEIR REPRESENTATIVE, MAY OBSERVE TAB ACTIVITIES.
3. UNLESS OTHERWISE NOTED RESTAURATEUR SHALL PROCURE SERVICES OF AND CONTRACT
DIRECTLY WITH AN INDEPENDENT TAB CONTRACTOR (BALANCER) MEETING QUALIFICATIONS OF
THIS SECTION. BALANCER SHALL TEST, BALANCE, AND ADJUST ALL AIR MOVING EQUIPMENT
(RTUS AND FANS), AIR DISTRIBUTION DUCTS AND AIR DEVICES, EXHAUST SYSTEMS, AND
TEMPERATURE CONTROL SYSTEMS.
4. IF CONTRACTOR IS REQUIRED TO PROCURE TAB SERVICES DIRECTLY, CONTRACTOR SHALL
PROVIDE QUALIFICATIONS OF BALANCER TO RESTAURATEUR OR THEIR REPRESENTATIVE FOR
APPROVAL. CONTRACTOR SHALL CONTRACT BALANCER AS SOON AS POSSIBLE AFTER
CONSTRUCTION START TO COORDINATE THEIR WORK WITH OTHER TRADES, WHILE MEETING
COMPLETION DATE. CONTRACTOR SHALL PREPARE A CRITICAL PATH SCHEDULE,
COORDINATED WITH SUBCONTRACTORS, TO ACCOMPLISH ALL TASKS REQUIRED OF BALANCER.
5. CONTRACTORS SHALL COOPERATE AND ASSIST BALANCER AS REQUIRED. BALANCER SHALL
INSPECT MECHANICAL, EXHAUST, AND CONTROL SYSTEM WORK. ANY DEVIATIONS FROM PLANS
AND SPECIFICATIONS THAT MAY AFFECT PERFORMANCE OF THE SYSTEM SHALL BE REPORTED
IN WRITING TO CONTRACTOR, ARCHITECT OF RECORD, ENGINEER AND RESTAURATEUR.
F. CONTRACTOR SHALL COMPLETE THE FOLLOWING PRIOR TO TAB: PERMANENT POWER SHALL BE
PROVIDED, ROOFTOP UNIT FULL INSTALLED AND STARTED, HOOD SYSTEMS AND FANS STARTED,
COMPLETE CONTROLS OPERATIONAL AND PROGRAMMED, DUCTWORK, DIFFUSER AND CEILING
INSTALLATION COMPLETED. ADDITIONAL TAB COSTS ARE THE CONTRACTOR'S RESPONSIBILITY IF
REQUIRED ITEMS ARE NOT COMPLETE AT START OF TAB PROCEDURES.
G. DESIGN BALANCE DEVIATION TOLERANCES:
1. KITCHEN HOODS ARE UL LISTED AND SHALL BE BALANCED FROM 100% TO 105% OF DESIGN
AIRFLOW. DO NOT SET EXHAUST RATE BELOW THAT SCHEDULED. INCREASE RTU AIRFLOW AS
NEEDED TO ACHIEVE POSITIVE PRESSURE IN THE RESTAURANT.
2. TOTAL OF ALL AIR DISTRIBUTION DEVICES ON SAME ROOFTOP UNIT DUCT SYSTEM SHALL BE
BALANCED TO 100% TO 105% OF DESIGN.
3. ROOFTOP UNITS SHALL PROVIDE OUTDOOR AIR CFM BETWEEN 100% TO 105% OF DESIGN FOR
ALL SUPPLY FAN SPEEDS DURING REGULAR HOURS AND SHALL BE SET TO TRACK AIR VOLUME
WITH THE SUPPLY FAN FOR THE FAN SPEED PROVIDED BY THE UNITS.
4. ECONOMIZERS SHALL PROVIDE REQUIRED OUTDOOR AIR WHEN CLOSED FOR BUSINESS
(MINIMUM ONLY).
5. OVERALL SYSTEM SHALL BE BALANCED TO POSITIVE CFM AS SHOWN ON THE VENTILATION
SCHEDULE WITH SUPPLY AND EXHAUST FANS IN OPERATION.
6. CONTACT RTU MANUFACTURER TO RESOLVE AIRFLOW DELIVERY IF ROOFTOP UNIT AIRFLOWS
ARE BELOW DESIGN. THIS INCLUDES VERIFICATION OF DUCTWORK STATIC PRESSURE,
ADJUSTMENT OF FAN RPM, REPLACEMENT OF DRIVES, ETC. RESTAURANT SHALL BE LEFT IN A
POSITIVE AIR PRESSURE STATE.
H. PLAN REVIEW: PROVIDE WRITTEN TESTING AND BALANCING PLAN REVIEW WITHIN FIVE (5)
BUSINESS DAYS UPON RECEIPT OF CONTRACT. PLAN REVIEW SHALL INCLUDE
RECOMMENDATIONS TO IMPROVE TESTING AND BALANCING. TRANSMIT THESE COMMENTS
DIRECTLY TO CONTRACTOR. REVIEW WENDY'S RESTAURANT VENTILATION EQUIPMENT PRE-START
AND START-UP FORMS.
I. EQUIPMENT SUBMITTAL DATA: CONTRACTOR SHALL PROVIDE RESTAURANT EQUIPMENT
SUBMITTAL DATA TO BALANCER. COMPLETED EQUIPMENT STARTUP AND CALIBRATION FORMS
SHALL BE PROVIDED TO BALANCER PRIOR TO PERFORMING TAB.
J. UPDATED DESIGN REQUIREMENTS: IF ANY, SHALL BE PROVIDED TO BALANCER PRIOR TO TAB.
DESIGN REQUIREMENT CHANGES SHALL INCLUDE DATE OF THE CHANGE AND REFERENCES TO
THE CONTRACT DOCUMENTS (ADDENDA, CHANGE ORDER, OR CONSTRUCTION CHANGE
DIRECTIVE), WHICH DIRECTED THE CHANGE. CHANGES MADE WITHOUT RESTAURATEUR WRITTEN
APPROVAL ARE INVALID.
K. BALANCER TEST AND BALANCE REPORT:
1. PERFORM TAB WORK ASSOCIATED WITH THE RESTAURANT VENTILATION SYSTEM PER DESIGN
DOCUMENTS. SUBMIT AN ELECTRONIC PDF COPY OF TABULATED REPORTS IN NEATLY
ORGANIZED TYPED FORMS (WITH NUMBERED PAGES) WITH AABC OR NEBB FULLY COMPLETED,
STAMPED AND SEALED REPORTS. REPORT SHALL BE PROVIDED WITHIN SEVEN (7) DAYS OF
COMPLETION OF TESTS TO ARCHITECT OF RECORD, ENGINEER, CONTRACTOR AND
RESTAURATEUR. REPORT SHALL INCLUDE START-UP CHECKLIST FORMS AND REPORTS
PROVIDED TO BALANCER BY CONTRACTOR, EQUIPMENT TEST DATA AND DRAWINGS TO
COINCIDE WITH TEST REPORT. IN ADDITION, REPORTS SHALL INCORPORATE:
2. A SUMMARY THAT SHALL INCLUDE A GENERAL DESCRIPTION OF PROJECT (BUILDING TYPE,
SYSTEM TYPE, AND EQUIPMENT DESCRIPTION).
3. A DESCRIPTIVE LIST OF ALL EQUIPMENT AND TEST RESULTS THAT DO NOT MEET PLANS AND
SPECIFICATIONS (INCLUDE PHOTOGRAPHS).
4. COPIES OF REDUCED PLAN DRAWINGS THAT UNIQUELY IDENTIFY AND CROSS REFERENCE AIR
DEVICES AND HVAC EQUIPMENT.
5. PROVIDE BUILDING PRESSURE TABLES THAT INDICATE DESIGN AND ACTUAL RESULTS.
6. REPORTS THAT ARCHITECT AND/OR ENGINEER DETERMINES IS INACCURATE, OR INCOMPLETE,
SHALL BE RETURNED FOR CORRECTION, COMPLETION, OR RE-TESTING AT BALANCERS COST.
REVISED REPORTS SHALL BE SUBMITTED IN THEIR ENTIRETY. EACH REVISION SHALL BE
HIGHLIGHTED AND SHALL INDICATE REVISION DATE. COVER PAGE SHALL INDICATE DATE OF
FIRST EDITION AND REVISION DATE.
L. TEST & BALANCE CONFIRMATION FORM: BALANCER SHALL COMPLETE A WENDY'S TEST & BALANCE
CONFIRMATION FORM WHILE PERFORMING SYSTEM TESTING. IT SHALL BE SIGNED OFF WHEN TAB
IS COMPLETE AND INCLUDED AT THE END OF THE TEST AND BALANCE REPORT. A DIGITAL VERSION
OF THIS FORM CAN BE FOUND UNDER TEST AND BALANCE REPORTS AT:
HTTP://WWW.IGNITORLABS.COM/WRVT-DOC-HOME/
M. CONTRACTOR'S RESPONSIBILITIES FOR TAB:
1. CONTRACTOR SHALL BE COMPLETELY FAMILIAR WITH ALL PROVISIONS AND RESPONSIBILITIES
OF BALANCER AND SHALL PROVIDE COOPERATION AND SUPPORT REQUIRED.
2. CONTRACTOR SHALL CORRECT OR REPAIR DEFICIENCIES NOTED BY BALANCER IMMEDIATELY.
IF DEFICIENCIES ARE NOT CORRECTED WHILE BALANCER IS ON SITE, AND DEFICIENCIES
PREVENT COMPLETION OF TAB WORK, CONTRACTOR SHALL ASSUME COSTS FOR EXTENDING
TAB, OR FOR FOLLOW UP TAB VISITS.
3. CONTRACTOR SHALL PROVIDE DOCUMENTATION OF CORRECTION OF ANY OPEN ISSUES PRIOR
TO SUBMISSION OF FINAL REPORT. SHOULD ANY OPEN HVAC SYSTEM ITEMS BE INCAPABLE OF
CORRECTION WITHIN SEVEN DAY PERIOD FOR THE FINAL BALANCING REPORT, CONTRACTOR
SHALL INFORM BALANCER AND OWNER IMMEDIATELY AND CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL COSTS, DELAYS, AND RESCHEDULING REQUIRED.
4. CONTRACTOR IS RESPONSIBLE FOR CORRECTION OF IDENTIFIED ITEMS AND FOR SUBSEQUENT
TESTS IN EVENT OF THE FOLLOWING:
a. NO PERMANENT POWER FOR THE RESTAURANT.
b. DIFFUSERS NOT INSTALLED FOR TEST.
c. CEILING TILES NOT INSTALLED.
d. PASSWORD FOR RTU THERMOSTATS NOT PROVIDED.
e. INOPERABLE EQUIPMENT.
f. THERMOSTATS NOT PROGRAMMED.
5. ADDITIONAL RESPONSIBILITIES INCLUDE; PROVIDE REQUIRED SHOP DRAWINGS AND
EQUIPMENT DATA INCLUDING ANY APPROVALS OF DESIGN MODIFICATIONS, PROVIDE SAFE AND
CLEAR ACCESS TO ALL HVAC SYSTEMS AS NEEDED TO PERFORM TAB WORK (LADDERS, LIFTS,
ROOF ACCESS, ACCESS PANELS AND THE LIKE), PROVIDE TEST OPENINGS AS REQUIRED FOR
TESTING AND BALANCING HVAC SYSTEMS, PROVIDE UPDATED JOB SCHEDULE AND TIMELY
NOTICE PRIOR TO SCHEDULED EVENTS. MAKE TESTS AND CALIBRATION TO ESTABLISH
ADEQUACY, QUALITY, SAFETY, COMPLETED STATUS, AND SATISFACTORY OPERATION OF HVAC
SYSTEMS AND COMPONENTS.
6. DURING TAB PERIOD, OPERATE HVAC EQUIPMENT AS NECESSARY TO PERMIT SYSTEMS TO BE
TESTED AND BALANCED AS FULLY OPERATING FUNCTIONAL SYSTEMS. WORK HARMONIOUSLY
WITH BALANCER TO EXPEDITE THE WORK. REMOVE AND REPLACE CEILINGS AS NECESSARY TO
PERMIT TAB OPERATIONS. REMOVE AND REPLACE EQUIPMENT, LIGHTS, OR OTHER ITEMS
WHICH OBSTRUCT TESTING AND BALANCING OPERATIONS (WHERE EQUIPMENT, LIGHTS, OR
OTHER ITEMS INTERFERE WITH FUTURE ADJUSTMENTS OF HVAC SYSTEM. SUCH EQUIPMENT,
LIGHTS, OR OTHER ITEMS SHALL BE RELOCATED BY CONTRACTOR AS DIRECTED BY ENGINEER
OF RECORD.
7. REPLACE BELTS AND DRIVES AS REQUIRED FOR PROPER BALANCING - DRIVES SHALL BE
ADJUSTED AND ALIGNED BY CONTRACTOR TO PREVENT ABNORMAL BELT WEAR AND
VIBRATION. ADJUST FAN SPEED AS REQUIRED NOT TO EXCEED MOTOR CAPACITY.
CONTRACTOR SHALL ADJUST DAMPERS FOR THE BALANCER DURING TAB WORK. IDENTIFY
CONCEALED DAMPER LOCATIONS WITH ORANGE TAPE. MANUALLY OPEN AND TEST DAMPERS
FOR SMOOTH VIBRATION-FREE OPERATION AND TIGHTEN PRIOR TO COMMENCEMENT OF TAB
WORK. VERIFY THAT ALL CONTROLS ARE INSTALLED AND OPERATING AS REQUIRED IN BOTH
STORE OPEN AND CLOSED MODES. BEFORE REQUESTING FINAL TESTING AND BALANCING,
SUBMIT SIGNED STATEMENT THAT HVAC SYSTEMS ARE INSTALLED, ADJUSTED, SERVICED,
OPERATING SATISFACTORILY, AND ARE READY FOR USE.
N. SYSTEM READY NOTICE: ALLOW ADEQUATE TIME TO PERFORM TESTING AND BALANCING WORK.
TAB IS REQUIRED TO BE PERFORMED PRIOR TO RESTAURANT OPENING. NOTIFY BALANCER UPON
COMMENCEMENT OF WORK RELATED TO HVAC SYSTEM AND COORDINATE PROPER TIME FOR
NOTICE TO SCHEDULE TRAVEL AND PROVIDE THE DURATION REQUIRED FOR TEST AND BALANCING
AND FOR ANY POSSIBLE CORRECTIONS.
O. BALANCER RESPONSIBILITIES:
1. RECORD DATA REQUIRED BY AABC OR NEBB FORMS. TEST AND ADJUST SYSTEMS FOR DESIGN
CFM OF SUPPLY, OUTSIDE AIR (IN MULTIPLE FAN SPEEDS), AND EXHAUST AIR. KITCHEN
APPLIANCES SHOULD BE OPERATIONAL WHILE MAKING ADJUSTMENTS. HOOD SIDE SKIRTS
SHALL BE IN PLACE ON THE CORRECT ENDS OF HOODS (FRY HOOD DUMP SKIRT HAS A CUT
OUT). TEST AND RECORD SYSTEM STATIC PRESSURE PROFILES. ADJUST SUPPLY AND RETURN
DUCTS TO DESIGN AIRFLOW. TEST AND ADJUST FANS. ADJUST ALL DIFFUSERS, GRILLES, AND
REGISTERS TO MINIMIZE DRAFTS. PROVIDE BUILDING DIFFERENTIAL PRESSURE (INSIDE TO
OUTSIDE) AT ALL OPERATIONAL CONDITIONS AND INCLUDE IN THE FINAL REPORT.
2. PROVIDE TABLE IN THE REPORT THAT ITEMIZES ALL SUPPLY AND EXHAUST AIR CFM (SPECIFIED
AND ACTUAL) TO SHOW THAT BUILDING SHOULD BE UNDER POSITIVE PRESSURE. SIZE, Ak
CATALOG FACTORS OF DIFFUSERS, GRILLES, REGISTERS, AND ALL TESTED EQUIPMENT SHALL
BE IDENTIFIED AND LISTED. READINGS AND TEST OF DIFFUSERS, GRILLES, AND REGISTERS
SHALL INCLUDE REQUIRED VELOCITY (FPM), REQUIRED CFM, AND RESULTANT CFM. WHEN
DIRECT CFM MEASURING INSTRUMENTS ARE USED, VELOCITIES ARE NOT REQUIRED.
3. BALANCER SHALL COMPLETE A WENDY'S TEST & BALANCE CONFIRMATION FORM WHILE
PERFORMING SYSTEM TESTING. FORM SHALL BE SIGNED OFF WHEN TAB IS COMPLETE AND
INCLUDED AT THE END OF TAB REPORT.
230700 HVAC INSULATION
A. DUCT INSULATION AND APPURTENANCES SHALL HAVE FLAME SPREAD RATING NOT EXCEEDING
TWENTY-FIVE (25) AND SMOKE DEVELOPED RATING NOT EXCEEDING FIFTY (50). DUCT INSULATION
SHALL HAVE AN INSTALLED R-VALUE OF 6.
B. CONCEALED SUPPLY DUCTWORK SHALL HAVE FLEXIBLE FIBERGLASS DUCT WRAP LAMINATED TO
FOIL REINFORCED KRAFT VAPOR BARRIER FACING WITH 2" STAPLING FLANGE OF SUFFICIENT
DENSITY AND THICKNESS TO MEET LOCAL CODE REQUIREMENTS. ONLY COMMERCIAL GRADE
INSULATION PRODUCTS MAY BE USED.
C. INSULATION SHALL NOT BE APPLIED UNTIL CONSTRUCTION HAS PROGRESSED SUFFICIENTLY TO
ENSURE AGAINST PHYSICAL OR MOISTURE DAMAGE TO INSULATION. INSULATION DAMAGED
THROUGH FAILURE TO OBSERVE THIS DIRECTIVE SHALL BE REPLACED AT THIS CONTRACTOR'S
EXPENSE.
D. HANGER RODS SHALL BE PERPENDICULAR TO DUCTWORK BEFORE INSULATION IS INSTALLED.
E. INSTALL INSULATION ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.
F. INSULATION SHALL BE APPLIED OVER FLANGES, JOINTS AND SEAMS IN PIPING AND DUCTWORK.
G. JOINTS AND SEAMS IN INSULATION SHALL BE PROPERLY SEALED TO MAINTAIN VAPOR BARRIER.
H. INSULATION SHALL BE OWENS-CORNING. EQUAL PRODUCT BY ARMSTRONG, CERTAINTEED,
SCHULLER OR KNAUF MAY BE PROVIDED AT CONTRACTOR'S OPTION.
230800 COMMISSIONING OF HVAC
A. THIS CONTRACTOR SHALL COORDINATE COMMISSIONING OF HVAC SYSTEMS AND SHALL ASSIST
OWNERS TAB CONTRACTOR TO COMPLETION. CONTRACTOR IS RESPONSIBLE FOR CORRECTING
DEFICIENCIES NOTED IN THE TAB REPORT.
C. CONTRACTOR SHALL PROVIDE DOCUMENTATION OF TESTING AND COMMISSIONING TO BE
INCLUDED IN OPERATING INSTRUCTIONS MANUAL (SEE GENERAL REQUIREMENTS).
DOCUMENTATION SHALL INCLUDE:
1. CONSTRUCTION AND SYSTEM CHECKLISTS.
2. CERTIFICATE OF READINESS.
3. INTERIM AND FINAL TEST AND INSPECTION REPORTS AND CERTIFICATES.
4. APPROVED SUBMITTALS.
5. CERTIFICATE OF COMPLETION.
6. AS-BUILT DOCUMENTATION.
233133 METAL DUCTS
A. THIS SECTION INCLUDES SPECIFICATIONS FOR DUCTWORK EXCEPT 'GREASE DUCT' (EXHAUST
DUCT CONNECTED TO TYPE I HOODS WHERE GREASE LADEN VAPORS MAY BE PRESENT). REFER
TO PLANS AND DETAILS FOR INFORMATION ON 'GREASE DUCT'.
B. CONTRACTOR SHALL PROVIDE COMPLETE DUCT SYSTEM CONSISTING OF DUCTWORK, PLENUMS,
FITTINGS AND CONNECTORS OF SIZE AND LOCATION AS INDICATED ON DRAWINGS.
C. ALL PORTIONS OF DUCT SYSTEM SHALL BE DESIGNED, FABRICATED AND INSTALLED PER THE
FOLLOWING REQUIREMENTS:
1. LATEST EDITION OF SMACNA “HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE”.
2. RIGID GALVANIZED SHEET METAL OF THICKNESS AND WITH STIFFENERS AS INDICATED IN
SMACNA PER 2” WATER COLUMN CHART.
3. AIR VELOCITIES NO MORE THAN 2000 FPM AND STATIC PRESSURE IN DUCT OF 2” OR LESS.
4. SEALING PER SMACNA 'CLASS B' OR AS REQUIRED TO MEET AIR BALANCE.
5. CROSS-BREAKING, STIFFENING, BRACES, TOES, ANGLES AND OTHER BRACING AND SUPPORT
REQUIRED TO MAINTAIN DUCT CONFORMITY (TRUE TO SHAPE, PREVENT BUCKLING OR
CAVITATION).
6. ALL VERTICAL DUCTS SHALL BE ABLE TO CARRY AN ADDITIONAL 100 LBS. SUSPENDED LOAD
FROM HANGERS WITHOUT BUCKLING.
7. SEAMS OF ALL DUCTS AND JOINTS SHALL BE HAMMERED TO A SMOOTH SURFACE ON THE
INSIDE.
D. FLEXIBLE CONNECTIONS SHALL BE INSTALLED AT ROOFTOP UNIT SUPPLY AND RETURN AIR
CONNECTIONS. CONNECTIONS SHALL BE AT LEAST 6" LONG, MADE OF NFPA 90A APPROVED
FLAMEPROOF FABRIC.
E. INSTALL HANGERS AND SUPPORTS WITHIN 24 INCHES OF EACH ELBOW AND WITHIN 48 INCHES OF
EVERY BRANCH CONNECTION. HANGERS EXPOSED TO VEIW SHALL BE THREADED ROD AND ANGLE
OR CHANNEL SUPPORTS.
F. ROUND SHEET METAL DUCT: PROVIDE SPIRAL SEAM (ALL SIZES) OR SNAP LOCK (DUCT
CONCEALED ABOVE CEILINGS SIZES UP TO 10") GALVANIZED STEEL COMPLYING WITH SMACNA
STANDARDS. SPIRAL SEAM DUCTWORK SHALL HAVE SMACNA SEAM TYPE RL-1. ROUND EXPOSED
DUCTWORK SHALL BE SPIRAL SEAM (ALL SIZES).
G. EXPOSED DUCTWORK: EXPOSED DUCTWORK SHALL BE CLEANED OF DEBRIS AND OIL, THEN WIPED
DOWN WITH VINEGAR OR OTHER SURFACE PREPARING CHEMICAL TO PREPARE DUCT FOR PAINT.
H. PROVIDE VOLUME CONTROLLER AND EXTRACTOR AT BRANCH TAKEOFFS IN SUPPLY AND RETURN
AND AT OTHER LOCATIONS IN SUPPLY AND RETURN MAIN DUCTS AS REQUIRED TO PROPERLY
BALANCE SYSTEMS. DAMPER SHALL BE AS SPECIFIED IN SECTION 233300.
I. PROVIDE TURNING VANES IN ELBOWS OF RECTANGULAR SUPPLY DUCTS. BLADES SHALL BE
HOLLOW-FORMED DOUBLE THICKNESS VANES.
J. PROVIDE SUPPLY, RETURN, AND EXHAUST REGISTERS, GRILLES AND DIFFUSERS AS INDICATED ON
DRAWINGS AND/OR SCHEDULES. VERIFY AIR DEVICE REQUIREMENTS WITH GENERAL
CONTRACTOR PRIOR TO ORDERING.
K. PROVIDE FLEXIBLE SUPPLY AIR DUCTWORK UL 181, CLASS 1, TWO-PLY VINYL FILM SUPPORTED BY
HELICALLY WOUND SPRING-STEEL WIRE, R-6 FIBERGLASS BLANKET INSULATION WITH METALIZED
FILM VAPOR BARRIER OUTER JACKET IN LENGTHS THAT DO NOT EXCEED SIX FEET, AT AIR DEVICE
CONNECTIONS (GRILLES, REGISTERS AND DIFFUSERS).
233300 DAMPERS
A. CONTRACTOR SHALL PROVIDE RECTANGULAR AND ROUND GALVANIZED STEEL MANUAL AND/OR
MOTORIZED VOLUME CONTROL DAMPERS THAT SHALL BE:
1. NO MORE THAN 6" IN ONE DIMENSION (LARGER DAMPERS SHALL BE OPPOSED-BLADE WITH
EACH BLADE BEING NO MORE THAN 6”),
2. MINIMUM OF 16 GAUGE AND AT LEAST 2 GAUGES HEAVIER THAN DUCT INSTALLED IN,
3. CHANNEL FRAME WITH BRACED CORNERS, CONCEALED LINKAGE, TEFLON FILLED BEARINGS,
BLADE STOPS
4. REPLACEABLE BUTYL RUBBER SEALS INSTALLED ALONG TOP, BOTTOM AND SIDES OF FRAME
AS WELL AS ALONG ALL SIDES OF EACH BLADE
5. 6" LONG CONTROL SHAFT WITH INSULATION STAND-OFF,
6. LOCKING QUADRANT MANUAL HANDLES OR MOTORIZED OPERATORS COMPATIBLE WITH
CONTROL SYSTEM,
7. OPERATE FROM FULL OPEN TO FULL CLOSED.
B. PROVIDE ACCESS AND PROPER CLEARANCES AS REQUIRED TO OPERATE DAMPERS.
C. CHECK DAMPERS FOR PROPER OPERATION BEFORE AND AFTER INSTALLATION.
D. INSTALL BALANCE DAMPERS WHERE INDICATED ON DRAWINGS AND ELSEWHERE AS NECESSARY
TO OBTAIN PROPER SYSTEM BALANCE.
233418 ROOF EXHAUST FAN
A. ROOF MOUNTED UP BLAST EXHAUST FAN SHALL BE CENTRIFUGAL DIRECT DRIVE TYPE. FAN SHALL
BE CONSTRUCTED OF SPUN ALUMINUM WITH STRUCTURAL ELEMENTS OF MINIMUM 16 GAUGE
MARINE ALLOY ALUMINUM.
B. INTEGRAL MOTOR SHALL BE HEAVY DUTY TYPE WITH PERMANENTLY LUBRICATED SEALED
BEARINGS ENCLOSED IN WEATHER-TIGHT COMPARTMENT AND SEPARATED FROM THE EXHAUST
AIR STREAM.
C. THE WHEEL SHALL BE CENTRIFUGAL BACKWARD INCLINED TYPE WITH COMPLETELY ALUMINUM
CONSTRUCTION WITH CONE INLET AND DYNAMICALLY BALANCED TO MINIMIZE VIBRATION.
D. FANS SHALL BEAR THE AMCA CERTIFIED RATINGS SEAL FOR SOUND AND AIR PERFORMANCE AND
SHALL BE UL LISTED AND CSA APPROVED. CAPACITIES AS SHOWN ON THE DRAWINGS.
E. WIRING SHALL BE BY ELECTRICAL CONTRACTOR.
F. VERIFY MANUFACTURER MAKE AND MODEL OF EXHAUST FANS WITH HOOD DRAWINGS.
233713 AIR DISTRIBUTION DEVICES
A. DIFFUSERS, REGISTERS AND GRILLES SHALL BE PROVIDED BY CONTRACTOR.
B. COORDINATE AIR DISTRIBUTION DEVICE LOCATIONS WITH AFFECTED CONTRACTORS BEFORE
INSTALLING DUCTWORK. CHANGES IN LOCATION FROM THE DRAWINGS MUST BE APPROVED BY
OWNER BEFORE INSTALLATION.
C. SUSPEND CEILING AIR DEVICES FROM STRUCTURE ON WIRE HANGERS OR FROM RIGID
DUCTWORK. CEILING MUST NOT BE USED TO SUPPORT AIR DISTRIBUTION DEVICES.
D. SECURELY FASTEN SIDE WALL AIR DEVICES TO RIGID DUCTWORK OR STRUCTURE.
233813 - COMMERCIAL-KITCHEN HOODS
A. PROVIDE SUBMITTALS ON TYPE I HOODS, FILTERS AND BAFFLES, AND LIGHTING FIXTURES.
B. COORDINATE WITH KITCHEN EQUIPMENT LAYOUT, LIGHTING FIXTURES, HVAC EQUIPMENT,
PLUMBING, SPRINKLER SYSTEM, AND FIRE-SUPPRESSION SYSTEM COMPONENTS.
C. TYPE I HOOD SHALL BE MANUFACTURED OF STAINLESS STEEL ASTM A 666, TYPE 304 STEEL WITH
MINIMUM THICKNESS OF 0.050".
D. TYPE I HOODS SHALL BE WELDED AT ALL JOINTS EXPOSED TO GREASE WITH CONTINUOUS WELDS,
HAVE EASILY ACCESSIBLE FILTERS/BAFFLES, AND MAKE-UP AIR DIFFUSERS EASILY ACCESSIBLE
FOR CLEANING. HOODS SHALL BE FABRICATED ACCORDING TO FSF2 AND UL 710 LISTED AND
LABELED.
E. PROVIDE ACCESS PANELS FOR FIRE DAMPERS AND FUSIBLE LINKS.
F. DUCT-COLLAR FIRE DAMPERS - COLLAR AND DAMPER SHALL COMPLY WITH UL 710 TESTING AND
LISTING REQUIRED FOR THE ENTIRE HOOD.
G. LIGHTING FIXTURES - LIGHTING FIXTURES ARE PROVIDED IN THE LIGHTING PACKAGE. LED HEAT
RATED LAMPS AT 3500K ARE REQUIRED. SUBSTITUTION OF CFL OR INCANDESCENT LAMPS IS NOT
AUTHORIZED.
H. HOOD CONTROLS - HOOD CONTROLS SHALL BE ENCLOSED WITHIN A WALL MOUNTED CONTROL
PANEL, FACTORY WIRED AND FABRICATED OF STAINLESS STEEL. ON-OFF SWITCHES SHALL START
AND STOP THE EXHAUST FAN WITH AN INTERLOCK FOR THE SUPPLY FAN TO OPERATE
SIMULTANEOUSLY. INTERLOCK EXHAUST FAN WITH FIRE-SUPPRESSION SYSTEM TO OPERATE FAN
DURING FIRE-SUPPESSION-AGENT RELEASE AND TO REMAIN IN OPERATION UNTIL MANUALLY
STOPPED.
12
/
2
2
/
2
0
1
7
4
:
1
3
:
4
7
P
M
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
MECHANICAL
SPECIFICATIONS
M4.0
OM
DRC
AC-K
1
3
2
4
5
6
7
8
9
10
11
11
13
14
12
8
9
6
7
5
10
4
TRANE Baysens924
KITCHEN UNIT
FIELD WIRED
TERMINALS
RTRM J6
FIELD WIRED
(REFER TO PROVIDED DIAGRAM FOR
ADDITIONAL INFORMATION)
ELECTRICAL CONTRACTOR: THESE WIRING DETAILS FOR
FAN CONTROL LIGHTING CONTROL PANEL INCLUDED IN
MODULAR PANEL SYSTEM. MECHANICAL CONTRACTOR TO
ENSURE JUMPER IS IN CORRECT POSITION TO DISPLAY
EXTERNAL SENSOR TEMPERATURE READING. REFER TO
MANUFACTURER'S INSTRUCTIONS FOR ADDITIONAL
INFORMATION. (TYP)
15 A
120/1/60
MECHANICAL CONTRACTOR TO
EXTEND 120V POWER TO EACH
HOOD FOR CAPTUREJET FAN.
REMOTE HEAT SENSOR FURNISHED
WITH HOOD, EC TO FURNISH AND
INSTALL TWO CONDUCTORS FROM
SENSOR TO TERMINALS #1 AND #2 IN
PANEL FOR 'REMOTE HEAT SENSOR'
PRE-WIRED WITHIN SWITCHBOARD
(UNLESS OTHERWISE NOTED)
RS
SC
TRANE REMOTE SENSOR (REFER TO M1.1
DRAWING FOR LOCATION OF REMOTE
SENSOR ON WALL)
FCLC SWITCHBOARD
(VERIFY LOCATION WITH PLANS)
ALL 120V WIRING FURNISHED AND INSTALLED BY EC.
ALL LOW VOLTAGE WIRING (24V) FURNISHED BY EC AND INSTALLED BY MC.
(UNLESS OTHERWISE NOTED)
AT ROOFTOP UNIT (RTU) CONTROL BOX.
VERIFY LOCATION OF RTU WITH PLANS
TO GRILL CONTROL CONTACT (24V)-OPTIONAL AS REQUIRED BY LOCAL CODE
FROM GRILL CONTROL CONTACT (24V RETURN)-OPTIONAL AS REQUIRED BY LOCAL CODE
24 VOLT - #18 SHIELDED THERMOSTAT WIRE OR BACNET WIRE
120 VOLT - #12 THHN in 1/2" EMT CONDUIT
3
2
1
FIELD WIRING PROVIDED
BY THIS CONTRACTOR.
MOUNTED AND WIRED IN THE FCLC BY THE FCLC
SUPPLIER.
1
2
BCI-R
(REFER TO DRAWINGS FOR
LOCATION)
AC-D
1
3
2
4
5
6
7
8
9
10
11
11
13
14
12
8
9
6
7
5
10
4
TRANE Baysens924
DINING UNIT
FIELD WIRED TERMINALS
RTRM J6
(REFER TO PROVIDED DIAGRAM FOR
ADDITIONAL INFORMATION)
PRE-WIRED WITHIN SWITCHBOARD
(UNLESS OTHERWISE NOTED)
RS
SC
TRANE REMOTE SENSOR (REFER TO M1.1
DRAWING FOR LOCATION OF REMOTE
SENSOR ON WALL)
3
2
1
FIELD WIRING PROVIDED BY THIS CONTRACTOR.
1
2
BCI-R
(REFER TO DRAWINGS FOR
LOCATION)BACNET
BACNET
BACNET
BACNET
COM
SHIELD
13 14 15 16 17 18
LOAD SHED COMMON
LOAD SHED INPUT
24 VOLT AC
J6
24 VOLT COMMON
456
1 2 3 4 5 6 7 8 9 10 11 12 14
LINK
WCI BACNET
BCI-R
RTRM
ZONE SENSOR
J4
BACNET+ BACNET-
12 34 12
TX2Y2W2GW1
/0
J7
Y1R
SUGGESTED SUPPLIER: WINDY CITY WIRE
x PLENUM RATED P/N:043005AL
x NON-PLENUM RATED P/N:108760
ELECTRICAL CONTRACTOR MUST INCLUDE COST OF WIRING, INTERLOCKS, FINAL CONNECTIONS,
CONDUITS, PLUS MISCELLANEOUS MATERIALS AND LABOR REQUIRED TO COMPLETE CONTROLS
SYSTEMS AS INDICATED, SPECIFIED, DETAILED OR OTHERWISE NOTED IN THIS CONSTRUCTION
DOCUMENT SET, AND AS WOULD NORMALLY BE REQUIRED FOR SIMILAR WORK, AND AS REQUIRED
BY LOCAL CODE REQUIREMENTS AS LINE ITEM ADD IN BASE BID. FIELD VERIFY AND COORDINATE
WORK WITH EQUIPMENT VENDORS, OTHER TRADES, OWNER AND LOCAL INSPECTORS PRIOR TO
START OF WORK.
MECHANICAL CONTRACTOR MUST INCLUDE COST OF PROGRAMMING, COMMISSIONING, CONTROLS,
ETC. PLUS MISCELLANEOUS MATERIALS AND LABOR REQUIRED TO COMPLETE CONTROLS SYSTEMS
AS INDICATED, SPECIFIED, DETAILED OR OTHERWISE NOTED IN THIS CONSTRUCTION DOCUMENT
SET, AND AS WOULD NORMALLY BE REQUIRED FOR SIMILAR WORK, AND AS REQUIRED BY LOCAL
CODE AS LINE ITEM ADD IN BASE BID. FIELD VERIFY AND COORDINATE WORK WITH EQUIPMENT
VENDORS, OTHER TRADES, OWNER AND LOCAL INSPECTORS PRIOR TO START OF WORK.
1. CONTRACTOR TO PROGRAM BAYSENS924 THERMOSTAT PER TRANE INSTALLER GUIDE AND
WENDY'S QUICK REFERENCE GUIDE.
2. CONTRACTOR TO COMPLETE AND RECORD RESULTS FROM THESE TEST AND CALIBRATIONS:
A. HOOD SYSTEM
B. FAN CONTROL LIGHTING CONTROL SYSTEM
C. RTU SYSTEM
PROCEDURES AND FORMS ARE PROVIDED FOR THESE TESTS IN FAN CONTROL LIGHTING CONTROL
PANEL BOOK
SEQUENCE OF OPERATIONS - FAN CONTROL LIGHTING CONTROL SYSTEM.
NOTE TO THE MECHANICAL CONTRACTOR:
1. CHOOSE FAHRENHEIT AND WHOLE DEGREES (1.0)
2. DUAL SETPOINT
3. DEADBAND - 2 DEGREES
4. SELECT HEAT/COOL/AUTO/OFF
5. FAN - OFF/HIGH (ON)
6. OCCUPANCY (TIMED OVERRIDE) ENABLED
7. SETTINGS SUMMARY
8. PRESS CONFIGURATION BUTTON ON REAR OF ZONE SENSOR TO RETURN TO OPERATING MODE.
ENSURE DISCHARGE TEMPERATURE LIMIT POTENTIOMETER IS SET UP 9 O CLOCK / 55 DEGREES
CONTACT TRANE 866-986-4822 FOR MORE INFORMATION
ZONE SENSOR AND BCI-R FORMA TWO NODE BACNET MS/TP NETWORK. WIRE SYSTEM AS SHOWN IN
SCHEMATIC BELOW WHILE ADHERING TO THESE RECOMMENDATIONS:
x BACNET WIRE: SHIELDED TWISTED PAIR, 22 AWG OR LARGER.
x AT RTRM BOARD, TERMINATE SHIELD WIRE AT J7-COM TERMINAL. SHIELD WIRE MAY NEED TO BE
EXTENDED TO MAKE THIS CONNECTION. USE AN INSULATED EXTENSION WIRE TO PREVENT
CONTACT WITH METAL ENCLOSURE AND CIRCUIT BOARDS.
x AT ZONE SENSOR, REMOVE OR INSULATE SHIELD WIRE TO PREVENT CONTACT WITH CIRCUIT
BOARD.
x SET LINK SWITCH ON BCI-R TO BACNET.
TO MICRO-SWITCH IN GRILL ANSUL
FROM MICRO-SWITCH IN GRILL ANSUL
TO PHOTOCELL
TO PHOTOCELL
(REFER TO PROVIDED DIAGRAM FOR
ADDITIONAL INFORMATION)
PRE-WIRED WITHIN SWITCHBOARD
(UNLESS OTHERWISE NOTED)
TO MICRO-SWITCH IN FRYER ANSUL
FROM MICRO-SWITCH IN FRYER ANSUL
REMOTE PUSHBUTTON POWER
KILL SWITCH. REFER TO POWER
PLAN SHEET E2.1 FOR
LOCATIONS
24VAC FROM RTU-1 (IF REQUIRED)
OCC SIGNAL TO RTU-1 (IF REQUIRED)
24VAC FROM RTU-2 (IF REQUIRED)
OCC SIGNAL TO RTU-2 (IF REQUIRED)
WIRING LEGEND
TRANE NOTES
POWER AND COMMUNICATION WIRING
NOTE TO ELECTRICAL CONTRACTOR
NOTE TO MECHANICAL CONTRACTOR
FIELD WIRING PROVIDED BY THIS CONTRACTOR.
1
3
2
4
1
TB-2
TB-2
10
9
SHD
TB-1
TB-2
MS
1
MS
2
MS
2
MS
2
ST
1
ST
3
ST
1
OC
1
OC
2
OC
2
OC
12
/
2
2
/
2
0
1
7
4
:
1
3
:
5
6
P
M
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
TRANE CONTROL
WIRING DIAGRAM
W1.1T
AUTHOR
CHECKER
IN ALL CLIMATES WHERE HUMIDITY IS CONTROLLED, SET POINT OF 55% RH IS REASONABLE. DO
NOT SET BELOW THIS CONDITION AND NOT ABOVE 60% RH. AS OUTDOOR HUMIDITY LOWERS
SPACE HUMIDITY SHALL DROP BELOW SET POINT AS NO HUMIDIFICATION IS PROVIDED.
COMFORTABLE TEMPERATURES CAN VARY BASED ON LOCALE AND SEASON. HOTTER CLIMATES
MAY REQUIRE HIGHER DINING ROOM TEMPERATURES IN SUMMER SUCH AS 75 DEGREES F, WHERE
COLDER REGIONS MAY PERMIT COLDER TEMPERATURES SUCH AS 68 DEGREES F IN WINTER.
MUCH IS DEPENDENT ON CLOTHING BEING WORN AND HUMIDITY.
IN CLIMATES WHERE HUMIDITY IS HIGHER SUCH AS TROPICAL AND SUB-TROPICAL REGIONS,
SOUTHERN STATES AND MUCH OF MIDWEST UNITED STATES, IT CAN FEEL COLD AND DAMP
WHERE LOW TEMPERATURES ARE PRESENT WITH HIGHER HUMIDITY. AS TEMPERATURE IS
LOWERED RELATIVE HUMIDITY SHALL RISE CAUSING COLD AND DAMP CONDITION. RAISING ROOM
TEMPERATURE SHALL IMPROVE THIS CONDITION, LOWERING IT SHALL MAKE IT WORSE.
USING THESE TEMPERATURES SHALL HANDLE MOST CONDITIONS, THOUGH SHOULDER SEASONS
(SPRING AND FALL) HAVE VARIABLE TEMPERATURES FROM DAY TO DAY AND MAY OCCASIONALLY
CAUSE SOME LESS THAN PERFECT SPACE CONDITIONS AS HEATING AND COOLING EQUIPMENT
SHIFTS FROM HEATING TO COOLING SET POINT CONDITIONS AND BACK.
DO NOT SET COOLING TEMPERATURES BELOW 72 DEGREES F. DO NOT SET UNOCCUPIED
TEMPERATURES FOR COOLING ABOVE 78 DEGREES F OR FOR HEATING BELOW 65 DEGREES F.
THIS CAN AFFECT PERFORMANCE OF HVAC SYSTEM REACHING TEMPERATURES WHEN DESIRED.
KITCHEN
STATUS RECOMMEDED SET POINT SET POINT
UNOCCUPIED COOLING 78°F
____
OCCUPIED COOLING 73°F ____
OCCUPIED HEATING 70°F
____
UNOCCUPIED HEATING 65°F
____
RESPONSIBILITY SCHEDULE
S: SUPPLIED & PREWIRED BY VENDOR
MC : MECHANICAL CONTRACTOR
EC: ELECTRICAL CONTRACTOR GC : GENERAL CONTRACTOR
ITEM SU
P
P
L
I
E
D
IN
S
T
A
L
L
E
D
FI
N
A
L
U
T
I
L
I
T
Y
CO
N
N
E
C
T
I
O
N
COMMENTS
MODULAR ELECTRICAL PANEL SYSTEM
POWER TO MODULAR ELECTRICAL PANEL EC EC EC REFER TO E3.1 FOR ADDITIONAL INFORMATION
ROOFTOP UNITS
POWER WIRING TO ELECTRICAL PANEL EC EC EC REFER TO E3.1 FOR ADDITIONAL INFORMATION
LOW VOLTAGE CONTROL WIRING FROM FCLC TO RTU
CABINET
EC MC
LOW VOLTAGE CONTROL WIRING FROM FCLC OR RTU
CABINET TO REMOTE SENSORS
EC MC MC
KITCHEN HOODS
120V POWER TO HOODS EC EC EC REFER TO E3.1 FOR ADDITIONAL INFORMATION
LOW VOLTAGE CONTROL WIRING FROM FCLC TO HOOD
TEMPERATURE SENSORS EC EC
PHOTOCELL
PHOTOCELL ASSEMBLY KIT S EC N/A
PHOTOCELL WIRING TO FCLC EC EC EC
NOTES:
1
2
3
CONDUIT, WIRING, AND PIPING DEPICTED ON DRAWINGS AND/OR REQUIRED TO MAKE FINAL CONNECTIONS ARE BY GC UNLESS NOTED OTHERWISE.
NOTE: IN EVENT OF CONFLICT BETWEEN THIS SCHEDULE AND CONSTRUCTION DETAILS, CONSTRUCTION DETAILS PREVAIL.
WIRING INSIDE MODULAR PANEL (FCLC)S S S REFER TO VENDOR'S SHOP DRAWINGS
MC
EC
WIRING FROM FCLC TO MICROSWITCH IN ANSUL FOR
GRILL HOOD AND FRYER HOOD EC EC
120V WIRING BETWEEN HOODS EC EC
120V PUSHBUTTON 'POWER KILL SWITCH' WIRING EC EC
EC
EC
EC REFER TO E3.1 FOR ADDITIONAL INFORMATION
REFER TO E2.1 FOR ADDITIONAL INFORMATION
REFER TO E2.2 FOR ADDITIONAL INFORMATION
OPERATION SCHEDULE
EXPANDED LIGHTING CONTROLS DESCRIPTION (AS APPLICABLE)
ZONE 1
KITCHEN:
a. MANUAL SWITCH REQUIRED AND USED FOR KITCHEN LIGHTS. OPERATOR CAN TURN ON/OFF, KITCHEN LIGHTING USING MANUAL SWITCH.
b. LIGHTING CONTROL PROVIDES REQUIRED AUTOMATIC OFF. LIGHTING CONTROL SYSTEM TURNS OFF LIGHTING AT DRIVE THROUGH CLOSING PLUS 2 HOURS.
ZONE 2
DINING ROOM - GENERAL LIGHTING:
a. SYSTEM USES MANUAL BI-LEVEL SWITCH AND AUTOMATIC SHUT OFF.
b. GENERAL OPERATIONAL STANDARD IS FOR MANAGER TO TURN ON GENERAL LIGHTING AT 100% DURING MORNING PREPARATION AND AT CLEAN UP.
c. GENERAL LIGHTS ARE TURNED DOWN 90% (10%) APPROXIMATELY 30 MINUTES PRIOR TO DINING ROOM OPENING.
d. LIGHTING CONTROL SYSTEM PROVIDES REQUIRED AUTOMATIC OFF AT DRIVE THROUGH CLOSING PLUS 1 HOUR.
DINING ROOM - DECORATIVE LIGHTING:
a. GENERAL OPERATIONAL STANDARD IS TO TURN OFF DECORATIVE LIGHTING DURING MORNING PREPARATION AND AFTER DINING ROOM IS CLOSED.
b. OPERATOR CAN TURN ON OR OFF DECORATIVE LIGHTING USING MANUAL SWITCH.
c. LIGHTING CONTROL SYSTEM PROVIDES REQUIRED AUTOMATIC OFF AT DRIVE THROUGH CLOSING PLUS 2 HOURS.
ZONE 4
EXTERIOR PARKING LOT LIGHTS:
a. EXTERIOR LIGHTS ARE CONTROLLED VIA EXTERIOR PHOTOCELL, ASTRONOMICAL TIME CLOCK, RESTAURANT OPEN SWITCH, AND OVERRIDE BUTTON.
b. EXTERIOR LIGHTS SHALL NOT TURN ON UNLESS IT IS DARK AND RESTAURANT OPEN SWITCH IS ACTIVATED OR MANUAL OVERRIDE BUTTON IS PRESSED.
c. GENERAL OPERATIONAL STANDARD IS TO HAVE RESTAURANT OPEN SWITCH IN OFF POSITION UNLESS DRIVE THROUGH WINDOW IS OPEN.
d. LIGHTING CONTROL PROVIDES REQUIRED AUTOMATIC OFF. SYSTEM IS SET TO AUTOMATICALLY TURN OFF EXTERIOR LIGHTS AT PICK UP WINDOW CLOSE PLUS 2 HOURS
ZONE 5:
BUILDING SIGNS / EXTERIOR SIGNS:
a. EXTERIOR BUILDING SIGNS, EXTERIOR SIGNS ARE CONTROLLED VIA EXTERIOR PHOTOCELL, ASTRONOMICAL TIME CLOCK, RESTAURANT OPEN SWITCH, AND OVERRIDE BUTTON.
b. EXTERIOR LIGHTS SHALL NOT TURN ON UNLESS IT IS DARK AND RESTAURANT OPEN SWITCH IS ACTIVATED OR MANUAL OVERRIDE BUTTON IS PRESSED.
c. GENERAL OPERATIONAL STANDARD IS TO HAVE SIGNS OFF UNLESS RESTAURANT IS OPEN (DRIVE THROUGH IS OPEN).
d. LIGHTING CONTROL PROVIDES REQUIRED AUTOMATIC OFF. SYSTEM IS SET TO AUTOMATICALLY TURN OFF EXTERIOR LIGHTS AT DRIVE THROUGH CLOSE PLUS 2 HOURS.
EXTERIOR MENU BOARD / PRE-SALE BOARD:
a. EXTERIOR MENU BOARD AND PRE-SALE BOARD (NON-DIGITAL DRIVE THROUGH SIGNS) ARE CONTROLLED BY ASTRONOMICAL TIME CLOCK, RESTAURANT OPEN SWITCH, AND OVERRIDE BUTTON.
b. MENU BOARD SIGNS ARE ON WHEN RESTAURANT OPEN SWITCH IS ACTIVATED.
c. GENERAL OPERATIONAL STANDARD IS TO HAVE RESTAURANT OPEN SWITCH IN OFF POSITION UNLESS DRIVE THROUGH IS OPEN.
d. LIGHTING CONTROLLER PROVIDES REQUIRED AUTOMATIC OFF. SYSTEM IS SET TO AUTOMATICALLY TURN OFF EXTERIOR LIGHTS AT DRIVE THROUGH CLOSE PLUS 2 HOURS.
NON-ZONE LIGHTS
RESTROOMS:
a. LIGHTS ARE CONTROLLED BY MANUAL ON/AUTO OFF WALL MOUNTED MOTION SENSOR.
b. RESTROOM EXHAUST FAN RUNS DURING ALL OCCUPIED TIME PERIODS.
c. MOTION SENSOR IS SET TO TURN OFF LIGHTS AFTER 30 MINUTES WITH NO MOTION DETECTED.
OFFICE AREA:
a. LIGHTS ARE CONTROLLED BY MANUAL ON/AUTO OFF WALL MOUNTED MOTION SENSOR.
b. MOTION SENSOR IS SET TO TURN OFF LIGHTS AFTER 30 MINUTES OF INACTIVITY.
WALK IN COOLER / FREEZER / DRY STORAGE :
a. LIGHTS IN COOLER, FREEZER, AND DRY STORAGE ARE CONTROLLED BY CEILING MOTION SENSOR IN EACH AREA.
b. MOTION SENSOR IS SET TO TURN OFF LIGHTS AFTER 30 MINUTES OF INACTIVITY.
c. NO WALL SWITCH IS PROVIDED.
WENDY'S SEQUENCE OF OPERATION
PUSHBUTTON CONTROL ZONE ACTION COMMENTS
1
HOODS ON/OFF ZONE 1, 2, 3, 6 AND 7 xTURN ZONES ON/OFF (OFF WITH SCHEDULE)
xENABLE/DISABLE RTU THERMOSTAT OCCUPIED MODE
RTUS REVERT TO UNOCCUPIED
OPERATION WHEN OFF
2
RESTAURANT OPEN/CLOSE ZONE 4 AND 5 xTURN ZONES ON/OFF (OFF WITH SCHEDULE)
xPHOTOCELL CONTROLLED DURING RESTAURANT OPEN
3
LOT LIGHT OVERRIDE ZONE 4 xTURN ZONE ON FOR ONE HOUR (OFF WITH SCHEDULE)
4
RESTAURANT OVERRIDE ZONE 1, 2, 3
xTURN ZONES ON FOR TEMPORARY OVERIDE (OFF WITH
SCHEDULE)
xENABLE/DISABLE RTU THERMOSTAT OCCUPIED MODE
RTUS REVERT TO UNOCCUPIED
OPERATION WHEN OFF
ADDITIONAL INFORMATION
1. SEE EXPANDED LIGHTING ZONE FOR ADDITIONAL INFORMATION.
2. PUSH BUTTON 4 OVERRIDE TIME IS PROGRAMMABLE. FOR OPERATIONAL REQUIREMENTS IT IS SET TO ONE HOUR.
HOOD CONTROLS:
1. HOODS, AND ASSOCIATED KITCHEN FANS EF-1 AND EF-2, ARE ACTIVATED THROUGH HOOD PUSHBUTTON.
2. GRILL HOOD CURRENT CT: WHEN GRILL CT SENSES CURRENT, EXHAUST FANS ARE ACTIVATED. THESE ARE SAFETY FEATURES AND NOT DESIGNED METHOD FOR ACTIVATING EXHAUST FANS. PROPER
PROCEDURE FOR TURNING ON EXHAUST FANS IS USE OF HOODS ON BUTTON.
3. GRILL HOOD HEAT SENSOR: WHEN GRILL HOOD TEMPERATURE SENSOR EXCEEDS PRESET TEMPERATURE, EXHAUST FANS ARE ACTIVATED. NOTE: THESE ARE SAFETY FEATURES AND NOT DESIGNED
METHOD FOR ACTIVATING EXHAUST FANS. PROPER PROCEDURE FOR TURNING ON EXHAUST FANS IS USE OF HOODS ON BUTTON.
4. FRYER HOOD HEAT SENSOR: WHEN FRYER HOOD TEMPERATURE SENSOR EXCEEDS PRE-SET TEMPERATURE, EXHAUST FANS ARE ACTIVATED. NOTE: THESE ARE SAFETY FEATURES AND NOT DESIGNED
METHOD FOR ACTIVATING EXHAUST FANS. PROPER PROCEDURE FOR TURNING ON EXHAUST FANS IS USE OF HOODS ON BUTTON.
5. DURING FIRE EVENT EACH HOOD HAS MICROSWITCH, WIRED TO MODULAR PANEL SYSTEM TO INDICATE NORMAL OR FIRE OPERATION. DURING FIRE, SHUNT TRIPS ARE ACTIVATED FOR COOKING
EQUIPMENT PANELS AND OAU, RTU, AND EXHAUST FANS ARE FORCED ON.
6. HOODS/EXHAUST FANS ARE AUTOMATICALLY TURNED OFF BY AUTOMATIC SHUT OFF SYSTEM AFTER HOURS.
HVAC CONTROLS:
1. THERMOSTATS ARE FACTORY INSTALLED IN MODULAR PANEL SYSTEM AND PROGRAMMED FOR OCCUPIED/UNOCCUPIED CONDITIONS BY MECHANICAL CONTRACTOR.
2. FANS SHALL RUN CONTINUOUSLY IN OCCUPIED MODE WITH OUTDOOR AIR DAMPERS PROVIDING REQUIRED MAKE-UP AIR TO HOODS WITH AUTOMATIC HEATING, COOLING AND DEHUMIDIFICATION BASED
ON ROOM SENSORS, ONE FOR OAU AND ONE FOR RTU.
3. DURING UNOCCUPIED MODE, OUTDOOR AIR DAMPERS SHALL FULLY CLOSE.
4. SIGNAL FROM MODULAR PANEL SYSTEM SHALL CLOSE TWO CONTACTORS, ONE FOR OAU AND ONE FOR RTU, THAT SHALL ENABLE OCCUPIED MODE AT EACH OF TWO SENSORS REVERTING OPERATION
FOR OAU AND RTU FROM UNOCCUPIED TO OCCUPIED MODE COINCIDING WITH HOOD OPERATION.
CONTROL ZONE
1. INTERIOR LIGHTS: ON WITH HOODS BUTTON 1; OFF WITH HOODS BUTTON 1 OR SCHEDULE.
2. DINING LIGHTS: ON WITH HOODS BUTTON 1; OFF WITH HOODS BUTTON 1 OR SCHEDULE.
3. HOODS: ON WITH HOODS BUTTON 1; OFF WITH HOODS BUTTON 1 OR SCHEDULE.
4. LOT LIGHTS: ON WITH RESTAURANT BUTTON 2; OFF WITH RESTAURANT BUTTON 2 OR SCHEDULE; PHOTOCELL CONTROLLED WHEN "OPEN."
5. EXTERIOR BUILDING LIGHTS & SIGNS: ON WITH RESTAURANT BUTTON 2; OFF WITH RESTAURANT BUTTON 2 OR SCHEDULE; PHOTOCELL CONTROLLED WHEN "OPEN."
x ARCHITECT OF RECORD TO OBTAIN OPERATING TIMES FOR SITE SPECIFIC LOCATION.
x DOES RESTAURANT HAVE SAME SCHEDULE OVER 7 DAYS PER PER WEEK OR DIFFERENT
SCHEDULE ON WEEKENDS (5+2)? 7 DAY / 5+2 DAY
xx FOR 7 DAY SCHEDULE, FILL OUT ONE FORM.
xx FOR 5+2 SCHEDULE, FILL OUT 2 FORMS - ONE FOR WEEKDAY, ONE FOR WEEKEND.
ADDITIONAL SET POINT RECOMMENDATION:
KITCHEN
EVENT TYPICAL TIME
PREP START 5:00 AM
____ AM
DRIVE THRU OPEN 6:30 AM
____ AM
DRIVE THRU CLOSED 1:00 AM
____ AM/PM
CLEAN UP COMPLETE 2:30 AM ____ AM/PM
DINING ROOM
STATUS RECOMMEDED SET POINT SET POINT
UNOCCUPIED COOLING 78°F ____
OCCUPIED COOLING 73°F
____
OCCUPIED HEATING 70°F
____
UNOCCUPIED HEATING 65°F
____
DINING ROOM
EVENT TYPICAL TIME
DINING ROOM OPEN 9:30 PM
____ AM
DINING ROOM CLOSED 10:00 PM
____ AM
DINING ROOM CLEAN UP COMPLETE 11:00 AM ____ AM/PM
COMPLETION OF CHECKLIST FORM
SET HOOD SPEED/ EXHAUST SPEED
COMPLETION OF CHECKLIST FORM
FINAL CALIBRATION - T&B MC
MC
MC
MC
MC
MC
MC
MC
MC
INITIAL RTU CALIBRATION MC MC MC
INITIAL RTU CALIBRATION MC MC MC
EC EC EC
12
/
2
2
/
2
0
1
7
4
:
1
3
:
5
6
P
M
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
CONTROL WIRING
NOTES & DETAILS
W1.2
AUTHOR
CHECKER
TOTAL EXH. CFM =
20"
11"L0502 EO 1500 0.30" 0.18" 1
5
-
20"
20"EXP 18GA. 430 S.S. 495
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
HOOD DETAILS
H1.1
HALTON
HALTON
THIS ENTIRE SHEET WAS UPDATED DURING REVISIONS 3
TOTAL EXH. CFM =
20"
11"L0307 EO 1100 0.28" .16" 1
3
-
13"
13"EXPO 18 GA. 430 S.S. 385
ALUM.
BAFFLE
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
HOOD DETAILS
H1.2
HALTON
HALTON
THIS ENTIRE SHEET WAS UPDATED DURING REVISIONS 3THIS ENTIRE SHEET WAS UPDATED DURING REVISIONS 3
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
HOOD DETAILS
H1.3
HALTON
HALTON
THIS ENTIRE SHEET WAS UPDATED DURING REVISIONS 3
SP
MAXLITE
LED
MAXLITE
LED
MAXLITE
LED
EX
T
.
R
A
M
P
MA
X
L
I
T
E
LE
D
MAXLITE
LED
MA
X
L
I
T
E
LE
D
MAXLITE
LED
LCA672LCE6120
MAXLITE
LED
MAXLITE
LED
1LIGHTING PLAN
1/4" = 1'-0"
DINING
101
A- 6
A7
T2
T2
EX1B
A7
6'
P4L
P4L
EX1B
T2
T2
6'
A- 2
SWITCH E
A7
4'
T2
2'
T2
EM2B
A7
EM2B
A7
A7
8
6
2
J
J
J
#10
A7/NL
A7/NL
SWITCH C
TL1
EX1RB
T2T
T2T
T2T
T2T
T2
A7
A7 A7
A-12
SWITCH B
A6
T1 T1
P4L
P4L
SWITCH D
SWITCH C
A7/NL
T1
T1 T1
SWITCH D
K12A-2 #10
T1
A6
A-2
TL1
8
8
TL1
K12 K12
K12A-2
#10
K12K12 K12
2 A-4
J
7 A-2#10
A1
OS1 EM2WEM2W
A-17
OS1
OS OS
OS1
OS
A1
A1
A1
A1
EM2W
A1
A1
A1
A1A1
A1
5
A1/NL
A-33
SWITCH A
A1/NL
J
EM2W
4
NL
B4B4 B4
EM2W
NL
B4B4
B4
B4
EM2W
1
1
33 3
HL1HL1HL1
3
HL1
3
HL1
J
J
C-21
2
B4/NL
A-8
J
#10
NL
B4
NL
B4
NL
B4
B4
B4B4
B4
B4B4
B4
B4
OS
EM2W
A-13
B4
B4
EX1W
D
EX1RB
WP4
WB1
EX1W
OS2OS
A-11
OS2
OS
WB1
WB1
WB1
WB1
WB1
WB1
WB1WB1
K12 K12
A-2
OS2
OS
T1
T1
B4
T1
K12
A- 16
2
J
#10
EM2W
EM2W
FAMILY
103
FAMILY
102OFFICE
108
FREEZER
110
RECEIVING
112
COOLER
111
CREW
114
KITCHEN
106
DRIVE THRU
105
PAY WINDOW
113
SERVICE
104
UTILITY
116
ENTRY
100
A-25
G1
G1
12
/
2
2
/
2
0
1
7
4
:
0
9
:
5
0
P
M
LIGHTING PLAN
E1.1
KH
MJ
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
A-2
B1
RECESSED CAN LIGHT FIXTURE
RECESSED CAN NIGHT LIGHT FIXTURE
LED LIGHT FIXTURE
LED NIGHT LIGHT FIXTURE
HANGING LIGHT FIXTURE
MONO POINT LIGHT FIXTURE
EMERGENCY REMOTE EGRESS HEAD
CIRCUIT NUMBER
FIXTURE SYMBOL
OCCUPANCY SENSOR (WALL MOUNTED OR
CEILING MOUNTED)
SINGLE POLE WALL SWITCH AT 4'-6" A.F.F.
EMERGENCY FLOOR LIGHT (WALL MOUNTED OR
CEILING SURFACE MOUNTED)
DIMMER SWITCH, (LEVITON #IP710-DLZ-WH)D
OS
LIGHTING LEGEND
LED TAPE LIGHT
GLOBE PENDANT LIGHT
PENDANT LIGHT
TRACK HEAD
BUILDING MOUNTED DECORATIVE LIGHT
OS
LIGHTING TRACK
A. COORDINATE WORK WITH MECHANICAL, REFRIGERATION AND EQUIPMENT CONTRACTORS,
INCLUDING COOLER/FREEZER WORK AND ICE MACHINE CONDENSING UNITS.
B. VERIFY ROUGH-IN DIMENSIONS AND POWER REQUIREMENTS WITH KITCHEN EQUIPMENT
DISTRIBUTOR PRIOR TO ROUGH-IN.
C. PROVIDE FINAL CONNECTIONS WITHIN FRONT COUNTER, COOKCENTER PANEL, REMOTE
REFRIGERATION UNITS, AND ICE MACHINE REMOTE UNIT WHEN INSTALLED BY VENDOR.
D. VERIFY AVAILABLE FAULT CURRENT AT PRIMARY SERVICE AND COMPATIBILITY WITH
MODULAR PANEL SYSTEM.
E. ENSURE ADEQUATE CONDUIT SIZE FOR ELECTRICAL AND COMMUNICATION WIRING ON SITE
AND INTO BUILDING.
F. CIRCUITS MAY BE GROUPED WITHIN COMMON CONDUITS PER NEC REQUIREMENTS UNLESS
NOTED OTHERWISE.
G. PROVIDE WALL BOX WITH 1/2" CONDUIT WITH PULLSTRING AND NYLON BUSHING STUBBED
ABOVE NEAREST ACCESSIBLE CEILING FOR THERMOSTATS, TEMPERATURE SENSORS,
CARBON DIOXIDE SENSOR, AND HUMIDISTATS UNLESS OTHERWISE NOTED.
H. WIRE ROOF TOP UNIT CONTROL CIRCUIT THROUGH AUXILIARY CONTACTS IN SMOKE
DETECTOR AND MAKE ALL FINAL CONNECTIONS. (TYPICAL OF ALL ROOF TOP UNITS)
I. COOKCENTER IS ASSEMBLED AND PREWIRED AT THE FACTORY. WIRING IS PROVIDED IN THE
PRE- INSTALLED SPLICE BOX, COILED AND TAGGED. A LENGTH OF CONDUIT WITH WIRES IS
PROVIDED FOR THE REMOTE CONDENSING ROOFTOP UNIT. RUNS POWER FROM THE SPLICE
BOX TO THE COOKCENTER PANEL.
J. ROOFTOP UNIT IS FACTORY PROVIDED WITH DISCONNECT AND UNPOWERED SERVICE
RECEPTACLE.
K. IN AREAS WITHOUT CEILINGS OR WHERE ANY CONDUITS, CONDUCTORS, FEEDERS. OR LOW-
VOLTAGE WALL EMT CONDUIT. CABLING IS VISIBLE, ALL WIRING SHALL BE IN RIGID
GALVANIZED STEEL (RGSC) OR THIN WALL EMT CONDUIT. BX, AC, AND MC CABLE ARE NOT
PERMITTED. CONDUITS ARE TO BE RUN TIGHT TO DECK EITHER PARALLEL OR
PERPENDICULAR TO BUILDING LINES AND ONLY DROP AT POINT OF CONNECTION. JUNCTION
BOXES SHALL HAVE CIRCUIT NUMBERS WRITTEN ON THE INSIDE OF THE JUNCTION BOX
COVER.
L. SEAL ROOF PENETRATIONS PER ROOFING MANUFACTURER'S INSTRUCTIONS.
M. COORDINATE WORK ABOVE THE CEILING WITH OTHER TRADES TO PROVIDE THE GREATEST
POSSIBLE CLEARANCE.CONDUITS SHALL BE ROUTED IN THE DIRECTION OF THE TRUSSES.
N. ONLY EMT CONDUITS ARE ALLOWED IN RECEIVING/DRY STORAGE.
O. DEFINITIONS: FURNISH MEANS TO SUPPLY AND DELIVER TO PROJECT SITE, READY FOR
INSTALLATION. INSTALL MEANS TO PLAN IN POSITION AND MAKE CONNECTIONS FOR SERVICE
OR USE. PROVIDE MEANS TO FURNISH AND INSTALL, COMPLETE AND READY FOR INTENDED
USE.
1. JUNCTION BOX ABOVE CEILING FOR HOOD LIGHTS AND EXHAUST HOOD.
2. PROVIDE WEATHERPROOF JUNCTION BOX AND TOGGLE TYPE 20A-1P DISCONNECT FOR
SIGNAGE. COORDINATE EXACT REQUIREMENTS WITH SIGN CONTRACTOR. VERIFY
LOCATION PRIOR TO ROUGH IN.
3. PROVIDE LAMP FOR HOOD LIGHT. SUBSTITUTION OF CFL OR INCANDESCENT LAMP IS
PROHIBITED.
4. LOCATION OF LIGHTING SWITCH BANK. REFER TO SWITCH AND HOOD SUPPRESSION
ELEVATION ON SHEET E5.2 FOR ADDITIONAL INFORMATION.
5. PROVIDE JUNCTION BOX AND SWITCH FOR ILLUMINATED MIRROR AT 4'-0" AFF AND CONNECT
TO CIRCUIT SHOWN. REFER TO ARCHITECTURAL ELEVATIONS FOR EXACT MOUNTING
LOCATION.
6. LED TAPE LIGHTING DRIVER MUST BE INSTALLED INSIDE OF BUILDING DUE TO
TEMPERATURE RATING OF DRIVER. REFER TO LED DRIVER MOUNTING DETAIL, SHEET E5.2.
7. LIGHTS IN CANOPY PROVIDED BY CANOPY MANUFACTURER.
8. EXTERIOR LED TAPE LIGHTING 'TL1'. REFER TO ARCHITECTURAL SHEETS FOR MORE
INFORMATION. VERIFY LENGTHS AND DRIVER REQUIREMENTS PRIOR TO INSTALLATION.
REFER TO WALL PENETRATION DETAIL, SHEET E5.2.
CODED NOTES:LIGHTING GENERAL NOTES
A. CONNECT EXIT/EMERGENCY/NIGHT FIXTURES TO UNSWITCHED HOT CONDUCTOR AHEAD OF
ANY LIGHTING CONTROLS.
B. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN AND DETAILS FOR THE LOCATION OF
ALL LIGHTING FIXTURES AND ALL OTHER CEILING MOUNTED EQUIPMENT. VERIFY MOUNTING
HEIGHTS AND FINISHES WITH ARCHITECT PRIOR TO ROUGH-IN.
C. REFER TO THE POWER PLANS FOR LOCATION OF ELECTRICAL EQUIPMENT.
D. PROVIDE INDICATED CONDUCTOR SIZE FOR ENTIRE CIRCUIT WHERE CONDUCTOR SIZES
ARE SHOWN ON HOMERUNS.
E. PROVIDE A DEDICATED NEUTRAL WITH ALL DIMMING SYSTEM CIRCUITS. NO COMMON
NEUTRALS SHALL BE ALLOWED.
F. PROVIDE (2) ADDITIONAL #12 CONDUCTORS FOR ALL 0-10V DIMMING CIRCUITS.
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
12
/
2
2
/
2
0
1
7
4
:
0
9
:
5
0
P
M
PHOTOMETRIC PLAN
E1.2
KH
MJ
CT CABINET
AND METER
#CODED NOTES:
1
2POWER PLAN (ENLARGED PUW)
1/2" = 1'-0"
RECEPTACLE AND COVER PLATE LEGEND
AREA RECEPTACLE
COVER RECEPTACLE USB PORTS SPECIAL NOTES
KITCHEN &
GENERAL AREA STAINLESS STEEL WHITE NO GFI AS NOTED
DEDICATED IT
CIRCUITS STAINLESS STEEL ORANGE (IG)NO CIRCUIT MARKED AS SPG OR IG
DINING ROOM BLACK BLACK YES TAMPER RESISITANT
DINING ROOM-
CUSTOMER VIEW WHITE WHITE YES TAMPER RESISITANT
JUNCTION BOX
* = A-H AS COOKLINE JUNCTION BOXES
REFER TO DETAIL #3 ON SHEET E4.2
20 AMP 120V-1PH SIMPLEX RECEPTACLE
+16" AFF OR AS NOTED
20 AMP 120V-1PH DUPLEX RECEPTACLE
+16" AFF OR AS NOTED
120V-1PH QUADRUPLEX RECEPTACLE
SPECIAL RECEPTACLE, SEE KITCHEN
EQUIPMENT SCHEDULE
20 AMP QUADRUPLEX 120V-1PH
HUBBELL # USB20X2W (QTY 2)
DISCONNECT SWITCH BY ELECTRICAL
CONTRACTOR
DATA CONNECTION
REMOTE PIEZO ALERT FROM RTU-1 &
RTU-2 SMOKE DETECTORS (96" A.F.F.)
EMERGENCY POWER KILL SWITCH (48" AFF)
120 VOLT MOMENTARY CONTACT NORMALLY
OPEN EMERGENCY OFF SWITCH, EATON
10250T WITH SHROUD. REFER SHUNT TRIP
CIRCUIT DETAIL, SHEET E3.1
REMOTE FIRE SUPPRESSION PULL STATION (48")
VOLUME CONTROL
ELECTRIC MOTOR
TELEPHONE CONNECTION
TELEPHONE/DATA CONNECTION
REMOTE TEST STATION (54")20 AMP 120V-1PH HUBBELL
#USB20X2BK RECEPTACLE PARTIAL CIRCUIT
20 AMP 120V-1PH HUBBELL #IG5362
ISOLATED GROUND RECEPTACLE
20 AMP QUAD HUBBELL #IG5362 (QTY 2)
ISOLATED GROUND RECEPTACLE
F
RT
W
VC
RT
J
THERMOSTAT, TEMPERATURE
SENSOR AND HUMIDISTAT
BY MECHANICAL CONTRACTOR
ST
S/T
ELECTRICAL LEGEND
GFI
WP
20 AMP 120V-1PH GROUND FAULT
INTERRUPTING RECEPTACLE
20 AMP 120V-1PH WEATHERPROOF
RECEPTACLE
3 15 HOME RUN TO PANEL. CIRCUIT NUMBERS,
PHASE, NEUTRAL & GROUND CONDUCTORS
INDICATED ALONG WITH ISOLATED GROUND
CONDUCTOR IF APPLICABLE.
DISCONNECT SWITCH SUPPLIED WITH
EQUIPMENT
*
R 20 AMP 120V-1PH RECESSED
RECEPTACLE
1. IN AREAS WITHOUT CEILINGS OR WHERE ANY CONDUITS, CONDUCTORS, FEEDERS. OR
LOW-VOLTAGE CABLING IS VISIBLE, ALL WRITING SHALL BE IN RIGID GALVANIZED STEEL
(RGSC) OR THIN WALL EMT CONDUIT. BX, AC, AND MC CABLE ARE NOT PERMITTED.
CONDUITS ARE TO BE RUN TIGHT TO DECK EITHER PARALLEL OR PERPENDICULAR TO
BUILDING LINES AND ONLY DROP AT POINT OF CONNECTION. WHERE EXPOSED TO VIEW,
ALL MATERIALS (CONDUITS. JUNCTION BOXES, ETC.) SHALL BE INSTALLED IN AN ORDERLY
FASHION AND SHALL BE CLEAN AND FREE FROM ALL VISIBLE MARKING. JUNCTION BOXES
SHALL HAVE CIRCUIT NUMBERS WRITTEN ON THE INSIDE OF THE JUNCTION BOX COVER.
2. ELECTRICAL CONTRACTOR TO COORDINATE WORK WITH MECHANICAL, REFRIGERATION
AND EQUIPMENT CONTRACTORS, INCLUDING COOLER/FREEZER WORK AND ICE MACHINE
CONDENSING UNIT.
3. ELECTRICAL CONTRACTOR TO VERIFY ALL ROUGH-IN DIMENSIONS AND POWER
REQUIREMENTS WITH KITCHEN EQUIPMENT DISTRIBUTOR PRIOR TO ROUGH-IN.
4. ELECTRICAL CONTRACTOR TO HOOK UP FIELD CONNECTIONS WITHIN FRONT COUNTER,
COOKCENTER PANEL CIRCUITS, REMOTE REFRIGERATION (ON ROOF) AND ICE MACHINE
REMOTE UNIT (ON ROOF) AT TIME OF INSTALLATION.
5. GENERAL CONTRACTOR IS TO VERIFY SIZE OF FAULT CURRENT COMING OFF PRIMARY
SERVICE AND IS TO INSURE ITS COMPATIBILITY w/WENDY'S DISTRIBUTION PANEL.
6. GENERAL CONTRACTOR IS TO INSURE ADEQUATE CONDUIT SIZE FOR ELECTRICAL AND
PHONE WIRING ON SITE AND INTO BUILDING.
7. HEIGHTS INDICATED FOR RECEPTACLES AND JUNCTION BOXES ARE MEASURED FROM
FINISH FLOOR TO THE CENTER OF THE BOX.
8. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL TELEPHONE LINES AND
TERMINATIONS. VERIFY QUANTITY AND LOCATIONS WITH OWNER PRIOR TO BIDDING.
9. ALL CIRCUITS MAY BE CORRECTED TO THE LEAST AMOUNT OF CONDUIT RUN UNLESS
NOTED OTHERWISE.
10. ALL COVER PLATES TO BE SATIN FINISH STAINLESS STEEL IN BACK OF HOUSE AREA.
DINING AREA COVER PLATES SHALL BE WHITE UNLESS OTHERWISE NOTED.
11. ALL 120V RECEPTACLES IN KITCHEN AND RESTROOMS TO HAVE GROUND-FAULT CIRCUIT
INTERRUPTER PROTECTION PROVIDED IN ELECTRICAL PANELS.
12. COOKCENTER IS ASSEMBLED AND PREWIRED AT THE FACTORY. A LENGTH OF CONDUIT
W/WIRES IS PROVIDED FOR THE REMOTE CONDENSING ROOFTOP UNIT.
13. POWER DISCONNECT, UNPOWERED SERVICE OUTLET AND SMOKE DETECTOR ARE PART
OF ROOFTOP UNIT IF SUPPLIED BY AN APPROVED HVAC SUPPLIER. ELECTRICIAN MUST
PROVIDE WITH ALL OTHER MODELS (TYPICAL AT ALL RTU'S UNITS).
14. THERMOSTATS, TEMPERATURE SENSORS, CARBON DIOXIDE SENSORS AND HUMIDISTATS:
UNLESS NOTED OTHERWISE, PROVIDE WALL BOX WITH 1/2" CONDUIT STUBBED OUT TO
ABOVE ACCESSIBLE CEILING WITH NYLON BUSHINGS AND PULLSTRING.
15. MECHANICAL CONTRACTOR TO FURNISH REMOTE TEST STATION/ALARM. ELECTRICAL
CONTRACTOR TO WIRE ROOF TOP UNIT CONTROL CIRCUIT THRU AUXILIARY CONTACTS IN
SMOKE DETECTOR AND MAKE ALL FINAL CONNECTIONS. (TYPICAL OF ALL ROOF TOP
UNITS)
16. REFER TO SHEET E5.1 ELECTRICAL ELEVATIONS FOR RECEPTACLE AND COVER PLATE
LEGEND TO ENSURE PROPER RECEPTACLE TYPE, COLOR, AND COVER PLATE.
17. ALL ROOF PENETRATIONS NEED TO BE SEALED ACCORDING TO ROOFING
MANUFACTURER'S INSTRUCTIONS.
18. COORDINATE WORK ABOVE THE CEILING WITH OTHER TRADES TO PROVIDE THE
GREATEST POSSIBLE CLEARANCE.CONDUITS SHALL BE ROUTED IN THE DIRECTION OF
THE TRUSSES.
19. ONLY EMT CONDUITS ARE ALLOWED IN RECEIVING/DRY STORAGE.
20. PROVIDE WALL BOX WITH 1/2" CONDUIT STUBBED OUT TO ABOVE ACCESSIBLE CEILING
WITH NYLON BUSHINGS AND PULLSTRING FOR ALL LOW VOLTAGE DEVICES.
21. REFER TO SHEET E2.2 FOR DATA AND POS SYSTEM REQUIREMENTS.
GENERAL NOTES
2 E5.1 5
1
A-3
A0105
10
B-1
E5.1
A-31
N0508
16"
40"
4
16"
100"
100"
A-1
A-37
OFFICE
108
RT 15
RT
A-15
5
40"
A-35
A-21
+38"
CREW
114
B-39
14
S
+16"
+16"
13
+86"R
B-15
A-23
GFI
+60"
17
B-33
WH-1
RTU-1
WP
B-38
+16"
FAMILY
102
FAMILY
103
HALLWAY
109
UTILITY
116
+38"
A-21
+78"
C-24,26
A0801
+48"
B-23
QP0909
KITCHEN
106
J
2
B-30
V0105
19
+40"
J
A-32
A-1
A-35
WPB-38
+16"
PAY
WINDOW
113
V0105
V0105
B-13
B-17
J
21
FREEZER
110
16
WPB-22
J
21
COOLER
111
RECEIVING
112
WPB-38
+16"
J
10
J
10
B-22
B-41
+72"
+38"
+38"
4
B-32
19
+40"
J
J
A-24
A-30
B-3
+36"
A-19
33"
33"
T
T
T
B-5
11
A-9
DINING
101
ENTRY
100
A-29
C-28,30
UH-1
20
J
D0201
A-3
B-24
B-21
V0105
Q0605
9
D0101
J
18
DRIVE-THRU
105
2
E2.1
D3002
K1401
C-7,9
C-1,3,5
J
C-21
J
3 L0504
L0308
5
E5.1
1
8'-9" CENTER OF GRILL RECEPTACLES.
A B E F G
LKJ
6
6
CC-25,27,29
CC-26,28,30
+65"
A-1
+65"K0821 K0824
EP1537
D0101
C-2,4
+18"
22
J
C-6
WH-2
UTILITY
116
3
C-8,10
A0608
C-20
A1301
A-1
Q0606
B-29
A-1
B-7,9,11 Q0807
A-3
D1701
D1703
D1702
12
4
4
U0510 7
A-7
J
PAY WINDOW
A-7
J
B-31
A-3
V1503
D0101
V2201
V1801
C-39C-34
Q0608
V2201
V0702
C-36
C-37
1. MODULAR PANEL SYSTEM. SEE DETAIL #1 ON SHEET E3.1 FOR MORE INFORMATION.
2. JUNCTION BOX ABOVE CEILING FOR FOR USED COOKING OIL TANK ALARM. PROVIDE 1"
CONDUIT WITH PULL STRING FOR SUPPLIER FOR INSTALLATION OF ALARM. COORDINATE
REQUIREMENTS WITH SUPPLIER.
3. 120 VOLT NORMALLY OPEN MOMENTARY CONTACT MICROSWITCH MOUNTED IN HOOD
EXTINGUISHING SYSTEM SUCH THAT OPERATION OF EXTINGUISHING SYSTEM SHALL CAUSE
MICROSWITCH TO CLOSE (TYPICAL OF 2) REFER TO SHEET M1.1. REFER TO DETAIL 2, SHEET
E3.1.
4. RECEPTACLES PREWIRED IN MODULAR COUNTER. RUN CIRCUIT WIRING TO THE WALL AND
RUN ABOVE CEILING. COORDINATE WITH COUNTER SHOP DRAWINGS. PROVIDE 1" CONDUIT
WITH PULLSTRING FOR POS DATA BOXES.
5. PROVIDE RECEPTACLE FOR IRRIGATION SYSTEM CONTROLLER. COORDINATE REQUIREMENT
AND LOCATION WITH ARCHITECT.
6. REFER TO GRILL LINE ELEVATION DETAIL, SHEET E5.1 FOR CIRCUIT CONNECTIONS TO
PREWIRED JUNCTION BOXES IN KITCHEN EQUIPMENT SUPPLIED CHASE. REFER TO KITCHEN
EQUIPMENT CONNECTION SCHEDULE, SHEET E3.2 FOR ADDITIONAL INFORMATION.
7. PROVIDE POWER CONNECTION TO JUNCTION BOX ABOVE CEILING IN THIS AREA FOR STATIC
MENU BOARD. CONNECTION TO LED SPINNER MENU TRANSFORMER. MAKE CONNECTIONS
FROM TRANSFORMER TO (7) MENU PANELS. NO OTHER ELECTRICAL OR DATA DEVICES ARE
NEEDED FOR MENU BOARDS..
8. NOT USED.
9. ONE (1) POWER AND ONE (1) DATA 1" CONDUITS WITH PULL STRING UNDER SLAB.
COORDINATE EXACT PLACEMENT & LOCATE CONDUITS ACCORDINGLY PRIOR TO ROUGH-IN.
REFER TO ARCHITECTURAL PLANS. REFER TO DETAIL #10 ON SHEET E5.1.
10. PROVIDE POWER CONNECTION TO DOOR HEATER & EMERGENCY DOOR ALARM. REFER TO
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
11. PROVIDE RECEPTACLE FOR ICE MACHINE AND FREESTYLE MACHINE IN KITCHEN EQUIPMENT
SUPPLIED CHASE G1402. WIRE THROUGH JUNCTION BOXES SUPPLIED IN CHASE. COORDINATE
MOUNTING LOCATION WITH KITCHEN EQUIPMENT SUPPLIER.
12. MOUNT RECEPTACLE FOR BEVERAGE SCREEN IN CEILING BULKHEAD. REFER TO SERVICE
AREA ELEVATION, SHEET E5.1.
13. RECESSED RECEPTACLE FOR FLY LIGHT. COORDINATE FINAL LOCATION WITH ARCHITECT
PRIOR TO ROUGH-IN.
14. PROVIDE RECEPTACLE AT 18" AFF FOR CARBON DIOXIDE METER. PROVIDE CAT 5 CABLE BACK
TO MANAGERS OFFICE FOR REMOTE DISPLAY UNIT. COORDINATE FINAL LOCATIONS WITH
ARCHITECT. COORDINATE ALL REQUIREMENTS WITH VENDOR.
15. PROVIDE BOX AND CONDUIT RUN ABOVE CEILING FOR RTU REMOTE TEST SWITCH.
16. PROVIDE HEAT TRACE AND REQUIRED RECEPTACLE FOR CONDENSATION LINE, COORDINATE
WITH PLUMBING CONTRACTOR THE EXACT LOCATION PRIOR TO ROUGH-IN.
17. PROVIDE OUTLET FOR RE-CIRC PUMP. COORDINATE EXACT LOCATION AND REQUIREMENT
WITH PLUMBING CONTRACTOR. PLACE ON KITCHEN LIGHT CONTROL ZONE..
18. PROVIDE FLEXIBLE CONDUIT FROM FURNITURE MOUNTED POWER AND DATA OUTLET TO
JUNCTION BOX ON THE WALL FOR CUSTOMER SELF ORDER STATION, UPS AND POS.
COORDINATE EXACT LOCATION PRIOR TO ROUGH-IN..
19. MOUNT RECEPTACLE HORIZONTAL TO ENSURE CLEARANCE WITH COUNTER TOP AND BACK
SPLASH.
20. PROVIDE POWER CONNECTION TO UNIT HEATER. COORDINATE REQUIREMENTS WITH
MECHANICAL CONTRACTOR.
21. PROVIDE CONNECTION TO EVAPORATOR POWERED BY ROOF MOUNTED CONDENSER UNIT.
22. PROVIDE 60A 2-POLE 208V NON-FUSED DISCONNECT SWITCH FOR DISHWASHER WATER
HEATER. MOUNT 96" ABOVE FINISH FLOOR IN ACCESSIBLE LOCATION. COORDINATE WORK
WITH PLUMBING AND KITCHEN EQUIPMENT SUPPLIER.
23. PANIC HARDWARE SHALL BE INSTALLED AS PER IBC SECTION 1010.10.
24. PROVIDE RECEPTACLES FOR FUTURE DIGITAL MENUBOARD. COORDINATE EXACT MOUNTING
LOCATION PRIOR TO ROUGH-IN.
25. 1" CONDUIT WITH 1-120V CIRCUIT TO PRE-SELL BOARD.
26. PROVIDE (3) 3/4" CONDUITS FOR POWER FROM ELECTRICAL PANEL (UNDERGROUND) TO MENU
BOARD WITH THREE (3) 120V CIRCUIT FOR MENU BOARD AND PRE-SELL MENUBOARD.
27. 1" CONDUIT FORM ELECTRICAL PANEL A (UNDERGROUND) TO ORDER CANOPY WITH TWO (2)
120V POWER FOR CANOPY LIGHTING AND LCD AND ONE (1) FOR OPTIONAL CANOPY HEAT
TAPE.
28. ENSURE CONDUIT STUBS ARE WITHIN THE 5"X5" OPEN AREA IN THE BOTTOM OF EACH
CANOPY SUPPORT.
A- 7
8
J
DRIVE THRU
WINDOW
WF
E5.1
7
N0501
D0201
+38"
C-33
B-27
Q0406
B-35 B-37
11
D0200
E1417
Q0606
B-19
4
C-41
+84"
CC-19,21,23
K0821
EP1529
J
B-35
20 AMP 120V-1PH CEILING MOUNTED
RECEPTACLE
DATA CONNECTION - CEILING MOUNTED
3
108"
108"
108"
108"
24
TYPICAL
A-32A-27
V0105
28
25
26
REFER TO CIVIL
SITE SHEETS FOR
MORE INFORMATION
PRE-SELL MENU BOARD
MENU BOARD
ORDER
CONFIRMATION
BOARD 27A-20 A-22
J
J
J
A-18
A-40
A-42
J
J
A-34
J
CANOPY
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
POWER PLAN
E2.1
KH
MJ
1
1IT PLAN
1/4" = 1'-0"
1. VOLUME CONTROL AT 48" A.F.F. PROVIDE 3/4" CONDUIT TO JUNCTION BOX AT MUSIC SYSTEM.
2. 2'x4'x3/4" FIRE RESISTANT PLYWOOD BACKBOARD FOR INCOMING TELEPHONE SERVICE.
3. PROVIDE (2) 1" DATA CONDUIT WITH PULL STRING TO NETWORK HUB. PROVIDE CONNECTION
TO FURNITURE MOUNTED DATA OUTLET. COORDINATE REQUIREMENT PRIOR TO ROUGH-IN.
4. ONE (1) 1" CONDUIT WITH PULL STRING IN SLAB FOR DRIVE-THRU WINDOW. COORDINATE
EXACT LOCATION PRIOR TO ROUGH-IN. REFER TO ARCHITECTURAL PLANS. REFER TO
CONDUIT IN SLAB DETAIL, SHEET E5.1.
5. ONE (1) DATA 1" CONDUITS WITH PULL STRING UNDER SLAB. COORDINATE EXACT PLACEMENT
& LOCATE CONDUITS ACCORDINGLY PRIOR TO ROUGH-IN. REFER TO ARCHITECTURAL PLANS.
REFER TO DETAIL #10 ON SHEET E5.1.
6. SOUND SPEAKER, REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHT AND
ORIENTATION. SPEAKERS CAN BE DAISY-CHAINED SPEAKER TO SPEAKER AND WIRED BACK
TO JUNCTION BOX IN MANAGER'S OFFICE.
7. RUN (1) 3/4"CONDUIT FROM SOUND SYSTEM JUNCTION BOX IN WALL IN MANAGER'S OFFICE
ABOVE CEILING TO DINING AREA (AND PATIO) FOR SPEAKERS WITH PULL STRING.
8. PROVIDE WIRING FROM TELEPHONE BOX TO DEMARCATION POINT.
9. PROVIDE CAT 5 CABLE BACK TO MANAGERS OFFICE FOR CARBON DIOXIDE METER REMOTE
DISPLAY UNIT. COORDINATE FINAL LOCATIONS WITH ARCHITECT. COORDINATE ALL
REQUIREMENTS WITH VENDOR.
10. FRONT COUNTER REGISTER DATA OUTLETS PREWIRED IN MODULAR COUNTER. PROVIDE
1-1/2" CONDUIT WITH PULL STRING FOR POS DATA BOXES.
11. PROVIDE JUNCTION BOX WITH 1' CONDUIT WITH PULL STRING THROUGH CURB TO 2" BELOW
PAVEMENT LINE FOR CAR SENSOR DETECTOR LOOP. COORDINATE WITH CIVIL PLANS AND
COORDINATE INSTALLATION IN FIELD WITH SUPPLIER.
12. (1) 1" CONDUIT FOR DATA & (1) 1" CONDUIT FOR AUDIO AND TIMER SIGNAL UNDERGROUND TO
ORDER CONFIRMATION DISPLAY.
13. PROVIDE 1" CONDUIT WITH PULL STRING FOR FUTURE DIGITAL MENUBOARD DATA
CONNECTION. STUB UP AND CAP. COORDINATE FINAL LOCATION OF STUB-UP IN THE FIELD.
14. PROVIDE (1) 2" CONDUIT FOR DATA FROM BUILDING ABOVE CEILING TO MENUBOARD.
15. PROVIDE 1" CONDUIT WITH PULL STRING THROUGH CURB TO 2" BELOW PAVEMENT LINE FOR
DETECTOR LOOP.
16. PROVIDE 4" PVC CONDUIT/CHASE ABOVE CEILING FOR DATA DROPS FROM IT RACK. PROVIDE
AS STRAIGHT A RUN AS FEASIBLE, WITH 45DEG MAXIMUM BENDS. COORDINATE WITH OTHER
UTILITIES ABOVE CEILING.
#CODED NOTES:
A. THE CONDUITS, JUNCTION BOXES AND OUTLETS SHOWN ARE INSTALLED BY ELECTRICAL
CONTRACTOR AND ARE IN ADDITION TO THOSE INDICATED ON SHEET E2.1. ALL ITEMS SHOWN
ARE TO CLARIFY AND EMPHASIZE THE IMPORTANCE OF PROPER PLACEMENT.
B. ALL CONDUITS SHOULD BE STEEL STUBBED OUT ABOVE THE CEILING LINE AND TERMINATED
INTO A J-BOX AS NOTED AND CAPABLE OF ACCEPTING A FACEPLATE COVER.
C. ALL J-BOXES SHOULD BE INSTALLED IN SUCH A WAY THAT THEY ARE NOT BLOCKED BY OTHER
EQUIPMENT OR STRUCTURAL COMPONENTS.
D. ALL CABLE ACCESS OPENINGS THRU S/S MUST HAVE RUBBER OR PLASTIC GROMMETS
INSTALLED.
E. TELEPHONE, DATA AND CATV CABLING SHALL BE PROVIDED BY OTHERS.
F. PROVIDED NYLON BUSHINGS ON ALL CONDUITS.
G. REFER TO SHEET E1.1 FOR GENERAL ELECTRICAL NOTES.
H. MOUNT DEVICES INSTALLED ON EQUIPMENT ON NON-REMOVABLE PANEL. COORDINATE
LOCATION PRIOR TO COMMENCING ROUGH-IN WORK.
I. HEIGHTS INDICATED FOR RECEPTACLES AND JUNCTION BOXES ARE MEASURED FROM FINISH
FLOOR TO THE CENTER OF THE BOX.
LOW VOLTAGE/IT GENERAL NOTES
6
6
ENTRY
100
J
3
+65"
CHASE #3
BY KED
KITCHEN
106
DRIVE-THRU
105
E5.1
DRIVE THRU
105
J
J
11
CHASE #4
BY KED
PAY
WINDOW
113
J
+16"
11
1
N0508
E5.1 4
VC VC
40"
100"
2
8
9
+16"
100"+16"
+16"
+16"
J
OFFICE
108
CREW
114
66
FAMILY
102
FAMILY
103
HALLWAY
109
UTILITY
116
7
10
COOLER
111
FREEZER
110
RECEIVING
112
93"
D1702
D1703
D1701
D0200
D0101
+65"
+65"
5
1
3
D0201
DRIVE THRU
WINDOW
J
4
+65"
D0101
2 E5.1
5
6 E5.1
+108"
+108"
+108"
+108"
CEILING
MOUNTED
SECURITY
MONITOR
16
14
15
REFER TO CIVIL
SITE SHEETS FOR
MORE INFORMATION
PRE-SELL
MENU BOARD
MENU BOARD
CANOPY
J
J
J
J
J
12
13
ORDER
CONFIRMATION
BOARD
J
J
J
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
LOW VOLTAGE / IT PLAN
E2.2
KH
MJ
1ROOF POWER PLAN
1/4" = 1'-0"
PHOTO CONTROLS,
MOUNT ON ROOF TO
PARAPET WALL. SEE
DETAIL 02 ON THIS
SHEET
KITCHEN ICE
MACHINE
CONDENSING
UNIT
FREESTYLE ICE
MACHINE
CONDENSING UNIT
WALK - IN COOLER
CONDENSING UNIT B-34,36
EF-3
A-26
CC-12
B-26,28
EF-2
EF-1
1
SANDWICH LINE
CONDENSING UNIT
A. REFER TO SHEET E1.1 FOR GENERAL ELECTRICAL NOTES AND SHEET E2.1 FOR ELECTRICAL
LEGEND.
B. VERIFY EXACT LOCATIONS OF HVAC AND PLUMBING EQUIPMENT, CONDUIT STUB-UPS AND
POWER CONNECTIONS PRIOR TO ROUGH-IN.
C. WIRE ROOF TOP UNIT CONTROL CIRCUIT THROUGH AUXILIARY CONTACTS IN SMOKE
DETECTOR AND MAKE ALL FINAL CONNECTIONS. (TYPICAL OF ALL ROOF TOP UNITS)
D. PROVIDE NEMA 3R DISCONNECT SWITCH IF EQUIPMENT MANUFACTURER DOES NOT PROVIDE
ONE WITH EQUIPMENT. VERIFY DISCONNECT REQUIREMENTS WITH MANUFACTURER.
E. DISCONNECTS ARE SHOWN FOR REFERENCE ONLY. ACTUAL LOCATION OF DISCONNECTS
SHALL BE COORDINATED AND VERIFIED WITH EQUIPMENT MANUFACTURER AND FINAL
ORIENTATION OF EQUIPMENT ONCE PLACED ON ROOF.
1. PROVIDE CONNECTION TO ASSOCIATED HOOD ON SWITCH. COORDINATE ALL REQUIREMENTS
WITH MECHANICAL DRAWING AND HOOD WIRING DIAGRAM PRIOR TO ROUGH-IN.
2. PROVIDE 30A 208V 3P DISCONNECT SWITCH FUSED AT 15A IN NEMA 3R ENCLOSURE. PROVIDE
(2)#10 AND (1)#10 GROUND IN 3/4" CONDUIT FROM EQUIPMENT TO REMOTE UNIT. VERIFY ALL
OTHER REQUIRED WIRING. COORDINATE EXACT REQUIREMENTS WITH MANUFACTURER AND
MAKE ALL FINAL CONNECTIONS REQUIRED FOR PROPER OPERATION.
3. WEATHERPROOF RECEPTACLE PROVIDED WITH ROOF UNIT. PROVIDE POWER AS INDICATED.
4. PROVIDE 30A 208V 2P DISCONNECT SWITCH IN NEMA 3R ENCLOSURE FOR ICE MACHINE
CONDENSING UNITS. MAKE ALL CONNECTIONS TO ASSOCIATED UNIT PER MANUFACTURER'S
INSTRUCTIONS.
ROOF
4"
3/4" CONDUIT TO
CONTROL SECTION
OF FCLC.
SINGLE-GANG WEATHERPROOF
JUNCTION BOX MOUNTED
HORIZONTALLY WITH ROOF
SURFACE (TYPICAL).
PHOTO SENSOR PROVIDED BY FAN
CONTROL/LIGHTING CONTROL
PANEL SUPPLIER. INSTALL ON SIDE
OF PARAPET WALL FACING NORTH,
4" DOWN FROM THE TOP. INSTALL
PER MANUFACTURER'S
INSTRUCTIONS. ENSURE THAT NO
SHADOWS CAST DIRECTLY ON
PHOTOCELL.
TOP OF
PARAPET WALL
ROOF PLAN GENERAL NOTES #CODED NOTES:*HVAC MOTORS & EQUIPMENT CONNECTIONS
MARK SERVING MOCP V/P
UNIT
LOCATION
FEEDER
CO
N
D
U
C
T
O
R
S
(G
R
O
U
N
D
N
O
T
IN
C
L
U
D
E
D
)
WI
R
E
S
I
Z
E
GR
O
U
N
D
S
I
Z
E
EF-1 GRILL EXHAUST 20 208/1 ROOF 2 10 10
EF-2 FRYER EXHAUST 20 208/1 ROOF 2 10 10
EF-3 RESTROOM EXHAUST 20 120/1 ROOF
21212
DISCONNECT STARTER CONTROL
FA
C
T
O
R
Y
I
N
S
T
A
L
L
E
D
DI
S
C
O
N
N
E
C
T
WP
.
D
I
S
C
O
N
N
E
C
T
SW
I
T
C
H
ST
A
R
T
E
R
-
IN
T
E
G
R
A
L
WI
T
H
E
Q
U
I
P
M
E
N
T
LOCATION
SW
I
T
C
H
O
R
BR
E
A
K
E
R
IN
T
E
R
L
O
C
K
W/
T
H
E
R
M
O
S
T
A
T
WI
R
I
N
G
B
Y
NE
A
R
U
N
I
T
EQ
U
I
P
M
E
N
T
PA
N
E
L
RO
O
M
N
U
M
B
E
R
XEC
XEC
EC
X
X
X
CO
N
D
U
I
T
3/4"
3/4"
3/4"
X
X
X
108
108
108 X
2 PHOTOCELL CONTROL MOUNTING DETAIL
NOT TO SCALE
C-17,19 4B-14,16
4
WALK - IN FREEZER
CONDENSING UNIT
B-2,4,6
2
C- 31
RTU-1
MDP-3
RTU-2
MDP-4
WP
3
3
WP
B-8,10,12
2
TRANE - NATURAL GAS
TRANE - NATURAL GAS
80 208/3 ROOF 3 3
8
80 208/3 ROOF 3 3
8
RTU-1
RTU-2
XXX XEC
XXX XEC
1-1/4"X
X
108
1081-1/4"
WP
C- 31
3
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
ROOF POWER PLAN
E2.3
KH
MJ
NEUTRAL
SHUNT
TRIP
BREAKERS
IN 'MDP'
RED
BLACK
CIRCUIT
A-5
MICRO SWITCH
IN HOOD
POWER KILL
SWITCHES
NOT TO SCALE
SHUNT TRIP CIRCUIT DETAIL 2
SERIES RATED NOTES
MAIN BREAKERS IN MDP TO BE "FULLY" RATED TO WITHSTAND THE AVAILABLE
FAULT CURRENT AT M.D.P. OF 65,000 AMPS R.M.S.
2. THE DISTRIBUTION SYSTEM IS TO BE A "SERIES" RATED, TWO-TIER, 65/10 SYSTEM.
3. MOTOR LOAD CONTRIBUTION TO THESE PANELBOARDS SHALL NOT EXCEED 1.0%
OF THE PANELBOARD A.I.C. RATING.
4. WHERE "SERIES" RATING IS USED, PANELBOARDS AND DISTRIBUTION PANELS ARE
TO BE LEGIBLY MARKED TO INDICATE THE EQUIPMENT HAS BEEN APPLIED WITH A
"SERIES" COMBINATION RATING. LABELS CAN BE FACTORY INSTALLED OR
ENGRAVED PLASTIC-LAMINATE CARD. MARKING SHALL COMPLY WITH ARTICLE
110-22 OF N.E.C.
CONTROL ZONES
ZONE 1 KITCHEN LIGHTS & WORK LIGHTS
ZONE 2 DINING ROOM - GENERAL LIGHTS
ZONE 3 HOODS
ZONE 4 PARKING LOT LIGHTS
ZONE 5 EXTERIOR BUILDING LIGHTS/ BUILDING SIGNS/ MENU BOARDS
ZONE 6 NOT USED
ZONE 7 NOT USED
*SEE SHEET W1.1 FOR LIGHT ZONE CONTROL INFORMATION.
ARC FLASH LABELING
A. SWITCHBOARDS, PANELBOARDS AND BUSWAY SHALL HAVE A COMMERCIALLY
PRODUCED PERMANENT LABEL APPLIED, SIMILAR TO IMAGE BELOW, TO WARN OF
POTENTIAL ARC FLASH HAZARDS IN ACCORDANCE WITH NEC 110.16 AND NFPA 70E
B. LABELING MAY BE COMPLETED BY THE CONTRACTOR. THE CONTRACTOR SHALL
VERIFY THAT SWITCHBOARDS AND PANELBOARDS ARE PROPERLY LABELED IN THE
FIELD.
C. PROVIDE AND INSTALL A LABEL SIMILAR TO BELOW TO COMPLY WITH NEC 110.16
AND NFPA 70E. THE MARKING SHALL BE LOCATED SO AS TO BE CLEARLY TO
QUALIFIED PERSONS BEFORE EXAMINATION, ADJUSTMENT, SERVICING OR
MAINTENANCE OF THE EQUIPMENT. LABEL SHALL NOT BE LOCATED ON A HINGED
DOOR, OR A MOVABLE SERVICE.
PANEL
'C'
PANEL
'A'
PANEL
'B'
'COOK-
CENTER'
PANEL
PANEL
'MDP'
EXTERIOR WALL
POWER COMPANY
METER
WP C/T EQUIPMENT
CABINET
REFER TO SHEET W1.2
FOR MORE INFORMATION
ON 'FC/LC'
'LC'
LIGHTING
CONTROL
'FC'
FAN
CONTROL
CONTACT SUPPLIER FOR
SEISMIC BRACING.
SEE ARCHITECTURAL
SHEETS FOR CURB AT
SWITCHGEAR
NOTE: CONTRACTOR TO
ORDER ELECTRICAL PANEL
SYSTEM AT THE START OF
CONSTRUCTION GIVEN THE
6 WEEK LEAD TIME FOR THE
MODULAR PANEL SYSTEM.
CONTRACTOR TO PROVIDE
MECHANICAL AND
ELECTRICAL PLANS WHEN
PLACING ORDER.
SURGE PROTECTION
DEVICE
SPD
NOTE:
CONTRACTOR TO DOWNLOAD AND EXECUTE
MODULAR PANEL SYSTEM'S START UP AND
SYSTEM CHECK LIST REQUIREMENTS FROM
WENDY'S.
PANEL B RTU #2 *
208V
3PH, 3W
*SHUNT-TRIP BREAKER CONTROLLED
BY ANSUL SYSTEM. SHUTDOWN OF
POWER ON LOAD SIDE OF BREAKER
SHALL OCCUR ON ACTIVATION OF FIRE
SUPPRESSION SYSTEM OR UPON
MOMENTARY CONTACT OF
ELECTRICAL SHUT DOWN SWITCH "W"
SUB FEEDERS TO PANELS "A", "B", "C"
AND "COOKCENTER" ARE PREWIRED
AND PREINSTALLED INSIDE THE
MODULAR PANEL SYSTEM.
GND. 2/0
AWG, CU.
1
200/3
6
200/3*
SHUNT
TRIP
3
80/3*
SHUNT
TRIP
5
225/3*
SHUNT
TRIP
2/0 AWG, CU.
PANEL A
MDP
208/120V, 3 PHASE,
4 WIRE 65K AIC
PANEL
COOKCENTER*
MAIN WATER
SERVICE PIPE
REFER TO HVAC
CONNECTION
SCHEDULE IN
SHEET E3.2
C.T.
METER
800A. BUS
2
200/3
E.C. TO PROVIDE NEW WEATHERPROOF
C/T CABINET WITH 8OOA C/T IN
ACCORDANCE WITH UTILITY COMPANY
REQUIREMENTS.
80/3*
SHUNT
TRIP
PANEL C *
EC TO PROVIDE NEW 120/208V,
800A METER SOCKET IN
LANDLORD PROVIDED METER
BASE IN ACCORDANCE WITH
UTILITY COMPANY
REQUIREMENTS.
NEUT.
ISOLATED GROUND
2/0 AWG, CU.
BUILDING STEEL
2/0 AWG, CU.
#6 AWG, CU.
10'-0" COPPER
CLAD GND. ROD
G.C. AND UTILITY TO VERIFY CAPACITY OF EXISTING TRANSFORMER.
IF EXISTING TRANSFORMER ISN'T LARGE ENOUGH FOR UPGRADED
SERVICE SIZE, UTILITY TO UPGRADE TRANSFORMER.
E.C. TO PROVIDE TWO PARALLEL SETS OF
FOUR 600MCM EACH IN 4"CONDUIT
4
RTU #1 *
208V
3PH, 3W
ELECTRICAL DISTRIBUTION GENERAL NOTES
1. PANELS "A", "B" , "C" AND "COOKCENTER" SHALL BE CIRCUITED AS SHOWN.
2. THERMOSTATS TO BE PROVIDED WITH "FC/LC" FAN CONTROL/LIGHTING CONTROL PANEL ALONG WITH REMOTE SENSORS.
3. SYSTEM IS DESIGNED TO FORCE EXHAUST FANS ON WHEN ANSUL SYSTEM ACTIVATES TO MEET CODE REQUIREMENTS.
NEW PRE-PACKAGED,
PRE-WIRED
SWITCHGEAR MODULAR
PANEL SYSTEM
800/3P
MAIN CIRCUIT
BREAKER
NOT TO SCALE
ELECTRICAL ONE-LINE DIAGRAM 1NOT TO SCALE
ELECTRICAL DISTRIBUTION ELEVATION (CPI)3
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFIGFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
FI
FI
EC IS RESPONSIBLE FOR FIELD VERIFICATION OF SITE CONDITIONS AND REPORTING ANY DIFFERENCES
OR DISCREPANCIES TO ELECTRICAL ENGINEER PRIOR TO BID. NO EXTRAS OR CHANGE ORDERS SHALL BE
GIVEN FOR CONTRACTOR'S FAILURE TO VERIFY SITE CONDITIONS PRIOR TO BIDDING. UNLESS
SPECIFICALLY DETERMINED IN THE LEASE, IT IS THE RESPONSIBILITY OF THE TENANT TO INSTALL A
UTILITY OR SUB METER PER LANDLORD SPECIFICATIONS. ALL SUB METERS MUST BE FUNCTIONING
PROPERLY BEFORE TENANT OPENS FOR BUSINESS. THE TOTAL TENANT CONNECTED LOAD CANNOT
EXCEED THE LANDLORD SUPPLIED UTILITY.
ELECTRICAL CONTRACTOR SHALL VERIFY ALL EQUIPMENT VOLTAGE AND
AMPERAGE REQUIREMENTS PRIOR TO FINAL CONNECTION AND REPORT ANY
DIFFERENCES TO ENGINEER. DO NOT MAKE ANY FINAL CONNECTIONS IF
VOLTAGES SHOWN ON PLANS DO NOT MATCH EQUIPMENT DELIVERED.
x ALL KITCHEN 120V, SINGLE PHASE, 15A AND 20A RECEPTACLES SHALL BE GFI TYPE PER
NEC SECTION 210.8 (B).
x ALL GFCI RECEPTACLES SHALL BE INSTALLED IN A READILY ACCESSIBLE LOCATION OR A
GFCI CIRCUIT BREAKER SHALL BE USED TO FEED THE CIRCUIT NOTED.
x ALL 125V, 15A AND 20A CIRCUITS TO KITCHEN EQUIPMENT SHALL BE FED WITH A
DEDICATED NEUTRAL WIRE.
FI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
E.C. TO PROVIDE TWO PARALLEL SETS OF
FOUR 600MCM EACH IN 4"CONDUIT
FI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
GFI
MINIMUM OF
20',00" OF 1/2"
REBAR IN
BUILDING WALL
FOOTING
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
ELECTRIC DISTRIBUTION
(GAS HEAT/GAS COOKING)
E3.1
KH
MJ
GENERAL NOTES
FIXTURE & EQUIPMENT CONNECTION SCHEDULE
SYMBOL QUANTI
TY GENERAL FIXTURE DESCRIPTION
CONNECTIONS FEEDER
REMARKSKILOWATT
S
VOLTAGE/PHA
SE TYPE
PLUG
CORD
FURNIS
HED *
CONDU
CTORS*
*
WIRE
SIZE
GROUN
D SIZE
CONDUI
T SIZE
FRONT COUNTER - HOCKEY STICK
Q0606 1 REFRIGERATOR - FRONT COUNTER .888 120V/1PH DUPLEX RECEPTACLE ES 2 #12 #12 12"
E1417 1
FRONT COUNTER (PRE-WIRED)120V/1PH PRE-WIRED DUPLEX RECEPTACLE
BEVERAGE LINE - FREESTYLE
A0105 1
BEVERAGE SYSTEM, PUW - FREESTYLE .800 120V-1PH DUPLEX RECEPTACLE EC 2 #12 #12
12"
A0608 1 COFFEE BREWER 2.680 120/208V-1PH L14-20R RECEPTACLE EC 3 #12 #12
12"
A1302 1 BEVERAGE DISPENSER (BUBBLER).396 120V/1PH DUPLEXRECEPTACLE EC 2 #12 #12
12"
Q0807 1 FROSTY MACHINE - DUAL HEAD 5.8A 208V/3PH L 15-30R RECEPTACLE EC 3 #8 #10 1-1/4"
(1)
SINGLE LINE COOK CENTER EP1528
L0308 1 EXHAUST HOOD DSG2-SINGLE LINE 1.92 120V/1PH JUNCTION BOX MOUNTED IN THE HOOD EC 2 #12 #12
12"
E1528 1 SANDWICH STATION REFRIGERATOR .690 120V/1PH JUNCTION BOX 'A' IN CHASE #EP1528 ES 2 #12 #12
12"
E1528 1 SANDWICH STATION CONDENSING UNIT .172 120V/1PH JUNCTION BOX 'A' IN CHASE #EP1528 ES 2 #12 #12
12"
2 HMP6 WARMER .756 120V/1PH JUNCTION BOX 'B' IN CHASE #EP1528 ES 2 #12 #12
12"
V0608 1 BUN WARMER .600 120V/1PH JUNCTION BOX 'E' IN CHASE #EP1528 ES 2 #12 #12
12"
V1903 1 MPC-22 - WARMER .399 120V/1PH JUNCTION BOX 'E' IN CHASE #EP1528 ES 2 #12 #12
12"
V1902 1 MPC-1L - WARMER .110 120V/1PH JUNCTION BOX 'E' IN CHASE #EP1528 ES 2 #12 #12
12"
V0608 1 BUN WARMER .600 120V/1PH JUNCTION BOX 'E' IN CHASE #EP1528 ES 2 #12 #12
12"
D0201 1 POS TERMINAL .1 120V/1PH JUNCTION BOX 'F' IN CHASE #EP1528 ES 2 #12 #12
12"(2)
V0304 1 TOASTER 2.8 208V/1PH JUNCTION BOX 'G' IN CHASE #EP1528 ES 2 #12 #12
12"
V1902 1 MPC-1L - WARMER .110 120V/1PH JUNCTION BOX 'G' IN CHASE #EP1528 ES 2 #12 #12
12"
V1903 1 MPC-22 - WARMER .399 120V/1PH JUNCTION BOX 'G' IN CHASE #EP1528 ES 2 #12 #12
12"
V1903 1 MPC-22 - WARMER .399 120V/1PH JUNCTION BOX 'G' IN CHASE #EP1528 ES 2 #12 #12
12"
E1527 1 SALAD STATION 1.726 120V/1PH JUNCTION BOX 'H' IN CHASE #EP1528 ES 2 #12 #12
12"
K0502 1 MICROWAVE 1.726 208V/1PH JUNCTION BOX 'J' IN CHASE #EP1528 ES 2 #12 #12
12"
E1529 1 MEATWELL REFRIGERATION 1.726 120V/1PH JUNCTION BOX 'K' IN CHASE #EP1528 ES 2 #12 #12
12"
V1902 1 MPC-1L - WARMER .110 120V/1PH JUNCTION BOX 'L' IN CHASE #EP1528 ES 2 #12 #12
12"
K0824 1 ELECTRIC STAGING GRILL 7.2 208V/3PH SPECIAL RECEPTACLE NEMA 15-30 EC 3 #10 #10 3/4"
K0821 1 GRILL - LEFT SIDE 17.0 208V/3PH SPECIAL RECEPTACLE NEMA 15-60 EC 3 #6 #10 1"
K0821 1 GRILL - RIGHT SIDE 8.5 208V/3PH SPECIAL RECEPTACLE NEMA 15-30 EC 3 #10 #10 3/4"
KITCHEN EQUIPMENT - FRYLINE
L0504 1 EXHAUST HOOD FRYLINE 1.0 120V/1PH JUNCTION BOX MOUNTED IN THE HOOD EC 2 #12 #12
12"
J1004 1 OPEN FRYER - 4 WELL 1.0 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
12"
K1401 1 COMBI OVEN 6.8 208V/3PH SPECIAL RECEPTACLE NEMA 15-30 EC 3 #10 #10
3 4"
K1402 1 OVEN, HIGH SPEED 5.7 208V/1PH SPECIAL RECEPTACLE NEMA 6-30 EC 2 #10 #10
3 4"
Q0406 1 FREEZER, UPRIGHT - 1 DOOR 1.08 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
12"
Q0605 1 REFRIGERATOR, UNDERCOUNTER - 1
DOOR .480 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
12"
V0105 4 COOKER/WARMER 1.4 120V/1PH SIMPLEX RECEPTACLE EC 2 #12 #12
12"
V2201 1 FRY HOLDING MOLDULE 1.0 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
12"
D2201 1 FRY LINE TIMER 0.2 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
12"
V0702 1
FOOD WARMER, 3-LANE 0.5 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
12"
V1503 1 NUGGET WARMER HOLDING CABINET 1.2 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
12"
V1801 1 FRY STAGING WARMER 0.350 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
12"
Q0608 1 FREEZER, UNDERCOUNTER - 2 DOOR 0.572 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
12"
KITCHEN EQUIPMENT - PREP AREA / WAREWASH
A0801 1 TEA BREWER 1.7 120/1PH DUPLEX RECEPTACLE NEMA 5-20 EC 2 #12 #12
12"
WH-2 1
WATER HEATER (FOR T2061)6.0 208V/1PH WP DISCONNECT AT UNIT EC 2 #8 #10
3 4"
T2062 1 WAREWASH MACHINE W/BOOSTER 5.0 208V/1PH HARDWIRED EC 2 #10 #10
3 4"
KITCHEN EQUIPMENT - DRINK EQUIPMENT
QP0909 1 ICE MAKER WITH BIN - KITCHEN 0.4 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
3 4"
Q01##1 ICE MAKER REMOTE 1.260 208V/1PH WP DISCONNECT AT UNIT EC 3 #12 #12
3 4"
OFFICE/EMPLOYEE AND SAFETY
N0508 1 BACK OFFICE SAFE .18 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
12"
DINING ROOM - DRINK STAND
A0202 2 FREESTYLE BEVERAGE SYSTEM
(SELF-SERVE - DINING ROOM).800 120V/1PH DUPLEX RECEPTACLE ES 2 #12 #12
12"
QP0222 2 ICE MAKER - DINING ROOM 0.4 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
3 4"
Q01##1 ICE MAKER REMOTE 1.260 208V/1PH WP DISCONNECT AT UNIT EC 3 #12 #12
3 4"
POS SYSTEM AND KIOSK
D0101 5 POS MONITOR .1 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
12"(2)
D0201 4 POS MONITOR .1 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
12"(2)
D1701 1 CUSROMER ORDER PICK UP SCREEN .1 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
12"(2)
D1702 1 ORDER RUNNER SCREEN .1 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
12"(2)
D1703 1 BEVERAGE SCREEN .1 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
12"(2)
U0510 1 STATIC MENUBOARD .1 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
12"(2)
D1701 1 SELF ORDER STATION KIOSK .1 120V/1PH DUPLEX RECEPTACLE EC 2 #12 #12
12"(2)
A. EC - EQUIPMENT FURNISHED BY ELECTRICAL CONTRACTOR. ES - EQUIPMENT SHALL BE PREWIRED BY EQUIPMENT SUPPLIER, SUPPLIER, FIELD CONNECTIONS BY ELECTRICIAN.
B. ELECTRICAL CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS TO KITCHEN EQUIPMENT.
C. ALL HARDWIRED CONNECTIONS TO BE MADE WITH SEAL-TIGHT FLEXIBLE METAL CONDUIT WITH INSULATED GROUND WIRE INSTALLED WITH PHASE AND NEUTRAL CONDUCTORS.
GROUND WIRE TO BE BONDED AT BOTH ENDS.
D. ELECTRICAL CONTRACTOR SHALL VERIFY ALL EQUIPMENT REQUIREMENTS (INCLUDING THOSE SCHEDULED) WITH SUPPLIER PRIOR TO ROUGH-IN.
E. THE FOLLOWING KITCHEN RECEPTACLES SHALL HAVE GFI PROTECTION BY MEANS OF BREAKERS OR SEPARATE UL 943C DEVICES:
- 120V AND 208V, SINGLE PHASE, RATED LESS THAN 50A.
- 208V THREE-PHASE, RATED LESS THAN 100A.
F. PROVIDE (2)#10 AND (1)#10 GROUND IN 3/4" CONDUIT FROM EQUIPMENT TO REMOTE UNIT. COORDINATE EXACT REQUIREMENTS WITH MANUFACTURER AND MAKE ALL FINAL
CONNECTIONS REQUIRED FOR PROPER OPERATION.
*VERIFY QUANTITIES WITH ARCHITECTURAL EQUIPMENT PLAN AND SCHEDULE.*
REMARKS (#)
1. CORD WITH NEMA 15-30 PLUG PROVIDED BY KED.
2. DEDICATED CIRCUIT WITH ISOLATED GROUND.
3. REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS.
4. MOUNTING HEIGHT AS DIRECTED BY EQUIPMENT SUPPLIER.
Kitchen Equipment Schedule
E3.2
KH
MJ
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
A
B
1
'TIMELOCK' SAFE
DECAL - PART OF
MARKETING
DECALS. SUPPLIED
AND INSTALLED BY
OTHERS.
DROP BOX
N0202
SECURITY
MONITOR
'TIMELOCK'
SAFE DECAL -
PART OF
MARKETING
DECALS.
SUPPLIED AND
INSTALLED BY
OTHERS.
'TIMELOCK' SAFE DECAL -
PART OF MARKETING DECALS.
SUPPLIED AND INSTALLED BY
OTHERS.
DROP BOX
N0202
E4.1
4
'DO NOT
OPEN'
DOOR
STICKER
48" A.F.F.
(INSIDE)
E4.1
E4.1
5
2
18"
E4.1
E4.1
6
3
INSTALL NON-CONDUCTIVE 1/2"
CONDUIT WITH PULL LINE FROM
UTILITY ROOM TO J-BOX. REFER TO
DETAILS #3 & #6.
"TIMELOCK"
SAFE
DECAL
48" A.F.F.
(OUTSIDE)
SMART SAFE LOCATION
N0501
DROP BOX
N0202
OFFICE SAFE
N0508
AIM TO
VIEW
ORDERING
AREA
1SECURITY PLAN
1/4" = 1'-0"
DC
DC
DC
MD
KP
CP
AS
DB
DB
DB
OS
C1
C7
C2
C6
C5
C4
C8
WP
C11
C3
C9 C10
18"WP
MD
DR
48
"
TIME CLOCK
SECURITY
KEYPAD
48" A.F.F.
5 SECURITY KEYPAD LOCATION
NOT TO SCALE
18
"
INTERIOR ELEVATION OF COOLER/FREEZER
J-BOX WITH PULL
LINE
INTERIOR
WALL OF
WIC/WIF BOX
DOOR FROM
COOLER/FREEZER
1/2" PVC CONDUIT
NOT TO SCALE
WALK-IN PANIC BUTTON 6
INTERIOR ELEVATION
"TIMELOCK" SAFE DECAL - PART OF
MARKETING DECALS. SUPPLIED AND
INSTALLED BY OTHERS.
OF PICK-UP WINDOW
NOT TO SCALE
PUW DECALS 4
1"
COOLER CEILING
WIRING BY OTHERS
TERMINATE
CONDUIT IN J-BOX
12" CONDUIT WITH
PULL STRING
SEAL
PENETRATIONS
OF CONDUIT
WIRING BY
OTHERS
FINISHED
CEILING
GC NEED TO SEAL
INTERIOR AND EXTERIOR
CONDUIT ONCE LOW
VOLTAGE WIRING IS RUN.
NOT TO SCALE
SECURITY WIRING DETAIL 3
STOP
ALTO!
STOP
ALTO!
NO ABRIR SIN ESTAR UN GERENTE
PRESENTE Y NUNCA DESPUES
DE ANOCHECER.
DO NOT OPEN
WITHOUT MANAGER BEING
PRESENT AND NEVER AFTER DARK
5'
-
0
"
H
E
I
G
H
T
O
F
M
O
S
T
S
E
C
U
R
I
T
Y
WI
N
D
O
W
S
O
R
D
O
O
R
S
C
O
P
E
S
RED
(BACKGROUND)
WHITE (LETTERS)
DOOR CONTACTS
BACK DOOR
VIEWER
MOUNT STICKER BELOW
WINDOW OR SCOPE ON
INSIDE FACE OF REAR
DOOR EXITING STORE
NOT TO SCALE
SECURITY SIGN LOCATION 2
A. THE SAFE IS PROVIDED WITH A 3/4" DIAMETER ANCHOR HOLE IN THE BOTTOM.
ALONG WITH A LEAD SHIELD ANCHOR ASSEMBLY FOR FIELD INSTALLATION.
B. SAFE ANCHORING TO BE DONE BY LOCKSMITH.
C. THE SAFE IS TO BE ANCHORED TO THE FLOOR TO MAXIMIZE SECURITY.
D. FOR PROPER INSTALLATION FOLLOW STEPS BELOW:(ANCHOR ASSEMBLY 1/2-13
THREAD)
1. MARK THE AREA DESIRED FOR ANCHORING
2. DRILL INTO FLOOR WITH A 1" DIAMETER MASONRY BIT 1" DEEP
3. DIS-ASSEMBLE THE ANCHORING BOLT/WASHER FROM THE LEAD SHIELD
ASSEMBLY
4. TAP THE LEAD SHIELD ANCHOR IN THE FLOOR FLUSH WITH THE SURFACE
5. LOCATE AND ALIGN THE HOLE IN THE BOTTOM OF THE SAFE WITH THE LEAD
SHIELD ANCHOR IN THE FLOOR.
6. INSTALL THE FLAT WASHER/BOLT THROUGH THE BOTTOM OF THE SAFE AND
TIGHTEN SECURELY. BY DOING SO, THE SLEEVE ON THE ANCHOR ASSEMBLY
WILL SWELL, WEDGING THE ANCHOR TO THE FLOOR.
SAFE NOTES
DINING ROOM #1
FRONT COUNTER
PICK-UP WINDOW
PAY WINDOW
BACK DOOR/OFFICE
RESTROOM HALLWAY
LEVEL RECOMMENDED
LEVEL 1 THRU 3
LEVEL 2 THRU 3
LEVEL 2 & 3
LEVEL 3
LEVEL 3
CAMERAL LOCATION
C7 PATIO (IF EXISTING)
C8 EXTERIOR MENUBOARD
C9 DRIVE THRU #1
C10 DRIVE THRU #2
C11 MAIN ENTRANCE DOOR
LEVEL RECOMMENDED
LEVEL 1 THRU 3
LEVEL 1 THRU 3
LEVEL 1 THRU 3
LEVEL 1 THRU 3
LEVEL 1 THRU 3
LEVEL 1 THRU 3
CAMERAL LOCATION
C1
C2
C3
C4
C5
C6
SECURITY CAMERA LOCATION
MOUNTING NOTES
IN FRAME HEAD ON LATCH SIDE OF OPENING
CEILING MOUNT
WALL MOUNT 12" TO 18" A.F.F.
WALL MOUNT 65" A.F.F.
WALL MOUNT ABOVE DOOR
SIREN JUST ABOVE CEILING STROBE SURFACE MOUNTED ON
CEILING
SEE SAFE INSTRUCTION
BOLTED DOWN UNDER REGISTER
WALL MOUNT 8" BELOW CEILING -OR- CEILING MOUNT
POST MOUNTED TIGHT TO UNDERSIDE OF STRUCTURE
ADDITIONAL 120 VAC POWER REQUIRED
MOUNTED INSIDE UPPER CABINET IN MANAGERS
OFFICE. ADDIATIONAL 120 VAC AC POWER REQUIRED
ITEM
DOOR CONTACT
MOTION DETECTOR (360
DEGREE CEILING MOUNTED)
WALK-IN PANIC BUTTON
KEYPAD
CONTROL PANEL
SIREN / STROBE
OFFICE SAFE
DROPBOX
CAMERA
SECURITY MONITOR
DVR
MARK
BOLTED DOWN UNDER REGISTER(S)SMART SAFE
SECURITY LEGEND
DC
KP
CP
SS
OS
DB
CX
AS
MD
WP
DR
ENTRY
100
SERVICE
DINING
101
PREP. AREA
107
DRIVE THRU
105
KITCHEN
106
SERVICE
104
UTILITY
116
FAMILY
103FAMILY
102
OFFICE
108
RECEIVING
112
COOLER
111
FREEZER
110
PAY WINDOW
113
CREW
114
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
SECURITY PLAN
E4.1
KH
MJ
E FG
AB
LJK
4'
-
6
"
D0101
E1537
V1902
V1902
E1529
V1903
V1903
V0105
EP1537
NOTE:
THE COOKCENTER IS UL LISTED.
STANDARD RECEPTACLE IN COOKCENTER WITH GFI BREAKERS.
CHASES ARE PRE-WIRED. PULL WIRES TO CONNECT PANEL CIRCUITS TO
CORRESPONDING EQUIPMENT IN THE CHASE J-BOXES. REFER TO
SEPARATE FEEDS JUNCTION BOX SCHEDULE AND KITCHEN EQUIPMENT
SCHEDULE.
VERIFY CONFIGURATIONS WITH SHOP DRAWINGS.
L0307
K0821
V0608
V0403
V0601
5'
-
5
"
6"1'-4"3"3"
8'-8"
V1903
V1902
V1902
V1902
SEPARATE FEED JUNCTIONS BOX SCHEDULE
SINGLE LINE COOK CENTER
EQ. NO.DESCRIPTION CONNECTED THROUGH CIRCUIT NO.
E1528 SANDWICH STATION REFRIGERATOR JUNCTION BOX 'A' CC-8
E1528 SANDWICH STATION CONDENSING UNIT (ROOF)JUNCTION BOX 'A' CC-12
HMP6 BUILT IN WARMER JUNCTION BOX 'B' CC-6
HMP6 BUILT IN WARMER JUNCTION BOX 'B' CC-17
V0608 BUN WARMER JUNCTION BOX 'E' CC-4
V1903 MPC-22 - WARMER JUNCTION BOX 'E' CC-10
V1902 MPC-1L - WARMER JUNCTION BOX 'E' CC-11
D0201 KITCHEN VIDEO SCREEN JUNCTION BOX 'F' A-1
V0403 TOASTER JUNCTION BOX 'G'
CC-1,3
V1902 MPC-1L - WARMER JUNCTION BOX 'G' CC-16
V1903 MPC-22 - WARMER JUNCTION BOX 'G' CC-18
K0502 MICROWAVE JUNCTION BOX 'J'
CC-13,15
E1529 MEATWELL REFRIGERATION JUNCTION BOX 'K' CC-2
V1902 MPC-1L - WARMER JUNCTION BOX 'L' CC-20
K0821 GRILL - LEFT SIDE SPECIAL RECEPTACLE NEMA 15-60
CC-25,27,29
K0821 GRILL - RIGHT SIDE SPECIAL RECEPTACLE NEMA 15-30
CC-26,28,30
K0824 ELECTRIC STAGING GRILL SPECIAL RECEPTACLE NEMA 15-30
CC-5,7,9
DRY STORAGE ONLY
6"
D0101
INSTALL WITH
GROUND PIN UP
15-60R 15-30R 15-30R
6"
K0824
OPEN TO
BEYOND
1'
-
4
"
8'
-
4
"
3'
-
2
"
V0105
ANSUL PULL
STATION
EMERGENCY
SHUT-FF SWITCH
USED COOKING
OIL ALARM
D0201
D0600
N0501
N0202
HEADSET HOLDER
2'-0"3'-5"1'-2"
2'-2"
1'-6"
NOT TO SCALE
PAY WINDOW COUNTER ELEVATION 6
4'
-
0
"
2'-3"
SWITCH 'E'
DIMMER SWITCH 'F'
SWITCH 'D'
UNDER HOOD
POWER KILL
BUTTON
SWITCH 'B'
SWITCH 'A'
SWITCH 'C'
SWITCH
NOTES
x ENGRAVE COVERPLATE PER
CONTROL ZONE
x DIMMER SHALL HAVE INDIVIDUAL
NEUTRAL CONDUCTOR
x DIMMER SWITCHES SHALL BE
INSTALLED PER MANUFACTURE
REQUIREMENTS
CONTROL ZONE
A SERVICE/HALLWAY
B DISPLAY LIGHTS
C TRACK LIGHTS
D MONOPOINT LIGHTS
E DINING LIGHTS
F KITCHEN LIGHTS
HOOD SYSTEM
ANSUL PULL
A0801
QP0909
3'
-
1
"
3'
-
1
"
1'
-
4
"
3'-0"2'-7"2'-1"2'-6"4'-7"
1/2" = 1'-0"
SWITCH AND HOOD FIRE SUPPRESSION ELEVATION 7
NOT TO SCALE
GRILL LINE ELEVATION 5
1'
-
4
"
5'
-
5
"
11"
1'-3"
1'-7"
2'-3"
1'-11"
FINISH FLOOR
COORDINATOR SCREEN
POWER
COORDINATOR
SCREEN DATA
PRINTER CABLE BOX
PROVIDE 1 12" CONDUIT
TO ABOVE CEILING.
V0105
Q0605
3'
-
6
"
PRINTER POWER
D0101
POS DATA
POS POWER
1" DATA CONDUIT TO
ABOVE CEILING WITH
BUSHING AND PULL WIRE
1'
-
4
"
11"
1'-6"
3'-2"
4'-0"
4'-8"
3'
-
4
"
8'
-
4
"
3'-6"
FINISH FLOOR
NETWORK HUB
DATA
SOUND SYSTEM
POWER
SOUND SYSTEM DATA
OFFICE POWER
OFFICE DATA
OFFICE POWER
QUAD RECEPTACLE
NETWORK HUB
TELEPHONE J-BOX.
GC TO PULL TELEPHONE
WIRE FROM D-MARC TO
J-BOX.
N0508
1" DATA CONDUIT TO
ABOVE CEILING WITH
BUSHING AND PULL WIRE
1/2" = 1'-0"
OFFICE WALL DETAIL 4
2DRIVE THRU BACK COUNTER
1/2" = 1'-0"
Q0606
Q0807
D0201
D1701 D0101D1703
D1702
E1417
2'-10"
1'
-
4
"
6'
-
1
0
"
TIMER POWER
TIMER DATA
POS POWER
POS DATA
PRINTER CABLE
BOX PROVIDE 1 12"
CONDUIT TO
ABOVE CEILING.
A0105
A1301
A0608
2'-8"
7'-11"
7'
-
9
"
OPEN TO
BEYOND
3'-2"1'-0"1'-9"
9'
-
3
"
3'-2"
4"
9'
-
0
"
3'-7"4"
OUTLET PROVIDED IN THE
MODULAR COUNTER
1'-6"3'-2"
1-1/2" CONDUIT WITH
PULL STRING FOR DATA,
AND 1" CONDUIT FOR
POWER
Q0606
JUNCTION BOX IN WALL
TO TIE INTO POS
COUNTER
3'
-
0
"
3'
-
4
"
1" DATA CONDUIT TO
ABOVE CEILING WITH
BUSHING AND PULL WIRE
1/4" = 1'-0"
SERVICE AREA ELEVATION 3
J1004
D0101
K1401
Q0406
K1402
N0501
4'
-
0
"
2'
-
6
"
1'
-
4
"
CAR DETECTOR
LOOP JUNCTION BOX
DRIVE THROUGH
POWER
6'
-
1
0
"
2'
-
3
"
A1301
A0513
A0105
Q0807
D0201
L0504
D1701
CAR DETECTOR
LOOP JUNCTION BOX
DRIVE THROUGH
POWER
1'
-
4
"
8"8"8"8"2'-10"6"11 1/4"
4"
8"
V1801
V0702
V1503
Q0608
D2201
V2201
J1004
1'-4"
2'-11"
1'-4"1'-4"
3'
-
3
"
1FRYER LINE ELEVATION
NOT TO SCALE
12
/
2
2
/
2
0
1
7
4
:
1
0
:
5
6
P
M
ELECTRICAL ELEVATIONS
E5.1
KH
MJ
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
EXTEND CONDUIT 6"
BEYOND FLOOR
FLOOR
SEALANT APPLIED WITHIN
ANNULUS FLUSH WITH TOP
SURFACE OF FLOOR(TYP)
1CONDUIT FLOOR PENETRATION
NOT TO SCALE
EXTEND
CONDUIT 6"
BEYOND FLOOR
FLOOR NEW CONCRETE
PATCH
NOT TO SCALE
CONDUIT IN SLAB 2
GALVANIZED
RIGID
CONDUIT
EXTEND CONDUIT
6" BEYOND WALL
CAULK AROUND BOTH END OF
SLEEVE WITH WEATHER
PROOF CAULK (TYP)
1/2" (TYP)
WALL
SEAL BOTH ENDS
OF CONDUIT ONCE
WIRE HAS BEEN
INSTALLED
3CONDUIT WALL PENETRATION
NOT TO SCALE
MOUNT LED DRIVER IN
ACCESSIBLE LOCATION AND AS
INCONSPICUOUS AS POSSIBLE
CEILING JOIST
ROOF
EXTERIOR WALL
NOT TO SCALE
LED DRIVER MOUNTING DETAIL 4
FINISH FLOOR
D3002
2'
-
5
"
2'-6"2'-6"
D3002 D3002
1'-3"
1" DATA CONDUIT TO
ABOVE CEILING WITH
BUSHING AND PULL WIRE
5CUSTOMER SELF ORDER STATION
NOT TO SCALE
12
/
2
2
/
2
0
1
7
4
:
1
0
:
5
6
P
M
ELECTRICAL ELEVATIONS
E5.2
KH
MJ
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
260500 - COMMON WORK RESULTS FOR ELECTRICAL
A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL NEW
COMPLETE ELECTRICAL SYSTEM AS INDICATED ON DRAWINGS, AS REQUIRED BY CODE AND AS
SPECIFIED HEREIN, IN SECTIONS 260500 THROUGH 270511.
1. TEMPORARY SERVICE AS REQUIRED.
2. PRIMARY DISTRIBUTION BY ELECTRIC COMPANY.
3. SECONDARY SERVICE AND METERING INSTALLATION BY CONTRACTOR.
4. EMERGENCY AND EXIT LIGHTING SYSTEMS.
5. TELEPHONE SYSTEM CONDUIT AND CABLES AS SHOWN ON THE DRAWINGS.
6. LIGHTING, HEATING AND POWER PANELS AND BRANCH CIRCUIT WIRING.
7. WIRING DEVICES AND PLATES.
8. INTERIOR AND EXTERIOR LIGHTING FIXTURES AND LAMPS, INSTALLATION AND WIRING.
9. LIGHTING CONTROLS.
10. CONNECTIONS TO EQUIPMENT FURNISHED BY OTHERS.
B. WORK WHICH SHALL BE PERFORMED BY OTHERS INCLUDES THE FOLLOWING:
1. FINAL CONNECTIONS OF MISCELLANEOUS EQUIPMENT BY ELECTRICAL CONTRACTOR.
2. CONTROL WIRING THAT IS FURNISHED BY OTHERS PRE-WIRED IN UNITS.
3. TELEPHONES AND FINAL CONNECTION OF WIRING THERETO.
4. INTERNAL WIRING OF EQUIPMENT FURNISHED AND PRE-WIRED BY OTHERS.
5. SECURITY SYSTEM FURNISHED AND INSTALLED BY SECURITY CONTRACTOR.
C. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND EQUIPMENT NECESSARY TO
INSTALL ALL OF THE 208/120 VOLT ELECTRICAL SERVICE FROM THE UTILITY COMPANY
TRANSFORMER TO THE SERVICE ENTRANCE EQUIPMENT, INCLUDING CABLES, CONDUIT, PULL
WIRE, AND GROUND ROD AND SLEEVE. CONTRACTOR SHALL COORDINATE INSTALLATION OF THE
MAIN ELECTRICAL DISCONNECT WITH THIS WORK.
D. ELECTRICAL EQUIPMENT FURNISHED BY OTHER TRADES OR BY THIS CONTRACTOR AND SPECIFIED
IN OR SHOWN ON CONTRACT DOCUMENTS SHALL BE INSTALLED AND CONNECTED BY THIS
CONTRACTOR, EXCEPT AS OTHERWISE NOTED. PROVIDE BRANCH CIRCUIT CONNECTIONS TO
ELECTRICALLY OPERATED EQUIPMENT FURNISHED BY OTHERS AS SPECIFIED IN OR SHOWN ON
THE CONTRACT DOCUMENTS. TEMPORARY WIRING FOR OTHER CONTRACTORS SHALL BE
FURNISHED AND INSTALLED BY THIS CONTRACTOR WHO SHALL BE ENTIRELY RESPONSIBLE FOR
THE SAFE AND SATISFACTORY OPERATION OF SAID TEMPORARY WIRING. COMPLY WITH LATEST
REQUIREMENTS OF OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA). PROVIDE PERSONNEL
GROUND FAULT PROTECTION ON ALL TEMPORARY POWER AND LIGHTING CIRCUITS 30 AMPERES
OR LESS. GROUND FAULT CIRCUIT INTERRUPTERS ON CONSTRUCTION CIRCUITS ARE NOT
REQUIRED WHERE CIRCUIT IS A PERMANENT CIRCUIT TO BE A PART OF THE COMPLETED
BUILDING. HOWEVER, CONTRACTOR SHALL PROVIDE APPROVED CORD SETS INCORPORATING
GFCI PROTECTION FOR PERSONNEL. REFER TO THE NEC.
E. ALL FINISH PAINTING IS TO BE PERFORMED BY GENERAL CONTRACTOR EXCEPT THAT THIS
CONTRACTOR SHALL RESTORE TO ORIGINAL CONDITION ANY PAINTING DEFACED BY THIS
CONTRACTOR AFTER ORIGINAL PAINTING.
F. ALL WORK SHALL BE DONE IN ACCORDANCE WITH:
1. 2017 NATIONAL ELECTRICAL CODE.
2. CODES: STATE, CITY AND COUNTY BUILDING CODES AND ORDINANCES.
3. NATIONAL BOARD OF FIRE UNDERWRITERS.
4. CERTAIN CODES AND STANDARDS AS SET UP BY VARIOUS TECHNICAL SOCIETIES SUCH AS
UL, NEMA, NECA, IEEE, ASTM, IES, IPCEA, AND ANSI.
5. THIS WORK SHALL BE GOVERNED ALSO BY LOCAL INSPECTOR'S REQUIREMENTS.
6. FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT STANDARDS.
7. AMERICANS WITH DISABILITIES ACT.
G. ALL PERMITS REQUIRED BY LAWS, ORDINANCES AND BUILDING CODES HAVING JURISDICTION
SHALL BE OBTAINED AT PROPER TIME BY AND AT THE EXPENSE OF THIS CONTRACTOR.
H. ALL ELECTRICAL WORK SHALL BE INSPECTED BY THE GOVERNMENTAL AGENCY HAVING
JURISDICTION, INCLUDING LOCAL INSPECTION AUTHORITIES.
I. UPON COMPLETION OF THE WORK, THIS CONTRACTOR SHALL FURNISH TO THE ARCHITECT A
CERTIFICATE OF INSPECTION AND APPROVAL FROM THE ABOVE DEPARTMENT BEFORE FINAL
PAYMENT ON CONTRACT WILL BE ALLOWED.
J. TEST ALL WIRING AND CONNECTIONS FOR CONTINUITY AND GROUNDING BEFORE ANY EQUIPMENT
IS CONNECTED. WHEN DIRECTED BY ARCHITECT, DEMONSTRATE BY PROPER VOLTAGE MEGGER
TEST OF INSULATION RESISTANCE OF ANY CONDUCTORS AND REPLACE ALL CONDUCTORS WHICH
FAIL SAID TESTS UNTIL ALL CONDUCTORS ARE FREE FROM INSULATION FAULTS.
K. ELECTRICAL LAYOUTS ARE SCHEMATIC. EXACT LOCATIONS ARE DETERMINED BY EXACT LOCATION
OF EQUIPMENT, ETC., AND MAY BE REVISED TO SUIT THE CONSTRUCTION CONDITIONS AND AID IN
COORDINATION WITH WORK OF OTHER CONTRACTORS.
L. ELECTRICAL DRAWINGS ARE INTENDED TO INDICATE APPROXIMATE LOCATIONS OF SWITCHES,
RECEPTACLES, LIGHTING FIXTURES AND OTHER ITEMS OF VARIOUS ELECTRICAL SYSTEMS OF
PROJECT. EXACT LOCATIONS AND ROUGH-IN DIMENSIONS FOR ALL WORK AND EQUIPMENT SHALL
BE OBTAINED FROM ARCHITECT OR OWNER AS WORK PROGRESSES. SHOULD THE ELECTRICAL
CONTRACTOR FAIL TO PROPERLY OBTAIN SUCH LOCATIONS OR DIMENSIONS, THE CONTRACTOR
SHALL REVISED THE LOCATIONS AT THE CONTRACTOR'S EXPENSE WHEN REQUESTED BY
ARCHITECT OR OWNER. ARCHITECT AND OWNER RESERVE THE RIGHT TO MAKE MINOR CHANGES
IN LOCATION OF ELECTRICAL WORK OR EQUIPMENT PRIOR TO ROUGHING IN WITH NO ADDITIONAL
COST.
M. OWNER RESERVES THE RIGHT TO DIRECT REMOVAL AND REPLACEMENT OF ANY ITEM WHICH DO
NOT PRESENT AN ORDERLY OR REASONABLY NEAT OR WORKMANLIKE APPEARANCE, PROVIDED
THAT SUCH ITEM CAN BE PROPERLY INSTALLED IN SUCH ORDERLY WAY BY METHODS USUAL IN
SUCH WORK. ADDITIONALLY, OWNER WILL DIRECT REMOVAL AND REPLACEMENT OF ANY ITEM
WHICH DOES NOT COMPLY WITH CONTRACT DRAWINGS OR SPECIFICATIONS. SUCH REMOVALS OR
REPLACEMENTS SHALL BE AT THE SOLE DISCRETION OF THE OWNER AND SHALL BE DONE BY
CONTRACTOR, AT THE CONTRACTOR'S EXPENSE, WHEN SO DIRECTED IN WRITING BY THE OWNER.
N. THE MATERIALS AND EQUIPMENT INSTALLED IN THE WORK SHALL MEET THE REQUIREMENTS OF
THE CONTRACT DOCUMENTS AND NO MATERIALS OR EQUIPMENT SHALL BE ORDERED UNTIL
REVIEWED BY THE OWNER.
O. MANUFACTURER'S CATALOG CUTS MAY BE SUBMITTED FOR STANDARD CATALOG LIGHTING
FIXTURES AND OTHER EQUIPMENT. CATALOG CUTS MAY BE MARKED UP TO MEET THE PROJECT
SPECIFICATIONS. CUTS SHALL BE MARKED TO INDICATE MODEL NUMBER, SIZE, TYPE, COLOR,
RATING, ETC., OF THE ITEM TO BE FURNISHED.
P. PROVIDE INSTRUCTION TO OWNER'S OPERATING PERSONNEL AS NECESSARY, SHOWING
LOCATIONS AND PROPER OPERATION OF MAJOR ITEMS OF EQUIPMENT AND SYSTEM
COMPONENTS AND REFERRING TO THE OPERATING INSTRUCTION MANUAL DESCRIBED BELOW AS
A GUIDE.
Q. COMPILE TWO (2) WRITTEN MANUALS OF OPERATING INSTRUCTIONS INCLUDING COPIES OF SHOP
DRAWINGS AND A LISTING OF EQUIPMENT SUPPLIERS. ASSEMBLE IN 8-1/2" X 11" HARD BACKED
INDEXED BINDER. MATERIAL SHALL BE AS FOLLOWS:
1. TITLE PAGE: TITLE OF JOB, TENANT, ADDRESS, DATE OF SUBMISSION, CONTRACTOR, AND
ENGINEER.
2. INDEX.
3. LIST OF MAJOR EQUIPMENT USED IN PROJECT ACCOMPANIED BY CONTRACTOR PURCHASE
ORDER NUMBERS AND SUPPLIERS' NAMES AND ADDRESSES.
4. ONE COPY OF EACH SHOP DRAWING GROUPED BY TYPES OF EQUIPMENT, I.E., LIGHTING
FIXTURES, PANELBOARDS, ETC.
5. SECTION FOR EACH SYSTEM, INCLUDING:
a. BRIEF DESCRIPTION OF SYSTEM OPERATION WITH LOCATION OF MAJOR COMPONENTS.
b. LIST OF ITEMS IN SYSTEM REQUIRING PERIODIC SERVICE. REQUIRES SEPARATE SECTION
FOR EACH OF: ELECTRICAL DISTRIBUTION SYSTEM FROM THE SERVICE ENTRANCE TO
EACH LIGHTING AND POWER PANEL AND OTHER SYSTEMS (I.E. CONTROL SYSTEMS AND
ANY OTHER ELECTRICAL CONTRACTOR SYSTEM LISTED IN THESE SPECIFICATIONS.)
R. ELECTRICAL CONTRACTOR SHALL GUARANTEE HIS WORKMANSHIP AND MATERIAL FOR A PERIOD
OF ONE YEAR FROM DATE OF SUBSTANTIAL COMPLETION AND LEAVE HIS WORK IN PERFECT
ORDER AT COMPLETION.
S. SHOULD DEFECTS DEVELOP WITHIN GUARANTEE PERIOD, THIS CONTRACTOR SHALL, UPON
NOTICE OF SAME, REMEDY DEFECTS AND HAVE DAMAGES TO OTHER WORK OR FURNISHINGS
CAUSED BY DEFECTS OR WORK OR CORRECTING SAME REPAIRED AND/OR REPLACED AT HIS
EXPENSE TO CONDITION BEFORE SUCH DAMAGE.
T. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL
INSTALLATION SHALL BE PROVIDED TO THE BUILDING OWNER. RECORD DRAWINGS SHALL INCLUDE
AS A MINIMUM THE LOCATION AND RATING OF EACH PIECE OF EQUIPMENT, GENERAL
CONFIGURATION OF WIRE AND CONDUITS INCLUDING SIZES AND ROUTING, ETC.
260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
A. CONDUCTORS SHALL BE COPPER. UNLESS NOTED OTHERWISE ON THE DRAWINGS, THE MINIMUM
COPPER WIRE SIZES FOR WET AND DRY AREAS AS DEFINED BY THE NEC.
B. CONDUCTORS USED FOR EMERGENCY LIGHTING CIRCUITS SHALL BE #10 AWG, MINIMUM, AND
SHALL BE RUN IN SEPARATE CONDUIT USED FOR NO OTHER PURPOSE.
C. THE FOLLOWING COLOR CODE SHALL BE USED:
208/120 VOLT
PHASE A BLACK
PHASE B RED
PHASE C BLUE
NEUTRAL WHITE
GROUND GREEN
ISOLATED GROUND GREEN/YELLOW TRACER
260526 - GROUNDING AND BONDING
A. FURNISH AND INSTALL A COMPLETE GROUNDING SYSTEM IN COMPLIANCE WITH ALL
REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE.
B. BOND ALL STRUCTURAL STEEL TO EARTH, GROUND RODS OR PLATES, OR WATER SYSTEM AND
ISOLATED GROUND FOR IT.
C. BOND ALL ROOF MOUNTED EQUIPMENT TO NEC ACCEPTABLE GROUNDS ONLY.
D. A SEPARATE EQUIPMENT GROUNDING CONDUCTOR, MINIMUM SIZE PER NEC TABLE 250.122, SHALL
BE INSTALLED IN ALL FEEDERS, BRANCH CIRCUITS AND CONTROL CIRCUITS. CONDUCTOR
INSULATION SHALL BE GREEN.
E. CONDUIT SYSTEM SHALL BE ELECTRICALLY CONTINUOUS. ALL ENCLOSURES AND NON-CURRENT
CARRYING METALS TO BE GROUNDED. ALL LOCK NUTS MUST CUT THROUGH ENAMELED OR
PAINTED SURFACES ON ENCLOSURES. WHERE ENCLOSURES AND NON-CURRENT CARRYING
METALS ARE ISOLATED FROM THE CONDUIT SYSTEM, USE BONDING JUMPERS WITH APPROVED
CLAMPS.
F. ALL RECEPTACLES SHALL BE BONDED TO A GROUND CONDUCTOR USING A #12 AWG MINIMUM
BONDING JUMPER BETWEEN RECEPTACLE TERMINAL AND GROUND CONDUCTOR.
METAL-TO-METAL CONTACT BETWEEN THE DEVICE YOKE AND THE OUTLET BOX IS NOT
ACCEPTABLE FOR EITHER SURFACE MOUNTED BOXES OR FLUSH TYPE BOXES.
G. LIGHTING FIXTURES SHALL BE GROUNDED BY THE USE OF A PIGTAIL FASTENED ON BARE METAL
THAT IS FREE OF PAINT.
260533 - RACEWAY AND BOXES
A. ELECTRICAL CONDUCTORS SHALL BE ENCLOSED IN CONTINUOUS GROUNDED EMT CONDUIT
RACEWAY SYSTEM EXCEPT AS OTHERWISE NOTED.
B. RACEWAY AND ENCLOSURE SIZES SHALL BE AS SHOWN ON DRAWINGS OR, IF NOT SHOWN, SHALL
BE SIZED TO COMPLY WITH NEC FILL REQUIREMENTS FOR CONDUCTORS ENCLOSED.
C. PULL OR JUNCTION BOXES SHALL BE PROVIDED IN ALL RACEWAY SYSTEMS AT MAXIMUM OF 100
FOOT INTERVALS AND WHERE REQUIRED TO AVOID EXCESSIVE NUMBER OF BENDS, TO FACILITATE
WIRE PULLING OR TO PROVIDE ACCESS TO RACEWAY SYSTEM.
D. RACEWAYS AND ENCLOSURES SHALL BE ADEQUATELY SUPPORTED FROM BUILDING STRUCTURE
WITH APPROVED SUPPORT RODS AND/OR CLAMPS.
E. ALL CONDUIT SHALL BE RIGID HEAVYWALL GALVANIZED STEEL OR THIN WALL EMT WHERE
PERMITTED BY CODE OR AS HEREINAFTER SPECIFIED. PVC SCHEDULE 80 CONDUIT WITH RIGID
GALVANIZED STEEL ELBOWS MAY BE USED UNDER FLOOR SLAB. MINIMUM CONDUIT SIZE SHALL BE
1", UNLESS NOTED OTHERWISE ON PLANS OR DETAILS.
F. ALL CONDUIT FITTINGS SHALL BE GALVANIZED MALLEABLE IRON OR STEEL. CONNECTORS AND
COUPLINGS SHALL BE THREADED OR CUPPED SET SCREW TYPE, CONCRETE TIGHT. CONDUIT
BODIES SHALL BE MALLEABLE IRON, THREADED FOR HEAVYWALL CONDUIT AND CUPPED SET
SCREW TYPE FOR EMT, WITH CADMIUM FINISH AND CADMIUM PLATED SHEET STEEL COVERS.
SYNTHETIC RUBBER GASKETS SHALL BE USED UNDER BODY COVERS EXPOSED TO WEATHER. EMT
CONNECTORS SHALL BE INSULATED THROAT TYPE.
G. EMT THIN WALL CONDUIT MAY BE USED INSIDE HOLLOW PARTITIONS, AND ABOVE SUSPENDED
CEILINGS AND EXPOSED ABOVE 8'-0" ABOVE FINISHED FLOOR OR ABOVE PANELBOARDS. EMT
CONDUIT MAY NOT BE USED BURIED IN EARTH OR FILL, IN OR UNDER CONCRETE FLOOR OR IN
POURED CONCRETE CONSTRUCTION. PVC CONDUIT USED UNDER FLOOR SLABS SHALL HAVE
RIGID GALVANIZED STEEL ELLS AND METALLIC CONDUIT ABOVE FLOOR SLAB.
H. CONDUIT SHALL GENERALLY BE CONCEALED WHERE POSSIBLE. NO CONDUIT SHALL BE RUN IN
SLAB, EXCEPT AS REQUIRED FOR FLOOR-MOUNTED DEVICES.
I. EXPOSED CONDUIT WILL BE PERMITTED IN ELECTRIC ROOMS, AND SIMILAR UNFINISHED SPACES,
OVERHEAD IN AREAS WITHOUT CEILINGS AND ELSEWHERE AT THE DISCRETION OF THE OWNER.
J. DURING ROUGHING-IN, CAP ALL CONDUITS WHICH MAY BECOME FOULED WITH FOREIGN MATERIAL.
1. FLEXIBLE CONDUIT SHALL BE USED FOR "MAKEUP" CONNECTIONS TO VIBRATING
EQUIPMENT, MOTORS, AND AS OTHERWISE NECESSARY OR PERMITTED BY CODE. LIGHTING
FIXTURES MAY BE SUPPLIED WITH SHORT LENGTHS (MAX. 6'-0") OF FLEXIBLE CONDUIT.
GROUNDING SHALL BE GREEN GROUNDING CONDUCTOR AS SPECIFIED IN "GROUNDING".
2. FLEXIBLE CONDUIT SHALL BE UL APPROVED 1/2" MINIMUM TRADE SIZE.
3. LIQUID-TIGHT FLEXIBLE CONDUIT AND LIQUID-TIGHT FITTINGS SHALL BE USED IN AREAS
EXPOSED TO THE WEATHER OR EXCESSIVE MOISTURE.
K. NO MORE THAN FOUR (4) 90-DEGREE BENDS WILL BE ALLOWED IN ANY ONE CONDUIT RUN. WHERE
MORE BENDS ARE NECESSARY IN ANY SINGLE RUN, A PULL BOX SHALL BE INSTALLED. PULL BOXES
SHALL ALSO BE INSTALLED IN LONG RUNS AT A MAXIMUM SEPARATION OF 100'-0". ALL CONDUIT
EXCEPT IN CONCRETE SLAB OR EARTH SHALL BE ROUTED PARALLEL OR PERPENDICULAR TO THE
LINES OF THE BUILDING, AND NO OUT-OF-PLUMB OR DIAGONAL LINES WILL BE ACCEPTED.
L. OUTLETS SHALL BE PROVIDED FOR DEVICES, LIGHTING FIXTURES, MOTORS AND
EQUIPMENT CONNECTIONS, SYSTEMS EQUIPMENT CONNECTIONS, SPECIAL OUTLETS, AND
AS OTHERWISE REQUIRED.
260553 - IDENTIFICATION
A. PROVIDE NAMEPLATES ON THE FOLLOWING EQUIPMENT: PANEL BOARDS, DISCONNECTS
SWITCHES, MOTOR STARTERS, AND CONTROL PANEL ENCLOSURES.
B. NAMEPLATES SHALL INDICATE FUNCTION OF EACH DEVICE. NAMEPLATES SHALL BE LAMINATED
PHENOLIC WITH A WHITE SURFACE AND BLACK CORE. USE 1/16" THICK MATERIAL FOR PLATES UP
TO 2" X 4". FOR LARGER SIZES, USE 1/8" THICK MATERIAL.
C. LETTERING SHALL BE CONDENSED GOTHIC. THE SPACE BETWEEN LINES SHALL BE EQUAL TO THE
WIDTH OF THE LETTERS. USE 1/4" MINIMUM HEIGHT LETTERS WHICH OCCUPY FOUR TO THE INCH.
INCREASE LETTER SIZE TO 3/4" ON LARGER PLATES.
D. FASTEN NAMEPLATES TO EQUIPMENT USING ADHESIVE MATERIAL THAT IS INTENDED FOR USE ON
ENAMELED SURFACES. ADHESIVE SHALL BE NON_AGING FOR AN APPLICATION AND USAGE
TEMPERATURE RANGE OF 0 TO 50 DEGREES CELSIUS.
262416 - PANELBOARDS
A. INSTALL MODULAR SWITCHGEAR WHICH INCLUDES PANELBOARDS WITH ALL CIRCUIT BREAKERS,
PLUS CONTROL SYSTEMS FOR HOODS, HVAC AND LIGHTING AS SHOWN ON THE DRAWINGS.
SUBSTITUTIONS OF LOOSE PANELS INSTEAD OF MODULAR SWITCHGEAR IS NOT ALLOWED.
MODULAR SWITCHGEAR SHALL BE LISTED/LABLED BY A RECOGNIZED TESTING LABORATORY.
B. MODULAR SWITCHGEAR SHALL BE PURCHASED FROM ONE OF THE 'SUPPLIER LIST' COMPANIES
(REFER TO ARCHITECTURAL DRAWINGS). NO SUBSTITUTIONS ARE ALLOWED. THIS CONTRACTOR
MUST VERIFY ALL REQUIREMENTS OF MODULAR SWITCHGEAR WITH SUPPLIER PRIOR TO
ORDERING. AT MINIMUM, THIS CONTRACTOR SHALL VERIFY THE FOLLOWING:
1. ANY BREAKER MODIFICATIONS (AMPACITY, NUMBER OF POLES, CONTROL, RATINGS, GFCI,
HACR, SWITCHING DUTY, SHUNT TRIP, ETC.).
2. RELOCATION OF ANY CIRCUITS.
3. AIC RATING REQUIRED, AFTER COORDINATING THIS WITH THE LOCAL UTILITY COMPANY.
4. HVAC (RTU AND HOOD FANS) CONTROL PACKAGE INCLUDED.
5. ANY OTHER SITE SPECIFIC MODIFICATIONS.
C. CIRCUIT BREAKERS SHALL BE QUICK MAKE, QUICK BREAK, BOLT ON, THERMAL MAGNETIC TRIP
(ENCLOSURE COMPENSATED), MOLDED CASE TYPE, UL LISTED. 15 AND 20 AMP SINGLE POLE
BREAKERS SHALL CARRY THE UL "SWD" MARKING.
D. REFER TO PANEL SCHEDULES ON PLANS FOR ADDITIONAL INFORMATION.
E. THIS CONTRACTOR SHALL PROVIDE A TYPED CIRCUIT DIRECTORY CARD MOUNTED IN A FRAME
WITH A CLEAR PLASTIC PROTECTIVE COVER ON INSIDE OF PANEL DOORS.
262713 - ELECTRICAL SERVICE AND METERING
A.METERING EQUIPMENT SHALL BE FURNISHED BY ELECTRICAL UTILITY COMPANY, AND INSTALLED
BY THIS CONTRACTOR. COORDINATE WITH ELECTRIC COMPANY. EQUIPMENT SHALL BE INSTALLED
AS INDICATED IN ONE-LINE DIAGRAM ON THE DRAWINGS.
262726 - WIRING DEVICES
A. FURNISH AND INSTALL WIRING DEVICES, INCLUDING SWITCHES, RECEPTACLES AND POWER
RECEPTACLES, TELEPHONE OUTLET BOXES, COVERPLATES AND BLANK OUTLET PLATES AS
SHOWN OR DESCRIBED ON DRAWINGS. WIRING DEVICES SHALL BE HUBBELL OR EQUIVALENT
PREMIUM SPECIFICATION GRADE AS MANUFACTURED BY BRYANT, EAGLE, SLATER, PASS &
SEYMOUR, OR LEVITON. COLOR SHALL BE AS DIRECTED BY ARCHITECT OR OWNER.
B. RECESSED OUTLET BOXES SHALL BE STAMPED STEEL SUITABLE FOR THE DEVICE INSTALLED.
C. SURFACE MOUNTED OUTLET BOXES SHALL BE CAST IRON SUITABLE FOR THE DEVICE INSTALLED.
D. DUPLEX RECEPTACLES SHALL BE A MINIMUM OF 20 AMPERE RATING.
E. COVERPLATES SHALL BE PLASTIC UNLESS OTHERWISE NOTED. COLOR SHALL BE AS DIRECTED BY
ARCHITECT OR OWNER.
F. COVERPLATES FOR SURFACE MOUNTED BOXES SHALL BE STAMPED STEEL SUITABLE FOR THE
PARTICULAR BOX AND DEVICE CONFIGURATION.
G. WIRING DEVICES UNLESS OTHERWISE PROPERLY AUTHORIZED, SHALL BE SAME MANUFACTURERS
ONLY; NO ADDITIONAL MANUFACTURERS SHALL BE PERMITTED UNLESS SPECIFICALLY
AUTHORIZED BY THE OWNER.
H. LOW VOLTAGE CONTROL DEVICES SHALL BE AS NOTED ON DRAWINGS OR AS REQUIRED.
I. THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL MOTOR CONTROLS, INCLUDING STARTERS,
SAFETY DEVICES AND REMOTE CONTROL STATIONS, UNLESS FURNISHED BY EQUIPMENT
MANUFACTURER IN PRE-WIRED ASSEMBLIES.
J. FURNISH AND INSTALL CONTACTORS, CONTROL RELAYS, PUSHBUTTON STATIONS, SELECTOR
SWITCHES, PILOT LIGHTS, FUSES AND SIMILAR CONTROL AUXILIARIES AS SHOWN ON DRAWINGS
AND/OR REQUIRED TO PROVIDE PROPER CONTROL AND ISOLATION BETWEEN VARIOUS
AUTOMATIC CONTROLLERS AND EQUIPMENT SHOWN ON THE DRAWINGS.
K. ALL CIRCUIT BREAKERS FEEDING MOTOR LOADS SHALL BE HACR TYPE.
L. EQUIPMENT SHALL BE SAME MAKE AS MOTOR STARTERS. PUSHBUTTON STATIONS, SELECTOR
SWITCHES, PILOT LIGHTS: HEAVY DUTY, OIL TIGHT, STANDARD SIZE, WITH TRANSFORMER TYPE
PILOT LIGHTS, FLUSH MOUNTED WHERE PRACTICAL.
M. ANY ACCESS PANELS REQUIRED BUT NOT SPECIFIED OR SHOWN ON DRAWINGS SHALL BE
FURNISHED BY THIS CONTRACTOR WITH DESIGN TO BE APPROVED BY ARCHITECT BEFORE
INSTALLATION.
N. ALL WIRING MUST MEET 2017 NEC STANDARDS.
262813 - FUSES
A. ALL FUSES SHALL BE BUSSMANN, SIZES AS NOTED ON DRAWINGS.
B. ALL FUSES SHALL BE UL LISTED, CURRENT-LIMITING TYPE, MINIMUM 200,000 AMPS INTERRUPTING
CAPACITY.
C. FUSES 1 AMP AND ABOVE SHALL BE BUSSMANN "LOW PEAK" RK-1. 250 VOLT FUSES SHALL BE USED
ON 208/120 VOLT SYSTEMS.
D. CONTROL FUSES FOR MOTOR STARTERS, CONTACTORS, AND CONTROL PANEL TRANSFORMERS
SHALL BE BUSSMANN FNQ-R SIZED AT 500% RATED CURRENT.
E. FURNISH SPARE FUSES TO THE OWNER IN THE FOLLOWING QUANTITIES: 10% OF TOTAL PROJECT
QUANTITY (BUT NOT LESS THAN THREE (3) FOR EACH TYPE AND RATING OF FUSES).
F. TYPED LIST OF ALL SPARES SHALL ALSO BE INCLUDED.
262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS
A. DISCONNECT SWITCHES SHALL BE HEAVY-DUTY TYPE, UL LISTED.
B. ALL SWITCHES SHALL HAVE SWITCH BLADES WHICH ARE FULLY VISIBLE IN THE "OFF" POSITION
WHEN THE SWITCH DOOR IS OPEN. SWITCHES SHALL HAVE REMOVABLE ARC SUPPRESSORS
WHERE NECESSARY TO PERMIT EASY ACCESS TO LINE SIDE LUGS. LUGS SHALL BE FRONT
REMOVABLE AND UL LISTED FOR 75 DEGREES C., ALUMINUM OR COPPER WIRES.
C. SWITCHES SHALL BE QUICK-MAKE, QUICK-BREAK. THE OPERATING HANDLE SHALL BE AN INTEGRAL
PART OF THE BOX, NOT THE COVER. PROVISIONS FOR PADLOCKING THE SWITCH IN THE "OFF"
POSITION WITH AT LEAST THREE LOCKS SHALL BE PROVIDED. SWITCHES SHALL HAVE A DUAL
COVER INTERLOCK TO PREVENT UNAUTHORIZED OPENING OF THE SWITCH DOOR WHEN THE
HANDLE IS IN THE "ON" POSITION, AND TO PREVENT CLOSING OF THE SWITCH MECHANISM WITH
THE DOOR OPEN. THE HANDLE POSITION SHALL INDICATE WHETHER THE SWITCH IS "ON" OR "OFF".
D. SWITCHES SHALL BE FURNISHED IN NEMA 1 GENERAL PURPOSE ENCLOSURE EXCEPT ALL
SWITCHES LOCATED OUTDOORS SHALL BE NEMA 3R WEATHERPROOF (WP). NEMA 3R ENCLOSURE
SHALL BE MANUFACTURED FROM GALVANIZED STEEL. ENCLOSURES SHALL HAVE A GRAY BAKED
ENAMEL FINISH, ELECTRODEPOSITED, ON CLEANED, PHOSPHATIZED STEEL.
E. SWITCHES SHALL BE RATED FOR AC. FUSIBLE SWITCHES MUST ACCEPT CLASS R FUSES AND HAVE
PROVISIONS TO REJECT ALL FUSES EXCEPT CLASS R. THE UL LISTED SHORT CIRCUIT RATING OF
THE SWITCHES SHALL BE 200,000 RMS SYMMETRICAL AMPERES WHEN CLASS R FUSES ARE USED.
265100 - INTERIOR LIGHTING
A. INSTALL LIGHTING FIXTURES AS SHOWN ON THE DRAWINGS.
B. ALL FIXTURES SHALL BE LISTED AND LABELED BY UNDERWRITERS LABORATORIES AND ENERGY
STAR AND/OR DLC LISTING.
C. FIXTURES ARE TO BE PROVIDED COMPLETE WITH END AND TRIM PLATES AND ALL MOUNTING
ACCESSORIES REQUIRED FOR A COMPLETE FIXTURE INSTALLATION.
D. USE STEEL WIRE HANGERS FASTENED TO THE BUILDING STRUCTURE TO SUPPORT RECESSED
FIXTURES AT EACH CORNER. (FOUR-CORNER SUSPENDED). FIXTURES TO FIT TIGHT AGAINST
CONSTRUCTION TO ELIMINATE LIGHT LEAKS.
E. WALL-MOUNTED FIXTURES SHALL BE MOUNTED PLUMB WITH BUILDING LINES AND
INSTALLED WITH LIGHTING CONTROL PROPER BOX AND COVER HARDWARE.
F. SURFACE-MOUNTED FIXTURES SHALL COVER MOUNTING HARDWARE. USE A CANOPY THAT IS NO
LONGER THAN THE LENGTH AND WIDTH OF THE FIXTURE AND AT A HEIGHT THAT IS NO HIGHER
THAN REQUIRED TO MOUNT FIXTURE ABSOLUTELY VERTICAL. CANOPY FINISH SHALL MATCH
FIXTURE FINISH.
G. STEM-MOUNTED FIXTURES SHALL BE MOUNTED SO AS TO BE ABSOLUTELY VERTICAL AND
HORIZONTAL. INSTALL AND SUPPORT AS SHOWN ON DRAWINGS.
270510 - TELEPHONE CONDUIT SYSTEM
A. CONDUIT FOR TELEPHONE WALL OUTLETS SHALL BE A MINIMUM OF 3/4" UNLESS NOTED
OTHERWISE.
B. TELEPHONE OUTLET BOXES SHALL BE SINGLE GANG. PLATES SHALL BE FURNISHED AND
INSTALLED BY THIS CONTRACTOR.
C. FURNISH AND INSTALL A 3/4" THICK TELEPHONE BACKBOARD AT LOCATION SHOWN ON THE
DRAWINGS. THE PLYWOOD BACKBOARD SHALL BE SECURELY ATTACHED TO THE BUILDING WALLS
TO SUPPORT RELAY PANELS, TERMINAL BLOCKS AND OTHER HARDWARE WEIGHING
APPROXIMATELY 10 POUNDS PER SQUARE FOOT. PRIME AND PAINT THE BACKBOARD SIDES AND
EDGES WITH TWO COATS OF GRAY FLAMEPROOF PAINT.
D. CONDUIT SYSTEM SHALL BE CONTINUOUS FROM OUTLETS TO TELEPHONE BACKBOARD. INSTALL
PULL STRING IN EMPTY CONDUITS.
E. INSTALL #6 GROUND WIRE FROM TELEPHONE BACKBOARD TO SERVICE ENTRANCE GROUND PER
TELEPHONE COMPANY'S REQUIREMENTS.
270511 - IT INSTALLATION
A. THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING AND UNDERSTANDING WENDY'S
REQUIREMENTS AND FORMS TO ENSURE A TIMELY INSTALLATION OF IT EQUIPMENT. THE
CONTRACTOR SHALL COMPLETE, SIGN, AND RETURN THE IT READINESS FORM AS REQUIRED.
B. THE FOLLOWING ARE THE SITE READINESS MINIMUM REQUIREMENTS.
1. THE INSTALLATION OF ALL KITCHEN EQUIPMENT IS COMPLETE.
2. THE BUILDING HAS PERMANENT POWER.
3. ALL ISOLATED GROUND (IG RECEPTACLES) ARE INSTALLED AND ENERGIZED.
4. THE FRONT COUNTERS ARE COMPLETE AND ENERGIZED.
6. INTERIOR WALLS ARE COMPLETED FOR KIOSKS. ELECTRICAL EQUIP IS INSTALLED &
OPERATIONAL.
7. ELECTRICAL IS INSTALLED AND ENERGIZED & WALLS ARE COMPLETED & READY FOR
QUEUING BOARDS.
8. DRIVE THRU LOOPS ARE INSTALLED TO HME'S SPECIFICATIONS.
9. BUN WARMERS ARE INSTALLED.
10. MWS CART IS ONSITE.
11. HME LOOPS (DRIVE THRU LOOPS) ARE VISIBLE.
C. THE CONTRACTOR SHALL COORDINATE WITH WENDY'S CONSTRUCTION MANAGER, WENDY'S IT
MANAGER, AND WENDY'S IT INSTALLATION CONTRACTOR TO SCHEDULE THE INSTALLATION IN A
TIMELY MANNER.
ELECTRICAL SPECIFICATIONS
12
/
2
2
/
2
0
1
7
4
:
1
3
:
5
2
P
M
79
6
M
e
r
u
s
C
o
u
r
t
St
.
L
o
u
i
s
,
M
O
6
3
0
2
6
T
6
3
6
.
3
4
9
.
1
6
0
0
F
6
3
6
.
3
4
9
.
1
7
3
0
CE
R
T
I
F
I
C
A
T
E
O
F
A
U
T
H
O
R
I
T
Y
N
O
.
3
8
0
0
01/19/2023
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: 08/17/2021
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
1 10/20/2021 City Comments
2 11/26/2021 City Comments
3 01/12/2023 City/Owner Comments
ELECTRICAL
SPECIFICATIONS
E6.1
KH
MJ
1
DIVISION 1 - GENERAL SPECIFICATIONS
(OMITTED)
DIVISION 3 - CONCRETE
FOOTINGS
SLABS AND FOOTINGS
SIDEWALKS AND RAMPS
PAVING
CONCRETE PADS
CONCRETE PAD - WALK IN BOX - COOLER / FREEZER / DRY STORAGE
DIVISION 4 - MASONRY
GENERAL
CMU
MORTAR FOR FACE BRICK
FACE BRICK
DIVISION 6 - WOOD, PLASTICS, AND COMPOSITES
ROUGH CARPENTRY
STRUCTURAL LUMBER
FINISH CARPENTRY
SOLID SURFACING MATERIAL
BUILDING WEATHER BARRIER
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
BUILDING INSULATION
ROOFING INSULATION
GENERAL ROOFING
ROOFING HANDLING
ROOFING STORAGE
ROOFING OVERNIGHT COVER
ROOFING AND SHEET METAL
ROOFING SURFACE PREPARATION
ROOFING WOOD DECKS
ROOFING MEMBRANE
FLASHING
ROOFING PERIMETER LAPS
ROOFING PROJECT / SITE CLEAN-UP
ROOFING INSPECTIONS
ROOFING CONTRACTOR QUALIFICATION ASSURANCE
ROOF METAL TRIMS
SEALANT
SEALANT MATERIALS
KNOTWOOD
DIVISION 8 - OPENINGS
ALUMINUM ENTRANCE DOORS AND STOREFRONT & CURTAINWALL
GLAZING
STEEL SERVICE DOORS AND FRAMES
PREFINISHED DOORS
PICK-UP WINDOW
ACCESS DOOR
WALL LOUVER
DIVISION 9 - FINISHES
FLOOR AND WALL TILE INSTALLATION
GYPSUM DRYWALL
SUSPENDED CEILING SYSTEM
NON-TILE FIBERGLASS REINFORCED POLYESTER (FRP) PANELS
PAINTING
PAINT SCHEDULE
PATIO CONCRETE SLAB
DIVISION 10 - SPECIALTIES
EXTERIOR TRASH ENCLOSURE
GENERAL SIGNAGE
ROOM IDENTIFICATION SIGN
RESTROOM IDENTIFICATION SIGN
PUBLIC RESTROOM ACCESSORIES
WALL DECOR
HEIGHT WARNING DEVICE
ORDER STATION CANOPY
SMOKELESS SNUFFER
STAINLESS STEEL CORNERS
KITCHEN EQUIPMENT
HOOD FIRE SUPPRESSION SYSTEM AND PORTABLE FIRE EXTINGUISHERS
FIRE EXTINGUISHER CABINETS
WALK-IN COOLER/FREEZER/DRY STORAGE (PRE-FABRICATED)
WALK-IN COOLER/FREEZER/DRY STORAGE (FIELD ERECTED)
COMMUNICATION SYSTEM
A.
B.
C.
A.
B.
C.
D.
1.
A.
B.
A.
A.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
DIVISION 3 - CONCRETE
NOTE: FURNISH LABOR, MATERIALS AND EQUIPMENT NECESSARY TO COMPLETE
CONCRETE WORK INCLUDING EXCAVATION, TRENCHING, FORM WORK, REINFORCING,
CEMENT FINISH AND PRECAST CONCRETE.
FOOTINGS
REFER TO DRAWINGS FOR SIZES, DEPTHS, AND REINFORCEMENT. EARTH TRENCH
WILL BE PERMITTED FOR FOOTINGS IF CONDITIONS ARE FAVORABLE. SIDES OF
TRENCHES SHALL BE CLEAN, EVEN, VERTICAL AND TRUE, AND BOTTOMS SHALL BE
LEVEL, CLEAN AND WITHOUT FILL.
BREINFORCING SHALL BE UNPAINTED AND UNCOATED, FREE FROM RUST OR
SCALE, AND SHALL BE CLEANED AND STRAIGHTENED BEFORE BEING SHAPED AND
PLACED IN POSITION, ACCURATELY POSITION REINFORCEMENT AND SECURED
AGAINST DISPLACEMENT, WHERE THERE IS DELAY IN POURING, RE-INSPECT
REINFORCEMENT AND CLEAN OFF ANY DRIED CEMENT, MORTAR OR RUST.
REINFORCEMENT SHALL BE OF SIZE AND SPACING AS NOTED ON THE DRAWINGS
OR AS PER LOCAL CODES.
SLABS AND FOOTINGS
REFER TO DRAWINGS FOR CONCRETE STRENGTH, THICKNESS AND REINFORCING.
1. ALTERNATE: "FIBERMESH" OR EQUAL, A 100% HOMOPOLYMER VIRGIN
POLYPROPYLENE FIBRILLATED FIBERS CONTAINING NO REPROCESSED OLEFIN
MATERIALS AND ARE SPECIFICALLY ENGINEERED AND MANUFACTURED TO AN
OPTIMUM GRADUATION FOR USE AS FIBROUS REINFORCEMENT FOR
CONCRETE.
PROVIDE CONTINUOUS 6 MIL 'VISQUEEN' VAPOR BARRIER ON LEVEL 4" GRAVEL
BASE UNDER BUILDING SLABS. LAP EDGES 6" AND SEAL (TURN UP AT WALLS).
POUR CONCRETE FLOORS LEVEL, EXCEPT WHERE FLOOR DRAINS OCCUR, IN
WHICH CASE THEY SHALL HAVE A 36" TO 48" RADIUS SLOPED TO DRAIN. TOTAL
SLOPE IS NOT TO EXCEED 3/4" BELOW FLOOR LEVEL.
SECURE AND BUILD INTO CONCRETE WORK THE FOLLOWING MATERIALS:
PLUMBING AND SYRUP LINES, ELECTRIC CONDUIT, CONCRETE INSERTS,
HANGERS, ANCHORS, FLOOR CLIPS, SLEEVES FOR PIPING, ETC., AND WHEN
REQUIRED FOR ANCHOR BOLTS, PLATES, ETC., FOR EQUIPMENT.
SIDEWALKS AND RAMPS
3,000 PSI AIR ENTRAINED CONCRETE, 4" THICK, BROOM FINISH SCORE WITH 3/4"
DEEP CONTRACTION JOINTS INTO APPROXIMATELY 4'-0" SQUARES AS SHOWN ON
DETAIL ON THE FOUNDATION PLAN.
SIDEWALKS AND RAMPS TO MEET LOCAL CODES ALONG WITH REQUIRED SLOPES
AND CROSS SLOPES IN THE AMERICANS WITH DISABILITIES ACT FOR ACCESSIBLE
DESIGN.
PAVING
SPECIFICATIONS FOR CONCRETE PAVING REQUIRED TO BE VERIFIED BY OWNER'S
CONSTRUCTION ENGINEER.
CONCRETE PADS
CONCRETE PADS AT PICK-UP WINDOW, ORDER STATION AND TRASH ENCLOSURE
(REFER TO SITE PLAN): COLOR TREATED AS NOTED IN EXTERIOR FINISHES
SCHEDULE ON DRAWINGS. A TRIAL SLAB SHALL BE MADE, USING THE SAME
MATERIALS THAT ARE TO BE USED ON THE JOB TO ASSURE OWNER ACCEPTANCE.
CONCRETE PAD - WALK IN BOX - COOLER / FREEZER / DRY STORAGE
A. A LEVEL CONCRETE PAD IS REQUIRED FOR THE WALK IN BOX. THE PAD CAN NOT
DEVIATE MORE THAN 1/4" OVER 10' IN ANY DRIECTION.
B. A SQUARE CONCRETE PAD IS REQUIRED FOR THE WALK IN BOX. THE PAD CAN NOT
DEVIATE MORE THAN 1/2" ON DIAGONAL MEASUREMENTS.
C. A MINIMUM OF 6" OF CONCRETE IS REQUIRED AROUND THE PERIMETER OF THE
WALK IN BOX. NO CONTROL JOINTS ARE ALLOWED IN THE SLAB FOR THE WALK IN
BOX.
DIVISION 4 - MASONRY
NOTE: FURNISH LABOR, MATERIALS AND EQUIPMENT NECESSARY TO COMPLETE
MASONRY WORK INCLUDING STRUCTURAL STEEL, WALL TIES, MASONRY
REINFORCING , ETC.
GENERAL
WORK TO BE LAID TRUE TO DIMENSIONS, PLUMB, SQUARE, AND IN BOND AND
PROPERLY ANCHORED. COURSES SHALL BE LEVEL WITH JOINTS OF UNIFORM
WIDTH, NO JOINTS SHALL EXCEED SPECIFIED SIZE, AND IF NECESSARY, CLIPPED
COURSES SHALL BE PROVIDED TO LEVEL OFF.
PERFORM MASONRY WORK IN ACCORDANCE WITH ESTABLISHED TRADE
PRACTICES. BRACE "GREEN" WALLS AND PROTECT MORTAR FROM "WASHING-OUT"
AT END OF DAYS WORK USING PLANKS, WEIGHTED CANVAS, OR SIMILAR MEANS TO
COVER WALL. COOPERATE WITH OTHER TRADES IN JOINTLY EXECUTED WORK AND
BUILT-IN ITEMS. PATCH OPENINGS AS REQUIRED FOR PASSAGE OF MECHANICAL
AND ELECTRICAL WORK. "UNCORED" UNITS MUST BE USED AT ALL EXPOSED AND
OR SEMI-EXPOSED CONDITIONS OF BRICK ROWLOCK CAPS, SILLS, ETC. SIZE AND
LOCATION SHOWN ON CONSTRUCTION DOCUMENTS.
LINTELS SHALL BE OF SIZE AND SHAPE AS SHOWN OR NOTED ON THE DRAWINGS
AND SHALL BE STRUCTURALLY SOUND FOR THE SPANS AND LOADS INVOLVED.
COORDINATE INSTALLATION OF OTHERS WORK ITEMS, SUCH AS ANGLES, ANCHOR
BOLTS, FLASHING, STEEL LINTELS AND FRAMING, VENTS, SLEEVES, DOOR FRAMES,
MISCELLANEOUS STEEL WORK WITH ANCHORS, ETC.
CMU TO BE LAID IN A RUNNING BOND.
CMU TO BE LAID WITH FULL MORTAR IN THE BED AND HEAD JOINTS.
1. CONCAVE TOOLED JOINT USING A TOOL OF LARGER THAN 1/2" DIAMETER..
FLASHING TO BE PLASTIC COATED ALUMINUM BY HOHMANN & BARNARD, OR THIN
COATED COPPER BY YORK FLASHING. THE FLASHING SHOULD PENETRATE THE
BRICKWORK AND BE TRIMMED AT THE COMPLETION OF THE MASONRY WORK.
CLEAN AND POINT CONCRETE BLOCK WORK AT END OF EACH WORKING DAY. AT
THE COMPLETION OF WORK AS AN ENTIRETY.
CMU: ASTM C90, MEDIMUM WEIGHT.
REFER TO STRUCTURAL DWGS. FOR MORE INFORMATION.
A.
A.
B.
C.
D.
A.
A.
A.
A.
A.
A.
B.
ROOFING INSULATION
WHERE NOTED ON PLAN, INSULATION SHALL BE INSTALLED IN THE FOLLOWING
MANNER:
1. MECHANICALLY FASTENED - THE ROOF INSULATION BOARDS SHALL BE
INSTALLED WITH FACTORY APPROVED FASTENERS AND STRESS DISTRIBUTION
PLATES. LENGTH WILL VARY TO MEET THE JOB CONDITIONS. MINIMUM
FASTENER PENETRATION THROUGH THE ROOF DECK PER MANUFACTURER'S
RECOMMENDATIONS. CUT SCREWS AND PAINT TO MATCH SURROUNDING
CONDITIONS.
2. GLUE DOWN -THE ROOF INSULATION BOARDS SHALL BE INSTALLED WITH
FACTORY APPROVED ADHESIVES. COVERAGE RATES PER MANUFACTURER'S
RECOMMENDATIONS.
GENERAL ROOFING
COMPONENTS OF THE MANUFACTURERS ROOFING SYSTEM SHALL BE PRODUCTS
OF THAT MANUFACTURER. SUBSTITUTES OF THEIR RELATED MATERIALS MUST
HAVE PRIOR ACCEPTANCE BY THE MANUFACTURER.
DEVIATION FROM MANUFACTURERS SPECIFICATIONS AND INSTALLATION
INSTRUCTIONS SHALL VOID WARRANTY ISSUANCE UNLESS THE DEVIATION IS
APPROVED BY A DULY AUTHORIZED REPRESENTATIVE OF THE MANUFACTURER IN
WRITING.
SHOP DRAWINGS ARE REQUIRED FOR ORDERING, MANUFACTURING, AND FINAL
INSPECTION OF THE ROOFING SYSTEM. SHOP DRAWINGS SHALL INCLUDE ROOF
OUTLINE, SIZE, ROOF PENETRATIONS, INSULATION TYPE AND THICKNESS, PIECE
LAYOUT AND PARAPET LOCATION. ORDERS AND SHOP DRAWINGS SHALL BE
APPROVED BY ROOFING MANUFACTURER AND ASSIGNED A MANUFACTURER
NUMBER.
WARRANTY: MANUFACTURERS STANDARD 15 YEAR, NO DOLLAR LIMIT WARRANTY.
ROOFING DELIVERY
ROOFING AND RELATED MATERIALS SHALL BE DELIVERED TO JOB SITE IN ORIGINAL
PACKAGING WITH SHIPPING LABELS INTACT. IF SHORTAGES OR DAMAGES ARE
DISCOVERED UPON DELIVERY, DO NOT ACCEPT THEM UNTIL THE FREIGHT AGENT
MAKES A DAMAGED OR SHORT NOTATION ON YOUR FREIGHT BILL. IN CASE OF
CONCEALED LOSS OR DAMAGE, IT IS NECESSARY TO NOTIFY YOUR FREIGHT
AGENT AT ONCE.
ROOFING HANDLING
THERE SHALL BE ADEQUATE PERSONNEL AND EQUIPMENT TO LIFT ROOFING
MATERIAL FOR PLACEMENT ON THE ROOF TO PREVENT DAMAGE TO MATERIAL.
THE MATERIAL SHALL BE DEPOSITED ON THE ROOF NEAR THE ENDS OF JOISTS OR
OTHER ROOF LOAD BEARING MEMBERS OF THE BUILDING FRAME AND
CONVENIENTLY LOCATED FOR FINAL PLACEMENT.
ROOFING STORAGE
ROOFING MATERIAL SHALL BE STORED IN ORIGINAL PACKAGING TO PROTECT
MEMBRANE FROM GETTING WET OR BEING DAMAGED AND SOILED. ADHESIVES
AND SEALANTS SHALL BE PROPERLY STORED AND PROTECTED AS RECOMMENDED
BY THEIR MANUFACTURERS.
ROOFING OVERNIGHT COVER
A TEMPORARY WATER SEAL SHALL BE PERFORMED EACH NIGHT TO AVOID WATER
PENETRATING UNDERNEATH THE INSTALLED MEMBRANE AND CAUSING DAMAGE
TO THE BUILDING AND THE INSULATION BEING USED.
1. INSTALLATION: WITH THE MEMBRANE EXTENDED OVER EXPOSED INSULATION
(IF USED), SET INTO A WATER RESISTANT, NON-BITUMINOUS SEALANT,
GENEROUSLY APPLIED OVER A DUST, GREASE, AND MOISTURE FREE
SUBSTRATE. FASTEN 12" ON CENTER USING TERMINATION BAR.
ROOFING AND SHEET METAL
FURNISH AND COMPLETELY INSTALL THE ROOFING SYSTEM PER OWNER'S
APPROVED SUPPLIER SPECIFICATIONS AND DIAGRAMS AS OUTLINED AND
FURNISHED BY THE SUPPLIER. THE ROOFING SYSTEM SHALL BE INSTALLED
EXCLUSIVELY BY A OWNER'S APPROVED MANUFACTURER INSTALLER. FINAL
INSPECTION PRIOR TO WARRANTY ISSUANCE SHALL BE PERFORMED BY AN
AUTHORIZED QUALITY CONTROL FIELD INSPECTOR AS PER CURRENT
SPECIFICATIONS, INSTALLATION AND INSPECTION POLICIES.
ROOFING SURFACE PREPARATION
THE ROOF SHALL HAVE AN ADEQUATELY PREPARED SURFACE TO RECEIVE THE
INSULATION, ROOFING AND FLASHING. PRIOR TO ONSET OF WORK, THE
APPLICATOR SHALL INSPECT THE ENTIRE AREA TO BE ROOFED, AND DEFECTS AND
IMPROPER CONDITIONS AFFECTING THE ROOF INSTALLATION SHALL BE
CORRECTED BEFORE APPLICATION OF THE INSULATION.
NSTALL 1/2" DENS-DECK PRIME ROOF BOARD OVER RIGID INSULATION PRIOR TO
MEMBRANE INSTALLATION.
A.
B.
C.
D.
A.
A.
A.
A.
A.
A.
B.
A.
B.
C.
D.
E.
F.
FLASHING
FLASHING ON PARAPET WALLS SHALL BE FASTENED 12" ON CENTER ALONG
BOTTOM ON MAIN DECK WITH A MINIMUM 6" LAP WELDABLE TO DECK MEMBRANE,
COVERING APPROVED FASTENERS. PARAPET WALLS SHALL BE COVERED
MINIMUM OF 12" HIGH.
PROVIDE AND INSTALL FLASHING FOR PARAPET WALLS AND WALK IN BOX. (FINISH
AS NOTED ON EXTERIOR ELEVATIONS AND SCHEDULES.)
FLASH AND COUNTER-FLASH ITEMS THAT PASS THROUGH THE ROOF PROVIDE
"PITCH POCKETS" AS REQUIRED TO FORM A COMPLETE JOB.
PROVIDE NECESSARY MOUNTING CLIPS, CLOSURES, FASTENINGS, ETC., REQUIRED
TO COMPLETE THE COUNTER-FLASHING, GRAVEL STOPS, CAPS AND COPINGS,
INDICATED ON THE DRAWINGS.
ROOFING PERIMETER LAPS
ANY TIME A ROOF EDGE DOES NOT HAVE A PARAPET WALL OR ROOF TIE-IN, (I.E.
DRIP EDGE, WATER/GRAVEL STOP, TERMINATION BAR ON EDGE, GUTTER, ETC.)
THEN THE ROOF SECTION MUST HAVE A LAP 27" IN FROM THE EDGE AND
REVERSED. THIS HELPS REDUCE WIND UP-LIFT AROUND PERIMETERS AND
REVERSING THE LAP, ALLOWS CONTRACTOR APPLICATOR TO PLACE ROOF
SECTION AWAY FROM THE EDGE.
ROOFING PROJECT/SITE CLEAN-UP
UPON COMPLETION, THE ROOFING CONTRACTOR SHALL REMOVE RUBBISH,
WASTE MATERIALS, ETC. FROM THE ROOF, LEAVING THE ROOF IN A CLEAN
CONDITION AND FURTHER REMOVING SUCH ROOFING DEBRIS FROM THE WORK
SITE. A RIGOROUS INSPECTION FOR WATERTIGHT FIELD SEAMS SHALL BE MADE
AFTER COMPLETION OF JOB.
ROOFING INSPECTIONS
UPON COMPLETION OF EACH ROOFING JOB, CONTRACTOR SHALL FILL OUT
INSPECTION CARD AND RETURN TO MANUFACTURER. EACH ROOF SHALL BE
INSPECTED BY AN AUTHORIZED QUALITY CONTROL FIELD INSPECTOR TO MAKE
SURE APPLICATION MEETS MANUFACTURERS SPECIFICATIONS, BEFORE ISSUANCE
OF WARRANTY. CONTRACTOR SHALL ACCOMPANY INSPECTOR ON INSPECTIONS
AND OBTAIN SIGNED WARRANTY FROM CUSTOMER AND RETURN TO
MANUFACTURER, WITH NO FINAL PAYMENT BEING MADE UNTIL AN OWNER'S
REPRESENTATIVE HAS WARRANTY.
ROOFING CONTRACTOR QUALIFICATION ASSURANCE
THE ROOFING CONTRACTOR SHALL BE DULY CERTIFIED BY ROOFING
MANUFACTURER FOR COMPLETE APPLICATION AND INSTALLATION OF THIS
ROOFING SYSTEM. TO MAINTAIN ROOF WARRANTY, FUTURE REPAIRS AND
ALTERATIONS SHALL BE MADE BY PERSONNEL DULY CERTIFIED BY ROOFING
MANUFACTURER.
ROOF METAL TRIMS
THIS SECTION INCLUDES METAL TRIM AT PARAPET CAPS, WALL CAPS, BREAK
METAL TRIMS, AND THE BOTTOM TRIM ON THE FASCIAS. TRIM MATERIAL SHALL
CONSIST OF PREFINISHED (REFER TO FINISH SCHEDULE FOR COLOR), .040"
ALUMINUM SHEETS OR 24 GA. GALVALUME STEEL, FORMED TO THE PROFILES
SHOWN ON THE DRAWINGS. ATTACHMENT TO THE SUB STRUCTURE SHALL BE BY
NON-FERROUS FASTENERS THAT ARE CONCEALED FROM VIEW WHERE POSSIBLE.
FASTENERS NOT CONCEALED FROM VIEW MUST MATCH THE COLOR OF THE TRIM
BEING FASTENED.
SEALANT
SURFACES TO RECEIVE SEALANT ARE TO BE DRY AND THOROUGHLY CLEANED OF
LOOSE PARTICLES OF DIRT AND DUST, OIL, GREASE, OR OTHER FOREIGN MATTER.
SEAL AT EXTERIOR DOOR FRAMES, WINDOW FRAMES, AND OPENINGS FOR
PLUMBING, ELECTRICAL REFRIGERANT AND GAS LINES IN EXTERIOR WALLS,
FLOORS AND ROOFS.
SEALANT MATERIALS
JOINT LOCATIONS AND JOINT SEALANT TYPES ARE NOTES ON DRAWINGS.
ACCEPTABLE MANUFACTURER/TYPE PER EACH JOINT TREATMENT TYPE IS AS
FOLLOWS:
(JS-1) POLYSULFIDE POLYMER BASE COMPOUND SHALL CONFORM TO AMERICAN
STANDARD SPECIFICATION A-116 , 1960 CLASS A OR B, AND EQUAL TO THAT
MANUFACTURED BY SONNEBORN OR PECORA.
(JS-2) BYTYL SEALANT SHALL BE BUTYL RUBBER BASE COMPOUND EQUAL TO THAT
MANUFACTURED BY SONNEBORN OR PECORA.
(JS-3) LATEX JOINT SEALANT. ACRYLIC LATEX OR SILICONE LATEX., ASTM C834,
TYPE OP, GRADE NF. EQUAL TO THAT MANUFACTURED BY BOSTIK, INC., PECORA
OR TREMCO.
(JS-4) SINGLE-COMPONENT, PURABLE, MOISTURE CURING POLYURETHANE JOINT
SEALANT: ASTM C920, TYPE S, GRADE P, CLASS 100/50. EQUAL TO THAT
MANUFACTURED BY PECORA, TREMCO OR GE.
(JS-5) SINGLE-COMPONENT, MILDEW RESISTANT, NEUTRAL CURING SILICONE JOINT
SEALANT: ASTM C920, TYPE S, GRADE NS, CLASS 25. EQUAL TO THAT
MANUFACTURED BY PECORA, TREMCO OR GE.
INDEX TO SPECIFICATIONS
KNOTWOOD
ALUMINUM SIDING, SOFFITS, AND ACCESSORIES
GENERAL
SECTION INCLUDES
A. ALUMINUM SIDING.
B. ALUMINUM SOFFITS.
C. ALUMINUM TRIM AND ACCESSORIES.
D. 88MM SHUTTER BLADE.
E. FIXED ROUTED LOUVER SECTIONS.
F. 65MM SLAT.
G. SMALL INFILL.
RELATED SECTIONS
A. COLD-FORMED METAL FRAMING: METAL FRAMING
FOR SUPPORT OF ALUMINUM SOFFITS.
B. ROUGH CARPENTRY: WOOD STUD FRAMING,
FURRING AND SHEATHING FOR SUPPORT OF ALUMINUM SOFFITS.
C. BUILDING INSULATION: RIGID THERMAL INSULATION
INSTALLED BEHIND SIDING.
D. FLASHING AND SHEET METAL: SHEET METAL
GUTTERS AND DOWNSPOUTS.
E. JOINT SEALANTS: SEALANTS USED IN CONJUNCTION WITH
ALUMINUM SIDING INSTALLATION.
DELIVERY, STORAGE, AND HANDLING
A. PACKAGE AND STORE PRODUCTS UNDER COVER IN MANUFACTURER'S
UNOPENED PACKAGING UNTIL READY FOR TRANSPORT AND
INSTALLATION.
B. PROTECT PANELS FROM ACCELERATED WEATHERING BY REMOVING OR
VENTING SHEET PLASTIC SHIPPING WRAP.
C. STORE PREFINISHED MATERIAL OFF GROUND PROTECTED FROM
WEATHER, TO PREVENT TWISTING, BENDING, OR ABRASION, AND PROVIDE
VENTILATION. SLOP METAL SHEETS TO ENSURE DRAINAGE.
D. PREVENT CONTACT WITH MATERIALS CAPABLE OF CAUSING
DISCOLORATION OR STAINING.
PROJECT CONDITIONS
A. MAINTAIN ENVIRONMENTAL CONDITIONS (TEMPERATURE, HUMIDITY, AND
VENTILATION) WITHIN LIMITS RECOMMENDED BY MANUFACTURER FOR
OPTIMUM RESULTS. DO NOT FABRICATE PRODUCTS UNDER
ENVIRONMENTAL CONDITIONS OUTSIDE MANUFACTURER'S ABSOLUTE
LIMITS.
COORDINATION
A. COORDINATE WORK WITH INSTALLATION OF WINDOWS, LOUVERS, AND
ADJACENT COMPONENTS OR MATERIALS.
WARRANTY
A. KNOTWOOD'S LIMITED LIFETIME WARRANTY AGAINST CRACKING, PEELING
AND GLOSS/COLOR RETENTION WITHIN THE GUIDELINES STATED BY THE
AMERICAN ALUMINUM MANUFACTURERS ASSOCIATION (AAMA).
1. STANDARD COLORS
a. DULUX DURATEC - AAMA 2604 (5 YEAR FLORIDA) 15 YEAR
MANUFACTURER'S WARRANTY.
b. DULUX FLUOROSET - AAMA 2605 (10 YEAR FLORIDA) 20 YEAR
MANUFACTURER'S WARRANTY.
2. WOOD GRAINS
a. AMMA 2064 (5 YEAR FLORIDA) 15 YEAR MANUFACTURER'S
WARRANTY.
PRODUCTS
MANUFACTURERS
A. ACCEPTABLE MANUFACTURER: KNOTWOOD LLC. , WHICH IS LOCATED AT:
10914 NE 39TH STREET SUITE B-3
VANCOUVER, WA 98682: INFO AT HYPERLINK
"MAILTO:SALES@KNOTWOOD.COM"SALES@KNOTWOOD.COM WEB:
HYPERLINK "HTTP://WWW.KNOTWOOD.COM"WWW.KNOTWOOD.COM ;
B. SUBSTITUTIONS: NOT PERMITTED
MATERIALS
A. EXTRUDED ALUMINUM SIDING AND SOFFITS: KNOTWOOD WOOD GRAIN
ALUMINUM SIDING AND SOFFITS WITH ALLUMINATE BONDED FILM
FINISH IS EXTRUDED ALUMINUM.
EXDC90- 3-3/4" X 5/8" X 18'6" CLADDING BOARD SMOOTH
EXDC100R- 4" X 5/8" X 18'6" CLADDING BOARD RIBBED
EXDC100S- 4" 5/8" X 18'6" CLADDING BOARD SMOOTH
EXDC150- 6" X 5/8" X 18'6" CLADDING BOARD SMOOTH
EXSM3816- 1-1/2" X 5/8" X 18'6" SELF MATING SLAT (2-PART)
EXSM6516- 2-1/2" X 5/8 X 18'6" SELF MATING SLAT (2-PART)
EXSM10016- 4" X 5/8" X 18'6" SELF MATING SLAT (2-PART)
ESM15016- 6" X 5/8" X 18'6" SELF MATING SLAT (2-PART)
B. EXTRUDED ALUMINUM VENTED SOFFIT: KNOTWOOD WOOD GRAIN
ALUMINUM VENTED SOFFITS WITH ALLUMINATE BONDED FILM FINISH IS
EXTRUDED ALUMINUM.
KWCV150- 6" X 5/8" X 18'6" CLADDING VENTED BOARD
C. EXTRUDED ALUMINUM ACCESSORIES AND TRIM: KNOTWOOD WOOD
GRAIN ALUMINUM TRIM AND ACCESSORIES WITH ALLUMINATE BONDED
FILM FINISH IS EXTRUDED ALUMINUM.
EXDCST- STARTER PIECE FOR CLADDING AND DECKING 18'6"
KWCFB- CLADDING FLASHING BASE 16'4" (USED WITH
KWCFTCL OR KWCFTCS)
KWCFTCL- CLADDING TOP CLIP 16'4"
KWCFTCS- CLADDING TOP BLIP SMALL 16'4"
KWCBJ- CLADDING BOTTOM JOINER 16'4" (USED WITH KWCTJ)
KWCTJ- CLADDING TOP JOINER 16'4"
KWCTF- CLADDING WINDOW AND DOOR TOP FLASHING 16'4"
KWCIEFC- CLADDING INTERNAL/EXTERNAL FEMALE CORNER 16'4"
KWCIEMC- CLADDING INTERNAL/EXTERNAL MALE CORNER 16'4"
D. EXTRUDED ALUMINUM SHUTTER BLADE, SLAT, SMALL INFILL, AND FIXED
LOUVER SECTIONS: KNOTWOOD WOOD GRAIN ALUMINUM TRIM AND
ACCESSORIES WITH ALLUMINATE BONDED FILM FINISH IS EXTRUDED
ALUMINUM.
EXS88- 3-7/16" (88MM) X 18'6" SHUTTER BLADE.
EXS6516- 2-1/2" X 5/8" X 18'6" SLAT
EXINFS- SMALL INFILL LENGTH: 18'6"
KWRF65L- ROUTERED LOUVER FRAME LEFT TO FIT 2-1/2" SLAT
LENGTH: 17'8"
KWRF65R- ROUTERED LOUVER FRAME RIGHT TO FIT 2-1/2" SLAT
LENGTH: 17'8"
KWRF65M- ROUTERED LOUVER FRAME MID-RAIL TO 2-1/2" SLAT
LENGTH: 17'8"
KWRF88L- ROUTERED LOUVER FRAME LEFT TO FIT EXS88 LENGTH: 17'8"
KWRF88R- ROUTERED LOUVER FRAME RIGHT TO FIT EXS88 LENGTH: 17'8"
KWRF88M- ROUTERED LOUVER FRAME MID-RAIL TO FIT EXS88 LENGTH:
17'8"
KWRF- ROUTERED TOP BOTTOM FRAME LENGTH: 17'8"
FINISHES
A. PRETREATMENT: E-CLPS CHROME FREE FIVE STAGER ALUMINUM
PRETREATMENT SYSTEM. COMPLIES WITH, AAMA 2604, AND AAMA 2605
SUPERIOR PERFORMANCE STANDARD AND MEETS EPA, OSHA, STATE AND
LOCAL ENVIRONMENTAL REQUIREMENTS AND CONTAINS NO CHROMATES,
CYANIDES, OR OTHER HEAVY METALS. WASTE TREATMENT IS USUALLY A
SIMPLE PH NEUTRALIZATION AND DISPOSAL TO THE SANITARY SEWER.
B. DULUX GROUP MANNEX BASE COAT AND DURATEC SERIES
ELECTROSTATIC APPLIED ARCHITECTURAL POWDER COATINGS ARE
APPROVED TO AAMA 2604 PERFORMANCE STANDARD.
1. GLOSS LEVEL: STANDARD GLOSS IS 30 PERCENT, PLUS OR MINUS 5
PERCENT.
C. SUPER DURABLE POWDER COATINGS: ALLUMINATE PREMIUM WOOD
FINISHES USE A POLYURETHANE POWDER COAT WITH INK BASED WOOD
GRAIN PATTERNS SUBLIMATED INTO THE BASE POWDER EFFECTIVELY
TATTOOING THE POWDER. THE COMBINED EFFECT CREATES ALL THE
AESTHETIC ASPECTS OF REAL WOOD WHILE OFFERING THE SAME
ENVIRONMENTAL ADVANTAGES OF POWDER COATED FINISHES.
1. WOOD GRAINED
a. LIGHT OAK
FABRICATION
A. PREPARE SURFACES, PRE-TREAT AND COAT COMPONENTS IN
ACCORDANCE WITH AAMA 2604 AND 2605 QUALITY STANDARDS AND
APPLICABLE EUROPEAN STANDARDS FOR THE COATING MATERIAL
SPECIFIED.
B. WRAP AND PACKAGE COATED COMPONENTS USING METHODS SUITABLE
FOR TRANSIT AND COVERED SITE STORAGE WITHOUT DAMAGE.
A.
B.
C.
A.
A.
B.
A.
B.
DIVISION 6 - WOOD, PLASTICS, AND COMPOSITES
FURNISH LABOR, TOOLS, EQUIPMENT AND MATERIALS TO COMPLETE WORK UNDER
THIS HEADING AS INDICATED ON THE DRAWINGS AND DESCRIBED IN THE
SPECIFICATIONS.
ROUGH CARPENTRY
PROVIDE AND MAINTAIN TEMPORARY ENCLOSURES, AND BARRICADES AS
REQUIRED BY GOVERNING LOCAL ORDINANCES.
PROVIDE TEMPORARY DOOR AND WINDOW ENCLOSURES AS REQUIRED.
HEADERS TO BE SIZED AS DETAILED IN THE STRUCTURAL DRAWINGS.
STRUCTURAL LUMBER
REFER TO STRUCTURAL DRAWINGS FOR INFORMATION ON STRUCTURAL LUMBER,
SHEATHING, PRE-FABRICATED WOOD JOISTS, FASTENING AND ATTACHMENT.
FINISH CARPENTRY
FURNISH LABOR AND MATERIALS TO COMPLETE WORK UNDER THIS SECTION AS
INDICATED ON DRAWINGS AND DESCRIBED IN THESE SPECIFICATIONS.
HARDWARE DIMENSIONS ARE TO BE NET SIZE AND NOT NOMINAL SIZE. MATERIAL
FOR INTERIOR FINISH SHALL BE AS FOLLOWS:
1. DINING ROOM TRIM - REFER TO FINISH SCHEDULE & DETAILED DRAWINGS.
2. COUNTERTOPS TO BE FURNISHED AND INSTALLED BY KITCHEN EQUIPMENT
SUPPLIER.
SOLID SURFACING MATERIAL
VANITY TOPS AND WINDOW SILLS: DUPONT CORIAN, COLORS AS NOTED ON
DRAWINGS.
PROVIDE IN THICKNESS, FINISH AND EDGE TREATMENT AS REQUIRED AND
COORDINATED WITH THE OWNER'S REPRESENTATIVE.
A.
A.
B.
ROOFING WOOD DECKS
ROOF SHALL BE CLEAN, SMOOTH AND SUITABLE FOR ACCEPTANCE OF THE
ROOFING SYSTEM. REMOVE AND REPLACE DETERIORATED WOOD NAILERS, ROOF
CURBS AND SOURED OR BADLY DETERIORATED ROOF INSULATION. JOINT OR
CRACKS GREATER THAN 1/4" SHALL BE REPAIRED.
ROOFING MEMBRANE
THE MEMBRANE MATERIAL SHALL BE IN ACCORDANCE WITH APPROVED
MANUFACTURER SPECIFICATIONS. MEMBRANE: (BASE BID) PRECISION
FABRICATED, FLEXIBLE, SINGLE-PLY,40 MIL PVC ROOFING SYSTEM. BASIS OF
DESIGN: DURO-LAST ROOFING INC. (ALTERNATE BID) SAME AS LISTED ABOVE BUT
50 MIL.
1. ALL ASHRAE ZONES: COLOR WHITE
RELATED MATERIALS:
1. DRIP EDGES, GRAVEL STOPS, COPINGS AND COUNTER FLASHINGS TO BE
COMPATIBLE AND INSTALLED ACCORDING TO ROOF MANUFACTURERS
SPECIFICATION. IF PRODUCTS USED ARE SHEET METAL, IT MUST BE A 26
GA (MIN) GALVANIZED. METAL COUNTER FLASHING, COPING, DRIP EDGES
AND GRAVEL STOPS SHALL HAVE A 3" OVERLAP FOR EXPANSION AND
CONTRACTING. CONTRACTOR TO CONSIDER UTILIZING EXCEPTIONAL
METALS PRODUCTS TO ENSURE A FULL SYSTEM WARRANTY.
2. ROOF SCUPPER LININGS: CUT ROOF SCUPPER LINING TO FIT ROOF
SCUPPERS, ALLOWING ADEQUATE MATERIAL FOR FIELD WELDING TO ROOF
COVER AND BASE FLASHING. APPLY APPROVED ADHESIVE TO SCUPPER,
INSTALL LINING IN SCUPPER AND MAKE FIELD WELDS TO ROOF COVER AND
BASE FLASHING. APPLY APPROVED SEALANT TO EXTERIOR EDGES OF
LINING ON EXTERIOR OF WALL, UNDER AND ON TOP OF THE TERMINATION
BAR SURROUNDING THE EDGES. CONTRACTOR MUST UTILIZE DURO-LAST
PREFABRICATED SCUPPER FLASHING PER DURO-LAST DETAIL 2061.
3. WOOD MEMBERS: LUMBER SHALL BE #2 SOUTHERN YELLOW PINE,
DOUGLAS FIR OR OTHER APPROVED SPECIES, AND IT SHALL BE FREE
FROM WARPING, EXCESSIVE KNOTS AND GRADE MARKED. IT SHALL BE
"WOLMANIZED" (CCA) PRESSURE-TREATED AND SHALL BEAR THE TRADE
MARK "WOLMANIZED" OR AN APPROVED EQUAL TREATMENT.
4. ROOF DRAINS AND OVERFLOW DRAINS TO BE INSTALLED ACCORDING TO
ZURN Z180 CORNICE DRAIN INSTALLATION GUIDE.
REFERENCES
A. ASTM D 958 - PRACTICE FOR DETERMINING TEMPERATURES OF STANDARD
ASTM MOLDS FOR TEST SPECIMENS OF PLASTICS.
B. AAMA 2605-05 - VOLUNTARY SPECIFICATION, PERFORMANCE REQUIREMENTS
AND TEST PROCEDURES FOR SUPERIOR PERFORMING ORGANIC COATINGS
ON ALUMINUM EXTRUSIONS AND PANELS.
C. AAMA 2604 - VOLUNTARY SPECIFICATION, PERFORMANCE REQUIREMENTS
AND TEST PROCEDURES FOR HIGH PERFORMING ORGANIC COATINGS ON
ALUMINUM EXTRUSIONS AND PANELS.
D. AAMA 2603 - VOLUNTARY SPECIFICATION, PERFORMANCE REQUIREMENTS
AND TEST PROCEDURES FOR HIGH PERFORMING ORGANIC COATINGS ON
ALUMINUM EXTRUSIONS AND PANELS.
PERFORMANCE REQUIREMENTS
A. COMPONENTS: DESIGN AND SIZE COMPONENTS TO WITHSTAND DEAD
AND LIVE LOADS CAUSED BY POSITIVE AND NEGATIVE WIND PRESSURE
ACTING NORMAL TO PLANE OF WALLS AS CALCULATED IN ACCORDANCE
WITH APPLICABLE CODE.
B. MOVEMENT: ACCOMMODATE MOVEMENT WITHIN SYSTEM WITHOUT
DAMAGE TO COMPONENTS OR MOVEMENT WITHIN SYSTEM: MOVEMENT
BETWEEN SYSTEM AND PERIMETER COMPONENTS WHEN SUBJECT TO
SEASONAL TEMPERATURE CYCLING: DYNAMIC LOADING AND RELEASE OF
LOADS: DEFLECTION OF STRUCTURAL SUPPORT FRAMING.
C. DRAINAGE: PROVIDE POSITIVE DRAINAGE TO EXTERIOR FOR MOISTURE
ENTERING OR CONDENSATION OCCURRING WITHIN PANEL SYSTEM.
SUBMITTALS
A. PRODUCT DATA: MANUFACTURER'S DATA SHEETS ON EACH PRODUCT TO
BE USED, INCLUDING:
1. PREPARATION INSTRUCTIONS AND RECOMMENDATIONS.
2. STORAGE AND HANDLING REQUIREMENTS AND RECOMMENDATIONS.
3. INSTALLATION METHODS.
B. SHOP DRAWINGS: INDICATE DIMENSIONS, LAYOUT, JOINTS, EXPANSION
JOINTS, CONSTRUCTION DETAILS, METHODS OF ANCHORAGE, AND
INTERFACE WITH ADJACENT MATERIALS.
A.
B.
C.
D.
E.
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
BUILDING INSULATION
FURNISH LABOR, MATERIALS AND EQUIPMENT NECESSARY TO COMPLETE WORK
AS INDICATED ON THE CONSTRUCTION DOCUMENTS AND DESCRIBED IN THE
SPECIFICATIONS.
EXTERIOR WALL INSULATION: REFER TO INSULATION SCHEDULE ON DRAWINGS.
VAPOR BARRIER SHALL BE GRIFFOLYN T-65 BY REEF INDUSTRIES, INC. OR EQUAL.
THE MATERIAL SHALL HAVE A 3-PLY, HIGH DENSITY POLYETHYLENE AND NYLON
YARN LAMINATE. MATERIAL SHALL HAVE A REINFORCED NON-WOVEN GRID WITH A
PPT TEAR STRENGTH OF AT LEAST 15.0 LBS. VAPOR BARRIER SHALL BE APPLIED
IN THE WIDEST PRACTICAL WIDTHS. SIDE AND END JOINTS SHALL BE LAPPED AT
LEAST 6". LAPS SHALL BE SEALED USING FAB TAPE. PUNCTURES OR TEARS ARE
TO BE REPAIRED USING GRIFFOLYN'S GRIFF TAPE, FAB TAPE OR EQUAL. VAPOR
BARRIER MUST PROVIDE A COMPLETE SEAL TO PREVENT MOISTURE TRANSFER.
NOTE: FOR SOUTHERN COASTAL AREAS, THE VAPOR BARRIER SHOULD BE USED
ON THE EXTERIOR OF THE WALL. WHERE THERE IS UNCERTAINTY, FOLLOW LOCAL
PRACTICE.
RIGID ROOF INSULATION: FURNISHED AND INSTALLED BY THE ROOFING
CONTRACTOR. INSULATION TO BE MINIMUM OF (2) LAYERS OF ROOF
MANUFACTURER'S RECOMMENDED INSULATION BOARDS. INSTALL IN THICKNESS
REQUIRED TO MEET THE R-VALUES INDICATED IN THE INSULATION SCHEDULE ON
DRAWINGS. CONTRACTOR TO PROVIDE BID UTILIZING DURO-GUARD ISO II BOARDS.
'ENRGY 3' INSULATION BOARDS BY JOHNS MANVILLE ARE AN ACCEPTABLE EQUAL.
PERIMETER INSULATION: REFER TO INSULATION SCHEDULE ON DRAWINGS..
C. SELECTION SAMPLES: FOR EACH FINISH PRODUCT SPECIFIED, TWO
COMPLETE SETS OF COLOR CHIPS REPRESENTING THE
MANUFACTURER'S FULL RANGE OF AVAILABLE COLORS AND PATTERNS.
D. VERIFICATION SAMPLES: FOR EACH FINISH PRODUCT SPECIFIED, TWO
SAMPLES, MINIMUM SIZE 2 INCHES (51MM) BY 3-1/2 INCHES (89MM),
REPRESENTING ACTUAL PRODUCT, COLOR AND GLOSS.
E. MANUFACTURER'S CERTIFICATES: CERTIFY PRODUCTS MEET OR EXCEED
SPECIFIED REQUIREMENTS.
F. CLOSEOUT SUBMITTALS: PROVIDE MANUFACTURER'S MAINTENANCE
INSTRUCTIONS THAT INCLUDE RECOMMENDATIONS FOR PERIODIC
CLEANING AND MAINTENANCE OF COMPONENTS.
QUALITY ASSURANCE
A. MANUFACTURER'S QUALIFICATIONS: MINIMUM TEN YEARS' EXPERIENCE
PRODUCING ALUMINUM FINISHES OF THE TYPES SPECIFIED IN AAMA
2604 AND 2605 CERTIFIED.
B. INSTALLER: COMPANY SPECIALIZING IN PERFORMING WORK OF THIS
SECTION WITH MINIMUM THREE YEARS DOCUMENTED EXPERIENCE.
C. MOCK-UP: PROVIDE A MOCK-UP FOR EVALUATION OF SURFACE
PREPARATION TECHNIQUES AND APPLICATION WORKMANSHIP.
1. FINISH AREAS DESIGNED BY ARCHITECT.
2. DO NOT PROCEED WITH REMAINING WORK UNTIL WORKMANSHIP,
COLOR, AND GLOSS ARE APPROVED BY ARCHITECT.
REFINISH MOCK-UP AREA AS REQUIRED TO PRODUCE ACCEPTABLE
WORK.
BUILDING WEATHER BARRIER
PROVIDE WHEATHER BARRIER AS NOTED ON PLANS, SECTIONS, DETAILS, ETC.
A. FLUID APPLIED
1. ASTM E1677 : DUPONT TYVEK FLUID APPLIED WB
2. BUILDING-WRAP COMPOUND: TYVEK FLUID APPLIED FLASHING & JOINT COMPOUND
AND DUPONT SEALANT FOR TYVEK FLUID APPLIED SYSTEM.
B. BUILDING WRAP:
1. ASTM E1677: DOPONT TYVEK COMMERCIAL WRAP
2. BUILDING WRAP TAPE: PRESSURE SENSITIVE PLASTIC TAPE REMCOMENED BY
BUILDING WRAP MANUFACTURER FOR SEALING JOINTS ADN PENETRATIONS IN
BUILDING WRAP.
C. FLUID APPLIED AT E.I.F.S.
1. AS NOTED IN E.I.F.S. SECTION OF THESE SPECIFIICATIONS
12
/
2
2
/
2
0
1
7
1
2
:
3
7
:
5
9
P
M
SPECIFICATIONS
SP1
IT
EC
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
NO
T
U
S
E
D
NO
T
U
S
E
D
NO
T
U
S
E
D
A.
B.
C.
D.
E.
F.
A.
DIVISION 8 - OPENINGS
ALUMINUM ENTRANCE DOORS, STOREFRONT & CURTAINWALL
DOORS AND WINDOWS SHALL HAVE PRODUCT LABELS INDICATING U-VALUE, SHGC
AND AIR LEAKAGE RATE IN COMPLIANCE WITH LATEST ENERGY CODES. ALLOWED
AIR LEAKAGE SHALL NOT EXCEED 1.0 CFM/FT2 FOR GLAZED DOORS AND 0.3 CFM/FT2
FOR WINDOWS.
SYSTEMS: REFER TO EXTERIOR MATERIALS AND FINISHES SCHEDULE ON
DRAWINGS.
DOORS SHALL BE "350 MEDIUM STILE" DOOR, MANUFACTURED BY US ALUMINUM.
HARDWARE FOR ENTRANCE DOORS: SEE HARDWARE SCHEDULE ON DRAWINGS.
EXPOSED ALUMINUM MATERIAL SHALL BE CLEAR ANODIZED ALUMINUM. HARDWARE
SHALL MATCH.
MISCELLANEOUS TRIMS, SHAPES, SPACERS, AND ADAPTERS AS REQUIRED.
GLAZING
EXTERIOR GLASS SHALL BE 1" INSULATED (UNLESS NOTED OTHERWISE). SEE THE
FINISH SCHEDULE. GLAZING MUST MEET SAFETY CODES AS REQUIRED. GLASS
MUST HAVE 5-YEAR WARRANTY AGAINST SEAL FAILURE.
1. GLASS THICKNESSES: SELECT MIN. GLASS THICKNESSES PER ASTM E 1300,
PER FOLLOWING REQUIREMENTS:
a. SPECIFIED DESIGN WIND LOADS: DESIGN WIND LOADS APPLICABLE
TO PROJECT FROM BASIC WIND SPEED - IN MILES PER HOUR
(METERS PER SECOND) AT 33 FEET (10 M) ABOVE GRADE,
ACCORDING TO ASCE 7, "MINIMUM DESIGN LOADS FOR BUILDINGS
AND OTHER STRUCTURES": SECTION 6.4.2, "ANALYTIC PROCEDURE,"
BASED ON MEAN ROOF HEIGHTS ABOVE GRADE INDICATED ON
DRAWINGS.
b. PROBABILITY OF BREAKAGE FOR VERTICAL GLAZING: 8 LITES PER
1000 FOR LITES SET VERTICALLY OR NOT MORE THAN 15 DEGREES
OFF VERTICAL AND UNDER WIND ACTION.
1) LOAD DURATION: 60 SECONDS OR LESS.
c. MIN. GLASS THICKNESS FOR EXTERIOR LITES: NOT LESS THAN 6
MM.
d. THICKNESS OF TINTED AND HEAT-ABSORBING GLASS:
1) PROVIDE THE SAME THICKNESS FOR EACH TINT COLOR
INDICATED THROUGHOUT PROJECT.
B. PRODUCTS AND MANUFACTURERS
1. AVAILABLE PRODUCTS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS,
PRODUCTS THAT MAY BE INCORPORATED INTO THE WORK INCLUDE, BUT
ARE NOT LIMITED TO, THE PRODUCTS INDICATED IN SCHEDULES ON THE
DRAWINGS.
C. PRIMARY FLOAT GLASS
1. ASTM C 1036, TYPE I (TRANSPARENT GLASS, FLAT), QUALITY Q3 (GLAZING
SELECT); CLASS I (CLEAR).
D. HEAT-TREATED FLOAT GLASS
1. ASTM C 1048; TYPE I (TRANSPARENT GLASS, FLAT); QUALITY Q3 (GLAZING
SELECT); CLASS, KIND, AND CONDITION AS INDICATED.
A.
B.
A.
J. PREPARATION
1. CLEAN GLAZING CHANNELS AND OTHER FRAMING MEMBERS RECEIVING
GLASS IMMEDIATELY BEFORE GLAZING. REMOVE COATINGS NOT FIRMLY
BONDED TO SUBSTRATES.
K. GLAZING, GENERAL
1. COMPLY WITH COMBINED WRITTEN INSTRUCTIONS OF MANUFACTURERS OF
GLASS, SEALANTS, GASKETS, AND OTHER GLAZING MATERIALS, UNLESS
MORE STRINGENT REQUIREMENTS ARE INDICATED, INCLUDING THOSE IN
REFERENCED GLAZING PUBLICATIONS.
2. GLAZING CHANNEL DIMENSIONS, AS INDICATED ON DRAWINGS, PROVIDE
NECESSARY BITE ON GLASS, MINIMUM EDGE AND FACE CLEARANCES, AND
ADEQUATE SEALANT THICKNESSES, WITH REASONABLE TOLERANCES.
ADJUST AS REQUIRED BY PROJECT CONDITIONS DURING INSTALLATION.
3. PROTECT GLASS EDGES FROM DAMAGE DURING HANDLING AND
INSTALLATION. REMOVE DAMAGED GLASS FROM PROJECT SITE AND
LEGALLY DISPOSE OF OFF PROJECT SITE. DAMAGED GLASS IS GLASS WITH
EDGE DAMAGE OR OTHER IMPERFECTIONS THAT, WHEN INSTALLED, COULD
WEAKEN GLASS AND IMPAIR PERFORMANCE AND APPEARANCE.
4. APPLY PRIMERS TO JOINT SURFACES WHERE REQUIRED FOR ADHESION OF
SEALANTS, AS DETERMINED BY PRECONSTRUCTION SEALANT-SUBSTRATE
TESTING.
5. INSTALL SETTING BLOCKS IN SILL RABBETS, SIZED AND LOCATED TO
COMPLY WITH REFERENCED GLAZING PUBLICATIONS, UNLESS OTHERWISE
REQUIRED BY GLASS MANUFACTURER. SET BLOCKS IN THIN COURSE OF
COMPATIBLE SEALANT SUITABLE FOR HEEL BEAD.
6. DO NOT EXCEED EDGE PRESSURES PER GLASS MANUFACTURERS FOR
INSTALLING GLASS LITES.
a. PROVIDE SPACERS FOR GLASS LITES WHERE THE LENGTH PLUS
WIDTH IS LARGER THAN 50 INCHES: LOCATE SPACERS DIRECTLY
OPPOSITE EACH OTHER ON BOTH INSIDE AND OUTSIDE FACES OF
GLASS. INSTALL CORRECT SIZE AND SPACING TO PRESERVE
REQUIRED FACE CLEARANCES, UNLESS GASKETS AND GLAZING
TAPES ARE USED THAT HAVE DEMONSTRATED ABILITY TO MAINTAIN
REQUIRED FACE CLEARANCES AND TO COMPLY WITH SYSTEM
PERFORMANCE REQUIREMENTS.
b. PROVIDE 1/8-INCH (3-MM) MINIMUM BITE OF SPACERS ON GLASS AND
USE THICKNESS EQUAL TO SEALANT WIDTH. WITH GLAZING TAPE,
USE THICKNESS LESS THAN FINAL THICKNESS OF TAPE.
7. PROVIDE EDGE BLOCKING WHERE INDICATED OR NEEDED TO PREVENT
GLASS LITES FROM MOVING SIDEWAYS IN GLAZING CHANNEL, AS
RECOMMENDED IN WRITING BY GLASS MANUFACTURER AND ACCORDING TO
REQUIREMENTS IN REFERENCED GLAZING PUBLICATIONS.
8. SET GLASS LITES IN EACH SERIES WITH UNIFORM PATTERN, DRAW, BOW,
AND SIMILAR CHARACTERISTICS.
9. GLASS STOPS ARE EXTRUDED ALUMINUM SNAP-IN TYPE FOR INTERIOR
GLAZING OF GLASS OF PANELS 5/8" THICK (CUSTOM STOPS FOR
THICKNESSES UP TO AN 1" ARE AVAILABLE) AND HAVE A FIXED GASKET OF
HIGH QUALITY ELASTOMERIC MATERIAL PERIMETER WOOL PILE AND
ELASTOMERIC WEATHER-STRIP IS FACTORY APPLIED.
10. GLASS MUST HAVE (5) FIVE YEAR WARRANTY AGAINST SEAL FAILURE.
L. GLASS TYPES: REFER TO EXTERIOR MATERIALS AND FINISHES SCHEDULE ON
DRAWINGS.
STEEL SERVICE DOOR AND FRAME
STEEL DOOR FRAMES: SHALL BE 18 GUAGE STEEL WELDED VERTICAL EDGE,
MECHANICAL INTERLOCK NOT ACCEPTED, AS NOTED IN THE DOOR SCHEDULE
ON THE DRAWINGS AND AS MANUFACTURED BY BLACK MOUNTAIN,
DOOR, SERIES 400, OR EQUAL IF APPROVED BY ARCHITECT.
1. SEE THE FINISH SCHEDULE, EXTERIOR SCHEDULE AND THIS SHEET FOR
APPLICABLE PAINT.
C. STEEL HOLLOW METAL DOOR: SHALL BE 1 3/4" THICK, FLUSH TYPE, MINIMUM 18
GAUGE STEEL FACE DOOR WITH POLYSTYRENE CORE, INSULATION, ETC, AND
MANUFACTURED AS FRAMES ABOVE, REFER TO DRAWINGS.
1. SEE THE FINISH SCHEDULE, EXTERIOR SCHEDULE AND THIS SHEET FOR
APPLICABLE PAINT.
D. FINISH HARDWARE: DOORS SHALL BE PREPARED TO RECEIVE HEAVY-DUTY
HARDWARE. SEE HARDWARE SCHEDULE ON DRAWINGS FOR HARDWARE
SPECIFICATIONS.
PREFINISHED DOORS
LAMINATED DOORS: TO BE 1 3/4" SOLID CORE PRE-HUNG DOORS AS MANUFACTURED
BY MARLITE PRODUCTS. DOORS OF THIS TYPE TO BE FINISHED IN HIGH PRESSURE
LAMINATE FURNISHED COMPLETE WITH ADJUSTABLE ALUMINUM FRAME AND
HARDWARE.
1. SEE DOOR SCHEDULE FOR HARDWARE SPECIFICATIONS.
A.
A.
A.
B.
C.
D.
E.
PICK-UP WINDOW
A. ANODIZED ALUMINUM, CLEAR ANODIZED ALUMINUM FINISH.
B. VERIFY CONSTRUCTION IS READY TO RECEIVE PICK UP WINDOW. VERIFY ROUGH
OPENINGS ARE CORRECT SIZE AND IN CORRECT LOCATION. ORIENT PICK UP
WINDOW SO THAT THE OPENING MATCHES THE BUILDING ELEVATION.
EXAMINE ROUGHING-IN FOR EMBEDDED AND BUILT-IN ANCHORS TO VERIFY ACTUAL
LOCATIONS OF SECURITY WINDOW CONNECTIONS BEFORE SECURITY WINDOW
INSTALLATION. CONTRACTOR TO PROVIDE ANCHOR SCREWS.
INSPECT BUILT-IN AND CAST-IN ANCHOR INSTALLATIONS, BEFORE INSTALLING SECURITY
WINDOWS, TO VERIFY THAT ANCHOR INSTALLATIONS COMPLY WITH REQUIREMENTS.
REMOVE AND REPLACE ANCHORS WHERE INSPECTIONS INDICATE THAT THEY DO NOT
COMPLY WITH SPECIFIED REQUIREMENTS. REINSPECT AFTER REPAIRS OR
REPLACEMENTS ARE MADE.
FOR GLAZING MATERIALS WHOSE ORIENTATION IS CRITICAL FOR PERFORMANCE,
VERIFY INSTALLATION ORIENTATION. PROCEED WITH INSTALLATION ONLY AFTER
UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED.
FURNISH FRAMES AND ANCHORS TO OTHER SECTIONS AS REQUIRED FOR
INSTALLATION IN SURROUNDING PARTITION AND CASEWORK CONSTRUCTION.
INSTALL PICK UP WINDOW IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
ALIGN PICK UP WINDOW PLUMB, LEVEL AND SQUARE.
RIGIDLY SECURE PICK UP WINDOW TO ADJACENT SUPPORTING CONSTRUCTION.
GLAZE WINDOWS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS
SEAL PERIMETER JOINTS
CONNECT ELECTRICAL COMPONENTS TO POWER SOURCE.
PROTECTION: WHERE DISSIMILAR METALS WILL CONTACT EACH OTHER, PROTECT
AGAINST GALVANIC ACTION BY PAINTING CONTACT SURFACES WITH PRIMER OR BY
APPLYING SEALANT OR TAPE RECOMMENDED IN WRITING BY MANUFACTURER FOR THIS
PURPOSE. WHERE ALUMINUM WILL CONTACT CONCRETE OR MASONRY, PROTECT
AGAINST CORROSION BY PAINTING CONTACT SURFACES WITH BITUMINOUS PAINT.
ACCESS DOOR
GALVANIZED STEEL, 16 GA., 24"X24" GREY ENAMEL PRIMED DOOR AND FRAME,
INSULATED DOOR; THE WILLIAMS BROS. MODEL EXT 1300 WITH CONTINUOUS HINGE,
GASKET AND KEYED CYLINDER LOCK WITH TEE HANDLE.
WALL LOUVER
STATIONARY WIND-DRIVEN RESISTANT LOUVER: RUSKIN (816-761-7476), MODEL
EME220DD, 6"X6", MILL FINISH ALUMINUM, OR APPROVED EQUAL. FIELD PAINTED AS
NOTED ON DRAWINGS.
DIVISION 9 - FINISHES
NOTE: IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE USE OF "CLASS A" OR
"CLASS C" MATERIAL.
FLOOR AND WALL TILE INSTALLATION
PROVIDE TILE WORK COMPLETE IN PLACE AS INDICATED ON DRAWINGS, SPECIFIED
HEREIN.
TILE WORK SHALL BE SUBJECT TO PERFORMANCE STANDARDS AS SET BY THE
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) SPECIFICATION A-137J-80 FOR
CERAMIC TILE OR CTI-69-5 FOR SPECIAL PURPOSE TILE AND THE TILE COUNCIL OF
AMERICA (TCA) CURRENT HANDBOOK FOR CERAMIC TILE INSTALLATION.
DELIVER MATERIAL TO THE JOB SITE AND STORE IN ORIGINAL UNOPENED CARTONS
WITH LABELS INTACT AND LEGIBLE.
TILE SHOULD BE STORED IN A DRY COVERED AREA.
TILE SHALL BE STANDARD GRADE IN ACCORDANCE WITH SPECIFICATIONS
PUBLISHED BY ANSI A-137J-80 FOR CERAMIC TILE OR CTI-69-5 FOR SPECIAL
PURPOSE TILE.
1. EXTERIOR DECORATIVE WALL TILE: SEE FINISH SCHEDULE.
2. INTERIOR FLOOR TILE: SEE FINISH SCHEDULE.
A.
B.
A.
B.
A.
B.
C.
A.
B.
A.
B.
A.
B.
C.
D.
F. TILE SETTING, GROUTING MATERIALS, AND WATERPROOFING MEMBRANE:
1. BASIS-OF-DESIGN: LATICRETE INTERNATIONAL, INC.
2. APPROVED EQUAL: MAPEI CORPORATION.
G. [MR-1] MODIFIED-PORTLAND CEMENT THIN SET MORTAR: ISO 13007: C2EP1 /
C2TES1PA AND ANSI A118.15.
1. PRODUCTS: LATICRETE: 254 PLATIUM THINSET OR MAPEI: ULTRA FLEX 2.
H. [MR-2] MEDIUM BED, MODIFIED-PORTLAND CEMENT THIN SET MORTAR: ISO 13007:
C2EP1 / C2TES1PA AND ANSI A118.15 AND CAPABLE OF BEING INSTALLED UP TO 1/4
INCH THICK.
1. PRODUCTS: LATICRETE: 4XLT OR MAPEI: ULTRA FLEX LFT.
I. [GR-1] POLYMER-MODIFIED HIGH PERFORMANCE CEMENT TILE GROUT: ISO 13007:
CG-2WAF AND ANSI A118.7.
1. PRODUCTS: FOR JOINTS 1/8-INCH OR WIDER (SANDED GROUT): LATICRETE:
PERMACOLOR: ULTRACOLOR PLUS.
2. COLORS: SEE INTERIOR AND EXTERIOR FINISH SCHEDULES..
J. [WM-1] INTERIOR WATERPROOFING MEMBRANE: COMPLY WITH ANSI A118.10.
ADJOINING FLOOR AND WALL AREAS AT MOP SINK LOCATIONS OR WHERE
INDICATED ON DRAWINGS, AND ELSEWHERE AS REQUIRED FOR WATERPROOFING
TILE ASSEMBLY AS SPECIFIED IN ANSI A108.13.
1. PRODUCTS: LATICRETE: HYDROBAN OR MAPEI: AQUA DEFENSE.
K. THRESHOLDS: PROVIDE THRESHOLDS TO ADJUST BETWEEN TILE AND OTHER
FLOOR FINISHES.
L. ACCEPTABILITY OF SURFACES: SURFACES TO BE TILED SHALL BE SMOOTH AND
LEVEL FOR MORTAR BED AT THE REQUIRED FINISH ELEVATION, AND A STEEL
TROWEL FINISH WITH A LIGHT BROOM TEXTURED FINISH WITHOUT MORE THAN THE
FOLLOWING MAXIMUM VARIATIONS:
1. PORTLAND CEMENT MORTAR: WALLS AND CEILINGS - 1/4" IN 8"; FLOORS - 1/8"
IN 10'-0".
2. DRY SET, LATEX AND CEMENT MORTARS: WALLS AND CEILINGS - 1/8" IN 8";
FLOORS - 1/8" IN 10'-0".
M. PREPARATION: PRIOR TO THE START OF LAYING TILE, SWEEP OR VACUUM AND
WASH SURFACES TO BE COVERED. SURFACE SHOULD BE FREE FROM COATING,
CURING COMPOUNDS, OIL, GREASE, WAX AND DUST.
N. JOB CONDITIONS: A MINIMUM TEMPERATURE OF 50 DEGREES F (10 DEGREES C)
SHOULD BE MAINTAINED DURING TILE WORK AND FOR SEVEN (7) DAYS
THEREAFTER. PROVIDE ADEQUATE LIGHTING FOR GOOD GROUTING AND CLEAN-
UP.
O. LAYOUT OF WORK: INTERIOR WALL AND FLOOR FINISH LAYOUTS AND PATTERNS
FOR KITCHEN, RESTROOMS AND DINING ROOM SHALL BE AS SHOWN ON INTERIOR
ELEVATIONS AND FLOOR TILE PLAN. REFER TO THE FINISH SCHEDULE. DETERMINE
LOCATIONS OF MOVEMENT (EXPANSION) JOINTS BEFORE STARTING TILE WORK.
LAYOUT TILE WORK SO AS TO MINIMIZE CUTS LESS THAN ONE HALF TILE IN SIZE.
LOCATE CUTS IN BOTH WALLS AND FLOORS SO AS TO BE LEAST CONSPICUOUS.
P. SETTING METHODS: SET TO TILE COUNCIL OF AMERICA SPECIFICATIONS WALLS
W242-98 AND FLOORS F113-98.
Q. GROUTING: FOLLOW MANUFACTURER'S RECOMMENDATIONS AS TO GROUTING
PROCEDURES AND PRECAUTIONS. REMOVE GROUT HAZE, OBSERVING GROUT
MANUFACTURER'S RECOMMENDATIONS AS TO THE USE OF VARIOUS CLEANERS.
FLOOR TILE GROUT TO BE 1/4" WIDE; WALL TILE GROUT TO BE 1/16" WIDE.
R. FINISHING: THOROUGHLY RINSE TILE WORK. USE NEUTRAL CLEANER WITH
ABRASIVE ADDITIVE (WALTER G. LEGGE'S "TEXSPAR" OR EQUAL) FOR FINAL
CLEANING. ACID CLEANERS ARE NOT RECOMMENDED EXCEPT AS NOTED.
1. USE MIXTURE OF 75% WATER AND 25% MAPEI KARACLEAN TO CLEAN TILE
SURFACE (EQUAL LATICRETE TILE CLEANER 1:3 DILUTION RATIO). APPLY AND
BUFF.
2. USE PHOSPHORIC ACID OR SULFAMIC ACID ONLY FOR REMOVAL OF GROUT
RESIDUE. DO NOT USE MURIATIC ACID.
GYPSUM DRYWALL
FURNISH MATERIAL AND LABOR NECESSARY TO PROVIDE FINISHED DRYWALL
SURFACES IN AREAS SCHEDULED TO RECEIVE THIS FINISH ON THE DRAWINGS.
TAPE, SPACKLE AND SAND SURFACES TO RECEIVE PAINT. REPEAT AS REQUIRED.
DRYWALL OVER FURRING AND WOOD STUDS SHALL BE 5/8" FIRECODE GYPSUM.
MATERIALS SHALL BE STANDARD PRODUCTS MANUFACTURED BY US GYPSUM,
NATIONAL GYPSUM OR GOLD BOND GYPSUM COMPANY.
SUSPENDED CEILING SYSTEM
FURNISH MATERIALS AND LABOR TO PROVIDE A COMPLETE SUSPENDED CEILING
INCLUDING CEILING TILE, HANGERS, GRID TEES, AND MOLDINGS.
ACOUSTICAL CEILING MATERIALS IN CORRIDOR AT RESTROOMS, RE: CT-2 ON FINISH
SCHEDULE.
C. CEILING IN THE KITCHEN, RE: CT-1 ON FINISH SCHEDULE
D. THE CEILING IN THE RESTROOMS SHALL BE SMOOTH, PAINTED GYPSUM DRYWALL.
1. COLOR: SEE THE FINISH SCHEDULE.
NON-TILE FIBERGLASS REINFORCED POLYESTER (FRP) PANELS
NON TILE WALL FINISH FRP (FOOD PREP AREA): SEE FINISH SCHEDULE.
TEXTURED FIBERGLASS REINFORCED POLYESTER (FRP) PANELS SANITARY WALL
SYSTEMS TO BE FRP PANEL. INSTALL 4'X9'X1/8 PANEL WITH HARMONIZING PVC
MOLDINGS, ADHESIVE AND SEALANTS IN STRICT ACCORDANCE WITH
MANUFACTURERS WRITTEN INSTALLATION INSTRUCTIONS.
NON-TILE WALL FINISH (DINING ROOM AREA): SEE FINISH SCHEDULE.
PAINTING
PROVIDE MATERIALS, LABOR, TOOLS AND EQUIPMENT REQUIRED TO COMPLETE THE
PAINTING OF BUILDING AS SPECIFIED.
WORKMANSHIP:
1. MATERIALS SHALL BE APPLIED FREE FROM RUNS, SAGS, WRINKLES,
STREAKS, SHINERS AND BRUSH MARKS.
2. MATERIALS SHALL BE APPLIED UNIFORMLY. IF REDUCTION OF THE COATINGS
VISCOSITY IS NECESSARY, IT SHALL BE DONE IN ACCORDANCE WITH THE
MANUFACTURER'S LABEL DIRECTIONS.
3. NEW PLASTER AND OTHER MASONRY SURFACES SHALL NOT BE PRIMED
UNTIL IT HAS BEEN DETERMINED THESE SUBSTRATES HAVE DRIED
SUFFICIENTLY TO SAFELY ACCEPT PAINT. A RELIABLE ELECTRONIC
MOISTURE METER SHOULD BE USED TO MAKE THIS DETERMINATION.
UNACCEPTABLE MOISTURE CONTENT SHOULD BE REPORTED TO THE
ARCHITECT OR HIS REPRESENTATIVE.
4. A MINIMUM INTERIOR TEMPERATURE OF 65 DEGREES F SHALL BE
MAINTAINED DURING THE ACTUAL APPLICATION AND DRYING OF THE PAINT,
AND UNTIL OCCUPANCY OF THE BUILDING OCCURS. ADEQUATE VENTILATION
SHALL BE MAINTAINED TO CONTROL EXCESSIVE HUMIDITY WHICH WILL
ADVERSELY AFFECT THE CURING OF COATINGS. THE GENERAL
CONTRACTOR IS SOLELY RESPONSIBLE FOR MAINTAINING SUITABLE
TEMPERATURES AND VENTILATION.
5. BEFORE PAINTING BEGINS, VERIFY WORK THAT CREATES DUST OR DEBRIS
HAS BEEN COMPLETED. THE ROOMS OR AREAS ARE TO BE LEFT IN BROOM
CLEAN CONDITION.
6. ENAMEL AND VARNISH UNDERCOATS ARE TO BE SANDED PRIOR TO THE
RECOATING. TOP AND BOTTOMS OF DOORS ARE TO BE FINISHED IN THE
SAME MANNER AS DOOR FACING.
7. NO EXTERIOR PAINTING SHALL BE UNDERTAKEN IF AIR OR SURFACE
TEMPERATURE IS BELOW 50 DEGREES F, NOR IMMEDIATELY FOLLOWING
RAIN OR UNTIL FROST, DEW OR CONDENSATION HAS EVAPORATED.
SURFACES SHOULD ALWAYS BE TESTED WITH MOISTURE METER BEFORE
PROCEEDING.
C. PREPARATION OF SURFACES:
1. DO NOT COMMENCE WORK UNTIL SURFACE IS IN PROPER CONDITION.
2. SURFACES ARE TO BE CLEAN. IF FOR ANY REASON THE SURFACE CANNOT
BE CLEANED, THIS CONDITION SHALL BE PROMPTLY REPORTED TO THE
GENERAL CONTRACTOR AND OWNER.
3. THE PRIME COAT SHOULD BE APPLIED SOON AFTER SURFACE PREPARATION
HAS BEEN COMPLETED, TO PREVENT CONTAMINATION OF THE SUBSTRATE.
D. INSPECTION: WORK NOT CONFORMING TO THE SPECIFICATIONS OR NOT MEETING
WITH THE APPROVAL OF THE OWNER, SHALL BE REMOVED OR CORRECTED AND/OR
REPAINTED AS APPROVED BY THE OWNER.
PAINT SCHEDULE
EXTERIOR ITEMS: REFER TO EXTERIOR FINISH SCHEDULE.
INTERIOR WOOD TRIM: REFER TO FINISH SCHEDULE
PATIO CONCRETE SLAB
CONCRETE SLAB TO BE A MINIMUM OF 5" THICK - VERIFY SLAB REQUIREMENTS WITH
GEOTECHNICAL REPORT.
BROOM FINISHED CONCRETE WITH TROWELED EDGES.
CONCRETE SEALER: 'SCOFIELD' CEMENTONE CLEAR SEALER. APPLY PER
MANUFACTURER'S RECOMMENDATIONS.
CONCRETE COLOR HARDENER: 'SCOFIELD' LITHOCHROME, A33 "CLASSIC GREY"
APPLY PER MANUFACTURER'S RECOMMENDATIONS.
EXECUTION
EXAMINATION
A. DO NOT BEGIN INSTALLATION UNTIL COLORS HAVE BEEN VERIFIED.
B. VERIFY FRAMING MEMBERS ARE READY TO RECEIVE PANEL SYSTEM.
C. IF PREPARATION IS THE RESPONSIBILITY OF ANOTHER INSTALLER, NOTIFY
ARCHITECT OF UNSATISFACTORY PREPARATION BEFORE PROCEEDING.
PREPARATION
A. CLEAN SURFACES THOROUGHLY PRIOR TO INSTALLATION.
B. PREPARE SURFACES USING METHODS RECOMMENDED BY THE
MANUFACTURER.
INSTALLATION
A. INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION
INSTRUCTIONS.
B. BARRIER PROTECTION: DO NOT INSTALL OVER CEMENTITIOUS MATERIALS,
DISSIMILAR METALS OR PRESSURE TREATED MATERIAL WITHOUT
ADEQUATE BARRIER PROTECTION.
1. INSTALL BUILDING PAPER HORIZONTALLY ON WALLS TO RECEIVE
METAL SIDING.
2. WEATHER LAP EDGES 6 INCHES (150MM) AND ENDS MINIMUM 6 INCHES
(150MM).
3. STAGGER VERTICAL JOINTS F EACH LAYER.
4. SECURELY STAPLE, NAIL IN PLACE.
C. FASTEN SIDING TO STRUCTURAL SUPPORTS; ALIGNED, LEVEL, AND
PLUMB.
D. LOCATE JOINTS OVER SUPPORTS.
E. INSTALL EXPANSION CONTROL JOINTS WHERE NEEDED.
F. USE CONCEALED FASTENERS UNLESS OTHERWISE APPROVED BY
ARCHITECT.
G. INSTALL SOFFITS, AND ACCESSORIES IN ACCORDANCE WITH BEST
PRACTICE, WITH ALL JOINT MEMBERS PLUMB AND TRUE.
FIELD QUALITY CONTROL
A. AFTER INSTALLATION OF SOFFITS, CHECK ENTIRE SURFACE FOR
OBVIOUS FLAWS OR DEFECTS.
B. REPLACE AND REPAIR ANY PROBLEM AREAS, PAYING CLOSE ATTENTION
TO THE SUBSTRATE FOR CAUSES OF THE PROBLEM.
CLEANING
A. UPON COMPLETION OF SOFFIT APPLICATION, CLEAN ENTIRE AREA,
REMOVING ALL SCRAP METAL, PACKAGING AND UNUSED MATERIALS
RELATED TO THE INSTALLATION. CLEAN PANELS AS NECESSARY TO
REMOVE ALL FINGERPRINTS AND SOILED AREAS.
PROTECTION
A. PROTECT INSTALLED PRODUCTS UNTIL COMPLETION OF PROJECT
TOUCH-UP, REPAIR OR REPLACE DAMAGED PRODUCTS BEFORE
SUBSTANTIAL COMPLETION.
E. INSULATING GLASS
1. PREASSEMBLED UNITS CONSISTING OF SEALED LITES OF GLASS
SEPARATED BY A DEHYDRATED INTERSPACE, AND COMPLYING WITH ASTM E
774 FOR CLASS CBA UNITS AND WITH REQUIREMENTS SPECIFIED IN THIS
ARTICLE.
a. PROVIDE KIND HS (HEAT-STRENGTHENED) FLOAT GLASS IN PLACE OF
ANNEALED GLASS WHERE NEEDED TO RESIST THERMAL STRESSES
INDUCED BY DIFFERENTIAL SHADING OF INDIVIDUAL GLASS LITES
AND TO COMPLY WITH GLASS DESIGN REQUIREMENTS SPECIFIED IN
"PERFORMANCE REQUIREMENTS" ARTICLE. PROVIDE KIND FT (FULLY
TEMPERED) WHERE SAFETY GLASS IS INDICATED.
2. OVERALL UNIT THICKNESS AND THICKNESS OF EACH LITE: DIMENSIONS
INDICATED IN THE GLASS SCHEDULE ARE NOMINAL AND THE OVERALL
THICKNESSES OF UNITS MEASURED PERPENDICULARLY FROM OUTER
SURFACES OF GLASS LITES AT UNIT'S EDGE.
3. SEALING SYSTEM: DUAL SEAL, WITH PRIMARY AND SECONDARY SEALANTS
AS FOLLOWS:
a. RETAIN ONE SEALANT SYSTEM BELOW OR REVISE TO INSERT OTHER
COMBINATIONS; CORRELATE WITH PRODUCTS/MANUFACTURERS
SELECTED.
1) MANUFACTURER'S STANDARD SEALANTS.
4. SPACER SPECIFICATIONS: MANUFACTURER'S STANDARD SPACER MATERIAL
AND CONSTRUCTION COMPLYING WITH THE FOLLOWING REQUIREMENTS:
a. ALUMINUM WITH CLEAR ANODIZED ALUMINUM FINISH.
b. DESICCANT: MOLECULAR SIEVE OR SILICA GEL, OR BLEND OF BOTH.
c. CORNER CONSTRUCTION: MANUFACTURER'S STANDARD CORNER
CONSTRUCTION.
5. LOW E - SPUTTER-COATED FLOAT GLASS; ASTM C1376 APPLIED TO SURFACE
#2.
F. SPANDREL GLASS: REFER TO EXTERIOR MATERIALS AND FINISHES SCHEDULE ON
DRAWINGS.
G. MISCELLANEOUS GLAZING MATERIALS
1. GENERAL: PROVIDE PRODUCTS OF MATERIAL, SIZE, AND SHAPE COMPLYING
WITH REFERENCED GLAZING STANDARD, REQUIREMENTS OF
MANUFACTURERS OF GLASS AND OTHER GLAZING MATERIALS FOR
APPLICATION INDICATED, AND WITH A PROVEN RECORD OF COMPATIBILITY
WITH SURFACES CONTACTED IN INSTALLATION.
2. CLEANERS, PRIMERS, AND SEALERS: TYPES RECOMMENDED BY SEALANT
OR GASKET MANUFACTURER.
3. SETTING BLOCKS: ELASTOMERIC MATERIAL WITH A SHORE TYPE A
DUROMETER HARDNESS OF 85, +/- 5.
4. SPACERS: ELASTOMERIC BLOCKS OR CONTINUOUS EXTRUSIONS WITH A
SHORE TYPE A DUROMETER HARDNESS REQUIRED BY GLASS
MANUFACTURER TO MAINTAIN GLASS LITES IN PLACE FOR INSTALLATION
INDICATED.
5. EDGE BLOCKS: ELASTOMERIC MATERIAL OF HARDNESS NEEDED TO LIMIT
GLASS LATERAL MOVEMENT (SIDE WALKING).
H. FABRICATION OF GLASS AND OTHER GLAZING PRODUCTS
1. FABRICATE GLASS AND OTHER GLAZING PRODUCTS IN SIZES REQUIRED TO
GLAZE OPENINGS INDICATED FOR PROJECT, WITH EDGE AND FACE
CLEARANCES, EDGE AND SURFACE CONDITIONS, AND BITE COMPLYING WITH
WRITTEN INSTRUCTIONS OF PRODUCT MANUFACTURER AND REFERENCED
GLAZING STANDARD, TO COMPLY WITH SYSTEM PERFORMANCE
REQUIREMENTS.
2. GRIND SMOOTH AND POLISH EXPOSED GLASS EDGES.
I. EXAMINATION
1. EXAMINE FRAMING GLAZING, WITH INSTALLER PRESENT, FOR COMPLIANCE
WITH THE FOLLOWING:
a. MANUFACTURING AND INSTALLATION TOLERANCES, INCLUDING
THOSE FOR SIZE, SQUARENESS, AND OFFSETS AT CORNERS.
b. PRESENCE AND FUNCTIONING OF WEEP SYSTEM.
c. MINIMUM REQUIRED FACE OR EDGE CLEARANCES.
d. EFFECTIVE SEALING BETWEEN JOINTS OF GLASS-FRAMING
MEMBERS.
2. PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS
HAVE BEEN CORRECTED.
KNOTWOOD (CONTINUED)
“
NO
T
U
S
E
D
12
/
2
2
/
2
0
1
7
1
2
:
3
8
:
0
9
P
M
SPECIFICATIONS
SP2
IT
EC
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
A.
A.
A.
B.
A.
B.
A.
A.
A.
B.
C.
A.
DIVISION 10 - SPECIALTIES
GENERAL SIGNAGE
A. FOR BUILDING, FREE-STANDING PYLON, AND GROUND AND DIRECTIONAL SIGNS:
1. NEW STORES: WHITE WENDY'S LETTERS ON RED BACKGROUND, POLES AND
HARDWARE PAINTED PPG "BRILLIANT RED."
2. REMODEL STORES: NEW SIGN FACE, BODY REPAINTED PPG "BRILLIANT
RED."
B. SIGNAGE INCLUDING MENU AND SPEAKER SIGNS SHALL BE FURNISHED BY OWNER
AND INSTALLED BY LICENSED SIGN ERECTOR. SEE APPROVED SIGN
MANUFACTURERS LIST.
C. BUILDING SIGNS:
1. COORDINATE BUILDING IDENTITY SIGNS WITH OWNERS REPRESENTATIVE.
2. SIGNS TO BE PROVIDED AND INSTALLED BY MANUFACTURER FROM
APPROVED SIGN MANUFACTURERS LIST.
D. MENU BOARDS (INTERIOR AND EXTERIOR): SEE LISTING OF APPROVED SIGN
MANUFACTURERS.
1. BUILDINGS REQUIRE:
a. ONE EXTERIOR BRONZE MENU BOARD WITH ORDER CONFIRMATION
SYSTEM WITHIN SPEAKER PEDESTAL.
ROOM IDENTIFICATION SIGN
A. SIGN IS DESIGNED WITH CONTRASTING COLORS, RAISED LETTERS, AND GRADE II
BRAILLE CONFORMING WITH THE AMERICANS WITH DISABILITIES ACT STANDARDS
FOR ACCESSIBLE DESIGN.
RESTROOM IDENTIFICATION SIGN
SIGN IS DESIGNED WITH CONTRASTING COLORS, RAISED LETTERS, AND GRADE II
BRAILLE CONFORMING WITH THE AMERICANS WITH DISABILITIES ACT STANDARDS
FOR ACCESSIBLE DESIGN. FURNISHED BY OWNER AND INSTALLED BY
CONTRACTOR. SIGN IS MOUNTED ON WALL (LATCH SIDE OF DOOR) PER THE
DRAWINGS.
PUBLIC RESTROOM ACCESSORIES
TOILET ROOM ACCESSORIES TO BE PROVIDED AND INSTALLED BY THE GENERAL
CONTRACTOR. SEE PROJECT DRAWINGS FOR ACCESSORY SPECIFICATION AND
LOCATIONS.
WALL DECOR
A. ARTWORK TO BE MOUNTED TO WALLS WITH CONCEALED SECURITY HARDWARE
SUPPLIED WITH DECOR. REFER TO "MISCELLANEOUS-FINISH SCHEDULE"
MISCELLANEOUS ITEMS: FURNISHINGS: VERIFY ALL MATERIALS AND FINISHES WITH
THE FINISH SCHEDULE AND OWNER'S REPRESENTATIVE.
HEIGHT WARNING DEVICE
HEIGHT WARNING DEVICES, IF USED ARE TO BE STEEL PIPE CONSTRUCTION WITH A
SELF RETURNING 6' MIN. LENGTH HORIZONTAL WARNING BAR MOUNTED AT A
HEIGHT AT OR BELOW THE HEIGHT OF ANY AWNINGS THEY ARE MEANT TO
PROTECT. WARNING DEVICE SHALL BE EQUIPPED WITH A SIGN INDICATING THE
SAFE VEHICLE HEIGHT.
WARNING DEVICES SHOULD BE INSTALLED WHEREVER DRIVE-THRU
AWNINGS ARE INSTALLED AND THERE IS NO OTHER MEANS OF WARNING THAT THE
VEHICLE IS IN DANGER OF CONTACTING THOSE AWNINGS. VERIFY EXACT LOCATION
OF WARNING DEVICES WITH OWNER PRIOR TO INSTALLATION.
FOR APPROVED WARNING DEVICE MANUFACTURERS: SEE APPROVED SUPPLIERS
LIST.
ORDER STATION CANOPY
THE CANOPY SUPPLIER IS RESPONSIBLE FOR THE DESIGN, CONSTRUCTION AND
MOUNTING DETAILS NECESSARY TO PROVIDE A SAFE AND STRUCTURALLY SOUND
INSTALLATION FOR THE GEOGRAPHICAL LOCATION IN WHICH THE CANOPY IS
INSTALLED. WIND LOADS SHOULD BE PER THE LOCAL BUILDING CODES. IF
REQUESTED BY THE LOCAL BUILDING AUTHORITY, THE CANOPY SUPPLIER SHALL
SHOW COMPLIANCE WITH THE BUILDING CODE BY SUPPLYING DETAILED DRAWINGS
SIGNED AND SEALED BY AN ENGINEER REGISTERED IN THE STATE IN WHICH THE
CANOPY IS BEING INSTALLED.
THE CANOPY SUPPLIER WILL PROVIDE THERMOSTATICALLY CONTROLLED HEAT
TRACE SNOW MELTING UNITS ON THE ORDER STATION CANOPY IN ASHRAE ZONES
4 AND HIGHER. SNOW HEAT TRACE UNITS ARE OPTIONAL IN ZONE 3. THE
ARCHITECT OF RECORD AND ENGINEER OF RECORD ARE RESPONSIBLE FOR
DETERMINING IF THE HEAT TRACE IS WARRANTED.
KITCHEN EQUIPMENT
KITCHEN EQUIPMENT SERVICEMAN WILL SET UP EQUIPMENT WITH GENERAL
CONTRACTOR MAKING FINAL HOOK-UPS. (THIS WILL ALSO INCLUDE PURCHASED
KITCHEN EQUIPMENT ITEMS).
HOOD FIRE SUPPRESSION SYSTEM AND PORTABLE FIRE EXTINGUISHERS
HOOD FIRE SUPPRESSION SYSTEM SHALL BE AS PER SPECIFICATIONS AND
DRAWINGS MANUFACTURED BY PYRO-CHEM OR ANSUL (NO SUBSTITUTES).
SYSTEM SHALL BE FURNISHED AND INSTALLED BY HOOD MANUFACTURER UNLESS
OTHERWISE INSTRUCTED BY OWNER (VERIFY WITH OWNER BEFORE
CONSTRUCTION). PORTABLE EXTINGUISHERS SHALL BE FURNISHED BY GC
AND SHALL BE INSTALLED AS DIRECTED BY LOCAL FIRE CONTROL
AUTHORITY.
FIRE EXTINGUISHER CABINETS
FIRE EXTINGUISHER CABINET: CONSULT BUILDING MATERIAL CONSOLIDATOR
REFER TO DRAWINGS FOR INSTALLATION LOCATION.
BLOCKING: G.C. SHALL PROVIDE IN-WALL WOOD BLOCKING AS REQUIRED FOR
INSTALLATION OF CABINET
FINISH SPECIFICATIONS:
1. DOOR STYLE: FULL GLAZING (STYLE F)
2. DOOR GLAZING: CLEAR TEMPERED GLASS.
3. CABINET FINISH: STANDARD CLEAR ANODIZED ALUMINUM
WALK-IN FREEZER/COOLER/DRY STORAGE (PRE-FABRICATED)
A. PLACEMENT OF PRE-FABRICATED, WALK-IN FREEZER/COOLER/DRY STORAGE SHALL
BE PART OF THIS CONTRACT. UNIT WILL BE SUPPLIED BY OWNER AND WILL BE
SHIPPED DIRECT TO STORE LOCATION WITH ALL UNCRATING AND ERECTION
COORDINATED BY GENERAL CONTRACTOR AND WALK-IN MANUFACTURER. UNIT
WILL BE SHIPPED COMPLETE WITH HARDWARE AND INSTRUCTIONS.
B. FLOOR IN FREEZER IS PREFABRICATED. FLOORING IN COOLER AND DRY STORAGE
IS CERAMIC TILE WITH STAINLESS STEEL COVE BASE BY GENERAL CONTRACTOR.
INSTALLATION OF REFRIGERATION TO BE COORDINATED BY GENERAL CONTRACTOR
AND WALK-IN MANUFACTURER.
C. GENERAL CONTRACTOR SCOPE OF WORK. REFER TO DRAWINGS
1. ELECTRICAL CONNECTION OF WALK IN BOX LIGHTS AND CONDENSERS.
2. INSTALL CONDENSATE DRAIN LINE FROM WALK IN BOX TO DESIGNATED FLOOR
SINK.
3. SECURITY SYSTEM CONDUITS FOR SECURITY ALARM IN COOLER / FREEZER.
4. SUPPLY AND INSTALL COUNTER FLASHING FOR WALK IN BOX / BUILDING
INTERFACE
WALK-IN FREEZER/COOLER/DRY STORAGE (FIELD ERECTED)
A. INSTALLATION OF FIELD ERECTED WALK-IN FREEZER/COOLER/DRY STORAGE IS NOT
PART OF THIS CONTRACT. UNIT WILL BE SUPPLIED BY OWNER. WALK IN BOX
SUPPLIER INSTALLS PANELS, REFRIGERATION SYSTEM, AND MEMBRANE ROOF.
B. FLOOR IN FREEZER IS INSTALLED BY WALK IN BOX SUPPLIER. FLOORING IN COOLER
AND DRY STORAGE IS CERAMIC TILE BY GENERAL CONTRACTOR. I SEE EQUIPMENT
PLAN OF THE CONSTRUCTION DOCUMENTS.
C. GENERAL CONTRACTOR SCOPE OF WORK. REFER TO DRAWINGS.
1. PROVIDE AND INSTALL CONDUITS AND WIRING FOR LIGHTS
2. CONNECT ELECTRICAL FOR REFRIGERATION SYSTEM
3. INSTALL CONDUITS FOR SECURITY ALARM IN COOLER / FREEZER
4. INSTALL CONDENSATE DRAIN LINE SYSTEM INSIDE WALK IN BOX TO DESIGNATED
FLOOR SINK.
5. SUPPLY AND INSTALL COUNTER FLASHING FOR WALK IN BOX / BUILDING
INTERFACE
COMMUNICATION SYSTEM
TOTAL COMMUNICATION SYSTEM AS INDICATED ON DRAWINGS. SYSTEM SHALL BE
AS MANUFACTURED BY H.M.E. SYSTEM SHALL BE FURNISHED AND INSTALLED BY
OWNER. CONTRACTOR TO FURNISH CONDUIT, ELECTRICAL CONNECTION AND CO-
ORDINATE INSTALLATION.
C. APPROVED CANOPY MANUFACTURES: SEE APPROVED SUPPLIERS LISTS.
12
/
2
2
/
2
0
1
7
1
2
:
3
8
:
1
5
P
M
SPECIFICATIONS
SP3
IT
EC
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
EDIN CORALIC, R.A., NCARB
2643 CAROUSEL DRIVE
ST. LOUIS, MO 63125
(314)578-4953
FUTURE BEE HIVE CREDIT UNION
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: **/**/****
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
GREBEIFRFF
J
E
E
R
E
E
N
I
G
NEONALSI
E S
ROF
P
01 EXIST. SANITARY SEWER
02 EXIST. 16" WATER LINE
03 EXIST. FIRE HYDRANT
04 EXIST. WATER VALVE
05 EXIST. POWER POLE
06 EXIST. CURB & GUTTER, RETAIN & PROTECT
07 16" x 8" HOT TAP WITH 8" GATE VALVE
(SEE SHEET 4)
08 8" CLASS 50 DUCTILE IRON WATER LINE
(SEE SHEET 3.0)
09 20' - 8" CLASS 50 D.I. WATER LINE STUB
10 8" GATE VALVE
11 STD. FIRE HYDRANT RE: ISPWC SD-404
12 1
12" WATER SERVICE CONNECTION RE: CITY OF
REXBURG STD. DWG. 402
13 1
12" INTERIOR WATER METER RE: CITY OF
REXBURG STD. DWG. 402
14 1
12" HDPE WATER SERVICE LINE
15 1
12" HDPE LANDSCAPE WATER LINE
16 CITY APPROVED BACKFLOW PREVENTOR
17 4" x 8" SANITARY SEWER TEE
18 8" PVC SANITARY SEWER LINE
(SEE SHEET C3.0)
19 SANITARY SEWER MANHOLE
(SEE SHEET C3.0)
20 20' - 8" PVC SANITARY SEWER STUB @0.40%
21 4" PVC SDR35 SANITARY SEWER SERVICE LINE
22 1500 GALLON TRAFFIC RATED GREASE TRAP
23 4" TRAFFIC RATED CLEAN-OUT
RE: ISPWC SD-506A
24 RMP TRANSFORMER RE: ELECTRICAL SITE PLAN
25 UNDERGROUND ELECTRICAL CONDUIT
RE: ELECTRICAL SITE PLAN
26 GAS LINE - TRENCH BY SITE CONTRACTOR, GAS
LINE AND METER BY IMG.
27 DELIVERY ACCESS RAMP
28 ADA RAMP; RE: B2 / C4.0
29 4" YELLOW PAVEMENT MARKING
30 WHITE PAVEMENT MARKING WHERE SHOWN
31 ADA PARKING PAVEMENT MARKINGS WITH
RESERVED PARKING SIGN
32 4' WIDE TRUNCATED DOME PANEL
33 WHITE PAINTED CROSSWALK
34 4" WIDE YELLOW PARKING STRIPE
35 DUMPSTER ENCLOSURE RE: ARCHITECTURAL
PLANS (NO GATES)
36 PEDESTAL SIGN RE: ELECTRICAL SITE PLAN
37 SITE LIGHTING RE: ELECTRICAL SITE PLAN
38 PRE-SELL BOARD
39 ORDER STATION
40 2" CALIPER DECIDUOUS TREES @ 30' O.C.
(5 EACH) (SEE LANDSCAPING PLAN L1.00)
41 TURF SEEDING / SOD
(SEE LANDSCAPING PLAN L1.00)
42 LARGE SHRUB / SCREENING SHRUB
(SEE LANDSCAPING PLAN L1.00)
43 SMALL SHRUB (SEE LANDSCAPING PLAN L1.00)
44 4" GREASE LINE
45 4" WASTE LINE
46 8" THICK CONCRETE PAD
47 FUTURE BEEHIVE CREDIT UNION SERVICE LINES
48 SNOW STORAGE
49 SAFETY RAILING RE: 9/C5.3
50 STEEL BOLLARDS RE: 12/C5.3
51 PEDISTRIAN AREA AND BENCH
52 CITY STREET LIGHT (LOCATION TO BE
DETERMINED)
#
SITE/UTILITY PLAN
01
02
03
0405
06
07
08
10 09
11
12
13
14
15
17
18
18
19
19
19
20
20
21
22
23
24
25
26
27
28
08
2930
31
32
33
34
29
2929
34
35
36
37
38
38
39
39
40 41
41
42
42
43
43
43
43
44
45
46
47
SITE INFORMATION
SNOW STORAGE
SURFACE AREA - 14,350 SQ. FT.
STORAGE AREA REQUIRED - 1,435 SQ. FT.
STORAGE AREA PROVIDED - 2,492 SQ. FT.
SNOW STORAGE FOR PRIVATE ROAD WILL BE
ALONG THE EAST AND SOUTH SIDE
RESPECTIVELY
LANDSCAPE
LOT AREA - 29,666 SQ. FT.
LANDSCAPE REQUIRED - 2,967 SQ. FT. (10%)
LANDSCAPE PROVIDED - 5,020 SQ. FT.
48 48
48
48
48
48
49
50
50
51
16
52
FUTURE BEE HIVE CREDIT UNION
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: **/**/****
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
GREBEIFRFF
J
E
E
R
E
E
N
I
G
NEONALSI
E S
ROF
P
STORMWATER NOTE
REQUIRED STORM WATER TO RETAIN ON SITE WAS
CALCULATED USING THE FOLLOWING VALUES:
EAST SIDE
C (weighted) = 0.83
INTENSITY (i) = 0.9 in/hr
AREA (A) West = 0.49 acres
Q = CiA = 0.37 cfs
T (Storm Duration) = 1 hr = 3600 seconds
V = CiAT = 1,318 cu. ft.
SITE STORM WATER RETENTION REQ'D - 1,318 cu. ft.
INFILTRATOR STORAGE PROV'D - 1,525 cu. ft.
WEST SIDE
C (weighted) = 0.83
INTENSITY (i) = 0.9 in/hr
AREA (A) East = 0.40 acres
Q = CiA = 0.30 cfs
T (Storm Duration) = 1 hr = 3600 seconds
V = CiAT = 1,076 cu. ft.
SITE STORM WATER RETENTION REQ'D - 1,076 cu. ft.
INFILTRATOR STORAGE PROV'D - 1,346 cu. ft.
01 A.C. PAVEMENT SECTION RE: C3 / C4.0
02 CURB TYPE INLET BOX RE: A2 / C4.0
03 AREA TYPE INLET BOX RE: A3 / C4.0
04 12" HDPE STORM DRAIN
05 6" PVC ROOF DRAIN
06 STORM SEWER MANHOLE RE: ISPWC SD-501
07 STORMTECH MC-3500 CHAMBERS
(7 UNITS WEST SIDE, 8 UNITS EAST SIDE)
08 4" TRAFFIC RATED CLEAN-OUT
RE: ISPWC SD-506A
09 6" x 12" INSERTA-TEE
10 CONCRETE DRIVEWAY APRON RE: B3 / C4.0
11 PRIVATE CONCRETE SIDEWALK RE: B4 / C4.0
12 CITY OF REXBURG CONCRETE SIDEWALK
RE: REXBURG STANDARD DRAWING SHT. 3
13 NORTH - SOUTH PRIVATE ROAD RE: C1 / C4.0
14 EAST - WEST PRIVATE ROAD RE: C2 / C4.0
15 COMMERCIAL DRIVEWAY RE: REXBURG
STANDARD DRAWING SHT. 7
16 DEPRESS CURB AT ADA RAMP
17 DITCH WATER DIVERSION BERM RE: C1 / C4.0
18 FUTURE CITY OF REXBURG SIDEWALK
#
GRADING/DRAINAGE PLAN
01
01
01
02
02
03
03
03
04
04
04
04
05
05
06
07
07
08 05
08
09
10
10
11
10
12
14
13
15 15
16
17
04
ROLLED CURB AND GUTTER RE: A1 / C4
FLAT CURB AND GUTTER RE: A1 / C4
CATCH CURB AND GUTTER RE: A1 / C4
18
11
11
11
11
4860
4870
4880
4860
4870
4880
4850 4850
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: **/**/****
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
GREBEIFRFF
J
E
E
R
E
E
N
I
G
NEONALSI
E S
ROF
P
PRIVATE DRIVE PROFILE
01 STANDARD MANHOLE TYPE A RE: ISPWC SD 501
02 8" PVC SDR35 SANITARY SEWER MAIN LINE
03 CONNECT EXISTING SEWER LINE TO NEW
MANHOLE
04 8" CLASS 50 DUCTILE IRON WATER LINE
(6' MIN. BURY)
05 GATE VALVE (SEE SHT. C1.0 FOR OTHER
LOCATIONS)
06 16" x 8" HOT TAP WITH 8" GATE VALVE
07 CAP WITH THRUST BLOCK
#
01 0101
01
02
03
04
05
06
07
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: **/**/****
PROJECT NUMBER: 21-008
DRAWN BY:
CHECKED BY:
SHEET NAME
SHEET NUMBER
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
PROJECT TYPE:
SITE NUMBER:
BUILDING TYPE:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
DESIGN TYPE:
#13487
(2.0) SMART 40+
FREESTANDING
NEW
FRANCHISE
2020
NEW BUILD
2021
(2.0) UM BRITE
SUMMER
NEW
SMART 40+
GREBEIFRFF
J
E
E
R
E
E
N
I
G
NEONALSI
E S
ROF
P
A2 CURB TYPE INLET BOX
PRIVATE DRIVE SECTION (NORTH-SOUTH)
AREA TYPE INLET BOXA3
C1
TYPICAL CURB SECTIONSA1
ROLLED CURB & GUTTER SECTION
NOTES:
FLAT CURB & GUTTER SECTION
DETECTABLE WARNING PAVERS
6" MIN.
3'
-
0
"
5'
-
0
"
M
A
X
.
.
W
I
T
H
O
U
T
S
H
O
R
I
N
G
666"66"MMMMMIMINNINNNNN66666"6666666666 MMMMMMMMMMMMMMMMIINNNNNNNNNMMIINNNNNNN...NNNNNNNNMMMIIINNNNNNNN..MMMMMMMMIIIIN""""""""""MMMMMMMMMMMM6666666MM6666666666666666666666 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN.........MMMMMMMMMMMMMMMMMMMIIMMIIMIIIIIIIINNNIIINNNNNNNNNNNN""""""""MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM666666666666666666666666 66666666
6"
M
I
N
.
SIDEWALK DETAILB4B2ADA RAMP DETAIL
PROJECT PAVEMENT SECTIONC3
STANDARD BACK FILL TRENCH & RESURFACINGB1
12"MIN
EACH
SIDEPI
P
E
S
I
Z
E
VA
R
I
E
S
PE
R
VA
R
I
E
S
P
E
R
TR
E
N
C
H
DE
P
T
H
CONCRETE DRIVEWAY APRONB3
SURFACE REPAIR WIDTH
(1/2 OF TRENCH DEPTH ALLOWED PER SIDE - MAXIMUM)NOTES:
1. TRENCH EXCAVATION PER SECTION 301
2. BACKFILL AND COMPACTION CLASS A-1
SITE DETAILS
PRIVATE DRIVE SECTION (EAST-WEST)C2
CATCH CURB & GUTTER SECTION
TRASH ENCLOSURE ELEVATIONS
SCALE: 3/8"=1'-0"
TRASH ENCLOSURE PLAN
SCALE: 3/8"=1'-0"
WALL SECTION-ALT. SPLIT FACE CMU
SCALE: 3/4"=1'-0"
DROP PIN DETAIL
SCALE: 3/4"=1'-0"
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: **/**/****
PROJECT NUMBER: *****
DRAWN BY: ***
CHECKED BY: ***
SHEET NAME
SHEET NUMBER
SITE NUMBER:
BASE MODEL:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
FURNITURE PACKAGE:
PROJECT TYPE:
3 business days
prior to excavation:
Know what's below.
Call before you dig.
00000
CIVIL/SITE PROTO
COMPANY
NEW
COMPANY
2020
NEW BUILD
2020
XXX
SUMMER 2020
CIVIL/SITE
PROTOTYPE
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
MASONRY TRASH
ENCLOSURE DETAILS
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: **/**/****
PROJECT NUMBER: *****
DRAWN BY: ***
CHECKED BY: ***
SHEET NAME
SHEET NUMBER
SITE NUMBER:
BASE MODEL:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
FURNITURE PACKAGE:
PROJECT TYPE:
3 business days
prior to excavation:
Know what's below.
Call before you dig.
00000
CIVIL/SITE PROTO
COMPANY
NEW
COMPANY
2020
NEW BUILD
2020
XXX
SUMMER 2020
CIVIL/SITE
PROTOTYPE
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
DRIVE-THRU ORDER
STATION DETAILS
2 CANOPY FOOTING SECTION
5 MENU BOARD FOOTING
CLEARANCE 9'-0"
4 ORDER STATION CANOPY FOOTING1ORDER STATION PLAN VIEW 3 ORDER STATION CANOPY
6 CANOPY PROTECTION BAR
7 PRE-SELL BOARD FOOTING
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: **/**/****
PROJECT NUMBER: *****
DRAWN BY: ***
CHECKED BY: ***
SHEET NAME
SHEET NUMBER
SITE NUMBER:
BASE MODEL:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
FURNITURE PACKAGE:
PROJECT TYPE:
3 business days
prior to excavation:
Know what's below.
Call before you dig.
00000
CIVIL/SITE PROTO
COMPANY
NEW
COMPANY
2020
NEW BUILD
2020
XXX
SUMMER 2020
CIVIL/SITE
PROTOTYPE
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
MISCELLANEOUS
SITE DETAILS
SUMMER RELEASE 20208/31/20R3
SPRING RELEASE 20194/22/19R1
1 FROSTY BIKE RACK DETAIL 5 FLAG POLE DETAIL
10
VAN ACCESSIBLEBARRIER FREE PARKING SIGN
6 STOP SIGN DETAIL
11 PERFORATED UNDERDRAIN DETAIL
2 PAVEMENT MARKING DETAIL
7 STANDARD BARRIER FREE PARKING SPACE DETAIL
4 BIKE RACK DETAIL
3 PAVEMENT MARKING DETAIL
9 SAFETY RAILING DETAIL
8 PATIO RAILING DETAIL
12 BOLLARD DETAIL
SEAL
DESCRIPTIONDATEREV.
ISSUE DATE: **/**/****
PROJECT NUMBER: *****
DRAWN BY: ***
CHECKED BY: ***
SHEET NAME
SHEET NUMBER
SITE NUMBER:
BASE MODEL:
OWNER:
BASE VERSION:
DRAWING RELEASE:
PROJECT YEAR:
ASSET TYPE:
CLASSIFICATION:
UPGRADE CLASSIFICATION:
FURNITURE PACKAGE:
PROJECT TYPE:
3 business days
prior to excavation:
Know what's below.
Call before you dig.
00000
CIVIL/SITE PROTO
COMPANY
NEW
COMPANY
2020
NEW BUILD
2020
XXX
SUMMER 2020
CIVIL/SITE
PROTOTYPE
MO
O
D
Y
R
D
&
N
2
N
D
E
RE
X
B
U
R
G
,
I
D
8
3
4
4
0
CIVIL SPECIFICATIONS
”
PART 1 - GENERAL
PART 2 - EARTHWORK
PART 3 - UTILITIES
PART 4 - PAVING PART 5 - LANDSCAPING MATERIALS
PART 7 - SOIL EROSION AND SEDIMENTATION
PART 6 - ELECTRICAL
FUTURE BEE HIVE CREDIT UNION
4
CV
5
RA
3
EA
5
CV
3
HS
7
EA
6
PV
5
EA
6
PV
5
EA
3
JS
4
RA
6
HS
3
WF
4
EA
9
RA
3
JS
5
SR
5
EA
5
CV
5
CV
3
EA6
PV
10
BU
4
PV
6
BU
5
CV
5
MA
5
PV
LANDSCAPE LEGEND
QUANTITY
PLANT IDENTIFICATION KEY
PLANTS TO BE INSTALLED
CUT EDGE AS DETAILED
PROPERTY LINE (VERIFY)
2
QC
MAINTAINED LAWN AREAS
TURF SOD AND TOPSOIL AS
SPECIFIED
1" MINUS BLACK AND TAN
PERMABARK MULCH AT 3"
DEPTH OVER TOPSOIL AS
SPECIFIED
PLANT SCHEDULE
QTY KEY BOTANICAL NAME COMMON NAME SIZE NOTES
DECIDUOUS SHADE TREES
5 MA Malus "Spring Snow" Springsnow Flowering Crabapple 2" CAL. B&B Class I - 15' H x 15' W
SHRUBS/PERENNIALS/ORNAMENTAL GRASSES
16 BU Buxus x 'Glencoe'Chicagoland Green® Boxwood 1 gal. 2' H x 2' W; pruned to hedge in future
24 CV
Coreopsis verticillata 'Moonbeam' Moonbeam Coreopsis 1 gal.2' H x 2' W
37 EA Euonymus alatus 'Compactus' Compact Burning Bush 5 gal.5' H x 5' W
9 HS Helictotrichon sempervirens Blue Oat Grass 1 gal.3' H x 3' W
6JSJuniperus sabina 'Broadmoor' Broadmoor Juniper 2 fgal.2.5' H x 6' W
27 PV
Panicum virgatum 'Heavy Metal'Heavy Metal Switch Grass 2 gal.5' H x 2' W
18 RA Rhus aromatica "Gro-Low" Gro-Low Sumac
2 gal.2' H x 6' W
5 SR Saccharum ravennae Ravenna Grass
5 gal.12' H x 6' W
3 WF Weigela florida 'Red Prince'Red Prince Weigela 5 gal.6' H x 6' W
LA-238
S T A T E O F IDA
H
O
L
I
C
E
N
S
E
D
LANDSCA P E ARCHITEC
T
RODN EY P . EVA
N
S J
R
.
L1.00
WENDY'S
MOODY RD. & N 2ND E
REXBURG, ID 83440
City Review
21077
BSS RE
08/18/2021
-
-
-
-
-
-
-
-
-
-
-
-
LANDSCAPE PLAN
123456789101112131415
A
B
C
D
E
F
G
H
J
K
L
M
DRAWN BY CHECKED BY
PROJECT
DATE
SHEET
REVISION/ISSUENO. DATE
CALL 2 BUSINESS DAYSIN ADVANCE BEFOREYOU DIG, GRADE, OREXCAVATE FOR THEMARKING OFUNDERGROUNDMEMBER UTILITIES
Co
p
y
r
i
g
h
t
2
0
2
1
Al
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
.
R
e
p
r
o
d
u
c
t
i
o
n
o
r
u
s
e
i
n
a
n
y
f
o
r
m
o
r
b
y
a
n
y
m
e
a
n
s
w
i
t
h
o
u
t
w
r
i
t
t
e
n
p
e
r
m
i
s
s
i
o
n
o
f
R
o
d
n
e
y
E
v
a
n
s
+
P
a
r
t
n
e
r
s
,
P
L
LC
.
i
s
u
n
l
a
w
f
u
l
a
n
d
s
u
b
j
e
c
t
t
o
c
r
i
m
i
n
a
l
p
r
o
s
e
c
u
t
i
o
n
.
reandpartners.com + 208-514-3300 + 1450 W. Bannock Street, Boise, Idaho 83702
LA
N
D
S
C
A
P
E
A
R
C
H
I
T
E
C
T
U
R
E
+
U
R
B
A
N
D
E
S
I
G
N
+
L
A
N
D
P
L
A
N
N
I
N
G
+
G
R
A
P
H
I
C
C
O
M
M
U
N
I
C
A
T
I
O
N
+
P
R
O
J
E
C
T
M
A
N
A
G
E
M
E
N
T
SCALE:
0
1"= 20'-0"
20 40 6020
LANDSCAPE PLAN
LANDSCAPE NOTES:
1. CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR AND/OR PREVENT
THE PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK.
2. NO MATERIAL SUBSTITUTIONS SHALL BE MADE WITHOUT THE LANDSCAPE ARCHITECT'S PRIOR WRITTEN
APPROVAL. ALTERNATE MATERIALS OF SIMILAR SIZE AND CHARACTER MAY BE CONSIDERED IF SPECIFIED
PLANT MATERIALS CAN NOT BE OBTAINED.
3. COORDINATE ALL WORK WITH ALL OTHER SITE RELATED DEVELOPMENT DRAWINGS.
4. COORDINATE WORK SCHEDULE AND OBSERVATIONS WITH LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION
START-UP.
5. ALL PLANT MATERIAL SHALL BE INSTALLED AS PER DETAILS.
6. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE
SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION.
7. IN THE EVENT OF A PLANT COUNT DISCREPANCY, PLANT SYMBOLS SHALL OVERRIDE SCHEDULE QUANTITIES
AND CALL OUT SYMBOL NUMBERS.
8. ALL PLANTING BEDS SHALL BE COVERED WITH A MINIMUM OF 3" DEPTH OF 1" MINUS BLACK AND TAN
PERMA-BARK ROCK MULCH OVER DEWITT PRO-5 WEED BARRIER LANDSCAPE FABRIC. SUBMIT SAMPLE FOR
APPROVAL.
9. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF
ACCEPTANCE BY THE OWNER. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY CONDITION
IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO COST TO THE OWNER.
10. FINISH GRADES SHALL PROVIDE A SMOOTH TRANSITION WITH ADJACENT SURFACES AND ENSURE POSITIVE
DRAINAGE IN ACCORDANCE WITH THE SITE CIVIL GRADING PLAN.
11. AMEND EXISTING APPROVED TOPSOIL AT A RATIO OF THREE CUBIC YARDS OF APPROVED COMPOST PER 1000
SQUARE FEET. ROTO-TILL ORGANIC MATTER A MINIMUM OF 6 INCHES INTO TOPSOIL.
12. FERTILIZE ALL TREES AND SHRUBS WITH 'AGRIFORM' PLANTING TABLETS. QUANTITY PER MANUFACTURER'S
RECOMMENDATIONS.
13. ALL PLANTING BEDS SHALL HAVE A MINIMUM 18" DEPTH OF TOPSOIL. LAWN AREAS SHALL HAVE A MINIMUM
12" DEPTH OF TOPSOIL. SPREAD, COMPACT, AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE
3" BELOW ADJACENT SURFACES OF PLANTER BED AREAS, 1-1/2" BELOW ADJACENT SURFACES OF TURF SOD
AREAS, AND 1" BELOW ADJACENT SURFACES OF TURF SEED AREAS.
14. REUSE EXISTING TOPSOIL STOCKPILED ON THE SITE. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN
QUANTITIES ARE INSUFFICIENT. VERIFY SUITABILITY AND CONDITION OF TOPSOIL AS A GROWING MEDIUM.
PERFORM SOIL TEST/ ANALYSIS AND PROVIDE ADDITIONAL AMENDMENT AS DETERMINED BY SOIL TESTS.
TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS
WEEDS, WEED SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A HAVE A PH OF 5.5 TO 7.0. IF
ONSITE TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTOR IS RESPONSIBLE TO EITHER:
A) PROVIDE APPROVED IMPORTED TOPSOIL, OR
B) IMPROVE ON-SITE TOPSOIL WITH METHODS APPROVED BY THE LANDSCAPE ARCHITECT.
15. IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, ENSURE IT IS FERTILE, FRIABLE, NATURAL
LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND
FREE OF ROOTS, STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR
TOXIC MATTER HARMFUL TO PLANT GROWTH.
A) OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS TO
THOSE FOUND ON THE PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY, WELL-DRAINED SITES
WHERE TOPSOIL OCCURS AT A DEPTH OF NOT LESS THAN 4 INCHES.
B) REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY, TOXICITY, AND GENERAL
TEXTURE BY A RECOGNIZED COMMERCIAL OR GOVERNMENT AGENCY AND COPIES OF THE TESTING
AGENCY'S FINDINGS AND RECOMMENDATIONS SHALL BE FURNISHED TO THE OWNER'S REPRESENTATIVE
BY THE CONTRACTOR. NO TOPSOIL SHALL BE DELIVERED IN A FROZEN OR MUDDY CONDITION.
ACIDITY/ALKALINITY RANGE - PH. 5.5 TO 7.6.
16. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE
OPERATIONS AND DISPOSE OF PROPERLY OFF SITE.
17. TREES SHALL NOT BE PLANTED WITHIN THE 10'-0" CLEAR ZONE OF ALL STORM DRAIN PIPE, STRUCTURES, OR
FACILITIES.
18. STORM DRAINAGE FACILITIES MUST BE PROTECTED FROM ANY AND ALL CONTAMINATION DURING THE
CONSTRUCTION AND INSTALLATION OF THE LANDSCAPE IRRIGATION SYSTEM.
19. IN THE EVENT OF A DISCREPANCY, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY.
1. ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDERGROUND SPRINKLER SYSTEM WHICH INSURES
COMPLETE COVERAGE AND PROPERLY ZONED FOR REQUIRED WATER USES. EACH HYDROZONE IS TO BE
IRRIGATED WITH SEPARATE INDIVIDUAL STATIONS.
2. PLANTER BEDS AND LAWN AREAS ARE TO HAVE SEPARATE HYDRO-ZONES.
3. POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OF 4 INCHES AT LAWN AREAS, 6 -12 INCHES
IN UN-MAINTAINED LAWNS AREAS.
4. PLANTER BEDS ARE TO HAVE IN-LINE EMITTER DRIP TUBING IRRIGATION LAID OUT IN A LATERAL PATTERN PER
MANUFACTURER'S RECOMMENDATIONS.
5. ELECTRONIC WATER DISTRIBUTION/ TIMING CONTROLLERS ARE TO BE PROVIDED. MINIMUM CONTROLLER
REQUIREMENTS ARE AS FOLLOWS:
a. PRECISE INDIVIDUAL STATION TIMING
b. RUN TIME CAPABILITIES FOR EXTREMES IN PRECIPITATION RATES
c. AT LEAST ONE PROGRAM FOR EACH HYDROZONE
d. SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN-OFF
e. POWER FAILURE BACKUP FOR ALL PROGRAMED INDIVIDUAL VALVED WATERING STATIONS WILL BE
DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO-ZONES.
f. WIFI ENABLED CONTROLLER IF POSSIBLE WITH BUILDING SERVICES AVAILABLE.
6. INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO
RESPECTIVE HYDRO-ZONES.
7. THE POP-UP OR ROTOE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% HEAD TO HEAD
COVERAGE WITH TRIANGULAR SPACING.
8. SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVERSPRAY ONTO IMPERVIOUS SURFACES (BUILDINGS,
SIDEWALKS, DRIVEWAYS, AND ASPHALT AREAS).
9. PROVIDE MINIMUM (1) QUICK COUPLER VALVE PER EACH (6) AUTOMATIC VALVE ZONES. APPROVE Q.C.V.
LOCATIONS WITH LANDSCAPE ARCHITECT.
IRRIGATION NOTES:
1. ALL AREAS TO BE PLANTED OR HYDROSEEDED SHALL HAVE WEED ABATEMENT OPERATIONS PERFORMED ON
THEM PRIOR TO PLANTING OR HYDROSEEDING.
2. CONTRACTOR SHALL SPRAY ALL EXPOSED WEEDS WITH “ROUND-UP” (CONTACT HERBICIDE) OR APPROVED
EQUAL.
3. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE EXPOSED WEEDS FROM THE SITE.
4. CONTRACTOR SHALL OPERATE THE AUTOMATIC IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN (14) DAYS.
AT CONCLUSION OF THIS WATERING PERIOD, DISCONTINUE WATERING FOR THREE TO FIVE (3-5) DAYS.
5. APPLY SECOND APPLICATION OF “ROUND-UP” TO ALL EXPOSED WEEDS. APPLY IN STRICT CONFORMANCE
WITH MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. DO NOT WATER FOR AT LEAST SEVEN (7)
DAYS. REMOVE WEEDS FROM THE SITE.
6. IF ANY EVIDENCE OF WEED GERMINATION EXISTS AFTER TWO (2) APPLICATIONS, CONTRACTOR SHALL BE
DIRECTED TO PERFORM A THIRD APPLICATION.
7. AT THE TIME OF PLANTING AND HYDROSEEDING, ALL PLANTING AREAS SHALL BE WEED FREE.
WEED ABATEMENT NOTES:
PROJECT INFORMATION
LANDSCAPE REQUIREMENTS
1. DUMPSTER ENCLOSURE
2. VISION TRIANGLE
3. EXISTING POWER POLE
4. SITE LIGHTING - SEE SITE ELECTRICAL PLANS
5. 1-1/2" HDPE LANDSCAPE WATER LINE
6. PEDESTAL SIGN LOCATION - SAVE AND PROTECT
7. LANDSCAPE BY ADJACENT OWNER
8. SNOW STORAGE
CALLOUT NOTES #CALLOUT NUMBERS
REFER TO NUMBERED
NOTES BELOW
CITY OF REXBURG CODE:
TOTAL SITE AREA: 29,666 S.F.
TOTAL LANDSCAPE AREA: 5,020 S.F. (17% OF SITE)
CBC ZONE REQUIRES 10% MINUMUM SITE LANDSCAPE
STREET LANDSCAPE BUFFER REQUIREMENTS:
a. SCREENING REQUIREMENTS.
THE BUFFER SHALL CONSIST OF A MINIMUM FIVE (5') FEET
WIDE LANDSCAPED STRIP TO BE PLANTED WITH GROUND
COVER, ONE (1) TWO (2”) INCH DECIDUOUS TREE AND FIVE (5)
FIVE-GALLON SHRUBS PER THIRTY (30') LINEAL FEET.
LANDSCAPING MUST BE MAINTAINED AS IN ITS ORIGINAL
DESIGN AND PURPOSE.
i. PARKING AREAS.
AN EFFECTIVE BUFFER SHALL BE PROVIDED BETWEEN
PARKING AREAS FOR FIVE (5) OR MORE VEHICLES AND
EXISTING RESIDENTIAL USES, SCHOOLS, HOSPITALS,
NURSING HOMES AND OTHER INSTITUTIONS FOR LONG-
TERM HUMAN CARE. COMMERCIAL PARKING LOTS SHALL BE
SEPARATED FROM THE CITY RIGHT-OF-WAY WITH A MINIMUM
TEN (10') FEET WIDE BUFFER. A SIX (6') FEET VINYL OR
MASONRY FENCE MAY BE SUBSTITUTED FOR THE
LANDSCAPE BUFFER, BUT NOT IN THE FRONT YARD OR
FRONT YARD SETBACKS, SEE PARAGRAPH B. BELOW.
LANDSCAPING MUST BE MAINTAINED AS IN ITS ORIGINAL
DESIGN AND PURPOSE.
NORTH BOUNDARY STREET BUFFER:
162 LIN. FT. (MOODY HIGHWAY)
TREES REQUIRED- 5
TREES PROVIDED- 5
SHRUBS REQUIRED - 27
SHRUBS PROVIDED - XX
WIDTH OF BUFFERS REQUIRED: 5'-0" MINIMUM
WIDTH OF BUFFERS PROVIDED: 10'-0"
EAST BOUNDARY STREET BUFFER:
154 LIN. FT. (PRIVATE DR.)
TREES REQUIRED - NOT CITY RIGHT OF WAY
TREES PROVIDED- 0
WIDTH OF BUFFERS REQUIRED:0'
WIDTH OF BUFFERS PROVIDED: VARIES 7'-8'
SOUTH BOUNDARY BUFFER:
151 LIN. FT. (UNDEVELOPED-SAME CBC ZONING)
TREES REQUIRED- 0
TREES PROVIDED- 0
WIDTH OF BUFFERS REQUIRED: 0'
WIDTH OF BUFFERS PROVIDED: VARIES 8'-20'
WEST BOUNDARY BUFFER:
182 LIN. FT. (UNDEVELOPED-FUTURE-SAME CBC ZONING)
TREES REQUIRED- 0
TREES PROVIDED- 0
WIDTH OF BUFFERS REQUIRED: 0'
WIDTH OF BUFFERS PROVIDED: 5' MINIMUM
REQUIRED PLANT MATERIAL SIZES
DECIDUOUS TREES - 2" CAL. MIN. - PROVIDED 2" CAL.
EVERGREEN TREES - 7' HT. MIN. - PROVIDED 7'-8' HT.
SHRUBS - 5 GAL, MIN. - PROVIDED 5 GAL.
1
23
6
5
7
8 8
8
4
1. LIMIT TURF SUBGRADE PREPARATION TO AREAS TO BE PLANTED.
2. NEWLY GRADED SUBGRADES: LOOSEN SUBGRADE TO A MINIMUM DEPTH OF 4 INCHES. REMOVE STONES
LARGER THAN 1 INCH IN ANY DIMENSION AND STICKS, ROOTS, RUBBISH, AND OTHER EXTRANEOUS MATTER
AND LEGALLY DISPOSE OF THEM OFF OWNER'S PROPERTY.
3. SPREAD PLANTING SOIL OVER LOOSENED SUBGRADE.
4. REDUCE ELEVATION OF PLANTING SOIL TO ALLOW FOR SOIL THICKNESS OF SOD.
5. UNCHANGED SUBGRADES: IF TURF IS TO BE PLANTED IN AREAS UNALTERED OR UNDISTURBED BY
EXCAVATING, GRADING, OR SURFACE-SOIL STRIPPING OPERATIONS, PREPARE SURFACE SOIL AS FOLLOWS:
A. REMOVE EXISTING GRASS, VEGETATION, AND TURF. DO NOT MIX INTO SURFACE SOIL.
B. LOOSEN SURFACE SOIL TO A DEPTH OF AT LEAST 6 INCHES. APPLY SOIL AMENDMENTS AND
FERTILIZERS ACCORDING TO PLANTING SOIL MIX PROPORTIONS AND MIX THOROUGHLY INTO TOP 6
INCHES OF SOIL. TILL SOIL TO A HOMOGENEOUS MIXTURE OF FINE TEXTURE.
6. APPLY SOIL AMENDMENTS DIRECTLY TO SURFACE SOIL BEFORE LOOSENING.
A. REMOVE STONES LARGER THAN 1 INCH IN ANY DIMENSION AND STICKS, ROOTS, TRASH, AND OTHER
EXTRANEOUS MATTER.
B. LEGALLY DISPOSE OF WASTE MATERIAL, INCLUDING GRASS, VEGETATION, AND TURF, OFF OWNER'S
PROPERTY.
7. FINISH GRADING: GRADE PLANTING AREAS TO A SMOOTH, UNIFORM SURFACE PLANE WITH LOOSE,
UNIFORMLY FINE TEXTURE. GRADE TO WITHIN PLUS OR MINUS 1/2 INCH OF FINISH ELEVATION. ROLL AND
RAKE, REMOVE RIDGES, AND FILL DEPRESSIONS TO MEET FINISH GRADES. LIMIT FINISH GRADING TO AREAS
THAT CAN BE PLANTED IN THE IMMEDIATE FUTURE.
8. MOISTEN PREPARED AREA BEFORE PLANTING IF SOIL IS DRY. WATER THOROUGHLY AND ALLOW SURFACE TO
DRY BEFORE PLANTING. DO NOT CREATE MUDDY SOIL.
9. BEFORE PLANTING, OBTAIN LANDSCAPE ARCHITECT'S ACCEPTANCE OF FINISH GRADING; RESTORE PLANTING
AREAS IF ERODED OR OTHERWISE DISTURBED AFTER FINISH GRADING.
TURF AREA PREPARATION NOTES:
LA-238
S T ATT T E O F IDADD
H
AA
O
E
N
EE
S
E
DLARAA
CHCCITEC
T
RODNDD ENNYE
P .EVEAVV
N
AA
SJ
R
.
8/19/2021
LA-238
S T A T E O F IDA
H
O
L
I
C
E
N
S
E
D
LANDSCA P E ARCHITEC
T
RODN EY P . EVA
N
S J
R
.
L1.50
LANDSCAPE DETAILS
123456789101112131415
A
B
C
D
E
F
G
H
J
K
L
M
DRAWN BY CHECKED BY
PROJECT
DATE
SHEET
REVISION/ISSUENO. DATE
CALL 2 BUSINESS DAYSIN ADVANCE BEFOREYOU DIG, GRADE, OREXCAVATE FOR THEMARKING OFUNDERGROUNDMEMBER UTILITIES
Co
p
y
r
i
g
h
t
2
0
2
1
Al
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
.
R
e
p
r
o
d
u
c
t
i
o
n
o
r
u
s
e
i
n
a
n
y
f
o
r
m
o
r
b
y
a
n
y
m
e
a
n
s
w
i
t
h
o
u
t
w
r
i
t
t
e
n
p
e
r
m
i
s
s
i
o
n
o
f
R
o
d
n
e
y
E
v
a
n
s
+
P
a
r
t
n
e
r
s
,
P
L
LC
.
i
s
u
n
l
a
w
f
u
l
a
n
d
s
u
b
j
e
c
t
t
o
c
r
i
m
i
n
a
l
p
r
o
s
e
c
u
t
i
o
n
.
reandpartners.com + 208-514-3300 + 1450 W. Bannock Street, Boise, Idaho 83702
LA
N
D
S
C
A
P
E
A
R
C
H
I
T
E
C
T
U
R
E
+
U
R
B
A
N
D
E
S
I
G
N
+
L
A
N
D
P
L
A
N
N
I
N
G
+
G
R
A
P
H
I
C
C
O
M
M
U
N
I
C
A
T
I
O
N
+
P
R
O
J
E
C
T
M
A
N
A
G
E
M
E
N
T
WENDY'S
MOODY RD. & N 2ND E
REXBURG, ID 83440
City Review
21077
BSS RE
08/18/2021
-
-
-
-
-
-
-
-
-
-
-
-
CALLOUT NUMBERS
REFER TO NUMBERED
NOTES BELOW
DECIDUOUS TREE PLANTING3 NOT TO SCALE
SOIL LINE
ROOT FLARE TO BE AT SOIL LINE
NOTES:
1. REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP
2 3 OF ROOTBALL. REMOVE ALL NAILS, TIES, AND PLASTIC FROM
ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY
BIODEGRADABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL.
2. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO ENSURE
THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR
AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE
WARRANTY PERIOD.
3. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE
ARCHITECT BEFORE PROCEEDING.
4. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT
MATERIAL.
5. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING
METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE.
6. WATER TREE TWICE WITHIN THE FIRST 24 HOURS.
7. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY.
8. FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8'-0" IN WIDTH, PROVIDE TREE ROOT BARRIER (DEEPROOT
#24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND EDGE OF SIDEWALK. ALL TREE INSTALLATIONS
SHALL CONFORM TO ALL AGENCY APPROVAL REQUIREMENTS, CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS.
REMOVE DEAD/DAMAGED BRANCHES AND
PRUNE TO INTERNATIONAL SOCIETY OF
ARBORICULTURE STANDARDS; IMPROPERLY
PRUNED TREES (AS DETERMINED BY THE
LANDSCAPE ARCHITECT) SHALL BE REMOVED
AND REPLACED. DO NOT REMOVE MAIN
LEADER!!
RUBBER CINCH TIE
2"x 2" WOOD STAKE (LENGTH AS
REQUIRED)-DO NOT PENETRATE ROOTBALL.
SEE NOTE 1. SET STAKES PARALLEL TO
PREVAILING WIND.
REMOVE TREE WRAP TRUNK PROTECTION,
AFTER INSTALLATION
CONSTRUCT 2" EARTH BERM AT EDGE OF
ROOTBALL, FILL TREE RING W/ MULCH, AS
SPECIFIED.
3" THICK MULCH LAYER, KEEP MULCH 3" AWAY
FROM TRUNK.
FINISH GRADE
PREVAILING WIND DIRECTION
COMMERCIAL SLOW RELEASE FERTILIZER
TABLETS
SIDES OF HOLE ROUGH & UNEVEN
BACKFILL WITH APPROVED TOPSOIL AND
SOIL AMENDMENTS AS SPECIFIED.
BACKFILL IN 6" LIFTS, WATER EACH LAYER,
TAMP LIGHTLY AS REQUIRED, BACKFILL
SOIL EVEN W/ TOP OF ROOTBALL,
DO NOT OVER COMPACT!!
SET ROOTBALL ON NATIVE, UNDISTURBED
SOIL
SHRUB PLANTING4 NOT TO SCALE
1. SHRUB SHALL BEAR SAME RELATIONSHIP TO GRADE AS IT DID IN NURSERY.
2. WATER SHRUB TWICE WITHIN FIRST 24 HOURS.
3. THIN BRANCHES AND FOLIAGE BY
13.
4. DO NOT CUT LEADERS TO RETAIN NATURAL SHRUB SHAPE.
5. FOR CONTAINER GROWN PLANTS THAT ARE ROOTBOUND, SPLIT THE ROOTBALL WITH 3 EQUAL SPACED
VERTICAL CUTS.
NOTES:
REMOVE ANY PLASTIC, BURLAP, NAILS, OR OTHER
MATERIALS FROM THE ROOTBALL WHICH MAY LIMIT
ROOT GROWTH
CONSTRUCT 2" EARTH BERM TO FORM A WATER
RETENTION BASIN, FILL BERM WITH MULCH, AS
SPECIFIED
MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO
NOT COVER CROWNS OF PLANTS
PROVIDE COMMERCIAL FERTILIZER TABLETS AND
BIOSTIMULANT, AS SPECIFIED, FOR EACH SHRUB
BACKFILL WITH APPROVED TOPSOIL AND SOIL
AMENDMENTS, AS SPECIFIED. BACKFILL IN 6" LIFTS,
WATER EACH LAYER, DO NOT TAMP OR OVER
COMPACT.
CONSTRUCT 6" MOUND OF TOPSOIL
GROUNDCOVER PLANTING2 NOT TO SCALE
SECTION
PLAN VIEW
1. ALL GROUNDCOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIANGULAR PATTERN.
2. APPLY SPECIFIED PRE-EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL GROUNDCOVER
BEDS.
NOTES:
FINISH GRADE PER PLANS
GROUNDCOVER PLANTING PER PLANTING PLAN
MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED.
DO NOT COVER CROWNS OF PLANTS
TILL SOIL TO A DEPTH OF 12", BACKFILL WITH
APPROVED TOPSOIL AND SOIL AMENDMENTS, AS
SPECIFIED.
SUBGRADE
A = LENGTH, AS SPECIFIED
OR PER PLANT SCHEDULE
B = 85% OF 'A'
PLANTER BED CUT EDGE
(TYPICAL AT TREES IN TURF AREAS)1 NOT TO SCALE
APPROVED TOPSOIL AND SOIL
AMENDMENTS AS SPECIFIED
3" DEPTH OF MULCH AT PLANTER
BEDS
FINISH GRADE,
PER PLANS
LA-2383838383833838383333333
S TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAATTTTTTTTT T E O F IIDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAADD
HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH
AA
O
E
N
EE
S
E
DLAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAARRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRAAAAAA
CHCCITEC
T
RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRROOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOODDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNDDDDDDDDDDDDD EEEEEEEEEEEEEEEEEEEEEEENNYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYEEEEEEEEEEEEE
PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP .EVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVEAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVV
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
AA
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJ
RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR
...............
8/19/2021