Loading...
HomeMy WebLinkAboutRESPONSE LETTER MEP AND STRUCTURAL - 21-00694 - 240 E Moody - Wendy's - New Buildingmechanical electrical plumbing fire protection structural Case Engineering Inc. T 636 349 1600 796 Merus Court F 636 349 1730 St. Louis, MO 63026 caseengineeringinc.com November 9, 2021 Electrical Narrative E1.1 – EMT or MC cable assumed in concealed locations. If not accurate please verify. Response: EMT called out on drawing. E1.2 – Photometric Plan added to set E3.1 – Available Fault Current calculations. Response: Fault current calcs added to one-line diagram. E6.1 – All wiring must meet 2017 NEC standards. Response: Note added to specifications. Plumbing Narrative P1.0 – WH-2 added to electric water heater schedule. Structural Narrative S0.1 – Minimum Frost Depth Ground Surface to Bottom of Footing 36" Response: See Foundations General Note B.3 on S0.1 for required footing frost depth. S1.1 – Stamp needs to be from an Idaho licensed Engineer. Response: Drawings updated with required seal. S1.1 – 36 " frost depth for footing depth. Response: See Foundations General Note B.3 on S0.1 for required footing frost depth. Owner Requested Change REV 2: S1.1 – Updated Structural Foundations from CMU to Concrete S1.2 – Updated Structural Sections showing Concrete in lieu of CMU stem walls Plumbing – Hand Sink model changed to T2703