HomeMy WebLinkAboutBUILDING PLANS 6.07.2021 Rev. (1) - 21-00187 - Rexburg Rowhouses - Bldg 1 Units 101-1253 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
GI001
Cover Sheet
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
Rexburg Rowhouses
conformed set - june 4, 2021
structural engineer
Frost Engineering
1020 lincoln road
idaho falls, idaho 83401
(208) 227-8404
contact: markell bateman
owner
clearstone, llc
2141 parleys terrace
salt lake city, utah 84109
(801) 809-9965
contact: mike wade
architect
method studio
160 west 2nd south, ste. 201
rexburg, idaho 83440
(208) 701-0068
contact: kyler hokanson
civil engineer
connect engineering
1150 hollipark dr.
idaho falls, idaho 83405
(208) 681-8590
contact: steve heath
mechanical engineer
engineered systems associates (esa)
1355 east center street
pocatello, idaho 83201
(208) 223-0501
contact: dwayne sudweeks
electrical engineer
payne engineering
1823 east center
pocatello, idaho 83201
(208) 232-4439
contact: shawn meador
ALLOWANCES NEEDED FOR:
1. SIGNAGE
2. LANDSCAPE
FINISH NOTES:
1. EXTERIOR FINISHES, (SAMPLES, COLORS, ETC..)INCLUDING BREAK METAL,
FLASHING, FIBER CEMENT BOARD, ALUMINUM "FAUX WOOD" SIDING,
SHINGLES, ETC... ARE TO BE SUBMITTED TO THE ARCHITECT FOR
SUBMITTAL REVIEW REVIEW.
2. INTERIOR FINISHES, ACCESSORIES AND APPLIANCES ARE TO BE
SUMBITTED TO THE OWNER FOR REVIEW.
3. ALL FINISHE SAMPLES AND SUBMITTALS ARE TO BE APPROVED BY THE
ARCHITECT OR OWNER PRIOR TO PURCHASE AND INSTALLATION.
The Conformed Set and project manual is intended to include changes made to the
construction documents via addendum #1 and ASI#001 & ASI#002. While we
have made every attempt to include all of this information, it is the Contractor's
responsibility to construct the project based on the contract documents already
received. This document represents the design teams effort to consolidate those
documents for the owner and the convenience of the Contractor.
ARCHITECTURAL SYMBOLS
REVISION CLOUD
CLOUDED AREA
DELTA MARKER
AE101.a
A1
WINDOW/CURTAIN WALL TAG
DOOR TAG
S3x
NORTH ARROW
ROOM TAG
ROOM NAME
ROOM NUMBER
DETAIL CALLOUT
VIEW ON SHEET
SHEET NUMBER
VIEW TITLE
VIEW NAME
DRAWING SCALE
VIEW ON SHEET
SHEET NUMBER
INTERIOR/EXTERIOR ELEVATION
VIEW ON SHEET
SHEET NUMBER
A1
AE101
SIM
BUILDING SECTION
VIEW ON SHEET
SHEET NUMBER
A1
AE101
SIM
AE101.a
A1
DETAIL
VIEW ON SHEET
SHEET NUMBER
WALL TAG
Name
Elevation LEVEL DATUM
LEVEL NAME
LEVEL ELEVATION
KEYNOTE TAG
A
B
1 2
GRID REFERENCE MARK
A1 STARTS AT LOWER LEFT CORNER
(NATIONAL CAD STANDARD); NUMBERS
ARE VERTICAL GRIDS (READ LEFT TO
RIGHT) LETTERS ARE HORIZONTAL GRIDS
(BOTTOM TO TOP) LETTERS "I" AND "O"
ARE EXCLUDED FROM GRID NAMING
CONVENTION
AE101a SHEET NUMBERING SYSTEM
DISCIPLINE
SHEET TYPE
SHEET NUMBER SEQUENCE
(CONSULTING ENGINEERS TO FOLLOW SAME)
(SEE RESPECTIVE DISCIPLINES FOR SYMBOLS NOT DEFINED HERE)
A1
AE101
SIM
C1 10' - 0"CEILING TAG
CEILING TYPE
CEILING HEIGHT
VIEW NUMBER
A1
AE101
SIM
WALL SECTION
VIEW ON SHEET
SHEET NUMBER
BUILDING SECTION -PARTIAL
000x
A1 View Name
1/8" = 1'-0"
CW1
CURTAIN PANEL TAGA
AE101
1 Ref
1
Re
f
1 Ref
1
Re
f
SHEET NUMBER (AREA PLANS)
R1
F1 FLOOR TAG
ROOF TAG
DEPTH
HEIGHT
WIDTH
AWS STANDARD CASEWORK TYPE
w/ MODIFICATION DENOTED BY "M"REFER TO CASEWORK DESIGN SERIES
(CDS) OF THE ARCHITECTURAL
WOODWORK STANDARDS (AWS) FOR A
FULL DESCRIPTION OF CASEWORK
TYPES. SEE SHEET SERIES AE900 FOR
CASEWORK DETAILS.MODIFIER
CASEWORK TAG
XX
FINISH SYMBOL
MATERIAL
TYPE
MATERIAL
TRANSITION
01.01
STRUCTURE TYPE
SIZE OF STRUCTURAL LAYER (INCHES)
CONFIGURATION
SEE WALL TYPE SHEET (AE500 SERIES) FOR A
COMPLETE LIST OF WALL TYPES
CSI DIVISION (00-49) [DOT SEPARATOR)
KEYNOTE #
101M
30
36
24
Extra Shelf
SPOT ELEVATION
1 BEDROOM
A101
EARTH (existing)
02 SITE CONSTRUCTION
EARTH (backfill)
DRAINAGE FILL
CONCRETE -
CAST-IN-PLACE
03 CONCRETE
CONCRETE -
PRECAST
BRICK
04 MASONRY
CONCRETE
MASONRY UNITS
STEEL
05 METALS
ALUMINUM
06 WOODS AND PLASTICS
CONTINUOUS WOOD
INTERMITTENT WOOD/BLOCKING
SHEATHING
FINISH WOOD
HARDBOARD
PARTICLE BOARD
07 THERMAL & MOISTURE PROTECTION
BATT INSULATION
LOOSE FILL INSULATION
RIGID INSULATION
09 FINISHES
GYPSUM BOARD
MATERIAL LEGEND
COMPACTED FILL
FIRE SPRAY
GROUT
MISCELLANEOUS GENERAL NOTES
1. THE PROJECT MANUAL, SHEET SPECIFICATIONS WITHIN THIS SET, ARE AN
INTEGRAL PART OF THESE CONSTRUCTION DRAWINGS.
2. PLANS, SECTIONS, ELEVATIONS, DETAILS AND DIMENSIONS LABELED
"TYPICAL" SHALL APPLY TO ALL SITUATION OCCURRING THAT ARE THE SAME
OR SIMILAR TO THOSE SPECIFICALLY KEYED ON THE DRAWINGS.
3. ALL WORK, MATERIALS, AND METHODS SHALL BE IN CONFORMANCE WITH THE
CODES, ORDINANCES AND REGULATIONS OF ALL GOVERNMENTAL AGENCIES
HAVING JURISDICTION AT THE PROJECT LOCATION.
4. UNLESS OTHERWISE INDICATED IN THE CONSTRUCTION DOCUMENTS AS
BEING NOT IN CONTRACT (N.I.C.) OR EXISTING, ALL ITEMS, MATERIALS AND
INSTALLATION OF SAME ARE PART OF THE CONTRACT AS DEFINED BY THE
CONSTRUCTION DOCUMENTS. THE CONTRACTOR SHALL PROVIDE AND
INSTALL ALL ACCESSORIES, COMPONENTS AND ASSEMBLIES REQUIRED FOR
THE WORK DEPICTED OR SPECIFIED.
5. CONTRACTORS ARE RESPONSIBLE FOR ALL WORK REGARDLESS OF THE
LOCATION OF THE INFORMATION ON THE DOCUMENTS.
6. KEEP SITE CLEAN AND CLEAR OF DEBRIS AND IN ORDERLY CONDITION THAT
DOES NOT DETRACT FROM THE SURROUNDING SITE AND REPAIR ANY
DAMAGE CAUSED BY WORK OF THE CONTRACT.
7. ALL DIMENSIONS ARE TO THE FACE OF METAL OR WOOD STUD FRAMED
WALLS AND TO THE FACE OF CONCRETE AND MASONRY WALLS AS SHOWN,
UNLESS NOTED OTHERWISE.
8. INSTALL SEALANT AT EXTERIOR SIDE OF ALL JOINTS, SEAMS, CONNECTIONS
OR OPENINGS WHICH WOULD ALLOW WATER OR AIR INFILTRATION EXCEPT
AS NOTED OTHERWISE. SEALANT COLOR TO MATCH ADJACENT SURFACE.
COLOR REQUIRES ARCHITECTS APPROVAL.
9. DOOR OPENINGS IN FRAME CONSTRUCTION WHICH ARE NOT DIMENSIONED
ARE EITHER CENTERED IN THE WALL, FACE OF JAMB OR LOCATED 4" FROM
THE FACE OF STUD TO THE FINISHED JAMB.
10. ALL SPECIAL ACCESSIBLE FACILITIES SHALL BE IDENTIFIED WITH APPROVED
SIGNAGE.
11. THE CONTRACTOR IS RESPONSIBLE FOR PRODUCING A WEATHER TIGHT
BUILDING, DETAILS AND OMISSIONS TO DRAWINGS NOTWITHSTANDING. ALL
DRAWING CONFLICTS WHICH MAY NOT ALLOW A WEATHERTIGHT CONDITION
SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT.
12. DISCREPANCIES BETWEEN ACTUAL CONDITIONS AND PLANS SHALL BE
BROUGHT TO THE ATTENTION OF THE ARCHITECT. CONTRACTOR SHALL
SUBMIT SPECIFIC DISCREPANCIES FOR ARCHITECT REVIEW.
13. PROVIDE FULL METAL BACKING PLATE (16 GAUGE X 6" HIGH SECURED TO 3
STUDS MIN.) OR WOOD BLOCKING AS REQUIRED TO SECURELY ANCHOR ALL
WALL MOUNTED EQUIPMENT (CABINETS, TOILET ROOM ACCESSORIES,
HARDWARE, ETC.). BLOCKING SHALL PROVIDE A RIGID CONNECTION CAPABLE
OF SUPPORTING DESIGN LOADS. PROVIDE A 16 GAUGE X 6" STL. STUD/TRACK
SECURED TO 2 STUDS TO SECURELY SUPPORT ALL WALL STOPS (DOOR
BUMPER).
14. COORDINATE WITH ALL TRADES, SIZES AND LOCATIONS OF ALL OPENINGS
FOR MECHANICAL, PLUMBING AND ELECTRICAL EQUIPMENT, EQUIPMENT
PADS OR BASES, AS WELL AS ELECTRIC POWER, WATER, AND DRAIN
INSTALLATIONS, BEFORE PROCEEDING WITH WORK. CONTRACTOR SHALL
PROVIDE COORDINATION DRAWINGS FOR PROPER PLACEMENT OF ALL
TRADES' WORK. ANY CONCERNS, SPACE LIMITATIONS OR STRUCTURAL
CONFLICTS, SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. A
REASONABLE RESPONSE TIME SHALL BE ALLOWED AS NOTED IN THE
SPECIFICATIONS.
15. ALL FLOOR OR WALL OPENINGS REQUIRED FOR PIPES, DUCTS,
CONDUITS,ETC. SHALL BE SEALED IN AN APPROVED MANNER.
16. FIRE SPRINKLER DESIGN TO BE DONE BY A CERTIFIED SUB-CONTRACTOR AND
WILL REQUIRE APPROVALS BY THE CITY AND STATE FIRE MARSHAL.
APPROVALS BY THE FIRE MARSHAL ARE TO BE OBTAINED BY THE
CONTRACTOR PRIOR TO SUBMITTAL TO ARCHITECT. SUBMITTAL TO THE
ARCHITECT ALSO INDICATES THAT THE CONTRACTOR HAS REVIEWED AND
COORDINATED FIRE-SPRINKLER PIPING LOCATIONS WITH ALL TRADES.
17. ROOMS ENCLOSED WITH RATED WALLS REQUIRE RATED DOORS. ANY DUCTS
PASSING THROUGH WALLS REQUIRE FIRE DAMPERS AND OR FIRE/SMOKE
DAMPERS. ANY CONDUIT OR PIPING REQUIRES RATED SEALANT AT JOINTS.
18. GENERAL STRUCTURAL NOTES GOVERN TYPICAL CONDITIONS WHETHER OR
NOT SPECIFICALLY DETAILED OR NOTED.
19. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE AND LOCATE
ELECTRICAL, DATA AND PHONE RECEPTACLES, SWITCHES, ETC. TO AVOID
CASEWORK, DOORS, ETC.
20. THE DRAWINGS AND SPECIFICATIONS INDICATE THE GENERAL SCOPE OF THE
PROJECT IN TERMS OF THE ARCHITECTURAL AND STRUCTURAL DESIGN
CONCEPT. THE DIMENSIONS OF THE BUILDING, THE TYPE OF STRUCTURAL,
MECHANICAL, ELECTICAL AND UTILITY SYSTEMS AND MAJOR ARCHITECTURAL
ELEMENTS OF CONSTRUCTION AS "SCOPE" DOCUMENTS.
21. THE DRAWINGS AND SPECIFICATIONS DO NOT NECESSARILY INDICATE OR
DESCRIBE ALL WORK REQUIRED FOR THE FULL PERFORMANCE AND
COMPLETION OF THE WORK. CONTRACTS SHALL BE LET ON THE BASIS OF
SUCH DOCUMENTS, WITH THE UNDERSTANDING THAT THE CONTRACTOR IS
TO FURNISH ALL ITEMS REQUIRED FOR PROPER COMPLETION OF THE WORK
WITH OUT ADJUSTMENT TO CONTRACT PRICE. IT IS INTENDED THAT THE
WORK TO BE OF SOUND AND QUALITY CONSTRUCTION AND THE
CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE INCLUSION OF
ADEQUATE AMOUNTS TO COVER INSTALLATION OF ALL ITEMS INDICATED,
DESCRIBED OR REASONABLY IMPLIED.
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
GI002
General
Information
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
ABBREVIATION SCHEDULE
Abbrev. Description
ID INSIDE DIAMETER
IE INVERT ELEVATION
INSUL INSULATION
INT INTERIOR
INTX INTERSECTION
INV INVERT
J
JB JUNCTION BOX
JCT JUNCTION
JST JOIST
JT JOINT
L
L ANGLE
L LENGTH
LC LENGTH OF CURVE
LDC LEAD COVERED
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LT LIGHT
M
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MET METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTD MOUNTED
MTG MOUNTING
MULL MULLION
MWP MEMBRANE WATERPROOFING
N
N NORTH
NA NOT APPLICABLE
NE NORTHEAST
NEC NATIONAL ELECTRIC CODE
NEUT NEUTRAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
NW NIORTHWEST
O
OA OUTSIDE AIR
OA OUTSIDE AIR
OC ON CENTER
OFCI OWNER FURNISHED, CONTRACTOR INSTALLED
OFOI OWNER FURNISHED, OWNER INSTALLED
OPP OPPOSITE
OVHD OVERHEAD
P
PI POINT IF INTERSECTION
PL PLATE
PLAS PLASTER
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
PRELIM PRELIMINARY
PRESS PRESSURE
PRIM PRIMARY
PRTN PARTITION
PT POINT, POINT OF TANGENT
Q
QT QUARRY TILE
R
R RADIUS
RA RETURN AIR
RB RESILIENT VINYL BASE
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
RECP RECEPTACLE
REINF REINFORCEMENT
REQD REQUIRED
REV REVISION
RF ROOF
RFLCP REFLECTIVE CEILING PLAN
RM ROOM
RVT RESILIENT VINYL TILE
S
S SOUTH
SCH SCHEDULE
SD STORM DRAIN
SE SOUTHEAST
SECT SECTION
SHT SHEET
SIM SIMILIAR
SL SLOPE
SPEC SPECIFICATION
SQ SQUARE
STL STEEL
SUSP SUSPENDED
T
T TOP
T&B TOP AND BOTTOM
TEL TELEPHONE
TEMP TEMPORARY
TERM TERMINAL
THK THICK/THICKNESS
THRSLD THRESHOLD
TO TOP OF
TOS TOP OF STEEL, TOP OF SLAB
TOW TOP OF WALL
TYP TYPICAL
U
UNO UNLESS NOTED OTHERWISE
V
VCT VINYL COMPOSITION TILE
VENT VENTILIATING
VERT VERTICAL
VEST VESTIBULE
VWC VINYL WALL COVERING
W
W WIDTH, WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WIDTH
WT WEIGHT
WWF WELDED WIRE FABRIC
X
X TRANSFORMER
ABBREVIATION SCHEDULE
Abbrev. Description
0
# NUMBER OR POUND
& AND
2:1 SL 2 HORIZONTAL TO 1 VERTICAL SLOPE
@ AT
[ CHANNEL
± PLUS MINUS
≤ LESS THAN OR EQUAL TO
≥ GREATER THAN OR EQUAL TO
A
AB ANCHOR BOLT
AC APSHALTIC CONCRETE
ACST ACOUSTIC
AD AREA DRAIN
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
AL ALUMINUM
ALT ALTERNATE
ARCH ARCHITECTURAL, ARCHITECT, ARCHITECTURE
ASPH ASPHALT
B
B BASELINE
B BOTTOM
BEJ BRICK EXPANSION JOINT
BLDG BUILDING
BLK BLOCK
BM BEAM
BO BOARD
BRG BEARING
BSMT BASEMENT
C
C&G CURB & GUTTER
CAP CAPACITY
CEM CEMENT
CG CORNER GUARD
CIP CAST IN PLACE, CAST IRON PIPE
CIR CIRCULATING
CJ CONTROL JOINT
CL CENTERLINE
CL CENTERLINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNITS
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CSK COUNTERSUNK
CT CERAMIC TILE
CTR CENTER
D
D DEPTH
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DN DOWN
DS DOWNSPOUT
DWG DRAWING
E
E EAST
E/P EDGE OF PAVEMENT
EA EACH
EL ELEVATION
ELECT ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXP EXPANSION
EXP JT EXPANSION JOINT
EXT EXTERIOR
F
F.V. FIELD VERIFY
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FFE FINISHED FLOOR ELEVATION
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FINISH
FLR FLOOR
FR FRAME
FTG FOOTING
FXTR FIXTURE
G
G GROUND
GA GA
GALV GALVANIZED
GL GLASS
GR GRADE
GRD GROUND
GWB GYPSUM WALL BOARD
H
HB HOSE BIBB
HC HANDICAPPED
HDW HARDWARE
HGT HEIGHT
HORZ HORIZONTAL
HR HOUR
HW HOT WATER
I
DRAWING INDEX
GENERAL
GI001 Cover Sheet
GI002 General Information
GI003 ADA Building Blocks and Blocking Details
GI101 Code Analysis & Code Plans
GI201 Sheet Specs
GI202 Sheet Specs
GI203 Sheet Specs
GI204 Sheet Specs
GI205 Sheet Specs
GI206 Sheet Specs
GI207 Sheet Specs
GI208 Sheet Specs
GI209 Sheet Specs
CIVIL
C-1 COVER
C-2 NOTES
C-3 REFERENCE SHEET
C-4 SITE PLAN
C-5 MAIN ACCES PLAN & PROFILE
C-6 BUILDING 1 PLAN & PROFILE
C-7 BUILDING 2 PLAN & PROFILE
C-8 IRRIGATION DITCH PLAN & PROFILE
C-9 DETAILS SHEET
STRUCTURAL
S1.0 GENERAL STRUCTURAL NOTES
S1.1 TYPICAL DETAILS
S1.2 TYPICAL DETAILS
S2.0 FOUNDATION PLAN
S2.1 ROOF FRAMING PLAN
S3.0 FOUNDATION & ROOF FRAMING DETAILS
ARCHITECTURAL SITE
AS101 Architectural Site Plan & Unit Concept
ARCHITECTURAL
AE101 Overall Dimension & Wall Type Plan
AE101.1 Mirrored Overall Dimension & Wall Type Plan
AE102 Overall Annotation Plan
AE102.1 Mirrored Overall Annotation Plan
AE111 Overall Slab Edge Plan
AE111.1 Mirrored Overal Slab Edge Plan
AE131 Overall Reflected Ceiling Plan
AE141 Overall Roof Plan
AE141.1 Mirrored Overall Roof Plan
AE142 Enlarged Roof Plans
AE201 Overall Exterior Elevations
AE202 Enlarged Exterior Elevations
AE301 Building Sections
AE401 Enlarged Type B Unit Plans / Elevations
AE402 Enlarged Type A Unit Plans / Elevations
AE501 Vertical & Horizontal Assemblies
AE541 Door & Window Details
AE601 Door Schedule & Window Types
AE901 Accessible Cabinets & Casework Details
MECHANICAL
M101 Mechanical Floor Plan
PLUMBING
P101 Plumbing Floor Plan
P201 Plumbing Details and Schedules
ELECTRICAL
E0.0 ELECTRICAL SYMBOLS & DETAILS
E2.0 ELECTRICAL BUILDING PLANS
E3.0 POWER RISER, DETAILS AND SCHEDULES
60" MIN
Circular
T-Shaped
60" MIN
36" MIN
60" MIN
12" MIN 36" MIN 12" MIN
24" MIN
Size of Clear Floor Space
30" MIN
48" MIN
Forward
30" MIN
48" MIN
30" MIN
48" MIN
Parallel
Forward Approach
36" MIN
x > 24"
x > 15"
60" MIN
Parallel Approach
POSITION OF CLEAR FLOOR SPACE
MANEUVERING CLEARANCE IN AN ALCOVE
UNOBSTRUCTED FORWARD REACH OBSTRUCTED FORWARD REACH UNOBSTRUCTED SIDE REACH OBSTRUCTED HIGH SIDE REACH
15
M
I
N
38
0
48
M
A
X
12
2
0
48
M
A
X
12
2
0
44
M
A
X
11
2
0
>20-25 MAX
510-635
20 MAX
510
(a)(b)
10 MAX
255
12
2
0
48
M
A
X
15
M
I
N
38
0
10 MAX
255
12
2
0
48
M
A
X
34
M
A
X
86
5
34
M
A
X
86
5
46
M
A
X
11
7
0
> 10-24 MAX
255-610
(a)(b)
16"- 18"
56" MIN
60" MIN
30" MIN
48" MIN
SIZE OF CLEARANCE FOR WATER CLOSET
NOTE:
FLUSH CONTROLS SHALL BE LOCATED ON
OPEN SIDE OF WATER CLOSET
12" MAX 42"
39" -41"
54" MIN
18" MIN
39" -41"
33"- 36"
36"
33"- 36"
24" MIN 12" MIN
17" -19"
604.10.4
11" - 17" @
children's facilities
NOTE:
FLUSH CONTRILS SHALL BE LOCATED ON
OPEN SIDE OF WATER CLOSET
DRINKING FOUNTAIN SPOUT LOCATION
3 1/2" MAX
Forward Approach Parallel Approach
5" MAX 15" MIN
Below Grab Bar
18" MIN
1 1/2" MIN
CL
7" -9"
12" MIN
CL
7" -9"
Above Grab Bar
48" MAX604.10.7
14"-19" Children's
4'
-
0
"
M
A
X
.
3'
-
4
"
M
A
X
.
3'
-
2
"
MIRROR SOAP
DISPENSER
PAPER TOWEL
DISPENSER
15
"
M
I
N
.
2'
-
0
"
4'
-
0
"
M
A
X
2'
-
6
"
TOILET PAPER
HOLDER
SANITARY
NAPKIN
DISPOSAL
SANITARY
NAPKIN
DISPENSER
2'
-
3
"
BABY
CHANGING
STATION
4'
-
0
"
M
A
X
.
SANITARY SEAT
NAPKIN
DISPENSER
WASTE
RECEPTACLE
TO
P
O
F
O
P
E
N
I
N
G
4'
-
0
"
M
A
X
.
T
O
30" MIN
30" MIN
CL SIDE WALL
CL
BACK WALL
60" MIN
CLSIDE WALL
60" MIN
15"- 16"
3" MAX
2 1/2" MAX
1 1/2" MAX
RECTANGULAR SHOWER COMPARTMENT SEATSTANDARD ROLL-IN SHOWER COMPARTMENT
SIZE AND CLEARANCE
GRAB BAR IN STANDARD ROLL-IN SHOWERS
6" MAX 48" MAX
6" MAX
END
WALL
END
WALL
ROLL-IN SHOWER CONTROLS AND HANDSHOWER LOCATION
(SHADED AREA)
CONTROLS
38" MIN TO B.O.
CONTROLS
48" MAX TO T.O.
27" MAX
BACK
WALL
19"
GRAB BAR SHALL NOT EXTEND
OVER SEAT
FOLD DOWN OR
REMOVABLE SEAT
FOLD DOWN OR
REMOVABLE
SHOWER SEAT
16" MIN
NO GRAB BARS ABOVE
SHOWER SEAT
WALL CONSTRUCTION
ACCESSORY
MOUNTED OVER
FINISHED WALL
GYPSUM BOARD
NOTE:
1. TYPICAL BLOCKING
REQUIRED BEHIND
WALL MOUNTED
ACCESSORIES AND
EQUIPMENT
(OPTION 1) 20 GA x 6"
FLAT STEEL BLOCKING.
ATTACH W SELF TAPPING
PAN HEAD SCREWS
(OPTION 3) SISTER
16 GA. STL. STUD
ATTACH FIXTURE TO
SISTER STUD W/
SELF TAPPING
SCREWS OR
ANCHORS
(OPTION 2) INLAID
FIRE RETARDANT
WOOD BLOCKING
(COMPLY WITH
IBC 2006 2303.2)
STUDS SHOWN @ 16" O.C. SEE WALL TYPES
FOUNTAIN
20 GA x 6" FLAT
STEEL
BLOCKING
20 GA x 6" FLAT
STEEL
BLOCKING
16 GA SUPPORT
STUD
FOR STL. ANGLE
BRACING
WATER
COOLER/
FOUNTAIN
PROVIDE FULL VERTICAL
BLOCKING AT
CENTERLINE OF URINAL
NAPKIN
TAMPON
HAND DRYER
20 GA x 6" FLAT
STEEL
BLOCKING
TYPICAL BLOCKING DETAILS
46" MAX REACH
>10"- 24" MAX
TYPICAL ACCESSIBLE UNIT
MILLWORK PROFILE
TYPICAL ACCESSIBLE UNIT
MILLWORK PROFILE W/ UPPER
CABINET / FAN
TYPICAL ACCESSIBLE UNIT
FAN SWITCH LOCATION
TYPICAL TYPE B MILLWORK
PROFILE
TYPICAL TYPE B MILLWORK
PROFILE W/ MICROWAVE / FAN
TYPICAL TYPE B MILLWORK
PROFILE W/ UPPER CABINET
NOTE:
ALL ADA UNITS TO WIRE THE
KITCHEN HOOD AND LIGHTS A
TO (HORIZONTAL) WALL
SWITCH THAT MEETS ANSI
HEIGHT AND REACH RANGE
REQUIREMENTS.
SECTION 308.2.1 AND 305.5
EL
E
V
A
T
I
O
N
S
SE
E
IN
T
E
R
I
O
R
TY
P4"
EL
E
V
A
T
I
O
N
S
SE
E
I
N
T
E
R
I
O
R
1'
-
6
"
3'
-
0
"
4"
T
Y
P
3"
T
Y
P
SE
E
I
N
T
E
R
I
O
R
E
L
E
V
A
T
I
O
N
S
3'
-
0
"
1
'
-
6
"
SE
E
I
N
T
E
R
I
O
R
E
L
E
V
A
T
I
O
N
S
MICROWAVE
EL
E
V
A
T
I
O
N
SE
E
IN
T
E
R
I
O
R
3'
-
0
"
2
'
-
6
"
SE
E
I
N
T
E
R
I
O
R
E
L
E
V
A
T
I
O
N
S
3"
T
Y
P
2'
-
1
0
"
1
'
-
2
"
EL
E
V
A
T
I
O
N
SE
E
IN
T
E
R
I
O
R
OD
B
O
T
T
O
M
S
H
E
L
F
4'
-
0
"
T
O
P
S
I
D
E
SE
E
I
N
T
E
R
I
O
R
E
L
E
V
A
T
I
O
N
S
2'
-
1
0
"
1
'
-
2
"
SE
E
I
N
T
E
R
I
O
R
E
L
E
V
A
T
I
O
N
S
2'
-
1
0
"
8
1
/
2
"
HORIZONTAL
SWITCH
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
GI003
ADA Building
Blocks and
Blocking
Details
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
3/8" = 1'-0"D3 Turning Space (ANSI 304)
3/8" = 1'-0"B1 Clear Floor Space (ANSI 305)
3/8" = 1'-0"B2 Reach Ranges (ANSI 308)
3/8" = 1'-0"A6 Restroom Stall Layout (ANSI 604)
3/8" = 1'-0"A5 Grab Bar Placement (ANSI 604)
3/8" = 1'-0"A4 Drinking Fountain (ANSI 602)
3/8" = 1'-0"D2 Dispenser Location (ANSI 604)
3/8" = 1'-0"A1 Typical Toilet Accessories Mounting Height
3/8" = 1'-0"C2 ADA Roll-In Shower (ANSI 608)
1/2" = 1'-0"B5 Millwork Profiles
DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DWDW DWR R R R R R R R R R R R R R R R R R RR R
DW R
DWR DW R DWR
DWR
DW R
CODE ANALYSIS
APPLICABLE CODES
International Residential Code:
International Mechanical Code:
International Plumbing Code:
International Fire Code:
International Energy:
Conservation Code
National Electrical Code:
ADA Accessibility Guidelines:
A.Occupancy and Group: Single family housing townhomes (IRC)
B.Type of Construction (circle one):
FOOTNOTES:
1)In case of conflict with the U.S. Department of Justice Federal Registers Parts I through V -ADA Guidelines and
specific reference to the International Residential Code Accessibility Chapters, the more restrictive requirement
shall govern.
2)Additional Code Information shall be provided at the discretion of the Building Official for Complex Buildings,
including, but not limited to -
a.High Rise Requirements
b.Atriums
c.Performance Base Criteria
d.Means or Egress Criteria
e.Fire Assembly Locator Sheet
f.Exterior and Interior Accessibility Route
g.Fire Stopping, including tested design number
h.Fire Penetration Details
I
A
I
B
II
A
II
B
III
A
III
B
IV
A
IV
B
V
A
V
B
2018
2017
2018
2018
2018 IRC
2017
2018 IBC
2018 IRC Notes:
1. This buidling will not be sprinkled and the exterior walls are per table R302.1 (see code
plan on this sheet).
2. Double walls will be provided between the units (see code plan on this sheet and wall type
assembly FW4b on sheet AE501.
3. Accessible units are per the IBC 2018 code. There are 25 units total. 24 units areType B
units and one unit is Type A.
A. See enlarged plans on sheet AE401 and AE402 for acessibility clearances.
4. Each unit is aproximatley 530sf to 540sf in area.
5. Approximate overall area is 13,460 square feet.
6. See the site plan on sheet AS101 for public way access, parking and the fire lane.
7. Res check is provided for a middle unit typical and an end unit typical (see information on
this sheet).
AE401
B4 FOR ADA
REQUIREMENTS AE402
B4 FOR ADA
REQUIREMENTS
MECH
A127
ELEC
A126
1 BEDROOM
A101 1 BEDROOM
A102
1 BEDROOM
A103
1 BEDROOM
A104
1 BEDROOM
A105
1 BEDROOM
A106
1 BEDROOM
A107
1 BEDROOM
A108
1 BEDROOM
A109
1 BEDROOM
A110
1 BEDROOM
A111
1 BEDROOM
A112
1 BEDROOM
A113
1 BEDROOM
A114
1 BEDROOM
A115
1 BEDROOM
A116
1 BEDROOM
A117
1 BEDROOM
A118
1 BEDROOM
A119
1 BEDROOM
A120
1 BEDROOM
A121
1 BEDROOM
A122
1 BEDROOM
A123
1 BEDROOM
A124
1 BEDROOM
A125
(12) @ 539 sf (13) @ 531 sf
GRAPHIC LEGEND
FIRE BARRIER RATING
2 HOUR RATED WALL FIRE BARRIER, SEE
VERTICAL ASSEMBLIES
PATH OF EGRESS
COMMON PATH OF EGRESS (CPE)
TRAVEL DISTANCE (TD)
POINT AT WHICH A CHOICE OF 2 EXITS
BECOMES AVAILABLE
ALLOWABLE DISTANCE = 100'-0"
ALLOWABLE EXIT DISTANCE = 250'-0"
1
1
A A
2
2
B B
OCC.
Req.
Prov.
2"
DOOR
36"
10
A A
2
2
3
3
B B
OCC.
Req.
Prov.
2"
DOOR
36"
10
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
GI101
Code
Analysis &
Code Plans
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
3/32" = 1'-0"A1 Overall Code Plan
1/8" = 1'-0"D5 Enlarged Code Plan (TYP) - Type B Unit
1/8" = 1'-0"B5 Enlarged Code Plan (TYP)- Type A Unit
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
GI201
Sheet Specs
20.0550
- april 7, 2021
Rexburg
Rowhouses
bid set
DIVISION 01-GENERAL REQUIREMENTS
SECTION 01 0000 - GENERAL REQUIREMENTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE
CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY
CONDITIONS AND OTHER DIVISION 1 SPECIFICATION SECTIONS,
APPLY TO THIS SECTION.
1.2 SUMMARY
A. THIS SECTION INCLUDES GENERAL REQUIREMENTS
THAT ARE TO APPLY TO ALL WORK THROUGHOUT THE PROJECT.
REQUIREMENTS INCLUDED IN THIS SECTION ARE TO APPLY TO ALL
OTHER SPECIFICATION SECTIONS.
B. CERTIFICATES OF OCCUPANCY ARE TO BE OBTAINED AT THE
END OF CONSTRUCTION TO ALLOW THE OWNER TO OCCUPY EACH
SINGLE FAMILY ONE BEDROOM HOME.
1.3 DEFINITIONS
A. GENERAL: BASIC CONTRACT DEFINITIONS ARE INCLUDED IN
THE CONDITIONS OF THE CONTRACT.
B. “CENTER OF...”: INDICATES A SPECIFIC SINGLE POINT AT
THE EXACT CENTER OF THE TILE, PANEL, OR OTHER SURFACE
INDICATED.
C. CONFORMS”: WHEN USED TO CONVEY ARCHITECT’S
ACTION ON CONTRACTOR’S SUBMITTALS, APPLICATIONS, AND
REQUESTS, “CONFORMS” IS LIMITED TO ARCHITECT’S DUTIES
AND RESPONSIBILITIES AS STATED IN THE CONDITIONS OF THE
CONTRACT.
D. “CONTRACTOR”: THE GENERAL CONTRACTOR UNLESS
OTHERWISE STATED.
E. “DIRECTED”: A COMMAND OR INSTRUCTION BY ARCHITECT,
UNLESS INDICATED AS BY OWNER OR TENANT. OTHER TERMS
INCLUDING “REQUESTED,” “AUTHORIZED,” “SELECTED,”
“APPROVED,” “REQUIRED,” AND “PERMITTED” HAVE THE SAME
MEANING AS “DIRECTED.”
F. “FURNISH”: SUPPLY AND DELIVER TO PROJECT SITE, READY
FOR UNLOADING, UNPACKING, ASSEMBLY, INSTALLATION, AND
SIMILAR OPERATIONS.
G. “INDICATED”: REQUIREMENTS EXPRESSED BY GRAPHIC
REPRESENTATIONS OR IN WRITTEN FORM ON DRAWINGS, IN
SPECIFICATIONS, AND IN OTHER CONTRACT DOCUMENTS. OTHER
TERMS INCLUDING “SHOWN,” “NOTED,” “SCHEDULED,” AND
“SPECIFIED” HAVE THE SAME MEANING AS “INDICATED.”
H. “INSTALL”: OPERATIONS AT PROJECT SITE INCLUDING
UNLOADING, TEMPORARILY STORING, UNPACKING,
ASSEMBLING, ERECTING, PLACING, ANCHORING, APPLYING,
WORKING TO DIMENSION, FINISHING, CURING, PROTECTING,
CLEANING, AND SIMILAR OPERATIONS.
I. “PROJECT REPRESENTATIVE”: THE OWNER’S OR TENANT’S
PROJECT REPRESENTATIVE(S).
J. “PROJECT SITE”: SPACE AVAILABLE FOR PERFORMING
CONSTRUCTION ACTIVITIES. THE EXTENT OF PROJECT SITE IS
SHOWN ON DRAWINGS AND MAY OR MAY NOT BE IDENTICAL WITH
THE DESCRIPTION OF THE LAND ON WHICH PROJECT IS TO BE
BUILT.
K. “PROVIDE”: FURNISH AND INSTALL, COMPLETE AND READY
FOR THE INTENDED USE.
L. “REGULATIONS”: LAWS, ORDINANCES, STATUTES, AND
LAWFUL ORDERS ISSUED BY AUTHORITIES HAVING JURISDICTION,
AND RULES, CONVENTIONS, AND AGREEMENTS WITHIN THE
CONSTRUCTION INDUSTRY THAT CONTROL PERFORMANCE OF THE
WORK.
M. “RELATED SECTIONS”: RELATED SECTIONS ARTICLES ARE
INCLUDED HEREIN AS A COURTESY TO ASSIST IN THE LOCATING OF
ITEMS IN THE SPECIFICATIONS THAT THE READER MIGHT EXPECT
TO FIND IN THE SECTION BUT THAT ARE SPECIFIED ELSEWHERE.
THE LIST OF SECTIONS MAY OR MAY NOT BE COMPLETE. ‘RELATED
SECTIONS’ ARTICLES DO NOT RELIEVE THE CONTRACTOR OF THE
CONTRACTUAL OBLIGATION TO PERFORM TO ALL THE CONTRACT
DOCUMENTS OR TO COORDINATE WHO DOES WHAT AMONGST THE
TEAM OF SUBCONTRACTORS.
1.4 SITE INSPECTION
A. EXAMINE THE PREMISES AND SITE AND COMPARE THEM
WITH THE DRAWINGS AND SPECIFICATIONS.
B. BECOME FAMILIAR WITH EXISTING CONDITIONS SUCH
AS OBSTRUCTIVE AREAS AND ANY PROBLEMS RELATED TO
CONSTRUCTION. NO ALLOWANCES WILL SUBSEQUENTLY BE MADE
BY REASON OF FAILURE TO EXAMINE THE SITE.
1.5 SCOPE OF THE WORK
A. AS A SUMMARY OF THE WORK, THIS WILL BE 25 SINGLE
LEVEL SINLGLE FAMILY ONE BEDROOM HOMES IN THE FORM OF
ROW HOUSES. THEY WILL BE RENTED OUT AND NOT USED AS
CONDOS.
B. UNLESS OTHERWISE PROVIDED, ALL MATERIALS, LABOR,
EQUIPMENT, TOOLS, TRANSPORTATION, AND UTILITIES NECESSARY
FOR THE SUCCESSFUL COMPLETION OF THE PROJECT SHALL BE
PROVIDED AT THE EXPENSE OF THE CONTRACTOR.
C. REQUIREMENTS OF THE WORK ARE CONTAINED IN THE
CONTRACT DOCUMENTS, AND INCLUDE CROSS-REFERENCES
HEREIN TO PUBLISHED INFORMATION, WHICH IS NOT NECESSARILY
BOUND THEREWITH.
D. PROVIDE, AS PART OF THE BID AND WITHOUT ADDITIONAL
CHARGE, ALL INCIDENTAL ITEMS REQUIRED FOR COMPLETION OF
THE WORK, EVEN IF NOT SPECIFICALLY INDICATED.
1. INSTALL ALL WORK SO THAT ITS SEVERAL COMPONENT
PARTS FUNCTION TOGETHER AS A COMPLETE AND
WORKABLE SYSTEM, AND WITH ALL EQUIPMENT PROPERLY
ADJUSTED AND IN WORKING ORDER.
E. CONFORM TO HIGHEST QUALITY STANDARDS FOR
MATERIALS AND WORKMANSHIP TO EXECUTE WORK THAT IS
INDICATED OR SPECIFIED AND THAT IS NECESSARY TO FULLY
SATISFY THE CONTRACT DOCUMENT REQUIREMENTS FOR A
COMPLETE, FINISHED, ACCEPTABLE INSTALLATION REGARDLESS OF
WHETHER INDICATED OR SPECIFIED OR NOT.
F. RESPONSIBILITIES OF THE CONTRACTOR INCLUDES THE
RESPONSIBILITY TO VERIFY ALL FIELD MEASUREMENTS OF ACTUAL
BUILDING CONDITIONS SO THAT ALL WORK FITS PROPERLY IN
THE LOCATIONS INDICATED AND SPECIFIED. PROTECT EXISTING
STRUCTURES, IMPROVEMENTS, TREES, AND OTHER ITEMS FROM
PHYSICAL DAMAGE, UNLESS IDENTIFIED TO BE REMOVED.
G. ANY EXISTING SURFACES, FINISHES, FURNITURE OR
EQUIPMENT THAT ARE DAMAGED BY THE CONTRACTOR ARE TO BE
RESTORED TO THEIR ORIGINAL CONDITION, OR BETTER, TO THE
SATISFACTION OF THE OWNER.
H. RESTORE ROADS, UTILITIES, WALKS, CURBS, GUTTERS
OR OTHER IMPROVEMENTS BELONGING TO THE OWNER, TO THE
SAME CONDITION AS THEY EXISTED PRIOR TO COMMENCEMENT
OF CONSTRUCTION. WHERE SAID IMPROVEMENTS ARE DAMAGED,
THEY SHALL BE REPLACED BY NEW WORK TO MATCH EXISTING
ADJACENT WORK, OR REPAIRED IF ACCEPTABLE TO PROJECT
REPRESENTATIVE, AT NO COST TO OWNER.
1.6 WORKERS
A. ENFORCE STRICT DISCIPLINE AND GOOD ORDER AMONG
HIS/HER EMPLOYEES AT ALL TIMES AND SHALL NOT EMPLOY ON
THE PROJECT ANY UNFIT PERSON OR ANYONE NOT SKILLED IN THE
WORK ASSIGNED TO HIM/HER.
B. CONSUMPTION OF ALCOHOL, OR ANY OTHER CONTROLLED,
NON-MEDICALLY PRESCRIBED SUBSTANCE WILL NOT BE ALLOWED
ON THE PROJECT.
C. E-CIGARETTES, SMOKING AND THE USE OF ALL OTHER
TOBACCO PRODUCTS IS NOT ALLOWED WITHIN BUILDING
ENVELOPE AND IS ONLY PERMITTED IN DESIGNATED AREAS ON
CONSTRUCTION SITE.
D. RECTIFY BEHAVIOR UNACCEPTABLE TO THE OWNER
OR OWNER’S PROJECT REPRESENTATIVE BY STRICT
ENFORCEMENT OF DISCIPLINE. OWNER RESERVES THE RIGHT TO
REQUEST DISMISSAL OF INDIVIDUAL WORKERS FOR FAILURE TO
COMPLY WITH STANDARDS OF BEHAVIOR COMMUNICATED TO THE
CONTRACTOR.
1.7 TAXES
A. THE CONTRACTOR SHALL PAY SALES, USE, PAYROLL,
UNEMPLOYMENT, OLD AGE PENSION, OR SURTAX APPLICABLE TO
THIS PROJECT.
B. THE OWNER SHALL PAY TAXES AND ASSESSMENTS ON REAL
PROPERTY COMPRISING THE SITE OF THIS PROJECT.
1.8 MANUFACTURER’S DIRECTIONS
A. MANUFACTURED ARTICLES, MATERIALS, OR EQUIPMENT
SHALL BE APPLIED, INSTALLED, CONNECTED, ERECTED, USED,
CLEANED, AND CONDITIONED IN ACCORDANCE WITH THE
MANUFACTURER’S PRINTED DIRECTIONS UNLESS OTHERWISE
INDICATED IN THE CONTRACT DOCUMENTS.
1.9 FASTENERS
A. UNLESS NOTED OTHERWISE, THE TRADE REQUIRING THE
FASTENING OF ITS WORK TO ANY SUBSTRATE OR SUPPORT IS
RESPONSIBLE FOR PROVISION AND INSTALLATION OF REQUISITE
FASTENERS.
END OF SECTION 01 0000.
SECTION 01 2500 - SUBSTITUTION PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND
OTHER DIVISION 01 SPECIFICATION SECTIONS, APPLY TO THIS
SECTION.
1.2 SUMMARY
A. SECTION INCLUDES ADMINISTRATIVE AND PROCEDURAL
REQUIREMENTS FOR SUBSTITUTIONS.
B. RELATED REQUIREMENTS:
1. DIVISION 01 SECTION “PRODUCT REQUIREMENTS” FOR
REQUIREMENTS FOR SUBMITTING COMPARABLE PRODUCT
SUBMITTALS FOR PRODUCTS BY LISTED MANUFACTURERS.
1.3 DEFINITIONS
A. SUBSTITUTIONS: CHANGES IN PRODUCTS, MATERIALS,
EQUIPMENT, AND METHODS OF CONSTRUCTION FROM THOSE
REQUIRED BY THE CONTRACT DOCUMENTS AND PROPOSED BY
CONTRACTOR.
1. SUBSTITUTIONS FOR CAUSE: CHANGES PROPOSED
BY CONTRACTOR THAT ARE REQUIRED DUE TO CHANGED
PROJECT CONDITIONS, SUCH AS UNAVAILABILITY OF
PRODUCT, REGULATORY CHANGES, OR UNAVAILABILITY OF
REQUIRED WARRANTY TERMS.
2. SUBSTITUTIONS FOR CONVENIENCE:
CHANGES PROPOSED BY CONTRACTOR OR OWNER
THAT ARE NOT REQUIRED IN ORDER TO MEET OTHER
PROJECT REQUIREMENTS BUT MAY OFFER ADVANTAGE TO
CONTRACTOR OR OWNER.
1.4 ACTION SUBMITTALS
A. SUBSTITUTION REQUESTS: SUBMIT ONE DIGITAL COPY
OR TWO HARD COPIES OF EACH REQUEST FOR CONSIDERATION.
IDENTIFY PRODUCT OR FABRICATION OR INSTALLATION METHOD
TO BE REPLACED. INCLUDE SPECIFICATION SECTION NUMBER AND
TITLE AND DRAWING NUMBERS AND TITLES. ALL SUBSTITUTION
REQUESTS TO OCCUR IN FIRST 30 DAYS OF CONTRACT.
1. SUBSTITUTION REQUEST FORM: USE CSI FORM 13.1A,
OR OTHER FORM APPROVED BY ARCHITECT.
2. DOCUMENTATION: SHOW COMPLIANCE WITH
REQUIREMENTS FOR SUBSTITUTIONS AND THE FOLLOWING,
AS APPLICABLE:
a. STATEMENT INDICATING WHY SPECIFIED PRODUCT OR
FABRICATION OR INSTALLATION CANNOT BE PROVIDED, IF
APPLICABLE.
b. COORDINATION INFORMATION, INCLUDING A LIST
OF CHANGES OR REVISIONS NEEDED TO OTHER PARTS
OF THE WORK AND TO CONSTRUCTION PERFORMED
BY OWNER AND SEPARATE CONTRACTORS, THAT
WILL BE NECESSARY TO ACCOMMODATE PROPOSED
SUBSTITUTION.
c. DETAILED COMPARISON OF SIGNIFICANT QUALITIES
OF PROPOSED SUBSTITUTION WITH THOSE OF THE WORK
SPECIFIED. INCLUDE ANNOTATED COPY OF APPLICABLE
SPECIFICATION SECTION. SIGNIFICANT QUALITIES MAY
INCLUDE ATTRIBUTES SUCH AS PERFORMANCE,
WEIGHT, SIZE,DURABILITY, VISUAL EFFECT, SUSTAINABLE
DESIGN CHARACTERISTICS, WARRANTIES, AND SPECIFIC
FEATURES AND REQUIREMENTS INDICATED. INDICATED
DEVIATIONS, IF ANY, FROM THE WORK SPECIFIED.
d. PRODUCT DATA, INCLUDING DRAWINGS AND
DESCRIPTIONS OF PRODUCTS AND FABRICATION AND
INSTALLATION PROCEDURES.
e. SAMPLES, WHERE APPLICABLE OR REQUESTED.
f. CERTIFICATES AND QUALIFICATION DATA, WHERE
APPLICABLE OR REQUESTED.
g. LIST OF SIMILAR INSTALLATIONS FOR COMPLETED
PROJECTS WITH PROJECT NAMES AND ADDRESSES AND
NAMES AND ADDRESSES OF ARCHITECTS AND OWNERS.
h. MATERIAL TEST REPORTS FROM A QUALIFIED TESTING
AGENCY INDICATING AND INTERPRETING TEST RESULTS
FOR COMPLIANCE WITH REQUIREMENTS INDICATED.
i. RESEARCH REPORTS EVIDENCING COMPLIANCE WITH
BUILDING CODE IN EFFECT FOR PROJECT, FROM ICC-ES.
j. DETAILED COMPARISON OF CONTRACTOR’S
CONSTRUCTION SCHEDULE USING PROPOSED
SUBSTITUTION WITH PRODUCTS SPECIFIED FOR
THE WORK, INCLUDING EFFECT ON THE OVERALL
CONTRACT TIME. IF SPECIFIED PRODUCT OR METHOD
OF CONSTRUCTION CANNOT BE PROVIDED WITHIN
THE CONTRACT TIME, INCLUDE LETTER FROM
MANUFACTURER, ON MANUFACTURER’S LETTERHEAD,
STATING DATE OF RECEIPT OF PURCHASE ORDER, LACK
OF AVAILABILITY, OR DELAYS IN DELIVERY.
k. COST INFORMATION, INCLUDING A PROPOSAL OF
CHANGE, IF ANY, IN THE CONTRACT SUM.
l. CONTRACTOR’S CERTIFICATION THAT PROPOSED
SUBSTITUTION COMPLIES WITH REQUIREMENTS IN
THE CONTRACT DOCUMENTS EXCEPT AS INDICATED IN
SUBSTITUTION REQUEST, IS COMPATIBLE WITH RELATED
MATERIALS, AND IS APPROPRIATE FOR APPLICATIONS
INDICATED.
m. CONTRACTOR’S WAIVER OF RIGHTS TO ADDITIONAL
PAYMENT OR TIME THAT MAY SUBSEQUENTLY
BECOME NECESSARY BECAUSE OF FAILURE OF
PROPOSED SUBSTITUTION TO PRODUCE INDICATED
RESULTS.
3. ARCHITECT’S ACTION: IF NECESSARY, ARCHITECT WILL
REQUEST ADDITIONAL INFORMATION OR DOCUMENTATION
FOR EVALUATION WITHIN SEVEN DAYS OF RECEIPT OF A
REQUEST FOR SUBSTITUTION. ARCHITECT WILL NOTIFY
CONTRACTOR OF ACCEPTANCE OR REJECTION OF
PROPOSED SUBSTITUTION WITHIN 15 DAYS OF RECEIPT
OF REQUEST, OR SEVEN DAYS OF RECEIPT OF ADDITIONAL
INFORMATION OR DOCUMENTATION, WHICHEVER IS LATER.
a. FORMS OF ACCEPTANCE: CHANGE ORDER,
CONSTRUCTION CHANGE DIRECTIVE, OR ARCHITECT’S
SUPPLEMENTAL INSTRUCTIONS FOR MINOR CHANGES IN
THE WORK.
b. USE PRODUCT SPECIFIED IF ARCHITECT DOES NOT
ISSUE A DECISION ON USE OF A PROPOSED SUBSTITUTION
WITHIN TIME ALLOCATED.
1.5 QUALITY ASSURANCE
A. COMPATIBILITY OF SUBSTITUTIONS: INVESTIGATE AND
DOCUMENT COMPATIBILITY OF PROPOSED SUBSTITUTION WITH
RELATED PRODUCTS AND MATERIALS. ENGAGE A QUALIFIED
TESTING AGENCY TO PERFORM COMPATIBILITY TESTS
RECOMMENDED BY MANUFACTURERS.
1.6 PROCEDURES
A. COORDINATION: REVISE OR ADJUST AFFECTED WORK
AS NECESSARY TO INTEGRATE WORK OF THE APPROVED
SUBSTITUTIONS.
PART 2 - PRODUCTS
2.1 SUBSTITUTIONS
A. SUBSTITUTIONS FOR CAUSE: SUBMIT REQUESTS FOR
SUBSTITUTION IMMEDIATELY ON DISCOVERY OF NEED FOR
CHANGE, BUT NOT LATER THAN 15 DAYS PRIOR TO TIME REQUIRED
FOR PREPARATION AND REVIEW OF RELATED SUBMITTALS. ALL
SUBSTITUTION REQUEST SHALL BE ACCOMPANIED BY A STATEMENT
FROM THE CONTRACTOR STATING THAT THE SUBSTITUTION
MEETS OR EXCEEDS REQUIREMENTS OF THE PRODUCT BEING
SUBSTITUTED
1. CONDITIONS: ARCHITECT WILL CONSIDER
CONTRACTOR’S REQUEST FOR SUBSTITUTION WHEN THE
FOLLOWING CONDITIONS ARE SATISFIED. IF THE FOLLOWING
CONDITIONS ARE NOT SATISFIED, ARCHITECT WILL RETURN
REQUESTS WITHOUT ACTION, EXCEPT TO RECORD
NONCOMPLIANCE WITH THESE REQUIREMENTS:
a. REQUESTED SUBSTITUTION IS CONSISTENT WITH THE
CONTRACT DOCUMENTS AND WILL PRODUCE INDICATED
RESULTS.
b. REQUESTED SUBSTITUTION PROVIDES SUSTAINABLE
DESIGN CHARACTERISTICS THAT SPECIFIED PRODUCT
PROVIDED.
c. SUBSTITUTION REQUEST IS FULLY DOCUMENTED AND
PROPERLY SUBMITTED.
d. REQUESTED SUBSTITUTION WILL NOT ADVERSELY
AFFECT CONTRACTOR’S CONSTRUCTION SCHEDULE.
e. REQUESTED SUBSTITUTION HAS RECEIVED
NECESSARY APPROVALS OF AUTHORITIES HAVING
JURISDICTION.
f. REQUESTED SUBSTITUTION IS COMPATIBLE WITH
OTHER PORTIONS OF THE WORK.
g. REQUESTED SUBSTITUTION HAS BEEN COORDINATED
WITH OTHER PORTIONS OF THE WORK.
h. REQUESTED SUBSTITUTION PROVIDES SPECIFIED
WARRANTY.
i. IF REQUESTED SUBSTITUTION INVOLVES MORE THAN
ONE CONTRACTOR, REQUESTED SUBSTITUTION HAS
BEEN COORDINATED WITH OTHER PORTIONS OF THE
WORK, IS UNIFORM AND CONSISTENT, IS COMPATIBLE
WITH OTHER PRODUCTS, AND IS ACCEPTABLE TO ALL
CONTRACTORS INVOLVED.
B. SUBSTITUTIONS FOR CONVENIENCE: NOT ALLOWED.
END OF SECTION 01 2500
SECTION 01 2600 - CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND
OTHER DIVISION 01 SPECIFICATION SECTIONS, APPLY TO THIS
SECTION.
1.2 SUMMARY
A. SECTION INCLUDES ADMINISTRATIVE AND PROCEDURAL
REQUIREMENTS FOR HANDLING AND PROCESSING CONTRACT
MODIFICATIONS.
B. RELATED REQUIREMENTS:
1. DIVISION 01 SECTION “SUBSTITUTION PROCEDURES”
FOR ADMINISTRATIVE PROCEDURES FOR HANDLING
REQUESTS FOR SUBSTITUTIONS MADE AFTER THE
CONTRACT AWARD.
1.3 MINOR CHANGES IN THE WORK
A. ARCHITECT WILL ISSUE SUPPLEMENTAL INSTRUCTIONS
AUTHORIZING MINOR CHANGES IN THE WORK, NOT INVOLVING
ADJUSTMENT TO THE CONTRACT SUM OR THE CONTRACT
TIME, ON AIA DOCUMENT G710, “ARCHITECT’S SUPPLEMENTAL
INSTRUCTIONS.”
1.4 PROPOSAL REQUESTS
A. OWNER-INITIATED PROPOSAL REQUESTS: ARCHITECT
WILL ISSUE A DETAILED DESCRIPTION OF PROPOSED CHANGES IN
THE WORK THAT MAY REQUIRE ADJUSTMENT TO THE CONTRACT
SUM OR THE CONTRACT TIME. IF NECESSARY, THE DESCRIPTION
WILL INCLUDE SUPPLEMENTAL OR REVISED DRAWINGS AND
SPECIFICATIONS.
1. WORK CHANGE PROPOSAL REQUESTS ISSUED BY
ARCHITECT ARE NOT INSTRUCTIONS EITHER TO STOP WORK
IN PROGRESS OR TO EXECUTE THE PROPOSED CHANGE.
2. WITHIN TIME SPECIFIED IN PROPOSAL REQUEST OR
20 DAYS, WHEN NOT OTHERWISE SPECIFIED, AFTER RECEIPT
OF PROPOSAL REQUEST, SUBMIT A QUOTATION ESTIMATING
COST ADJUSTMENTS TO THE CONTRACT SUM AND THE
CONTRACT TIME NECESSARY TO EXECUTE THE CHANGE.
a. INCLUDE A LIST OF QUANTITIES OF PRODUCTS
REQUIRED OR ELIMINATED AND UNIT COSTS, WITH
TOTAL AMOUNT OF PURCHASES AND CREDITS TO BE
MADE. IF REQUESTED, FURNISH SURVEY DATA TO
SUBSTANTIATE QUANTITIES.
b. INDICATE APPLICABLE TAXES, DELIVERY CHARGES,
EQUIPMENT RENTAL, AND AMOUNTS OF TRADE
DISCOUNTS.
c. INCLUDE COSTS OF LABOR AND SUPERVISION
DIRECTLY ATTRIBUTABLE TO THE CHANGE.
d. INCLUDE AN UPDATED CONTRACTOR’S
CONSTRUCTION SCHEDULE THAT INDICATES THE EFFECT
OF THE CHANGE, INCLUDING, BUT NOT LIMITED TO,
CHANGES IN ACTIVITY DURATION, START AND FINISH
TIMES, AND ACTIVITY RELATIONSHIP. USE AVAILABLE
TOTAL FLOAT BEFORE REQUESTING AN EXTENSION
OF THE CONTRACT TIME.
e. QUOTATION FORM: USE FORMS ACCEPTABLE TO
ARCHITECT.
B. CONTRACTOR-INITIATED PROPOSALS: IF LATENT OR
CHANGED CONDITIONS REQUIRE MODIFICATIONS TO THE
CONTRACT, CONTRACTOR MAY INITIATE A CLAIM BY SUBMITTING A
REQUEST FOR A CHANGE TO ARCHITECT/OWNER.
1. INCLUDE A STATEMENT OUTLINING REASONS FOR THE
CHANGE AND THE EFFECT OF THE CHANGE ON THE WORK.
PROVIDE A COMPLETE DESCRIPTION OF THE PROPOSED
CHANGE. INDICATE THE EFFECT OF THE PROPOSED CHANGE
ON THE CONTRACT SUM AND THE CONTRACT TIME.
2. INCLUDE A LIST OF QUANTITIES OF PRODUCTS
REQUIRED OR ELIMINATED AND UNIT COSTS, WITH TOTAL
AMOUNT OF PURCHASES AND CREDITS TO BE MADE. IF
REQUESTED, FURNISH SURVEY DATA TO SUBSTANTIATE
QUANTITIES. INDICATE APPLICABLE TAXES, DELIVERY
CHARGES, EQUIPMENT RENTAL, AND AMOUNTS OF TRADE
DISCOUNTS.
3. INCLUDE COSTS OF LABOR AND SUPERVISION
DIRECTLY ATTRIBUTABLE TO THE CHANGE.
4. INCLUDE AN UPDATED CONTRACTOR’S
CONSTRUCTION SCHEDULE THAT INDICATES THE EFFECT OF
THE CHANGE, INCLUDING, BUT NOT LIMITED TO, CHANGES IN
ACTIVITY DURATION, START AND FINISH TIMES, AND ACTIVITY
RELATIONSHIP. USE AVAILABLE TOTAL FLOAT BEFORE
REQUESTING AN EXTENSION OF THE CONTRACT TIME.
5. COMPLY WITH REQUIREMENTS IN DIVISION 01
SECTION “SUBSTITUTION PROCEDURES” IF THE PROPOSED
CHANGE REQUIRES SUBSTITUTION OF ONE PRODUCT OR
SYSTEM FOR PRODUCT OR SYSTEM SPECIFIED.
6. PROPOSAL REQUEST FORM: USE FORM ACCEPTABLE
TO ARCHITECT.
1.5 CHANGE ORDER PROCEDURES
A. ON OWNER’S APPROVAL OF A WORK CHANGES PROPOSAL
REQUEST, ARCHITECT WILL ISSUE A CHANGE ORDER FOR
SIGNATURES OF OWNER AND CONTRACTOR ON AIA DOCUMENT
G701.
1.6 CONSTRUCTION CHANGE DIRECTIVE
A. CONSTRUCTION CHANGE DIRECTIVE: ARCHITECT MAY ISSUE
A CONSTRUCTION CHANGE DIRECTIVE ON AIA DOCUMENT G714.
CONSTRUCTION CHANGE DIRECTIVE INSTRUCTS CONTRACTOR
TO PROCEED WITH A CHANGE IN THE WORK, FOR SUBSEQUENT
INCLUSION IN A CHANGE ORDER.
1. CONSTRUCTION CHANGE DIRECTIVE CONTAINS A
COMPLETE DESCRIPTION OF CHANGE IN THE WORK. IT ALSO
DESIGNATES METHOD TO BE FOLLOWED TO DETERMINE
CHANGE IN THE CONTRACT SUM OR THE CONTRACT TIME.
B. DOCUMENTATION: MAINTAIN DETAILED RECORDS ON A TIME
AND MATERIAL BASIS OF WORK REQUIRED BY THE CONSTRUCTION
CHANGE DIRECTIVE.
1. AFTER COMPLETION OF CHANGE, SUBMIT AN ITEMIZED
ACCOUNT AND SUPPORTING DATA NECESSARY TO
SUBSTANTIATE COST AND TIME ADJUSTMENTS TO THE
CONTRACT.
END OF SECTION 01 2600
SECTION 01 2900 - PAYMENT PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND
OTHER DIVISION 01 SPECIFICATION SECTIONS, APPLY TO THIS
SECTION.
1.2 SUMMARY
A. SECTION INCLUDES ADMINISTRATIVE AND PROCEDURAL
REQUIREMENTS NECESSARY TO PREPARE AND PROCESS
APPLICATIONS FOR PAYMENT.
B. RELATED REQUIREMENTS:
1. DIVISION 01 SECTION “CONTRACT MODIFICATION
PROCEDURES” FOR ADMINISTRATIVE PROCEDURES FOR
HANDLING CHANGES TO THE CONTRACT.
2. DIVISION 01 SECTION “CONSTRUCTION PROGRESS
DOCUMENTATION” FOR ADMINISTRATIVE REQUIREMENTS
GOVERNING THE PREPARATION AND SUBMITTAL OF THE
CONTRACTOR’S CONSTRUCTION SCHEDULE.
1.3 DEFINITIONS
A. SCHEDULE OF VALUES: A STATEMENT FURNISHED BY
CONTRACTOR ALLOCATING PORTIONS OF THE CONTRACT SUM TO
VARIOUS PORTIONS OF THE WORK AND USED AS THE BASIS FOR
REVIEWING CONTRACTOR’S APPLICATIONS FOR PAYMENT.
1.4 SCHEDULE OF VALUES
A. COORDINATION: COORDINATE PREPARATION OF THE
SCHEDULE OF VALUES WITH PREPARATION OF CONTRACTOR’S
CONSTRUCTION SCHEDULE.
1. COORDINATE LINE ITEMS IN THE SCHEDULE OF
VALUES WITH OTHER REQUIRED ADMINISTRATIVE FORMS
AND SCHEDULES, INCLUDING THE FOLLOWING:
a. APPLICATION FOR PAYMENT FORMS WITH
CONTINUATION SHEETS.
b. SUBMITTAL SCHEDULE.
c. ITEMS REQUIRED TO BE INDICATED AS SEPARATE
ACTIVITIES IN CONTRACTOR’S CONSTRUCTION
SCHEDULE.
B. SUBMIT THE SCHEDULE OF VALUES TO ARCHITECT AT
EARLIEST POSSIBLE DATE, BUT NO LATER THAN SEVEN DAYS
BEFORE THE DATE SCHEDULED FOR SUBMITTAL OF INITIAL
APPLICATIONS FOR PAYMENT.
1. SUBSCHEDULES FOR SEPARATE ELEMENTS OF WORK:
WHERE THE CONTRACTOR’S CONSTRUCTION SCHEDULE
DEFINES SEPARATE ELEMENTS OF THE WORK, PROVIDE
SUBSCHEDULES SHOWING VALUES COORDINATED WITH
EACH ELEMENT.
C. FORMAT AND CONTENT: USE PROJECT MANUAL TABLE
OF CONTENTS AS A GUIDE TO ESTABLISH LINE ITEMS FOR THE
SCHEDULE OF VALUES. PROVIDE AT LEAST ONE LINE ITEM FOR
EACH SPECIFICATION SECTION.
1. IDENTIFICATION: INCLUDE THE FOLLOWING PROJECT
IDENTIFICATION ON THE SCHEDULE OF VALUES:
a. PROJECT NAME AND LOCATION.
b. NAME OF ARCHITECT.
c. ARCHITECT’S PROJECT NUMBER.
d. CONTRACTOR’S NAME AND ADDRESS.
e. DATE OF SUBMITTAL.
2. ARRANGE SCHEDULE OF VALUES CONSISTENT WITH
FORMAT OF AIA DOCUMENT G703.
3. ARRANGE THE SCHEDULE OF VALUES IN TABULAR
FORM WITH SEPARATE COLUMNS TO INDICATE THE
FOLLOWING FOR EACH ITEM LISTED:
a. RELATED SPECIFICATION SECTION OR DIVISION.
b. DESCRIPTION OF THE WORK.
c. NAME OF SUBCONTRACTOR.
d. NAME OF MANUFACTURER OR FABRICATOR.
e. NAME OF SUPPLIER.
f. CHANGE ORDERS (NUMBERS) THAT AFFECT VALUE.
g. DOLLAR VALUE OF THE FOLLOWING, AS A
PERCENTAGE OF THE CONTRACT SUM TO NEAREST
ONE-HUNDREDTH PERCENT, ADJUSTED TO TOTAL 100
PERCENT.
1) LABOR.
2) MATERIALS.
3) EQUIPMENT.
4) PROVIDE A BREAKDOWN OF THE CONTRACT
SUM IN ENOUGH DETAIL TO FACILITATE CONTINUED
EVALUATION OF APPLICATIONS FOR PAYMENT AND
PROGRESS REPORTS. COORDINATE WITH PROJECT
MANUAL TABLE OF CONTENTS. PROVIDE MULTIPLE
LINE ITEMS FOR PRINCIPAL SUBCONTRACT AMOUNTS
IN EXCESS OF FIVE PERCENT OF THE CONTRACT SUM.
h. INCLUDE SEPARATE LINE ITEMS UNDER CONTRACTOR
AND PRINCIPAL SUBCONTRACTS FOR PROJECT CLOSEOUT
REQUIREMENTS IN AN AMOUNT TOTALING FIVE PERCENT
OF THE CONTRACT SUM AND SUBCONTRACT AMOUNT.
4. ROUND AMOUNTS TO NEAREST WHOLE DOLLAR;
TOTAL SHALL EQUAL THE CONTRACT SUM.
5. PROVIDE A SEPARATE LINE ITEM IN THE SCHEDULE
OF VALUES FOR EACH PART OF THE WORK WHERE
APPLICATIONS FOR PAYMENT MAY INCLUDE MATERIALS OR
EQUIPMENT PURCHASED OR FABRICATED AND STORED, BUT
NOT YET INSTALLED.
a. DIFFERENTIATE BETWEEN ITEMS STORED ON-SITE
AND ITEMS STORED OFF-SITE. IF REQUIRED, INCLUDE
EVIDENCE OF INSURANCE.
7. PROVIDE SEPARATE LINE ITEMS IN THE SCHEDULE
OF VALUES FOR INITIAL COST OF MATERIALS, FOR EACH
SUBSEQUENT STAGE OF COMPLETION, AND FOR TOTAL
INSTALLED VALUE OF THAT PART OF THE WORK.
8. EACH ITEM IN THE SCHEDULE OF VALUES AND
APPLICATIONS FOR PAYMENT SHALL BE COMPLETE. INCLUDE
TOTAL COST AND PROPORTIONATE SHARE OF GENERAL
OVERHEAD AND PROFIT FOR EACH ITEM.
a. TEMPORARY FACILITIES AND OTHER MAJOR COST
ITEMS THAT ARE NOT DIRECT COST OF ACTUAL WORK-
IN-PLACE MAY BE SHOWN EITHER AS SEPARATE LINE
ITEMS IN THE SCHEDULE OF VALUES OR DISTRIBUTED
AS GENERAL OVERHEAD EXPENSE, AT CONTRACTOR’S
OPTION.
9. SCHEDULE UPDATING: UPDATE AND RESUBMIT THE
SCHEDULE OF VALUES BEFORE THE NEXT APPLICATIONS
FOR PAYMENT WHEN CHANGE ORDERS OR CONSTRUCTION
CHANGE DIRECTIVES RESULT IN A CHANGE IN THE CONTRACT
SUM.
1.5 APPLICATIONS FOR PAYMENT
A. EACH APPLICATION FOR PAYMENT FOLLOWING THE INITIAL
APPLICATION FOR PAYMENT SHALL BE CONSISTENT WITH PREVIOUS
APPLICATIONS AND PAYMENTS AS CERTIFIED BY ARCHITECT AND
PAID FOR BY OWNER .
1. INITIAL APPLICATION FOR PAYMENT, APPLICATION
FOR PAYMENT AT TIME OF SUBSTANTIAL COMPLETION,
AND FINAL APPLICATION FOR PAYMENT INVOLVE ADDITIONAL
REQUIREMENTS.
B. PAYMENT APPLICATION TIMES: THE DATE FOR EACH
PROGRESS PAYMENT IS INDICATED IN THE AGREEMENT BETWEEN
OWNER AND CONTRACTOR. THE PERIOD OF CONSTRUCTION WORK
COVERED BY EACH APPLICATION FOR PAYMENT IS THE PERIOD
INDICATED IN THE AGREEMENT.
C. APPLICATION FOR PAYMENT FORMS: AIA G-701-702
D. APPLICATION PREPARATION: COMPLETE EVERY ENTRY
ON FORM. NOTARIZE AND EXECUTE BY A PERSON AUTHORIZED
TO SIGN LEGAL DOCUMENTS ON BEHALF OF CONTRACTOR.
ARCHITECT WILL RETURN INCOMPLETE APPLICATIONS WITHOUT
ACTION.
1. ENTRIES SHALL MATCH DATA ON THE SCHEDULE OF
VALUES AND CONTRACTOR’S CONSTRUCTION SCHEDULE.
USE UPDATED SCHEDULES IF REVISIONS WERE MADE.
2. INCLUDE AMOUNTS FOR WORK COMPLETED
FOLLOWING PREVIOUS APPLICATION FOR PAYMENT,
WHETHER OR NOT PAYMENT HAS BEEN RECEIVED. INCLUDE
ONLY AMOUNTS FOR WORK COMPLETED AT TIME OF
APPLICATION FOR PAYMENT.
3. INCLUDE AMOUNTS OF CHANGE ORDERS AND
CONSTRUCTION CHANGE DIRECTIVES ISSUED BEFORE LAST
DAY OF CONSTRUCTION PERIOD COVERED BY APPLICATION.
4. INDICATE SEPARATE AMOUNTS FOR WORK BEING
CARRIED OUT UNDER OWNER-REQUESTED PROJECT
ACCELERATION.
E. STORED MATERIALS: INCLUDE IN APPLICATION FOR
PAYMENT AMOUNTS APPLIED FOR MATERIALS OR EQUIPMENT
PURCHASED OR FABRICATED AND STORED, BUT NOT YET
INSTALLED. DIFFERENTIATE BETWEEN ITEMS STORED ON-SITE AND
ITEMS STORED OFF-SITE.
1. PROVIDE CERTIFICATE OF INSURANCE, EVIDENCE OF
TRANSFER OF TITLE TO OWNER, AND CONSENT OF SURETY
TO PAYMENT, FOR STORED MATERIALS.
2. PROVIDE SUPPORTING DOCUMENTATION THAT
VERIFIES AMOUNT REQUESTED, SUCH AS PAID INVOICES.
MATCH AMOUNT REQUESTED WITH AMOUNTS INDICATED ON
DOCUMENTATION; DO NOT INCLUDE OVERHEAD AND PROFIT
ON STORED MATERIALS.
3. PROVIDE SUMMARY DOCUMENTATION FOR STORED
MATERIALS INDICATING THE FOLLOWING:
a. VALUE OF MATERIALS PREVIOUSLY STORED
AND REMAINING STORED AS OF DATE OF PREVIOUS
APPLICATIONS FOR PAYMENT.
b. VALUE OF PREVIOUSLY STORED MATERIALS PUT
IN PLACE AFTER DATE OF PREVIOUS APPLICATION
FOR PAYMENT AND ON OR BEFORE DATE OF CURRENT
APPLICATION FOR PAYMENT.
c. VALUE OF MATERIALS STORED SINCE DATE OF
PREVIOUS APPLICATION FOR PAYMENT AND REMAINING
STORED AS OF DATE OF CURRENT APPLICATION FOR
PAYMENT.
F. TRANSMITTAL: SUBMIT THREE SIGNED AND NOTARIZED
ORIGINAL COPIES OF EACH APPLICATION FOR PAYMENT TO
ARCHITECT BY A METHOD ENSURING RECEIPT WITHIN 24 HOURS.
ONE COPY SHALL INCLUDE WAIVERS OF LIEN AND SIMILAR
ATTACHMENTS IF REQUIRED.
1. TRANSMIT EACH COPY WITH A TRANSMITTAL FORM
LISTING ATTACHMENTS AND RECORDING APPROPRIATE
INFORMATION ABOUT APPLICATION.
G. WAIVERS OF MECHANIC’S LIEN: WITH EACH APPLICATION
FOR PAYMENT, SUBMIT WAIVERS OF MECHANIC’S LIEN FROM
ENTITIES LAWFULLY ENTITLED TO FILE A MECHANIC’S LIEN ARISING
OUT OF THE CONTRACT AND RELATED TO THE WORK COVERED BY
THE PAYMENT.
1. SUBMIT PARTIAL WAIVERS ON EACH ITEM FOR
AMOUNT REQUESTED IN PREVIOUS APPLICATION, AFTER
DEDUCTION FOR RETAINAGE, ON EACH ITEM.
2. WHEN AN APPLICATION SHOWS COMPLETION OF AN
ITEM, SUBMIT CONDITIONAL FINAL OR FULL WAIVERS.
3. OWNER RESERVES THE RIGHT TO DESIGNATE WHICH
ENTITIES INVOLVED IN THE WORK MUST SUBMIT WAIVERS.
4. WAIVER FORMS: SUBMIT EXECUTED WAIVERS OF LIEN
ON FORMS ACCEPTABLE TO OWNER.
H. INITIAL APPLICATION FOR PAYMENT: ADMINISTRATIVE
ACTIONS AND SUBMITTALS THAT MUST PRECEDE OR COINCIDE
WITH SUBMITTAL OF FIRST APPLICATION FOR PAYMENT INCLUDE
THE FOLLOWING:
1. LIST OF SUBCONTRACTORS.
2. SCHEDULE OF VALUES.
3. CONTRACTOR’S CONSTRUCTION SCHEDULE
(PRELIMINARY IF NOT FINAL).
4. PRODUCTS LIST (PRELIMINARY IF NOT FINAL).
5. SCHEDULE OF UNIT PRICES.
6. SUBMITTAL SCHEDULE (PRELIMINARY IF NOT FINAL).
7. LIST OF CONTRACTOR’S STAFF ASSIGNMENTS.
8. LIST OF CONTRACTOR’S PRINCIPAL CONSULTANTS.
9. COPIES OF BUILDING PERMITS.
10. COPIES OF AUTHORIZATIONS AND LICENSES FROM
AUTHORITIES HAVING JURISDICTION FOR PERFORMANCE
OF THE WORK.
11. INITIAL PROGRESS REPORT.
12. REPORT OF PRECONSTRUCTION CONFERENCE.
13. CERTIFICATES OF INSURANCE AND INSURANCE
POLICIES.
14. PERFORMANCE AND PAYMENT BONDS.
15. DATA NEEDED TO ACQUIRE OWNER’S INSURANCE.
I. APPLICATION FOR PAYMENT AT SUBSTANTIAL COMPLETION:
AFTER ARCHITECT ISSUES THE CERTIFICATE OF SUBSTANTIAL
COMPLETION, SUBMIT AN APPLICATION FOR PAYMENT SHOWING 100
PERCENT COMPLETION FOR PORTION OF THE WORK CLAIMED AS
SUBSTANTIALLY COMPLETE.
1. INCLUDE DOCUMENTATION SUPPORTING CLAIM THAT
THE WORK IS SUBSTANTIALLY COMPLETE AND A STATEMENT
SHOWING AN ACCOUNTING OF CHANGES TO THE CONTRACT
SUM. THIS APPLICATION SHALL REFLECT CERTIFICATE(S) OF
SUBSTANTIAL COMPLETION ISSUED PREVIOUSLY FOR OWNER
OCCUPANCY OF DESIGNATED PORTIONS OF THE WORK.
J. FINAL PAYMENT APPLICATION: AFTER COMPLETING PROJECT
CLOSEOUT REQUIREMENTS, SUBMIT FINAL APPLICATION FOR
PAYMENT WITH RELEASES AND SUPPORTING DOCUMENTATION NOT
PREVIOUSLY SUBMITTED AND ACCEPTED, INCLUDING, BUT NOT
LIMITED, TO THE FOLLOWING:
1. EVIDENCE OF COMPLETION OF PROJECT CLOSEOUT
REQUIREMENTS.
2. INSURANCE CERTIFICATES FOR PRODUCTS AND
COMPLETED OPERATIONS WHERE REQUIRED AND
2. PROOF THAT TAXES, FEES, AND SIMILAR OBLIGATIONS
WERE PAID.
3. UPDATED FINAL STATEMENT, ACCOUNTING FOR FINAL
CHANGES TO THE CONTRACT SUM.
4. AIA DOCUMENT G706, “CONTRACTOR’S AFFIDAVIT OF
PAYMENT OF DEBTS AND CLAIMS.”
5. AIA DOCUMENT G706A, “CONTRACTOR’S AFFIDAVIT OF
RELEASE OF LIENS.”
6. AIA DOCUMENT G707, “CONSENT OF SURETY TO FINAL
PAYMENT.”
7. EVIDENCE THAT CLAIMS HAVE BEEN SETTLED.
8. FINAL METER READINGS FOR UTILITIES, A MEASURED
RECORD OF STORED FUEL, AND SIMILAR DATA AS OF DATE
OF SUBSTANTIAL COMPLETION OR WHEN OWNER TOOK
POSSESSION OF AND ASSUMED RESPONSIBILITY FOR
CORRESPONDING ELEMENTS OF THE WORK.
9. FINAL LIQUIDATED DAMAGES SETTLEMENT
STATEMENT.
END OF SECTION 01 2900
SECTION 01 3100 - PROJECT MANAGEMENT AND
COORDINATION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND
OTHER DIVISION 01 SPECIFICATION SECTIONS, APPLY TO THIS
SECTION.
1.2 SUMMARY
A. SECTION INCLUDES ADMINISTRATIVE PROVISIONS FOR
COORDINATING CONSTRUCTION OPERATIONS ON PROJECT
INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
1. GENERAL COORDINATION PROCEDURES.
2. COORDINATION DRAWINGS.
3. REQUESTS FOR INFORMATION (RFIS).
4. PROJECT MEETINGS.
B. EACH CONTRACTOR SHALL PARTICIPATE IN COORDINATION
REQUIREMENTS. CERTAIN AREAS OF RESPONSIBILITY ARE
ASSIGNED TO A SPECIFIC CONTRACTOR.
C. RELATED REQUIREMENTS:
1. DIVISION 01 SECTION “CONSTRUCTION PROGRESS
GI101
conformed set
revisions :
p r o j e c t # :
d a t e :
20.0550
- june 4, 2021
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
GI202
Sheet Specs
20.0550
- april 7, 2021
Rexburg
Rowhouses
bid set
DOCUMENTATION” FOR PREPARING AND SUBMITTING
CONTRACTOR’S CONSTRUCTION SCHEDULE.
2. DIVISION 01 SECTION “EXECUTION” FOR PROCEDURES
FOR COORDINATING GENERAL INSTALLATION AND FIELD-
ENGINEERING SERVICES, INCLUDING ESTABLISHMENT OF
BENCHMARKS AND CONTROL POINTS.
3. DIVISION 01 SECTION “CLOSEOUT PROCEDURES” FOR
COORDINATING CLOSEOUT OF THE CONTRACT.
1.3 DEFINITIONS
A. RFI: REQUEST FROM OWNER, TENANT, ARCHITECT,
OR CONTRACTOR SEEKING INFORMATION REQUIRED BY OR
CLARIFICATIONS OF THE CONTRACT DOCUMENTS.
1.4 INFORMATIONAL SUBMITTALS
A. SUBCONTRACT LIST: PREPARE A WRITTEN SUMMARY
IDENTIFYING INDIVIDUALS OR FIRMS PROPOSED FOR EACH PORTION
OF THE WORK, INCLUDING THOSE WHO ARE TO FURNISH PRODUCTS
OR EQUIPMENT FABRICATED TO A SPECIAL DESIGN. INCLUDE THE
FOLLOWING INFORMATION IN TABULAR FORM:
1. NAME, ADDRESS, AND TELEPHONE NUMBER OF ENTITY
PERFORMING SUBCONTRACT OR
SUPPLYING PRODUCTS.
2. NUMBER AND TITLE OF RELATED SPECIFICATION
SECTION(S) COVERED BY SUBCONTRACT.
3. DRAWING NUMBER AND DETAIL REFERENCES, AS
APPROPRIATE, COVERED BY SUBCONTRACT.
B. KEY PERSONNEL NAMES: WITHIN 15 DAYS OF STARTING
CONSTRUCTION OPERATIONS, SUBMIT A LIST OF KEY PERSONNEL
ASSIGNMENTS, INCLUDING SUPERINTENDENT AND OTHER
PERSONNEL IN ATTENDANCE AT PROJECT SITE. IDENTIFY
INDIVIDUALS AND THEIR DUTIES AND RESPONSIBILITIES; LIST
ADDRESSES AND TELEPHONE NUMBERS, INCLUDING HOME, OFFICE,
AND CELLULAR TELEPHONE NUMBERS AND E-MAIL ADDRESSES.
PROVIDE NAMES, ADDRESSES, AND TELEPHONE NUMBERS OF
INDIVIDUALS ASSIGNED AS ALTERNATES IN THE ABSENCE OF
INDIVIDUALS ASSIGNED TO PROJECT.
1. POST COPIES OF LIST IN PROJECT MEETING ROOM,
IN TEMPORARY FIELD OFFICE, AND BY EACH TEMPORARY
TELEPHONE. KEEP LIST CURRENT AT ALL TIMES.
1.5 GENERAL COORDINATION PROCEDURES
A. COORDINATION: COORDINATE CONSTRUCTION OPERATIONS
INCLUDED IN DIFFERENT SECTIONS OF THE SPECIFICATIONS TO
ENSURE EFFICIENT AND ORDERLY INSTALLATION OF EACH PART OF
THE WORK. COORDINATE CONSTRUCTION OPERATIONS, INCLUDED
IN DIFFERENT SECTIONS, THAT DEPEND ON EACH OTHER FOR
PROPER INSTALLATION, CONNECTION, AND OPERATION.
1. SCHEDULE CONSTRUCTION OPERATIONS IN
SEQUENCE REQUIRED TO OBTAIN THE BEST RESULTS WHERE
INSTALLATION OF ONE PART OF THE WORK DEPENDS ON
INSTALLATION OF OTHER COMPONENTS, BEFORE OR AFTER
ITS OWN INSTALLATION.
2. COORDINATE INSTALLATION OF DIFFERENT
COMPONENTS TO ENSURE MAXIMUM PERFORMANCE AND
ACCESSIBILITY FOR REQUIRED MAINTENANCE, SERVICE, AND
REPAIR.
3. MAKE ADEQUATE PROVISIONS TO ACCOMMODATE
ITEMS SCHEDULED FOR LATER INSTALLATION.
4. TAKE INTO CONSIDERATION THE REQUIRED PHASING OF
THE PROJECT (ONE FLOOR AT A TIME).
B. PREPARE MEMORANDA FOR DISTRIBUTION TO EACH PARTY
INVOLVED, OUTLINING SPECIAL PROCEDURES REQUIRED FOR
COORDINATION. INCLUDE SUCH ITEMS AS REQUIRED NOTICES,
REPORTS, AND LIST OF ATTENDEES AT MEETINGS.
1. PREPARE SIMILAR MEMORANDA FOR OWNER AND
SEPARATE CONTRACTORS IF COORDINATION OF THEIR WORK
IS REQUIRED.
C. ADMINISTRATIVE PROCEDURES: COORDINATE SCHEDULING
AND TIMING OF REQUIRED ADMINISTRATIVE PROCEDURES
WITH OTHER CONSTRUCTION ACTIVITIES TO AVOID CONFLICTS
AND TO ENSURE ORDERLY PROGRESS OF THE WORK. SUCH
ADMINISTRATIVE ACTIVITIES INCLUDE, BUT ARE NOT LIMITED TO, THE
FOLLOWING:
1. PREPARATION OF CONTRACTOR’S CONSTRUCTION
SCHEDULE.
2. PREPARATION OF THE SCHEDULE OF VALUES.
3. INSTALLATION AND REMOVAL OF TEMPORARY
FACILITIES AND CONTROLS.
4. DELIVERY AND PROCESSING OF SUBMITTALS.
5. PROGRESS MEETINGS.
6. PREINSTALLATION CONFERENCES.
7. PROJECT CLOSEOUT ACTIVITIES.
8. STARTUP AND ADJUSTMENT OF SYSTEMS.
D. CONSERVATION: COORDINATE CONSTRUCTION ACTIVITIES
TO ENSURE THAT OPERATIONS ARE CARRIED OUT WITH
CONSIDERATION GIVEN TO CONSERVATION OF ENERGY, WATER,
AND MATERIALS. COORDINATE USE OF TEMPORARY UTILITIES TO
MINIMIZE WASTE.
1. SALVAGE MATERIALS AND EQUIPMENT INVOLVED IN
PERFORMANCE OF, BUT NOT ACTUALLY INCORPORATED INTO,
THE WORK. SEE OTHER SECTIONS FOR DISPOSITION OF
SALVAGED MATERIALS THAT ARE DESIGNATED AS OWNER’S
PROPERTY.
1.6 COORDINATION DRAWINGS
A. COORDINATION DRAWINGS, GENERAL: PREPARE
COORDINATION DRAWINGS ACCORDING TO REQUIREMENTS IN
INDIVIDUAL SECTIONS, AND ADDITIONALLY WHERE INSTALLATION
IS NOT COMPLETELY SHOWN ON SHOP DRAWINGS, WHERE
LIMITED SPACE AVAILABILITY NECESSITATES COORDINATION, OR
IF COORDINATION IS REQUIRED TO FACILITATE INTEGRATION OF
PRODUCTS AND MATERIALS FABRICATED OR INSTALLED BY MORE
THAN ONE ENTITY.
1. CONTENT: PROJECT-SPECIFIC INFORMATION, DRAWN
ACCURATELY TO A SCALE LARGE ENOUGH TO INDICATE
AND RESOLVE CONFLICTS. DO NOT BASE COORDINATION
DRAWINGS ON STANDARD PRINTED DATA. INCLUDE THE
FOLLOWING INFORMATION, AS APPLICABLE:
a. USE APPLICABLE DRAWINGS AS A BASIS FOR
PREPARATION OF COORDINATION DRAWINGS. PREPARE
SECTIONS, ELEVATIONS, AND DETAILS AS NEEDED TO
DESCRIBE RELATIONSHIP OF VARIOUS SYSTEMS AND
COMPONENTS.
b. COORDINATE THE ADDITION OF TRADE-SPECIFIC
INFORMATION TO THE COORDINATION DRAWINGS BY
MULTIPLE CONTRACTORS IN A SEQUENCE THAT BEST
PROVIDES FOR COORDINATION OF THE
INFORMATION AND RESOLUTION OF CONFLICTS BETWEEN
INSTALLED COMPONENTS BEFORE SUBMITTING FOR
REVIEW.
c. INDICATE FUNCTIONAL AND SPATIAL RELATIONSHIPS OF
COMPONENTS OF ARCHITECTURAL, STRUCTURAL, CIVIL,
MECHANICAL, AND ELECTRICAL SYSTEMS.
d. INDICATE SPACE REQUIREMENTS FOR ROUTINE
MAINTENANCE AND FOR ANTICIPATED REPLACEMENT OF
COMPONENTS DURING THE LIFE OF THE INSTALLATION.
e. SHOW LOCATION AND SIZE OF ACCESS DOORS
REQUIRED FOR ACCESS TO CONCEALED DAMPERS,
VALVES, AND OTHER CONTROLS.
f. INDICATE REQUIRED INSTALLATION SEQUENCES.
g. INDICATE DIMENSIONS SHOWN ON THE DRAWINGS.
SPECIFICALLY NOTE DIMENSIONS THAT APPEAR TO BE IN
CONFLICT WITH SUBMITTED EQUIPMENT AND MINIMUM
CLEARANCE REQUIREMENTS. PROVIDE ALTERNATE
SKETCHES TO ARCHITECT INDICATING PROPOSED
RESOLUTION OF SUCH CONFLICTS. MINOR DIMENSION
CHANGES AND DIFFICULT INSTALLATIONS WILL NOT BE
CONSIDERED CHANGES TO THE CONTRACT.
B. COORDINATION DRAWING ORGANIZATION: ORGANIZE
COORDINATION DRAWINGS AS FOLLOWS:
1. FLOOR PLANS AND REFLECTED CEILING PLANS:
SHOW ARCHITECTURAL AND STRUCTURAL ELEMENTS, AND
MECHANICAL, PLUMBING, FIRE-PROTECTION, FIRE-ALARM,
AND ELECTRICAL WORK. SHOW LOCATIONS OF VISIBLE
CEILING-MOUNTED DEVICES RELATIVE TO ACOUSTICAL
CEILING GRID. SUPPLEMENT PLAN DRAWINGS WITH
SECTION DRAWINGS WHERE REQUIRED TO ADEQUATELY
REPRESENT THE WORK.
2. MECHANICAL ROOMS: PROVIDE COORDINATION
DRAWINGS FOR MECHANICAL ROOMS SHOWING PLANS AND
ELEVATIONS OF MECHANICAL, PLUMBING, FIRE-PROTECTION,
FIRE-ALARM, AND ELECTRICAL EQUIPMENT.
3. SLAB EDGE AND EMBEDDED ITEMS: INDICATE SLAB
EDGE LOCATIONS AND SIZES AND LOCATIONS OF EMBEDDED
ITEMS FOR METAL FABRICATIONS, SLEEVES, ANCHOR BOLTS,
BEARING PLATES, ANGLES, DOOR FLOOR
CLOSERS, SLAB DEPRESSIONS FOR FLOOR FINISHES, CURBS
AND HOUSEKEEPING PADS, AND SIMILAR ITEMS.
4. MECHANICAL AND PLUMBING WORK: SHOW THE
FOLLOWING:
a. SIZES AND BOTTOM ELEVATIONS OF DUCTWORK,
PIPING, AND CONDUIT RUNS, INCLUDING INSULATION,
BRACING, FLANGES, AND SUPPORT SYSTEMS.
b. DIMENSIONS OF MAJOR COMPONENTS, SUCH
AS DAMPERS, VALVES, DIFFUSERS, ACCESS DOORS,
CLEANOUTS AND ELECTRICAL DISTRIBUTION EQUIPMENT.
c. FIRE-RATED ENCLOSURES AROUND DUCTWORK.
5. ELECTRICAL WORK: SHOW THE FOLLOWING:
a. RUNS OF VERTICAL AND HORIZONTAL CONDUIT 1-1/4
INCHES IN DIAMETER AND LARGER.
b. LIGHT FIXTURE, EXIT LIGHT, EMERGENCY BATTERY
PACK, SMOKE DETECTOR, AND OTHER FIRE ALARM
LOCATIONS.
c. PANEL BOARD, SWITCH BOARD, SWITCHGEAR,
TRANSFORMER, BUSWAY, GENERATOR, AND MOTOR
CONTROL CENTER LOCATIONS.
d. LOCATION OF PULL BOXES AND JUNCTION BOXES,
DIMENSIONED FROM COLUMN CENTER LINES.
6. REVIEW: ARCHITECT WILL REVIEW COORDINATION
DRAWINGS TO CONFIRM THAT THE WORK IS BEING
COORDINATED, BUT NOT FOR THE DETAILS OF THE
COORDINATION, WHICH ARE CONTRACTOR’S RESPONSIBILITY.
IF ARCHITECT DETERMINES THAT COORDINATION DRAWINGS
ARE NOT BEING PREPARED IN SUFFICIENT SCOPE OR DETAIL,
OR ARE OTHERWISE DEFICIENT, ARCHITECT WILL SO INFORM
CONTRACTOR, WHO SHALL MAKE CHANGES AS DIRECTED AND
RESUBMIT.
7. COORDINATION DRAWING PRINTS: PREPARE
COORDINATION DRAWING PRINTS ACCORDING TO
REQUIREMENTS IN DIVISION 01 SECTION “SUBMITTAL
PROCEDURES.”
1.7 REQUESTS FOR INFORMATION (RFIS)
A. GENERAL: IMMEDIATELY ON DISCOVERY OF THE NEED FOR
ADDITIONAL INFORMATION OR INTERPRETATION OF THE CONTRACT
DOCUMENTS, CONTRACTOR SHALL PREPARE AND SUBMIT AN RFI IN
THE FORM SPECIFIED.
1. ARCHITECT WILL RETURN RFIS SUBMITTED
TO ARCHITECT BY OTHER ENTITIES CONTROLLED BY
CONTRACTOR WITH NO RESPONSE.
2. COORDINATE AND SUBMIT RFIS IN A PROMPT MANNER
SO AS TO AVOID DELAYS IN CONTRACTOR’S WORK OR WORK
OF SUBCONTRACTORS.
B. CONTENT OF THE RFI: INCLUDE A DETAILED, LEGIBLE
DESCRIPTION OF ITEM NEEDING INFORMATION OR INTERPRETATION
AND THE FOLLOWING:
1. PROJECT NAME.
2. PROJECT NUMBER.
3. DATE.
4. NAME OF CONTRACTOR.
5. NAME OF ARCHITECT.
6. RFI NUMBER, NUMBERED SEQUENTIALLY.
7. RFI SUBJECT.
8. SPECIFICATION SECTION NUMBER AND TITLE AND
RELATED PARAGRAPHS, AS APPROPRIATE.
9. DRAWING NUMBER AND DETAIL REFERENCES, AS
APPROPRIATE.
10. FIELD DIMENSIONS AND CONDITIONS, AS APPROPRIATE.
11. CONTRACTOR’S SUGGESTED RESOLUTION. IF
CONTRACTOR’S SUGGESTED RESOLUTION IMPACTS THE
CONTRACT TIME OR THE CONTRACT SUM, CONTRACTOR
SHALL STATE IMPACT IN THE RFI.
12. CONTRACTOR’S SIGNATURE.
13. ATTACHMENTS: INCLUDE SKETCHES, DESCRIPTIONS,
MEASUREMENTS, PHOTOS, PRODUCT DATA, SHOP DRAWINGS,
COORDINATION DRAWINGS, AND OTHER INFORMATION
NECESSARY TO FULLY DESCRIBE ITEMS NEEDING
INTERPRETATION.
a. INCLUDE DIMENSIONS, THICKNESSES, STRUCTURAL
GRID REFERENCES, AND DETAILS OF AFFECTED
MATERIALS, ASSEMBLIES, AND ATTACHMENTS ON
ATTACHED SKETCHES.
14. STATEMENT AS TO COST OR NO COST IF COST. COST
DIFFERENCE TO BE SUBMITTED NO MORE THAN 7 DAYS AFTER
ANSWER IS PROVIDED
C. RFI FORMS: AIA DOCUMENT G716.
D. ARCHITECT’S ACTION: ARCHITECT WILL REVIEW EACH RFI,
DETERMINE ACTION REQUIRED, AND RESPOND. ALLOW SEVEN
WORKING DAYS FOR ARCHITECT’S RESPONSE FOR EACH RFI. RFIS
RECEIVED BY ARCHITECT AFTER 1:00 P.M. WILL BE CONSIDERED
AS RECEIVED THE FOLLOWING WORKING DAY.
1. THE FOLLOWING CONTRACTOR-GENERATED RFIS WILL
BE RETURNED WITHOUT ACTION:
a. REQUESTS FOR APPROVAL OF SUBMITTALS.
b. REQUESTS FOR APPROVAL OF SUBSTITUTIONS.
c. REQUESTS FOR APPROVAL OF CONTRACTOR’S MEANS
AND METHODS.
d. REQUESTS FOR COORDINATION INFORMATION ALREADY
INDICATED IN THE CONTRACT DOCUMENTS.
e. REQUESTS FOR ADJUSTMENTS IN THE CONTRACT TIME
OR THE CONTRACT SUM.
f. REQUESTS FOR INTERPRETATION OF ARCHITECT’S
ACTIONS ON SUBMITTALS.
g. INCOMPLETE RFIS OR INACCURATELY PREPARED RFIS.
2. ARCHITECT’S ACTION MAY INCLUDE A REQUEST FOR
ADDITIONAL INFORMATION, IN WHICH CASE ARCHITECT’S
TIME FOR RESPONSE WILL DATE FROM TIME OF RECEIPT OF
ADDITIONAL INFORMATION.
3. ARCHITECT’S ACTION ON RFIS THAT MAY RESULT IN A
CHANGE TO THE CONTRACT TIME OR THE CONTRACT SUM
MAY BE ELIGIBLE FOR CONTRACTOR TO SUBMIT CHANGE
PROPOSAL ACCORDING TO DIVISION 01 SECTION “CONTRACT
MODIFICATION PROCEDURES.”
a. IF CONTRACTOR BELIEVES THE RFI RESPONSE
WARRANTS CHANGE IN THE CONTRACT TIME OR THE
CONTRACT SUM, NOTIFY ARCHITECT IN WRITING WITHIN 10
DAYS OF RECEIPT OF THE RFI RESPONSE.
E. RFI LOG: PREPARE, MAINTAIN, AND SUBMIT A TABULAR LOG
OF RFIS ORGANIZED BY THE RFI NUMBER. SUBMIT LOG WEEKLY.
INCLUDE THE FOLLOWING:
1. PROJECT NAME.
2. NAME AND ADDRESS OF CONTRACTOR.
3. NAME AND ADDRESS OF ARCHITECT.
4. RFI NUMBER INCLUDING RFIS THAT WERE RETURNED
WITHOUT ACTION OR WITHDRAWN.
5. RFI DESCRIPTION.
6. DATE THE RFI WAS SUBMITTED.
7. DATE ARCHITECT’S RESPONSE WAS RECEIVED.
F. ON RECEIPT OF ARCHITECT’S ACTION, UPDATE THE
RFI LOG AND IMMEDIATELY DISTRIBUTE THE RFI RESPONSE
TO AFFECTED PARTIES. REVIEW RESPONSE AND NOTIFY
ARCHITECT WITHIN SEVEN DAYS IF CONTRACTOR
DISAGREES WITH RESPONSE.
1. IDENTIFICATION OF RELATED MINOR CHANGE IN
THE WORK, CONSTRUCTION CHANGE DIRECTIVE, AND
PROPOSAL REQUEST, AS APPROPRIATE.
2. IDENTIFICATION OF RELATED FIELD ORDER, WORK
CHANGE DIRECTIVE, AND PROPOSAL REQUEST, AS
APPROPRIATE.
1.8 PROJECT MEETINGS
THERE IS A POSSIBILITY THAT THE TI CONTRACTOR WILL BE ONSITE
WORKING IN A BUILDING BEING CONSTRUCTED BY ANOTHER CONTRACTOR.
TI CONTRACTOR WILL BE REQUIRED TO ATTEND WEEKLY OWNER
COORDINATION MEETINGS WITH THE CORE/SHELL CONTRACTOR.
A. GENERAL: SCHEDULE AND CONDUCT MEETINGS AND
CONFERENCES AT PROJECT SITE UNLESS OTHERWISE INDICATED.
1. ATTENDEES: INFORM PARTICIPANTS AND OTHERS
INVOLVED, AND INDIVIDUALS WHOSE PRESENCE IS REQUIRED,
OF DATE AND TIME OF EACH MEETING. NOTIFY OWNER AND
ARCHITECT OF SCHEDULED MEETING DATES AND TIMES.
2. AGENDA: PREPARE THE MEETING AGENDA.
DISTRIBUTE THE AGENDA TO ALL INVITED ATTENDEES.
3. MINUTES: ENTITY RESPONSIBLE FOR CONDUCTING
MEETING WILL RECORD SIGNIFICANT DISCUSSIONS AND
AGREEMENTS ACHIEVED. DISTRIBUTE THE MEETING MINUTES
TO EVERYONE CONCERNED, INCLUDING OWNER AND
ARCHITECT, WITHIN THREE DAYS OF THE MEETING.
B. PRECONSTRUCTION CONFERENCE: SCHEDULE AND
CONDUCT A PRECONSTRUCTION CONFERENCE BEFORE STARTING
CONSTRUCTION, AT A TIME CONVENIENT TO OWNER AND ARCHITECT,
BUT NO LATER THAN 15 DAYS AFTER EXECUTION OF THE
AGREEMENT.
1. CONDUCT THE CONFERENCE TO REVIEW
RESPONSIBILITIES AND PERSONNEL ASSIGNMENTS.
2. ATTENDEES: AUTHORIZED REPRESENTATIVES OF
OWNER ARCHITECT, AND THEIR CONSULTANTS; CONTRACTOR
AND ITS SUPERINTENDENT; MAJOR SUBCONTRACTORS;
SUPPLIERS; AND OTHER CONCERNED PARTIES SHALL ATTEND
THE CONFERENCE. PARTICIPANTS AT THE CONFERENCE
SHALL BE FAMILIAR WITH PROJECT AND AUTHORIZED TO
CONCLUDE MATTERS RELATING TO THE WORK.
3. AGENDA: DISCUSS ITEMS OF SIGNIFICANCE THAT
COULD AFFECT PROGRESS, INCLUDING THE FOLLOWING:
a. TENTATIVE CONSTRUCTION SCHEDULE.
b. CRITICAL WORK SEQUENCING AND LONG-LEAD ITEMS.
c. DESIGNATION OF KEY PERSONNEL AND THEIR DUTIES.
d. LINES OF COMMUNICATIONS.
e. PROCEDURES FOR PROCESSING FIELD DECISIONS AND
CHANGE ORDERS.
f. PROCEDURES FOR RFIS.
g. PROCEDURES FOR TESTING AND INSPECTING.
h. PROCEDURES FOR PROCESSING APPLICATIONS FOR
PAYMENT.
i. DISTRIBUTION OF THE CONTRACT DOCUMENTS.
j. SUBMITTAL PROCEDURES.
k. PREPARATION OF RECORD DOCUMENTS.
l. USE OF THE PREMISES AND EXISTING BUILDING.
m. WORKING HOURS.
n. RESPONSIBILITY FOR TEMPORARY FACILITIES AND
CONTROLS.
o. PROCEDURES FOR DISRUPTIONS AND SHUTDOWNS.
p. PARKING AVAILABILITY.
q. OFFICE, WORK, AND STORAGE AREAS.
r. EQUIPMENT DELIVERIES AND PRIORITIES.
s. FIRST AID.
t. SECURITY.
u. PROGRESS CLEANING.
4. MINUTES: ENTITY RESPONSIBLE FOR CONDUCTING
MEETING WILL RECORD AND DISTRIBUTE MEETING MINUTES.
C. PREINSTALLATION CONFERENCES: CONDUCT A
PREINSTALLATION CONFERENCE AT PROJECT SITE BEFORE EACH
CONSTRUCTION ACTIVITY THAT REQUIRES COORDINATION WITH
OTHER CONSTRUCTION.
1. ATTENDEES: INSTALLER AND REPRESENTATIVES
OF MANUFACTURERS AND FABRICATORS INVOLVED IN OR
AFFECTED BY THE INSTALLATION AND ITS COORDINATION OR
INTEGRATION WITH OTHER MATERIALS AND INSTALLATIONS
THAT HAVE PRECEDED OR WILL FOLLOW, SHALL ATTEND
THE MEETING. ADVISE ARCHITECT OF SCHEDULED MEETING
DATES.
2. AGENDA: REVIEW PROGRESS OF OTHER
CONSTRUCTION ACTIVITIES AND PREPARATIONS FOR THE
PARTICULAR ACTIVITY UNDER CONSIDERATION, INCLUDING
REQUIREMENTS FOR THE FOLLOWING:
a. CONTRACT DOCUMENTS.
b. OPTIONS.
c. RELATED RFIS.
d. RELATED CHANGE ORDERS.
e. PURCHASES.
f. DELIVERIES.
g. SUBMITTALS.
h. REVIEW OF MOCKUPS.
i. POSSIBLE CONFLICTS.
j. COMPATIBILITY REQUIREMENTS.
k. TIME SCHEDULES.
l. WEATHER LIMITATIONS.
m. MANUFACTURER’S WRITTEN INSTRUCTIONS.
n. WARRANTY REQUIREMENTS.
o. COMPATIBILITY OF MATERIALS.
p. ACCEPTABILITY OF SUBSTRATES.
q. TEMPORARY FACILITIES AND CONTROLS.
r. SPACE AND ACCESS LIMITATIONS.
s. REGULATIONS OF AUTHORITIES HAVING JURISDICTION.
t. TESTING AND INSPECTING REQUIREMENTS.
u. INSTALLATION PROCEDURES.
v. COORDINATION WITH OTHER WORK.
w. REQUIRED PERFORMANCE RESULTS.
x. PROTECTION OF ADJACENT WORK.
y. PROTECTION OF CONSTRUCTION AND PERSONNEL.
3. RECORD SIGNIFICANT CONFERENCE DISCUSSIONS,
AGREEMENTS, AND DISAGREEMENTS, INCLUDING REQUIRED
CORRECTIVE MEASURES AND ACTIONS.
4. REPORTING: DISTRIBUTE MINUTES OF THE MEETING
TO EACH PARTY PRESENT AND TO OTHER PARTIES REQUIRING
INFORMATION.
5. DO NOT PROCEED WITH INSTALLATION IF THE
CONFERENCE CANNOT BE SUCCESSFULLY CONCLUDED.
INITIATE WHATEVER ACTIONS ARE NECESSARY TO RESOLVE
IMPEDIMENTS TO PERFORMANCE OF THE WORK AND
RECONVENE THE CONFERENCE AT EARLIEST FEASIBLE DATE.
D. PROJECT CLOSEOUT CONFERENCE: SCHEDULE AND
CONDUCT A PROJECT CLOSEOUT CONFERENCE, AT A TIME
CONVENIENT TO OWNER AND ARCHITECT, BUT NO LATER THAN
10 DAYS PRIOR TO THE SCHEDULED DATE OF SUBSTANTIAL
COMPLETION.
1. CONDUCT THE CONFERENCE TO REVIEW
REQUIREMENTS AND RESPONSIBILITIES RELATED TO PROJECT
CLOSEOUT.
2. ATTENDEES: AUTHORIZED REPRESENTATIVES OF
OWNER, ARCHITECT, AND THEIR CONSULTANTS; CONTRACTOR
AND ITS SUPERINTENDENT; MAJOR SUBCONTRACTORS;
SUPPLIERS; AND OTHER CONCERNED PARTIES SHALL
ATTEND THE MEETING. PARTICIPANTS AT THE MEETING SHALL
BE FAMILIAR WITH PROJECT AND AUTHORIZED TO CONCLUDE
MATTERS RELATING TO THE WORK.
3. AGENDA: DISCUSS ITEMS OF SIGNIFICANCE THAT
COULD AFFECT OR DELAY PROJECT CLOSEOUT, INCLUDING
THE FOLLOWING:
a. PREPARATION OF RECORD DOCUMENTS.
b. PROCEDURES REQUIRED PRIOR TO INSPECTION FOR
SUBSTANTIAL COMPLETION AND FOR FINAL INSPECTION
FOR ACCEPTANCE.
c. SUBMITTAL OF WRITTEN WARRANTIES.
d. REQUIREMENTS FOR PREPARING OPERATIONS AND
MAINTENANCE DATA.
e. REQUIREMENTS FOR DELIVERY OF MATERIAL SAMPLES,
ATTIC STOCK, AND SPARE PARTS.
f. REQUIREMENTS FOR DEMONSTRATION AND TRAINING.
g. PREPARATION OF CONTRACTOR’S PUNCH LIST.
h. PROCEDURES FOR PROCESSING APPLICATIONS FOR
PAYMENT AT SUBSTANTIAL COMPLETION AND FOR FINAL
PAYMENT.
i. SUBMITTAL PROCEDURES.
j. INSTALLATION OF OWNER’S FURNITURE, FIXTURES, AND
EQUIPMENT.
k. RESPONSIBILITY FOR REMOVING TEMPORARY
FACILITIES AND CONTROLS.
4. MINUTES: ENTITY CONDUCTING MEETING WILL RECORD
AND DISTRIBUTE MEETING MINUTES.
E. PROGRESS MEETINGS: CONDUCT PROGRESS MEETINGS AT
WEEKLY INTERVALS.
1. COORDINATE DATES OF MEETINGS WITH PREPARATION
OF PAYMENT REQUESTS.
2. ATTENDEES: IN ADDITION TO REPRESENTATIVES
OF OWNER AND ARCHITECT, EACH CONTRACTOR,
SUBCONTRACTOR, SUPPLIER, AND OTHER ENTITY
CONCERNED WITH CURRENT PROGRESS OR INVOLVED IN
PLANNING, COORDINATION, OR PERFORMANCE OF FUTURE
ACTIVITIES SHALL BE REPRESENTED AT THESE MEETINGS
AS NEEDED. ALL PARTICIPANTS AT THE MEETING SHALL BE
FAMILIAR WITH PROJECT AND AUTHORIZED TO CONCLUDE
MATTERS RELATING TO THE WORK.
3. AGENDA: REVIEW AND CORRECT OR APPROVE
MINUTES OF PREVIOUS PROGRESS MEETING. REVIEW OTHER
ITEMS OF SIGNIFICANCE THAT COULD AFFECT PROGRESS.
INCLUDE TOPICS FOR DISCUSSION AS APPROPRIATE TO
STATUS OF PROJECT.
a. CONTRACTOR’S CONSTRUCTION SCHEDULE: REVIEW
PROGRESS SINCE THE LAST MEETING. DETERMINE
WHETHER EACH ACTIVITY IS ON TIME, AHEAD OF
SCHEDULE, OR BEHIND SCHEDULE, IN RELATION TO
CONTRACTOR’S CONSTRUCTION SCHEDULE. DETERMINE
HOW CONSTRUCTION BEHIND SCHEDULE WILL BE
EXPEDITED; SECURE COMMITMENTS FROM
PARTIES INVOLVED TO DO SO. DISCUSS WHETHER
SCHEDULE REVISIONS ARE REQUIRED TO ENSURE
THAT CURRENT AND SUBSEQUENT ACTIVITIES WILL BE
COMPLETED WITHIN THE
CONTRACT TIME.
1) REVIEW SCHEDULE FOR NEXT PERIOD.
b. REVIEW PRESENT AND FUTURE NEEDS OF EACH
ENTITY PRESENT, INCLUDING THE FOLLOWING:
1) INTERFACE REQUIREMENTS.
2) SEQUENCE OF OPERATIONS.
3) STATUS OF SUBMITTALS.
4) DELIVERIES.
5) OFF-SITE FABRICATION.
6) ACCESS.
7) SITE UTILIZATION.
8) TEMPORARY FACILITIES AND CONTROLS.
9) PROGRESS CLEANING.
10) QUALITY AND WORK STANDARDS.
11) STATUS OF CORRECTION OF DEFICIENT ITEMS.
12) FIELD OBSERVATIONS.
13) STATUS OF RFIS.
14) STATUS OF PROPOSAL REQUESTS.
15) PENDING CHANGES.
16) STATUS OF CHANGE ORDERS.
17) PENDING CLAIMS AND DISPUTES.
18) DOCUMENTATION OF INFORMATION FOR
PAYMENT REQUESTS.
4. MINUTES: ENTITY RESPONSIBLE FOR CONDUCTING
THE MEETING WILL RECORD AND DISTRIBUTE THE MEETING
MINUTES TO EACH PARTY PRESENT AND TO PARTIES
REQUIRING INFORMATION.
a. SCHEDULE UPDATING: REVISE CONTRACTOR’S
CONSTRUCTION SCHEDULE AFTER EACH PROGRESS
MEETING WHERE REVISIONS TO THE SCHEDULE HAVE
BEEN MADE OR RECOGNIZED. ISSUE REVISED
SCHEDULE CONCURRENTLY WITH THE REPORT OF EACH
MEETING.
F. COORDINATION MEETINGS: CONDUCT PROJECT
COORDINATION MEETINGS AT WEEKLY INTERVALS. PROJECT
COORDINATION MEETINGS ARE IN ADDITION TO SPECIFIC MEETINGS
HELD FOR OTHER PURPOSES, SUCH AS PROGRESS MEETINGS AND
PREINSTALLATION CONFERENCES.
1. ATTENDEES: IN ADDITION TO REPRESENTATIVES OF
OWNER AND ARCHITECT AS NEEDED, EACH CONTRACTOR,
SUBCONTRACTOR, SUPPLIER, AND OTHER ENTITY
CONCERNED WITH CURRENT PROGRESS OR INVOLVED IN
PLANNING, COORDINATION, OR PERFORMANCE OF FUTURE
ACTIVITIES SHALL BE REPRESENTED AT THESE MEETINGS.
ALL PARTICIPANTS AT THE MEETINGS SHALL BE FAMILIAR
WITH PROJECT AND AUTHORIZED TO CONCLUDE MATTERS
RELATING TO THE WORK.
2. AGENDA: REVIEW AND CORRECT OR APPROVE
MINUTES OF THE PREVIOUS COORDINATION MEETING.
REVIEW OTHER ITEMS OF SIGNIFICANCE THAT COULD
AFFECT PROGRESS. INCLUDE TOPICS FOR DISCUSSION AS
APPROPRIATE TO STATUS OF PROJECT.
a. COMBINED CONTRACTOR’S CONSTRUCTION SCHEDULE:
REVIEW PROGRESS SINCE THE LAST COORDINATION
MEETING. DETERMINE WHETHER EACH CONTRACT IS ON
TIME, AHEAD OF SCHEDULE, OR BEHIND SCHEDULE, IN
RELATION TO COMBINED CONTRACTOR’S CONSTRUCTION
SCHEDULE. DETERMINE HOW CONSTRUCTION BEHIND
SCHEDULE WILL BE EXPEDITED; SECURE COMMITMENTS
FROM PARTIES INVOLVED TO DO SO. DISCUSS WHETHER
SCHEDULE REVISIONS ARE REQUIRED TO ENSURE
THAT CURRENT AND SUBSEQUENT ACTIVITIES WILL BE
COMPLETED WITHIN THE CONTRACT TIME.
b. SCHEDULE UPDATING: REVISE COMBINED
CONTRACTOR’S CONSTRUCTION SCHEDULE AFTER EACH
COORDINATION MEETING WHERE REVISIONS TO THE
SCHEDULE HAVE BEEN MADE OR RECOGNIZED. ISSUE
REVISED SCHEDULE CONCURRENTLY WITH REPORT OF
EACH MEETING.
c. REVIEW PRESENT AND FUTURE NEEDS OF EACH
CONTRACTOR PRESENT, INCLUDING THE FOLLOWING:
1) INTERFACE REQUIREMENTS.
2) SEQUENCE OF OPERATIONS.
3) STATUS OF SUBMITTALS.
4) DELIVERIES.
5) OFF-SITE FABRICATION.
6) ACCESS.
7) SITE UTILIZATION.
8) TEMPORARY FACILITIES AND CONTROLS.
9) WORK HOURS.
10) HAZARDS AND RISKS.
11) PROGRESS CLEANING.
12) QUALITY AND WORK STANDARDS.
13) CHANGE ORDERS.
3. REPORTING: RECORD MEETING RESULTS AND
DISTRIBUTE COPIES TO EVERYONE IN ATTENDANCE AND TO
OTHERS AFFECTED BY DECISIONS OR ACTIONS RESULTING
FROM EACH MEETING.
END OF SECTION 01 3100
SECTION 01 3200 - CONSTRUCTION PROGRESS
DOCUMENTATION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND
OTHER DIVISION 01 SPECIFICATION SECTIONS, APPLY TO THIS
SECTION.
1.2 SUMMARY
A. SECTION INCLUDES ADMINISTRATIVE AND PROCEDURAL
REQUIREMENTS FOR DOCUMENTING THE PROGRESS OF
CONSTRUCTION DURING PERFORMANCE OF THE WORK, INCLUDING
THE FOLLOWING:
1. STARTUP CONSTRUCTION SCHEDULE.
2. CONTRACTOR’S CONSTRUCTION SCHEDULE.
3. CONSTRUCTION SCHEDULE UPDATING REPORTS.
4. DAILY CONSTRUCTION REPORTS.
5. SPECIAL REPORTS.
B. RELATED REQUIREMENTS:
1. DIVISION 01 SECTION “SUBMITTAL PROCEDURES” FOR
SUBMITTING SCHEDULES AND REPORTS.
2. DIVISION 01 SECTION “QUALITY REQUIREMENTS” FOR
SUBMITTING A SCHEDULE OF TESTS AND INSPECTIONS.
1.3 DEFINITIONS
A. ACTIVITY: A DISCRETE PART OF A PROJECT THAT CAN BE
IDENTIFIED FOR PLANNING, SCHEDULING, MONITORING, AND
CONTROLLING THE CONSTRUCTION PROJECT. ACTIVITIES INCLUDED
IN A CONSTRUCTION SCHEDULE CONSUME TIME AND RESOURCES.
1. CRITICAL ACTIVITY: AN ACTIVITY ON THE CRITICAL PATH
THAT MUST START AND FINISH ON THE PLANNED EARLY START
AND FINISH TIMES.
2. PREDECESSOR ACTIVITY: AN ACTIVITY THAT PRECEDES
ANOTHER ACTIVITY IN THE NETWORK.
3. SUCCESSOR ACTIVITY: AN ACTIVITY THAT FOLLOWS
ANOTHER ACTIVITY IN THE NETWORK.
B. CPM: CRITICAL PATH METHOD, WHICH IS A METHOD OF
PLANNING AND SCHEDULING A CONSTRUCTION PROJECT WHERE
ACTIVITIES ARE ARRANGED BASED ON ACTIVITY RELATIONSHIPS.
NETWORK CALCULATIONS DETERMINE WHEN ACTIVITIES CAN BE
PERFORMED AND THE CRITICAL PATH OF PROJECT.
C. CRITICAL PATH: THE LONGEST CONNECTED CHAIN OF
INTERDEPENDENT ACTIVITIES THROUGH THE NETWORK SCHEDULE
THAT ESTABLISHES THE MINIMUM OVERALL PROJECT DURATION AND
CONTAINS NO FLOAT.
D. EVENT: THE STARTING OR ENDING POINT OF AN ACTIVITY.
E. FLOAT: THE MEASURE OF LEEWAY IN STARTING AND
COMPLETING AN ACTIVITY.
1. FLOAT TIME IS NOT FOR THE EXCLUSIVE USE OR
BENEFIT OF EITHER OWNER OR CONTRACTOR, BUT IS A
JOINTLY OWNED, EXPIRING PROJECT RESOURCE AVAILABLE
TO BOTH PARTIES AS NEEDED TO MEET SCHEDULE
MILESTONES AND CONTRACT COMPLETION DATE.
2. FREE FLOAT IS THE AMOUNT OF TIME AN ACTIVITY CAN
BE DELAYED WITHOUT ADVERSELY AFFECTING THE EARLY
START OF THE SUCCESSOR ACTIVITY.
3. TOTAL FLOAT IS THE MEASURE OF LEEWAY IN STARTING
OR COMPLETING AN ACTIVITY WITHOUT
ADVERSELY AFFECTING THE PLANNED PROJECT COMPLETION
DATE.
F. RESOURCE LOADING: THE ALLOCATION OF MANPOWER AND
EQUIPMENT NECESSARY FOR THE COMPLETION OF AN ACTIVITY AS
SCHEDULED.
1.4 INFORMATIONAL SUBMITTALS
A. FORMAT FOR SUBMITTALS: SUBMIT REQUIRED SUBMITTALS IN
THE FOLLOWING FORMAT:
1. PDF ELECTRONIC FILE.
B. STARTUP CONSTRUCTION SCHEDULE.
1. APPROVAL OF COST-LOADED, STARTUP CONSTRUCTION
SCHEDULE WILL NOT CONSTITUTE APPROVAL OF SCHEDULE
OF VALUES FOR COST-LOADED ACTIVITIES.
C. STARTUP NETWORK DIAGRAM: OF SIZE REQUIRED TO
DISPLAY ENTIRE NETWORK FOR ENTIRE CONSTRUCTION PERIOD.
SHOW LOGIC TIES FOR ACTIVITIES.
D. CONTRACTOR’S CONSTRUCTION SCHEDULE: INITIAL
SCHEDULE, OF SIZE REQUIRED TO DISPLAY ENTIRE SCHEDULE FOR
ENTIRE CONSTRUCTION PERIOD.
E. CPM REPORTS: CONCURRENT WITH CPM SCHEDULE,
SUBMIT EACH OF THE FOLLOWING REPORTS. FORMAT FOR EACH
ACTIVITY IN REPORTS SHALL CONTAIN ACTIVITY NUMBER, ACTIVITY
DESCRIPTION, COST AND RESOURCE LOADING, ORIGINAL DURATION,
REMAINING DURATION, EARLY START DATE, EARLY FINISH DATE, LATE
START DATE, LATE FINISH DATE, AND TOTAL FLOAT IN CALENDAR
DAYS.
1. ACTIVITY REPORT: LIST OF ALL ACTIVITIES SORTED BY
ACTIVITY NUMBER AND THEN EARLY START DATE, OR ACTUAL
START DATE IF KNOWN.
2. TOTAL FLOAT REPORT: LIST OF ALL ACTIVITIES SORTED
IN ASCENDING ORDER OF TOTAL FLOAT.
3. EARNINGS REPORT: COMPILATION OF CONTRACTOR’S
TOTAL EARNINGS FROM COMMENCEMENT OF THE
WORK UNTIL MOST RECENT APPLICATION FOR PAYMENT.
F. CONSTRUCTION SCHEDULE UPDATING REPORTS: SUBMIT
WITH APPLICATIONS FOR PAYMENT.
G. DAILY CONSTRUCTION REPORTS: SUBMIT AT WEEKLY
INTERVALS.
H. SPECIAL REPORTS: SUBMIT AT TIME OF UNUSUAL EVENT.
1.5 QUALITY ASSURANCE
A. SCHEDULING CONSULTANT QUALIFICATIONS: AN
EXPERIENCED SPECIALIST IN CPM SCHEDULING AND REPORTING,
WITH CAPABILITY OF PRODUCING CPM REPORTS AND DIAGRAMS
WITHIN 24 HOURS OF ARCHITECT’S REQUEST.
B. PRESCHEDULING CONFERENCE: CONDUCT CONFERENCE
AT PROJECT SITE TO COMPLY WITH REQUIREMENTS IN DIVISION 01
SECTION “PROJECT MANAGEMENT AND COORDINATION.” REVIEW
METHODS AND PROCEDURES RELATED TO THE PRELIMINARY
CONSTRUCTION SCHEDULE AND CONTRACTOR’S CONSTRUCTION
SCHEDULE, INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
1. REVIEW SOFTWARE LIMITATIONS AND CONTENT AND
FORMAT FOR REPORTS.
2. VERIFY AVAILABILITY OF QUALIFIED PERSONNEL
NEEDED TO DEVELOP AND UPDATE SCHEDULE.
3. REVIEW SUBMITTAL REQUIREMENTS AND
PROCEDURES.
4. REVIEW TIME REQUIRED FOR REVIEW OF SUBMITTALS
AND RESUBMITTALS.
5. REVIEW REQUIREMENTS FOR TESTS AND INSPECTIONS
BY INDEPENDENT TESTING AND INSPECTING AGENCIES.
REVIEW TIME REQUIRED FOR PROJECT CLOSEOUT AND
OWNER STARTUP PROCEDURES.
7. REVIEW AND FINALIZE LIST OF CONSTRUCTION
ACTIVITIES TO BE INCLUDED IN SCHEDULE.
8. REVIEW PROCEDURES FOR UPDATING SCHEDULE.
1.6 COORDINATION
A. COORDINATE PREPARATION AND PROCESSING OF
SCHEDULES AND REPORTS WITH PERFORMANCE OF CONSTRUCTION
ACTIVITIES.
B. COORDINATE CONTRACTOR’S CONSTRUCTION SCHEDULE
WITH THE SCHEDULE OF VALUES, SUBMITTAL SCHEDULE, PROGRESS
REPORTS, PAYMENT REQUESTS, AND OTHER REQUIRED SCHEDULES
AND REPORTS.
1. SECURE TIME COMMITMENTS FOR PERFORMING
CRITICAL ELEMENTS OF THE WORK FROM
ENTITIES INVOLVED.
2. COORDINATE EACH CONSTRUCTION ACTIVITY IN THE
NETWORK WITH OTHER ACTIVITIES AND SCHEDULE THEM IN
PROPER SEQUENCE.
PART 2 - PRODUCTS
2.1 CONTRACTOR’S CONSTRUCTION SCHEDULE, GENERAL
A. TIME FRAME: EXTEND SCHEDULE FROM DATE ESTABLISHED
FOR COMMENCEMENT OF THE WORK TO DATE OF SUBSTANTIAL
COMPLETION.
1. CONTRACT COMPLETION DATE SHALL NOT BE CHANGED
BY SUBMISSION OF A SCHEDULE THAT SHOWS AN EARLY
COMPLETION DATE, UNLESS SPECIFICALLY AUTHORIZED BY
CHANGE ORDER.
B. ACTIVITIES: TREAT EACH STORY OR SEPARATE AREA AS A
SEPARATE NUMBERED ACTIVITY FOR EACH MAIN ELEMENT OF THE
WORK. COMPLY WITH THE FOLLOWING:
1. ACTIVITY DURATION: DEFINE ACTIVITIES SO NO
ACTIVITY IS LONGER THAN 20 DAYS, UNLESS SPECIFICALLY
ALLOWED BY ARCHITECT.
2. SUBMITTAL REVIEW TIME: INCLUDE REVIEW AND
RESUBMITTAL TIMES INDICATED IN DIVISION 01 SECTION
“SUBMITTAL PROCEDURES” IN SCHEDULE. COORDINATE
SUBMITTAL REVIEW TIMES IN CONTRACTOR’S CONSTRUCTION
SCHEDULE WITH SUBMITTAL SCHEDULE.
3. STARTUP AND TESTING TIME: INCLUDE NO FEWER
THAN 15 DAYS FOR STARTUP AND TESTING.
4. SUBSTANTIAL COMPLETION: INDICATE COMPLETION
IN ADVANCE OF DATE ESTABLISHED FOR SUBSTANTIAL
COMPLETION, AND ALLOW TIME FOR ARCHITECT’S
ADMINISTRATIVE PROCEDURES
NECESSARY FOR CERTIFICATION OF SUBSTANTIAL
COMPLETION.
5. PUNCH LIST AND FINAL COMPLETION: INCLUDE NOT
MORE THAN 30 DAYS FOR COMPLETION OF PUNCH LIST ITEMS
AND FINAL COMPLETION.
C. CONSTRAINTS: INCLUDE CONSTRAINTS AND WORK
RESTRICTIONS INDICATED IN THE CONTRACT DOCUMENTS AND AS
FOLLOWS IN SCHEDULE, AND SHOW HOW THE SEQUENCE OF THE
WORK IS AFFECTED.
1. WORK RESTRICTIONS: SHOW THE EFFECT OF THE
FOLLOWING ITEMS ON THE SCHEDULE:
a. LIMITATIONS OF CONTINUED OCCUPANCIES.
b. UNINTERRUPTIBLE SERVICES.
c. USE OF PREMISES RESTRICTIONS.
GI101
conformed set
revisions :
p r o j e c t # :
d a t e :
20.0550
- june 4, 2021
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
GI203
Sheet Specs
20.0550
- april 7, 2021
Rexburg
Rowhouses
bid set
d. SEASONAL VARIATIONS.
2. WORK STAGES: INDICATE IMPORTANT STAGES OF
CONSTRUCTION FOR EACH MAJOR PORTION OF THE WORK,
INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
a. SUBCONTRACT AWARDS.
b. SUBMITTALS.
c. PURCHASES.
d. MOCKUPS.
e. FABRICATION.
f. SAMPLE TESTING.
g. DELIVERIES.
h. INSTALLATION.
i. TESTS AND INSPECTIONS.
j. ADJUSTING.
k. BUILDING FLUSH-OUT.
l. STARTUP AND PLACEMENT INTO FINAL USE AND
OPERATION.
3. CONSTRUCTION AREAS: IDENTIFY EACH MAJOR AREA
OF CONSTRUCTION FOR EACH MAJOR PORTION OF THE WORK.
INDICATE WHERE EACH CONSTRUCTION ACTIVITY WITHIN A
MAJOR AREA MUST BE SEQUENCED OR INTEGRATED WITH
OTHER CONSTRUCTION ACTIVITIES TO PROVIDE FOR THE
FOLLOWING:
a. COMPLETION OF MECHANICAL INSTALLATION.
b. COMPLETION OF ELECTRICAL INSTALLATION.
c. SUBSTANTIAL COMPLETION.
D. MILESTONES: INCLUDE MILESTONES INDICATED IN THE
CONTRACT DOCUMENTS IN SCHEDULE, INCLUDING, BUT NOT LIMITED
TO, THE NOTICE TO PROCEED, SUBSTANTIAL COMPLETION, AND
FINAL
COMPILATION.
E. COST CORRELATION: SUPERIMPOSE A COST CORRELATION
TIMELINE, INDICATING PLANNED AND ACTUAL COSTS. ON THE LINE,
SHOW PLANNED AND ACTUAL DOLLAR VOLUME OF THE WORK
PERFORMED AS OF PLANNED AND ACTUAL DATES USED FOR
PREPARATION OF PAYMENT REQUESTS.
1. SEE DIVISION 01 SECTION “PAYMENT PROCEDURES”
FOR COST REPORTING AND PAYMENT PROCEDURES.
F. UPCOMING WORK SUMMARY: PREPARE SUMMARY REPORT
INDICATING ACTIVITIES SCHEDULED TO OCCUR OR COMMENCE
PRIOR TO SUBMITTAL OF NEXT SCHEDULE UPDATE. SUMMARIZE THE
FOLLOWING ISSUES:
1. UNRESOLVED ISSUES.
2. UNANSWERED REQUESTS FOR INFORMATION.
3. REJECTED OR UNRETURNED SUBMITTALS.
4. NOTATIONS ON RETURNED SUBMITTALS.
5. PENDING MODIFICATIONS AFFECTING THE WORK AND
CONTRACT TIME.
G. RECOVERY SCHEDULE: WHEN PERIODIC UPDATE INDICATES
THE WORK IS 14 OR MORE CALENDAR DAYS BEHIND THE
CURRENT APPROVED SCHEDULE, SUBMIT A SEPARATE RECOVERY
SCHEDULE INDICATING MEANS BY WHICH CONTRACTOR INTENDS TO
REGAIN COMPLIANCE WITH THE SCHEDULE. INDICATE CHANGES TO
WORKING HOURS, WORKING DAYS, CREW SIZES, AND EQUIPMENT
REQUIRED TO ACHIEVE COMPLIANCE, AND DATE BY WHICH
RECOVERY WILL BE ACCOMPLISHED.
H. COMPUTER SCHEDULING SOFTWARE: PREPARE
SCHEDULES USING CURRENT VERSION OF A PROGRAM THAT HAS
BEEN DEVELOPED SPECIFICALLY TO MANAGE CONSTRUCTION
SCHEDULES.
2.2 STARTUP CONSTRUCTION SCHEDULE
A. BAR-CHART SCHEDULE: SUBMIT STARTUP, HORIZONTAL, BAR-
CHART-TYPE CONSTRUCTION SCHEDULE WITHIN SEVEN DAYS OF
DATE ESTABLISHED FOR COMMENCEMENT OF THE WORK.
B. PREPARATION: INDICATE EACH SIGNIFICANT CONSTRUCTION
ACTIVITY SEPARATELY. IDENTIFY FIRST WORKDAY OF EACH WEEK
WITH A CONTINUOUS VERTICAL LINE. OUTLINE SIGNIFICANT
CONSTRUCTION ACTIVITIES FOR FIRST 90 DAYS OF CONSTRUCTION.
INCLUDE SKELETON DIAGRAM FOR THE REMAINDER OF THE WORK
AND A CASH REQUIREMENT PREDICTION BASED ON INDICATED
ACTIVITIES. REMAINDER OF THE WORK AND A CASH REQUIREMENT
PREDICTION BASED ON INDICATED ACTIVITIES.
2.3 CONTRACTOR’S CONSTRUCTION SCHEDULE (CPM SCHEDULE)
A. GENERAL: PREPARE NETWORK DIAGRAMS USING AON
(ACTIVITY-ON-NODE) FORMAT.
B. STARTUP NETWORK DIAGRAM: SUBMIT DIAGRAM WITHIN 14
DAYS OF DATE ESTABLISHED FOR COMMENCEMENT OF THE WORK.
OUTLINE SIGNIFICANT CONSTRUCTION ACTIVITIES FOR THE FIRST 90
DAYS OF CONSTRUCTION. INCLUDE SKELETON DIAGRAM FOR THE
REMAINDER OF THE WORK AND A CASH REQUIREMENT PREDICTION
BASED ON INDICATED ACTIVITIES.
C. CPM SCHEDULE: PREPARE CONTRACTOR’S CONSTRUCTION
SCHEDULE USING A TIME-SCALED CPM NETWORK ANALYSIS
DIAGRAM FOR THE WORK.
1. DEVELOP NETWORK DIAGRAM IN SUFFICIENT TIME TO
SUBMIT CPM SCHEDULE SO IT CAN BE ACCEPTED FOR
USE NO LATER THAN 60 DAYS AFTER DATE ESTABLISHED FOR
COMMENCEMENT OF THE WORK.
g. FAILURE TO INCLUDE ANY WORK ITEM REQUIRED FOR
PERFORMANCE OF THIS CONTRACT SHALL NOT EXCUSE
CONTRACTOR FROM COMPLETING ALL WORK WITHIN
APPLICABLE COMPLETION DATES, REGARDLESS OF
ARCHITECT’S APPROVAL OF THE SCHEDULE.
2. CONDUCT EDUCATIONAL WORKSHOPS TO TRAIN
AND INFORM KEY PROJECT PERSONNEL, INCLUDING
SUBCONTRACTORS’ PERSONNEL, IN PROPER METHODS OF
PROVIDING DATA AND USING CPM SCHEDULE INFORMATION.
3. ESTABLISH PROCEDURES FOR MONITORING AND
UPDATING CPM SCHEDULE AND FOR REPORTING PROGRESS.
COORDINATE PROCEDURES WITH PROGRESS MEETING AND
PAYMENT REQUEST DATES.
4. USE “ONE WORKDAY” AS THE UNIT OF TIME FOR
INDIVIDUAL ACTIVITIES. INDICATE NONWORKING DAYS AND
HOLIDAYS INCORPORATED INTO THE SCHEDULE IN ORDER TO
COORDINATE WITH THE CONTRACT TIME.
D. CPM SCHEDULE PREPARATION: PREPARE A LIST OF ALL
ACTIVITIES REQUIRED TO COMPLETE THE WORK. USING THE
STARTUP NETWORK DIAGRAM, PREPARE A SKELETON NETWORK TO
IDENTIFY PROBABLE CRITICAL PATHS.
1. ACTIVITIES: INDICATE THE ESTIMATED TIME DURATION,
SEQUENCE REQUIREMENTS, AND RELATIONSHIP OF EACH
ACTIVITY IN RELATION TO OTHER ACTIVITIES. INCLUDE
ESTIMATED TIME FRAMES FOR THE FOLLOWING
ACTIVITIES:
a. PREPARATION AND PROCESSING OF SUBMITTALS.
b. MOBILIZATION AND DEMOBILIZATION.
c. PURCHASE OF MATERIALS.
d. DELIVERY.
e. FABRICATION.
f. UTILITY INTERRUPTIONS.
g. INSTALLATION.
h. WORK BY OWNER THAT MAY AFFECT OR BE AFFECTED
BY CONTRACTOR’S ACTIVITIES.
i. TESTING.
j. PUNCH LIST AND FINAL COMPLETION.
k. ACTIVITIES OCCURRING FOLLOWING FINAL
COMPLETION.
2. CRITICAL PATH ACTIVITIES: IDENTIFY CRITICAL PATH
ACTIVITIES, INCLUDING THOSE FOR INTERIM COMPLETION
DATES. SCHEDULED START AND COMPLETION DATES SHALL
BE CONSISTENT WITH CONTRACT MILESTONE DATES.
3. PROCESSING: PROCESS DATA TO PRODUCE OUTPUT
DATA ON A COMPUTER-DRAWN, TIME-SCALED NETWORK.
REVISE DATA, REORGANIZE ACTIVITY SEQUENCES, AND
REPRODUCE AS OFTEN AS NECESSARY TO PRODUCE THE CPM
SCHEDULE WITHIN THE LIMITATIONS OF THE CONTRACT TIME.
4. FORMAT: MARK THE CRITICAL PATH. LOCATE THE
CRITICAL PATH NEAR CENTER OF NETWORK; LOCATE
PATHS WITH MOST FLOAT NEAR THE EDGES.
a. SUBNETWORKS ON SEPARATE SHEETS ARE
PERMISSIBLE FOR ACTIVITIES CLEARLY OFF THE CRITICAL
PATH.
b. SHOW PHASING SUCH THAT EACH FLLOR CAN BE
OCCUPIED UPON COMPLETION AND BEFORE THE NEXT
FLOOR STARTS DEMOLITION.
E. CONTRACT MODIFICATIONS: FOR EACH PROPOSED
CONTRACT MODIFICATION AND CONCURRENT WITH ITS SUBMISSION,
PREPARE A TIME-IMPACT ANALYSIS USING A NETWORK FRAGMENT
TO DEMONSTRATE THE EFFECT OF THE PROPOSED CHANGE ON THE
OVERALL PROJECT SCHEDULE.
F. INITIAL ISSUE OF SCHEDULE: PREPARE INITIAL NETWORK
DIAGRAM FROM A SORTED ACTIVITY LIST INDICATING STRAIGHT
“EARLY START-TOTAL FLOAT.” IDENTIFY CRITICAL ACTIVITIES.
PREPARE TABULATED REPORTS SHOWING THE FOLLOWING:
1. CONTRACTOR OR SUBCONTRACTOR AND THE WORK
OR ACTIVITY.
2. DESCRIPTION OF ACTIVITY.
3. MAIN EVENTS OF ACTIVITY.
4. IMMEDIATE PRECEDING AND SUCCEEDING ACTIVITIES.
5. EARLY AND LATE START DATES.
6. EARLY AND LATE FINISH DATES.
7. ACTIVITY DURATION IN WORKDAYS.
8. TOTAL FLOAT OR SLACK TIME.
9. AVERAGE SIZE OF WORKFORCE.
10. DOLLAR VALUE OF ACTIVITY (COORDINATED WITH THE
SCHEDULE OF VALUES).
G. SCHEDULE UPDATING: CONCURRENT WITH MAKING
REVISIONS TO SCHEDULE, PREPARE TABULATED REPORTS SHOWING
THE FOLLOWING:
1. IDENTIFICATION OF ACTIVITIES THAT HAVE CHANGED.
2. CHANGES IN EARLY AND LATE START DATES.
3. CHANGES IN EARLY AND LATE FINISH DATES.
4. CHANGES IN ACTIVITY DURATIONS IN WORKDAYS.
5. CHANGES IN THE CRITICAL PATH.
6. CHANGES IN TOTAL FLOAT OR SLACK TIME.
7. CHANGES IN THE CONTRACT TIME.
H. VALUE SUMMARIES: PREPARE TWO CUMULATIVE VALUE
LISTS, SORTED BY FINISH DATES.
1. IN FIRST LIST, TABULATE ACTIVITY NUMBER, EARLY
FINISH DATE, DOLLAR VALUE, AND CUMULATIVE DOLLAR
VALUE.
2. IN SECOND LIST, TABULATE ACTIVITY NUMBER, LATE
FINISH DATE, DOLLAR VALUE, AND CUMULATIVE DOLLAR
VALUE.
3. IN SUBSEQUENT ISSUES OF BOTH LISTS, SUBSTITUTE
ACTUAL FINISH DATES FOR ACTIVITIES COMPLETED AS OF LIST
DATE.
4. PREPARE LIST FOR EASE OF COMPARISON WITH
PAYMENT REQUESTS; COORDINATE TIMING WITH PROGRESS
MEETINGS.
a. IN BOTH VALUE SUMMARY LISTS, TABULATE “ACTUAL
PERCENT COMPLETE” AND “CUMULATIVE VALUE
COMPLETED” WITH TOTAL AT BOTTOM.
2.4 REPORTS
A. DAILY CONSTRUCTION REPORTS: PREPARE A DAILY
CONSTRUCTION REPORT RECORDING THE FOLLOWING
INFORMATION CONCERNING EVENTS AT PROJECT SITE:
1. LIST OF SUBCONTRACTORS AT PROJECT SITE.
2. LIST OF SEPARATE CONTRACTORS AT PROJECT SITE.
3. APPROXIMATE COUNT OF PERSONNEL AT PROJECT
SITE.
4. EQUIPMENT AT PROJECT SITE.
5. MATERIAL DELIVERIES.
6. HIGH AND LOW TEMPERATURES AND GENERAL
WEATHER CONDITIONS, INCLUDING PRESENCE OF RAIN OR
SNOW.
7. ACCIDENTS.
8. MEETINGS AND SIGNIFICANT DECISIONS.
9. UNUSUAL EVENTS (SEE SPECIAL REPORTS).
10. STOPPAGES, DELAYS, SHORTAGES, AND LOSSES.
11. METER READINGS AND SIMILAR RECORDINGS.
12. EMERGENCY PROCEDURES.
13. ORDERS AND REQUESTS OF AUTHORITIES HAVING
JURISDICTION.
14. CHANGE ORDERS RECEIVED AND IMPLEMENTED.
15. CONSTRUCTION CHANGE DIRECTIVES RECEIVED AND
IMPLEMENTED.
16. SERVICES CONNECTED AND DISCONNECTED.
17. EQUIPMENT OR SYSTEM TESTS AND STARTUPS.
18. PARTIAL COMPLETIONS AND OCCUPANCIES.
19. SUBSTANTIAL COMPLETIONS AUTHORIZED.
B. MATERIAL LOCATION REPORTS: AT WEEKLY INTERVALS,
PREPARE AND SUBMIT A COMPREHENSIVE LIST OF MATERIALS
DELIVERED TO AND STORED AT PROJECT SITE. LIST SHALL BE
CUMULATIVE, SHOWING MATERIALS PREVIOUSLY REPORTED PLUS
ITEMS RECENTLY DELIVERED. INCLUDE WITH LIST A STATEMENT OF
PROGRESS ON AND DELIVERY DATES FOR MATERIALS OR ITEMS OF
EQUIPMENT FABRICATED OR STORED AWAY FROM PROJECT SITE.
INDICATE THE FOLLOWING CATEGORIES FOR STORED MATERIALS:
1. MATERIAL STORED PRIOR TO PREVIOUS REPORT AND
REMAINING IN STORAGE.
2. MATERIAL STORED PRIOR TO PREVIOUS REPORT AND
SINCE REMOVED FROM STORAGE AND INSTALLED.
3. MATERIAL STORED FOLLOWING PREVIOUS REPORT AND
REMAINING IN STORAGE.
C. SITE CONDITION REPORTS: IMMEDIATELY ON DISCOVERY OF
A DIFFERENCE BETWEEN SITE CONDITIONS AND THE CONTRACT
DOCUMENTS, PREPARE AND SUBMIT A DETAILED REPORT. SUBMIT
WITH A REQUEST FOR INFORMATION. INCLUDE A DETAILED
DESCRIPTION OF THE DIFFERING CONDITIONS, TOGETHER WITH
RECOMMENDATIONS FOR CHANGING THE CONTRACT DOCUMENTS.
2.5 SPECIAL REPORTS
A. GENERAL: SUBMIT SPECIAL REPORTS DIRECTLY TO OWNER
WITHIN ONE DAY OF AN OCCURRENCE. DISTRIBUTE COPIES OF
REPORT TO PARTIES AFFECTED BY THE OCCURRENCE.
B. REPORTING UNUSUAL EVENTS: WHEN AN EVENT OF AN
UNUSUAL AND SIGNIFICANT NATURE OCCURS AT PROJECT SITE,
WHETHER OR NOT RELATED DIRECTLY TO THE WORK, PREPARE
AND SUBMIT A SPECIAL REPORT. LIST CHAIN OF EVENTS, PERSONS
PARTICIPATING, RESPONSE BY CONTRACTOR’S PERSONNEL,
EVALUATION OF RESULTS OR EFFECTS, AND SIMILAR PERTINENT
INFORMATION. ADVISE OWNER IN ADVANCE WHEN THESE EVENTS
ARE KNOWN OR PREDICTABLE.
PART 2 - EXECUTION
2.1 CONTRACTOR’S CONSTRUCTION SCHEDULE
A. CONTRACTOR’S CONSTRUCTION SCHEDULE UPDATING: AT
MONTHLY INTERVALS, UPDATE SCHEDULE TO REFLECT ACTUAL
CONSTRUCTION PROGRESS AND ACTIVITIES. ISSUE SCHEDULE ONE
WEEK BEFORE EACH REGULARLY SCHEDULED PROGRESS MEETING.
1. REVISE SCHEDULE IMMEDIATELY AFTER EACH
MEETING OR OTHER ACTIVITY WHERE REVISIONS HAVE
BEEN RECOGNIZED OR MADE. ISSUE UPDATED SCHEDULE
CONCURRENTLY WITH THE REPORT OF EACH SUCH
MEETING.
2. INCLUDE A REPORT WITH UPDATED SCHEDULE THAT
INDICATES EVERY CHANGE, INCLUDING, BUT NOT LIMITED
TO, CHANGES IN LOGIC, DURATIONS, ACTUAL STARTS AND
FINISHES, AND ACTIVITY DURATIONS.
3. AS THE WORK PROGRESSES, INDICATE FINAL
COMPLETION PERCENTAGE FOR EACH ACTIVITY.
B. DISTRIBUTION: DISTRIBUTE COPIES OF APPROVED SCHEDULE
TO ARCHITECT, OWNER, SEPARATE CONTRACTORS, TESTING
AND INSPECTING AGENCIES, AND OTHER PARTIES IDENTIFIED BY
CONTRACTOR WITH A NEED-TO-KNOW SCHEDULE RESPONSIBILITY.
1. POST COPIES IN PROJECT MEETING ROOMS AND
TEMPORARY FIELD OFFICES.
2. WHEN REVISIONS ARE MADE, DISTRIBUTE UPDATED
SCHEDULES TO THE SAME PARTIES AND POST IN THE SAME
LOCATIONS. DELETE PARTIES FROM DISTRIBUTION WHEN
THEY HAVE COMPLETED THEIR ASSIGNED PORTION OF THE
WORK AND ARE NO LONGER INVOLVED IN PERFORMANCE OF
CONSTRUCTION ACTIVITIES.
END OF SECTION 01 3200
SECTION 01 3300 - SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND
OTHER DIVISION 01 SPECIFICATION SECTIONS, APPLY TO THIS
SECTION.
1.2 SUMMARY
A. SECTION INCLUDES REQUIREMENTS FOR THE SUBMITTAL
SCHEDULE AND ADMINISTRATIVE AND PROCEDURAL REQUIREMENTS
FOR SUBMITTING SHOP DRAWINGS, PRODUCT DATA, SAMPLES, AND
OTHER SUBMITTALS.
B. RELATED REQUIREMENTS:
1. DIVISION 01 SECTION “PAYMENT PROCEDURES” FOR
SUBMITTING APPLICATIONS FOR PAYMENT AND THE SCHEDULE
OF VALUES.
2. DIVISION 01 SECTION “CONSTRUCTION PROGRESS
DOCUMENTATION” FOR SUBMITTING SCHEDULES AND
REPORTS, INCLUDING CONTRACTOR’S CONSTRUCTION
SCHEDULE.
3. DIVISION 01 SECTION “OPERATION AND MAINTENANCE
DATA” FOR SUBMITTING OPERATION AND MAINTENANCE
MANUALS.
4. DIVISION 01 SECTION “PROJECT RECORD DOCUMENTS”
FOR SUBMITTING RECORD DRAWINGS, RECORD
SPECIFICATIONS, AND RECORD PRODUCT DATA.
1.3 DEFINITIONS
A. ACTION SUBMITTALS: WRITTEN AND GRAPHIC INFORMATION
AND PHYSICAL SAMPLES THAT REQUIRE ARCHITECT’S
RESPONSIVE ACTION. ACTION SUBMITTALS ARE THOSE
SUBMITTALS INDICATED IN INDIVIDUAL SPECIFICATION SECTIONS AS
“ACTION SUBMITTALS.”
B. INFORMATIONAL SUBMITTALS: WRITTEN AND GRAPHIC
INFORMATION AND PHYSICAL SAMPLES THAT DO NOT REQUIRE
ARCHITECT’S RESPONSIVE ACTION. SUBMITTALS MAY BE REJECTED
FOR NOT COMPLYING WITH REQUIREMENTS. INFORMATIONAL
SUBMITTALS ARE THOSE SUBMITTALS INDICATED IN INDIVIDUAL
SPECIFICATION SECTIONS AS “INFORMATIONAL SUBMITTALS.”
C. PORTABLE DOCUMENT FORMAT (PDF): AN OPEN STANDARD
FILE FORMAT LICENSED BY ADOBE SYSTEMS USED FOR
REPRESENTING DOCUMENTS IN A DEVICE-INDEPENDENT AND
DISPLAY RESOLUTION- INDEPENDENT FIXED-LAYOUT DOCUMENT
FORMAT.
1.4 ACTION SUBMITTALS
A. SUBMITTAL SCHEDULE: SUBMIT A SCHEDULE OF SUBMITTALS,
ARRANGED IN CHRONOLOGICAL ORDER BY DATES REQUIRED BY
CONSTRUCTION SCHEDULE. INCLUDE TIME REQUIRED FOR REVIEW,
ORDERING, MANUFACTURING, FABRICATION, AND DELIVERY WHEN
ESTABLISHING DATES. INCLUDE ADDITIONAL TIME REQUIRED FOR
MAKING CORRECTIONS OR REVISIONS TO SUBMITTALS NOTED BY
ARCHITECT AND ADDITIONAL TIME FOR HANDLING AND REVIEWING
SUBMITTALS REQUIRED BY THOSE CORRECTIONS.
1. COORDINATE SUBMITTAL SCHEDULE WITH LIST
OF SUBCONTRACTS, THE SCHEDULE OF VALUES, AND
CONTRACTOR’S CONSTRUCTION SCHEDULE.
2. INITIAL SUBMITTAL: SUBMIT CONCURRENTLY WITH
STARTUP CONSTRUCTION SCHEDULE. INCLUDE SUBMITTALS
REQUIRED DURING THE FIRST 60 DAYS OF CONSTRUCTION.
LIST THOSE SUBMITTALS REQUIRED TO MAINTAIN
ORDERLY PROGRESS OF THE WORK AND THOSE REQUIRED
EARLY BECAUSE OF LONG LEAD TIME FOR MANUFACTURE OR
FABRICATION.
3. FINAL SUBMITTAL: SUBMIT CONCURRENTLY WITH
THE FIRST COMPLETE SUBMITTAL OF CONTRACTOR’S
CONSTRUCTION SCHEDULE.
a. SUBMIT REVISED SUBMITTAL SCHEDULE TO REFLECT
CHANGES IN CURRENT STATUS AND TIMING FOR
SUBMITTALS.
4. FORMAT: ARRANGE THE FOLLOWING INFORMATION IN A
TABULAR FORMAT:
a. SCHEDULED DATE FOR FIRST SUBMITTAL.
b. SPECIFICATION SECTION NUMBER AND TITLE.
c. SUBMITTAL CATEGORY: ACTION; INFORMATIONAL.
d. NAME OF SUBCONTRACTOR.
e. DESCRIPTION OF THE WORK COVERED.
f. SCHEDULED DATE FOR ARCHITECT’S FINAL RELEASE
OR APPROVAL.
g. SCHEDULED DATE OF FABRICATION.
h. SCHEDULED DATES FOR PURCHASING.
i. SCHEDULED DATES FOR INSTALLATION.
j. ACTIVITY OR EVENT NUMBER.
1.5 SUBMITTAL ADMINISTRATIVE REQUIREMENTS
A. COORDINATION: COORDINATE PREPARATION AND
PROCESSING OF SUBMITTALS WITH PERFORMANCE OF
CONSTRUCTION ACTIVITIES.
1. COORDINATE EACH SUBMITTAL WITH FABRICATION,
PURCHASING, TESTING, DELIVERY, OTHER SUBMITTALS, AND
RELATED ACTIVITIES THAT REQUIRE SEQUENTIAL ACTIVITY.
2. SUBMIT ALL SUBMITTAL ITEMS REQUIRED FOR EACH
SPECIFICATION SECTION CONCURRENTLY UNLESS PARTIAL
SUBMITTALS FOR PORTIONS OF THE WORK ARE INDICATED ON
APPROVED SUBMITTAL SCHEDULE.
3. SUBMIT ACTION SUBMITTALS AND INFORMATIONAL
SUBMITTALS REQUIRED BY THE SAME SPECIFICATION SECTION
AS SEPARATE PACKAGES UNDER SEPARATE TRANSMITTALS.
4. COORDINATE TRANSMITTAL OF DIFFERENT TYPES
OF SUBMITTALS FOR RELATED PARTS OF THE WORK SO
PROCESSING WILL NOT BE DELAYED BECAUSE OF NEED TO
REVIEW SUBMITTALS CONCURRENTLY FOR COORDINATION.
a. ARCHITECT RESERVES THE RIGHT TO WITHHOLD
ACTION ON A SUBMITTAL REQUIRING COORDINATION WITH
OTHER SUBMITTALS UNTIL RELATED SUBMITTALS ARE
RECEIVED.
B. PROCESSING TIME: ALLOW TIME FOR SUBMITTAL REVIEW,
INCLUDING TIME FOR RESUBMITTALS, AS FOLLOWS. TIME
FOR REVIEW SHALL COMMENCE ON ARCHITECT’S RECEIPT OF
SUBMITTAL. NO EXTENSION OF THE CONTRACT TIME WILL BE
AUTHORIZED BECAUSE OF FAILURE TO TRANSMIT SUBMITTALS
ENOUGH IN ADVANCE OF THE WORK TO PERMIT PROCESSING,
INCLUDING RESUBMITTALS.
1. INITIAL REVIEW: ALLOW 15 DAYS FOR INITIAL
REVIEW OF EACH SUBMITTAL. ALLOW ADDITIONAL TIME IF
COORDINATION WITH SUBSEQUENT SUBMITTALS IS REQUIRED.
ARCHITECT WILL ADVISE CONTRACTOR WHEN A SUBMITTAL
BEING PROCESSED MUST BE DELAYED FOR COORDINATION.
2. INTERMEDIATE REVIEW: IF INTERMEDIATE SUBMITTAL
IS NECESSARY, PROCESS IT IN SAME MANNER AS INITIAL
SUBMITTAL.
3. RESUBMITTAL REVIEW: ALLOW 15 DAYS FOR REVIEW
OF EACH RESUBMITTAL.
C. ELECTRONIC SUBMITTALS: IDENTIFY AND INCORPORATE
INFORMATION IN EACH ELECTRONIC SUBMITTAL FILE AS FOLLOWS:
1. ASSEMBLE COMPLETE SUBMITTAL PACKAGE INTO
A SINGLE INDEXED FILE INCORPORATING SUBMITTAL
REQUIREMENTS OF A SINGLE SPECIFICATION SECTION AND
TRANSMITTAL FORM WITH LINKS ENABLING NAVIGATION TO
EACH ITEM.
2. NAME FILE WITH SUBMITTAL NUMBER OR OTHER
UNIQUE IDENTIFIER, INCLUDING REVISION IDENTIFIER.
a. FILE NAME SHALL USE PROJECT IDENTIFIER AND
SPECIFICATION SECTION NUMBER FOLLOWED BY A
DECIMAL POINT AND THEN A SEQUENTIAL NUMBER (E.G.,
LNHS-061000.01). RESUBMITTALS SHALL INCLUDE AN
ALPHABETIC SUFFIX AFTER ANOTHER DECIMAL POINT
(E.G., LNHS-061000.01.A).
3. PROVIDE MEANS FOR INSERTION TO PERMANENTLY
RECORD CONTRACTOR’S REVIEW AND APPROVAL MARKINGS
AND ACTION TAKEN BY ARCHITECT.
4. TRANSMITTAL FORM FOR ELECTRONIC SUBMITTALS:
USE ELECTRONIC FORM ACCEPTABLE TO OWNER, CONTAINING
THE FOLLOWING INFORMATION:
a. PROJECT NAME.
b. DATE.
c. NAME AND ADDRESS OF ARCHITECT.
d. NAME OF CONSTRUCTION MANAGER.
e. NAME OF CONTRACTOR.
f. NAME OF FIRM OR ENTITY THAT PREPARED SUBMITTAL.
g. NAMES OF SUBCONTRACTOR, MANUFACTURER, AND
SUPPLIER.
h. CATEGORY AND TYPE OF SUBMITTAL.
i. SUBMITTAL PURPOSE AND DESCRIPTION.
j. SPECIFICATION SECTION NUMBER AND TITLE.
k. SPECIFICATION PARAGRAPH NUMBER OR DRAWING
DESIGNATION AND GENERIC NAME FOR EACH OF MULTIPLE
ITEMS.
l. DRAWING NUMBER AND DETAIL REFERENCES, AS
APPROPRIATE.
m. LOCATION(S) WHERE PRODUCT IS TO BE INSTALLED, AS
APPROPRIATE.
n. RELATED PHYSICAL SAMPLES SUBMITTED DIRECTLY.
o. INDICATION OF FULL OR PARTIAL SUBMITTAL.
p. TRANSMITTAL NUMBER.
q. SUBMITTAL AND TRANSMITTAL DISTRIBUTION RECORD.
r. OTHER NECESSARY IDENTIFICATION.
s. REMARKS.
5. METADATA: INCLUDE THE FOLLOWING INFORMATION AS
KEYWORDS IN THE ELECTRONIC SUBMITTAL FILE METADATA:
a. PROJECT NAME.
b. NUMBER AND TITLE OF APPROPRIATE SPECIFICATION
SECTION.
c. MANUFACTURER NAME.
d. PRODUCT NAME.
D. OPTIONS: IDENTIFY OPTIONS REQUIRING SELECTION BY
ARCHITECT.
E. DEVIATIONS AND ADDITIONAL INFORMATION: ON AN
ATTACHED SEPARATE SHEET, PREPARED ON CONTRACTOR’S
LETTERHEAD, RECORD RELEVANT INFORMATION, REQUESTS FOR
DATA, REVISIONS OTHER THAN THOSE REQUESTED BY ARCHITECT
ON PREVIOUS SUBMITTALS, AND DEVIATIONS FROM REQUIREMENTS
IN THE CONTRACT DOCUMENTS, INCLUDING MINOR VARIATIONS
AND LIMITATIONS. INCLUDE SAME IDENTIFICATION INFORMATION AS
RELATED SUBMITTAL.
F. RESUBMITTALS: MAKE RESUBMITTALS IN SAME FORM AND
NUMBER OF COPIES AS INITIAL SUBMITTAL.
1. NOTE DATE AND CONTENT OF PREVIOUS SUBMITTAL.
2. NOTE DATE AND CONTENT OF REVISION IN LABEL OR
TITLE BLOCK AND CLEARLY INDICATE EXTENT OF REVISION.
3. RESUBMIT SUBMITTALS UNTIL THEY ARE MARKED WITH
APPROVAL NOTATION FROM ARCHITECT’S ACTION STAMP.
G. DISTRIBUTION: FURNISH COPIES OF FINAL SUBMITTALS TO
MANUFACTURERS, SUBCONTRACTORS, SUPPLIERS, FABRICATORS,
INSTALLERS, AUTHORITIES HAVING JURISDICTION, AND OTHERS AS
NECESSARY FOR PERFORMANCE OF CONSTRUCTION ACTIVITIES.
SHOW DISTRIBUTION ON TRANSMITTAL FORMS.
H. USE FOR CONSTRUCTION: RETAIN COMPLETE COPIES
OF SUBMITTALS ON PROJECT SITE. USE ONLY FINAL ACTION
SUBMITTALS THAT ARE MARKED WITH APPROVAL NOTATION FROM
ARCHITECT’S ACTION STAMP.
PART 2 - PRODUCTS
2.1 SUBMITTAL PROCEDURES
A. GENERAL SUBMITTAL PROCEDURE REQUIREMENTS: PREPARE
AND SUBMIT SUBMITTALS REQUIRED BY INDIVIDUAL SPECIFICATION
SECTIONS. TYPES OF SUBMITTALS ARE INDICATED IN INDIVIDUAL
SPECIFICATION SECTIONS.
1. SUBMIT ELECTRONIC SUBMITTALS VIA EMAIL AS PDF
ELECTRONIC FILES.
a. ARCHITECT WILL RETURN ANNOTATED FILE. ANNOTATE
AND RETAIN ONE COPY OF FILE AS AN ELECTRONIC
PROJECT RECORD DOCUMENT FILE.
2. ACTION SUBMITTALS: SUBMIT ELECTRONIC FILES OF
EACH SUBMITTAL UNLESS OTHERWISE INDICATED. ARCHITECT
WILL RETURN A COPY.
3. INFORMATIONAL SUBMITTALS: ELECTRONIC FILES OF
EACH SUBMITTAL UNLESS OTHERWISE INDICATED. ARCHITECT
WILL NOT RETURN COPIES.
4. CERTIFICATES AND CERTIFICATIONS SUBMITTALS:
PROVIDE A STATEMENT THAT INCLUDES SIGNATURE OF ENTITY
RESPONSIBLE FOR PREPARING CERTIFICATION. CERTIFICATES
AND CERTIFICATIONS SHALL BE SIGNED BY AN OFFICER OR
OTHER INDIVIDUAL AUTHORIZED TO SIGN DOCUMENTS ON
BEHALF OF THAT ENTITY.
a. PROVIDE A DIGITAL SIGNATURE WITH DIGITAL
CERTIFICATE ON ELECTRONICALLY SUBMITTED
CERTIFICATES AND CERTIFICATIONS WHERE INDICATED.
b. PROVIDE A NOTARIZED STATEMENT ON ORIGINAL
PAPER COPY CERTIFICATES AND CERTIFICATIONS WHERE
INDICATED.
B. PRODUCT DATA: COLLECT INFORMATION INTO A SINGLE
SUBMITTAL FOR EACH ELEMENT OF CONSTRUCTION AND
TYPE OF PRODUCT OR EQUIPMENT.
1. IF INFORMATION MUST BE SPECIALLY PREPARED FOR
SUBMITTAL BECAUSE STANDARD PUBLISHED DATA ARE NOT
SUITABLE FOR USE, SUBMIT AS SHOP DRAWINGS, NOT AS
PRODUCT DATA.
2. MARK EACH COPY OF EACH SUBMITTAL TO SHOW
WHICH PRODUCTS AND OPTIONS ARE APPLICABLE.
3. INCLUDE THE FOLLOWING INFORMATION, AS
APPLICABLE:
a. MANUFACTURER’S CATALOG CUTS.
b. MANUFACTURER’S PRODUCT SPECIFICATIONS.
c. STANDARD COLOR CHARTS.
d. STATEMENT OF COMPLIANCE WITH SPECIFIED
REFERENCED STANDARDS.
e.TESTING BY RECOGNIZED TESTING AGENCY.
f. APPLICATION OF TESTING AGENCY LABELS AND SEALS.
g. NOTATION OF COORDINATION REQUIREMENTS.
h. AVAILABILITY AND DELIVERY TIME INFORMATION.
4. FOR EQUIPMENT, INCLUDE THE FOLLOWING IN
ADDITION TO THE ABOVE, AS APPLICABLE:
a. WIRING DIAGRAMS SHOWING FACTORY-INSTALLED
WIRING.
b. PRINTED PERFORMANCE CURVES.
c. OPERATIONAL RANGE DIAGRAMS.
d. CLEARANCES REQUIRED TO OTHER CONSTRUCTION, IF
NOT INDICATED ON ACCOMPANYING SHOP DRAWINGS.
5. SUBMIT PRODUCT DATA BEFORE OR CONCURRENT
WITH SAMPLES.
6. SUBMIT PRODUCT DATA IN THE FOLLOWING FORMAT:
a. PDF ELECTRONIC FILE.
C. SHOP DRAWINGS: PREPARE PROJECT-SPECIFIC
INFORMATION, DRAWN ACCURATELY TO SCALE. DO NOT BASE SHOP
DRAWINGS ON REPRODUCTIONS OF THE CONTRACT DOCUMENTS
OR STANDARD PRINTED DATA.
1. PREPARATION: FULLY ILLUSTRATE REQUIREMENTS IN
THE CONTRACT DOCUMENTS. INCLUDE THE FOLLOWING
INFORMATION, AS APPLICABLE:
a. IDENTIFICATION OF PRODUCTS.
b. SCHEDULES.
c. COMPLIANCE WITH SPECIFIED STANDARDS.
d. NOTATION OF COORDINATION REQUIREMENTS.
e. NOTATION OF DIMENSIONS ESTABLISHED BY FIELD
MEASUREMENT.
f. RELATIONSHIP AND ATTACHMENT TO ADJOINING
CONSTRUCTION CLEARLY INDICATED.
g. SEAL AND SIGNATURE OF PROFESSIONAL ENGINEER IF
SPECIFIED.
2. SHEET SIZE: EXCEPT FOR TEMPLATES, PATTERNS, AND
SIMILAR FULL-SIZE DRAWINGS, SUBMIT SHOP DRAWINGS ON
SHEETS AT LEAST 8-1/2 BY 11 INCHES, BUT NO LARGER THAN
30 BY 42 INCHES.
3. SUBMIT SHOP DRAWINGS IN THE FOLLOWING FORMAT:
a. PDF ELECTRONIC FILE.
D. SAMPLES: SUBMIT SAMPLES FOR REVIEW OF KIND, COLOR,
PATTERN, AND TEXTURE FOR A CHECK OF THESE CHARACTERISTICS
WITH OTHER ELEMENTS AND FOR A COMPARISON OF THESE
CHARACTERISTICS BETWEEN SUBMITTAL AND ACTUAL COMPONENT
AS DELIVERED AND INSTALLED.
1. TRANSMIT SAMPLES THAT CONTAIN MULTIPLE, RELATED
COMPONENTS SUCH AS ACCESSORIES TOGETHER IN ONE
SUBMITTAL PACKAGE.
2. IDENTIFICATION: ATTACH LABEL ON UNEXPOSED SIDE
OF SAMPLES THAT INCLUDES THE FOLLOWING:
a. GENERIC DESCRIPTION OF SAMPLE.
b. PRODUCT NAME AND NAME OF MANUFACTURER.
c. SAMPLE SOURCE.
d. NUMBER AND TITLE OF APPLICABLE SPECIFICATION
SECTION.
e. SPECIFICATION PARAGRAPH NUMBER AND GENERIC
NAME OF EACH ITEM.
3. FOR PROJECTS WHERE ELECTRONIC SUBMITTALS
ARE REQUIRED, PROVIDE CORRESPONDING ELECTRONIC
SUBMITTAL OF SAMPLE TRANSMITTAL, DIGITAL IMAGE FILE
ILLUSTRATING SAMPLE CHARACTERISTICS, AND
IDENTIFICATION INFORMATION FOR RECORD.
4. DISPOSITION: MAINTAIN SETS OF APPROVED
SAMPLES AT PROJECT SITE, AVAILABLE FOR QUALITY-
CONTROL COMPARISONS THROUGHOUT THE COURSE OF
CONSTRUCTION ACTIVITY. SAMPLE SETS MAY BE USED
TO DETERMINE FINAL ACCEPTANCE OF CONSTRUCTION
ASSOCIATED WITH EACH SET.
a. SAMPLES THAT MAY BE INCORPORATED INTO THE
WORK ARE INDICATED IN INDIVIDUAL SPECIFICATION
SECTIONS. SUCH SAMPLES MUST BE IN AN UNDAMAGED
CONDITION AT TIME OF USE.
b. SAMPLES NOT INCORPORATED INTO THE WORK, OR
OTHERWISE DESIGNATED AS OWNER’S PROPERTY, ARE THE
PROPERTY OF CONTRACTOR.
5. SAMPLES FOR INITIAL SELECTION: SUBMIT
MANUFACTURER’S COLOR CHARTS CONSISTING OF UNITS OR
SECTIONS OF UNITS SHOWING THE FULL RANGE OF COLORS,
TEXTURES, AND PATTERNS AVAILABLE.
a. NUMBER OF SAMPLES: SUBMIT ONE FULL SET(S) OF
AVAILABLE CHOICES WHERE COLOR, PATTERN, TEXTURE,
OR SIMILAR CHARACTERISTICS ARE REQUIRED TO BE
SELECTED FROM MANUFACTURER’S PRODUCT LINE.
ARCHITECT WILL RETURN SUBMITTAL WITH OPTIONS
SELECTED.
6. SAMPLES FOR VERIFICATION: SUBMIT FULL-SIZE
UNITS OR SAMPLES OF SIZE INDICATED, PREPARED FROM
SAME MATERIAL TO BE USED FOR THE WORK, CURED AND
FINISHED IN MANNER SPECIFIED, AND PHYSICALLY IDENTICAL
WITH MATERIAL OR PRODUCT PROPOSED FOR USE, AND THAT
SHOW FULL RANGE OF COLOR AND TEXTURE VARIATIONS
EXPECTED. SAMPLES INCLUDE, BUT ARE NOT LIMITED TO,
THE FOLLOWING: PARTIAL SECTIONS OF MANUFACTURED OR
FABRICATED COMPONENTS; SMALL CUTS OR CONTAINERS
OF MATERIALS; COMPLETE UNITS OF REPETITIVELY USED
MATERIALS; SWATCHES SHOWING COLOR, TEXTURE, AND
PATTERN; COLOR RANGE SETS; AND COMPONENTS USED FOR
INDEPENDENT TESTING AND INSPECTION.
a. NUMBER OF SAMPLES: SUBMIT THREE SETS OF
SAMPLES. ARCHITECT WILL RETAIN TWO SAMPLE SETS;
REMAINDER WILL BE RETURNED. MARK UP AND RETAIN
ONE RETURNED SAMPLE SET AS A PROJECT RECORD
SAMPLE.
1) SUBMIT A SINGLE SAMPLE WHERE ASSEMBLY
DETAILS, WORKMANSHIP, FABRICATION TECHNIQUES,
CONNECTIONS, OPERATION, AND OTHER SIMILAR
CHARACTERISTICS ARE TO BE DEMONSTRATED.
2) IF VARIATION IN COLOR, PATTERN, TEXTURE, OR
OTHER CHARACTERISTIC IS INHERENT IN MATERIAL
OR PRODUCT REPRESENTED BY A SAMPLE, SUBMIT
AT LEAST THREE SETS OF PAIRED UNITS THAT SHOW
APPROXIMATE LIMITS OF VARIATIONS.
E. PRODUCT SCHEDULE: AS REQUIRED IN INDIVIDUAL
SPECIFICATION SECTIONS, PREPARE A WRITTEN SUMMARY
INDICATING TYPES OF PRODUCTS REQUIRED FOR THE WORK AND
THEIR INTENDED LOCATION. INCLUDE THE FOLLOWING INFORMATION
IN TABULAR FORM:
4. TYPE OF PRODUCT. INCLUDE UNIQUE IDENTIFIER FOR
EACH PRODUCT INDICATED IN THE
CONTRACT DOCUMENTS OR ASSIGNED BY CONTRACTOR IF
NONE IS INDICATED.
5. MANUFACTURER AND PRODUCT NAME, AND MODEL
NUMBER IF APPLICABLE.
6. NUMBER AND NAME OF ROOM OR SPACE.
7. LOCATION WITHIN ROOM OR SPACE.
8. SUBMIT PRODUCT SCHEDULE IN THE FOLLOWING
FORMAT:
a. PDF ELECTRONIC FILE.
F. COORDINATION DRAWING SUBMITTALS: COMPLY
WITH REQUIREMENTS SPECIFIED IN DIVISION 01 SECTION
“PROJECT MANAGEMENT AND COORDINATION.”
G. CONTRACTOR’S CONSTRUCTION SCHEDULE: COMPLY WITH
REQUIREMENTS SPECIFIED IN DIVISION 01 SECTION “CONSTRUCTION
PROGRESS DOCUMENTATION.”
H. APPLICATION FOR PAYMENT AND SCHEDULE OF VALUES:
COMPLY WITH REQUIREMENTS SPECIFIED IN DIVISION 01 SECTION
“PAYMENT PROCEDURES.”
I. TEST AND INSPECTION REPORTS AND SCHEDULE OF TESTS
AND INSPECTIONS SUBMITTALS: COMPLY WITH REQUIREMENTS
SPECIFIED IN DIVISION 01 SECTION “QUALITY REQUIREMENTS.”
J. CLOSEOUT SUBMITTALS AND MAINTENANCE MATERIAL
SUBMITTALS: COMPLY WITH REQUIREMENTS SPECIFIED IN DIVISION
01 SECTION “CLOSEOUT PROCEDURES.”
K. MAINTENANCE DATA: COMPLY WITH REQUIREMENTS
SPECIFIED IN DIVISION 01 SECTION “OPERATION AND MAINTENANCE
DATA.”
L. QUALIFICATION DATA: PREPARE WRITTEN INFORMATION
THAT DEMONSTRATES CAPABILITIES AND EXPERIENCE OF FIRM OR
PERSON. INCLUDE LISTS OF COMPLETED PROJECTS WITH PROJECT
NAMES AND ADDRESSES, CONTACT INFORMATION OF ARCHITECTS
AND OWNERS, AND OTHER INFORMATION SPECIFIED.
M. WELDING CERTIFICATES: PREPARE WRITTEN CERTIFICATION
THAT WELDING PROCEDURES AND PERSONNEL COMPLY WITH
REQUIREMENTS IN THE CONTRACT DOCUMENTS. SUBMIT RECORD
OF WELDING PROCEDURE SPECIFICATION AND PROCEDURE
QUALIFICATION RECORD ON AWS FORMS. INCLUDE NAMES OF FIRMS
AND PERSONNEL CERTIFIED.
N. INSTALLER CERTIFICATES: SUBMIT WRITTEN STATEMENTS
ON MANUFACTURER’S LETTERHEAD CERTIFYING THAT INSTALLER
COMPLIES WITH REQUIREMENTS IN THE CONTRACT DOCUMENTS
AND, WHERE REQUIRED, IS AUTHORIZED BY MANUFACTURER FOR
THIS SPECIFIC PROJECT.
O. MANUFACTURER CERTIFICATES: SUBMIT WRITTEN
STATEMENTS ON MANUFACTURER’S LETTERHEAD CERTIFYING THAT
MANUFACTURER COMPLIES WITH REQUIREMENTS IN THE CONTRACT
DOCUMENTS. INCLUDE EVIDENCE OF MANUFACTURING EXPERIENCE
WHERE REQUIRED.
P. PRODUCT CERTIFICATES: SUBMIT WRITTEN STATEMENTS
ON MANUFACTURER’S LETTERHEAD CERTIFYING THAT PRODUCT
COMPLIES WITH REQUIREMENTS IN THE CONTRACT DOCUMENTS.
Q. MATERIAL CERTIFICATES: SUBMIT WRITTEN STATEMENTS
ON MANUFACTURER’S LETTERHEAD CERTIFYING THAT MATERIAL
COMPLIES WITH REQUIREMENTS IN THE CONTRACT DOCUMENTS.
R. MATERIAL TEST REPORTS: SUBMIT REPORTS WRITTEN BY
A QUALIFIED TESTING AGENCY, ON TESTING AGENCY’S STANDARD
FORM, INDICATING AND INTERPRETING TEST RESULTS OF MATERIAL
FOR COMPLIANCE WITH REQUIREMENTS IN THE CONTRACT
DOCUMENTS.
6. PRODUCT TEST REPORTS: SUBMIT WRITTEN REPORTS
INDICATING THAT CURRENT PRODUCT PRODUCED BY
MANUFACTURER COMPLIES WITH REQUIREMENTS IN THE
CONTRACT DOCUMENTS. BASE REPORTS ON EVALUATION OF
TESTS PERFORMED BY MANUFACTURER AND WITNESSED BY A
QUALIFIED TESTING AGENCY, OR ON COMPREHENSIVE TESTS
PERFORMED BY A QUALIFIED TESTING AGENCY.
A. RESEARCH REPORTS: SUBMIT WRITTEN EVIDENCE, FROM A
MODEL CODE ORGANIZATION ACCEPTABLE TO AUTHORITIES HAVING
JURISDICTION, THAT PRODUCT COMPLIES WITH BUILDING CODE IN
EFFECT FOR PROJECT. INCLUDE THE FOLLOWING INFORMATION:
1. NAME OF EVALUATION ORGANIZATION.
2. DATE OF EVALUATION.
3. TIME PERIOD WHEN REPORT IS IN EFFECT.
4. PRODUCT AND MANUFACTURERS’ NAMES.
5. DESCRIPTION OF PRODUCT.
6. TEST PROCEDURES AND RESULTS.
7. LIMITATIONS OF USE.
U. PRECONSTRUCTION TEST REPORTS: SUBMIT REPORTS
WRITTEN BY A QUALIFIED TESTING AGENCY, ON TESTING AGENCY’S
STANDARD FORM, INDICATING AND INTERPRETING RESULTS
OF TESTS PERFORMED BEFORE INSTALLATION OF PRODUCT,
FOR COMPLIANCE WITH PERFORMANCE REQUIREMENTS IN THE
CONTRACT DOCUMENTS.
V. COMPATIBILITY TEST REPORTS: SUBMIT REPORTS WRITTEN
GI101
conformed set
revisions :
p r o j e c t # :
d a t e :
20.0550
- june 4, 2021
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
GI204
Sheet Specs
20.0550
- april 7, 2021
Rexburg
Rowhouses
bid set
BY A QUALIFIED TESTING AGENCY, ON TESTING AGENCY’S STANDARD
FORM, INDICATING AND INTERPRETING RESULTS OF COMPATIBILITY
TESTS PERFORMED BEFORE INSTALLATION OF PRODUCT. INCLUDE
WRITTEN RECOMMENDATIONS FOR PRIMERS AND SUBSTRATE
PREPARATION NEEDED FOR ADHESION.
W. FIELD TEST REPORTS: SUBMIT WRITTEN REPORTS
INDICATING AND INTERPRETING RESULTS OF FIELD TESTS
PERFORMED EITHER DURING INSTALLATION OF PRODUCT OR AFTER
PRODUCT IS INSTALLED IN ITS FINAL LOCATION, FOR COMPLIANCE
WITH REQUIREMENTS IN THE CONTRACT DOCUMENTS.
PART 3 - EXECUTION
3.1 CONTRACTOR’S REVIEW
A. ACTION AND INFORMATIONAL SUBMITTALS: REVIEW EACH
SUBMITTAL AND CHECK FOR COORDINATION WITH OTHER WORK
OF THE CONTRACT AND FOR COMPLIANCE WITH THE CONTRACT
DOCUMENTS. NOTE CORRECTIONS AND FIELD DIMENSIONS. MARK
WITH APPROVAL STAMP BEFORE SUBMITTING TO ARCHITECT.
B. PROJECT CLOSEOUT AND MAINTENANCE MATERIAL
SUBMITTALS: SEE REQUIREMENTS IN DIVISION 01 SECTION
“CLOSEOUT PROCEDURES.”
C. APPROVAL STAMP: STAMP EACH SUBMITTAL WITH A UNIFORM,
APPROVAL STAMP. INCLUDE PROJECT NAME AND LOCATION,
SUBMITTAL NUMBER, SPECIFICATION SECTION TITLE AND NUMBER,
NAME OF REVIEWER, DATE OF CONTRACTOR’S APPROVAL, AND
STATEMENT CERTIFYING THAT SUBMITTAL HAS BEEN REVIEWED,
CHECKED, AND APPROVED FOR COMPLIANCE WITH THE CONTRACT
DOCUMENTS.
3.2 ARCHITECT’S ACTION
A. ACTION SUBMITTALS: ARCHITECT WILL REVIEW EACH
SUBMITTAL, MAKE MARKS TO INDICATE CORRECTIONS OR
REVISIONS REQUIRED, AND RETURN IT. ARCHITECT WILL STAMP
EACH SUBMITTAL WITH AN ACTION STAMP AND WILL MARK
STAMP APPROPRIATELY TO INDICATE
1. “REVIEWED”: SUBMITTAL APPEARS TO CONFORM TO
THE INTENT OF THE CONSTRUCTION REQUIREMENTS; OR WITH
MINOR CHANGES AS NOTED (NOTES) WILL MEET THE INTENT
OF THE CONSTRUCTION DOCUMENTS. THE SUBMITTAL MAY BE
USED FOR WORK ON THE PROJECT AS NOTED.
2. “FURNISH AS CORRECTED”: THE SUBMITTAL INCLUDES
INFORMATION THAT MUST BE ADDED TO THE SUBMITTAL FOR
IT TO CONFORM TO THE INTENT OF THE CONSTRUCTION
DOCUMENTS.
3. “REVISE AND RESUBMIT”: THE SUBMITTAL MUST BE
REVISED IN ACCORDANCE WITH COMMENTS NOTED AND
RESUBMITTED FOR REVIEW. THE SUBMITTAL MAY NOT BE
USED FOR WORK ON THE PROJECT.
4. “REJECTED”: THE SUBMITTAL MAY NOT BE USED FOR
WORK ON THE PROJECT.
B. INFORMATIONAL SUBMITTALS: ARCHITECT WILL REVIEW EACH
SUBMITTAL AND WILL NOT RETURN IT, OR WILL RETURN IT IF IT DOES
NOT COMPLY WITH REQUIREMENTS. ARCHITECT WILL FORWARD
EACH SUBMITTAL TO APPROPRIATE PARTY.
C. PARTIAL SUBMITTALS PREPARED FOR A PORTION OF THE
WORK WILL BE REVIEWED WHEN USE OF PARTIAL SUBMITTALS HAS
RECEIVED PRIOR APPROVAL FROM ARCHITECT.
D. INCOMPLETE SUBMITTALS ARE UNACCEPTABLE, WILL BE
CONSIDERED NONRESPONSIVE, AND WILL BE RETURNED FOR
RESUBMITTAL WITHOUT REVIEW.
E. SUBMITTALS NOT REQUIRED BY THE CONTRACT DOCUMENTS
MAY BE RETURNED BY THE ARCHITECT WITHOUT ACTION.
END OF SECTION 01 3300
SECTION 01 4000 - QUALITY REQUIREMENTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND
OTHER DIVISION 01 SPECIFICATION SECTIONS, APPLY TO THIS
SECTION.
1.2 SUMMARY
A. SECTION INCLUDES ADMINISTRATIVE AND PROCEDURAL
REQUIREMENTS FOR QUALITY ASSURANCE AND QUALITY CONTROL.
B. TESTING AND INSPECTING SERVICES ARE REQUIRED
TO VERIFY COMPLIANCE WITH REQUIREMENTS SPECIFIED OR
INDICATED. THESE SERVICES DO NOT RELIEVE CONTRACTOR OF
RESPONSIBILITY FOR COMPLIANCE WITH THE CONTRACT DOCUMENT
REQUIREMENTS.
1. SPECIFIC QUALITY-ASSURANCE AND -CONTROL
REQUIREMENTS FOR INDIVIDUAL CONSTRUCTION ACTIVITIES
ARE SPECIFIED IN THE SECTIONS THAT SPECIFY THOSE
ACTIVITIES. REQUIREMENTS IN THOSE SECTIONS MAY ALSO
COVER PRODUCTION OF STANDARD PRODUCTS.
2. SPECIFIED TESTS, INSPECTIONS, AND RELATED
ACTIONS DO NOT LIMIT CONTRACTOR’S OTHER QUALITY-
ASSURANCE AND -CONTROL PROCEDURES THAT
FACILITATE COMPLIANCE WITH THE CONTRACT DOCUMENT
REQUIREMENTS.
3. REQUIREMENTS FOR CONTRACTOR TO PROVIDE
QUALITY-ASSURANCE AND -CONTROL SERVICES REQUIRED BY
ARCHITECT, OWNER, OR AUTHORITIES HAVING JURISDICTION
ARE NOT LIMITED BY PROVISIONS OF THIS SECTION.
1.3 DEFINITIONS
A. QUALITY-ASSURANCE SERVICES: ACTIVITIES, ACTIONS, AND
PROCEDURES PERFORMED BEFORE AND DURING EXECUTION OF
THE WORK TO GUARD AGAINST DEFECTS AND DEFICIENCIES AND
SUBSTANTIATE THAT PROPOSED CONSTRUCTION WILL COMPLY
WITH REQUIREMENTS.
B. QUALITY-CONTROL SERVICES: TESTS, INSPECTIONS,
PROCEDURES, AND RELATED ACTIONS DURING AND AFTER
EXECUTION OF THE WORK TO EVALUATE THAT ACTUAL PRODUCTS
INCORPORATED INTO THE WORK AND COMPLETED
CONSTRUCTION COMPLY WITH REQUIREMENTS. SERVICES DO NOT
INCLUDE CONTRACT ENFORCEMENT ACTIVITIES PERFORMED BY
ARCHITECT.
C. MOCKUPS: FULL-SIZE PHYSICAL ASSEMBLIES THAT ARE
CONSTRUCTED ON-SITE. MOCKUPS ARE CONSTRUCTED TO VERIFY
SELECTIONS MADE UNDER SAMPLE SUBMITTALS; TO DEMONSTRATE
AESTHETIC EFFECTS AND, WHERE INDICATED, QUALITIES OF
MATERIALS AND EXECUTION; TO REVIEW COORDINATION, TESTING,
OR OPERATION; TO SHOW INTERFACE BETWEEN DISSIMILAR
MATERIALS; AND TO DEMONSTRATE COMPLIANCE WITH SPECIFIED
INSTALLATION TOLERANCES. MOCKUPS ARE NOT SAMPLES. UNLESS
OTHERWISE INDICATED, APPROVED MOCKUPS ESTABLISH THE
STANDARD BY WHICH THE WORK WILL BE JUDGED.
1. LABORATORY MOCKUPS: FULL-SIZE PHYSICAL
ASSEMBLIES CONSTRUCTED AT TESTING FACILITY TO VERIFY
PERFORMANCE CHARACTERISTICS.
D. PRECONSTRUCTION TESTING: TESTS AND INSPECTIONS
PERFORMED SPECIFICALLY FOR PROJECT BEFORE PRODUCTS
AND MATERIALS ARE INCORPORATED INTO THE WORK, TO VERIFY
PERFORMANCE OR COMPLIANCE WITH SPECIFIED CRITERIA.
E. PRODUCT TESTING: TESTS AND INSPECTIONS THAT ARE
PERFORMED BY AN NRTL, AN NVLAP, OR A TESTING AGENCY
QUALIFIED TO CONDUCT PRODUCT TESTING AND ACCEPTABLE
TO AUTHORITIES HAVING JURISDICTION, TO ESTABLISH PRODUCT
PERFORMANCE AND COMPLIANCE WITH SPECIFIED
REQUIREMENTS.
F. SOURCE QUALITY-CONTROL TESTING: TESTS AND
INSPECTIONS THAT ARE PERFORMED AT THE SOURCE, E.G., PLANT,
MILL, FACTORY, OR SHOP.
G. FIELD QUALITY-CONTROL TESTING: TESTS AND INSPECTIONS
THAT ARE PERFORMED ON-SITE FOR INSTALLATION OF THE WORK
AND FOR COMPLETED WORK.
H. TESTING AGENCY: AN ENTITY ENGAGED TO PERFORM
SPECIFIC TESTS, INSPECTIONS, OR BOTH. TESTING LABORATORY
SHALL MEAN THE SAME AS TESTING AGENCY.
I. INSTALLER/APPLICATOR/ERECTOR: CONTRACTOR OR
ANOTHER ENTITY ENGAGED BY CONTRACTOR AS AN EMPLOYEE,
SUBCONTRACTOR, OR SUB-SUBCONTRACTOR, TO PERFORM A
PARTICULAR CONSTRUCTION OPERATION, INCLUDING INSTALLATION,
ERECTION, APPLICATION, AND SIMILAR OPERATIONS.
1. USE OF TRADE-SPECIFIC TERMINOLOGY IN REFERRING
TO A TRADE OR ENTITY DOES NOT REQUIRE THAT CERTAIN
CONSTRUCTION ACTIVITIES BE PERFORMED BY ACCREDITED OR
UNIONIZED INDIVIDUALS, OR THAT REQUIREMENTS SPECIFIED
APPLY EXCLUSIVELY TO SPECIFIC TRADE(S).
J. EXPERIENCED: WHEN USED WITH AN ENTITY OR INDIVIDUAL,
“EXPERIENCED” MEANS HAVING SUCCESSFULLY COMPLETED A
MINIMUM OF FIVE PREVIOUS PROJECTS SIMILAR IN NATURE, SIZE,
AND EXTENT TO THIS PROJECT; BEING FAMILIAR WITH SPECIAL
REQUIREMENTS INDICATED; AND HAVING COMPLIED WITH
REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION.
1.4 CONFLICTING REQUIREMENTS
A. REFERENCED STANDARDS: IF COMPLIANCE WITH TWO OR
MORE STANDARDS IS SPECIFIED AND THE STANDARDS ESTABLISH
DIFFERENT OR CONFLICTING REQUIREMENTS FOR MINIMUM
QUANTITIES OR QUALITY LEVELS, COMPLY WITH THE MOST
STRINGENT REQUIREMENT. REFER CONFLICTING REQUIREMENTS
THAT ARE DIFFERENT, BUT APPARENTLY EQUAL, TO ARCHITECT FOR
A DECISION BEFORE PROCEEDING.
B. MINIMUM QUANTITY OR QUALITY LEVELS: THE QUANTITY
OR QUALITY LEVEL SHOWN OR SPECIFIED SHALL BE THE MINIMUM
PROVIDED OR PERFORMED. THE ACTUAL INSTALLATION MAY
COMPLY EXACTLY WITH THE MINIMUM QUANTITY OR QUALITY
SPECIFIED, OR IT MAY EXCEED THE MINIMUM WITHIN REASONABLE
LIMITS. TO COMPLY WITH THESE REQUIREMENTS, INDICATED
NUMERIC VALUES ARE MINIMUM OR MAXIMUM, AS APPROPRIATE,
FOR THE CONTEXT OF REQUIREMENTS. REFER UNCERTAINTIES TO
ARCHITECT FOR A DECISION BEFORE PROCEEDING.
1.5 ACTION SUBMITTALS
A. SHOP DRAWINGS: FOR INTEGRATED EXTERIOR MOCKUPS,
PROVIDE PLANS, SECTIONS, AND ELEVATIONS, INDICATING
MATERIALS AND SIZE OF MOCKUP CONSTRUCTION.
1. INDICATE MANUFACTURER AND MODEL NUMBER OF
INDIVIDUAL COMPONENTS.
2. PROVIDE AXONOMETRIC DRAWINGS FOR CONDITIONS
DIFFICULT TO ILLUSTRATE IN TWO DIMENSIONS.
1.6 INFORMATIONAL SUBMITTALS
A. CONTRACTOR’S QUALITY-CONTROL PLAN: FOR
QUALITY-ASSURANCE AND QUALITY-CONTROL ACTIVITIES AND
RESPONSIBILITIES.
B. QUALIFICATION DATA: FOR CONTRACTOR’S QUALITY-
CONTROL PERSONNEL.
C. CONTRACTOR’S STATEMENT OF RESPONSIBILITY: WHEN
REQUIRED BY AUTHORITIES HAVING JURISDICTION, SUBMIT COPY
OF WRITTEN STATEMENT OF RESPONSIBILITY SENT TO AUTHORITIES
HAVING JURISDICTION BEFORE STARTING WORK ON THE FOLLOWING
SYSTEMS:
1. SEISMIC-FORCE-RESISTING SYSTEM, DESIGNATED
SEISMIC SYSTEM, OR COMPONENT LISTED IN THE DESIGNATED
SEISMIC SYSTEM QUALITY-ASSURANCE PLAN PREPARED BY
ARCHITECT.
2. MAIN WIND-FORCE-RESISTING SYSTEM OR A WIND-
RESISTING COMPONENT LISTED IN THE WIND-FORCE-
RESISTING SYSTEM QUALITY-ASSURANCE PLAN PREPARED BY
ARCHITECT.
D. TESTING AGENCY QUALIFICATIONS: FOR TESTING AGENCIES
SPECIFIED IN “QUALITY ASSURANCE” ARTICLE TO DEMONSTRATE
THEIR CAPABILITIES AND EXPERIENCE. INCLUDE PROOF OF
QUALIFICATIONS IN THE FORM OF A RECENT REPORT ON THE
INSPECTION OF THE TESTING AGENCY BY A RECOGNIZED
AUTHORITY.
E. SCHEDULE OF TESTS AND INSPECTIONS: PREPARE IN
TABULAR FORM AND INCLUDE THE FOLLOWING:
1. SPECIFICATION SECTION NUMBER AND TITLE.
2. ENTITY RESPONSIBLE FOR PERFORMING TESTS AND
INSPECTIONS.
3. DESCRIPTION OF TEST AND INSPECTION.
4. IDENTIFICATION OF APPLICABLE STANDARDS.
5. IDENTIFICATION OF TEST AND INSPECTION METHODS.
6. NUMBER OF TESTS AND INSPECTIONS REQUIRED.
7. TIME SCHEDULE OR TIME SPAN FOR TESTS AND
INSPECTIONS.
8. REQUIREMENTS FOR OBTAINING SAMPLES.
9. UNIQUE CHARACTERISTICS OF EACH QUALITY-
CONTROL SERVICE.
1.7 REPORTS AND DOCUMENTS
A. TEST AND INSPECTION REPORTS: PREPARE AND SUBMIT
CERTIFIED WRITTEN REPORTS SPECIFIED IN OTHER SECTIONS.
INCLUDE THE FOLLOWING:
1. DATE OF ISSUE.
2. PROJECT TITLE AND NUMBER.
3. NAME, ADDRESS, AND TELEPHONE NUMBER OF
TESTING AGENCY.
4. DATES AND LOCATIONS OF SAMPLES AND TESTS OR
INSPECTIONS.
5. NAMES OF INDIVIDUALS MAKING TESTS AND
INSPECTIONS.
6. DESCRIPTION OF THE WORK AND TEST AND
INSPECTION METHOD.
7. IDENTIFICATION OF PRODUCT AND SPECIFICATION
SECTION.
8. COMPLETE TEST OR INSPECTION DATA.
9. T EST AND INSPECTION RESULTS AND AN
INTERPRETATION OF TEST RESULTS.
10. RECORD OF TEMPERATURE AND WEATHER CONDITIONS
AT TIME OF SAMPLE TAKING AND TESTING AND
INSPECTING.
11. COMMENTS OR PROFESSIONAL OPINION ON WHETHER
TESTED OR INSPECTED WORK COMPLIES WITH THE
CONTRACT DOCUMENT REQUIREMENTS.
12. NAME AND SIGNATURE OF LABORATORY INSPECTOR.
13. RECOMMENDATIONS ON RETESTING AND
REINSPECTING.
B. MANUFACTURER’S TECHNICAL REPRESENTATIVE’S FIELD
REPORTS: PREPARE WRITTEN INFORMATION DOCUMENTING
MANUFACTURER’S TECHNICAL REPRESENTATIVE’S TESTS AND
INSPECTIONS SPECIFIED IN OTHER SECTIONS. INCLUDE THE
FOLLOWING:
1. NAME, ADDRESS, AND TELEPHONE NUMBER OF
TECHNICAL REPRESENTATIVE MAKING REPORT.
2. STATEMENT ON CONDITION OF SUBSTRATES AND THEIR
ACCEPTABILITY FOR INSTALLATION OF PRODUCT.
3. STATEMENT THAT PRODUCTS AT PROJECT SITE COMPLY
WITH REQUIREMENTS.
4. SUMMARY OF INSTALLATION PROCEDURES BEING
FOLLOWED, WHETHER THEY COMPLY WITH REQUIREMENTS
AND, IF NOT, WHAT CORRECTIVE ACTION WAS TAKEN.
5. RESULTS OF OPERATIONAL AND OTHER TESTS AND
A STATEMENT OF WHETHER OBSERVED PERFORMANCE
COMPLIES WITH REQUIREMENTS.
6. STATEMENT WHETHER CONDITIONS, PRODUCTS, AND
INSTALLATION WILL AFFECT WARRANTY.
7. OTHER REQUIRED ITEMS INDICATED IN INDIVIDUAL
SPECIFICATION SECTIONS.
C. PERMITS, LICENSES, AND CERTIFICATES: FOR OWNER’S
RECORDS, SUBMIT COPIES OF PERMITS, LICENSES, CERTIFICATIONS,
INSPECTION REPORTS, RELEASES, JURISDICTIONAL SETTLEMENTS,
NOTICES, RECEIPTS FOR FEE PAYMENTS, JUDGMENTS,
CORRESPONDENCE, RECORDS, AND SIMILAR DOCUMENTS,
ESTABLISHED FOR COMPLIANCE WITH STANDARDS AND
REGULATIONS BEARING ON PERFORMANCE OF THE WORK.
1.8 QUALITY ASSURANCE
A. GENERAL: QUALIFICATIONS PARAGRAPHS IN THIS ARTICLE
ESTABLISH THE MINIMUM QUALIFICATION LEVELS REQUIRED;
INDIVIDUAL
SPECIFICATION SECTIONS SPECIFY ADDITIONAL REQUIREMENTS.
B. MANUFACTURER QUALIFICATIONS: A FIRM EXPERIENCED
IN MANUFACTURING PRODUCTS OR SYSTEMS SIMILAR TO THOSE
INDICATED FOR THIS PROJECT AND WITH A RECORD OF SUCCESSFUL
IN-SERVICE PERFORMANCE, AS WELL AS SUFFICIENT PRODUCTION
CAPACITY TO PRODUCE REQUIRED UNITS.
C. FABRICATOR QUALIFICATIONS: A FIRM EXPERIENCED IN
PRODUCING PRODUCTS SIMILAR TO THOSE INDICATED FOR THIS
PROJECT AND WITH A RECORD OF SUCCESSFUL IN-SERVICE
PERFORMANCE, AS WELL AS SUFFICIENT PRODUCTION CAPACITY TO
PRODUCE REQUIRED UNITS.
D. INSTALLER QUALIFICATIONS: A FIRM OR INDIVIDUAL
EXPERIENCED IN INSTALLING, ERECTING, OR ASSEMBLING WORK
SIMILAR IN MATERIAL, DESIGN, AND EXTENT TO THAT INDICATED FOR
THIS PROJECT, WHOSE WORK HAS RESULTED IN CONSTRUCTION
WITH A RECORD OF SUCCESSFUL IN-SERVICE PERFORMANCE.
E. PROFESSIONAL ENGINEER QUALIFICATIONS:
A PROFESSIONAL ENGINEER WHO IS LEGALLY QUALIFIED TO
PRACTICE IN JURISDICTION WHERE PROJECT IS LOCATED AND WHO
IS EXPERIENCED IN PROVIDING ENGINEERING SERVICES
OF THE KIND INDICATED. ENGINEERING SERVICES ARE DEFINED
AS THOSE PERFORMED FOR INSTALLATIONS OF THE SYSTEM,
ASSEMBLY, OR PRODUCT THAT ARE SIMILAR IN MATERIAL, DESIGN,
AND EXTENT TO THOSE INDICATED FOR THIS PROJECT.
F. TESTING AGENCY QUALIFICATIONS: AN NRTL, AN NVLAP,
OR AN INDEPENDENT AGENCY WITH THE EXPERIENCE AND
CAPABILITY TO CONDUCT TESTING AND INSPECTING INDICATED, AS
DOCUMENTED ACCORDING TO ASTM E 329; AND WITH ADDITIONAL
QUALIFICATIONS SPECIFIED IN INDIVIDUAL SECTIONS; AND, WHERE
REQUIRED BY AUTHORITIES HAVING JURISDICTION, THAT IS
ACCEPTABLE TO AUTHORITIES.
1. NRTL: A NATIONALLY RECOGNIZED TESTING
LABORATORY ACCORDING TO 29 CFR 1910.7.
2. NVLAP: A TESTING AGENCY ACCREDITED
ACCORDING TO NIST’S NATIONAL VOLUNTARY LABORATORY
ACCREDITATION PROGRAM.
G. MANUFACTURER’S TECHNICAL REPRESENTATIVE
QUALIFICATIONS: AN AUTHORIZED REPRESENTATIVE
OF MANUFACTURER WHO IS TRAINED AND APPROVED BY
MANUFACTURER TO OBSERVE AND INSPECT INSTALLATION OF
MANUFACTURER’S PRODUCTS THAT ARE SIMILAR IN MATERIAL,
DESIGN, AND EXTENT TO THOSE INDICATED FOR THIS PROJECT.
H. FACTORY-AUTHORIZED SERVICE REPRESENTATIVE
QUALIFICATIONS: AN AUTHORIZED REPRESENTATIVE OF
MANUFACTURER WHO IS TRAINED AND APPROVED BY
MANUFACTURER TO INSPECT INSTALLATION OF MANUFACTURER’S
PRODUCTS THAT ARE SIMILAR IN MATERIAL, DESIGN, AND EXTENT TO
THOSE INDICATED FOR THIS PROJECT.
I. PRECONSTRUCTION TESTING: WHERE TESTING AGENCY IS
INDICATED TO PERFORM METHODS, COMPLY WITH THE FOLLOWING:
1. CONTRACTOR RESPONSIBILITIES INCLUDE THE
FOLLOWING:
a. PROVIDE TEST SPECIMENS REPRESENTATIVE OF
PROPOSED PRODUCTS AND CONSTRUCTION.
b. SUBMIT SPECIMENS IN A TIMELY MANNER WITH
SUFFICIENT TIME FOR TESTING AND ANALYZING RESULTS
TO PREVENT DELAYING THE WORK.
c. PROVIDE SIZES AND CONFIGURATIONS OF TEST
ASSEMBLIES, MOCKUPS, AND LABORATORY MOCKUPS TO
ADEQUATELY DEMONSTRATE CAPABILITY OF PRODUCTS TO
COMPLY WITH PERFORMANCE REQUIREMENTS.
d. BUILD LABORATORY MOCKUPS AT TESTING FACILITY
USING PERSONNEL, PRODUCTS, AND METHODS OF
CONSTRUCTION INDICATED FOR THE COMPLETED WORK.
e. WHEN TESTING IS COMPLETE, REMOVE TEST
SPECIMENS, ASSEMBLIES, AND MOCKUPS, AND
LABORATORY MOCKUPS; DO NOT REUSE PRODUCTS ON
PROJECT.
2. TESTING AGENCY RESPONSIBILITIES: SUBMIT A
CERTIFIED WRITTEN REPORT OF EACH TEST, INSPECTION,
AND SIMILAR QUALITY-ASSURANCE SERVICE TO ARCHITECT,
WITH COPY TO CONTRACTOR. INTERPRET TESTS AND
INSPECTIONS AND STATE IN EACH REPORT WHETHER TESTED
AND INSPECTED WORK COMPLIES WITH OR DEVIATES FROM
THE CONTRACT DOCUMENTS.
J. MOCKUPS: BEFORE INSTALLING PORTIONS OF THE WORK
REQUIRING MOCKUPS, BUILD MOCKUPS FOR EACH FORM OF
CONSTRUCTION AND FINISH REQUIRED TO COMPLY WITH THE
FOLLOWING REQUIREMENTS, USING MATERIALS INDICATED FOR THE
COMPLETED WORK:
1. BUILD MOCKUPS IN LOCATION AND OF SIZE INDICATED
OR, IF NOT INDICATED, AS DIRECTED BY ARCHITECT.
2. NOTIFY ARCHITECT SEVEN DAYS IN ADVANCE OF DATES
AND TIMES WHEN MOCKUPS WILL BE CONSTRUCTED.
3. EMPLOY SUPERVISORY PERSONNEL WHO WILL
OVERSEE MOCKUP CONSTRUCTION. EMPLOY WORKERS THAT
WILL BE EMPLOYED DURING THE CONSTRUCTION AT PROJECT.
4. DEMONSTRATE THE PROPOSED RANGE OF AESTHETIC
EFFECTS AND WORKMANSHIP.
5. OBTAIN ARCHITECT’S APPROVAL OF MOCKUPS BEFORE
STARTING WORK, FABRICATION, OR CONSTRUCTION.
a. ALLOW SEVEN DAYS FOR INITIAL REVIEW AND EACH RE-
REVIEW OF EACH MOCKUP.
6. MAINTAIN MOCKUPS DURING CONSTRUCTION IN AN
UNDISTURBED CONDITION AS A STANDARD FOR JUDGING THE
COMPLETED WORK.
7. DEMOLISH AND REMOVE MOCKUPS WHEN DIRECTED
UNLESS OTHERWISE INDICATED.
K. LABORATORY MOCKUPS: COMPLY WITH REQUIREMENTS OF
PRECONSTRUCTION TESTING AND THOSE SPECIFIED IN INDIVIDUAL
SPECIFICATION SECTIONS IN DIVISIONS 02 THROUGH 33.
1.9 QUALITY CONTROL
A. OWNER RESPONSIBILITIES: WHERE QUALITY-CONTROL
SERVICES ARE INDICATED AS OWNER’S RESPONSIBILITY, OWNER
WILL ENGAGE A QUALIFIED TESTING AGENCY TO PERFORM THESE
SERVICES.
1. OWNER WILL FURNISH CONTRACTOR WITH NAMES,
ADDRESSES, AND TELEPHONE NUMBERS OF TESTING
AGENCIES ENGAGED AND A DESCRIPTION OF TYPES OF
TESTING AND INSPECTING THEY ARE ENGAGED TO PERFORM.
2. PAYMENT FOR THESE SERVICES WILL BE MADE FROM
TESTING AND INSPECTING ALLOWANCES, AS AUTHORIZED BY
CHANGE ORDERS.
3. COSTS FOR RETESTING AND RE-INSPECTING
CONSTRUCTION THAT REPLACES OR IS NECESSITATED
BY WORK THAT FAILED TO COMPLY WITH THE CONTRACT
DOCUMENTS WILL BE CHARGED TO CONTRACTOR.
B. CONTRACTOR RESPONSIBILITIES: TESTS AND INSPECTIONS
NOT EXPLICITLY ASSIGNED TO OWNER ARE CONTRACTOR’S
RESPONSIBILITY. PERFORM ADDITIONAL QUALITY-CONTROL
ACTIVITIES REQUIRED TO VERIFY THAT THE WORK COMPLIES
WITH REQUIREMENTS, WHETHER SPECIFIED OR NOT.
1. UNLESS OTHERWISE INDICATED, PROVIDE QUALITY-
CONTROL SERVICES SPECIFIED AND THOSE REQUIRED BY
AUTHORITIES HAVING JURISDICTION. PERFORM QUALITY-
CONTROL SERVICES REQUIRED OF CONTRACTOR BY
AUTHORITIES HAVING JURISDICTION, WHETHER SPECIFIED OR
NOT.
2. WHERE SERVICES ARE INDICATED AS CONTRACTOR’S
RESPONSIBILITY, ENGAGE A QUALIFIED TESTING AGENCY TO
PERFORM THESE QUALITY-CONTROL SERVICES.
3. NOTIFY TESTING AGENCIES AT LEAST 24 HOURS IN
ADVANCE OF TIME WHEN WORK THAT REQUIRES TESTING OR
INSPECTING WILL BE PERFORMED.
4. WHERE QUALITY-CONTROL SERVICES ARE INDICATED
AS CONTRACTOR’S RESPONSIBILITY, SUBMIT A CERTIFIED
WRITTEN REPORT, IN DUPLICATE, OF EACH QUALITY-CONTROL
SERVICE.
5. TESTING AND INSPECTING REQUESTED BY
CONTRACTOR AND NOT REQUIRED BY THE CONTRACT
DOCUMENTS ARE CONTRACTOR’S RESPONSIBILITY.
6. SUBMIT ADDITIONAL COPIES OF EACH WRITTEN
REPORT DIRECTLY TO AUTHORITIES HAVING JURISDICTION,
WHEN THEY SO DIRECT.
C. MANUFACTURER’S FIELD SERVICES: WHERE INDICATED,
ENGAGE A FACTORY-AUTHORIZED SERVICE REPRESENTATIVE
TO INSPECT FIELD-ASSEMBLED COMPONENTS AND EQUIPMENT
INSTALLATION, INCLUDING SERVICE CONNECTIONS. REPORT
RESULTS IN WRITING AS SPECIFIED IN DIVISION 01 SECTION
“SUBMITTAL PROCEDURES.”
D. MANUFACTURER’S TECHNICAL SERVICES: WHERE INDICATED,
ENGAGE A MANUFACTURER’S TECHNICAL REPRESENTATIVE TO
OBSERVE AND INSPECT THE WORK. MANUFACTURER’S TECHNICAL
REPRESENTATIVE’S SERVICES INCLUDE PARTICIPATION IN
PREINSTALLATION CONFERENCES, EXAMINATION OF SUBSTRATES
AND CONDITIONS, VERIFICATION OF MATERIALS, OBSERVATION OF
INSTALLER ACTIVITIES, INSPECTION OF COMPLETED PORTIONS OF
THE WORK, AND SUBMITTAL OF WRITTEN REPORTS.
E. RETESTING/REINSPECTING: REGARDLESS OF WHETHER
ORIGINAL TESTS OR INSPECTIONS WERE CONTRACTOR’S
RESPONSIBILITY, PROVIDE QUALITY-CONTROL SERVICES, INCLUDING
RETESTING AND REINSPECTING, FOR CONSTRUCTION THAT
REPLACED WORK THAT FAILED TO COMPLY WITH THE CONTRACT
DOCUMENTS.
F. TESTING AGENCY RESPONSIBILITIES: COOPERATE WITH
ARCHITECT AND CONTRACTOR IN PERFORMANCE OF DUTIES.
PROVIDE QUALIFIED PERSONNEL TO PERFORM REQUIRED TESTS
AND INSPECTIONS.
1. NOTIFY ARCHITECT AND CONTRACTOR PROMPTLY OF
IRREGULARITIES OR DEFICIENCIES OBSERVED IN THE WORK
DURING PERFORMANCE OF ITS SERVICES.
2. DETERMINE THE LOCATION FROM WHICH TEST
SAMPLES WILL BE TAKEN AND IN WHICH IN-SITU TESTS ARE
CONDUCTED.
3. CONDUCT AND INTERPRET TESTS AND INSPECTIONS
AND STATE IN EACH REPORT WHETHER TESTED AND
INSPECTED WORK COMPLIES WITH OR DEVIATES FROM
REQUIREMENTS.
4. SUBMIT A CERTIFIED WRITTEN REPORT, IN DUPLICATE,
OF EACH TEST, INSPECTION, AND SIMILAR QUALITY-CONTROL
SERVICE THROUGH CONTRACTOR.
5. DO NOT RELEASE, REVOKE, ALTER, OR INCREASE THE
CONTRACT DOCUMENT REQUIREMENTS OR APPROVE OR
ACCEPT ANY PORTION OF THE WORK.
6. DO NOT PERFORM ANY DUTIES OF CONTRACTOR.
G. ASSOCIATED SERVICES: COOPERATE WITH AGENCIES
PERFORMING REQUIRED TESTS, INSPECTIONS, AND SIMILAR
QUALITY-CONTROL SERVICES, AND PROVIDE REASONABLE
AUXILIARY SERVICES AS REQUESTED. NOTIFY AGENCY
SUFFICIENTLY IN ADVANCE OF OPERATIONS TO PERMIT ASSIGNMENT
OF PERSONNEL. PROVIDE THE FOLLOWING:
1. ACCESS TO THE WORK.
2. INCIDENTAL LABOR AND FACILITIES NECESSARY TO
FACILITATE TESTS AND INSPECTIONS.
3. ADEQUATE QUANTITIES OF EPRESENTATIVE SAMPLES
OF MATERIALS THAT REQUIRE TESTING AND INSPECTING.
ASSIST AGENCY IN OBTAINING SAMPLES.
4. FACILITIES FOR STORAGE AND FIELD CURING OF TEST
SAMPLES.
5. DELIVERY OF SAMPLES TO TESTING AGENCIES.
6. PRELIMINARY DESIGN MIX PROPOSED FOR USE FOR
MATERIAL MIXES THAT REQUIRE CONTROL BY TESTING
AGENCY.
7. SECURITY AND PROTECTION FOR SAMPLES AND FOR
TESTING AND INSPECTING EQUIPMENT AT PROJECT SITE.
H. COORDINATION: COORDINATE SEQUENCE OF ACTIVITIES TO
ACCOMMODATE REQUIRED QUALITY-ASSURANCE AND -CONTROL
SERVICES WITH A MINIMUM OF DELAY AND TO AVOID NECESSITY OF
REMOVING AND REPLACING CONSTRUCTION TO ACCOMMODATE
TESTING AND INSPECTING.
1. SCHEDULE TIMES FOR TESTS, INSPECTIONS, OBTAINING
SAMPLES, AND SIMILAR ACTIVITIES.
I. SCHEDULE OF TESTS AND INSPECTIONS: PREPARE A
SCHEDULE OF TESTS, INSPECTIONS, AND SIMILAR QUALITY-CONTROL
SERVICES REQUIRED BY THE CONTRACT DOCUMENTS. COORDINATE
AND SUBMIT CONCURRENTLY WITH CONTRACTOR’S CONSTRUCTION
SCHEDULE. UPDATE AS THE WORK PROGRESSES.
1. DISTRIBUTION: DISTRIBUTE SCHEDULE TO OWNER,
ARCHITECT, TESTING AGENCIES, AND EACH PARTY INVOLVED
IN PERFORMANCE OF PORTIONS OF THE WORK WHERE TESTS
AND INSPECTIONS ARE REQUIRED.
1.10 SPECIAL TESTS AND INSPECTIONS
A. SPECIAL TESTS AND INSPECTIONS: ENGAGE A QUALIFIED
TESTING AGENCY TO CONDUCT SPECIAL TESTS AND INSPECTIONS
REQUIRED BY AUTHORITIES HAVING JURISDICTION AS THE
RESPONSIBILITY OF OWNER, AS INDICATED IN STATEMENT OF
SPECIAL INSPECTIONS ATTACHED TO THIS SECTION, AND AS
FOLLOWS:
1. VERIFYING THAT MANUFACTURER MAINTAINS DETAILED
FABRICATION AND QUALITY-CONTROL PROCEDURES AND
REVIEWS THE COMPLETENESS AND ADEQUACY OF THOSE
PROCEDURES TO PERFORM THE WORK.
2. NOTIFYING ARCHITECT AND CONTRACTOR PROMPTLY
OF IRREGULARITIES AND DEFICIENCIES OBSERVED IN THE
WORK DURING PERFORMANCE OF ITS SERVICES.
3. SUBMITTING A CERTIFIED WRITTEN REPORT OF
EACH TEST, INSPECTION, AND SIMILAR QUALITY-CONTROL
SERVICE TO ARCHITECT WITH COPY TO CONTRACTOR AND TO
AUTHORITIES HAVING JURISDICTION.
4. SUBMITTING A FINAL REPORT OF SPECIAL TESTS AND
INSPECTIONS AT SUBSTANTIAL COMPLETION, WHICH INCLUDES
A LIST OF UNRESOLVED DEFICIENCIES.
5. INTERPRETING TESTS AND INSPECTIONS AND STATING
IN EACH REPORT WHETHER TESTED AND INSPECTED
WORK COMPLIES WITH OR DEVIATES FROM THE CONTRACT
DOCUMENTS.
6. RETESTING AND REINSPECTING CORRECTED WORK.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 TEST AND INSPECTION LOG
A. TEST AND INSPECTION LOG: PREPARE A RECORD OF TESTS
AND INSPECTIONS. INCLUDE THE FOLLOWING:
1. DATE TEST OR INSPECTION WAS CONDUCTED.
2. DESCRIPTION OF THE WORK TESTED OR INSPECTED.
3. DATE TEST OR INSPECTION RESULTS WERE
TRANSMITTED TO ARCHITECT.
4. IDENTIFICATION OF TESTING AGENCY OR SPECIAL
INSPECTOR CONDUCTING TEST OR INSPECTION.
B. MAINTAIN LOG AT PROJECT SITE. POST CHANGES AND
REVISIONS AS THEY OCCUR. PROVIDE ACCESS TO TEST AND
INSPECTION LOG FOR ARCHITECT’S REFERENCE DURING NORMAL
WORKING HOURS.
3.2 REPAIR AND PROTECTION
A. GENERAL: ON COMPLETION OF TESTING, INSPECTING,
SAMPLE TAKING, AND SIMILAR SERVICES, REPAIR DAMAGED
CONSTRUCTION AND RESTORE SUBSTRATES AND FINISHES.
1. PROVIDE MATERIALS AND COMPLY WITH INSTALLATION
REQUIREMENTS SPECIFIED IN OTHER SPECIFICATION
SECTIONS OR MATCHING EXISTING SUBSTRATES AND
FINISHES. RESTORE PATCHED AREAS AND EXTEND
RESTORATION INTO ADJOINING AREAS WITH DURABLE SEAMS
THAT ARE AS INVISIBLE AS POSSIBLE. COMPLY WITH THE
CONTRACT DOCUMENT REQUIREMENTS FOR C
CUTTING AND PATCHING IN DIVISION 01 SECTION “EXECUTION.”
B. PROTECT CONSTRUCTION EXPOSED BY OR FOR QUALITY-
CONTROL SERVICE ACTIVITIES.
C. REPAIR AND PROTECTION ARE CONTRACTOR’S
RESPONSIBILITY, REGARDLESS OF THE ASSIGNMENT OF
RESPONSIBILITY FOR QUALITY-CONTROL SERVICES.
END OF SECTION 01 4000
SECTION 01 5000 - TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND
OTHER DIVISION 01 SPECIFICATION SECTIONS, APPLY TO THIS
SECTION.
1.2 SUMMARY
A. SECTION INCLUDES REQUIREMENTS FOR TEMPORARY
UTILITIES, SUPPORT FACILITIES, AND SECURITY AND PROTECTION
FACILITIES.
B. RELATED REQUIREMENTS:
1. DIVISION 01 SECTION “SUMMARY” FOR WORK
RESTRICTIONS AND LIMITATIONS ON UTILITY INTERRUPTIONS.
1.3 USE CHARGES
A. GENERAL: INSTALLATION AND REMOVAL OF AND USE
CHARGES FOR TEMPORARY FACILITIES SHALL BE INCLUDED IN THE
CONTRACT SUM UNLESS OTHERWISE INDICATED. ALLOW OTHER
ENTITIES TO USE TEMPORARY SERVICES AND FACILITIES WITHOUT
COST, INCLUDING, BUT NOT LIMITED TO, ARCHITECT, TESTING
AGENCIES, AND AUTHORITIES HAVING JURISDICTION..
1.4 INFORMATIONAL SUBMITTALS
A. DUST- AND HVAC-CONTROL PLAN: SUBMIT COORDINATION
DRAWING AND NARRATIVE THAT INDICATES THE DUST- AND
HVAC-CONTROL MEASURES PROPOSED FOR USE, PROPOSED
LOCATIONS, AND PROPOSED TIME FRAME FOR THEIR OPERATION.
IDENTIFY FURTHER OPTIONS IF PROPOSED MEASURES ARE LATER
DETERMINED TO BE INADEQUATE. INCLUDE THE FOLLOWING:
1. LOCATIONS OF DUST-CONTROL PARTITIONS AT EACH
PHASE OF WORK.
2. HVAC SYSTEM ISOLATION SCHEMATIC DRAWING.
3. LOCATION OF PROPOSED AIR-FILTRATION SYSTEM
DISCHARGE.
4. WASTE HANDLING PROCEDURES.
5. OTHER DUST-CONTROL MEASURES.
1.5 QUALITY ASSURANCE
A. TESTS AND INSPECTIONS: ARRANGE FOR AUTHORITIES
HAVING JURISDICTION TO TEST AND INSPECT EACH TEMPORARY
UTILITY BEFORE USE. OBTAIN REQUIRED CERTIFICATIONS AND
PERMITS.
B. ACCESSIBLE TEMPORARY EGRESS: COMPLY WITH
APPLICABLE PROVISIONS IN THE U.S. ARCHITECTURAL &
TRANSPORTATION BARRIERS COMPLIANCE BOARD’S ADA-ABA
ACCESSIBILITY GUIDELINES AND ICC/ANSI A117.1.
1.6 PROJECT CONDITIONS
A. TEMPORARY USE OF PERMANENT FACILITIES: ENGAGE
INSTALLER OF EACH PERMANENT SERVICE TO ASSUME
RESPONSIBILITY FOR OPERATION, MAINTENANCE, AND
PROTECTION OF EACH PERMANENT SERVICE DURING ITS USE
AS A CONSTRUCTION FACILITY BEFORE OWNER’S ACCEPTANCE,
REGARDLESS OF PREVIOUSLY ASSIGNED RESPONSIBILITIES.
PART 2 - PRODUCTS
2.1 MATERIALS
A. DUST-CONTROL ADHESIVE-SURFACE WALK-OFF MATS:
PROVIDE MATS MINIMUM 36 BY 60 INCHES.
2.2 TEMPORARY FACILITIES
A. FIELD OFFICES, GENERAL: PREFABRICATED OR MOBILE
UNITS WITH SERVICEABLE FINISHES, TEMPERATURE CONTROLS, AND
FOUNDATIONS ADEQUATE FOR NORMAL LOADING.
B. COMMON-USE FIELD OFFICE: OF SUFFICIENT SIZE TO
ACCOMMODATE NEEDS OF OWNER, ARCHITECT, AND CONSTRUCTION
PERSONNEL OFFICE ACTIVITIES AND TO ACCOMMODATE PROJECT
MEETINGS SPECIFIED IN OTHER DIVISION 01 SECTIONS. KEEP
OFFICE CLEAN AND ORDERLY. FURNISH AND EQUIP OFFICES AS
FOLLOWS:
1. FURNITURE REQUIRED FOR PROJECT-SITE DOCUMENTS
INCLUDING FILE CABINETS, PLAN TABLES, PLAN RACKS, AND
BOOKCASES.
2. CONFERENCE ROOM OF SUFFICIENT SIZE TO
ACCOMMODATE MEETINGS OF 10 INDIVIDUALS. PROVIDE
ELECTRICAL POWER SERVICE AND 120-V AC DUPLEX
RECEPTACLES, WITH NO FEWER THAN ONE RECEPTACLE
ON EACH WALL. FURNISH ROOM WITH CONFERENCE TABLE,
CHAIRS, AND 4-FOOT- SQUARE TACK AND MARKER BOARDS.
3. DRINKING WATER AND PRIVATE TOILET.
4. COFFEE MACHINE AND SUPPLIES.
5. HEATING AND COOLING EQUIPMENT NECESSARY TO
MAINTAIN A UNIFORM INDOOR TEMP. OF 68 TO 72 DEG F.
6. LIGHTING FIXTURES CAPABLE OF MAINTAINING
AVERAGE ILLUMINATION OF 20 FC AT DESK HEIGHT.
2.3 EQUIPMENT
A. FIRE EXTINGUISHERS: PORTABLE, UL RATED; WITH CLASS
AND EXTINGUISHING AGENT AS REQUIRED BY LOCATIONS AND
CLASSES OF FIRE EXPOSURES.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. LOCATE FACILITIES WHERE THEY WILL SERVE PROJECT
ADEQUATELY AND RESULT IN MINIMUM INTERFERENCE WITH
PERFORMANCE OF THE WORK. RELOCATE AND MODIFY FACILITIES
AS REQUIRED BY PROGRESS OF THE WORK.
B. PROVIDE EACH FACILITY READY FOR USE WHEN NEEDED TO
AVOID DELAY. DO NOT REMOVE UNTIL FACILITIES ARE NO LONGER
NEEDED OR ARE REPLACED BY AUTHORIZED USE OF COMPLETED
PERMANENT FACILITIES.
3.2 SUPPORT FACILITIES INSTALLATION
A. GENERAL: COMPLY WITH THE FOLLOWING:
1. PROVIDE CONSTRUCTION FOR TEMPORARY OFFICES,
SHOPS, AND SHEDS LOCATED WITHIN CONSTRUCTION
AREA OR WITHIN 30 FEET OF BUILDING LINES THAT IS
NONCOMBUSTIBLE ACCORDING TO ASTM E 136. COMPLY WITH
NFPA 241.
2. MAINTAIN SUPPORT FACILITIES UNTIL ARCHITECT
SCHEDULES SUBSTANTIAL COMPLETION INSPECTION.
REMOVE BEFORE SUBSTANTIAL COMPLETION. PERSONNEL
REMAINING AFTER SUBSTANTIAL COMPLETION WILL BE
PERMITTED TO USE PERMANENT FACILITIES, UNDER
CONDITIONS ACCEPTABLE TO OWNER.
B. PARKING: USE DESIGNATED AREAS OF OWNER’S EXISTING
PARKING AREAS FOR CONSTRUCTION PERSONNEL.
C. EXISTING ELEVATOR USE: USE OF OWNER’S EXISTING
ELEVATORS WILL BE PERMITTED, PROVIDED ELEVATORS ARE
CLEANED AND MAINTAINED IN A CONDITION ACCEPTABLE TO OWNER.
AT SUBSTANTIAL COMPLETION, RESTORE ELEVATORS TO CONDITION
EXISTING BEFORE INITIAL USE, INCLUDING REPLACING WORN
CABLES, GUIDE SHOES, AND SIMILAR ITEMS OF LIMITED LIFE.
1. DO NOT LOAD ELEVATORS BEYOND THEIR RATED
WEIGHT CAPACITY.
2. PROVIDE PROTECTIVE COVERINGS, BARRIERS,
DEVICES, SIGNS, OR OTHER PROCEDURES TO PROTECT
ELEVATOR CAR AND ENTRANCE DOORS AND FRAME. IF,
DESPITE SUCH PROTECTION, ELEVATORS BECOME DAMAGED,
ENGAGE ELEVATOR INSTALLER TO RESTORE DAMAGED WORK
SO NO EVIDENCE REMAINS OF CORRECTION WORK. RETURN
ITEMS THAT CANNOT BE REFINISHED IN FIELD TO THE SHOP,
MAKE REQUIRED REPAIRS AND REFINISH ENTIRE UNIT, OR
PROVIDE NEW UNITS AS REQUIRED.
D. EXISTING STAIR USAGE: USE OF OWNER’S EXISTING
STAIRS WILL BE PERMITTED, PROVIDED STAIRS ARE CLEANED
AND MAINTAINED IN A CONDITION ACCEPTABLE TO OWNER. AT
SUBSTANTIAL COMPLETION, RESTORE STAIRS TO CONDITION
EXISTING BEFORE INITIAL USE.
1. PROVIDE PROTECTIVE COVERINGS, BARRIERS,
DEVICES, SIGNS, OR OTHER PROCEDURES TO PROTECT
STAIRS AND TO MAINTAIN MEANS OF EGRESS. IF STAIRS
BECOME DAMAGED, RESTORE DAMAGED AREAS SO NO
EVIDENCE REMAINS OF CORRECTION WORK.
3.3 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. PROTECTION OF EXISTING FACILITIES: PROTECT EXISTING
VEGETATION, EQUIPMENT, STRUCTURES, UTILITIES, AND OTHER
IMPROVEMENTS AT PROJECT SITE AND ON ADJACENT PROPERTIES,
EXCEPT THOSE INDICATED TO BE REMOVED OR ALTERED. REPAIR
DAMAGE TO EXISTING FACILITIES.
B. TEMPORARY PARTITIONS: IF NECESSARY, PROVIDE FLOOR-
TO-CEILING DUSTPROOF PARTITIONS TO LIMIT DUST AND DIRT
MIGRATION AND TO SEPARATE AREAS OCCUPIED BY TENANTS FROM
FUMES AND NOISE.
1. CONSTRUCT DUSTPROOF PARTITIONS WITH GYPSUM
WALLBOARD WITH JOINTS TAPED ON OCCUPIED SIDE, AND
FIRE-RETARDANT-TREATED PLYWOOD ON CONSTRUCTION
OPERATIONS SIDE.
2. INSULATE PARTITIONS TO CONTROL NOISE
TRANSMISSION TO OCCUPIED AREAS.
3. SEAL JOINTS AND PERIMETER. EQUIP PARTITIONS WITH
GASKETED DUSTPROOF DOORS AND SECURITY LOCKS WHERE
OPENINGS ARE REQUIRED.
4. PROTECT AIR-HANDLING EQUIPMENT.
5. PROVIDE WALK-OFF MATS AT EACH ENTRANCE
THROUGH TEMPORARY PARTITION.
3.4 OPERATION, TERMINATION, AND REMOVAL
A. SUPERVISION: ENFORCE STRICT DISCIPLINE IN USE OF
TEMPORARY FACILITIES. TO MINIMIZE WASTE AND ABUSE, LIMIT
AVAILABILITY OF TEMPORARY FACILITIES TO ESSENTIAL AND
INTENDED USES.
B. MAINTENANCE: MAINTAIN FACILITIES IN GOOD OPERATING
CONDITION UNTIL REMOVAL.
1. MAINTAIN OPERATION OF TEMPORARY ENCLOSURES,
HEATING, COOLING, HUMIDITY CONTROL, VENTILATION, AND
SIMILAR FACILITIES ON A 24-HOUR BASIS WHERE REQUIRED TO
GI101
conformed set
revisions :
p r o j e c t # :
d a t e :
20.0550
- june 4, 2021
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
GI205
Sheet Specs
20.0550
- april 7, 2021
Rexburg
Rowhouses
bid set
ACHIEVE INDICATED RESULTS AND TO AVOID POSSIBILITY OF
DAMAGE.
C. TERMINATION AND REMOVAL: REMOVE EACH TEMPORARY
FACILITY WHEN NEED FOR ITS SERVICE HAS ENDED, WHEN IT HAS
BEEN REPLACED BY AUTHORIZED USE OF A PERMANENT FACILITY,
OR NO LATER THAN SUBSTANTIAL COMPLETION. COMPLETE OR, IF
NECESSARY, RESTORE PERMANENT CONSTRUCTION THAT MAY HAVE
BEEN DELAYED BECAUSE OF INTERFERENCE WITH TEMPORARY
FACILITY. REPAIR DAMAGED WORK, CLEAN EXPOSED SURFACES,
AND REPLACE CONSTRUCTION THAT CANNOT BE SATISFACTORILY
REPAIRED.
1. MATERIALS AND FACILITIES THAT CONSTITUTE
TEMPORARY FACILITIES ARE PROPERTY OF CONTRACTOR.
OWNER RESERVES RIGHT TO TAKE POSSESSION OF PROJECT
IDENTIFICATION SIGNS.
2. AT SUBSTANTIAL COMPLETION, REPAIR, RENOVATE, AND
CLEAN PERMANENT FACILITIES USED DURING CONSTRUCTION
PERIOD. COMPLY WITH FINAL CLEANING REQUIREMENTS
SPECIFIED IN DIVISION 01 SECTION “CLOSEOUT PROCEDURES.”
END OF SECTION 01 5000
SECTION 01 6000 - PRODUCT REQUIREMENTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND OTHER
DIVISION 01 SPECIFICATION SECTIONS, APPLY TO THIS SECTION.
1.2 SUMMARY
A. SECTION INCLUDES ADMINISTRATIVE AND PROCEDURAL
REQUIREMENTS FOR SELECTION OF PRODUCTS FOR USE IN
PROJECT; PRODUCT DELIVERY, STORAGE, AND HANDLING;
MANUFACTURERS’ STANDARD WARRANTIES ON PRODUCTS; SPECIAL
WARRANTIES; AND COMPARABLE PRODUCTS.
B. RELATED REQUIREMENTS:
1. DIVISION 01 SECTION “SUBSTITUTION PROCEDURES”
FOR REQUESTS FOR SUBSTITUTIONS.
1.3 DEFINITIONS
A. PRODUCTS: ITEMS OBTAINED FOR INCORPORATING INTO
THE WORK, WHETHER PURCHASED FOR PROJECT OR TAKEN FROM
PREVIOUSLY PURCHASED STOCK. THE TERM “PRODUCT” INCLUDES
THE TERMS “MATERIAL,” “EQUIPMENT,” “SYSTEM,” AND TERMS OF
SIMILAR INTENT.
1. NAMED PRODUCTS: ITEMS IDENTIFIED BY
MANUFACTURER’S PRODUCT NAME, INCLUDING MAKE OR
MODEL NUMBER OR OTHER DESIGNATION SHOWN OR LISTED
IN MANUFACTURER’S PUBLISHED PRODUCT LITERATURE, THAT
IS CURRENT AS OF DATE OF THE CONTRACT DOCUMENTS.
2. NEW PRODUCTS: ITEMS THAT HAVE NOT PREVIOUSLY
BEEN INCORPORATED INTO ANOTHER PROJECT OR FACILITY.
PRODUCTS SALVAGED OR RECYCLED FROM OTHER PROJECTS
ARE NOT CONSIDERED NEW PRODUCTS.
3. COMPARABLE PRODUCT: PRODUCT THAT IS
DEMONSTRATED AND APPROVED THROUGH SUBMITTAL
PROCESS TO HAVE THE INDICATED QUALITIES RELATED TO
TYPE, FUNCTION, DIMENSION, IN-SERVICE PERFORMANCE,
PHYSICAL PROPERTIES, APPEARANCE, AND OTHER
CHARACTERISTICS THAT EQUAL OR EXCEED THOSE OF
SPECIFIED PRODUCT.
B. BASIS-OF-DESIGN PRODUCT SPECIFICATION: A SPECIFICATION
IN WHICH A SPECIFIC MANUFACTURER’S PRODUCT IS NAMED AND
ACCOMPANIED BY THE WORDS “BASIS-OF-DESIGN PRODUCT,”
INCLUDING MAKE OR MODEL NUMBER OR OTHER DESIGNATION,
TO ESTABLISH THE SIGNIFICANT QUALITIES RELATED TO TYPE,
FUNCTION, DIMENSION, IN-SERVICE PERFORMANCE, PHYSICAL
PROPERTIES, APPEARANCE, AND OTHER CHARACTERISTICS
FOR PURPOSES OF EVALUATING COMPARABLE PRODUCTS OF
ADDITIONAL MANUFACTURERS NAMED IN THE SPECIFICATION.
1.4 ACTION SUBMITTALS
A. COMPARABLE PRODUCT REQUESTS: SUBMIT REQUEST
FOR CONSIDERATION OF EACH COMPARABLE PRODUCT. IDENTIFY
PRODUCT OR FABRICATION OR INSTALLATION METHOD TO BE
REPLACED. INCLUDE SPECIFICATION SECTION NUMBER AND TITLE
AND DRAWING NUMBERS AND TITLES.
1. INCLUDE DATA TO INDICATE COMPLIANCE WITH THE
REQUIREMENTS SPECIFIED IN “COMPARABLE PRODUCTS”
ARTICLE.
2. ARCHITECT’S ACTION: IF NECESSARY, ARCHITECT WILL
REQUEST ADDITIONAL INFORMATION OR DOCUMENTATION
FOR EVALUATION WITHIN ONE WEEK OF RECEIPT OF A
COMPARABLE PRODUCT REQUEST. ARCHITECT WILL NOTIFY
CONTRACTOR OF APPROVAL OR REJECTION OF PROPOSED
COMPARABLE PRODUCT REQUEST WITHIN 15 DAYS OF
RECEIPT OF REQUEST, OR SEVEN DAYS OF RECEIPT OF
ADDITIONAL INFORMATION OR DOCUMENTATION, WHICHEVER
IS LATER.
a. FORM OF APPROVAL: AS SPECIFIED IN DIVISION 01
SECTION “SUBMITTAL PROCEDURES.”
b. USE PRODUCT SPECIFIED IF ARCHITECT DOES NOT
ISSUE A DECISION ON USE OF A COMPARABLE PRODUCT
REQUEST WITHIN TIME ALLOCATED.
B. BASIS-OF-DESIGN PRODUCT SPECIFICATION SUBMITTAL:
COMPLY WITH REQUIREMENTS IN DIVISION 01 SECTION “SUBMITTAL
PROCEDURES.” SHOW COMPLIANCE WITH REQUIREMENTS.
1.5 QUALITY ASSURANCE
A. COMPATIBILITY OF OPTIONS: IF CONTRACTOR IS GIVEN
OPTION OF SELECTING BETWEEN TWO OR MORE PRODUCTS FOR
USE ON PROJECT, SELECT PRODUCT COMPATIBLE WITH PRODUCTS
PREVIOUSLY SELECTED, EVEN IF PREVIOUSLY SELECTED PRODUCTS
WERE ALSO OPTIONS.
1. EACH CONTRACTOR IS RESPONSIBLE FOR PROVIDING
PRODUCTS AND CONSTRUCTION METHODS COMPATIBLE
WITH PRODUCTS AND CONSTRUCTION METHODS OF OTHER
CONTRACTORS.
2. IF A DISPUTE ARISES BETWEEN CONTRACTORS OVER
CONCURRENTLY SELECTABLE BUT INCOMPATIBLE PRODUCTS,
ARCHITECT WILL DETERMINE WHICH PRODUCTS SHALL BE
USED.
1.6 PRODUCT DELIVERY, STORAGE, AND HANDLING
A. DELIVER, STORE, AND HANDLE PRODUCTS USING MEANS
AND METHODS THAT WILL PREVENT DAMAGE, DETERIORATION,
AND LOSS, INCLUDING THEFT AND VANDALISM. COMPLY WITH
MANUFACTURER’S WRITTEN INSTRUCTIONS.
B. DELIVERY AND HANDLING:
1. SCHEDULE DELIVERY TO MINIMIZE LONG-TERM
STORAGE AT PROJECT SITE AND TO PREVENT OVERCROWDING
OF CONSTRUCTION SPACES.
2. COORDINATE DELIVERY WITH INSTALLATION TIME
TO ENSURE MINIMUM HOLDING TIME FOR ITEMS THAT ARE
FLAMMABLE, HAZARDOUS, EASILY DAMAGED, OR SENSITIVE
TO DETERIORATION, THEFT, AND OTHER LOSSES.
3. DELIVER PRODUCTS TO PROJECT SITE IN AN
UNDAMAGED CONDITION IN MANUFACTURER’S ORIGINAL
SEALED CONTAINER OR OTHER PACKAGING SYSTEM,
COMPLETE WITH LABELS AND INSTRUCTIONS FOR HANDLING,
STORING, UNPACKING, PROTECTING, AND INSTALLING.
4. INSPECT PRODUCTS ON DELIVERY TO DETERMINE
COMPLIANCE WITH THE CONTRACT DOCUMENTS AND
TO DETERMINE THAT PRODUCTS ARE UNDAMAGED AND
PROPERLY PROTECTED.
C. STORAGE:
1. STORE PRODUCTS TO ALLOW FOR INSPECTION AND
MEASUREMENT OF QUANTITY OR COUNTING OF UNITS.
2. STORE MATERIALS IN A MANNER THAT WILL NOT
ENDANGER PROJECT STRUCTURE.
3. STORE PRODUCTS THAT ARE SUBJECT TO DAMAGE
BY THE ELEMENTS, UNDER COVER IN A WEATHERTIGHT
ENCLOSURE ABOVE GROUND, WITH VENTILATION ADEQUATE
TO PREVENT CONDENSATION.
4. PROTECT FOAM PLASTIC FROM EXPOSURE TO
SUNLIGHT, EXCEPT TO EXTENT NECESSARY FOR PERIOD OF
INSTALLATION AND CONCEALMENT.
5. COMPLY WITH PRODUCT MANUFACTURER’S WRITTEN
INSTRUCTIONS FOR TEMPERATURE, HUMIDITY, VENTILATION,
AND WEATHER-PROTECTION REQUIREMENTS FOR STORAGE.
6. PROTECT STORED PRODUCTS FROM DAMAGE AND
LIQUIDS FROM FREEZING.
7. PROVIDE A SECURE LOCATION AND ENCLOSURE AT
PROJECT SITE FOR STORAGE OF MATERIALS AND EQUIPMENT
BY OWNER’S CONSTRUCTION FORCES. COORDINATE
LOCATION WITH OWNER.
1.7 PRODUCT WARRANTIES
A. WARRANTIES SPECIFIED IN OTHER SECTIONS SHALL BE IN
ADDITION TO, AND RUN CONCURRENT WITH, OTHER WARRANTIES
REQUIRED BY THE CONTRACT DOCUMENTS. MANUFACTURER’S
DISCLAIMERS AND LIMITATIONS ON PRODUCT WARRANTIES DO NOT
RELIEVE CONTRACTOR OF OBLIGATIONS UNDER REQUIREMENTS OF
THE CONTRACT DOCUMENTS.
1. MANUFACTURER’S WARRANTY: WRITTEN WARRANTY
FURNISHED BY INDIVIDUAL MANUFACTURER FOR A
PARTICULAR PRODUCT AND SPECIFICALLY ENDORSED BY
MANUFACTURER TO OWNER.
2. SPECIAL WARRANTY: WRITTEN WARRANTY REQUIRED
BY THE CONTRACT DOCUMENTS TO PROVIDE SPECIFIC
RIGHTS FOR OWNER.
B. SPECIAL WARRANTIES: PREPARE A WRITTEN DOCUMENT THAT
CONTAINS APPROPRIATE TERMS AND IDENTIFICATION, READY FOR
EXECUTION.
1. MANUFACTURER’S STANDARD FORM: MODIFIED TO
INCLUDE PROJECT-SPECIFIC INFORMATION AND PROPERLY
EXECUTED.
2. SPECIFIED FORM: WHEN SPECIFIED FORMS ARE
INCLUDED WITH THE SPECIFICATIONS, PREPARE A WRITTEN
DOCUMENT USING INDICATED FORM PROPERLY EXECUTED.
3. SEE DIVISIONS 02 THROUGH 33 SECTIONS FOR
SPECIFIC CONTENT REQUIREMENTS AND PARTICULAR
REQUIREMENTS FOR SUBMITTING SPECIAL WARRANTIES.
C. SUBMITTAL TIME: COMPLY WITH REQUIREMENTS IN DIVISION
01 SECTION “CLOSEOUT PROCEDURES.”
PART 2 - PRODUCTS
2.1 PRODUCT SELECTION PROCEDURES
A. GENERAL PRODUCT REQUIREMENTS: PROVIDE PRODUCTS
THAT COMPLY WITH THE CONTRACT DOCUMENTS, ARE UNDAMAGED
AND, UNLESS OTHERWISE INDICATED, ARE NEW AT TIME OF
INSTALLATION.
1. PROVIDE PRODUCTS COMPLETE WITH ACCESSORIES,
TRIM, FINISH, FASTENERS, AND OTHER ITEMS NEEDED FOR A
COMPLETE INSTALLATION AND INDICATED USE AND EFFECT.
2. STANDARD PRODUCTS: IF AVAILABLE, AND UNLESS
CUSTOM PRODUCTS OR NONSTANDARD OPTIONS ARE
SPECIFIED, PROVIDE STANDARD PRODUCTS OF TYPES THAT
HAVE BEEN PRODUCED AND USED SUCCESSFULLY IN SIMILAR
SITUATIONS ON OTHER PROJECTS.
3. OWNER RESERVES THE RIGHT TO LIMIT SELECTION
TO PRODUCTS WITH WARRANTIES NOT IN CONFLICT WITH
REQUIREMENTS OF THE CONTRACT DOCUMENTS.
4. WHERE PRODUCTS ARE ACCOMPANIED BY THE TERM
“AS SELECTED,” ARCHITECT WILL MAKE SELECTION.
5. DESCRIPTIVE, PERFORMANCE, AND REFERENCE
STANDARD REQUIREMENTS IN THE SPECIFICATIONS
ESTABLISH SALIENT CHARACTERISTICS OF PRODUCTS.
6. OR EQUIVALENT: FOR PRODUCTS SPECIFIED BY NAME
AND ACCOMPANIED BY THE TERM “OR EQUIVALENT,” OR
“OR APPROVED EQUAL,” OR “OR APPROVED,” COMPLY WITH
REQUIREMENTS IN “COMPARABLE PRODUCTS” ARTICLE TO
OBTAIN APPROVAL FOR USE OF AN UNNAMED PRODUCT.
B. PRODUCT SELECTION PROCEDURES:
1. PRODUCT: WHERE SPECIFICATIONS NAME A
SINGLE MANUFACTURER AND PRODUCT, PROVIDE THE
NAMED PRODUCT THAT COMPLIES WITH REQUIREMENTS.
COMPARABLE PRODUCTS OR SUBSTITUTIONS FOR
CONTRACTOR’S CONVENIENCE WILL NOT BE CONSIDERED.
2. MANUFACTURER/SOURCE: WHERE SPECIFICATIONS
NAME A SINGLE MANUFACTURER OR SOURCE, PROVIDE A
PRODUCT BY THE NAMED MANUFACTURER OR SOURCE THAT
COMPLIES WITH REQUIREMENTS. COMPARABLE PRODUCTS
OR SUBSTITUTIONS FOR CONTRACTOR’S CONVENIENCE WILL
NOT BE CONSIDERED.
3. PRODUCTS:
a. RESTRICTED LIST: WHERE SPECIFICATIONS INCLUDE
A LIST OF NAMES OF BOTH MANUFACTURERS AND
PRODUCTS, PROVIDE ONE OF THE PRODUCTS LISTED
THAT COMPLIES WITH REQUIREMENTS. COMPARABLE
PRODUCTS OR SUBSTITUTIONS FOR CONTRACTOR’S
CONVENIENCE WILL NOT BE CONSIDERED UNLESS
OTHERWISE INDICATED.
b. NONRESTRICTED LIST: WHERE SPECIFICATIONS
INCLUDE A LIST OF NAMES OF BOTH AVAILABLE
MANUFACTURERS AND PRODUCTS, PROVIDE ONE OF
THE PRODUCTS LISTED, OR AN UNNAMED PRODUCT,
THAT COMPLIES WITH REQUIREMENTS. COMPLY WITH
REQUIREMENTS IN “COMPARABLE PRODUCTS” ARTICLE
FOR CONSIDERATION OF AN UNNAMED PRODUCT.
4. MANUFACTURERS:
a. RESTRICTED LIST: WHERE SPECIFICATIONS INCLUDE
A LIST OF MANUFACTURERS’ NAMES, PROVIDE A PRODUCT
BY ONE OF THE MANUFACTURERS LISTED THAT COMPLIES
WITH REQUIREMENTS. COMPARABLE PRODUCTS OR
SUBSTITUTIONS FOR CONTRACTOR’S CONVENIENCE WILL
NOT BE CONSIDERED UNLESS OTHERWISE INDICATED.
b. NONRESTRICTED LIST: WHERE SPECIFICATIONS
INCLUDE A LIST OF AVAILABLE MANUFACTURERS, PROVIDE
A PRODUCT BY ONE OF THE MANUFACTURERS LISTED,
OR A PRODUCT BY AN UNNAMED MANUFACTURER,
THAT COMPLIES WITH REQUIREMENTS. COMPLY WITH
REQUIREMENTS IN “COMPARABLE PRODUCTS” ARTICLE
FOR CONSIDERATION OF AN UNNAMED MANUFACTURER’S
PRODUCT.
5. BASIS-OF-DESIGN PRODUCT: WHERE SPECIFICATIONS
NAME A PRODUCT, OR REFER TO A PRODUCT INDICATED
ON DRAWINGS, AND INCLUDE A LIST OF MANUFACTURERS,
PROVIDE THE SPECIFIED OR INDICATED PRODUCT OR AN
EQUIVALENT PRODUCT BY ONE OF THE OTHER NAMED
MANUFACTURERS. DRAWINGS AND SPECIFICATIONS INDICATE
SIZES, PROFILES, DIMENSIONS, AND OTHER CHARACTERISTICS
THAT ARE BASED ON THE PRODUCT NAMED. COMPLY WITH
REQUIREMENTS IN “COMPARABLE PRODUCTS” ARTICLE FOR
CONSIDERATION OF AN UNNAMED PRODUCT BY ONE OF THE
OTHER NAMED MANUFACTURERS.
C. VISUAL MATCHING SPECIFICATION: WHERE SPECIFICATIONS
REQUIRE “MATCH ARCHITECT’S SAMPLE”, PROVIDE A PRODUCT
THAT COMPLIES WITH REQUIREMENTS AND MATCHES ARCHITECT’S
SAMPLE. ARCHITECT’S DECISION WILL BE FINAL ON WHETHER A
PROPOSED PRODUCT MATCHES.
1. IF NO PRODUCT AVAILABLE WITHIN SPECIFIED
CATEGORY MATCHES AND COMPLIES WITH OTHER SPECIFIED
REQUIREMENTS, COMPLY WITH REQUIREMENTS IN DIVISION
01 SECTION “SUBSTITUTION PROCEDURES” FOR PROPOSAL OF
PRODUCT.
D. VISUAL SELECTION SPECIFICATION: WHERE SPECIFICATIONS
INCLUDE THE PHRASE “AS SELECTED BY ARCHITECT FROM
MANUFACTURER’S FULL RANGE” OR SIMILAR PHRASE, SELECT A
PRODUCT THAT COMPLIES WITH REQUIREMENTS. ARCHITECT WILL
SELECT COLOR, GLOSS, PATTERN, DENSITY, OR TEXTURE FROM
MANUFACTURER’S PRODUCT LINE THAT INCLUDES BOTH STANDARD
AND PREMIUM ITEMS.
2.2 COMPARABLE PRODUCTS
A. CONDITIONS FOR CONSIDERATION: ARCHITECT WILL
CONSIDER CONTRACTOR’S REQUEST FOR COMPARABLE OR
EQUIVALENT PRODUCT WHEN THE FOLLOWING CONDITIONS ARE
SATISFIED. IF THE FOLLOWING CONDITIONS ARE NOT SATISFIED,
ARCHITECT MAY RETURN REQUESTS WITHOUT ACTION, EXCEPT TO
RECORD NONCOMPLIANCE WITH THESE REQUIREMENTS:
1. EVIDENCE THAT THE PROPOSED PRODUCT DOES NOT
REQUIRE REVISIONS TO THE CONTRACT DOCUMENTS, THAT
IT IS CONSISTENT WITH THE CONTRACT DOCUMENTS AND
WILL PRODUCE THE INDICATED RESULTS, AND THAT IT IS
COMPATIBLE WITH OTHER PORTIONS OF THE WORK.
2. DETAILED COMPARISON OF SIGNIFICANT QUALITIES
OF PROPOSED PRODUCT WITH THOSE NAMED IN THE
SPECIFICATIONS. SIGNIFICANT QUALITIES INCLUDE
ATTRIBUTES SUCH AS PERFORMANCE, WEIGHT, SIZE,
DURABILITY, VISUAL EFFECT, AND SPECIFIC FEATURES AND
REQUIREMENTS INDICATED.
3. EVIDENCE THAT PROPOSED PRODUCT PROVIDES
SPECIFIED WARRANTY.
4. LIST OF SIMILAR INSTALLATIONS FOR COMPLETED
PROJECTS WITH PROJECT NAMES AND ADDRESSES AND
NAMES AND ADDRESSES OF ARCHITECTS AND OWNERS, IF
REQUESTED.
5. SAMPLES, IF REQUESTED.
END OF SECTION 01 6000
SECTION 017020 - AIRTIGHT CONSTRUCTION FOR SOUND
ISOLATION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND
DIVISION 1 SPECIFICATION SECTIONS, APPLY TO THIS SECTION.
1.2 DESIGNATED CONSTRUCTION
A. CERTAIN WALLS OF THE BUILDING CONSTRUCTION ON THE
PROJECT ARE DESIGNATED AIRTIGHT (LEAK-PROOF) FOR THE
PURPOSES OF SOUND ISOLATION, INCLUDING, BUT NOT LIMITED TO
THE WALLS FOR THE FOLLOWING ROOMS:
B. ALL EXTERIOR WALLS, APARTMENT RESIDENTIAL UNITS AT
ALL DEMISING WALLS AND WALLS BETWEEN THE UNIT AND THE
CORRIDOR. REGARDLESS OF GRAPHICAL REPRESENTATION.
1.3 DESCRIPTION
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND
DIVISION 1 SPECIFICATION SECTIONS, APPLY TO THIS SECTION.
B. WHERE CONSTRUCTION IS DESIGNATED AIRTIGHT, ALL DETAILS
FOR AIRTIGHTNESS THAT ARE APPROPRIATE SHALL BE EMPLOYED.
THE RESPONSIBILITY FOR AIRTIGHT CONSTRUCTION SHALL FALL
ON THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS. ALL
WORK BETWEEN TRADES MUST BE COORDINATED IN THE FIELD
TO INSURE THAT AIRTIGHTNESS IS ACHIEVED WHERE SCHEDULED
OR REQUIRED. THEY MUST MEET ENERGY STAR V3 INSTALLATION
REQUIREMENTS, AND BE PASSED OFF BY THE GREEN RATER BEFORE
PROCEEDING.
C. EVERY PRECAUTION SHALL BE TAKEN TO MAINTAIN
CONSTRUCTION COMPLETELY AIRTIGHT AROUND CONSTRUCTION
THAT IS DESIGNATED AIRTIGHT. CONSTRUCTION JOINTS,
STRUCTURAL PENETRATIONS, MECHANICAL AND ELECTRICAL
DUCT PENETRATIONS, PIPE AND CONDUIT PENETRATIONS,
ELECTRICAL BOXES AND FIXTURES, CABINETS, DOORS, ACCESS
PANELS, WINDOWS, FRAMES, SUPPORTS, ETC. ALL SHALL BE
BUILT AND INSTALLED IN SUCH MANNER AS TO PREVENT SOUND
TRANSMISSION. PROVIDE LINTELS, EXTRA FRAMES, BLOCKING,
ESCUTCHEONS, GROUTING, GASKETS, PACKING, CAULKING, DENSE
PUTTIES, TAPING, FILLING, ETC. AS REQUIRED TO STOP SOUND
TRANSMISSION.
1.4 APPLICABLE STANDARDS, REQUIREMENTS, DETAILS, AND PRODUCTS
A. ASTM E497 (STANDARD PRACTICE FOR INSTALLING SOUND-
ISOLATING LIGHTWEIGHT PARTITIONS).
B. ASTM C919 (PRACTICE FOR USE OF SEALANTS IN ACOUSTICAL
APPLICATIONS).
C. SPECIFIC REQUIREMENTS LISTED BELOW.
D. DETAILS AND PRODUCTS IN THE PROJECT DOCUMENTS.
E. FIRE RATED ASSEMBLY REQUIREMENTS, SEALANTS, FIRE RATE
BOXES.
1.5 SPECIFIC REQUIREMENTS
AIRTIGHT CONSTRUCTION REQUIREMENTS FOR THE PROJECT INCLUDED
(BUT ARE NOT LIMITED TO) THE FOLLOWING:
A. PARTITION BASES: PROVIDE 1/4” (HIGH) CONTINUOUS BEAD OF
ACOUSTICAL SEALANT AT ALL LOCATIONS WHERE GYPSUM BOARD
MEETS STRUCTURAL FLOORING. THE DEPTH OF THE SEALANT
SHALL EQUAL THE THICKNESS OF THE GYPSUM LAYER OR LAYERS.
B. PARTITION HEADS: PROVIDE THE SAME DETAIL AS FOR BASES
AT FLAT STRUCTURE. PROVIDE DETAILS IN THE PROJECT DRAWINGS
FOR OTHER CONDITIONS.
C. PARTITION OR CEILING JOINTS AT DISSIMILAR MATERIALS:
PROVIDE 1/4” CONTINUOUS BEAD OF ACOUSTICAL SEALANT AT ALL
LOCATIONS WHERE GYPSUM BOARD MEETS DISSIMILAR MATERIAL.
THE DEPTH OF THE SEALANT SHALL EQUAL THE THICKNESS OF THE
GYPSUM LAYER OR LAYERS.
D. PARTITION/PARTITION OR PARTITION/CEILING JOINTS:
PROVIDE STANDARD CORNER TAPING DETAIL.
E. PIPE, DUCT, CONDUIT, OR STRUCTURAL PENETRATIONS:
PROVIDE 1/4” WIDE BEAD OF ACOUSTICAL SEALANT AROUND
PERIMETER OF SMALL PENETRATING ELEMENTS WITH CONTROLLED
OPENINGS. PROVIDE DETAILS IN THE PROJECT DRAWINGS FOR
OTHER CONDITIONS. THE DEPTH OF THE SEALANT SHALL EQUAL THE
THICKNESS OF THE GYPSUM LAYER OR LAYERS.
F. ELECTRICAL BOXES 4”X 4” OR UNDER: PROVIDE 1/4”
WIDE BEAD OF ACOUSTICAL SEALANT AROUND PERIMETERS OF
ELECTRICAL BOXES. THE DEPTH OF THE SEALANT SHALL EQUAL THE
THICKNESS OF THE GYPSUM LAYER OR LAYERS. PROVIDE SHEET
CAULKING CONTINUOUSLY AROUND THE BACK SIDE OF BOXES.
G. ELECTRICAL, LIGHTING, OR OTHER RECESSED BOXES OVER
4”X 4”: PROVIDE ONE LAYER OF 5/8” GYPSUM BOARD CONTINUOUS
AROUND THE BACK OF SUCH BOXES. CAULK OR TAPE ALL JOINTS
AND CAULK ALL CONDUIT PENETRATIONS WITH ACOUSTICAL
SEALANT. FIRE PROOF ALL PENETRATIONS OR J-BOXES THAT ARE
LOCATED IN A FIRE RATED ASSEMBLY.
1.6 DETAILS AND PRODUCTS
THE PRODUCT SPECIFICATION BELOW DESIGNATES SPECIFIC MATERIALS
AND COMPONENTS TO BE USED TO ACCOMPLISH AIRTIGHT DETAILING.
THE CONTRACTOR SHALL BE ALERT FOR CONDITIONS THAT MAY REQUIRE
SPECIAL DETAILS OR MATERIALS IN ORDER TO ACHIEVE AIRTIGHTNESS AND
SHALL BRING THESE TO THE ATTENTION OF THE ARCHITECT.
PART 2 - PRODUCTS
2.1 LOW-DENSITY GLASS FIBER INSULATION
LONG-STRAND GLASS FIBER INSULATION OF 1- TO 2-PCF DENSITY, WITHOUT
COVERING, THICKNESS AS REQUIRED FOR PACKING AND FILLING SMALL
JOINTS AND OPENINGS BEHIND SEALANTS. ACCEPTABLE PRODUCTS ARE
AS FOLLOWS:
A. AEROCOR BY OWENS-CORNING FIBERGLAS.
B. MICROLITE BY JOHNS MANVILLE.
C. ULTRALITE BY CERTAINTEED.
2.2 HIGH-DENSITY CERAMIC OR MINERAL FIBER SAFING
LONG-STRAND CERAMIC OR MINERAL FIBER INSULATION OF MINIMUM 6-PCF
DENSITY, WITHOUT COVERING, THICKNESS AS REQUIRED FOR PACKING
AND FILLING LARGE AND/OR CRITICAL OPENINGS, USUALLY BEHIND A
SEALANT OR PUTTY. ACCEPTABLE PRODUCTS ARE AS FOLLOWS:
A. FIBERFRAX BY STANDARD OIL ENGINEERED MATERIALS,
FIBERS DIVISION.
B. THERMAFIBER BY U.S. GYPSUM.
2.3 GENERAL PURPOSE ACOUSTICAL SEALANT
LONG-LASTING, PERMANENTLY-FLEXIBLE SEALANT WITH EXCELLENT
ADHESION FOR CLOSING SMALL OPENINGS AND JOINTS UP TO A
MAXIMUM OF 1” WIDE. SEALANT BACKED WITH GLASS FIBER PACKING,
COMPRESSIBLE JOINT FILLER OR RESILIENT BACKER ROD. ACCEPTABLE
PRODUCTS ARE AS FOLLOWS:
A. ACOUSTICAL SEALANT BY TREMCO. A BLACK SYNTHETIC
RUBBER MATERIAL SUITABLE FOR CONCEALED LOCATIONS ONLY.
B. ACOUSTICAL SEALANT BY U.S. GYPSUM. A WHITE WATER BASE
MATERIAL SUITABLE FOR EXPOSED OR CONCEALED LOCATIONS, BUT
NOT WATERPROOF.
C. SOUND SEALANT BY OHIO SEALANTS. A WHITE WATER BASE
OR RUBBER BASE SEALANT SUITABLE FOR CONCEALED LOCATIONS.
2.4 FIRE-BARRIER PUTTY
NON-SHRINKING, HIGHLY-ADHESIVE, MINIMUM 40-PCF DENSITY FIRE-
BARRIER PUTTY FOR CLOSING LARGE OPENINGS AND JOINTS TYPICALLY
OVER 1” WIDE. APPLIED FULL DEPTH OR BACKED WITH A DENSE SAFING, AS
DETAILED. ACCEPTABLE PRODUCTS ARE AS FOLLOWS:
A. CP 25N/S NO SAG OR CP25S/L SELF LEVELING FIRE BARRIER
CAULK BY 3M ELECTRICAL PRODUCTS DIVISION.
B. TYPE FSP FIRESTOP PUTTY BY NELSON ELECTRIC DIVISION OF
GENERAL SIGNAL.
C. FYRE PUTTY BY STANDARD OIL ENGINEERING MATERIALS
COMPANY, FIBERS DIVISION.
2.5 FOAMED-IN-PLACE SILICONE SEALANT
FIRE-RESISTANT, MINIMUM 17-PCF DENSITY, FOAMED-IN-PLACE
SILICONE SEALANT FOR CLOSING ELECTRICAL DUCTS AND CABLE
TRAYS WHERE THEY PENETRATE CONSTRUCTIONS. WILL EXPAND
AND FILL AROUND AND BETWEEN SEPARATED CABLES. USUALLY
APPLIED FULL DEPTH OF CONSTRUCTION BETWEEN PERMANENT OR
TEMPORARY DAMS. ACCEPTABLE PRODUCT IS 3-6548 SILICONE RTV
FOAM BY DOW CORNING.
2.6 SHEET CAULKING (ELECTRICAL OUTLET BOX PADS)
POLYBUTENE-BUTYL OR EQUAL FIRE-RESISTANT PADS WITH INERT FILLERS,
1/4” X 4” X 8” OR 1/8” X 6” X 8” IN SIZE FOR SEALING THE BACKS AND SIDES
OF STANDARD ELECTRICAL BACK BOXES. AVAILABLE IN SHEETS OR PADS
OF STANDARD SIZES.
A. OUTLET BOX PADS BY HARRY A. LOWRY & ASSOCIATES.
B. TYPE FSP FIRESTOP PUTTY PADS BY NELSON ELECTRIC.
2.7 FELT-LINED METAL SLEEVES
SHEET METAL SLEEVE WITH FELT LINING FOR IMPLEMENTING A SEAL
AROUND A PIPE, HANGER ROD OR OTHER ROUND ELEMENT PENETRATING
A CONSTRUCTION. INSIDE SLEEVE DIAMETER TO EQUAL OUTSIDE
DIAMETER OF PENETRATING ELEMENT. EXPOSED END OF SLEEVE CLOSED
WITH ACOUSTICAL SEALANT. ACCEPTABLE PRODUCTS ARE AS FOLLOWS:
A. PIPE ISOLATOR BY ELEEN.
B. P-R ISOLATOR BY POTTER-ROEMER.
C. TRISOLATOR BY STONEMAN ENGINEERING.
2.8 SELF-ADHESIVE BUBBLE GASKETS
NOMINAL 1/4” X 1/2” COMPRESSIBLE BULB OF SILICONE RUBBER OR
POLYPROPYLENE WITH SELF-ADHESIVE ON ONE SIDE FOR PROVIDING
AN ACOUSTICAL SEAL AROUND THE EDGE OF AN OPERATING ACCESS
PANELS. TYPICALLY SET ON JAMB OR HEAD FRAME OR STOP TO ACT AS A
COMPRESSION SEAL. ACCEPTABLE PRODUCTS ARE AS FOLLOWS:
A. PF 181 BY NATIONAL GUARD PRODUCTS.
B. S88D OR S88W SILICONSEAL BY PEMKO.
C. 797 OR 797W BY REESE ENTERPRISES.
D. 10-5050 DOUBLEGUARD BY STANLEY HARDWARE.
E. WS176 BY ULTRA INDUSTRIES.
PART 3 - EXECUTION
3.1 PRE-INSTALLATION CONFERENCE
PRIOR TO THE START OF INSTALLATION OF THE WORK OF THIS
SECTION, CONVENE A PRE-INSTALLATION CONFERENCE UNDER
PROVISIONS SPECIFIED ELSEWHERE. THE CONTRACTOR AND ALL
SUBCONTRACTORS AND TRADES RESPONSIBLE FOR WORK IN THIS
SECTION SHALL BE PRESENT TO REVIEW AREAS OF POTENTIAL
INTERFERENCE AND CONFLICT AND TO REVIEW THE REQUIREMENTS
FOR AIRTIGHT CONSTRUCTION TO SEE THAT AIRTIGHTNESS IS
ACHIEVED WHERE SCHEDULED OR REQUIRED.
3.2 INSTALLATION
THE FOLLOWING IS REQUIRED FOR ALL CONSTRUCTION WHICH IS
DESIGNATED AIRTIGHT.
A. EXTEND CONSTRUCTION TO A MINIMUM OF 1/8” AND A
MAXIMUM OF 1/2” OF ADJACENT CONSTRUCTION OR PENETRATIONS
TO PROVIDE A SUITABLE SPACE FOR PACKING AND CAULKING.
B. CUT OPENINGS IN CONSTRUCTION ACCURATELY FOR
ELECTRICAL BOXES, PIPING, DUCTWORK AND OTHER PENETRATING
ELEMENTS. LEAVE ENOUGH SPACE AROUND SUCH ELEMENTS SO
THEY REMAIN FREE OF RIGID CONNECTION WITH THE SURROUNDING
CONSTRUCTION.
C. PRIOR TO PACKING AND CAULKING PENETRATIONS AS
DETAILED HEREIN, VERIFY THAT ALL PENETRATING ELEMENTS SUCH
AS PIPING AND DUCTWORK ARE FREE AND CLEAR OF THE OPENING
TO BE PACKED AND CAULKED.
D. WHERE MULTIPLE LAYERS OF GYPSUM BOARD ARE USED,
STAGGER ALL JOINTS IN ADJACENT LAYERS A MINIMUM OF 24”.
E. APPLY ALL ACOUSTICAL SEALANTS AND CAULKS IN
ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS.
END OF SECTION 01702
SECTION 01 7300 - EXECUTION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND OTHER
DIVISION 01 SPECIFICATION SECTIONS, APPLY TO THIS SECTION.
1.2 SUMMARY
A. SECTION INCLUDES GENERAL ADMINISTRATIVE AND
PROCEDURAL REQUIREMENTS GOVERNING EXECUTION OF THE
WORK INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
1. CONSTRUCTION LAYOUT.
2. INSTALLATION OF THE WORK.
3. CUTTING AND PATCHING.
4. PROGRESS CLEANING.
5. STARTING AND ADJUSTING.
6. PROTECTION OF INSTALLED CONSTRUCTION.
7. CORRECTION OF THE WORK.
B. RELATED REQUIREMENTS:
1. DIVISION 01 SECTION “SUMMARY” FOR LIMITS ON USE
OF PROJECT SITE.
2. DIVISION 01 SECTION “CLOSEOUT PROCEDURES”
FOR SUBMITTING FINAL PROPERTY SURVEY WITH PROJECT
RECORD DOCUMENTS, RECORDING OF OWNER-ACCEPTED
DEVIATIONS FROM INDICATED LINES AND LEVELS, AND FINAL
CLEANING.
1.3 DEFINITIONS
A. CUTTING: REMOVAL OF IN-PLACE CONSTRUCTION
NECESSARY TO PERMIT INSTALLATION OR PERFORMANCE OF OTHER
WORK.
B. PATCHING: FITTING AND REPAIR WORK REQUIRED TO
RESTORE CONSTRUCTION TO ORIGINAL CONDITIONS AFTER
INSTALLATION OF OTHER WORK.
1.4 INFORMATIONAL SUBMITTALS
A. CUTTING AND PATCHING PLAN: SUBMIT PLAN DESCRIBING
PROCEDURES AT LEAST 10 DAYS PRIOR TO THE TIME CUTTING
AND PATCHING WILL BE PERFORMED. INCLUDE THE FOLLOWING
INFORMATION:
1. EXTENT: DESCRIBE REASON FOR AND EXTENT OF EACH
OCCURRENCE OF CUTTING AND PATCHING.
2. CHANGES TO IN-PLACE CONSTRUCTION: DESCRIBE
ANTICIPATED RESULTS. INCLUDE CHANGES TO STRUCTURAL
ELEMENTS AND OPERATING COMPONENTS AS WELL AS
CHANGES IN BUILDING APPEARANCE AND OTHER SIGNIFICANT
VISUAL ELEMENTS.
3. PRODUCTS: LIST PRODUCTS TO BE USED FOR
PATCHING AND FIRMS OR ENTITIES THAT WILL PERFORM
PATCHING WORK.
4. DATES: INDICATE WHEN CUTTING AND PATCHING WILL
BE PERFORMED.
5. UTILITIES AND MECHANICAL AND ELECTRICAL SYSTEMS:
LIST SERVICES AND SYSTEMS THAT CUTTING AND PATCHING
PROCEDURES WILL DISTURB OR AFFECT. LIST SERVICES AND
SYSTEMS THAT WILL BE RELOCATED AND THOSE THAT WILL BE
TEMPORARILY OUT OF SERVICE. INDICATE LENGTH OF TIME
PERMANENT SERVICES AND SYSTEMS WILL BE DISRUPTED.
a. INCLUDE DESCRIPTION OF PROVISIONS FOR
TEMPORARY SERVICES AND SYSTEMS DURING
INTERRUPTION OF PERMANENT SERVICES AND SYSTEMS.
1.5 QUALITY ASSURANCE
A. CUTTING AND PATCHING: COMPLY WITH REQUIREMENTS FOR
AND LIMITATIONS ON CUTTING AND PATCHING OF CONSTRUCTION
ELEMENTS.
1. STRUCTURAL ELEMENTS: WHEN CUTTING AND
PATCHING STRUCTURAL ELEMENTS, NOTIFY ARCHITECT OF
LOCATIONS AND DETAILS OF CUTTING AND AWAIT DIRECTIONS
FROM ARCHITECT BEFORE PROCEEDING. SHORE, BRACE,
AND SUPPORT STRUCTURAL ELEMENTS DURING CUTTING AND
PATCHING. DO NOT CUT AND PATCH STRUCTURAL ELEMENTS
IN A MANNER THAT COULD CHANGE THEIR LOAD-CARRYING
CAPACITY OR INCREASE DEFLECTION
2. OPERATIONAL ELEMENTS: DO NOT CUT AND PATCH
OPERATING ELEMENTS AND RELATED COMPONENTS IN A
MANNER THAT RESULTS IN REDUCING THEIR CAPACITY TO
PERFORM AS INTENDED OR THAT RESULTS IN INCREASED
MAINTENANCE OR DECREASED OPERATIONAL LIFE OR SAFETY.
3. OTHER CONSTRUCTION ELEMENTS: DO NOT CUT AND
PATCH OTHER CONSTRUCTION ELEMENTS OR COMPONENTS
IN A MANNER THAT COULD CHANGE THEIR LOAD-CARRYING
CAPACITY, THAT RESULTS IN REDUCING THEIR CAPACITY TO
PERFORM AS INTENDED, OR THAT RESULTS IN INCREASED
MAINTENANCE OR DECREASED OPERATIONAL LIFE OR SAFETY.
4. VISUAL ELEMENTS: DO NOT CUT AND PATCH
CONSTRUCTION IN A MANNER THAT RESULTS IN VISUAL
EVIDENCE OF CUTTING AND PATCHING. DO NOT CUT AND
PATCH EXPOSED CONSTRUCTION IN A MANNER THAT WOULD,
IN ARCHITECT’S OPINION, REDUCE THE BUILDING’S AESTHETIC
QUALITIES. REMOVE AND REPLACE CONSTRUCTION THAT
HAS BEEN CUT AND PATCHED IN A VISUALLY UNSATISFACTORY
MANNER.
B. CUTTING AND PATCHING CONFERENCE: BEFORE
PROCEEDING, MEET AT PROJECT SITE WITH PARTIES INVOLVED IN
CUTTING AND PATCHING, INCLUDING MECHANICAL AND ELECTRICAL
TRADES. REVIEW AREAS OF POTENTIAL INTERFERENCE AND
CONFLICT. COORDINATE PROCEDURES AND RESOLVE POTENTIAL
CONFLICTS BEFORE PROCEEDING.
C. MANUFACTURER’S INSTALLATION INSTRUCTIONS: OBTAIN AND
MAINTAIN ON-SITE MANUFACTURER’S WRITTEN RECOMMENDATIONS
AND INSTRUCTIONS FOR INSTALLATION OF PRODUCTS AND
EQUIPMENT.
PART 2 - PRODUCTS
2.1 MATERIALS
A. GENERAL: COMPLY WITH REQUIREMENTS SPECIFIED IN
OTHER SECTIONS.
B. IN-PLACE MATERIALS: USE MATERIALS FOR PATCHING
IDENTICAL TO IN-PLACE MATERIALS. FOR EXPOSED SURFACES, USE
MATERIALS THAT VISUALLY MATCH IN-PLACE ADJACENT SURFACES
TO THE FULLEST EXTENT POSSIBLE.
1. IF IDENTICAL MATERIALS ARE UNAVAILABLE OR
CANNOT BE USED, USE MATERIALS THAT, WHEN INSTALLED,
WILL PROVIDE A MATCH ACCEPTABLE TO ARCHITECT FOR
THE VISUAL AND FUNCTIONAL PERFORMANCE OF IN-PLACE
MATERIALS.
PART 3 - EXECUTION
3.1 EXAMINATION
A. EXAMINATION AND ACCEPTANCE OF CONDITIONS: BEFORE
PROCEEDING WITH EACH COMPONENT OF THE WORK, EXAMINE
SUBSTRATES, AREAS, AND CONDITIONS, WITH INSTALLER OR
APPLICATOR PRESENT WHERE INDICATED, FOR COMPLIANCE WITH
REQUIREMENTS FOR INSTALLATION TOLERANCES AND OTHER
CONDITIONS AFFECTING PERFORMANCE. RECORD OBSERVATIONS.
1. EXAMINE ROUGHING-IN FOR MECHANICAL AND
ELECTRICAL SYSTEMS TO VERIFY ACTUAL LOCATIONS
OF CONNECTIONS BEFORE EQUIPMENT AND FIXTURE
INSTALLATION.
2. EXAMINE WALLS AND FLOORS FOR SUITABLE
CONDITIONS WHERE PRODUCTS AND SYSTEMS ARE TO BE
INSTALLED.
3. VERIFY COMPATIBILITY WITH AND SUITABILITY OF
SUBSTRATES, INCLUDING COMPATIBILITY WITH EXISTING
FINISHES OR PRIMERS.
B. PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY
CONDITIONS HAVE BEEN CORRECTED. PROCEEDING WITH THE
WORK INDICATES ACCEPTANCE OF SURFACES AND CONDITIONS.
3.2 PREPARATION
A. FIELD MEASUREMENTS: TAKE FIELD MEASUREMENTS AS
REQUIRED TO FIT THE WORK PROPERLY. RECHECK MEASUREMENTS
BEFORE INSTALLING EACH PRODUCT. WHERE PORTIONS OF THE
WORK ARE INDICATED TO FIT TO OTHER CONSTRUCTION, VERIFY
DIMENSIONS OF OTHER CONSTRUCTION BY FIELD MEASUREMENTS
BEFORE FABRICATION. COORDINATE FABRICATION SCHEDULE WITH
CONSTRUCTION PROGRESS TO AVOID DELAYING THE WORK.
B. SPACE REQUIREMENTS: VERIFY SPACE REQUIREMENTS AND
DIMENSIONS OF ITEMS SHOWN DIAGRAMMATICALLY ON DRAWINGS.
C. REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS:
IMMEDIATELY ON DISCOVERY OF THE NEED FOR CLARIFICATION
OF THE CONTRACT DOCUMENTS CAUSED BY DIFFERING FIELD
CONDITIONS OUTSIDE THE CONTROL OF CONTRACTOR, SUBMIT
A REQUEST FOR INFORMATION TO ARCHITECT ACCORDING TO
REQUIREMENTS IN DIVISION 01 SECTION “PROJECT MANAGEMENT
AND COORDINATION.”
3.3 CONSTRUCTION LAYOUT (NOT USED)
3.4 FIELD ENGINEERING
A. IDENTIFICATION: OWNER WILL IDENTIFY EXISTING
BENCHMARKS, CONTROL POINTS, AND PROPERTY CORNERS.
B. REFERENCE POINTS: LOCATE EXISTING PERMANENT
BENCHMARKS, CONTROL POINTS, AND SIMILAR REFERENCE
POINTS BEFORE BEGINNING THE WORK. PRESERVE AND PROTECT
PERMANENT BENCHMARKS AND CONTROL POINTS DURING
CONSTRUCTION OPERATIONS.
1. DO NOT CHANGE OR RELOCATE EXISTING
BENCHMARKS OR CONTROL POINTS WITHOUT PRIOR WRITTEN
APPROVAL OF ARCHITECT. REPORT LOST OR DESTROYED
PERMANENT BENCHMARKS OR CONTROL POINTS PROMPTLY.
REPORT THE NEED TO RELOCATE PERMANENT BENCHMARKS
OR CONTROL POINTS TO ARCHITECT BEFORE PROCEEDING.
2. REPLACE LOST OR DESTROYED PERMANENT
BENCHMARKS AND CONTROL POINTS PROMPTLY. BASE
REPLACEMENTS ON THE ORIGINAL SURVEY CONTROL POINTS.
3.5 INSTALLATION
A. GENERAL: LOCATE THE WORK AND COMPONENTS OF THE
WORK ACCURATELY, IN CORRECT ALIGNMENT AND ELEVATION, AS
INDICATED.
1. MAKE VERTICAL WORK PLUMB AND MAKE HORIZONTAL
WORK LEVEL.
2. WHERE SPACE IS LIMITED, INSTALL COMPONENTS TO
MAXIMIZE SPACE AVAILABLE FOR MAINTENANCE AND EASE OF
REMOVAL FOR REPLACEMENT.
3. CONCEAL PIPES, DUCTS, AND WIRING IN FINISHED
AREAS UNLESS OTHERWISE INDICATED.
4. MAINTAIN MINIMUM HEADROOM CLEARANCE OF 96
INCHES IN OCCUPIED SPACES AND 90 INCHES IN UNOCCUPIED
SPACES.
B. COMPLY WITH MANUFACTURER’S WRITTEN INSTRUCTIONS
AND RECOMMENDATIONS FOR INSTALLING PRODUCTS IN
APPLICATIONS INDICATED.
C. INSTALL PRODUCTS AT THE TIME AND UNDER CONDITIONS
THAT WILL ENSURE THE BEST POSSIBLE RESULTS. MAINTAIN
CONDITIONS REQUIRED FOR PRODUCT PERFORMANCE UNTIL
SUBSTANTIAL COMPLETION.
D. CONDUCT CONSTRUCTION OPERATIONS SO NO PART OF
THE WORK IS SUBJECTED TO DAMAGING OPERATIONS OR LOADING
IN EXCESS OF THAT EXPECTED DURING NORMAL CONDITIONS OF
OCCUPANCY.
E. SEQUENCE THE WORK AND ALLOW ADEQUATE CLEARANCES
TO ACCOMMODATE MOVEMENT OF CONSTRUCTION ITEMS ON SITE
AND PLACEMENT IN PERMANENT LOCATIONS.
F. TOOLS AND EQUIPMENT: DO NOT USE TOOLS OR EQUIPMENT
THAT PRODUCE HARMFUL NOISE LEVELS.
G. TEMPLATES: OBTAIN AND DISTRIBUTE TO THE PARTIES
INVOLVED TEMPLATES FOR WORK SPECIFIED TO BE FACTORY
PREPARED AND FIELD INSTALLED. CHECK SHOP DRAWINGS OF
OTHER WORK TO CONFIRM THAT ADEQUATE PROVISIONS ARE
MADE FOR LOCATING AND INSTALLING PRODUCTS TO COMPLY WITH
INDICATED REQUIREMENTS.
H. ATTACHMENT: PROVIDE BLOCKING AND ATTACHMENT PLATES
AND ANCHORS AND FASTENERS OF ADEQUATE SIZE AND NUMBER
TO SECURELY ANCHOR EACH COMPONENT IN PLACE, ACCURATELY
LOCATED AND ALIGNED WITH OTHER PORTIONS OF THE WORK.
WHERE SIZE AND TYPE OF ATTACHMENTS ARE NOT INDICATED,
VERIFY SIZE AND TYPE REQUIRED FOR LOAD CONDITIONS.
1. MOUNTING HEIGHTS: WHERE MOUNTING HEIGHTS ARE
NOT INDICATED, MOUNT COMPONENTS AT HEIGHTS DIRECTED
BY ARCHITECT.
2. ALLOW FOR BUILDING MOVEMENT, INCLUDING THERMAL
EXPANSION AND CONTRACTION.
3. COORDINATE INSTALLATION OF ANCHORAGES.
FURNISH SETTING DRAWINGS, TEMPLATES, AND DIRECTIONS
FOR INSTALLING ANCHORAGES, INCLUDING SLEEVES,
CONCRETE INSERTS, ANCHOR BOLTS, AND ITEMS WITH
INTEGRAL ANCHORS, THAT ARE TO BE EMBEDDED IN
CONCRETE OR MASONRY. DELIVER SUCH ITEMS TO PROJECT
SITE IN TIME FOR INSTALLATION.
I. JOINTS: MAKE JOINTS OF UNIFORM WIDTH. WHERE JOINT
LOCATIONS IN EXPOSED WORK ARE NOT INDICATED, ARRANGE
GI101
conformed set
revisions :
p r o j e c t # :
d a t e :
20.0550
- june 4, 2021
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
GI206
Sheet Specs
20.0550
- april 7, 2021
Rexburg
Rowhouses
bid set
JOINTS FOR THE BEST VISUAL EFFECT. FIT EXPOSED CONNECTIONS
TOGETHER TO FORM HAIRLINE JOINTS.
J. HAZARDOUS MATERIALS: USE PRODUCTS, CLEANERS, AND
INSTALLATION MATERIALS THAT ARE NOT CONSIDERED HAZARDOUS.
3.6 CUTTING AND PATCHING
A. CUTTING AND PATCHING, GENERAL: EMPLOY SKILLED
WORKERS TO PERFORM CUTTING AND PATCHING. PROCEED WITH
CUTTING AND PATCHING AT THE EARLIEST FEASIBLE TIME, AND
COMPLETE WITHOUT DELAY.
1. CUT IN-PLACE CONSTRUCTION TO PROVIDE FOR
INSTALLATION OF OTHER COMPONENTS OR PERFORMANCE
OF OTHER CONSTRUCTION, AND SUBSEQUENTLY PATCH
AS REQUIRED TO RESTORE SURFACES TO THEIR ORIGINAL
CONDITION.
B. EXISTING WARRANTIES: REMOVE, REPLACE, PATCH, AND
REPAIR MATERIALS AND SURFACES CUT OR DAMAGED DURING
INSTALLATION OR CUTTING AND PATCHING OPERATIONS, BY
METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING
WARRANTIES.
C. TEMPORARY SUPPORT: PROVIDE TEMPORARY SUPPORT OF
WORK TO BE CUT.
D. PROTECTION: PROTECT IN-PLACE CONSTRUCTION
DURING CUTTING AND PATCHING TO PREVENT DAMAGE. PROVIDE
PROTECTION FROM ADVERSE WEATHER CONDITIONS FOR PORTIONS
OF PROJECT THAT MIGHT BE EXPOSED DURING CUTTING AND
PATCHING OPERATIONS.
E. ADJACENT OCCUPIED AREAS: WHERE INTERFERENCE WITH
USE OF ADJOINING AREAS OR INTERRUPTION OF FREE PASSAGE
TO ADJOINING AREAS IS UNAVOIDABLE, COORDINATE CUTTING AND
PATCHING ACCORDING TO REQUIREMENTS IN DIVISION 01 SECTION
“SUMMARY.”
F. EXISTING MECHANICAL/ELECTRICAL SYSTEMS: WHERE
EXISTING SERVICES/SYSTEMS ARE REQUIRED TO BE REMOVED,
RELOCATED, OR ABANDONED, BYPASS SUCH SERVICES/SYSTEMS
BEFORE CUTTING TO PREVENT INTERRUPTION TO OCCUPIED AREAS.
G. CUTTING: CUT IN-PLACE CONSTRUCTION BY SAWING,
DRILLING, BREAKING, CHIPPING, GRINDING, AND SIMILAR
OPERATIONS, INCLUDING EXCAVATION, USING METHODS
LEAST LIKELY TO DAMAGE ELEMENTS RETAINED OR ADJOINING
CONSTRUCTION. IF POSSIBLE, REVIEW PROPOSED PROCEDURES
WITH ORIGINAL INSTALLER; COMPLY WITH ORIGINAL INSTALLER’S
WRITTEN RECOMMENDATIONS.
1. IN GENERAL, USE HAND OR SMALL POWER TOOLS
DESIGNED FOR SAWING AND GRINDING, NOT HAMMERING AND
CHOPPING. CUT HOLES AND SLOTS NEATLY TO MINIMUM SIZE
REQUIRED, AND WITH MINIMUM DISTURBANCE OF ADJACENT
SURFACES. TEMPORARILY COVER OPENINGS WHEN NOT IN
USE.
2. FINISHED SURFACES: CUT OR DRILL FROM THE
EXPOSED OR FINISHED SIDE INTO CONCEALED SURFACES.
3. MECHANICAL AND ELECTRICAL SERVICES: CUT OFF
PIPE OR CONDUIT IN WALLS OR PARTITIONS TO BE REMOVED.
CAP, VALVE, OR PLUG AND SEAL REMAINING PORTION OF
PIPE OR CONDUIT TO PREVENT ENTRANCE OF MOISTURE OR
OTHER FOREIGN MATTER AFTER CUTTING.
4. PROCEED WITH PATCHING AFTER CONSTRUCTION
OPERATIONS REQUIRING CUTTING ARE COMPLETE.
H. PATCHING: PATCH CONSTRUCTION BY FILLING, REPAIRING,
REFINISHING, CLOSING UP, AND SIMILAR OPERATIONS FOLLOWING
PERFORMANCE OF OTHER WORK. PATCH WITH DURABLE SEAMS
THAT ARE AS INVISIBLE AS PRACTICABLE. PROVIDE MATERIALS AND
COMPLY WITH INSTALLATION REQUIREMENTS SPECIFIED IN OTHER
SECTIONS, WHERE APPLICABLE.
1. INSPECTION: WHERE FEASIBLE, TEST AND INSPECT
PATCHED AREAS AFTER COMPLETION TO DEMONSTRATE
PHYSICAL INTEGRITY OF INSTALLATION.
2. EXPOSED FINISHES: RESTORE EXPOSED FINISHES
OF PATCHED AREAS AND EXTEND FINISH RESTORATION INTO
RETAINED ADJOINING CONSTRUCTION IN A MANNER THAT WILL
MINIMIZE EVIDENCE OF PATCHING AND REFINISHING.
a. CLEAN PIPING, CONDUIT, AND SIMILAR FEATURES
BEFORE APPLYING PAINT OR OTHER FINISHING MATERIALS.
b. RESTORE DAMAGED PIPE COVERING TO ITS ORIGINAL
CONDITION.
3. FLOORS AND WALLS: WHERE WALLS OR PARTITIONS
THAT ARE REMOVED EXTEND ONE FINISHED AREA INTO
ANOTHER, PATCH AND REPAIR FLOOR AND WALL SURFACES IN
THE NEW SPACE. PROVIDE AN EVEN SURFACE OF UNIFORM
FINISH, COLOR, TEXTURE, AND APPEARANCE. REMOVE IN-
PLACE FLOOR AND WALL COVERINGS AND REPLACE WITH NEW
MATERIALS, IF NECESSARY, TO ACHIEVE UNIFORM COLOR AND
APPEARANCE.
a. WHERE PATCHING OCCURS IN A PAINTED
SURFACE, PREPARE SUBSTRATE AND APPLY PRIMER
AND INTERMEDIATE PAINT COATS APPROPRIATE FOR
SUBSTRATE OVER THE PATCH, AND APPLY FINAL PAINT
COAT OVER ENTIRE UNBROKEN SURFACE CONTAINING THE
PATCH. PROVIDE ADDITIONAL COATS UNTIL PATCH BLENDS
WITH ADJACENT SURFACES.
4. CEILINGS: PATCH, REPAIR, OR REHANG IN-PLACE
CEILINGS AS NECESSARY TO PROVIDE AN EVEN-PLANE
SURFACE OF UNIFORM APPEARANCE.
I. CLEANING: CLEAN AREAS AND SPACES WHERE CUTTING AND
PATCHING ARE PERFORMED. REMOVE PAINT, MORTAR, OILS, PUTTY,
AND SIMILAR MATERIALS FROM ADJACENT FINISHED SURFACES.
3.7 PROGRESS CLEANING
A. GENERAL: CLEAN PROJECT SITE AND WORK AREAS DAILY,
INCLUDING COMMON AREAS. ENFORCE REQUIREMENTS STRICTLY.
DISPOSE OF MATERIALS LAWFULLY.
1. COMPLY WITH REQUIREMENTS IN NFPA 241 FOR
REMOVAL OF COMBUSTIBLE WASTE MATERIALS AND DEBRIS.
2. DO NOT HOLD WASTE MATERIALS MORE THAN SEVEN
DAYS DURING NORMAL WEATHER OR THREE DAYS IF THE
TEMPERATURE IS EXPECTED TO RISE ABOVE 80 DEG F.
3. CONTAINERIZE HAZARDOUS AND UNSANITARY WASTE
MATERIALS SEPARATELY FROM OTHER WASTE. MARK
CONTAINERS APPROPRIATELY AND DISPOSE OF LEGALLY,
ACCORDING TO REGULATIONS.
a. USE CONTAINERS INTENDED FOR HOLDING WASTE
MATERIALS OF TYPE TO BE STORED.
B. SITE: MAINTAIN PROJECT SITE FREE OF WASTE MATERIALS
AND DEBRIS.
C. WORK AREAS: CLEAN AREAS WHERE WORK IS IN PROGRESS
TO THE LEVEL OF CLEANLINESS NECESSARY FOR PROPER
EXECUTION OF THE WORK.
1. REMOVE LIQUID SPILLS PROMPTLY.
2. WHERE DUST WOULD IMPAIR PROPER EXECUTION OF
THE WORK, BROOM-CLEAN OR VACUUM THE ENTIRE WORK
AREA, AS APPROPRIATE.
D. INSTALLED WORK: KEEP INSTALLED WORK CLEAN. CLEAN
INSTALLED SURFACES ACCORDING TO WRITTEN INSTRUCTIONS OF
MANUFACTURER OR FABRICATOR OF PRODUCT INSTALLED, USING
ONLY CLEANING MATERIALS SPECIFICALLY RECOMMENDED. IF
SPECIFIC CLEANING MATERIALS ARE NOT RECOMMENDED, USE
CLEANING MATERIALS THAT ARE NOT HAZARDOUS TO HEALTH OR
PROPERTY AND THAT WILL NOT DAMAGE EXPOSED SURFACES.
E. CONCEALED SPACES: REMOVE DEBRIS FROM CONCEALED
SPACES BEFORE ENCLOSING THE SPACE.
F. EXPOSED SURFACES IN FINISHED AREAS: CLEAN EXPOSED
SURFACES AND PROTECT AS NECESSARY TO ENSURE FREEDOM
FROM DAMAGE AND DETERIORATION AT TIME OF SUBSTANTIAL
COMPLETION.
G. WASTE DISPOSAL: DO NOT BURY OR BURN WASTE
MATERIALS ON-SITE. DO NOT WASH WASTE MATERIALS DOWN
SEWERS OR INTO WATERWAYS. COMPLY WITH WASTE DISPOSAL
REQUIREMENTS IN DIVISION 01 SECTION “TEMPORARY FACILITIES
AND CONTROLS.”
H. DURING HANDLING AND INSTALLATION, CLEAN AND PROTECT
CONSTRUCTION IN PROGRESS AND ADJOINING MATERIALS ALREADY
IN PLACE. APPLY PROTECTIVE COVERING WHERE REQUIRED TO
ENSURE PROTECTION FROM DAMAGE OR DETERIORATION AT
SUBSTANTIAL COMPLETION.
I. CLEAN AND PROVIDE MAINTENANCE ON COMPLETED
CONSTRUCTION AS FREQUENTLY AS NECESSARY THROUGH
THE REMAINDER OF THE CONSTRUCTION PERIOD. ADJUST AND
LUBRICATE OPERABLE COMPONENTS TO ENSURE OPERABILITY
WITHOUT DAMAGING EFFECTS.
J. LIMITING EXPOSURES: SUPERVISE CONSTRUCTION
OPERATIONS TO ASSURE THAT NO PART OF THE CONSTRUCTION,
COMPLETED OR IN PROGRESS, IS SUBJECT TO HARMFUL,
DANGEROUS, DAMAGING, OR OTHERWISE DELETERIOUS EXPOSURE
DURING THE CONSTRUCTION PERIOD.
3.8 STARTING AND ADJUSTING
A. START EQUIPMENT AND OPERATING COMPONENTS TO
CONFIRM PROPER OPERATION. REMOVE MALFUNCTIONING UNITS,
REPLACE WITH NEW UNITS, AND RETEST.
B. ADJUST EQUIPMENT FOR PROPER OPERATION. ADJUST
OPERATING COMPONENTS FOR PROPER OPERATION WITHOUT
BINDING.
C. TEST EACH PIECE OF EQUIPMENT TO VERIFY PROPER
OPERATION. TEST AND ADJUST CONTROLS AND SAFETIES. REPLACE
DAMAGED AND MALFUNCTIONING CONTROLS AND EQUIPMENT.
D. MANUFACTURER’S FIELD SERVICE: COMPLY WITH
QUALIFICATION REQUIREMENTS IN DIVISION 01 SECTION “QUALITY
REQUIREMENTS.”
3.9 PROTECTION OF INSTALLED CONSTRUCTION
A. PROVIDE FINAL PROTECTION AND MAINTAIN CONDITIONS THAT
ENSURE INSTALLED WORK IS WITHOUT DAMAGE OR DETERIORATION
AT TIME OF SUBSTANTIAL COMPLETION.
B. COMPLY WITH MANUFACTURER’S WRITTEN INSTRUCTIONS
FOR TEMPERATURE AND RELATIVE HUMIDITY.
END OF SECTION 01 7300
SECTION 01 7700 - CLOSEOUT PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND
OTHER DIVISION 01 SPECIFICATION SECTIONS, APPLY TO THIS
SECTION.
1.2 SUMMARY
SECTION INCLUDES ADMINISTRATIVE AND PROCEDURAL REQUIREMENTS
FOR CONTRACT CLOSEOUT, INCLUDING, BUT NOT LIMITED TO, THE
FOLLOWING:
1. SUBSTANTIAL COMPLETION PROCEDURES.
2. FINAL COMPLETION PROCEDURES.
3. WARRANTIES.
4. FINAL CLEANING.
5. REPAIR OF THE WORK.
B. RELATED REQUIREMENTS:
1. DIVISION 01 SECTION “EXECUTION” FOR PROGRESS CLEANING
OF PROJECT SITE.
2. DIVISION 01 SECTION “OPERATION AND MAINTENANCE DATA” FOR
OPERATION AND MAINTENANCE MANUAL REQUIREMENTS.
3. DIVISION 01 SECTION “PROJECT RECORD DOCUMENTS” FOR
SUBMITTING RECORD DRAWINGS, RECORD SPECIFICATIONS, AND RECORD
PRODUCT DATA.
4. DIVISIONS 02 THROUGH 33 SECTIONS FOR SPECIFIC CLOSEOUT AND
SPECIAL CLEANING REQUIREMENTS FOR THE WORK IN THOSE SECTIONS.
1.3 ACTION SUBMITTALS
A. PRODUCT DATA: FOR CLEANING AGENTS.
B. CONTRACTOR’S LIST OF INCOMPLETE ITEMS: INITIAL
SUBMITTAL AT SUBSTANTIAL COMPLETION.
C. CERTIFIED LIST OF INCOMPLETE ITEMS: FINAL SUBMITTAL AT
FINAL COMPLETION.
1.4 CLOSEOUT SUBMITTALS
A. CERTIFICATES OF RELEASE: FROM AUTHORITIES HAVING
JURISDICTION.
B. CERTIFICATE OF INSURANCE: FOR CONTINUING COVERAGE.
C. FIELD REPORT: FOR PEST CONTROL INSPECTION.
1.5 MAINTENANCE MATERIAL SUBMITTALS
A. SCHEDULE OF MAINTENANCE MATERIAL ITEMS: FOR
MAINTENANCE MATERIAL SUBMITTAL ITEMS SPECIFIED IN OTHER
SECTIONS.
1.6 SUBSTANTIAL COMPLETION PROCEDURES
A. CONTRACTOR’S LIST OF INCOMPLETE ITEMS: PREPARE
AND SUBMIT A LIST OF ITEMS TO BE COMPLETED AND CORRECTED
(CONTRACTOR’S PUNCH LIST), INDICATING THE VALUE OF EACH ITEM
ON THE LIST AND REASONS WHY THE WORK IS INCOMPLETE.
B. SUBMITTALS PRIOR TO SUBSTANTIAL COMPLETION:
COMPLETE THE FOLLOWING A MINIMUM OF 10 DAYS PRIOR TO
REQUESTING INSPECTION FOR DETERMINING DATE OF SUBSTANTIAL
COMPLETION. LIST ITEMS BELOW THAT ARE INCOMPLETE AT TIME OF
REQUEST.
1. CERTIFICATES OF RELEASE: OBTAIN AND SUBMIT
RELEASES FROM AUTHORITIES HAVING JURISDICTION
PERMITTING OWNER UNRESTRICTED USE OF THE WORK AND
ACCESS TO SERVICES AND UTILITIES. INCLUDE OCCUPANCY
PERMITS, OPERATING CERTIFICATES, AND SIMILAR RELEASES.
2. SUBMIT CLOSEOUT SUBMITTALS SPECIFIED IN OTHER
DIVISION 01 SECTIONS, INCLUDING PROJECT RECORD
DOCUMENTS, OPERATION AND MAINTENANCE MANUALS,
FINAL COMPLETION CONSTRUCTION PHOTOGRAPHIC
DOCUMENTATION, DAMAGE OR SETTLEMENT SURVEYS,
PROPERTY SURVEYS, AND SIMILAR FINAL RECORD
INFORMATION.
3. SUBMIT CLOSEOUT SUBMITTALS SPECIFIED
IN INDIVIDUAL DIVISIONS 02 THROUGH 33 SECTIONS,
INCLUDING SPECIFIC WARRANTIES, WORKMANSHIP BONDS,
MAINTENANCE SERVICE AGREEMENTS, FINAL CERTIFICATIONS,
AND SIMILAR DOCUMENTS.
4. SUBMIT MAINTENANCE MATERIAL SUBMITTALS
SPECIFIED IN INDIVIDUAL DIVISIONS 02 THROUGH 33
SECTIONS, INCLUDING TOOLS, SPARE PARTS, EXTRA
MATERIALS, AND SIMILAR ITEMS, AND DELIVER TO LOCATION
DESIGNATED BY ARCHITECT. LABEL WITH MANUFACTURER’S
NAME AND MODEL NUMBER WHERE APPLICABLE.
a. SCHEDULE OF MAINTENANCE MATERIAL ITEMS:
PREPARE AND SUBMIT SCHEDULE OF MAINTENANCE
MATERIAL SUBMITTAL ITEMS, INCLUDING NAME AND
QUANTITY OF EACH ITEM AND NAME AND NUMBER OF
RELATED SPECIFICATION SECTION. OBTAIN ARCHITECT’S
SIGNATURE FOR RECEIPT OF SUBMITTALS.
5. SUBMIT TEST/ADJUST/BALANCE RECORDS.
6. SUBMIT SUSTAINABLE DESIGN SUBMITTALS REQUIRED
IN DIVISION 01 SUSTAINABLE DESIGN REQUIREMENTS SECTION
AND IN INDIVIDUAL DIVISION 02 THROUGH 33 SECTIONS.
7. SUBMIT CHANGEOVER INFORMATION RELATED TO
OWNER’S OCCUPANCY, USE, OPERATION, AND MAINTENANCE.
C. PROCEDURES PRIOR TO SUBSTANTIAL COMPLETION:
COMPLETE THE FOLLOWING A MINIMUM OF 10 DAYS PRIOR TO
REQUESTING INSPECTION FOR DETERMINING DATE OF SUBSTANTIAL
COMPLETION. LIST ITEMS BELOW THAT ARE INCOMPLETE AT TIME OF
REQUEST.
1. ADVISE OWNER OF PENDING INSURANCE CHANGEOVER
REQUIREMENTS.
2. MAKE FINAL CHANGEOVER OF PERMANENT LOCKS AND
DELIVER KEYS TO OWNER. ADVISE OWNER’S PERSONNEL OF
CHANGEOVER IN SECURITY PROVISIONS.
3. COMPLETE STARTUP AND TESTING OF SYSTEMS AND
EQUIPMENT.
4. PERFORM PREVENTIVE MAINTENANCE ON EQUIPMENT
USED PRIOR TO SUBSTANTIAL COMPLETION.
5. INSTRUCT OWNER’S PERSONNEL IN OPERATION,
ADJUSTMENT, AND MAINTENANCE OF PRODUCTS, EQUIPMENT,
AND SYSTEMS. SUBMIT DEMONSTRATION AND TRAINING
VIDEO RECORDINGS SPECIFIED IN DIVISION 01 SECTION
“DEMONSTRATION AND TRAINING.”
6. ADVISE OWNER OF CHANGEOVER IN HEAT AND OTHER
UTILITIES.
7. PARTICIPATE WITH OWNER IN CONDUCTING
INSPECTION AND WALKTHROUGH WITH LOCAL EMERGENCY
RESPONDERS.
8. TERMINATE AND REMOVE TEMPORARY FACILITIES
FROM PROJECT SITE, ALONG WITH MOCKUPS, CONSTRUCTION
TOOLS, AND SIMILAR ELEMENTS.
9. COMPLETE FINAL CLEANING REQUIREMENTS,
INCLUDING TOUCHUP PAINTING.
10. TOUCH UP AND OTHERWISE REPAIR AND RESTORE
MARRED EXPOSED FINISHES TO ELIMINATE VISUAL DEFECTS.
D. INSPECTION: SUBMIT A WRITTEN REQUEST FOR INSPECTION
TO DETERMINE SUBSTANTIAL COMPLETION A MINIMUM OF 10
DAYS PRIOR TO DATE THE WORK WILL BE COMPLETED AND READY
FOR FINAL INSPECTION AND TESTS. ON RECEIPT OF REQUEST,
ARCHITECT WILL EITHER PROCEED WITH INSPECTION OR NOTIFY
CONTRACTOR OF UNFULFILLED REQUIREMENTS. ARCHITECT WILL
PREPARE THE CERTIFICATE OF SUBSTANTIAL COMPLETION AFTER
INSPECTION OR WILL NOTIFY CONTRACTOR OF ITEMS, EITHER
ON CONTRACTOR’S LIST OR ADDITIONAL ITEMS IDENTIFIED BY
ARCHITECT, THAT MUST BE COMPLETED OR CORRECTED BEFORE
CERTIFICATE WILL BE ISSUED.
1. REINSPECTION: REQUEST REINSPECTION WHEN THE
WORK IDENTIFIED IN PREVIOUS INSPECTIONS AS INCOMPLETE
IS COMPLETED OR CORRECTED.
2. RESULTS OF COMPLETED INSPECTION WILL FORM THE
BASIS OF REQUIREMENTS FOR FINAL COMPLETION.
1.7 FINAL COMPLETION PROCEDURES
A. SUBMITTALS PRIOR TO FINAL COMPLETION: BEFORE
REQUESTING FINAL INSPECTION FOR DETERMINING FINAL
COMPLETION, COMPLETE THE FOLLOWING:
1. SUBMIT A FINAL APPLICATION FOR PAYMENT
ACCORDING TO DIVISION 01 SECTION “PAYMENT
PROCEDURES.”
2. CERTIFIED LIST OF INCOMPLETE ITEMS: SUBMIT
CERTIFIED COPY OF ARCHITECT’S SUBSTANTIAL
COMPLETION INSPECTION LIST OF ITEMS TO BE
COMPLETED OR CORRECTED (PUNCH LIST), ENDORSED
AND DATED BY ARCHITECT. CERTIFIED COPY OF THE LIST
SHALL STATE THAT EACH ITEM HAS BEEN COMPLETED OR
OTHERWISE RESOLVED FOR ACCEPTANCE.
3. CERTIFICATE OF INSURANCE: SUBMIT EVIDENCE OF
FINAL, CONTINUING INSURANCE COVERAGE COMPLYING
WITH INSURANCE REQUIREMENTS.
4. SUBMIT PEST-CONTROL FINAL INSPECTION REPORT.
B. INSPECTION: SUBMIT A WRITTEN REQUEST FOR FINAL
INSPECTION TO DETERMINE ACCEPTANCE A MINIMUM OF 10 DAYS
PRIOR TO DATE THE WORK WILL BE COMPLETED AND READY
FOR FINAL INSPECTION AND TESTS. ON RECEIPT OF REQUEST,
ARCHITECT WILL EITHER PROCEED WITH INSPECTION OR NOTIFY
CONTRACTOR OF UNFULFILLED REQUIREMENTS. ARCHITECT WILL
PREPARE A FINAL CERTIFICATE FOR PAYMENT AFTER INSPECTION
OR WILL NOTIFY CONTRACTOR OF CONSTRUCTION THAT MUST BE
COMPLETED OR CORRECTED BEFORE CERTIFICATE WILL BE ISSUED.
1. REINSPECTION: REQUEST REINSPECTION WHEN THE
WORK IDENTIFIED IN PREVIOUS INSPECTIONS AS INCOMPLETE
IS COMPLETED OR CORRECTED.
1.8 LIST OF INCOMPLETE ITEMS (PUNCH LIST)
A. ORGANIZATION OF LIST: INCLUDE NAME AND IDENTIFICATION
OF EACH SPACE AND AREA AFFECTED BY CONSTRUCTION
OPERATIONS FOR INCOMPLETE ITEMS AND ITEMS NEEDING
CORRECTION INCLUDING, IF NECESSARY, AREAS DISTURBED BY
CONTRACTOR THAT ARE OUTSIDE THE LIMITS OF CONSTRUCTION.
1. ORGANIZE ITEMS APPLYING TO EACH SPACE BY MAJOR
ELEMENT, INCLUDING CATEGORIES FOR CEILING, INDIVIDUAL
WALLS, FLOORS, EQUIPMENT, AND BUILDING SYSTEMS.
2. INCLUDE THE FOLLOWING INFORMATION AT THE TOP OF
EACH PAGE:
a. PROJECT NAME.
b. DATE.
c. NAME OF ARCHITECT.
d. NAME OF CONTRACTOR.
e. PAGE NUMBER.
3. SUBMIT LIST OF INCOMPLETE ITEMS IN THE FOLLOWING
FORMAT:
a. PDF ELECTRONIC FILE. ARCHITECT WILL RETURN
ANNOTATED FILE.
1.9 SUBMITTAL OF PROJECT WARRANTIES
A. TIME OF SUBMITTAL: SUBMIT WRITTEN WARRANTIES ON
REQUEST OF ARCHITECT FOR DESIGNATED PORTIONS OF THE WORK
WHERE COMMENCEMENT OF WARRANTIES OTHER THAN DATE
OF SUBSTANTIAL COMPLETION IS INDICATED, OR WHEN DELAY IN
SUBMITTAL OF WARRANTIES MIGHT LIMIT OWNER’S RIGHTS UNDER
WARRANTY.
B. PARTIAL OCCUPANCY: SUBMIT PROPERLY EXECUTED
WARRANTIES WITHIN 15 DAYS OF COMPLETION OF DESIGNATED
PORTIONS OF THE WORK THAT ARE COMPLETED AND OCCUPIED OR
USED BY OWNER DURING CONSTRUCTION PERIOD BY SEPARATE
AGREEMENT WITH CONTRACTOR.
C. ORGANIZE WARRANTY DOCUMENTS INTO AN ORDERLY
SEQUENCE BASED ON THE TABLE OF CONTENTS OF PROJECT
MANUAL.
1. BIND WARRANTIES AND BONDS IN HEAVY-DUTY, THREE-
RING, VINYL-COVERED, LOOSE-LEAF BINDERS, THICKNESS AS
NECESSARY TO ACCOMMODATE CONTENTS, AND SIZED TO
RECEIVE 8-1/2-BY-11-INCH PAPER.
2. PROVIDE HEAVY PAPER DIVIDERS WITH PLASTIC-
COVERED TABS FOR EACH SEPARATE WARRANTY. MARK TAB
TO IDENTIFY THE PRODUCT OR INSTALLATION. PROVIDE A
TYPED DESCRIPTION OF THE PRODUCT OR INSTALLATION,
INCLUDING THE NAME OF THE PRODUCT AND THE NAME,
ADDRESS, AND TELEPHONE NUMBER OF INSTALLER.
3. IDENTIFY EACH BINDER ON THE FRONT AND SPINE WITH
THE TYPED OR PRINTED TITLE “WARRANTIES,” PROJECT NAME,
AND NAME OF CONTRACTOR.
4. WARRANTY ELECTRONIC FILE: SCAN WARRANTIES AND
BONDS AND ASSEMBLE COMPLETE WARRANTY AND BOND
SUBMITTAL PACKAGE INTO A SINGLE INDEXED ELECTRONIC
PDF FILE WITH LINKS ENABLING NAVIGATION TO EACH ITEM.
PROVIDE BOOKMARKED TABLE OF CONTENTS AT BEGINNING
OF DOCUMENT
D. PROVIDE ADDITIONAL COPIES OF EACH WARRANTY TO
INCLUDE IN OPERATION AND MAINTENANCE MANUALS.
PART 2 - PRODUCTS
2.1 MATERIALS
A. CLEANING AGENTS: USE CLEANING MATERIALS AND AGENTS
RECOMMENDED BY MANUFACTURER OR FABRICATOR OF THE
SURFACE TO BE CLEANED. DO NOT USE CLEANING AGENTS THAT
ARE POTENTIALLY HAZARDOUS TO HEALTH OR PROPERTY OR THAT
MIGHT DAMAGE FINISHED SURFACES.
PART 3 - EXECUTION
3.1 FINAL CLEANING
A. GENERAL: PERFORM FINAL CLEANING. CONDUCT CLEANING
AND WASTE-REMOVAL OPERATIONS TO COMPLY WITH LOCAL LAWS
AND ORDINANCES AND FEDERAL AND LOCAL ENVIRONMENTAL AND
ANTIPOLLUTION REGULATIONS.
B. CLEANING: EMPLOY EXPERIENCED WORKERS OR
PROFESSIONAL CLEANERS FOR FINAL CLEANING. CLEAN EACH
SURFACE OR UNIT TO CONDITION EXPECTED IN AN AVERAGE
COMMERCIAL BUILDING CLEANING AND MAINTENANCE PROGRAM.
COMPLY WITH MANUFACTURER’S WRITTEN INSTRUCTIONS.
1. COMPLETE THE FOLLOWING CLEANING OPERATIONS
BEFORE REQUESTING INSPECTION FOR CERTIFICATION OF
SUBSTANTIAL COMPLETION FOR ENTIRE PROJECT OR FOR A
DESIGNATED PORTION OF PROJECT:
a. CLEAN PROJECT SITE, YARD, AND GROUNDS, IN AREAS
DISTURBED BY CONSTRUCTION ACTIVITIES, INCLUDING
LANDSCAPE DEVELOPMENT AREAS, OF RUBBISH, WASTE
MATERIAL, LITTER, AND OTHER FOREIGN SUBSTANCES.
b. SWEEP PAVED AREAS BROOM CLEAN. REMOVE
PETROCHEMICAL SPILLS, STAINS, AND OTHER FOREIGN
DEPOSITS.
c. REMOVE TOOLS, CONSTRUCTION EQUIPMENT,
MACHINERY, AND SURPLUS MATERIAL FROM PROJECT SITE.
d. CLEAN EXPOSED INTERIOR HARD-SURFACED FINISHES
TO A DIRT-FREE CONDITION, FREE OF STAINS, FILMS,
AND SIMILAR FOREIGN SUBSTANCES. AVOID DISTURBING
NATURAL WEATHERING OF EXTERIOR SURFACES.
RESTORE REFLECTIVE SURFACES TO THEIR ORIGINAL
CONDITION.
e. REMOVE DEBRIS AND SURFACE DUST FROM LIMITED
ACCESS SPACES, INCLUDING ROOFS, PLENUMS, SHAFTS,
TRENCHES, EQUIPMENT VAULTS, MANHOLES, ATTICS, AND
SIMILAR SPACES.
f. SWEEP CONCRETE FLOORS BROOM CLEAN IN
UNOCCUPIED SPACES.
g. VACUUM CARPET AND SIMILAR SOFT SURFACES,
REMOVING DEBRIS AND EXCESS NAP; CLEAN ACCORDING
TO MANUFACTURER’S RECOMMENDATIONS IF VISIBLE SOIL
OR STAINS REMAIN.
h. CLEAN TRANSPARENT MATERIALS, INCLUDING MIRRORS
AND GLASS IN DOORS AND WINDOWS. REMOVE GLAZING
COMPOUNDS AND OTHER NOTICEABLE, VISION-OBSCURING
MATERIALS. POLISH MIRRORS AND GLASS, TAKING CARE
NOT TO SCRATCH SURFACES.
i. REMOVE LABELS THAT ARE NOT PERMANENT.
j. WIPE SURFACES OF MECHANICAL AND ELECTRICAL
EQUIPMENT AND SIMILAR EQUIPMENT. REMOVE EXCESS
LUBRICATION, PAINT AND MORTAR DROPPINGS, AND OTHER
FOREIGN SUBSTANCES.
k. CLEAN PLUMBING FIXTURES TO A SANITARY CONDITION,
FREE OF STAINS, INCLUDING STAINS RESULTING FROM
WATER EXPOSURE.
l. REPLACE DISPOSABLE AIR FILTERS AND CLEAN
PERMANENT AIR FILTERS. CLEAN EXPOSED SURFACES OF
DIFFUSERS, REGISTERS, AND GRILLS.
m. CLEAN DUCTS, BLOWERS, AND COILS IF UNITS WERE
OPERATED WITHOUT FILTERS DURING CONSTRUCTION OR
THAT DISPLAY CONTAMINATION WITH PARTICULATE MATTER
ON INSPECTION.
1) CLEAN HVAC SYSTEM IN COMPLIANCE WITH
NADCA STANDARD 1992-01. PROVIDE WRITTEN REPORT
ON COMPLETION OF CLEANING.
n. CLEAN LIGHT FIXTURES, LAMPS, GLOBES, AND
REFLECTORS TO FUNCTION WITH FULL EFFICIENCY.
o. LEAVE PROJECT CLEAN AND READY FOR OCCUPANCY.
C. CONSTRUCTION WASTE DISPOSAL: COMPLY WITH WASTE
DISPOSAL REQUIREMENTS IN DIVISION 01 SECTION “TEMPORARY
FACILITIES AND CONTROLS.”
3.2 REPAIR OF THE WORK
A. COMPLETE REPAIR AND RESTORATION OPERATIONS BEFORE
REQUESTING INSPECTION FOR DETERMINATION OF SUBSTANTIAL
COMPLETION.
B. REPAIR OR REMOVE AND REPLACE DEFECTIVE
CONSTRUCTION. REPAIRING INCLUDES REPLACING DEFECTIVE
PARTS, REFINISHING DAMAGED SURFACES, TOUCHING UP WITH
MATCHING MATERIALS, AND PROPERLY ADJUSTING OPERATING
EQUIPMENT. WHERE DAMAGED OR WORN ITEMS CANNOT BE
REPAIRED OR RESTORED, PROVIDE REPLACEMENTS. REMOVE AND
REPLACE OPERATING COMPONENTS THAT CANNOT BE REPAIRED.
RESTORE DAMAGED CONSTRUCTION AND PERMANENT FACILITIES
USED DURING CONSTRUCTION TO SPECIFIED CONDITION.
1. REMOVE AND REPLACE CHIPPED, SCRATCHED,
AND BROKEN GLASS, REFLECTIVE SURFACES, AND OTHER
DAMAGED TRANSPARENT MATERIALS.
2. TOUCH UP AND OTHERWISE REPAIR AND RESTORE
MARRED OR EXPOSED FINISHES AND SURFACES. REPLACE
FINISHES AND SURFACES THAT THAT ALREADY SHOW
EVIDENCE OF REPAIR OR RESTORATION.
a. DO NOT PAINT OVER “UL” AND OTHER REQUIRED
LABELS AND IDENTIFICATION, INCLUDING MECHANICAL AND
ELECTRICAL NAMEPLATES. REMOVE PAINT APPLIED TO
REQUIRED LABELS AND IDENTIFICATION.
3. REPLACE PARTS SUBJECT TO OPERATING CONDITIONS
DURING CONSTRUCTION THAT MAY IMPEDE OPERATION OR
REDUCE LONGEVITY.
4. REPLACE BURNED-OUT BULBS, BULBS NOTICEABLY
DIMMED BY HOURS OF USE, AND DEFECTIVE AND NOISY
STARTERS IN FLUORESCENT AND MERCURY VAPOR FIXTURES
TO COMPLY WITH REQUIREMENTS FOR NEW FIXTURES.
END OF SECTION 017700
SECTION 01 7823 - OPERATION AND MAINTENANCE DATA
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND
OTHER DIVISION 01 SPECIFICATION SECTIONS, APPLY TO THIS
SECTION.
1.2 SUMMARY
A. SECTION INCLUDES ADMINISTRATIVE AND PROCEDURAL
REQUIREMENTS FOR PREPARING OPERATION AND MAINTENANCE
MANUALS, INCLUDING THE FOLLOWING:
1. OPERATION AND MAINTENANCE DOCUMENTATION
DIRECTORY.
2. EMERGENCY MANUALS.
3. OPERATION MANUALS FOR SYSTEMS, SUBSYSTEMS,
AND EQUIPMENT.
4. PRODUCT MAINTENANCE MANUALS.
5. SYSTEMS AND EQUIPMENT MAINTENANCE MANUALS.
B. RELATED REQUIREMENTS:
1. DIVISION 01 SECTION “SUBMITTAL PROCEDURES” FOR
SUBMITTING COPIES OF SUBMITTALS FOR OPERATION AND
MAINTENANCE MANUALS.
1.3 DEFINITIONS
A. SYSTEM: AN ORGANIZED COLLECTION OF PARTS, EQUIPMENT,
OR SUBSYSTEMS UNITED BY REGULAR INTERACTION.
B. SUBSYSTEM: A PORTION OF A SYSTEM WITH
CHARACTERISTICS SIMILAR TO A SYSTEM.
1.4 CLOSEOUT SUBMITTALS
A. MANUAL CONTENT: OPERATIONS AND MAINTENANCE MANUAL
CONTENT IS SPECIFIED IN INDIVIDUAL SPECIFICATION SECTIONS
TO BE REVIEWED AT THE TIME OF SECTION SUBMITTALS. SUBMIT
REVIEWED MANUAL CONTENT FORMATTED AND ORGANIZED AS
REQUIRED BY THIS SECTION.
1. ARCHITECT WILL COMMENT ON WHETHER CONTENT
OF OPERATIONS AND MAINTENANCE SUBMITTALS ARE
ACCEPTABLE.
2. WHERE APPLICABLE, CLARIFY AND UPDATE REVIEWED
MANUAL CONTENT TO CORRESPOND TO REVISIONS AND FIELD
CONDITIONS.
B. FORMAT: SUBMIT OPERATIONS AND MAINTENANCE MANUALS
IN THE FOLLOWING FORMAT:
1. PDF ELECTRONIC FILE. ASSEMBLE EACH MANUAL INTO
A COMPOSITE ELECTRONICALLY INDEXED FILE. SUBMIT ON
DIGITAL MEDIA ACCEPTABLE TO ARCHITECT.
a. NAME EACH INDEXED DOCUMENT FILE IN COMPOSITE
ELECTRONIC INDEX WITH APPLICABLE ITEM NAME. INCLUDE
A COMPLETE ELECTRONICALLY LINKED OPERATION AND
MAINTENANCE DIRECTORY.
b. ENABLE INSERTED REVIEWER COMMENTS ON DRAFT
SUBMITTALS.
C. INITIAL MANUAL SUBMITTAL: SUBMIT DRAFT COPY OF EACH
MANUAL AT LEAST 30 DAYS BEFORE COMMENCING DEMONSTRATION
AND TRAINING. ARCHITECT WILL COMMENT ON WHETHER GENERAL
SCOPE AND CONTENT OF MANUAL ARE ACCEPTABLE.
D. FINAL MANUAL SUBMITTAL: SUBMIT EACH MANUAL IN FINAL
FORM PRIOR TO REQUESTING INSPECTION FOR SUBSTANTIAL
COMPLETION AND AT LEAST 15 DAYS BEFORE COMMENCING
DEMONSTRATION AND TRAINING. ARCHITECT WILL RETURN COPY
WITH COMMENTS.
1. CORRECT OR REVISE EACH MANUAL TO COMPLY
WITH ARCHITECT’S COMMENTS. SUBMIT COPIES OF EACH
CORRECTED MANUAL WITHIN 15 DAYS OF RECEIPT OF
ARCHITECT’S COMMENTS AND PRIOR TO COMMENCING
DEMONSTRATION AND TRAINING.
PART 2 - PRODUCTS
2.1 OPERATION AND MAINTENANCE DOCUMENTATION DIRECTORY
A. DIRECTORY: PREPARE A SINGLE, COMPREHENSIVE
DIRECTORY OF EMERGENCY, OPERATION, AND MAINTENANCE DATA
AND MATERIALS, LISTING ITEMS AND THEIR LOCATION TO FACILITATE
READY ACCESS TO DESIRED INFORMATION. INCLUDE A SECTION IN
THE DIRECTORY FOR EACH OF THE FOLLOWING:
1. LIST OF DOCUMENTS.
2. LIST OF SYSTEMS.
3. LIST OF EQUIPMENT.
4. TABLE OF CONTENTS.
B. LIST OF SYSTEMS AND SUBSYSTEMS: LIST SYSTEMS
ALPHABETICALLY. INCLUDE REFERENCES TO OPERATION AND
MAINTENANCE MANUALS THAT CONTAIN INFORMATION ABOUT EACH
SYSTEM.
C. LIST OF EQUIPMENT: LIST EQUIPMENT FOR EACH SYSTEM,
ORGANIZED ALPHABETICALLY BY SYSTEM. FOR PIECES OF
EQUIPMENT NOT PART OF SYSTEM, LIST ALPHABETICALLY IN
SEPARATE LIST.
D. TABLES OF CONTENTS: INCLUDE A TABLE OF CONTENTS FOR
EACH EMERGENCY, OPERATION, AND MAINTENANCE MANUAL.
E. IDENTIFICATION: IN THE DOCUMENTATION DIRECTORY
AND IN EACH OPERATION AND MAINTENANCE MANUAL, IDENTIFY
EACH SYSTEM, SUBSYSTEM, AND PIECE OF EQUIPMENT WITH
SAME DESIGNATION USED IN THE CONTRACT DOCUMENTS. IF
NO DESIGNATION EXISTS, ASSIGN A DESIGNATION ACCORDING
TO ASHRAE GUIDELINE 4, “PREPARATION OF OPERATING AND
MAINTENANCE DOCUMENTATION FOR BUILDING SYSTEMS.”
2.2 REQUIREMENTS FOR EMERGENCY, OPERATION, AND MAINTENANCE
MANUALS
A. ORGANIZATION: UNLESS OTHERWISE INDICATED, ORGANIZE
EACH MANUAL INTO A SEPARATE SECTION FOR EACH SYSTEM
AND SUBSYSTEM, AND A SEPARATE SECTION FOR EACH PIECE OF
EQUIPMENT NOT PART OF A SYSTEM. EACH MANUAL SHALL CONTAIN
THE FOLLOWING MATERIALS, IN THE ORDER LISTED:
1. TITLE PAGE.
2. TABLE OF CONTENTS.
3. MANUAL CONTENTS.
B. TITLE PAGE: INCLUDE THE FOLLOWING INFORMATION:
1. SUBJECT MATTER INCLUDED IN MANUAL.
2. NAME AND ADDRESS OF PROJECT.
3. NAME AND ADDRESS OF OWNER.
4. DATE OF SUBMITTAL.
5. NAME AND CONTACT INFORMATION FOR CONTRACTOR.
6. NAME AND CONTACT INFORMATION FOR ARCHITECT.
7. NAMES AND CONTACT INFORMATION FOR MAJOR
CONSULTANTS TO THE ARCHITECT THAT DESIGNED THE
SYSTEMS CONTAINED IN THE MANUALS.
8. CROSS-REFERENCE TO RELATED SYSTEMS IN OTHER
OPERATION AND MAINTENANCE MANUALS.
C. TABLE OF CONTENTS: LIST EACH PRODUCT INCLUDED IN
MANUAL, IDENTIFIED BY PRODUCT NAME, INDEXED TO THE CONTENT
OF THE VOLUME, AND CROSS-REFERENCED TO SPECIFICATION
SECTION NUMBER IN PROJECT MANUAL.
1. IF OPERATION OR MAINTENANCE DOCUMENTATION
REQUIRES MORE THAN ONE VOLUME TO ACCOMMODATE DATA,
INCLUDE COMPREHENSIVE TABLE OF CONTENTS FOR ALL
VOLUMES IN EACH VOLUME OF THE SET.
D. MANUAL CONTENTS: ORGANIZE INTO SETS OF
MANAGEABLE SIZE. ARRANGE CONTENTS ALPHABETICALLY BY
SYSTEM, SUBSYSTEM, AND EQUIPMENT. IF POSSIBLE, ASSEMBLE
INSTRUCTIONS FOR SUBSYSTEMS, EQUIPMENT, AND COMPONENTS
OF ONE SYSTEM INTO A SINGLE BINDER.
E. MANUALS, ELECTRONIC FILES: SUBMIT MANUALS IN THE
FORM OF A MULTIPLE FILE COMPOSITE ELECTRONIC PDF FILE FOR
EACH MANUAL TYPE REQUIRED.
1. ELECTRONIC FILES: USE ELECTRONIC FILES PREPARED
BY MANUFACTURER WHERE AVAILABLE. WHERE SCANNING OF
PAPER DOCUMENTS IS REQUIRED, CONFIGURE SCANNED FILE
FOR MINIMUM READABLE FILE SIZE.
FILE NAMES AND BOOKMARKS: ENABLE BOOKMARKING
OF INDIVIDUAL DOCUMENTS BASED ON FILE NAMES. NAME
DOCUMENT FILES TO CORRESPOND TO SYSTEM, SUBSYSTEM,
AND EQUIPMENT NAMES USED IN MANUAL DIRECTORY AND
TABLE OF CONTENTS. GROUP DOCUMENTS FOR EACH SYSTEM
AND SUBSYSTEM INTO INDIVIDUAL COMPOSITE BOOKMARKED
FILES, THEN CREATE COMPOSITE MANUAL, SO THAT
RESULTING BOOKMARKS REFLECT THE SYSTEM, SUBSYSTEM,
AND EQUIPMENT NAMES IN A READILY NAVIGATED FILE TREE.
CONFIGURE ELECTRONIC MANUAL TO DISPLAY BOOKMARK
PANEL ON OPENING FILE.
2.3 EMERGENCY MANUALS
A. CONTENT: ORGANIZE MANUAL INTO A SEPARATE SECTION
FOR EACH OF THE FOLLOWING:
1. TYPE OF EMERGENCY.
2. EMERGENCY INSTRUCTIONS.
3. EMERGENCY PROCEDURES.
B. TYPE OF EMERGENCY: WHERE APPLICABLE FOR EACH
TYPE OF EMERGENCY INDICATED BELOW, INCLUDE INSTRUCTIONS
AND PROCEDURES FOR EACH SYSTEM, SUBSYSTEM, PIECE OF
EQUIPMENT, AND COMPONENT:
1. FIRE.
2. FLOOD.
3. GAS LEAK.
4. WATER LEAK.
5. POWER FAILURE.
6. WATER OUTAGE.
7. SYSTEM, SUBSYSTEM, OR EQUIPMENT FAILURE.
8. CHEMICAL RELEASE OR SPILL.
C. EMERGENCY INSTRUCTIONS: DESCRIBE AND EXPLAIN
WARNINGS, TROUBLE INDICATIONS, ERROR MESSAGES, AND SIMILAR
CODES AND SIGNALS. INCLUDE RESPONSIBILITIES OF OWNER’S
OPERATING PERSONNEL FOR NOTIFICATION OF INSTALLER,
SUPPLIER, AND MANUFACTURER TO MAINTAIN WARRANTIES.
D. EMERGENCY PROCEDURES: INCLUDE THE FOLLOWING, AS
APPLICABLE:
1. INSTRUCTIONS ON STOPPING.
2. SHUTDOWN INSTRUCTIONS FOR EACH TYPE OF
EMERGENCY.
3. OPERATING INSTRUCTIONS FOR CONDITIONS OUTSIDE
NORMAL OPERATING LIMITS.
4. REQUIRED SEQUENCES FOR ELECTRIC OR
ELECTRONIC SYSTEMS.
5. SPECIAL OPERATING INSTRUCTIONS AND
PROCEDURES.
2.4 OPERATION MANUALS
A. CONTENT: IN ADDITION TO REQUIREMENTS IN THIS SECTION,
INCLUDE OPERATION DATA REQUIRED IN INDIVIDUAL SPECIFICATION
SECTIONS AND THE FOLLOWING INFORMATION:
1. SYSTEM, SUBSYSTEM, AND EQUIPMENT DESCRIPTIONS.
USE DESIGNATIONS FOR SYSTEMS AND EQUIPMENT
INDICATED ON CONTRACT DOCUMENTS.
2. PERFORMANCE AND DESIGN CRITERIA IF CONTRACTOR
HAS DELEGATED DESIGN RESPONSIBILITY.
3. OPERATING STANDARDS.
4. OPERATING PROCEDURES.
5. OPERATING LOGS.
6. WIRING DIAGRAMS.
7. CONTROL DIAGRAMS.
8. PIPED SYSTEM DIAGRAMS.
9. PRECAUTIONS AGAINST IMPROPER USE.
10. LICENSE REQUIREMENTS INCLUDING INSPECTION AND
RENEWAL DATES.
B. DESCRIPTIONS: INCLUDE THE FOLLOWING:
1. PRODUCT NAME AND MODEL NUMBER. USE
DESIGNATIONS FOR PRODUCTS INDICATED ON CONTRACT
DOCUMENTS.
2. MANUFACTURER’S NAME.
3. EQUIPMENT IDENTIFICATION WITH SERIAL NUMBER OF
EACH COMPONENT.
4. EQUIPMENT FUNCTION.
5. OPERATING CHARACTERISTICS.
6. LIMITING CONDITIONS.
7. PERFORMANCE CURVES.
8. ENGINEERING DATA AND TESTS.
9. COMPLETE NOMENCLATURE AND NUMBER OF
REPLACEMENT PARTS.
C. OPERATING PROCEDURES: INCLUDE THE FOLLOWING, AS
APPLICABLE:
1. STARTUP PROCEDURES.
2. EQUIPMENT OR SYSTEM BREAK-IN PROCEDURES.
3. ROUTINE AND NORMAL OPERATING INSTRUCTIONS.
4. REGULATION AND CONTROL PROCEDURES.
5. INSTRUCTIONS ON STOPPING.
6. NORMAL SHUTDOWN INSTRUCTIONS.
7. SEASONAL AND WEEKEND OPERATING INSTRUCTIONS.
8. REQUIRED SEQUENCES FOR ELECTRIC OR
ELECTRONIC SYSTEMS.
9. SPECIAL OPERATING INSTRUCTIONS AND
PROCEDURES.
D. SYSTEMS AND EQUIPMENT CONTROLS: DESCRIBE THE
GI101
conformed set
revisions :
p r o j e c t # :
d a t e :
20.0550
- june 4, 2021
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
GI207
Sheet Specs
20.0550
- april 7, 2021
Rexburg
Rowhouses
bid set
SEQUENCE OF OPERATION, AND DIAGRAM CONTROLS AS INSTALLED.
E. PIPED SYSTEMS: DIAGRAM PIPING AS INSTALLED, AND
IDENTIFY COLOR-CODING WHERE REQUIRED FOR IDENTIFICATION.
2.5 PRODUCT MAINTENANCE MANUALS
A. CONTENT: ORGANIZE MANUAL INTO A SEPARATE
SECTION FOR EACH PRODUCT, MATERIAL, AND FINISH. INCLUDE
SOURCE INFORMATION, PRODUCT INFORMATION, MAINTENANCE
PROCEDURES, REPAIR MATERIALS AND SOURCES, AND WARRANTIES
AND BONDS, AS DESCRIBED BELOW.
B. SOURCE INFORMATION: LIST EACH PRODUCT INCLUDED IN
MANUAL, IDENTIFIED BY PRODUCT NAME AND ARRANGED TO MATCH
MANUAL’S TABLE OF CONTENTS. FOR EACH PRODUCT, LIST NAME,
ADDRESS, AND TELEPHONE NUMBER OF INSTALLER OR SUPPLIER
AND MAINTENANCE SERVICE AGENT, AND CROSS-REFERENCE
SPECIFICATION SECTION NUMBER AND TITLE IN PROJECT MANUAL
AND DRAWING OR SCHEDULE DESIGNATION OR IDENTIFIER WHERE
APPLICABLE.
C. PRODUCT INFORMATION: INCLUDE THE FOLLOWING, AS
APPLICABLE:
1. PRODUCT NAME AND MODEL NUMBER.
2. MANUFACTURER’S NAME.
3. COLOR, PATTERN, AND TEXTURE.
4. MATERIAL AND CHEMICAL COMPOSITION.
5. REORDERING INFORMATION FOR SPECIALLY
MANUFACTURED PRODUCTS.
D. MAINTENANCE PROCEDURES: INCLUDE MANUFACTURER’S
WRITTEN RECOMMENDATIONS AND THE FOLLOWING:
1. INSPECTION PROCEDURES.
2. TYPES OF CLEANING AGENTS TO BE USED AND
METHODS OF CLEANING.
3. LIST OF CLEANING AGENTS AND METHODS OF
CLEANING DETRIMENTAL TO PRODUCT.
4. SCHEDULE FOR ROUTINE CLEANING AND
MAINTENANCE.
5. REPAIR INSTRUCTIONS.
E. REPAIR MATERIALS AND SOURCES: INCLUDE LISTS OF
MATERIALS AND LOCAL SOURCES OF MATERIALS AND RELATED
SERVICES.
F. WARRANTIES AND BONDS: INCLUDE COPIES OF WARRANTIES
AND BONDS AND LISTS OF CIRCUMSTANCES AND CONDITIONS THAT
WOULD AFFECT VALIDITY OF WARRANTIES OR BONDS.
1. INCLUDE PROCEDURES TO FOLLOW AND REQUIRED
NOTIFICATIONS FOR WARRANTY CLAIMS.
2.6 SYSTEMS AND EQUIPMENT MAINTENANCE MANUALS
A. CONTENT: FOR EACH SYSTEM, SUBSYSTEM, AND PIECE
OF EQUIPMENT NOT PART OF A SYSTEM, INCLUDE SOURCE
INFORMATION, MANUFACTURERS’ MAINTENANCE DOCUMENTATION,
MAINTENANCE PROCEDURES, MAINTENANCE AND SERVICE
SCHEDULES, SPARE PARTS LIST AND SOURCE INFORMATION,
MAINTENANCE SERVICE CONTRACTS, AND WARRANTY AND BOND
INFORMATION, AS DESCRIBED BELOW.
B. SOURCE INFORMATION: LIST EACH SYSTEM, SUBSYSTEM,
AND PIECE OF EQUIPMENT INCLUDED IN MANUAL, IDENTIFIED
BY PRODUCT NAME AND ARRANGED TO MATCH MANUAL’S TABLE
OF CONTENTS. FOR EACH PRODUCT, LIST NAME, ADDRESS,
AND TELEPHONE NUMBER OF INSTALLER OR SUPPLIER AND
MAINTENANCE SERVICE AGENT, AND CROSS-REFERENCE
SPECIFICATION SECTION NUMBER AND TITLE IN PROJECT MANUAL
AND DRAWING OR SCHEDULE DESIGNATION OR IDENTIFIER WHERE
APPLICABLE.
C. MANUFACTURERS’ MAINTENANCE DOCUMENTATION:
MANUFACTURERS’ MAINTENANCE DOCUMENTATION INCLUDING THE
FOLLOWING INFORMATION FOR EACH COMPONENT PART OR PIECE
OF EQUIPMENT:
1. STANDARD MAINTENANCE INSTRUCTIONS AND
BULLETINS.
2. DRAWINGS, DIAGRAMS, AND INSTRUCTIONS REQUIRED
FOR MAINTENANCE, INCLUDING DISASSEMBLY AND
COMPONENT REMOVAL, REPLACEMENT, AND ASSEMBLY.
3. IDENTIFICATION AND NOMENCLATURE OF PARTS AND
COMPONENTS.
4. LIST OF ITEMS RECOMMENDED TO BE STOCKED AS
SPARE PARTS.
D. MAINTENANCE PROCEDURES: INCLUDE THE FOLLOWING
INFORMATION AND ITEMS THAT DETAIL ESSENTIAL MAINTENANCE
PROCEDURES:
1. TEST AND INSPECTION INSTRUCTIONS.
2. TROUBLESHOOTING GUIDE.
3. PRECAUTIONS AGAINST IMPROPER MAINTENANCE.
4. DISASSEMBLY; COMPONENT REMOVAL, REPAIR, AND
REPLACEMENT; AND REASSEMBLY INSTRUCTIONS.
5. ALIGNING, ADJUSTING, AND CHECKING INSTRUCTIONS.
6. DEMONSTRATION AND TRAINING VIDEO RECORDING, IF
AVAILABLE.
E. MAINTENANCE AND SERVICE SCHEDULES: INCLUDE SERVICE
AND LUBRICATION REQUIREMENTS, LIST OF REQUIRED LUBRICANTS
FOR EQUIPMENT, AND SEPARATE SCHEDULES FOR PREVENTIVE
AND ROUTINE MAINTENANCE AND SERVICE WITH STANDARD TIME
ALLOTMENT.
1. SCHEDULED MAINTENANCE AND SERVICE: TABULATE
ACTIONS FOR DAILY, WEEKLY, MONTHLY, QUARTERLY,
SEMIANNUAL, AND ANNUAL FREQUENCIES.
2. MAINTENANCE AND SERVICE RECORD: INCLUDE
MANUFACTURERS’ FORMS FOR RECORDING MAINTENANCE.
F. SPARE PARTS LIST AND SOURCE INFORMATION: INCLUDE
LISTS OF REPLACEMENT AND REPAIR PARTS, WITH PARTS IDENTIFIED
AND CROSS-REFERENCED TO MANUFACTURERS’ MAINTENANCE
DOCUMENTATION AND LOCAL SOURCES OF MAINTENANCE
MATERIALS AND RELATED SERVICES.
G. MAINTENANCE SERVICE CONTRACTS: INCLUDE COPIES OF
MAINTENANCE AGREEMENTS WITH NAME AND TELEPHONE NUMBER
OF SERVICE AGENT.
H. WARRANTIES AND BONDS: INCLUDE COPIES OF WARRANTIES
AND BONDS AND LISTS OF CIRCUMSTANCES AND CONDITIONS THAT
WOULD AFFECT VALIDITY OF WARRANTIES OR BONDS.
1. INCLUDE PROCEDURES TO FOLLOW AND REQUIRED
NOTIFICATIONS FOR WARRANTY CLAIMS.
PART 3 - EXECUTION
3.1 MANUAL PREPARATION
A. OPERATION AND MAINTENANCE DOCUMENTATION DIRECTORY:
PREPARE A SEPARATE MANUAL THAT PROVIDES AN ORGANIZED
REFERENCE TO EMERGENCY, OPERATION, AND MAINTENANCE
MANUALS.
B. EMERGENCY MANUAL: ASSEMBLE A COMPLETE SET OF
EMERGENCY INFORMATION INDICATING PROCEDURES FOR USE BY
EMERGENCY PERSONNEL AND BY OWNER’S OPERATING PERSONNEL
FOR TYPES OF EMERGENCIES INDICATED.
C. PRODUCT MAINTENANCE MANUAL: ASSEMBLE A COMPLETE
SET OF MAINTENANCE DATA INDICATING CARE AND MAINTENANCE
OF EACH PRODUCT, MATERIAL, AND FINISH INCORPORATED INTO THE
WORK.
D. OPERATION AND MAINTENANCE MANUALS: ASSEMBLE A
COMPLETE SET OF OPERATION AND MAINTENANCE DATA INDICATING
OPERATION AND MAINTENANCE OF EACH SYSTEM, SUBSYSTEM, AND
PIECE OF EQUIPMENT NOT PART OF A SYSTEM.
1. ENGAGE A FACTORY-AUTHORIZED SERVICE
REPRESENTATIVE TO ASSEMBLE AND PREPARE INFORMATION
FOR EACH SYSTEM, SUBSYSTEM, AND PIECE OF EQUIPMENT
NOT PART OF A SYSTEM.
2. PREPARE A SEPARATE MANUAL FOR EACH SYSTEM AND
SUBSYSTEM, IN THE FORM OF AN INSTRUCTIONAL MANUAL
FOR USE BY OWNER’S OPERATING PERSONNEL.
E. MANUFACTURERS’ DATA: WHERE MANUALS CONTAIN
MANUFACTURERS’ STANDARD PRINTED DATA, INCLUDE ONLY
SHEETS PERTINENT TO PRODUCT OR COMPONENT INSTALLED.
MARK EACH SHEET TO IDENTIFY EACH PRODUCT OR COMPONENT
INCORPORATED INTO THE WORK. IF DATA INCLUDE MORE THAN
ONE ITEM IN A TABULAR FORMAT, IDENTIFY EACH ITEM USING
APPROPRIATE REFERENCES FROM THE CONTRACT DOCUMENTS.
IDENTIFY DATA APPLICABLE TO THE WORK AND DELETE REFERENCES
TO INFORMATION NOT APPLICABLE.
1. PREPARE SUPPLEMENTARY TEXT IF MANUFACTURERS’
STANDARD PRINTED DATA ARE NOT AVAILABLE AND WHERE
THE INFORMATION IS NECESSARY FOR PROPER OPERATION
AND MAINTENANCE OF EQUIPMENT OR SYSTEMS.
F. DRAWINGS: PREPARE DRAWINGS SUPPLEMENTING
MANUFACTURERS’ PRINTED DATA TO ILLUSTRATE THE RELATIONSHIP
OF COMPONENT PARTS OF EQUIPMENT AND SYSTEMS AND
TO ILLUSTRATE CONTROL SEQUENCE AND FLOW DIAGRAMS.
COORDINATE THESE DRAWINGS WITH INFORMATION CONTAINED
IN RECORD DRAWINGS TO ENSURE CORRECT ILLUSTRATION OF
COMPLETED INSTALLATION.
1. DO NOT USE ORIGINAL PROJECT RECORD DOCUMENTS
AS PART OF OPERATION AND MAINTENANCE MANUALS.
2. COMPLY WITH REQUIREMENTS OF NEWLY PREPARED
RECORD DRAWINGS IN DIVISION 01 SECTION “PROJECT
RECORD DOCUMENTS.”
G. COMPLY WITH DIVISION 01 SECTION “CLOSEOUT
PROCEDURES” FOR SCHEDULE FOR SUBMITTING OPERATION AND
MAINTENANCE DOCUMENTATION.
END OF SECTION 01 7823
DIVISION 03 - CONCRETE
1. SEE SEPARATE DISCIPLINE SPECIFIC SHEET SPECIFICATIONS FOR
MORE INFORMATION
DIVISION 04 - MASONRY
1. SEE SEPARATE DISCIPLINE SPECIFIC SHEET SPECIFICATIONS FOR
MORE INFORMATION
DIVISION 5 - METAL
1. PROVIDE ALL MISCELLANEOUS METAL ITEMS INCLUDING MATERIALS,
FABRICATIONS, FASTENINGS, AND ACCESSORIES REQUIRED FOR FINISHED
INSTALLATION AS INDICATED AND SPECIFIED.
2. STEEL SHALL BE ASTM A366 AMERICAN OPEN HEARTH SHEET
STEEL, FREE FROM SCALE AND PITTING AND OTHER DEFECTS AFFECTING
APPEARANCE.
3. TUBING SHALL CONFORM TO REQUIREMENTS OF ASTM A500 OR A501
AS APPROVED.
4. WHERE METAL ITEMS ARE TO BE ERECTED AND IN CONTACT WITH
DISSIMILAR MATERIALS. PROVIDE CONTACT SURFACES WITH COATING OF
AN IMPROVED ZINC CHROMATE PRIMER IN MANNER TO OBTAIN NOT LESS
THAN 1.0 MIL DRY FILM THICKNESS.
5. SHEET STEEL SHALL CONFORM TO REQUIREMENTS OF ASTM A606.
6. CARBON STEEL BARS SHALL CONFORM TO REQUIREMENTS OF ASTM
A321.
7. ALUMINUM EXTRUSIONS SHALL CONFORM TO ASTM B221.
8. FASTENERS SHALL BE AS REQUIRED FOR ASSEMBLY AND
INSTALLATION OF FABRICATED ITEMS.
9. BOLTS SHALL BE LOW CARBON STEEL EXTERNALLY AND INTERNALLY
THREADED FASTENERS CONFORMING WITH REQUIREMENTS OF ASTM
A307. INCLUDE NECESSARY NUTS AND PLAIN HARDENED WASHERS. FOR
MEMBERS FOR SUPPORT OF STRUCTURAL MEMBERS OR CONNECTION
THERETO. USE FASTENERS CONFORMING WITH ASTM A325. FOR STAINLESS
STEEL AND NON-FERROUS ITEMS, USE TYPE 302 AND 304 STAINLESS STEEL
FASTENERS.
10. MISCELLANEOUS MATERIALS: PROVIDE ALL INCIDENTAL ACCESSORY
MATERIALS, TOOLS, METHODS, AND EQUIPMENT REQUIRED FOR
FABRICATION AND INSTALLATION OF MISCELLANEOUS METAL ITEMS AS
INDICATED ON DRAWINGS.
11. VERIFY DIMENSIONS PRIOR TO FABRICATION OR CASTING, FORM
METAL ITEMS TO ACCURATE SIZES AND CONFIGURATIONS AS INDICATED
ON DRAWINGS AND OTHERWISE REQUIRED FOR PROPER INSTALLATION;
FABRICATE WITH ALL LINES STRAIGHT AND ANGLES SHARP, CLEAN AND
TRUE; DRILL, COUNTERSINK, TAP, AND OTHERWISE PREPARE ITEMS
FOR CONNECTION WITH WORK OF OTHER TRADES MAKE. PERMANENT
CONNECTIONS BY WELDING AND GRIND ALL EXPOSED WELDS SMOOTH TO
MATCH ADJACENT SURFACES; ROUGH JOINT SURFACES NOT PERMITTED
AVOID USING BOLTS AND SCREWS UNLESS SPECIFICALLY INDICATED OR
APPROVED; WHEN USED, DRAW UP TIGHT AND TIE THREADS TO PREVENT
LOOSENING.
12. ALL FERROUS METAL ITEMS SHALL BE SHOP FINISHED. TOUCH-
UP OR REPAIR DAMAGED AREAS PRIOR TO INSTALLATION WITH SAME
MATERIAL.
13. PROVIDE CONTACT SURFACES WITH CONCRETE MASONRY OR
OTHER DISSIMILAR MATERIALS WITH A MINIMUM ONE POINT ZERO (1.0) MIL
DRY THICKNESS OF AN APPROVED ZINC CHROMATE PRIMER.
14. PROVIDE ALL STEEL BLOCKING AND BRACING IN METAL STUD
FRAMED PARTITIONS NECESSARY FOR A COMPLETE INSTALLATION.
INCLUDE AS REQUIRED FOR SUPPORT OF ALL WALL-MOUNTED EQUIPMENT
AND FABRICATIONS AS INDICATED ON DRAWINGS. PROVIDE SUPPORTS AT
JAMBS OF DOORS AND ELSEWHERE, AS REQUIRED.
15. FABRICATE ALL MISCELLANEOUS FRAMING AND BRACING ITEMS
TO DETAIL OF STRUCTURAL SHAPES, PLATES AND BARS; WELD JOINTS
WHERE PRACTICAL; PROVIDE BOLTS AND OTHER CONNECTION DEVICES
REQUIRED. INCLUDE ANCHORAGES, CLIP ANGLES, SLEEVES, ANCHOR
PLATE, AND SIMILAR DEVICES, WHETHER IMPLIED OR INDICATED. SET
ACCURATELY IN POSITION AS REQUIRED AND ANCHOR SECURELY TO
BUILDING CONSTRUCTION WITH FASTENERS APPROPRIATE TO THE
INSTALLATION.
DIVISION 6 - WOOD AND PLASTICS
SECTION 061000-ROUGH CARPENTRY
1. SEE SEPARATE DISCIPLINE SPECIFIC SHEET SPECIFICATIONS FOR
MORE INFORMATION
SECTION 064116-WOOD VENEER ARCHITECTURAL CABINETS
PART 1 - GENERAL1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 01
SPECIFICATION SECTIONS, APPLY TO THIS SECTION.
1.2 SUMMARY
A. THIS SECTION INCLUDES THE FOLLOWING:
1. WOOD VENEER CABINETS
2. METAL TRIM ASSOCIATED WITH MILLWORK
B. RELATED SECTIONS INCLUDE THE FOLLOWING:
1. DIVISION 06 SECTION “MISCELLANEOUS ROUGH
CARPENTRY” FOR WOOD BLOCKING, SHIMS, AND HANGING
STRIPS REQUIRED FOR INSTALLING WOODWORK AND
CONCEALED WITHIN OTHER CONSTRUCTION BEFORE
WOODWORK INSTALLATION.
2. COORDINATE WITH DIV 12 SECTION 123661 FOR
SIMULATED STONE COUNTERTOPS
1.3 DEFINITIONS
A. INTERIOR ARCHITECTURAL WOODWORK INCLUDES
WOOD FURRING, BLOCKING, SHIMS, AND HANGING STRIPS FOR
INSTALLING WOODWORK ITEMS UNLESS CONCEALED WITHIN OTHER
CONSTRUCTION BEFORE WOODWORK INSTALLATION.
1.4 SUBMITTALS
A. PRODUCT DATA: FOR EACH TYPE OF PRODUCT INDICATED,
INCLUDING CABINET HARDWARE AND ACCESSORIES AND FINISHING
MATERIALS AND PROCESSES.
B. SHOP DRAWINGS: SHOW LOCATION OF EACH ITEM,
DIMENSIONED PLANS AND ELEVATIONS, LARGE-SCALE DETAILS,
ATTACHMENT DEVICES, AND OTHER COMPONENTS.
1. SHOW DETAILS FULL SIZE.
2. SHOW LOCATIONS AND SIZES OF FURRING, BLOCKING,
AND HANGING STRIPS, INCLUDING CONCEALED BLOCKING AND
REINFORCEMENT SPECIFIED IN OTHER SECTIONS.
3. SHOW LOCATIONS AND SIZES OF CUTOUTS AND HOLES
FOR PLUMBING FIXTURES, FAUCETS, AND OTHER ITEMS
INSTALLED IN ARCHITECTURAL WOODWORK.
C. SAMPLES FOR VERIFICATION:
1. VENEER LEAVES REPRESENTATIVE OF AND SELECTED
FROM FLITCHES TO BE USED FOR TRANSPARENT-FINISHED
CABINETS: 8 BY 10 INCHES
2. QUARTZ: 6 BY 6 INCHES FOR EACH TYPE, COLOR,
PATTERN.
3. SOLID SURFACING MATERIAL: 6 BY 6 INCHES
4. EXPOSED CABINET HARDWARE AND ACCESSORIES, ONE
UNIT FOR EACH TYPE AND FINISH.
D. PRODUCT CERTIFICATES: FOR EACH TYPE OF PRODUCT,
SIGNED BY PRODUCT MANUFACTURER.
1.5 QUALITY ASSURANCE
A. FABRICATOR QUALIFICATIONS: SHOP THAT EMPLOYS SKILLED
WORKERS WHO CUSTOM-FABRICATE PRODUCTS SIMILAR TO THOSE
REQUIRED FOR THIS PROJECT AND WHOSE PRODUCTS HAVE A
RECORD OF SUCCESSFUL IN-SERVICE PERFORMANCE. SHOP IS A
CERTIFIED PARTICIPANT IN AWI’S QUALITY CERTIFICATION PROGRAM.
B. INSTALLER QUALIFICATIONS: CERTIFIED PARTICIPANT IN AWI’S
QUALITY CERTIFICATION PROGRAM. (SEE 2.2.1)
C. SOURCE LIMITATIONS: ENGAGE A QUALIFIED WOODWORKING
FIRM TO ASSUME UNDIVIDED RESPONSIBILITY FOR PRODUCTION OF
INTERIOR ARCHITECTURAL WOODWORK WITH SEQUENCE-MATCHED
WOOD VENEERS AND TRANSPARENT-FINISHED WOOD DOORS THAT
ARE REQUIRED TO BE OF SAME SPECIES AS WOODWORK.
D. QUALITY STANDARD: UNLESS OTHERWISE INDICATED, COMPLY
WITH AWI’S “ARCHITECTURAL WOODWORK QUALITY STANDARDS”
FOR GRADES OF INTERIOR ARCHITECTURAL WOODWORK INDICATED
FOR CONSTRUCTION, FINISHES, INSTALLATION, AND OTHER
REQUIREMENTS.
1. PROVIDE WOODWORK, INCLUDING INSTALLATION,
COMPLYING WITH REQUIREMENTS OF GRADES SPECIFIED.
E. MOCKUPS: BUILD MOCKUPS TO VERIFY SELECTIONS MADE
UNDER SAMPLE SUBMITTALS AND TO DEMONSTRATE AESTHETIC
EFFECTS AND SET QUALITY STANDARDS FOR MATERIALS AND
EXECUTION.
1. APPROVED MOCKUPS MAY BECOME PART OF THE
COMPLETED WORK IF UNDISTURBED AT TIME OF SUBSTANTIAL
COMPLETION.
F. PREINSTALLATION CONFERENCE: CONDUCT CONFERENCE
AT PROJECT SITE TO COMPLY WITH REQUIREMENTS IN DIVISION 01
SECTION “PROJECT MANAGEMENT AND COORDINATION.”
1.6 DELIVERY, STORAGE, AND HANDLING
A. DO NOT DELIVER WOODWORK UNTIL PAINTING AND SIMILAR
OPERATIONS THAT COULD DAMAGE WOODWORK HAVE BEEN
COMPLETED IN INSTALLATION AREAS. IF WOODWORK MUST BE
STORED IN OTHER THAN INSTALLATION AREAS, STORE ONLY IN
AREAS WHERE ENVIRONMENTAL CONDITIONS COMPLY WITH
REQUIREMENTS SPECIFIED IN “PROJECT CONDITIONS” ARTICLE.
1.7 PROJECT CONDITIONS
A. ENVIRONMENTAL LIMITATIONS: DO NOT DELIVER OR
INSTALL WOODWORK UNTIL BUILDING IS ENCLOSED, WET WORK IS
COMPLETE, AND HVAC SYSTEM IS OPERATING AND MAINTAINING
TEMPERATURE AND RELATIVE HUMIDITY AT OCCUPANCY LEVELS
DURING THE REMAINDER OF THE CONSTRUCTION PERIOD.
B. FIELD MEASUREMENTS: WHERE WOODWORK IS INDICATED
TO FIT TO OTHER CONSTRUCTION, VERIFY DIMENSIONS OF OTHER
CONSTRUCTION BY FIELD MEASUREMENTS BEFORE FABRICATION,
AND INDICATE MEASUREMENTS ON SHOP DRAWINGS.
C. COORDINATE FABRICATION SCHEDULE WITH CONSTRUCTION
PROGRESS TO AVOID DELAYING THE WORK.
1. LOCATE CONCEALED FRAMING, BLOCKING, AND
REINFORCEMENTS THAT SUPPORT WOODWORK BY FIELD
MEASUREMENTS BEFORE BEING ENCLOSED, AND INDICATE
MEASUREMENTS ON SHOP DRAWINGS.
2. ESTABLISHED DIMENSIONS: WHERE FIELD
MEASUREMENTS CANNOT BE MADE WITHOUT DELAYING
THE WORK, ESTABLISH DIMENSIONS AND PROCEED WITH
FABRICATING WOODWORK WITHOUT FIELD MEASUREMENTS.
PROVIDE ALLOWANCE FOR TRIMMING AT SITE, AND
COORDINATE CONSTRUCTION TO ENSURE THAT ACTUAL
DIMENSIONS CORRESPOND TO ESTABLISHED DIMENSIONS.
1.8 COORDINATION
A. COORDINATE SIZES AND LOCATIONS OF FRAMING, BLOCKING,
FURRING, REINFORCEMENTS, AND OTHER RELATED UNITS OF
WORK SPECIFIED IN OTHER SECTIONS TO ENSURE THAT INTERIOR
ARCHITECTURAL WOODWORK CAN BE SUPPORTED AND INSTALLED
AS INDICATED.
PART 2 - PRODUCTS
2.1 WOODWORK FABRICATORS
A. FABRICATORS: SUBJECT TO COMPLIANCE WITH
REQUIREMENTS, PROVIDE INTERIOR ARCHITECTURAL WOODWORK
AS APPROVED BY OWNER.
B. ANY ALTERNATE WOODWORK FABRICATOR MUST SUBMIT THE
FOLLOWING TO THE ARCHITECT & OWNER FOR APPROVAL:
1. 3 REFERENCES FROM GENERAL CONTRACTORS OR
PAST COMMERCIAL CLIENTS
2. IMAGES AND INFORMATION ON PAST COMMERCIAL JOBS
THAT ARE SIMILAR IN SCOPE
3. GENERAL INFORMATION OF THE COMPANY
2.2 MATERIALS
A. GENERAL: PROVIDE MATERIALS THAT COMPLY WITH
REQUIREMENTS OF AWI’S QUALITY STANDARD FOR EACH TYPE OF
WOODWORK AND QUALITY GRADE SPECIFIED, UNLESS OTHERWISE
INDICATED.
B. WOOD PRODUCTS: COMPLY WITH THE FOLLOWING:
1. HARDBOARD: AHA A135.4.
2. MEDIUM-DENSITY FIBERBOARD: ANSI A208.2,
GRADE MD, MADE WITH BINDER CONTAINING NO UREA
FORMALDEHYDE.
3. SOFTWOOD PLYWOOD: DOC PS 1, MEDIUM DENSITY
OVERLAY.
E. HIGH-PRESSURE DECORATIVE LAMINATE: NEMA LD 3, GRADES
AS INDICATED OR, IF NOT INDICATED, AS REQUIRED BY WOODWORK
QUALITY STANDARD.
F. MANUFACTURER: PROVIDE INDICATED PRODUCTS BY
MANUFACTURERS INDICATED IN THE FINISH LEGEND IN DRAWINGS.
G. VENEER-FACED PANEL PRODUCTS : MADE WITH ADHESIVE
CONTAINING NO UREA FORMALDEHYDE
H. FINISHES MUST COMPLY WITH THE FLAME SPREAD
RATINGS PER 2012 IBC REGULATIONS
2.3 CABINET HARDWARE AND ACCESSORIES
A. FRAMELESS CONCEALED HINGES (EUROPEAN TYPE): BHMA
A156.9, B01602, 170 DEGREES OF OPENING, SELF-CLOSING.
B. BACK-MOUNTED PULLS: PULLS AS SELECTED BY ARCHITECT.
C. CATCHES: PUSH-IN MAGNETIC CATCHES, BHMA A156.9, B03131.
D. ADJUSTABLE SHELF STANDARDS AND SUPPORTS: BHMA
A156.9, B04071; WITH SHELF RESTS, B04081.
E. SHELF RESTS: BHMA A156.9, B04013; METAL.
F. DRAWER SLIDES: BHMA A156.9, B05091.
15. HEAVY DUTY (GRADE 1HD-100 AND GRADE 1HD-200):
SIDE MOUNTED; FULL-OVERTRAVEL-EXTENSION TYPE; ZINC-
PLATED STEEL BALL-BEARING SLIDES.
16. BOX DRAWER SLIDES: GRADE 1HD-100; FOR DRAWERS
NOT MORE THAN 6 INCHES HIGH AND 24 INCHES WIDE.
17. FILE DRAWER SLIDES: GRADE 1HD-200; FOR DRAWERS
MORE THAN 6 INCHES HIGH OR 24 INCHES WIDE.
G. DOOR LOCKS: BHMA A156.11, E07121.
H. DRAWER LOCKS: BHMA A156.11, E07041.
I. GROMMETS FOR CABLE PASSAGE THROUGH COUNTERTOPS:
2-INCH OD, BLACK, MOLDED-PLASTIC GROMMETS AND MATCHING
PLASTIC CAPS WITH SLOT FOR WIRE PASSAGE.
1. PRODUCT: SUBJECT TO COMPLIANCE WITH
REQUIREMENTS, PROVIDE “OG SERIES” BY DOUG MOCKETT &
COMPANY, INC.
J. EXPOSED HARDWARE FINISHES: FOR EXPOSED HARDWARE,
PROVIDE FINISH THAT COMPLIES WITH BHMA A156.18 FOR BHMA
FINISH NUMBER INDICATED.
1. SEE DRAWINGS.
K. FOR CONCEALED HARDWARE, PROVIDE MANUFACTURER’S
STANDARD FINISH THAT COMPLIES WITH PRODUCT CLASS
REQUIREMENTS IN BHMA A156.9.
2.4 MISCELLANEOUS MATERIALS
A. FURRING, BLOCKING, SHIMS, AND HANGING STRIPS: FIRE-
RETARDANT-TREATED SOFTWOOD LUMBER, KILN DRIED TO LESS
THAN 15 PERCENT MOISTURE CONTENT.
B. ANCHORS: SELECT MATERIAL, TYPE, SIZE, AND FINISH
REQUIRED FOR EACH SUBSTRATE FOR SECURE ANCHORAGE.
PROVIDE NONFERROUS-METAL OR HOT-DIP GALVANIZED ANCHORS
AND INSERTS ON INSIDE FACE OF EXTERIOR WALLS AND ELSEWHERE
AS REQUIRED FOR CORROSION RESISTANCE. PROVIDE TOOTHED-
STEEL OR LEAD EXPANSION SLEEVES FOR DRILLED-IN-PLACE
ANCHORS.
C. VOC LIMITS FOR INSTALLATION ADHESIVES AND GLUES: USE
INSTALLATION ADHESIVES THAT COMPLY WITH THE FOLLOWING
LIMITS FOR VOC CONTENT WHEN CALCULATED ACCORDING TO 40
CFR 59, SUBPART D (EPA METHOD 24):
1. WOOD GLUES: 30 G/L.
2. CONTACT ADHESIVE: 250 G/L.
2.5 FABRICATION, GENERAL
A. INTERIOR WOODWORK GRADE: UNLESS OTHERWISE
INDICATED, PROVIDE CUSTOM-GRADE INTERIOR WOODWORK
COMPLYING WITH REFERENCED QUALITY STANDARD.
B. WOOD MOISTURE CONTENT: COMPLY WITH REQUIREMENTS
OF REFERENCED QUALITY STANDARD FOR WOOD MOISTURE
CONTENT IN RELATION TO AMBIENT RELATIVE HUMIDITY DURING
FABRICATION AND IN INSTALLATION AREAS.
C. FABRICATE WOODWORK TO DIMENSIONS, PROFILES, AND
DETAILS INDICATED. EASE EDGES TO RADIUS INDICATED FOR THE
FOLLOWING:
1. CORNERS OF CABINETS AND EDGES OF SOLID-WOOD
(LUMBER) MEMBERS 3/4 INCH THICK OR LESS: 1/16 INCH.
2. EDGES OF RAILS AND SIMILAR MEMBERS MORE THAN 3/4
INCH THICK: 1/8 INCH.
3. CORNERS OF CABINETS AND EDGES OF SOLID-WOOD
(LUMBER) MEMBERS AND RAILS: 1/16 INCH.
D. COMPLETE FABRICATION, INCLUDING ASSEMBLY, FINISHING,
AND HARDWARE APPLICATION, TO MAXIMUM EXTENT POSSIBLE
BEFORE SHIPMENT TO PROJECT SITE. DISASSEMBLE COMPONENTS
ONLY AS NECESSARY FOR SHIPMENT AND INSTALLATION. WHERE
NECESSARY FOR FITTING AT SITE, PROVIDE AMPLE ALLOWANCE FOR
SCRIBING, TRIMMING, AND FITTING.
1. NOTIFY ARCHITECT SEVEN DAYS IN ADVANCE OF
THE DATES AND TIMES WOODWORK FABRICATION WILL BE
COMPLETE.
2. TRIAL FIT ASSEMBLIES AT FABRICATION SHOP THAT
CANNOT BE SHIPPED COMPLETELY ASSEMBLED. INSTALL
DOWELS, SCREWS, BOLTED CONNECTORS, AND OTHER
FASTENING DEVICES THAT CAN BE REMOVED AFTER TRIAL
FITTING. VERIFY THAT VARIOUS PARTS FIT AS INTENDED AND
CHECK MEASUREMENTS OF ASSEMBLIES AGAINST FIELD
MEASUREMENTS INDICATED ON SHOP DRAWINGS BEFORE
DISASSEMBLING FOR SHIPMENT.
E. SHOP-CUT OPENINGS TO MAXIMUM EXTENT POSSIBLE
TO RECEIVE HARDWARE, APPLIANCES, PLUMBING FIXTURES,
ELECTRICAL WORK, AND SIMILAR ITEMS. LOCATE OPENINGS
ACCURATELY AND USE TEMPLATES OR ROUGHING-IN DIAGRAMS
TO PRODUCE ACCURATELY SIZED AND SHAPED OPENINGS. SAND
EDGES OF CUTOUTS TO REMOVE SPLINTERS AND BURRS.
1. SEAL EDGES OF OPENINGS IN COUNTERTOPS WITH A
COAT OF VARNISH.
PART 3 - EXECUTION
3.1 PREPARATION
A. BEFORE INSTALLATION, CONDITION WOODWORK TO AVERAGE
PREVAILING HUMIDITY CONDITIONS IN INSTALLATION AREAS.
B. BEFORE INSTALLING ARCHITECTURAL WOODWORK,
EXAMINE SHOP-FABRICATED WORK FOR COMPLETION AND
COMPLETE WORK AS REQUIRED, INCLUDING REMOVAL OF PACKING
AND BACKPRIMING.
3.2 INSTALLATION
A. GRADE: INSTALL WOODWORK TO COMPLY WITH
REQUIREMENTS FOR THE SAME GRADE SPECIFIED IN PART 2 FOR
FABRICATION OF TYPE OF WOODWORK INVOLVED.
B. ASSEMBLE WOODWORK AND COMPLETE FABRICATION AT
PROJECT SITE TO COMPLY WITH REQUIREMENTS FOR FABRICATION
IN PART 2, TO EXTENT THAT IT WAS NOT COMPLETED IN THE SHOP.
C. INSTALL WOODWORK LEVEL, PLUMB, TRUE, AND STRAIGHT.
SHIM AS REQUIRED WITH CONCEALED SHIMS. INSTALL LEVEL
AND PLUMB (INCLUDING TOPS) TO A TOLERANCE OF 1/8 INCH IN 96
INCHES.
D. SCRIBE AND CUT WOODWORK TO FIT ADJOINING
WORK, REFINISH CUT SURFACES, AND REPAIR DAMAGED FINISH AT
CUTS.
E. ANCHOR WOODWORK TO ANCHORS OR BLOCKING BUILT
IN OR DIRECTLY ATTACHED TO SUBSTRATES. SECURE WITH
COUNTERSUNK, CONCEALED FASTENERS AND BLIND NAILING AS
REQUIRED FOR COMPLETE INSTALLATION. USE FINE FINISHING
NAILS FOR EXPOSED FASTENING, COUNTERSUNK AND FILLED FLUSH
WITH WOODWORK AND MATCHING FINAL FINISH IF TRANSPARENT
FINISH IS INDICATED.
F. CABINETS: INSTALL WITHOUT DISTORTION SO DOORS AND
DRAWERS FIT OPENINGS PROPERLY AND ARE ACCURATELY ALIGNED.
ADJUST HARDWARE TO CENTER DOORS AND DRAWERS IN OPENINGS
AND TO PROVIDE UNENCUMBERED OPERATION. COMPLETE
INSTALLATION OF HARDWARE AND ACCESSORY ITEMS AS INDICATED.
1. INSTALL CABINETS WITH NO MORE THAN 1/8 INCH IN 96-
INCH SAG, BOW, OR OTHER VARIATION FROM A STRAIGHT LINE.
2. FASTEN WALL CABINETS THROUGH BACK, NEAR TOP
AND BOTTOM, AT ENDS AND NOT MORE THAN 16 INCHES
O.C. WITH NO. 10 WAFER-HEAD SCREWS SIZED FOR 1-INCH
PENETRATION INTO WOOD FRAMING, BLOCKING, OR HANGING
STRIPS.
G. COUNTERTOPS: ANCHOR SECURELY BY SCREWING THROUGH
CORNER BLOCKS OF BASE CABINETS OR OTHER SUPPORTS INTO
UNDERSIDE OF COUNTERTOP.
1. INSTALL COUNTERTOPS WITH NO MORE THAN 1/8 INCH
IN 96-INCH SAG, BOW, OR OTHER VARIATION FROM A STRAIGHT
LINE.
2. SECURE BACKSPLASHES TO TOPS WITH CONCEALED
METAL BRACKETS AT 16 INCHES O.C. AND TO WALLS WITH
ADHESIVE.
3. CALK SPACE BETWEEN BACKSPLASH AND WALL
WITH SEALANT SPECIFIED IN DIVISION 07 SECTION “JOINT
SEALANTS.”
3.3 ADJUSTING AND CLEANING
A. REPAIR DAMAGED AND DEFECTIVE WOODWORK, WHERE
POSSIBLE, TO ELIMINATE FUNCTIONAL AND VISUAL DEFECTS; WHERE
NOT POSSIBLE TO REPAIR, REPLACE WOODWORK. ADJUST JOINERY
FOR UNIFORM APPEARANCE.
B. CLEAN, LUBRICATE, AND ADJUST HARDWARE.
C. CLEAN WOODWORK ON EXPOSED AND SEMIEXPOSED
SURFACES. TOUCH UP SHOP-APPLIED FINISHES TO RESTORE
DAMAGED OR SOILED AREAS.
END OF SECTION 064116
DIVISION 7 - WEATHER AND MOISTURE BARRIERS
SECTION 07 2500 - WEATHER BARRIERS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND
DIVISION 01 SPECIFICATION SECTIONS, APPLY TO THIS SECTION.
1.2 SUMMARY
A. SECTION INCLUDES:
1. BUILDING WRAP.
2. FLEXIBLE FLASHING.
B. RELATED REQUIREMENTS:
1. SECTION 06 1600 “SHEATHING” FOR SHEATHING JOINT
AND PENETRATION TREATMENT.
2. SECTION 07 2713 “MODIFIED BITUMINOUS SHEET AIR
BARRIERS” FOR SHEET AIR BARRIER APPLIED OVER WALL SHEATHING.
1.3 ACTION SUBMITTALS
A. PRODUCT DATA: FOR EACH TYPE OF PRODUCT.
1. FOR BUILDING WRAP, INCLUDE DATA ON AIR AND WATER-
VAPOR PERMEANCE BASED ON TESTING ACCORDING TO
REFERENCED STANDARDS.
1.4 INFORMATIONAL SUBMITTALS
A. EVALUATION REPORTS: FOR WATER-RESISTIVE BARRIER
AND FLEXIBLE FLASHING, FROM ICC-ES.
PART 2 - PRODUCTS
2.1 WATER-RESISTIVE BARRIER
A. BUILDING WRAP: ASTM E 1677, TYPE I AIR BARRIER; WITH
FLAME-SPREAD AND SMOKE-DEVELOPED INDEXES OF LESS THAN
25 AND 450, RESPECTIVELY, WHEN TESTED ACCORDING TO ASTM
E 84; UV STABILIZED; AND ACCEPTABLE TO AUTHORITIES HAVING
JURISDICTION.
1. PRODUCTS: SUBJECT TO COMPLIANCE WITH
REQUIREMENTS, AVAILABLE PRODUCTS THAT MAY BE
INCORPORATED INTO THE WORK INCLUDE, BUT ARE NOT
LIMITED TO, THE FOLLOWING:
A. DOW CHEMICAL COMPANY (THE); STYROFOAM
WEATHERMATE PLUS BRAND HOUSEWRAP.
B. DUPONT (E. I. DU PONT DE NEMOURS AND
COMPANY); TYVEK COMMERCIALWRAP.
C. RAVEN INDUSTRIES INC.; FORTRESS PRO
WEATHER PROTECTIVE BARRIER.
2. WATER-VAPOR PERMEANCE: NOT LESS THAN 20 PERMS
PER ASTM E 96/E 96M, DESICCANT METHOD (PROCEDURE A).
3. AIR PERMEANCE: NOT MORE THAN 0.004 CFM/SQ. FT. AT
0.3-INCH WG WHEN TESTED ACCORDING TO ASTM E 2178.
4. ALLOWABLE UV EXPOSURE TIME: NOT LESS THAN
THREE MONTHS.
B. BUILDING-WRAP TAPE: PRESSURE-SENSITIVE PLASTIC TAPE
RECOMMENDED BY BUILDING-WRAP MANUFACTURER FOR SEALING
JOINTS AND PENETRATIONS IN BUILDING WRAP.
2.2 MISCELLANEOUS MATERIALS
A. FLEXIBLE FLASHING: COMPOSITE, SELF-ADHESIVE,
FLASHING PRODUCT CONSISTING OF A PLIABLE, BUTYL RUBBER
OR RUBBERIZED-ASPHALT COMPOUND, BONDED TO A HIGH-
DENSITY POLYETHYLENE FILM, ALUMINUM FOIL, OR SPUNBONDED
POLYOLEFIN TO PRODUCE AN OVERALL THICKNESS OF NOT LESS
THAN 0.030 INCH.
1. PRODUCTS: SUBJECT TO COMPLIANCE WITH
REQUIREMENTS, AVAILABLE PRODUCTS THAT MAY BE
INCORPORATED INTO THE WORK INCLUDE, BUT ARE NOT
LIMITED TO, THE FOLLOWING:
A. DUPONT (E. I. DU PONT DE NEMOURS AND
COMPANY); DUPONT FLASHING TAPE.
B. GRACE CONSTRUCTION PRODUCTS, A UNIT OF W.
R. GRACE & CO. - CONN.; VYCOR BUTYL SELF ADHERED
FLASHING.
C. RAVEN INDUSTRIES INC.; FORTRESS
FLASHSHIELD.
D. CARLISLE COATINGS & WATERPROOFING; CCW-
705-TWF THRU-WALL FLASHING.
E. GRACE CONSTRUCTION PRODUCTS, A UNIT OF W.
R. GRACE & CO. - CONN.; VYCOR PLUS SELF-ADHERED
FLASHING.
F. POLYGUARD PRODUCTS, INC.; POLYGUARD JT-30
TAPE.
B. PRIMER FOR FLEXIBLE FLASHING: PRODUCT RECOMMENDED
BY MANUFACTURER OF FLEXIBLE FLASHING FOR SUBSTRATE.
C. NAILS AND STAPLES: ASTM F 1667.
PART 3 - EXECUTION
3.1 WATER-RESISTIVE BARRIER INSTALLATION
A. COVER EXPOSED EXTERIOR SURFACE OF SHEATHING WITH
WATER-RESISTIVE BARRIER SECURELY FASTENED TO FRAMING
IMMEDIATELY AFTER SHEATHING IS INSTALLED.
B. COVER SHEATHING WITH WATER-RESISTIVE BARRIER AS
FOLLOWS:
1. CUT BACK BARRIER 1/2 INCH ON EACH SIDE OF THE
BREAK IN SUPPORTING MEMBERS AT EXPANSION- OR
CONTROL-JOINT LOCATIONS.
2. APPLY BARRIER TO COVER VERTICAL FLASHING WITH A
MINIMUM 4-INCH OVERLAP UNLESS OTHERWISE INDICATED.
C. BUILDING WRAP: COMPLY WITH MANUFACTURER’S WRITTEN
INSTRUCTIONS.
1. SEAL SEAMS, EDGES, FASTENERS, AND PENETRATIONS
WITH TAPE.
2. EXTEND INTO JAMBS OF OPENINGS AND SEAL CORNERS
WITH TAPE.
3.2 FLEXIBLE FLASHING INSTALLATION
A. APPLY FLEXIBLE FLASHING WHERE INDICATED TO COMPLY
WITH MANUFACTURER’S WRITTEN INSTRUCTIONS.
1. PRIME SUBSTRATES AS RECOMMENDED BY FLASHING
MANUFACTURER.
2. LAP SEAMS AND JUNCTURES WITH OTHER MATERIALS
AT LEAST 4 INCHES EXCEPT THAT AT FLASHING FLANGES OF
OTHER CONSTRUCTION, LAPS NEED NOT EXCEED FLANGE
WIDTH.
3. LAP FLASHING OVER WATER-RESISTIVE BARRIER AT
BOTTOM AND SIDES OF OPENINGS.
4. LAP WATER-RESISTIVE BARRIER OVER FLASHING AT
HEADS OF OPENINGS.
5. AFTER FLASHING HAS BEEN APPLIED, ROLL SURFACES
WITH A HARD RUBBER OR METAL ROLLER TO ENSURE THAT
FLASHING IS COMPLETELY ADHERED TO
SUBSTRATES.
END OF SECTION 07 2500
DIVISION 8 - OPENINGS
SECTION 081416 FLUSH WOOD DOORS
PART 1 - GENERAL
1.1 SUMMARY
A. SECTION INCLUDES:
1. SOLID-CORE PAINT GRADE DOORS
2. FACTORY FITTING FLUSH WOOD DOORS TO FRAMES AND
FACTORY MACHINING FOR HARDWARE.
1.2 ACTION SUBMITTALS
A. PRODUCT DATA: FOR EACH TYPE OF DOOR.
B. SHOP DRAWINGS: INDICATE LOCATION, SIZE, AND HAND OF
EACH DOOR; ELEVATION OF EACH KIND OF DOOR; CONSTRUCTION
DETAILS NOT COVERED IN PRODUCT DATA; AND THE FOLLOWING:
1. DIMENSIONS AND LOCATIONS OF BLOCKING.
2. DIMENSIONS AND LOCATIONS OF MORTISES AND HOLES
FOR HARDWARE.
3. DIMENSIONS AND LOCATIONS OF CUTOUTS.
4. UNDERCUTS.
5. REQUIREMENTS FOR VENEER MATCHING.
6. DOORS TO BE FACTORY FINISHED AND FINISH
REQUIREMENTS.
7. FIRE-PROTECTION RATINGS FOR FIRE-RATED DOORS.
C. SAMPLES: FOR FACTORY-FINISHED DOORS.
1.3 INFORMATIONAL SUBMITTALS
A. QUALITY STANDARD COMPLIANCE CERTIFICATES: AWI QUALITY
CERTIFICATION PROGRAM CERTIFICATES.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. ALGOMA HARDWOODS, INC.
B. AMPCO.
C. CHAPPELL DOOR CO.
D. EGGERS INDUSTRIES.
E. GENERAL VENEER MANUFACTURING CO.
F. GRAHAM WOOD DOORS (ASSA ABLOY GROUP)
G. HALEY BROTHERS, INC.
H. IPIK DOOR COMPANY.
I. LAMBTON DOORS.
J. MARLITE.
K. MARSHFIELD DOOR SYSTEMS, INC.
L. MOHAWK DOORS; A MASONITE COMPANY.
M. PONCRAFT DOOR COMPANY.
N. VANCOUVER DOOR COMPANY.
O. VT INDUSTRIES
2.2 FLUSH WOOD DOORS, GENERAL
A. QUALITY STANDARD: IN ADDITION TO REQUIREMENTS
SPECIFIED, COMPLY WITH AWI’S STANDARDS.”
1. PROVIDE AWI QUALITY CERTIFICATION LABELS
INDICATING THAT DOORS COMPLY WITH REQUIREMENTS OF
GRADES SPECIFIED.
B. SMOKE- AND DRAFT-CONTROL DOOR ASSEMBLIES: LISTED AND
LABELED FOR SMOKE AND DRAFT CONTROL, BASED ON TESTING
ACCORDING TO UL 1784.
C. STRUCTURAL-COMPOSITE-LUMBER-CORE DOORS:
1. STRUCTURAL COMPOSITE LUMBER: WDMA I.S.10.
a. SCREW WITHDRAWAL, FACE: 700 LBF .
b. SCREW WITHDRAWAL, EDGE: 400 LBF .
2.3 2.4 LIGHT FRAMES AND LOUVERS
A. WOOD-VENEERED BEADS FOR LIGHT OPENINGS IN FIRE-
RATED DOORS: MANUFACTURER’S STANDARD WOOD-VENEERED
NONCOMBUSTIBLE BEADS MATCHING VENEER SPECIES OF DOOR
FACES AND APPROVED FOR USE IN DOORS OF FIRE-PROTECTION
RATING INDICATED. INCLUDE CONCEALED METAL GLAZING CLIPS
WHERE REQUIRED FOR OPENING SIZE AND FIRE-PROTECTION
RATING INDICATED.
2.5 FABRICATION
A. FACTORY MACHINE DOORS FOR HARDWARE THAT IS NOT
GI101
conformed set
revisions :
p r o j e c t # :
d a t e :
20.0550
- june 4, 2021
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
GI208
Sheet Specs
20.0550
- april 7, 2021
Rexburg
Rowhouses
bid set
SURFACE APPLIED.
B. OPENINGS: FACTORY CUT AND TRIM OPENINGS THROUGH
DOORS.
1. LIGHT OPENINGS: TRIM OPENINGS WITH MOLDINGS OF
MATERIAL AND PROFILE INDICATED.
2.6 FACTORY FINISHING
A. GENERAL: COMPLY WITH REFERENCED QUALITY STANDARD
FOR FACTORY FINISHING. COMPLETE FABRICATION, INCLUDING
FITTING DOORS FOR OPENINGS AND MACHINING FOR HARDWARE
THAT IS NOT SURFACE APPLIED, BEFORE FINISHING.
1. FINISH FACES, ALL SIX EDGES, EDGES OF CUTOUTS, AND
MORTISES. STAINS AND FILLERS MAY BE OMITTED ON TOP AND
BOTTOM EDGES, EDGES OF CUTOUTS, AND MORTISES.
PART 3 - EXECUTION
3.1 INSTALLATION
A. HARDWARE: FOR INSTALLATION, SEE SECTION 087100 “DOOR
HARDWARE.”
B. INSTALLATION INSTRUCTIONS: INSTALL DOORS TO COMPLY
WITH MANUFACTURER’S WRITTEN INSTRUCTIONS AND REFERENCED
QUALITY STANDARD, AND AS INDICATED.
1. INSTALL FIRE-RATED DOORS ACCORDING TO NFPA 80.
2. INSTALL SMOKE- AND DRAFT-CONTROL DOORS
ACCORDING TO NFPA 105.
C. FACTORY-FITTED DOORS: ALIGN IN FRAMES FOR UNIFORM
CLEARANCE AT EACH EDGE.
D. FACTORY-FINISHED DOORS: RESTORE FINISH BEFORE
INSTALLATION IF FITTING OR MACHINING IS REQUIRED AT PROJECT
SITE.
SECTION 08 71 00 – DOOR HARDWARE
SECTION 08 71 00 – DOOR HARDWARE
PART 1 - GENERAL
1.01 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND
DIVISION 01 SPECIFICATION SECTIONS, APPLY TO THIS SECTION.
1.02 SUMMARY
A. SECTION INCLUDES:
1. MECHANICAL DOOR HARDWARE FOR:
a. SWINGING DOORS.
2. THE INTENT OF THE HARDWARE SPECIFICATION IS TO
SPECIFY THE HARDWARE FOR INTERIOR AND EXTERIOR DOORS,
AND TO ESTABLISH A TYPE, CONTINUITY, AND STANDARD OF
QUALITY. HOWEVER, IT IS THE DOOR HARDWARE SUPPLIER’S
RESPONSIBILITY TO THOROUGHLY REVIEW EXISTING CONDITIONS,
SCHEDULES, SPECIFICATIONS, DRAWINGS, AND OTHER CONTRACT
DOCUMENTS TO VERIFY THE SUITABILITY OF THE HARDWARE
SPECIFIED.
B. EXCLUSIONS: UNLESS SPECIFICALLY LISTED IN HARDWARE
SETS, HARDWARE IS NOT SPECIFIED IN THIS SECTION FOR:
1. WINDOWS
2. CABINETS (CASEWORK), INCLUDING LOCKS IN CABINETS
3. SIGNAGE
4. TOILET ACCESSORIES
5. OVERHEAD DOORS
C. RELATED SECTIONS:
1. DIVISION 01 SECTION “ALTERNATES” FOR ALTERNATES
AFFECTING THIS SECTION.
2. DIVISION 07 SECTION “JOINT SEALANTS” FOR SEALANT
REQUIREMENTS APPLICABLE TO THRESHOLD INSTALLATION
SPECIFIED IN THIS SECTION.
3. DIVISION 09 SECTIONS FOR TOUCHUP, FINISHING OR
REFINISHING OF EXISTING OPENINGS MODIFIED BY THIS SECTION.
4. DIVISION 13 SECTION “RADIATION PROTECTION” FOR
REQUIREMENTS FOR LEAD-LINING FOR DOOR HARDWARE AT
OPENINGS INDICATED TO RECEIVE RADIATION PROTECTION.
5. DIVISION 26 SECTIONS FOR CONNECTIONS TO ELECTRICAL
POWER SYSTEM AND FOR LOW-VOLTAGE WIRING.
6. DIVISION 28 SECTIONS FOR COORDINATION WITH OTHER
COMPONENTS OF ELECTRONIC ACCESS CONTROL SYSTEM.
1.03 REFERENCES
A. UL - UNDERWRITERS LABORATORIES
1. UL 10B - FIRE TEST OF DOOR ASSEMBLIES
2. UL 10C - POSITIVE PRESSURE TEST OF FIRE DOOR
ASSEMBLIES
3. UL 1784 - AIR LEAKAGE TESTS OF DOOR ASSEMBLIES
4. UL 305 - PANIC HARDWARE
B. DHI - DOOR AND HARDWARE INSTITUTE
1. SEQUENCE AND FORMAT FOR THE HARDWARE SCHEDULE
2. RECOMMENDED LOCATIONS FOR BUILDERS HARDWARE
3. KEY SYSTEMS AND NOMENCLATURE
C. ANSI - AMERICAN NATIONAL STANDARDS INSTITUTE
1. ANSI/BHMA A156.1 - A156.29, AND ANSI/BHMA A156.31 -
STANDARDS FOR HARDWARE AND SPECIALTIES
1.04 SUBMITTALS
A. GENERAL:
1. SUBMIT IN ACCORDANCE WITH CONDITIONS OF CONTRACT
AND DIVISION 01 REQUIREMENTS.
2. HIGHLIGHT, ENCIRCLE, OR OTHERWISE SPECIFICALLY IDENTIFY
ON SUBMITTALS DEVIATIONS FROM CONTRACT DOCUMENTS,
ISSUES OF INCOMPATIBILITY OR OTHER ISSUES WHICH MAY
DETRIMENTALLY AFFECT THE WORK.
3. PRIOR TO FORWARDING SUBMITTAL, COMPLY WITH
PROCEDURES FOR VERIFYING EXISTING DOOR AND FRAME
COMPATIBILITY FOR NEW HARDWARE, AS SPECIFIED IN PART 3,
“EXAMINATION” ARTICLE, HEREIN.
B. ACTION SUBMITTALS:
1. PRODUCT DATA: TECHNICAL PRODUCT DATA FOR EACH
ITEM OF DOOR HARDWARE, INSTALLATION INSTRUCTIONS,
MAINTENANCE OF OPERATING PARTS AND FINISH, AND OTHER
INFORMATION NECESSARY TO SHOW COMPLIANCE WITH
REQUIREMENTS.
2. RISER AND WIRING DIAGRAMS: AFTER FINAL APPROVAL OF
HARDWARE SCHEDULE, SUBMIT DETAILS OF ELECTRIFIED DOOR
HARDWARE, INDICATING:
a. WIRING DIAGRAMS: FOR POWER, SIGNAL, AND CONTROL
WIRING AND INCLUDING:
1) DETAILS OF INTERFACE OF ELECTRIFIED DOOR
HARDWARE AND BUILDING SAFETY AND SECURITY SYSTEMS.
2) SCHEMATIC DIAGRAM OF SYSTEMS THAT INTERFACE
WITH ELECTRIFIED DOOR HARDWARE.
3) POINT-TO-POINT WIRING.
4) RISERS.
3. SAMPLES FOR VERIFICATION: IF REQUESTED BY ARCHITECT,
SUBMIT PRODUCTION SAMPLE OF REQUESTED DOOR HARDWARE
UNIT IN FINISH INDICATED, AND TAGGED WITH FULL DESCRIPTION
FOR COORDINATION WITH SCHEDULE.
a. SAMPLES WILL BE RETURNED TO SUPPLIER. UNITS THAT
ARE ACCEPTABLE TO ARCHITECT MAY, AFTER FINAL CHECK
OF OPERATIONS, BE INCORPORATED INTO WORK, WITHIN
LIMITATIONS OF KEY COORDINATION REQUIREMENTS.
4. DOOR HARDWARE SCHEDULE: SUBMIT SCHEDULE WITH
HARDWARE SETS IN VERTICAL FORMAT AS ILLUSTRATED BY
SEQUENCE OF FORMAT FOR THE HARDWARE SCHEDULE AS
PUBLISHED BY THE DOOR AND HARDWARE INSTITUTE. INDICATE
COMPLETE DESIGNATIONS OF EACH ITEM REQUIRED FOR EACH
DOOR OR OPENING, INCLUDE:
a. DOOR INDEX; INCLUDE DOOR NUMBER, HEADING NUMBER,
AND ARCHITECTS HARDWARE SET NUMBER.
b. OPENING LOCK FUNCTION SPREADSHEET: LIST LOCKING
DEVICE AND FUNCTION FOR EACH OPENING.
c. QUANTITY, TYPE, STYLE, FUNCTION, SIZE, AND FINISH OF EACH
HARDWARE ITEM.
d. NAME AND MANUFACTURER OF EACH ITEM.
e. FASTENINGS AND OTHER PERTINENT INFORMATION.
f. LOCATION OF EACH HARDWARE SET CROSS-REFERENCED TO
INDICATIONS ON DRAWINGS.
g. EXPLANATION OF ALL ABBREVIATIONS, SYMBOLS, AND CODES
CONTAINED IN SCHEDULE.
h. MOUNTING LOCATIONS FOR HARDWARE.
i. DOOR AND FRAME SIZES AND MATERIALS.
j. NAME AND PHONE NUMBER FOR LOCAL MANUFACTURER’S
REPRESENTATIVE FOR EACH PRODUCT.
k. OPERATIONAL DESCRIPTION OF OPENINGS WITH ANY
ELECTRIFIED HARDWARE (LOCKS, EXITS, ELECTROMAGNETIC
LOCKS, ELECTRIC STRIKES, AUTOMATIC OPERATORS, DOOR
POSITION SWITCHES, MAGNETIC HOLDERS OR CLOSER/HOLDER
UNITS, AND ACCESS CONTROL COMPONENTS). OPERATIONAL
DESCRIPTION SHOULD INCLUDE OPERATIONAL DESCRIPTIONS
FOR: EGRESS, INGRESS (ACCESS), AND FIRE/SMOKE ALARM
CONNECTIONS.
1) SUBMITTAL SEQUENCE: SUBMIT DOOR HARDWARE
SCHEDULE CONCURRENT WITH SUBMISSIONS OF PRODUCT
DATA, SAMPLES, AND SHOP DRAWINGS. COORDINATE
SUBMISSION OF DOOR HARDWARE SCHEDULE WITH
SCHEDULING REQUIREMENTS OF OTHER WORK TO FACILITATE
FABRICATION OF OTHER WORK THAT IS CRITICAL IN PROJECT
CONSTRUCTION SCHEDULE.
5. KEY SCHEDULE:
a. AFTER KEYING CONFERENCE, PROVIDE KEYING SCHEDULE
LISTING LEVELS OF KEYING AS WELL AS EXPLANATION OF KEY
SYSTEM’S FUNCTION, KEY SYMBOLS USED AND DOOR NUMBERS
CONTROLLED.
b. USE ANSI/BHMA A156.28 “RECOMMENDED PRACTICES
FOR KEYING SYSTEMS” AS GUIDELINE FOR NOMENCLATURE,
DEFINITIONS, AND APPROACH FOR SELECTING OPTIMAL KEYING
SYSTEM.
c. PROVIDE 3 COPIES OF KEYING SCHEDULE FOR REVIEW
PREPARED AND DETAILED IN ACCORDANCE WITH REFERENCED
DHI PUBLICATION. INCLUDE SCHEMATIC KEYING DIAGRAM AND
INDEX EACH KEY TO UNIQUE DOOR DESIGNATIONS.
d. INDEX KEYING SCHEDULE BY DOOR NUMBER, KEYSET,
HARDWARE HEADING NUMBER, CROSS KEYING INSTRUCTIONS,
AND SPECIAL KEY STAMPING INSTRUCTIONS.
e. PROVIDE ONE COMPLETE BITTING LIST OF KEY CUTS AND ONE
KEY SYSTEM SCHEMATIC ILLUSTRATING SYSTEM USAGE AND
EXPANSION.
1) FORWARD BITTING LIST, KEY CUTS AND KEY SYSTEM
SCHEMATIC DIRECTLY TO OWNER, BY MEANS AS DIRECTED BY
OWNER.
f. PREPARE KEY SCHEDULE BY OR UNDER SUPERVISION OF
SUPPLIER, DETAILING OWNER’S FINAL KEYING INSTRUCTIONS
FOR LOCKS.
6. TEMPLATES: AFTER FINAL APPROVAL OF HARDWARE
SCHEDULE, PROVIDE TEMPLATES FOR DOORS, FRAMES AND
OTHER WORK SPECIFIED TO BE FACTORY OR SHOP PREPARED
FOR DOOR HARDWARE INSTALLATION.
C. INFORMATIONAL SUBMITTALS:
1. QUALIFICATION DATA: FOR SUPPLIER, INSTALLER AND
ARCHITECTURAL HARDWARE CONSULTANT.
2. PRODUCT DATA FOR ELECTRIFIED DOOR HARDWARE:
a. CERTIFY THAT DOOR HARDWARE APPROVED FOR USE ON
TYPES AND SIZES OF LABELED FIRE-RATED DOORS COMPLIES
WITH LISTED FIRE-RATED DOOR ASSEMBLIES.
3. WARRANTY: SPECIAL WARRANTY SPECIFIED IN THIS SECTION.
D. CLOSEOUT SUBMITTALS:
1. OPERATIONS AND MAINTENANCE DATA: PROVIDE IN
ACCORDANCE WITH DIVISION 01 AND INCLUDE:
a. COMPLETE INFORMATION ON CARE, MAINTENANCE, AND
ADJUSTMENT; DATA ON REPAIR AND REPLACEMENT PARTS, AND
INFORMATION ON PRESERVATION OF FINISHES.
b. CATALOG PAGES FOR EACH PRODUCT.
c. FACTORY ORDER ACKNOWLEDGEMENT NUMBERS (FOR
WARRANTY AND SERVICE)
d. NAME, ADDRESS, AND PHONE NUMBER OF LOCAL
REPRESENTATIVE FOR EACH MANUFACTURER.
e. PARTS LIST FOR EACH PRODUCT.
f. FINAL APPROVED HARDWARE SCHEDULE, EDITED TO REFLECT
CONDITIONS AS-INSTALLED.
g. FINAL KEYING SCHEDULE
h. COPIES OF FLOOR PLANS WITH KEYING NOMENCLATURE
i. AS-INSTALLED WIRING DIAGRAMS FOR EACH OPENING
CONNECTED TO POWER, BOTH LOW VOLTAGE AND 110 VOLTS.
j. COPY OF WARRANTIES INCLUDING APPROPRIATE REFERENCE
NUMBERS FOR MANUFACTURERS TO IDENTIFY PROJECT.
1.05 DELIVERY, STORAGE, AND HANDLING
A. INVENTORY DOOR HARDWARE ON RECEIPT AND PROVIDE
SECURE LOCK-UP FOR HARDWARE DELIVERED TO PROJECT SITE.
B. TAG EACH ITEM OR PACKAGE SEPARATELY WITH
IDENTIFICATION COORDINATED WITH FINAL DOOR HARDWARE
SCHEDULE, AND INCLUDE INSTALLATION INSTRUCTIONS, TEMPLATES,
AND NECESSARY FASTENERS WITH EACH ITEM OR PACKAGE.
1. DELIVER EACH ARTICLE OF HARDWARE IN MANUFACTURER’S
ORIGINAL PACKAGING.
C. PROJECT CONDITIONS:
1. MAINTAIN MANUFACTURER-RECOMMENDED ENVIRONMENTAL
CONDITIONS THROUGHOUT STORAGE AND INSTALLATION
PERIODS.
2. PROVIDE SECURE LOCK-UP FOR DOOR HARDWARE DELIVERED
TO PROJECT. CONTROL HANDLING AND INSTALLATION OF
HARDWARE ITEMS SO THAT COMPLETION OF WORK WILL NOT
BE DELAYED BY HARDWARE LOSSES BOTH BEFORE AND AFTER
INSTALLATION.
D. PROTECTION AND DAMAGE:
1. PROMPTLY REPLACE PRODUCTS DAMAGED DURING SHIPPING.
2. HANDLE HARDWARE IN MANNER TO AVOID DAMAGE, MARRING,
OR SCRATCHING. CORRECT, REPLACE OR REPAIR PRODUCTS
DAMAGED DURING WORK.
3. PROTECT PRODUCTS AGAINST MALFUNCTION DUE TO PAINT,
SOLVENT, CLEANSER, OR ANY CHEMICAL AGENT.
1.06 COORDINATION
A. COORDINATE LAYOUT AND INSTALLATION OF FLOOR-
RECESSED DOOR HARDWARE WITH FLOOR CONSTRUCTION. CAST
ANCHORING INSERTS INTO CONCRETE.
B. INSTALLATION TEMPLATES: DISTRIBUTE FOR DOORS, FRAMES,
AND OTHER WORK SPECIFIED TO BE FACTORY OR SHOP PREPARED.
CHECK SHOP DRAWINGS OF OTHER WORK TO CONFIRM THAT
ADEQUATE PROVISIONS ARE MADE FOR LOCATING AND INSTALLING
DOOR HARDWARE TO COMPLY WITH INDICATED REQUIREMENTS.
C. SECURITY: COORDINATE INSTALLATION OF DOOR HARDWARE,
KEYING, AND ACCESS CONTROL WITH OWNER’S SECURITY
CONSULTANT.
D. ELECTRICAL SYSTEM ROUGHING-IN: COORDINATE LAYOUT
AND INSTALLATION OF ELECTRIFIED DOOR HARDWARE WITH
CONNECTIONS TO POWER SUPPLIES AND BUILDING SAFETY AND
SECURITY SYSTEMS.
E. EXISTING OPENINGS: WHERE EXISTING DOORS, FRAMES AND/
OR HARDWARE ARE TO REMAIN, FIELD VERIFY EXISTING FUNCTIONS,
CONDITIONS AND PREPARATIONS AND COORDINATE TO SUIT
OPENING CONDITIONS AND TO PROVIDE PROPER DOOR OPERATION.
1.07 WARRANTY
A. WARRANTY: MANUFACTURER’S STANDARD FORM IN WHICH
MANUFACTURER AGREES TO REPAIR OR REPLACE COMPONENTS
OF DOOR HARDWARE THAT FAIL IN MATERIALS OR WORKMANSHIP
WITHIN SPECIFIED WARRANTY PERIOD.
1. WARRANTY PERIOD: BEGINNING FROM DATE OF SUBSTANTIAL
COMPLETION, FOR DURATIONS INDICATED.
a. CLOSERS:
1) MECHANICAL: 10 YEARS.
2) ELECTRIFIED: 2 YEARS.
b. LOCKSETS:
1) MECHANICAL: 10 YEARS
ELECTRIFIED: 1 YEAR.
c. CONTINUOUS HINGES: LIFETIME WARRANTY.
d. KEY BLANKS: LIFETIME
2. WARRANTY DOES NOT COVER DAMAGE OR FAULTY OPERATION
DUE TO IMPROPER INSTALLATION, IMPROPER USE OR ABUSE.
PART 2 - PRODUCTS
2.01 MANUFACTURERS
A. THE OWNER REQUIRES USE OF CERTAIN PRODUCTS FOR
THEIR UNIQUE CHARACTERISTICS AND PROJECT SUITABILITY TO
INSURE CONTINUITY OF EXISTING AND FUTURE PERFORMANCE
AND MAINTENANCE STANDARDS. AFTER INVESTIGATING AVAILABLE
PRODUCT OFFERINGS, THE AWARDING AUTHORITY HAS ELECTED TO
PREPARE PROPRIETARY SPECIFICATIONS. THESE PRODUCTS ARE
SPECIFIED WITH THE NOTATION: “NO SUBSTITUTE.”
1. WHERE “NO SUBSTITUTE” IS NOTED, SUBMITTALS AND
SUBSTITUTION REQUESTS FOR OTHER PRODUCTS WILL NOT BE
CONSIDERED.
B. APPROVAL OF MANUFACTURERS AND/OR PRODUCTS
OTHER THAN THOSE LISTED AS “SCHEDULED MANUFACTURER” OR
“ACCEPTABLE MANUFACTURERS” IN THE INDIVIDUAL ARTICLE FOR
THE PRODUCT CATEGORY SHALL BE IN ACCORDANCE WITH QUALITY
ASSURANCE ARTICLE, HEREIN.
C. APPROVAL OF PRODUCTS FROM MANUFACTURERS INDICATED
IN “ACCEPTABLE MANUFACTURERS” IS CONTINGENT UPON THOSE
PRODUCTS PROVIDING ALL FUNCTIONS AND FEATURES AND
MEETING ALL REQUIREMENTS OF SCHEDULED MANUFACTURER’S
PRODUCT.
D. WHERE SPECIFIED HARDWARE IS NOT ADAPTABLE TO
FINISHED SHAPE OR SIZE OF MEMBERS REQUIRING HARDWARE,
FURNISH SUITABLE TYPES HAVING SAME OPERATION AND QUALITY
AS TYPE SPECIFIED, SUBJECT TO ARCHITECT’S APPROVAL.
2.02 MATERIALS
A. FASTENERS
1. PROVIDE HARDWARE MANUFACTURED TO CONFORM TO
PUBLISHED TEMPLATES, GENERALLY PREPARED FOR MACHINE
SCREW INSTALLATION.
2. FURNISH SCREWS FOR INSTALLATION WITH EACH HARDWARE
ITEM. FINISH EXPOSED (EXPOSED UNDER ANY CONDITION) SCREWS
TO MATCH HARDWARE FINISH, OR, IF EXPOSED IN SURFACES OF
OTHER WORK, TO MATCH FINISH OF THIS OTHER WORK INCLUDING
PREPARED FOR PAINT SURFACES TO RECEIVE PAINTED FINISH.
3. PROVIDE CONCEALED FASTENERS FOR HARDWARE UNITS
EXPOSED WHEN DOOR IS CLOSED EXCEPT WHEN NO STANDARD
UNITS OF TYPE SPECIFIED ARE AVAILABLE WITH CONCEALED
FASTENERS. DO NOT USE THRU-BOLTS FOR INSTALLATION WHERE
BOLT HEAD OR NUT ON OPPOSITE FACE IS EXPOSED IN OTHER
WORK UNLESS THRU-BOLTS ARE REQUIRED TO FASTEN HARDWARE
SECURELY. REVIEW DOOR SPECIFICATION AND ADVISE ARCHITECT
IF THRU-BOLTS ARE REQUIRED.
4. INSTALL HARDWARE WITH FASTENERS PROVIDED BY
HARDWARE MANUFACTURER.
B. MODIFICATION AND PREPARATION OF EXISTING DOORS:
WHERE EXISTING DOOR HARDWARE IS INDICATED TO BE REMOVED
AND REINSTALLED.
1. PROVIDE NECESSARY FILLERS, DUTCHMEN,
REINFORCEMENTS, AND FASTENERS, COMPATIBLE WITH
EXISTING MATERIALS, AS REQUIRED FOR MOUNTING NEW
OPENING HARDWARE AND TO COVER EXISTING DOOR AND FRAME
PREPARATIONS.
2. USE MATERIALS WHICH MATCH MATERIALS OF ADJACENT
MODIFIED AREAS.
3. WHEN MODIFYING EXISTING FIRE-RATED OPENINGS, PROVIDE
MATERIALS PERMITTED BY NFPA 80 AS REQUIRED TO MAINTAIN
FIRE-RATING.
C. PROVIDE SCREWS, BOLTS, EXPANSION SHIELDS, DROP PLATES
AND OTHER DEVICES NECESSARY FOR HARDWARE INSTALLATION.
1. WHERE FASTENERS ARE EXPOSED TO VIEW: FINISH TO MATCH
ADJACENT DOOR HARDWARE MATERIAL.
D. OPTION: CABLE AND CONNECTORS: HARDWIRED ELECTRONIC
ACCESS CONTROL LOCKSET AND EXIT DEVICE TRIM:
1. DATA: 24AWG, 4 CONDUCTOR SHIELDED, BELDEN 9843, 9841 OR
COMPARABLE.
2. DC POWER: 18 AWG, 2 CONDUCTOR, BELDEN 8760 OR
COMPARABLE.
3. PROVIDE TYPE OF DATA AND DC POWER CABLING REQUIRED
BY ACCESS CONTROL DEVICE MANUFACTURER FOR THIS
INSTALLATION.
4. WHERE SCHEDULED IN THE HARDWARE SETS, PROVIDE EACH
ITEM OF ELECTRIFIED HARDWARE AND WIRE HARNESSES WITH
SUFFICIENT NUMBER AND WIRE GAUGE WITH STANDARDIZED
MOLEX PLUG CONNECTORS TO ACCOMMODATE ELECTRIC
FUNCTION OF SPECIFIED HARDWARE. PROVIDE MOLEX
CONNECTORS THAT PLUG DIRECTLY INTO CONNECTORS FROM
HARNESSES, ELECTRIC LOCKING AND POWER TRANSFER DEVICES.
PROVIDE THROUGH-DOOR WIRE HARNESS FOR EACH ELECTRIFIED
LOCKING DEVICE INSTALLED IN A DOOR AND WIRE HARNESS FOR
EACH ELECTRIFIED HINGE, ELECTRIFIED CONTINUOUS HINGE,
ELECTRIFIED PIVOT, AND ELECTRIC POWER TRANSFER FOR
CONNECTION TO POWER SUPPLIES.
2.03 HINGES
A. MANUFACTURERS AND PRODUCTS:
1. SCHEDULED MANUFACTURER AND PRODUCT: IVES 5BB
SERIES.
2. ACCEPTABLE MANUFACTURERS AND PRODUCTS: MCKINNEY
TA/T4A SERIES, STANLEY FBB SERIES.
B. REQUIREMENTS:
1. PROVIDE HINGES CONFORMING TO ANSI/BHMA A156.1.
2. 1-3/4 INCH (44 MM) THICK DOORS, UP TO AND INCLUDING 36
INCHES (914 MM) WIDE:
a. EXTERIOR: STANDARD WEIGHT, BRONZE OR STAINLESS STEEL,
4-1/2 INCHES (114 MM) HIGH
b. INTERIOR: STANDARD WEIGHT, STEEL, 4-1/2 INCHES (114 MM)
HIGH
3. 1-3/4 INCH (44 MM) THICK DOORS OVER 36 INCHES (914 MM)
WIDE:
a. EXTERIOR: HEAVY WEIGHT, BRONZE/STAINLESS STEEL, 5
INCHES (127 MM) HIGH
b. INTERIOR: HEAVY WEIGHT, STEEL, 5 INCHES (127 MM) HIGH
4. 2 INCHES OR THICKER DOORS:
a. EXTERIOR: HEAVY WEIGHT, BRONZE OR STAINLESS STEEL, 5
INCHES (127 MM) HIGH
b. INTERIOR: HEAVY WEIGHT, STEEL, 5 INCHES (127 MM) HIGH
5. PROVIDE THREE HINGES PER DOOR LEAF FOR DOORS 90
INCHES (2286 MM) OR LESS IN HEIGHT, AND ONE ADDITIONAL HINGE
FOR EACH 30 INCHES (762 MM) OF ADDITIONAL DOOR HEIGHT.
6. WHERE NEW HINGES ARE SPECIFIED FOR EXISTING DOORS
OR EXISTING FRAMES, PROVIDE NEW HINGES OF IDENTICAL SIZE
TO HINGE PREPARATION PRESENT IN EXISTING DOOR OR EXISTING
FRAME.
7. HINGE PINS: EXCEPT AS OTHERWISE INDICATED, PROVIDE
HINGE PINS AS FOLLOWS:
a. STEEL HINGES: STEEL PINS
b. NON-FERROUS HINGES: STAINLESS STEEL PINS
c. OUT-SWINGING EXTERIOR DOORS: NON-REMOVABLE PINS
d. OUT-SWINGING INTERIOR LOCKABLE DOORS: NON-REMOVABLE
PINS
e. INTERIOR NON-LOCKABLE DOORS: NON-RISING PINS
8. WIDTH OF HINGES: 4-1/2 INCHES (114 MM) AT 1-3/4 INCH (44
MM) THICK DOORS, AND 5 INCHES (127 MM) AT 2 INCHES (51 MM) OR
THICKER DOORS. ADJUST HINGE WIDTH AS REQUIRED FOR DOOR,
FRAME, AND WALL CONDITIONS TO ALLOW PROPER DEGREE OF
OPENING.
9. PROVIDE HINGES WITH ELECTRIFIED OPTIONS AS SCHEDULED
IN THE HARDWARE SETS. PROVIDE WITH SUFFICIENT NUMBER AND
WIRE GAGE TO ACCOMMODATE ELECTRIC FUNCTION OF SPECIFIED
HARDWARE. LOCATE ELECTRIC HINGE AT SECOND HINGE FROM
BOTTOM OR NEAREST TO ELECTRIFIED LOCKING COMPONENT.
10. PROVIDE MORTAR GUARD FOR EACH ELECTRIFIED HINGE
SPECIFIED.
11. PROVIDE SPRING HINGES WHERE SPECIFIED. PROVIDE TWO
SPRING HINGES AND ONE BEARING HINGE PER DOOR LEAF FOR
DOORS 90 INCHES (2286 MM) OR LESS IN HEIGHT. PROVIDE ONE
ADDITIONAL BEARING HINGE FOR EACH 30 INCHES (762 MM) OF
ADDITIONAL DOOR HEIGHT.
2.04 MORTISE LOCKS
A. MANUFACTURERS AND PRODUCTS:
1. SCHEDULED MANUFACTURER AND PRODUCT: SCHLAGE L9000
SERIES.
2. ACCEPTABLE MANUFACTURERS AND PRODUCTS: NO
SUBSTITUTE.
B. REQUIREMENTS:
1. PROVIDE MORTISE LOCKS CONFORMING TO ANSI/BHMA
A156.13 SERIES 1000, GRADE 1, AND UL LISTED FOR 3 HOUR FIRE
DOORS.
2. PROVIDE LOCKS MANUFACTURED FROM HEAVY GAUGE STEEL,
CONTAINING COMPONENTS OF STEEL WITH A ZINC DICHROMATE
PLATING FOR CORROSION RESISTANCE.
3. PROVIDE LOCK CASE THAT IS MULTI-FUNCTION AND FIELD
REVERSIBLE FOR HANDING WITHOUT OPENING CASE. CYLINDERS:
REFER TO “KEYING” ARTICLE, HEREIN.
4. PROVIDE LOCKS WITH STANDARD 2-3/4 INCHES (70 MM)
BACKSET WITH FULL 3/4 INCH (19 MM) THROW STAINLESS STEEL
MECHANICAL ANTI-FRICTION LATCHBOLT. PROVIDE DEADBOLT WITH
FULL 1 INCH (25 MM) THROW, CONSTRUCTED OF STAINLESS STEEL.
5. PROVIDE STANDARD ASA STRIKES UNLESS EXTENDED LIP
STRIKES ARE NECESSARY TO PROTECT TRIM.
6. PROVIDE ELECTRIFIED OPTIONS AS SCHEDULED IN THE
HARDWARE SETS. WHERE SCHEDULED, PROVIDE SWITCHES AND
SENSORS INTEGRATED INTO THE LOCKS AND LATCHES.
7. LEVER TRIM: SOLID BRASS, BRONZE, OR STAINLESS STEEL,
CAST OR FORGED IN DESIGN SPECIFIED, WITH WROUGHT ROSES
AND EXTERNAL LEVER SPRING CAGES. PROVIDE THRU-BOLTED
LEVERS WITH 2-PIECE SPINDLES.
a. LEVER DESIGN: SCHLAGE MATCH BUILDING STANDARD.
2.05 CYLINDRICAL LOCKS – GRADE 1
A. MANUFACTURERS AND PRODUCTS:
1. SCHEDULED MANUFACTURER AND PRODUCT: SCHLAGE ND
SERIES.
2. ACCEPTABLE MANUFACTURERS AND PRODUCTS: NO
SUBSTITUTE.
B. REQUIREMENTS:
1. PROVIDE CYLINDRICAL LOCKS CONFORMING TO ANSI/BHMA
A156.2 SERIES 4000, GRADE 1, AND UL LISTED FOR 3 HOUR FIRE
DOORS.
2. CYLINDERS: REFER TO “KEYING” ARTICLE, HEREIN.
3. PROVIDE LOCKS WITH STANDARD 2-3/4 INCHES (70 MM)
BACKSET, UNLESS NOTED OTHERWISE, WITH 1/2 INCH LATCH
THROW. PROVIDE PROPER LATCH THROW FOR UL LISTING AT
PAIRS.
4. PROVIDE LOCKSETS WITH SEPARATE ANTI-ROTATION THRU-
BOLTS, AND NO EXPOSED SCREWS.
5. PROVIDE INDEPENDENTLY OPERATING LEVERS WITH TWO
EXTERNAL RETURN SPRING CASSETTES MOUNTED UNDER ROSES
TO PREVENT LEVER SAG.
6. PROVIDE STANDARD ASA STRIKES UNLESS EXTENDED LIP
STRIKES ARE NECESSARY TO PROTECT TRIM.
7. PROVIDE ELECTRIFIED OPTIONS AS SCHEDULED IN THE
HARDWARE SETS.
8. LEVER TRIM: SOLID CAST LEVERS WITHOUT PLASTIC INSERTS
AND WROUGHT ROSES ON BOTH SIDES.
a. LEVER DESIGN: SCHLAGE MATCH BUILDING STANDARD
2.06 PASSIVE INFRARED MOTION SENSORS
A. MANUFACTURERS AND PRODUCTS:
1. SCHEDULED MANUFACTURER AND PRODUCT: SCHLAGE SCAN
II SERIES.
2. ACCEPTABLE MANUFACTURERS AND PRODUCTS: RCI 915
SERIES, SECURITRON XMS SERIES, SECURITY DOOR CONTROLS
MD-31D SERIES.
B. REQUIREMENTS:
1. PROVIDE MOTION SENSORS AS SPECIFIED IN HARDWARE
GROUPS.
2.07 CYLINDERS
A. MANUFACTURERS:
1. SCHEDULED MANUFACTURER: SCHLAGE
B. REQUIREMENTS:
1. PROVIDE CYLINDERS/CORES TO MATCH OWNER’S EXISTING
KEY SYSTEM, COMPLIANT WITH ANSI/BHMA A156.5; LATEST
REVISION; CYLINDER FACE FINISHED TO MATCH LOCKSET,
MANUFACTURER’S SERIES AS INDICATED. REFER TO “KEYING”
ARTICLE, HEREIN.
2.08 KEYING
A. COMPLY WITH GUIDELINES IN ANSI/BHMA A156.28,
INCORPORATING DECISIONS MADE AT KEYING CONFERENCE.
B. PROVIDE CYLINDERS/CORES KEYED INTO OWNER’S EXISTING
KEYING SYSTEM.
C. REQUIREMENTS:
1. PROVIDE PERMANENT CYLINDERS/CORES KEYED BY THE
MANUFACTURER ACCORDING TO THE FOLLOWING KEY SYSTEM.
a. MASTER KEYING SYSTEM AS DIRECTED BY THE OWNER.
2.09 DOOR CLOSERS
A. MANUFACTURERS AND PRODUCTS:
1. SCHEDULED MANUFACTURER AND PRODUCT: FALCON SC80A
SERIES.
2. ACCEPTABLE MANUFACTURERS AND PRODUCTS: LCN 1450
SERIES, NORTON 8000 SERIES.
B. REQUIREMENTS:
1. PROVIDE DOOR CLOSERS CONFORMING TO ANSI/BHMA A156.4
GRADE 1 REQUIREMENTS BY BHMA CERTIFIED INDEPENDENT
TESTING LABORATORY.
2. PROVIDE DOOR CLOSERS WITH FULLY HYDRAULIC, FULL RACK
AND PINION ACTION WITH ALUMINUM CYLINDER.
3. CLOSER BODY: 1-1/4 INCH (32 MM) DIAMETER, WITH 5/8 INCH (16
MM) DIAMETER HEAT-TREATED PINION JOURNAL.
4. HYDRAULIC FLUID: FIREPROOF, PASSING REQUIREMENTS OF
UL10C, AND REQUIRING NO SEASONAL CLOSER ADJUSTMENT FOR
TEMPERATURES RANGING FROM 120 DEGREES F TO -30 DEGREES
F.
5. SPRING POWER: CONTINUOUSLY ADJUSTABLE OVER FULL
RANGE OF CLOSER SIZES, AND PROVIDING REDUCED OPENING
FORCE AS REQUIRED BY ACCESSIBILITY CODES AND STANDARDS.
6. HYDRAULIC REGULATION: BY TAMPER-PROOF, NON-CRITICAL
VALVES, WITH SEPARATE ADJUSTMENT FOR LATCH SPEED,
GENERAL SPEED, AND BACKCHECK.
7. PRESSURE RELIEF VALVE (PRV) TECHNOLOGY: NOT
PERMITTED.
8. PROVIDE SPECIAL TEMPLATES, DROP PLATES, MOUNTING
BRACKETS, OR ADAPTERS FOR ARMS AS REQUIRED FOR DETAILS,
OVERHEAD STOPS, AND OTHER DOOR HARDWARE ITEMS
INTERFERING WITH CLOSER MOUNTING.
2.10 DOOR TRIM
A. MANUFACTURERS:
1. SCHEDULED MANUFACTURER: IVES.
2. ACCEPTABLE MANUFACTURERS: BURNS, ROCKWOOD.
B. REQUIREMENTS:
1. PROVIDE PUSH PLATES 4 INCHES (102 MM) WIDE BY 16 INCHES
(406 MM) HIGH BY 0.050 INCH (1 MM) THICK AND BEVELED 4 EDGES.
WHERE WIDTH OF DOOR STILE PREVENTS USE OF 4 INCHES (102
MM) WIDE PLATE, ADJUST WIDTH TO FIT.
2. PROVIDE PUSH BARS OF SOLID BAR STOCK, DIAMETER AND
LENGTH AS SCHEDULED. PROVIDE PUSH BARS OF SUFFICIENT
LENGTH TO SPAN FROM CENTER TO CENTER OF EACH STILE.
WHERE REQUIRED, MOUNT BACK TO BACK WITH PULL.
3. PROVIDE OFFSET PULLS OF SOLID BAR STOCK, DIAMETER AND
LENGTH AS SCHEDULED. WHERE REQUIRED, MOUNT BACK TO BACK
WITH PUSH BAR.
4. PROVIDE FLUSH PULLS AS SCHEDULED. WHERE REQUIRED,
PROVIDE BACK-TO-BACK MOUNTED MODEL.
5. PROVIDE PULLS OF SOLID BAR STOCK, DIAMETER AND LENGTH
AS SCHEDULED. WHERE REQUIRED, MOUNT BACK TO BACK WITH
PUSH BAR.
6. PROVIDE PULL PLATES 4 INCHES (102 MM) WIDE BY 16 INCHES
(406 MM) HIGH BY 0.050 INCH (1 MM) THICK, BEVELED 4 EDGES, AND
PREPPED FOR PULL. WHERE WIDTH OF DOOR STILE PREVENTS
USE OF 4 INCHES (102 MM) WIDE PLATE, ADJUST WIDTH TO FIT.
7. PROVIDE WIRE PULLS OF SOLID BAR STOCK, DIAMETER AND
LENGTH AS SCHEDULED.
8. PROVIDE DECORATIVE PULLS AS SCHEDULED. WHERE
REQUIRED, MOUNT BACK TO BACK WITH PULL.
2.11 OVERHEAD STOPS AND OVERHEAD STOP/HOLDERS
A. MANUFACTURERS:
1. SCHEDULED MANUFACTURERS: GLYNN-JOHNSON.
2. ACCEPTABLE MANUFACTURERS: RIXSON, SARGENT.
B. REQUIREMENTS:
1. PROVIDE HEAVY DUTY CONCEALED MOUNTED OVERHEAD
STOP OR HOLDER AS SPECIFIED FOR EXTERIOR AND INTERIOR
VESTIBULE SINGLE ACTING DOORS.
2. PROVIDE HEAVY DUTY CONCEALED MOUNTED OVERHEAD
STOP OR HOLDER AS SPECIFIED FOR DOUBLE ACTING DOORS.
3. PROVIDE HEAVY OR MEDIUM DUTY AND CONCEALED OR
SURFACE MOUNTED OVERHEAD STOP OR HOLDER FOR INTERIOR
DOORS AS SPECIFIED. PROVIDE MEDIUM DUTY SURFACE MOUNTED
OVERHEAD STOP FOR INTERIOR DOORS AND AT ANY DOOR THAT
SWINGS MORE THAN 140 DEGREES BEFORE STRIKING WALL,
OPEN AGAINST EQUIPMENT, CASEWORK, SIDELIGHTS, AND
WHERE CONDITIONS DO NOT ALLOW WALL STOP OR FLOOR STOP
PRESENTS TRIPPING HAZARD.
4. WHERE OVERHEAD HOLDERS ARE SPECIFIED PROVIDE
FRICTION TYPE AT DOORS WITHOUT CLOSER AND POSITIVE TYPE
AT DOORS WITH CLOSER.
2.12 DOOR STOPS AND HOLDERS
A. MANUFACTURERS:
1. SCHEDULED MANUFACTURER: IVES.
2. ACCEPTABLE MANUFACTURERS: BURNS, ROCKWOOD.
B. PROVIDE DOOR STOPS AT EACH DOOR LEAF:
1. PROVIDE WALL STOPS WHEREVER POSSIBLE. PROVIDE
CONVEX TYPE WHERE MORTISE TYPE LOCKS ARE USED AND
CONCAVE TYPE WHERE CYLINDRICAL TYPE LOCKS ARE USED.
2. WHERE A WALL STOP CANNOT BE USED, PROVIDE UNIVERSAL
FLOOR STOPS FOR LOW OR HIGH RISE OPTIONS.
3. WHERE WALL OR FLOOR STOP CANNOT BE USED, PROVIDE
MEDIUM DUTY SURFACE MOUNTED OVERHEAD STOP.
2.13 FINISHES
A. SEE HARDWARE SETS
PART 3 - EXECUTION
3.01 EXAMINATION
A. PRIOR TO INSTALLATION OF HARDWARE, EXAMINE DOORS
AND FRAMES, WITH INSTALLER PRESENT, FOR COMPLIANCE WITH
REQUIREMENTS FOR INSTALLATION TOLERANCES, LABELED
FIRE-RATED DOOR ASSEMBLY CONSTRUCTION, WALL AND
FLOOR CONSTRUCTION, AND OTHER CONDITIONS AFFECTING
PERFORMANCE.
B. FIELD VERIFY EXISTING DOORS AND FRAMES RECEIVING NEW
HARDWARE AND EXISTING CONDITIONS RECEIVING NEW OPENINGS.
VERIFY THAT NEW HARDWARE IS COMPATIBLE WITH EXISTING DOOR
AND FRAME PREPARATION AND EXISTING CONDITIONS.
C. EXAMINE ROUGHING-IN FOR ELECTRICAL POWER SYSTEMS
TO VERIFY ACTUAL LOCATIONS OF WIRING CONNECTIONS BEFORE
ELECTRIFIED DOOR HARDWARE INSTALLATION.
D. PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY
CONDITIONS HAVE BEEN CORRECTED.
3.02 PREPARATION
A. WHERE ON-SITE MODIFICATION OF DOORS AND FRAMES IS
REQUIRED:
1. CAREFULLY REMOVE EXISTING DOOR HARDWARE AND
COMPONENTS BEING REUSED. CLEAN, PROTECT, TAG, AND STORE
IN ACCORDANCE WITH STORAGE AND HANDLING REQUIREMENTS
SPECIFIED HEREIN.
2. FIELD MODIFY AND PREPARE EXISTING DOOR AND FRAME FOR
NEW HARDWARE BEING INSTALLED.
3. WHEN MODIFICATIONS ARE EXPOSED TO VIEW, USE
CONCEALED FASTENERS, WHEN POSSIBLE.
4. PREPARE HARDWARE LOCATIONS AND REINSTALL IN
ACCORDANCE WITH INSTALLATION REQUIREMENTS FOR NEW
DOOR HARDWARE AND WITH:
a. STEEL DOORS AND FRAMES: FOR SURFACE APPLIED DOOR
HARDWARE, DRILL AND TAP DOORS AND FRAMES ACCORDING TO
ANSI/SDI A250.6.
b. WOOD DOORS: DHI WDHS.5 “RECOMMENDED HARDWARE
REINFORCEMENT LOCATIONS FOR MINERAL CORE WOOD FLUSH
DOORS.”
c. DOORS IN RATED ASSEMBLIES: NFPA 80 FOR RESTRICTIONS
ON ON-SITE DOOR HARDWARE PREPARATION.
3.03 INSTALLATION
A. MOUNT DOOR HARDWARE UNITS AT HEIGHTS TO COMPLY WITH
THE FOLLOWING, UNLESS OTHERWISE INDICATED OR REQUIRED TO
COMPLY WITH GOVERNING REGULATIONS.
1. STANDARD STEEL DOORS AND FRAMES: ANSI/SDI A250.8.
2. CUSTOM STEEL DOORS AND FRAMES: HMMA 831.
3. WOOD DOORS: DHI WDHS.3, “RECOMMENDED LOCATIONS FOR
ARCHITECTURAL HARDWARE FOR WOOD FLUSH DOORS.”
B. INSTALL EACH HARDWARE ITEM IN COMPLIANCE WITH
MANUFACTURER’S INSTRUCTIONS AND RECOMMENDATIONS, USING
ONLY FASTENERS PROVIDED BY MANUFACTURER.
C. DO NOT INSTALL SURFACE MOUNTED ITEMS UNTIL FINISHES
HAVE BEEN COMPLETED ON SUBSTRATE. PROTECT ALL INSTALLED
HARDWARE DURING PAINTING.
D. SET UNITS LEVEL, PLUMB AND TRUE TO LINE AND LOCATION.
ADJUST AND REINFORCE ATTACHMENT SUBSTRATE AS NECESSARY
FOR PROPER INSTALLATION AND OPERATION.
E. DRILL AND COUNTERSINK UNITS THAT ARE NOT FACTORY
PREPARED FOR ANCHORAGE FASTENERS. SPACE FASTENERS AND
ANCHORS ACCORDING TO INDUSTRY STANDARDS.
F. INSTALL OPERATING PARTS SO THEY MOVE FREELY
AND SMOOTHLY WITHOUT BINDING, STICKING, OR EXCESSIVE
CLEARANCE.
G. HINGES: INSTALL TYPES AND IN QUANTITIES INDICATED IN
DOOR HARDWARE SCHEDULE BUT NOT FEWER THAN QUANTITY
RECOMMENDED BY MANUFACTURER FOR APPLICATION INDICATED
OR ONE HINGE FOR EVERY 30 INCHES (750 MM) OF DOOR HEIGHT,
WHICHEVER IS MORE STRINGENT, UNLESS OTHER EQUIVALENT
MEANS OF SUPPORT FOR DOOR, SUCH AS SPRING HINGES OR
PIVOTS, ARE PROVIDED.
H. INTERMEDIATE OFFSET PIVOTS: WHERE OFFSET PIVOTS ARE
INDICATED, PROVIDE INTERMEDIATE OFFSET PIVOTS IN QUANTITIES
INDICATED IN DOOR HARDWARE SCHEDULE BUT NOT FEWER THAN
ONE INTERMEDIATE OFFSET PIVOT PER DOOR AND ONE ADDITIONAL
INTERMEDIATE OFFSET PIVOT FOR EVERY 30 INCHES (750 MM) OF
DOOR HEIGHT GREATER THAN 90 INCHES (2286 MM).
I. WIRING: COORDINATE WITH DIVISION 26, ELECTRICAL
SECTIONS FOR:
1. CONDUIT, JUNCTION BOXES AND WIRE PULLS.
2. CONNECTIONS TO AND FROM POWER SUPPLIES TO
ELECTRIFIED HARDWARE.
3. CONNECTIONS TO FIRE/SMOKE ALARM SYSTEM AND SMOKE
EVACUATION SYSTEM.
4. CONNECTION OF WIRE TO DOOR POSITION SWITCHES
AND WIRE RUNS TO CENTRAL ROOM OR AREA, AS DIRECTED BY
ARCHITECT.
5. TESTING AND LABELING WIRES WITH ARCHITECT’S OPENING
NUMBER.
J. DOOR CLOSERS: MOUNT CLOSERS ON ROOM SIDE OF
CORRIDOR DOORS, INSIDE OF EXTERIOR DOORS, AND STAIR SIDE
OF STAIRWAY DOORS FROM CORRIDORS. MOUNT CLOSERS SO
THEY ARE NOT VISIBLE IN CORRIDORS, LOBBIES AND OTHER PUBLIC
SPACES UNLESS APPROVED BY ARCHITECT.
K. CLOSER/HOLDERS: MOUNT CLOSER/HOLDERS ON ROOM SIDE
OF CORRIDOR DOORS, INSIDE OF EXTERIOR DOORS, AND STAIR SIDE
OF STAIRWAY DOORS.
L. POWER SUPPLIES: LOCATE POWER SUPPLIES AS INDICATED
OR, IF NOT INDICATED, ABOVE ACCESSIBLE CEILINGS OR IN
EQUIPMENT ROOM, OR ALTERNATE LOCATION AS DIRECTED BY
ARCHITECT.
M. THRESHOLDS: SET THRESHOLDS IN FULL BED OF SEALANT
COMPLYING WITH REQUIREMENTS SPECIFIED IN DIVISION 07
SECTION “JOINT SEALANTS.”
N. STOPS: PROVIDE FLOOR STOPS FOR DOORS UNLESS WALL OR
OTHER TYPE STOPS ARE INDICATED IN DOOR HARDWARE SCHEDULE
DO NOT MOUNT FLOOR STOPS WHERE THEY MAY IMPEDE TRAFFIC
OR PRESENT TRIPPING HAZARD.
O. PERIMETER GASKETING: APPLY TO HEAD AND JAMB, FORMING
SEAL BETWEEN DOOR AND FRAME.
P. MEETING STILE GASKETING: FASTEN TO MEETING STILES,
FORMING SEAL WHEN DOORS ARE CLOSED.
Q. DOOR BOTTOMS: APPLY TO BOTTOM OF DOOR, FORMING SEAL
WITH THRESHOLD WHEN DOOR IS CLOSED.
3.04 ADJUSTING
A. INITIAL ADJUSTMENT: ADJUST AND CHECK EACH OPERATING
ITEM OF DOOR HARDWARE AND EACH DOOR TO ENSURE PROPER
OPERATION OR FUNCTION OF EVERY UNIT. REPLACE UNITS THAT
CANNOT BE ADJUSTED TO OPERATE AS INTENDED. ADJUST DOOR
CONTROL DEVICES TO COMPENSATE FOR FINAL OPERATION OF
HEATING AND VENTILATING EQUIPMENT AND TO COMPLY WITH
REFERENCED ACCESSIBILITY REQUIREMENTS.
3.05 CLEANING AND PROTECTION
A. CLEAN ADJACENT SURFACES SOILED BY DOOR HARDWARE
INSTALLATION.
B. CLEAN OPERATING ITEMS AS NECESSARY TO RESTORE
PROPER FUNCTION AND FINISH.
C. PROVIDE FINAL PROTECTION AND MAINTAIN CONDITIONS THAT
ENSURE DOOR HARDWARE IS WITHOUT DAMAGE OR DETERIORATION
AT TIME OF SUBSTANTIAL COMPLETION.
3.06 DOOR HARDWARE SCHEDULE
A. HARDWARE ITEMS ARE REFERENCED IN THE FOLLOWING
HARDWARE. REFER TO THE ABOVE-SPECIFICATIONS FOR
SPECIAL FEATURES, OPTIONS, CYLINDERS/KEYING, AND OTHER
GI101
conformed set
revisions :
p r o j e c t # :
d a t e :
20.0550
- june 4, 2021
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
GI209
Sheet Specs
20.0550
- april 7, 2021
Rexburg
Rowhouses
bid set
REQUIREMENTS.
B. HARDWARE SETS: SEE SHEET AE601
END OF SECTION 087100
SECTION 08800 GLAZING
1. ALL TEMPERED GLASS TO COMPLY WITH ASTM C1048, ANSI Z97.1, AND
CPSC 16 CFR 1201, CATEGORY II. PROCESS IN HORIZONTAL POSITION SO
THAT INHERENT ROLLER DISTORTION WILL RUN PARALLEL TO BUILDING
FLOOR LINES AFTER INSTALLATION.
A. CONTRACTOR TO SUBMIT TO ARCHITECT FOR VERIFICATION AND
APPROVAL PRIOR TO INSTALLING MATERIAL.
PART 1 - GENERAL
1.1 DESCRIPTION
WORK INCLUDED: PROVIDE GLAZING AND GLAZING ACCESSORIES
WHERE SHOWN ON THE DRAWINGS, AS SPECIFIED HEREIN, AND AS
NEEDED FOR A COMPLETE AND PROPER INSTALLATION.
RELATED WORK:
DOCUMENTS AFFECTING WORK OF THIS SECTION INCLUDE,
BUT NOT NECESSARILY LIMITED TO GENERAL CONDITIONS,
SUPPLEMENTARY CONDITIONS, AND SECTIONS IN DIVISION 1 OF
THESE SPECIFICATIONS.
SECTION 07920: SEALANTS
SECTION 08210: WOOD DOORS
1.2 QUALITY ASSURANCE
USE ADEQUATE NUMBERS OF SKILLED WORKMEN WHO ARE
THOROUGHLY TRAINED AND EXPERIENCED IN THE NECESSARY
CRAFTS AND WHO ARE COMPLETELY FAMILIAR WITH THE SPECIFIED
REQUIREMENTS AND THE METHODS NEEDED FOR PROPER
PERFORMANCE OF THE WORK OF THESE SECTIONS.
1.3 SUBMITTALS
COMPLY WITH PERTINENT PROVISIONS OF SECTION 013400.
PRODUCT DATA: WITHIN 60 CALENDAR DAYS AFTER THE
CONTRACTOR HAS RECEIVED THE OWNER’S NOTICE TO PROCEED,
SUBMIT:
MATERIALS LIST OF ITEMS PROPOSED TO BE PROVIDED UNDER THIS
SECTION.
MANUFACTURER’S SPECIFICATIONS AND OTHER DATA NEEDED TO
PROVE COMPLIANCE WITH THE SPECIFIED REQUIREMENTS.
MANUFACTURER’S RECOMMENDED INSTALLATION PROCEDURES
WHICH, WHEN APPROVED BY THE ARCHITECT, WILL BECOME THE
BASIS FOR ACCEPTING OR REJECTING ACTUAL INSTALLATION
PROCEDURES USED ON THE WORK.
SAMPLES. ACCOMPANYING THE ABOVE PRODUCT DATA, SUBMIT:
SAMPLES OF EACH TYPE OF GASKET PROPOSED TO BE USED.
SAMPLES OF EACH TYPE OF SEALANT PROPOSED TO BE USED,
TESTED FOR EACH SUBSTRATE INVOLVED PROVING COMPLIANCE
WITH MANUFACTURER’S RECOMMENDED SEALANTS FOR USE WITH
SPECIALTY GLASS.
1.4 PRODUCT HANDLING
COMPLY WITH PERTINENT PROVISIONS OF SECTION 01640.
FOLLOW STRICT GLASS HANDLING AND STORAGE
RECOMMENDATIONS OF REFERENCED STANDARDS, INCLUDING
ANY SPECIAL INSTRUCTIONS FROM THE SPECIALTY GLASS
MANUFACTURER.
1.5 WARRANTIES
CONTRACTOR SHALL WARRANT FOR ONE YEAR THE SATISFACTORY
PERFORMANCE OF THE GLAZING INSTALLATION .
1.6 SECTION INCLUDES ALL GLASS DOORS
PART 2 - PRODUCTS
2.1 GLASS
GENERAL
ALL GLASS TO COMPLY WITH ASTM C-1036-06.
PROVIDE THE TYPE AND THICKNESS SHOWN ON THE DRAWINGS OR
SPECIFIED HEREIN.
WHERE TYPE OR THICKNESS, OR BOTH ARE NOT SHOWN ON
THE DRAWINGS OR AS SPECIFIED HEREIN, PROVIDE TYPE AND
THICKNESS DIRECTED BY THE ARCHITECT.
TEMPERED GLASS: COMPLY WITH ASTM C-1048-85 AND Z976.1-84.
GLASS USED CAN BE ANNEALED, HEAT STRENGTHENED, OR
TEMPERED.
2.2 OTHER MATERIALS .
SPECIAL GLAZING REQUIREMENTS
INTERIOR BUTT GLAZING WHERE INDICATED
PANELS CAN BE BUTT GLAZED USING A RECOMMENDED MINIMUM
7/16” THICKNESS PANEL.
A STANDARD NEUTRAL CURE STRUCTURAL SILICONE SEALANT MAY
BE USED TO CLOSE THE JOINT. A MINIMUM OF A 1/4” SEPARATION
BETWEEN PANELS IS RECOMMENDED.
REFER TO APPLICABLE LOCAL BUILDING CODES FOR DESIGN LOAD
REQUIREMENTS REGARDING INTERIOR GLAZING.
BACK PAINTED GLASS PANELS; SEE DRAWINGS
PART 3 - EXECUTION
3.1 SURFACE CONDITIONS
THE PURCHASER MUST EXAMINE THE AREAS AND CONDITIONS
UNDER WHICH WORK OF THIS SECTION WILL BE PERFORMED.
CORRECT CONDITIONS ARE DETRIMENTAL TO THE TIMELY AND
PROPER COMPLETION OF THIS WORK. DO NOT PROCEED UNTIL
UNSATISFACTORY CONDITIONS ARE CORRECTED.
AFTER PREPARATION OF THE GLAZING SYSTEM, CLEAN
GLAZING CHANNELS, STOPS AND RABBETS TO RECEIVE THE GLAZING
MATERIALS, MAKING FREE FROM OBSTRUCTIONS AND DELETERIOUS
SUBSTANCES WHICH MIGHT IMPAIR THE WORK.
REMOVE PROTECTIVE COATING WHICH MIGHT FALL IN ADHESION OR
INTERFERE WITH BOND OF SEALANTS.
COMPLY WITH MANUFACTURERS’INSTRUCTIONS FOR FINAL WIPING
OF SURFACES IMMEDIATELY PRIOR TO APPLICATION OF PRIMER
AND GLAZING COMPOUNDS OR TAPES. USE ONLY NEUTRAL CURE
SILICONES. DO NOT USE ACETIC SILICONES.
3.2 INSTALLATION
INSPECT EACH PIECE OF GLASS IMMEDIATELY PRIOR TO START OF
INSTALLATION.
DO NOT INSTALL ITEMS WHICH ARE IMPROPERLY SIZED, HAVE
DAMAGED EDGES, OR ARE SCRATCHED, ABRADED, OR DEFICIENT IN
ANY OTHER MANNER.
DO NOT REMOVE LABELS THAT WERE PROVIDED BY THE GLASS
SUPPLIER FROM THE GLASS UNTIL SO DIRECTED BY THE ARCHITECT.
LOCATE SILL SETTING BLOCKS OF STANDARD WIDTH AND THICKNESS
AT QUARTER POINTS OF ALL GLASS LIGHTS UNLESS OTHERWISE
RECOMMENDED BY MANUFACTURER OR SUPPLIER.
USE BLOCKS OF PROPER DUROMETER, SIZE AND THICKNESS TO
SUPPORT THE GLASS IN ACCORDANCE WITH THE MANUFACTURERS’
RECOMMENDATIONS.
GLASS LAP AND EDGE CLEARANCES MUST BE PROVIDED ACCORDING
TO PERTINENT CODES AND STANDARDS OF MANUFACTURERS.
SET GLASS IN A MANNER WHICH PRODUCES THE GREATEST
POSSIBLE DEGREE OF UNIFORMITY IN APPEARANCE.
INSTALLATIONS OF THE GLASS IN DYNAMIC FRAMES SUCH AS
SLIDING DOORS MUST MEET ARCHITECTURAL SPECIFICATIONS.
PRESSURE GLAZING SYSTEMS WITHOUT POSITIVE POSITIONING
STOPS ARE NOT TO BE USED WITH THIS GLASS.
CUT AND SEAL THE JOINTS OF GLAZING GASKETS IN ACCORDANCE
WITH THE MANUFACTURERS’ RECOMMENDATIONS, PROVIDE
WATERTIGHT AND AIRTIGHT SEAL AT CORNERS AND OTHER
LOCATIONS WHERE JOINTS ARE REQUIRED.
3.3 PROTECTION
PROTECT GLASS FROM BREAKAGE AFTER INSTALLATION BY
PROMPTLY INSTALLING STREAMERS OF RIBBONS, SUITABLY
ATTACHED TO THE FRAMING AND HELD FREE FROM THE GLASS. DO
NOT APPLY WARNING MARKINGS, STREAMERS, RIBBONS, OR OTHER
ITEMS DIRECTLY TO THE GLASS EXCEPT AS SPECIFICALLY DIRECTED
BY THE ARCHITECT. NOTE: WINDBLOWN OBJECTS, WELDING SPARKS,
OR OTHER MATERIAL APPLIED TO THE GLASS SURFACE DURING
CONSTRUCTION MAY CAUSE IRREVERSIBLE DAMAGE.
3.4 CLEANING
A. IMMEDIATELY AFTER INSTALLATION REMOVE NONPERMANENT
LABELS AND CLEAN SURFACES.
B. PROTECT GLASS FROM CONTACT WITH CONTAMINATING
SUBSTANCES RESULTING FROM CONSTRUCTION OPERATIONS.
EXAMINE GLASS SURFACES ADJACENT TO OR BELOW EXTERIOR
CONCRETE AND OTHER MASONRY SURFACES AT FREQUENT
INTERVALS DURING CONSTRUCTION, BUT NOT LESS THAN ONCE
A MONTH, FOR BUILDUP OF DIRT, SCUM, ALKALINE DEPOSITS, OR
STAINS.
4. IF, DESPITE SUCH PROTECTION, CONTAMINATING
SUBSTANCES DO COME INTO CONTACT WITH GLASS, REMOVE
SUBSTANCES IMMEDIATELY AS RECOMMENDED IN WRITING BY
GLASS MANUFACTURER. REMOVE AND REPLACE GLASS THAT
CANNOT BE CLEANED WITHOUT DAMAGE.
END OF SECTION 088000
DIVISION 9 - FINISHES
SECTION 09 2900 GYPSUM BOARD
1. PROVIDE GYPSUM WALL PANELS MANUFACTURED IN ACCORDANCE
WITH REQUIREMENTS OF ASTM 336.
2. PROVIDE METAL EDGE AND CORNER BEADS AT ENDS, EDGES AND
CORNERS.
3. WATER RESISTANT GYPSUM WALL BOARD SHALL BE 5/8” THICK
TAPERED AND ROUNDED EDGES AND SHALL BE INSTALLED IN ALL WET
AREAS AS INDICATED ON DRAWINGS. (“GREEN BOARD” IS NOT ALLOWED)
4. PROVIDE FASTENERS IN ACCORDANCE WITH ASTM C646: UNLESS
OTHERWISE NOTED OR INDICATED, PROVIDE TYPE “S” BUGLE HEAD
SCREWS FOR ATTACHMENT OF WALL BOARD TO METAL FRAMING, AND
TYPE “S” PAN HEAD SCREWS FOR ATTACHMENT OF FRAMING TO DOOR
FRAMES.
5. PROVIDE ALL INCIDENTAL AND ACCESSORY MATERIALS, TOOLS,
EQUIPMENT AND METHODS REQUIRED FOR SATISFACTORY COMPLETION
OF GYPSUM WALL BOARD CONSTRUCTION INCLUDING ACCESS DOORS
AND PANELS.
6. APPLY CONTINUOUS BEAD SEALANT AT ALL JOINTS OF WALL BOARD
ABUTTING ADJACENT CONSTRUCTION, INCLUDING AROUND FRAMED
OPENINGS AND OTHER PROTRUSIONS THROUGH WALL BOARD WHERE
SEALANT IS EXPOSED. PROVIDE POLY-SULFIDE SEALANT; WHERE
UNEXPOSED. PROVIDE ACOUSTIC SEALANT.
7. APPLY PRE-FILL COMPOUND TO JOINTS IN ACCORDANCE WITH
INDUSTRY STANDARDS. APPLY EMBEDDING COMPOUND REINFORCING
TAPE CENTERED OVER JOINT; APPLY SKIM COAT. AFTER TAPING AND
EMBEDDING COMPOUND IS DRY, APPLY SECOND COAT FILLING AND
TAPER FLUSH WITH SURFACE: FIRE TAPE PENETRATIONS AT DEMISING
WALLS, CORRIDOR ENVELOPE AND OTHER RATED ASSEMBLIES.
8. PROVIDE FINAL FINISH THAT IS SMOOTH, WITHOUT DIVOTS, BUMPS,
BOWS OR ANY OTHER SURFACE BLEMISH READY TO RECEIVE PAINT
UNLESS NOTED OTHERWISE. ALL GYPSUM WALL BOARD FINISHES TO
BE BE DETERMINED BY OWNER (LEVEL-3-4 OR TO MATCH EXISTING IF
CURRENT FINISHES ARE NOT REMOVED)
SECTION 09 6513 - RESILIENT BASE AND ACCESSORIES
PART 1 - GENERAL
1.1 SUMMARY
A. SECTION INCLUDES:
1. RESILIENT BASE.
1.2 SUBMITTALS
A. ACTION SUBMITTALS
A. PRODUCT DATA: FOR EACH TYPE OF PRODUCT.
B. SAMPLES: FOR EACH EXPOSED PRODUCT AND FOR EACH
COLOR AND TEXTURE SPECIFIED, NOT LESS THAN 12 INCHES
LONG.
PART 2 - PRODUCTS
2.1 THERMOSET-RUBBER BASE
A. PRODUCT STANDARD: ASTM F 1861, TYPE TS (RUBBER,
VULCANIZED THERMOSET), GROUP I (SOLID, HOMOGENEOUS).
1. STYLE : STRAIGHT
B. THICKNESS: 0.125 “.
C. HEIGHT: AS INDICATED ON DRAWINGS.
D. LENGTHS: COILS IN MANUFACTURER’S STANDARD LENGTH.
E. OUTSIDE CORNERS: PREFORMED.
F. INSIDE CORNERS: JOB FORMED OR PREFORMED.
G. COLORS: AS SELECTED BY OWNER FROM FULL RANGE OF
INDUSTRY COLORS.
2.2 RUBBER MOLDING ACCESSORY
A. DESCRIPTION: TRANSITION STRIPS.
B. PROFILE AND DIMENSIONS: AS INDICATED.
C. LOCATIONS: PROVIDE RUBBER MOLDING ACCESSORIES IN
AREAS INDICATED.
D. COLORS AND PATTERNS: AS SELECTED BY ARCHITECT FROM
FULL RANGE OF INDUSTRY COLORS.
2.3 INSTALLATION MATERIALS
A. TROWELABLE LEVELING AND PATCHING COMPOUNDS: LATEX-
MODIFIED, PORTLAND CEMENT BASED OR BLENDED HYDRAULIC-
CEMENT-BASED FORMULATION PROVIDED OR APPROVED BY
RESILIENT-PRODUCT MANUFACTURER FOR APPLICATIONS
INDICATED.
B. ADHESIVES: WATER-RESISTANT TYPE RECOMMENDED BY
RESILIENT-PRODUCT MANUFACTURER FOR RESILIENT PRODUCTS
AND SUBSTRATE CONDITIONS INDICATED.
PART 3 - EXECUTION
3.1 PREPARATION
A. PREPARE SUBSTRATES ACCORDING TO MANUFACTURER’S
WRITTEN INSTRUCTIONS TO ENSURE ADHESION OF RESILIENT
PRODUCTS.
B. FILL CRACKS, HOLES, AND DEPRESSIONS IN SUBSTRATES
WITH TROWELABLE LEVELING AND PATCHING COMPOUND; REMOVE
BUMPS AND RIDGES TO PRODUCE A UNIFORM AND SMOOTH
SUBSTRATE.
C. DO NOT INSTALL RESILIENT PRODUCTS UNTIL THEY ARE
THE SAME TEMPERATURE AS THE SPACE WHERE THEY ARE TO BE
INSTALLED.
D. IMMEDIATELY BEFORE INSTALLATION, SWEEP AND VACUUM
CLEAN SUBSTRATES TO BE COVERED BY RESILIENT PRODUCTS.
3.2 RESILIENT BASE INSTALLATION
A. COMPLY WITH MANUFACTURER’S WRITTEN INSTRUCTIONS
FOR INSTALLING RESILIENT BASE.
B. APPLY RESILIENT BASE TO WALLS, COLUMNS, PILASTERS,
CASEWORK AND CABINETS IN TOE SPACES, AND OTHER PERMANENT
FIXTURES IN ROOMS AND AREAS WHERE BASE IS REQUIRED.
C. INSTALL RESILIENT BASE IN LENGTHS AS LONG AS PRACTICAL
WITHOUT GAPS AT SEAMS AND WITH TOPS OF ADJACENT PIECES
ALIGNED.
D. TIGHTLY ADHERE RESILIENT BASE TO SUBSTRATE
THROUGHOUT LENGTH OF EACH PIECE, WITH BASE IN CONTINUOUS
CONTACT WITH HORIZONTAL AND VERTICAL SUBSTRATES.
E. DO NOT STRETCH RESILIENT BASE DURING INSTALLATION.
F. PREFORMED CORNERS: INSTALL PREFORMED CORNERS
BEFORE INSTALLING STRAIGHT PIECES.
3.3 RESILIENT ACCESSORY INSTALLATION
A. COMPLY WITH MANUFACTURER’S WRITTEN INSTRUCTIONS
FOR INSTALLING RESILIENT ACCESSORIES.
B. RESILIENT MOLDING ACCESSORIES: BUTT TO ADJACENT
MATERIALS AND TIGHTLY ADHERE TO SUBSTRATES THROUGHOUT
LENGTH OF EACH PIECE. INSTALL REDUCER STRIPS AT EDGES OF
FLOOR COVERING THAT WOULD OTHERWISE BE EXPOSED.
3.4 CLEANING AND PROTECTION
A. COMPLY WITH MANUFACTURER’S WRITTEN INSTRUCTIONS
FOR CLEANING AND PROTECTING RESILIENT PRODUCTS.
B. COVER RESILIENT PRODUCTS SUBJECT TO WEAR AND FOOT
TRAFFIC UNTIL SUBSTANTIAL COMPLETION.
END OF SECTION 09 6513
SECTION 09 9113 EXTERIOR PAINTING
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes surface preparation and the application of paint systems
on the following exterior substrates:
1. Concrete.
2. Clay masonry.
3. Concrete masonry units (CMU).
4. Steel.
5. Galvanized metal.
6. Aluminum (not anodized or otherwise coated).
7. Wood.
8. Plastic trim fabrications.
9. Exterior portland cement (stucco).
10. Exterior gypsum board.
1.2 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Samples: For each fi nish and for each color and texture required.
C. Product List: Printout of current “MPI Approved Products List” for each
product category specifi ed in Part 2, with the proposed product highlighted.
1.3 QUALITY ASSURANCE
A. MPI Standards:
1. Products: Complying with MPI standards indicated and listed in “MPI
Approved Products List.”
2. Preparation and Workmanship: Comply with requirements in “MPI
Architectural Painting Specifi cation Manual” for products and paint systems
indicated.
B. Mockups: Apply benchmark samples of each paint system indicated and
each color and fi nish selected to verify preliminary selections made under sample
submittals and to demonstrate aesthetic effects and set quality standards for
materials and execution.
1. Architect will select one surface to represent surfaces and conditions for
application of each paint system specifi ed in Part 3.
a. Vertical and Horizontal Surfaces: Provide samples of at least 100 sq. ft..
b. Other Items: Architect will designate items or areas required.
2. Final approval of color selections will be based on benchmark samples.
a. If preliminary color selections are not approved, apply additional benchmark
samples of additional colors selected by Architect at no added cost to Owner.
1.4 EXTRA MATERIALS
A. Furnish extra materials described below that are from same production run
(batch mix) as materials applied and that are packaged for storage and identifi ed
with labels describing contents.
1. Quantity: Furnish an additional 5 percent, but not less than 1 gal. of each
material and color applied.
PART 2 - PRODUCTS
2.1 PAINT, GENERAL
A. Material Compatibility:
1. Provide materials for use within each paint system that are compatible with
one another and substrates indicated, under conditions of service and application as
demonstrated by manufacturer, based on testing and fi eld experience.
2. For each coat in a paint system, provide products recommended in writing by
manufacturers of topcoat for use in paint system and on substrate indicated.
B. Colors: As selected by Architect from manufacturer’s full range.
2.2 BLOCK FILLERS
A. Interior/Exterior Latex Block Filler: Block fi llers:
1. Block fi ller shall be used on interior painted surfaces of CMU walls and
Exterior surfaces of CMU prior to installation of fl uid applied membranes. Block fi ller
shall be coordinated to be compatible with fl uid applied membranes.
2.3 PRIMERS/SEALERS
A. Bonding Primer (Water Based):
B. Wood-Knot Sealer: Sealer recommended in writing by topcoat manufacturer
for use in paint system indicated.
2.4 WOOD PRIMERS
A. Exterior Latex Wood Primer: Compatible and recommended for use with
Superpaint
2.5 EXTERIOR LATEX PAINTS
A. Exterior Latex (Satin): Sherwin Williams Superpaint Acrylic Latex (Min. two
coats).
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions, with Applicator present, for compliance
with requirements for maximum moisture content and other conditions affecting
performance of work.
B. Maximum Moisture Content of Substrates: When measured with an
electronic moisture meter as follows:
1. Concrete: 12 percent.
2. Masonry (Clay and CMU): 12 percent.
3. Wood: 15 percent.
4. Plaster: 12 percent.
5. Gypsum Board: 12 percent.
C. Verify suitability of substrates, including surface conditions and compatibility
with existing fi nishes and primers.
D. Begin coating application only after unsatisfactory conditions have been
corrected and surfaces are dry.
1. Beginning coating application constitutes Contractor’s acceptance of
substrates and conditions.
3.2 PREPARATION AND APPLICATION
A. Comply with manufacturer’s written instructions and recommendations in
“MPI Architectural Painting Specifi cation Manual” applicable to substrates and paint
systems indicated.
B. Clean substrates of substances that could impair bond of paints, including
dirt, oil, grease, and incompatible paints and encapsulants.
1. Remove incompatible primers and reprime substrate with compatible primers
as required to produce paint systems indicated.
C. Apply paints to produce surface fi lms without cloudiness, spotting,
holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface
imperfections. Cut in sharp lines and color breaks.
D. Protect work of other trades against damage from paint application. Correct
damage to work of other trades by cleaning, repairing, replacing, and refi nishing, as
approved by Architect, and leave in an undamaged condition.
E. At completion of construction activities of other trades, touch up and restore
damaged or defaced painted surfaces.
3.3 EXTERIOR PAINTING SCHEDULE
A. Wood Panel Substrates: Including fascias & soffi ts.
1. Latex System: MPI EXT 6.4K.
a. Prime Coat: Exterior latex wood primer.
b. Intermediate Coat: Exterior latex matching topcoat.
c. Topcoat: Exterior latex satin.
B. Dimension Lumber Substrates, Nontraffi c .
1. Latex System: MPI EXT 6.2M.
a. Prime Coat: Exterior latex wood primer.
b. Intermediate Coat: Exterior latex matching topcoat.
c. Topcoat: Exterior latex satin.
C. Exterior Gypsum Board Substrates:
1. Latex System: MPI EXT 9.2A.
a. Prime Coat: Exterior latex matching topcoat.
b. Intermediate Coat: Exterior latex matching topcoat.
c. Topcoat: Exterior latex satin.
END OF SECTION 099113
SECTION 09 9123 INTERIOR PAINTING
1. CONTRACTOR TO SUBMIT PAINTING DRAW DOWN SAMPLES WITH
SPECIFICATION DATA TO OWNERFOR VERIFICATION AND APPROVAL IN
WRITING PRIOR TO FABRICATION.
2. PROVIDE PAINT FINISHES FOR BUILDING AND OTHER SURFACES AS
SCHEDULED ON DRAWINGS OR AS SPECIFIED HEREAFTER INCLUDING
SEALING OF CONCRETE FLOOR. NO PAINT FINISH IS REQUIRED ON ITEMS
HAVING COMPLETE FACTORY FINISH, EXCEPT AS SPECIFIED HEREAFTER:
PUTTY AND/OR SEALANT AT ALUMINUM WINDOWS: NON-FERROUS METAL
UNLESS SPECIFICALLY MENTIONED IN THE PAINTING SCHEDULE: STAINLESS
STEEL; INTERIOR OR EXTERIOR OF EXISTING BUILDING. NO PAINTING IS
REQUIRED FOR INSULATING PIPING, EXCEPT WHERE EXPOSED IN FINISH,
NON-MECHANICAL ROOM SPACES.
3. PROTECT WORK OF OTHER TRADES FROM DAMAGE AND
DEFACEMENT CAUSED BY THIS WORK. REPAIR ANY DAMAGE CAUSED BY
THE WORK OF THIS SECTION. REMOVE ELECTRICAL OUTLET AND SWITCH
PLATES, MECHANICAL DIFFUSERS, GRILLES, ESCUTCHEONS, REGISTERS,
SURFACE HARDWARE, FITTINGS AND FASTENINGS PRIOR TO COMMENCING
THE WORK, STORE, CLEAN AND REPLACE UPON COMPLETION.
4. PAINT CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR IF
ANY SURFACE TO BE PAINTED OR STAINED IS FOUND TO BE UNSUITABLE
TO PRODUCE PROPER FINISH. APPLY NO FINISH MATERIAL UNTIL THE
UNSUITABLE SURFACES HAVE BEEN MADE SATISFACTORY. ALL GYPSUM
WALLS TO BE LEVEL 4 FINISH UNLESS NOTED OTHERWISE.
5. FINISH WORK SHALL BE UNIFORM, OF APPROVED COLOR, SMOOTH
AND FREE FROM RUNS. MAKE ENDS OF PAINT ADJOINING OTHER
MATERIALS OR COLORS SHARP AND CLEAN WHERE HIGH GLOSS ENAMEL IS
USED, LIGHTLY SAND UNDERCOAT TO OBTAIN A SMOOTH FINISH COAT.
6. PROVIDE ALL NEWLY PAINTED SURFACES WITH (1) COAT TINTED
PRIMER AND A MINIMUM OF (2) COATS FINAL COLOR COAT, (UNLESS NOTED
OTHERWISE OR RECOMMENDED BY MANUFACTURER’S SPECIFICATIONS)
TO PROVIDE A SOLID, UNIFORM AND DURABLE FINISH. ALLOW PROPER
DRYING TIME BETWEEN COATS.
7. DELIVER ALL PAINT TO JOBSITE IN UNOPENED CONTAINERS BEARING
THE MANUFACTURER’S LABEL, AND SHOWING PAINT TYPE, SHEEN AND
COLOR.
8. PAINT TYPES USED SHALL BE THOSE SPECIFICALLY RECOMMENDED
BY THE MANUFACTURER FOR THE MATERIAL TO WHICH THEY WILL BE
APPLIED. PAINTING CONTRACTOR SHALL FOLLOW MANUFACTURER’S
INSTRUCTIONS FOR PROPER APPLICATION OF THE PAINT.
9. ALL SURFACES TO BE PAINTED SHALL BE THOROUGHLY CLEANED,
AND PREPARED FOR PAINTING PRIOR TO APPLICATION OF PAINT. PROVIDE
VENTILATORS AS REQUIRED TO PREVENT BUILD-UP OF FUMES.
10. SANDPAPER ALL NEW WOOD TO SMOOTH AND EVEN SURFACE AND
DUST OFF. AFTER PRIMING COAT HAS BEEN APPLIED, THOROUGHLY FILL ALL
NAIL HOLES AND OTHER SURFACE IMPERFECTIONS WITH PUTTY TINTED
WITH PRIMER OR STAIN TO MATCH WOOD COLOR. SAND ALL WOODWORK
BETWEEN COATS TO A SMOOTH SURFACE.
11. PRIME ALL SURFACES WHICH RECEIVE PAINT PRIOR TO
APPLICATION OF FINAL FINISH, IN ACCORDANCE WITH MANUFACTURER’S
SPECIFICATIONS.
12. BACK PRIME ALL EXTERIOR AND INTERIOR WOOD AND TRIM PRIOR
TO INSTALLATION. THOROUGHLY CLEAN SURFACES AND APPLY NO
FINISH UNLESS SURFACES ARE DRY AND READY FOR APPLICATION. SAND
SURFACES OF TRIM SMOOTH AND WIPE CLEAN. AFTER STAIN COAT HAS
BEEN APPLIED. FILL CRACKS AND HOLES WITH PLASTIC WOOD OR PUTTY.
IF STAIN HAS BEEN USED, TINT CRACK FILLER TO MATCH; PRIME BACKS OF
TRIM, PRIME BARE WOOD SCHEDULED TO RECEIVE PAINT FINISH; FINISH
NAIL HOLES, CRACKS AND OTHER IMPERFECTIONS WITH PUTTY AND SAND
SMOOTH.
13. AT COMPLETION, TOUCH-UP AND RESTORE FINISH WHERE DAMAGED
AND LEAVE ALL SURFACES IN GOOD AND CLEAN CONDITION. PROVIDE FOR
MULTIPLE SITE VISITS AS REQUIRED FOR TOUCH-UP AND REFINISHING.
14. OTHER PAINT MANUFACTURER’S MATCHING IN QUALITY MAY
BE SUBMITTED FOR REVIEW AS AN ALTERNATE. SUB CONTRACTOR IS
REQUIRED TO COLOR MATCH.
15. COORDINATE WITH DIV 3 CONCRETE FOR SEALED CONCRETE
FLOORS
DIVISION 10 SPECIALTIES
SECTION 102800 – TOILET AND BATH ACCESSORIES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION
01 SPECIFICATION SECTIONS, APPLY TO THIS SECTION.
1.2 SUMMARY
A. SECTION INCLUDES:
1. PRIVATE-USE BATHROOM ACCESSORIES.
2. CHILDCARE ACCESSORIES.
3. UNDERLAVATORY GUARDS.
4. CUSTODIAL ACCESSORIES.
1.3 COORDINATION
A. COORDINATE ACCESSORY LOCATIONS WITH OTHER WORK TO
PREVENT INTERFERENCE WITH CLEARANCES REQUIRED FOR ACCESS
BY PEOPLE WITH DISABILITIES, AND FOR PROPER INSTALLATION,
ADJUSTMENT, OPERATION, CLEANING, AND SERVICING OF
ACCESSORIES.
B. DELIVER INSERTS AND ANCHORING DEVICES SET INTO CONCRETE
OR MASONRY AS REQUIRED TO PREVENT DELAYING THE WORK.
1.4 ACTION SUBMITTALS
A. PRODUCT DATA: FOR EACH TYPE OF PRODUCT.
1. INCLUDE CONSTRUCTION DETAILS, MATERIAL DESCRIPTIONS,
DIMENSIONS OF INDIVIDUAL COMPONENTS AND PROFILES, AND
FINISHES.
2. INCLUDE ANCHORING AND MOUNTING REQUIREMENTS,
INCLUDING REQUIREMENTS FOR CUTOUTS IN OTHER WORK AND
SUBSTRATE PREPARATION.
B. SAMPLES: FULL SIZE, FOR EACH EXPOSED PRODUCT AND FOR EACH
FINISH SPECIFIED.
1. APPROVED FULL-SIZE SAMPLES WILL BE RETURNED AND MAY
BE USED IN THE WORK.
C. PRODUCT SCHEDULE: INDICATING TYPES, QUANTITIES, SIZES, AND
INSTALLATION LOCATIONS BY ROOM OF EACH ACCESSORY REQUIRED.
1. IDENTIFY LOCATIONS USING ROOM DESIGNATIONS INDICATED.
1.5 INFORMATIONAL SUBMITTALS
A. SAMPLE WARRANTY: FOR MANUFACTURER’S SPECIAL WARRANTY.
1.6 CLOSEOUT SUBMITTALS
A. MAINTENANCE DATA: FOR ACCESSORIES TO INCLUDE IN
MAINTENANCE MANUALS.
1.7 WARRANTY
A. MANUFACTURER’S SPECIAL WARRANTY FOR MIRRORS:
MANUFACTURER AGREES TO REPAIR OR REPLACE MIRRORS THAT
FAIL IN MATERIALS OR WORKMANSHIP WITHIN SPECIFIED WARRANTY
PERIOD.
1. FAILURES INCLUDE, BUT ARE NOT LIMITED TO, VISIBLE SILVER
SPOILAGE DEFECTS.
2. WARRANTY PERIOD: 15 YEARS FROM DATE OF SUBSTANTIAL
COMPLETION.
PART 2 - PRODUCTS
2.1 PUBLIC-USE WASHROOM ACCESSORIES
A. SOURCE LIMITATIONS: OBTAIN PUBLIC-USE WASHROOM
ACCESSORIES FROM SINGLE SOURCE FROM SINGLE MANUFACTURER.
B. REFER TO ACCESSORY SCHEDULE FOR REQUIRED ITEMS AND BOD:
2.2 PRIVATE-USE BATHROOM ACCESSORIES
A. SOURCE LIMITATIONS: OBTAIN PRIVATE-USE BATHROOM
ACCESSORIES FROM SINGLE SOURCE FROM SINGLE MANUFACTURER.
B. REFER TO ACCESSORY SCHEDULE FOR REQUIRED ITEMS AND BOD:
2.3 CHILDCARE ACCESSORIES
A. SOURCE LIMITATIONS: OBTAIN CHILDCARE ACCESSORIES FROM
SINGLE SOURCE FROM SINGLE MANUFACTURER.
B. REFER TO ACCESSORY SCHEDULE FOR REQUIRED ITEMS AND BOD
2.4 UNDERLAVATORY GUARDS
A. UNDERLAVATORY GUARD :
1. MANUFACTURERS: SUBJECT TO COMPLIANCE WITH
REQUIREMENTS, AVAILABLE MANUFACTURERS OFFERING PRODUCTS
THAT MAY BE INCORPORATED INTO THE WORK INCLUDE, BUT ARE
NOT LIMITED TO, THE FOLLOWING:
a. BUCKAROOS, INC.
b. PLUMBEREX SPECIALTY PRODUCTS, INC.
c. TRUEBRO BY IPS CORPORATION.
2. DESCRIPTION: INSULATING PIPE COVERING FOR SUPPLY
AND DRAIN PIPING ASSEMBLIES THAT PREVENTS DIRECT CONTACT
WITH AND BURNS FROM PIPING; ALLOW SERVICE ACCESS WITHOUT
REMOVING COVERINGS.
3. MATERIAL AND FINISH: ANTIMICROBIAL, MOLDED PLASTIC,
WHITE.
2.5 CUSTODIAL ACCESSORIES
A. SOURCE LIMITATIONS: OBTAIN CUSTODIAL ACCESSORIES FROM
SINGLE SOURCE FROM SINGLE MANUFACTURER.
B. REFER TO ACCESSORY SCHEDULE FOR REQUIRED ITEMS AND BOD
2.6 MATERIALS
A. STAINLESS STEEL: ASTM A240/A240M OR ASTM A666, TYPE 304, 0.031-
INCH MINIMUM NOMINAL THICKNESS UNLESS OTHERWISE INDICATED.
B. STEEL SHEET: ASTM A1008/A1008M, DESIGNATION CS (COLD ROLLED,
COMMERCIAL STEEL), 0.036-INCH MINIMUM NOMINAL THICKNESS.
C. FASTENERS: SCREWS, BOLTS, AND OTHER DEVICES OF SAME
MATERIAL AS ACCESSORY UNIT AND TAMPER-AND-THEFT RESISTANT
WHERE EXPOSED, AND OF GALVANIZED STEEL WHERE CONCEALED.
D. CHROME PLATING: ASTM B456, SERVICE CONDITION NUMBER SC 2
(MODERATE SERVICE).
E. MIRRORS: ASTM C1503, MIRROR GLAZING QUALITY, CLEAR-GLASS
MIRRORS, NOMINAL 6.0 MM THICK.
2.7 FABRICATION
A. GENERAL: FABRICATE UNITS WITH TIGHT SEAMS AND JOINTS, AND
EXPOSED EDGES ROLLED. HANG DOORS AND ACCESS PANELS WITH
FULL-LENGTH, CONTINUOUS HINGES. EQUIP UNITS FOR CONCEALED
ANCHORAGE AND WITH CORROSION-RESISTANT BACKING PLATES.
B. KEYS: PROVIDE UNIVERSAL KEYS FOR INTERNAL ACCESS TO
ACCESSORIES FOR SERVICING AND RESUPPLYING. PROVIDE MINIMUM
OF SIX KEYS TO OWNER’S REPRESENTATIVE.
PART 3 - EXECUTION
3.1 INSTALLATION
A. INSTALL ACCESSORIES ACCORDING TO MANUFACTURERS’ WRITTEN
INSTRUCTIONS, USING FASTENERS APPROPRIATE TO SUBSTRATE
INDICATED AND RECOMMENDED BY UNIT MANUFACTURER. INSTALL
UNITS LEVEL, PLUMB, AND FIRMLY ANCHORED IN LOCATIONS AND AT
HEIGHTS INDICATED.
B. GRAB BARS: INSTALL TO WITHSTAND A DOWNWARD LOAD OF AT
LEAST 250 LBF, WHEN TESTED ACCORDING TO ASTM F446.
3.2 ADJUSTING AND CLEANING
A. ADJUST ACCESSORIES FOR UNENCUMBERED, SMOOTH OPERATION.
REPLACE DAMAGED OR DEFECTIVE ITEMS.
B. REMOVE TEMPORARY LABELS AND PROTECTIVE COATINGS.
C. CLEAN AND POLISH EXPOSED SURFACES ACCORDING TO
MANUFACTURER’S WRITTEN INSTRUCTIONS.
END OF SECTION 102800
DIVISION 11 - EQUIPMENT
NOT USED
DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING
1. SEE SEPARATE DISCIPLINE SPECIFIC SHEET SPECIFICATIONS FOR
MORE INFORMATION
DIVISION 26 - ELECTRICAL
1. SEE SEPARATE DISCIPLINE SPECIFIC SHEET SPECIFICATIONS FOR
MORE INFORMATION
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
1. SEE SEPARATE DISCIPLINE SPECIFIC SHEET SPECIFICATIONS FOR
MORE INFO
GI101
conformed set
revisions :
p r o j e c t # :
d a t e :
20.0550
- june 4, 2021
11
6
9
7
PRO
F
E
S
S
I
O
N
A
L
EN G I N E E R
R
E
G
I
S
T
ERE D
S T ATE
O
F
I
D
A
H
O
M A R KEL
L
B
A
T
E
M
A
N
6/
3
/
2
1
03
/
2
9
/
2
0
2
1
P
E
R
M
I
T
S
E
T
04
/
0
7
/
2
0
2
1
B
I
D
S
E
T
06
/
0
4
/
2
0
2
1
A
S
I
#
0
0
2
PR
O
J
E
C
T
M
A
N
A
G
E
R
:
CA
D
O
P
E
R
A
T
O
R
:
DATE:
JO
B
N
O
.
:
ST
R
U
C
T
U
R
A
L
E
N
G
I
N
E
E
R
S
S
E
A
L
:
PR
O
J
E
C
T
:
CL
I
E
N
T
:
RE
V
.
DA
T
E
BY
DE
S
C
R
I
P
T
I
O
N
2 3 4 5
CURRENT REV.
Th
i
s
d
r
a
w
i
n
g
i
s
t
h
e
p
r
o
p
e
r
t
y
o
f
F
R
O
S
T
S
t
r
u
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
,
In
c
.
L
e
g
a
l
l
y
,
t
h
e
d
r
a
w
i
n
g
c
a
n
N
O
T
b
e
c
o
p
i
e
d
i
n
w
h
o
l
e
o
r
i
n
pi
e
c
e
s
.
I
t
i
s
o
n
l
y
t
o
b
e
u
s
e
d
f
o
r
t
h
e
p
r
o
j
e
c
t
a
n
d
s
i
t
e
s
p
e
c
i
f
i
c
a
l
l
y
id
e
n
t
i
f
i
e
d
h
e
r
e
o
n
a
n
d
i
s
n
o
t
t
o
b
e
u
s
e
d
o
n
a
n
y
o
t
h
e
r
p
r
o
j
e
c
t
.
Co
n
t
r
a
c
t
o
r
s
h
a
l
l
c
a
r
e
f
u
l
l
y
r
e
v
i
e
w
a
l
l
d
i
m
e
n
s
i
o
n
s
,
d
e
t
a
i
l
s
,
a
n
d
co
n
d
i
t
i
o
n
s
a
n
d
r
e
p
o
r
t
a
t
o
n
c
e
a
n
y
e
r
r
o
r
,
i
n
c
o
n
s
i
s
t
e
n
c
y
o
r
om
i
s
s
i
o
n
d
i
s
c
o
v
e
r
e
d
b
e
f
o
r
e
c
o
n
s
t
r
u
c
t
i
o
n
.
Th
e
c
o
n
t
r
a
c
t
o
r
a
s
s
u
m
e
s
f
u
l
l
l
i
a
b
i
l
i
t
y
f
o
r
d
e
v
i
a
t
i
o
n
s
f
r
o
m
t
h
e
in
t
e
n
t
o
f
t
h
e
s
e
p
l
a
n
s
.
1
St
r
u
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
fa
x
:
2
0
8
.
2
2
7
.
8
4
0
5
10
2
0
E
.
L
i
n
c
o
l
n
R
o
a
d
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
ph
o
n
e
:
2
0
8
.
2
2
7
.
8
4
0
4
co
n
t
a
c
t
@
f
r
o
s
t
-
s
t
r
u
c
t
u
r
a
l
.
c
o
m
S1.0
6/3/21
RE
X
B
U
R
G
R
O
W
H
O
U
S
E
S
KY
L
E
R
H
O
K
A
N
S
O
FA
C
MT
B
IF
2
1
-
0
0
7
GE
N
E
R
A
L
S
T
R
U
C
T
U
R
A
L
N
O
T
E
S
RE
X
B
U
R
G
,
I
D
A
H
O
--
-
-
--
-
-
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
GENERAL STRUCTURAL NOTES
(APPLY UNLESS NOTED OTHERWISE ON PLANS/DETAILS)
GENERAL REQUIREMENTS:
1.THE STRUCTURAL SYSTEMS AND MEMBERS DEPICTED HEREIN HAVE BEEN DESIGNED
PRIMARILY TO SAFEGUARD AGAINST MAJOR STRUCTURAL DAMAGE AND LOSS OF
LIFE, NOT TO LIMIT DAMAGE OR MAINTAIN FUNCTION (IBC SECTION 101.3).
2.THESE DRAWINGS, AND THEIR ASSOCIATED STRUCTURAL CALCULATIONS, HAVE
BEEN PERFORMED USING STANDARDS OF PROFESSIONAL CARE AND
COMPLETENESS NORMALLY EXERCISED UNDER SIMILAR CIRCUMSTANCES BY
REPUTABLE STRUCTURAL ENGINEER'S IN THIS OR SIMILAR LOCALITIES. THEY
NECESSARILY ASSUME THAT THE WORK DEPICTED WILL BE PERFORMED BY AN
EXPERIENCED CONTRACTOR AND/OR WORKMEN WHO HAVE A WORKING
KNOWLEDGE OF THE INTERNATIONAL BUILDING CODE CONVENTIONAL FRAMING
REQUIREMENTS AND OF INDUSTRY ACCEPTED STANDARD GOOD PRACTICE. AS NOT
EVERY CONDITION OR FRAMING ELEMENT IS (OR CAN BE) EXPLICITLY SHOWN ON
THESE DRAWINGS, IT IS UNDERSTOOD THAT THE CONTRACTOR WILL USE INDUSTRY
ACCEPTED STANDARD GOOD PRACTICE FOR ALL MISCELLANEOUS WORK NOT
EXPLICITLY SHOWN.
3.THESE DRAWINGS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE
THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL BE SOLELY
RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES
AND PROCEDURES. CONSTRUCTION MATERIALS SHALL BE SPREAD OUT IF PLACED
ON FRAMED CONSTRUCTION SUCH THAT DESIGN LIVE LOAD PER SQUARE FOOT AS
STATED HEREIN IS NOT EXCEEDED. OPTIONS ARE FOR CONTRACTOR'S
CONVENIENCE. IF AN OPTION IS USED, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR ALL NECESSARY CHANGES, AND SHALL COORDINATE ALL DETAILS.
4.WHERE DISCREPANCIES OCCUR BETWEEN PLANS, DETAILS, GENERAL STRUCTURAL
NOTES AND SPECIFICATIONS, THE GREATER REQUIREMENTS SHALL GOVERN.
TYPICAL DETAILS AND NOTES ARE NOT NECESSARILY INDICATED ON THE PLANS, BUT
SHALL APPLY NONE-THE-LESS. WHERE NO DETAILS ARE SHOWN, CONSTRUCTION
SHALL CONFORM TO SIMILAR WORK ON THE PROJECT. DETAILS MAY SHOW ONLY
ONE SIDE OF CONNECTION OR MAY OMIT INFORMATION FOR CLARITY.
5.ESTABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR ARCHITECTURAL,
MECHANICAL, PLUMBING AND ELECTRICAL WITH APPROPRIATE TRADES, DRAWINGS
AND SUBCONTRACTORS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL BE
RESPONSIBLE FOR VERIFICATION OF ALL DIMENSIONS WITH ARCHITECTURAL
DRAWINGS PRIOR TO START OF CONSTRUCTION. RESOLVE ANY DISCREPANCY WITH
THE ARCHITECT AND STRUCTURAL ENGINEER.
6.ANY INSPECTIONS, SPECIAL (IBC CHAPTER 17) OR OTHERWISE THAT ARE REQUIRED
BY THE BUILDING CODES, LOCAL BUILDING DEPARTMENTS, OR BY THESE PLANS
SHALL BE DONE BY AN INDEPENDENT INSPECTION COMPANY OR THE BUILDING
DEPARTMENT, SITE VISITS BY THE STRUCTURAL ENGINEER DO NOT CONSTITUTE AN
OFFICIAL INSPECTION, UNLESS SPECIFICALLY CONTRACTED FOR.
BASIS FOR DESIGN:
1.BUILDING CODE: 2018 EDITION OF THE IBC WITH CITY/COUNTY AMENDMENTS.
RISK CATEGORY = II
4. SEISMIC DESIGN PARAMETERS:
ANALYSIS PROCEDURE EQUIVALENT LATERAL FORCE
PROCEDURE
IMPORTANCE FACTOR Ie = 1.00
SITE CLASS D
SEISMIC DESIGN CATEGORY D
MAPPED SPECTRAL RESPONSE
ACCELERATIONS S1 = 0.219, SS = 0.366
DESIGN SPECTRAL RESPONSE
ACCELERATIONS SD1 = 0.219, SDS = 0.368
PERCENT SNOW INCLUDED WITH
SEISMIC LOADS 20
VERTICAL SHEAR TRANSFER ELEMENTS:
PLYWOOD SHEARWALL(S)R = 6.5, CS = 0.069
GYPCRETE SHEARWALL(S)R=2, CS=0.184
5. WIND DESIGN PARAMETERS (STRENGTH):
ULTIMATE WIND SPEED 105 MPH (3 SECOND GUST)
WIND EXPOSURE C
IMPORTANCE FACTOR Iw = 1.00
INTERNAL PRESSURE COEFFICIENT -0.18
COMPONENT AND CLADDING PRESSURE 32.2 PSF
NET UPLIFT ON ROOF 13.8 PSF
2. VERTICAL LOADS:
LOCATION LIVE / SNOW
LOAD DEAD LOAD
ROOF 35 PSF 15 PSF
3. DEFLECTION LIMITS:
ELEMENTS LIVE LOAD TOTAL LOAD
ROOF TRUSSES/JOISTS L/360 L/240
BEAMS L/360 L/240
FOUNDATION NOTES:
1.IN LIEU OF A GEOTECHNICAL REPORT: THE FOUNDATION HAS BEEN DESIGNED
ACCORDING TO THE RECOMMENDATIONS OF CHAPTER 18 OF THE IBC.
2.THE SOIL DESIGN VALUES LISTED BELOW HAVE BEEN APPROVED BY THE
CITY/COUNTY BUILDING DEPARTMENT, CONTINGENT THAT THE SOIL ON THE SITE
PREDOMINATELY CONSISTS OF SAND AND/OR GRAVEL.
SPECIFIC SOIL CLASSIFICATIONS SHOULD BE ONE OF THE FOLLOWING: SANDY
GRAVEL OR GRAVEL(GW OR GP), SAND(SW AND SP), SILTY SAND(SM), CLAYEY
SAND(SC), SILTY GRAVEL(GM), OR CLAYEY GRAVEL(GC). THESE SOIL
CLASSIFICATIONS CAN BE FOUND IN TABLE 1806.2 OF CHAPTER 18 OF THE IBC.
VERIFICATION OF SOIL CLASSIFICATION IS THE RESPONSIBILITY OF THE
CONTRACTOR.
3.A ONE-THIRD INCREASE IN BEARING PRESSURES IS ALLOWED WITH SEISMIC OR
WIND LOAD COMBINATIONS. LATERAL BEARING AND LATERAL SLIDING RESISTANCE
MAY BE COMBINED.
4.ALL FOUNDATIONS SHALL BEAR ON COMPACTED ENGINEERED FILL OR COMPETENT
NATIVE SOIL SUBBASE COMPACTED TO 95% DRY DENSITY (STANDARD PROCTOR).
GRADE IS DEFINED AS LOWEST ADJACENT GRADE WITHIN 5 FEET OF THE BUILDING
FOR PERIMETER FOOTINGS. WHERE EXTERIOR PAVING OR CONCRETE IS DIRECTLY
ADJACENT TO BUILDING, GRADE IS DEFINED AS TOP OF EXTERIOR PAVING AT LEAST
5 FEET FROM BUILDING. CONCRETE FOOTING EXCAVATIONS SHALL BE CLEAN AND
FREE OF LOOSE DEBRIS OR UN-COMPACTED MATERIAL AT TIME OF CONCRETE
PLACEMENT.
5.CONCRETE SLABS ON GRADE SHALL BE SUPPORTED ON A 4 INCH (MIN) LAYER OF
FREE-DRAINING GRANULAR MAT (DRAINAGE FILL COURSE). THE MAT SHOULD
CONSIST OF A WELL GRADED SAND AND GRAVEL MIXTURE WITH MAXIMUM 3/4-INCH
CRUSHED AGGREGATE. THE GRANULAR MAT SHOULD BE COMPACTED TO NO LESS
THAN 95% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY ASTM D1557.
6.BACKFILL AGAINST RESTRAINED WALLS SHALL NOT BE PLACED UNTIL AFTER THE
WALLS ARE SUPPORTED BY THE COMPLETION OF INTERIOR FLOOR SYSTEMS AND
CONCRETE OR GROUT STRENGTH HAS REACHED THE 28 DAY STRENGTH LISTED
BELOW.
THE SOIL DESIGN VALUES FOR THE FOUNDATION ARE:
ALLOWABLE BEARING PRESSURE 1500 PSF
ALLOWABLE LATERAL BEARING PRESSURE 150 PSF/FT
ALLOWABLE LATERAL SLIDING COEFFICIENT 0.25
LATERAL BACKFILL PRESSURE (UNRESTRAINED)30 PSF/FT
LATERAL BACKFILL PRESSURE (RESTRAINED)50 PSF/FT
FOUNDATION BEARING DEPTH
36" BELOW FINISHED GRADE
CONCRETE:
2.ALL NORMAL WEIGHT CONCRETE SHALL BE REGULAR WEIGHT OF 150 POUNDS PER
CUBIC FOOT USING HARD-ROCK AGGREGATES. AGGREGATE USED IN CONCRETE
SHALL CONFORM TO ASTM C33.
3.LAP SPLICES FOR BEAMS AND FLOOR SLABS SLABS SHALL BE ACCORDING TO
CHAPTER 12 OF ACI 318 OR LAP SCHEDULE ON THESE DRAWINGS.
STAGGER SPLICES A MINIMUM OF ONE LAP LENGTH. NO TACK WELDING OF
REINFORCING BARS ALLOWED WITHOUT PRIOR REVIEW OF PROCEDURE WITH THE
STRUCTURAL ENGINEER. LATEST ACI CODE AND DETAILING MANUAL APPLY. PROVIDE
BENT CORNER BARS TO MATCH AND LAP WITH HORIZONTAL BARS AT ALL CORNERS
AND INTERSECTIONS PER TYPICAL DETAILS. VERTICAL WALL BARS SHALL BE
SPLICED AT OR NEAR FLOOR LINES.
4.ALL DIMENSIONS SHOWING THE LOCATION OF REINFORCING STEEL NOT NOTED AS
"CLEAR" OR "CLR" ARE TO CENTER OF STEEL. MINIMUM COVER FOR
NON-PRESTRESSED CONCRETE REINFORCING SHALL BE AS FOLLOWS:
5.MAXIMUM SLUMP FOR ALL CONCRETE SHALL BE 6". PORTLAND CEMENT SHALL
CONFORM TO ASTM C150. TYPE V CEMENT SHALL BE USED FOR CONCRETE IN
CONTACT WITH ALKALINE SOIL, AND TYPE II ELSEWHERE.
6.NO MORE THAN 90 MINUTES SHALL ELAPSE BETWEEN CONCRETE BATCHING AND
CONCRETE PLACEMENT UNLESS APPROVED BY THE TESTING AGENCY.
7.CONCRETE PLACEMENT AND QUALITY SHALL BE PER RECOMMENDATIONS IN ACI 614,
ACI 301 AND ACI 318. MECHANICALLY VIBRATE ALL CONCRETE WHEN PLACED,
EXCEPT THAT SLABS ON GRADE NEED BE VIBRATED ONLY AROUND AND UNDER
FLOOR DUCTS, ETC. CAST CLOSURE POUR, WHERE SHOWN ON PLANS AROUND
COLUMNS AFTER COLUMN DEAD LOAD IS APPLIED. REMOVE ALL DEBRIS FROM
FORMS BEFORE PLACING CONCRETE.
ALL ITEMS TO BE CAST IN CONCRETE SUCH AS REINFORCING, DOWELS, BOLTS,
ANCHORS, PIPES, SLEEVES, ETC., SHALL BE SECURELY POSITIONED IN THE FORMS
BEFORE PLACING THE CONCRETE.
8.ALL CONCRETE SLABS ON GRADE SHALL BE DIVIDED INTO AREAS BY CONTROL
JOINTS (KEYED OR SAW CUT) SUCH THAT ONE SLAB AREA DOES NOT EXCEED A
MAXIMUM LENGTH OF 24 TIMES THE SLAB THICKNESS IN BOTH DIRECTIONS
(EXAMPLE: 4" SLAB = 8'-0" LENGTH). SQUARE LAYOUTS ARE PREFERRED, BUT THE
SLAB GEOMETRY MAY DICTATE OTHERWISE. THE RATIO OF THE LONG TO SHORT
DISTANCE SHALL NOT EXCEED 1.3. IT IS RECOMMENDED THAT SAW CUTS BE MADE
WITHIN 16 HOURS OF CONCRETE BATCHING.
KEYED CONTROL JOINTS NEED ONLY OCCUR AT EXPOSED EDGES DURING POURING,
ALL OTHER JOINTS MAY BE SAW CUT.
9.HORIZONTAL PIPES AND ELECTRICAL CONDUITS SHALL NOT BE EMBEDDED IN
STRUCTURAL CONCRETE AND SLABS ON GRADE EXCEPT WHERE SPECIFICALLY
APPROVED OR NOTED BY THE STRUCTURAL ENGINEER. PIPES AND CONDUITS SHALL
NOT IMPAIR THE STRENGTH OF THE WORK.
10.FLY ASH MAY BE USED ONLY IF PERMITTED BY ARCHITECTURAL SPECIFICATIONS
AND SHALL BE LIMITED TO 18 PERCENT OF CEMENTITIOUS MATERIALS AND SHALL
HAVE A REPLACEMENT FACTOR OF 1.2 RELATIVE TO CEMENT REPLACED. NO FLY ASH
ADDITIVES SHALL BE USED IN FLATWORK OR ARCHITECTURALLY EXPOSED
CONCRETE.
11.COLD/HOT WEATHER CONCRETE CONSTRUCTION: PROTECT CONCRETE FROM
DAMAGE OR REDUCED STRENGTH IN COMPLIANCE WITH ACI 305 AND 306.
12.CONCRETE MIXES SHALL BE DESIGNED BY A CERTIFIED LABORATORY AND
APPROVED BY THE STRUCTURAL ENGINEER.
13.LIMIT ALKALI-SILICA REACTION (ASR) TO 0.1% EXPANSION AT 28 DAYS IN CONCRETE
MIX AT ALL EXTERIOR CONCRETE AND INTERIOR CONCRETE EXPOSED TO MOISTURE.
LOCATION:MINIMUM
COVER TOLERANCE
CAST AGAINST EARTH (FOOTINGS)3"± 3 8"
SLABS ON GRADE 112"± 14"
EXPOSED TO EARTH OR WEATHER - #5 AND SMALLER 112"± 3 8"
EXPOSED TO EARTH OR WEATHER - #6 AND LARGER 2"± 3 8"
NOT EXPOSED TO WEATHER OR IN CONTACT WITH THE
GROUND ROOF SLAB 1"18"
STRUCTURAL SLABS AND WALLS 3 4"18"
BEAMS AND COLUMNS (PRIMARY) REINFORCEMENT,
TIES, STIRRUPS AND SPIRALS 112"3 8"
1. MINIMUM 28 DAY CONCRETE STRENGTH SHALL BE AS FOLLOWS:
USE:CONCRETE
STRENGTH:
MAX W/C
RATIO
AIR
ENTRAINMENT
FOOTINGS 3500 PSI 0.50 5.5% ± 1%
FOUNDATION WALLS 4500 PSI 0.45 5.5% ± 1%
INTERIOR CONCRETE
SLABS ON GRADE 3500 PSI 0.45 N/A
REINFORCING STEEL:
1.ASTM A615 GRADE 60 (FY = 60 KSI) DEFORMED BARS FOR ALL BARS #4 AND LARGER.
ASTM A615 GRADE 40 (FY = 40 KSI) DEFORMED BARS FOR ALL BARS #3 AND SMALLER.
GRADE 60 DEFORMED BARS SHALL BE USED FOR CONCRETE WALLS, BEAMS,
ELEVATED SLABS AND COLUMN REINFORCING.
2.WELDING OF REINFORCING BARS SHALL BE MADE ONLY TO ASTM A706 GRADE 60
BARS AND ONLY USING E90 SERIES RODS. WELDING OF REINFORCING BARS SHALL
BE MADE ONLY AT LOCATIONS SHOWN ON PLANS OR DETAILS.
3.REINFORCING BAR SPACING GIVEN ARE MAXIMUM ON CENTERS. ALL BARS PER CRSI
SPECIFICATIONS AND HANDBOOK. DOWEL ALL VERTICAL REINFORCING TO
FOUNDATION. SECURELY TIE ALL BARS IN LOCATION BEFORE PLACING CONCRETE.
WOOD:
1.GENERAL: DO NOT NOTCH OR DRILL JOISTS, BEAMS, OR LOAD BEARING STUDS
WITHOUT PRIOR APPROVAL OF THE STRUCTURAL ENGINEER THROUGH THE
ARCHITECT. DOUBLE UP JOISTS AND BLOCKING UNDER PARTITIONS. PROVIDE 2"
(NOMINAL) SOLID BLOCKING AT SUPPORTS OF ALL JOISTS. UNLESS NOTED
OTHERWISE ON PLANS/DETAILS PROVIDE 2x SOLID BLOCKING AT MID-HEIGHT OF
BEARING STUD WALLS. ALL NAILING NOT NOTED SHALL BE ACCORDING TO IBC TABLE
2304.10.1. JOIST HANGERS AND OTHER MISC. FRAMING ANCHORS SHALL BE SIMPSON
STRONG-TIE COMPANY, INC. OR OTHER MANUFACTURER WITH CURRENT ICC-ES
APPROVAL.
2.SAWN LUMBER: FRAMING LUMBER SHALL COMPLY WITH THE LATEST EDITION OF THE
GRADING RULES OF THE WESTERN WOOD PRODUCTS ASSOCIATION (WWPA) OR THE
WEST COAST LUMBER INSPECTION BUREAU (WCLIB). ALL SAWN LUMBER SHALL BE
STAMPED WITH THE GRADE MARK OF AN APPROVED LUMBER GRADING AGENCY.
SAWN LUMBER SHALL HAVE THE FOLLOWING MINIMUM GRADE UNLESS NOTED
OTHERWISE IN SCHEDULES:
USE:MATERIAL:
2x4 STUDS DOUGLAS-FIR NO. 2, MINIMUM (U.N.O.)
2x6 STUDS DOUGLAS-FIR NO. 2, MINIMUM (U.N.O.)
JOISTS, TOP PLATES AND ALL OTHER
SAWN LUMBER DOUGLAS-FIR NO. 2, MINIMUM (U.N.O.)
BEAMS AND POSTS DOUGLAS-FIR NO. 2, MINIMUM (U.N.O.)
LOCATION:NOMINAL
THICKNESS:
SPAN
INDEX
RATING:
EDGE
ATTACHMENT:
FIELD
ATTACHMENT:
WALL 7 16" OR 12"24 16 8d AT 6" O.C.8d AT 12" O.C.
ROOF 7 16" OR 12"24 16 8d AT 6" O.C.8d AT 12" O.C.
ROOF 15 32" OR 12"32 16 8d AT 6" O.C.8d AT 12" O.C.
ROOF 19 32" OR 5 8"40 20 10d AT 6" O.C.10d AT 12" O.C.
ROOF 23 32" OR 3 4"48 24 10d AT 6" O.C.10d AT 12" O.C.
ROOF 7 8"60 32 10d AT 6" O.C.10d AT 12" O.C.
FLOOR 3 4" T&G 48 24
10d AT 6" O.C. OR
#8 SCREWS AT 6" O.C.
10d AT 6" O.C. OR
#8 SCREWS AT 12" O.C.
FLOOR 7 8" T&G 60 32
10d AT 6" O.C. OR
#8 SCREWS AT 6" O.C.
10d AT 6" O.C. OR
#8 SCREWS AT 12" O.C.
FLOOR 118" T&G 60 48
10d AT 6" O.C. OR
#8 SCREWS AT 6" O.C.
10d AT 6" O.C. OR
#8 SCREWS AT 12" O.C.
3.PLYWOOD: ALL PLYWOOD SHALL BE C-D OR C-C SHEATHING CONFORMING TO
STANDARD PS 1-95. LAY UP PLYWOOD WITH FACE GRAIN IN PERPENDICULAR TO
SUPPORTS (ON ROOFS WHERE PLYWOOD IS LAID UP WITH FACE GRAIN PARALLEL TO
SUPPORTS, USE A MINIMUM OF 5-PLY PLYWOOD, STAGGER JOINTS). ALL NAILING,
COMMON NAILS. BLOCKING AT PANEL EDGES WHERE INDICATED ON PLANS. ALL
PLYWOOD SHALL BE OF THE FOLLOWING NOMINAL THICKNESS, SPAN/INDEX RATING
AND SHALL BE NAILED AS FOLLOWS UNLESS NOTED OTHERWISE ON THE PLANS:
DEFERRED SUBMITTAL ITEMS:
PREFABRICATED WOOD ROOF TRUSSES
CAST IN PLACE
CENTERLINE
CENTERLINE OF BEAM
CENTERLINE OF COLUMN
CENTERLINE OF WALL
CLEAR
CONCRETE
CONCRETE CONTROL JOINT
CONCRETE SAWCUT JOINT
CONCRETE MASONRY UNIT
CONNECTION
CONTINUOUS
DEAD LOAD
DOWN
DRAWING(S)
EQUAL
EQUIPMENT
EXPANSION JOINT
EACH WAY
FINISHED FLOOR
FACE OF STEEL
FACE OF WALL
GAUGE
GALVANIZED
GENERAL STRUCTURAL NOTES
CENTERLINE OF FOOTING
FACE OF MEMBER
EXPANSION BOLT
EDGE OF SLAB
DIAMETER
GALV
GSN
DN.
DWG(S)
EQ
EQUIP
EXP. JT (E.J.)
E.W.
F.F.
F.O.S.
F.O.W.
GA
F.O.M.
EXP. BOLT
E.O.S.
Ø OR DIA.
C.I.P.
C L
C.L.B.
C.L.C.
C.L.W.
CLR
CONC
C.C.J.
C.S.J.
C.M.U.
CONN.
CONT
D L
C.L.F.
W/WITH
W/O WITHOUT
T.O.P.
U.N.O.
W.W.F.
TYP
VERT
T.O.S.
T.O.W.
T.O.D.
T.O.F.
T.O.L.
T.O.M.
STD
T.O.B.
T L
SLH
SLV
SIM
SQ
PSF
PSI
REINF
PREFAB
OPP
P.C.
PLF
N.T.S.
O.C.
O.F.W.
TOP OF FOOTING
UNLESS NOTED OTHERWISE
WELDED WIRE FABRIC
TOP OF MASONRY
TOP OF PLATE
TOP OF STEEL
TOP OF WALL
TYPICAL
VERTICAL
STANDARD
TOP OF BEAM
TOP OF DECK
TOP OF LEDGER
TOTAL LOAD
OUTSIDE FACE OF WALL
PRECAST CONCRETE
POUNDS PER LINEAR FOOT
POUNDS PER SQUARE INCH
SHORT LEG VERTICAL
SHORT LEG HORIZONTAL
REINFORCING
SIMILAR
SQUARE
NOT TO SCALE
ON CENTER
OPPOSITE
PREFABRICATED
AGGREGATE BASE COURSE
AIR CONDITIONER
ABOVE FINISHED FLOOR
ALTERNATE
ANCHOR BOLT
AT (MEASUREMENT)
BEAM
BOTTOM OF BEAM
BOTTOM OF DECK
BEARING
BELOW FINISHED FLOOR
BOTTOM OF FOOTING
A.B.C.
A/C
A.F.F.
ALT
A.B.
@
BM
B.O.B.
B.O.D.
BRG
B.F.F
B.O.F.
ABBREVIATIONS
LBS (#)
MFR('S)
M.C.J.
MECH
N/A
LLV
LLH
HORIZ
K(KIP)
L L
LONG LEG VERTICAL
MANUFACTURER('S)
MASONRY CONTROL JOINT
NOT APPLICABLE
LONG LEG HORIZONTAL
POUNDS
MECHANICAL
HORIZONTAL
1000 POUNDS
LIVE LOAD
EXISTING(E)
MIN MINIMUM
MAX MAXIMUM
POUNDS PER SQUARE FOOT
GLUED-LAMINATED BEAMGLB
PFT PREFAB FLOOR TRUSSES
PRT PREFAB ROOF TRUSSES
I.F.W.INSIDE FACE OF WALL
PT PRESSURE TREATED
SCREWS AT FLOOR SHEATHING SHALL BE #8 SCREWS AND SHALL PENETRATE AT
LEAST 112" INTO THE SUPPORTING MEMBER. ALL FLOOR SHEATHING SHALL BE GLUED
TO SUPPORTING MEMBERS WITH AN APA AFG-01 QUALIFIED GLUE.
PLYWOOD ALTERNATE: AMERICAN PLYWOOD ASSOCIATION PERFORMANCE RATED
SHEATHING MAY BE USED AS AN ALTERNATE TO PLYWOOD WITH PRIOR APPROVAL
OF OWNER, ARCHITECT AND ROOFER. IT MAY NOT BE USED ON ROOFS WHERE
BUILT-UP ROOF SYSTEM IS TO BE GUARANTEED BY ROOFER. RATED SHEATHING
SHALL COMPLY WITH CURRENT ICC-ES REPORTS AND SHALL HAVE A SPAN RATING
EQUIVALENT TO OR BETTER THAN THE PLYWOOD IT REPLACES. ATTACHMENT AND
THICKNESS (WITHIN 132") SHALL BE THE SAME AS THE PLYWOOD IT REPLACES.
INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
4.NOMINAL 2x AND 3x DECKING. TONGUE AND GROOVE TYPE. MINIMUM Fb = 1,600 PSI,
MINIMUM E = 1,300,000 PSI. INSTALL WITH TONGUES UP SLOPE ON PITCHED ROOFS,
AND OUTWARD IN THE DIRECTION OF LAYING ON FLAT ROOFS. NAIL EACH PLANK
WITH 16d TOENAIL (THRU THE TONGUE) AND 16d FACE NAIL AT EACH SUPPORT. DECK
SHALL BE INSTALLED AS SIMPLE SPAN WITH ALL PLANKS BEARING ON TWO
SUPPORTS. FOR REFERENCE AND/OR ADDITIONAL INFORMATION SEE AITC 117-2010.
5.GLUED-LAMINATED BEAMS (GLB): GLUED-LAMINATED BEAMS SHALL BE DOUGLAS FIR
COMBINATION AT 24F-V4 AT SIMPLE SPAN BEAMS AND 24F-V8 AT MULTI-SPAN AND
CANTILEVERED BEAMS WITH THE FOLLOWING MINIMUM PROPERTIES: FB = 2,400 PSI,
FV = 190 PSI, FC (PERPENDICULAR) = 650 PSI, E =1,800 KSI. ALL BEAMS SHALL BE
FABRICATED USING WATERPROOF GLUE. FABRICATION AND HANDLING PER LATEST
AITC AND WCLA STANDARDS. BEAMS TO BEAR GRADE STAMP AND AITC STAMP AND
CERTIFICATE. CAMBER AS SHOWN ON DRAWINGS. STANDARD CAMBER IS BASED ON
A RADIUS OF CURVATURE OF 2000 FEET.
7.LAMINATED VENEER LUMBER (LVL): DESIGN, FABRICATION AND ERECTION IN
ACCORDANCE WITH THE LATEST ICC-ES REPORT. MINIMUM PROPERTIES FOR LVLs
SHALL BE: FB = 2,600 PSI, FV = 285 PSI, E = 2,000 KSI.
8.SILL PLATES RESTING ON CONCRETE OR MASONRY SHALL BE OF TREATED FIR.
SHEAR WALLS AND EXTERIOR WALL SILLS AT CONCRETE SLAB SHALL HAVE A
MINIMUM OF (2) ANCHOR BOLTS PER PIECE. PROVIDE ANCHOR BOLT AT 9" MAXIMUM,
4" MINIMUM FROM THE END OF EACH PIECE AT SPLICE OR END OF WALL. MAXIMUM
ANCHOR BOLT SPACING SHALL BE 72" ON CENTER UNLESS NOTED OTHERWISE ON
PLANS OR DETAILS. ALL ANCHOR BOLTS (OTHER THAN BOLTS FOR HOLDOWNS)
SHALL EMBED 7" INTO CONCRETE. ANCHOR BOLTS FOR HOLDOWNS SHALL NOT BE
CONSIDERED AS PART OF REQUIRED ANCHOR BOLTS ON SHEAR WALLS. ALL
EXTERIOR WALLS SHALL BE SECURED WITH MINIMUM ANCHOR BOLTS. INTERIOR
WALLS MAY BE SECURED TO CONCRETE WITH EITHER ANCHOR BOLTS OR POWER
DRIVEN SHOT PINS UNLESS NOTED OTHERWISE ON PLANS.
9.BOLTING: ALL BOLTS IN WOOD CONNECTIONS SHALL CONFORM TO ASTM A307.
BOLTS SHALL BE INSTALLED IN HOLES BORED WITH A BIT 116" LARGER THAN THE Ø
(DIAMETER) OF THE BOLT. BOLTS AND NUTS SEATING ON WOOD SHALL HAVE CUT
STEEL WASHERS UNDER HEADS AND NUTS. NICK THREADS TO PREVENT LOOSENING.
10.PREFABRICATED WOOD TRUSSES: PREFABRICATED WOOD TRUSSES SHALL BE
DESIGNED TO SUPPORT SELF WEIGHT PLUS LIVE LOAD AND SUPERIMPOSED DEAD
LOADS. WHERE ATTIC SPACE CAN BE USED FOR STORAGE, A 40 PSF LIVE LOAD ON
THE BOTTOM CHORD SHALL BE INCLUDED IN THE ANALYSIS. BRIDGING SIZE AND
SPACING BY TRUSS MANUFACTURER UNLESS NOTED OTHERWISE. CONTRACTOR
SHALL SUBMIT SHOP DRAWINGS WITH DESIGN CALCULATIONS SEALED BY A
REGISTERED ENGINEER FOR REVIEW PRIOR TO MANUFACTURE FOR BOTH ROOF
AND FLOOR TRUSSES WHEN USED.
SHOP DRAWINGS SHALL SHOW ANY SPECIAL DETAILS REQUIRED AT BEARING
POINTS. ALL CONNECTORS SHALL HAVE CURRENT ICC-ES APPROVAL. ADDITIONAL
TRUSSES SHALL BE SUPPLIED AS REQUIRED TO SUPPORT MECHANICAL EQUIPMENT.
PER IBC SECTION 2303.4 AND TPI-1: EACH TRUSS SHALL BE LEGIBLY BRANDED,
MARKED OR OTHERWISE HAVE PERMANENTLY AFFIXED THERETO THE IDENTITY OF
THE COMPANY MANUFACTURING THE TRUSS, THE DESIGN LOADS, AND THE TRUSS
SPACING - WITHIN TWO FEET OF THE CENTER OF THE SPAN ON THE FACE OF THE
BOTTOM CHORD.
PREFABRICATED WOOD/STEEL WEB JOIST/PURLINS (TJI/TJL SERIES OR EQUAL):
DESIGN, FABRICATION AND ERECTION IN ACCORDANCE WITH THE LATEST EDITION
ICC-ES REPORT. CONNECTIONS AND BEARING MATERIAL TO BE DESIGNED AND
FURNISHED BY JOIST FABRICATOR. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS
WITH DESIGN CALCULATIONS SEALED BY A REGISTERED STRUCTURAL ENGINEER
FOR REVIEW PRIOR TO MANUFACTURE. ADDITIONAL JOISTS SHALL BE SUPPLIED AS
REQUIRED TO SUPPORT MECHANICAL EQUIPMENT.
KEYNOTES:
1.FINISHED GRADE WHERE OCCURS
2.DO NOT EXCAVATE A TRENCH
CLOSER THAN A 45 DEGREE ANGLE
TO BELOW BOTTOM FOOTING OR
FOUNDATION
3.BOTTOM OF CONCRETE FOOTING
4.BOTTOM OF TRENCH
NOTE:
A.DO NOT UNDERCUT EXISTING
FOOTINGS
B.NO PIPE OR OTHER UTILITIES SHALL
PASS THRU WALL FOOTINGS OR
UNDER COLUMN FOOTINGS
FOR CONSTRUCTION ABOVE
FOOTING, SEE DETAILS.
T1 TRENCH PARALLEL TO CONTINUOUS STRIP FOOTING
TD01 NO SCALE
1
1
4
3
2
1
KEYNOTES:
1.CONCRETE FOOTING
2.SLEEVE - PROVIDE 12" MINIMUM
CLEARANCE AROUND PIPE OR
CONDUIT
3.PIPE OR CONDUIT
4.CONCRETE FILL TO BE PLACED
BEFORE FOOTING IS POURED -
FORM SAME AS FOOTING AND
POUR FULL WIDTH OF PIPE TRENCH
5.STEM WALL
NOTE:
A.NO PIPE SHALL PASS THRU
FOOTING OR UNDER COLUMN
FOOTINGS. FOR TRENCHES
GREATER THAN 3'-6" BELOW
BOTTOM OF FOOTING, SEE PIPE
PASSING BELOW WALL FOOTING
DETAIL.
T2 PIPE PASSING UNDER WALL FOOTING IN SHALLOW TRENCH
TD02 NO SCALE
6"
M
I
N
8"
M
I
N
3'
-
0
"
M
A
X
8" MIN
A
SECTIONA
5
1
2
3
4
5
1
2
3
4
KEYNOTES:
1.STEM WALL
2.CONCRETE FOOTING
3.1'-6" MAXIMUM - WHERE TRENCH
EXCEEDS 1'-6" NOTIFY STRUCTURAL
ENGINEER PRIOR TO PLACEMENT
OF FOOTINGS
4.BACKFILL AND RECOMPACT
TRENCH PER SOILS REPORT AND
SPECIFICATIONS
5.BOTTOM OF TRENCH
NOTE:
A.DO NOT UNDERCUT EXISTING
FOOTINGS
B.NO PIPES OR OTHER UTILITIES
SHALL PASS THRU WALL FOOTINGS
OR UNDER COLUMN FOOTINGS
3'
-
1
"
O
R
G
R
E
A
T
E
R
FOR CONSTRUCTION ABOVE
FOOTING, SEE DETAILS.
T3 PIPE PASSING BELOW FOOTING IN DEEP TRENCH
TD03 NO SCALE
5
3
2
1
44
1
KEYNOTES:
1.SLOPED FINISH GRADE
2.MINIMUM FOOTING DEPTH PER
G.S.N. - 12" MINIMUM
3.DEEPEN FOOTING AS REQUIRED TO
ACCOUNT FOR SLOPED GRADE
4.CONCRETE FOOTING
NOTE:
A.FOR ADDITIONAL INFORMATION,
SEE PLANS AND DETAILS
5'-0"
T4 TYPICAL DETAIL FOR FOUNDATION EMBEDMENT
TD04 NO SCALE
1
2
3
4
KEYNOTES:
1.CORNER DOWELS TO MATCH
HORIZONTAL REINFORCEMENT
2.CONCRETE WALL WITH
REINFORCEMENT
18" MIN LAP
SPLICE (TYP)
T5 TYPICAL CONCRETE CORNER
TD05 NO SCALE
2
1
KEYNOTES:
1.CONCRETE SLAB ON GRADE
2.CONT KEYED JOINT
3.SAWCUT 18" WIDE x 14 SLAB
THICKNESS IN DEPTH - CUT SHALL
BE MADE SOON ENOUGH TO
PREVENT SHRINKAGE CRACKING,
BUT NOT SO SOON AS TO CAUSE
SPALLING OF THE CONCRETE
WHILE SAWING. WORK MUST BE
COMPLETE WITHIN 16 HOURS OF
CONCRETE PLACEMENT.
NOTE:
A.KEYED JOINTS NEED ONLY OCCUR
AT EXPOSED EDGES DURING
PLACEMENT UNLESS SPECIFICALLY
NOTED ON THE PLANS.
B."TOOL WET JOINT", "ZIP STRIP", ETC
SHALL MATCH SAWCUT
REQUIREMENTS
12"6"6"12"
SAWCUT JOINT
KEYED JOINT
T6 CONTROL JOINTS IN CONCRETE SLAB ON GRADE
TD07 NO SCALE
1 3
1 2
KEYNOTES:
1.MINIMUM LAP PER PLAN (24" MIN) -
TYPICAL
2.TOP OF WALL FOOTING
3.REGULAR FOOTING THICKNESS AS
SHOWN ON PLAN OR FOOTING
SCHEDULE
NOTE:
A.D = 2'-0" MAX
2D 2D
D
D
D
1D MIN 1D MIN 1D MIN
2D
T7 TYPICAL STEP IN CONCRETE FOOTING
TD08 NO SCALE
2
3
1
T8 TYPICAL REINFORCING DETAILS
TD10 NO SCALE
6 MIN
BAR OFFSET
BAR CLEARANCE SPLICE DETAIL
BEND & HOOK DETAILS
COLUMN TIES BEAM STIRRUPS
"d"
45°
"d"
"d"
1
8 8
KEYNOTES:
1.LAP - SEE G.S.N.
2.MAXIMUM 15 LAP BUT NOT MORE
THAN 6"
3.WIRE TIES
4.1d (1" MINIMUM)
5.RADIUS = 3d FOR BARS NOT OVER
#8; 4d FOR #9, #10, AND #11 BARS; 5d
FOR #14 AND #18 BARS, 5d FOR ALL
GRADE 40 BARS WITH 180 DEGREE
HOOK
6.4D (4" MINIMUM)
7.12d (90 DEGREE HOOK)
8.6d (4" MINIMUM)
9.135 DEGREE BEND
10.BEND AROUND 112" PIN FOR #3
BARS. BEND AROUND 2" PIN FOR #4
BARS. BEND AROUND 212" PIN FOR
#5 BARS.
3
1 2
4
6
7
5
55
5
99
10 10
6
8
KEYNOTES:
1.CONCRETE FOOTING, SEE PLAN
2.COMPACTED SUB-GRADE BELOW
FOOTING, SEE PLAN
3.#4 DOWEL TO MATCH FOOTING
REINFORCEMENT
4.#4 DOWEL TO LAP AND MATCH
WALL REINFORCEMENT
NOTE:
A.FOR ITEMS SHOWN BUT NOT
KEYNOTED, SEE FOUNDATION
DETAILS
B.WHERE NEW FOOTING TIES INTO
EXISTING FOOTING, DRILL AND
EPOXY 24" LONG DOWELS INTO
EXISTING, PROVIDE 4" MIN
EMBEDMENT
2
3"
CLR
3"
CL
R
24"
24"
1
3
2 1
4
24"
24"
T9 CONCRETE FOOTING AT CONCRETE WALL
TD12 NO SCALE
NOTES:
1.TOP BARS ARE ANY HORIZONTAL BARS PLACED SO THAT MORE THAN 12" OF FRESH CONCRETE IS CAST IN THE
MEMBER BELOW THE REINFORCEMENT.
2.UNLESS NOTED OTHERWISE, LAP SPLICES IN CONCRETE BEAMS, SLABS AND WALLS SHALL BE CLASS "B" TENSION LAP
SPLICES.
BAR
SIZE
CLASS B TENSION SPLICE LENGTHS
f'c = 3,000 PSI f'c = 4,000 PSI f'c = 5,000 PSI
HORIZONTAL
BARS W/ >12" OF
CONC. BELOW
VERTICAL AND
BOTTOM
HORIZONTAL
BARS
HORIZONTAL
BARS W/ >12" OF
CONC. BELOW
VERTICAL AND
BOTTOM
HORIZONTAL
BARS
HORIZONTAL
BARS W/ >12" OF
CONC. BELOW
VERTICAL AND
BOTTOM
HORIZONTAL
BARS
#3 12"12"12"12"12"12"
#4 19"15"17"13"15"12"
#5 29"23"26"20"23"18"
#6 32"25"28"21"25"19"
#7 54"41"47"36"42"32"
#8 70"54"61"47"54"42"
#9 89"68"77"59"69"53"
#10 112"87"97"75"87"67"
T10 STEEL REINFORCING LAP SPLICES IN CONCRETE
TD14 NO SCALE
T11 STRAP AT OPENING IN SHEARWALL
TD17 NO SCALE
KEYNOTES:
1.SHEATHING MATERIAL
2.SHEARWALL END POST (DBL STUD
AT HOLDOWN U.N.O.)
3.EDGE NAILING AT ALL SHEATHING
PANEL EDGES - STAGGER NAILS AT
DOUBLE STUD END POSTS
4.FULL HEIGHT WOOD STUDS
5.ANCHOR BOLTS TO FOUNDATION
OR NAILS TO LOWER FRAMING PER
SHEARWALL SCHEDULE
6.SIMPSON STRAP TYPE HOLDOWN,
WHERE OCCURS
7.SOLID BLOCKING AND EDGE
NAILING REQUIRED AT PLYWOOD
SHEET EDGES
8.CONT 2x PT SOLE PLATE
9.FIELD NAILING AWAY FROM PANEL
EDGES
10.WOOD HEADER
11.TRIMMER STUD UNDER HEADER
AND SILL, PROVIDE ADDITIONAL
TRIMMER STUDS WHERE INDICATED
ON PLANS
12.FULL HEIGHT KING STUD, PROVIDE
ADDITIONAL KING STUDS WHERE
INDICATED ON PLANS
13.2x BLOCKING FOR STRAP NAILING
14.STRAP, PER PLAN, ABOVE AND
BELOW OPENING AS SHOWNFINISHED FLOOR
24" MIN BEYOND
OPENING (TYP)
24" MIN BEYOND
OPENING (TYP)
1
2
14
4
3 12
13
2
3
6
8
9
1111
3
10
77
5
OPEN
T12 ELEVATION-TYPICAL 1-STORY SHEARWALL
TD19 NO SCALE
KEYNOTES:
1.SHEATHING MATERIAL
2.DOUBLE STUDS AT EACH END OF
SHEARWALL, EDGE NAIL ALONG
DOUBLE STUDS
3.FULL HEIGHT WOOD STUDS
4.BOTTOM PLATE ATTACHMENT
5.SIMPSON STHD TYPE HOLDOWN
6.MIDHEIGHT BLOCKING AND EDGE
NAILING REQUIRED
7.SIMPSON "PHD" TYPE HOLDOWN
8.FINISHED FLOOR
9.CONT 2x PT SOLE PLATE
1
3
6
8
7
4
5
2
9
T13 STRAP TYPE HOLDOWNS / SHEARWALL END POSTS, PLAN VIEW - HOLDOWN LOCATIONS
TD15 NO SCALE
NOTE:
A.ALL CONDITIONS MAY NOT BE
SHOWN. FOR CONDITIONS NOT
SHOWN, USE THESE DETAILS AS A
GUIDE.
B.SOME LARGER HOLDOWNS
REQUIRE 6x6 POSTS, SEE PLANS
AND SCHEDULES.
C.WHERE MULTIPLE TRIMMER STUDS
OR KING STUDS OCCUR, MAKE
ADJUSTMENTS AS REQUIRED.
KEYNOTES:
1.WOOD STUD WALL, SEE PLAN
2.SHEARWALL SHEATHING, SEE PLAN
3.STRAP TYPE HOLDOWN
4.EDGE OF FOUNDATION
5.(25) - SIMPSON SDS 14"x6" LONG WOOD
SCREWS, STAGGERED
6.SHEARWALL END POSTS (2 STUDS)
7.SHEARWALL EDGE NAILING
8.TRIMMER STUD TO SUPPORT
HEADER
9.BLOCK TO SUPPORT WINDOW SILL
10.BUILT UP WOOD POST
"STRAP" TYPE HOLDOWN
WINDOW JAMB
"STRAP" TYPE HOLDOWN
DOOR JAMB OR WALL END
(1) SHEARWALL
(1) STRAP HOLDOWN
AT EXTERIOR CORNER
(2) SHEARWALLS
(1) STRAP HOLDOWN
AT EXTERIOR CORNER
(2) SHEARWALLS
(1) STRAP HOLDOWN
AT RE-ENTRANT CORNER
(1) SHEARWALL
(1) STRAP HOLDOWN
AT RE-ENTRANT CORNER
WINDOW
OPENING
DOOR
OPENING
1.5"
1.5"
3"3"
4 2
1
3
3
7
2
2
1
1 9
3
1 6 8
4
3
5
4
23
7
2
5
10
23
1
6
6
6
6 6
7
74
4
4
2
7 2
4 7
6
7
4
4
7
4
1
NOTE:
A.CONNECT FRAMING AT OVERBUILD
AREAS PER TYPICAL DETAILS
B.FRAMING NOT BEARING ON
SUPPORT SHALL BE HUNG USING
SIMPSON LU, U, LUP OR LSSU TYPE
HANGERS DESIGNATED FOR THE
JOIST SIZE AT SPANS LESS THAN
10'-0" SIMPSON A34 OR (4)-16d NAILS
MAY BE USED, AT SPANS LESS
THAN 5'-6", (3)-16d NAILS MAY BE
USED
2x6
2x8
2x10
SIMPLE ROOF FRAMING OR ROOF OVERBUILD FRAMING
6'-6"
5'-0"
3'-6"
2x8
2x6
2x4
MAXIMUM
HORIZONTAL SPAN JOIST FRAMING
RIDGE/VALLEY/HIP
SIMPLE CEILING FRAMING
HORIZONTAL SPAN
7'-0"
10'-0"
6'-0"
MAXIMUM
2x6
2x8
2x4
CEILING JOIST
T14 TYPICAL JOIST SCHEDULE FOR SIMPLE FRAMING
TD20 NO SCALE
KEYNOTES:
1.PREFAB WOOD ROOF TRUSS,
GIRDER TRUSS, OR HIP TRUSS
2.WOOD ROOF JOISTS OR RAFTER
3.CONNECTION WITH NAILS OR
SIMPSON HANGER (SIMPSON LU, U,
LUP, OR LSS) TYPE HANGER
DESIGNED FOR THE JOIST SIZE.
USE SKEWED MODEL AS REQUIRED
JOIST CONNECTION
2x4
2x6
2x8
LARGER
2x10
OR
SIMPSON A34
SIMPSON HANGER OR
3-16d NAILS OR
4-16d NAILS OR SIMPSON
HANGER OR SIMPSON A34
2 - 16d NAILS
SIMPSON HANGER OR
SIMPSON A35 AND
SIMPSON HANGER
T15 TYPICAL SIMPLE FRAMING AT WOOD TRUSS
TD21 NO SCALE
3
2
1
3
2
1
PR
O
J
E
C
T
M
A
N
A
G
E
R
:
CA
D
O
P
E
R
A
T
O
R
:
DATE:
JO
B
N
O
.
:
ST
R
U
C
T
U
R
A
L
E
N
G
I
N
E
E
R
S
S
E
A
L
:
PR
O
J
E
C
T
:
CL
I
E
N
T
:
RE
V
.
DA
T
E
BY
DE
S
C
R
I
P
T
I
O
N
2 3 4 5
CURRENT REV.
Th
i
s
d
r
a
w
i
n
g
i
s
t
h
e
p
r
o
p
e
r
t
y
o
f
F
R
O
S
T
S
t
r
u
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
,
In
c
.
L
e
g
a
l
l
y
,
t
h
e
d
r
a
w
i
n
g
c
a
n
N
O
T
b
e
c
o
p
i
e
d
i
n
w
h
o
l
e
o
r
i
n
pi
e
c
e
s
.
I
t
i
s
o
n
l
y
t
o
b
e
u
s
e
d
f
o
r
t
h
e
p
r
o
j
e
c
t
a
n
d
s
i
t
e
s
p
e
c
i
f
i
c
a
l
l
y
id
e
n
t
i
f
i
e
d
h
e
r
e
o
n
a
n
d
i
s
n
o
t
t
o
b
e
u
s
e
d
o
n
a
n
y
o
t
h
e
r
p
r
o
j
e
c
t
.
Co
n
t
r
a
c
t
o
r
s
h
a
l
l
c
a
r
e
f
u
l
l
y
r
e
v
i
e
w
a
l
l
d
i
m
e
n
s
i
o
n
s
,
d
e
t
a
i
l
s
,
a
n
d
co
n
d
i
t
i
o
n
s
a
n
d
r
e
p
o
r
t
a
t
o
n
c
e
a
n
y
e
r
r
o
r
,
i
n
c
o
n
s
i
s
t
e
n
c
y
o
r
om
i
s
s
i
o
n
d
i
s
c
o
v
e
r
e
d
b
e
f
o
r
e
c
o
n
s
t
r
u
c
t
i
o
n
.
Th
e
c
o
n
t
r
a
c
t
o
r
a
s
s
u
m
e
s
f
u
l
l
l
i
a
b
i
l
i
t
y
f
o
r
d
e
v
i
a
t
i
o
n
s
f
r
o
m
t
h
e
in
t
e
n
t
o
f
t
h
e
s
e
p
l
a
n
s
.
1
St
r
u
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
fa
x
:
2
0
8
.
2
2
7
.
8
4
0
5
10
2
0
E
.
L
i
n
c
o
l
n
R
o
a
d
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
ph
o
n
e
:
2
0
8
.
2
2
7
.
8
4
0
4
co
n
t
a
c
t
@
f
r
o
s
t
-
s
t
r
u
c
t
u
r
a
l
.
c
o
m
S1.1
6/3/21
RE
X
B
U
R
G
R
O
W
H
O
U
S
E
S
KY
L
E
R
H
O
K
A
N
S
O
FA
C
MT
B
IF
2
1
-
0
0
7
TY
P
I
C
A
L
D
E
T
A
I
L
S
RE
X
B
U
R
G
,
I
D
A
H
O
--
-
-
--
-
-
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
11
6
9
7
PRO
F
E
S
S
I
O
N
A
L
EN G I N E E R
R
E
G
I
S
T
ERE D
S T ATE
O
F
I
D
A
H
O
M A R KEL
L
B
A
T
E
M
A
N
6/
3
/
2
1
03
/
2
9
/
2
0
2
1
P
E
R
M
I
T
S
E
T
04
/
0
7
/
2
0
2
1
B
I
D
S
E
T
06
/
0
4
/
2
0
2
1
A
S
I
#
0
0
2
KEYNOTES:
1.SOLID BLOCKING TO BE TIGHT
AGAINST PLYWOOD
2.PREFAB WOOD TRUSS OR WOOD
JOIST
3.TOP OF WOOD PLATE OR BEAM AS
OCCURS
4.PLYWOOD SHEATHING
5.EDGE NAILING
NOTE:
A.FOR CONSTRUCTION BELOW
BLOCKING, SEE PLAN AND DETAILS.
BLOCKING IS CONTINUOUS
B.INDIVIDUAL SHEAR BLOCKS MAY BE
OMITTED EVERY 5TH BLOCK
DEPTH X
2"6"
2.5"8"
10"
12"
3"
3"
X X2X
X
SOLID 2x BLOCKING
WITH FIELD CUT VENTILATION
VENTILATION OPENINGS
TYPICAL SOLID BLOCKING
DE
P
T
H
TYPICAL SOLID BLOCKING
WITH PREFAB VENTILATION
X
T16 ELEVATION - TYPICAL SOLID 2x BLOCKING
TD22 NO SCALE
4 5
2 31
5
4
2 31
5
5
4
2 31
KEYNOTES:
1.NAILS BETWEEN SPLICE LOCATION
PER SCHEDULE - STAGGERED
2.DBL 2x TOP PLATE
3.WOOD STUD WALL, SEE PLAN
4.SPLICE OVER STUD
5.SIMPSON ST6224 OR MSTC40 STRAP
AT LOCATIONS WHERE PLATES CAN
NOT BE SPLICED
NOTE:
A.DO NOT SPLICE TOP PLATES WITHIN
6'-0" OF ENDS OF PLYWOOD
SHEARWALLS. THIS DETAIL
REQUIRED AT ALL EXTERIOR WALLS
AND OVER SHEARWALLS - NOT
REQUIRED AT INTERIOR
NON-SHEARWALLS.
(30) 16d
(24) 16dLESS THAN 20'
OVER 20'
4'-0"
6'-0"
LENGTH OF WALL
(BETWEEN CORNERS)SPLICE LENGTH
NAILS ALONGSPLICE LENGTH
MINIMUM
SPLICE LENGTH PER SCHEDULE
T17 ELEVATION - TYPICAL TOP PLATE SPLICE
TD24 NO SCALE
4
5
1
3
2
3
2
KEYNOTES:
1.WOOD STUD WALL, SEE PLAN
2.WOOD HEADER
3.KING STUD(S) PER PLAN
4.(2) 16d NAILS AT 2" O.C.
5.16d NAILS AT 12" O.C.
6.TRIMMER STUD(S) PER PLAN
2
6
3 1
5
4
5
T19 TYPICAL HEADER CONNECTION
TD25 NO SCALE
KEYNOTES:
1.BOUNDARY NAILING 8d NAILS AT 4"
O.C.
2.2x8 (MIN) CONT BEARING PLATE
ATTACH PER ATTACHMENT
SCHEDULE
3.TOE NAIL OVER-BUILD FRAMING TO
BEARING PLATE W/ (3) 16d NAILS
MIN
4.ROOF SHEATHING
5.2x OVERBUILD FRAMING, SEE PLAN
6.TOP CHORD OF TRUSS OR ROOF
FRAMING MEMBER, SEE PLAN
7.2x STUD PONY WALL AS OCCURS
ON PLAN (5'-0" O.C. MAX AND WALL
SHALL BE CENTERED BETWEEN
MAX SPAN)
8.ROOF SHEATHING (SHEATH LOWER
ROOF PRIOR TO CONSTRUCTION OF
OVER-BUILD)
9.PREFABRICATED OVERBUILD ROOF
TRUSS W/ SIMPSON VTCR CLIP AT
24" O.C.
OPTION 2
OPTION 1
6
8
9
4
1
2
542
1
6
3
8
7
4:12 TO 7:12
10:12 TO 12:12
7:12 TO 10:12
< 4:12 (3) 16d NAILS
ROOF
SLOPE
PLATE
ATTACHMENT
(5) 16d NAILS
(3)#10x31
2"
LONG SCREWS
(4)#10x31
2"
LONG SCREWS
ATTACHMENT SCHEDULE
T18 TYPICAL OVER-BUILD
TD27 NO SCALE
CONNECTION TYPE
JOIST OR TRUSS BEARING ON SILL OR GIRDER
BRIDGING TO JOIST
SOLE PLATE TO JOIST OR BLOCKING, FACE NAIL
TOP PLATE TO STUD
DOUBLE STUDS, FACE NAIL
DOUBLE TOP PLATES
CONTINUOUS HEADER TO STUD
CEILING JOISTS, LAPS OVER PARTITIONS
CEILING JOISTS TO PARALLEL RAFTERS, FACE NAIL
RAFTER OR TRUSS TO PLATE
BUILT-UP CORNER STUDS
TOENAIL
(4)-8d COMMON (2 1/2" x 0.131")
NAILING
(3)-8d COMMON (2 1/2" x 0.131")
(3)-3"x 0.131" NAILS (Gun Nail)
(3)-3"x 14 GAUGE STAPLES
TOENAIL EACH END(2)-3"x 0.131" NAILS (Gun Nail)
(2)-3"x 14 GAUGE STAPLES
16d (3 1/2"x 0.135") AT 16" O.C.
FACE NAIL
3"x 14 GAUGE STAPLES AT 12" O.C.
3"x 0.131" NAILS (Gun Nail) AT 8" O.C.
END NAIL
(2)-16d COMMON (3 1/2"x 0.162")
(3)-3"x 0.131" NAILS (Gun Nail)
(3)-3"x 14 GAUGE STAPLES
SOLE PLATE TO STUD
END NAIL
(2)-16d COMMON (3 1/2"x 0.162")
(3)-3"x 0.131" NAILS (Gun Nail)
(3)-3"x 14 GAUGE STAPLES
FACE NAIL
16d (3 1/2"x 0.135") AT 24" O.C.
3"x 14 GAUGE STAPLES AT 8" O.C.
3"x 0.131" NAILS (Gun Nail) AT 8" O.C.
FACE NAIL
16d (3 1/2"x 0.135") AT 16" O.C.
3"x 14 GAUGE STAPLES AT 12" O.C.
3"x 0.131" NAILS (Gun Nail) AT 12" O.C.
DOUBLE TOP PLATES -
FACE NAIL
(8)-16d COMMON (3 1/2"x 0.162")
(12)-3"x 0.131" NAILS (Gun Nail)
(12)-3"x 14 GAUGE STAPLES
LAP SPLICE
RIM JOIST TO TOP PLATE 8d (2 1/2"x 0.131") AT 6" O.C.
3"x 14 GAUGE STAPLES AT 6" O.C.
3"x 0.131" NAILS (Gun Nail) AT 6" O.C.
BLOCKING BETWEEN JOISTS OR RAFTERS
TOENAIL
(3)-8d COMMON (2 1/2"x 0.131")
(3)-3"x 0.131" NAILS (Gun Nail)
(3)-3"x 14 GAUGE STAPLES
AND TOP PLATE
TOENAIL
TOP PLATES, LAPS AND INTERSECTIONS
FACE NAIL
(2)-16d COMMON (3 1/2"x 0.162")
(3)-3"x 0.131" NAILS (Gun Nail)
(3)-3"x 14 GAUGE STAPLES
CONTINUOUS HEADER, TWO PIECES 16d COMMON (3 1/2"x 0.162") FACE NAIL AT 16"
O.C. ALONG EDGES
CEILING JOISTS TO PLATE
TOENAIL
(3)-8d COMMON (2 1/2"x 0.131")
(5)-3"x 0.131" NAILS (Gun Nail)
(5)-3"x 14 GAUGE STAPLES
FACE NAIL
(3)-16d COMMON (3 1/2"x 0.162)
(4)-3"x 0.131" NAILS (Gun Nail)
(4)-3"x 14 GAUGE STAPLES
(3)-16d COMMON (3 1/2"x 0.162)
(4)-3"x 0.131" NAILS (Gun Nail)
(4)-3"x 14 GAUGE STAPLES
FACE NAIL
(3)-8d COMMON (2 1/2"x 0.131")
(3)-3"x 0.131" NAILS (Gun Nail)
(3)-3"x 14 GAUGE STAPLES
TOENAIL
TOENAIL
16d COM.(3 1/2"x 0.162") AT 24" O.C.
3"x 14 GAUGE STAPLES AT 16" O.C.
3"x 0.131" NAILS (Gun Nail) AT 16" O.C.FACE NAIL
(2)-8d COMMON (2 1/2" x 0.131")
USE- SIMPSON A35 AT 48" O.C.-NA-
SIMPSON A35 AT EVERY OTHER BLOCK -NA-
NOTE:
A.MINIMUM NAILING SPECIFIED
HEREIN SHALL BE PROVIDED
UNLESS NOTED OTHERWISE ON
PLANS, DETAILS OR GENERAL
STRUCTURAL NOTES
B.NAILING NOT NOTED ON THESE
PLANS OR DETAILS SHALL BE PER
I.B.C. TABLE 2304.10.1
T20 MINIMUM NAILING SCHEDULE - UNLESS NOTED OTHERWISE
TD34 NO SCALE
2
6
34
1 5
2
1
74
2
1
3
4
18
AT BEAM
AT MID WALL
AT TOP PLATE
T21 TYPICAL BEAM POCKET
TD26 NO SCALE
2
1
4
AT CORNER
10
9
KEYNOTES:
1.WOOD BEAM
2.(2) 16d NAILS AT 6" O.C.
3.KING STUD EACH SIDE OF BEAM
4.SOLID BUILT-UP POST BELOW BEAM
5.STRAP BROKEN TOP PLATE ON SIDE
OR TOP
6.CONT DBL 2x TOP PLATE W/ LAP
SPLICE PER TYPICAL DETAIL
7.FULL-HEIGHT KING STUD EACH SIDE
OF BEAM
8.HGA10 CLIP EACH SIDE
9.FULL-HEIGHT KING STUD AT END OF
BEAM
10.FULL-HEIGHT KING STUD, OPPOSITE
SIDE OF THE BEAM
PR
O
J
E
C
T
M
A
N
A
G
E
R
:
CA
D
O
P
E
R
A
T
O
R
:
DATE:
JO
B
N
O
.
:
ST
R
U
C
T
U
R
A
L
E
N
G
I
N
E
E
R
S
S
E
A
L
:
PR
O
J
E
C
T
:
CL
I
E
N
T
:
RE
V
.
DA
T
E
BY
DE
S
C
R
I
P
T
I
O
N
2 3 4 5
CURRENT REV.
Th
i
s
d
r
a
w
i
n
g
i
s
t
h
e
p
r
o
p
e
r
t
y
o
f
F
R
O
S
T
S
t
r
u
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
,
In
c
.
L
e
g
a
l
l
y
,
t
h
e
d
r
a
w
i
n
g
c
a
n
N
O
T
b
e
c
o
p
i
e
d
i
n
w
h
o
l
e
o
r
i
n
pi
e
c
e
s
.
I
t
i
s
o
n
l
y
t
o
b
e
u
s
e
d
f
o
r
t
h
e
p
r
o
j
e
c
t
a
n
d
s
i
t
e
s
p
e
c
i
f
i
c
a
l
l
y
id
e
n
t
i
f
i
e
d
h
e
r
e
o
n
a
n
d
i
s
n
o
t
t
o
b
e
u
s
e
d
o
n
a
n
y
o
t
h
e
r
p
r
o
j
e
c
t
.
Co
n
t
r
a
c
t
o
r
s
h
a
l
l
c
a
r
e
f
u
l
l
y
r
e
v
i
e
w
a
l
l
d
i
m
e
n
s
i
o
n
s
,
d
e
t
a
i
l
s
,
a
n
d
co
n
d
i
t
i
o
n
s
a
n
d
r
e
p
o
r
t
a
t
o
n
c
e
a
n
y
e
r
r
o
r
,
i
n
c
o
n
s
i
s
t
e
n
c
y
o
r
om
i
s
s
i
o
n
d
i
s
c
o
v
e
r
e
d
b
e
f
o
r
e
c
o
n
s
t
r
u
c
t
i
o
n
.
Th
e
c
o
n
t
r
a
c
t
o
r
a
s
s
u
m
e
s
f
u
l
l
l
i
a
b
i
l
i
t
y
f
o
r
d
e
v
i
a
t
i
o
n
s
f
r
o
m
t
h
e
in
t
e
n
t
o
f
t
h
e
s
e
p
l
a
n
s
.
1
St
r
u
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
fa
x
:
2
0
8
.
2
2
7
.
8
4
0
5
10
2
0
E
.
L
i
n
c
o
l
n
R
o
a
d
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
ph
o
n
e
:
2
0
8
.
2
2
7
.
8
4
0
4
co
n
t
a
c
t
@
f
r
o
s
t
-
s
t
r
u
c
t
u
r
a
l
.
c
o
m
S1.2
6/3/21
RE
X
B
U
R
G
R
O
W
H
O
U
S
E
S
KY
L
E
R
H
O
K
A
N
S
O
FA
C
MT
B
IF
2
1
-
0
0
7
TY
P
I
C
A
L
D
E
T
A
I
L
S
RE
X
B
U
R
G
,
I
D
A
H
O
--
-
-
--
-
-
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
11
6
9
7
PRO
F
E
S
S
I
O
N
A
L
EN G I N E E R
R
E
G
I
S
T
ERE D
S T ATE
O
F
I
D
A
H
O
M A R KEL
L
B
A
T
E
M
A
N
6/
3
/
2
1
03
/
2
9
/
2
0
2
1
P
E
R
M
I
T
S
E
T
04
/
0
7
/
2
0
2
1
B
I
D
S
E
T
06
/
0
4
/
2
0
2
1
A
S
I
#
0
0
2
1'-0"
4" CONCRETE SLAB ON GRADE
(SEE GSN)
CONCRETE SLAB ON GRADE
4" CONCRETE SLAB ON GRADE
(SEE GSN)
CONCRETE SLAB ON GRADE
4" CONCRETE SLAB ON GRADE
(SEE GSN)
CONCRETE SLAB ON GRADE
4" CONCRETE SLAB ON GRADE
(SEE GSN)
CONCRETE SLAB ON GRADE
4" CONCRETE SLAB ON GRADE
(SEE GSN)
CONCRETE SLAB ON GRADE
4" CONCRETE SLAB ON GRADE
(SEE GSN)
CONCRETE SLAB ON GRADE
WF18/W1 WF18/W1 WF18/W1
WF18/W1 WF18/W1
WF18/W1 WF18/W1 WF18/W1
WF18/W1 WF18/W1 WF18/W1
WF
1
8
/
W
1
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
6
WF
1
8
/
W
1
F30 F30 F30
F30 F30 F30
F30 F30 F30
F30 F30 F30WF
1
6
183'-71
2"
7'-6"
14'-11
2"14'-11
2"14'-11
2"14'-11
2"14'-11
2"14'-11
2"14'-11
2"14'-11
2"14'-11
2"14'-11
2"14'-11
4"14'-11
2"
37
'
-
1
"
39
'
-
1
"
1'
-
0
"
1'
-
0
"
13'-3"13'-3"
14'-11
2"
F30 F30 F30
F30 F30 F30 F30
TYP
101
TYP
101
TYP
101
TYP
101
TYP
101
TYP
101
TYP
101
TYP
101
TYP
101
TYP
101
TYP
101
TYP
101
TYP
101
TYP
101
TYP
102
TYP
102
TYP
102
TYP
102
TYP
102
TYP
102
13'-3"13'-3"15'-0"13'-3"15'-0"15'-0"15'-0"13'-3"15'-0"6'-71
2"
MATCH LINE
MATCH LINE
7'-6"13'-3"15'-0"13'-3"15'-0"13'-3"15'-0"13'-3"15'-0"13'-3"15'-0"13'-3"7'-6"
169'-6"
14'-11
2"14'-11
2"14'-11
2"14'-11
2"14'-11
2"14'-11
2"14'-11
2"14'-11
2"14'-11
2"14'-11
2"14'-11
2"14'-11
2"
15'-0"
1'
-
0
"
1'
-
0
"
5 5 5 5 5 5 5 5 5
5 5 5 5 5 5 5 5 5 5 5 5
4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
5
44
5 5 5
20'-9"15'-0"41'-6"15'-0"41'-6"15'-0"20'-9"
20'-9"15'-0"41'-6"15'-0"41'-6"15'-0"34'-101
2"
5
9'
-
1
1
3 4"
17
'
-
1
1 4"
11
'
-
0
"
5
WF
1
8
/
W
1
55 5 5 5 5 5 5 5 5
5 5 5 5 5 5 5 5 55
5 5 5
5 5 5
5
5
5
WF
1
8
/
W
1
10
'
-
0
"
10
'
-
0
"
17
'
-
1
"
PR
O
J
E
C
T
M
A
N
A
G
E
R
:
CA
D
O
P
E
R
A
T
O
R
:
DATE:
JO
B
N
O
.
:
ST
R
U
C
T
U
R
A
L
E
N
G
I
N
E
E
R
S
S
E
A
L
:
PR
O
J
E
C
T
:
CL
I
E
N
T
:
RE
V
.
DA
T
E
BY
DE
S
C
R
I
P
T
I
O
N
2 3 4 5
CURRENT REV.
Th
i
s
d
r
a
w
i
n
g
i
s
t
h
e
p
r
o
p
e
r
t
y
o
f
F
R
O
S
T
S
t
r
u
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
,
In
c
.
L
e
g
a
l
l
y
,
t
h
e
d
r
a
w
i
n
g
c
a
n
N
O
T
b
e
c
o
p
i
e
d
i
n
w
h
o
l
e
o
r
i
n
pi
e
c
e
s
.
I
t
i
s
o
n
l
y
t
o
b
e
u
s
e
d
f
o
r
t
h
e
p
r
o
j
e
c
t
a
n
d
s
i
t
e
s
p
e
c
i
f
i
c
a
l
l
y
id
e
n
t
i
f
i
e
d
h
e
r
e
o
n
a
n
d
i
s
n
o
t
t
o
b
e
u
s
e
d
o
n
a
n
y
o
t
h
e
r
p
r
o
j
e
c
t
.
Co
n
t
r
a
c
t
o
r
s
h
a
l
l
c
a
r
e
f
u
l
l
y
r
e
v
i
e
w
a
l
l
d
i
m
e
n
s
i
o
n
s
,
d
e
t
a
i
l
s
,
a
n
d
co
n
d
i
t
i
o
n
s
a
n
d
r
e
p
o
r
t
a
t
o
n
c
e
a
n
y
e
r
r
o
r
,
i
n
c
o
n
s
i
s
t
e
n
c
y
o
r
om
i
s
s
i
o
n
d
i
s
c
o
v
e
r
e
d
b
e
f
o
r
e
c
o
n
s
t
r
u
c
t
i
o
n
.
Th
e
c
o
n
t
r
a
c
t
o
r
a
s
s
u
m
e
s
f
u
l
l
l
i
a
b
i
l
i
t
y
f
o
r
d
e
v
i
a
t
i
o
n
s
f
r
o
m
t
h
e
in
t
e
n
t
o
f
t
h
e
s
e
p
l
a
n
s
.
1
St
r
u
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
fa
x
:
2
0
8
.
2
2
7
.
8
4
0
5
10
2
0
E
.
L
i
n
c
o
l
n
R
o
a
d
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
ph
o
n
e
:
2
0
8
.
2
2
7
.
8
4
0
4
co
n
t
a
c
t
@
f
r
o
s
t
-
s
t
r
u
c
t
u
r
a
l
.
c
o
m
S2.0
6/3/21
RE
X
B
U
R
G
R
O
W
H
O
U
S
E
S
KY
L
E
R
H
O
K
A
N
S
O
FA
C
MT
B
IF
2
1
-
0
0
7
FO
U
N
D
A
T
I
O
N
P
L
A
N
RE
X
B
U
R
G
,
I
D
A
H
O
--
-
-
--
-
-
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
SCALE:
FOUNDATION PLAN
1/8" = 1'-0"
11
6
9
7
PRO
F
E
S
S
I
O
N
A
L
EN G I N E E R
R
E
G
I
S
T
ERE D
S T ATE
O
F
I
D
A
H
O
M A R KEL
L
B
A
T
E
M
A
N
6/
3
/
2
1
03
/
2
9
/
2
0
2
1
P
E
R
M
I
T
S
E
T
04
/
0
7
/
2
0
2
1
B
I
D
S
E
T
06
/
0
4
/
2
0
2
1
A
S
I
#
0
0
2
A.VERIFY ALL DIMENSIONS WITH ALL ARCHITECTURAL
DRAWINGS.
B.ALL SCHEDULED MARK DESIGNATIONS MAY NOT
NECESSARILY BE FOUND ON THIS PLAN. SCHEDULES ARE
TYPICAL TO THIS PROJECT.
C.THE DEPTH OF FOOTING DIMENSION INDICATED IN THE G.S.N.
IS A MINIMUM. FOUNDATION CONTRACTOR SHALL
COORDINATE WITH THE SOILS REPORT AND OTHER TRADES
TO INSURE THAT THESE MINIMUMS ARE SUFFICIENT FOR THE
WORK. SEE TYPICAL DETAILS FOR ADDITIONAL
REQUIREMENTS.
D. WALLS WITH SOLID LINES DESIGNATED
STRUCTURAL (BEARING) WALLS.
E. WALLS WITH DASHED LINES DESIGNATE
NON-STRUCTURAL (NON-BEARING) WALLS.
F. , , , -AS SHOWN ON PLAN INDICATES A
SHEARWALL; HATCHING IN WALL DESIGNATES SHEARWALL
LENGTH.
G. , , - AS SHOWN ON PLAN INDICATES A SHEARWALL
HOLDOWN. SEE HOLDOWN SCHEDULES AND DETAILS FOR
ADDITIONAL INFORMATION.
H.W1, W2, ETC. - AS SHOWN ON PLAN INDICATES CONCRETE OR
MASONRY WALLS. SEE WALL SCHEDULE FOR ADDITIONAL
INFORMATION.
I.WF18, WF24, ETC. - AS SHOWN ON PLAN INDICATES A
CONTINUOUS WALL FOOTING. SEE FOOTING SCHEDULE FOR
ADDITIONAL INFORMATION.
J.F36, F48, ETC. - AS SHOWN ON PLAN INDICATES A CONCRETE
FOOTING. SEE FOOTING SCHEDULE FOR ADDITIONAL
INFORMATION.
K.P1, P2, ETC. AS SHOWN ON PLAN INDICATES A WOOD POST.
SEE POST SCHEDULE FOR MORE INFORMATION.
L.PROVIDE CONTINUOUS BEARING FOR ALL POSTS AND
BUILT-UP STUDS TO THE FOUNDATION PER TYPICAL "SOLID
BLOCKING BETWEEN FLOORS" DETAIL.
M.ALL EXTERIOR WALLS SHALL BE CONSTRUCTED WITH TYPE
"5" SHEARWALLS, UNO.
N.FOR SIDEWALK AND LANDING LOCATIONS, SEE
ARCHITECTURAL DRAWINGS.
FOUNDATION PLAN NOTES
5 6.7
A B
WALL (W) SCHEDULE
MARK THICKNESS
AND TYPE
VERTICAL
REINFORCING
HORIZONTAL
REINFORCING REMARKS
W1 6" CONCRETE #4 AT 18" O.C.#4 AT 18" O.C.---
FOOTING SCHEDULE
NOTES:
1. FOR CONSTRUCTION ABOVE FOOTING, SEE DETAILS.
2. FOR MINIMUM CLEARANCE (CLR) OF REINFORCING, SEE GENERAL STRUCTURAL NOTES (GSN).
MARK LENGTH WIDTH THICKN
ESS FOOTING REINFORCING REMARKS
F30 30"30"10"(3) #4 EACH WAY
BOTTOM ---
WF16 CONT 16"6"#4 CONT BOTTOM ---
WF18 CONT 18"10"(2) #4 CONT BOTTOM STRIP FOOTING
SHEARWALL TYPE SCHEDULE
NOTES:
1. SHEARWALL TYPES LISTED BELOW ARE NOT JOB SPECIFIC. SOME TYPES MAY NOT BE USED ON
THE PLANS.
2. FRAMING MEMBER SUPPORTING MATERIAL SHALL BE SPACED AT 16" ON CENTER (O.C.) MAXIMUM.
3. ANCHOR BOLTS TO FOUNDATION SHALL BE 10" LONG AND SHALL BE EMBED 7" INTO CONCRETE.
EXPANSION BOLTS OR SHOT PINS MAY BE USED AT INTERIOR WALLS (AWAY FROM EDGE OF SLAB OR
SLAB STEP-DOWN) PER SUPPLEMENTAL INSTRUCTIONS.
4. A MINIMUM OF (2) ANCHOR BOLTS SHALL BE USED ON EACH BASE PLATE PIECE. PROVIDE (1)
ANCHOR BOLT MINIMUM WITHIN 9" OF EACH END PIECE.
5. PROVIDE CONTINUOUS DOUBLE 2x TOP PLATE AT ALL SHEARWALLS AND EXTERIOR WALL. UNLESS
NOTED OTHERWISE (U.N.O.), LAP SPLICE TOP PLATE A MINIMUM 4'-0" WITH 16d NAILS STAGGERED AT 2"
ON CENTER (O.C.) ((24) 16d NAILS TOTAL BETWEEN SPLICE JOINTS.)
6. PROVIDE FULL HEIGHT DOUBLE STUDS AT ENDS OF SHEARWALLS UNLESS NOTED OTHERWISE ON
PLANS OR DETAILS.
7. BLOCK ALL PANEL EDGES. EDGE NAIL SHEATHING AT BLOCKED EDGES.
MARK SHEATHING MATERIAL EDGE NAILING FIELD NAILING BOTTOM PLATE ATTACHMENT
5/8" GYPSUM
WALLBOARD
(UNBLOCKED)
NO. 6 TYPE S
OR W
DRYWALL
SCREWS 1-1/4"
LONG AT 6"
O.C.
NO. 6 TYPE S
OR W
DRYWALL
SCREWS 1-1/4"
LONG AT 12"
O.C.
CONCRETE: 12"Ø A.B. W/ STD CUT
WASHERS AT 36" O.C.
WOOD: 16d STAGGERED AT 6" O.C.
7 16" APA RATED
SHEATHING
(BLOCKED)
ONE SIDE OF WALL
8d COMMON
AT 6" O.C.
8d COMMON
AT 12" O.C.
CONCRETE: 12"Ø A.B. W/ 14"x3"x3"
PLATE WASHERS AT 36" O.C.
CONCRETE: 5 8"Ø A.B. W/ 14"x3"x3"
PLATE WASHERS AT 48" O.C.
WOOD: 16d STAGGERED AT 6" O.C.
4
5
GT
GT
GT GT GT GT GT
GT GT GT GT GT GT
GT GT GT GT GT GT GT GT GT GT GT GT
GT GT GT GT GT GT GT GT GT GT GT GT
TYP
201
TYP
201
TYP
201
TYP
203
TYP
206
TYP
206TYP
204
TYP
202
TYP
203
TYP
203
TYP
203
TYP
206
TYP
206
TYP
206
TYP
206
TYP
206
TYP
201
TYP
201
TYP
201
TYP
202
TYP
203
TYP
203
TYP
203
B2 B2 B2 B2 B2 B2
B1
B2
B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1
B2
B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1
B2
B1
B1
B1
B1
B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2
B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2
B2 B2 B2 B2 B2
GT
B2
B1
GT
B1
TYP
204
TYP
204
TYP
204
TYP
204
TYP
204
TYP
204
TYP
204
MATCH LINE
MATCH LINE
PREFAB ROOF TRUSS
AT 24" O.C.
PREFAB ROOF TRUSS
AT 24" O.C.
P1 P1 P1 P1 P1 P1
P1 P1 P1 P1 P1 P1
P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1
P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1
7/16" APA RATED ROOF SHEATHING W/
8d COMMON NAILS AT 6" O.C. AT PANEL
EDGES / BOUNDARY AND AT 12" O.C. IN
THE FIELD.
TYPICAL ROOF SHEATHING:
7/16" APA RATED ROOF SHEATHING W/
8d COMMON NAILS AT 6" O.C. AT PANEL
EDGES / BOUNDARY AND AT 12" O.C. IN
THE FIELD.
TYPICAL ROOF SHEATHING:
B1
B1
205
2 TYP 2 TYP 2 TYP
2 TYP
2 TYP
2 TYP
2 TYP
B2B2B2B2B2B2
B2 B2 B2 B2 B2 B2
B3 B3 B3 B3 B3 B3
B3 B3 B3 B3 B3 B3
B3
B1
4 TYP
BA
C
K
-
S
P
A
N
B
E
A
M
3'
-
0
"
M
I
N
4 TYP
4 TYP4TYP
55 5 5 5 5 5 5 5 5
5 5 5 5 5 5 5 5 5
4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
5 5 5 5 5 5 5 5 5
5 5 5 5 5 5 5 5 5 5 5 5
5
4
5
4
5 5 5
55
5 5 5
5 5 5
5
5
5
PR
O
J
E
C
T
M
A
N
A
G
E
R
:
CA
D
O
P
E
R
A
T
O
R
:
DATE:
JO
B
N
O
.
:
ST
R
U
C
T
U
R
A
L
E
N
G
I
N
E
E
R
S
S
E
A
L
:
PR
O
J
E
C
T
:
CL
I
E
N
T
:
RE
V
.
DA
T
E
BY
DE
S
C
R
I
P
T
I
O
N
2 3 4 5
CURRENT REV.
Th
i
s
d
r
a
w
i
n
g
i
s
t
h
e
p
r
o
p
e
r
t
y
o
f
F
R
O
S
T
S
t
r
u
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
,
In
c
.
L
e
g
a
l
l
y
,
t
h
e
d
r
a
w
i
n
g
c
a
n
N
O
T
b
e
c
o
p
i
e
d
i
n
w
h
o
l
e
o
r
i
n
pi
e
c
e
s
.
I
t
i
s
o
n
l
y
t
o
b
e
u
s
e
d
f
o
r
t
h
e
p
r
o
j
e
c
t
a
n
d
s
i
t
e
s
p
e
c
i
f
i
c
a
l
l
y
id
e
n
t
i
f
i
e
d
h
e
r
e
o
n
a
n
d
i
s
n
o
t
t
o
b
e
u
s
e
d
o
n
a
n
y
o
t
h
e
r
p
r
o
j
e
c
t
.
Co
n
t
r
a
c
t
o
r
s
h
a
l
l
c
a
r
e
f
u
l
l
y
r
e
v
i
e
w
a
l
l
d
i
m
e
n
s
i
o
n
s
,
d
e
t
a
i
l
s
,
a
n
d
co
n
d
i
t
i
o
n
s
a
n
d
r
e
p
o
r
t
a
t
o
n
c
e
a
n
y
e
r
r
o
r
,
i
n
c
o
n
s
i
s
t
e
n
c
y
o
r
om
i
s
s
i
o
n
d
i
s
c
o
v
e
r
e
d
b
e
f
o
r
e
c
o
n
s
t
r
u
c
t
i
o
n
.
Th
e
c
o
n
t
r
a
c
t
o
r
a
s
s
u
m
e
s
f
u
l
l
l
i
a
b
i
l
i
t
y
f
o
r
d
e
v
i
a
t
i
o
n
s
f
r
o
m
t
h
e
in
t
e
n
t
o
f
t
h
e
s
e
p
l
a
n
s
.
1
St
r
u
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
fa
x
:
2
0
8
.
2
2
7
.
8
4
0
5
10
2
0
E
.
L
i
n
c
o
l
n
R
o
a
d
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
ph
o
n
e
:
2
0
8
.
2
2
7
.
8
4
0
4
co
n
t
a
c
t
@
f
r
o
s
t
-
s
t
r
u
c
t
u
r
a
l
.
c
o
m
S2.1
6/3/21
RE
X
B
U
R
G
R
O
W
H
O
U
S
E
S
KY
L
E
R
H
O
K
A
N
S
O
FA
C
MT
B
IF
2
1
-
0
0
7
S2
.
1
R
O
O
F
F
R
A
M
I
N
G
P
L
A
N
RE
X
B
U
R
G
,
I
D
A
H
O
--
-
-
--
-
-
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
SCALE:
S2.1 ROOF FRAMING PLAN
1/8" = 1'-0"
11
6
9
7
PRO
F
E
S
S
I
O
N
A
L
EN G I N E E R
R
E
G
I
S
T
ERE D
S T ATE
O
F
I
D
A
H
O
M A R KEL
L
B
A
T
E
M
A
N
6/
3
/
2
1
03
/
2
9
/
2
0
2
1
P
E
R
M
I
T
S
E
T
04
/
0
7
/
2
0
2
1
B
I
D
S
E
T
06
/
0
4
/
2
0
2
1
A
S
I
#
0
0
2
BEAM (B) SCHEDULE
MARK SIZE
B1 (2) 2x6 OR 4x6 OR (2) 13 4x512 LVL
B2 (2) 2x8 OR 4x8 OR (2) 13 4x512 LVL
B3 (2) 2x10 OR 4x10 OR (2) 13 4x912 LVL
1.ALIGN ADDITIONAL TRUSS W/ EACH SHEAR WALL D=1300 LB
(ASD LOAD)
2.STEP TOP CHORD FOR 5 8" GYP-BOARD FOR FIRE TATED
ASSEMBLY, SEE ARCHITECTURAL AND DETAIL 203
3.SIMPSON LUS26 HANGER
4.POCKET BEAM INTO WALL PER TYPICAL DETAIL
PLAN KEYNOTESX
ROOF FRAMING PLAN NOTES
A.VERIFY ALL DIMENSIONS WITH ALL ARCHITECTURAL
DRAWINGS.
B.ALL SCHEDULED MARK DESIGNATIONS MAY NOT NECESSARILY
BE FOUND ON THIS PLAN. SCHEDULES ARE TYPICAL TO THIS
PROJECT.
C.IF DOUBLE TOP PLATE IS NOTCHED, STEPPED OR BROKEN,
PROVIDE A SIMPSON MSTC40 STRAP AT DISCONTINUITY.
D.TYPICAL BEARING WALL FRAMING SHALL BE 2x6 STUDS AT 16"
O.C. UNO. WHERE ROOF TRUSSES OR JOISTS SPANS EXCEED
20'-0" ALIGN ADDITIONAL STUD BELOW ROOF FRAMING
MEMBER.
E.PROVIDE TRIMMER STUDS (TS) AND KING STUDS (KS) AT
OPENINGS AS FOLLOWS, U.N.O.: OPENINGS 6'-0" OR LESS, (1)
TS & (1) KS, OPENINGS 6'-1" TO 9'-0", (1) TS & (2) KS, 9'-1" TO
12'-0", (2) TS & (3) KS. FOR ATTACHMENT, SEE "TYPICAL
HEADER CONNECTION" DETAIL.
F. WALLS WITH SOLID LINES DESIGNATED
STRUCTURAL (BEARING) WALLS.
G. WALLS WITH DASHED LINES DESIGNATE
NON-STRUCTURAL (NON-BEARING) WALLS.
H. , , , -AS SHOWN ON PLAN INDICATES A
SHEARWALL; HATCHING IN WALL DESIGNATES SHEARWALL
LENGTH.
I.B1, B2, ETC. - AS SHOWN ON PLAN INDICATES A BEAM OR
HEADER. SEE BEAM SCHEDULE FOR ADDITIONAL
INFORMATION.
J.P1, P2, ETC. AS SHOWN ON PLAN INDICATES A WOOD POST.
SEE POST SCHEDULE FOR MORE INFORMATION.
K.TIE EACH ROOF TRUSS AT BEARING LOCATIONS WITH (1) H2.5A
OR (1) H1 CLIP, AND EACH GIRDER TRUSS WITH (2) H2.5A CLIPS,
UNO.
L."D=" INDICATES DRAG LOAD (ASD) THAT TRUSS
MANUFACTURER IS TO DESIGN TRUSS FOR IN BOTH TENSION
AND COMPRESSION.
M.PROVIDE BUILT-UP 2x POSTS BELOW EACH GIRDER TRUSS,
MATCH GIRDER TRUSS WIDTH, U.N.O.
N.CS16, CS18, ETC. - AS SHOWN AT WALL OPENINGS, PROVIDE
STRAPPING PER "TYPICAL STRAP AT OPENING" DETAIL.
O.PROVIDE CONTINUOUS BEARING FOR ALL POSTS AND
BUILT-UP STUDS TO THE FOUNDATION PER TYPICAL "SOLID
BLOCKING BETWEEN FLOORS" DETAIL
P.FOR CLARITY, DETAILS MAY SHOW ONLY ONE SIDE OF
FRAMING CONDITION.
Q.ALL EXTERIOR WALLS SHALL BE CONSTRUCTED WITH TYPE "5"
SHEARWALLS, UNO.
5 6.7
SHEARWALL TYPE SCHEDULE
NOTES:
1. SHEARWALL TYPES LISTED BELOW ARE NOT JOB SPECIFIC. SOME TYPES MAY NOT BE USED ON
THE PLANS.
2. FRAMING MEMBER SUPPORTING MATERIAL SHALL BE SPACED AT 16" ON CENTER (O.C.) MAXIMUM.
3. ANCHOR BOLTS TO FOUNDATION SHALL BE 10" LONG AND SHALL BE EMBED 7" INTO CONCRETE.
EXPANSION BOLTS OR SHOT PINS MAY BE USED AT INTERIOR WALLS (AWAY FROM EDGE OF SLAB OR
SLAB STEP-DOWN) PER SUPPLEMENTAL INSTRUCTIONS.
4. A MINIMUM OF (2) ANCHOR BOLTS SHALL BE USED ON EACH BASE PLATE PIECE. PROVIDE (1)
ANCHOR BOLT MINIMUM WITHIN 9" OF EACH END PIECE.
5. PROVIDE CONTINUOUS DOUBLE 2x TOP PLATE AT ALL SHEARWALLS AND EXTERIOR WALL. UNLESS
NOTED OTHERWISE (U.N.O.), LAP SPLICE TOP PLATE A MINIMUM 4'-0" WITH 16d NAILS STAGGERED AT 2"
ON CENTER (O.C.) ((24) 16d NAILS TOTAL BETWEEN SPLICE JOINTS.)
6. PROVIDE FULL HEIGHT DOUBLE STUDS AT ENDS OF SHEARWALLS UNLESS NOTED OTHERWISE ON
PLANS OR DETAILS.
7. BLOCK ALL PANEL EDGES. EDGE NAIL SHEATHING AT BLOCKED EDGES.
MARK SHEATHING MATERIAL EDGE NAILING FIELD NAILING BOTTOM PLATE ATTACHMENT
5/8" GYPSUM
WALLBOARD
(UNBLOCKED)
NO. 6 TYPE S
OR W
DRYWALL
SCREWS 1-1/4"
LONG AT 6"
O.C.
NO. 6 TYPE S
OR W
DRYWALL
SCREWS 1-1/4"
LONG AT 12"
O.C.
CONCRETE: 12"Ø A.B. W/ STD CUT
WASHERS AT 36" O.C.
WOOD: 16d STAGGERED AT 6" O.C.
7 16" APA RATED
SHEATHING
(BLOCKED)
ONE SIDE OF WALL
8d COMMON
AT 6" O.C.
8d COMMON
AT 12" O.C.
CONCRETE: 12"Ø A.B. W/ 14"x3"x3"
PLATE WASHERS AT 36" O.C.
CONCRETE: 5 8"Ø A.B. W/ 14"x3"x3"
PLATE WASHERS AT 48" O.C.
WOOD: 16d STAGGERED AT 6" O.C.
4
5
POST (P) SCHEDULE
NOTES:
1. FOR CONNECTIONS AT EITHER END OF POST, SEE DETAILS.
2. UNO, SEE GENERAL STRUCTURAL NOTES (GSN) FOR LUMBER SPECIES AND GRADE.
MARK SIZE SPECIES AND GRADE CONNECTION
P1 (2) 2x4 DOUG FIR NO. 2 SEE TYPICAL DETAILS
101 WOOD STUD WALL AT FOUNDATION
CW_S102 NO SCALE
3"
CLR
3"
CL
R
8
10
7
9
6
1
2
5
4
3
6"
MI
N
KEYNOTES:
1.WOOD STUD WALL, SEE PLAN
2.CONT 2x PT SOLE PLATE W/ ANCHOR
BOLTS PER SHEARWALL SCHEDULE
3.CONCRETE SLAB ON GRADE, SEE PLAN
4.CONCRETE WALL, SEE PLAN
5.CONCRETE FOOTING, SEE PLAN
6.COMPACTED SUB-GRADE BELOW
FOOTING, SEE PLAN
7.MINIMUM FOOTING DEPTH, SEE GSN
8.SIDEWALK, PAVEMENT, OR FINISH GRADE
PER ARCH
9.EDGE NAILING, SEE SHEARWALL
SCHEDULE
10.WALL SHEATHING AS OCCURS, SEE PLAN
NOTES:
A.WATERPROOF ANY EXTERIOR WOOD
FRAMING WITHIN 6" OF GRADE PER ARCH
DRAWINGS
102 WOOD STUD WALL AT FOUNDATION
CW_S128 NO SCALE
KEYNOTES:
1.WOOD STUD WALL, SEE PLAN
2.CONT 2x PT SOLE PLATE W/ ANCHOR
BOLTS PER SHEARWALL SCHEDULE
3.CONCRETE SLAB ON GRADE, SEE PLAN
4.CONCRETE FOOTING, SEE PLAN
5.COMPACTED SUB-GRADE BELOW
FOOTING, SEE PLAN
6.EDGE NAILING, SEE SHEARWALL
SCHEDULE
7.WALL SHEATHING AS OCCURS, SEE PLAN
3"
CL
R
7
6
5
1
4
3
312"
MI
N
2
7
6
1
2
KEYNOTES:
1.WOOD TRUSS W/ CLIP, SEE PLAN
2.CONT DBL 2x TOP PLATE W/ LAP
SPLICE, SEE TYPICAL DETAIL
3.WOOD STUD WALL, SEE PLAN
4.WALL SHEATHING AS OCCURS, SEE
PLAN
5.EDGE NAILING, SEE SHEARWALL
SCHEDULE
6.FULL HEIGHT TIMBER STRAND
BLOCKING BETWEEN EACH TRUSS
7.ROOF SHEATHING, SEE PLAN
8.BOUNDARY NAILING, SEE PLAN
1
2
3
5
NOTE:
A.NO WALL SHEATHING SPLICE
BETWEEN BLOCKING AND TOP
PLATE, IF SHEATHING BREAKS
PROVIDE A35 CLIP AT EACH BLOCK
B.COORDINATE ROOF VENTILATION
C.FASCIA PER ARCHITECTURAL
DETAILS
5
4
7
8
6
6"
212"
6"
201 WOOD TRUSS AT WOOD STUD WALL
WW_RT303 NO SCALE
KEYNOTES:
1.WOOD TRUSS, SEE PLAN
2.2x4x8'-0" LONG AT 6'-0" O.C. W/ (2)
16d NAILS AT EACH TRUSS
3.WOOD TRUSS W/ HGA10 CLIP AT 36"
O.C.
4.CONT DBL 2x TOP PLATE W/ LAP
SPLICE, SEE TYPICAL DETAIL
5.WOOD STUD WALL, SEE PLAN
6.WALL SHEATHING AS OCCURS, SEE
PLAN
7.BOUNDARY NAILING, SEE PLAN
8.ROOF SHEATHING, SEE PLAN
NOTE:
A.COORDINATE ROOF VENTILATION
B.FASCIA PER ARCHITECTURAL
DETAILS
1
2 3
4
5
6
8
7
202 WOOD TRUSS AT WOOD STUD WALL
WW_RT309 NO SCALE
KEYNOTES:
1.WOOD TRUSS, SEE PLAN
2.CONT DBL 2x TOP PLATE W/ LAP
SPLICE, SEE TYPICAL DETAIL
3.WOOD STUD WALL, SEE PLAN
4.WALL SHEATHING, SEE PLAN
5.EDGE NAILING, SEE SHEARWALL
SCHEDULE
6.2x LEDGER W/ (2) #8 SCREWS AT
EACH STUD
7.BOUNDARY NAILING, SEE PLAN
8.ROOF SHEATHING, SEE PLAN
9.2x4x8'-0" LONG AT 6"-0" O.C. W/ (2)
16D NAILS AT EACH TRUSS
10.STEP TOP CHORD FOR 5 8" GYP
BOARD, SEE ARCH
11.CONT 2x BOTTOM PLATE W/ (2) 16d
NAILS AT 16" O.C.
1
10
203 WOOD TRUSS AT WOOD STUD WALL
WW_RT316 NO SCALE
2
3
4
5
7
2
3
4
5
7
1
KEYNOTES:
1.WOOD TRUSS, SEE PLAN
2.2x4 AT 6'-0" O.C. W/ (2) 16d NAILS AT
EACH TRUSS
3.WOOD TRUSS W/ HGA10 CLIP AT 36"
O.C.
4.CONT DBL 2x TOP PLATE W/ LAP
SPLICE, SEE TYPICAL DETAIL
5.WOOD STUD WALL, SEE PLAN
6.WALL SHEATHING AS OCCURS, SEE
PLAN
7.WOOD TRUSS W/ HANGER, SEE
PLAN
8.OVERBUILD 2x FRAMING W/
HANGER, SEE PLAN
9.BOUNDARY NAILING, SEE PLAN
10.ROOF SHEATHING, SEE PLAN
11.2x BLOCKING BETWEEN EACH
TRUSS W/ (3) 16d NAILS AT EACH
BLOCK
NOTE:
A.COORDINATE ROOF VENTILATION
B.FASCIA PER ARCHITECTURAL
DETAILS
9
1
2
3
4
5
6
10
204 WOOD TRUSS AT WOOD STUD WALL
WW_RT309 NO SCALE
11
9
8
7
669 9
99
KEYNOTES:
1.WOOD TRUSS, SEE PLAN
2.2x4x8'-0" LONG AT 6'-0" O.C. W/ (2)
16d NAILS AT EACH TRUSS
3.WOOD TRUSS W/ HGA10 CLIP AT 36"
O.C.
4.CONT DBL 2x TOP PLATE W/ LAP
SPLICE, SEE TYPICAL DETAIL
5.WOOD STUD WALL, SEE PLAN
6.ROOF SHEATHING, SEE PLAN
7.(3) 16d NAILS INTO EACH STUD
8.BOUNDARY NAILING, SEE PLAN
9.EDGE NAILING, SEE SHEARWALL
SCHEDULE
10.WALL SHEATHING, SEE PLAN
1
2
3
4
5
10
6 8
9
9
67
8
1
1
205 WOOD TRUSS AT WOOD STUD WALL
WW_RT319 NO SCALE
NOTE:
A.COORDINATE ROOF VENTILATION
B.FASCIA PER ARCHITECTURAL
DETAILS
1
3
4
5
9
8
9
8
22
1111
KEYNOTES:
1.WOOD TRUSS W/ CLIP, SEE PLAN
2.CONT DBL 2x TOP PLATE W/ LAP
SPLICE, SEE TYPICAL DETAIL
3.WOOD STUD WALL, SEE PLAN
4.WALL SHEATHING AS OCCURS, SEE
PLAN
5.EDGE NAILING, SEE SHEARWALL
SCHEDULE
6.FULL HEIGHT TIMBER STRAND
BLOCKING BETWEEN EACH TRUSS
7.ROOF SHEATHING, SEE PLAN
8.BOUNDARY NAILING, SEE PLAN
9.WOOD BEAM, SEE PLAN
10.CONT 2x LEDGER W/ (2) 16d NAILS
AT 16" O.C.
11.2xBLOCKING AT 24" O.C. W/ (2) 16d
NAILS AT EACH END
1
2
3
NOTE:
A.NO WALL SHEATHING SPLICE
BETWEEN BLOCKING AND TOP
PLATE, IF SHEATHING BREAKS
PROVIDE A35 CLIP AT EACH BLOCK
B.COORDINATE ROOF VENTILATION
C.FASCIA PER ARCHITECTURAL
DETAILS
4
7
8
6
6"
212"
6"
206 WOOD TRUSS AT WOOD STUD WALL
WW_RT303 NO SCALE
1'-2" MAX
9
10
7 8
5
8
11
PR
O
J
E
C
T
M
A
N
A
G
E
R
:
CA
D
O
P
E
R
A
T
O
R
:
DATE:
JO
B
N
O
.
:
ST
R
U
C
T
U
R
A
L
E
N
G
I
N
E
E
R
S
S
E
A
L
:
PR
O
J
E
C
T
:
CL
I
E
N
T
:
RE
V
.
DA
T
E
BY
DE
S
C
R
I
P
T
I
O
N
2 3 4 5
CURRENT REV.
Th
i
s
d
r
a
w
i
n
g
i
s
t
h
e
p
r
o
p
e
r
t
y
o
f
F
R
O
S
T
S
t
r
u
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
,
In
c
.
L
e
g
a
l
l
y
,
t
h
e
d
r
a
w
i
n
g
c
a
n
N
O
T
b
e
c
o
p
i
e
d
i
n
w
h
o
l
e
o
r
i
n
pi
e
c
e
s
.
I
t
i
s
o
n
l
y
t
o
b
e
u
s
e
d
f
o
r
t
h
e
p
r
o
j
e
c
t
a
n
d
s
i
t
e
s
p
e
c
i
f
i
c
a
l
l
y
id
e
n
t
i
f
i
e
d
h
e
r
e
o
n
a
n
d
i
s
n
o
t
t
o
b
e
u
s
e
d
o
n
a
n
y
o
t
h
e
r
p
r
o
j
e
c
t
.
Co
n
t
r
a
c
t
o
r
s
h
a
l
l
c
a
r
e
f
u
l
l
y
r
e
v
i
e
w
a
l
l
d
i
m
e
n
s
i
o
n
s
,
d
e
t
a
i
l
s
,
a
n
d
co
n
d
i
t
i
o
n
s
a
n
d
r
e
p
o
r
t
a
t
o
n
c
e
a
n
y
e
r
r
o
r
,
i
n
c
o
n
s
i
s
t
e
n
c
y
o
r
om
i
s
s
i
o
n
d
i
s
c
o
v
e
r
e
d
b
e
f
o
r
e
c
o
n
s
t
r
u
c
t
i
o
n
.
Th
e
c
o
n
t
r
a
c
t
o
r
a
s
s
u
m
e
s
f
u
l
l
l
i
a
b
i
l
i
t
y
f
o
r
d
e
v
i
a
t
i
o
n
s
f
r
o
m
t
h
e
in
t
e
n
t
o
f
t
h
e
s
e
p
l
a
n
s
.
1
St
r
u
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
fa
x
:
2
0
8
.
2
2
7
.
8
4
0
5
10
2
0
E
.
L
i
n
c
o
l
n
R
o
a
d
Id
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
ph
o
n
e
:
2
0
8
.
2
2
7
.
8
4
0
4
co
n
t
a
c
t
@
f
r
o
s
t
-
s
t
r
u
c
t
u
r
a
l
.
c
o
m
S3.0
6/3/21
RE
X
B
U
R
G
R
O
W
H
O
U
S
E
S
KY
L
E
R
H
O
K
A
N
S
O
FA
C
MT
B
IF
2
1
-
0
0
7
FO
U
N
D
A
T
I
O
N
&
R
O
O
F
F
R
A
M
I
N
G
D
E
T
A
I
L
S
RE
X
B
U
R
G
,
I
D
A
H
O
--
-
-
--
-
-
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
11
6
9
7
PRO
F
E
S
S
I
O
N
A
L
EN G I N E E R
R
E
G
I
S
T
ERE D
S T ATE
O
F
I
D
A
H
O
M A R KEL
L
B
A
T
E
M
A
N
6/
3
/
2
1
03
/
2
9
/
2
0
2
1
P
E
R
M
I
T
S
E
T
04
/
0
7
/
2
0
2
1
B
I
D
S
E
T
06
/
0
4
/
2
0
2
1
A
S
I
#
0
0
2
VAN
VAN
DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DWDW DWR R R R R R R R R R R R R R R R R R RR R
DW R
DWR DW R DWR
DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DWDW DW
R R R R R R R R R R R R R R R R R R RR R
DW R
DWR DW R DWR
7TH NORTH
CA
R
L
O
W
359' - 1 3/4"
SEE CIVIL DRAWINGS FOR DUMPSTER ENCLOSURE
24
'
-
0
"
24' - 0"
24
'
-
0
"
26' - 0"
20
'
-
0
"
TYPICAL
9' - 0"
20
'
-
0
"
T
Y
P
I
C
A
L
GENERAL NOTES -SITE PLAN
1. DO NOT SCALE DRAWINGS
2. LANDSCAPE DRAWINGS WILL BE DESIGN BUILD AT A FUTURE DATE
4. STAGING AREA TO BE COORDINATED BY CONTRACTOR WITH AUTHORITIES HAVING JURISDICTION
5. SEE CIVIL DRAWINGS FOR ADDITIONAL SITE INFORMATION AND DETAILS
6. SEE MECHANICAL FOR DRAIN AND PLUMBING LOCATIONS
SITE LEGEND
FIRE LANE
ADA ACCESSIBLE ROUTE
ROOF OUTLINE
102 PARKING STALLS REQUIRED
102 PARKING STALLS PROVIDED
4 ADA PARKING STALLS REQUIRED
4 ADA PARKING STALLS PROVIDED, INCLUDING (2) VAN ACCESSIBILITY STALLS
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AS101
Architectural
Site Plan &
Unit Concept
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
1/16" = 1'-0"A1 Architectural Site Plan
2 ASI 001 6/4/21
3 ASI 002 6/4/21
DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DWDW DWR R R R R R R R R R R R R R R R R R RR R
DW R
DWR DW R DWR
1
1
A A
2
2
3
3
4
4
B B
AE201
C1
AE201
B1
38
'
-
0
"
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
5' - 1 1/4" 13' - 7 3/4" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 6 1/4"
1 BEDROOM
A101
TYPE B
1 BEDROOM
A102
1 BEDROOM
A103
1 BEDROOM
A104
1 BEDROOM
A105
1 BEDROOM
A106
1 BEDROOM
A107
1 BEDROOM
A108
1 BEDROOM
A109
1 BEDROOM
A110
1 BEDROOM
A111
1 BEDROOM
A112
1 BEDROOM
A113
1 BEDROOM
A114
1 BEDROOM
A115
1 BEDROOM
A116
1 BEDROOM
A117
1 BEDROOM
A118
1 BEDROOM
A119
1 BEDROOM
A120
1 BEDROOM
A121
1 BEDROOM
A122
1 BEDROOM
A123
1 BEDROOM
A124
1 BEDROOM
A125
TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE BTYPE A TYPE B TYPE B
AE202D4
AE202 B4
ELEC
A126
MECH
A127
353' - 0 1/2"
5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"
11
'
-
0
"
10
'
-
0
"
7' - 0 1/4" 7' - 5 1/4"7' - 0 1/4" 7' - 5 1/4"7' - 0 1/4" 7' - 5 1/4"7' - 0 1/4" 7' - 5 1/4"7' - 0 1/4" 7' - 5 1/4"7' - 0 1/4" 7' - 5 1/4"
1' - 11 3/4"4' - 11 3/4"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"
EW6v
EW6v
EW6v
EW6h
EW6v
EW6h
EW6v
EW6h
EW6v
EW6h
EW6v
EW6h
EW6v
EW6h
EW6v
EW6v
EW6v
EW6v
EW6v EW6h
SEE
ELEV
EW6v
SEE
ELEV
EW6h EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6hEW6v
EW6v
EW6h
EW6vEW6vEW6vEW6vEW6vEW6vEW6vEW6vEW6vEW6vEW6vEW6v
FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b
8'
-
2
1
/
2
"
8'
-
4
3
/
8
"
1
1
'
-
0
"
AE401
B4
AE402
B4
AE101
E6
AE601
D4
AE601
6
1' - 0"
2'
-
9
"
2'
-
9
"
EW6v
SCHEDULED DOOR
FIRE RATED DEMISING
WALL, RE: FLOOR PLAN,
CONTINUE TO EXTERIOR
WALL FACE & TO UPPER
ROOF DECK
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE101
Overall
Dimension &
Wall Type
Plan
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
3/32" = 1'-0"B1 Overall Dimension & Wall Type Plan
GENERAL NOTES - DIM PLANS
1 GENERAL CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND SHALL REPORT TO THE ARCHITECT ANY
UNKNOWN CONDITIONS, ERRORS, OR CONFLICTS IN THE DRAWINGS BEFORE BEGINNING WORK
2 DO NOT SCALE DRAWINGS
5 SEE SHEET SERIES AE600 FOR DOOR AND WINDOW TYPES
6 SEE SHEET SERIES AE500 FOR HORIZONTAL AND VERTICAL ASSEMBLY TYPES
7 WALL TYPES ARE TAGGED FOR LENGTH OF ENTIRE WALL RUN, UNLESS NOTED OTHERWISE
8 ALL DIMENSIONS ARE TO THE FACE OF WOOD STUD FRAMED WALLS AS SHOWN, UNLESS NOTED OTHERWISE
3 ASI 002 6/4/21
1 1/2" = 1'-0"E6 Demising Wall / Exterior Wall Condition
DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DWDW DW
R R R R R R R R R R R R R R R R R R RR R
DW R
DWR DW R DWR
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
5' - 1 1/4" 13' - 7 3/4" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 6 1/4"
1 BEDROOM
A201
TYPE B
1 BEDROOM
A202
1 BEDROOM
A203
1 BEDROOM
A204
1 BEDROOM
A205
1 BEDROOM
A206
1 BEDROOM
A207
1 BEDROOM
A208
1 BEDROOM
A209
1 BEDROOM
A210
1 BEDROOM
A211
1 BEDROOM
A212
1 BEDROOM
A213
1 BEDROOM
A214
1 BEDROOM
A215
1 BEDROOM
A216
1 BEDROOM
A217
1 BEDROOM
A218
1 BEDROOM
A219
1 BEDROOM
A220
1 BEDROOM
A221
1 BEDROOM
A222
1 BEDROOM
A223
1 BEDROOM
A224
1 BEDROOM
A225
TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE BTYPE A TYPE B TYPE B
ELEC
A227
MECH
A226
5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"5 3/4"7' - 0 1/4" 7' - 5 1/4"7' - 0 1/4" 7' - 5 1/4"7' - 0 1/4" 7' - 5 1/4"7' - 0 1/4" 7' - 5 1/4"7' - 0 1/4" 7' - 5 1/4"7' - 0 1/4" 7' - 5 1/4"
1' - 11 3/4"
4' - 11 3/4"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"6' - 4 1/2"
7 1/2"7 1/2"
5' - 11"
EW6v
EW6v EW6v EW6h
EW6v
EW6h
EW6v
EW6h
EW6v
EW6h
EW6v
EW6h
EW6v
EW6h
EW6v
EW6v
EW6v
EW6v
EW6v EW6h EW6vEW6hEW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6vEW6vEW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6h EW6v
SEE
ELEV
EW6v EW6v EW6hEW6v
EW6v
EW6h
EW6vEW6vEW6vEW6vEW6vEW6vEW6vEW6vEW6vEW6vEW6vEW6v
FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b FW4b
8'
-
2
1
/
2
"
8
'
-
4
3
/
8
"
AE401
B4
AE402
B4
1' - 0"
2'
-
9
"
2'
-
9
"
C C
D D
MIRRORED MIRRORED
AE202 B4
AE201
C1
AE202D4
AE201
B1
AE101
E6
MIRRORED
MIRRORED
MIRRORED
MIRRORED
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE101.1
Mirrored
Overall
Dimension &
Wall Type
Plan
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
2 ASI 001 6/4/21
3/32" = 1'-0"B1 Overall Dimension & Wall Type Plan (Mirrored)
GENERAL NOTES - DIM PLANS
1 GENERAL CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND SHALL REPORT TO THE ARCHITECT ANY
UNKNOWN CONDITIONS, ERRORS, OR CONFLICTS IN THE DRAWINGS BEFORE BEGINNING WORK
2 DO NOT SCALE DRAWINGS
5 SEE SHEET SERIES AE600 FOR DOOR AND WINDOW TYPES
6 SEE SHEET SERIES AE500 FOR HORIZONTAL AND VERTICAL ASSEMBLY TYPES
7 WALL TYPES ARE TAGGED FOR LENGTH OF ENTIRE WALL RUN, UNLESS NOTED OTHERWISE
8 ALL DIMENSIONS ARE TO THE FACE OF WOOD STUD FRAMED WALLS AS SHOWN, UNLESS NOTED OTHERWISE
DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DWDW DWR R R R R R R R R R R R R R R R R R RR R
DW R
DWR DW R DWR
1
1
A A
2
2
3
3
4
4
B B
AE201
B1
B3
AE301
B1
AE301
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
D1
AE301
D3
AE301
ELEC
A126
MECH
A127
A A A A A
A
A
A A
103 104103104
126
127
125124123120119116115115112111115108107
A
A A A A A A A A A A A A A A A A A A A A A A
A
A
A A A A A A A A A A A A A A A A A A A A
AE401
B4
AE402
B4
AE202 B4
AE202D4
AE201
C1
101 102 105 106 109 110 113 114
1 BEDROOM
A101
TYPE B
1 BEDROOM
A102
1 BEDROOM
A103
1 BEDROOM
A104
1 BEDROOM
A105
1 BEDROOM
A106
1 BEDROOM
A107
1 BEDROOM
A108
1 BEDROOM
A109
1 BEDROOM
A110
1 BEDROOM
A111
1 BEDROOM
A112
1 BEDROOM
A113
1 BEDROOM
A114
1 BEDROOM
A115
1 BEDROOM
A116
1 BEDROOM
A117
1 BEDROOM
A118
1 BEDROOM
A119
1 BEDROOM
A120
1 BEDROOM
A121
1 BEDROOM
A122
1 BEDROOM
A123
1 BEDROOM
A124
1 BEDROOM
A125
TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE BTYPE A TYPE B TYPE B
117 118 121 122
03.04
21.0121.0121.0121.01 21.01 21.01 21.0121.01 21.01 21.01 21.0121.01 21.01 21.01 21.01 21.01 21.0121.01 21.01 21.01 21.01 21.01 21.0121.01
22.02
AE601
D4
AE601
6
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE102
Overall
Annotation
Plan
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
KEYED NOTES
03.04 CONCRETE SLAB ON GRADE OVER GRAVEL BED, RE: STRUCTURAL
21.01 2 HR DEMISING / PARTY WALL, TO UNDERSIDE OF UPPER ROOF, RE: WALL TYPES
22.02 METER LOCATION FOR ALL UNITS; SEE ELECTRICAL
3/32" = 1'-0"B1 Overall Annotated Plan
GENERAL NOTES - FLOOR PLAN
1 GENERAL CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND SHALL REPORT TO THE ARCHITECT ANY
UNKNOWN CONDITIONS, ERRORS, OR CONFLICTS IN THE DRAWINGS BEFORE BEGINNING WORK
2 DO NOT SCALE DRAWINGS
5 SEE SHEET GI003 FOR TYPICAL MOUNTING HEIGHTS. PROVIDE SOLID BLOCKING IN WALLS FOR ALL WALL-MOUNTED
ITEMS WHETHER BLOCKING IS DEPICTED IN DRAWINGS OR NOT
6 COORDINATE ALL EQUIPMENT AND ACCESSORIES, INCLUDING ITEMS THAT ARE OFOI, WITH OWNER.
7 SEE SHEET SERIES AE500 FOR HORIZONTAL AND VERTICAL ASSEMBLY TYPES
8 SEE SHEET SERIES AE600 FOR DOOR & WINDOW TYPES
10 TYPE A & TYPE B UNITS REQUIRE DIFFERENT HEIGHTS FOR CABINETRY, COUNTERTOPS & REACHES, RE: GI003
11 SEE ELEVATIONS AND FINISH SCHEDULES, SHEETS AE401 & AE402
12 SEE ELEVATIONS, SECTIONS, AND DETAILS FOR ADDITIONAL WALL CONSTRUCTION INFORMATION
13 SEE AE901 FOR CASEWORK & ACCESSIBLE MILLWORK DETAILS
14 OWNER IS TO SELECT ALL APPLIANCES. COORDINATE MILLWORK WITH SELECTED APPLIANCES BEFORE
CONSTRUCTION AND INSTALLATION.
3 ASI 002 6/4/21
DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DWDW DW
R R R R R R R R R R R R R R R R R R RR R
DW R
DWR DW R DWR
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
C C
D D
A
A A
A AA A A AA A A AA A A AA A A AA
A
A A AA
A
A
A
A A A A A A A A A A A A A A A A A A A A A A A
A
127
126
1 BEDROOM
A201
1 BEDROOM
A202
1 BEDROOM
A203
1 BEDROOM
A204
1 BEDROOM
A205
1 BEDROOM
A206
1 BEDROOM
A207
1 BEDROOM
A208
1 BEDROOM
A209
1 BEDROOM
A210
1 BEDROOM
A211
1 BEDROOM
A212
1 BEDROOM
A213
1 BEDROOM
A214
1 BEDROOM
A215
1 BEDROOM
A216
1 BEDROOM
A217
1 BEDROOM
A218
1 BEDROOM
A219
1 BEDROOM
A220
1 BEDROOM
A221
1 BEDROOM
A222
1 BEDROOM
A223
1 BEDROOM
A224
1 BEDROOM
A225
ELEC
A227
MECH
A226
101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125
AE202 B4
AE202D4
TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE BTYPE A TYPE B TYPE B
21.0121.0121.0121.01 21.01 21.01 21.0121.01 21.01 21.01 21.0121.01 21.01 21.01 21.01 21.01 21.0121.01 21.01 21.01 21.01 21.01 21.0121.01
22.02
AE401
B4
AE402
B4
MIRROREDMIRRORED AE201
C1
AE201
B1
MIRRORED
MIRRORED
MIRRORED
MIRRORED
B3
AE301
B1
AE301
D1
AE301MIRRORED MIRRORED
MIRRORED
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE102.1
Mirrored
Overall
Annotation
Plan
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
2 ASI 001 6/4/21
3/32" = 1'-0"B1 Overall Annotated Plan (Mirrored)
GENERAL NOTES - DIM PLANS
1 GENERAL CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND SHALL REPORT TO THE ARCHITECT ANY
UNKNOWN CONDITIONS, ERRORS, OR CONFLICTS IN THE DRAWINGS BEFORE BEGINNING WORK
2 DO NOT SCALE DRAWINGS
5 SEE SHEET SERIES AE600 FOR DOOR AND WINDOW TYPES
6 SEE SHEET SERIES AE500 FOR HORIZONTAL AND VERTICAL ASSEMBLY TYPES
7 WALL TYPES ARE TAGGED FOR LENGTH OF ENTIRE WALL RUN, UNLESS NOTED OTHERWISE
8 ALL DIMENSIONS ARE TO THE FACE OF WOOD STUD FRAMED WALLS AS SHOWN, UNLESS NOTED OTHERWISE
1
1
A A
2
2
3
3
4
4
B B
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
38
'
-
0
"
13' - 7 3/4" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2"14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 6 1/4"
100' - 0"100' - 0"
100' - 0"
100' - 0"
100' - 0"
100' - 0"
100' - 0"
7' - 7 1/4" 6' - 6 1/4" 7' - 4 3/4" 6' - 8 3/4"7' - 7 1/4" 6' - 6 1/4" 7' - 4 3/4" 6' - 8 3/4"7' - 7 1/4" 6' - 6 1/4" 7' - 4 3/4" 6' - 8 3/4"7' - 7 1/4" 6' - 6 1/4" 7' - 4 3/4" 6' - 8 3/4"7' - 7 1/4" 6' - 6 1/4" 7' - 4 3/4" 6' - 8 3/4"7' - 7 1/4" 6' - 6 1/4" 7' - 4 3/4" 6' - 8 3/4"
16
'
-
0
"
10
'
-
0
"
1'
-
6
"
6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"4' - 7 1/4" 6' - 11"
1'
-
6
"
1'
-
6
"
1'
-
6
"
1'
-
6
"
1'
-
6
"
1'
-
6
"
1'
-
6
"
1'
-
6
"
1'
-
6
"
1'
-
6
"
1'
-
6
"
1'
-
6
"
16
'
-
0
3
/
8
"
1
1
'
-
0
"
F1
F1
F103.04
03.04 03.04
6"
T
Y
P
6" TYP
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
T
Y
P
6" TYP
SLAB EDGE LEGEND
SLAB ON GRADE, RE: STRUCTURAL
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE111
Overall Slab
Edge Plan
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
GENERAL NOTES - SLAB EDGE
1 COORDINATE SLAB EDGE PLANS WITH STRUCTURAL DRAWINGS
2 COORDINATE SLAB EDGE PLANS WITH MECHANICAL DRAWINGS
3/32" = 1'-0"B1 Overall Slab Plan
KEYED NOTES
03.04 CONCRETE SLAB ON GRADE OVER GRAVEL BED, RE: STRUCTURAL
3 ASI 002 6/4/21
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
C C
D D
13' - 7 3/4" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2"14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 6 1/4"
100' - 0"100' - 0"
100' - 0"
100' - 0"
100' - 0"
100' - 0"
100' - 0"
03.04
03.04 03.04
F1
F1
F1
38
'
-
0
"
13' - 7 3/4" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2"14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 6 1/4"
7' - 7 1/4" 6' - 6 1/4" 7' - 4 3/4" 6' - 8 3/4"7' - 7 1/4" 6' - 6 1/4" 7' - 4 3/4" 6' - 8 3/4"7' - 7 1/4" 6' - 6 1/4" 7' - 4 3/4" 6' - 8 3/4"7' - 7 1/4" 6' - 6 1/4" 7' - 4 3/4" 6' - 8 3/4"7' - 7 1/4" 6' - 6 1/4" 7' - 4 3/4" 6' - 8 3/4"7' - 7 1/4" 6' - 6 1/4" 7' - 4 3/4" 6' - 8 3/4"
16
'
-
0
"
1
0
'
-
0
"
1'
-
6
"
6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"6' - 6 1/4" 7' - 4 3/4"4' - 7 1/4" 6' - 11"
1'
-
6
"
1'
-
6
"
1'
-
6
"
1'
-
6
"
1'
-
6
"
1'
-
6
"
1'
-
6
"
1'
-
6
"
1'
-
6
"
1'
-
6
"
1'
-
6
"
1'
-
6
"
16
'
-
0
3
/
8
"
1
1
'
-
0
"
6"
T
Y
P
6" TYP
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
T
Y
P
6" TYP
SLAB EDGE LEGEND
SLAB ON GRADE, RE: STRUCTURAL
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE111.1
Mirrored
Overal Slab
Edge Plan
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
2 ASI 001 6/4/21
3/32" = 1'-0"B1 Overall Slab Plan (Mirrored)
GENERAL NOTES - SLAB EDGE
1 COORDINATE SLAB EDGE PLANS WITH STRUCTURAL DRAWINGS
2 COORDINATE SLAB EDGE PLANS WITH MECHANICAL DRAWINGS
KEYED NOTES
03.04 CONCRETE SLAB ON GRADE OVER GRAVEL BED, RE: STRUCTURAL
1
1
A A
2
2
3
3
4
4
B B
AE401
B5
B3
AE301
B1
AE301
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
D1
AE301
D3
AE301
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
AE402
B5
G1 9' - 0"G1 9' - 0"
09.01 09.01 09.01 09.01 09.01 09.01 09.01 09.01 09.01 09.0109.01 09.01 09.01 09.01 09.01 09.0109.01 09.01 09.01 09.01 09.01 09.0109.01 09.01 09.01
08.11
08.11
08.11 08.11 08.11 08.11 08.11 08.11 08.11 08.11 08.11 08.11 08.11 08.11 08.11 08.11 08.11 08.11 08.11 08.11 08.11 08.11 08.11 08.11 08.11
CEILING LEGEND
G1 GYPSUM BOARD (PAINTED), ATTACHED TO BOTTOM OF
TRUSSES W/ R-30 OPEN CELL BLOWN-IN INSULATION ABOVE
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE131
Overall
Reflected
Ceiling Plan
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
3/32" = 1'-0"B1 Overall Reflected Ceiling Plan
KEYED NOTES
08.11 CEILING ACCESS PANEL - COORDINATE EXACT LOCATION WITH MECHANICAL EQUIPMENT AND ACCESS
REQUIREMENTS - PAINTED (MATCH COLOR OF ADJACENT CEILING). PROVIDE R-30 INSULATION ABOVE THE
ATTIC ACCESS
09.01 PAINTED GYP BD. (PT-1)
GENERAL NOTES - CEILING PLAN
1 GENERAL CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND SHALL REPORT TO THE ARCHITECT ANY
UNKNOWN CONDITIONS, ERRORS, OR CONFLICTS IN THE DRAWINGS BEFORE BEGINNING WORK
2 DO NOT SCALE DRAWINGS
3 SEE SHEET AE511 FOR TYPICALCEILING DETAILS
4 FOR LIGHTING LAYOUT, SEE ELECTRICAL LIGHTING PLAN
3 ASI 002 6/4/21
ROOF MEMBRANE (WHITE) OVER RIGID INSULATION
OVER SHEATHING
ROOF LEGEND
ASPHALT ROOF SHINGLE SYSTEM - GAF 3-TAB:
ROYAL SOVEREIGN (CHARCOAL)
1. FOR GUTTERS, MATCH THE ADJACENT COLOR. (I.E. BREAK METAL DARK OR LIGHT). FOR
DOWNSPOUTS, MATCH THE GUTTER COLOR (I.E. IF GUTTER IS LIGHT, THEN MAKE
DOWNSPOUT LIGHT. IF GUTTER IS DARK, THEN MAKE DOWNSPOUT DARK)
GENERAL NOTES
1
1
A A
2
2
3
3
4
4
B B
B3
AE301
B1
AE301
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
D1
AE301
D3
AE301
353' - 1 5/8"
38
'
-
0
"
13' - 7 3/4" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2"14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 6 1/4"
7"
/
1
2
"
3"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
14" / 12"
7"
/
1
2
"
14" / 12"
14" / 12"14" / 12"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
14" / 12"
7"
/
1
2
"
14" / 12"
14" / 12"14" / 12"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
3"
/
1
2
"
3"
/
1
2
"
14" / 12"
7"
/
1
2
"
14" / 12"
14" / 12"14" / 12"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
3"
/
1
2
"
3"
/
1
2
"
14" / 12"
7"
/
1
2
"
14" / 12"
14" / 12"14" / 12"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
3"
/
1
2
"
3"
/
1
2
"
14" / 12"
7"
/
1
2
"
14" / 12"
14" / 12"14" / 12"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
3"
/
1
2
"
3"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
3"
/
1
2
"
3"
/
1
2
"
R1
R1
R1
R2
R1
R2
R1
R1
R2
R1
R2
R1
R1
R2
R1
R2
R1
R1
R2
R1
R2
R1
R1
R2
R1
R2
R1
R2
R1
R1R1
R1R1R1
R1R1
R1R1
R1
R1
EQ
EQ
07.03 07.03
07.0307.03
07.03
07.03
07.03 07.03
07.03
07.03
07.03
07.03
07.03
07.03
07.03
07.03
07.0307.03
07.03
07.02 07.02 07.02 07.02 07.02 07.02 07.02 07.02 07.02 07.02
07.05
AE142
B1
07.05
21.0321.03
TYP
TYP
07.05
TYP
TYP
07.05
21.0321.03
TYP
TYP
07.05
21.0321.03
TYP
TYP
21.0321.03
TYP
TYP
07.05
21.0321.03
TYP
TYP
07.05
7"
/
1
2
"
7"
/
1
2
"
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE141
Overall Roof
Plan
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
GENERAL NOTES - ROOF PLAN
1 GENERAL CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND SHALL REPORT
TO THE ARCHITECT ANY UNKNOWN CONDITIONS, ERRORS, OR CONFLICTS IN THE
DRAWINGS BEFORE BEGINNING WORK
2 DO NOT SCALE DRAWINGS
3 CRICKET AT ALL MECHANICAL ITEMS, 1/4" PER FOOT BACKSLOPE MINIMUM
4 SEE BUILDING AND WALL SECTIONS FOR ADDITIONAL ROOF INFO; SEE SHEET AE501
FOR ROOF ASSEMBLY CONSTRUCTION
KEYED NOTES
07.02 CANOPY: SINGLE-PLY ROOF MEMBRANE OVER RIGID INSULATION OVER SHEATHING
07.03 ASPHALT 30 YEAR ROOF SHINGLES OVER SELF-ADHERED UNDERLAYMENT (GRACE OR EQ)
07.05 RIDGE VENT, QUARRIX - STORM STOP OR EQ
21.03 RIDGE VENT TO BEGIN/END 4'-0" FROM FACE OF DEMISING WALLS (EA WAY)
3/32" = 1'-0"B1 Overall Roof Plan
3 ASI 002 6/4/21
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
13' - 7 3/4" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2"14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 1 1/2" 14' - 6 1/4"
C C
D D
38
'
-
0
"
7"
/
1
2
"
3"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
14" / 12"
7"
/
1
2
"
14" / 12"
14" / 12"14" / 12"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
14" / 12"
7"
/
1
2
"
14" / 12"
14" / 12"14" / 12"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
3"
/
1
2
"
3"
/
1
2
"
14" / 12"
7"
/
1
2
"
14" / 12"
14" / 12"14" / 12"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
3"
/
1
2
"
3"
/
1
2
"
14" / 12"
7"
/
1
2
"
14" / 12"
14" / 12"14" / 12"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
3"
/
1
2
"
3"
/
1
2
"
14" / 12"
7"
/
1
2
"
14" / 12"
14" / 12"14" / 12"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
3"
/
1
2
"
3"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
3"
/
1
2
"
3"
/
1
2
"
R1
R1
R1
R2
R1
R2
R1
R1
R2
R1
R2
R1
R1
R2
R1
R2
R1
R1
R2
R1
R2
R1
R1
R2
R1
R2
R1
R2
R1
R1R1
R1R1R1
R1R1
R1R1
R1
R1
EQ
EQ
07.03 07.03
07.0307.03
07.03
07.03
07.03 07.03
07.03
07.03
07.03
07.03
07.03
07.03
07.03
07.03
07.0307.03
07.03
07.02 07.02 07.02 07.02 07.02 07.02 07.02 07.02 07.02 07.02
07.05 07.05
21.0321.03
TYP
TYP
07.05
TYP
TYP
07.05
21.0321.03
TYP
TYP
07.05
21.0321.03
TYP
TYP
21.0321.03
TYP
TYP
07.05
21.0321.03
TYP
TYP
07.05
AE142
B1
MIRRORED
353' - 0 1/2"
ROOF MEMBRANE (WHITE) OVER RIGID INSULATION
OVER SHEATHING
ROOF LEGEND
ASPHALT ROOF SHINGLE SYSTEM - GAF 3-TAB:
ROYAL SOVEREIGN (CHARCOAL)
1. FOR GUTTERS, MATCH THE ADJACENT COLOR. (I.E. BREAK METAL DARK OR LIGHT). FOR
DOWNSPOUTS, MATCH THE GUTTER COLOR (I.E. IF GUTTER IS LIGHT, THEN MAKE
DOWNSPOUT LIGHT. IF GUTTER IS DARK, THEN MAKE DOWNSPOUT DARK)
GENERAL NOTES
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE141.1
Mirrored
Overall Roof
Plan
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
2 ASI 001 6/4/21
3/32" = 1'-0"B1 Overall Roof Plan (Mirrored)
GENERAL NOTES - ROOF PLAN
1 GENERAL CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND SHALL REPORT
TO THE ARCHITECT ANY UNKNOWN CONDITIONS, ERRORS, OR CONFLICTS IN THE
DRAWINGS BEFORE BEGINNING WORK
2 DO NOT SCALE DRAWINGS
3 CRICKET AT ALL MECHANICAL ITEMS, 1/4" PER FOOT BACKSLOPE MINIMUM
4 SEE BUILDING AND WALL SECTIONS FOR ADDITIONAL ROOF INFO; SEE SHEET AE501
FOR ROOF ASSEMBLY CONSTRUCTION
KEYED NOTES
07.02 CANOPY: SINGLE-PLY ROOF MEMBRANE OVER RIGID INSULATION OVER SHEATHING
07.03 ASPHALT 30 YEAR ROOF SHINGLES OVER SELF-ADHERED UNDERLAYMENT (GRACE OR EQ)
07.05 RIDGE VENT, QUARRIX - STORM STOP OR EQ
21.03 RIDGE VENT TO BEGIN/END 4'-0" FROM FACE OF DEMISING WALLS (EA WAY)
7"
/
1
2
"
7"
/
1
2
"
07.03
07.03
07.03
E5
AE142 TYP
1
1
A
2
2
3
3
4
4
B
B3
AE301
B1
AE301
5
5
D1
AE301
D3
AE301
AE142
E2
7"
/
1
2
"
7"
/
1
2
"
3"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
07.03
07.05
07.03
07.03
07.03
21.02 21.02
4' - 0"4' - 0"
TYP AT ALL
DEMISING
WALLS
TYP AT ALL
DEMISING
WALLS
21.02 21.02
4' - 0"
TYP AT ALL
DEMISING
WALLS
TYP AT ALL
DEMISING
WALLS
21.02 21.02
4' - 0"
TYP AT ALL
DEMISING
WALLS
TYP AT ALL
DEMISING
WALLS
21.02 21.02
TYP AT ALL
DEMISING
WALLS
TYP AT ALL
DEMISING
WALLS
4' - 0" 4' - 0" 4' - 0"4' - 0"
TYP
TYP
07.05
21.0321.03
TYP
TYP
07.05
21.0321.03
TYP
TYP
07.05
21.0321.03
TYP
TYP
07.05
21.0321.03
05.02
05.02 05.02
05.02
05.02
05.02
ROOF MEMBRANE (WHITE) OVER RIGID INSULATION
OVER SHEATHING
ROOF LEGEND
ASPHALT ROOF SHINGLE SYSTEM - GAF 3-TAB:
ROYAL SOVEREIGN (CHARCOAL)
1. FOR GUTTERS, MATCH THE ADJACENT COLOR. (I.E. BREAK METAL DARK OR LIGHT). FOR
DOWNSPOUTS, MATCH THE GUTTER COLOR (I.E. IF GUTTER IS LIGHT, THEN MAKE
DOWNSPOUT LIGHT. IF GUTTER IS DARK, THEN MAKE DOWNSPOUT DARK)
GENERAL NOTES
Top Plate
110' -0"
30 YEAR ROOF SHINGLES OVER SELF-ADHERED UNDERLAYMENT
CONTINUOUS VAPOR & MOISTURE BARRIER
SHEATHING, RE: STRUCTURAL
ROOF TRUSSES, RE: STRUCTURAL
BLOCKING BETWEEN
TRUSSES, RE:
STRUCTURAL
BRAKE METAL FASCIA (TIMELY PREFINISHED STEEL COLOR: SNOW WHITE
CC311), RUN DOWN FACE OF FASCIA AND ON TOP OF CANOPY ROOF
CONTINUOUS VAPOR & MOISTURE BARRIER
CONTINUOUS VAPOR & MOISTURE BARRIER
FASCIA BRAKE METAL (TIMELY PREFINISHED STEEL COLOR: BLACK SC103)
SELF-ADHERED UNDERLAYMENT
RIGID INSULATION
WRAP FASCIA BRAKE METAL (BLACK) UP AND OVER TOP 3" MIN
(R
I
G
I
D
)
ALUMINUM CEILING PANEL (TIMELY PREFINISHED STEEL COLOR: BLACK SC103)
BEND FASCIA BRAKE METAL AND WRAP CORNER 1"1"
ALUMINUM 'FAUX WOOD' SIDING PANEL SYSTEM (KNOTWOOD 4" CLADDING: BEACHWOOD COLOR)
TOP PLATES / BLOCKING AS REQ'D
TOE NAIL INTO 2X10 LEDGER, RE: STRUCTURAL
LAP WHITE BRAKE METAL OVER TOP OF BLACK BREAK METAL 3" MIN
2x NAILER @ TOP, RE: STRUCTURAL
1/
2
"
METAL GUTTER - COLOR TO MATCH ADJACENT BRAKE METAL
(2) 2X10 ' HEADER FLUSH WITH EXTERIOR WALL . RE: STRUCTURAL.
2X10 ' FASCIA BOARD
30 YEAR ROOF SHINGLES OVER SELF-ADHERED UNDERLAYMENT
CONTINUOUS VAPOR & MOISTURE BARRIER
SHEATHING, RE: STRUCTURAL
ROOF TRUSSES, RE: STRUCTURAL
BLOCKING BETWEEN
TRUSSES, RE:
STRUCTURAL
BRAKE METAL FASCIA (TIMELY PREFINISHED STEEL COLOR: SNOW WHITE
CC311), RUN DOWN FASCIA FACE AND WRAP UNDER FASCIA
CONTINUOUS VAPOR & MOISTURE BARRIER
SCHEDULED WALL
TOP PLATE, RE: STRUCTURAL
2x NAILER @ TOP, RE: STRUCTURAL
CEMENT BOARD SIDING (VERTICAL)
QUARRIX FURRING STRIPS (3" x 5/16") OR
QUARRIX PROTECT DRAIN MAT
CONTINUOUS VAPOR & MOISTURE BARRIER
MIN2"
2x8 STUD ATTACHED TO FACE AT TOP OF WALL
COVER TOP OF SIDING W/ BRAKE METAL/FLASHING
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE142
Enlarged
Roof Plans
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
3/4" = 1'-0"E2 Typical Canopy / Roof
1/4" = 1'-0"B1 Enlarged Roof Plan
GENERAL NOTES - ROOF PLAN
1 GENERAL CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND SHALL REPORT
TO THE ARCHITECT ANY UNKNOWN CONDITIONS, ERRORS, OR CONFLICTS IN THE
DRAWINGS BEFORE BEGINNING WORK
2 DO NOT SCALE DRAWINGS
3 CRICKET AT ALL MECHANICAL ITEMS, 1/4" PER FOOT BACKSLOPE MINIMUM
4 SEE BUILDING AND WALL SECTIONS FOR ADDITIONAL ROOF INFO; SEE SHEET AE501
FOR ROOF ASSEMBLY CONSTRUCTION
KEYED NOTES
05.02 RAIN GUTTER - COLOR MATCH ADJACENT BRAKE METAL
07.03 ASPHALT 30 YEAR ROOF SHINGLES OVER SELF-ADHERED UNDERLAYMENT (GRACE OR EQ)
07.05 RIDGE VENT, QUARRIX - STORM STOP OR EQ
21.02 5/8" TYPE 'X' GYPSUM BOARD, EXTEND OUT 4'-0" MIN FROM FACE OF DEMISING WALL (EA SIDE), UNDER ROOF
SHEATHING - HOLD DOWN ROOF TRUSSES 5/8" AT THIS AREA TO ACCOMODATE GYPSUM SHEATHING AND
ASSURE FLUSH ROOF SHEATHING FLUSH
21.03 RIDGE VENT TO BEGIN/END 4'-0" FROM FACE OF DEMISING WALLS (EA WAY)
1 1/2" = 1'-0"E5 Canopy Detail
1 1/2" = 1'-0"D5 Top of Wall / Siding Detail
PRE-PAINTED FIBER CEMENT SIDING BOARD, HARDIEPANEL:
ARCTIC WHITE -SMOOTH W/ 1x2 BATTENS @ 16" O.C.
*ALTERNATE: JAMES HARDIE ARTISAN V-GROOVE SIDING (8.25" x
144") ARCTIC WHITE -SMOOTH
MATERIAL LEGEND
ALUMINUM 'FAUX WOOD' SIDING PANEL SYSTEM (KNOTWOOD 4"
CLADDING: COLOR TO BE SELECTED BY OWNER/ARCHITECT
FROM KNOTWOOD FULL COLOR SAMPLE CHAIN (PROVIDED BY
CONTRACTOR)
BRAKE METAL DARK (BMD):
MBCI -COLOR: COAL BLACK SIG 200
(WALLS / ABOVE WINDOWS / CANOPY CEILING PANELS / RAIN GUTTERS &
DOWNSPOUTS)
ASPHALT ROOF SHINGLE SYSTEM -GAF 3-TAB: ROYAL
SOVEREIGN (CHARCOAL)
BRAKE METAL LIGHT (BML):
TIMELY PREFINISHED STEEL COLOR: SNOW WHITE CC311
(AT ROOF FASCIAS)
Finish Floor
100' -0"
1
Top Plate
110' -0"
234
T.O. Ridge
121' -11"
B3
AE301
B1
AE301
567891011121314151617181920212223242526
D1
AE301
AE202
D1
T.O. Lower Ridge
115' -9"
EW6v
EW6vEW6vEW6vEW6vEW6vEW6v
EW6v EW6v EW6v EW6v EW6v
EW6h
EW6v
EW6hEW6hEW6hEW6hEW6hEW6hEW6hEW6hEW6hEW6hEW6hEW6hEW6hEW6hEW6hEW6hEW6hEW6hEW6hEW6hEW6hEW6hEW6hEW6h
R1R1R1R1 R1 R1
Finish Floor
100' -0"
1
Top Plate
110' -0"
2 3 4
T.O. Ridge
121' -11"
B3
AE301
B1
AE301
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
D1
AE301
AE202
B1
T.O. Lower Ridge
115' -9"
R1R1 R1 R1 R1
EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h EW6h
EW6vEW6vEW6v EW6v EW6v EW6v EW6v EW6v
R1R1
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE201
Overall
Exterior
Elevations
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
3/32" = 1'-0"B1 Overall Ext Elevation North
3/32" = 1'-0"C1 Overall Ext Elevation South
Finish Floor
100' -0"
1
Top Plate
110' -0"
2 3 4
T.O. Ridge
121' -11"
B3
AE301
B1
AE301 5D1
AE301
T.O. Lower Ridge
115' -9"
A A A AA
103 104
7"
/
1
2
"
7"
/
1
2
"
3"
/
1
2
"
EW6p EW6p
EW6h EW6h
EW6hEW6h EW6h
R1 R1
R1R1
EW6v
EW6v EW6v EW6hEW6h EW6h
EW6p
EW6p EW6p
EW6h EW6h
BB B B
101 102126
EW6v
7"
/
1
2
"
E5
AE142
BMD
BMDBMD
BMD BMD BMDBMD
BMD
BMD
BMDBMD
BMD
BML
BML
BML
B
M
LBML
BML
BML BML
26.06
18
'
-
0
"
A4
AE202
A4
AE202
A4
AE202
A4
AE202
A4
AE202
A4
AE202
A4
AE202
A4
AE202
A4
AE202
D5
AE142
D5
AE142
05.02
05.02
05.02 05.02 05.0205.0105.01 05.01 05.01 05.01
C1
AE541
B4
AE541
A6
AE541
PRE-PAINTED FIBER CEMENT SIDING BOARD, HARDIEPANEL:
ARCTIC WHITE -SMOOTH W/ 1x2 BATTENS @ 16" O.C.
*ALTERNATE: JAMES HARDIE ARTISAN V-GROOVE SIDING (8.25" x
144") ARCTIC WHITE -SMOOTH
MATERIAL LEGEND
ALUMINUM 'FAUX WOOD' SIDING PANEL SYSTEM (KNOTWOOD 4"
CLADDING: COLOR TO BE SELECTED BY OWNER/ARCHITECT
FROM KNOTWOOD FULL COLOR SAMPLE CHAIN (PROVIDED BY
CONTRACTOR)
BRAKE METAL DARK (BMD):
MBCI -COLOR: COAL BLACK SIG 200
(WALLS / ABOVE WINDOWS / CANOPY CEILING PANELS / RAIN GUTTERS &
DOWNSPOUTS)
ASPHALT ROOF SHINGLE SYSTEM -GAF 3-TAB: ROYAL
SOVEREIGN (CHARCOAL)
BRAKE METAL LIGHT (BML):
TIMELY PREFINISHED STEEL COLOR: SNOW WHITE CC311
(AT ROOF FASCIAS)
Finish Floor
100' -0"
A
Top Plate
110' -0"
B
T.O. Ridge
121' -11"
D3
AE301
T.O. Lower Ridge
115' -9"
A A
7 " / 1 2 "7" / 12"
7 " / 1 2 "7" / 12"EW6v
EW6vEW6vEW6v EW6v EW6v
EW6hEW6h
R1
R1 R1
R1
R1 R1
3" / 12"
AB
AA
7 " / 1 2 "7" / 12"
EW6v
EW6h
R1 R1
R2
EW6h
EW6v EW6v
7" / 12"7 " / 1 2 "
Finish Floor
100' -0"
1
Top Plate
110' -0"
234
T.O. Ridge
121' -11"
B3
AE301
B1
AE3015D1
AE301
AAAA
127
T.O. Lower Ridge
115' -9"
7"
/
1
2
"
7"
/
1
2
"
7"
/
1
2
"
EW6h
EW6v
EW6h
EW6v
EW6h EW6h
EW6v
EW6v
R1 R1
R1
E5
AE142
D5
AE142
ROOF MEMBRANE (WHITE) OVER RIGID INSULATION
OVER SHEATHING
ROOF LEGEND
ASPHALT ROOF SHINGLE SYSTEM - GAF 3-TAB:
ROYAL SOVEREIGN (CHARCOAL)
1. FOR GUTTERS, MATCH THE ADJACENT COLOR. (I.E. BREAK METAL DARK OR LIGHT). FOR
DOWNSPOUTS, MATCH THE GUTTER COLOR (I.E. IF GUTTER IS LIGHT, THEN MAKE
DOWNSPOUT LIGHT. IF GUTTER IS DARK, THEN MAKE DOWNSPOUT DARK)
GENERAL NOTES
PRE-FINISHED METAL FLASHING SHROUD , COLOR TO
MATCH ADJACENT EIFS WALL FINISH
EXTERIOR FINISH, RE: ELEVS/PLANS
WRAP MOISTURE BARRIER
UP SHROUD
EXTERIOR FINISH, RE: ELEVS/PLANS -
SHROUD TO PROJECT 1/2" FROM THICKEST
MATERIAL FINISH
SCHEDULED WALL, RE: PLANS
MIN
1/
2
"
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE202
Enlarged
Exterior
Elevations
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
1/4" = 1'-0"B1 Enlarged Ext Elevation South
1/4" = 1'-0"B4 Enlarged Ext Elevation West
1/4" = 1'-0"D4 Enlarged Ext Elevation East
1/4" = 1'-0"D1 Enlarged Ext Elevation North
3 ASI 002 6/4/21
6" = 1'-0"A4 Typical Material Transition Shroud
KEYED NOTES
05.01 GUTTER DOWNSPOUT - COLOR MATCH THE GUTTER IT IS CONNECTED TO
05.02 RAIN GUTTER - COLOR MATCH ADJACENT BRAKE METAL
26.06 LIGHTING FIXTURE; SEE ELECTRICAL
Finish Floor
100' -0"
A
Top Plate
110' -0"
B
T.O. Ridge
121' -11"
D3
AE301
T.O. Lower Ridge
115' -9"
09.01
06.06
06.07
06.08
06.07
07.01
08.01
03.04
03.01
07.04
11.02
09.01
06.07
07.01
08.02
06.06
06.09
07.05
F1F1
4'-0" WIDE SHEET
REMAINING FROM 4'-0" WIDE SHEET
REMAINING FROM
Finish Floor
100' -0"
A
Top Plate
110' -0"
B
T.O. Ridge
121' -11"
D3
AE301
T.O. Lower Ridge
115' -9"
06.08
07.05
03.04
07.04
03.01
08.02
06.08
06.07
09.01
06.07
07.01
08.01
4'-0" WIDE SHEET
REMAINING FROM
4'-0" WIDE SHEET
REMAINING FROM
05.01
AE142
E5 SIM
ASSEMBLY TYPES
ROOF R1
R2
F1FLOOR TYPICAL SLAB-ON-GRADE
TYPICAL ROOF ASSEMBLY
TYPICAL CANOPY ASSEMBLY
NOTE: SEE AE501 SHEET SERIES FOR COMPLETE ASSEMBLY TYPES
Finish Floor
100' -0"
A
Top Plate
110' -0"
B
T.O. Ridge
121' -11"
D3
AE301
T.O. Lower Ridge
115' -9"
06.07
06.07
03.04
03.01
09.01
06.07
07.01
08.01
06.01
22.04
10.08
10.06 10.07
22.03
09.01
06.07
07.01
08.02
06.08
07.05
07.04
F1 F1
4'-0" WIDE SHEET
REMAINING FROM
4'-0" WIDE SHEET
REMAINING FROM
26.06
08.11
Finish Floor
100' -0"
1
Top Plate
110' -0"
2 3 4
T.O. Ridge
121' -11"
B3
AE301
B1
AE301
5
D1
AE301
T.O. Lower Ridge
115' -9"
08.02
06.07
03.01
03.04
07.04
A A A A
09.01
06.07
07.01
21.01
06.06
07.03 07.03
09.01
06.07
07.01
21.01
4' - 0"4' - 0"
4' - 0"
21.02
4' - 0"
21.02 21.02
4' - 0"4' - 0"
F1 F1
21.02 21.02
R1 R1
R1
21.02
4'-0" WIDE SHEET
REMAINING FROM
4' - 0"
4
' -
0
"
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE301
Building
Sections
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
1/4" = 1'-0"B1 Building Section Grid 1.3
1/4" = 1'-0"B3 Building Section Grid 2.2
KEYED NOTES
22.04 SHOWER / TUB INSERT, RE: PLUMBING
26.06 LIGHTING FIXTURE; SEE ELECTRICAL
KEYED NOTES
03.01 FOUNDATION, RE: STRUCTURAL
03.04 CONCRETE SLAB ON GRADE OVER GRAVEL BED, RE: STRUCTURAL
05.01 GUTTER DOWNSPOUT - COLOR MATCH THE GUTTER IT IS CONNECTED TO
06.01 CLOSET SHELF (PAINTED) W/ ROD
06.06 ROOF OVERBUILD FRAMING, RE: STRUCTURAL
06.07 ROOF TRUSS/FRAMING, RE: STRUCTURAL
06.08 HEADER/BEAM, RE: STRUCTURAL
06.09 CONTINUE EXTERIOR WALL FACE UP TO SHED ROOF CONNECTION
07.01 LOOSE INSULATION TO CREATE A CONTINUOUS R-30 INSULATION AT ROOF, RE: COMCHECK
07.03 ASPHALT 30 YEAR ROOF SHINGLES OVER SELF-ADHERED UNDERLAYMENT (GRACE OR EQ)
07.04 R-10 RIGID INSULATION (INSIDE FACE OF FOUNDATION WALLS) AT ALL FOUNDATIONS OF OCCUPIABLE INTERIOR
SPACES
07.05 RIDGE VENT, QUARRIX - STORM STOP OR EQ
08.01 DOOR AS SCHEDULED
08.02 WINDOW AS SCHEDULED
08.11 CEILING ACCESS PANEL - COORDINATE EXACT LOCATION WITH MECHANICAL EQUIPMENT AND ACCESS
REQUIREMENTS - PAINTED (MATCH COLOR OF ADJACENT CEILING). PROVIDE R-30 INSULATION ABOVE THE ATTIC
ACCESS
09.01 PAINTED GYP BD. (PT-1)
10.06 18" GRAB BAR, STAINLESS STEEL; FOR BLOCKING & MOUNTING, SEE GI004
10.07 36" GRAB BAR, STAINLESS STEEL; FOR BLOCKING & MOUNTING, SEE GI004
10.08 42" GRAB BAR, STAINLESS STEEL; FOR BLOCKING & MOUNTING, SEE GI004
11.02 TV - BY TENANT, N.I.C.
21.01 2 HR DEMISING / PARTY WALL, TO UNDERSIDE OF UPPER ROOF, RE: WALL TYPES
21.02 5/8" TYPE 'X' GYPSUM BOARD, EXTEND OUT 4'-0" MIN FROM FACE OF DEMISING WALL (EA SIDE), UNDER ROOF
SHEATHING - HOLD DOWN ROOF TRUSSES 5/8" AT THIS AREA TO ACCOMODATE GYPSUM SHEATHING AND
ASSURE FLUSH ROOF SHEATHING FLUSH
22.03 FLOOR MOUNTED WATER CLOSET, RE: PLUMBING
1/4" = 1'-0"D1 Building Section Grid 2.8
1/4" = 1'-0"D3 Building Section Grid A.2
DWR
1
1
A A
2
2
B B
38
'
-
0
"
10
'
-
2
3
/
4
"
2'
-
4
3
/
4
"
11
1
/
2
"
5'
-
6
3
/
4
"
18
'
-
1
0
3
/
8
"
B1
AE301
AE401
E2
D6
E3 D7
AE401
E6
E4
E7 E5
AE401
D4
D2
D5 D3
D3
AE301
A
A
A
A
5' - 6 1/2" 4' - 7 1/2"
EQ EQ
1'
-
3
"
36
"
P
A
T
H
36
"
P
A
T
H
EQ EQ
PW6b PW4b
PW4b
PW4b
PW4b
PW4b
13' - 7 3/4"
FW4b
FW4b
U02
U03
U01
101
21.01
11.05 11.01 22.01 11.04
22.03
11.01
11.03
22.06 06.01
11.02
VERIFY W/ OWNER
6'
-
0
"
10.13
10.01
10.03
2'
-
6
"
1'
-
6
"
4"
2'
-
8
"
4"
3'
-
0
"
11.01
22.0109.01
11.10
11.05
11.08
09.01
09.03 2' - 4"
06.04
06.05
06.04
09.02
09.03
2' - 1 3/4"2' - 6 3/4"2' - 2"10"2' - 2"
B2
AE901
C1
AE901
A1
AE901
2'
-
8
"
1'
-
6
"
2
'
-
6
"
11.02
TO CENER OF OUTLET / DATA
5'
-
0
"
4"
3'
-
0
"
09.01
09.02
09.03
VERIFY W/ OWNER
6' - 0"
A
101
B
09.01
09.01
09.02
4"
2
'
-
8
"
1'
-
6
"
2
'
-
6
"
3'
-
0
"
A
09.01
09.02
10.01
22.04
4"
2
'
-
8
"
4
"
3'
-
0
"
U01
09.01
11.07
09.03
4"
2
'
-
8
"
4
"
CL1' - 6"
22.03
11.07
22.01
09.01
06.04
09.06
3' - 7"
C1
AE901
3'
-
6
"
3
'
-
6
"
10.03
4"
2'
-
8
"
4"
3'
-
0
"
A
09.01
09.02
09.01
09.02
09.0109.01
09.01
A
09.02
1
1
A A
2
2
B B
B1
AE301
D3
AE301
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
38
'
-
0
"
13' - 7 3/4"
09.01
09.01
09.01
09.01
09.01
08.11
UNIT TYPE B FINISH SCHEDULE
FLOOR
LUXURY VINYL TILE - TO BE SELECTED BY OWNER
WALLS
PT-1 (FIELD PAINT) - TO BE SELECTED BY OWNER
WALL BASE
4" WOOD BASE: PAINT GRADE - FINISH AND TO BE SELECTED BY OWNER
CEILING
PT-1 (FIELD PAINT) - TO BE SELECTED BY OWNER
COUNTERS
SS-1 - GRANITE SOLID SURFACE, TO BE SELECTED BY OWNER
APPLIANCE SCHEDULE
STACKABLE WASHER / DRYER
SPEED QUEEN: ATEE9AGP173TW01 - 27" x 78 3/16" x 27 3/4"
WASHER / DRYER COMBO
LG: WM3997HWA - 27" x 38 11/16" x 29 3/4"
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE401
Enlarged
Type B Unit
Plans /
Elevations
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
GENERAL NOTES - INT PLAN/ELEV
1 GENERAL CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND SHALL REPORT TO THE ARCHITECT ANY
UNKNOWN CONDITIONS, ERRORS, OR CONFLICTS IN THE DRAWINGS BEFORE BEGINNING WORK
2 DO NOT SCALE DRAWINGS
3 SEE SHEET GI003 FOR TYPICAL MOUNTING HEIGHTS. PROVIDE SOLID BLOCKING IN WALLS FOR ALL WALL-MOUNTED
ITEMS WHETHER BLOCKING IS DEPICTED IN DRAWINGS OR NOT.
4 UPPER, LOWER, AND TALL MILLWORK CABINETS NOT TO EXCEED 36" IN WIDTH
5 WHERE POSSIBLE AND UNLESS NOTED OTHERWISE, MATCH UPPER CABINET WIDTH DIMENSIONS TO BASE
CABINETS - TYP.
6 ALL ELECTRICAL AND DATA OUTLETS ABOVE COUNTER TOPS SHOULD BE
MOUNTED HORIZONTALLY
7 PROVIDE SAFETY INSULATION ON ALL EXPOSED SUPPLY WATER LINES AND WASTE LINES
12 ALL MILLWORK INTERIOR FINISH TO BE SELECTED BY OWNER, UNLESS NOTED OTHERWISE
13 COUNTERTOP EDGE PROFILES TO BE SQUARE EDGE. IF SHOWN IN ELEVATION, PROVIDE 4" BACKSPLASH
14 ALL WOOD WALLCOVERING GRAIN TO RUN VERTICALLY, UNLESS NOTED OTHERWISE
1/4" = 1'-0"B4 Enlarged Floor Plan - Type B Unit
GENERAL NOTES - CEILING PLAN
1 GENERAL CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND SHALL REPORT TO THE ARCHITECT ANY
UNKNOWN CONDITIONS, ERRORS, OR CONFLICTS IN THE DRAWINGS BEFORE BEGINNING WORK
2 DO NOT SCALE DRAWINGS
3 SEE SHEET AE511 FOR TYPICALCEILING DETAILS
4 FOR LIGHTING LAYOUT, SEE ELECTRICAL LIGHTING PLAN
1/4" = 1'-0"D2 Type B Kitchen - North
1/4" = 1'-0"D3 Type B Kitchen - East
1/4" = 1'-0"D4 Type B Kitchen - South
1/4" = 1'-0"D5 Type B Kitchen - West
1/4" = 1'-0"D6 Type B Bathroom - North
1/4" = 1'-0"D7 Type B Bathroom - East
1/4" = 1'-0"E2 Type B Bathroom - South
1/4" = 1'-0"E3 Type B Bathroom - West
1/4" = 1'-0"E4 Type B Bedroom - North
1/4" = 1'-0"E5 Type B Bedroom - East
1/4" = 1'-0"E6 Type B Bedroom - South
1/4" = 1'-0"E7 Type B Bedroom - West
KEYED NOTES
06.01 CLOSET SHELF (PAINTED) W/ ROD
06.04 MILLWORK TO BE SELECTED BY OWNER
06.05 FINISHED MILLWORK END PANEL, FINISH TO CORRESPOND TO ADJACENT MILLWORK
08.11 CEILING ACCESS PANEL - COORDINATE EXACT LOCATION WITH MECHANICAL EQUIPMENT AND ACCESS
REQUIREMENTS - PAINTED (MATCH COLOR OF ADJACENT CEILING). PROVIDE R-30 INSULATION ABOVE THE ATTIC
ACCESS
09.01 PAINTED GYP BD. (PT-1)
09.02 4" WOOD WALL BASE - PAINTED (PT-1)
09.03 SOLID SURFACE COUNTERTOP AND BACK SPLASH (GRANITE)- TO BE SELECTED BY OWNER
09.06 PLASTIC LAMINATE COUNTERTOP AND BACK SPLASH - TO BE SLECTED BY OWNER
10.01 TOWEL BAR
10.03 HAND TOWEL RING
10.13 TOILET PAPER DISPENSER, SEE ACCESSORY SCHEDULE.
11.01 RANGE (FULLY ADA COMPLIANT IN TYPE A UNIT). TO BE SELECTED BY OWNER
11.02 TV - BY TENANT, N.I.C.
11.03 STACKABLE WASHER / DRYER, RE: MECH/PLUMBING & APPLIANCE SCHEDULE
11.04 UNDERCOUNTER DISHWASHER (FULLY ADA COMPLIANT IN TYPE A UNIT). TO BE SELECTED BY OWNER, RE:
PLUMBING & APPLIANCE SCHEDULE
11.05 REFRIGERATOR (FULLY ADA COMPLIANT IN TYPE A UNIT). TO BE SELECTED BY OWNER
11.07 FRAMELESS MIRROR
11.08 KITCHEN HOOD, RE: MECH
11.10 UNDERCABINET MICROWAVE / HOOD COMBO (TO BE SELECTE BY OWNER), RE: MECH
21.01 2 HR DEMISING / PARTY WALL, TO UNDERSIDE OF UPPER ROOF, RE: WALL TYPES
22.01 SINK, RE: PLUMBING
22.03 FLOOR MOUNTED WATER CLOSET, RE: PLUMBING
22.04 SHOWER / TUB INSERT, RE: PLUMBING
22.06 WATER HEATER, RE: MECH/PLUMBING
GENERAL NOTES - FLOOR PLAN
1 GENERAL CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND SHALL REPORT TO THE ARCHITECT ANY
UNKNOWN CONDITIONS, ERRORS, OR CONFLICTS IN THE DRAWINGS BEFORE BEGINNING WORK
2 DO NOT SCALE DRAWINGS
5 SEE SHEET GI003 FOR TYPICAL MOUNTING HEIGHTS. PROVIDE SOLID BLOCKING IN WALLS FOR ALL WALL-MOUNTED
ITEMS WHETHER BLOCKING IS DEPICTED IN DRAWINGS OR NOT
6 COORDINATE ALL EQUIPMENT AND ACCESSORIES, INCLUDING ITEMS THAT ARE OFOI, WITH OWNER.
7 SEE SHEET SERIES AE500 FOR HORIZONTAL AND VERTICAL ASSEMBLY TYPES
8 SEE SHEET SERIES AE600 FOR DOOR & WINDOW TYPES
10 TYPE A & TYPE B UNITS REQUIRE DIFFERENT HEIGHTS FOR CABINETRY, COUNTERTOPS & REACHES, RE: GI003
11 SEE ELEVATIONS AND FINISH SCHEDULES, SHEETS AE401 & AE402
12 SEE ELEVATIONS, SECTIONS, AND DETAILS FOR ADDITIONAL WALL CONSTRUCTION INFORMATION
13 SEE AE901 FOR CASEWORK & ACCESSIBLE MILLWORK DETAILS
14 OWNER IS TO SELECT ALL APPLIANCES. COORDINATE MILLWORK WITH SELECTED APPLIANCES BEFORE
CONSTRUCTION AND INSTALLATION.
1/4" = 1'-0"B5 Enlarged RCP - Type B Unit
1 Addendum 01 00.00.00
DW R
A A
2
2
3
3
B B
B3
AE301
AE402
D4
D2
D5 D3
AE402
E2
D6
E3 D7
AE402
E6
E4
E7 E5
D1
AE301
D3
AE301
A
30" x 60" BATHTUB
FR
O
N
T
A
P
P
R
O
A
C
H
SIN
K
3
0
"
x
4
8
"
FR
O
N
T
A
P
P
R
O
A
C
H
WC
3
0
"
x
4
8
"
PARALLEL
APPROACH
BATHTUB 30" x 48"
FRONT LOAD
W/D COMBO
FR
O
N
T
A
P
P
R
O
A
C
H
30
"
x
4
8
"
BEDROOM EGRESS
6 0 " ø
FW4b
EW6v
FW4b
EW6v
EW6h
EW6h
EW6h A
SHELF +54" A.F.F.
ROD + 48" A.F.F.
ADJACENT
APPROACH 30" x 48"
PARALLEL
APPROACH 30" x 48"
PARALLEL
APPROACH 30" x 48"
1 BEDROOM
A102
TYPE A
CLEAR FLOOR
SPACE IN FRONT OF
CLOTHES
30" x 48"
38
'
-
0
"
6
1
/
2
"
5
1
/
2
"
9'
-
7
"
2'
-
5
"
1'
-
3
1
/
2
"
1'
-
3
1
/
2
"
7'
-
5
"
14
'
-
7
1
/
2
"
1'
-
0
"
LINEN NICHE
4' - 1"2' - 8 1/2"5' - 7"
EQ EQEQ
3"
APPROACH
18
"
C
L
R
34 3/4" CLR > 32"
36
"
D
O
O
R
APPROACH
18
"
C
L
R
PW6b
PW4b
PW6b
PW4bPW4b
PW4b
EQ
PW4b
PW4b
34 3/4" CLR > 32"
36" DOOR
U02
U01
U04
U01
102
REMOVABLE CABINET
UNDER SINK. FLOOR
FINISH EXTENDS TO
WALL. WALLS BEHIND
AND SURROUNDING
WALLS MUST BE
FINISHED
FLUSH CONTROL IS
REQUIRED ON THE
OPEN SIDE OF THE
WATER CLOSET
TOP RIM OF SINK ≤ 34" A.F.F.TOP OF COUNTER ≤ 34" A.F.F.
APPROACH
18" CLR
11.05
11.01
22.0111.08
10.06
10.08
10.07
22.03
TOP OF
COUNTER
≤ 34" A.F.F.
22.01
22.0422.06
11.09
06.01
06.02
7' - 1 1/2"7' - 0 1/2"
14' - 1 1/2"
11.02
VE
R
I
F
Y
W
/
O
W
N
E
R
5'
-
3
"
10.13
10.03
10.01
A A
2
2
3
3
B B
B3
AE301
D1
AE301
D3
AE301
38
'
-
0
"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
09.01
09.01
09.01
09.01
09.01
08.11
4"
2'
-
6
"
4"
1'
-
2
"
2'
-
1
0
"
2'
-
6
"
4'
-
0
"
06.04
06.05
11.04 11.01
06.04
11.05
09.01
11.08
09.03
22.01
2' - 4"
09.0109.01
09.02
09.03
A2
AE901 B2
AE901
06.03
B4
AE901
30" CLEAR MIN.
2' - 6 3/4"
2' - 2"10"2' - 2"2' - 6 3/4"2' - 1 3/4"
4"
2
'
-
6
"
1'
-
2
"
2'
-
1
0
"
4'
-
0
"
2
'
-
6
"
09.02
09.01
11.08
06.04
06.04 09.03
A
102
B
09.01 09.01
09.02
TO CENER OF OUTLET / DATA
5'
-
0
"
11.02
09.02
11.08
06.04
06.04
09.01VERIFY W/ OWNER
5' - 3"
22.04
09.01
09.01
9'
-
0
"
09.01
C3
AE901
22.04
09.01
10.06
10.08
10.07
22.03
09.02 10.13
10.01
5' - 0"
2'
-
1
0
"
TO
M
I
R
R
O
R
S
U
R
F
A
C
E
3'
-
4
"
10.08
10.06
10.07
22.03
06.03
11.07
06.04
09.06
09.02
09.01
10.03 22.04
09.0109.01
22.01
11.07
4"
2
'
-
6
"
2'
-
1
0
"
A
09.02
09.01 09.01 09.01
09.02
09.02
09.01 09.01
09.02
09.01
09.02
UNIT TYPE A FINISH SCHEDULE
FLOOR
LUXURY VINYL TILE - TO BE SELECTED BY OWNER/ARCHITECT
WALLS
PT-1 (FIELD PAINT) - TO BE SELECTED BY OWNER/ARCHITECT
WALL BASE
CEILING
PT-1 (FIELD PAINT) - TO BE SELECTED BY OWNER/ARCHITECT
COUNTERS
SS-1 - SOLID SURFACE, TO BE SELECTED BY OWNER/ARCHITECT
4" WOOD BASE: PAINT GRADE - FINISH TO BE SELECTED BY OWNER/ARCHITECT
GENERAL NOTES -FINISH SCHEDULE
1. ALL MATERIALS LISTED MUST BE APPROVED BY SUBMITTAL PROCESS TO THE ARCHITECT
2. CONTRACTOR TO PREPARE 3' X 3' ON-SITE PAINT MOCK-UP FOR COLOR APPROVAL BY ARCHITECT
PRIOR TO COMMENCING PAINTING WORK
3. UNLESS NOTED OTHERWISE, TILE INSTALLER IS TO FOLLOW TNCA & ANSI STANDARDS; ALL
APPROPRIATE TRIM PIECES TO BE INCLUDED WITH TILE
4. NO SUBSTITUTIONS OR OMISSIONS PERMITTED WITHOUT PRIOR WRITTEN APPROVAL FROM
ARCHITECT
5. ARCHITECT TO SELECT FROM FULL RANGE OF COLORS AND FINISHES OFFERED BY
MANUFACTURERS, INCLUDING CUSTOM
6. USE CRACK ISOLATION MEMBRANCE UNDERA ALL TILE INSTALLATIONS
APPLIANCE SCHEDULE
STACKABLE WASHER / DRYER
SPEED QUEEN: ATEE9AGP173TW01 - 27" x 78 3/16" x 27 3/4"
WASHER / DRYER COMBO
LG: WM3997HWA - 27" x 38 11/16" x 29 3/4"
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE402
Enlarged
Type A Unit
Plans /
Elevations
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
GENERAL NOTES - INT PLAN/ELEV
1 GENERAL CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND SHALL REPORT TO THE ARCHITECT ANY
UNKNOWN CONDITIONS, ERRORS, OR CONFLICTS IN THE DRAWINGS BEFORE BEGINNING WORK
2 DO NOT SCALE DRAWINGS
3 SEE SHEET GI003 FOR TYPICAL MOUNTING HEIGHTS. PROVIDE SOLID BLOCKING IN WALLS FOR ALL WALL-MOUNTED
ITEMS WHETHER BLOCKING IS DEPICTED IN DRAWINGS OR NOT.
4 UPPER, LOWER, AND TALL MILLWORK CABINETS NOT TO EXCEED 36" IN WIDTH
5 WHERE POSSIBLE AND UNLESS NOTED OTHERWISE, MATCH UPPER CABINET WIDTH DIMENSIONS TO BASE
CABINETS - TYP.
6 ALL ELECTRICAL AND DATA OUTLETS ABOVE COUNTER TOPS SHOULD BE
MOUNTED HORIZONTALLY
7 PROVIDE SAFETY INSULATION ON ALL EXPOSED SUPPLY WATER LINES AND WASTE LINES
12 ALL MILLWORK INTERIOR FINISH TO BE SELECTED BY OWNER, UNLESS NOTED OTHERWISE
13 COUNTERTOP EDGE PROFILES TO BE SQUARE EDGE. IF SHOWN IN ELEVATION, PROVIDE 4" BACKSPLASH
14 ALL WOOD WALLCOVERING GRAIN TO RUN VERTICALLY, UNLESS NOTED OTHERWISE
GENERAL NOTES - CEILING PLAN
1 GENERAL CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND SHALL REPORT TO THE ARCHITECT ANY
UNKNOWN CONDITIONS, ERRORS, OR CONFLICTS IN THE DRAWINGS BEFORE BEGINNING WORK
2 DO NOT SCALE DRAWINGS
3 SEE SHEET AE511 FOR TYPICALCEILING DETAILS
4 FOR LIGHTING LAYOUT, SEE ELECTRICAL LIGHTING PLAN
KEYED NOTES
06.01 CLOSET SHELF (PAINTED) W/ ROD
06.02 BUILT-IN LINEN SHELVING - 3/4" PARTICLE BOARD W/ MALAMINE EDGE (PAINT GRADE)
06.03 REMOVABLE CABINET UNDER SINK. FLOOR FINISH EXTENDS TO WALL. WALLS BEHIND AND SURROUNDING WALLS
MUST BE FINISHED
06.04 MILLWORK TO BE SELECTED BY OWNER
06.05 FINISHED MILLWORK END PANEL, FINISH TO CORRESPOND TO ADJACENT MILLWORK
08.11 CEILING ACCESS PANEL - COORDINATE EXACT LOCATION WITH MECHANICAL EQUIPMENT AND ACCESS
REQUIREMENTS - PAINTED (MATCH COLOR OF ADJACENT CEILING). PROVIDE R-30 INSULATION ABOVE THE ATTIC
ACCESS
09.01 PAINTED GYP BD. (PT-1)
09.02 4" WOOD WALL BASE - PAINTED (PT-1)
09.03 SOLID SURFACE COUNTERTOP AND BACK SPLASH (GRANITE)- TO BE SELECTED BY OWNER
09.06 PLASTIC LAMINATE COUNTERTOP AND BACK SPLASH - TO BE SLECTED BY OWNER
10.01 TOWEL BAR
10.03 HAND TOWEL RING
10.06 18" GRAB BAR, STAINLESS STEEL; FOR BLOCKING & MOUNTING, SEE GI004
10.07 36" GRAB BAR, STAINLESS STEEL; FOR BLOCKING & MOUNTING, SEE GI004
10.08 42" GRAB BAR, STAINLESS STEEL; FOR BLOCKING & MOUNTING, SEE GI004
10.13 TOILET PAPER DISPENSER, SEE ACCESSORY SCHEDULE.
11.01 RANGE (FULLY ADA COMPLIANT IN TYPE A UNIT). TO BE SELECTED BY OWNER
11.02 TV - BY TENANT, N.I.C.
11.04 UNDERCOUNTER DISHWASHER (FULLY ADA COMPLIANT IN TYPE A UNIT). TO BE SELECTED BY OWNER, RE:
PLUMBING & APPLIANCE SCHEDULE
11.05 REFRIGERATOR (FULLY ADA COMPLIANT IN TYPE A UNIT). TO BE SELECTED BY OWNER
11.07 FRAMELESS MIRROR
11.08 KITCHEN HOOD, RE: MECH
11.09 WASHER/DRYER COMBO UNIT (FULLY ADA COMPLIANT), RE: MECH/PLUMBING & APPLIANCE SCHEDULE
22.01 SINK, RE: PLUMBING
22.03 FLOOR MOUNTED WATER CLOSET, RE: PLUMBING
22.04 SHOWER / TUB INSERT, RE: PLUMBING
22.06 WATER HEATER, RE: MECH/PLUMBING
GENERAL NOTES - FLOOR PLAN
1 GENERAL CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND SHALL REPORT TO THE ARCHITECT ANY
UNKNOWN CONDITIONS, ERRORS, OR CONFLICTS IN THE DRAWINGS BEFORE BEGINNING WORK
2 DO NOT SCALE DRAWINGS
5 SEE SHEET GI003 FOR TYPICAL MOUNTING HEIGHTS. PROVIDE SOLID BLOCKING IN WALLS FOR ALL WALL-MOUNTED
ITEMS WHETHER BLOCKING IS DEPICTED IN DRAWINGS OR NOT
6 COORDINATE ALL EQUIPMENT AND ACCESSORIES, INCLUDING ITEMS THAT ARE OFOI, WITH OWNER.
7 SEE SHEET SERIES AE500 FOR HORIZONTAL AND VERTICAL ASSEMBLY TYPES
8 SEE SHEET SERIES AE600 FOR DOOR & WINDOW TYPES
10 TYPE A & TYPE B UNITS REQUIRE DIFFERENT HEIGHTS FOR CABINETRY, COUNTERTOPS & REACHES, RE: GI003
11 SEE ELEVATIONS AND FINISH SCHEDULES, SHEETS AE401 & AE402
12 SEE ELEVATIONS, SECTIONS, AND DETAILS FOR ADDITIONAL WALL CONSTRUCTION INFORMATION
13 SEE AE901 FOR CASEWORK & ACCESSIBLE MILLWORK DETAILS
14 OWNER IS TO SELECT ALL APPLIANCES. COORDINATE MILLWORK WITH SELECTED APPLIANCES BEFORE
CONSTRUCTION AND INSTALLATION.
1/4" = 1'-0"B4 Enlarged Floor Plan - Type A Unit
1/4" = 1'-0"B5 Enlarged RCP - Type A Unit
1/4" = 1'-0"D2 Type A Kitchen - North
1/4" = 1'-0"D3 Type A Kitchen - East
1/4" = 1'-0"D4 Type A Kitchen - South
1/4" = 1'-0"D5 Type A Kitchen - West
1/4" = 1'-0"D6 Type A Bathroom - North
1/4" = 1'-0"D7 Type A Bathroom - East
1/4" = 1'-0"E2 Type A Bathroom - South
1/4" = 1'-0"E3 Type A Bathroom - West
1/4" = 1'-0"E4 Type A Bedroom - North
1/4" = 1'-0"E5 Type A Bedroom - East
1/4" = 1'-0"E6 Type A Bedroom - South
1/4" = 1'-0"E7 Type A Bedroom - West
1 Addendum 01 00.00.00
1. REFER TO AE100 SHEET SERIES FOR LOCATION OF WALL TYPES.
2. NO PENETRATIONS ALLOWED THROUGH THE SHAFT LINER OF THE RATED FW4B WALL TYPE
3. NON-RATED WALLS TO BE BUILT TO BE BUILT TO BOTTOM OF TRUSSES
4. ALL RATED WALLS SHALL BE CONSTRUCTED FIRST AND HAVE CONTINUITY PRIORITY OVER NON-RATED WALLS.
SECONDARY, OR NON-RATED WALLS, ARE TO ABUTT, BUT NOT PENETRATE THE RATED WALLS.
5. FIRESTOPPING TO BE PROVIDED AT ALL PENETRATIONS THROUGH RATED WALLS AS SPECIFIED. COORDINATE WITH
CODE PLANS.
6. APPROPRIATE SUBMITTAL INFORMATION MUST BE PROVIDED TO SUBSTANTIATE THAT THE MATERIALS AND
ASSEMBLY USED BY THE CONTRACTOR HAVE BEEN TESTED BY A RECOGNIZED TESTING AGENCY TO MEET THE FIRE
RESISTANCE RATING SCHEDULED ON THESE WALL TYPES.
7. ALL GYPSUM WALL BOARD MUST BE MOISTURE RESISTANT AT THE FOLLOWING LOCATIONS:
a. TOILET ROOMS
b. WET WALLS
c. SHOWERS
8. SOUND ATTENUATION BLANKETS SHALL EXTEND THE FULL HEIGHT OF THE WALLS.
9. UL DESIGN NUMBERS REFER TO FIRE RESISTANCE IN MOST CURRENT EDITION OF THE UL DIRECTORY.
10. IN PARTITIONS WITHOUT GYP BOARD ON BOTH SIDES, SUPPORT INSULATION WITH WIRE MESH TO STRUCTURE.
GENERAL NOTES -WALL TYPES
FIRE RATING:
FIRE TEST:
SOUND RATING:
SOUND TEST:
FW4b UL# U336
60
RAL-TL88-350
2 HR FIRE RATING:
FIRE TEST:
SOUND RATING:
SOUND TEST:
EW6h
EXTERIOR WALL ASSEMBLIESFIRE RATED WALL ASSEMBLIES
FIRE RATING:
FIRE TEST:
SOUND RATING:
SOUND TEST:
PW6b
2x WOOD FRAMING, RE: STRUCTURAL
5/8" GYPSUM BOARD
GLASS FIBER BATT INSULATION
(WHERE OCCURS - SEE ENLARGED PLANS)
5/8" GYPSUM BOARD
INTERIOR WALL ASSEMBLIES
PW6b -INDICATES A 2x6 STUD
PW4b -INDICATES A 2x4 STUD
2x6 WOOD FRAMING, RE: STRUCTURAL
GLASS FIBER BATT INSULATION
(WHERE OCCURS - SEE ENLARGED PLANS)
5/8" GYPSUM BOARD
ALUMINUM 'FAUX WOOD' SIDING PANEL SYSTEM
(KNOTWOOD 4" CLADDING: BEACHWOOD COLOR)
FIRE RATING:
FIRE TEST:
SOUND RATING:
SOUND TEST:
EW6v
2x6 WOOD FRAMING, RE: STRUCTURAL
GLASS FIBER BATT INSULATION
(WHERE OCCURS - SEE ENLARGED PLANS)
5/8" GYPSUM BOARD
CEMENT BOARD SIDING (VERTICAL)
AIR & MOISTURE BARRIER
AIR & MOISTURE BARRIER
FIRE RATING:
FIRE TEST:
SOUND RATING:
SOUND TEST:
EW6p
2x6 WOOD FRAMING, RE: STRUCTURAL
GLASS FIBER BATT INSULATION
(WHERE OCCURS - SEE ENLARGED PLANS)
5/8" GYPSUM BOARD
METAL PANEL
AIR & MOISTURE BARRIER
FIRE RATING:
FIRE TEST:
SOUND RATING:
SOUND TEST:
EW6b
2x6 WOOD FRAMING, RE: STRUCTURAL
GLASS FIBER BATT INSULATION
(WHERE OCCURS - SEE ENLARGED PLANS)
5/8" GYPSUM BOARD
SHEATHING, RE: STRUCTURAL
SHEATHING, RE: STRUCTURAL
SHEATHING, RE: STRUCTURAL
SHEATHING, RE: STRUCTURAL
2x4 WOOD FRAMING, RE: STRUCTURAL
3" BATT INSULATION, MIN.
(2) 1" SHAFT LINERS RUN TO UPPER ROOF SHEATHING
5/8" 'TYPE X' GYPSUM BOARD
3/4" AIR GAP
3/4" AIR GAP
5/8" 'TYPE X' GYPSUM BOARD RUN TO UPPER
ROOF SHEATHING
R1
ROOF ASSEMBLIES
SHEATHING, RE: STRUCTURAL
SELF-ADHERED UNDERLAYMENT, GRACE ICE & WATER
SHIELD (OR EQ) AT ROOF EDGES AND VALLEYS
ROOF STRUCTURE / FRAMING, RE: STRUCTURAL
AIR & MOISTURE BARRIER
ASPHALT ROOF SHINGLES
R2
SHEATHING, RE: STRUCTURAL
2x10 WOOD FRAMING @ 16" O.C.
AIR & MOISTURE BARRIER
FLASHING, RE: DETAIL
HORIZONTAL ASSEMBLIES
F1
GRAVEL BASE, RE: STRUCTURAL
CONCRETE SLAB ON GRADE
(2) 'H' STEEL STUD SPACED @ 24" O.C.
TIED TO WOOD TRUSSES
QUARRIX FURRING STRIPS (3" x 5/16") OR
QUARRIX PROTECT DRAIN MAT
QUARRIX FURRING STRIPS (3" x 5/16") OR
QUARRIX PROTECT DRAIN MAT
RIGID INSULATION FOR ROOF SLOPE
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE501
Vertical &
Horizontal
Assemblies
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
DOOR PER SCHEDULE
VA
R
I
E
S
1/4"2 1/2"
1/4"2 1/2"
WALL ASSEMBLY AS SCHEDULED
2 1/2" x 1/2" MDF TRIM (PAINTED)
SHIM AS REQUIRED
HARDWOOD FRAME TO MATCH DOOR
PAINTED GYP BD, RE: FINISH SCHEDULE
DOOR PER SCHEDULE
VARIES
1/
4
"
2"
1/
4
"
2"
WALL ASSEMBLY AS SCHEDULED
2 1/2" x 1/2" MDF TRIM (PAINTED)
PREHUNG DOOR FRAME W
PAINT FINISH
SHIM AS REQUIRED
WINDOW PER SCHEDULE (SHOWN
FOR CONTEXT)
HEADER, RE: STRUCTURAL
COMPOSITE DOOR FRAME,
SMOOTH, PAINT GRADE
DOOR AS SCHEDULED
QUARRIX FURRING STRIPS (3" x 5/16")
OR QUARRIX PROTECT DRAIN MAT
AIR & MOISTURE BARRIER
BRAKE METAL PANEL - MATCH ADJACENT DARK
COLOR, RE: ELEVATIONS
ALUMINUM 'FAUX WOOD' PANEL SYSTEM, INSTALLED PER MANUF
COMPOSITE DOOR FRAME, SMOOTH, PAINT GRADE - PAINT
BLACK TO MATCH ADJACENT WINDOW AND DOOR FRAMES.
FINAL COLOR TO BE APPROVED BY OWNER / ARCHITECT
DOOR AS SCHEDULED
SHIM AS REQ'D (BACKER ROD &
SEALANT EA SIDE)
VAPOR & MOISTURE BARRIER
QUARRIX FURRING STRIPS (3" x 5/16") OR
QUARRIX PROTECT DRAIN MAT
DOOR PER SCHEDULE
ALUM. THRESHOLD W/
GASKET SEAL
INTERIOR EXTERIOR
SEALANT
DOOR PER SCHEDULE
FLOOR FINISH
WINDOW, SEE WINDOW TYPES
5/8" GYP. BD.
CONT. SEALANT
FLEXIBLE FLASHING
CONT. BEAD OF SEALANT, TYP.
VAPOR AND MOISTURE BARRIER CONT.
BEHIND WINDOW FRAME
METAL CORNER BEAD, TYP
DRYVIT AQUAFLASH SYSTEM OR EQUAL
CONT. EXPANDING FOAM, TYP.
PREFINISHED FLASHING EXTEND 1/4"
FURTHER THAN FACE OF WALL (TYP)
CLOSED CELL BACKER ROD & SEALANT
ALUMINUM 'FAUX WOOD' PANEL SYSTEM,
INSTALLED PER MANUF
WALL AS SCHEDULED
QUARRIX FURRING STRIPS (3" x 5/16") OR
QUARRIX PROTECT DRAIN MAT
WINDOW, SEE WINDOW TYPES
5/8" GYP. BD.
CONT. SEALANT
FLEXIBLE FLASHING
CONT. BEAD OF SEALANT, TYP.
VAPOR AND MOISTURE BARRIER CONT.
BEHIND WINDOW FRAME
METAL CORNER BEAD, TYP
DRYVIT AQUAFLASH SYSTEM OR EQUAL
CONT. EXPANDING FOAM, TYP.
PREFINISHED FLASHING EXTEND 1/4"
FURTHER THAN FACE OF WALL (TYP)
FIBER CEMENT SIDING, INSTALL PER MANUF
QUARRIX FURRING STRIPS (3" x 5/16") OR
QUARRIX PROTECT DRAIN MAT
SEALANT
AIR / MOISTURE BARRIER
AT A 45 DEGREE ANGLE, CAREFULLY
CUT THE BARRIER ON A DIAGONAL.
GENTLY RAISE THE TOP EDGE OF THE
BARRIER UP AND TAPE THE TOP
CORNERS AND CENTER TO THE
EXTERIOR AIR / MOISTURE BARRIER
SURFACE ABOVE
1
SECURE AIR /
MOISTURE BARRIER
AT HEAD
SEALANT
JAMB FLASHING
EXTEND JAMB FLASHING TO
OVERLAP SILL FLASHING.
EXTEND JAMB FLASHING 8 1/2"
OBOVE ROUGH OPENING AT
HEAD. TUCK TOP OF JAMB
FLASHING UNDER THE FLAP
OF AIR / MOISTURE BARRIER
AT THE HEAD. SEE DIAGRAM.
5
8
1
CUT LINE
SHIM AND ADJUST WINDOW TO ACHIEVE SQUARE,
PLUMB, AND LEVEL CONDITION. USE CORROSION
RESISTANT FASTENERS. FASTEN WINDOWS PER
WINDOW MANUFACTURER SPECIFICATIONS.
SILL FLASHING
9"
8 1 /2 "
JAMB FLASHING FLASHING
APPLY CONT. SEAL TO THE MOUNTING
FLANGES AT THE TOP (HEAD) AND SIDES
(JAMB) OF WINDOW. EXTEND SEALANT
AT JAMBS 8 1/2" ABOVE THE R.O. AT
HEAD. EMBED JAMB FLASHING INTO
SEALANT AND FASTEN IN PLACE.
(FLASHING GOES OVER SEALANT)
SEAL THE WINDOW FRAME TO OPENING.
APPLY A 3/8" NOM. Ø TO THE
BACKSIDE(INTERIOR) OF THE WINDOW
FLANGE, IN LINE WITH ANY PRE-PUNCHED
HOLES OR SLOTS
HEAD FLASHING
EMBED BOTTOM OF THE HEAD
FLASHING AGAINST THE PREVIOUSLY
APPLIED SEALANT (FLASHING GOES
OVER SEALANT). EXTEND EACH
JAMB FLASHING. FASTEN IN PLACE
7
5
1
8
7
2
5
3
FLASHING AT HEAD EXTENDS
1" BEYOND JAMB FLASHING
SEALANT BEAD BETWEEN
FLASHING AND MOUNTING
FLANGE
SEALANT BEAD BEHIND
MOUNTING FLANGE
FLASHING
WEATHER RESISTANT BARRIER
8
SECTION A
THROUGH WINDOW JAMB
IN WATER SHEDDING FASHION, STARTING AT
THE BASE OF THE WALL & WORKING TOWARDS
THE TOP, INSTALL THE AIR / MOISTURE BARRIER
TO THE FACE OF THE SHEATING.
APPLY SILL FLASHING.
APPLY BEAD OF SEALANT AT BACK OF WINDOW
USING PAN HEAD SCREWS TO FACILITATE
INSPECTION.
APPLY BEAD OF SEALANT AT SIDE JAMBS.
EXTEND 8 1/2".
APPLY JAMB FLASHING
APPLY BEAD OF SEALANT AT HEAD
APPLY HEAD FLASHING
REMOVE PREVIOUSLY APPLIED TAPE,
ALLOWING AIR / MOISTURE BARRIER TO LAY
FLAT OVER HEAD FLASHING, APPLY NEW
SHEATHING TAPE OVER DIAGONAL CUT -SEE
DIAGRAM.
A
A
1
2
3
4
5
6
7
8
STEPS
AIR / MOISTURE BARRIER APPLIED PRIOR
TO THE WINDOW INSTALLATION.
FLASHING APPLIED OVER THE FACE OF
THE MOUNTING FLANGE.
8 1 /2 "
4
INTERIOR VIEW
TOP LEFT CORNER OF WINDOW
WINDOW PER SCHEDULE
HEADER, RE: STRUCTURAL
BACKER ROD & SEALANT
PREFINISHED METAL FLASHING
QUARRIX FURRING STRIPS (3" x 5/16")
OR QUARRIX PROTECT DRAIN MAT
DOOR FRAME, RE: SCHEDULE
AIR & MOISTURE BARRIER
BRAKE METAL PANEL
WINDOW, SEE WINDOW TYPES
5/8" GYP. BD.
CONT. SEALANT
FLEXIBLE FLASHING
CONT. BEAD OF SEALANT, TYP.
VAPOR AND MOISTURE BARRIER CONT.
BEHIND WINDOW FRAME
METAL CORNER BEAD, TYP
DRYVIT AQUAFLASH SYSTEM OR EQUAL
CONT. EXPANDING FOAM, TYP.
PREFINISHED FLASHING EXTEND 1/4"
FURTHER THAN FACE OF WALL (TYP)
FIBER CEMENT SIDING, INSTALL PER MANUF
HEADER, RE: STRUCTURAL
QUARRIX FURRING STRIPS (3" x 5/16") OR
QUARRIX PROTECT DRAIN MAT
WINDOW, SEE WINDOW TYPES
5/8" GYP. BD.
CONT. SEALANT
FLEXIBLE FLASHING
CONT. BEAD OF SEALANT, TYP.
VAPOR AND MOISTURE BARRIER CONT.
BEHIND WINDOW FRAME
METAL CORNER BEAD, TYP
DRYVIT AQUAFLASH SYSTEM OR EQUAL
CONT. EXPANDING FOAM, TYP.
PREFINISHED FLASHING EXTEND FURTHER
THAN FACE OF WINDOW FRAME
BRAKE METAL PANEL - MATCH ADJACENT DARK COLOR, RE: ELEVATIONS
HEADER, RE: STRUCTURAL
QUARRIX FURRING STRIPS (3" x 5/16") OR
QUARRIX PROTECT DRAIN MAT
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE541
Door &
Window
Details
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
3" = 1'-0"A2 Wood Frame/Door Jamb at Interior
3" = 1'-0"A3 Wood Frame/Door Head at Interior
3" = 1'-0"A5 Exterior Door Head
3" = 1'-0"A6 Exterior Door Jamb at Alum 'Wood' Siding
3" = 1'-0"A4 Exterior Door Threshold
3" = 1'-0"A1 Interior Door Sill
3" = 1'-0"B4 Fiberglass Window Sill @ Alum 'Wood' Siding
3" = 1'-0"B2 Window Jamb at Fiber Cement Siding
1 1/2" = 1'-0"C4 Window Installation Detail
3" = 1'-0"B1 Window Sill at Exterior Door Head
3" = 1'-0"B3 Window Head at Fiber Cement Siding
3" = 1'-0"C1 Window Head at Brake Metal Panel
EXTERIOR DOOR:
INSULATED
SOLID CORE
FIBERGLASS
A
B
A4
AE541
A5
AE541
A6
AE541
COMPOSITE
SMOOTH
(PAINT GRADE)
A
2"
SE
E
S
C
H
E
D
U
L
E
2"SEE SCHEDULE2"
WOOD FRAME
(PAINT GRADE)
B
2"
SE
E
S
C
H
E
D
U
L
E
2" SEE SCHEDULE 2"
UNIT DOOR:
PRE-HUNG
SOLID CORE
WOOD W/ WOOD JMB
(PAINT GRADE)
B
A1
AE541
A2
AE541
A3
AE541
UNIT DOOR:
PRE-HUNG
SOLID CORE
WOOD W/ WOOD JMB
(PAINT GRADE)
C
A3
AE541
A2
AE541
A1
AE541
DOOR SCHEDULE -UNITS
Number WD HGT THK Type Material Finish Type Material Finish Head Jamb Sill Fire Rating Hardware Set Comments
U01 3' - 0" 6' - 8" 1 3/4"B Wood Paint B Wood Paint 00/AE602 00/AE602 00/AE602 N / A See Hardware Groups
U02 4' - 0" 6' - 8" 1 3/4" C Wood Paint B Wood Paint 00/AE602 00/AE602 00/AE602 N / A
C
B
U03 3' - 0" 6' - 8" 1 3/4" Wood Paint B Wood Paint 00/AE602 00/AE602 00/AE602 N / A
U04 2' - 6" 6' - 8" 1 3/4" Wood Paint B Wood Paint 00/AE602 00/AE602 00/AE602 N / A
Double 2' - 0" Doors
Double 1' - 6" Doors
See Hardware Groups
See Hardware Groups
See Hardware Groups
SINGLE-HUNG
VINYL
EXTERIOR: BLACK
INTERIOR: WHITE
A
5'
-
1
1
1
/
2
"
3'
-
0
"
3' - 5 1/2"
8'
-
1
1
1
/
2
"
B4
AE541
B3
AE541
B2
AE541
C1
AE541 @ BRAKE METAL
@ FIBER CEMENT
FIXED
VINYL
EXTERIOR: BLACK
INTERIOR: WHITE
B
1'
-
1
0
"
7'
-
6
"
3' - 4"
9'
-
4
"
B1
AE541
E5
AE142
A6
AE541
SIM
GENERAL NOTES -WINDOWS
1. GENERAL CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS BEFORE BIDDING, ORDERING AND INSTALLING
2. WINDOWS MUST BE ENERGY EFFICIENT
3. DOORS SHOWN FOR CONTEXT. SEE DOOR SCHEDULE FOR DOOR TYPE, SIZE, ETC.
4. WINDOW DIMENSIONS ARE NOMINAL, UNLESS OTHERWISE NOTED. CONTRACTOR SHALL CREAT ROUGH
OPENING SIZES ACCORDING TO MANUFACTURER'S INSTRUCTIONS.
126
127
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE601
Door
Schedule &
Window
Types
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
DOOR SCHEDULE
Number
Door Dimensions Door Frame
Hardware Set CommentsWD HGT THK Type Finish Type Finish
101 3' - 0" 7' - 0" 1 3/4"
102 3' - 0" 7' - 0" 1 3/4"
103 3' - 0" 7' - 0" 1 3/4"
104 3' - 0" 7' - 0" 1 3/4"
105 3' - 0" 7' - 0" 1 3/4"
106 3' - 0" 7' - 0" 1 3/4"
107 3' - 0" 7' - 0" 1 3/4"
108 3' - 0" 7' - 0" 1 3/4"
109 3' - 0" 7' - 0" 1 3/4"
110 3' - 0" 7' - 0" 1 3/4"
111 3' - 0" 7' - 0" 1 3/4"
112 3' - 0" 7' - 0" 1 3/4"
113 3' - 0" 7' - 0" 1 3/4"
114 3' - 0" 7' - 0" 1 3/4"
115 3' - 0" 7' - 0" 1 3/4"
116 3' - 0" 7' - 0" 1 3/4"
117 3' - 0" 7' - 0" 1 3/4"
118 3' - 0" 7' - 0" 1 3/4"
119 3' - 0" 7' - 0" 1 3/4"
120 3' - 0" 7' - 0" 1 3/4"
121 3' - 0" 7' - 0" 1 3/4"
122 3' - 0" 7' - 0" 1 3/4"
123 3' - 0" 7' - 0" 1 3/4"
124 3' - 0" 7' - 0" 1 3/4"
125 3' - 0" 7' - 0" 1 3/4"
126 3' - 0" 7' - 0" 1 3/4"
127 3' - 0" 7' - 0" 1 3/4"
GENERAL NOTES - DOORS
1 DOOR DIMENSIONS ARE NOMINAL, UNLESS OTHERWISE NOTED. CONTRACTOR SHALL CREATE ROUGH OPENING SIZES
ACCORDING TO MANUFACTURER'S INSTRUCTIONS.
2 ALL INTERIOR DOORS/FRAMES TO BE PAINTED TO MATCH ADJACENT WALLS. COLOR TO BE SELECTED BY OWNER
3 WOOD DOOR GRAIN DIRECTION TO MATCH ANY ADJACENT WOOD DOOR GRAIN DIRECTION
4 ALL EXTERIOR HARDWARE IS TO MATCH DOOR, DOOR JAMB AND DOOR TRIM.
1/4" = 1'-0"E4 Door Types
1/4" = 1'-0"E5 Frame Types
1/4" = 1'-0"D4 Window Types
1 Addendum 01 00.00.00
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
APRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)
PRE-FINISH (BLACK)See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
See Hardware Groups
DOOR INDEX
COUNTERTOP
SINK RE: PLUMBING
PLUMBING FIXTURE RE: PLUMBING
CABINET FRONT
REMOVABLE CABINET FRONT
UNDER-SINK MILLWORK APRON
COUNTERTOP
SINK RE: PLUMBING
PLUMBING FIXTURE RE: PLUMBING
CABINET FRONT
MOVABLE AND RETRACTABLE
CABINET DOORS
CABINET DOOR TRACK
BASIS OF DESIGN ACCURIDE 1319
INSTRUCTIONS:
1. SWING DOORS, OPEN 90 DEG
2. SLIDE BACK INTO THE BASE
CABINET,OUT OF THE WAY
DOOR HARDWARE
ALTERNATE
TY
P
E
'
B
'
U
N
I
T
M
I
L
L
W
O
R
K
H
E
I
G
H
T
=
3
'
-
0
"
TY
P
E
'
A
'
A
C
C
E
S
S
I
B
L
E
M
I
L
L
W
O
R
K
H
E
I
G
H
T
=
2
'
-
1
0
"
WALL AS SCHEDULED; RE: PLAN.
BACKSPLASH: GRANITE IN THE KITCHEN, RE:
ELEVATION. SCRIBE COUNTERTOP TO WALL TIGHTLY,
SEAL SEAM WITH CLEAR SILICONE WHERE THERE IS
NO BACKSPLASH. PLAM IN BATHROOMS.
COUNTERTOP: GRANITE; W/ 1/2" MDF SUBSTRATE.
1 1/2" THICK BUILT UP, MITER CORNERS IN
KITCHEN. PLAM IN BATHROOM.
ADJUSTABLE SHELF
CABINET CONSTRUCTION: 3/4" MDF CORE,
FACED W/ WHITE MELAMINE.
TYP, BASE CABINET DOORS / DRAWER & FILLER:
3/4" MDF CORE, THERMALLY FUSED LAMINATE, RE:
INTERIOR ELEVATION
FINISHED FLOOR
BASE AS SCHEDULED; RE: INTERIOR
ELEVATIONS
ALUMINUM CABINET PULL - RICHELIEU FINGER
CABINET PULL BP 98988010 AS BASIS OF
DESIGN @ ALL UPPER AND LOWER CABINET
DOORS AND DRAWERS.
TYPE 'B' UNIT MILLWORK DEPTH = 25" MAX
TYPE 'A' MILLWORK DEPTH = 24" MAX
1"
1/4
"
5
1
/
2
"
1/
4
"
1
1
/
2
"
3"
4"
TY
P
E
B
U
N
I
T
M
I
L
L
W
O
R
K
H
E
I
G
H
T
=
3
'
-
0
"
TY
P
E
'
A
'
A
C
C
E
S
S
I
B
L
E
M
I
L
L
W
O
R
K
H
E
I
G
H
T
=
2
'
-
1
0
"
TYPE B UNIT MILLWORK DEPTH = 25" MAX
ACCESSIBLE MILLWORK DEPTH = 24" MAX
4"
EQ
1/
4
"
EQ
1/
4
"
EQ
1/
4
"
5
1
/
2
"
1/
4
"
1
1
/
2
"
SEE FLOOR PLAN FOR WALL TYPES
CABINET INTERIOR: 3/4" MDF CORE FACED
W/ WHITE MELAMINE
FINISHED FLOOR
BASE AS SCHEDULED; RE: ELEVATION.
TYP, BASE CABINET DRAWERS / FILLER:
3/4" MDF CORE, THERMALLY FUSED LAMINATE, RE:
INTERIOR ELEVATION.
3"
BACKSPLASH: GRANITE IN THE KITCHEN, RE:
ELEVATION. SCRIBE COUNTERTOP TO WALL TIGHTLY,
SEAL SEAM WITH CLEAR SILICONE WHERE THERE IS
NO BACKSPLASH. PLAM IN BATHROOMS.
COUNTERTOP: GRANITE; W/ 1/2" MDF SUBSTRATE.
1 1/2" THICK BUILT UP, MITER CORNERS IN
KITCHEN. PLAM IN BATHROOM.
ALUMINUM CABINET PULL - RICHELIEU FINGER
CABINET PULL BP 98988010 AS BASIS OF
DESIGN @ ALL UPPER AND LOWER CABINET
DOORS AND DRAWERS.
TY
P
E
'
B
'
U
N
I
T
M
I
L
L
W
O
R
K
H
E
I
G
H
T
=
3
'
-
0
"
TY
P
E
'
A
'
A
C
C
E
S
S
I
B
L
E
M
I
L
L
W
O
R
K
H
E
I
G
H
T
=
2
'
-
1
0
"
WALL AS SCHEDULED; RE: PLAN.
ADJUSTABLE SHELF
CABINET CONSTRUCTION: 3/4" MDF CORE,
FACED W/ WHITE MELAMINE.
BASE CABINET DOORS / FILLER: 3/4" MDF
CORE, THERMALLY FUSED LAMINATE,
RE: INTERIOR ELEVATION FOR TYPE
FINISHED FLOOR
BASE AS SELECTED BY OWNER
TYPE B UNIT MILLWORK DEPTH = 25" MAX
ACCESSIBLE MILLWORK DEPTH = 24" MAX
1/
4
"
1
1
/
2
"
4"
ALUMINUM CABINET PULL - RICHELIEU FINGER
CABINET PULL BP 98988010 AS BASIS OF
DESIGN @ ALL UPPER AND LOWER CABINET
DOORS AND DRAWERS.
BACKSPLASH: GRANITE IN THE KITCHEN, RE:
ELEVATION. SCRIBE COUNTERTOP TO WALL TIGHTLY,
SEAL SEAM WITH CLEAR SILICONE WHERE THERE IS
NO BACKSPLASH. PLAM IN BATHROOMS.
COUNTERTOP: GRANITE; W/ 1/2" MDF SUBSTRATE.
1 1/2" THICK BUILT UP, MITER CORNERS IN
KITCHEN. PLAM IN BATHROOM.
TY
P
E
'
A
'
A
C
C
E
S
S
I
B
L
E
M
I
L
L
W
O
R
K
H
E
I
G
H
T
=
2
'
-
1
0
"
SCHEDULED WALL, RE: PLAN FOR
TYPE.
ANTI-TIP SUPPORT BLOCKING
FRONT CABINET FILLER: 3/4"
PLYWOOD SUBSTRATE, PLASTIC
LAMINATE FINISH TO MATCH ADJ.
MILLWORK.
FINISHED FLOOR; RE: FINISH
FLOOOR PLANS.
BASE AS SELECTED BY OWNER
FILLER SUPPORT AS NEEDED
DROP IN OVEN; RE: APPLIANCE
SCHEDULE
ADA DROP IN ELECTRIC
STOVE. TO BE SELECTED BY
OWNER.
SCHEDULED WALL, SEE
FLOOR PLAN FOR WALL
TYPES
SECTION VEW PLAN VEW
GRANITE COUNTERTOP TO
CONTINUE BEHIND OVEN.
GRANITE COUNTERTOP TO
CONTINUE BEHIND OVEN.
SHELF BRACKET: BASIS OF DESIGN -
STANLEY HOME DESIGNS (BRACKET
820225)
PROVIDE BLOCKING AS
REQUIRED (BEHIND)
3/4" MDF SHELF - PAINTED TO
MATCH ADJACENT SURFACE.
3/4" MDF SHELF - PAINTED TO
MATCH ADJACENT SURFACE
3/4" SHELF SUPPORT: MDF
WOOD STRIP - PAINTED TO
MATCH ADJACENT SURFACE.
3/4" CHAMFER
1/4" BULLNOSE
3/4" MDF SHELF - PAINTED TO
MATCH ADJACENT SURFACE
PROVIDE BLOCKING AS
REQUIRED
FULLY ACCESSIBLE
48" MAX
STANDARD HT (NON ADA)
72"
CLEAR FLOOR SPACE AS REQUIRED
SHELF BRACKET: BASIS OF DESIGN -
STANLEY HOME DESIGNS (BRACKET
820225)
PROVIDE BLOCKING AS REQUIRED
WALL BRACKET AT EACH END -
TYP
REFER TO PLANS FOR WALL TYPE
PROVIDE BLOCKING AS REQ'D
CABINET CONSTRUCTION: 3/4" CORE MDF,
INTERIOR FACED W/ WHITE MELAMINE.
CABINET DOOR: 3/4" MDF CORE, FINISHED
WITH THERMALLY FUSED LAMINATE, RE:
INTERIOR ELEVATIONS. USE
CORRESPONDING EDGE BANDING.
W/ EQUIP.
VERIFY RE: ELEVATIONS
WALL MOUNTED MICROWAVE OR HOOD, RE:
PLANS AND ELEVS. CONTRACTOR
PROVIDED, CONTRACTOR INSTALLED -
VERIFY DIMENSIONS OF MICROWAVE TO
ENSURE PROPER FIT WITH OVERHEAD
CABINET
PROVIDE JUNCTION BOX AT BACK OF
CABINET FOR MICROWAVE OR HOOD
POWER - PROVIDE ACCESS TO POWER
FROM APPLIANCE THROUGH BOTTOM OF
CABINET
OVERLAP
1/4
"
ALUMINUM CABINET PULL - RICHELIEU FINGER
CABINET PULL BP 98988010 AS BASIS OF DESIGN
@ ALL UPPER AND LOWER CABINET DOORS AND
DRAWERS.
CABINET PULL
HARDWARE
CABINET DOOR
UPPER CABINET DOOR
BASE CABINET DOORS
DRAWER
DRAWER FRONT
DRAWER PULL HARDWARE
CABINET PULL
HARDWARE
CABINET DOOR
CL
3/4" MDF SHELF - PAINTED TO
MATCH ADJ. SURFACE; RE:
ELEVATIONS
1x SUPPORT AT PERIMETER
PLAM BULLNOSE
EDGE
30" x 48" MIN CLEAR FLOOR
SPACE, AS REQUIRED
PROVIDE BLOCKING AS
REQUIRED
1'
-
4
"
1
'
-
4
"
1
'
-
4
"
1
'
-
6
"
1
'
-
6
"
4'
-
0
"
MAX
15"
TYPE 'B' UNIT MILLWORK HEIGHT = 3'-0"
TYPE 'A' ACCESSIBLE MILLWORK HEIGHT = 2' - 10"
WALL AS SCHEDULED; RE: PLAN.
CABINET CONSTRUCTION: 3/4" MDF CORE,
FACED W/ WHITE MELAMINE.
BASE CABINET DOORS / FILLER: 3/4" MDF
CORE, THERMALLY FUSED LAMINATE,
RE: INTERIOR ELEVATION FOR TYPE
FINISHED FLOOR
BASE AS SCHEDULED; RE: INTERIOR
ELEVATIONS
TYPE B UNIT MILLWORK DEPTH = 25" MAX
ACCESSIBLE MILLWORK DEPTH = 24" MAX
1/4
"
1
1
/
2
"
4"
ALUMINUM CABINET PULL - RICHELIEU FINGER
CABINET PULL BP 98988010 AS BASIS OF
DESIGN @ ALL UPPER AND LOWER CABINET
DOORS AND DRAWERS.
BACKSPLASH: GRANITE IN THE KITCHEN, RE:
ELEVATION. SCRIBE COUNTERTOP TO WALL TIGHTLY,
SEAL SEAM WITH CLEAR SILICONE WHERE THERE IS
NO BACKSPLASH. PLAM IN BATHROOMS.
COUNTERTOP: GRANITE; W/ 1/2" MDF SUBSTRATE.
1 1/2" THICK BUILT UP, MITER CORNERS IN
KITCHEN. PLAM IN BATHROOM.
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
3 / 29 / 2021
AE901
Accessible
Cabinets &
Casework
Details
20.0550
- june 4, 2021
Rexburg
Rowhouses
conformed set
3/4" = 1'-0"A2 Removable Sink Cabinet Doors
1 1/2" = 1'-0"A5 Base Cabinet w/ Door & Drawer
1 1/2" = 1'-0"B2 Base Cabinet w/ Drawers
1 1/2" = 1'-0"B3 Base Cabinet
1 1/2" = 1'-0"B4 Drop-In Oven at Type A Unit
3/4" = 1'-0"C5 Type 'A' Accessible & Type 'B' Closet Elevation / Section
1 1/2" = 1'-0"A1 Upper Cabinet / Appliance Below
3/4" = 1'-0"C4 Millwork Hardware Locations
3/4" = 1'-0"C3 Accessible Unit Linen Shelves
1 1/2" = 1'-0"C1 Base Cabinet at Sink
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
April 23, 2021
REXBURG
ROWHOUSES
Engineered
Systems
Associates
20.0550
conformed setMarch 29, 2021
ASI#001 06/04/21
C-
D-
A-THE CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND CONNECTIONS ON THE JOB SITE.
ALL WORK SHALL BE EXECUTED FROM
MEASUREMENTS TAKEN AT THE SITE.
THE MECHANICAL CONTRACTOR SHALL BE
RESPONSIBLE TO INSURE PROPER CODE
CLEARANCES FOR ELECTRICAL AND MECHANICAL
ACCESS WHEN INSTALLING ANY EQUIPMENT
SUPPLIED BY THE MECHANICAL CONTRACTOR.
IT IS CRITICAL THAT THIS CONTRACTOR COORDINATE
EQUIPMENT LOCATIONS WITH PIPING, DUCTWORK,
ELECTRICAL CONDUIT AND BUILDING STRUCTURE TO
INSURE CODE COMPLIANCE.
CEILING DIFFUSERS ARE SHOWN IN APPROXIMATE
LOCATIONS. REFER TO LIGHTING PLANS AND
REFLECTED CEILING PLAN FOR EXACT LOCATIONS.
DUCT DIMENSIONS CALLED OUT ON DRAWINGS ARE
INSIDE FREE AREA DIMENSIONS. ACOUSTICAL DUCT
LINER ARE TO BE ADDED TO OVERALL
MEASUREMENTS.
E-
B-
1 SEE TYPICAL LARGE SCALE PLANS ON THIS SHEET.
SEE DRYER DUCT CONNECTION DETAIL & GOOSENECK ROOF
TERMINATION ON SHEET M201. DRYER DUCT TO BE UNDER 35'
LENGTH.
INSTALL COVE HEATER AS HIGH AS POSSIBLE. SEE
MANUFACTURE INSTRUCTIONS FOR REQUIRED INSTALL &
CLEARANCES.
HP
1
SYM.COOLINGMCACHARKW EER REMARKSCFMHEATING
BTU BTU A
A UNIT TO BE COMPLETE WITH WALL SLEEVE, CONDENSATE DRAIN KIT PIPED THRU WALL AND WALL MOUNTED REMOTE
THERMOSTAT. ARCHITECTURAL EXTERIOR WALL LOUVER TO BE SUPPLIED WITH UNIT.
MOP
28.3208-1Ø 4.6 11.242015,700 14,900 LG MODEL LP153HDUC WITH 4.6 KW
ELECTRIC COIL. WITH 30A CORD30
ELECTRONIC THERMOSTAT
EQUIPMENT SYMBOLFC
1
T
INSULATED FLEXIBLE DUCT
CEILING DIFFUSER
ROUND BRANCH DUCT
WITH HAND DAMPER
HAND DAMPER
HD
DESCRIPTIONSYMBOL
ROOF MOUNTED UPBLAST
EXHAUST GRILLE
RETURN AIR OR
EXHAUST FAN
1
1
A A
2
2
3
3
4
4
B B
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
A101 A102 A103 A104 A105 A106 A107 A108 A109 A110 A111 A112 A113 A114 A115 A116 A117 A118 A119 A120 A121 A122 A123 A124 A125
ELEC
A126
MECH
A127
EH
2 WALL MOUNTED 6824 2 208/60/1 INTEGRAL T-STAT QMARK TYPE CRA2024-T2 COMPLETE WITH CRASM SURFACE MOUNTING
FRAME.
SCALE: 1/4" = 1'-0"SCALE: 1/4" = 1'-0"
HP
1
HP
1
SCALE: 3/32" = 1'-0"
SYMBOL DESCRIPTION
CEILING MOUNTED EXHAUST FAN - TWIN CITY T080 (80 CFM) METAL DUCT COLLAR W/
BACK-DRAFT DAMPER AND EXTERIOR ROOF CAP.1
EF
1
EF
REMARKSFIRE
DAMPERFINISHCONSTR.DAMPER
BALANCINGCFM
RANGESIZE THROW
PATTERNTYPESYM.
RC-1 ROOFCAP NA NANAALUM.803"Ø ALUM.TWIN CITY MODEL 636P W/
INSECT SCREEN & BACK DRAFT
DAMPER
RC-1
1
EF
RC-1
1 1
EH
2
OUTDOOR GRILLE
CAULKSTEEL LINTEL
WALL RECEPTACLE AND
CONDUIT BY ELECTRICAL
CAULK AROUND PERIMITER OF WALL
CASE ON ALL FOUR SIDES WHERE IT
JOINS THE BUILDING (INTERIOR AND
EXTERIOR)
SLAB
MAINTAIN 15" MINIMUM
CLEARANCE IN FRONT OF
UNITS.
3" MIN.
5" MAX.
EXTERIOR WALL
ROOM
CABINET
MOUNTING SCREWS BY
INSTALLER
NO SCALE
NO SCALE
A
FLOOR
CEILING
4" HOSE CLAMP
DRYER
4" FLEXIBLE
DRYER VENT HOSE
DRYER VENT HOSE
A
4" FLEXIBLE
DUCT UP IN WALL
4" HOSE CLAMP
4"Ø (OR 10Ø)
RISE 4"Ø DUCT
UP IN WALL
NOTE:
1-
2-
NO PROJECTIONS SUCH AS SCREWS OF
SHEET METAL CORNERS IN DUCTWORK OR AT
ELBOWS ARE ALLOWED.
MAXIMUM DUCT LENGTH IS 25'-0" INCLUDING
5'-0" REDUCTION FOR EACH 90Ø ELBOW.
PROVIDE 4"Ø HOSE
CONNECTION AT 4" AFF.
EXTEND THRU WALL 2"
MINIMUM FOR DRYER
CONNECITON.
PROVIDE MODEL DB425 "DRYERBOX" IN WALL
WITH 4"Ø DUCT THRU ROOF. CONNECT 4"Ø
FLEXIBLE DRYER VENT TO EXHAUST DUCT4" HOSE CLAMP
ROOF
SHINGLES
AND SEAL WATERTIGHT
FLASH INTO SHINGLES
ROOF CAP
(SLOPED ROOF)
EXHAUST DUCT
(SEE PLAN FOR SIZE)
DAMPER
BACK-DRAFT
CEILING GRILLE CEILING
EXHAUST FAN
FAN ASSEMBLY
CABINET
INSULATED
NO SCALE
2
2 2
M101
Mechanical
Floor Plan
SYM.TYPE BTU KW CHAR CONTROL REMARKS
EH
1 HIGH WALL MOUNTED 2560 .750 120/60/1 INTEGRAL T-STAT QMARK COVE HEATER RCC SERIES MODEL RCC10508C
EH
1
3
3 EH
1 3
N ORTH
N ORTH N ORTH
TO EXHAUST
ELECTRIC
METERS
W/D
W/D RC-2RC-2
RC-2 ROOFCAP NA NANAALUM.1003"Ø ALUM.TWIN CITY MODEL 636P & BACK
DRAFT DAMPER
SCALE: 3/32" = 1'-0"
1
1
A A
2
2
3
3
4
4
B B
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
April 23, 2021
REXBURG
ROWHOUSES
Engineered
Systems
Associates
20.0550
conformed setMarch 29, 2021
ASI#001 06/04/21
SCALE: 1/4" = 1'-0"
A101 A102 A103 A104 A105 A106 A107 A108 A109 A110 A111 A112 A113 A114 A115 A116 A117 A118 A119 A120 A121 A122 A123 A124 A125
ELEC
A126
MECH
A127
BALL TYPE ISOLATION VALVE
PIPE RISE
PIPE DROP
SYMBOL
CO
WCO
COTG
VTR
V VENT
VENT THRU ROOF
CLEANOUT
WALL CLEANOUT
CLEANOUT TO GRADE
DESCRIPTION
SOIL OR WASTE PIPING
VENT LINE PIPING
GAS PIPINGG
DOMESTIC HOT WATER PIPING
DOMESTIC COLD WATER PIPING
CONDENSATE DRAIN PIPINGCD
F FIRE SPRINKLER LINE
C-
D-
A-THE CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND CONNECTIONS ON THE JOB SITE.
ALL WORK SHALL BE EXECUTED FROM
MEASUREMENTS TAKEN AT THE SITE.
THE MECHANICAL CONTRACTOR SHALL BE
RESPONSIBLE TO INSURE PROPER CODE
CLEARANCES FOR ELECTRICAL AND MECHANICAL
ACCESS WHEN INSTALLING ANY EQUIPMENT
SUPPLIED BY THE MECHANICAL CONTRACTOR.
IT IS CRITICAL THAT THIS CONTRACTOR COORDINATE
EQUIPMENT LOCATIONS WITH PIPING, DUCTWORK,
ELECTRICAL CONDUIT AND BUILDING STRUCTURE TO
INSURE CODE COMPLIANCE.
CEILING DIFFUSERS ARE SHOWN IN APPROXIMATE
LOCATIONS. REFER TO LIGHTING PLANS AND
REFLECTED CEILING PLAN FOR EXACT LOCATIONS.
DUCT DIMENSIONS CALLED OUT ON DRAWINGS ARE
INSIDE FREE AREA DIMENSIONS. ACOUSTICAL DUCT
LINER ARE TO BE ADDED TO OVERALL
MEASUREMENTS.
E-
B-
3
1
2
4
5
NOT USED
WATER LINE FOR IRRIGATION.
SEE CIVIL PLANS FOR CONTINUATION.
SEE TYPICAL LARGE SCALE PLANS ON THIS SHEET.
RAISE WATER LINE IN THIS LOCATION AND INSTALL AS PER
WATER PRESSURE REDUCING STATION DETAIL ON SHEET P201.
ACCESS PANEL TO BE ON BATHROOM SIDE.
INSTALL 2" VENT IN THIS APPROXIMATE LOCATION & AS HIGH TO
PEAK ROOF AS POSSIBLE. VENT TO NOT BE VISIBLE FROM
FRONT OF BUILDING.
DO NOT PENETRATE WALL BETWEEN APARTMENTS WITH ANY
WASTE, WATER, OR VENT.
OWNER FURNISHED DISHWASHER. CONNECT WATER AND DRAIN
TO ADJACENT SINK.
SEE THIS SHEET FOR WATER LINE SIZES.
SEE THIS SHEET FOR CONTINUATION.
ALL WASTE LINES UNDER SLAB MUST BE 2" OR GREATER.
NEW 4" COTG. SEE CIVIL FOR INVERTS.
3
4 4
555
5
5
T-1
WH-1
WB-1
KS-1
WB-1
WC-1
L-1
L-2
WC-2
T-2
FD-1
P101
Plumbing
Floor Plan
6
7
62" VTR
6 2" VTR
7
7
7
7
7
7
7
8
8
8
DW
DW
N ORTH
N ORTH
9
SCALE: 1/4" = 1'-0"N ORTH
10
10
4"
2"
2"
2"
2"
2"
11
5
5
8
DW
3/4"
3/4"
1/2"1/2"
3/4"
3/4"
KS-1
L-1
WC-1
T-1
WH-1
FD-1
7
7
WH-1
WB-1
SCALE: 1/4" = 1'-0"N ORTH
SCALE: 1/4" = 1'-0"N ORTH
7
7
7
7
10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
10
KS-2 KS-2
3"3"
FD-1
WH-1
L-2
WC-2
T-2
3/4"1/2"
WB-1
8
DW
WH-1
2"
2"
2"
ELECTRIC
METERS
W/D W/D
W/D W/D
12
10
4"
12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 1233333333333333333333333 3
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3
3/4"
3/4"
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
4"4"4"4"4"4"4"4"4"4"4"4"4"4"4"4"4"4"4"4"4"4"4"4"4"
TRAP
1-1/4"LAVATORY
WATER CLOSET
L-1
SYM.
WC-1
DESCRIPTION
1-1/2"1-1/2"1/2"1/2"
PIPE SIZE
2"
VENTWASTE
INT.3"
C.W.
1/2"
H.W.
-
COUNTER MOUNTED
FLUSH TANK (RESIDENTIAL) WITH ELONGATED BOWL
REMARKS
WATER HEATERWH-1 ---3/4"3/4"40 GALLON A.O. SMITH SIGNATURE WATER HEATER WITH QTY
(2) 4500 WATT ELECTRICAL HEATING ELEMENT,T&P VALVE &
EXP. TANK. 208/60/1.
1-1/2"TUB / SHOWERT-1 1-1/2"1-1/2"1/2"1/2"
1-1/2"KITCHEN SINKKS-1 1/2"1/2"S.S. COUNTERTOP SINGLE COMPARTMENT WITH DISH WASHER CONNECTION
WASHER BOXWB-1 2"2"2"1/2"1/2"POLY WASHER BOX WITH 1/2" HW AND CW STOP VALVES
2" STANDPIPE WITH P-TRAP (SEE DETAIL THIS SHEET)
FLOOR DRAINFD-1 2"2"--
2"2"
-
WATER HEATER PIPING DETAIL
NO SCALE
R
3/4"
WATER HEATER ANCHOR
COLD WATER LINE
HOT WATER LINE
DIELECTRIC UNION (TYP)
HEAT TRAP FITTING
THERMOMETER
DRAIN VALVE W/ THREADED
HOSE CONNECTION
PIPE FULL SIZE
TO FLOOR DRAIN T&P RELIEF VALVE SIZED
TO MATCH WATER
HEATER
AMTROL ST-5
EXPANSION TANK
ELECTRIC
WATER HEATER
5" Ø STRAINER
CLEAN OUT DETAILS
FLOOR CLEANOUT (FCO)
NO SCALE
CLEANOUT TO GRADE (COTG)
WASTE LINE
FLOOR LINE
FINISH GRADE
1'-0"
WALL CLEANOUT (WCO)
1/8 BEND
FLOOR LINE
WALL
BRASS CLEANOUT PLUG
WITH COUNTER SUNK HEAD
16" SQUARE CONC PAD
TROWEL SMOOTH
CLEANOUT AND ACCESS
COVER. TOP OF COVER
TO BE FLUSH WITH TOP
OF FLOOR.
BALANCE OF PIPING
SAME AS CLEANOUT
TO GRADE.
CLEANOUT SHOULD
NOT BE LOCATED IN
CARPETED AREA.1/8 BEND IF CLEANOUT
OCCURS AT END OF LINE.
WASTE LINE.
LENGTH TO SUIT.
CHROME
WALL COVER
AND SCREW
MAY EXTEND AS A
WASTE OR VENT
PLUGGED TEE
WITH CLEANOUT
BALANCE OF PIPING
SAME AS CLEANOUT TO
GRADE.
1/8 BEND
1/8 BEND
PEX PIPE FITTING DETAILS
NO SCALE
POLYMER, COPPER,
BRONZE OR BRASS FITTING
PEX PIPING
AS SHOWN
ON PLANS
REINFORCED RING
THIS TYPE (COLD EXPANSION) OF FITTING REQUIRES THAT THE PEX PIPING, WITH REINFORCING
PEX RING PLACED OVER THE END OF THE END OF THE PIPE, IS EXPANDED BEFORE THE FITTING
IS INSERTED INTO THE PIPE END. THE EXPANDED PIPE END IS ALLOWED TO RETRACT ONTO
THE FITTING TO FORM THE SEAL. THE MEMORY OF THE PIPE ALLOWS IT TO TIGHTEN OVER THE
FITTING. AN EXPANDER TOOL IS REQUIRED TO EXPAND THE PIPE AND THE PEX RING
TOGETHER.
NOTE:
STAINLESS STEEL CAMP
BANDS ARE ALSO PERMITTED
FOR REINFORCING RING.
ALL JOINTS (TEES. ELBOWS, COUPLINGS, ETC.) ARE JOINTED SIMILARLY.
12"
6"HEAT
SOURCE
PEX PIPING
MIN. CLEARANCES
KEEP TUBING A
MINIMUM OF 12"
VERTICALLY OR 6"
HORIZONTALLY FROM
SOURCES OF HIGH
HEAT SUCH AS LIGHT
FIXTURES, FLUES OR
HEATING EQUIPMENT.
PEX PIPE HANDLING DETAILS
NO SCALE
NOTE:
USE ONLY CONTINUOUS LENGTH
TUBING (NO FITTINGS) WHEN
INSTALLING PEX UNDER OR WITHIN A
SLAB. PROTECT PEX TUBING WITH
NONMETALLIC SLEEVES WHERE IT
PENETRATES A SLAB OR
FOUNDATION WALL.
DO NOT CRUSH
OR KINK TUBING
DO NOTE DRAG TUBING
OVER ROUGH TERRAIN,
ROCKS, OR ANY SURFACE
THAT CAN CUT, PUNCTURE
OR DAMAGE TUBING WALL.
3/8"4"
1/2"5"
3/4"7"
1"9"
TUBING
SIZE
MIN. RADIUS
BENDING
TUBING AND FITTINGS SHALL BE STORED
UNDERCOVER FOR CLEANLINESS AND TO AVOID
EXPOSURE TO SUNLIGHT. CONSULT
MANUFACTURER FOR RECOMMENDED LIMITS TO
OUTSIDE STORAGE.
PEX PIPE INSTALLATION DETAILS
NO SCALE
NAIL PLATE
WALL STUD (WOOD
OR METAL SIMILAR)
PEX PIPING
WALL INSTALLATION
DO NOT USE IN ANY APPLICATION WHERE TUBING WILL BE EXPOSED TO DIRECT SUNLIGHT.
PIPE SUPPORTS
PIPE SUPPORTS:
PLASTIC HANGERS AND STRAPS ARE
RECOMMENDED, BUT METAL SUPPORTS
WHICH ARE DESIGNED FOR USE WITH
PLASTIC TUBING CAN BE USED.
DO NOT USE SUPPORTS THAT PINCH OR
CUT THE TUBING. SUPPORT SHOULD
ALLOW FREE TUBING MOVEMENT.
INSPECT ALL SUPPORTS PRIOR TO
INSTALLATION TO ENSURE THAT SHARP
EDGES DO NOT EXIST THAT CAN DAMAGE
THE TUBING.
VERTICAL TUBING TO BE SUPPORTED EVERY
8'-0"
WHEN PENETRATING METAL STUDS, UTILIZE A
BUSING DESIGNED FOR PLASTIC TUBING.
SUPPORTS S.9HALL BE INSTALLED AT
CHANGES IN DIRECTION TO RELIEVE STRESS
AS SHOWN.
APPROVED
BUSHING
CLAMP
WOOD
STUD
METAL STUD
CLAMP
AT TURN
FLOOR DRAIN IN CONCRETE FLOOR
2" WASTE LINE TO
WASTE AND VENT
NO SCALE
SYSTEM 2" DEEP SEAL P-TRAP
TO FINISH FLOOR LEVEL
STRAINER ADJUST
FLOOR DRAIN BODY
TILE AND GROUT
CONCRETE FLOOR
3 6 0 w e s t a s p e n a v e n u e
s a l t l a k e c i t y , u t a h 8 4 1 0 1
8 0 1 5 3 2 4 4 2 2
sheet:
title:
revisions :
p r o j e c t # :
d a t e :
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
project:
E
D
C
B
A
E
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
April 23, 2021
REXBURG
ROWHOUSES
Engineered
Systems
Associates
20.0550
conformed setMarch 29, 2021
ASI#001 06/04/21
WATER CLOSETWC-2 2"INT.3"1/2"-ADA FLUSH TANK (RESIDENTIAL) WITH ELONGATED BOWL
1-1/4"LAVATORYL-2 1-1/2"1-1/2"1/2"1/2"ADA COUNTER MOUNTED WITH INSULATION SLEEVES
1-1/2"T-2 1-1/2"1-1/2"1/2"1/2"ADA WITH HANDHELD SHOWER & 3 PIECE SURROUND
1-1/2"KITCHEN SINKKS-2 1/2"1/2"ADA S.S. COUNTERTOP SINGLE COMPARTMENT WITH DISH WASHER CONNECTION2"2"
P201
Plumbing
Details and
Schedules
ADA TUB / SHOWER
TUB WITH 3-PIECE SURROUND
AND INSULATION SLEEVES
5'-0"
CONTRACTOR
BY PLUMBING
CONTRACTOR
BY SITE UTILITIES
GRADE
EXT WALL
NO SCALE
WATER PRESSURE REDUCING STATION DETAIL
1" WATER SUPPLY
TO INDIVIDUAL TENANT SPACE
PROVIDE WALL FLUSH ACCESS PANEL
PLUMBING CONTRACTOR TO
CONCRETE SLAB FLOOR
TYPICAL UNION
3/4" SUPPLY TO BUILDING
3/4" HOSE
THREAD
FITTING
COMBINATION PRESSURE
REDUCING VALVE AND STRAINER.
SET DISCHARGE AT 60 PSIG
PRESSURE GAGE
0 - 100 PSI RANGE
TYP. BALL VALVE
M
TO REMOTE
READOUT AS PER
CITY OF REXBURG
SLEEVE FLOOR PENETRATIONS
AROUND WATER SUPPLY LINES
COLOR TO MATCH WALL.