HomeMy WebLinkAboutMadison StationCody,
I reviewed the radon gas piping and the interface on the interior footings.
It is acceptable to “notch” the top of the interior footing to accommodate the piping.
The rebar is to run continuous through the interior footing (below the pipe) and be encased in concrete below the piping.
On future buildings, the piping may be placed under the footing as an option.
Sincerely,
Brent