Loading...
HomeMy WebLinkAboutRESPONSE LETTER 10.31.2023 - 23-00732 - Good 2 Go - New Commercial BldgOctober 31,2023 Cody Jones|Building Official &Alex Owens |Electrical City of Rexburg |Building Division &Building Safety Electrical Inspector 35 North 1st East Rexburg,Idaho 83440 Cody.Jones@rexburg.org Alex.Owens@rexburg.org 208.372.2173 Re:Project #22007 G2G 104 Rexburg ID -23-00732 -1055 S 12th W Good 2 Go -New Commercial Bldg Good 2 Go C-Store Rexburg,ID Dear Cody Jones &Alex Owens Please see responses to your comments below: 1.Comment:Sheet A-100 -Ventilation is provided as per IBC Section 1203 Response:See M-002 for ventilation calculations that meets the requirements per IBC Section 1203. 1.Comment:Sheet E-500 -For verification:250.66B does not require a concrete encased electrode to be big ger than #4 copper. Response:Detail no longer requires a concrete encased electrode to be big ger than #4 copper –See updated drawings. 2.Comment:Sheet E-500 -Please provide available fault current calculation for meterpacks. Response:Fault cur rent relocated to be below individual meters –See updated drawings. Sincerely, 305 1ST STREET ▪IDAHO FALLS,ID 83402 ▪208.757.5700 ▪RESINARCHITECTURE.COM Page 1 of 2 Jonathan Gallup,AIA,NCARB jonathan@resinarchitecture.com O:(208)757-5700 M:(208)596-8710 305 1ST STREET ▪IDAHO FALLS,ID 83402 ▪208.757.5700 ▪RESINARCHITECTURE.COM Page 2 of 2