Loading...
HomeMy WebLinkAboutSITE PLANS - 23-00669 - Tagg N Go - Car Wash14'' w toe e e e sd sd to b tobto b ss ss ss ss ss ss ss ss ss ss ss ss w w S ssssssss pp pp pp fl 14'' w R18 . 5 ' 11.4' 3. 9 ' 9 . 1 ' 7.7' 5' 6. 8 ' R3 0 ' 5'6.5' 3. 9 ' 0.8'6'4.5' R23 . 5 ' 6.5 ' 3. 9 ' R 2 ' R3' R 1 5 ' R 5 5 . 9 ' R 1 2 . 5 ' R13 . 5 ' R39. 5 ' R2 . 7 ' R3' R 1 9 . 5 ' R3' R7' R2' R 1 0 ' R 1 2 . 5 ' R 1 8 ' R 1 4 ' R1 5 ' R2 2 . 5 ' 14.8' 19 . 5 ' 17 . 5 ' 9.8'5' 2. 4 ' 27.2' 55' 12.8'16 . 5 ' 3. 2 ' 3. 4 ' 17.9' 46.3' 43 . 2 ' 277.1' 36.5' 36.5' 29 . 5 ' 45 . 6 ' 5.1' 5.1'36 . 6 ' 10 . 2 ' 5' 225.9' 8' 3' 3' 8' 4.5'17.2' 17 . 5 ' 33'2'2' 2' 10 . 3 ' 41 . 6 ' 4' 20 ' TY P 9.8' TYP 3.5' TYP 20 ' TY P 9' TYP 6.3' 7. 6 ' 17 . 3 ' 51.2' 13 8 . 7 ' R10 . 5 ' 32 7 ' 8 . 8 ' 8.8 ' 24' 297.2' 5' 5.9' 6'24' 6. 5 ' 291.2' 5' R15' 19. 3 ' 19. 3 ' 19 6 . 5 ' R10 ' 5'15.7' 8.7 ' 8. 6 ' 15.7' 36 ' 30 ' 6' 6' 14 ' 8. 1 ' 6.1' 5.9' R4 ' R3 ' 22 . 2 ' 15 ' 16 . 4 ' 27 ' 25 ' 25 ' 24' 24.5' 24' 1 5 . 5 ' 22 ' 14 . 5 ' 35 ' 150' 7. 7 ' 5' 41 ' 73.5'74' 37.1' 73.5'74'37.1' 4' 4'4' 4'4' 5' 5' 38 . 1 ' 5' 4' 5'5' 12' 12.1' 4. 9 ' 3.4' 6' 16.6' 3' 4. 5 ' 11.6'7' 7' 22' 5' 3'9.5' 55.1'34'3.3' 14' 5. 1 ' 5. 1 ' 5. 1 ' 207.2'8' 3' 20 . 2 ' 4. 5 ' 22.1' 17 . 1 ' 5' R18 . 5 ' 5' 5' 6. 5 ' 10' 11.2' 1 0 . 9 ' 8.7 ' 11' R 2 3 . 5 ' 1 5 . 2 ' 17.3' 37.5' 11 9 . 3 ' 26' 2.5' 24' R1 5 ' R10' 4' 0. 5 ' R4' 4'5. 4 ' 8' 6' 10' 12' 7' H:\!2023\id-8116-23 rexburg - tagg-n-go car wash\project data\02 CAD\2.03 sheet files\construction drawings\C.3.1_SITE PLAN.dwg - SITE PLAN - 9/21/2023 11:26am, jalen.fuhriman 1 5 RE V I S I O N S RE V # DA T E DR A W I N G I N F O DA T E DE S I G N E D DR A W N *S E E G E N E R A L N O T E S S H E E T WA R N I N G 0 1 2 IF T H I S B A R D O E S N O T ME A S U R E 2 " T H E N DR A W I N G I S N O T T O S C A L E CI T Y R E V I E W S E T ww w . h o r r o c k s . c o m PAGE C PR O J E C T CH E C K E D D B A # 2 3 4 21 9 4 S n a k e R i v e r P k w y . , S u i t e 2 0 5 Id a h o F a l l s , I D 8 3 4 0 2 (2 0 8 ) 5 2 2 - 1 2 2 3 PRELIMINARY NOT FOR CONSTRUCTION 1 09 / 1 5 / 2 0 2 3 H O R R O C K S E N G I N E E R SN 0 20'40' SCALE: 1" = 20' SHEET NOTES: 1.DRIVE AISLE DIMENSIONS MEASURED TO FACE OF CURB, WHERE CURB IS PROPOSED OR TO EDGE OF PAVEMENT OTHERWISE. SITE PLAN KEYNOTES INSTALL LIGHT DUTY ASPHALT (SEE FLEXIBLE PAVEMENT SECTION SUMMARY TABLE SHEET C.3.1) INSTALL HEAVY DUTY ASPHALT (SEE FLEXIBLE PAVEMENT SECTION SUMMARY TABLE SHEET C.3.1) INSTALL 1.5' FLAT PAN CURB & GUTTER SEE DETAIL 1 SHEET C.3.1 INSTALL 1.5' FLAT PAN CURB & GUTTER W/ DEPRESSED CURB HEAD PER DETAIL 2 SHEET C.3.1 TIE INTO EXISTING ASPHALT, SAWCUT AS REQUIRED INSTALL 4" THICK SIDEWALK, (WIDTH PER PLAN) PER ISPWC SD-709, 714, 714A, 714B (2020) UNLESS OTHERWISE NOTED INSTALL BOLLARD PER DETAIL 3 SHEET C.3.1 ADA SIGN PER DETAIL 4 SHEET C.3.1 INSTALL ADA RAMP WITH TRUNCATED DOMES PER ISPWC SD - 712A (2020) INSTALL LANDSCAPE PER LANDSCAPE PLAN STRIPING PER MUTCD STANDARDS INSTALL CONCRETE PAVEMENT PER PCCP PAVEMENT SECTION PER TABLE SHEET C.3.1 INSTALL TRASH ENCLOSURE PAD PER DETAIL 5 SHEET C.3.1 INSTALL "NO ENTRY" SIGN PER MUTCD STANDARDS INSTALL CURB TRANSITION PER ISPWC SD-707 (2020) (LENGTH PER PLANS) INSTALL STOP SIGN PER MUTCD STANDARDS INSTALL WHEEL BLOCK INSTALL HEATED CONCRETE PER MANUFACTURES SPECIFICATIONS INSTALL RIGHT TURN ONLY SIGN PER MUTCD STANDARDS INSTALL TRAFFIC LIGHT PER ELECTRICAL PLANS INSTALL COMMERCIAL APPROACH PER CITY OF REXBURG STANDARDS SHEET 7 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 ID - 8 1 1 6 - 2 3 CJ F NM C TL M 08 / 3 0 / 2 0 2 3 SI T E P L A N TA G G - N - G O C A R W A S H RE X B U R G , I D A H O 6 C.3.1 MOODY RD N 2 N D E PROPOSED BUILDING ± 5443 SF 02 02 02 02 02 01 01 01 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 0303 03 04 03 03 03 03 03 03 03 05 05 04 03 04 03 03 03 03 03 03 04 04 03 03 0404 04 04 04 04 06 06 06 06 06 06 06 06 07 08 09 09 03 04 03 03 04 04 10 10 10 10 10 10 10 10 10 10 10 10 10 10 STORM SWALE 111111 11 11 11 11 11 12 12 12 12 12 13 03 04 03 14 14 14 14 10 10 10 16 05 05 11 11 12 17 11 10 18 18 C.3.2 6 09 09 04 04 04 04 MATCH CITY CURBING DURING INSTALL CONTRACTOR TO BRING THIS SECTION TO PIT RUN GRADE IN ORDER TO PREPARE FOR FUTURE DEVELOPMENT. ROAD SECTION TO BE INSTALLED IN THE FUTURE 20 18 6 21 INSTALL RIGHT TURN ONLY PORKCHOP19 R1' R 4 . 5 ' R4 . 5 ' R1 ' R 1 ' 3'